Loading...
HomeMy WebLinkAbout; ; 2006 State of Effectiveness Report; 2006-06-01Introduction This State of Effectiveness Report is designed to provide an overview of the City of Carlsbad's overall performance in many different service areas. This report represents the sixth full year that the City of Carlsbad has been involved in performance measurement. The departmental performance measures, growth management measures and citizen survey results are contained in this report. The summaries are organized by Council Strategic Goal and are subdivided into service delivery areas where appropriate. Departments are encouraged to develop outcome-based measures. The achievement of the desired outcomes is focused on three related areas * service delivery, cost efficiency, and customer satisfaction. This process of defining and measuring these three areas helps provide a balanced approach in evaluating the overall effectiveness of a department or service. The report, where applicable, indicates compliance with the Growth Management Standard for that particular service, and highlights any relevant results from the annual citizen survey. Included this year are introductory summaries for each City Council Strategic Goal. These summaries are a consolidation of the information contained within each of the measures. By focusing greater attention on the summaries, staff is able to better identify the overall effectiveness of the service area. Since the organization's efforts to accomplish the Council's strategic goals involve management goals, those goals are also listed. The performance measurement process represents the feedback loop between organizational effort and achieving the desired outcomes. In Carlsbad, the State of Effectiveness Report also represents the beginning of the next goal cycle. At the beginning of each calendar year, the results of the citywide public opinion survey are finalized and presented to Council at their annual goal-setting workshop. The State of Effectiveness Report is also completed and published at this time. The survey results and the report provide information that helps influence strategic priorities for the upcoming year. Based on direction from Council, departments develop goals and cost estimates for new programs, which are then included in the City's budgeting and management goal process. Departments implement new programs, measure results, contact other agencies for benchmarking, and analyze data during the second half of the calendar year. The format of this year's State of Effectiveness Report is similar to last year's. There are many new measures in this year's report there are still parts of the organization that are not fully integrated into the performance measurement program. Staff will continue to develop measures in the coming year. Lastly, staff would like to thank the various Departments actively engaged in continuous improvement through the Performance Measurement process. These service providers are openly committed to the efficient delivery of services to the people who live, work, and play in the City of Carlsbad. Defining an outcome and measuring progress towards improving that outcome can be difficult and staff thanks all participants for their commitment to continuous improvement. Table of Contents Introduction Balanced Community Development Capital Improvement Program - Engineering Services Capital Improvement Program - Construction Timeliness Capital Improvement Program - Construction Cost Code Enforcement Responsiveness Code Enforcement Cost Effectiveness Code Enforcement Customer Satisfaction Redevelopment Services Redevelopment Services Cost Redevelopment Customer Satisfaction Section 8 Program Assessment Citizen Connection Service Delivery Volunteer Program Cost-Effective Volunteer Program Customer Satisfaction Volunteer Program Communications Citizen/Customer Response Times Citywide Communications Citywide Communications Cost Per Capita Records Information Responsiveness Confidence in City Government Environmental Management Sewer System Service Delivery Sewer Cost Efficiency Sewer Service Customer Satisfaction Growth Management/Sewer Collection System Solid Waste Diversion Solid Waste Cost Solid Waste Customer Service & Satisfaction Storm Water Service Delivery Storm Water Protection Cost Storm Water Protection Customer Service & Satisfaction Growth Management/Drainage Growth Management/Wastewater Treatment Facilities Financial Health Business Licensing Finance Report Distribution Long-Term Fiscal Condition Outgoing Payment Processing Finance Call Center - Resolution Rate Effectiveness Risk Management - Claims Administration Risk Management - General Liability Expenditures For All Claims Learning, Culture And Arts State Library Ranking Library Operating Cost Library Services Citizen Satisfaction Growth Management/Libraries Employee Training & Development Investment Employee Training & Development Satisfaction Recreation Program Sportsmanship Recreation & Park Planning Operating Cost Recreation Customer Service & Satisfaction I Parks, Open Space And Trails Parks Service Delivery Park Maintenance Cost Parks Customer Service And Satisfaction Growth Management - Parks Citywide Trails Program - Service Delivery Citywide Trails Program - Customer Satisfaction Citywide Trails Maintenance Cost Growth Management/Open Space Top Quality Services - Internal Services Overall Citizen Satisfaction With City Services Facilities Service Delivery Facilities Maintenance Cost Facilities Customer Service And Satisfaction Fleet Availability, Maintenance & Repair Cost and Customer Satisfaction Human Resources - Injured Employee Time Off Human Resources - Employee Turnover Rate Human Resources - Cost Efficiency Information Technology Network Operability Information Technology Cost Information Technology Service and Satisfaction Growth Management/City Administrative Facilities Top Quality Services - Safety Building Inspection Services Building Inspection Cost Building Inspection Customer Satisfaction Fire Response Time Fire Operating Cost Fire Customer Service And Satisfaction Fire Stations Growth Management Standard Fire Emergency Medical Services Response Time Fire Prevention Inspections Fire Prevention Development Process Police Response Time Police Cases Cleared Community Perception of Crime Police Operating Cost Police Customer Service & Satisfaction Transportation And Circulation Roadway Service Delivery Roadway Cost Efficiency Roadway Safety Roadway Circulation Roadway Reliability Transportation Customer Satisfaction Growth Management/Circulation Water Potable Water Quality Water Service Delivery Water Delivery Cost Efficiency Water Service Customer Satisfaction Recycled Water Service Delivery Recycled Water Delivery Cost Efficiency Growth Management/Water Distribution System Appendix CO <D Q- O OT3 O 33§32-c Be a city that connects community, place and spirit, through balanced and economically sustainable * land uses Balanced Community Indicators - Code Enforcement Responsiveness - Code Enforcement Cost - Code Enforcement Customer Satisfaction - Section 8 Program Assessment - Planning General Plan Implementation - Planning Citizen and Customer Satisfaction - Redevelopment Property Values, Sales Tax, and Vacancy Rates - Redevelopment Investments - Redevelopment Visitor Satisfaction Management Goals • Update Title 20, Subdivision Ordinance • Fire Station No. 6 • Fire Station No. 3 Relocation Feasibility Study • Village Retail Analysis Wants & Needs • Village Redevelopment Standards Amendments • Streamline CUP Process • Carlsbad Centre City Gateway • Development Process Review • Public Works Facility Redevelopment The Village Area has experienced another year above the benchmark in terms of Public/Private investment ratio. Two projects contributed most prominently to this: The Village by the Sea mixed use project, and the Laguna Point Luxury Condominiums. Both projects are keys to improving the North State Street Area. Customer experience within the Village Area was measured in 2004. The results of that survey indicate that 61.3 percent of the respondents visit the downtown Village Area at least once a week. Respondents of the 2004 survey were asked to give their overall impression of Carlsbad Village by giving a rating from 0 to 10, with 0 meaning poor and 10 meaning excellent. The average rating was 7.99. A total of 86% of the respondents gave the Village a rating of 7 or higher, which is in the good to excellent range. Dining was the most common reason given for visiting the Village Area. The Redevelopment Agency is conducting a needs assessment survey to determine additional ways to make the area more attractive to visitors, businesses and residents. Property tax and sales tax increased by 3% and 13% respectively in the Village Redevelopment Area in 2005. Commercial vacancy rates were at 5% - within the benchmark standard of 5% or less. The Agency processed 10 Major and 14 Administrative Redevelopment Permits - both well above their benchmarks. The ratio of Public Funding to Private Investment was $1: $15. This is the third consecutive year of a positive Public: Private ratio. Capital Improvement Program (CIP) In this initial year of Performance Measurement for the CIP, Engineering Services reported that their average project delivery cost percentage was 23% - a smaller cost percentage than the top four performing cities in their benchmarking study. 10 of the 12 projects completed were below the 41 % expected "soft costs" allowed for Engineering Services. 57% of the projects were completed within the approved construction schedule, although two projects missed their deadline by a few days. The actual construction costs for these 12 projects were all within approved budget (including change orders). Public Works CAPITAL IMPROVEMENT PROGRAM - ENGINEERING SERVICES THE OUTCOME Cost effective capital improvement project delivery. THE MEASUREMENT Data will be collected on a fiscal year basis to compare the engineering staff and consultant costs to project construction costs. WHAT THE DATA MEANS Each project in the capital improvement program should be completed with Engineering Division expenses not exceeding normal project cost projections for project administration, engineering inspection, and specialized consultant services such as environmental and geotechnical investigations. -.•*% t% Costs for engineering services will be measured for identified projects and compared to project construction costs to determine the project delivery cost *) percentages. The data will then be compared to the California Multi-Agency * CIP Benchmarking Study (Benchmarking Study), which includes seven cities in California. It is desirable to maintain project delivery costs, for engineering services, within the top four of the best performing of the seven cities in the Benchmarking Study. Certain projects may be precluded from the survey because they have extreme environmental requirements, include special financing consultants such as assessment districts, or are relatively small in construction cost. 31 DEPARTMENTS INVOLVED I Engineering. *% BENCHMARK Project delivery cost percentages will be compared to the cost percentages of cities identified in the Benchmarking Study. The average project delivery cost percentage should not exceed the top range for the four top performing cities identified in the Study (30%). Additionally, 75% of all identified City of Carlsbad projects should have project delivery costs below the maximum average project delivery cost percentage listed in the Study (40.7%). RESULTS Average Engineering costs as a percentage of total construction costs Percentage of Projects where Engineering costs are below suggested maximum of 40.7% as a percentage of total construction costs Benchmark Not to Exceed 30% 75% or Greater FY04-05 23% 83% ANALYSIS The City of Carlsbad's average project delivery cost percentage for fiscal year 2004 -2005 is 23% of total construction cost (TCC.) This is below the range of the top four performing cities in the Benchmarking Study, which ranged from 25.3% to 30.1%. Therefore, Carlsbad's results are better than any of the other cities identified in the Benchmarking Study. In reviewing the Project Delivery Percentage Costs, ten out of twelve of Carlsbad's CIP projects, or more that 75% of Carlsbad's CIP Projects, were below the maximum allowed of 40.7% for engineering services as listed in the Benchmarking Study. This result is within the benchmark requirement. Based on the findings in this first year of analysis, the City of Carlsbad is in compliance with the benchmark objectives established for project delivery in relation to engineering costs. PROJECT DELIVERY PERCENTAGES CALCULATIONS Projects Receiving Notice of Completion in 2O04-05 1 2 3 4 5 6 7 8 9 10 11 Project Name Traffic Signal at Calle Barcelona and PaseoAliso (3894-1) Rehabilitation North Agua Hedionda Interceptor Eastern Segment ( 3874) Carlsbad Water Recycling Facility (3675-2) Avenida Encinas Sewer Rehabilitation (Funded by O&M) Poinsettia Lane Reach C (3673) Domestic Transmission Main (3585) Recycled Transmission Main (3887) Jefferson Street Sidewalk Project (3883) 2004-05 Pavement Overlay (3667-9) Traffic Signal at Alga Road and Xana Way (3893-1) Palomar Airport 12-inch Water Pipeline (3479) El Camino Real Sewer Tamarack to Chestnut (3891) Average Total Percentage of TCC For All CIP Projects Total Engineering Costs $13,933 $113,215 $2,561,955 $57,015 $292,191 $275,585 (a) $72,070 $116,464 $17,797 $39,769 $14,895 $3,574,889 Total Construction Costs $141,980 $183,610 $10,013,754 $167,547 $2,546,598 $784,372 (a) $472,880 $2,878,380 $178,000 $93,179 $423,699 $17,883,999 Total Percent of TCC 10% 62% 26% 34% 12% 35% 12% 15% 4% 10% 43% 4% 23% (a) Pipeline Cost for Project No. 3887 (Recycled Transmission Main) is included in the total for Project No. 3673 (Poinsettia Lane Reach C) Project. ACTION PLAN Data will be collected during the fiscal year to compare the engineering staff and consultant costs to project construction costs. The data will be analyzed on an annual basis to determine cost effectiveness of capital improvement project delivery. Where engineering service costs exceed benchmark percentages, explanations will be provided in an effort to improve results in subsequent fiscal year analysis. POINT OF CONTACT Bill Plummer (760) 602-2768, Bplum@ci.carlsbad.ca.us. Public Works CAPITAL IMPROVEMENT PROGRAM - CONSTRUCTION TIMELINESS THE OUTCOME A high level of customer satisfaction by delivering CIP projects on time. THE MEASUREMENT The percent of projects completed on time. The information for project start and completion dates is obtained from the final progress payment prepared for each project. The contract completion date is the date of "substantial completion" in accordance with the contract documents and the approved construction schedule. This project milestone was chosen because it represents the customer service milestone of project delivery, which is not to be confused with the Notice of Completion (NOC) date, a legal noticing date for the purpose of notifying anyone who may have a claim against the project. Copies of the final progress payments for each of the projects completed in fiscal year 2004- 2005 are available. This data is summarized below for reference. The analysis is based on comparing the "contract completion date" (substantial completion date) to the "actual completion date." WHAT THE DATA MEANS Completing projects according to the approved contract schedule provides a high degree of customer service and satisfaction. Completion of projects on time allows public access to designated projects as scheduled. DEPARTMENTS INVOLVED Engineering/Construction Management and Inspection, Engineering/Design Division, Client Departments. BENCHMARK 90% of CIP projects completed on or before the approved contract completion date. RESULTS Percentage of Projects Completed on Time Benchmark 90% FY 04-05 57% ANALYSIS The table below shows that four (4) out of the seven (7) projects were completed within the contract completion date, or 57% of the projects were completed within the project schedule. The benchmark requiring that 90% of the CIP projects be completed within the schedule approved by the City Council for any given fiscal year was not met for fiscal year 2004-2005. COMPARISON OF REVISED COMPLETION DATE TO ACTUAL Pavement Overlay of Palomar Airport Rd, El Camino Real, & Paseo Del Norte (3667-5)04-19-2004 08-20-2004 08-11-2004 X Jefferson Street Sidewalk (3883)09-08-2004 09-09-2004 X TS at Alga Road & Xana Way (3893-1) 09-22-2004 09-15-2004 X Palomar Airport Rd. 12- inch Water Pipeline (3479)08-22-2004 10-14-2004 X 2003/04 Street Sealing (3667-8)10-19-2004 10-28-2004 11-01-2004 X 2004-2005 Street Overlay (3667-9)11-15-2004 11-22-2004 11-18-2004 X ECR Sewer from Tamarack to Chestnut (3991)11-05-2004 01-04-2005 12-22-2004 X TOTAL Percent of all Projects Completed Within Approved Schedule 57% Two of the three projects that were not completed on time, missed the actual completion day by one day or just a few days, which had no effect on customer service expectations. The Palomar Airport 12-inch Water Pipeline Project (3479) was delayed as a result of material delivery at the beginning of the project. Once the material was delivered to the contractor, he proceeded diligently. There are no recommendations to improve project delivery on these three projects. ACTION PLAN Data will be collected during the fiscal year to determine the percent of projects completed on time. The data will be analyzed to determine the level of customer satisfaction by delivering CIP projects on time. Staff will collect data for fiscal year 2002-2004 and fiscal year 2003-2004 to provide additional historical data. POINT OF CONTACT Skip Hammann (760) 602-7321, Shamrn@ci.carlsbad.ca.us. Public Works CAPITAL IMPROVEMENT PROGRAM - CONSTRUCTION COST THE OUTCOME A high level of customer satisfaction by delivering CIP projects within contract budget. THE MEASUREMENT The percentage of projects completed within or under budget at the time of contract award. The analysis compares the actual construction costs to the approved construction budget. The construction budget is defined as the contract award amount, combined with the construction contingency amount, as approved by Council. The actual construction cost is the amount paid to the contractor for all work in accordance with the original contract documents or as amended by Change Order. WHAT THE DATA MEANS Completing projects within the approved project budget means that the City is managing construction in an efficient and effective manner. DEPARTMENTS INVOLVED Engineering/Construction Management and Inspection, Engineering/Design Division, Client Departments. BENCHMARK 90% of CIP projects shall be completed within the approved construction contract budget. RESULTS Percentage of Projects Completed Within Approved Budget Benchmark 90% FY 04-05 100% ANALYSIS One hundred percent of projects completed in fiscal year 2004-2005 were within their approved construction budget. This result achieves the benchmark of at least 90 percent of the CIP projects completed during the fiscal year are within their approved construction budget. Therefore, City staff is providing a high level of satisfaction delivering construction projects within budget. COMPARISON OF ACTUAL CONSTRUCTION COST TO APPROVED CONSTRUCTION BUDGET Projects with Notice of Completion Issued in 2004-05 Traffic Signal at Calle Barcelona and Paseo Aliso (3894-1) $141,980 $163.X Rehabilitation North Agua Hedionda Interceptor (3874) $179,940 $206.931 X Carlsbad Water Recycling Facility (3675-2) $8,874,372 $9,298,204 X O & M Avenida Encinas Sewer Rehabilitation $167,574 $194,486 Poinsettia Lane Ranch C (3673) $923,098 $948,010 Domestic Transmission Main (3585) $713,392 $789.883 Recycled Transmission Main (3887) $464,527 $516,706 Jefferson Street Sidewalk (3883) $454,488 $495,179 X 2004-2005 Pavement Overlay (3667-9) $2.878,380 $3,224,901 X Traffic Signal at Alga and Xana (3893-1) $178,000 $204,700 Palomar Airport 12" Water (3479) $93,179 $98.122 X El Camino Real Sewer (3891)$423,698 $434.700 Total Number of Projects Within Approved Construction Budget ACTION PLAN Data will be collected during the year to determine the percentage of projects completed within or under budget from the time of contract award. The data will be analyzed to determine the level of customer satisfaction by delivering CIP projects within contract budget. POINT OF CONTACT Bill Plummer (760) 602-2768, Bplum@ci.carlsbad.ca.us. Community Development CODE ENFORCEMENT RESPONSIVENESS THE OUTCOME A high level of responsiveness by Code Enforcement THE MEASUREMENT This is a multi-modal approach combining: Time for case resolution: The time increment required for closing complaints Recidivism rate: The rate for similar complaints at the same address. WHAT THE DATA MEANS Time for case resolution: Responding to Code Enforcement concerns is a fundamental service provided by the City. Complainants want their call to Code Enforcement to result in positive resolution of the case as soon as is reasonably possible. Resolving cases in a timely manner preserves neighborhood integrity and builds confidence in the value of local government. Code Enforcement has developed a complaint resolution measurement system that will track the time increments needed to resolve those complaints that have been found to be violations of the Municipal Code. Recidivism rate: When open cases do not recur within a reasonable length of time, this could be an indication that the Code Enforcement department has created a level of understanding with the property owner about codes and ordinances, their importance to the well being of the community, and the quality of life in the community. A recheck of all open cases against the history for the prior three years will determine the recidivism rate for all code enforcement matters. DEPARTMENTS INVOLVED Code Enforcement, Building, City Attorney, Planning BENCHMARK and RESULTS The varying case types handled by Code Enforcement have differing degrees of importance relative to the amount of time needed to resolve those cases. There are twenty (20) different categories into which complaints are filed and tracked. Each type of case has a varying time increment at which 90% of the cases are resolved. The ten most common complaint categories' standard for compliance and case closure is: *» Type of Call for Service Engineering/ROW Signs Expired Bldg Permit Zoning Vehicle Abatement Vehicle Zoning Building Garbage & Junk Business License Totals or Average Number of Cases Opened 2005 80 101 20 99 25 49 212 112 123 821 2004 85 117 28 77 46 64 198 107 121 843 2003 75 118 48 50 37 79 220 131 122 880 2002 71 132 53 97 38 84 208 104 161 948 Standard for 90% Compliance 30 Days 30 Days 60 Days 60 Days 60 Days 60 Days 90 Days 30 Days 60 Days % of Cases Resolved within Standard 2005 81% 77% 85% 71% 76% 84% 77% 68% 89% 79% 2004 80% 79% 82% 90% 91% 92% 82% 64% 81% 82% 2003 88% 77% 79% 82% 89% 88% 84% 75% 86% 83% 2002 87% 79% 79% 78% 76%. 75% 73% 73% 72% 76% The industry recidivism rate (same violation at same address within 3 years) benchmark is unknown. The City's rate will become the baseline rate for future comparisons. Recidivism rate for FY-2005 at same address is: Total Number of Cases 2005 2004 2003 2002 2612 2758 2302 1828 Number of Repeat Cases on Same Property 212 275 221 162 % Of Reopened Cases 8% 9% 9% 8% ANALYSIS Case closure declined in five categories and minimally increased in the other four. This translated into a slight decrease in the average case closure time for the first time in four years. Recidivism rate dropped for the first time, perhaps demonstrating limited success of our efforts in educating the public on our codes. ACTION PLAN Code Enforcement, The City Attorneys Office, Planning Staff, Police Department Personal and Storm Water Staff meet on a monthly schedule to discuss current issues and to ensure consistent enforcement. Code Enforcement staff will also meet independently on a monthly basis to review the declining categories to determine the cause and implement changes to correct this. POINT OF CONTACT Patrick Kelley, Building and Code Enforcement Manager (760) 602 2716 pkell(%ci. carlsbad. ca. us Community Development CODE ENFORCEMENT COST EFFECTIVENESS THE OUTCOME An efficient Code Enforcement operation. THE MEASUREMENT The specific measurement in this cost efficiency measure is: The number of cases closed in the fiscal year divided by the fully burdened cost for the Code Enforcement operation. Cases are those complaints found to be violations of a Municipal Code. Costs include the fully burdened salaries of the code enforcement officers, the clerical staff, allocated supervision, management, and Deputy City Attorney salaries, along with vehicle and telephone costs. WHAT THE DATA MEANS The cost of providing Code Enforcement services will be tabulated each year for comparative purposes in order to assist in determining the optimal level of service in the community. The number of cases may vary, and the department is reviewing case-types to determine means by which caseloads can be lowered. This may be by providing more information to residents and businesses about codes and standards most commonly violated. This may result in the cost per case rising since some of the expenses are fixed. DEPARTMENTS INVOLVED Code Enforcement RESULTS Fiscal Year 2O05 2O04 2003 Expenditures $369,000 $352,000 $332,000 Cases Closed 1066 869 987 Average Cost per Case $346 $405 $336 BENCHMARK This is the second year for this measure, and subsequent years will be compared to this year's results. Benchmarking may be possible using the ICMA database. ANALYSIS As the City continues to grow, the number of Code Enforcement cases is likely to increase. This past year there was no additional staff added to this department, and as a result, the cost per case decreased by about 14%. ACTION PLAN We will establish a benchmark and perform a survey of comparable cities to see how we are doing. POINT OF CONTACT Patrick Kelley, Building and Code Enforcement Manager, (760) 602 2716, pkell@ci.carlsbad.ca.us Community Development CODE ENFORCEMENT CUSTOMER SATISFACTION THE OUTCOME A high level of Code Enforcement customer satisfaction. THE MEASUREMENT Results of a customer satisfaction survey sent to Code Enforcement customers at the close of the particular case. WHAT THE DATA MEANS The Code Enforcement Department sends a pre-addressed, postage-paid, mail- back survey to customers at the completion of cases. The survey asks customers to rate the Office Service, and Code Enforcement Officer Service on four-point scale (Excellent, Good, Fair, and Poor). DEPARTMENTS INVOLVED Building. BENCHMARK 90% of survey respondents rank all Code Enforcement services as either excellent or good. RESULTS Six surveys were returned ranking Office and Code Enforcement Services. Survey results were: f c e e Courtesy Timely Call Backs Professionalism Overall Service BENCHMARK 90% 90% 90% 90% FY2005 100% 100% 100% 86% FY2OO4 92% 75% 83% 100% ANALYSIS The number of self-selecting surveys returned was low (7), although the results received were excellent. Surveys were sent out all year, and very few were returned. In the 7 surveys returned with 9 ratings each, there were only 2 marks below good or excellent (97% good or excellent). The two poor marks were from a complainant who was frustrated at a repeated violation at a neighbor's house. e e t ACTION PLAN More effort will take place at sending out surveys to ensure a higher number of returns next fiscal year. The Community Development Department is also having an audit performed this year by an outside firm. Code Enforcement Services will also be audited as part of this effort. POINT OF CONTACT Patrick Kelley, Building and Code Enforcement Manager, (760) 602 2716 pkell(«jci.carlsbad.ca.us. Community Development REDEVELOPMENT SERVICES THE OUTCOME A quality shopping, working and living environment in the Village Redevelopment Area. THE MEASUREMENT This is a multi-modal approach combining: • Annual Property Values • Annual Sales Tax • Commercial Building Vacancy Rates at an Acceptable Level • Redevelopment Permits Issued WHAT THE DATA MEANS A redevelopment area can be determined to be successful when there is a program being implemented that removes blight and/or blighting influences (see definition below). The measures of this success can be tracked according to increases in property values and sales taxes, and maintenance of commercial building (retail and office) vacancy rates at an acceptable level. To measure the success of redevelopment in Carlsbad, the following indicators will be evaluated each year: Blight and influences: Conditions, which cause a reduction or lack of proper utilization of an area. The blight can be physical or economic. Conditions may include inadequate public facilities, unsafe buildings, building code violations, deterioration of buildings, underutilization of property, depreciated or stagnant property values, high business vacancies, abandoned buildings, lack of necessary commercial facilities, and/or an excess of bars, liquor stores and/or other businesses that lead to problems of public safety and welfare. Annual Property Values: Declining or stagnant property values may indicate a problem within an area and are typically the focus of redevelopment programs. Redevelopment activities are funded with tax increment, which is the incremental increase in property values within an area. Therefore, to measure success of a redevelopment area, we need to measure the increase in property values from year to year. Annual Sales Tax: Similar to property values, declining or stagnant sales tax may indicate a problem within an area. Increases in sales tax demonstrate the health of the business community within an area. Commercial Building Vacancy Rates: A significant percentage of vacant buildings within a redevelopment area create a blighting influence from both an economic and visual/aesthetic standpoint. Although a certain percentage of vacancy (i.e., 5% or less) is reasonable within an area and does not indicate a significant problem, increasing vacancy rates in commercial buildings may indicate a problem within an area. Redevelopment Permits Issued: By measuring the number of redevelopment permits issued for projects which eliminate blight, we will be able to determine the level of interest in redevelopment and revitalization from the private sector and help to determine the overall success of the City's redevelopment programs and health of the area. DEPARTMENTS INVOLVED Housing and Redevelopment Department/Redevelopment Agency. BENCHMARK In the Village Redevelopment Area: • Achieve a 5% or higher increase in property tax values each year • Achieve a 3% or higher increase in sales tax each year • Maintain commercial building vacancy rate of (5%) or less each year • Process at least five (5) new redevelopment permits each year that eliminate blight or blighting influences. RESULTS Village Redevelopment Area Benchmark Property Tax Values Sales Taxes Commercial Vacancy Rates # Redev. Permits Processed Desired Increase 5% 3% 5% or less 5 or more 2003-2004 $253,301,749 $ 1,007,119 5% 10 -Total 2004-2005 $261,930,026 $ 1,140,925 5% 14- Admin % Change 3% 13% N/A N/A ANALYSIS The Village Area has experienced an increase of 3% in Property Tax Values over the last fiscal year. This did not meet the desired increase of 5%. This is primarily due to the fact that there were fewer property sales transactions in 2004-05 and the development projects under construction had not yet been completed by June 30, 2005 in order to be included in the final tax assessor data. Consequently, it is anticipated that a much larger increase will be experienced in FY05-06. The Village Area has experienced a 13% increase in sales tax dollars. This significantly exceeds the desired increase of 3%. Fortunately for the Village Area, there has been an increase in the number of new shopping and dining opportunities that have assisted in the sales tax increase. The new businesses include Sonoma Valley Market, Merle Norman Cosmetics, the Poached Pear, Le Muse, and Las Olas Restaurant. The vacancy rates have remained constant at an acceptable industry rate (5% or less). In terms of redevelopment permits, the totals processed each year have varied. The permits being processed in fiscal year 2004-2005 include the Carlsbad Village Townhomes on Roosevelt Street, the Pine Avenue condominiums, and a new hotel on Carlsbad Boulevard. In the last year, staff has experienced a significant increase in the number of developer contacts, preliminary reviews and new applications. Developers are sincerely interested in purchasing property within the Village and constructing new projects. This interest continues to signal a renewed interest in redevelopment activities within the Village. In summary, the Village Area is continuing to grow from a financial health standpoint. The incremental growth in property and sales tax indicates that the market is gaining strength in the Village Area. The low vacancy rates combined with increasing sales tax indicates that the business climate remains healthy. In the last few years, and most specifically the last fiscal year of 2004- 05, the Village has experienced a peaked interest from successful businesses operating in other areas. Those businesses have opened or will soon open new stores in the Village Area, adding to the diversity of businesses and helping to ensure more favorable sales tax revenue. ACTION PLAN Staff will continue to implement programs that focus on revitalization and redevelopment of the Village Redevelopment Area. It is anticipated that within the next year a retail analysis will be completed for the Village Area. This analysis will consider the desires and demands of the local populations and determine the best type of retail to encourage within the Village Area. In the next year, staff will also complete a review of the development standards for the Village Area to determine if those standards are causing a constraint to new development. Appropriate revisions to the development standards will be recommended to the Housing and Redevelopment Commission for consideration. Staff will also continue to work with property owners to implement improvements on their Village property, and to encourage them to lease property to desired businesses. To continue the success, staff will continue to work with the Chamber of Commerce's Downtown Enhancement Committee and other appropriate organizations to implement new programs and/or projects that will continue to revitalize the downtown area and ensure the sustainability of its financial health into the future. POINT OF CONTACT Debbie Fountain, Housing and Redevelopment Director, (760) 434-2815, dfoun@ci.carlsbad.ca.us Community Development REDEVELOPMENT SERVICES COST '*", THE OUTCOME ••% An efficient Redevelopment Program that encourages private development and investment in Carlsbad's Redevelopment Areas. "> THE MEASUREMENT ••<% The specific measurement in this cost efficiency measure is: The ratio of public ^ dollar expenditures (for administration and projects) to private investment expenditures to successfully implement redevelopment activities and revitalize ^ the Village and South Carlsbad Coastal Redevelopment Areas. ^ WHAT THE DATA MEANS A redevelopment area can be determined to be successful when there is a program being implemented which removes blight and/or blighting influences *! (see definition below). The measures of this success can be tracked according *! to the investment of public funding investments as incentives to subsequently ^ encourage private funding investments into the area, which may result from the construction of new projects, rehabilitation of buildings or sale of property for investment purposes. Blight and Influences: Conditions that cause a reduction or lack of proper utilization of an area. The blight can be physical or economic. Conditions may include inadequate public facilities, unsafe buildings, building code violations, ^ deterioration of buildings, underutilization of property, depreciated or stagnant «% property values, high business vacancies, abandoned buildings, lack of ^ necessary commercial facilities, and/or an excess of bars, liquor stores and/or * other businesses that lead to problems of public safety and welfare. DEPARTMENTS INVOLVED Housing and Redevelopment Department/Redevelopment Agency. BENCHMARK Achieve a 1:10 ratio of public funding to private investment in the Village and/or South Carlsbad Coastal Redevelopment Area on an annual basis. For each $1 of public expenditures, the goal is to demonstrate that there has been at least $10 of private expenditures of investment in the area(s) per year. RESULTS Vi I lage Redevelopment Area Benchmark Public Funding Private Investment Ratio 2O04-2005 $2,573,887 $37,953,277 1:15 2003-2O04 $337,159 $26,919,199 1:79 ANALYSIS In 2003/04, the Village Redevelopment Area far exceeded the goal for the ratio (1:10) of public funding to private investment for the Village Area. In 2004/05, the Village Redevelopment Area again exceeded the goal. The two primary projects in the Village Area this year are the Village by the Sea Mixed Use Project (65 condos/townhomes and 8600sf retail) and the Laguna Point Luxury Condominiums (21 total). In addition to representing new private investment in the Village Area, both of these projects are key to the continued revitalization effort for the North State Street Area. Several more projects are currently in the development/application phase, which will continue the increase in statistics for private investment in the Village. From 1981 to 1995, the Redevelopment Agency had been making substantial investments (over $20 million) to improve and beautify the Village Area. The Village Master Plan was adopted in 1995. An objective of the Master Plan was to begin to reduce the public investment while increasing private investment in the area. The funding of the Agency after 1995 was primarily for planning and land use regulations, and for stimulating greater private investment, which would provide benefits to the City as a whole. The investment ratios for the past two years continue to demonstrate the success of this change in investment focus. ACTION PLAN Staff will continue to work with property owners and/or developers interested in development or redevelopment of various sites in the Village Area. It is staffs intent to continue to encourage private investment in both redevelopment areas by meeting with property owners and assisting with the processing of proposed projects. Staff is currently reviewing the development standards for the Village Area to determine if they are providing constraints to private investment. As appropriate, recommendations will be made to the Housing and Redevelopment Commission to revise standards, which are a constraint to private development. The South Carlsbad Coastal Redevelopment Area (SCCRA) has been mostly in planning stages for the last couple of years. It will continue in the planning process through the next year. Concurrently development applications are being processed for new hotels and mixed-use projects within the SCCRA. In the next year or two, the Agency will begin to consider this performance measure as related to the SCCRA in addition to the Village Area. POINT OF CONTACT Debbie Fountain, Housing and Redevelopment Director (760) 434-2815, dfoun(a),ci. carlsbad. ca. us Community Development REDEVELOPMENT CUSTOMER SATISFACTION THE OUTCOME -^A highly positive experience for customers visiting the Village Redevelopment *• Area to shop, dine or play. •->!•, THE MEASUREMENT The specific measurement in this customer satisfaction measure is: The results of one or more customer satisfaction survey question(s) on the City of * Carlsbad's annual public opinion telephone survey. The survey questions shall * be as follows: -a*• How often do you visit the Downtown Village Area of Carlsbad? "*> • How would you rate your experience while visiting the Village Area? * • What would improve the quality of your experience when visiting the Village? WHAT THE DATA MEANS A redevelopment area can be determined to be successful if the customers * visiting the area indicate that they have had a positive experience while » shopping, dining or playing. This measure will evaluate the success of redevelopment and other private investment activities in addressing ^ deficiencies, which may be creating a less than positive customer experience, '*! and/or continuing to maintain a high quality standard for the experience. ^DEPARTMENTS INVOLVED.-» Housing and Redevelopment Department/ Redevelopment Agency. ;•% BENCHMARK 90% of all respondents to the City public opinion survey rank their Village experience as 7 or higher (on a scale of 0 to 10, with 0 meaning poor and 10 excellent). A ranking of 7 or higher will indicate a ranking of good or excellent. RESULTS Fiscal Year 2003-04 was the first year for measuring the customer experience within the Village Area. The results of the survey indicate that 61.3% of the respondents visit the downtown Village Area at least once a week. Dining was * the most common reason given for visiting the Village Area. ••'-% Respondents of the City Survey were asked to give their overall impression of ~ Carlsbad Village by giving a rating from 0 to 10, with 0 meaning poor and 10 '* meaning excellent. The average rating was 7.99. A total of 86% of the respondents gave the Village a rating of 7 or higher, which is in the good to excellent range. The City survey for 2004-05 did not include the above questions. Therefore, we do not have any new statistics on customer satisfaction for this year. The questions will be asked every other year. Therefore, we will have new statistics in fiscal year 2005-2006. ANALYSIS No new statistics for 2004-05 for analysis purposes. The customer satisfaction questions will appear on the next citizen survey for 2005-2006. ACTION PLAN Staff will continue to work with the Village businesses to promote the area as a desirable shopping and dining experience. Staff will also work with Village property owners to continue the effort to revitalize the area and to recruit new businesses that may have greater appeal to local residents, especially those in the southern section of the City. These actions are intended to increase the frequency of visits to the Village by local residents and to improve the overall impression score for the Village Area. These actions will ensure the long-term sustainability of the area as part of the City of Carlsbad by appealing to local residents as well as visitors. In June 2005, the Redevelopment Agency entered into an agreement with the Community Land Use and Economics Group to complete a retail analysis and "wants and needs" study for the Village Area. This study will be complete by June 30, 2006. It will provide additional information on the retail sales void in the Village and new retail uses desired by visitors/shoppers. It will assist in the effort to improve the customer experience in the Village. POINT OF CONTACT Debbie Fountain, Housing and Redevelopment Director, (760) 434-2815, dfoun(@ci. carlsbad. ca. us Community Development «! SECTION 8 PROGRAM ASSESSMENT *Kg ^ THE OUTCOME * Maximize rental assistance opportunities for low-income residents of Carlsbad.••»i , THE MEASUREMENT % The rating from the United States Department of Housing and Urban Development for the City's Section 8 rental assistance housing program.4 ^ 1 WHAT THE DATA MEANS ^ The United States Department of Housing and Urban Development (HUD) has instituted a Section 8 Management Assessment Program. Using 15 adopted ^ indicators; HUD evaluates and certifies a local agency's success of *") administering individual federally funded housing programs. HUD's ratings «j include "High Performer," "Standard Performer," or "Troubled Performer." ^ Repeated failure to secure a HUD rating of "Standard Performer" or higher can jeopardize a local agency's continued federal funding for its Section 8 rental assistance-housing program. DEPARTMENTS INVOLVED Housing and Redevelopment - Section 8 Division.> BENCHMARK *> Achieve a HUD rating of Standard Performer or higher 100% of time. " RESULTS * For FY 2005, the Housing Agency received a rating of Standard Performer. ••"*, -% ANALYSIS The Housing Agency has met the benchmark by receiving a rating of Standard Performer for FY 2005 and continues to be considered successful in administering the Section 8 Rental Assistance Program. ACTION PLAN Continue to evaluate the 15 indicators and identify the areas where the agency can improve in an effort to attain "High Performer." POINT OF CONTACT Debbie Fountain, Housing 85 Redevelopment Director (760) 434-2935, dfounCmci.carlsbad.ca.us. o N(D3 Oo CD O13 Be a city that embraces community connectivity through the effective use of technological and interpersonal mediums BENCHMARK Overall recruitment and orientation process Training recevied to perform volunteer assignment { Supervisor in providing guidance and feedback 75% Level of respect and recognition received 74% 81% | 91% ! j Overall volunteer experience with the City of Carlsbad 92% Volunteers In the fiscal year 2004/2005, volunteers donated 46,887 hours of time. Using the Independent Sector's calculations adjusted for inflaction, that time was valued at an attention-getting $951,422.32—a gift to the City of Carlsbad of almost $1 million. The table to the left lists the percentage of City volunteers that rate the mentioned aspects of the volunteer experience as good or excellent. Citywide SERVICE DELVERY VOLUNTEER PROGRAM THE OUTCOME A prompt and efficient process to involve potential volunteers. THE MEASUREMENT Volunteerism has not been exempt from change. An increased reliance on technology and a reduction in long-term commitment are apparent when reviewing volunteer trends. The 21st century volunteer will find often a volunteer assignment using the Internet. Communication and response are expected to be immediate. Staff will measure the number of days from first contact to response and from orientation to referral to volunteer position. The data will track the efficiency of the procedures used to engage potential volunteers. WHAT THE DATA MEANS A prompt response to an expression of interest from a potential volunteer is essential to top-quality service. Volunteers who define the initial process as prompt and efficient are more likely to volunteer for the organization. Staff created a Pre-Tracking Database to track response time to volunteers during the process of engagement. Potential volunteers are entered into the database when they first express an interest. Then tracked at each step of the process. Those steps are: • Initial Contact to Response • Response to Orientation • Orientation to Referral to Department DEPARTMENTS INVOLVED Citywide BENCHMARK ACTIVITY Initial Contact to Response Offered Orientations Orientation to Referral BENCHMARK <3 days 90% of the time 1 per month <3 days 90% of the time RESULTS ACTIVITY Initial Contact to Response <3 days Offered Orientations Orientation to Referral <3 days BENCHMARK 90% 1 per month 90% 2OO5 95% Yes 90% ANALYSIS Potential volunteers receive a very prompt response to an indication of interest. An auto-reply has been added to go out immediately to those who indicate an interest via our website. One hundred percent of the time, an email or phoned response is given to all volunteers who express an interest within 3 days. A Pre-Tracking Database has been designed and implemented to keep track of the potential volunteer throughout the involvement process. Potential volunteers are immediately invited to an orientation usually offered within 14 days. They continue to be invited to the next three orientations. Once the potential volunteer attends an orientation, the application is forwarded on to the relevant department within 3 days 90% of the time. ACTION PLAN Continue to work with departments to find ways to engage potential volunteers at their earliest convenience. POINT OF CONTACT Sue Irey (760) 434-2820, Sireyfa/ci.carlsbad.ca.us. Citywide VOLUNTEER PROGRAM COST THE OUTCOME A cost-effective volunteer program. THE MEASUREMENT Expenditures for volunteer operations will be compared to the calculated value of hourly volunteer time and the value of volunteer support in the community. The hourly calculation is established for California by the Independent Sector and derived from the annual President's Economic Report. WHAT THE DATA MEANS In the fiscal year 2004/05, volunteers donated 46,887 hours of time. Using the Independent Sector's calculations adjusted for inflation, that time was valued at $951,422. However, this gift of almost $1 million value has associated costs. There has been a tendency to subsume the volunteer program costs into our general operating budget. While we are proud of the contribution of volunteers and the fact that volunteers contribute without expectation of monetary reward, we must confront the myth of "free" volunteers. Volunteers cost the City time, money and effort and we must consider whether or not these costs are justified. There are direct costs in the Volunteer Program budget and for volunteer recognition events held throughout the City. There are indirect costs in staff time associated with training and involving volunteers. These costs are shared across different functions and departments and have not been tracked historically. Equipment costs are often difficult to quantify as the equipment is often shared with paid staff. Hard data was difficult to gather because staff had not previously been asked to "break out" their time and effort spent involving volunteers. However, each department sent in data and will have a greater ability to present valid measures next year. Also, the indirect value in terms of volunteer support in the community is an additional consideration. The support of volunteers to who speak directly to their friends and neighbors about City programs is an extremely valuable in terms of community outreach. This Cost Effectiveness analysis does not include measurement of that important benefit. Staff hopes to find a valid measurement tool in the future. DEPARTMENTS INVOLVED Citywide ••*>•n BENCHMARK For every return. LJVIY $1 invested in the volunteer program, the City receives $11.10 in RESULTS We have begun to quantify the cost of the volunteer program. To the extent that the City rallies behind the vision of an engaged citizenry - a citizenry that recognizes the opportunities to be part of the solution - it will be necessary to build up the capacity to accommodate these gifts of time and service. 07/01/2004- 06/30/2005 No. of volunteers ^o. of hours Avg. hrs per volunteer Avg. value aer volunteer Cost Impacts Avg. expenditure per volunteer Avg. cost per volunteer hour Ratio - Avg. value/ Avg. expenditure Adult Literacy 103 6,315 61 $1,244 $114,160 $1,108 $18.08 1.1 Art* . 47 1,016 22 $439 $12,880 $274 $12.68 1.6 General 336 1,595 5 $96 $87,160 $259 $54.65 0.4 Library 152 3,644 24 $486 $32,359 $213 $8.88 2.3 Police & Fire 147 13,652 93 $1,885 $75,000 $510 $5.49 3.7 Recreation 135 7,707 57 $1,158 $6,500 $48 $0.84 24.1 Senior Center 165 12,225 74 $1,503 $4,545 $28 $0.37 54.6 Trails 80 733 9 $186 $16,250 $203 $22.17 0.9 Avg. 43 $875 $330 11.1 Total 1,165 46,887 *$ Value of a Volunteer Hour $20.29 POINT OF CONTACT Sue Irey (760) 434-2820, Sirev@ci.carlsbad.ca.us. Citywide CUSTOMER SATISFACTION VOLUNTEER PROGRAM THE OUTCOME Volunteers express a high level of satisfaction with their volunteer involvement. THE MEASUREMENT A goal team was formed to design, distribute and analyze a volunteer satisfaction survey. The volunteer satisfaction survey measured the satisfaction of volunteers about several aspects of the volunteer program and their volunteer experience. In January 2006 the survey was sent out to 801 persons. Results are based on the 144 that were returned (18% of total sent). WHAT THE DATA MEANS The data assessed the current strengths and weaknesses of the City's volunteer program from the perspective of the volunteers. Recommendations were given based on the analysis of the data gathered. DEPARTMENTS INVOLVED Citywide BENCHMARK The following table lists the percentage of City volunteers that rate the mentioned aspects of the volunteer experience as good or excellent. Since this is the first year of the survey, no prior benchmark exists. Overall recruitment and orientation process Training received to perform volunteer assignment Supervisor in providing guidance and feedback Level of respect and recognition received Overall volunteer experience with City of Carlsbad 2005 75% 74% 81% 91% 92% RESULTS In response to the survey question asking volunteers to rate the overall volunteer recruitment and orientation process, 75% rated it positively (4 or 5 on a 1-5 scale). A majority of the respondents (74) rated their volunteer training positively. Over 80% gave positive ratings to their supervisor for providing guidance and feedback. Over 90% gave positive ratings about the level of respect and recognition they receive as a volunteer. 92% of respondents gave positive ratings about their overall volunteer experience at the City of Carlsbad and 93% of the volunteers indicated that the Carlsbad volunteer experience met their personal expectations. ANALYSIS Overall, the responding volunteers are very positive about their experience. An impressive 92% rated their overall volunteer experience as Good or Excellent. They enjoy what they are doing and feel rewarded. About half would like to take development classes. However, a few negative comments need to be taken seriously: sometimes volunteers are not used to their full potential and feel underutilized. Some would like more guidance from their supervisor or something like a performance measure. Also, there is a need for more information about volunteer opportunities and the development classes. ACTION PLAN Develop activities and programs to address weaknesses identified in survey. POINT OF CONTACT Sue Irey (760) 434-2820, Sirey@ci.carisbad.ca.us oo 3 3c3 o'Q) Ensure that community members, Council, and staff are well informed, continuing to be a more responsive government while providing a high level of citizen confidence in its government. Why is ii important -*""* -S H « --I* Bycreatingandmaintainingabalancedcirculation system, the City is able to provide transportation choices and improvements to mobility. The ability to move people and goods is essential to the economic vitality and quality of life in a region. Business location and expansion decisions, consumer choices regarding goods and services, and land values are largely a function of accessibility and are directly related to quality of life. Communication Indicators - Citywide Communications - Communications Cost per Capita - Confidence In Local Government - Requests for Action - Information Responsiveness Communications continues to be a major area of effort and focus for the City. The City evaluates its communication efforts based on the level of information residents feel they have, the cost to provide information, the level of confidence residents have in local government, and the way in which the City responds to citizen requests. A correlation has been established between the residents' ratings of communication and the their level of confidence in their City government - that is, the higher ratings that citizens give the City's communications, the higher they rate their level of confidence in the City organization. Current Year Results Results from this year's Citywide survey show that both citizens' feelings regarding Communication and Confidence stayed the same as last year (79% & 78% respectively). Communication expenditures per capita increased from the prior year ($10.15 vs. $13.55), however, staff believes this increase is due to more accurate cost reporting and is comparable to what the City has spent in this area over the past several years. The primary reason for the cost increase was the inclusion of the City's website, which accounts for more than $2.50 of the per capita expenditure, or nearly 20% of overall communication expenditures. Citizen Survey Responses to Communication and Confidence 100 60 50 40 30 • Confidence • Communication 2000 i 2001 ! 2002 ! 2003 ! 2004 I 2005 Trends & Observations While the City has not yet reached its benchmark in any of the categories, the five year trend shows a significant initial increase in results over the first three years followed by a recent leveling off. This trend is consistent in all aspects of communications, including costs when adjusted for accuracy, and though results have not improved in the last two years, ratings remain positive. Staff will continue to identify and evaluate more effective methods of outreach. This year the City developed a new performance measure on Request for Actions, and expects future results to provide valuable information as to how successful the City manages its customer relations. Based on the City's capital construction program and increasing public expectations, there appears to be the need to further the City's communication and outreach efforts in the near-term. As is the case in other areas, the primary challenge facing the City will be to meet this increasing demand (scope, volume, and responsiveness) in a cost-effective and efficient manner. Citywide CITIZEN/CUSTOMER RESPONSE TIMES THE OUTCOME A well-informed citizenry with a high level of confidence in local government. THE MEASUREMENT City of Carlsbad responds to citizen requests in a timely manner. WHAT THE DATA MEANS A key function of local government is the ability to identify and address citizen and customer concerns in a timely fashion. By resolving customer requests appropriately, the City can positively impact the public's confidence in local government. DEPARTMENTS INVOLVED Citywide. BENCHMARK 90% of Request for Actions are resolved within the predetermined timeframes. RESULTS % of cases resolved Benchmark 90% 2005 78% ANALYSIS A key function of local government is responding to a variety of citizen and customer concerns and requests in a timely fashion. This is the first year that the City has tracked how efficiently it is able to resolve customer issues based on preset timeframes. In 2005 (from November 2004 - October 2005), the City opened more than 4400 Requests for Actions. Of these, approximately 3700 required some type of response from the City. Staff was able to respond in a timely manner in 2900 of those cases. This results in an overall responsiveness rate of 78%. There has been increased management oversight of the RFA process, and staff anticipates that as the City's population increases, so too will the number of concerns and complaints that the City receives. ACTION PLAN Staff will continue to develop this measure and work with departments to find ways to improve resolution and reporting processes. Ascertain relevant customer service providers to compare against. POINT OF CONTACT Joe Garuba (760) 434-2820, Jgarufeici.carlsbad.ca.us. Citywide CITYWIDE COMMUNICATIONS THE OUTCOME A well-informed citizenry with a high level of confidence in local government. THE MEASUREMENT Survey results to the question in the citywide survey that asks, "Using a scale of 0 to 10, where 0 means poor and 10 means excellent, how would you rate the job the city does in providing you with information about issues that are important to you?" WHAT THE DATA MEANS The dissemination of information to the public is a key function of local government. Citizens who feel more informed, and are able to access information about the City when and where they need it should result in greater understanding of local issues and positively impact the public's confidence in local government. DEPARTMENTS INVOLVED Citywide. BENCHMARK 90% of respondents rate 6 or greater on a scale of 0-10. RESULTS Benchmark 90% 2001 55% 2002 62% 2003 86% 2O04 80% 20O5 79% ANALYSIS This is the fifth year residents have been asked how the City is doing in providing them with information on issues that are important to them. As shown through previous surveys, there appears to be a correlation between the way residents rate their level of communication and their impressions of land use decisions, overall services, and confidence in local government. While the City has failed to achieve the benchmark in any given year, the ratings for this measure have stayed relatively consistent over the past three years, and reflect a significant net increase over the past five years. Something to note this year is the emerging difference in ratings based upon the geographic location of the residents and their age. g 25° o 200 tf 150 o> 13Z 50 I I I " I J I I I I 10 "How informed do you feel?" The above chart illustrates the breakdown of the survey respondents and how well informed they believe they are. As is evident in the graph, the vast majority of the respondents give the city positive scores in its communication efforts. This year the citywide survey included a question asking how people would want to receive information. The results of the 2005 survey question are reflected in the chart below. Information Method Community Services Guide Monthly E-mail newsletter Quarterly Newsletter via Postal Mail News Highlights in Utility Bill Quarterly E-mail Newsletter Monthly Newsletter via Postal Mail Average Rating 6.7 6.1 6.1 5.9 5.8 5.6 As is evident, several tools that the City uses for information dispersion are not included in the results. This is due in large part to the way the survey question was framed, and is part of the ongoing process to clearly identify where and how citizens would like to receive city-related information. Citizen access to the internet continues to be high with nearly 90% of the respondents saying they have some sort of access in their homes. Almost 80% of those homes with internet have a high-speed connection. The internet is a vital component to the City's communication efforts, which ultimately provides a fast yet relatively inexpensive way to deliver information. ACTION PLAN While the City has begun the process to better define how people want to C receive their information, there is still much research and analysis needed in | this area. Staff has identified the need to conduct a more comprehensive - evaluation on the different methods of communication and their effectiveness. C Over the past several years, the City Council has identified communication as || one of its Strategic Goals. Staff continues to develop and implement an g overarching strategy that will provide a coordinated approach to implementing and measuring the city's communications efforts. •POINT OF CONTACT f Denise Vedder (760) 434-2820, Dveddfeci.carlsbad.ca.us. t t C V- /fc- t* e Citywide CITYWIDE COMMUNICATIONS COST PER CAPITA THE OUTCOME A cost effective external communications program. THE MEASUREMENT Citywide communication costs per capita. WHAT THE DATA MEANS The dissemination of information to the public is a key function of local government. A more informed public should result in greater understanding of local issues and positively impact the public's confidence in local government. This measure evaluates the cost per capita spent by the City on communication. DEPARTMENTS INVOLVED Citywide BENCHMARK Base Year (2004) plus Consumer Price Index (3.4%) RESULTS Population Expenditure Benchmark Per Capita Actual Per Capita 2002 88,400 $586,000 $6.65 $6.65 2003 92,400 $984,900 $6.94 $10.65 2004 94,400 $958,711 $7.20 $10.15 2005* 95,150 $1,290,000 $7.45 $13.55 * 2005 is the first year that the cost of the City's website was included. ANALYSIS This measure provides the ability for staff to better evaluate the cost in conjunction with the effectiveness of the City's many communications efforts. This measure takes into account the costs outlined in the communication budget as well as other communication endeavors sent from the City. The City volunteer coordinator and associated expenses are also included in the communications budget. As the City's communications program has become more sophisticated, and more programs are either consolidated or, partnerships between departments occur, better tracking of costs has ensued, which allows for a more accurate, detailed understanding of expenses related to communications. Included in this analysis: • Communications budget (salaries, video production, calendar, see budget for full details) • City Website • Community Services Guide - printing, mailing, graphic design • Public affairs and community outreach for public works related to specific projects) Not included: • Environmental outreach • Recreation spring camp guide • Arts department newsletter • Water bill stuffers • Brochures completed by individual departments. A significant change in the expenditures this year is that the cost of the City's website (approximately $250,000, or $2.60 cents per capita) has been included for the first time. It is important to note, however, that while costs for the website are reflected for the first time this year, the site costs are not increasing and expenses are consistent with those in prior years. The website is proving to be more and more the primary tool for information and communication, and will continue to be an area of emphasis for the foreseeable future. While the overall per capita cost grew by a significant amount, staff believes that this year is a better representation of the actual amount spent on communications. Results in the Citywide survey show that residents continue to rank communication at a fairly high level, which demonstrates by proxy the effectiveness of the City's communications. ACTION PLAN Staff has developed an overall Communication Strategy, and will continue to identify how best to allocate City resources to meet Council's objectives. Staff will continue to evaluate cost effectiveness of various communication tools and adjust accordingly. Staff will also further analyze this year's survey, in which specific questions on how residents would like to receive their information was included, in order to better identify the effectiveness and emphasis of ongoing communication efforts. POINT OF CONTACT Denise Vedder (760) 434-2820, Dveddfcici.carlsbad.ca.us. Records Management RECORDS INFORMATION RESPONSIVENESS THE OUTCOME Timely and accurate dissemination of information to aid in decision-making. THE MEASUREMENT This is a multi-modal approach combining: Time for legislative documents: A measurement of how quickly Council's weekly legislative documents are available for internal and external customers. Use of on-line Document Management System: A measurement of the number of times that both external and internal customers visit the Document Management System site. WHAT THE DATA MEANS Time for legislative documents: Managers and the City Council depend on accurate and timely processing of legislative documents such as Agreements, Resolutions, and Ordinances. City projects can be stalled without timely attention to processing citywide documents. From July 1, 2005 to date Records Management has achieved a 95% on-time record in having legislative documents from Council Meetings available on the DMS by the following Friday. Use of on-line Document Management System: The use of the Document Management System by both City employees and the public are critical to providing top quality service. By analysis of how many people are using this service, and understanding the timeframes of usage, we can gauge the effectiveness of this service. At the request of Records Management, the IT Department periodically runs reports regarding the usage of the DMS system distinguishing both internal city use and external usage. The last report, run from the September 26, 2005 to October 7, 2005, offers the following measurements: Time Frame 9/27/05-10/7/05 9/27/05-10/7/05 Customers Internal External User Number 109 83 Search Number 3,848 1,630 DEPARTMENTS INVOLVED Records Management, Information Technology. BENCHMARK To be determined. POINT OF CONTACT Lorraine Wood, City Clerk (760) 434-2880 x 2970, Lwoodfeci.carlsbad.ca.us. Citywide CONFIDENCE IN CITY GOVERNMENT THE OUTCOME High level of citizen confidence in the City's ability to positively affect the community. THE MEASUREMENT Survey results to the question in the citywide survey that asks "How confident are you in the Carlsbad City Government to make decisions which positively affect the lives of its community members?" WHAT THE DATA MEANS Evaluating citizen's confidence in the local government in conjunction with other service rating measures, the City can determine those actions that have a positive impact on the perception of the effectiveness of local government. DEPARTMENTS INVOLVED Citywide. BENCHMARK 90% of respondents rate confidence 6 or greater on a 0-10 scale. RESULTS Benchmark 90% 200O 60% 2001 68% 20O2 72% 2003 79% 2004 76% 2O05 78% ANALYSIS This is the sixth year that the City has asked its residents how confident they are in local government effectiveness. During this timeframe, the percentage of the respondents who have a positive confidence level in local government has increased by 18 percentage points. This trend seems to show some signs of leveling off, with positive responses essentially unchanged over the past three years. In evaluating what drives Citizen confidence, staff has determined that there are numerous components within the City's sphere of influence that impact this rating. The degree of information that the residents feel they have the citizen's perception of how effective the City uses land have an impact on their confidence rating in the City. Land use has a greater impact in affecting the confidence question than does communication, but one may be a function of the other as citizens may not know our land use plan if we aren't communicating effectively on this subject. In 2004, citizen ratings of land use were essentially unchanged and slightly lower when rating communication. Staff believes that these corresponding decreases as well as other significant factors such as major construction projects in the City are reflected in the lower citizen confidence rating. ACTION PLAN Because this measure represents a critical outcome of the City's effort and while the decrease in ratings is nominal, Staff will continue to monitor this rating and will work to identify and implement ways in which to positively affect both communication and land use perceptions, it is moving in a direction counter to the City's goal. POINT OF CONTACT Joe Garuba (760) 434 2820, JgaruCojci.carlsbad.ca.us. V e V c* e t e e 251 S|n» 3 Bean environmentally sensitive community by focusing on conservation, storm water, sewage collection and treatment, solid waste, and cost effective and efficient use of enemy including alternative energy sources SOLID WASTE Solid Waste Indicators • Solid Waste Cost • Solid Waste Diversion • Solid Waste Customer Service and Satisfaction Current Results • The solid waste program continues to report consistent results in all three areas - customer service, service delivery and cost. • For the first time in seven years, solid waste rates increased. However, the rates continue to rank among the lowest in the County. • The state mandated diversion requirement of 50% was exceeded - the 2004 diversion rate is projected at 57%. • Customer service ratings are consistent with prior year results. Trends and Observations • The solid waste program continues to introduce enhancements to the citizens of Carlsbad. During FY 2006 three new programs will be available to residents including door to door Household Hazardous Waste (HHW) collection; composting and an HHW one day special collection event. • The City maintains a good working relationship with the contractor responsible for operating this program. Through informal negotiations, the vendor has increased bulky item pick-up services and will expand recycling efforts by accepting mixed paper at curbside in the Spring of 2006. • Citizen complaints are tracked in the City's RFA system, the majority of the complaints received in the area of solid waste are related to the limited recycling program the City offers. The introduction of enhancements to this particular program would most likely result in increased monthly rates to the residents. Staff continues to analyze this area, ensuring that enhancements to the program are cost effective. • Hazardous Waste Collection is a service that typically receives some of the lowest customer service ratings (66% good or excellent). Two new programs will be introduced in 2006, which may have a positive impact on these ratings in the future. Customer Service Ratings YEAR Trash Collection Recycling Household Hazardous Collection Waste Collection Benchmark 2003 2004 2005 >90% 88.6% I 87.3% 1 87% >90% 82.7% 81 .5% 83% >90% 69 68 5% 2% 66.3% STORM WATER Storm Water Indicators - Storm Water Protection Cost - Storm Water Service Delivery - Storm Water Protection Customer Service and Satisfaction - Growth Management Drainage - Growth Management Waste Water Treatment Facilities Current Results - Response time goals were met for on-site investigation of reports of illegal discharge into the storm drain system. In over 90% of all active cases (12 cases in 04-05), a Storm Water Protection staff member was dispatched within 30 minutes. - Storm Water personnel operate efficiently, three of the four components of the cost measure are the lowest when compared to our benchmark partners. - The water quality measure is currently focused on Agua Hedionda Lagoon and Agua Hedionda Creek as a pilot program. Staff monitors water quality of one site at the creek upstream of the lagoon, and three sites on the lagoon. Samples from the lagoon sites rated good or fair for all three measures, namely fecal coli form bacteria, dissolved oxygen, and turbidity. The creek site rated fair for fecal coli form, but it exceeded the benchmark six out of 12 monthly samples. • Planned drainage maintenance activities did not meet City standards due to a lack of focused resources. However, several changes occurred at the end of FY 04-05 to implement improve- ments: a new vacuum truck was purchased and designated for full-time use for storm drain maintenance, new leadership was established to direct the program, and a team was put in place to meet monthly to help with track progress and make further improvements. Trends and Observations • A new NPDES permit is expected to be issued to the City of Carlsbad (as a member Copermittee) by the Regional Water Quality Control Board in the Spring of 2006. More, not less, will be required of the City to maintain compliance in all areas under the permit. The City will need to stress the importance of this permit to all personnel and develop programs to ensure cost effective compliance. • Mandatory requirements to improve water qual- ity will be issued in the next few years for im- paired water bodies within the City of Carlsbad - specifically, Aqua Hedionda Lagoon and Bue- na Vista Lagoon. These requirements will have long-term financial impacts to the City. • The Regional Board has issued a draft Monitor- ing Order for Aqua Hedionda Lagoon. When this order is implemented, annual expenses to com- ply with the order could run as high as $250,000 (not including special studies) and will need to start being implemented by the Fall 2007. Other stakeholders in the watershed may share costs but this is based on their participation and sign- ing of a Memorandum of Understanding. • There have been no beach closures in the City of Carlsbad from high bacteria readings in Storm water runoff for the past three years. Public Works SEWER SYSTEM SERVICE DELIVERY THE OUTCOME Sewer system reliability. THE MEASUREMENT This measure uses a multi-modal approach combining: Volume of Spills: Volume of reportable sewage spills per mile of sewer mains. For the purposes of this report, a "spill" is defined as any untreated sewage flow that escapes from the City's sewer collection system and has the potential for entering the city's surface water and/or storm drain system. Volume of Spills: Recaptured so that contaminated water does not enter the city's surface water and/or storm drain systems. The volume of spills component looks at spills that were caused by a failure in the city's sewer system. This does not include spills from sewer laterals within the city. Station Facility Maintenance: Percentage of work activities completed during the fiscal year based on standards established in the Maintenance Assessment Program. Sewer Main Cleaning: Percentage of work activities completed during the fiscal year based on standards established in the Maintenance Assessment Program. WHAT THE DATA MEANS Measures the integrity of the sewer system, the ability of staff to respond quickly and efficiently to spills, and the effectiveness of preventive maintenance operations. DEPARTMENTS INVOLVED Public Works/Maintenance and Operations. BENCHMARK Volume of Spills: Annual volume of reported sewage spills due to system failure will be zero. This benchmark is consistent with the requirements of the Regional Water Quality Control Board. Volume of Spills Recaptured: Recapture 100% of all spills from the city maintained sewer system so that sewage never enters the city's surface water and/or storm drain system. 1 'tl Station Facility Maintenance: At least 90% of all pump station electrical moving parts, wet wells, generators, valves and pumps are tested and repaired annually. This program includes station maintenance, electrical maintenance, wet well maintenance, generator maintenance, station surveillance operations, valve maintenance and pump maintenance/repair. Sewer Main Cleaning: At least 90% of all priority sewer main lines will receive high velocity cleaning to ensure proper conveyance of sewage and to prevent sewer system overflows and backups. Priority sewer lines are scheduled for cleaning depending on the location of the lines, flow rates, historical information on the frequency of blockages, and pipe material. RESULTS Volume of Spills Fiscal Year No. of Reportable Spills1 Reportable Gallons Spilledi Total Miles of Sewer Mains Benchmark 2001 2002 2003 2004 2005 9 14 7 6 11 1,125 7,835 7,550 209 3,030 212 212 232 235 254 Reportable Gallons Spilled per Mile O 5 37 33 0.89 12 1. This column includes all spills that were caused by a failure in the city's sewer system (excludes recycled water spills and/or spills from sewer laterals). Volume of Spills Recaptured Fiscal Year Reportable Gallons Spilled * Reportable Gallons Recaptured 2 Benchmark 2001 2002 2003 2004 2005 1,125 3 7,835 7,550 209 3,030 2,640 4 6,845 2,200 164 1,025 Percentage of Gallons Recaptured 10O% 235% 87% 29% 76% 34% l.This column includes all spills that were caused by a failure in the city's sewer system (excludes recycled water spills and/or spills from sewer laterals). Figures are adjusted from previous years reports. 2. Data is based on total reportable gallons recaptured from the City's public sewer system. 3. Of note, two significant spills occurred to the recycled water system and are not included above. 4. Residual and/ or any other water from other areas during recapture was reported. Station Facility Maintenance and Sewer Main Cleaning Activity Station Facility Maintenance Pump Station Maint. Pump Station Electrical Maint. Pump Station Wet Well Maint. Pump Station Generator Maint. Pump Valves & Check Valves Maint. Pump Station Pump Maint. Benchmark 90% 90% 90% 90% 90% 90% Overall % Maintenance Achieved 1- FY 2O03 104% 102% 63% 104% 8% 86% 77.8% FY 2004 FY 2005 100% 51% 41% 113% 61% 17% 64% 102% 94% 49% 98% 91% 30% 77% Sewer Main Cleaning Priority Sewer Every 3 Months Priority Sewer Every 6 Months Priority Sewer Every 12 Months VCP Sewer Lines Every 24 Months PVC Sewer Lines Every 36 Months Benchmark 90% 90% 90% 90% 90% Overall Data not available Data not available Data not available Data not available Data not available N/A 103% 86% 93% 100% 100% 96% 86% 108% 80% 100% 100% 95% 1. Achievement levels as reported in the "Maintenance Assessment Program" report. ANALYSIS Volume of Spills: This component of the sewer system delivery measure includes reportable spills due specifically to system failure. In past reports, the volume measure included only those spills of 50 gallons or more per incident. However, because staff reports all spills regardless of the volume spilled, all spills are now used in this measure. Also, because our benchmark partners do not have responsibility for sewer laterals and in order to maintain comparability of data, this measure does not include spills from sewer laterals even though we report those types of spills when they occur. The number of gallons spilled per mile of sewer main as a result of system failure was 12. The volume increase over the previous year are due to five additional spills that occurred as a result of blockage in sections of the sewer main system primarily in the older, downtown area. These blockages were caused by grease and/or root intrusion. These sections were inspected and subsequently cleaned as part of our routine sewer main cleaning. Sewer mains in the older areas of the city are categorized as "high priority." These areas are inspected and cleaned every three months as a proactive measure to mitigate the potential of possible blockage and/or spills. If staff identifies areas that •* continue to have blockage problems, these areas are included in the high priority maintenance list. The result should be a lowering in potential for sewer spills. Compared to benchmark agencies, Carlsbad had the lowest reportable gallons spilled due to sewer system failure. It should be noted that we are measuring only sewage spills. Recycled water spill data was included in prior year's reports because the City is required by the Regional Water Quality Control Board to also report recycled water spills. But the focus of this measure is on the integrity of the City's sewage conveyance system so recycled water spills are not included in the measure. Agency City of Carlsbad Leucadia W/W District City of Chula Vista Reportable Gallons Spilled due to System Failure 3,030 4,880 40,660 Total Miles of Mains 254 199 400 Reportable Gallons Spilled Per Mile from All Sources 12 25 102 There are too many variables associated with how and when sewer spills occur to make any meaningful comparisons to other agencies. However, staff believes it is important to continue with year-to-year internal comparisons to measure the integrity of the city's sewage conveyance system. Volume of Spills Recaptured: This measure is included to represent the effectiveness of the City's "Sewer Response Plan." The number of gallons recaptured in fiscal year 2005 was 34% of total reportable gallons spilled due to system failure. This did not meet the benchmark of 100%. Staff responds immediately to all spills upon notification; however, in some cases notification to staff did not come in time to allow for the total recapture or containment of spilled sewage. There were two separate incidences in which staff was unable to fully recapture spills. Both were related to areas where new construction was occurring. Staff believes that debris resulting from the construction blocked the 8" collector mains and was the most likely cause of the stoppages. The total uncaptured sewage from these two events alone was 1,500 gallons. This amount represents the majority of the volume of spills that were not captured. Agency City of Carlsbad City of Chula Vista Leucadia W/W District Reportable Gallons Spilled 3,030 40,660 4,880 Reportable Gallons Recaptured 1,025 3,390 250 Percent of Gallons Recaptured 34% 8% 5% As compared to the partner agencies contacted, Carlsbad reported the highest percentage of sewage recaptured. However, inconsistent reporting procedures among other agencies does not allow for establishing any comparability of data for this measure. It is difficult to determine by comparing to other agencies whether or not Carlsbad is operating at a high performance level or if any particular standard is being met. As with the volume of spills measure, staff will continue with year-to-year internal comparisons to measure the effectiveness by which staff administers the City's Sewer Spill Response Plan. Maintenance Assessment Program: A Public Works Maintenance Assessment Program is used to establish and document the frequency of recommended preventive maintenance and/or responsiveness to repair needs. At the end of each fiscal year, the level of accomplishment is measured by comparing the percent of completed work to planned maintenance. A high maintenance standard can result in increased costs to provide the required preventive maintenance services. Conversely, a decrease in the amount of preventive maintenance may decrease costs in the short-term, but puts the overall system reliability at risk. When benchmarks are met or exceeded, optimal operating efficiency and reliability of the sewer conveyance system are achieved. This results in reduced repairs and sewage spills/blockages, and enhanced protection of the environment. The Public Works Maintenance Management Program and work order systems are used to collect and analyze performance data. Station Facility Maintenance: The standard for station facility maintenance includes the testing and repair of all pump station electrical moving parts, wet wells, generators, valves and pumps to ensure easy access to station locations and proper pumping (conveyance) of sewage. The benchmark for these activities is 90% of all planned maintenance will be completed during the year. Each component was tested and serviced in accordance with the Maintenance Management Program, with the results shown in the table above. Staff was able to maintain the benchmark standards in the majority of work activities by better coordinating planned with corrective maintenance. One area in particular that was addressed was in generator maintenance. This activity was contracted out via an annual generator maintenance agreement. This allowed staff to redistribute time to other planned maintenance and/or repairs. As the levels of maintenance of activities under Station Facility Maintenance (such as maintenance of pumps, electrical, etc.) will vary from year to year, staff will make sure that the more critical components receive a proper level of attention. Sewer Main Cleaning: The standard for sewer main cleaning includes the high velocity cleaning of all priority sewer main lines to ensure proper conveyance of sewage and to prevent sanitary sewer overflows, as required by the California Regional Water Quality Control Board. The benchmark for sewer main cleaning is 90% of all planned maintenance will be completed during the year. Overall planned sewer main cleaning was completed 95% of the time. With only small variations in results, fiscal year 2005 was consistent with prior year's results and demonstrates that staff continues to maintain its annual sewer main cleaning as planned. ACTION PLAN Volume of Spills • Staff will continue with preventive maintenance sewer line inspection and monitoring work in a proactive attempt to eliminate the volume of spills. • Contractors/Developers are required to keep construction debris out of the sewer system. CM&I inspectors are tasked with inspecting the new sewer systems and making sure that they are kept clean of debris. However, debris can inadvertently end up in a sewer system at any time, so occasionally some spills/blockages will occur. Staff will continue with ongoing inspection of new construction to ensure that any debris ending up in the sewer system is held to a minimum and does not result in a spill or blockage. Volume of Spills Recaptured • Staff will continue to investigate and implement mitigation efforts and enhancements to the Sewer Response Plan to increase the percentage of spills recaptured. The measure of recaptured spills will include any sewage spill that occurs, whether or not it's the result of system integrity failure or caused by other occurrences, e.g., line damage due to construction and blockages caused by grease disposal into sewer system Station Facility Maintenance • Staff will look into alternative work methods to improve the balance of planned versus corrective maintenance. This will include, but not be limited to, the use of contract services, temporary help, and/or consolidation of services with other Public Works divisions. Sewer Main Cleaning • Even though sewer main cleaning is meeting the benchmark, staff will look into alternative work methods to improve work productivity in this activity. This will include, but not be limited to, the use of contract services, temporary help, and/or consolidation of services with other Public Works divisions. • In fiscal year 2006, staff will implement a new work management system (Hansen) that will automate scheduling and record maintenance of work activities, and tie maintenance and/or repair work to a specific asset in the sewer system. Priority categories as defined in the Maintenance Assessment Program will be incorporated into the new system to ensure that the levels of maintenance are achieved. Staff will monitor this activity on an ongoing basis and make adjustments as necessary. • Staff will compare sewer main cleaning procedures and standards with benchmark agencies. • Staff of the M&O and Storm Water Protection divisions will review the possible development of a FOG monitoring and compliance program for the prevention of fats, oils and grease ("FOG") discharges into the City's sanitary sewer system. The program may also be used to assist commercial FOG generating customers in meeting their wastewater discharge limits. POINT OF CONTACT Clint Phillips (760) 438-2722, x7110, cphil@ci.carlsbad.ca.us. Public Works SEWER COST EFFICIENCY THE OUTCOME Sewer operations cost efficiency. THE MEASUREMENT The total cost of service per million gallons of sewage collected, treated and discharged. This measure is calculated by dividing the total annual O&M expenditures, including payment to the Encina Wastewater Authority (EWA), less depreciation, by the total sewage flow assessed to Carlsbad by the EWA. WHAT THE DATA MEANS The annual expenditures per million gallons of sewage collected, treated and discharged represent a financially efficient system when the benchmark is achieved. The outcome is to ensure the safe conveyance and treatment of sewage within a prudent level of expenditures. DEPARTMENTS INVOLVED Public Works/Maintenance and Operations. BENCHMARK Annual cost of service will not exceed $2,001 per million gallons of sewage. This benchmark was established based on the results of a survey conducted by the American Water Works Association in February 2005. $2,001 per mg is the median score for all agencies surveyed within the 50,001 to 100,000 customer base category. The 25th percentile score is $1,258 per mg. The 75th percentile score is $3,003 per mg. This is the first year that this benchmark has been used and will be updated based on the results of subsequent surveys conducted by AWWA. RESULTS Fiscal Year 2001 2002 2003 2004 2005 O&M Expenses 1- $3,490,008 $3,569,236 $3,151,172 $3,946,119 $3,992,462 Annual Flow (MG) 2,373 2,278 2,493 2,789 2,688 $/mg $1,471 $1,567 $1,632 $1,415 $1,485 Benchmark 2- $2,001 1. The new benchmark excludes depreciation as part of annual costs. As a result, annual costs from previous years were reduced by the amount budgeted for depreciation in those years. 2. Source: AWWA publication titled, "Benchmarking Performance Indicators for Water & Wastewater Utilities: Data and Analyses Report," dated 02/2005. Data population category, 50,001 - 100,000. ANALYSIS This is the first year that staff has used data from a wastewater agency survey conducted by the American Water Works Association. For fiscal year 2005, Carlsbad's cost of service of $1,485 per million gallons (mg) is below the AWWA survey benchmark of $2,001/mg. The AWWA survey benchmark is the median score of all results. Carlsbad's cost of service measure ranks slightly above the 25th percentile of all those surveyed. This seems to indicate that Carlsbad's sanitation system is operating efficiently within existing resources. The comparatively low cost may also be indicative of a system that is relatively new and has not yet experienced significant failures or greater than anticipated reactive maintenance work which can increase as a system ages. A Public Works Service Plan proposal was implemented in fiscal year 2006 that included installation of a bypass at larger pump stations. With the bypass, staff can conduct wet well cleaning during the day. Without a bypass the cleaning is conducted at night during which time there are low flows. The ability to do cleaning during the day enhances work safety and reduces operational costs by reducing overtime pay to employees for after-hours work. Because the city is in a growth mode, there will continue to be fluctuations on the amount of flow to Encina. Also, in abnormally wet years infiltration due to excessive rainfall may artificially inflate the amount of flow registered to the City of Carlsbad. This could skew the results of the per-mg cost being measured. Agency Chula Vista San Diego County City 7 Leucadia WW District Carlsbad FY 2005 Expenses $7,961,050 $4,705,568 $2,324,249 $3,992,462 Total Annual Plow (MG) 6,398 3,762 1,667 2,688 Cost Per MG $1,202 $1,250 $1,394 $1,485 /. City did not wish to be identified Costs for maintenance and repair of sewer laterals are included in the City of Carlsbad's expenditures. Because other agencies do not have responsibility for sewer laterals, these costs are not included in their budgets. ACTION PLAN • Staff will continue to use information from the Maintenance Assessment Program to evaluate operational practices within the Sanitation Operations and Construction/Maintenance divisions in an effort to ensure the most cost effective means by which services are rendered. • The cost of service per million gallons (mg) of sewage flow is one of three measures that the AWWA reports in its survey report. The other two measures are cost of service per account and direct cost of treatment per million gallons. Only one of the three-benchmark standards is being used in this year's report. The other two measures may be used in subsequent reports if staff can determine that this data is meaningful to Carlsbad. • Staff will continue to conduct research to determine if national benchmark standards are available for use in this measure. POINT OF CONTACT Clint Phillips (760) 438-2722, x7110, cphil@ci.carlsbad.ca.us. Public Works SEWER SERVICE CUSTOMER SATISFACTION THE OUTCOME A high level of customer satisfaction THE MEASUREMENT City of Carlsbad Public Opinion Survey. WHAT THE DATA MEANS Highly satisfied customers are an indication that we are providing services in a manner that is desired and/or expected, contributing greater confidence in the Construction Maintenance and Sanitation Operations divisions, and local government in general, resulting in high quality of life for community members. DEPARTMENTS INVOLVED Maintenance and Operations/Sanitation Operations, Construction Maintenance and Utility Account Maintenance; Finance/Utility Billing. BENCHMARK 90% of customers rate sewer services as "good or excellent." RESULTS Benchmark 90% 2001 92% 2002 91% 2003 93% 2004 No data 20O5 92% ANALYSIS The customer service rating for this measure has consistently met or exceeded the benchmark for a number of years, and there is no anticipated change in the service levels. As a result, it was determined that this question would be asked only in alternating years. 2004 was an "off year," but in 2005 the City's customer service rating in sewer service once again exceeded the benchmark. Sewer service citywide is provided by three separate agencies; the City of Carlsbad, the Leucadia Wastewater District and the Vallecitos Water District. The service areas that incorporate City of Carlsbad customers are described as follows: • City of Carlsbad Service Area fCMWD): The City of Carlsbad sewer service area covers approximately 65% of the city and generally covers the area north of La Costa Avenue to El Camino Real, east of El Camino Real, and north of Alga Road extending all the way to the northern City border. • Leucadia Wastewater District fLWWD): The LWD service area is contained within the Southeast Quadrant of the City and includes the area south of Alga Road to the southern City border, bordered by El Camino Real to the west, and to the eastern border of the City. • Vallecitos Water District Service Area (VWD): The VWD service area is contained within the central/eastern portion of the Southeast Quadrant of the City. In this years report, staff successfully worked with SBRI to develop a service area comparative analysis of customer satisfaction by comparing SBRI's list of respondents from the Southeast Quadrant to lists of Carlsbad customers being served by LWWD and VWD. Staff is now able to differentiate sewer service customer satisfaction results between the City of Carlsbad's service area and those who receive services from other service providers. The survey results revealed that customer service and satisfaction within Carlsbad's service area is still above the benchmark and consistent with citywide results incorporating the other two service providers. ACTION PLAN Continue to include sewer services questions in the citywide public opinion survey in alternating years. In addition, the Social and Behavioral Research Institute (SBRI) at Cal State San Marcos, which conducts the survey for the City, has the ability to determine which quadrant of the City a citizen resides. POINT OF CONTACT Clint Phillips (760) 438-2722 x 7110, cphiKo)ci.carlsbad.ca.us. Public Works GROWTH MANAGEMENT/SEWER COLLECTION SYSTEM THE OUTCOME Adequate sewer capacity for City residents and businesses. THE MEASUREMENT Trunk line capacity will have sufficient conveyance capacity to handle tributary wastewater flows under peak flow conditions. WHAT THE DATA MEANS The sewer trunk capacity is greater than the flow from each respective sewer basin. The 2003 City of Carlsbad Sewer Master Plan Update is used to identify the facilities necessary for development occurring within the City's Sewer Service Area. These new facilities are funded with development fees and sewer connection fees. New developments in the City are conditioned to either start their construction after required facilities are operational, or construct the facilities concurrent with their projects. The Leucadia County Wastewater District (LWD) serves the La Costa area in the southeast part of the City. The City coordinates development with LWD and conditions projects to ensure facilities are in place prior to the completion of the development. DEPARTMENT INVOLVED Engineering, Maintenance 86 Operations. GROWTH MANAGEMENT STANDARD Trunk-line capacity to meet demand, as determined by the appropriate sewer districts, must be provided concurrent with development. RESULTS Currently in compliance with the Growth Management Standard ANALYSIS The 2003 City of Carlsbad Sewer Master Plan Update evaluated the sewer infrastructure needs of the Carlsbad Sewer District and identified those facilities required to accommodate future customers. Sewer trunk main capacities are estimated by comparing wastewater flow projections to the capacity of the sewer system. Using a sewer model, the existing and future sewer demands are estimated and compared to the capacity. In addition, annual flow measurement information is also used to determine actual flows in the sewer trunk mains. The City of Carlsbad is served by four major interceptor systems and are described in more detail as follows: Vista/Carlsbad Interceptor: The Vista/Carlsbad (V/C) Interceptor is jointly owned by the City of Vista and the City of Carlsbad. The V/C Interceptor is approximately eight miles long and extends from College Blvd at Highway 78 to the Encina Water Pollution Control Facility (WPCF). The agreement for Ownership, Operation and Maintenance was revised in February 2002. Carlsbad's ownership rights are based on the full flow pipeline capacity and increases in the direction of flow, reaching approximately 50% ownership in the downstream reaches. Projected flows for Carlsbad are now lower, and the percentage of flow for Carlsbad in this reach is estimated at 37.2%. The 2003 Sewer Master Plan recommends a new agreement be negotiated based on the updated flow projections. A capacity analysis included in the 2003 Sewer Master Plan Update indicates three relatively flat pipeline portions of Reaches VC13, VC14 & VC15. As a result, during peak period flows, the pipeline is flowing full. The FY 2005/06 Capital Improvement Program has programmed funds for construction of upgrades to these reaches projected to begin in FY 2006/07. The replacement pipelines are sized based on ultimate flows from both the Carlsbad and Vista Sewer Districts. Buena Interceptor: The Buena Interceptor begins at the corner of El Camino Real and Palomar Airport Road and flows through the industrial park parallel with Palomar Airport Road to the Encina WPCF. The City of Carlsbad leases capacity in the Buena Interceptor from the City of Vista. Carlsbad's ownership rights increase in the direction of flow beginning with 17.65 percent as the interceptor enters the city and approaches 35 percent ownership in the downstream reaches. The 2003 Sewer Master Plan Update provided an analysis of available capacity of this interceptor and concluded Carlsbad will not require additional capacity to convey projected ultimate flows. It is noted the existing Buena Interceptor does not have the capacity to convey build out flows based on ultimate flow projections for the Carlsbad Sewer District, Buena Sanitation District and the City of Vista Raceway Basin. The City of Vista included a project in their 2001 Master Plan to construct a new force main from the Buena and Raceway Lift Station to the Vallecitos Interceptor. The Carlsbad Sewer District is currently working cooperatively with the Buena Sanitation and Vista Sanitation Districts to develop a project, which will ensure adequate sewer capacity to accommodate ultimate flows. Vallecitos Interceptor: The Vallecitos Interceptor begins near the intersection of Camino Vida Roble and El Camino Real and follows Palomar Airport Road to the Encina WPCF. The City of Carlsbad currently leases 5.0 MGD of capacity in the Vallecitos Interceptor. City of Carlsbad ultimate peak flows in this interceptor are projected to be less than 3.5 MGD. The existing interceptor does not have the capacity to convey build out flows for the Vallecitos Water District (VWD) and future flows from the Buena Sanitation District (BSD) and the City of Vista Raceway Basin. The VWD plans to replace the existing Vallecitos Interceptor with a larger capacity pipeline. Based on the projected ultimate flows, Carlsbad could reduce their leased capacity to approximately 4.0 MGD. Occidental Sewer: The City of Carlsbad, the Encinitas Sanitation District (ESD), and the LWD jointly own the Occidental Sewer Interceptor. This interceptor system enters the city at the intersection of Carlsbad Blvd and La Costa Ave, and runs parallel the SDNR railroad tracks to the Encina WPCF. Carlsbad's current ownership capacity, which is estimated to be approximately 8.5 MGD, is projected to be approximately 4.0 MGD in excess of what is required to convey the ultimate peak wet weather flows. The LWD projects they will need to acquire an additional 1.6 MGD of conveyance capacity in the Occidental Sewer to accommodate projected future flows. It is recommended the ownership capacities defined in the 1972 Occidental Pipeline Agreement be updated based on current flow projections. The City of Carlsbad also utilizes three localized sewer interceptor systems as follows: North Agua Hedionda Interceptor: The North Agua Hedionda (NAH) Interceptor transverses along the north shore of the lagoon between El Camino Real and the V/C Interceptor in the SDNR railroad right-of-way. The NAH Interceptor is entirely owned by the City of Carlsbad and conveys only City of Carlsbad wastewater. With the recent construction of the South Agua Hedionda Interceptor Lift Station, flows, which were temporarily directed to the NAH Interceptor, have been removed. Continued flow monitoring of this interceptor system must be performed to determine if and when appropriate capacity upgrades must be constructed. South Agua Hedionda Interceptor: The South Agua Hedionda (SAH) Interceptor will serve areas south and east of the Agua Hedionda Lagoon, and will connect with the V/C Interceptor at the SDNR railroad right-of-way. The South Agua Hedionda Interceptor Lift Station is currently operational and all flows originating east of the lift station are now flowing into the new lift station. The remainder of the interceptor east of El Camino Real will be constructed concurrent with development in the area. North Batiquitos Interceptor: The North Batiquitos (NB) Interceptor collects only City of Carlsbad flows in the upper reaches. The last 2,415 feet into the Encina WPCF (the Occidental Sewer) is jointly owned by the City of Carlsbad, the LWD, and the ESD. The NB Interceptor begins on the north shore of the Batiquitos Lagoon near El Camino Real and flows westerly along the north shore of the lagoon to the SDNR railroad right-of-way. The 2003 Sewer Master Plan Update determined this interceptor system is adequate to accommodate future flows within the tributary basin. The sewer connection fee has been updated based on updated construction cost with a lower number of equivalent dwelling units projected at build out compared to the previous master plan. The FY 2005/06 Capital Improvement Program included a description of the future sewer line projects and allocated funds for their construction. ACTION PLAN • Vista/Carlsbad Interceptor - Reaches 11B - 15 (between the Agua Hedionda Lagoon and the Encina Wastewater Treatment Facility) are scheduled in the CIP to be replaced in FY 2006/07. • North Agua Hedionda Interceptor - Scheduled for continued field monitoring to track existing flows. • South Agua Hedionda Interceptor - Condition future land development projects east of El Camino Real to construct the remaining reaches of the South Agua Hedionda Interceptor system concurrent with development. • Buena Interceptor - Continue routine field monitoring to track existing flows and remaining available sewer capacity. Coordinate with the City of Vista to develop a strategy to design and fund a parallel relief sewer. • Other reaches of concern will continue to be monitored. POINT OF CONTACT Steven Jantz, (760) 602-2738, sjant®ci.carlsbad.ca.us Public Works SOLID WASTE DIVERSION t ii THE OUTCOME Environmentally sound solid waste services. THE MEASUREMENT Diversion of solid waste from disposal in compliance with state law (AB 939), as reported annually to the California Integrated Waste Management Board (CIWMB). WHAT THE DATA MEANS Measures the level at which the City of Carlsbad environmentally sound solid waste services for its citizens. is maintaining The diversion rate is a measurement tool for the California Integrated Waste Management Board (CIWMB) to assess compliance with AB 939. AB 939 requires local agencies to reduce the amount of solid waste disposed in landfills by 50 percent from an approved base year amount. To achieve the AB 939 diversion requirements, jurisdictions are required to promote recycling and maximize the use of feasible source reduction and recycling options. Jurisdictions that fail to meet the diversion rate requirements may be subject to both monetary and non-monetary penalties. Diversion rate information is reported on the calendar year prior, so the City is finalizing its 2004 diversion rate figure now. DEPARTMENTS INVOLVED Public Works Administration & Environmental Programs BENCHMARK Achieve an annual diversion rate of 50% or greater to be in compliance with AB 939. *t RESULTS Benchmark >50% 2000 59% 2001 55% 2002 55% 2003 48%* 2004 57%** 'Because CIWMB approves diversion rates in two-year increments, the 2003 Figure has not been approved yet. ** The 2004 diversion rate is calculated using the TSDI data as explained in the Analysis section. r f f f*- f ANALYSIS In 2004, the City's diversion rate was 57%, well above the State-mandated minimum level. Due to the changes in diversion rate calculation methodology, it is difficult to compare the past several years' solid waste diversion rate to prior years. Over the last three years the rate has fluctuated from 55% to 48% and back to 57%. This fluctuation can be explained by examining CIWMB policies for calculating the rate and their attempts to be flexible and responsive to cities' concerns and needs. Specific changes were made in each of the past two years, which resulted in the rather large disparity. In calculating the results for 2004, the CIWMB allowed cities to choose between two types of economic data. This change led to the significant increase in the 2004 data - but is more in line with historical results. Comparisons may become even more complicated in 2006 should the Board adopt proposed changes to AB 939 reporting. Proposals exist that would take the onus of diversion from individual municipalities and place that burden on all jurisdictions in a county as a whole. ACTION PLAN Staff will continue to ensure residents enjoy the best service possible while also seeing that Carlsbad meets its state-mandated diversion requirements. To this end, staff is working to implement three new programs that Council approved for implementation in the FY05-06 fiscal year: residential composting, a Household Hazardous Waste (HHW) collection event, and door-to-door HHW collection. Staff will also investigate other program enhancements, for example commercial recycling, that could assist with increased diversion. POINT OF CONTACT Dan Weinheimer, Associate Analyst, (760) 602-2776, dwein@ci.carlsbad.ca.us Public Works SOLID WASTE COST THE OUTCOME Solid waste services cost efficiency. THE MEASUREMENT Solid waste service rates adjusted to exclude franchise and other City fees. WHAT THE DATA MEANS Identifies the services offered and measures the cost of providing solid waste services. DEPARTMENTS INVOLVED Public Works Administration & Environmental Programs BENCHMARK Carlsbad contracted solid waste service rates for residential and commercial customers will rank in the lowest one-third when compared to other cities in San Diego County. RESULTS Year Residential Ranking Commercial Ranking Benchmark Lowest One- Third Lowest One- Third 2001 Yes Yes 2002 Yes Yes 2003 Yes Yes 2004 Yes Yes 2005* Yes Yes I I "1 ••<*, RESIDENTIAL RATES* City Chula Vista Carlsbad Escondido Del Mar San Marcos El Cajon La Mesa Lemon Grove Coronado No. Co. City Encinitas Solana Beach Vista Oceanside Adjusted Rate What is Paid to the Hauler $13.78 $14.07 $14.09 $15.02 $15.07 $15.40 $15.51 $15.66 $15.94 $15.99 $16.07 $16.24 $17.09 $18.53 *Residential rates used in the analysis are for the standard once per week collection service. COMMERICAL RATES4 City Carlsbad Escondido Chula Vista Coronado El Cajon Encinitas Solana Beach Lemon Grove Del Mar No. Co. City San Marcos Oceanside Vista La Mesa Adjusted Rate What is Paid to the Hauler $72.69 $73.76 $ 74.46 $75.22 $75.85 $78.18 $78.82 $78.83 $79.32 $79.92 $82.38 $82.52 $83.56 $85.20 *Standard 3-yard once per week pick-up service used for comparison. NOTES: Imperial Beach, National City and Santee are not included due to differences in their fee structure. San Diego is not included because service is not provided by contract. ANALYSIS As shown in the tables above, the City's residential and commercial adjusted rates remain among the lowest when compared to the other jurisdictions. For the first time staff is comparing the City of Chula Vista in the rate comparison. Chula Vista is significant because that city benchmarks services against others in the County and their waste hauler agreement mandates that their service be the least expensive in the County. With that said, Carlsbad ranks number 2 on the survey of San Diego County cities for residential rates and number 1 for commercial rates. For the last five years, the City's solid waste services continue to achieve the cost efficiency benchmark of ranking in the lowest one-third when compared to other San Diego cities. A significant factor in the City's achievement of the solid waste services cost efficiency benchmark had been the stability of its adjusted rates. This year marks the first time in seven years that Carlsbad has increased the cost of solid waste service. The unadjusted rate for residential service rose from $16.47 to $17.50 per month; a $1.03 increase which factors to 6.1%. The cost for commercial service also increased - up 7.2% from $86.23 to $92.44. Despite these increases, Carlsbad continued to achieve the cost efficiency benchmark. In searching for a common denominator to compare cost efficiency, the City selected the adjusted rate because it provides a universal point for cost comparison by removing the individual fees (franchise, storm water, household hazardous waste) imposed by the evaluated jurisdictions. The adjusted rate is what jurisdictions pay to the hauler. The unadjusted rate includes the fees discussed above and is the rate that residents and businesses pay for service. Each city varies in regards to the solid waste services provided. Many cities in San Diego County offer automated trash and recycling collection as opposed to manual collection. Some cities offer free bulky item collection (bulky items include appliances or furniture that are often too heavy to be collected during weekly service), while other cities offer specific free collection dates for bulky items and otherwise charg' ~r item collected outside those dates. Carlsbad provides manual trash and recycling collection, access to permanent household hazardous waste facilities, electronic waste collection sites, and various special item collection services. Carlsbad is one of only three cities (others are Oceanside and Coronado) in San Diego County that still have manual residential trash and recycling. Oceanside is the only other city not using single stream recycling - where all recyclable material is commingled in a bin by the resident. ACTION PLAN While being in the lowest one-third for residential and commercial rates is attractive, it does not necessarily translate into providing top quality service. Staff will continue to ensure residents enjoy the best service possible while also seeing that Carlsbad meets its state-mandated recycling requirements. To this end, staff is working to implement three new programs that Council approved last year: residential composting, a Household Hazardous Waste (HHW) collection event, and door-to-door HHW collection. Staff will also investigate other program enhancements that could be added to the solid waste program that would increase diversion. POINT OF CONTACT Dan Weinheimer, Associate Analyst, (760) 602-2776, dwein@ci.carlsbad.ca.us Public Works SOLID WASTE CUSTOMER SERVICE & SATISFACTION THE OUTCOME A high level of customer satisfaction. THE MEASUREMENT Results of annual citywide public opinion survey. WHAT THE DATA MEANS Best indication as to whether solid waste customers' needs and expectations are being met. DEPARTMENTS INVOLVED Public Works Administration BENCHMARK 90% of customers rate Solid Waste Services as "Good" (3 on a 1-4 scale) or higher in all customer service survey categories. RESULTS YEAR Benchmark 2003 2004 2005 Trash Collection >90.0% 88.6% 87.3% 87.0% Recycling Collection >90.0% 82.7% 81.5% 83.0% Household Hazardous Waste Collection >90.0% 69.5% 68.2% 66.3% ANALYSIS Although customer satisfaction remains under the benchmark for this goal, the results are consistent with previous years - with a slight increase in the satisfaction rate for the recycling program. The number of surveyed customers who rated Carlsbad's trash collection at good to excellent in 2005 was 87% and the recycling program was rated at 83%. The results of the last several years have been quite stable - differences n the percentages displayed are not statistically significant. Trash collection received the highest ranking for a contracted service. The survey results also show that 65.5% of Carlsbad residents rate hazardous waste disposal as good to excellent. Although this represents a majority of residents, these numbers also reflect a need for staff to look for improvement in household hazardous waste (HHW) collection services. Incorporating the door- to-door HHW collection program and the special HHW collection event authorized by Council in the FY 05-06 budget is expected to improve the marks received on HHW collection. Complaints about the program generally focus on a comparison of services offered by other San Diego County cities - for example automated trash collection and single-stream recycling. When contacted by a resident, staff documents the complaint or service problem using the Request for Action (RFA) system and works promptly to resolve the matter. ACTION PLAN Staff will continue to ensure residents enjoy the best service possible while also seeing that Carlsbad meets its state-mandated recycling requirements. To this end, staff is working to implement three new programs that Council approved last year: residential composting, a Household Hazardous Waste (HHW) collection event, and door-to-door HHW collection. Staff will also investigate other program enhancements that could be added to the solid waste program that would increase diversion. Staff is working with our Contractor to enhance existing services; an additional bulky item collection day will be added in 2007 - bringing the total to five collection event days; in 2006 residents will be able to dispose of two bulky items per event; and beginning Spring 2006 Carlsbad will have curbside mixed paper recycling. POINT OF CONTACT Dan Weinheimer, Associate Analyst, (760) 602-2776, dwein@ci.carlsbad.ca.us Public Works STORM WATER SERVICE DELIVERY THE OUTCOME Water quality that maintains the beneficial uses of Carlsbad's creeks and * lagoons. THE MEASUREMENT A multi-modal approach combining: * • Water Quality (Bacteria, dissolved oxygen concentration, turbidity) •; • Drainage Service Delivery Water Quality: The City monitors storm water discharges and water quality of ^ various creeks, lagoons and the ocean (receiving waters) in Carlsbad as part of *^ the Coastal Lagoon and Outfall Monitoring program and the annual Dry * Weather Program. In addition, the City participates in regional monitoring programs that collect data on local creeks and lagoons. The receiving water results are compared to Water Quality Objectives listed in the State's Basin Plan, which are set by the State to be protective of beneficial uses. Fecal coliform bacteria, dissolved oxygen and transparency or turbidity results will ^ be routinely monitored in Agua Hedionda Lagoon and Creek to help determine if beneficial uses are being met. Results may also show if water quality is * improving or declining over time. Drainage Service Delivery: In addition to these sampling events, the Drainage Service Delivery index will provide a statistical comparison of completed maintenance activities versus scheduled maintenance. This will encompass the following three maintenance activities: • Drainage inlets inspected annually • High priority inlets cleaned annually • All other identified basins cleaned annually WHAT THE DATA MEANS Water Quality: Beneficial uses are the uses of water necessary for the survival or well being of humans, plants, and wildlife. Examples include recreation, industrial and agricultural water supply and the support of aquatic habitats. Beneficial uses for all surface and ground waters in the San Diego Region are designated by the State in the Basin Plan (Water Quality Control Plan for the San Diego Basin, 1994). Water quality objectives are defined as "the limits or levels of water quality constituents or characteristics which are established for the reasonable protection of beneficial uses of water or the prevention of nuisance within a specific area." If water quality objectives or other conditions are not met, the State may designate a waterbody as being "impaired," indicating that beneficial uses may not be adequately protected, thus requiring additional costly monitoring and pollution control programs. Agua Hedionda Lagoon is a highly used waterbody that the State has identified as being impaired by sedimentation and bacteria. This lagoon has many designated beneficial uses including recreational, commercial, industrial and habitat for aquatic organisms. This measure is currently focused on Agua Hedionda Lagoon and Agua Hedionda Creek as a pilot program, and may be expanded in the future to other lagoons and creeks in Carlsbad. This measure determines if the numerical water quality objectives for fecal coliform bacteria, dissolved oxygen and transparency/turbidity are being met in the Lagoon and Creek. Fecal coliform bacteria concentrations are measured as human-health related indicators of sewage pollution. Fecal coliform levels must be met in order to protect recreational beneficial uses. Dissolved oxygen in the water column is critical for respiration of most aquatic organisms. It is one of the most universal indicators of overall water quality. High dissolved oxygen concentrations represent good conditions, while low concentrations can indicate organic pollution. A transparency tube or turbidity measurement can be used to estimate the clarity of surface waters. High transparency is generally indicative of clean water. Low transparency is typically associated with degraded waters, indicating light limiting conditions which in turn, negatively affect plant growth and the aquatic habitat. The turbidity standard applies to the creek and the transparency standard applies to the lagoon. Meeting water quality objectives for dissolved oxygen and transparency/turbidity helps demonstrate protection of aquatic life and habitat, as well as beneficial uses for humans. Drainage Service Delivery: The Drainage Service Delivery index will measure the effectiveness of a portion of the drainage system maintenance program. This program is being revised for FY 2005-06 in order to optimize maintenance activities and to make full use of new vacuum equipment obtained at the beginning of the year. The new program establishes and documents the frequency of recommended preventive maintenance and then measures the level of accomplishment each year by comparing percent of completed work to scheduled maintenance. Data are tracked in the Hansen work order system. DEPARTMENTS INVOLVED PW Administration and Environmental Programs General Services/ Storm Drain Maintenance BENCHMARK Water Quality: Each sampling measure to achieve a "good" rating 100% of the time. The following table details the sampling benchmarks. Please note that turbidity, or cloudiness, is measured in Nephelometric Turbidity Units (NTU). MEASURE Dissolved Oxygen Fecal Coliform Transparency Turbidity (Creek) GOOD > 5.0 ppm < 400/100 ml > 50% of depth < 20 NTU FAIR < 5.0 less than half the time > 400/100 ml less than half the time < 50% of depth less than half the time > 20 NTU less than half the time POOR < 5.0 more than half the time > 400/100 ml more than half the time < 50% of depth more than half the time > 20 NTU more than half the time Drainage Service Delivery: activities. 90% completion of all scheduled maintenance RESULTS Water Quality: Results from the 12 monthly sampling events during the sampling year are shown below. Site A3 A6 A17 Creek Dissolved Oxygen Good Fair Fair Good Fecal Coliform Fair Fair Fair Fair Turbidity Good Good Fair Fair Creek Drainage Service Delivery: Last year's measure and results are as follows: Fiscal Year 2005 Benchmark 90% % Of High Priority Inlets Cleaned 34% % Of Inlets Inspected 15% % Of AllOther Basins Cleaned 75% ANALYSIS Water Quality: The water quality results shown above represent monthly sampling from October 2004 through September 2005. Samples from the lagoon sites rated good or fair for all three measures. The creek site also rated fair for fecal coliform, but it exceeded the benchmark 6 out of 12 monthly samples. The Storm Water Protection Program has continued to address potential urban sources of fecal bacteria (pet waste, sewage leaks, septic systems, horse stables, etc.) through inspections, enforcement and education, but no single source has yet been identified. An issue to consider in source identification and assessment is that the Fecal Coliform group also contains bacteria with species that are not necessarily fecal in origin. To help determine if the source is human or warm-blooded animals, it may be best to begin testing for additional bacterial indicators. These can include Fecal streptococci and/or E. Coli, which may be more specific to fecal material from humans and other warm-blooded animals. Other states have changed to some of these indicators, but California still uses Total Coliform, Fecal Coliform and Enterococcus in most water bodies. At the end of FY 2004-05, the City purchased a continuous water quality- monitoring device to be installed at the creek site. This probe is capable of continuously measuring dissolved oxygen, turbidity, pH, nitrate, ammonium, temperature, chlorophyll and specific conductance and will be tied into continuous flow monitoring equipment. This will be useful for further assessing water quality of the creek and inputs to the lagoon. Drainage Service Delivery: Previously, storm drain maintenance personnel did not have dedicated storm drain cleaning equipment, which limited the amount of maintenance that could occur. At the beginning of FY 05-06, a new dedicated vacuum truck was put into full-time use for storm drain maintenance. The program is now being modified to optimize inspection and cleaning of over 4500 catch basins and inlets. This includes the use of criteria to determine high priority basins/inlets that will be cleaned every 6 months. ACTION PLAN Water Quality: • Evaluate results from the continuous water quality-monitoring probe installed at the creek site. • Conduct a pilot sampling project to analyze creek samples for other bacterial indicators (fecal streptococci, E. coli, or enterococci) that may be more specific to human or warm-blooded animal fecal sources. Drainage Service Delivery: • Continue to refine the maintenance program to optimize pollutant removal. • Revise the measure for FY 05-06 as follows: • Percentage of high priority catch basins/inlets cleaned • Percentage of non-high priority catch basins/inlets inspected • Percentage of poor rated non-high priority catch basins/inlets cleaned. POINT OF CONTACT Elaine Lukey, Senior Environmental Specialist (760) 602-7582, eluke@ci.carlsbad.ca.us Public Works STORM WATER PROTECTION COST THE OUTCOME Storm Water Protection Program cost efficiency. THE MEASUREMENT A multi-method approach combining: • Cost per business inspected • Cost per outfall monitored • Outreach and education cost per capita • Maintenance cost per catch basin cleaned Staff time spent on inspection, monitoring and outreach activities is tracked in a time sheet database. The total numbers of facilities inspected and outfalls monitored are maintained in separate spreadsheets. Cost per business inspected is the time spent on this activity multiplied by the employee hourly rate (includes benefits) divided by the number of businesses inspected. Monitoring costs is the time spent on this activity multiplied by the employee hourly rate plus the laboratory costs for analyses divided by the total number of visits to outfalls for monitoring. Outreach and education cost is employee time spent on this activity multiplied by the employee hourly rate plus printing costs and promotional materials divided by population. Storm water conveyance system maintenance activities and costs are electronically tracked in the Hansen work order program. Cost per catch basin cleaned is calculated by dividing the total cost for these activities by the number of catch basins cleaned. WHAT THE DATA MEAN The City of Carlsbad is one of 20 jurisdictions in San Diego County covered under the State issued NPDES (National Pollutant Discharge Elimination System) permit. The NPDES permit required each jurisdiction to implement an Urban Runoff Management Plan, which details how permit requirements will be implemented and annually assessed. As this is still a new and evolving program, implementation methods vary from one jurisdiction to the next. Coastal jurisdictions have more monitoring requirements than inland jurisdictions. In addition, jurisdictions vary greatly in total land area, population and number of businesses, which prevents meaningful comparisons of overall program costs. This measure breaks out some of the main required program activities in order to provide unit costs for a more meaningful comparison with other jurisdictions or contractors. Results may be used to determine how specific program activities may be streamlined to improve cost efficiency, with consideration still being given to quality and customer service. Storm Water Protection Program staff annually inspect hundreds of commercial and industrial facilities in Carlsbad that fall under the storm water regulations. Staff develops and distributes educational information and participates in outreach events. Storm Water Protection Program staff also monitor- designated outfalls to the lagoons and ocean bi-weekly or monthly as required. General Services/Storm Drain Maintenance conducts maintenance activities on the storm water conveyance system, except for street sweeping which is a contracted service. •5 '1 DEPARTMENTS INVOLVED Public Works Administration and Environmental Programs Public Works General Services/Storm Drain Maintenance BENCHMARK Benchmarks will be determined after additional data are collected. RESULTS Fiscal Year 2003-04 2004-05 Benchmark TBD Cost per business inspected $96.37 $42.15 *Cost per outfall monitored $75.74 $52.53 Outreach cost per capita $0.24 $0.20 Cost per catch basin $42.10 $60.76 * This measure was modified so that the per outfall costs are based on every visit to the outfall. For 04-05, there were 341 outfalls visited. ANALYSIS Benchmark partner relationships were established with the Cities of Encinitas and Oceanside. Agency Encinitas Oceanside Cost per business inspected $212.50 $187.60 Cost per outfall monitored $68.80 $38.69 Outreach cost per capita $0.315 $0.390 Cost per catch basin $106.00 $ 67.80 The cost per business inspected for Carlsbad includes all office and field time and represents inspections of 250 commercial facilities and 289 industrial sites. Carlsbad costs per inspection decreased significantly over the previous year, possibly due to streamlined field inspection reports that were used and having some commercial inspections conducted by student interns. Under the Coastal outfall monitoring program, the City made 341 monitoring visits to outfalls and collected 171 samples. Carlsbad uses two people for sampling in order to help coordinate the sampling and data collection, as well as for the safety factor due to the remote locations of many of the sampling sites. This includes one student intern when schedules allow. Costs were also less than the previous year, as Carlsbad was able to decrease visits to sites that are routinely dry (432 visits in 2003-04 vs. 341 in 2004-05). The education and outreach costs vary between all jurisdictions. Carlsbad's costs continue to be lower than both previous years costs for the city, and other jurisdictions' costs. Carlsbad has done significant Environmental Programs outreach in the newspaper and other publications, and these have often been paid for through Used Oil Block Grant Funds. These funds are not included in the per capita costs. The maintenance cost covers the cost per catch basin cleaned. During FY 2004-05, 377 catch basins were cleaned at a cost of $60.76 per basin. Oceanside uses a contractor to perform annual inspection and cleaning of catch basins at a cost of $67.80 per catch basin. ACTION PLAN • Collect data, evaluate maintenance cost comparisons, and develop benchmarks for all activities. • Work with other committees to help standardize the Fiscal Analysis section of the Jurisdictional Urban Runoff Management Program annual report. POINT OF CONTACT Elaine Lukey, Senior Environmental Specialist (760) 602-7582, eluke@ci. carlsbad. ca. us Public Works STOI?M WATER PROTECTION CUSTOMER SERVICE AND SATISFACTION THE OUTCOME A high level of customer service and satisfaction. THE MEASUREMENT A multi-method approach combining: • Complaint response statistics • Survey results The SuiteResponse Request for Action (RFA) system is used by the Storm Water Protection Program to document reports of illegal washing or dumping incidents into the City's storm drain system. When a caller reports a potential discharge or dumping violation that is in progress, the person taking the report creates an issue in the RFA system with a high priority code. Storm Water Protection Program personnel are notified and respond to the site. This measure focuses on the response time, which is the time from the creation of the RFA issue to the time of the first action step, which is staff dispatch to the site. This time will be tracked in the RFA system. The survey measure is the results to the question in the citywide public opinion survey that asks, "Have you seen or heard anything during the past year about how residents can prevent the pollution of our creeks, lagoons or ocean?" If yes, the citizen is asked where they heard or saw this information. WHAT THE DATA MEANS The complaints portion of the measure indicates how well customer expectations are being met. The Storm Water Protection Program has a Hotline number (602-2799) and investigates all types of reports of illegal discharges to the City's storm drain system, which discharges directly to our creeks, lagoons and ocean. A person calling to report an illegal discharge that is happening now expects an immediate response. In addition to meeting customer needs, an immediate response also minimizes the potential for the harmful discharge to enter our waterways. Being able to catch someone in the act also provides a better opportunity for education or enforcement to prevent repeat occurrences. The survey question can be used to determine if the storm water protection program message is reaching the public. Current outreach materials include the hotline number that the public can call for more information or to report illegal discharges. Results from the survey question can be used to more effectively direct education and outreach methods and efforts in order to provide customer service through requests for action or information. DEPARTMENTS INVOLVED Public Works Administration and Environmental Programs BENCHMARK • Complaint Response: 90% of reports of washing or dumping incidents happening at the time of the report are dispatched within 30 minutes. • Survey Results: 75% of the public report having heard or seen messages regarding ways to prevent water pollution. RESULTS Following are results from Fiscal Year 04-05 and from the Public Opinion Survey. Complaint response: % of high priority incidents dispatched within 30 minutes: Year 2004 2005 Benchmark 90 90 % 90.5 91 Survey results: % of survey respondents reporting that they had heard or seen messages regarding ways to prevent water pollution: Year 2003 2004 2005* Benchmark 75 75 75 % 58 61 42 *The question was modified (see below). ANALYSIS Complaint Response During FY 04-05, there were 12 reports of washing or dumping to the storm drain system that met the high priority criteria, down from 42 during the previous year. Inspectors were dispatched to all but 1 of these incidents within 30-minutes, thus achieving the benchmark of 90%. This is a big drop in the number of in-progress calls from the previous year, which may signal that the public is becoming more aware of these types of illegal discharges and the City's response to these calls, resulting in fewer incidents. Survey Results For the 2005 survey, the question was changed to "Have you seen or heard anything during the past year about the City's Environmental Programs?" The results were significantly lower than previous years, possibly since this C r e e e question is specific to Carlsbad information whereas the previous question was not specific to only Carlsbad information. In addition, people may not yet be making the link between the storm water program, water conservation, and solid waste program with Environmental Programs. ACTION PLAN • Continue to develop and implement regular education and outreach programs, emphasizing the City's Environmental Programs as well as the linkage between storm water, water conservation and solid waste as Environmental Programs. • Continue to implement and assess the RFA and complaint response procedures. POINT OF CONTACT Elaine Lukey, Senior Environmental Specialist (760) 602-7582, eluke@ci. carlsbad. ca. us Public Works GROWTH MANAGEMENT DRAINAGE THE OUTCOME Adequate drainage facilities for protection against flooding and flood damage. THE MEASUREMENT Drainage facilities are adequate for runoff as determined by the Master Drainage and Storm Water Quality Management Plan. WHAT THE DATA MEANS The Master Drainage and Storm Water Quality Management Plan is used to identify the facilities necessary for development in the City. These facilities include both new drainage improvements and upgrades to existing storm drain facilities. The facilities are funded with developer fees and Planned Local Drainage Area (PLDA) fees. New development areas are typically conditioned to construct the facilities concurrently with the projects. DEPARTMENTS INVOLVED Engineering, Maintenance & Operations GROWTH MANAGEMENT STANDARD Drainage Facilities must be provided as required by the City concurrent with development. During the review of both public and private development projects, the Engineering Department Design Standards are used to determine the appropriate drainage facilities based on the following criteria: For areas one square mile in size and larger, all drainage facilities shall be sized for the 100-year storm. For areas less than one square mile in size the drainage facilities shall be sized to accommodate the following: YEAR FREQUENCY STORM 100 50 10 REQUIREMENT Runoff shall not damage adjacent existing or building and structure sites. Runoff shall not overflow outside of property private property or right-of-way in public streets potential lines on Minimum storm drain and inlet size to accommodate flow RESULTS All areas of the City meet current Growth Management Standards with the exception of the following: • The Rancho Carlsbad Mobile Home Park is located where the Calavera Creek flows into the Agua Hedionda Creek and has experienced flooding during heavy rains. In addition, new NPDES Permit requirements may require modifications to the City's existing drainage systems and additional drainage facilities. An assessment of these modifications and additions is on going and includes such items as dredging desiltation basins and the possible installation of new test stations. ANALYSIS The 1994 Master Drainage and Storm Water Quality Management Plan identifies facilities necessary for City build-out conditions. Fiscal analyses indicate current Planned Local Drainage Area (PLDA) fees are adequate for the facilities identified in the 1994 Master Plan. The Master Drainage Plan is currently being updated based on several changes in the City's growth patterns due to the Habitat Management Plan and the Habitat Conservation Plan that impact growth projections and densities in various areas of the City. These changes not only impact expected run-off, but also expected PLDA revenues. Drainage facilities required to meet NPDES standards require funding. A separate fee structure was developed for the maintenance of NPDES facilities and was approved by Council in 2004. Analysis of the Calavera Creek Channel was completed by the Engineering Department. Facilities to help control flooding are identified in the Drainage Master Plan and Storm Water Quality Management Plan as Detention Basins BJ and BJB. Recommendations for additional facilities to reduce potential flooding includes the following: • Construction of Basin BJB at the northeast corner of College Blvd and Cannon Road. (Complete) • Construction of Basin BJ with the extension of College Boulevard east of El Camino Real. (Under review) • Construct two additional detention basins in the Faraday Avenue and Melrose Drive extension project area. (Under construction) • Dredging and improvement of Agua Hedionda and Calavera Channels within and downstream of Rancho Carlsbad. (Under design) • Construction of a parallel 84" storm drainpipe for Calavera Creek in the Robertson Ranch area. (Under design and environmental review) ACTION PLAN An update to the Master Drainage and Storm Water Quality Management Plan, including a program Environmental Impact Report, is on-going and scheduled to be complete by the end of FY 05/06. The following action steps will lead to improvements in the flooding condition at the Rancho Carlsbad Mobile Home Park. • Complete construction of the basins near Melrose Drive and Faraday Avenue. • Complete the preliminary design and initiate environmental review for the Agua Hedionda and Calavera channel dredging, and implement project. • Construction of the Calavera Creek 84" storm drain pipe concurrent with the development of the Robertson Ranch area. POINT OF CONTACT Steven Jantz, (760) 602-2738, Sjantteci.carlsbad.ca.us. r t % t Public Works GROWTH MANAGEMENT/WASTEWATER TREATMENT FACILITIES THE OUTCOME Adequate sewer treatment plant capacity for projected build-out of the City. THE MEASUREMENT The City currently owns 9.24 MGD (million gallons per day) of sewer treatment capacity at the Encina Water Pollution Control Facility (EWPCF). Current flows are monitored by the EWPCF and reported to the city on a monthly basis. Staff evaluates the average annual flow rate and probable land use projections in an effort to anticipate future flows to ensure continued compliance with the Growth Management Standard. This analysis is also used during the development of the annual Capital Improvement Program to project the construction timing and funding allocations for needed sewer treatment plant upgrades. WHAT THE DATA MEANS The City is one of six member agencies that own and operate the EWPCF where the City's wastewater is collected and treated. The current treatment capacity at the EWPCF is 36 MGD with the city owning 25.7% of treatment plant capacity (9.24 MGD). DEPARTMENTS INVOLVED Engineering, Maintenance & Operations. GROWTH MANAGEMENT STANDARD Sewer treatment plant capacity is adequate for at least a five-year period. RESULTS The City's average sewage flow to EWPCF for the period from July 2004 through June 2005 was 7.36 MGD. This represents 79% of the City's 9.24 MGD capacity rights. ANALYSIS The 2003 City of Carlsbad Sewer Master Plan Update indicates the City's projected build-out flow is approximately 9.87 MGD. The master plan conducted an analysis of annual future sewer flow based on General Plan land use projections. The comparison of annual projected flows and existing sewer plant treatment rights indicates a need to secure additional treatment capacity by the year 2015 in order to accommodate anticipated sewer flows within the Carlsbad Sewer District. Therefore, based on the performance standard, adequate treatment capacity is available at the EWPCF through the year 2010. Encina Wastewater Authority is currently advertising for the construction of the Phase V expansion of the treatment facility, which will provide build-out treatment capacity for the Encina basin. The City has requested capacity rights to 10.26 MGD in the expansion project. The request for capacity at the EWPCF is based on sewer projections identified in the 2003 Sewer Master Plan Update. With the completion of the Encina Phase V expansion, the additional sewer treatment capacity will ensure compliance with the Growth Management Standard through build-out of the Carlsbad sewer service area. ACTION PLAN • Monitor existing flows. • Work with EWA to construct the Phase V expansion to meet build-out flow capacity requirements. POINT OF CONTACT Steven Jantz (760) 602-2738, sjantCajci.carlsbad.ca.us. f r -n 5'CO3O 9L ICDCO Pursue and implement proactive strategies that support sustainable economic health and manage fiscal resources effectively Financial Performance Indicators • Business Licensing • Financial Report Distribution • Long Term Fiscal Condition • Outgoing Payment Processing • Finance Call Center Response Rate Effectiveness • Risk Management - Claims Administration • Risk Management - General Liability Expenditures Management Goals • Cash Handling/Refunds Process Improvement • Tax Administration • Business Improvement District • Property Damage/Loss Claim Guidelines • Records Retention Goal • City Fiscal Policies • Implement new GASBs 44 & 45 • Fixed Asset Management • CIP Development Process • Franchise Fee Audit One area of concern is the trend in general liability expenditures. Although per capita liability expendi- tures went down this year ($16.17 to $12.30), it is still in excess of the national benchmark, and reflects the negative impact that a relatively few number of cases can have on Carlsbad's risk exposure. Trends and Observations The current forecast shows the City's General Fund Budget being balanced at least until 2012. However, this balance is dependant on a variety of factors, and could be adversely impacted if any of these are realized. Potential factors are • Unanticipated changes in the upcoming operational budgets, • Increasing capital costs which have the potential to strain the general fund, • National, state and local expenditure trends which effect our revenue, • Changes in the types and levels of service 'the City provides, Carlsbad's economic health is partially due to its diversified general fund revenue base. This diversity helps to soften the effect of economic downturns, and allows the fund to grow at a stable rate during good economic periods. The major revenue sources in the general fund are: - Property tax (30%) - Sales tax (27%) - Transient occupancy tax (TOT) (10%) - Development revenue (5%) - Franchise Tax (5%) Carlsbad's financial future includes a projected decline in development related revenues as the City approaches buildout. This reduction is offset by the expected increases in property tax, sales tax, and TOT resulting from the development of residential, commercial and office property during the forecast period. Administrative Services BUSINESS LICENSING THE OUTCOME Efficient, timely and accurate management of the City's Business License system and functions. THE MEASUREMENT • Percentage of license applications and renewals in a pending status • Percentage of delinquent renewals • Percentage of business license applications and renewals processed on-line via the City website WHAT THE DATA MEANS Pending Status: Without key critical information a business license cannot be processed, and is given a pending status. This status is generated under the following circumstances: • Payment deficiency: Fee is calculated or paid incorrectly • Critical information missing: Incomplete application or renewal forms • Missing verification: If required, verification is not received A reduction in the percentage of businesses in the pending status should result in a more efficient and effective system, ensuring that all businesses are treated in a fair and equitable manner. In addition, it will positively impact the business owner's satisfaction in dealing with the City. Delinquent Renewals: Without the proper monitoring and follow up delinquent renewals can become burdensome, creating additional costs. A reduction in the percentage of delinquent renewals should result in a more efficient and effective system, allowing for businesses to be treated consistently. A decrease in the amount of late penalties created by delinquent renewals, should reflect itself as a positive impact for business owners. On-line Applications and Renewals: The City can benefit from an increase in the number of licenses processed on-line. Without creating a manual burden on staff, the web-based system ensures that applications and renewals are processed in both a timely and effective manner. Another advantage of the on-line system is the reduction of the number of pending and delinquent applications and renewals. DEPARTMENTS INVOLVED Finance. BENCHMARK Pending and Delinquent: A reduction from year to year (fiscal) in the percentage of pending and delinquent licenses and renewals. On-line Applications and Renewals: An increase from year to year (fiscal) in the percentage of on-line business license processing. RESULTS Pending Licenses Delinquent Renewals On-Line Processing Total Licenses FY 2003 - 2004 FY 2004 - 2005 #/ month 192 113 499 Percentage 2.23% 1.31% 5.78% 8,634 #/ month 181 172 449 Percentage 2.12% 2.02% 5.28% 8,507 Our goal is for the Finance Department to monitor the businesses operating in the City of Carlsbad, to ensure that they are paying the appropriate business license tax in a timely manner. ANALYSIS During fiscal year 2003-04, the City hired a company to assist in identifying unlicensed businesses. This resulted in an increase in licenses processed. With the audit complete, the number of licenses processed in fiscal year 2004- 05 decreased slightly. Pending licenses decreased .11%. We have become more diligent in monitoring our delinquent accounts, and turning the businesses over to Code Enforcement. On-line renewals decreased by 50 applications or 0.5%. ACTION PLAN We instituted a Finance Call Center in June 2005. This increased the number of people available to answer business license calls. In addition, we will continue to work diligently, following up with companies that have not complied with our verification process and delinquent companies. The Finance website is currently under review. We are looking closely at the business license section for possible enhancements to increase on- line processing. POINT OF CONTACT Colette Wengenroth, Finance Mgr. (760) 602-2430, cweng@ci.carlsbad.ca.us. Finance Department FINANCE REPORT DISTRIBUTION tr THE OUTCOME Timely dissemination of financial information for decision-making. THE MEASUREMENT Measures how soon after the end of each month financial data is available to the users of the data (in business days). WHAT THE DATA MEANS Managers and the City Council depend on accurate, timely financial data in order to evaluate the progress of City programs and the ability of the City to continue to fund the programs. The older the financial information, the less valuable it is. This data is compiled based upon the City's fiscal year. DEPARTMENTS INVOLVED Finance. BENCHMARK The monthly financial status report is to be issued by the fifteenth business day after the end of the month except for June, which is thirty business days. This is due to the year-end close procedures, which hold the accounts payable process open for most of the month of July in order to ensure an accurate balance for fiscal year-end reporting. RESULTS 41 e •e AC\ qc QA OK W5* 9n(0 t-v 1 R in c Financial Status Report -£_.7^// ^ ^^4i^ >*^^ / JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN Date » Business Days to Issue Benchmark C f t t ANALYSIS The benchmark was met in every month except two during the year. The October report was issued a day past the target date. During that time, the department was finishing up the annual Comprehensive Annual Financial Report (CAFR) and related reports. However, in the previous fiscal year, the benchmark was met in every month except for three, an improvement by one month. As in prior years, the June report was issued several days after our target date of 30 business days. The month of June continues to be a month where we will focus additional attention in order to improve our performance. Finance staff is very conscientious of the monthly closing of the books, and the due date for issuing the Financial Status Report. Year-to-date activity is posted in the department so that staff can evaluate how well we are doing in achieving our goal. Average Working Days to Issue Financial Status Report 25 15 10 5 0 114.8 14 12.4 13.1 12.8 2001 2002 2003 2004 2005 Fiscal Year ACTION PLAN We will continue to work toward issuing the reports earlier than the monthly target date. For the year-end report, we will target the issuance for thirty days after year-end with the understanding that if any significant adjustments that may occur, will delay the report issuance. POINT OF CONTACT Kevin Branca, Assistant Finance Director, (760) 602-2430, kbran(«jci.carlsbad.ca.us. Administrative Services LONG-TERM FISCAL CONDITION THE OUTCOME Long-term financial health of the City's General Fund THE MEASURE Projected expenditures versus projected revenues for a ten (10) year timeframe. WHAT THE DATA MEANS The 10-year forecast provides the City with an early warning system that detects fiscal problems before they occur, which provides the City an opportunity to change its financial structure well before fiscal problems become unmanageable. As long as the revenue line is equal to or higher than the expenditure line, the City's fiscal structure is considered healthy. If the lines cross (revenue falls below expenditure), a financial problem is indicated. The number of years between today and the crossing of the lines gives an indication of the immediacy of the problem, and the magnitude of the correction can be determined by the distance between the expenditure and revenue lines. DEPARTMENTS INVOLVED Citywide. BENCHMARK A 10-year financial forecast for the General Fund that shows that revenues will be equal to or exceed expenditures in each year. RESULTS t e e * * e- General Fund Forecast Net Revenue over (under) Expenditures Operating Forecast General Fund ^6 «tA «*.___ FY OG Forecast "*^-^~^ _^— — *— -~ T. __ *. ^— — - ^ — • Balanced •OS '06 •02' '08 '09 '10 'IS. '0.2 '3.3 '14 Net Revenues over (under) Expenditure* e * *f t t A ANALYSIS Based on estimates developed during the 2005-06 budget process, revenues exceed expenditures, and the budget is essentially balanced through fiscal year 2014. Projections do not go beyond this point, however the trend reflected in the above chart would indicate that, with continued conservative financial management, the City should be in a good financial position into the foreseeable future. Based on the denned benchmark for this measure, the City's general fund appears to be entering a period of good financial health. Forecasts prepared during 2003 and 2004 suggested that the City needed to take action to avoid a budget imbalance in the mid-term. Corrective fiscal actions were taken during the 2004-05 budget process with significant success. The City implemented a more rigorous budget review process, as well as a number of revenue enhancement and expenditure control measures during the past fiscal year resulting in the balanced projection shown above. There is continued uncertainty over how the State of California will resolve its long-term fiscal issues. According to the State Legislative Analyst's Office (LAO), the state is facing a structural budget imbalance of $9 billion per year in the years beyond 2006. Although, the passage of Proposition 1A guaranteed certain revenues to local government, and Proposition A, renewing the TransNet program, have had a positive effect on Carlsbad's financial future, there is still concern about the ongoing fiscal crisis at the state level and how the future deficits will affect Carlsbad. The 10-year forecast summarized in this measure takes into consideration the City's current operating plan including the construction of new facilities, labor contracts, development projections, staffing projections, adjustments in revenues and service level changes. Based on these inputs, the forecast is for continued budget surpluses through 2014. Staff has proposed the following system to assist in evaluating the level of financial concern, and the extent of corrective action required Based on this standard, the City's financial health falls into the first category for the foreseeable future. Current Financial Status Recommended Corrective Action Revenues exceed expenditures over the life of the forecast. Benchmark achieved. The City's long-term financial health appears to be good into the foreseeable future. Expenditures begin to exceed revenues in the 6 to 10 year range. Although the current financial health appears to be good, some structural fiscal problems may exist. Corrective action will be necessary in the next few budget years. Expenditures begin to exceed revenues in the 3 to 6 year range. Short-term financial health may be acceptable, but significant concern exists regarding long-term health. Corrective action is called for in the next budget year. Expenditures begin to exceed revenues in the 1 to 2 year range. Significant financial problems exist that require immediate attention. The above chart is designed to identify the current financial state and to provide a recommended course of action. During the 2004-05 budget cycle, each department prepared a detailed forecast of its budget needs for the next five years. These forecasts took into consideration a number of scenarios including operations under normal fiscal conditions, and operation using a minimum of financial resources. These forecasts were very useful during the preparation of the 2005-06 budget, and provided a strong basis for creating the operating plan for the current year. Departments were encouraged to look at service levels, alternate ways of delivering services, and cost containment actions. In addition, staff initiated an effort to identify both new sources of revenue and ways to enhance existing revenue sources for the General Fund. The results of this work were successfully incorporated into the 2005-06 operating budget. ACTION PLAN Continued effort to control the growth of expenditures, and to enhance revenues is needed, however the immediate concerns raised in last years report have been addressed. POINT OF CONTACT Jim Elliott (760) 602-2409, Jelli(a)ci.carlsbad.ca.us. "I Finance Department- <s OUTGOING PAYMENT PROCESSING •** THE OUTCOME Facilitate timely and accurate payments to vendors and employees while ensuring compliance with City policies and procedures. THE MEASUREMENT • Percentage of payments made successfully • Percentage of payments made electronically. WHAT THE DATA MEANS Successful Payments Unsuccessful payments increase both staff time and banking service costs. *** • Stop payments * • Unclaimed checks *, • Checks returned for incorrect address •¥ "" Electronic Payments Electronic payments ensure timely receipt and proper delivery of payment. In addition, electronic payments on average run $.19 per payment (excluding staff time) while check processing runs approximately $.65 per payment (excluding staff time). Both measures support enhanced customer service as the customer will receive accurate and timely payment. ^ DEPARTMENTS INVOLVED * Finance "*. All City Departments •^ ^ BENCHMARK Percentage of Successful Payments: An increase from year-to-year (fiscal) in "*) the percentage of successful payments processed. „ Percentage of Electronic Payments: An increase from year-to-year (fiscal) in the percentage of electronic payments processed. RESULTS Successful Payments Electronic Payments Total Payments FY 2O03 - 04 # % 39,420* 16,317 99.6% 41.2% 39,581 FY 2004-05 # % 41,151 18,124 99.5% 43.9% 41,354 *Checks returned for incorrect address were not available for inclusion in this fiscal year. Our goal of increasing the percentage of successful payments from year-to-year is difficult to evaluate since we were not able to quantify the number of checks returned for incorrect addresses in fiscal year 2003-04. However, if we exclude those checks returned in fiscal year 2004-05, and compare percentages from the two fiscal years, the percentage of successful payments increases from 99.59% to 99.7%. ANALYSIS The City continues to have a very high successful payment rate, and we realize that this is a direct correlation to the number of electronic payments made (in addition to an accurate vendor database). In the early part of 2005, the City actively encouraged employees to sign up for direct deposit for their bi-weekly compensation through a promotional campaign. Through these efforts, an additional 50 employees signed up for this benefit. The success of this program can be seen through the increase in electronic payments from 41.22% to 43.86%. ACTION PLAN Continue to promote electronic payment processing, and take the necessary steps to ensure that all payments being made are as accurate as possible (amount, payee, address, accounts numbers, etc.). We also plan to initiate a pilot accounts payable electronic payment program for select vendors. Based on the success of the pilot program, our goal is to continue to expand the program to include additional vendors. POINT OF CONTACT: Kevin Branca, Assistant kbran(Sci. carlsbad. ca. us. Finance Director, (760) 602-2430, Administrative Services- FINANCE CALL CENTER - RESOLUTION RATE EFFECTIVENESS THE OUTCOME A centralized, functional, knowledgeable Finance Call Center. THE MEASUREMENT The number of requests resolved on the first contact with the Finance Call Center - "One and Done". WHAT THE DATA MEANS The measure is an indication of staffing levels, staff knowledge, and staff initiative to ensure that calls are resolved in both a timely and effective manner. DEPARTMENTS INVOLVED Finance - Call Center unit. BENCHMARK 80% of all priority 1 service calls resolved on the first contact with the Finance Call Center. RESULTS One & Done Escalated Benchmark 80% > 20% 2005-06 TBD TBD ANALYSIS Analysis of the call volume by resolution type showed the following results: Calls One & Done Escalated Total 2OO5-O6 TBD TBD TBD ACTION PLAN This is a new measure. The system went live on 6/2/05. We have begun to gather statistics and there will be data to report for fiscal year 2005-06. When the data is available further analysis will be performed. POINT OF CONTACT Colette Wengenroth, Finance Manager (760) 602-2468, cweng(a;ci.carlsbad.ca.us. Administrative Services RISK MANAGEMENT - CLAIMS ADMINISTRATION THE OUTCOME Protections afforded by the claim statutes are observed to the greatest extent possible and claimants receive determinations on their claims in a timely manner. THE MEASURE The percent of claims with a determination made within 45 days of receipt. WHAT THE DATA MEANS The departments' efforts to investigate, analyze and make determinations on claims within the statutory timeframe of 45 days are reflected in this measure. If the 45-day time limit passes without a determination, the claim is deemed denied by law and the claimant may sue. Also, the time limit for a suit is extended without a timely and formal determination. Finally, the measure reflects the City's level of responsiveness to claimants. Claimants have a time frame within which to expect claims to be investigated and then accepted, adjusted or denied. Although not frequent, there are occasions when determinations cannot be made based on the information or lack thereof in the claim, or when prudence dictates postponement of a decision. Some occurrences are on-going and it may be some time before all the facts needed for a determination regarding liability can be made. For this reason, as well as others, it may be in the City's best interest to postpone a decision beyond the 45-day timeframe. DEPARTMENTS INVOLVED Risk Management, all other departments. BENCHMARK 90% of claimants receive a determination on their claim within 45 days. RESULTS BENCHMARK 90% w/in 45 days FY 20O4 95% The percent of determinations made within 45 days was derived by dividing the number of claims with determinations made within 45 days by the total number of claims received within the reporting period. ANALYSIS 2004 is the first year of the measure. The results reflect data collected for calendar year 2004. The results show that the benchmark has been met and exceeded. ACTION PLAN Continue to meet or exceed benchmark. POINT OF CONTACT Erin Letsch, Risk Manager (760) 602-2470, Elets@ci.carisbad.ca.us. Administrative Services RISK MANAGEMENT - GENERAL LIABILITY EXPENDITURES FOR ALL CLAIMS THE OUTCOME Minimization of liability expenditures. THE MEASUREMENT General liability expenditures per capita. The level of expenditures reflect departments' efforts to reduce liability exposure throughout the City. WHAT THE DATA MEANS The FY 2004 ICMA benchmark is the mean of general liability expenditures, defined as miscellaneous claim expenditures, settlements, investigation fees, attorney fees, court costs and liability insurance premiums for 6 cities, including Carlsbad, under 100,000 in population. The FY 2000 and 2001 ICMA benchmarks were for non-vehicular (non-vehicular means losses related to City vehicles are not included) liability losses per capita (see more on "Benchmark" below). Carlsbad's results were limited to non-vehicular liability losses in FY 2001 only. DEPARTMENTS INVOLVED Risk Management, all other departments. BENCHMARK ICMA's measure was "Non-Vehicular Liability Losses" (non-vehicular means losses related to City vehicles are not included) in FY 2000 and 2001. It was changed to incorporate all liability expenditures where covered under one insurance policy. All data, i.e., population and expenditures, reflect the same period of ICMA's measurement. RESULTS CARLSBAD BENCHMARK FY 1999 $ 5.74 - FY 2000 $2.94 $6.71 FY 2O01 $6.74 $9.17 FY 2002 $ 7.35 $10.39 FY 2O03 $16.17 $ 6.02 FY 2O04 $12.30 $ 5.32 The amount of $12.30 was derived by dividing the total FY 2004 City expenditures of $1,160,920 by an approximate city population of 94,400 for this same time period. ANALYSIS Carlsbad's liability expenditures per capita for FY 2004 are lower than FY 2003. Carlsbad's expenditures were higher than the ICMA benchmark for the same time period, although less so than last year. Expenditures were due predominantly to claim and litigation costs, over half of which were the result of one case. Most of the remainder is spread over five cases, all unrelated. Although better than last year, Carlsbad does not compare well this year against other cities submitting data to ICMA and sharing the population category of less than 100,000. Only one of the cities in this category comprising the benchmark last year submitted data to ICMA this year. This year, ICMA's participants in the less than 100,000 population category are predominantly small cities, with populations of about 30,000 to 50,000. ACTION PLAN Risk Management will continue to use ICMA data for cost comparison purposes, unless a better benchmark is identified. POINT OF CONTACT Erin Letsch, Risk Manager (760) 602-2470, EletsfSci.carlsbad.ca.us. CO Promote and support continuous learning, cultural opportunities and the arts within the community and the city organization Library Department - STATE LIBRARY RANKING THE OUTCOME Top quality Library services. THE MEASUREMENT The Library Development Services Bureau of the California State Library collects statistical data annually from all California libraries. There are 13 basic ratings based on this data that appear annually in CALIFORNIA LIBRARY STATISTICS covering data from the previous fiscal year. The State uses seven population categories for public library rankings. Carlsbad is one of 33 libraries in the 60,000 to 100,000 population category. WHAT THE DATA MEANS Measurements used in this rating system are basic to all public libraries and, when related to per capita levels of activity, is an accurate way to compare the Carlsbad City Library to other top quality libraries in California. High index ratings are an indicator of excellence and establish benchmarks for both internal and external comparisons. DEPARTMENTS INVOLVED Library. BENCHMARK The Carlsbad City Library will be ranked above the 90th percentile among public libraries in the state in cities of 60,000 to 100,000 populations. For 2005, the 90th percentile equates to a ranking of fourth or better. RESULTS The benchmark was achieved by reaching an averaged ranking of first. Carlsbad remained in first place, which is the same ranking as last year among the 31 city libraries in California in the 60,000 - 100,000-population category. (Two cities changed population categories this year thereby increasing the total number of libraries from 31 to 33 in the 60,000 - 100,000 range.) BENCHMARK 5™ or higher 2001 4TH 2002 2ND 2003 1ST 2004 1st ANALYSIS Carlsbad was ranked against 33 other libraries in 13 measurement categories. Compared to the previous year, Carlsbad improved its ranking in 3 categories (Periodicals, Library Attendance, and Program Attendance). Carlsbad dropped slightly in 3 categories (Librarian FTE, Reference Questions Per Capita, and Registered Borrowers), and stayed the same in all the others. The table below shows how Carlsbad ranks with the top rated public libraries in California in the key measurement categories: Top Library Rankings Librarian FTE Total FTE Expenditures per cap. Volumes Microforms Audio materials . Videos Periodicals Circulation per cap. Ref. Questions per cap. Library attendance Program attendance Registered borrowers TOTAL: RANK: Carlsbad 4 1 1 4 1 1 3 1 4 3 4 4 5 36 JST Newport Beach 3 4 7 2 2 2 1 3 2 1 3 12 2 44 2ND Santa Monica 1 2 4 1 13 NR NR NR 11 10 5 2 NR 49 3RD Palo Alto 2 6 2 8 NR 5 5 2 1 5 2 5 18 61 4TH Mountain View 7 9 8 5 8 4 4 9 3 6 6 6 6 81 5TH Redwood City 5 5 3 14 7 3 2 4 8 24 15 1 19 110 6TH NR = Not Reported ACTION PLAN Staff will continue to analyze collection use, patron suggestions, and phasing of new technologies to see if they lead to any changes in the Library's performance. Staff will also analyze the value of tracking and measuring categories, such as collection holdings, that are more connected to multiple branches in larger geographical areas. These may not be as valid as per capita measures as indicators of quality or performance. Future measurements may also need a weighting system, so that emphasis can be placed on categories that are more significant than others. POINT OF CONTACT Cheryl Mast, Management Analyst (760) 602-2014, Camastfoci.carlsbad.ca.us. Community Services LIBRARY OPERATING COST THE OUTCOME Efficient use of Library resources. THE MEASUREMENT Under Development. WHAT THE DATA MEAN Under Development. STATUS OF THE MEASURE Under Development. DEPARTMENTS INVOLVED Library. BENCHMARK To be determined. RESULTS To be determined. ANALYSIS None Available. ACTION PLAN The Library has assembled a team of managers to develop and implement a balanced scorecard. The purpose of this scorecard is to assist the Library in identifying and evaluating their service delivery standards and cost effectiveness, which ultimately should impact their customer satisfaction. The Library is in the process of creating cost measures that will evaluate several different facets of library services as they relate to both cost and value of services provided. This measure will be available next year. POINT OF CONTACT Cheryl Mast, Management Analyst (760) 602-2049, Camast(ajci.carlsbad.ca.us. Learning, Culture, and Arts LIBRARY SERVICES - CITIZEN SATISFACTION THE OUTCOME High level of citizen satisfaction with the Library services. THE MEASUREMENT Survey results to the question in the citywide survey, "How do you rate the City's library services?" WHAT THE DATA MEANS This measure of how the citizens rate their level of satisfaction with the city's library services provides staff with a better understanding of the effectiveness and customer satisfaction with city programs. DEPARTMENTS INVOLVED Library BENCHMARK 90% of respondents rate satisfaction with Library services as "Good or Excellent". RESULTS BENCHMARK 90% 2000 96% 2001 96% 2002 97% 2003 97% 2O05 97% ANALYSIS This is the fifth year that the City has asked its residents how they rate their satisfaction with Library services. The trends shown by the survey reflect significant positive ratings from the public at large (less than 1% of the survey respondents rated City Library services as poor). The consistency and level of the rating is worth noting (over 95 % for the past five years). ACTION PLAN The Library staff is working on a more specific survey, which will identify, among other things, services or amenities the customers want but which may not be currently offered. This data will used in developing the next Strategic Plan for Library Services, and ultimately should reflect in a continuation of a high degree of satisfaction of the library's patrons. POINT OF CONTACT Cheryl Mast, (760 602 2014), Cmast@ci.carlsbad.ca.us. Library Department - GROWTH MANAGEMENT /LIBRARIES THE OUTCOME Adequate facility space to house library services and resources. THE MEASUREMENT Square footage per capita. The current Growth Management Standard is 0.8 square feet of library space per capita. WHAT THE DATA MEANS Space (leased/owned, public/non-public) is a standard library measurement of customer use and satisfaction and includes collection space, seating, meeting rooms, staff areas, technology, and other public facility needs. A performance standard for library facilities was adopted by the City Council in 1986 as part of the Growth Management Program's Citywide Facilities and Improvements Plan. This standard was originally developed at that time based on surveys of other libraries of comparable size and based on related standards (such as volumes per capita) set by the American Library Association. DEPARTMENTS INVOLVED Library. RESULTS The Library acquired a new facility location in 2004, which is referred to as the Learning Center. This location currently contains a building with 5,723 square feet of space that is not occupied nor being used for library services to date. Future plans include renovating and expanding the facility in order to house the Adult Learning and Centre de Informacion programs. The Library owns three facilities and leases two facilities, for a total of 96,874 square feet of leased and owned space. Owned: Dove Library 64,000 s.f. Cole Library 24,352 s.f. Learning Center 5,723 s.f. Leased: Adult Learning 1,359 s.f. Centre 1,440 s.f. Based on the benchmark standard and assuming a June 2005 estimated population of 95,146, the library is currently 20,757 square feet in excess of the standard. ANALYSIS The latest SANDAG forecast estimates the city's build-out population will be 140,980 in 2030. Carlsbad's population would need to reach about 121,093 before it would trigger the need for expanded library space. Growth to this population level is projected to be achieved in 2013, when there will be an estimated population of 122,337. Additional space needed will likely be programmed into a new Cole Library. When the Adult Learning and Centre de Informacion programs move into the renovated and expanded Learning Center facility, their leased space will be eliminated with a net result of 2,201 square feet of additional owned space. Additional space will also be added with the possible relocation of existing resources at Cole, such as Genealogy and Local History, to another facility. Some of these steps may need to be taken in the next few years to enable the Library to manage the projected growth of collections until a major expansion occurs. ACTION PLAN Staff will continue to monitor population growth projections, trends in library use, customer service issues, impacts of new technology, and how all of these relate to space needed for resources and services. POINT OF CONTACT Michele Masterson (760) 602-4600, mmastCajci.carlsbad.ca.us. Administrative Services EMPLOYEE TRAINING & DEVELOPMENT INVESTMENT THE OUTCOME To develop a highly qualified and competent staff. THE MEASUREMENT Human Resources annual training and development expenditures as a percent of total payroll. WHAT THE DATA MEANS This investment comparison can aid monitoring the fiscally responsible use of funds allocated to Human Resources Training and Development budget. DEPARTMENTS INVOLVED Human Resources. BENCHMARK According to the American Society for Training and Development's 2002 survey, organizations spend between 1% and 4% of total payroll on training and development. Expenditure figures include training/instructor fees, supplies, materials and other direct costs. The figures do not include facilities costs, support staff salary or time away from the job. RESULTS Training Program Carlsbad Academy Tuition Reimbursement Program Fire Department Training Police Department Training Total % of Payroll Annual Expenditures FY 2004/2O05 $141,700 $131,900 $ 22,900 $71,000 $ 367,500 1% ANALYSIS This is a new performance measure. Since Training and Development is not a centralized function, data was collected on only the largest training related programs in the City. The overall cost of city training, including technical training paid for by departments, is difficult to calculate and therefore may be understated. ACTION PLAN The Human Resources Department will continue to analyze training and development expenditures and find more tangible measures of performance. Staff will work with the Finance Department to see if tracking training expenses citywide is possible and feasible. Staff is working on acquiring a better attendance and reporting system in order to gather and provide more reliable data. Currently staff does not have a more comprehensive Learning Management System that will also track expenses. POINT OF CONTACT Rebecca Melillo, Management Analyst (760) 602-2442, Rmelwiici. carlsbad. ca.us. Administrative Services EMPLOYEE TRAINING & DEVELOPMENT SATISFACTION THE OUTCOME A high level of employee satisfaction with the City of Carlsbad's training and development program. THE MEASUREMENT The percentage of training survey respondents that "Strongly Agree" or "Agree" with survey statements regarding the effectiveness and value of City-wide training programs. WHAT THE DATA MEANS The data assesses the current strengths and weaknesses of the City's employee training and development program from the perspective of City staff. Training recommendations will be given based on the analysis of the data gathered. DEPARTMENTS INVOLVED Human Resources. BENCHMARK The benchmark is that 90% of City staff attending citywide training will "Strongly Agree" or "Agree" with the survey statements. RESULTS C C- e II t e t • *t * * *c Fiscal Year 2OO4-2005 Survey Statement The instructor was knowledgeable about the topic. This course was valuable for my job. Overall, this class was worthwhile. I am satisfied with the services provided by the City of Carlsbad Employee Development Program. % Strongly Agree or Agree 99% 92% 96% 97% ANALYSIS The data shown is from 280 respondents who participated in 1 or more of 28 different courses offered in fiscal year 2004-2005. The survey data collected clearly demonstrates that the employees who are attending classes are satisfied with the instructors, believe the classes are valuable, and are satisfied with the services provided by the Employee Development Program. fk f. t t * ACTION PLAN The objective of the training program at the City of Carlsbad is to improve and enhance the performance of individuals and teams throughout the organization, and to create an organizational environment that encourages and supports lifelong learning. Although the satisfaction data is useful in evaluating whether employees "like" the training offerings, the Human Resources staff is continuing to explore ways to demonstrate the value of the employee development program to the organization through performance measures. Human Resources will also continue to share this information through their annual training report to the organization. POINT OF CONTACT Rebecca Melillo, Management Analyst (760) 602-2442, Rmeli@ci. carisbad. ca. us. Community Services- RECREATION PROGRAM SPORTSMANSHIP THE OUTCOME A high level of customer satisfaction, program enrichment and safety through sportsmanship. THE MEASUREMENT This measure uses a multi-method approach combining: • Survey results • Participant complaints/compliments • Incident reports The Recreation Department has surveyed participants, coaches and parents on their perception of sportsmanship in our programs. The survey results rate their responses to their perception of sportsmanship, their agreement with the implementation of the Sportsmanship philosophy, and experiences they have had involving sportsmanship in our current programs. We have collected data on the number of ejections, suspensions and "technicals" administered during our sports leagues. WHAT THE DATA MEANS The survey results measure the sense of sportsmanship our participants, parents, and volunteer coaches experience and observe in our programs. The number of ejections, suspensions and "technicals" measure the actual number of customers who are directly affected by their own unsportsmanlike conduct. DEPARTMENTS INVOLVED Recreation. BENCHMARK This measure is unique to the City of Carlsbad's Recreation Department; therefore the benchmark has been developed through our own surveys. We set an initial benchmark of 90% of all surveys received will rate Carlsbad Sportsmanship program as "very good" or better (4 or 5 on a 1-5 scale). RESULTS The year 2000 figures are statistics taken prior to the implementation of the TRUST program. The year 2001 reflects statistics after introducing the program to league officials, team managers, volunteer coaches, and/or City Staff. The year 2002 results are after training, implementing and enforcing the program to league officials, team managers volunteer coaches, and/or City Staff. The year 2003 numbers represent statistics after expanding our TRUST program to include all Youth Basketball Officials in the program. The year 2004 numbers represent further expansion and implementation of the TRUST Program to all Adult Sports participants in Softball, Basketball, and Soccer Leagues, and all Youth Sports participants in Basketball, Indoor Soccer Programs, and all contractors of seasonal camps. The year 2005 reflects programmed sports with the Adult and Youth Sports Divisions. Results of the survey asking, "What are your observations regarding the level of sportsmanship in our leagues?" CARLSBAD ADULT SPORTS LEAGUES Softball, Basketball, and Soccer BENCHMARK 90% rating very good or better Technicals / ejections / suspensions 2000 55% 46/37/37 2001 67% 25/27/15 2002 74% 17/14/6 2003 78% 15/7/4 2004 80% 17/12/4 2005 83% 15/11/3 CARLSBAD YOUTH SPORTS LEAGUES Basketball, Pee Wee Indoor Soccer, and Sports Camps BENCHMARK 90% rating very good or better Technicals /ejections/ suspensions 2000 11% 43/7/0 2001 22% 35/4/0 2002 41% 26/3/0 2003 96% 13/0/0 2004 95% 8/2/1 2005 95% 13/0/0 ANALYSIS Adult Sports Program: The expansion of our TRUST program in the adult sports Softball, basketball and soccer leagues continues to have a positive influence. For the 2005 season's staff focused on further developing of the TRUST program by communicating the Department's expectations of proper sportsmanship to all managers and league participants. Literature is now distributed to all managers prior to each season. Sportsmanship is emphasized on the Sports Division Webpage. It is also promoted at all game locations and at each City athletic Facility through promotional banners and signs displaying the TRUST logo and message. In the five years since implementing the program, we have seen a significant decrease in the number of technical fouls, ejections and suspensions within the programs and the team manager's have overwhelmingly embraced this philosophy of sportsmanship. We attribute this to the efforts made by the adult sports staff to educate and enforce our sportsmanship philosophy to all of our adult softball, basketball and soccer league managers, participants, officials, spectators and City staff. Training the team managers and participants involves using the National Alliance for Youth Sports (NAYS) training material that is used by our youth sports program for its volunteer coaches. The overall response and feedback from our league managers has been supportive of continuing this program. Staff has also strived to promote proper sportsmanship behavior in all advertising and marketing of the Adult Sports Leagues, material, awards, schedules, and webpage by continually addressing proper behavior and sportsmanship while participating in our leagues. Over 90% of teams that participate in our Adult Sports Programs enjoy our leagues so much that they return season after season therefore in most cases new teams have to be placed on a waiting list to join our leagues. Youth Sports Program: The youth sports office introduced our TRUST program during the 2001 season of youth basketball. The initial introduction was done at the volunteer coach's level in addition to City staff. The youth sports program deals with four different populations that influence the level of sportsmanship within the program (officials, coaches, parents and youth participants). During the 2002 season, staff only selected volunteer coach's who were supportive of our TRUST philosophy. We also initiated a coach's clinic to educate and train the volunteer coaches regarding the TRUST program. Our 2003 season focused on continuing our education of the TRUST Program for officials, volunteer coaches, parents, and staff. The success of our TRUST program in the youth sports arena can be attributed to the training material used from NAYS. With this material, we have successfully trained and re- trained our volunteer coaches through the National Youth Sports Coaches Association (NYSCA). The parents continue to be educated and certified through the Parents Association for Youth Sports (PAYS). The NAYS training program involves certification through educational testing materials, brochures, and training videos. In the 2004 Youth Basketball Season, Staff has continued with the above- mentioned training for all patrons, as well as implementing a "Code of Conduct" for all youth participants to sign with their parent(s). In the 2005 season, Staff will work on implementing all facets of the Sportsmanship training into the Youth Basketball Program. The Program will also strive to recognize all participants with some type of prize for displaying proper sportsmanship behavior during the program. ACTION PLAN Adult Sports Program: The Adult Sports Staff will continue in its effort to further educate and enforce the TRUST program to the league managers and participants, officials, spectators and City Staff. This will be accomplished by continuing to use the NAYS training material, communicating with the team managers in an on-going basis during the seasons, implementing harsher penalties to discipline violators and mandating all managers to sign a "Code of Conduct" in order to participate in our leagues. The creation of a Department Sportsmanship Video has been discussed as a method of marketing this message to our participants and community. In 2006 staff will continue to train all managers and participants in softball, basketball, and soccer programs of the TRUST/Sportsmanship Program. Staff will be looking at different ways to promote Sportsmanship. Youth Sports Program: The Youth Sports Staff will continue to educate, train and enforce the TRUST program to City Staff, volunteer coaches, parents, and youth participants through clinics and training opportunities. This will involve requiring re-certification annually for all staff, coaches and parents through the NAYS training program. In 2005 Staff was successful in implementing sportsmanship training as a requirement for all resident Non-Profit Organizations in order to maintain a higher category status for field usage. Council Policy #28 was amended to include these requirements for field users. Staff has also been successful in implementing proper field behavior training sessions for organizations not associated with these types of trainings. In 2006 Staff will also look at expanding the TRUST/Sportsmanship Program to all Recreation sections. These programs will include, Youth and Adult Sport Programs, Preschool Programs, Seasonal Youth Camps, and Aquatic and Senior Programs. The Program will be implemented during Department activities. Surveys will be taken to measure the success. This information will be included as part of the 2006 Performance Measure Report. POINT OF CONTACT Gian Lauro (760) 434-2826, glaur.ci.carlsbad.ca.us. Community Services RECREATION & PARK PLANNING OPERATING COST THE OUTCOME Provide Recreation and Park Planning services in a cost effective manner. THE MEASUREMENT Operating Costs per capita for Recreation and Park Planning Services. WHAT THE DATA MEANS Tracking Recreation and Park Planning costs per capita provides an opportunity to compare year-to-year costs of these services and an opportunity to compare costs to other cities of similar size and economic composition. BENCHMARK The Operating Cost per capita will not exceed Baseline Budget plus annual CPI. RESULTS FISCAL YEAR 02-03 03-04 04-05 BENCHMARK $52.80 $54.75 $56.99* CARLSBAD $52.80 $55.30 $58.92 * 03-04 benchmark plus 4.1% CPI ANALYSIS Recreation and Park Planning spent $5,656,613 in fiscal year 2004-05. Utilizing the population figure of 96,000 and the CPI of 4.1% the cost per capita is $58.92. This is an increase of $3.62 per citizen over fiscal year 03-04. This increase could be due in part to improvements in our programs, services, trails 8& parks, including the preparation for the opening of two new parks. Another contributing factor is the increased cost of employee benefits. ACTION PLAN Recreation has a required goal level of a self-sustaining percentage for many programs. An intense analysis of self-sustaining is currently underway. Due to the complexity of this analysis, it is difficult to predict how this particular measure may evolve once that information is ascertained. Once this analysis is complete, the department intends to refine this measure further. This may include removing Park Planning and including the revenue raised through Recreation programs. POINT OF CONTACT Ken Price (760) 434-2826, Kpric^ci.carlsbad.ca.us. Community Services RECREATION CUSTOMER SERVICE & SATISFACTION THE OUTCOME A high level of customer satisfaction. THE MEASUREMENT Customer surveys will be distributed at all the Department recreational activity offices. WHAT THE DATA MEANS Highly satisfied customers are an indication that the Recreation Department is providing services in a satisfactory manner. DEPARTMENTS INVOLVED Recreation. BENCHMARK 90% of customers rate all Recreations services as "Good or Excellent" (4 or 5 on a 1-5 scale) in all customer service survey categories. RESULTS RECREATION DEPARTMENT Staff Courtesy Staff Knowledge Quality of Telephone Contact Classes /Activities Offered Fees - Competitive Registration Procedures Customer Service Facility Appearance /Operation Overall Rating - Recreation Programs % Respondents at Good or Excellent 2001 98 94 91 95 92 89 97 2002 98 96 94 95 93 90 97 2003* 96 93 86 87 88 81 92 2004 94 91 85 83 84 83 89 2005*t N/A 98 N/A 98 90 100 98 95 N/A * Survey methodology changed t Sample size not representative of community base ANALYSIS Survey methodology has changed over the years. In 2001 and 2002, the survey was available through handouts provided at the different City facilities and parks. However, upon analysis, staff felt that many residents were not reached. In 2003 the survey was distributed in the water bills of Carlsbad Municipal Water District (CMWD). Through this proves, over 1,000 surveys were returned. A drawback to using CMWD was that they do not service the entire City, particularly the southern quadrants. In an effort to reach more of the southern portion, the 2004 survey was mailed (bulk) to residents in 92009 not serviced by the CMWD. Consequently, the number of surveys returned increased to 1,800 in 2004, an 80% increase in participation from the prior year. The cost of expanding survey distribution to southern Carlsbad was more than $6,800, not including staff costs. In 2005, staff evaluated the high cost of the business reply mail and printing costs and elected to use comment cards already in use by the Recreation Department. In addition to cost containment, the cards helped us to achieve our action plan goal of creating clear and understandable survey questions. Comment cards were distributed at each of the Recreation Department facilities. Each patron who came to the registration counter or office was asked to fill out a comment card. The card contained major areas of service we wished to survey. The only difference was that it had a four-level rating scale of Exceptional-Good-Fair-Poor. Staff evaluated the ratings from last year and found that less than 0.03% of our survey participants rated the survey questions 1 or poor and that using a numeric 5 (Exceptional), 4 (Good), 3 (Fair), and 2 (Poor) rating scale would give us comparable data to the previous year. RECREATION CUSTOMER SERVICE & SATISFACTION • 2002 D2003 D2004 • 2005 Services Although staff made every effort to ask each patron to fill out a card, the response was poor. The number of responses in 2005 was 63. This small sample does not provide enough data to allow for a valid comparison to previous years. In preparation for updating the Recreation Department Strategic plan, the Department did contract with SBRI to conduct a Recreation telephone survey. Survey results indicate that Carlsbad Residents feel that Recreation programs offered are important to their household and are of high quality. ACTION PLAN The manner in which the surveys are delivered and the type of survey instrument will be analyzed. The current delivery of surveys was cost effective but did not provide a large enough sample to give valid data or provide an overall rating opportunity. Staff will investigate survey distribution mechanisms including utilizing the internet to email the survey to the thousands of families currently in the CLASS Activity Registration & Facility Reservation data base, and possibly returning to distributing surveys through the water districts or Waste Management bills. Fee studies for programs and facilities are done annually. This process will continue to make certain that our charges are competitive with neighboring programs. Customer service will remain among the top issues for the Department. Although customer convenience has been enhanced through our online registration site CarlsbadConnect, the Recreation Department is working closely with the IT Department to improve access and timeliness for patrons registering during the first day of our seasonal priority registration periods. POINT OF CONTACT Gail Lynn (760) 434-2826, glynn@ci.carlsbad.ca.us Q) Acquire, develop and maintain a broad range of open space and recreational facilities that actively address citizen needs which are fiscally responsible and are consistent with the General Plan and Growth Management Standards Public Works PARKS SERVICE DELIVERY THE OUTCOME Well-maintained and safe parks. THE MEASUREMENT By utilizing the Maintenance Assessment Program, rate the condition of City parks based on observation by community representatives, government employees, and outside professionals. WHAT THE DATA MEANS The Maintenance Assessment Program utilizes community representatives, outside professionals, and City employees to rate the overall quality of care a park is receiving. Observers complete a rating form while conducting an on- site evaluation; results are tabulated and an overall score is obtained. Areas of focus include irrigation, turf maintenance, tree maintenance, ground cover, litter control, restroom maintenance, tot lot maintenance, parking lot maintenance, park furnishings, and sports court maintenance. By establishing an objective rating value for City parks, the data from observers can be measured and compared to the established benchmark and opportunities for improvement in procedures, policies and/or methods of operations can be explored. DEPARTMENT INVOLVED General Services/Parks Maintenance. BENCHMARK 90% of the ratings are at or above 7 on a 10-point scale (1 being the lowest and 10 being the highest). RESULTS BENCHMARK 90% Fall 2003 83% Spring 2004 98% Fall 2004 94% Spring 2005 91% Fall 2005 91% ANALYSIS This is a measure that uses the Maintenance Assessment Program to obtain feedback from outside observers on the condition of City parks. If the condition of a park is rated low, staff will investigate the issues noted, and take corrective action if appropriate. In addition to all the normal parks on the assessment list the Downtown area of Carlsbad Village is also included on the MAP tours. The downtown area is a highly visible area of the city and requires many of the same types of maintenance activities as a park. It is frequented by tourists, business people and citizens, and is a central location for a variety of special events. A breakdown of the ratings for the parks that were evaluated follows: % Of Responses Greater Than Or Equal To 7 Evaluation Date: Nov. 17, 2003 May 5, 2004 Nov. 18, 2004 May 26, 2005 Oct. 20, 2005 Laguna Riviera 75% 100% 97% 90% 96% Calavera Hills 73% 100% 95% 96% 89% Stage coach Park 90% 98% __ LaCosta Canyon Park 85% 93% 90% 88% 86% Leo Carrillo Park __ 100% 95% 90% Poinsettia Park 100% 100% 94% Magee Park 96% 90% 91% .. Holiday Park 84% 98% 96% 90% „ Cannon Park 86% 79% 84% Cadencia 100% Down town 90% 98% 92% 95% 97% Overall rating 83% 98% 94% 91% 91% The most recent fall evaluation resulted in an overall park rating of 91%. This fluctuated between locations from 84% at Cannon Park to 94% at Poinsettia and 100% at Cadencia. The overall results of 91% exceeded the benchmark of 90%. This is considerably higher than the first assessment of Fall 2003 but slightly lower than the 2004 assessments. Specific comments received from the evaluators in the 2005 sessions follow with the plan to address concerns outlined in the action plan section below. Areas receiving a high rating were the Downtown section of the City, Cadencia, Laguna Riviera, and Poinsettia Parks. The Downtown area had comments that the planter boxes were "amazing", Poinsettia Park received a comment that maintenance is very good and that the citizens of Carlsbad are very fortunate to have such a place. Areas rating lower in the assessment were Cannon and La Costa Canyon Park. Comments for Cannon Park referred to picnic tables and park benches in need of replacement and a surrounding concrete block wall that is not aesthetically appealing. The portable restroom facility at this site was also pointed out as unattractive. La Costa Canyon Park received comments that the restroom facility required more cleaning and some of the fixtures could use updating. ACTION PLAN • Analyze identified areas of concern and consider the submission of Capital Outlay/CIP during the 06-07-budget process. • Proceed with plans to enhance Cannon Park with the replacement of old picnic tables, painting of perimeter wall, planting additional vines and trees, and the installation of a screened and handicapped accessible portable toilet. • Utilize the Hansen information system to summarize staff time allocation and determine where resources are being allocated. • Complete the hiring of a contract inspector for Parks to assist in obtaining high quality maintenance from the contracted services, such as restroom maintenance. • Begin Capital Outlay plan to remodel the La Costa Canyon, Laguna Rivera and a Holiday Park restroom. In the interim staff will take measures to update hand drying appliances and the light fixtures where appropriate. • Begin CIP project at La Costa Canyon Park to add a shade structure/picnic area. • Begin CIP projects at Scout House, and Stagecoach, Holiday, Hosp Grove, Laguna Riviera, and Poinsettia parks for upgrading ADA compliant tot lot equipment/rubberized matting. POINT OF CONTACT Kyle Lancaster, Parks Supervisor (760) 434-2941, Klanc(<x'.ci.carlsbad.ca.us. Public Works PARK MAINTENANCE COST THE OUTCOME Park cost efficiency. THE MEASUREMENT Cost per Acre Maintenance cost per acre (annual actual expenditures/total acres of developed parkland, roadside vegetation abatement, and downtown planter/tree maintenance). This measurement excludes costs for capital expenditures. Acres Per FTE This measure could be compared to other jurisdictions once the basis for determining what acreage should be included in the calculations is finalized. The Park acreage figure used below is the developed Park acreage number. The FTE figure used in the table includes full and part-time Park staff, less management and clerical support staff. WHAT THE DATA MEANS A goal for the Park Maintenance Department is to provide aesthetically appealing, well maintained parks, roadsides and high profile planter/tree areas. This measure can demonstrate fiscally responsible use of funds allocated to park maintenance, and show how resources are being used to achieve the identified goal. DEPARTMENT INVOLVED General Services/Parks Maintenance. BENCHMARK Cost Per Acre Carlsbad's Cost per acre will not exceed the benchmark of $10,463. This benchmark is calculated by taking the base year's benchmark and adjusting it by the San Diego Consumer Price Index each year (4.1% in 2003, 3.7% in 2004, and 3.3% in 2005). Acres Per FTE The benchmark is to be determined as this is the first year of this measures use. RESULTS Carlsbad Cost Per Acre Carlsbad 2003 2004 2005 Expenditures $2,782,299 $3,079,933 $3,311,116 Total Acres 270 278 278 Benchmark $9,692 $10,051 $10,383 Cost/ Acre $10,305 $11,078 $11,910 ANALYSIS The results of our historical cost analysis show that park maintenance costs per acre increased by a rate of 7.5% over last year, which is greater than the CPI adjustment to benchmark. Several factors have contributed to this increase. First, additional responsibilities have been placed on staff in this division as reviews of the Assessment Districts related to Tree and Median Maintenance have resulted in a realignment of both staff and work activities. Additionally, the City's park base, including open space is expanding. The Parks department must work closely with other related programs such as Trails, Tress and Median maintenance to manage this growth. Finally, personnel and benefits costs increased by 16.4% over the last year. All of these factors should begin to stabilize in the near future leading to more consistent increases over the new few years. Benchmark Partner Cost Data Agency Carlsbad Chula Vista San Diego County City* Santa Clara FY2005 Expenses $3,311,116 $4,535,490 $1,506,373 $4,912,800 Total Acreage 278 420 224 236 Cost Per Acre $11,910 $10,799 $6,725 $20,817 * City did not wish to be identified. Benchmark partners were asked for cost data this year, and the responses are shown in the table above. There is more investigation required to examine what criteria the partners used to determine which acreage they included, (e.g. developed parkland vs. open space reserves) as well as which expenditures they included. For example the San Diego County City does not include water costs as the city receives free water from the water utility for parkland. In addition, the level of service and maintenance that each partner provides plays a role in the level of costs incurred. Parks Acres per FTE excluding Management and Clerical Support 2004-05 Carlsbad Chula Vista Santa Clara San Diego County City Non-Admin FTE 24.4 42 44.5 17 Total Acreage 278 420 236 224 Acres per FTE 11.4 10.0 5.3 13.2 The acreage per FTE data above shows benchmark partner cities figures for comparison to Carlsbad's figure of 11.4 acres per FTE. Santa Clara maintains 5.3 acres of parkland per FTE; Chula Vista maintains 10 acres per FTE versus the San Diego County City that maintains 13.2 acres per FTE. The San Diego County City stated that they used volunteer teams and community service groups for hire to augment the regular city staff. Of note, the acreage per FTE data reflects the first year we have collected this data and as such represents a work-in-progress that will need to be refined as more data is collected. ACTION PLAN • Continue working with partner cities to learn more about the different maintenance standards and/or procedures. Ultimately, determine methods to perform maintenance activities more efficiently. • Continue to refine measures and examine the balance of maintenance work between contractor and City staff. POINT OF CONTACT Kyle Lancaster, Parks Supervisor (760) 434-2941, Klanc(o)ci.carlsbad.ca.us. Public Works PARKS CUSTOMER SERVICE AND SATISFACTION THE OUTCOME A high level of customer satisfaction. THE MEASUREMENT Annual City of Carlsbad Public Opinion Survey. WHAT THE DATA MEANS Highly satisfied customers are an indication that we are providing services in a manner that is desired and/or expected. DEPARTMENT INVOLVED General Services/Parks Maintenance. BENCHMARK 90% of customers rate the condition of developed parks at "Good" to "Excellent" as reported in the annual City of Carlsbad Public Opinion Survey. RESULTS City of Carlsbad Public Opinion Survey BENCHMARK 90% 200O 90% 2001 95% 20O2 91% 20O3 94% 2004 92% 2005 94% ANALYSIS The benchmark for the City of Carlsbad Public Opinion Survey has been met for the sixth consecutive year. The Parks Department survey results achieved an overall rating of 94%. ACTION PLAN • New CIP projects are being planned for next year that should improve and/or maintain customer satisfaction levels. Projects that have been initiated but not yet completed include restroom remodels at Holiday Park and Laguna Riviera Park, and ADA compliant rubberized surfacing in place of sand in several tot lots, including Laguna Riviera Park. • Include the newly constructed Aviara and Hidden Canyon Parks in next year's evaluation. • Complete survey and utilize the customer's feedback, to explore opportunities for improvement. POINT OF CONTACT Kyle Lancaster, Parks Supervisor (760) 434-2941, Klanc@.ci.carlsbd.ca.us Community Services- GROWTH MANAGEMENT - PARKS THE OUTCOME To provide adequate parkland that will support the recreational needs of those that live, work and play in Carlsbad. THE MEASURE The Carlsbad Park Standard identified in the Parks and Recreation Element of the City's General Plan is as follows: • Special Use Areas: 0.5 acres/1,000 population • Community Parks: 2.5 acres/1,000 population 3.0 acres/1,000 population Collectible standard Per Quimby Ordinance & Growth Management Standard • Special Resource Areas: 2.5 acres/1,000 population • Overall Park Standard: 5.5 acres/1,000 population Provisions for recreation facilities in the industrial zone are based upon, and provided for by the collection of $ .40/square foot of industrial development. There is no standard of acreage exclusively for the industrial based population. WHAT THE MEASURE MEANS According to the "Citywide Facilities and Improvement Management Plan", the growth management standard for parks that must be provided concurrent with growth is 3 acres/1,000 population. Carlsbad's standard for park adequacy is based upon the collective amount of Special Use Areas and Community Parks within each of the four quadrants of the City. The collective acreage within each quadrant is then compared to the population of each quadrant to ensure adequacy. A standard of 3 acres per 1,000 population is an accepted level of park space to meet active or passive recreational needs. In addition, a standard of 3 acres per 1,000 population insures a fiscally responsible maintenance and operation program that is allocated on an annual basis and required to sustain a safe and aesthetically pleasing recreation facility. The overall park standard of 5.5 acres/1,000 population has been in existence since 1982. The standard includes Special Use Areas, Community Parks and Special Resource Areas. For the most part, the majority of those collective 1 acres within Carlsbad belong to the Special Resource Area classification. They are typically sites that are over 100 acres in size and are of a unique character ^ such as lagoons and beaches. These amenities are typically outside the operational jurisdiction of the City of Carlsbad and require little if no operating „ expense. • For the purposes of the Growth Management Monitoring Report, the citywide * population figures are derived from information provided by the California Department of Finance. The per quadrant population figures are determined by the number of dwelling units in each quadrant, multiplied by a density figure of 2.3178 persons per dwelling unit. *) DEPARTMENTS INVOLVED » Recreation Department. ^ BENCHMARK **• The park adequacy standard means 3 acres of Special Use Area and/or Community Park, either active or passive, per 1,000 population. Because of an A existing Joint Use and Maintenance Agreement that the City and School District(s) operate under, several school sites are included within the park ^ inventory under Special Use areas. Those sites have been "Grandfathered" into •*5 the parks inventory and as of 1986, no further school sites will be included » within the park inventory. Currently there is a total of 32.2 acres of school ^ property being counted as park acreage; 20.4 ac. in the Northwest Quadrant, • 2.8 ac. in the Northeast Quadrant, 5 ac. in the Southwest Quadrant and 4 ac. in the Southeast Quadrant. The measured park acreage needs to be existing and open to the public. If it is not existing, it must be developed within a five year period or prior to construction of 1,562 dwelling units within the park district beginning at the "* time the need is first identified in accordance with the Growth Management Ordinance. RESULTS ^ The current population in each quadrant, compared to the existing and *> planned park acreage in each quadrant determines park adequacy. That level of adequacy is 3 acres of parkland for each 1,000 population. The required park acres to population ratio are in a shortfall situation at this time in three of the four city quadrants. In accordance with the Growth Management Ordinance, acquisition, planning, and development efforts are taking place to ensure compliance with the Ordinance. The Parks Performance Standard of the Growth Management Plan is in compliance with the Growth Management Ordinance. ANALYSIS The population figures that the department currently uses are based upon the Finance Department's "Growth Projection" chart. This population figure includes units built through January 1, 2005. The equation to determine population is based on the number of units built, multiplied by 2.3178 people per unit. The matrix presented below illustrates the status of the Park Performance Standard in each of the City's four park districts. Park acreage amounts are based upon Community Park (Com.) and Special Use Areas (SUA) collective acreage totals. QUADRANT NW NE SW SE CURRENT POPULATION 28,809 13,019 .22,029 33,366 REQUIRED ACRES COM &SUA 86.42 acres 39.05 acres 66.08 acres 100.09 acres EXISTING ACRES COM &SUA 79.90 20.00 71.25 73.34 CURRENT SURPLUS/ DEFICIT - 6.52 acres -19.05 acres + 5.7 acres -26.75 acres The City is currently in a shortfall situation in the Northwest (-6.52 acres}, Northeast (-19.05 acres.), and Southeast quadrant (-26.75 acres.). ACTION PLAN Northwest Quadrant: The Quadrant is currently in a shortfall situation of 6.52 acres of parkland. The Pine Avenue Park at the site of the former Pine School is currently under construction. Construction began in May of 2005 with completion anticipated by the second quarter of 2006. This park will add an additional 7+ acres to the inventory of the Northwest Quadrant, which will bring the park acreage to a surplus based on the current population in this quadrant. Northeast Quadrant: To meet the current park shortfall of 19.05 acres in the NE Quadrant, the entire Hidden Canyon Community Park (22.2 acres) will be developed and opened for public use by early 2006. The quadrant will then be in compliance with the Growth Management Ordinance. Another source of park acreage within the NE Quadrant will be the acquisition of an additional 10-15 acres. Although acquisition of a site is currently being pursued, at this time, its development and subsequent acreage amount is not required to meet the Park Performance Standard for the Quadrant. Southwest Quadrant: Currently, the western half of Aviara Community Park is open and being utilized by the public. The eastern half of the park site is presently undergoing a maturation process to ensure longevity of the landscape. A dedication ceremony for the 24.25 acre park is anticipated in early 2006. The quadrant will be in compliance with the Parks Performance Standard at that time and will have in excess of 5 acres of parkland. Southeast Quadrant: The current park acreage shortfall in the quadrant is 26.75 acres. Staff is currently processing plans and specifications for the park Master Plan for the 30 acre Alga Norte site. It is anticipated to be completed by the second quarter of 2007. This will assure continued compliance with the Growth Management Ordinance as the site will add 30+ acres to the park inventory in that quadrant. POINT OF CONTACT Ken Price (760) 434-2826, Kpricfrici.carisbad.ca.us. Community Services CITYWIDE TRAILS PROGRAM - SERVICE DELIVERY THE OUTCOME A multi-use recreational trail system that addresses the recreational and leisure needs of Carlsbad residents while supporting the protection and preservation of open spaces in accordance with the City of Carlsbad General Plan. THE MEASUREMENT This measure will monitor and track the expansion of the Citywide trail system by providing increased trail mileage each year. WHAT THE MEASURE MEANS The Citywide Trails Master plan identifies approximately 58 miles of multi-use recreational trails to be completed at build out in Open Space areas of the City. Approximately 90 miles of Circulation Element Trails will be built as part of roadway sidewalks and bike lane construction. Some of these trails are completed. Many of the trails will be built as part of private development. The remaining trail mileage is to be constructed by Citywide Trail volunteers as part of the Citywide Trail Volunteer program. This measurement will literally measure how many miles of trail are being added on an annual basis to the Trails system. DEPARTMENTS INVOLVED Recreation/Park Planning Division Planning Parks BENCHMARK The amount of trails made available to the public depends upon 3 factors: 1. The amount of trail mileage being built as part of private development. 2. The amount of trail mileage being adopted into the system as part of Trail Easement Agreements for outstanding lODs 3. The amount being built by Citywide Volunteers. The benchmark for expanding the trail mileage on an annual basis will be 4 miles per year. This is based upon the above 3 factors and the pattern of trail development thus far. RESULTS The chart below summarizes the trail mileage for multi use recreational trails that were made available to the public from 2002-2004. Year Existing 2000 2002-03 2002-03 2003-04 2003-04 2003-04 2003-04 2003-04 2003-04 2004 Trail Name Hosp Grove Rancho Carrillo La Costa Valley Arroyo Vista Villagio La Costa Glen Hidden Canyon Park Poinsettia Lane College Ave. Total Trail Mileage Length (Miles) <3> 4.0 1.3 0.5 0 .5 1.5 0.25 0 .25 1.0 14.O Constructed By Volunteers Private Dev. Private Dev. Private Dev. Private Dev. Private Dev. Volunteers Private Dev. Private Dev. ANALYSIS In 2005, Carlsbad exceeded its benchmark of providing 4 miles of trails per year as summarized in the chart below. Open Space Trails Villages of La Costa-The Ridge Total Circulation Element Trails Poinsettia Lane- VLC- The Greens El Fuerte- Bressi Ranch Alicante Rd.- Bressi Ranch Total Special Coastal Rail Trail Total New City wide Trail Mileage 2OO5 Trail Surface Paved /old RSF Road Unpaved Unpaved Paved Length in miles 1.0 1.0 2.1 1.0 1.0 4.0 0.7 5.8 Construction Developer Developer Developer Developer City This Performance Measurement has been met for 2005 and is due mainly to the construction of trails as part of private development and the Phase I construction of the Coastal Rail Trail. ACTION PLAN Continue to require public trail easements and the construction of trails as part of ongoing private development for trails identified in the Citywide Trails Master Plan that fall within private development areas. Continue to process Acceptance Agreements for Irrevocable Offers of Dedication(IODs) for Citywide public trail easements that were previously rejected as part of private development. Continue the construction of those trails that have been identified in the Trails Master Plan that will occur on public lands. (Examples: Lake Calavera and Veterans Park). POINT OF CONTACT Liz Ketabian (760) 434-2826, Lketa@ci.carlsbad.ca.us. Community Services CITYWIDE TRAILS PROGRAM - CUSTOMER SATISFACTION THE OUTCOME A high level of customer satisfaction with Citywide Trails. THE MEASUREMENT City of Carlsbad Public Opinion Survey. WHAT THE MEASURE MEANS The survey will indicate if citizens are satisfied with the development of trails throughout the City and if the Department is reaching its goal of increasing access to Open Space. It is anticipated that this measure will change once the trail system is built out. DEPARTMENTS INVOLVED Recreation/Park Planning Division Planning Parks Maintenance BENCHMARK 90% of all surveys received will rate Carlsbad trails as good or excellent. RESULTS This is a new measure, no data from the survey is available this Fiscal Year. ACTION PLAN Include trail questions in the 2006 Citywide survey. POINT OF CONTACT: Liz Ketabian (760) 434-2826, LKeta@ci.carlsbad.ca.us. Community Services CITYWIDE TRAILS MAINTENANCE COSTS THE OUTCOME Trails maintenance cost efficiency. THE MEASUREMENT Maintenance cost per mile (total miles maintained/annual expenditures). This measurement excludes costs for Capital Improvement Projects. WHAT THE MEASURE MEANS A goal for the Recreation and Parks Maintenance Departments is to provide well-maintained and safe trails for those using them to walk, hike, bike, jog, or view nature. This measure will demonstrate fiscally responsible use of funds allocated for trail maintenance and indicate how volunteer resources are being used to supplement the maintenance program for the trails. DEPARTMENTS INVOLVED Recreation Department and Parks Maintenance. BENCHMARK The benchmark is subject to change and may need to be adjusted in accordance with the number of volunteer resources available to supplement the City's Parks Maintenance staff. RESULTS For the past two years citywide trail maintenance and operations have been performed within the amounts budgeted for the program. Annual Maintenance and Operations costs for the trails are currently estimated at $3,276/mile. However, it is important to note that the amount budgeted for Maintenance and Operations in the past few years also includes materials and equipment costs for construction of new trails by Citywide trail volunteers. The table below indicates a summary of the miles of trails constructed/maintained over the past two years, the actual expenditures, and the cost per trail mile. Fiscal Year 2003-2004 2004-2005 Total Miles Maintained 8 12.5 Actual Expenditures $20,381 $40,951 Maintenance Cost Per Mile $2,548 $3,276 ANALYSIS Maintenance costs have increased as additional trails have been added to the citywide trails system. Salaries, materials, tools, and equipment needs have been adjusted in the Citywide Trails Budget to reflect these increases. The increased maintenance cost of $728 per trail mile in FY 04-05 was partially due to added construction by trails volunteers (e.g., Rancho Carrillo ADA Ramp, kiosks, signs/markers, and other improvements). The maintenance cost per mile is expected to further increase in FY 05-06, as a result of the incorporation of City Council approved budget additions to staffing and materials. These additions were approved in order to allow for the continuing construction and maintenance of the Citywide Trails System at a level that is appropriate to the citizens of Carlsbad's needs. Previous research and information from other municipalities in the region with similar trails programs, was utilized to determine an initial cost per mile of maintenance. This figure ranged between $2,500 and $5,800 per trail mile. ACTION PLAN In FY 05-06 the City Council approved the addition of a Parks Maintenance position whose duties will include Citywide Trails System maintenance. The recruitment is expected to be completed by January 2006. The person hired will provide maintenance assistance on the existing trails, and the balance of the 8.5 miles of trails projected to be accepted in FY 05-06. This addition increases the Parks Maintenance Department's ability to coordinate and maintain the trail system to ensure user safety and enjoyment. Since the implementation of the Citywide Trails Program began in 2002, the City has also utilized Trails Volunteers to assist in the maintenance and construction of trails. It is recommended that the use of the Citywide trail volunteers continue, as they are a valuable resource for providing and assisting Parks Maintenance staff in the effective delivery of well maintained trails to the public. As the amount of trail mileage increases, and as the number of volunteers fluctuates, adjustments will need to be made for the amount of Park Maintenance staff required to provide the maintenance care established by the Parks Department Citywide Trail Maintenance Plan. A Citywide Adopt-A-Trail Program will also be considered for possible future implementation. Over the next several years, a new benchmark will be established based on internal historical data and industry standards. It is anticipated that the maintenance costs per mile will steadily increase each year as private development and volunteer construction efforts continue. This pattern is expected to level off as the Citywide Trails System nears build-out. POINT OF CONTACT Liz Ketabian, (760) 434-2826) - Recreation, Lketa(ajci.carlsbad.ca.us. Community Development GROWTH MANAGEMENT - OPEN SPACE THE OUTCOME A comprehensive, connected open space system that protects and conserves the City's natural resources. THE MEASUREMENT The amount of land set aside for permanent open space. At build-out of the City, there will be approximately 40% of the land area in the City set-aside for permanent open space. WHAT THE DATA MEANS At the time of preparation of the Growth Management Plan, it was determined that an additional amount of open space (15%) needed to be set-aside in all areas of the City. This open space dedication is in addition to the environmentally constrained land that cannot be otherwise developed. Local Facility Management Plans have also been adopted to designate which additional land needs to be set aside. DEPARTMENTS INVOLVED Planning GROWTH MANAGEMENT STANDARD Fifteen Percent (15%) of the total land area in each of the 25 Local Facilities Management Zones must be set-aside for permanent open space and must be available concurrent with development. This does not include environmentally constrained, non-developable land. RESULTS At build-out of the City, as a result of this Growth Management Standard, there will be approximately 40% of the land area in the City set-aside for permanent open space. This is a product combining the 25% environmentally sensitivity open space and the 15% additional requirement of this Growth Management Standard. ANALYSIS The performance standard is working as anticipated. ACTION PLAN Continue to determine the acreage and location of the 15% performance measurement open space land at the time of preparation or amendment of Local Facility Zone Management Plans. Require land to be set-aside at time of individual project development. Over the next five years, it is anticipated that substantial amounts of open space will be set aside in compliance with the performance standard as a result of major projects such as Robertson Ranch and the Villages of La Costa. POINT OF CONTACT Michele Masterson(760) 602-4600, mmst@ci,carlsbad.ca.us. » O 5) 03. .o <.fl> oW CD Be a city that provides exceptional services on a daily basis Goals • Performance Measurement Resource Team • Technology Disaster Recovery Plan • Human Resources Business Process Plan • Integrated Financial & Personnel Management Systems • HR Service Center Work Processes • Library Balanced Scorecard Implementation • Library Information Security/Privacy • Recreation Department Marketing & Sponsorship Guidelines • Naming Rights for City Facilities • New Customer Service Initiative • Section 8 Management Administrative Handbook • PUD/Code Modifications • Land Status Database • Facilities Replacement Program Implementation • Capital Improvement Projects • Standard Operating Procedures for Maintenance & Operations • Performance Improvement for Sanitation Operations • Capital Improvement Projects • Water & Sewer Work Management Program • Assessment of Public Works Administrative Support Operations • Contract Maintenance Inspection • Downtown Maintenance/Enhancement Program Parks' Tot Lot Improvements Public Works Contract - Electronic Bidding Irrigation and Landscape Enhancement Fleet Inventory Control Program Fleet PM Maintenance Benchmarking Study Performance Improvement for Water Operations Technology Enhancement Construction Project Transition Northwest Quadrant Storm Drain Study Construction Specification Institute (CSI) Contract Document Update PW Performance Measurement Program CM Records Retention Update Management Goal Administration Citywide Customer Service Initiatives Leadership Team Achievement of MSA Goals Rancho Carlsbad Flood Control Maintenance Program Update Library Service Reorganization Tow Contracts Growth Management There are adequate City Administrative Facilities for the current population in Carlsbad, and the City is in conformance with the Growth Management Ordinance for City Administrative Facilities. Trends and Observations • Across the six years of the survey, the evaluation of Overall City Services has been very positive - over 90% of respondents have given ratings of Excellent or Good in each year. In 2005, the percentage of respondents rating city services as Excellent was the highest of any year surveyed. • The increase in expenditures for Facilities is due to an increase in associated personnel costs (34%) and an increase in contracted services (64%) • Police Department employees were responsible for over 60% of the Carlsbad's lost working days due to injury - with a total of 628 "lost days." The Fire Department has improved in this area significantly over the last year, with a total loss of 193 days. Police and Fire employees together were responsible for 79% of the lost days. Senate Bill 899 / Workers' Compensation Reform will play a significant role in reducing worker's compensation costs. City staff is actively pursuing worker's compensation claim closure and will work towards integrating and maximizing the efforts of accident prevention and claims management. Citywide OVERALL CITIZEN SATISFACTION WITH CITY SERVICES THE OUTCOME High level of citizen satisfaction with the overall City services. THE MEASUREMENT Survey results to the question in the citywide survey, "How do you rate the overall city services?" WHAT THE DATA MEANS Part of the City of Carlsbad's mission is to provide top-quality services to all those who live, work, and play in the City. This measure of how the citizens rate their overall level of satisfaction with city services provides staff with a better understanding of the overall effectiveness of city programs. DEPARTMENTS INVOLVED Citywide. BENCHMARK 90% of respondents rate their satisfaction with overall City services as "Good or Excellent". RESULTS BENCHMARK 90% 2000 92% 2001 96% 2002 95% 2O03 96% 2O04 91% 20O5 92% ANALYSIS This is the sixth year that the City has asked its residents how they rate their overall satisfaction with City services. As was the case last year, the trends reflect significant positive ratings from the public at large (less than 1% of the overall survey respondents rated City services as poor). The consistency of the rating is worth noting (over 90 % for the past six years), and continues to be above the benchmark. Through prior evaluation, staff has determined that a correlation exists between how respondents rate the City on land use, communication, confidence in Local Government, and overall services that the City provides. These numbers stayed fairly consistent with last years, thus the relatively small amount of change in the results. ACTION PLAN Continue to monitor and evaluate the overall satisfaction of city services. Continue to work to increase citizen satisfaction in communication, the City's use of land, and Citizen confidence in the local government. POINT OF CONTACT Joe Garuba (760)434-2820, Jgaru(a'ci.carisbad.ca.us. Public Works FACILITIES SERVICE DELIVERY THE OUTCOME Well-maintained and safe facilities. THE MEASUREMENT The condition of city-owned buildings based on observation by community representatives, City employees, and outside professionals. WHAT THE DATA MEANS The recently implemented Maintenance Assessment Program (MAP) utilizes community representatives, outside professionals, and City employees to rate the overall quality of care a facility is receiving. Observers complete a rating form while conducting an on-site evaluation, results are tabulated and an overall score is obtained. Areas of focus include exterior maintenance, interior maintenance, interior general space custodial services, and restroom cleaning. By establishing an objective rating value for City-owned buildings, the data from observers can be measured and compared to the established benchmark and opportunities for improvement in procedures, policies and/or methods of operations can be explored. DEPARTMENT INVOLVED General Services/Facilities Maintenance. BENCHMARK 90% of the ratings are at or above 7 on a 10-point scale (1 being the lowest and 10 being the highest). RESULTS BENCHMARK 90% Fall 2003 89% Spring 2004 98% Fall 2004 96% Spring 20O5 96% Fall 2005 94% ANALYSIS This measure utilizes the Maintenance Assessment Program to obtain feedback from outside observers on the condition of City facilities. If the condition of a facility is rated low, staff will investigate what caused the low score, and take corrective action if appropriate. Last year's MAP results included the first full-scale assessment conducted in the fall of 2004. Since that time we have conducted two reviews during 2005. In each review, two observer teams consisting of three to four raters visited a total of 6 buildings in the spring and 7 in the fall. The buildings evaluated in each review are listed in the table below. For each evaluation, a representative sampling of facilities will be selected for review. Consequently, not all facilities will have a score for each evaluation. A breakdown of the ratings for the buildings that were evaluated follows: % of responses greater than or equal to 7 Eval. Date: Oct. 10, 2003 May 5, 2004 Nov. 18, 2004 May 26, 2005 Oct. 20, 2005 Calavera Comm. Center 98% 98% 86% 93% 86% Dove Library 85% 99% 98% Faraday 100% 100% 97% Stagecoach Comm. Center 87% 96% 98% 96% 100% City Hall 92% 100% 97% 98% 93% Safety Centex -- -- - 98% Fire Station #1 - -- -- 100% Fire Station #2 78% 92% Fire Station #5 -- -- - 96% Harding Comm. Center -- -- -- 93% Carrillo Ranch -- -- -- 90% Cole Library 95% 92% 95% Magee House 98% 100% Maint. & Operations 95% 95% Overall Rating 89% 98% 96% 96% 94% ACTION PLAN • Continue to examine workload to determine what blend of contract and City staff should be used. • Continue to analyze current contract inspection practices to ensure contract work meets standards. • Analyze specific comments received during evaluation process and implement any Capital Improvement Projects during the 06-07-budget process. An area to consider is the interior of Calavera Community Center. POINT OF CONTACT Thomas Moore, Facilities and Streets Superintendent (760) 434-2939, Tmoor(a';ci.carlsba.d.ca.us. Public Works FACILITIES MAINTENANCE COST THE OUTCOME Facility cost efficiency. THE MEASUREMENT Maintenance cost per square foot of building space. Building space is defined as City-owned facilities that the City is obligated to maintain (utilized by city staff or leased to private and/or non-profit organizations). This measurement excludes capital expenditures. WHAT THE DATA MEANS This measure demonstrates the efficient use of funds allocated to facilities maintenance, and shows how resources are being used to achieve objectives. DEPARTMENT INVOLVED General Services/Facilities Maintenance. BENCHMARK Maintenance cost per square foot will be consistent with the national mean as reported by the International Facilities Management Association (IFMA). The IFMA survey is not completed on a yearly basis; the benchmark will be adjusted by the San Diego Consumer Price Index (CPI) on alternating years (3.3% in 2005). RESULTS Fiscal Year 2003 2004 2005 Expenditures $2,286,155 $2,687,338 $2,910,799 Total Maintained Square Feet 410,649 419,424 419,424 Cost per Square Foot $5.57 $6.41 $6.94 Benchmark $6.57 $6.39 $6.60! 1IFMA standards, revised benchmark multiplied by CPI of 3.3% ANALYSIS The 2004 IFMA report included the results of 440 returned surveys from IFMA professional members in the U.S. and Canada. The IFMA benchmarking report is completed only every second year so for this year's comparison the 2004 figure was multiplied by the San Diego CPI of 3.3% to create the benchmark number. The IFMA standard for cost per square foot is based on custodial, utility and maintenance costs of a facility. Based on the collected data, the City is $0.34 above the national mean. It should be noted that the IFMA figures are a national average and do not take into account the variations in costs between regions of the country. For example the March 2005 Civil Works construction Cost Index System report mentions that California has a weighting factor for costs of 1.19 above the national average. If this factor were applied to the IFMA figure of $6.60 it would result in a figure of $7.85 per square foot. Overall there was an increase in expenditures of $223,461 in the most recent fiscal year. 38% of the increase is attributable to an increase in the City employee benefit rate and 62% to an increase in contracted services costs. The contract service cost increase can be attributed to the increased cost of materials and labor in the booming southern California construction industry as well as a large increase to Heating and Air conditioner repairs required to keep some of these aging systems operating. The City owns approximately 54 buildings and is involved in managing and maintaining these facilities. Some of these facilities were not calculated in the total square footage because the City does not use these sites to conduct City business to any large degree. Of note, buildings such as Farmers Insurance Building, Helen Allman Girls Club and the Senior Center Annex (formally CUSD) require staff and contractor time to remain operational which create costs that register against the expenditure portion of the measure but due to the minimal City usage of these spaces the square footage has not been included with the total square footage in the above calculations. ACTION PLAN • Continue to learn which tasks can best be contracted out and which should remain the function of City staff. • Investigate the work being provided by contract staff and determine what level of inspection would ensure quality work is being provided. • Seek out energy efficient solutions to building maintenance needs that can heat, light and cool the facilities more efficiently. Use incentive and rebate programs where available to install energy efficient systems. • Replace some of the City's high maintenance HVAC systems such as at the Cole library. • Investigate the use of a Regional weighting for cost measurement comparison. POINT OF CONTACT Thomas Moore, Facilities and Streets Supervisor (760) 434-2939, Tmoorfo),ci.carlsbd.ca.us. Public Works FACILITIES CUSTOMER SERVICE AND SATISFACTION THE OUTCOME Buildings/offices that are safe, attractive and comfortable allowing employees to conduct City business and provide services to the Community. THE MEASUREMENT This measure uses a multi-modal approach combining: Internal Customer Service Survey: Survey results to questions in an annual survey of City employees that asks, "Using a scale of 1 to 5, where 1 means very poor and 5 means Excellent, how would you rate your level of satisfaction with Facilities Maintenance performance?" Work Order Response Time: The length of time it takes to complete work orders. WHAT THE DATA MEANS Internal Customer Service Survey. This measure is an indication of how well expectations are met while providing services to ensure buildings/offices are a safe and comfortable place to work. Work Order Response Time: This measure is an indication of how quickly staff can respond to work orders ensuring the safety, attractiveness, and comfort of the workspace. • Emergency work orders eliminate hazards, unsanitary conditions and reduce liabilities (e.g. broken plumbing or electrical, trip hazards, etc.). • High Priority work orders are repairs and alterations so the City can conduct its business and provide services to the community (e.g. audio visual equipment, furniture and HVAC repairs). • Medium Priority work orders are requests and/or repairs for scheduled activities that do not impede staffs ability to effectively perform his/her duties (e.g. hanging pictures on the wall, moving surplus, replacing doorstops, etc.). • Low Priority work orders are requests and/or repairs to improve the working environment of City staff (e.g. painting an office, changing furniture styles, etc). DEPARTMENT INVOLVED General Services/Facilities Maintenance. BENCHMARK Internal Customer Service Survey. 90% of internal surveys returned indicate the overall quality of service by Facilities Maintenance at Good or Excellent. Work Order Response Time: • 90% of Emergency work orders completed within 24 hours. • 90% of High Priority work orders completed within 72 hours. • 90% of Medium Priority work orders completed within 20 days. • 90% of Low Priority work orders completed within 30 days RESULTS Internal Customer Service Survey - Overall quality of service BENCHMARK 90% 20O2 81% 2003 83% 2004 95% 2005 89% Facilities Maintenance % Good or Excellent Timeliness of service Courtesy of staff Competence of staff Completeness of service Helpfulness of staff 2002 67% 96% 93% 80% 92% 2003 63% 96% 86% 81% 92% 20O4 83% 98% 94% 86% 94% 2005 80% 100% 98% 89% 96% Work Order Response Time: YEAR 2001-02 2002-03 2003-04 2004-05 BENCHMARK 90% 90% 90% 90% EMERGENCY 97% 97% 97% 96% HIGH PRIORITY 97% 98% 93% 93% MEDIUM PRIORITY 84% 92% 95% 96% LOW PRIORITY 82% 74% 88% 94% ANALYSIS Internal Customer Service Survey: The Facilities department received an overall quality of service rating of 89% this year. This rating was very close to the benchmark of 90% but a drop of six percentage points from the previous year. This rating will be closely monitored in next year's survey to ensure that the overall satisfaction rating remains at the current level or higher. Courtesy of staff continued to be a department strength with a 100% rating being received this year. Timeliness of service continued to be the lowest rated service attribute in the survey with a rating of 80% this year however this is an overall increase over the 2002 and 2003 years for this measure. The Facilities survey was sent to the entire 690 City full-time staff members this year compared to 2004 when only 270 surveys were distributed to targeted City staff. Sixty-five (9%) of surveyed employees returned their completed survey in 2005, which is down from a 33% response rate in 2004. This drop in response rate can be contributed in part from the shorten time line for returning the survey forms this year as well as the fact that the surveys were sent to all City staff this year. Total Work Orders and Percentage Completed: PRIORITY Emergency High Medium Low Total 2003 Work Orders 42 307 482 290 1,121 Percent Complete 97% 98% 92% 74% 2OO4 Work Orders 39 247 382 263 931 Percent Complete 97% 93% 95% 88% 2005 Work Orders 25 286 303 240 854 Percent Complete 96% 93% 96% 94% For the third year in a row, emergency-, high- and medium-priority work orders achieved benchmark with low priority work orders also exceeding the benchmark for the first time this year. Low priority work order completion within target has increased from 74% in 2003 to 94% in 2005. Overall there is a decrease in the total number of work orders opened from 1,121 in 2003 to 854 in 2005. While the decrease is most likely attributable to several factors, there were several large projects that took a considerable amount of time last year including the City Council chamber remodel, the Stagecoach lobby remodel and various jobs resulting from the winter storms. Additionally, small "add-on" jobs that are created by a request that occurs while a technician is completing another request are not necessarily captured, and this might have been heightened by the immediacy of dealing with requests related to last winter's storms. ACTION PLAN • Investigate the use of handheld Mainstar work order devices to allow staff to enter and close work orders from the field. This would assist in ensuring that jobs are always tracked on the system in the form of a work order. • Need to identify additional resources to assist facility staff to complete all requests in a timely manner. This will likely come in the form of contracted services. • Actively working to create a web based version of the survey so that staff can complete it online next year. It is expected that this easy-to-complete format would encourage a larger response rate and simplify compilation of the results. • As the department is under new management, the new Superintendent and Supervisor will review current processes to ensure adequate tracking and reporting is conducted. POINT OF CONTACT Thomas Moore, Facilities and Streets Superintendent (760) 434-2939, Tmoor(a}ci.carlsbad.ca.us. Public Works FLEET AVAILABILITY, COST & CUSTOMER SATISFACTION THE OUTCOME A fiscally responsible fleet maintenance program with highly satisfied customers and high levels of fleet availability. RESULTS MEASURE BENCHMARK RESULTS Customer Satisfaction 90%88% Fleet Availability 90% maintenance 95% availability 75% 98% Maintenance Costs Costs equal to or lower than National estimates 5 classes lower or equal to national benchmarks 2 classes slightly higher than national benchmarksl 2 classes benchmark to be determined. ANALYSIS Costs for Carlsbad's fleet maintenance program are in-line with national standards. The availability of the fleet is strong. Turnaround times for scheduled maintenance continue to be a challenge, and customer satisfaction while relatively strong, slipped just below benchmark levels. The vehicle liaison program was implemented this year, with the intent of improving timeliness of preventative maintenance and increasing overall customer satisfaction. The concept of the vehicle liaison program is to have a few specific individuals from each MSA, or major customer groups as contacts for Fleet. These individuals receive maintenance updates and messages from fleet, and communicate their divisions' needs to fleet. The liaison program was implemented in the final quarter of the fiscal year, so the full impact of this program is not reflected in the survey results. Additionally, staff continued to make efforts to notify employees via e-mail or by phone on the status of their vehicle. It is largely believed that communication is the most important component in achieving customer satisfaction. The percentage of customers who rated overall satisfaction as "Good" or "Excellent" dipped just below the 1 These classes are Light Truck Police and Police Motorcycle. ICMA standards combine these classes with Police Sedan, whereas the City considers them separately. •4 '«% benchmark of 90%, at 88%. Survey response rates continued to be low, at 26% (28 of 109 surveys returned). With low response rates, any individual survey would have a more significant impact on the overall results. This was certainly the case this year as survey results were generally favorable although a couple of respondents did relay concerns and their scores were reflected in the decreased results for this year. To address continuing low response rates, the Public Works Performance Measurement team is working to create a web-based survey for next fiscal year, with the hope of simplifying the customer service measurement process and providing more timely feedback. 24-hour turnaround of scheduled preventative maintenance continues to be a challenge. For the last three years, results have consistently been in the range of 70% to 78%. The department liaison program was created with the hope that improved communication would improve timeliness of vehicles being brought in for scheduled maintenance so that vehicles are serviced when there is adequate staffing available to complete the work on time. Implementation of the program occurred too late in the year to really have an impact in fiscal year 2005 results. However, staff is optimistic that it will have a positive impact in the coming year as a review of the 2005 data shows that many of the vehicles that did not meet the 24-hour turnaround are clustered around the same day which is indicative of vehicles brought in outside of their regular schedule. Vehicle drop-off time has impacted this measure. Of note, only 60% of the vehicles logged in during the afternoon were completed under 24-hours, and no vehicles logged in on Friday afternoon were completed within 24-hours. Afternoon drop-offs are generally a convenience for the customer; but, while it represents good customer service, it does decrease the ability of staff to get that vehicle back within the 24-hour target timeframe. Although adjustments to allowable drop-off times may improve the results for this particular measure, they would have a negative impact on customer service and potentially the overall quality of the service provided. With a full-year of the department liaison program in place, we expect turnaround rates to improve. However, missed appointments, and late drop-off times will continue to limit staffs ability to meet the 90% benchmark in this category. Once again we exceeded the benchmark for vehicles available for use (95%) reaching a 98% fleet availability rating. This year is the second full year in which the new Computerized Maintenance Management System (CMMS) reports were available. The cost data includes labor, parts, outside repairs, fuel, and oil. This data represents the cost per mile over the life of the vehicle from the inception of the CMMS. A significant change for this year is the introduction of new categories of vehicles, including breaking out police vehicles and fire apparatus. This is a more accurate snapshot of the various vehicle classes in the City's fleet. Maintenance costs should therefore be more accurately reflected. The chart below shows comparisons of costs of the various categories in the City's fleet: Vehicle Class Sedan Police Sedan** Light Truck Light Truck Police** Medium Truck Heavy Truck MICU** Fire Apparatus** Police Motorcycles** Avg. Cost for Fleet+ Benchmark National Estimates $0.17-$0.31 $0.23 $0.23-$0.41 $0.23 TBD TBD $0.66 $2.30 $0.23 CPM End of 2003* $0.16 $0.22*** N/A $0.22*** $1.65 N/A N/A CPM End of 2004 $0.28 $0.31*** N/A $0.35*** $0.80 N/A N/A CPM End of FY 2005 $0.19 $0.19 $0.32 $0.37 $0.58 $2.79 $0.41 $1.98 $0.38 $0.63 * Only 7 months of data available. **These classes either were not reported or were combined with other classes prior to 2005. ***Combination of classes in prior years' reports. These specific classes as currently defined are new for 2005. +Includes fuel for all classes of vehicles In an effort to determine if national standards existed, we were able to find comparisons for several of our vehicle classes. Two primary sources of data were used for comparison: Fleet Central, publisher of Government Fleet magazine, and ICMA. Fleet Central provides a lifetime cost analyzer for several models of sedans and light and medium duty trucks. ICMA provides data for classes including Police Vehicles, EMS vehicles (ambulances) and Fire Apparatus. Sedan costs for Carlsbad totaled $0.19 per mile; Fleet Central provides costs for compact and intermediate sedans that are model specific and range from $0.17 to $.31/mile. For light trucks, the cost range is $0.23 to $0.41/mile. This category includes compact and larger pick-up trucks, mini- vans, SUVs and full-size vans, which accounts for the broad range of costs. The City's average cost for this category is $0.32/mile. Some data was garnered from ICMA's survey of local jurisdictions, and is included here. Where ICMA data was used, the cost comparison does not include fuel costs, in order to provide amore accurate comparison. There are some drawbacks to using ICMA data. First, ICMA includes Motorcycles and SUVs in the Police Vehicle category, whereas the City separates these categories. Second, ICMA does not include fuel costs in their analysis, while Carlsbad does. However, as the chart illustrates, Carlsbad is generally within the range of expected costs for most vehicle classes. ACTION PLAN Customer Satisfaction • Continue department liaison program. • Work on Internet survey for post-service follow-up with customers. Preventive Maintenance Work Orders Completed in 24 hours: • Analyze impacts of the department liaison program after a full-year of implementation. Units Available for Use: • Continue tracking results and monitoring to ensure we remain above the established benchmark. Maintenance Costs • Find suitable benchmark data for those classes that do not currently have a benchmark. POINT OF CONTACT Gary Jenner, Public Works Supervisor, (760) 931-2192, gjennfaici.carlsbad.ca.us Administrative Services HUMAN RESOURCES - INJURED EMPLOYEE TIME OFF THE OUTCOME Minimization of the amount of time that industrially injured employees are off C work. ( x* THE MEASUREMENT /Number of days between the dates an employee is injured on the job and the date that the employee returns to full or modified duty with the City. WHAT THE DATA MEANS Research shows that the greater the amount of time that an injured employee remains off work, the less likely he/she will return as a productive member of the workforce. In fiscal year 2004-2005 the City spent over 2 million dollars on ( workers' compensation insurance and claims, and that figure does not even ?> include the fiscal impact of lost productivity. By reducing the number of days that an employee is out of the workplace, the City can reduce workers' *•' compensation expenditures; ensure adequate staffing levels for City C departments and enhance the connection between the injured employee and * the City. X V /*•This measure is used to analyze trends, identify high-risk work groups and as an efficiency comparison to other agencies. This data is tracked and posted at sites throughout the City per Cal OSHA requirements. This measure is part of •* Human Resources Total Disability Management Program. DEPARTMENTS INVOLVED Human Resources, all City departments. BENCHMARK An average of 4.2 days or less lost per claim. This benchmark is based on the ICMA average for agencies with less than 100,000 populations, and will be ' reviewed annually. £ RESULTS ^ Benchmark-ICMA Carlsbad FY 2002/2003 6.0 7.5 FY 2003/2004 4.8 10.8 FY 2004/2OOS 4.2 41.4 ANALYSIS This measure can be used as an indicator of the success of an agency's disability management program. The data shows that Carlsbad's average number of days lost per claim is 37 days more than the average for cities under 100,000 reporting to ICMA. Our average radically increased by 30 plus days over the last two years, while the ICMA average decreased. Based upon our analysis, Police Department employees were responsible for over 60% of Carlsbad's lost working days in this reporting period, with 628 lost days. The Police Department had a total of 16 claims this reporting period. Of those 16, the 6 largest claims account for 87% of the Police Departments lost days. Back injuries are responsible for 5 of the 6 largest claims. Last year, Fire Department employees were responsible for over 40% of Carlsbad's lost working days with a total of 371 lost days. They improved significantly this year with a total of 193 lost days. Police and Fire employees together were responsible for 79% of the lost days in this reporting period. For both Police and Fire, the large number of lost working days is partially attributed to the provisions of Labor Code Section 4850, which entitles Safety personnel who are totally temporarily disabled and not at work, full salary up to one year. This "benefit" often works as a disincentive for employees to return to work. Public Works also had fewer lost days of work compared to last year. They went from 241 lost days of work last reporting period, to 173 lost days this year. Public Works recently implemented a new-hire policy requiring pre- employment physicals for all new part-time employees. This may have contributed to the improved numbers. ACTION PLAN Human Resources has resumed the practice of distributing workers' compensation loss data to the Leadership Team and other managers in the City. The Police Department has recently instituted a formal monthly workers' compensation claim review process. We will work to establish a more formal, scheduled process to share this data with all city departments to ensure this cost center receives attention. In fiscal year 2004-2005 there was a management goal surrounding workers' compensation issues. As an outcome of the goal, the team created an injury management toolbox that includes a list of preventative action and cost mitigation process. The toolbox was shared with all levels of the organization. Human Resources have commenced a focused wellness strategy targeting the aging workface in the Police Department. The program designed for the Police Department consists of baseline medical testing, safety and wellness training directed toward supervisory and line staff, and the development of fitness plans for individual employees. Early in 2006, we will bring on-site, a mobile medical screening, which will < provide wellness screenings to all City employees. Senate Bill 899/Workers' ( Compensation Reform will play a significant role in reducing workers' compensation costs. Some of the key elements of the reforms are: • Management of medical treatment/Developed a Medical Provider Network * (MPN) M • Reduction in permanent disability for return to work { • Apportionment of permanent disability for prior injuries / /City staff is actively pursuing workers' compensation claim closure by attending workers' compensation hearings and depositions, delaying claims, utilizing sub-rosa or surveillance, and maintaining high visibility on every claim. In addition, staff will work towards integrating and maximizing the efforts of accident prevention and claims management. The City will continue to monitor this data and encourage the implementation of programs to reduce the number of days an employee is out of the workplace. POINT OF CONTACT Rebecca Melillo, Management Analyst, (760) 602-2442, Rmeli(fl)ci. carlsbad. ca. us t t » c e Administrative Services- HUMAN RESOURCES - EMPLOYEE TURNOVER RATE THE OUTCOME Minimization of costs to the organization that result from employee turnover. THE MEASUREMENT The number of full-time, permanent employees who left the organization during the reporting period, divided by the total number of employees. DEPARTMENTS INVOLVED Human Resources, all City departments BENCHMARK A turnover rate of less than 5.8%. This benchmark is based on the average turnover rate for agencies with population under 100,000 reporting to ICMA for fiscal year 2004/2005, and will be reviewed annually. RESULTS Reason for Separation from Organization Resignations Retirement Retirement Disability Retirement Industrial Terminations Termination during probation Deceased Total *Total for ICMA Benchmarking Carlsbad gross turnover rate *Carlsbad ICMA comparable turnover rate Average Turnover rate for ICMA agencies with under 100,000 population FY 01/02 16 8 0 1 3 4 0 32 19 3.2% FY 02/03 23 9 3 5 2 3 0 45 25 7.0% 3.9% 9.8% FY O3/O4 27 10 0 3 0 6 1 47 27 7.5% 4.3% 6.1% FY 04/05 23 27 1 3 1 2 0 57 23 8.9% 3.6% 5.8% The ICMA turnover figure includes only resignations and non-probationary terminations. ANALYSIS This measure is an indicator of the effectiveness of employee recruiting and selection, quality of the organizational environment, effectiveness of the employer's wage and benefit structure, and age demographics of an organization's employees. The turnover rate for the City of Carlsbad is about two percentage points less than the ICMA average. There were a total of 23 resignations in this reporting period. There were 9 resignations in the Public Works MSA, 4 of which are positions in the Management Analyst series. The Community Services MSA has the second largest number of resignations, with 5. There were only 2 resignations in the Police Department, down from 10 the previous fiscal year. The majority of Carlsbad turnover was due to retirements. There were 31 retirements in this reporting period. Last fiscal year there were only 13 retirements. The retirements were spread throughout the City. Public Works and Public Safety had the highest numbers at 8 each. The retirement figures do not impact the benchmark number we compare against from the ICMA survey, as ICMA only counts resignations and non-probationary terminations in their figures. However, retirements have a considerable impact on the organization and this data is important to consider and forecast. ACTION PLAN Human Resources will continue the exit interview program for all resignations. The data collected in these interviews provides information that is often valuable to our client departments and gives us information on our competitiveness in the salary market. Human Resources will be more proactive in sharing turnover data with our clients in the coming year, as the large amount of retirements and anticipated retirements are making staffing a significant organizational issue. The Human Resources staff continues to work with departments to ensure that the right employees are performing the right jobs, and that employees are held accountable. A turnover rate of up to 8% is considered "healthy", and may in fact prove to be beneficial in enhancing accountability in the organization. POINT OF CONTACT Rebecca Melillo, Management Analyst (760) 602-2441, Rmeli@ci.carlsbad.ca.us. Administrative Services HUMAN RESOURCES COST EFFICIENCY 1 •** THE OUTCOME Provide Human Resources services in a cost effective manner. THE MEASUREMENT Human Resources annual operating expenditures per number of full-time employees. WHAT THE DATA MEANS The goals of the Human Resources Department are to build people capability, build employee commitment and alignment, and build organizational capacity. This cost efficiency measure can monitor the fiscally responsible use of funds allocated to Human Resources to provide the services stated in our mission. DEPARTMENTS INVOLVED Human Resources. BENCHMARK Human Resources centralized expenditures as defined by ICMA Center for Performance Measurement. Figures include all HR staff salaries and benefits, all supplies, materials and direct costs. The figures do not include facilities costs, information technology costs, or worker's compensation. The benchmark agencies selected are California cities reporting to ICMA with HR Departments that provide similar services and serve similar size populations. RESULTS Benchmark Redwood City San Mateo Carlsbad Population 75,402 93,100 94,400 tFTE's 511 553 794 HR Expenditures $1,243,424 $630,600 1,242,650 Expenditure/ FTE $2,433 $1,140 $1,565 ANALYSIS The Human Resources operating expenditures per full-time employee fall between the expenditures of the two agencies identified. As a result of significant budget reductions and lay-offs, the numbers reported by San Mateo are considerably lower than in the previous reporting period and Redwood City is reporting fewer FTE's. The operating expenditure figure includes: salaries 85 benefits of HR staff and all direct costs such as supplies, materials, and professional services. The operating expenditure figure does not include salaries and benefits for employees or citywide training expenses. ACTION PLAN The Human Resources Department will continue to analyze expenditures and compare them with other high-performing agencies. The Department will identify individual HR services for benchmarking, such as Recruitment Advertising, as more specific measures may prove to be more useful. POINT OF CONTACT Rebecca Melillo, Management Analyst (760) 602-2442, i. carlsbad. ca.us. t e t *t Administrative Services NETWORK OPERABILITY THE OUTCOME A functional operating information technology network. THE MEASUREMENT Amount of time required for users to return to operational status. Problems are divided into two categories. Priority 1 • Total work stoppage on a critical system or operation • Server down: affects whole site • Core system down: Permits plus, IFAS, OPAC for Public Access, SIRSI, RFA, etc. • City-wide Internet access down • Telephones: remote site loses access - no voice and/or data • Critical failures of technology services regularly provided to the public at City facilities Priority 2 • Serious or potentially critical work slowdowns • Printer issues - can't print and no alternate print source is available • Hardware failure - monitor/keyboard/etc. • Public terminal with Internet access While not falling under the network operability performance measure, priority 3 and priority 4 calls are defined as follows and are included in the total tickets figure in the table below. Priority 3 • Slight interruptions in work flow, affecting one user Priority 4 • Minimal interruptions in workflow and/or waiting action by others for completion WHAT THE DATA MEANS The measure is an indication of staffing levels, staff knowledge, and staff initiative to ensure that calls are resolved and completed in both a timely and effective manner. DEPARTMENTS INVOLVED Information Technology. BENCHMARK • 90% of all priority 1 service calls resolved in 60 minutes • 90% of all priority 2 service calls resolved in 180 minutes RESULTS Priority 1 Priority 2 Benchmark 90% 90% 2001 85% 95% 2002 80% 98% 2003 84% 98% 2004 85% 97% 2005 88% 97% ANALYSIS Analysis of the call volume by priority showed the following results: Calls Priority 1 Priority 2 Total Tickets all Priorities 2001 107 676 6,676 2002 245 1249 6,423 2003 236 1874 5,361 20O4 27* 148* 5,432 2005 10 85 4,962 Service Calls now broken out into four levels: Urgent (1), High (2), Medium (3) and Low (4). Prior years reflected three levels: High (1), Medium (2), Low (3). The data collected tracks the elapsed time from when the service call was opened until the time the service call was resolved and the user returned to full operational status. Technology often times brings simplicity to our lives here at the City, however that simplicity is very elaborate in its implementation and support. This truth can be seen in the call trends. We are seeing fewer, yet more complicated calls. While the Priority 1 benchmark was not met, the Information Technology Department for the second year running did increase its performance over the prior year. ACTION PLAN • Continue monitoring of Urgent and High level calls. • Review the requests for service/tickets for possible trends, which might lead to a redesign, and new definition for priority levels. • Find possible benchmarking agencies. POINT OF CONTACT Kerry Jezisek, Sr. KieziCqjci.carlsbad.ca.us. Management Analyst (760) 602-2448, Administrative Services INFORMATION TECHNOLOGY COST THE OUTCOME Provide Information Technology Services in a cost-effective manner. THE MEASUREMENT Information Technology annual operating expenditures per full-time employee. WHAT THE DATA MEANS This measure evaluates the cost per employee spent by the IT Department on technology. The total cost of services includes all maintenance and operation costs incurred by Central IT for such items as: IT staff salary professional services, hardware and software maintenance, travel and communication charges. It does not include capital asset depreciation. BENCHMARK Annual cost of providing IT services per full-time employee will not exceed $7,555. This benchmark was established using data from the 2003 - 2004 baseline year (as calculated by itmWEB: Information Technology Spending Scorecard - IT Spending per Employee - All Industries) and has been adjusted each year by the San Diego Consumer Price Index ( 4.1% in 2004, 3.3% in 2005) RESULTS Fiscal Year 2003 2004 2005 Expenditures $3,064,329 $3,363,786 $3,685,175 # Full Time Employees 794 794 807 IT Spending/ Employee $3,859 $4,236 $4,566 Benchmark $6,918 $7,174 $7,411 Note: Each business is unique, and each may require resources significantly different from these figures. The intent of these benchmarks and metrics is for use as a "sanity check" against our current operation. ANALYSIS The metrics and benchmarks listed have been collected and summarized from sources considered to be reliable, and are recommended for use as a general reference for IT executives. Periodically revised, these statistics change as updated data becomes available. The City will reflect that changes with the benchmarking data tables. The 2005 IT spending per employee, like prior years, is below the benchmark. Spending in IT has been 2.5 - 3.0 times more than the CPI for that year. Spending levels have increased primarily due to large technology implementation efforts including the CAD and Library Web Services projects. ACTION PLAN This is the first year for this measure. In the upcoming year, Carlsbad IT Management will continue to perform industry research and leverage the relationships with partner IT organizations. The Department will analyze the year over year increases in expenditures to determine cause and conduct a SWOT analysis in any areas of concern. Another opportunity is to determine the best way to clarify, format and collect other cost data supporting additional meaningful comparisons. Incorporated into next year's measure are the results of this effort. POINT OF CONTACT Kerry Jezisek, Sr. Management Analyst (760) 602-2448, Kjezi@ci. carlsbad. ca. us Information Technology INFORMATION TECHNOLOGY SERVICE AND SATISFACTION THE OUTCOME A high level of customer service satisfaction and a high level of customer confidence in Information Technology (IT) staffs skills, knowledge and abilities. THE MEASUREMENT Results of an anonymous citywide employee opinion survey. WHAT THE DATA MEANS The measure is an indication of customer satisfaction with the Information Technology service levels provided to City staff. The measure is also an indication of staff knowledge, efficiency and effectiveness. DEPARTMENTS INVOLVED Information Technology. BENCHMARK Customer satisfaction: 90% of customers rate Information Technology as "Good" or "Excellent" (3 or better on a 1-4 scale) Customer Confidence: 80% of all service requests will be resolved in one on-site visit effort by IT staff RESULTS The following results were based on 535 surveys distributed via citywide email, 127 surveys completed, for a response percentage of 24%. Overall Customer Satisfaction with I.T. Services: Good or Year Excellent Benchmark 2001 - 2002 2002 - 2003 2003 - 2004 2004-2005 >90% 96% 81% 89% 90% Survey Results by % respondents at I.T. Service Area Good or Excellent Telephone Services Quality of Service Timeliness of Service Overall Satisfaction Network Services Quality of Service Timeliness of Service Overall Satisfaction Application Services Quality of Service Timeliness of Service Overall Satisfaction Desktop Services Quality of Service Timeliness of Service Overall Satisfaction Help Desk Services Quality of Service Timeliness of Service Staff Knowledge Overall Satisfaction 2004-2005 99% 95% 96% 95% 93% 94% 91% 91% 91% 92% 88% 89% 84% 81% 78% 80% Customer Confidence: Resolved in one Total # Benchmark Year on-site visit of Tickets 80% 2001 -2002 2002 - 2003 2003 - 2004 2004 - 2005 92.9% 92.1% 78.3% 82.9% 6,423 5,361 5,432 4,962 ANALYSIS This year's survey reflects a slight, but none-the-less significant increase in customer satisfaction. The increase is slight - only 1%, but significant because the benchmark rating of 90% was achieved. It is important to note that Information Technology is measuring not only our customer's level of satisfaction with the Information Technology Department, but also our customer's level of satisfaction with our outsourced help desk vendor. While the survey information is reviewed for overall satisfaction levels by IT management annually, it is the help desk services portion of the survey that comes under particular examination. ft-\. e ct 0 * * e The help desk is the functional area of the department that interfaces with City staff over the phone, but is generally the first contact if City staff requires assistance with technology resources. It is the help desk that receives, records, services and routes all requests for service by City staff. This group handles approximately 5,000 customer requests annually. Because of its level of importance, should the help desk receive a low rating (below 90% good or excellent), the help desk vendor's service premiums are reduced. The reduction of payment premium remains in effect until the appropriate customer service rating is received (at least 90% good or excellent.) It is in the category of help desk services that the highest percentage increases occurred. This increase is due primarily to two things: the vendor's increased familiarity with our technology environment and analysis of call solutions. When a call is resolved by the City of Carlsbad IT staff the solution is noted. The help desk reviews these tickets, reviews the solutions, trains their staff accordingly and then is able to offer a higher level of support to City staff. City staff is in-turn better pleased with the response and service they receive. In order for IT staff to achieve the 80% in one visit confidence measure, work effort must occur at a high competency and effectiveness level. The customer confidence measure has the benchmark goal of resolving 80% of all IT service calls effectively, to the requestor's satisfaction, and requiring only one on-site effort or contact by the IT staff member. The benchmark was exceeded this year - 2.9 points over goal. Staffs continued work on developing a stable infrastructure has paid off. Also seen is an increase in the stability and up time of the City's core applications/systems. This measure will continue to be a meaningful challenge - one that will help the Information Technology Department provide a solid, high level of service. ACTION PLAN • Continue monitoring of results of the citywide opinion survey. • Investigate methods for increasing help desk call resolution and satisfaction rate. • Develop a better methodology for tracking customer confidence - 80% of all tickets resolved in one on-site visit by IT staff. POINT OF CONTACT Kerry Jezisek, Sr. Management Analyst (760) 602-2448, KjeziCojci. carlsbad. ca. us. Citywide CITY ADMINISTRATIVE FACILITIES THE OUTCOME '• Provide Top Quality Services. I! r THE MEASUREMENT Administrative Facility Square Footage per 1000 population. WHAT THE DATA MEAN The standard of 1500 square feet per 1000 population is mandated per the Citywide Facilities and Improvement Management Plan. DEPARTMENTS INVOLVED f Citywide. ( BENCHMARK * 1500 square feet of administrative facilities per 1000 city population. * f" RESULTS Based upon a current population of 95, 150, the City is required to have at least 142,725 square feet of administrative office space. We will be required to have approximately 180,000 square feet at build-out. At the current time, the city has approximately 165,500 square feet of administrative facilities. This includes: • Faraday Center - 68,000 sq. ft • Public Safety Center - 64,000 sq. ft • City Hall - 13,000 sq. ft • Facility and Maintenance (Water Department) - 13,000 sq. ft • Oak Ave. - 5500 sq. ft • Redevelopment - 2000 sq. ft The City also owns the 300,000 sq. ft. Farmers Building which may be used as a City Hall in the future. ANALYSIS The city currently meets this growth management requirement. With the acquisition of the Farmers Insurance Building, the City is not required per the growth management standard to acquire any additional administrative space. The City has acquired the second story of the Senior Center for possible use as office space, and when renovations are complete, will be included in the City's ' inventory for Growth Management purposes. 1 ACTION PLAN Continue to monitor the increase in population growth in context of one required. POINT OF CONTACT Joe Garuba (760)434-2820, Jgaru@ci.carlsbad.ca.us. '*>, o So o ~ 0) COII^ o'CDO) Be a city that provides exceptional service on a daily basis Public Safety Indicators - Fire Regional Study - Emergency Medical Services Compliance Tracking - Fire Special Operations - Technology Enhancement - CEMAT - Joint First Responders Training Facility - Future Policing Methods - Police Process Improvements - Emergency Operating Procedures - Fire Emergency Operations Facilities Report - Tow Contracts Management Goals Building Inspection Services Building Inspection Cost Building Inspection Customer Satisfaction Fire Response Time Fire Operating Cost Fire Customer Service and Satisfaction Fire Stations Growth Management Standard Fire Emergency Medical Services Response Time Fire Prevention Inspections Fire Prevention Development Process Police Response Time Police Cases Cleared Community Perception of Crime Police Operating Cost Police Customer Service & Satisfaction Building Department The measures used to evaluate building inspection services are: the next day inspection rate, inspections per day per inspector, and the ratio of corrections. These three measures are used to evaluate consistent service delivery and were all within or close to accepted industry benchmarks. Staff has the benefit of additional staff with an increase of productivity that has allowed it to handle a 36% increase in the number of approved inspections while experiencing only a 13% increase in expenses. The customer satisfaction survey showed that 100% respondents found the service to be excellent or good. The number of respondents was low, and staff is working on adjusting the survey mechanism. Community Development BUILDING INSPECTION DELIVERY THE OUTCOME A safely built community ensured by prompt and efficient professional building inspection services. THE MEASUREMENT This is a multi-modal approach combining: • Next day inspection rate • Inspections per day per inspector • Ratio of corrections to inspection requests WHAT THE DATA MEANS • Next Day Inspection Rate: The department is achieving its service objective - 95% of building inspection service requests is made the next working day. • Inspections per Day per Inspector. There is adequate staffing to accommodate the number of inspection requests. • Ratio of Corrections to Inspection Requests: Inspectors are detecting and correcting construction deficiencies at an effective rate. Overall building code compliance is difficult to observe directly except with proxy indicators. When the following three statistical products are observed in sum, and the ratios are within acceptable industry standards, it's reasonable to deduce that an acceptable level of code compliance is being achieved. The Department's service objective is to make 95% of all inspection requests the next working day. When inspections are made in a timely manner, projects move forward, and compliance with the approved plans and codes is generally more assured. Builders anticipating timely service are more likely to secure permits, voluntarily build in conformance with codes and standards, and schedule all required inspections. The ratio of inspections per day per inspector is used to gauge the average day- to-day workload of an inspector. When an inspector is overwhelmed with inspection requests, their tendency is to move quickly through a series of inspections increasing the likelihood of missed code violations. The ratio of corrections detected to the actual inspection requests made is an indication of the inspectors' ability to detect construction deficiencies and cause them to be corrected. A decrease in this ratio is desired except when decrease is caused by an increase in daily workload. BENCHMARK • 95% of inspection requests will be made the next working day. • Inspectors will average no more than 25 inspections per person per day. • Corrections will be detected on average on at least 15% of inspections made. RESULTS Building Department Service Next Day Inspections Ave. Inspections per Day per Person % of Inspections Requiring Corrections Benchmark 95% <25 >15% FY20O2-03 95 18 17% FY2003-04 96 21 16% FY2004-05 95 25 13% ANALYSIS The three measures indicate a consistent service delivery within or very close to accepted industry benchmarks. Demand for inspections rose about 20% (21 to 25 inspections per day). Consequently, corrections were noted on about 13% of inspections made - a 17% drop in corrections cited. Inspectors made about 96% of service requests the next working day and they are still carrying a workload within acceptable levels. ACTION PLAN Staffing has been added this fiscal year with the addition of two limited-term full time building inspectors and a part-time inspector. This should relieve the increase in the average inspections per day per person and increase the next day inspection rate. The first two months of FY 2005-06 show the rate of corrections back to 15%. Staff will continue to monitor indices monthly and watch for increasing workload combined with lowered corrections detected. POINT OF CONTACT Patrick Kelley, Building and Code Enforcement Manager (760) 602-2716 pkell@ci.carlsbad.ca.us Community Development BUILDING INSPECTION COST THE OUTCOME Building Inspection Cost Efficiency THE MEASUREMENT Cost per approved inspection. WHAT THE DATA MEANS The outcome of the department is to have a safely built community. Timely, professional, and efficient building inspection service is an important component of the construction process. Permit fees are collected to provide this service and the efficient use of those fees contributes to the overall outcome of the department. Projects are inspected at regular intervals for compliance with the approved plans and adopted building codes. With each approval or partial approval a project may move into the next phase of construction. These approvals are what both the department and the builders desire. Efficient use of the fees collected for a professional service delivery system (delivering approved inspection results) is a highly desirable outcome. DEPARTMENTS INVOLVED Building BENCHMARK This is the third year of this measure and a benchmark has not yet been established. Staff will be seeking industry benchmarks that will require contacting other jurisdictions for their expenditures and results. RESULTS Building Department Service Approved or Partially Approved Inspections Department Expenditures Cost per Approved or Partial Approval Benchmark TBD TBD TBD FY2002-03 24,278 $1,410,000 $58.08 FY20O3-O4 23,986 $1,304,000 54.37 FY2O04-05 32,859 $1,476,000 $44.92 ANALYSIS The third year of this measure yields results demonstrate an improved efficiency. The number of approved inspection was up 36% and expenses rose only 13%. This improvement in the net cost per approved inspection can be attributed to two specific actions taken in the past year. Additional part-time staff was added specifically to work in production housing tracts, and the introductory packet with checklists for contractors has improved contractors' use of staff inspection time. Part-time staff added was an experienced inspector who requires very little supervision or management. Two limited-term positions were also filled. ACTION PLAN Staff implemented an introductory packet of information last year to provide valuable information to building permit clients. The packet includes the most typical items inspectors view as causing projects to be not ready for their inspection. A typical construction project is broken down into phases, and the typical "not ready" conditions inspectors find are detailed in writing so that builders can check off the most common reasons for failed inspection. There is also a great deal of other helpful customer service resource material in the introductory packet. Staff will develop other helpful checklists to add to the introductory packet to continue to improve the contractors' efficient use of staff resources. Staff will continue to monitor this trend and coach staff on techniques to economize the number of inspections needed to secure approved inspections. Staff will be seeking industry benchmarks that will require contacting other jurisdictions for their expenditures and results. POINT OF CONTACT Patrick Kelley, Building and Code Enforcement Manager (760) 602 2716 pkell@ci.carlsbad.ca.us Community Development BUILDING INSPECTION CUSTOMER SATISFACTION THE OUTCOME A high level of building inspection customer satisfaction. THE MEASUREMENT This is a multi-modal approach combining: • Results of a customer satisfaction survey sent to all building permit customers at the completion of their project • Ratio of Approved or Partially Approved Inspections to Inspection Requests WHAT THE DATA MEANS The Building Department sends a mail-back survey to customers at the completion of their project. The self-selecting survey asks customers to rate the Front Counter Services (plan check) and Building Inspection Service on four- point scale (Excellent, Good, Fair, and Poor). The survey also asks for an overall ranking using the same scale. The Building Department also tracks the number of approved or partially approved inspections and compares that to the number of inspection requests. Approved inspections are the customer's and the Department preferred expectation, and increasing this ratio is generally regarded as an indicator of a successful transaction. DEPARTMENTS INVOLVED Building. BENCHMARK 90% of survey respondents rank all Building Department services as either excellent or good 75% of all inspections are either approved or partially approved. RESULTS Front counter, inspection scheduling, and field inspections survey results were: Front Counter Inspection Scheduling Field Inspections Overall Service FY 2O04 97% 100% 98% 100% FY 2O05 94% 93% 95% 94% Approved Inspections: Inspection Results Approved Partially Approved Combined Approved/ Partially Approved Benchmark 75% FY 2003 Results 54% 6% 60% FY 2004 Results 53% 7% 61% FY 2005 Results 55% 7% 62% ANALYSIS This is the second year of results for this measure, and surveys were sent out for the entire year. Thirty-six (36) surveys were returned, which is a relatively low return rate. Although the good/excellent ratings dropped, the results received were still all above the 90% good/excellent benchmark. In the 32 surveys returned with 9 ratings each, 94% of the marks were good or excellent. Of the 20 fair or poor marks, 40% of those were for the timeliness of the plan review process; 60% were for the inspection process. This is roughly proportionate to the distribution of the work associated with the permitting and inspection process. Overall, the 94% good or excellent rating was well above the benchmark. The rate of Approved, or Partially Approved inspection moved slightly higher than the two previous years. This is a positive trend given the 23% increase in service demand between 2004 and 2005. ACTION PLAN Customer Service portfolios are now sent out with every permit issued at the time the permit is issued. There is a self-addressed, postage-paid survey included in every portfolio. This will assist in ensuring a higher number of surveys returned next fiscal year. Daily coaching of field inspectors assures they continue to focus on positive customer contacts at every inspection and accommodating builders whenever they can without yielding on code requirements. A third-party consultant is also analyzing the department and its work processes. This process will reveal any processing or inspection service improvement opportunities. The department is establishing a "Permit by Appointment" process that will allow some types of permit applications to be reviewed and approved over the counter. It is anticipated this will raise customer satisfaction levels with the permitting process. POINT OF CONTACT Patrick Kelley Building and Code Enforcement Manager (760) 602-2716, pkell(qjci. carlsbad. ca.us. Public Safety FIRE RESPONSE TIME THE OUTCOME Maximization of positive outcomes in a medical, fire, or rescue emergency. THE MEASUREMENT Fire Department response time in number of minutes from dispatch to arrival on scene. WHAT THE DATA MEANS One of the critical factors in achieving a positive outcome in an emergency that threatens life, property, or the environment is providing emergency services as quickly as possible. The Fire Department response time data represents all fire department responses in FY 2004-05 that threatened life, property or the environment, as well as other responses. Responses that were cancelled enroute are not included in this data set. DEPARTMENTS INVOLVED Fire. BENCHMARK First unit arrives on scene in eight minutes or less 90% of the time. RESULTS 8-Minute Response Time Fiscal Year 2003-04 2004-05 Benchmark 90% 90% Carlsbad 87% 88% ANALYSIS Until June 30, 2003, the City's Computer Aided Dispatch (CAD) system only had the capability of capturing travel time data, which is only one component of response time. Response time consists of: 1) dispatch; 2) personnel turnout time from dispatch to manned apparatus departure; and, 3) travel time to the scene. In FY 2003-04, the Fire Department began dispatch services with the North County Dispatch Joint Powers Authority (NCDJPA). The NCDJPA CAD system has created accessible response time data, which has been analyzed and is graphically presented on the following page. The FY 2003-04 data serves as the base year benchmark from which future fiscal year response time information can be analyzed and compared. The data represents the response time components from dispatch to the first responding unit's arrival on scene. The shaded bars represent the benchmark response time data from FY 2003- 04 and crosshatched bars represent the response time data from FY 2004-05. The response time benchmark of eight minutes is based upon FY 2002-03 ICMA fire department data. The ICMA response time data includes receipt of the 911 call as a component of response time, while the NCDJPA data excludes receipt of the 911 call in response time computations. Fire Response Times 0000- 01:00- 02:00-03:00-04:00- 05:00-06:00-07:00- 08:00-09:00- 1000- 11:00- 12:00- 13:00- 14:00- 15:00- 16:00- 17:00- 18:00- 19:00- 2000- 21:00->22:00 00:59 01:59 02:59 03:59 04:59 05:59 06:59 07:59 08:59 09:59 10:59 11:59 12:59 13:59 14:59 15:59 16:59 17:59 18:59 19:59 20:59 21:59 Response Time (Minutes) Q FY 04-05 I FY 03-04 Throughout the fiscal year, the Fire Department routinely analyzes overall response time data. The Fire Department has continuously monitored response times for all Fire Department Priority One calls for service from time of dispatch to the arrival of the first unit on scene with a benchmark of eight minutes. If these analyses reveal that response times are less than optimal, the department will identify the causes and develop, implement, and monitor new internal organizational practices to enhance response time and work with other City departments and outside agencies whose activities can affect and contribute to optimal response times. In FY 2004-05, the Fire Department identified potential internal organizational enhancements to include updating station-alerting technology, decreased personnel turnout time, capture response time data that includes receipt of the 911 call and continuing consolidation of resources for mandated training. ACTION PLAN: Throughout the fiscal year, the Fire Department routinely analyzes overall response time data. If these analyses reveal that response times are less than optimal, the department will identify the causes and develop, implement, and monitor new internal organizational practices to enhance response time and work with other City departments and outside agencies whose activities can affect and contribute to optimal response times. In FY 2004-05, the Fire Department identified potential internal organizational enhancements to include capturing response time data that includes receipt of the 911 call and continuing consolidation of resources for mandated training. From a response time optimization perspective, the Fire Department conducted research with NCDJPA to determine if response time data could be obtained that was inclusive of the time of receipt of the 911 call to dispatch. The Fire Department has concluded that for the Carlsbad Fire Department to capture this component of response time is currently cost prohibitive. The NCDJPA dispatch system enhancement required to accomplish this would be significant. Since this time component is relatively small and it is captured and routinely monitored by NCDJPA, the additional enhancements required to add this component to each agency's database is not warranted at this time. The installation and organizational implementation of the Fire Agencies videoconferencing system, which links all fire stations and fire administrative offices in North County, continues to increase the Fire Department's ability to administer mandated training while keeping apparatus within their districts and available to respond to calls for service. In FY 2005-06, the Fire Department will continue to explore, expand and optimize the use of the videoconferencing system. With the implementation of the EMS-related response standards, the Fire Department will be routinely monitoring the personnel turnout time, which is measured from the time of dispatch to manned apparatus departure. The Fire Department will be reviewing turnout time averages to identify trends and follow-up on extended turnout times, which generally occur when personnel are physically separated from their apparatus during certain training events and when performing administrative functions. POINT OF CONTACT Chris Heiser, Division Chief, (760) 931-2123, cheisfojci.carlsbad.ca.us Public Safety FIRE OPERATING COST THE OUTCOME Efficient use and recovery of General Fund revenues. THE MEASUREMENT Net operating cost per capita for fire, rescue, emergency medical, and fire prevention services WHAT THE DATA MEANS The efficient use of financial resources allows the City to provide a higher level of service, additional public services, or reduced service costs to the taxpayer. DEPARTMENT INVOLVED Fire. BENCHMARK The net cost per capita should not exceed $121 (using the 1999-00 as the base year and adjusting for inflation). The Consumer Price Index (CPI), as reported by the Bureau of Labor Statistics for San Diego County, for FY 2004-05 was 3.3%. Applying the CPI to the $117.18 for FY 2003-04, the FY 2004-05 benchmark is $121.05. RESULTS Based upon a current population of 95,146 the FY 2004-05 cost per capita to provide fire, rescue, and emergency medical and fire prevention services was $119. Benchmark $100 $106 $109 $113 $117 $121 Fiscal Year 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 Carlsbad $90 $101 $101 $105 $108 $119 Actual FY 2004-05 Fire Department Expenditures: $12,840,574 Actual FY-2004-05 Fire Department Revenues $ 1,534,095 Net Fire Department Cost $ 11,306,479 Population 95,146 Cost Per Capita $ 119 ANALYSIS The Fire Department is operationally mandated to provide constant staffing, which requires the department to maintain a complement of 23 emergency operations personnel, 24 hours per day, 7 days per week. In order to maintain constant staffing, personnel must be hired back to cover any personnel absent due to sickness, vacation, injury, or mandated off-site training. Since personnel costs represent a majority of every Department budget, the non- personnel budgets related to maintenance and operations are the remaining areas that are not entirely fixed. The Fire Department and the Finance Department monitor revenues associated with emergency medical services, mutual aid reimbursements and fire prevention activities. Fire prevention-related revenues were extensively revised and adopted in FY 2004-05. Fire prevention-related revenues include fees for fire inspection, fire protection system plan reviews and hazardous uses. The Fire Prevention Weed Abatement Program is essentially a self-sustaining program, with fees generally covering the cost of weed abatement services. Fire emergency operations revenues include emergency medical services fees, mutual aid response reimbursements, false alarm response fees, federal grants and donations. Emergency medical service fees were reviewed and new fees were adopted by the City Council for implementation in FY 2005-06. Mutual aid fees are revised annually. The Fire Department continues to seek revenue generation and enhancement opportunities. ACTION PLAN The Fire Department has reviewed the use of potential additional performance measures related to cost efficiency for FY 2004-05. These include fire operating and vehicle expenditures costs per capita and Fire Department staffing per population served. These two potential additional cost-related performance measures are reported for fire departments nationwide in the Annual Comparative Performance Measures Report produced by the Center for Performance Measurement of the International City/County Management Association (ICMA). The Fire Department has analyzed these two (2) measures as possible future year additions or replacements for cost-related performance measurements in order to establish ICMA-recognized national comparative benchmark standards. POINT OF CONTACT Chris Reiser, Division Chief, (760) 931-2123, cheis(ajci.carlsbad.ca.us Public Safety FIRE CUSTOMER SERVICE AND SATISFACTION THE OUTCOME A high level of customer satisfaction. THE MEASUREMENT A survey is mailed to a random sample of customers each month after emergency medical services (EMS) have been rendered. WHAT THE DATA MEANS Highly satisfied customers are an indication that the Fire Department is providing services in a manner that is desired and/or expected, contributing to greater confidence in the Fire Department and local government in general, resulting in a high quality of life for community members. DEPARTMENT INVOLVED Fire. BENCHMARK 95% of customers rate all EMS services as "Good" or "Excellent" in all customer service survey categories, utilizing a rating scale of l=Very Poor, 2=Poor, 3=Fair, 4=Good, and 5=Excellent. RESULTS The benchmark was exceeded in all categories. The majority of results show minimal changes from the previous year's survey. BENCHMARK 911 Dispatch Response Time Competence Courtesy Transportation 2002-03 > 95% 97% 99% 100% 99% 96% 2003-04 > 95% 98% 98% 99% 100% 100% 2004-05 > 95% 97% 97% 98% 99% 97% ANALYSIS In FY 2004-05, of the 550 mailed surveys, 247 surveys were completed and returned, resulting in a return rate of 45%. The customer service and satisfaction survey is conducted only with emergency medical service recipients, because those calls represent approximately 72% of all Fire Department calls for service. In FY 2003-04, the Fire Department began dispatch services with the North County Dispatch Joint Powers Authority (NCDJPA). The customer service and satisfaction survey results indicate that from a customer perspective, this dispatch change resulted in continuing positive outcomes. The survey results also continue to validate that the dispatchers and emergency medical service personnel are providing excellent customer service. In FY 2004-05, as in previous years, the vast majority of comments reflected a sincere appreciation for the Fire Department's assistance. ACTION PLAN The Fire Department continuously reviews the customer service and satisfaction survey data to identify trends and patterns. Any identified areas for improvement are analyzed and recommendations for improvement are developed, operationally implemented, and monitored. The Department is reviewing methods by which to best convey survey results to personnel involved in emergency medical services delivery. The Carlsbad Fire Department is always seeking new and better opportunities to expand and improve upon the level and quality of customer service and satisfaction. POINT OF CONTACT Chris Heiser, Division Chief, (760) 931-2123, cheis@ci.carlsbad.ca.us e t r c Public Safety FIRE STATIONS GROWTH MANAGEMENT STANDARD THE OUTCOME Emergency response resources that are distributed throughout the City in a manner that ensures effective and efficient delivery to the community of top quality fire, rescue, and emergency medical services. THE MEASUREMENT The number of dwelling units outside a five-minute "travel time" from the nearest fire station shall not exceed 1,500 units. WHAT THE DATA MEANS It was the intent of the City's Growth Management Plan (GMP) to ensure that adequate fire department services were maintained as residential development progressed toward build-out of the City. The GMP standard recognized a five- minute "travel time" from a fire station to the emergency scene as a reasonable means of locating fire station facilities throughout the community. At the time the GMP was developed, scientific fire behavior information and recognized best practices supported the position that a response time of five minutes would result in effective fire incident intervention. To determine the most desirable geographic sites for future fire stations, it was necessary to convert the five-minute response time to a measurable distance that could be applied to a future road network scheme. This distance, or "reach", attainable by emergency responders in a five-minute travel time was calculated to be 2.5 miles at an estimated average speed of 30 miles per hour. The reach of each existing and potential future fire station locations was then plotted on the planned road network maps of that time. This process enabled the fire department to predict the need for six fire stations at build out, each providing service to several Local Facility Management Zones (LFMZ). Once the number of fire station sites was determined, the timing of future fire station installations became the question. The threshold of 1,500 units was adopted as the maximum number of dwellings that could exist outside a five- minute travel time, or 2.5-road mile distance of the nearest fire station. Hence, development within a fire station response area that would exceed the 1,500- unit threshold would be delayed until fire station facilities are relocated or added in order to alleviate the shortfall. DEPARTMENTS INVOLVED Fire, CIS, Planning. RESULTS The Fire Department is in compliance with the Growth Management Plan standard. None of the six fire station response areas have experienced growth that exceeded the 1500 dwelling units outside a five-minute travel time. ANALYSIS Because the GMP provides no other trigger mechanism for the installation of additional fire stations, it follows that up to 1500 dwelling units could exist outside the five-minute reach of the closest fire station for an indeterminate length of time without violating the GMP standard. The five-minute travel time measure was selected exclusively as a means of logically positioning emergency response resources throughout the City. Therefore, the standard should be applied as a means of measuring compliance with locating fire facilities in accordance with the GMP, not the performance of the Fire Department meeting service responsibilities. ACTION PLAN The Fire Department continues to monitor the GMP standard compliance as housing development projects are proposed in the City. Four fire stations have been constructed at their permanent location. Fire Station 3 (3701 Catalina Drive) will be relocated as development occurs in their response area. Fire Station 3 will most likely be relocated farther south and east to coincide with development in the NE Section of the city. Fire Station 6, currently located in a temporary facility at 3131 Levante Street, is being relocated farther north to coincide with the housing development occurring in the SE section of the City. The permanent site for Fire Station 6 has been determined, and the fire station is in the final design and permitting phase of development. POINT OF CONTACT Chris Heiser, Division Chief, (760) 931-2123, cheis(a]ci.carlsbad.ca.us Public Safety FIRE EMERGENCY MEDICAL SERVICES RESPONSE TIME THE OUTCOME Maximization of positive outcomes in a medical emergency. THE MEASUREMENT Fire Department response time for the first and second units on scene for emergency medical service calls. WHAT THE DATA MEANS One of the critical factors in achieving a positive outcome in an emergency, which threatens life, is providing medical services as quickly as possible. The Fire Department emergency medical services (EMS) response time data represents all Fire Department EMS responses in FY 2004-05. Responses that were cancelled enroute are not included in this data set. DEPARTMENTS INVOLVED Fire. BENCHMARK For EMS calls for service, first Fire Department apparatus on the scene within five (5) minutes or less ninety percent (90%) of the time and the second Fire Department apparatus on the scene within eight (8) minutes or less ninety percent (90%) of the time. RESULTS EMS Unit(s) on scene 90% of the time within specified time frames BENCHMARK 1st Unit on Scene in 5 minutes 2nd Unit on Scene in 8 minutes Fiscal Year FY 2004-05 FY 2004-05 ICMA* 57.9 N/A Carlsbad * 2004 ICMA Mean for Emergency Calls by responding agencies with a population under 100,000 ANALYSIS The Fire Department continuously monitors response times for all Fire Department Priority One calls for service. Since approximately 72% of the 6,706 FY 2004-05 annual Fire Department calls were for emergency medical services (EMS), EMS-specific response times warrant additional analysis. The Fire Department researched and analyzed national, state and local mandates and guidelines, as well as fire and medical industry studies and their resulting standards. These analyses resulted in the development of the above- noted new EMS response time goals. For optimal patient outcomes, all of the mandates, guidelines and studies support the adopted goal of a minimum on scene arrival of the first apparatus within 5 minutes and the second apparatus within 8 minutes. The complement of apparatus required for an EMS call is one (1) Advanced Life Support (ALS)-equipped fire engine, with three (3) personnel, one (1) of which is a Paramedic/Firefighter, and one (1) ALS-equipped ambulance with two (2) Paramedic/Firefighters. Depending upon apparatus location at the time of the call, the fire engine may be the first apparatus to arrive on scene. Since effective field emergency medical services require a minimum of two (2) paramedics and the fire engine has only one (1) Paramedic /Firefighter trained to begin patient assessment and treatment, it is critical that other dispatched unit, the ambulance, arrive on scene to add the second Paramedic/Firefighter to the incident to effectively deliver patient assessment and treatment. The adopted response time goal for EMS calls will assist the Fire Department in analyzing EMS service delivery methods to achieve its on-going mission to efficiently and effectively meet the critical emergency medical needs of the community. ACTION PLAN: Throughout the fiscal year, the Fire Department will routinely analyze EMS response time data. If these analyses reveal that response times are consistently less than benchmark, the department will identify the causes and develop, implement, and monitor new corrective practices. The Fire Department has identified potential internal organizational enhancements to optimize EMS response times including updating station-alerting systems. Recent research has shown that the current technology, which would provide the greatest enhancement to response times, is a computer-linked dispatch terminal and an automatic vehicle locator system in each apparatus. The addition of these systems represents the next logical technological upgrade that would provide the most significant enhancement to decrease response time to all emergency incidents. The Fire Department will continue research efforts and, if warranted, develop a plan to acquire and implement these enhancements. In FY 2005-06, the Fire Department will also continue to research changes to station alerting systems. POINT OF CONTACT Chris Heiser, Division Chief, (760) 931-2123, cheisfajci.carlsbad.ca.us Public Safety FIRE PREVENTION INSPECTIONS THE OUTCOME Conduct State-mandated fire and life safety inspections of facilities in the City of Carlsbad THE MEASUREMENT Complete all State of California-mandated annual inspections for all public and private schools, apartments, and hotels located in the City of Carlsbad. WHAT THE DATA MEANS The data will demonstrate that the City of Carlsbad is in compliance with State-mandated requirements to conduct inspections in high life/safety occupancies including all public and private schools, apartments, and hotels located in the City of Carlsbad. DEPARTMENT INVOLVED Fire. BENCHMARK Applicable benchmarks are being reviewed for use in reporting FY 2005/06 data. RESULTS This is a new Performance Measure. Data will be collected and reported for FY 2005/06. ANALYSIS The Fire Prevention Division conducts annual required inspections for all public and private schools, apartment, and hotels located in the City of Carlsbad. In October 2005, the Fire Prevention Division instituted a new database management system called "Permits Plus," which allows the tracking and scheduling of inspections for state-mandated occupancies in the City. ACTION PLAN The Fire Prevention Division will establish the total number and types of occupancies and then develop a plan that ensures annual compliance and a monthly review process to ensure completion of all required inspections during the fiscal year. POINT OF CONTACT Chris Heiser, Division Chief, (760) 931-2123, cheisfcici.carlsbad.ca.us Public Safety FIRE PREVENTION DEVELOPMENT PROCESS THE OUTCOME Conduct State-mandated fire and life/safety reviews of all development plans for building construction in the City of Carlsbad in a timely manner. THE MEASUREMENT Conduct fire and life/safety reviews of development plans within ten (10) business days of submission to the Fire Prevention Division. WHAT THE DATA MEANS Enhance customer service by minimizing construction delays due to extended plan processing time. Ensure a maximum of 10 working days for Fire Prevention's plan review and processing ensures continuity of the plan check process with other involved MSAs. DEPARTMENT INVOLVED Fire. BENCHMARK Ten (10) days from date of submission 90% of the time. RESULTS This is a new Performance Measure. Data will be collected and reported for FY 2005/06. ANALYSIS The Fire Prevention Division conducts State-mandated fire and life/safety reviews of all development plans for building construction in the City of Carlsbad. In October 2005, the Fire Prevention Division instituted a new database management system called "Permits Plus," which allows the tracking of plan check turn-around times. ACTION PLAN The Fire Prevention Division will establish a process that monitors a plan throughout the ten (10) day period, highlighting those plans that are approaching the end of the ten (10) day plan check cycle. Plans nearing the end of the cycle can then be identified and expedited in order to meet the benchmark. POINT OF CONTACT Chris Heiser, Division Chief, (760) 931-2123, cheis(tx!ci.catisbad.ca.us Public Safety POLICE RESPONSIVENESS THE OUTCOME Minimize damage to life and property and increase probability of criminal apprehension with a fast patrol response. THE MEASUREMENT All calls are assigned a priority. The determination of a call's priority depends on the severity of the crime and the time frame in which it occurred. There is a priority assigned to each crime code within the computer-aided dispatch (CAD) system but the dispatcher has the option to upgrade a call's priority based on what the caller says or what the dispatcher may hear. The response time is the time it takes from the time the call is received to when the first police unit arrives on scene and can be broken down into two components - the time it takes to take and dispatch the call, and the officer travel time. Priority 1 calls are life and death emergencies such as all violent crimes in progress, some non-violent crimes in progress, armed robbery alarms, injury or no detail traffic collisions, and burglaries in progress. Other examples include kidnapping, domestic violence, or assault in progress. Priority one calls are generally less than one percent of the total police call volume. Priority 2 calls include non-violent crimes in progress such as petty theft and burglary alarms. Priority 3 calls include "cold" reports - reports being taken after the crime has occurred. Examples include coming home and finding that your house was burglarized earlier in the day or waking in the morning and discovering that your car has been stolen. Priority 4 calls are miscellaneous calls that generally are not citizen-initiated and may not result in a citizen interaction. Examples include a request for an officer to make a phone call or a request for extra patrol in a certain area. Although response time data has been measured for many years, a new computer-aided dispatch system was installed in May 2005 and data between the two systems is not completely comparable. Data from the former CAD system reported a combined average response time for citizen calls and officer- initiated calls. These officer-initiated calls generally have a response time of zero since the officer reports the call at the same time he is on-scene. The new CAD system breaks out the citizen calls for service so the response time is a more accurate reflection of our responsiveness to our citizens. WHAT THE DATA MEANS Most customers report that they believe response time reflects quality of service. As a result, response time is often a large factor in a customer's satisfaction rating. We have numerous data indicating that fast response times are very important to the customer. In actuality, response times are a reflection of not only quality of service but also other factors such as traffic circulation, staffing, and overall activity levels. Since priority one calls are only two percent of the total police call volume, the response times for priorities two and three are also examined because they are key to customer satisfaction as they reflect the majority of our citizen interactions. DEPARTMENTS INVOLVED Police BENCHMARK The FY 2004 ICMA mean average priority one response time was 6.1 minutes for cities under 100,000 population. Carlsbad has used the benchmarks of 6, 15, and 30 minutes for priorities 1,2, and 3 respectively for many years. Since ICMA has no benchmark for the other priorities and Carlsbad believes that our responsiveness to calls other than priority 1 is an important customer service measure and workload indicator, the police department is presenting both internal and ICMA benchmarks. RESULTS Priority 1 Priority 2 Priority 3 ICMA BENCHMARK 6.1 mins. N/A N/A CARLSBAD BENCHMARK 6.0 mins. 15.0 mins. 30.0 mins. CARLSBAD May 'OS- Jan. 31, '06 6.8 mins. 12.4 mins. 27.7 mins. May 2005 - January 2006 ANALYSIS Because the new CAD system data is not fully comparable to the former CAD system, only the data from the new system is being examined in this measure. We presently have nine months of data in the new system. The average priority 1 response time exceeds both benchmarks, however, it is difficult to determine if this is new or if this has been occurring for an expanded period since we cannot easily compare to data prior to May 2005. However, the average priority 1 response time has been fairly consistent month-to-month over the past nine months. There were two calls identified that had incorrect, extended response times of almost 60 minutes, thus increasing the priority one average. The average priority 2 response time has shown improvement during this time period due to an improvement in the dispatching time (approximately one minute faster); this improvement is the result of the communications operators becoming more familiar with the new system. The average priority 3 response time has also been consistent over the past nine months. The travel time component of response time has remained consistent over the past nine months for all three priorities. ACTION PLAN Response time will continue to be closely monitored on a monthly basis. The police beats were realigned with the new CAD system and response time by beat will be closely monitored to assure that geographic deployment is maximized for response time. The department continues to develop reports from the new CAD system and will report response time in a call distribution format (ex: 90 percent of all priority one calls were responded to in six minutes or less) in next year's State of Effectiveness report. POINT OF CONTACT Lynn Diamond, Sr. Management Analyst, 760-931-2170, ldiam(£;ci. carlsbad. ca. us Public Safety CRIME CASES CLEARED THE OUTCOME Maximize the number of crimes solved. t f THE MEASUREMENT A case is considered cleared when at least one person is arrested, charged, and turned over to court for prosecution, or the case is cleared exceptionally. A ' case can be cleared exceptionally if there is cause to arrest the suspect but ! there is some reason outside law enforcement that precludes arresting the , suspect. The number of FBI index cases cleared as a percentage of total FBI index crime cases is a fairly standard measure used throughout the law enforcement community. Clearance rates have been measured and reported by the police department for at least 25 years. In additional to the percentage for all FBI index crime cases overall, we also measure the percentage separately for violent crimes (homicide, rape, robbery, and aggravated assault), and for property crimes (burglary, larceny-theft, and motor vehicle theft) to help further identify strengths and weaknesses. WHAT THE DATA MEANS The clearance rate is one indicator of the achievement of law enforcement C personnel in solving crimes. Although generally thought of as a reflection of £ the investigations function, it also reflects the performance of the patrol and *, police records functions. .%» Some of the factors that influence clearance rates include: policies and € procedures used by various agencies; workload and/or the volume of cases reported; personnel staffing for preliminary and follow-up investigation; differential emphasis placed on investigating specific types of crime; the quality and nature of the crimes assigned for investigation; and the training and experience of officers. Changes in clearance rates over time could reflect data variability and/or changes in productivity. DEPARTMENTS INVOLVED Police. BENCHMARK The police department has established a benchmark to be within the top one- third of the county with regard to clearance rates for all crime, for violent crimes, and for property crimes. The police department uses San Diego County data since clearance data can vary greatly from state to state and even somewhat by county within California. We are fairly confident in our local county data due to a shared database that all agencies use and regular quality assurance audits that are conducted. RESULTS OVERALL CRIME VIOLENT CRIME PROPERTY CRIME BENCHMARK Top one-third Top one-third Top one-third CARLSBAD 2004 Yes Yes Yes Note: Individual city data is not yet available for 2005. RANK 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 CITY Carlsbad Lemon Grove San Marcos Santee La Mesa Poway > National City Vista Encinitas Imperial Beach Unincorporated/ Sheriff s El Cajon Oceanside Chula Vista San Diego Escondido Solana Beach Coronado Del Mar 2004 OVERALL CRIME CLEARANCE RATES 31% 27% 23% 22% 22% 21% 20% 20% 19% 19% 19% 18% 17% 16% 16% 16% 15% 13% 9% RANK 1 2 3 4 5 6 7 8 9 10 11 12 ••" •'>•/ •/ 13 14 15 16 17 18 19 verall iolent roperty 199 11°/ 22°/ go/ 2004 VIOLENT CRIME CLEARANCE RATES CITY Del Mar Carlsbad Santee La Mesa Solana Beach Unincorporated -;: - : '?• "' . : Imperial Beach Lemon Grove Vista San Marcos San Diego Encinitas Escondido Poway Oceanside El Cajon Coronado Chula Vista National City RATE 77% 69% 69% 68% 64% 59% 58% 58% 56% 55% 53% 49% ": • A ""' 46% 45% 43% 39% 37% 34% 28% 2004 PROPERTY CRIME CLEARANCE RATES CITY Carlsbad Lemon Grove La Mesa National City Poway San Marcos Encinitas Santee El Cajon Vista Oceanside Escondido '••• • •'-,'/. ' : .,'• ' "••'.; Unincorporated Imperial Beach Coronado Lemon Grove Solana Beach San Diego Del Mar RATE 26% 22% 18% 18% 18% 18% 15% 15% 15% 14% 13% 13% - ,:•/'.• - 12% 11% 11% 11% 10% 10% 4% CARLSBAD'S CLEARANCE RATES: 1994 - 2004 4 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 b 16% 21% 30% 24% o 43% 48% 52% 48% o 13% 18% 27% 22% 23% 23% 23% 19% 21% 31% 45% 56% 60% 47% 51% 69% 21% 19% 20% 16% 17% 26% ANALYSIS Carlsbad's 2004 overall clearance rate (41%) was the highest Carlsbad has achieved in at least 16 years. Although there has been much fluctuation in overall clearance rates over the years, Carlsbad has shown a steady increase the past three years. In contrast, the county average overall clearance rate has decreased in the past five years to an average rate in 2004 of 17%, almost half of Carlsbad's rate of 31%. Carlsbad's 2004 violent crime clearance rate (69%) was also the highest Carlsbad has achieved in at least 16 years. Again, there has been significant fluctuation in the rate over the years but there has been a steady increase in the past three years. This is especially significant given the downward trend in the county's average rate over the past five years to 51% in 2004. With regard to the property crime clearance rate, Carlsbad has had several other years with clearance rates equally good to those achieved in 2004 (26%), however, it has fluctuated greatly with no steady trend or predictability. 2004 was the third year of a steady improvement in the property crime clearance rate. At 26%, Carlsbad continues to far exceed the county average of 13%. ACTION PLAN Although our performance has exceeded the benchmark for the past several years, because of the variability in the results over the years a definitive plan was needed to maintain high clearance rates for an extended period. As a result, a management goal was developed last year to analyze the methods by which cases are reported, documented, assigned, investigated and closed, as well as the development and implementation of strategies to maximize clearance rates for an extended period. Sustaining this performance level is now the challenge. To help assure performance consistency, last year's team identified and/or implemented the following to help sustain clearance rate performance: • Detective training to teach each new detective in proper clearance rate procedures. • Fingerprint all misdemeanor arrest suspects and ensure that the policy is consistently practiced by all patrol shifts. • Improve patrol follow-up and investigation by better communicating expectations, education through the field training officer program, implementing a standard report format (in progress), improved accountability through the evaluation process, and quality control follow up including spot checks and feedback from Investigations. • Improved evidence collection and processing (in progress) • Ongoing audits in investigations to track the accuracy of clearance data, and identify potential problems before they adversely affect clearance rates. • Quarterly Investigative supervisor's review of detectives' open cases. POINT OF CONTACT Lynn Diamond, Sr. Management Analyst, 760-931-2170, ldiam(S>ci, carlsbad. ca. us Public Safety COMMUNITY PERCEPTION OF CRIME THE OUTCOME Citizens' sense of community safety THE MEASUREMENT A general citizen survey to measure how safe people feel in their community. WHAT THE DATA MEANS Many factors influence citizens' sense of safety in a community. Some of these factors include the media, current events including high profile crime cases, the age distribution in a community, neighborhood lighting, gender, city size, perception of police responsiveness, level of information regarding neighborhood crime and personal experiences. DEPARTMENTS INVOLVED Police BENCHMARK The benchmark for community sense of safety is the ICMA "Citizen Rating of Safety in Their Neighborhoods" for fiscal year 2004 for cities with a population under 100,000. Although ICMA uses a four-category response (very unsafe, somewhat safe, reasonably safe, and very safe), the City's survey consultants recommended using an 11 -point scale for increased accuracy. Carlsbad used responses of 9 or 10 on a 0 through 10-point scale (0 - not safe at all; 10 - very safe) for the "very safe" category. RESULTS How safe do you feel walking alone in your neighborhood during the day? PERCENT RESPONDING "VERY SAFE" CARLSBAD BENCHMARK AVERAGE 2000 86% 62% 9.5 2001 87% 64% 9.6 2002 87% 67% 9.6 2003 88% 66% 9.5 2004 N/A N/A N/A 2005 85% 57% 9.4 How safe do you feel walking alone in your neighborhood at night? PERCENT RESPONDING "VERY SAFE" CARLSBAD BENCHMARK AVERAGE 2OOO 41% 31% 7.5 20O1 43% 33% 7.6 2OO2 39% 37% 7.6 2003 43% 35% 7.8 20O4 N/A N/A N/A 2O05 44% 45% 7.8 ANALYSIS Carlsbad's ratings have been consistent for the past five years and are generally higher than the benchmark. The benchmark for daytime safety decreased while the benchmark for nighttime safety increased. Even with these changes, Carlsbad is consistently close to or above the benchmark. In looking at the safety survey responses, differences were found in the ratings of daytime as well as nighttime safety based on respondent age. Residents over 60 gave somewhat lower ratings for safety than younger age groups. No other significant differences in the 2005 daytime safety ratings were found when comparisons were made based on location of residence, length of residence, household income, home ownership, presence of children in the household, or household size. Homeowners rated their feelings of safety at night higher than renters (7.6), Respondents with higher incomes generally reported higher ratings of nighttime safety than those with lower incomes. Location of residence, length of residence, presence of children in the household and household size did not affect ratings of nighttime safety. The general trend for these safety ratings is reflected in the evaluation of Carlsbad's Police Services. In general residents who feel higher levels of safety in their neighborhood rate their satisfaction with police services higher. ACTION PLAN The department will continue programs that give citizens a strong feeling of police presence such as bicycle patrol, and senior volunteer neighborhood patrols, especially following residential burglaries. The department will also continue the crime statistics hotline, providing accurate and timely crime information to the public and will look for ways to expand the distribution of crime information. POINT OF CONTACT Lynn Diamond, ldiam@ci. carlsbad. ca. us Sr.Management Analyst, 760-931-2170, Public Safety POLICE OPERATING COSTS THE OUTCOME The efficient use of general fund resources. THE MEASUREMENT Operating cost per capita for police services. WHAT THE DATA MEAN The efficient use of financial resources allows the City to provide a higher level of service, more public services, or a reduced cost of services to the taxpayer. DEPARTMENTS INVOLVED Police BENCHMARK The operating cost per capita shall not exceed the San Diego County average for comparably sized municipal law enforcement agencies. RESULTS BENCHMARK CARLSBAD 01-02 $168 $165 02-03 $184 $173 03-04 $194 $197 ANALYSIS Carlsbad is close to the benchmark for this measure and is comparable to other cities of similar size. Compared to the previous fiscal year, Carlsbad's police expenditures increased by 14% in 2003-04 compared to a 5% increase for the benchmark agency group overall. The majority of this increase was due to a 16% increase in salary and benefit expenditures. Salary and benefit costs make up the majority of the police department's budget; they were 79% of the 2003-04 budget. The largest increases in salary and benefits were for retirement, health insurance, and workers compensation. Maintenance and operations expenses increased by 8% between 2002-03 and 2003-04. Much of this increase was due to initial expenses associated with the public safety technology project. The department was able to maintain or reduce remaining maintenance and operation costs. Chula Vista La Mesa Oceanside Escondido Carlsbad National City El Cajon Coronado Total , .-. " ..--.- 2003-04 Expenditures $35,831,638 $10,116,154 $32,255,226 $26,914,746 $18,234,521 $12,158,331 $23,046,136 $6,753,652 •- ;,>• $165^10^* 2004 Population 208,510 55,885 172,800 140,088 92,719 60,027 97,359 26,405 • t v 853,793 Per Capita Cost $172 $181 $187 $192 $197 $203 $237 $256 $194 Note: The jurisdictions listed above are those in San Diego County that provide their own law enforcement services. For data comparison purposes, expenditures include salary and benefits, plus department services and supplies. Capital expenditures and animal control services are excluded. For comparison purposes, the ICMA average per capital operating cost for 2003-04 was $179 for jurisdictions under 100,000 population (25 cities). ACTION PLAN The police department will continue to carefully monitor its budget, seek out alternative, non-general fund sources for funding such as grants, and continually look for less costly options while maintaining service levels. POINT OF CONTACT Lynn Diamond, ldiam(a)ci. carlsbad. ca. us Sr.Management Analyst, 760-931-2170, Public Safety POLICE CUSTOMER SERVICE & SATISFACTION THE OUTCOME A high level of customer satisfaction. THE MEASUREMENT This measure uses a multi-method approach combining: • Survey results (Public Opinion Survey and Crime Victim Survey) • Personnel complaints The survey portion takes the results from the section of the police department's crime victim survey that relates to satisfaction with various police services. The survey questions ask respondents to rate dispatch, patrol, detectives, records, and administration. This customer satisfaction measure has been in place for approximately 15 years. Also reported is the police service rating from the City's annual public opinion survey. The complaints portion of the measure is the number of sustained formal complaints made by citizens about police employees per 10,000 calls for service. After investigation complaints are classified as sustained, non- sustained, exonerated, or unfounded. A sustained complaint is one that involves a citizen complaint of an incorrect action on the part of a police employee that is upheld as an incorrect action. Using a ratio takes into account increasing contacts as the population and size of the workforce increase. The number of complaints by category has been measured for many years. WHAT THE DATA MEAN Highly satisfied customers are an indication that we are providing services in a manner that is desired and/or expected, contributing to greater confidence in the police department and local government in general, resulting in high quality of life for community members. The survey portion of the measure reflects customer satisfaction among those who have had a direct interaction with us through the filing of a crime report. Over time, this measure can help us identify areas of strength and weakness, as well as identify areas where changes in service levels are occurring. The results from the annual public opinion survey reflect the community's overall perception and satisfaction with police services. The complaints portion of the measure reflects the quality of the police employees and the level of customer service. Both a department directive (1.13) and a legal requirement (P.C. 832.5) define when a formal complaint is taken. DEPARTMENTS INVOLVED Police BENCHMARK For the customer survey portion of the measure, the department has set the benchmark at 90% of customers rate police services as good (4 on a 1-5 scale) or excellent in all customer service survey categories, utilizing a rating scale of 1 Unacceptable, 2-Poor, 3=Satisfactory, 4=Good, and 5=Excellent. ICMA FY 2004 survey results report an average of 62% good or excellent for cities with a population of 100,000 or less and is a comparable data source. The benchmark the department has set for the citizen complaints portion of the measure is zero sustained complaints per 10,000 calls for service. RESULTS PUBLIC OPINION SURVEY CRIME VICTIM SURVEY SUSTAINED COMPLAINTS/ 10,000 ICMA AVERAGE - 62% N/A CARLSBAD BENCHMARK 90% - 0 CARLSBAD 2005 90% 81% TBD % RATING POLICE SERVICE AS GOOD OR EXCELLENT 911 Dispatcher Uniformed personnel Detectives Records Total 2000 89% 94% 85% 89% 89% 2O01 85% 93% 81% 83% 86% 2002 90% 90% 86% 89% 88% 2003 85% 91% 80% 88% 87% 2004 87% 90% 85% 79% 87% 2005 82% 92% 84% 82% 81% SUSTAINED PERSONNEL COMPLAINTS PER 10,000 CALLS Sustained Citizen Complaints Per 10,000 Calls Calls 2OO1 0 0 68,798 2OO2 2 0.30 66,713 2O03 0 0 73,963 2OO4 1 0.14 73,667 20O5 2 0.27 74,546 ANALYSIS Customer Survey: Traditionally, uniformed personnel have the highest ^ customer service rating of all the police service areas; they have consistently (j * rated at 90% or higher in the crime victim survey and this continued in 2005. f- The Communications Center's rating was lower in 2005; this may be due to the transition to the new computer-aided dispatch system and the time needed for *• communications operators to become completely familiar with the system. The C* investigations ratings maintained consistency in 2005 while the records £* division rating is showing an increasing trend after a low in 2004. ^, \ /**•"-The overall citizen satisfaction with services based on the annual public opinion survey has been consistent with an overall rating of 90% rating police ' services as good or excellent. Citizen Complaints: The total number of complaints filed each year, as well as the number of those that are sustained, is a relatively small number. The rates per 10,000 calls for service presented usually represent just a few * sustained complaints per year out of less than 20 total annual complaints. In 2005 we had 2 sustained citizen complaints out of a total of 20. ACTION PLAN Key customer service processes will be reviewed in the three areas with overall ratings less than 90% (dispatch, detectives, records) in an effort to increase the ratings for the upcoming year. § Citizen complaints will continue to be carefully analyzed and monitored. f #*:•- POINT OF CONTACT Lynn Diamond, Sr. Management Analyst, 760-931-2170, ldiam(£jci. carlsbad. ca. us V. ^ .o s±. 3 O Provide and support a safe and efficient transportation system that moves people, services, and goods throughout Carlsbad Current Results TRAFFIC • Results of the 2005 Growth Management Traffic Monitoring program indicate that ALL roadway segments and intersections within the study meet the Growth Management Circulation Standard. • In general, travel times on El Camino Real have increased. This is in line with the overall increase in traffic volumes from year to year. Construction work has also impacted travel times. • Travel times on Palomar Airport Road have also increased but were found to be within the ranges established by previous studies. This is in line with the overall increase in traffic volumes from year to year. A notable exception is the decrease in travel times on Palomar Airport Road for the westbound direction during the am peak period. This may be the result of the newly added third westbound lane between the east City limits and Melrose Drive. • The number of reported traffic collisions is consistent with previous years. STREET MAINTENANCE • The City's roadway inventory has increased due to the development of several large projects. These projects include Bressi Ranch, La Costa Greens and La Costa Oaks amongst others. While these additional roadways represent a significant addition in total lane- miles, they have not yet had an impact on overall programs costs. Consequently for 2005, the results show that expenditures in Carlsbad decreased from the previous year of $592 per lane-mile. • Staff continues to develop annual work programs to ensure preventive maintenance is performed. A number of new measures in this area have been developed; results will be included in next year's report. ROADWAY CONDITIONS • The overall roadway conditions as monitored through the roadway condition index reflected an average rating of 90 for roadways within the City, exceeding the benchmark of 80 or greater. • The road condition rating as reflected in the annual City of Carlsbad Public Opinion Survey shows 64% of responses as either "Good " or "Excellent." These results reflect a recent trend of decreasing satisfaction with road con- ditions. The positive ratings has slipped from encompassing over 80% of respondents in 2002-2003 to only accounting for 66% of re- spondents in the current year. A contributing factor to this decrease is the significant con- struction in the south part of the City resulting in roads being impacted by traffic control plans that reduce capacity and increase delays. Overall Road Condition Ratings 2000-2005 25.0% 53.0% 22.3% 56.8% 13.8% 62.3% 13.9% 61.8% 13.7% 59.0% 17.0%58.5% )% 20% 40% 60% (POOR HFAIR BGOOD • EXCELLENT 80% 13.4% 16.6% 21.1% 21.2% 25.2% 21.9% 100% Increase in Mileage of Roadway 850 800 750 700 650 2003 2004 2005 Trends and Observations • Completion of a number of scheduled main- tenance activities report results below bench- mark. Staff continues to analyze alternative work methods to improve the balance of sched- uled versus unscheduled work. • As the roadway system continues to increase through development of the City, the challenges in trying to achieve the balance between scheduled and unscheduled maintenance will continue. • The total increase in lane miles between 2004 and 2005 represented a 12% increase to the streets inventory, and while it did not have a corresponding increase on the budget this year, it is expected that it will have a significant impact in upcoming years. • Current maintenance expenditures are running very close to budget. This is concerning as past budgets have not grown at the same pace as development. There is a concern that as the City grows larger and adds more roads, streetlights, and traffic signals, and more of these items begin to breakdown and need routine maintenance and repair, that the Streets maintenance workload continue to increase. This demand for service may result in the need for additional resources. Public Works ROADWAY SERVICE DELIVERY THE OUTCOME High quality roadway experience. THE MEASUREMENT A multi-modal approach combining: • Roadway Service • Roadway Environment Roadway Service: The roadway service measure is tied to the Maintenance Assessment Program and is achieved by completing 90% of the scheduled maintenance activities for the various components of the roadway system such as sidewalk repairs, traffic signals, street striping, traffic signs, and street lighting. Roadway Environment: The roadway environment measure is also tied to the Maintenance Assessment Program and monitors such things as litter control, median maintenance and weed control. WHAT THE DATA MEANS Roadway Service: In FY 2002-2003, staff developed a Maintenance Assessment Program to help evaluate the condition of public facilities. This program establishes and documents the frequency of recommended preventive maintenance and/or repair, then measures the level of accomplishment each year by comparing percent of completed work to scheduled maintenance or repair standards. The Public Works Maintenance Management and Hansen Work Management systems are used to collect and analyze performance data. Through use of the Maintenance Assessment Program, the Roadway Service measures the level of attainment and response times of the established preventive maintenance and repair programs. Roadway Environment: The Roadway Environment measure also utilizes the Maintenance Assessment Program. In contrast to measuring the frequency of preventive maintenance completed, observers from a pool of community representatives, outside professionals, and city employees are used to rate the overall quality of care that a roadway receives in relation to such items as litter control, median maintenance and weed control. Observers complete a rating form while conducting an on-site evaluation of various roadways, results are tabulated and an overall score is obtained. Reviews are currently scheduled semiannually. DEPARTMENTS INVOLVED Street Maintenance and Medians BENCHMARK Roadway Service: At least 90% of work completed on all scheduled maintenance and repair activities. Roadway Environment: 90% of the ratings are at or above 7 on a 10-point scale (1 being the lowest and 10 being the highest). RESULTS Roadway Service: In fiscal year 2004-05, the data collection process in Street Maintenance was not fully implemented. The portions that were tracked this fiscal year were taken from the Hansen work order system. Street Striping Work Activity * Line Striping - Major 85 Prime Line Striping - Other Arterials Crosswalks & Stop Bars (painted) Pavement Messages (painted) Curb & Bull Nose Benchmark 90 90 90 90 90 2003-04 completed % 94.8% 125.2% 78.4% 82.0% 2004-05 completed % 76.4% 159.8% 133.9% 65.9% 62.5% * Striping Standard: All Primes and Majors and school zones striped annually; all other streets every two years. Replace all thermoplastic markings every 7 years. Signal Lights Description % of days on Recall Benchmark 1% Result 2004-05 0.26% Street Lights Description Repair Response within 10 days •* Benchmark 90% Result 2004-05 88% Sidewalk Repairs Measure % of high priority repairs completed within 30 days % of medium priority repairs completed within 60 days % of all repairs completed within 100 days Benchmark 90% 90% 90% Result 20O4-05 82.8% 61.7% 76.4% Roadway Environment: The following table identifies the percent of responses from each assessment of the City's roadway environment greater than or equal to 7: Evaluation Date: Benchmark May 5, 2004 Nov. 18, 2004 May 26, 2005 Oct. 20, 2005 Litter Control 90% 97% 88% 88% 89% Median Maintenance 90% 100% 96% 75% 96% Weed Control 90% 87% 100% 100% 92% Overall rating 90% 95% 94% 88% 93% ANALYSIS Roadway Service: This measure utilizes the Hasen Work order system to track and measure the level of achievement for scheduled maintenance activities as follows: Street Striping: The Street Maintenance Division currently uses a crew of four maintenance workers to conduct street striping activities for the City. The results of how much scheduled maintenance was completed in the 2004-05 fiscal year show a great variation between work activities. The striping of Majors and Primes show a completion rate of 76.4%, which is below the benchmark of 90%. The striping of other arterials and painting of crosswalks and stop bars exceeded 100% completion due to the fact that more than the targeted annual amount of these items was painted during the last fiscal year. The striping program is not clearly defined and the current work plan the striping team follows is not linked to the measure to achieve the 90% benchmark goal. A work plan is in process to attempt to create a schedule for striping work in the City and then link that plan to the measurement process. Steps will also need to be conducted to ensure the data entered is accurate. Traffic Signals: Having functioning signal lights at intersections are crucial to maintain safety and traffic flow. City staff provides overall coordination and minor repair work of signal lights with contracted staff conducting preventative maintenance and major repairs. Lights that are on "Recall" are often cited as taking too long to change, so a tracking measure was developed to determine how many days signal lights in the city were in the "Recall" state. The 2004-05 results of this tracking resulted in the discovery that the City had 1,334 days that signal lights were on "recall". This involved a total of 10 signal lights of the 142 currently in the City inventory. When compared to the 51,830 (365 days x 142 lights) total number of days that signal lights could be functioning properly, City signal lights were on "Recall" 0.26% of the time. The signals were in "Recall" almost entirely because of road construction issues. This construction includes the installation of reclaimed water piping or road widening and causes the under pavement loops to be damaged. It is normal City practice to wait to replace the loops until the construction project is over which leaves the lights needing to stay in the "Recall" status until that point. Street Lights: Service requests received for bulb or sensor replacement were repaired within 10 days 88% of the time last fiscal year. Items that require power repair require a joint meeting with the utility company and due to scheduling can be delayed beyond the 10-day benchmark. Sidewalk Repairs: The Streets department contracts out the majority of the low and medium priority service requests and complete the high and emergency items with City staff. The contracting process has historically delayed the work time to completion, which in turn causes a drop in the amount of service requests completed within the benchmark time. Roadway Environment: The raters were asked to respond to a total of 3 questions, one each relating to Litter Control, Median Maintenance and Weed Control. Each question required the rater to provide a rating from 1 to 10 (1 being poor, 10 being excellent). The goal was to receive a 7 or higher on 90% of the ratings. Any questions that were left blank or were not applicable to the particular street were excluded from the total. Median Maintenance saw a large increase between the spring and fall assessments in 2005, from 75% in the spring to 96% in the fall. This was predominantly due to the time of year the review took place, the medians also had time to recover from the winter storms of January and March by the time the Fall survey occurred. ACTION PLAN • Data on progress toward completing scheduled maintenance activities will be reviewed on a regular basis to ensure maintenance goals are achieved. • Staff will use information obtained from partner agencies to establish standards and best business practices for each activity. This information will be used to analyze and compare work being conducted by city crews during the coming fiscal year. Roadway Service: Striping • Develop and implement a proactive striping program that balances the use of in-house staff with outside contractors. • Award thermoplastic contract to overlay painted legends In order to reduce the number of areas requiring annual repainting. Traffic Signals • Two new measures have been developed; staff will be trained on the proper tracking and entry of the information into the Hansen work order system so that results can be reported in next year's State of Effectiveness Report Street Lighting • A second measure has been developed; staff will be trained on the proper tracking and entry of the information into the Hansen work order system so that results can be reported in next Years State of Effectiveness Report. Sidewalk Repairs • Work with Streets staff to ensure Hansen entering and closing of work orders is timely. • Ensure curb, gutter and sidewalk concrete contract is created every six months to ensure long-term repairs can be completed Signage • There will also be several MAP measures for tracking response times for sign knockdowns of both Priority and Secondary signs. Data will also be collected over the course of this fiscal year to create a benchmark for response times to high priority and regular work orders from Transportation Engineering. The data for these measures will be tracked in the Hansen Work Management System. Roadway Environment: • Results will be analyzed and compared against the established benchmarks. If scores are below expectations, procedural changes and/or corrective action will be taken. POINT OF CONTACT Thomas Moore, Facilities and Streets Superintendent (760) 434-2939, Tmoortfflci. carlsbad. ca. us. Public Works ROADWAY COST EFFICIENCY THE OUTCOME High quality roadway experience. THE MEASUREMENT Actual street maintenance, traffic signals and street lighting expenses per lane- mile of roadway. WHAT THE DATA MEANS Measures the use of tax dollars allocated for the City's roadways and the relative change per year in expenditures. DEPARTMENTS INVOLVED Maintenance and Operations/Street Maintenance, Engineering BENCHMARK The 2005 City of Carlsbad maintenance cost per lane-mile benchmark will be set at $5,480 per lane-mile. The benchmark was established based on information reported in the baseline year (2003) and has been adjusted by the San Diego Consumer Price Index (2004 = 3.7% and 2005 = 3.3%). RESULTS Carlsbad Maintenance Costs Total Lane -Miles $/ Lane-Mile Benchmark 2003 $3,724,147 728 $5,116 $5,116 2004 $4,014,412 734 $5,469 $5,305 2005 $4,028,523 826 $4,877 $5,480 t € C c * ANALYSIS Annual Roadway Costs: The City's roadway inventory has increased due to the development of several large projects and subsequent acceptance of their related road projects into the City's inventory. These projects include Bressi Ranch, La Costa Greens and La Costa Oaks amongst others. While these additional roadways represent a significant addition in total lane-miles, they have not yet had an impact on overall programs costs. Consequently for 2005, the results show that expenditures in Carlsbad decreased from the previous year by $592 per lane-mile. This represents a 10.8% decrease from the prior year. This is lower than the benchmark by $603 per lane-mile. Total maintenance spending for 2005 was only $14,111 more than 2004 but total * * t e lane miles increased by 92 miles. The total increase in lane miles between 2004 and 2005 represented a 12.5% increase to the streets inventory, and while it did not have a corresponding increase on the budget this year, it is expected that it will have a significant impact in upcoming years. Current maintenance expenditures are running very close to budget. This is concerning as past budgets have not grown at the same pace as development. There is a concern that as the City grows larger and adds more roads, streetlights, and signals, and more of these items begin to breakdown and need routine maintenance and repair, that the Streets maintenance workload will exceed the annual block budget appropriations. With a 12.5% increase in the streets inventory, it is only a matter of time until a corresponding increase in maintenance and repair costs begin to be incurred. It is a reasonable expectation that costs will escalate for newly acquired roads on a yearly basis over the first few years after implementation. Routine maintenance will begin within the first year, while repairs due to road usage will build on a more gradual basis. When this occurs there will be pressure to defer maintenance to fit within the block budget provided. It will be very important going forward that the amount of maintenance that the city should do each year is measured and quantified so that the annual streets budget will be sufficient to properly maintain the City's streets. As the City grows, there are many opportunities to look for efficiencies in doing business. In FY 2004 a study was conducted to compare the cost of striping the city streets with contracted versus City staff. The results of this study showed that costs between these two groups were almost identical. These results determined that future city striping would remain a City staff function with contracting out of specialized tasks such as Thermoplasting being pursued. Thermoplasting of legends and crosswalk bars will last seven years without requiring repainting is a proven time and cost savings to the City. Thermoplasting requires equipment that the City does not have so a contract will be pursed in the later half of the 2005 fiscal year. A striping schedule to determine the time it takes the striping crew to stripe the City streets, complete engineering work orders, remove graffiti, and remove algae is being developed to ensure that the existing City crew can accomplish its core tasks of striping and engineering work order completion. Battery back up systems are being installed in many City signal lights to allow for flash functioning during power outages. This will reduce City staff and contractor call outs to monitor and reset these intersections as well as make City intersections safer during these power outages. The curb, gutter, and sidewalk repair work the Streets department is responsible for is being conducted using a series of contracts to repair the damaged areas. These contracts are used to supplement the City's streets crews to allow for the large volume of this work to be completed in a timely manner. Benchmark Partner Comparison Agency FY 2O05 Chula Vista San Diego County City San Marcos Carlsbad Maintenance Costs $4,956,587 $2,362,160 $2,461,000 $4,028,523 Total Lane- Miles 937 300 494 826 $/ Lane-Mile $4,956 $7,874 $4,982 $4,877 Benchmark partner comparison When staff evaluated the data that was collected from partner agencies it was noted that each agency had a different configuration of workload that was encompassed within the designation of "Streets Department." Interestingly the costs per lane mile results were very similar between Chula Vista, San Marcos and Carlsbad. ACTION PLAN • In conjunction with the Finance Department, develop an annual maintenance budget for the Streets department to ensure that proactive maintenance schedules can be implemented. • Refine the budget process to ensure the annual street maintenance budget is adequately funded to ensure street maintenance budget accompanies the transfer of new street mileage inventory to the streets department. This is necessary to maintain this new inventory according to existing standards. • Continue determining the best balance between staff and contractors for completion of striping and the curb, gutter, and sidewalk work. POINT OF CONTACT Thomas Moore, Facilities and Streets Superintendent (760) 434-2939. c Public Works ROADWAY SAFETY THE OUTCOME Roadway safety. THE MEASUREMENT Collision rate per million vehicle miles. WHAT THE DATA MEANS Many factors contribute to a safe roadway system including design, maintenance, traffic operations, and traffic enforcement. However, the experience, expertise, attentiveness and potential degree of impairment of drivers have a significant impact on roadway safety. This measurement brings the effectiveness of all these factors, excluding the driver, together to measure the safety outcome. Data is currently measured by both engineering and police. Data is gathered throughout the year and is summarized in the Engineering Department, Transportation Division's Annual Traffic Report. The roadway segment collision rate is the number of collisions occurring on a defined section of road, per one million vehicle miles. The California Department of Transportation has calculated statewide average collision rates on all State highways to be used to identify potential problem areas. These rates are reported for roadways with two to three lanes to undivided roadways with four or more lanes. CARLSBAD STREET CLASSIFICATIONS STUDIED Prime Arterial: >40,000 vehicles per day; six lanes; divided; access controlled; provides regional and intra-city circulation; provides connections to the freeways. Major Arterial: 20-40,000 vehicles per day; four lanes; divided; access controlled; provides intra-city circulation; provides connections to the freeways. Secondary Arterial: 10-20,000 vehicles per day; four lanes, striped median; moves traffic between collector and larger arterial streets. DEPARTMENTS INVOLVED Public Works Maintenance and Operations, Public Works Engineering, and Police Departments. . BENCHMARK 100% of road segments meet Caltrans collision rates by type of segment. RESULTS Roadway Segments Within Caltrans Collision Rates ROADWAY SEGMENT TYPE Secondary Arterials Major Arterials Prime Arterials Total Road Segments within Caltrans collision rates: Benchmark 100% 100% 100% 100% 19991 88% 100% 95% 95% 20002 886% 100% 95% 95% 2001^ 100% 100% 95% 98% 20O23 79% 77% 90% 82% 20033 79% 77% 95% 85% 20044 71% 79% 95% 83% 1 ~ 8 secondary, 11 major, and 19 prime arterial segments. 2-7 secondary, 11 major, and 18 prime arterial segments. 3-14 secondary, 13 major, and 19 prime arterial segments. 4-14 secondary, 14 major, and 19 prime arterial segments. ANALYSIS In 2004, 83% of the roadway segments measured were within the statewide collision rate. In 2004 there was one additional roadway segment that was measured in 2004 and not in 2003, there was a 2.1% increase in roadway segments measuring within the statewide collision rate for safety. The roadway segments below did not meet the statewide collision rate: • Carlsbad Boulevard from North City Limits to Mountain View Drive • Carlsbad Boulevard from Mountain View Drive to Carlsbad Village Drive • Carlsbad Boulevard from Tierra Del Oro Street to Palomar Airport Road • Carlsbad Village Drive from Carlsbad Boulevard to Harding Street • Carlsbad Village Drive from Harding Street to Pio Pico Drive • La Costa Avenue from Rancho Santa Fe Road to Camino de los Coches • Palomar Airport Road from Avenida Encinas to Paseo del Norte • Paseo Del Norte from Cannon Road to Palomar Airport Road The Carlsbad Village Drive segments from Carlsbad Boulevard to Harding Street and from Harding Street to Pio Pico Drive are laden with driveway entrances and exits serving businesses. The short distance between these driveways introduces traffic conflicts and significantly increases the starting and stopping of vehicles allowing motorists to enter into traffic flow. This roadway environment requires extra attention and safety precautions by motorists. The segments of Carlsbad Boulevard from North City limits to Palomar Airport Road are parallel to the 1-5 Freeway and to the Pacific Ocean. Congestion or the occurrence of incidents often causes traffic diversion from the freeway to Carlsbad Boulevard. This increase in volume may be a contributing factor to the number of collisions on the corridor. The high number of pedestrians and bicyclists may also be a factor due to driver distraction. The segment of Palomar Airport Road from Avenida Encinas to Paseo Del Norte features very high traffic volumes due to the proximity to the 1-5 Freeway on and off ramps. It also features closely spaced intersections and numerous business driveways. These factors and driver inattention may contribute to collisions on the segment. The segments between North City Limits to Mountain View Drive and Mountain View Drive to Carlsbad Village Drive continue to be heavily traveled corridors. Driver inattention in both of these corridors is a contributing factor in the number of collisions. The segment of Carlsbad Boulevard from the North City limits to Mountain View Drive is a thirty-five (35) mile per hour segment in Carlsbad. Drivers often are inattentive and make unsafe lane changes or attempt U-turn actions inappropriately. The segment of Paseo Del Norte and Cannon Road to Palomar Airport Road has numerous driveways serving commercial and retail establishments. Drivers' inattention and excessive speed contribute to many of the collisions. The segment of La Costa Avenue from Rancho Santa Fe Road to Camino Del Los Coches is a short segment serving a commercial development and residential development. Parking is permitted on the south side only. The road transitions in an eastbound direction from four lanes to two lanes. The road is used by high school drivers attending La Costa Canyon High School, residents in single-family homes south of Camino De Los Coches, and visitors of Stagecoach Park. This segment has relatively low traffic volumes that result in a high collision rate when several collisions occur. The collisions follow no ongoing repetitive pattern. Each of these segments is in a heavily traveled corridor. The segment on Carlsbad Village Drive is particularly problematic due to closely spaced intersections, many driveways, heavy pedestrian volumes and tourist destinations. The number of collisions has remained steady along many of the roadway segments compared to last year's numbers. City staff monitors collision reports on an individual basis as well as performing trend analysis to determine possible collision patterns. Some of the City's analysis and action to improve safety at individual roadway segments is addressed in the Annual Traffic Report prepared by the Public Works Transportation Division. Additionally, every two years the city staff reports on traffic signal needs and identifies a priority list of intersections for placement of future traffic signals. Interim measures are implemented when a collision pattern is identified until a permanent solution is attainable. In 2004, 880 collisions occurred in Carlsbad where a police officer reported to the scene of the accident as compared to 891 in 2003. Also in 2004, 158 collisions were classified as hit and run, which is an increase of 29 collisions compared to 2003 data. Sixty-six traffic collisions were a result of rainy conditions and/or wet roadways or fog during 2004. There were 37 collisions in construction zones, an increase of 23 collisions as compared to 2003 which reflects the significant amount of roadway construction in Carlsbad. Bicyclists were involved in 23 collisions in 2004, which is a 23% decrease over 2003. 2004 was the fourth year the Carlsbad Police Department tracked cell phone usage in a vehicle when a collision occurred. Of the 788 collision reports containing cell phone information, 15 reports listed a cell phone in use by the responsible party. Six hundred and one (601) reports listed a cell phone present, but not in use by the responsible party. The remaining 172 reports indicated no cell phone present. An intersection collision rate is defined as the number of collisions occurring per one million vehicles entering the intersection. Generally, an intersection is considered to be functioning satisfactorily when the rate is 1.5 or below. All intersections in Carlsbad function with a collision rate of less than 0.75. The intersection that experienced the highest number of collisions in 2004 was El Camino Real at Alga Road/Aviara Parkway. This intersection has a collision rate of 0.34. ACTION PLAN In 2004, the number of reported traffic collisions was about the same as the previous year. As traffic volumes continue to grow, the trend expected is for the number of traffic collisions to also increase. Correspondingly, there will be an ongoing emphasis on advanced planning, surveillance of existing conditions, performance measurement, a continued high level of Police Department traffic enforcement, and a well developed Capital Improvement Program (C.I.P.) to help counter any increase in the number of collisions that occur in Carlsbad. As a result, the goal of a safe and efficient transportation system in Carlsbad can be achieved and these efforts will help maintain the balance between growth, accessibility to parcels of land and mobility. A large number of the primary collision factors that result in collisions are outside the control of the City. Therefore, initiating preventive measures can be difficult due to the nature of the accidents/collisions (weather or driver inattention.) Almost all Carlsbad Village Drive and all Carlsbad street segments have been fully improved to city standards, including permanent signing and striping with traffic control devices in place. However, it is expected that all roadway segments could meet the benchmark of falling below within the Caltrans collision rates, and Westaff will continue to strive for this result. Staff currently monitors and consistently addresses safety needs along roadway segments where the number of collisions increases significantly or a pattern of collisions is identified. Solutions are identified and interim measures are implemented when needed unless a permanent solution is immediately attainable. Permanent solutions are typically developed with design and construction funding included as part of the annual capital improvement program. POINT OF CONTACT Bob Johnson (760) 602-2752, Bjohn(o).ci.carlsbad.ca.us. Public Works ROADWAY CIRCULATION THE OUTCOME Roadway circulation efficiency. THE MEASUREMENT Average travel time on El Camino Real and Palomar Airport Road. Travel time studies are conducted at least twice each year on these roadways on a regular basis by staff in the Transportation Division since June of 2000. The purpose of these studies is to compare performance measurement benchmarks for roadway circulation in the City. These studies are conducted once in June and again in December. The travel time study on El Camino Real was performed for the full length of the roadway in the City of Carlsbad, from the south city limit to Haymar Drive at the north city limit. During each travel time study, three time periods were evaluated. These were 7:00 a.m. to 9:00 a.m. (the a.m. peak period), 9:15 a.m. to 11:15 a.m. (the off-peak period), and 3:30 p.m. to 6:00 p.m. (the p.m. peak period). The travel time study on Palomar Airport Road was performed for the full length of the roadway in the City of Carlsbad, from Carlsbad Boulevard at the west to the east city limit. During each travel time study, three time periods were evaluated. These were 6:45 a.m. to 8:15 a.m. (the a.m. peak period), 9:45 a.m. to 11:15 a.m. (the off-peak period), and 4:00 p.m. to 6:00 p.m. (the p.m. peak period). Two test vehicles are used to conduct travel time studies. The "average-speed" technique is used, which involves driving the test vehicles along the length of the test section at a speed that represents the average speed of the traffic stream. During each of the a.m. peak, off-peak and p.m. peak study periods, each vehicle makes as many runs as can occur during the time frame measured. WHAT THE DATA MEANS • Palomar Airport Road (East City Limit to Carlsbad Blvd) Ideal Travel Time (Eastbound or Westbound) 7 min, 21 sec • El Camino Real (South City Limit to Havmar) Ideal Travel Time (Northbound or Southbound) 10 min, 53 sec ; i Ideal Travel Time is the length of time that it takes to travel from one point to the other based on the posted speed limit assuming no delays for traffic signals, construction, pedestrians, traffic congestion, etc. Average Travel Time is the average of actual travel times from one point to the other, including delays. Average travel time is most meaningful if reviewed in relationship to peak and off-peak periods (morning commute/evening commute). Several factors contribute to an efficient roadway circulation system including design, maintenance, traffic operations, and police enforcement. These measures can serve as an initial red flag to help determine the effectiveness of the City's roadway system to ensure efficient and time- effective travel. DEPARTMENTS INVOLVED Public Works Maintenance and Operations, Public Works Engineering, Police. BENCHMARK Travel times on El Camino Real and Palomar Airport Road will not exceed baseline rates collected in June 2000. RESULTS El Camino Real Average Travel Times in Minutes4 Bench- mark Dec. 2002 Jan 2003 June 2003 Dec 20O3 June 2O04 June 2O05 % Change Benchmark to June '05 Northbound - South. City Limit to Haymar 15.7 18.3 16.0 17.2 16.5 17.6 16.8 +7.0 Southbound - Haymar to South City Limit Northbound - South City Limit to Haymar 18.0 20.1 17.4 17.1 20.3 21.2 20.0 15.8 17.4 12.9 16.2 16.3 17.0 17.1 + 11.0 +8.3 Southbound - Haymar to South City Limit 16.0 18.3 14.9 16.5 16.6 16.3 19.1 + 19.4 Northbound - South City Limit to Haymar Southbound - Haymar to South City Limit 21.8 17.4 34.0 19.4 21.7 16.7 25.4 17.8 22.3 17.5 22.5 20.0 21.3 19.8 -2.3 + 13.8 'Benchmarks were established from June 2000 Travel Time Studies *The Percent Change From Benchmark represents the change from the original benchmark established in June 2000 to June 2005 Palomar Airport Road Average Travel Times in Minutes4 Benchmark Dec. 2002 Jan 2003 June 2003 Dec. 2003 June 2004 June 2005 % Change ^ from 1 Benchmark, Eastbound - Carlsbad Blvd to East City Limit Westbound - East City Limit to Carlsbad Blvd 11 11 11 11 12 10 12 12 11 11 12 13 13 11 «l + 12 f 1 V 1 -4 f' Eastbound - Carlsbad Blvd to East City Limit 11 11 12 10 12 11 +5 Westbound - East City Limit to Carlsbad Blvd Eastbound - Carlsbad Blvd to East City Limit 10 14 10 8 11 11 10 12 11 12 13 13 10 13 +4 -5 Westbound - East City Limit to Carlsbad Blvd 12 12 11 12 11 12 12 +2 *Benchmarks were established from June 2000 Travel Time Studies *The Percent Change From Benchmark represents the change from the original benchmark established in June 2000 to June 2005 ANALYSIS Staff obtained the average travel time information on both roads based upon roadway conditions on the day of the study. Both roads are future six-lane arterials. However, some segments have only been constructed with two-lanes in each direction. Travel times on both segments are influenced by traffic volumes, roadway geometries, driveway locations, traffic signals, the regional mall, pedestrian volumes, and lane closures due to construction. The presence of several major construction projects may have contributed to the increase of off-peak travel times and volumes. Afternoon peak hour delays are significantly higher due to the rising volume of traffic on both the subject roads and side streets at that time of day. Traffic volumes have steadily increased on El Camino Real and Palomar Airport Road in recent years. Increases in traffic volume can lead to increases in travel times due to more vehicles in the traffic stream, less maneuverability and more congestion. Both roadways have experienced increased travel times in conjunction with the increased traffic volumes. A slight decrease was seen in certain portions of El Camino Real and Palomar Airport Road. Traffic Volumes, El Camino Real Location Between S.R. 78 and Plaza Drive Between Faraday Avenue and Palomar Airport Road Between Levante Street and Calle Barcelona Traffic Volume ADT 2000 49,449 32,488 30,085 2005 44,123 35,659 35,169 % Change -11% + 10% + 17% Traffic Volumes, Palomar Airport Road Location Between 1-5 S/B Ramp and 1-5 N/B Ramp Between El Camino Real and El Fuerte Street Between Melrose Drive and Paseo Valindo Traffic Volume, ADT 2000 38,437 47,968 47,873 2005 38,217 51,278 49,487 % Change - .6% +7% +3% El Camino Real: The ideal travel time is 10 minutes, 53 seconds on El Camino Real. In general, travel times on El Camino Real have increased. This is in line with the overall increase in traffic volumes on El Camino Real from year to year. A notable exception is the decrease in travel times on northbound El Camino Real during the p.m. peak period over the past two years. This is probably the result of the restriping project that added an additional through lane on El Camino Real over the SR78 Bridge by the City of Oceanside in 2003 and general construction impacts. Immediate improvements to travel times on El Camino Real were noted with the implementation of peak-hour time-based signal coordination plans in 2003 for the entire length of El Camino Real. Since then, changes in vehicle volumes and construction impacts at various intersections along the corridor have resulted in some intersections being removed from the coordination plan on a temporary basis. This may account for some of the increases to travel times on El Camino Real. The major traffic delays occur at the intersections of Palomar Airport Road, La Costa Avenue, Tamarack Avenue, Faraday Avenue and Alga Road during the a.m. peak period. During the p.m. peak periods, major traffic congestion occurs at the intersections of La Costa Avenue, Faraday Avenue, Alga Road, Marron Road, and Cannon Road. The major traffic delays occur at the intersections of Calle Barcelona, La Costa Avenue, Palomar Airport Road, and Marron Road during the off peak periods. The opening of the College Boulevard/Cannon Road extension in August 2004 resulted in a noticeable reduction of traffic volumes on El Carnino Real. The shift in traffic volumes that results in fewer vehicles on El Camino Real has improved travel times. Palomar Airport Road: The ideal travel time is 7 minutes, 21 seconds on Palomar Airport Road. In general, travel times on Palomar Airport Road have increased but were found to be within the ranges established by previous studies. As was the case with El Camino Real, travel times on Palomar Airport Road have also increased in conjunction with increases in traffic volume. A notable exception is the decrease in travel times for the westbound direction during the a.m. peak period, which may be the result of the newly added third westbound lane between the east City limits and Melrose drive. As noted previously, signals pulled off of the signal coordination plan due to volume changes and construction affect peak hour travel and may have contributed to the increases in travel times. The major traffic delays occur at the intersections of eastbound Palomar Airport Road where Yarrow Drive, El Camino Real and El Fuerte intersect and on westbound Palomar Airport Road at the intersections of El Fuerte Street, El Camino and College Boulevard during the a.m. peak period. During the p.m. peak periods, major traffic congestion occurs on eastbound Palomar Airport Road where Armanda Drive and El Camino Real intersect and on westbound Palomar Airport Road at the intersections of El Camino Real Armanda Drive and Paseo Del Norte. ACTION PLAN Both Palomar Airport Road and El Camino Real are required to be completed to their full arterial width per the Circulation Element of the General Plan. Completion of other missing circulation element roadways and widening existing segments will help distribute traffic volumes to more lanes resulting in shorter platoons of vehicles traveling between intersections. Portions of both segments have traffic signals operating in coordination due to the closely spaced intersections. Additional traffic signals will be constructed on both El Camino Real and possibly on Palomar Airport Road in the future. At that time, intersection spacing will be closer and will benefit from coordinated traffic signals. The city has plans to construct a Transportation Management Center (TMC) in the future Public Works building to monitor and coordinate timing of traffic signals. At this time it is unknown when funding for the TMC will be appropriated. The opening of the College Boulevard/ Cannon Road extension in August 2004 resulted in a noticeable reduction of traffic volumes on El Camino Real. Roadway impacts will be analyzed after the December 2005 travel time study has been performed. Completing construction related impacts on Palomar Airport Road east of El Camino Real should also help improve travel times. The projected completion, in 2006, of Faraday Avenue and Melrose Drive should divert traffic volume from El Camino Real and Palomar Airport Road and improve travel times. Poinsettia Lane Reach "E" could be completed in a three to five year timeframe by private development and would further reduce traffic volume on Palomar Airport Road. Similarly, the widening of sections of El Camino Real and Palomar Airport Road, which have not yet been built to ultimate width to three lanes in each direction, should improve travel times by increasing capacity and eliminating operational bottlenecks. Additional travel time studies will be performed on El Camino Real and Palomar Airport Road in December 2005. The results from these studies will enable continued comparisons to be made with the results contained in this and previous studies in order to evaluate trends resulting from traffic improvements or delays on both roadways. POINT OF CONTACT Bob Johnson (760) 602-2752, Bjohn@ci.carlsbad.ca.us. Public Works ROADWAY RELIABILITY THE OUTCOME High quality roadway experience. THE MEASUREMENT Overall Roadway Condition Index (OCI) The OCI includes a target of 100% of roadways achieving a minimum score of 70 or higher. The Pavement Management software, based on the data collected during roadway condition surveys, generates OCI values. WHAT THE DATA MEANS The OCI reflects the condition of the roadway surface, which is related to the design and quality of the initial installation, the age, and maintenance of the roadways. Exposure to the elements and vehicle loadings cause pavement to deteriorate. Left untreated, the pavement will develop large cracks and potholes that would impact the structural integrity of the road as well as degrade the rideability or "smoothness" of the road. Pavement overlays can prevent cracks from occurring and help avoid more extensive and expensive roadway repairs. A proactive pavement management program is the most cost effective way to improve roadway reliability and protect the City's investment in its roadways. DEPARTMENTS INVOLVED Public Works, Engineering and Maintenance and Operations/Street Maintenance BENCHMARK Average OCI of 80 including a target of 100% of roadways scoring a minimum of 70 or higher. An OCI in the range of 70-85 indicates that the roadway is in "very good" condition, which means that the pavement has very few minor defects. RESULTS The following table identifies the OCI values of the City's roadways as of the end of the 2005 calendar year. Roadway Class Local Industrial Collector Secondary Arterial Major Arterial Prime Arterial City Wide Total Centerline Miles 242 14 4 29 26 24 339 Benchmark Average OCI 80 Actual Average OCI 92 83 84 88 91 87 90 Miles of Roadway Above an OCI of 70 231 12 3 26 25 22 319 % of Miles Above an OCI of 7O 95% 88% 80% 89% 98% 91% 94% ANALYSIS The results reflect the construction of the 2005 Management Program projects and the addition of approximately 11.1 miles of new roadways. The Pavement Management Program projects resulted in 17.0 miles of roadways being sealed and 10.6 miles of roadways receiving an overlay. The combined cost of the Pavement Management Program projects was $3,400,000. As a result of these activities, the City Wide OCI value increased from 88.5 to 89.9. The following table summarizes the OCI values and construction costs noted above. This table demonstrates the correlation between the funds expended on pavement management activities and the City Wide OCI values. Year 1998 2002 2OO3 2004 2005-1 * 20O5-2 ** Expenditures on Pavement Mgmt. Projects N/A $2,830,000 $2,935,000 $8,315,000 $3,400,000 $0 Average OCI (System Wide) 75 83 84 89 89 90 Miles of Roadway below an OCI of 70% of miles below an OCI of 70 N/A 53 miles / 16% 50 miles / 15% 27 miles / 8% 20 miles / 6% 20 miles /6% *2005-1- represents the results calculated by updating the last year's roadway inventory with the new OCI values after the 2005 Pavement Management Program projects are constructed. **2005-2-represents the results of the 2005 Pavement Management Program projects and the new roadways that have been constructed in the last year. ACTION PLAN Utilize the Pavement Management software program to analyze the cost and effectiveness of various management philosophies. The variables that will be evaluated include budget, minimum OCI values and the various types of pavement management construction tasks. Upon the completion of the analysis, the activities for next year will include identifying the scope of work for future projects, design and construction. POINT OF CONTACT Marshall Plantz (760) 602-2766, Mplan(g;ci.carlsbad.ca.us. Public Works TRANSPORTATION CUSTOMER SATISFACTION THE OUTCOME A high level of customer satisfaction. THE MEASUREMENT City of Carlsbad Public Opinion Survey. WHAT THE DATA MEANS Highly satisfied customers are an indication that we are providing services in a manner that is desired and/or expected, contributing greater confidence in the Engineering Transportation Division and local government in general, resulting in high quality of life for community members. DEPARTMENTS INVOLVED Engineering/Transportation and Design Divisions, and Maintenance and Operations / Construction Maintenance. BENCHMARK 90% of customers rate the condition of city streets and traffic circulation as "Good" or "Excellent." RESULTS Condition of City Streets Benchmark 90% 200O 80% 2001 84% 2002 83% 2003 83% 2OO4 73% 2005 64% Traffic Circulation Benchmark 90% 2OOO 41% 2OO1 45% 2002 46% 2003 44% 2O04 44% 2005 N/A ANALYSIS Carlsbad residents were asked about the condition of city streets. Overall conditions are rated positively with 13% of respondents giving a rating of "Excellent" and 53% as "Good." This year, the Condition of City Streets rating experienced a decrease in reported customer satisfaction over previous years. One factor that may be contributing to this decrease is that the City is in a significant construction period that results in many lane closures and/or traffic delays in many parts of the City. There is especially heavy construction in the south part of the City, which results in many of the roads to be impacted by traffic control plans that reduce roadway capacity during construction. The rating of road condition was analyzed to look for differences between demographic groups. Significant differences were found in the ratings given to road conditions depending upon the quadrant in which the respondent lived. "Excellent" ratings were given much more often by residents of the Southwest quadrant (18.6%) and much less often by residents of the Northwest quadrant (8.5%). Poor ratings were given most often by residents of the Southeast quadrant. Explanations for these differences may be related to ongoing construction projects in specific areas (e.g. Rancho Santa Fe Road widening in the Southeast quadrant) or consistently congested roadways (e.g. SR-78 and I- 5 interchanges in the Northern quadrants). Length of residence was also significantly related to ratings of road conditions. In general respondents who have lived in the City of Carlsbad longer were less likely to give positive ratings and more likely to give negative ratings. The customer service rating for traffic circulation has been constant for a number of years, and there is no anticipated change in the service levels. Therefore, it was determined that this question would be asked only in alternating years. ACTION PLAN Continue to include transportation related questions in the citywide Public Opinion Survey. In addition, explore the possibility of adding open-ended questions to explore reasons why residents rate traffic circulation and road conditions low. With the completion of construction projects this year and the anticipated opening of several major thoroughfares within the next several years, satisfaction with traffic circulation by region will be carefully monitored. POINT OF CONTACT Bob Johnson, Deputy City Engineer, Transportation Division, Engineering, (760) 602-2752, Bjohn^ci.carlsbad.ca.us. Public Works GROWTH MANAGEMENT CIRCULATION THE OUTCOME An efficient and effective circulation system is maintained in the City. THE MEASUREMENT No road segment or intersection within neither the City, nor any road segment or intersection outside the City (which is impacted by development within the City), shall be projected to exceed an unacceptable Level Of Service (LOS). WHAT THE DATA MEANS Comparison of traffic volumes to roadway and intersection capacities. The City of Carlsbad's combined North County Series 10 traffic model is maintained by SANDAG and used by staff to identify necessary roadway and intersection improvements based upon future traffic projections through the year 2030. The City of Carlsbad Annual Growth Management Traffic Monitoring Program conducts traffic counts of existing volumes and analyzes LOS conditions on critical roadways and intersections throughout the City. Both programs help identify and determine the timing of additional traffic mitigation and circulation improvements. LOS is a quantative measure of traffic conditions that reflects how restrictive vehicle movements are, or may become. For purposes of monitoring traffic throughout the City, the capacity of an intersection or roadway segment is compared to the actual volumes measured in the field. The six levels of traffic service range from A to F. Level A represents the most ideal conditions; Level E is at capacity; and Level F indicates forced flow, or stop and go traffic representing a gridlock condition. The Transportation Research Board Highway Capacity Manual further defines LOS based on specific measurements of traffic volumes and roadway capacities. DEPARTMENTS INVOLVED Engineering. GROWTH MANAGEMENT STANDARD No road segment or intersection in the City, nor any road segment or intersection outside the City (which is impacted by development in the City), shall be projected to exceed a service level as indicated for the following conditions: Condition 5 J ^ ~; During off-peak hours During peak hours L0S C D RESULTS The Growth Management Traffic Monitoring Program for 2005 included 31 roadway segments and 60 intersections. Results indicate all roadway segments and intersections meet the Growth Management Circulation Standard. Although traffic volumes grew in some locations of the City between 2004 and 2005, other locations have seen slight traffic volume decreases. Street improvements and alternative routes have been implemented which resulted in improved LOS at many of the city's intersections and roadways. During the past year, the city had completed the construction of major circulation element roadways such as the College Boulevard/Cannon Road extensions, the completion of Poinsettia Lane between Melrose Drive and El Camino Real, El Fuerte Drive between Poinsettia Lane and El Camino Real, and the widening of the intersection of Palomar Airport Road and Melrose Drive. The resulting construction of these roadways has significantly changed the circulation patterns through the city. In general, the 2005 Growth Management Traffic Monitoring Program indicates improved traffic levels of service for various circulation locations when compared to previously reported years. This indicates the number of through lanes and turn lanes provided on major roadways and intersections are generally appropriate for the prevailing traffic conditions. The following intersections and roadway segments, although reaching the peak hour threshold, currently meet the Growth Management Standards and will continue to be monitored: • El Camino Real/Cannon Road (LOS D in the PM Peak Hour) • El Camino Real/Palomar Airport Road (LOS D in the PM Peak Hour) • El Camino Real/Aviara Parkway (LOS D in the PM Peak Hour) • Carlsbad Boulevard/Cannon Road (LOS D in the PM Peak Hour) • Cannon Road between El Camino Real and College Boulevard (LOS D in the Peak Hour) ANALYSIS The Faraday Avenue and Melrose Drive extension projects are under construction and projected to be completed in fall 2006. Both roadways have the potential to alleviate congestion at the following intersections and roadway segments: • El Camino Real/Palomar Airport Road intersection • Palomar Airport Road/Melrose Drive intersection • Palomar Airport Road between Melrose Drive & Business Park Drive It should be noted the Palomar Airport Road/Melrose Drive intersection was reported at LOS of E in the 2004 Traffic Monitoring Report. In 2005 it was reported at LOS C. The difference in LOS may be attributed to the day-to-day variation in traffic using Palomar Airport Road as a connector between inland communities and the I-5/coastal corridor, and completion of Poinsettia Lane, a parallel arterial located south of Palomar Airport Road. This intersection will continue to be monitored and the LOS is anticipated to remain the same, or improve, when the Faraday Avenue and Melrose Drive extensions are completed. Completion of the College Boulevard/Cannon Road extension projects has changed the traffic patterns within the immediate project area. These extension projects now provide a direct connection to SR 78 via the College Boulevard interchange. Prior to this connection, access to SR 78 within the immediate project area was provided at the El Camino Real/SR 78 interchange. The 2005 volumes along El Camino Real between SR 78 and Cannon Road show an average decrease of about seventeen percent. In addition, a significant decrease from the 2004 ADT was calculated along Carlsbad Village Drive and between Pontiac Drive and Victoria Avenue (37% decrease). With a direct connection to SR 78, College Boulevard between Tamarack Avenue and the northern city limits, and Cannon Road between El Camino Real and College Boulevard should continue to be monitored as part of future traffic monitoring programs. Traffic volume levels along Rancho Santa Fe Road between Melrose Drive and La Costa Avenue have generally remained the same as previous years. The Rancho Santa Fe Road Phase I project between San Elijo Road and La Costa Avenue is complete. The Phase II bridge and new roadway is currently under construction and projected to be completed in the summer of 2006. Based on the 2005 Carlsbad Traffic Monitoring Program, the Levels of Service (LOS) for Rancho Santa Fe Road and adjoining intersections were found to be: • Rancho Santa Fe Road and Melrose Drive intersection - LOS C in the PM Peak • Rancho Santa Fe Road and La Costa Avenue intersection - LOS B in the AM Peak • Rancho Santa Fe Road between Melrose Drive and La Costa Meadows - LOSC • Rancho Santa Fe Road between San Elijo Road and Camino Junipero - LOS A When both phases of the Rancho Santa Fe Road Realignment and Widening project are complete, traffic flow and intersection operations in the surrounding area is expected to improve. Several intersections located on Carlsbad Boulevard are identified in the City's Traffic Impact Fee Report as future hot spots due to their unique character. Hot spots are locations that primarily serve regional traffic and are within limited control of the City. Because the roadway abuts the ocean, most major intersections on Carlsbad Boulevard are "T" intersections that tend to have high turning movement demands. Studies by both the City and SANDAG indicate Carlsbad Boulevard is used by regional traffic as an alternative to 1-5. The following is a summary of the Levels of Services for intersections with Carlsbad Blvd analyzed in the 2005 Carlsbad Traffic Monitoring Program: Location Carlsbad Blvd and Carlsbad Village Drive Carlsbad Blvd and Tamarack Avenue Carlsbad Blvd and Cannon Road Carlsbad Blvd and Poinsettia Lane AM Peak A A B A PM Peak B B D A The Carlsbad Boulevard/Cannon Road intersection will continue to be monitored with other major intersections located on Carlsbad Boulevard. The Interstate-5 Interchanges with the Circulation Element roadways in Carlsbad were also analyzed in the 2005 Carlsbad Traffic Monitoring Program. Based on the analysis, each on and off ramp intersection meets the Growth Management Circulation Standard. The freeway ramps will continue to be monitored on an annual basis. ACTION PLAN Engineering Department staff recommends the following actions: • Continue on-going analysis of impacts from new development. • Continue to conduct annual Growth Management Traffic Monitoring Program. • Complete construction of Rancho Santa Fe Road Realignment & Widening. • Complete Melrose Drive/Faraday Avenue connections. • Complete the spot widening of arterial roadways to their full General Plan configuration to eliminate congestion points and bottlenecks. • Complete Poinsettia Lane Reach E. • Consider initiating environmental studies for Cannon Road Reach 4. • Complete College Boulevard Reach A. POINT OF CONACT Steven Jantz (760) 602-2738, sjant@ci.carlsbad.ca.us 0) <D Ensure a reliable, high quality, diversified potable and recycled water system leading to a drought-resistant community, in the most cost effective manner. Water Indicators - Potable Water Quality - Water Service Delivery - Water Delivery Cost Efficiency - Water Service Customer Satisfaction - Recycled Water Service Delivery - Recycled Water Delivery Cost Efficiency - Growth Management Standard Water Distribution System Goals - Cathodic Protection Program - El Camino Real Water Pipeline Improvements - Water/Sewer System Connection Permits Trends and Observations • Completion of scheduled maintenance activities continued to be below benchmark. Staff continues to analyze alternative work methods to improve the balance of scheduled versus unscheduled work • As the water system continues to grow through development of the city, the challenges in trying to achieve the balance between scheduled and unscheduled maintenance will continue. • The percent of lost (i.e., unused) recycled water continues to be high due to the city's obligation to purchase recycled water through take-or-pay contracts. This trend will continue, but will decline over time as existing services are retrofitted over to the recycled water delivery system and more customers become available to utilize the system. CITY OF CARLSBAD Current and Projected Water Supplies (AFY) Water Supply Sources Purchased from SDCWA Desalinated Seawater (a) Recycled Water Total 18,917 0 1,803 20,720 20,200 0 2,000 22,200 (b> 13,475 5,000 5,000 23,475 14,891 5,000 6,300 26,191 17,607 5,000 6,300 28,907 (c) a) Denotes Carlsbad's option to purchase up to 25,000 acre-feet per year from Poseidon Resources or 5,000 acre-feet from CWA as per the Carlsbad/CWA MOU. (See discussion on Seawater Desalination). (b) For calendar year 2005, the estimated demand is projected to be approximately the same as 2004 at 22,000 AFY. Significant rainfall during the months of January through April in 2005 reduced the landscape irrigation water demand. (c) Ultimate demand is projected at 28,907 AFY including recycled water Public Works POTABLE WATER QUALITY THE OUTCOME High quality water free of pathogenic organisms. THE MEASUREMENT Monthly bacteriological samples. WHAT THE DATA MEANS Carlsbad purchases treated water from the Metropolitan Water District via the San Diego County Water Authority. Weekly water samples are taken and tested for the presence of coliform bacteria. Coliform bacteria are ever-present and therefore used as an indicator of the potential presence of pathogenic organisms that cause waterborne diseases. Positive samples are indicators of potential problems that are investigated and followed up with additional samples. Monthly bacteriological reports are sent to the State Department of Health Services. The goal is to achieve zero positive samples, with anything less than five percent being acceptable. DEPARTMENTS INVOLVED Public Works/Maintenance and Operations. BENCHMARK 98% of bacteria samples should be free of coliform. The State requires that at least 95% of all samples collected during any month are total coliform-free. RESULTS Fiscal Year Number Collected Total Positive Total Bacteria-Free Benchmark 2001 2002 2003 2004 2005 1,725 1,719 1,719 1,752 1,724 3 1 1 1 2 1,722 1,718 1,718 1,751 1,722 Percent Bacteria-Free 98% 99.8 99.9 99.9 99.9 98.8 ANALYSIS Data was gathered for fiscal year 2005. 1,724 samples were taken with two samples testing positive for bacteria. When positive samples are identified, staff takes repeat sample sets per State regulations. Actual results of 99.8% were above standard for this measurement and met all State and Federal legal, health and safety requirements. Data collected from outside agencies indicated that all maintain compliance with State and Federal regulations. However, the W more samples that are taken, the more likely that a positive sample may be || found. The minimum number of samples to be collected is based on the || number of customers and/or connections being served. This higher level of testing further assures a safe supply of potable water to customers. '* ACTION PLAN || To ensure a high level of water quality and safety, staff will continue weekly -. water sampling and testing in accordance with provisions of the California State Department of Health Services. *' e POINT OF CONTACT Clint Phillips, (760) 438-2722, x 7110, cphil@ci.carlsbad.ca.us. X c € ee • *f e e Public Works WATER SERVICE DELIVERY THE OUTCOME Water system reliability. THE MEASUREMENT Percent of planned work activities completed during the fiscal year based on a standard of maintenance. These activities include Valve Maintenance and Fire Hydrant Maintenance. WHAT THE DATA MEANS This measure reflects the level of care with which the integrity of the water distribution system is being maintained. DEPARTMENTS INVOLVED Maintenance and Operations/Construction Maintenance & Water Operations. BENCHMARK Valve Maintenance: At least 90% of all valves in the Carlsbad service area are tested and repaired bi-annually. Fire Hydrant Maintenance: At least 90% of all fire hydrants in the Carlsbad service area are tested and repaired bi-annually. RESULTS Activity Valve Maintenance (water distribution system) Fire Hydrant Maintenance Benchmark 90% 90% % of Planned Maintenance 2003 8% 10% 2004 24% 35% 2005 28% 35% ANALYSIS A Public Works Maintenance Assessment Program is used to establish and document the frequency of recommended preventive maintenance and/or responsiveness to repair needs. At the end of each fiscal year, the level of accomplishment is measured by comparing the percent of completed work to planned maintenance. The Public Works Maintenance Management Program and work order systems are used to collect and analyze performance data. The standard for the maintenance activities listed above includes the planned testing and repair of all water system structures and appurtenances to ensure optimal storage, distribution and quality of water in the Carlsbad service area. The benchmark for each of these activities was set at 90%. Ongoing maintenance at the benchmark level helps maintain the structural integrity of the water distribution system. Maintenance activities usually include the inspection and testing of water system structures. To more effectively balance planned and corrective maintenance schedules within existing resources, staff will revise the maintenance standard for Valve and Fire Hydrant Maintenance from bi-annual to every four years starting in fiscal year 2006. This will ensure that every water distribution valve and fire hydrant that needs inspection and maintenance will receive attention on a regular basis. Staff will closely monitor the impacts of this schedule change and note any "high priority" needs that may require more frequent attention. ACTION PLAN • Staff will continue to investigate and analyze alternative work methods to improve the balance of planned versus corrective maintenance. This will include, but not be limited to, the use of contract services, temporary help, and/or continued investigation and evaluation of service delivery alternatives using the Public Works Service Plan program, and ongoing review of the impacts of revised maintenance standards. • In fiscal year 2006, staff will revise the maintenance standard for each water distribution system valve and fire hydrant from bi-annual to every four years. • In fiscal year 2007 staff will implement a new work management system (Hansen) that will automate scheduling and record maintenance of work activities, and tie maintenance and/or repair work to a specific asset in the water system. POINT OF CONTACT Clint Phillips (760) 438-2722, x7110, cphil@ci.carlsbad.ca.us. Public Works WATER DELIVERY COST EFFICIENCY THE OUTCOME Water operations delivery efficiency. THE MEASUREMENT This measure uses a multi-modal approach combining: Unaccounted for Water: The percentage of produced water that fails to reach customers and cannot otherwise be accounted for through authorized use. Unaccounted for water is defined as the amount of water produced (water purchased plus or minus the amount of water held in storage) minus water sold, and divided by water produced. Cost of Service: The total cost of service using actual expenditures, including potable water purchases from the Metropolitan Water District via the San Diego County Water Authority, less depreciation, divided by the total acre-feet of potable water delivered produced (i.e., purchased from MWD, plus water taken from Maerkle Dam) per year. WHAT THE DATA MEANS Unaccounted for Water: The unaccounted for water measure, if kept within the benchmark, represents the results of an efficient and fiscally responsible operation. If the percentage of unaccounted for water is high, the result is potential revenue loss to the Water Operations Enterprise Fund. Cost of Service: The annual expenditures per acre-foot of potable water delivered represent an efficient system when the benchmark is achieved. The outcome is to satisfy customer demands with safe, reliable water within a prudent level of expenditures. DEPARTMENTS INVOLVED Maintenance and Operations. BENCHMARK Unaccounted for Water: Annual unaccounted for water not to exceed 6.0% as set by the California Department of Water Resources. Distribution system losses commonly range between 6% and 15%. Cost of Service: The cost of service will not exceed $1,531 per acre-foot of water produced. This benchmark was established based on results of a survey conducted by the American Water Works Association in February 2005. $1,531 per mg is the median score for all agencies surveyed within the 50,001 to 100,000 customer base category. The 25th percentile score is $812 per mg. The 75th percentile score is $2,088 per mg. This is the first year that this benchmark has been used and will be updated based on the results of subsequent surveys conducted by AWWA if available. RESULTS Unaccounted for Water Fiscal Year Benchmark 2001 2002 2003 2004 2005 Water Loss 1- <6% 4% 4% 5% 6% 5% 1. New water meters have an average rate of error of +1.5%. As a result, the percentage of unaccounted for water will never be zero. Cost of Service Fiscal Year 2001 2002 2003 2004 2005 Acre-Feet Produced 18,949 20,689 20,241 21,160 20,178 Cost of Service J $13,923,063 $14,979,036 $15,290,549 $16,579,385 $16,716,493 Cost Per Acre-Foot Produced $735 $724 $755 $784 $828 Benchmark 2 ;:• ', *' $1,531 1. The new benchmark excludes depreciation as part of annual costs. Annual costs from previous years were reduced by the amount budgeted for depreciation in those previous years. 2. Source: AWWA publication titled, "Benchmarking Performance Indicators for Water & Wastewater Utilities: Data and Analyses Report, "dated 02/2005. Data population category, 50,000-100,000. ANALYSIS Unaccounted for Water: This is an internal measure that is used to monitor performance over time and reflects that the established benchmark is being achieved. The fluctuations of percentages could be the result of variances in water meter reads. As water meters age or are affected by conditions within a vault pit setting, mechanical meters can become less accurate. A portion of water loss may be attributable to the inaccuracy of older, mechanical meters. The Meter Services Division continued with its implementation of a more aggressive meter exchange program in fiscal year 2005 that resulted, in part, to a reduced percentage of unaccounted for water. Water can also be lost as a result of flushing activities designed to maintain water quality, water used to clean water storage facilities and water used during new pipeline construction. New construction activity continues to be high in Carlsbad. It is expected that in subsequent years as new construction declines, the percentage of unaccounted for water may decline. Using data from a water survey conducted by the American Water Works Association, organizations of similar in customer base size to that of the District reported a median water loss of 9.6%. Using this measure as another benchmark comparison indicates that the Carlsbad Municipal Water District is doing an efficient job of ensuring that water purchased/produced is reaching its customers and is clearly within best practices standards. Cost of Service: This is the first year that staff has used data from a water agency survey conducted by the American Water Works Association. The cost of service per acre-foot of water produced is one of two measures that the AWWA reports in its survey report. The other measure is cost of service per account. Only one of the two-benchmark standards is being used in this year's report. The cost per account measure may be used in subsequent reports if staff can determine that this data is meaningful to Carlsbad. Not contained in AWWA's report is the age of the various agencies being surveyed, i.e., whether or not they are at build-out, etc. and the make up of the agencies customer base; single-family, commercial, industrial, irrigation, etc. This detail will be researched in more detail for next year's report. For fiscal year 2005, Carlsbad's cost of service of $828 per million gallons (mg) is significantly below the AWWA survey benchmark of $l,531/ac.-ft. The AWWA survey benchmark is the median score of all results. Carlsbad's cost of service measure ranks in the 25th percentile of all those surveyed. This ranking seems to indicate that Carlsbad's water system is being managed in a financial efficient manner. The low cost may also be indicative of a system that is relatively new and has not yet experienced significant failures or greater than anticipated unplanned maintenance work which can increase as a system ages. ACTION PLAN Unaccounted for Water: • Staff will continue with the meter replacement program based on the standards developed in the Maintenance Assessment Program. • Staff will more closely monitor the use of water by contractors on large construction sites. • Continue research of implementation of a mobile or fixed-based radio-read automated meter reading system. Cost of Service: • Staff will continue to use the results of the AWWA survey as a "best practices standard." If this information is not published next year, staff will research and review other survey data that is available to determine an appropriate best practices standard. • In fiscal year 2006, staff will continue to research the feasibility of implementing a mobile radio-read meter reading system. If such a system is approved, the costs associated with data use collection could be reduced significantly. • Staff will conduct more detailed research of data from the AWWA report to determine if this data is meaningful to Carlsbad. Issues such as whether or not an agency is near build-out, the number and type of customer classifications, etc., will be reviewed and may be included in next year's report. POINT OF CONTACT Clint Phillips (760) 438-2722, x 7110 , cphilfeci.carlsbad.ca.us. Public Works WATER SERVICE CUSTOMER SATISFACTION THE OUTCOME A high level of customer satisfaction THE MEASUREMENT City of Carlsbad Public Opinion Survey. WHAT THE DATA MEANS Highly satisfied customers are an indication that we are providing services in a manner that is desired and/or expected, contributing greater confidence in the Maintenance & Operations Division and local government in general, resulting in high quality of life for community members. DEPARTMENTS INVOLVED Maintenance and Operations/Water Operations, Construction Maintenance and Utility Account Maintenance; Finance/Utility Billing BENCHMARK 90% of customers rate water services as "good or excellent." RESULTS Benchmark 90% 20O1 91% 2002 89% 2003 91% 2004 No data 2005 93% ANALYSIS The customer service rating for this measure has consistently met or exceeded the benchmark for a number of years, and there is no anticipated change in the service levels. As a result, it was determined that this question would be asked only in alternating years. 2004 was an "off year," but in 2005 the City's customer service rating in water service once again exceeded the benchmark. Water service citywide is provided by three separate water agencies; the Carlsbad Municipal Water District, the Olivenhain Municipal Water District and the Vallecitos Water District. The service areas for these agencies are described as follows: • Carlsbad Municipal Water District Service Area fCMWD): The CMWD service area covers approximately 85% of the city and generally covers the area north of La Costa Avenue. • Olivenhain Municipal Water District (OMWD): OMWD serves several thousand Carlsbad residents in the area generally south of La Costa Avenue bordered by the southern and eastern boundaries of the incorporated area of the City of Carlsbad. • Vallecitos Water District Sendee Area: The VWD service area resides generally within the central/eastern portion of the Southeast Quadrant of the City. In this years report, staff successfully worked with SBRI to develop a service area comparative analysis of customer satisfaction by comparing SBRI's list of respondents from the Southeast Quadrant to lists of Carlsbad customers being served by OMWD and VWD. Staff is now able to differentiate water service customer satisfaction results between the Carlsbad Municipal Water District and those who receive services from other service providers. The survey results revealed that customer service and satisfaction within the CMWD service area is still above the benchmark and consistent with citywide results incorporating the other two service providers. ACTION PLAN Continue to include water services questions in the citywide public opinion survey in alternating years and collect data by City quadrant areas. POINT OF CONTACT Clint Phillips (760) 438-2722 x 72210, chphilCojci.carlsbad.ca.us. Public Works RECYCLED WATER SERVICE DELIVERY THE OUTCOME Recycled water system reliability. THE MEASUREMENT This measure uses a multi-modal approach combining: Annual and Four-Year Cross Connection Tests: Percentage of required annual and Four-Year Cross Connection Tests completed during the fiscal year. Walk-thru Inspections of Recycled Water Sites: Percentage of recycled water use sites that are physically inspected during the fiscal year. WHAT THE DATA MEANS Measures the level at which operations staff is performing required inspections and testing of recycled water use sites. DEPARTMENTS INVOLVED Public Works/Maintenance and Operations BENCHMARK Annual and Four-Year Cross Connection Tests: At least 90% of all scheduled cross connection tests are completed annually to ensure that no cross connections exist between the potable and recycled water systems. Walk-thru Inspections of Recycled Water Sites: At least 90% of all recycled water use sites are inspected annually to ensure compliance with rules and regulations regarding signage, valve labeling, and marking above-ground appurtenances. Inspections also include noting any "ponding" and overspray or run-off of recycled water onto unapproved areas. RESULTS Activity Planned Testing Cross Connection Test Four-Year Cross Connection Test Planned Inspections Walk-Through Inspections Benchmark 90% 90% Benchmark 90% % Maintenance Completed FY 2003 100% 100% 96% FY 2004 71% 200% 81% FY 2005 86% 125% 91% No. of Recycled Water Uses Sites No. of Annual Walk-Thru Inspections No. Annual & 4-yr. C/C Tests % Tests Completed City of San Diego 350 350 300 68% Otay WD 465 No data 39 14 100% Padre Dam MWD 166 166 2 25 100% North County City 150 90 0 75 50% City of Carlsbad 103 94 6 25 100% ANALYSIS Annual and Four-Year Cross Connection Tests: The purpose of the cross connection test is to reveal any connections between the potable and recycled water systems. The general method is to shut off either the potable or the recycled water, depressurize the system, and leave it for a period of time, optimally 24 hours. Pressure recorders are attached to both the system that is depressurized and the system that remains on. This procedure is then reversed. Re-pressurization of the depressurized system indicates a possible cross connection and warrants further investigation to identify if any cross connection exists. These tests occur four years after the initial installation of a recycled water site and every four years thereafter. For the purposes of establishing annual productivity projections, all existing recycled water sites are divided by four and this number is used for the productivity projection for the year. Because the City is still in a growth mode, the number of new sites that come on line each year will vary. Consequently, the number of sites that need inspection each year also varies. The result is that in years where greater than the normal number of recycled water sites are installed, the number of sites tested will be greater then the projected productivity. Conversely, in years where less than the normal number of recycled water sites are installed, the number of sites tested will be less then the projected productivity. Fiscal year 2005 is an example of the productivity being slightly lower because staff performed fewer tests than the projected average. The industry standard is to complete testing at all sites during the year. The benchmark partner data above indicates that there are varying degrees of productivity in inspections and testing depending upon the availability of staffing resources. The City of Carlsbad has been able to secure sufficient resources to maintain its internal benchmark. When the City reaches build-out and the number of sites to be inspected stabilizes, staff will be able to record and project more consistent annual productivity for this work. Walk-thru Inspections of Recycled Water Sites: As required by the California Department of Health Services and the San Diego County Department of Environmental Health Services, staff physically walks all recycled water use sites to ensure compliance with appropriate regulations regarding signage, tagging valves, and marking above ground appurtenances. While on site, staff also notes any ponding and overspray or run-off of recycled water onto unapproved areas. Data is captured for each fiscal year ending on June 30. In some cases, certain walk-thru inspections started in a fiscal year may not be completed until after June 30. When this occurs the productivity gets recorded into the following fiscal year. This results in productivity for the current year falling slightly below projections. Fiscal year 2005 is an example of the productivity being slightly higher because staff completed inspections begun in the previous fiscal year (2004). More meaningful interpretation of this data will be realized when evaluated/analyzed over several years and once the size of the City's recycled water system stabilizes; i.e., the number of recycled water use sites remains relatively constant over time. To put the significance of growth into perspective, there are currently 103 recycled water use sites in the City. At build-out, it is estimated that there will be 450 total recycled water use sites. ACTION PLAN Meet with partner agencies to further refine benchmarks and discuss performance measurement strategies. POINT OF CONTACT Clint Phillips (760) 438-2722 x7110 , cphil@ci.carlsbad.ca.us. Public Works RECYCLED WATER DELIVERY COST EFFICIENCY THE OUTCOME Recycled water operations delivery efficiency. THE MEASUREMENT This measure uses a multi-modal approach combining: Water Loss: The percentage of produced recycled water loss in the distribution system that is unused by customers. Water loss is defined as the amount of recycled water the City is contractually obligated to purchase for a year plus any potable water added to the distribution system (recycled water produced), minus the amount of recycled water sold for the year, divided by recycled water produced. Cost of Service: The total cost of service using actual expenditures, including contractual purchase agreements with the Leucadia Wastewater Authority and Vallecitos Water District, divided by the total of acre-feet of recycled water produced. WHAT THE DATA MEANS Water Loss: The water loss measure represents the effectiveness by which the City is able to use all the recycled water being delivered via contractual purchase agreements with the Leucadia Wastewater Authority and Vallecitos Water District. The percentage of loss will decrease as demand increases due to an increase in the number of recycled water connections. Cost of Service: The annual expenditures per acre-foot of recycled water delivered represent an efficient system when the benchmark is achieved. The aim is to satisfy customer demands for a reliable source of non-potable water within a prudent level of expenditures. DEPARTMENTS INVOLVED Public Works/Maintenance and Operations. BENCHMARK Water Loss: The benchmark for this measure will be established after further research and meetings with partner agencies have been held. According to California Department of Water Resources Standards, system losses range from 6% to 15%. Cost of Service: Annual cost of service per acre-feet of recycled water produced will not exceed $700. This benchmark was established based on information reported in the 2004 base line year; however, a best practices standard may be substituted in subsequent reports if comparable benchmarks can be obtained from outside agencies. RESULTS Water Loss Fiscal Year Benchmark 2004 2005 Water Loss To be determined 25% 23% Fiscal Year 2004-05 Carlsbad Production (Ac.-Ft.) 3,056 %of Production Lost 23% Quantity Lost (Ac.-Ft.) 703 Delivery Price per Ac.-Ft. !• $456 Est. Cost of Unused Deliveries $320,568 1. Delivery price per acre-foot is a "melded rate" from the two take-or-pay contracts. The actual delivery price per acre-foot is slightly higher because $456 it does not include the cost of make-up water purchased from the potable water system. Cost of Service Fiscal Year 2004 2005 Carlsbad Production (Acre-Ft.) 2,277 3,056 Cost of Service $1,643,079 $1,972,741 Cost Per Acre-Foot Produced $722 $646 Benchmark $700 ANALYSIS Water Loss: This is an internal measure that is used to monitor performance over time, it is not indicative of a "tight system." Carlsbad currently purchases recycled water from two agencies on a "take-or-pay" basis. This means that recycled water is delivered to Carlsbad in fixed, agreed-upon amounts. With this arrangement, at various times of the year supply can exceed demand. And because of Carlsbad's limited storage capacity, the result is a surplus of recycled water that cannot be stored and is instead discharged to the ocean via Encina Wastewater Authority's outfall line. The amount of discharge is represented in the water "loss" measure. Because Carlsbad is contractually obligated to purchase the water even at times when it is not needed, expenses are incurred for unused water. Over time, as the number of recycled water connections increases, the increased demand will allow for the City to use most, if not all, of the water being delivered. A more definitive water loss benchmark will be determined once the balance of supply and demand is reached. Cost of Service: The cost of service to "produce" recycled water ($646 per acre-foot) includes all annual expenditures for personnel, services and supplies, including the cost of recycled water purchased from the Vallecitos Water District and Leucadia Wastewater Authority, plus water purchased as "make-up water" from the Carlsbad Municipal Water District. During the dry Summer months, demands for recycled water occasionally exceeds available supplies. When this occurs, potable water from the District's supply is piped into the recycled water system to replace (i.e., "make up for") recycled water shortages. The recycled water-operating budget is charged for this use and that amount is factored into the total production cost of recycled water. As additional services are added to the recycled water system as described earlier, it is expected that economies of scale will result in lower per-unit production costs. This measure is still relatively new. It has not yet been determined if the $456 per acre-foot purchase price (derived from a "melded rate" from the two take-or- pay contracts), the $646 per acre-foot production cost, or the percentage relationship between the two are within any existing recognized best practices standards. Staff will continue to meet with other outside agencies to discuss recycled water costs and expenses in more detail. ACTION PLAN Water Loss: It is expected that recycled water loss will decrease as irrigation demands increase due to the addition of new recycled water irrigation sites, and implementation of Recycled Water Phase II that will include retrofitting existing potable water irrigation to recycled water. Cost of Service: • Staff will continue to meet with other outside agencies to discuss recycled water costs and expenses in more detail. POINT OF CONTACT Clint Phillips (760) 438-2722 x 7110, cphilfcici.carlsbad.ca.us. Public Works GROWTH MANAGEMENT/WATER DISTRIBUTION SYSTEM THE OUTCOME Adequate fire flow and water supply for City residents and businesses. THE MEASUREMENT Water capacity will meet demands as determined by the appropriate water district and is provided concurrent with development. A minimum 10 average-day potable storage capacity is provided concurrent with development in the Carlsbad Municipal Water District (CMWD). WHAT THE DATA MEANS Provide water for the greater demand of the two conditions within the Carlsbad Municipal Water District service area: • maximum day demand plus a fire event • peak hour demand. The 2003 CMWD Water Master Plan Update is used to identify the facilities necessary for construction within the Carlsbad Municipal Water District. Water storage in the Carlsbad Municipal Water District is equal to or greater than 10 average-days. The Vallecitos Water District and the Olivenhain Water District service the La Costa area. The City coordinates land development with these agencies and conditions projects to ensure facilities are in place prior to the completion of the development project. DEPARTMENTS INVOLVED Engineering, Maintenance 86 Operations. GROWTH MANAGEMENT STANDARD Waterline capacity to meet demand as determined by the appropriate water district must be provided concurrent with development. In addition, a minimum 10-day storage capacity must be provided prior to any development. DEMAND Water service demand requirements are estimated using a computer model to simulate the two water distribution scenarios: 1) maximum day demand plus a fire event, 2) peak hour demand as well as other possible scenarios. This computer model was calibrated using actual flow measurements collected in the field to verify it sufficiently represents the actual water system. 10 Average-day Storage Existing Maximum Daily Demand Existing Storage Requirement Existing Storage Future Maximum Daily Demand Future Storage Requirement 27 GD 40 GD 51 MGD 40 GD 55 MGD RESULTS Based on the water model analysis prepared with the 2003 Water Master Plan Update, future pipelines and water system facilities were identified to ensure a complete water system is constructed to accommodate future customers. In addition, funds for the construction of future facilities were included in the FY 2005-06 Capital Improvement Program. Therefore, the future water infrastructure is programmed to be in place at the time of need in order to ensure compliance with the performance standard. Adequate 10 average-day storage capacities exist for the current customers in the Carlsbad Municipal Water District based on the capacity of existing and future reservoirs. In 2004, the Olivenhain Municipal Water District (OMWD) completed construction of a water treatment facility at the San Diego County Water Authority Emergency Storage Reservoir. Therefore, areas of Carlsbad served by both CMWD and OMWD meet the minimum storage capacity. ANALYSIS The 2003 Water Master Plan Update identifies facilities necessary for City build-out conditions. The update identified additional improvements required to meet future water demands and the need for two additional water storage tanks to meet future 10 average-day storage requirements. Water connection fees were updated based on these improvements. Recycled water used for irrigation was incorporated into the 2003 CMWD Water Master Plan Update. The use of seawater desalination was not included in the master plan update but is being considered in a separate study that incorporates updated future water demands. As future land development projects are processed through the Development Services Division, the Water Master Plan is periodically used to check pipeline sizes and facility capacities to verify adequacy. In addition, land development projects may be required to install a master plan water project concurrent with construction of that specific project. ACTION PLAN • Continue to utilize the 2003 Water Master Plan to plan and construct major water transmission lines to ensure adequate potable water and fire flows needs area available at time of need. • Coordinate and participate in the development of a proposal by Poseidon Resources and the San Diego County Water Authority to construct a seawater desalination facility for the benefit of Carlsbad. (Currently preparing Environmental Impact Report) • Continue to install the recycled water transmission system. Continue with the installation of retrofit work and conversions to expand the use of recycled water. POINT OF CONTACT Steven Jantz, (760) 602-2738, sjant(ajci.carlsbad.ca.us CO 3 Q.x"