HomeMy WebLinkAbout; ; Citywide Facilities and Improvements Plan; 1997-04-22City of Carlsbad
Growth Management Program
Citywide Facilities and Improvements Plan
September 16, 1986
Amended January 9, 1990
Amended April 22, 1997
CITYWIDE FACILITIES AND IMPROVEMENTS PLAN
Adopted by City Council Resolution No. 8797
Septembter 23, 1986
MARY Ha CASLER, MAYOR
Claude A. Lewis, Vice Mayor Richard Chick, Councilmember
Ann J. Kulchin, Councilmember Mark V. Pettine, Councilmember
Frank D. Aleshire, City Manager
Vincent F. Biondo, City Attorney
Marty Orenyak, Community Development Director
Michael J. Holzmiller, Planning Director
PLAN PREPARATION
Michael J. Holzmiller,
Planning Director
James C. Hagaman,
Research/Analysis Manager
Gordon Peterson,
Systems Analyst
Bobbie Hoder,
Administrative Assistant XI
Philip 0. Carter,
Administrative Assistant 11
Grace Manues,
Administrative Assistant I
Anita Ramos-Sonas
Secretary I1
Barbara Nedros,
Word Processing Operator
Vicki Bowen,
Graphics
Consultants:
Fay Round, Automated Systems Paul Zucker, Planning
SANDAG - Automated Systems and Graphics
Special Assistance From:
Costa Real Municipal Water District
Leucadia County Water District
San Marcos County Water District
Olivenhain Municipal Water District
Carlsbad Unified School District
Encinitas Union Elementary School District
San Dieguito Union High School District
San Marcos Unified School District
Lee Rautenkranz, Information Systems Director
Charlie Grimm, Assistant Planning Director
Jim Elliott, Finance Director
Cliff Lange, Library Director
Dave Bradstreet, Parks & Recreation Director
Jim Thompson, Fire Chief
Roger Greer, Utilities & Maintenance Director
TABLE OF CONTENTS
SECTION I
SECTION 11
SECTION I11
SECTION IV
SECTION V
SECTION VI
SECTION VI1
SECTION VI11
SECTION IX
APPENDIX I
APPENDIX I1
APPENDIX I11
APPENDIX IV
APPENDIX V
APPENDIX VI
Overview Page 1
Contents of Citywide
Facilities and Improvements
Plan Page 1
Requirement for Local
Facility Management Plan
and Relationship to Citywide
Plan Page 3
Buildout Projections and
Assumptions Page 5
Citywide Requirements for
Public Facilities and
Services - Existing to
Buildout Page 12
Guidelines for Preparation
of Local Facility Management
Plans Page 56
Financing Options and
Policies
Growth Management
Information System
Page 70
Page 78
Applicability to Growth
Management Ordinance
(Section 2190 of the Page 90
Carlsbad Municipal Code)
Ordinance No. 9808
Growth Management Program
Resolution No. 8796 , Establishing the
Clarified Performance Standards
Resolution No. 8797 , Approving the Citywide
Facilities and Improvements Plan
Resolution No. 8798 , Establishing the
Guidelines for the Preparation of the Local
Facility Management Plans
Resolution No. 8799, Establishing a Local
Facility Management Plan Processing Fee
Resolution No. 8800, Directing Staff to
Prepare the Local Facility Management Plans
for Zones 1 through 6
FIGURES
1, Local Facility Management Zones
2. Comparison of Citywide and Local Plans
3. Density Control Map
4. Citywide Acreage Information
5. Projected Dwelling Units and Population
at Buildout
6. Dwelling Unit Sununary
7. Determination of Caapliance with Performance
Standards
8(A) Public Buildings - City Administrative
Facilities
8 (B) Public Buildings - Libraries
8(C) Public Buildings - Fire Stations
9. Sewer Service
10. Sewer District Boundaries
11. Parks
12. Drainage
1 3. circulation
14. Fire
1 5. Open Space
16. Schools
17. School District Boundaries
18. Water System
19. Water District Boundaries
20. Growth Management Information System
21. Entity Levels
22. Data Availability
23. Data Availability (Matrix Format)
24. Relationship to Parcel-Level Geobase
25. Informational Relationship Overview
Page(s)
3
4
8
9
10
11
13
15
22
42
27, 50
28, 51
32
37
39
43
45
47
48
53
54
82
83
84
85-87
88
89
SECTION 1. OVERVIEW
The Citywide Facilities and Improvements Plan will implement the
City's General Plan and Zoning Ordinance by ensuring that
development does not occur unless adequate public facilities and
services exist or will be provided concurrent with new
development. The preparation of the Citywide Plan is the first
phase in the implementation process of the City's Growth
Management Ordinance which was adopted by Ordinance No. 9810 on
July 1, 1986 by the Carlsbad City Council. Once the Citywide
Plan is adopted, a Local Facility Management Plan will be
required for each of the 25 local zones into which the City has
been divided. This must be done before any additional
development is allowed in any one of the zones. Then, when
individual development projects are considered, a public
facilities adequacy analysis will be provided as part of the
report on the project to ensure that it is consistent with
both the Citywide and Local Zone Plan.
SECTION 11. CONTENTS OF THE CITYWIDE FACILITIES
AND IMPROVEMENTS PLAN
The Citywide Facilities and Improvements Plan consists of the
following:
1. Identification of the existing level of development in the
City and a projection of the ultimate future buildout based
upon recent controls placed upon development as specified in
the General Plan and by the zoning.
2. Identification of all current and future public facilities
and improvements necessary to accommodate existing and
buildout demands for the land uses specified in the General
?lan and by the zoning.
3. Establishment of ongoing service' level requirements for
public facilities through the adoption of specific
performance standards for each of the following public
facilities and improvements:
City Administrative Facilities
Library
Wastewater Treatment Capacity
Parks
Drainage
Circulation
Fire
-1-
h) Open Space
i) Schools
jl Sewer Collection System
4.
5.
6.
The
k) Water Distribution System
Establishment of specific boundaries for each of the 25
Local Facility Management Zones and adoption of guidelines
for the preparation of plans for the local zones. The local
plans will specifically address the timing and financing of
public facilities.
Identification of the potential financing method, or
methods, for each public facility and improvement.
Establishment of an informational data based system to:
A) project demand for public facilities and
B) aid in the preparation of Local Facility Management
c) provide a mechanism to monitor the adequacy of
improvements,
Plans, and
public facilities on an ongoing basis.
purpose of the Citywide Facilities and Improvements Plan is
to assure the elimination of the shortages of public facilities
identified by the City Council to be detrimental to the public
health, safety and welfare of the citizens of Carlsbad. Through
the accomplishment of those tasks outlined above, the City will
be able to ensure adequate public facilities and improvements or
it will halt development until provisions have been made to
correct these inadequacies.
Again, the Citywide Facilities and Improvements Plan is the first
phase in the implementation of the City's overall Growth
Management Ordinance and it is intended to provide the framework
necessary to allow more detailed phasing and financing plans to
be accepted in the form of Local Facility Management Zone Plans.
-2-
SECTION 111. REQUIREMENTS FOR LOCAL FACILITY
MANAGEMENT PLANS - RELATIONSHIP
IMPROVEMENTS PLAN
As part of the overall Growth Management Program the City was
broken down into 25. Local Facility Management Zones (See
Figure 1). The boundaries for each of the 25 Local Facility
Management Zones were established based upon logical facilities
and improvements planning, construction and service relationships
to ensure the economically efficient and timely installation of
required public facilities and improvements. After the adoption
of the Citywide Facilities and Improvements Plan and prior to any
development occurring in any of these zones, a Local Facility
Management Plan must be submitted and approved. The plan must be
consistent with all aspects of the Citywide Facilities
Improvements Plan and shall implement the Citywide Facilities and
Improvements Plan within the Zone. It must ensure that each
public facility and improvement meets the adopted performance
standard prior to allowing any development.
TO THE CITYW'IDE FACILITI'ES AND
FIGURE 1
LOCAL FACILITY
MA NAGEM EN1 20 NES
-3-
The preparation and submittal of the Local Facility Management
Plan is the second phase in the implementation process of the
City's Growth Management Ordinance. The local plan takes the
Citywide plan and provides a more detailed description and
analysis of how the City will develop from its current status on
to ultimate buildout. The local plan will show how and when each
facility and improvement will be constructed in order to
accommodate development within the zone (phasing). It will also
provide a complete description of how each facility and
improvement will be financed. Figure 2 shows conceptually the
relationship between the Citywide Facilities and Improvements
Plan and the Local Facility Management Plan.
Citywide Plan
FIGURE 2
Local Plan
S tandards
Provision
For Public
Facilities
Funding
of
Facilities
Sets Standards Shows How Standards
Complied With
Inventory of Phasing from
Existing and Existing to Future
Future Buildout
Needs
Funding Detailed
Options Financing Plan
-4-
SECTION IV. BUILDOUT ASSUMPTIONS AND PROJECTIONS
In order to adequately assess and plan for Citywide public
facilities and services, it was necessary to project the level of
development that can be anticipated to the ultimate buildout of
the City. These projections take into consideration recent-
ordinances adopted by the City which reduce residential density
and restrict the overall future intensity of development
throughout the City.
The process used to estimate the total number of dwelling units
in the City at ultimate buildout is relatively straightforward.
Using the City's General Plan map as a basis, all of the land
uses shown were entered into a computer by the San Diego
Association of Governments (SANDAG) using a process known as
"digitizing.. The computer converted this digitized information
into gross acres for each land use designation. Environmentally
Constrained areas, beaches, wetlands, floodways, other water
bodies, riparian and woodland habitats, were also digitized and
converted into acreage figures in the same way. Other
constrained areas included slopes greater than 25 percent, major
roadways, railroad tracks, and major power line easements. The
primary sources used in identifying these areas included previous
environmental impact reports prepared for projects throughout the
City and a Citywide slope analysis map. To obtain net
developable acres, all of the 100 percent constrained acres and
one-half of the areas shown as 25-40 percent slopes were
subtracted from the gross acreage figure for each land use
category. In this way, ,a net developable acreage figure could be
established for the overall City, for each quadrant of the City,
and for each of the 25 Local Facility Management Zones.
The net developable acreage figure was then multiplied by the
number of dwelling units allowed per acre using the City's
"Control Yield" density ranges, which are listed below:
Residential Land Use Control Yield
RL
RLM
RM
RMH
RH
1 .o
3 -2
6 .O
11.5
19.0 ,
The Control Yield densities represent either the midpoint of the
City's adopted density ranges or actual experience using existing
developments within each land use category.
By applying the Control Yield densities to the net developable
acreage figures, an estimate of the total number of dwelling
units at full buildout can be derived. To carry the process one
step further, the per capita household size data provided by the
-5-
State Department of Finance can be used to estimate buildout
population. The data indicate that the City of Carlsbad had an
average household size of 2-A-W persons on 3trnmrq-t-,--F9%5.
The same type of calculations were used to estimate the total
number of square feet of industrial and commercial land uses at
buildout. However, instead of residential density ranges, a set
of assumptions regarding site coverage for industrial and
commercial development was applied to the net developable acreage
figures. It was assumed that every net developable acre of
industrial/commercial, would result in a maximum square footage
yield of 40%.
2.3178 April 32, 1997
The methodology described in the previous paragraphs was used to
provide a basis for determining the amount and types of public
facilities that will be needed to adequately serve the City at
buildout. However, it has a number of acknowledged short-
comings. For example, the digitizing process itself is not 100 percent accurate, and when applied to small geographical areas,
such as Local Facility Management Zones, some inaccuracies can
occur. A much more accurate means of providing the same
information would be via a parcel-level Geobase system, however,
such systems are very complex and require a substantially longer
time frame to implement. Therefore, concurrent with the
development of the overall Growth Management Program, the City
has begun work on developing such a Geobase system, which, at
some point in time will supplant the methodology described in the
previous paragraphs.
Likewise, the dwelling unit estimates at buildout represent a
straight conversion of acres to units, with no regard to the
number of units already existing or approved throughout the City.
This may result in inequities within certain zones where
development has previously occurred under less constraining
conditions or using higher density ranges than those represented
by the Control Yield. In those cases, remaining development will
have to occur at densities lower th’an the Control Yield figure.
Despite these recognized shortcomings, the approach and
methodology used within the Citywide Facilities and Improvements
Plan has been found to be quite adequate for the purpose to which
it was intended, namely long-range facility planning. Therefore,
until the parcel-level Geobase system described earlier is
implemented, this approach will be used to provide the baseline
estimates needed for both mid-term and long-term facilities
planning.
other planning assumptions used in preparing the Citywide
projections included:
1. Dwelling unit projections do not include any density
increases for special housing projects such as senior or
low income projects.
-6- Amended 4/22/97
2. Hotel, motel, time-share, board and care, and housing
units without individual kitchen facilities which do not
qualify as dwelling units in the building code were not
considered as units for the purpose of dwelling unit
calculations.
3. Likely changes to the City's Land Use Plan from a
residential to non-residential use.
The projection made for the total number of dwelling units in the
City at ultimate buildout has been translated into a Density
Control Map (see Figure 3). The map shows existing, future and
total dwelling units for each quadrant of the city.
Figure 4 (citywide Acreage Information) shows the number of acres
in each land use category which was used to make the Citywide
projections for ultimate buildout.
Figure 5 (Projected Dwelling Units and Population at Buildout)
shows how the acreage was converted into projected dwelling unit
and population totals.
Figure 6 (Dwelling Unit Summary) provides a summary of existing,
approved and remaining dwelling units in the City.
The information regarding buildout projections and assumptions is
needed to determine the required demand for public facilities and
services as growth occurs. The methodogy for projecting dwelling
units at buildout, a 'control yield", follows the procedure which
has always been used by the City in implementing the density
ranges of the Land Use Plan. It is important to formalize this
procedure as part of the Citywide Facilities and Improvements
Plan since the projection has been translated into ultimate
demand for public facilities and services. If the "control
yield" is not closely adhered to, then the planned facilities and
improvements may not be adequate.
-7-
-0-
FIGURE 3
DENSITY CONTROL
September 8,1986
DWELLING UNITS BY OUADRANT
4
Revised 1 /9/90
SEPTEMBER 16, 198
FIGURE 4
CITYWIDE ACREAGE INFORMATION
RESIDENTIAL :
RL LOW (0-1 .5)
RLM LoW-Med (0-4)
RM Medium (4-8)
RMH Med-Ei (8-15)
RE High (15-23)
COMMERCIAL :
CBD
C
N
RC
TS
0
RRFI
RRI
RS
Central Bus Dist
comamuni ty
Neighborhood
Recreation
Travel Services
Prof * 1 6 Related
Extensive Retail
Intensive Retail
Regional Service
INDUSTRIAL :
PI Planned Ind
OTHER :
E
J
H
AC
P
G
rj
NRR os
RR
PW
MAJ
MIN
COL
Elementary School
Jr. High School
Righ School
Continuation School
Private School
Government Facility
Public Utilities
Non-Res Reserve
Open Space
Railroad
Freeway
Ma jot Arterial Minor Arterial
Collector St
1,824
7,935
2,638
1,231
243
70
32 1
49
108
191
333
32
119
39
2,175
200
79
202
4
17
26 8
158
382
4,398
117
213
525
510
54 1
270
710
184
110
8.
0
41
11
30
31
80
0
5
0
148
9
0
10
0
0
0
19
2
2,078
117
213
525
510
54 1
37 9
660
156
79
5
1,364
6,895
2,375
1,081
233
70
280
38
78
160
253
32
114
39
2,027
191
79
192
4
17
26 8
139
38 0
2,320
0
0
0
0
0
TOTAL 24,920 5,652 1,279 18,629
-9- City of Carlsbad
FIGURE 5
SEPTEMBER 16. 1986
RMH
RH (& RVH)
CITY OF CARLSBAD
1,081 11.5 12,430 30,7 13
233 19 4,488 11,090
Projected Dwelling Unit and Population at Buildout
fi
18,629
LAND USE CONTROL D.U.s at POPULATION 1 YIELD BUILDOUT at BUILDOUT I
1,364 1 1,364 3,37 1
54,599 134,914
RLM 1 6,895 I 3.2 I 22,065 I 54,522
I I I I I I
RM 1 2,376 I 6 1 14,252 1 35,218
NON-RES 1 6,680 I
ASSUMPTIONS 2.3178
1) PERSONS PER DWELLING UNIT M AS PER
THE STATE DEPT. OF FINANCE
- 10- Amended 4/22/9
hit, of Carlsbad
FIGURE 6
SEPTEMBER 16. 1986
CITY OF CARLSBAD
DWELLING UNIT SUMMARY
EXISTING
39%
\ REMAINING \ I
EXISTING
APPROVED
REMAINING
BUILDOUT
21,121
10,298
23,180
54,599
-11- city of carlsbad
SECTION V. CITYWIDE REQUIREMENTS FOR PUBLIC
FACILITIES AND SERVICES - EXISTING
TO BUILDOUT
The Citywide Facilities and Improvements Plan addresses eleven
separate facilities:
City Administrative Facilities
Library
Wastewater Treatment Capacity
Parks
Drainage
C i r c u 1 a t i on
Fire
Open Space
Schools
sewer Collection System
Water Distribution System
For each one of these facilities and services the following is
provided:
An illustrative map showing what is existing and what is
needed Citywide at buildout (Figures 8 through 18).
City Administrative Facilities, Library and Fire have
been combined into one map - Figure 8 (A, B, C) and
Wastewater Treatment and Sewer Collection have been
combined into one map - Figure 9;
District boundary maps where applicable;
Adopted service level performance standard which must
be complied with at all times as growth occurs in the
City; and
A detailed facility planning and adequacy analysis for
each of the three Citywide facilities. A general
description of the facility planning information for the
remaining eight facilities. Compliance with the adopted
performance standard for each of these eight facilities
will be analyzed when a Local Facility Management Plan
is submitted.
Compliance with the adopted Performance Standards will be
reviewed and analyzed in the following manner:
Citywide Basis
1) City Administrative Facilities,
2) Library,
3) Wastewater Treatment Capacity.
These facilities will not need to be included in the Local
Facility Management Plan, so long as the preparers of those
plans feel these Citywide facilities will be constructed at a
time and on an adequate basis to correspond with projected development within the zone.
-12-
Quadrant Basis
-
City Administrative
Facilities
Library
Wastewater Treatment
Parks
Circulation
Drainage
Fire
Open Space
Schools
Sewer Collection
Water Distribution
4) Parks
Compliance will be determined at the time a Local Facility
Management Plan is submitted for the zone.
Zone Basis
5 ) Circulation
6) Drainage
7) Fire
8) Open Space
9) Schools
10) Sewer Collection System
11 1 Water Distribution System
Compliance of each of these facilities will be determined at the
time a Local Facility Management Plan is submitted for the zone.
At that time, the responsible governing agency will determine the
adequacy of schools, sewer and water.
Figure 7 (Determination of Compliance with Performance Standard)
summarizes how compliance will be determined.
FIGURE 7
DETERMINATION OF COMPLIANCE WITR PERFORMANCE STANDARD
b 1 I CITY * QUADRANT ZONE
CITYWIDE ZONE ZONE
DETERMINATION PLAN PLAN
OF ADEQUACY DETRRMSN- DETERMIN-
ATION OF ATION OF
ADEQUACY ADEQUACY
X
X
X
X
X
X
Ix
I ZONE
SPECIAL
DISTRICT
DETERMIN-
ATION OF
1
-13-
,
The type of adequacy and phasing analysis that is contained in
the Citywide Plan for City Administrative Facilities, Library and
Wastewater Treatment Capacity is Similar to what will be expected
for all the remaining facilities addressed in the Local Facility
Management Plans for each zone.
It should be emphasized regarding the maps in this section, that
because of their scale they are for illustrative purposes only.
Larger descriptive maps have also been prepared, however, precise
locations of facilities should be determined from Master Facility
Plans available in the department or agency responsible for the
facility. Also, because of the detail required, the maps for
sewer, water and drainage only illustrate future planned
facilities or improvements.
Performance Standards for Citv Administrative Facilities. Libraw. and Parks'
The Performance Standards for City Administrative Facilities, Library, and Parks
indicate that improvements must be "scheduled for construction within a five year period
or prior to construction of 6,250 dwelling units." This section is intended to provide
further clarification regarding what these Performance Standards mean and how they
are to be applied.
In developing the Performance Standards contained in this pian, staff projected that an
average of 1,250 dwelling units per year would be constructed after 1986. Therefore,
for purposes of City Administrative Facilities and Library the 'five year period" is
intended to mean the amount of residential development equal to 1,250 dwelling units
per year for five years, or a total of 6,250 dwelling units. The counting years or units
begins at the point in time that the demand for the facility first exceeds the supply.
Because Parks are addressed on the basis of Park District which coincide with the four
quadrants of the City, it is assumed that the 1.250 dwelling units per year are spread
equally among the four quadrants. This yields 312.5 dwelling units per quadrant per
year, which is rounded downward to 312 dwelling units. Therefore, the 'five year period"
for Parks is intended to means the amount of residential development equal to 312
dwelling units per year for five years, or a total of 1.560 dwelling units within a Park
District. The counting years or units begins at the point in time that the demand for the
facility first exceeds the supply.
For all three of these facilities, the phrase "scheduled for constrirction" means that the
improvements needed to meet the demand have been designed, that a site has been
selected and has been acquired or is being acquired, and that a financing plan for
construction of the facilrty has been approved by the City Council.
This section was included in the Cit;rwide Facilities and Improvements Plan by an amendment approved 1
on April 22, 1997 by City Council Resolution No. 97-437.
Amended 4/22/97
-14-
FIGURE S(.A!
PUB1 IC BUILDlNGS
SEPTEMBER 18, IS86
CITY ADMINISTRATION FACILITIES-EXISTING
CITY ADMINISTRATION FACILITIES-PLANNED ---- -
-15-
1
City of Carlsbad
CITY ADMINISTRATIVE FACILITIES
PERFORMANCE STANDARD
1500 square feet per 1000 population must be scheduled for
construction within a five year period or prior to construction of 6,250
dwelling units, beginning at the time the need is first identified.
FACILITY PLANNING AND ADEQUACY ANALYSIS
A. Inventory
1. Buildout Assumptions:
Population
Current 52,190
At Buildout 134,914
Required
Square Footage
78,300 sq.ft.
202,371 sq.ft.
2. Existing Facilities:
a. City Hall Facilities
City Hall 12,899 sq.ft.
Finance Modular 2,700 sq.€t.
Purchasing/Personnel
Modular 1,800 sq.ft.
Leased Space
R/A Group
Public Relations
Redevelopment
960 sq.ft.
200 sq.ft.
2,000 sq.ft.
Las Palmas Facility 22,627 sq.ft.
43,106 sq.ft..
b. Public Safety and Service Center
Phase I
Police and Fire 53,700 sq.ft.
Vehicle Maintenance 10,358 Sg.ft.
64,058 sq.ft.
c. Total Existing
Facilities 107,244 sq.€t,
- 16- Amende& b/22/97
CITY ADMINISTRATIVE FACILITIES (Continued)
3. Facilities in City's Five Year Capital Improvements
Program:
Item Source Year Amount - sq. ft.
a. Public Safety Center
Phase 11*
Design 86-87 $ 255,000
Construction 62,000 89-90 $3,455,000 PFF/s/w**
b. Total Facilities in City's 5 Year Capital Improvements Program.
62,000 square feet.
4. Capital Facilities to be Considered Later;
An additional expansion of City Hall is shown in the City's Capital
Improvements Program as a future project to "be considered". The
project is estimated at a cost of $4,000,000 to be funded by the Public
Facilities Fee. Although the square footage of this facility has not
been projected, a cost of $lOO/sq.ft. would result in a 40,000 sq. ft.
building.
PUBLIC SAFETY CENTER PAASE 11. Yard offices, Maintenance shops, and
Purchasing warehouse for the use of Utility Maintenance, Parks h
Recreation Maintenance, Street Maintenance and Purchasing. Ipproximate
size is 62,000 square feet, including two-story yard office and
Purchasing warehouse with 6,400 square feet mezzanine.
** PFF - Public Facilities Fee
S - Sewer
W - Water Enterprise
-17-
CITY ADMINISTRATIVE FACILITIES (Continued)
B. Phasing
Population projections for the entire City phased on a
yearly basis, are shown in Table 1 (Dwelling Unit and
Population Projections). These projections are based on a
review of the San Diego Association of Governments (SANDAG)
projections along with those utilized in the City's Capital
Improvement Program and the Public Facilities Management
system, Monitoring Report of April, 1986.
TABLE 1
PLANNING PROJECTIONS ONLY
DWELLING UNIT AND POPULATION PROJECTIONS ASSUMING A BUILDING RATE OF 1250 UNITS PER YEAR AND 2.471 PERSONS PER DWELLING UNIT
..............................................
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996 1997
1998
1999
2000
2001
2002 2003 2004
2005
2006
2007
2008
2009
2010
2011
2012 2013
21,121
22 , 371
23 , 621
24 , 871
26,121
27 , 371
28 , 621
29 , 871
31,121
32,371
33 , 621 34 , 871
36 , 121
37 , 371
38 , 621
39,871
41,121 42 , 371 43 , 621
44 , 871
46 , 121 47 , 371
48 , 621
49 , 871
51,121
52 , 371
53 , 621 54 , 599
33 , 478
32 , 228
30 , 978
29 , 728
28 , 478
27,228
25,978 24 , 728
23 , 478
20,978
19 , 728
18 , 478
17,228
15 , 978
14 , 728
13 , 478
12 , 228
10 , 978
9,728
8 , 478
7 , 228
5,978
4,728
3 , 478
2 , 228 978 0
22 , 228
1,250
1 , 250
1 , 250
1,250 1,250
1,250
1,250 1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250 1,250
1,250
1,250 978
52 , 190 55 , 279
58,367
61,456 64 , 545
67 , 634 70 , 722 73 , 811
76 , 900
83 , 077
86 , 166
89 , 255 92 , 344
95,432
98 , 521
101,610
104 , 699
107 , 787
110 , 876 113 , 965 117 , 054 120,142
123,231
126 , 320
129 , 409
132 , 497
79 , 989
55 , 279
58 , 367
61 , 456
64 , 545
67 , 634
70 , 722
73 I 811
76 , 900
79 989
83 , 077
86 , 166
89 , 255
92 I 344
95 , 432
98 , 521
101 , 610 104,699
107 787
110 , 876 113 , 965
117 , 054
120 , 142
123 I 231
126 , 320
129 409
132 497
134 , 914
- 18-
CITY ADMINISTRATIVE FACILITIES (Continued)
A comparison of the inventory to the standard yields the
following table:
TABLE 2
POPULATION SERVED BY PLANNED CITY ADMINISTRATIVE FACILITIES
Population Served
Existing or Planned Facilities According to Standard
Facility Square Footage For Increment Accumulated
Existing Facilities 107,244 sq.ft, 71,078 71,078
In 5 Year C.I.P. 62,000 sq.ft. 48,666 119,744
Future 40,000 sq.ft. 26,666 146,410
209,244 sq.ft.
Based on these population projections and the standard, the
number of square feet needed per year is shown in Table 3.
(Square Feet of City Administrative Facilities Needed by
Year and Square Feet Available) on page 21. The facilities
summarized in Table 2 have also been shown in Table 3.
A comparison of the Tables yields the following
conclusions:
1. Current City Administrative Facilities meet the
standard and will continue to meet the standard until
approximately 1992.
2. When the facilities proposed in the 5 year C.I.P. are
constructed the standard will be met to approximately
the year 2005.
3. After the year 2005, the additional "future- City
Administrative Facilities will need to be added to the
C.I.P. in order to meet the standard.
4. Based on current population per household of 2.471
persons, there is a future need for City Administrative
Facilities beyond that programed in the C.I.P. of
33,127 square feet.
-19-
CITY ADMINISTRATIVE FACILITIES (Continued)
C.
It should be noted that for the purpose of determining
the adequacy of City Administrative Facilities that
several leased facilities are included. These leased
facilities may not always be in use by the City and at
some future date may result in shortages of City
Administrative Facilities. Also, the City has no
centralized facility to serve the space needs of it's
staff. This, decentralization of City departments may
also need to be resolved.
The City Council on August 26, 1986 approved the final
report entitled, .A Strategic Plan and Space Needs Study
of the City of Carlsbad City Hall and Libraries' which
was prepared by Michael Feerer h Associates. The
Council held off from making any decisions regarding the
recommendations made in this study for City Hall
Facilities.
Financing
The City currently collects a Public Facility Fee (PFF)
which is set at 2.5% of permit valuation. This fee is paid
at time of building permit issuance. In calculating the PFF
the following expenditures were projected for City
Administrative Facilities:
Public Safety Center Phase I1 $3,400,000
City Hall - Futute $4,000,000
$7,400,000
In addition to the PFF fundsI the City's 5 year Capital
Improvement Program indicates the use of Sewer funds and
Water Enterprise funds for part of the Public Safety Center
Phase 11.
The City's current projection for City Administrative
Facilities as shown above indicates a need to expend a total
of $7,400,000. This amount could be funded by the projected
sources. Additionally, based on the standard, the entire
$4,000,000 expenditure may or may not be necessary.
However, there is no quarantee that the PFF fees will
actually be available when needed. Additional analysis
should be undertaken on or before the year 2005 to analyze the likely availability of the $4,000,000 needed for future
expansion.
-20-
TABLE 3
PLANNING PROJECTIONS ONLY
SQUARE FEET OF CITY ADMINISTRATIVE FACILITIES
-------------------.-----------------------------
NEEDED BY YEAR AND SQUARE FEET AVAILABLE
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
8 2005
2006
2007
2008
2009
2010
2011
2012
55,279
58 , 367
61,456
64 , 545
67 , 634
70,722
73 , 811
76 , 900
79 , 989
83 , 077
86 , 166
89 , 255
92 , 344
95 , 432
98,521
101,610
104,699
107 , 787
110,876
113 , 965
117 , 054
120,142
123 , 231
126,320
129,409
132 , 497
134,914
82,918
87 , 551
92 , 184
96,817
101,451
106,084
110 , 717
115,350
119 , 983
124 , 616
129,249
138 , 516
143 , 149
147,782
152 , 415
157,048
161 , 681
166,314
170,947
175 , 581
180,214
184 , 847
189 , 480
194 , 113
198 , 746
202 , 371
133,882
107,244
i1
11
169 , 244
II
II
II
11
11
11
II
0
II
II
II
II
11
11
11
11
FACILITY NEEDED
-2 1-
FIGURE S(3)
PUBLIC BUILDINGS
SEPTEMBER 16. 1086
FIRE STATIONS-EXISTING
(> FIRE STATIONS-PLANNED
CITY ADMINISTRATION FACILITIES-EX1 STING
CITY ADMINISTRATION FACILITIES-PLANNED
-22- City of Carlsbad
LIBRARY
PERFORMANCE STANDARD
800 square feet per 1,000 population must be scheduled for
construction within a five year period or prior to construction of 6,250
dwelling units, beginning at the time the need is first identified.
FACILITY PLANNING AND ADEQUACY ANALYSIS
A. Inventory
1. Buildout Assumptions:
Current
At Buildout
2. Existing Facilities:
Civic Center Library
Adult Learning Center
Audio/Visual Office
La Costa Area Library
Warehouse
Total
Population
52,190
134,914
Owned
sq. ft.
24,600
24,600
Required Square
Footage
41,752
107,931
Leased
sq. ft.
400
500
4,500
2,000
7,400
Total owned and leased space 32,000 sq. ft.
3. Facilities in the five year Capital Improvement
Program:
The adopted Five Year C.I.P. includes $650,000 for
the design of a main library in the southern area of
the City. Also, in Appendix A of the C.I.P. .To Be
Considered Capital Projects,. the construction of
this library is estimated at $6,900,000 to be funded
by the Public Facilities Fee.
4. Other Information:
The City Council on August 26, 1986 approved the
final report entitled, 'A Strategic Plan & Space
Needs Study of the City of Carlsbad City Hall h
Libraries' which was prepared by Michael Feerer &
Associates. The Council adopted option #5 of the
library portion of the study which directed staff to
initiate a site selection study to be returned for
Council consideration by
Amended April 22, 1997
-2 3-
LIBRARY (Continued)
B.
January 1 , 1987. If implemented, this would add R,000 square
feet to the existing northern library along with renovating
the current facility. The partial project costs are
estimated at $1,974,000.. It would also include building a
new 58,000 square foot facility in the southern portion of
the city at an estimated partial project cost of $8,365,000.
The report indicated these estimates do not include costs
for site acquisition or development, demolition, landscaping,
artwork, financing, City project administrative costs,
construction management or any parking structure costs.
Phasinz
Population projections for the entire city were prepared on a
yearly basis and are shown in Table 1 (Dwelling Unit and
Population Projections) on Page 18. These projections are
based on a review of the San Diego Association of Governments
(SANDAG) projections along with those utilized for the City's
Capital Improvements Program and the Public Facilities
Management System, Monitoring Report of April, 1986.
A comparison of the existing inventory of library facilities
to the adopted performance standard yields the following
table:
TABLE 2
Population Served By Existing or
Planned Library Facilities
Existing or Square Population Current
Planned Facilities Footage Served Population
Existing
Future*
32,000 - 40,000 - 52,190 -
*There are no approved future facilities
Table 3 (Square Feet of City Library Needed by Year and
Square Feet Available) provides a detailed breakdown of the
square footage of library space needed yearly to meet the
adopted performance standard based on the population
projection estimates from Table 1 (Dwelling Unit and
Population Projections) on Page 18.
A simple comparison of these tables clearly indicates a
current deficiency in Library facilities of 9,752 square
feet. If the City Council approved the new site location for
the southern facility and appropriated the necessary funds,
-24-
LIBRARY (Continued)
C.
the City's Library space needs would be adequate until
approximately the year 2005. If the additional 8,000 square
foot expansion of the northern library were also approved and
funded, this standard would be met until approximately the
year 2008. After the year 2008, additional space would be
necessary.
Pinancinql
The city currently collects a Public Facility Fee (P.P.F.)
which is set at 2.5% of Permit Valuation. This fee is paid
at the time of permit issuance. The adopted C.I.P.
allocates $650,000 of P.F.F. funds to design a new library
facility. Other possible funding sources could be: General
Capital Construction, Revenue Sharing or State or Federal
grants.
At the present time there are no funds appropriated for the
construction of additional Library space.
D. Alternatives
There are a number of alternatives which could be considered
to rectify the current library deficiency, however, after
discussing these options staff believes one of the following
three alternatives should be considered:
1. Amend the current five year C.I.P. to include funding
for new library facilities, which would require deleting
other projects;
2. Wait until the site selection study is completed and
returned on January 1 , 1987 and adopt the appropriate
recommendation to resolve the deficiency at that time
which would mean that no additional development could-
occur in the interim; or
3. Direct staff to attempt to resolve this deficiency based
on the Local Facility Management Plans which will be
received after the approval of the Citywide Facilities
and Improvements Plan.
It should be noted that for the purposes of assessing the
adequacy of the Library to the adopted Performance Standard that
leased apace has been included. This space should be considered
temporary and may not always be available for use by the
Library.
-25-
SEPTEMBER 16, 1986
TABLE 3
PLANNING PROJECTIONS ONLY .................................................
SQUARE FEET OF CITY LIBRARY NEEDED
BY YEAR AND SQUARE FEET AVAILABLE
YEAR ENDING SQUARE FEET SQUARE FEET
YEAR NEEDED PER AVAILABLE POP. STANDARD OR PLANNED
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1999
2000
2001
2002
2003
2004
2005
2006
2007
2009
2010
2011
2012
1998
2008
55,279
61,456
64 , 545
67,634
70,722
76,900
58 , 367
73,aii
79,989
a3 , 077
89,255
9a , 521
107 , 787
110, a76
86,166
92 , 344
95,432
101,610
104 , 699
113 , 965
117 , 054
120,142
123,231
126,320
129,409
132 , 497
134 , 914
44,223 32 , 000
46,694
49 , 165 CURRENT
51,636 DEFICIENCY
54,107 EXISTS
59,049 FACILITY
61,520 NEEDED
63 , 991
66 , 462
71,404
76 , 346
56,578
6a , 933
73 , a75
78,817
ai~aa
a3 , 759
86,230 aa , 701
91,172
93,643
96 , 114
101,056
103,527
107,931
98,585
105,gga
-26- City of Carlsbad
TRLHK UNES . . . . . . . WE UNE
& EXlSTlNG BUT LPaRADlNQ PLANNED
TREATMENT PLANT
-2 7-
FIGURE 9
SEWER SERVICE
SEPTEMBER 16. 1086
City of Cartshad
FIGURE 10
SEWER DISTRICT BOUNDARIES
SEPTEMBER 18. 198e
0 CARLSBAD SEWER SERVICE AREA
LEUCADIA COUNTY WATW DISTRICT
'.*...... SAN MARCOS COUNTY WATER DISTRICT
.*A:.
-2 8- City of Carlsbad
WASTEWATER TREATMENT CAPACITY
PERFORMANCE STANDARD
Sewer plant capacity is adequate for at least a five year period.
FACILITY PLANNING AND ADEQUACY ANALYSIS
A. Inventory
Sewer service to the City of Carlsbad is provided by three
separate and independent agencies. The majority of the City
receives service from the City's Sewer District. Approximately
5,200 acres of land in the southern part of the City receives
service from the Leucadia County Water District (LCWD), and the
San Marcos County Water District (SMCWDI provides sewer service
to roughly 550 acres on the eastern edge of the City. The
service areas of these two agencies extend well to the south and
east of the City's boundaries, but for the projections and
analysis only that portion of the District's service area within
the City of Carlsbad was considered.
1.
Car 1 sbad
LCWD
SMCWD
TOTAL
Buildout Assumptions:
Wastewater Treatment Demands
Population - EDU* %D**
Current Buildout Current Buildout Current Buildout
35,760 95,669 18,090 47,800 4.5 11.8
13,985 36,151 5,810 15,000 1.4 3.6
0.3
52,190 134,914 24,889 64,000 6 .O 15.7
- 0.2 - 2,445 3,094 989 1,200
EDU - Equivalent Dwelling Units = 246 gallons per day for
SMCWD, 238 for LCWD.
** MSD - Million Gallons per Day - Average Dry weather Flow
Carlsbad and
ADWF
2. Existing Facilities:
Wastewater from the three agencies is treated at the Encina Water Pollution
Control Facilities (WPCF), which is owned and operated by six separate
independent agencies.
City of Carlsbad, their currently owned treatment capacity at the Encina WPCF
is:
Of the three agencies which provide sewer service in the
Carlsbad Sewer District - 25.4% or 5.7 MGD
Leucadia County Water District - 16.7% or 3.8 MGD
San Marcos County Water District - 17.8% or 4.0 kK;D
-29-
WASTEWATER TREATMENT CAPACITY (Continued)
Both Leucadia and San Marcos own and operate their own separate treatment and reclamation facilities as shown below:
Leucadia County Water District: Gafner WitP - .75 MGD (ADWF)
San Marcos County Water District: Meadowlark WRP - 2.0 MGD (ADWF)
The City of Carlsbad also has an additional treatment facility at Calavera
Hills which will have a 1.2 MGD (ADWP) capacity when it is brought into
operation.
3. Facilities in the City's Five Year Capital Improvements Program:
Because the Leucadia County Water District and the San Marcos County Water
District are independent agencies, their specific capital improvements are
detailed in their appropriate long term planning documents. For this reason,
capital improvement facilities covered in this section will address those
within the purview of the City of Carlsbad only.
The adopted C.I.P. includes two items which will be funded from tihe sewer fund:
1. Encina WPCF - Phase IV scheduled for 1989 - $5,130,000
2. Calavera Hills - scheduled for 1990 - $2,000,000
B. Phasing
The following table provides a planning projection of demand and available
treatment capacity at Encina WPCF for the City of Carlsbad's service area.
As this table shows, the current capacity at the Encina WPCF is adequate to
accommodate the projected MGD demand for the City of Carlsbad's service area
until 1990. Following the Phase IV expansion at Encina, Carlsbad's capacity
will be adequate until 2000. If the scheduled expansion program is not carried
out as planned, the City has several options available which would maintain
adequate sewer treatment capacity, such as:
1. Activate the Calavera Hills Plant - 1.2 MGD (6,000 EDU)
2. Purchase or lease plant capacity from other agencies.
Based upon the information provided by the Leucadia County Water District and
the San Marcos County Water District for their existing demand in Carlsbad,
their capacity ownership at Encina WPCF, as well as their other sewer treatment
and reclamation facilities are adequate.
Each agency will review and approve the Local Facility Managment Plans and
specific phasing plans which could affect their facilities.
-30-
WASTEWATER TREATMENT CAPACITY (Continued)
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
C. Financing
18 , 090
19 , 233
20,376
21,519
22 , 662
23 , 805
24 , 948
26 , 091
27 , 234
28 , 377
29 , 520
30,663
31,806
32 , 949
34 , 092
35 , 235
36 , 378
37 , 521
38 , 664
39 , 807
40 , 950
42 , 093
43 , 236
44 , 379
45,522
46 , 665
47 , 800
4.5
4.7
5.0
5.3
5.6
5.9
6.1
6.4
6.7
7.0
7.3
7.5
7.8
8.1
8.4
8.7
8.9
9.2
9.5
9.8
10.1
10.4
10.6
10.9
11.2
11.5
11.8
5.7
It
tl
It
II
8.6
II
It
I1
It
It
It
I1
It
11
NEW FACILITIES NEEDED
The City of Carlsbad as well as the other two districts currently collect a
sewer hook-up fee for each dwelling unit or other type of ,3evelo,ment occuring
within their service area,
wastewater treatment capacity improvements.
These fees would be the funding source €OK
-31-
-32-
PARKS
PERFORMANCE STANDARD
Three acres of Community Park of Special Use Area per 1,000 population within the Park Dlstrrct D~ scheduled for construction within a five year period or prior to construction within a flve year perloc or
prior to construction Of 1,562 dwelling units within the Park District, beginntng at the time the need IS first
identified.
ADO~IONAL FACILITY PLANNING INFORMATION
The Growth Management Park standard has been developed to address Communtty
Park and Special Use Areas together. Combining the two will provide greater flexibility
for the Parks and Recreation Department to address the future needs of each quadrant
as development occurs.
The Parks and Recreation Department ramtty prepared an analysis of existing park
acreage in the City which produced the following information:
A. INVENTORY
1. Buildout Assumptions:
Northwest Quadrant
Current
At Buildout
Northeast Quadrant Current
At Buildout
Pow lation
23,539
37,979
7.1 07
22w
Southwest Quadrant
Current 541 6
At Buildout 31 ,nS
Southeast Quadrant
current 16,128
At Buildout 42,817
2. Existing Community Pulo and Specid Uso Are-:
Communitv Padq (Undwel0p.d)
Cannon taka
M8cuio Curyocr - crodit
Tow Und.vul0p.d
&m 5.4
27.0
6.8 AI
&Qa 2S.O
6.t
Total Reauired Acres
70.62
113.94
21.32
67.03
16.23
95.33
48.36
128.45
42.2
31 .?
-33. Revised 10/89 Revised 1 /9/90 Revised 4/22/97 -
PARKS (Continued)
Special Use Areas
Buena Vista
Cannon Park
Car County
Chase Field
CHS Tennis Courts
Barding community Center
Jefferson Elementary
Kelly Elementary
Magnolia
Yaxton Brown
Maxton Brown Extension
Oak
Pine Elementary
Pi0 Pic0
Rotary
Swim Complex
Valley Jr. High School
Total
Northeast Quadrant
Community Parks (Developed)
Calavera Hills Phase I
Larwin
Total Developed
Community Parks (Undeveloped)
Macario Canyon - credit Calavera Bills Phase 11
Total Undeveloped
Special Use Area
Larwin
Total
Southwest Quadrant
Community Parks (Developed)
A1 t ami r a
Total Developed
Community Parks (Undeveloped)
Macario Canyon - credit
Total Undeveloped
Acrcs
2.3
1.7
1 .o
2.3
3 .O
1 .o
2.6
2.8
4.2
1.4
2.1
0.4
2.0
0.8
1 .o
3 .O
7.5
39.1
Acres
8.0
18.3
26.3
Acres
25 .O
10.0
35 .O
Acres
4 :o
4 .O
Acre8
12.0
12.0
Acres
25.0 - 25.0
There are no Special Use Areas in the Southwest Quadrant.
-34-
- PARKS (Continued)
Southeast Quadrant
Communitv Parks (Developed)
La Costa Canyon
Stagecoach
Total Developed
Communitv Parks (Undeveloped)
Macario Canyon - credit
Alga Norte Carrillo Ranch
Total Undeveloped
Special Use Areas Cadencia
Fuerte
Fuerte Elementw
Levante
St. Elizabeth
Total
C. ADEQUACY EVALUATION
Acres Required Communlty
Per Standard Park lDevl
Northwest Quadrant 70.62 42.20
Northeast Quadrant 21.32 26.30
Southwest Quadrant 16.23 12.00
Southeast Quadrant 48.38 37.00
Cityuvlde Totals 1 sd.55 117.50
Acre?
9.0
37 0 - - Acres
25.0
23.0 - 10.3
58.30 -
Acres
4.1
3.6
2.0
8.0 u
18.7 -
Special Use Total
Area Acreaae
39.10 81.30
4.00 30.30
0 12.00
1 0.7Q 55.70
61.00 179.30
On a Citywido buir, tho ovurll puks acreage b adequato. However, the Growth Management
Program requiroa oadl qurdnnt to provide the appropriate acreago in relation to its residential
population. For that rea$on, th. southwest quadrant does not moot the performance standard
and is deflcknt T?w throo 0th.r quadrants meot the performance standard.
It should be notd 8a shown in the existhg acreage figures that in certain quadrants there
exista a greatw prom of Spocid Us0 Area acreage 8s compared to Communlty Park acreage. The pwformmca st8ndud allows the Puks and Recreation Department the ability
to more property address tho indlvidurl quadrant nods for either Communlty Park or Special
Use Area acreago 8s la plms am submitted.
-35- Revised 10189
Revised 1/9/90
PARKS (Continued)
Alternatives
There are several alternatives which could be considered to
rectify this deficiency, however, after discussing these options
staff believes one of the 'following should be considered:
1. Amend the current Five Year C.I.P. to include funding
for new park facility in the Southwest Quadrant which
would require deleting other projects.
2. Direct staff to attempt to resolve this deficiency based
on the Local Facility Management Plans which will be
received after the approval of the Citywide Facilities
and Improvements Plan.
-36-
FIGURE 12
DRAINAGE
SEPTEMBER 18. 1086
-37- City of Cirlsbad
DRAINAGE
PERFORMANCE STANDARD
Drainage facilities must be provided as required by the
City concurrent with development.
ADDITIONAL FACILITY PLANNING INFORMATION
The standard for drainage distinguishes it from all of the
other public facilities and improvements because by its
very nature it is more accurately assessed as the specific
development plans for individual projects are finalized.
Therefore, the standard has been written to allow the City
to require the appropriate development drainage facilities
as these plans are finalized and approved.
Those drainage facilities which are of a larger nature have
been addressed in the City's Master Drainage Plan which was
completed in March 1980. Since that time, the City has made
various improvements to the overall drainage system. At the
present time, the Engineering Department is working to
update the City's Master Drainage Plan. This is necessary
to address several issues although the following two items
are the major reasons for updating the plan:
1. The addition of the San Diego County Flood District
area to the City, and
2. The proposed change. to the calculation method used
to determine 50 and 100 year flood flows.
The City currently collects drainage fees in various
districts to fund these needed major drainage facilities.
The new Master Drainage Plan will assure that these funds
are sufficient to provide adequate drainage facilities.
-35-
FIGURE 13
CIRCUL A TlON
SEPTEMBER 16. 1986
-39- city of carlsbad
CIRCULATION
PERFORMANCE STANDARD
No road segment or intersection in the zone nor any road
segment or intersection out of the zone which is impacted
by development in the zone shall be projected to exceed a
service level C during off-peak hours, nor service level D
during peak hours. Impacted means where 20% or more of the
traffic generated by the local facility management zone
will use the road segment or intersection.
ADDITIONAL FACILITY PLANNING INFORMATION
The City is currently in the process of conducting a
comprehensive traffic analysis for the entire City exclusive
of the La Costa Area. The La Costa Area study was concluded
in May, 1986 and identified certain existing deficiencies
which will need to be addressed as the specific Local
Facility Management Plans are prepared. The current study
will provide this same type of information for the remainder
of the City. The final results will not be completed until
December 31, 1986. In the interim, all local plans will be
required to provide their own specific traffic analysis and
inventory of existing and future service levels. In order
to ensure consistency, the information and analysis in the
local plans will be verified by the traffic data generated
by the SANDAG Traffic Model and the La Costa Traffic Study.
Overall, the City is working to resolve the current traffic
problems with traffic impact fees as well as a Bridge h
Thoroughfare Benefit District with fees collected to improve
the interchanges at Palomar Airport Road, Poinsettia Lane
and La Costa Avenue at 1-5. It must be emphasized, however,
that while the City will start collecting fees to resolve
existing problems and to ensure future adequacy, the
necessary funds will not be available immediately. In the
interim, the cash flow to correct existing problems is a
development responsibility which must be addressed in the
Local Facility Management Plans. With respect to future
adequacy of the circulation system, the local plans must
address how all streets located within the zone, or impacted
by the zone, will be constructed and funded. For those
circulation facilities which are to be constructed at a
future time, the local plan must detail when and how
sufficient funds will be deposited with the City, beginning
with the initial unit of development to pay for the facility
when it is required by the phasing program.
-4Q-
CIRCULATION (Continued)
The intent of the circulation standard is to ensure an
acceptable service level during peak and non-peak hours on
road segments and intersections under the control and
jurisdiction of the City. Currently and in the future,
there may be certain intersections which fail to meet the
performance standard, but for which the City does not have
jurisdictional control and therefore, could not halt
development because of this condition. An example of this
is El Camino Real at Highway 78, which presently has an
inadequate service level but is located outside of the
Carlsbad City limits and is in Oceanside. The best the City
can do is to continue to work to resolve this condition and
collect fees to pay for future improvements.
-4 1-
FIGURE 8 (C)
PUBLIC BUILDINGS
SEPTEMBER 16, 1088
FIRE STATIONS-EXISTINQ
0 ,FIRE STATIONS-PLANNED
m Li BR ARi Es -PL ANN ED
& LIBRARIES-EXISTINQ
CITY ADMINISTRATION FACILITIES-EXISTING
CITY ADMl NI STRATION FACl LI TI ES-PLANNED
-42- city of Carlsbad
FIGURE 14
FIR E
SEPTEMBER 18. la06
THESE ZONES NEED TO AODRESS
THE FIRE STANDARD FOR THE ZONE
-4 3- City of Carlsbad
PERFORMANCE STANDARD
No more than 1,500 dwelling units oiitside of a five
minute response time.
ADDITIONAL FACILITY PLANNING INFORMATION
A. Inventory:
The city has four existing fire station locations:
Station 11 - 1275 ~lm Avenue
Station 12 - 1906 Arena1
Station 13 - 3701 Catalina
Station (14 - 6885 Batiquitos Road (Under construction)
At buildout the City will require two additional fire
stations which are proposed for the following
locations:
Station 15 - Rancho Santa Fe/Cadencia
Station 16 - At the Public Safety Center
Station #5 is scheduled for construction in the 5 year
C.1.P for 1989-90. Station (6 is scheduled for
construction in the 5 year C.I.P. for 1990-9.
Finally, station 13 is scheduled to be relocated in
1990-91.
B. Adequacy Evaluation:
The following Local Facility Management Zones presently
meet the fire performance standard and are adequately
covered to build-out of the city. These zones are:
remaining Local Facility Management Zones must address
fire adequacy in their local plans (see Figure 14 1.
1, 2, 3, 4, 9, 10, 19, 20, 21, 22, and 23. The
-44-
FIGURE 15
OPEN SPACE
SEPTEMBER 16, ieee
*...*... a AREAS WHERE 16% AOOlTlONAL PERMANENT
OPEN SPACE TO BE PROVIDED MCLUSIVE
OF ENVIRONMENTALLY COPIeTRAINED LAK)
-45- City of Cdsbad
OPEN SPACE
PERFORMANCE STANDARD:
Fifteen percent of the total land area in the zone
exclusive of environmentally constrained non-
developable land 'must be set aside for permanent open
space and must be available concurrent with
d ev e 1 opme n t .
ADDITIONAL FACILITY PLANNING INFORMATON:
The preceding map highlights those areas of the city
which will be required to comply with the open space
performance standard. The other areas of the city are
already developed or meet or exceed the requirement.
Local Facility Management Zones 1, 2, 3, 4, 5, 6, 7, 8,
9, 10, and 16 already meet the standard while Zones 11,
12, 13, 14, 15, 17, 18, 19, 20, 21, 22, 23, 24, and 25
must detail in their local plan how they will meet this
standard.
-46-
FIGURE 16
SC~OOLS
SEPTEMBER 18, 1980
-47- City of Carisbad
FIGURE Ti SCHOOL DISTRICT BOUNDARIES
SEPTEMBER 18, 1988
-48-
SCHOOLS
PERFORMANCE STANDARD
School capacity to meet projected enrollment within the
zone as determined by the appropriate school district
must be provided prior to projected occupancy.
ADDITIONAL FACILITY PLANNING INFORMATION
The City is served by four school districts:
1. Carlsbad Unified School District
2. San Marcos Unified School District
3. San Dieguito Union High school District
4. Encinitas Union Elementary School District
The preceding, illustrative map shows the proposed
future school sites along with those that presently
exist. These locations were- determined during the
School Master Location Study which was completed in
1982. Based on the new land use densities and the
information provided to the Carlsbad School District,
they are considering the possibility of updating the
School Location Plan. With the exception of the
Carlsbad School District, the remaining three districts
provide approval for new development so long as the
appropriate fee is collected. The Carlsbad School
District collects a fee but also negotiates certain
items on an individual basis with each developer prior
to providing a 'Will Serve' letter to the City.
The Growth Management Program and adopted school perfor-
mance standard will allow this process to continue.
The major difference to the previous process is that be-
fore, the districts were only able to review projects
individually. Now, during the Local Facility Management
Plan review, they will have the ability to view a much
larger, comprehensive plan. This added information will
enable the districts to consider alternate plans of
action and to make necessary adjustments in advance of
the impact of new development.
-49-
FIGURE 9 SEWER SERVICE
SEPTEMBER la. 1088
TRWX LINES
FVTLAE LINE . . . . . . .
R :lh- EXlSTlNQ BUT LWAADINQ PUNNED
TREATMENT PLAN7
-50-
City of Carlsbac
FIGURE 1G SEWER DISTRICT BOUNDARIES
SEPTEMBER 18. 7988
CARLSBAD SEWER SERVICE AREA
LEUCADIA COUNTY WATW DISTRICT
SAN MAACOS COUNTY WATER DISTRICT
.*.e....
-5 1- Gity of Carlsbar
SEWER COLLECTION SYSTEM
PERFORMANCE STANDARD
Trunk line capacity to meet demand as determined by the
appropriate sewer district must be provided concurrent
with development.
ADDITIONAL FACILITY PLANNING INFORMATION
The City is provided sewer service from three agencies:
1. City of Carlsbad
2. Leucadia County Water District
3. San Marcos County Water District
Each of the three service providers have completed
master plans for the major public facilities needed to
service the City. The San Marcos facilities are in
place now which will provide service for buildout needs
of their service area. The Leucadia County Water
District completed their agency's Master Study Plan in
September 1985 which provides for all facilities needed
to buildout. The Carlsbad Sewer Master Plan was
completed in April 1985, and it also provides for all
facilities needed to buildout.
Sewer facilities are such that the exact size and
capacity of each line depends on the individual
development projects being proposed. Theref ore, the
master plans developed by each agency are able to
address these needs at the project level.
The existing Sewer Collection System is adequate to
meet current service demands. The future plans of each
agency provide the necessary facilities to service the
City at buildout. Each service provider will review
and approve all local plans that affect their service
area to ensure that the adopted performance standard is
maintained based on the phasing of development.
-52-
FIGURE 18 WATER SYSTfM
SEPTEMBER 10. 108R
- FUTURE MUOR TRN( Ut€S
FUTURE RESEVOIR
-5 3- City of Carlsbad
FIGURE 19 WATER DISTRICT BOUNDARIES
SEPTEMBER 18. 1086
0 COATA REAL MUNICIPAL WATER DISTRICT
BUENA COLORADO WATER DISTRICT
SAN MARCOS COUNTY WATER DISTRICT
OLIVENHAIN MUNICIPAL WATER DISTRICT
-54- City of Carlsbad
WATER DISTRIBUTION SYSTEM
PERFORMANCE STANDARD
Line capacity to meet demand as determined by the
appropriate water district must be provided concurrent
with development.
A minimum 10 day average storage capacity must be
provided prior to any development.
ADDITIONAL FACILITY PLANNING INFORMATION
The City has three water service providers:
1. Costa Real Municipal Water District
2. Buena Colorado Water District*
3. San Marcos County Water District
4. Olivenhain Municipal Water District
Each of the three service providers, exclusive of Buena
Colorado Water District, have completed master plans
for the major public facilities needed to service the
City. The San Marcos facilities are in place now which
will provide service for the buildout needs of their
service area. Olivenhain has identified certain
existing facilities which will need to be upgraded and
improved in order to meet the needs of future growth.
Costa Real has identified those facilities which will
need to be added, upgraded, and improved in order to
meet the needs of future growth. For the most part,
the facilities needed to service the City are presently
in place, and where future facilities are needed, they
have been identified in the appropriate Master Plan.
The existing Water Distribution System is adequate to
meet current service demands. This includes both line
capacity and the minimum 10 day storage capacity. The
future plans of each service agency provide the
necessary facilities and storage capacity to meet the
buildout needs of the City.** Each service provider
will review all local plans that affect their service
area to ensure that the adopted performance standard is
maintained based on the phasing of development.
*At some future date, the Buena Colorado Water
District's Carlsbad service area will be absorbed into
the Costa Real Municipal Water District.
**The San Marcos County Water District has determined a
3.2 day storage supply of water for their district's
local service area. Because the Carlsbad service area
is so small, it has been determined that their storage capacity is adequate.
-55-
SECTION VI. GUIDELINES FOR PREPARATION OF
A.
B.
LOCAL FACILITY MANAGEMENT PLANS
REASONS FOR GUIDELINES
These guidelines have been prepared to:
1. Assure that the Local Facililty Management Plan
will be consistent with and implement the Citywide
Facilities and Improvements Plan and the overall
Growth Management Ordinance;
2. Develop a consistent format for each of the twenty-
five facility management zones which will
facilitate review by decision makers and the public
alike: and,
3. Provide clear directions to property owners,
consultants, and developers who may prepare
management plans, with the aim of reducing the
costs or time delays associated with the process.
OVERALL FORMAT
1.
2.
3.
4.
5.
8 1/2" by 11"
All documents to be 8 1/2" by 11. with a vertical
format. Where larger maps or tables are needed,
provide them on 11" by 17. fold out pages.
Print One Side Only
To facilitate review and notation of documents,
please print on one side of paper only.
Page Numbers
Page number the entire document sequentially,
rather than by section to facilitate easy
reference.
Exhibits, Figures and Tables
Label exhibits, figures and tables numerically or
alphabetically and include in the Table of
Contents.
Appendixes
Any lengthy documentation felt necessary, such as
traffic studies, lengthy calculations, large maps, etc., should be included in an appendix section, or
separate appendix document.
-56-
C. EDITORIAL GUIDELINES
1.
2.
3.
Adequate
Avoid using words like "adequate", instead, always
quantify in specific numerical terms.
Sources
When using or referring to secondary sources of
data, be specific, i.e., report names, dates,
authors, page numbers, etc.
Methodology
Be specific about the methodology used for analysis,
cite all secondary sources.
D. CONTENTS OVERVIEW
1.
2.
3.
Entire Zone
The plan should cover the entire zone. Plans
submitted for only a portion of the zone will not be
processed.
General Plan and Zoning
The Local Facility Management Plan shall be based
upon the General Plan and zoning applicable within
the local zone at the time of approval.
Citywide Facilities and Improvements Plan
The Local Facility Management Plan shall be
consistent with the Citywide Facilities and
Improvements Plan and shall implement this plan
within the specific zone.
E. SPECIFIC OUTLINE
The Local Facility Management Plan should follow the
outline and must include the contents listed below:
-57-
1. Title Page
Include zone number, name, address, and telephone
number of sponsor of zone plan, all consultants, and
date of preparation.
2. Table of Contents
The table of contents should be comprehensive and
include a list of exhibits, figures, tables and
appendices.
3. Introduction
Include, here, a brief description of the zone and
background maps. Maps should include the following:
A. citywide Local Facility Management Zones Map;
please highlight the specific zone under
consideration with a graphic pattern.
B. Latest General Plan map of the zone.
C. Latest City zoning map of the zone.
D. Map and table indicating the major (25 acres or
larger) property owners in the zone and acres
of property owned by each. For smaller
holdings, list the number of owners and acres
in aggregate. Also list popularly known names
of development projects included in the zone.
Where a specific project has been filed with or approved by the City include City's official
reference number.
4. Buildout Assumptions
A projection of the buildout for the zone shall be
provided including residential and non-residential
land use acreage and constrained land. A map and
tables showing how dwelling units and acreage
projections were determined shall be provided. The
map shall show the location of all environmental and
other constrained lands including beaches, permanent
bodies of water, floodways, wetlands, riparian or
woodland habitats, major power transmissions lines,
major roadways, railroad tracks, slopes with an
inclination of 25 percent to 40 percent and those
greater than 40 percent, open space areas previously
designated on the City's Land Use Map and other land
upon which significant environmental features are
-58-
located as determined by the environmental review
process for the Local Facility Management Plan.
Also include population projections based on 2.471
persons per household.
The buildout projection for the zone shall be
checked by City staff for compliance with the
methodology and projections made by the City as part
of the preparation of the Citywide Facilities and
lmprovements Plan.
Should the City Council's Referendum or the
Citizen's Initiative be passed on the November
ballot, additional instructions may be issued for
this section.
5. Facilities Having Citywide Impact
City Administrative Facilities Library and
Wastewater Treatment Capacity have been analyzed as
part of the Citywide Facilities and Improvements
Plan and are monitored as part of the City's annual
monitoring report.
To the extent that the preparers of the Local
Facility Management Plan feel that these Citywide
facilities will be constructed on a timely and
adequate basis for appropriate development within
the local zone, no further analysis is required
within the local zone plan. Analysis should be
included only if recommendations are made to modify
the Citywide Facilities and Improvements Plan for
these facilties including plans, standards, phasing
or funding. Additionally, any wastewater treatment
that is proposed to be handled at other than the
Encina Plant, such as the Calavera Bills Reclamation
Plant, should be discussed in detail in this
section.
If the Citywide analysis is acceptable, include in
this section a statement indicating that the
Citywide Facilities and Improvements Plan has been
reviewed for these three facilities and indicate
that it is acceptable for zone development.
6. 'Facilities Not Having Citywide Impact
A separate section shall be included for each of
the following eight facilities:
Parks
Circulation
-59-
Drainage
Fire
Open Space
Schools
Sewer Collection System
Water Distribution System
Each section shall contain the following sub-
sections described further below:
A. City Standards
B. Inventory
C. Phasing
D. Financing
I. City Standards
For ease of reference, please repeat the City
Performance Standard at the start of each section.
I I. Inventory
The Citywide Facilities and Improvements Plan
includes a preliminary inventory of present and
future requirements for each facility and
improvement. The Local Facility Management Plan
should confirm this inventory and provide
additional details including cost estimates for the
specific zone.
Because improvement requirements for certain
facilities and improvements may overlap zone
boundaries, a discussion of the need €or
coordination and a proposed coordination plan for
facilities extending from one zone to another shall
be included. It must be shown that development in
the zone will not reduce the facilities or
improvements capabilities or create facilities or
improvements shortages in other zones or reduce
service capability in any zone below the City's
adopted performance standard.
A few additional specific guidelines €or facility
inventory are included below:
1. PARKS
The plan shall include:
i. A map of the Park District within which
the zone is located. If a zone lies in
more than one Park District, a map shall
be shown for each Park District.
-60-
ii. A map and list of all existing and
proposed community or special use parks
within the related Park District (City
Quadrant I.
2. CIRCULATION
The plan shall include:
i. A map of the existing and proposed street
system, categorizing streets by the City
Circulation Element criteria. ~ll
existing prime arterials, major arterials,
secondary arterials and collector streets
shall be shown. For the proposed street
system, new collector streets that are
internal to the subdivisions and that will
be built and entirely funded by the
developer as part of an individual
development need not be shown. For any
circulation element road, an alignment
plan with a scale no greater than 200 feet
per inch shall be prepared showing the
vertical and horizontal alignment of the
road. The limits of the alignment should
be extended beyond the zone boundary to a
logical terminus as necessary subject to
the approval of the City Engineer.
For ease of analysis it is suggested that
existing streets be shown with a solid
line and proposed streets with a dotted
line. Use a wider line width for the
prime arterial scaling down to a narrow
line for collector streets.
The map should normally include land
outside of the zone which is necessary to
analyze how the circulation system works
for the entire zone. The map must
indicate 'impacted" road segments or
intersections outside the zone.
ii. A table and/or map indicating existing
street capacities, traffic volumes and
service levels during off-peak and peak
hours for all road segments and
intersections.
-61-
iii. A table and/or map indicating projected
street capacities, traffic volumes and
level of services during off-peak and peak
hours for all road segments and
intersections at buildout.
iv. A list of technical assumptions or
methodology used in the analysis such as
trip generation rates by land use, traffic
modeling systems used, etc. If city
studies are used for the analysis simply
reference the City studies.
v. Until the Citywide Traffic Impact Study is
completed (January 19871, the circulation
information shall be verified by City
staff requesting an independent review by
SANDAG (San Diego Association of
Governments).
3. DRAINAGE
The plan should include:
i. Map of natural drainage areas in relation
to topography.
ii. Map and listing of existing and proposed
facilities including:
Pipes
Desil tat ion basins
Retention basins
Open channels (earth or concrete)
Headwalls
Clean Outs
iii. For any facility not shown in the City's Master Drainage Plan or recommended
changes to the City's plan, list specific
assumptions and calculations used in the
analysis such as expected flows (cfs) and
capacities for each facility.
4. FIRE
The plan should include:
i. A map of existing and proposed fire
stations serving the zone. For each
station show the five minute response
time.
-62-
ii. A table and/or map indicating the number
of existing and proposed dwelling units
outside the five minute response time of
existing station.
5. OPEN SPACE
The plan should include:
i. A map and table (acres) showing all
existing land to be considered as open
space. Such areas might include pocket
parks, homeowners ball fields, planned
residential development (PRD) common
areas, golf courses, tot lots, swimming
pools, tennis courts or other areas
containing passive or active recreational
facilities, such as major power line
easements. where any portion of the zone
is to be developed with large lot,
standard single family development
(minimum 7,500 square foot lots) , the
amount of open space may be
proportionately modified.
ii. When known, a map and table indicating all
proposed future open spaces. If possible
relate these spaces to specific property
ownerships or developments. Where
feasible, the plan should inventory any
sites within the zone that are
particularly suited to open space use and
that will enhance the overall livability
within the zone.
6. SCHOOLS
List the name of the service agency(s) for the
zone. If more than one agency serves the zone,
list each agency, and include a map showinq each
agency's service area. Service agencies include
San Dieguito Union High School District,
Encinitas Union Elementary School District, San
Marcos Unified School District, and Carlsbad
Unified School District.
The plan should include a map of existing and
proposed elementary, junior high and high
schools serving the zone. For each school show
current and projected enrollment and rated
capacity. Indicate assumptions used such as
students per household.
-6 3-
7. SEWER COLLECTION SYSTEM
List the name of the service agency(s1 for the
zone. Service agencies include Leucadia, San
Marcos, and Carlsbad. If more than one agency
serves the zone, list each agency and include a
map showing areas served.
The plan should include:
i. Map of the natural drainage areas in
relation to topography.
ii. Map and list of existing and proposed
trunk lines (normally 12 inches and
larger), force mains, and pump stations.
iii. List of technical assumptions used in
analysis such as:
Gallons per day for residential uses.
Gallons per acre per day for non-
residential uses.
Buildout assumptions by drainage area.
iv. For each facility indicate size, capacity
in cubic feet per second, current
utilization in cubic feet per second,
projected buildout utilization in cubic
feet per second, cost estimates.
v. A discussion of how the proposed system
relates to water reclamation plans within
the zone or other zones should be
included. If golf courses or large park
and open spaces are included, the plan
shall include a specific discussion of the
reclamation potential, and indicate if the
property owner will agree to use reclaimed
water, if available.
8. WATER DISTRIBUTION SYSTEM
List the name of the service agencies for the
zone. Service Agencies include Olivenhain
Municipal Water District, San Marcos County
Water District, and Costa Real Municipal Water
District. If more than one agency serves the
zone, list each agency and include a map showing
each area served.
-64-
The inventory should include:
i. Map and list of existing and proposed
facilities including major transmission
lines, storage facilities, water -
treatment and pumping facilities, and
local water resources.
ii. List of technical assumptions used in
analysis such as:
Gallons per day for residential uses.
Gallons per acre per day for non-
residential uses.
All golf courses or proposed large
open spaces, or parks to be watered
shall be identified.
Fire flows.
iii. For each facility indicate size,
capacity, current utilization, projected
buildout utilization, cost estimates.
iv. A discussion of how the proposed system
relates to water reclamation plans within
this zone or other zones should be
included. If golf courses or large parks
and open spaces are included, the plan
shall include a specific discussion of the
reclamation potential and indicate if the
property owner will agree to use reclaimed
water, if available.
111. Phasing
A phasing schedule establishing the timing for
installation of the facilities or improvements in
relationship to the amount of development activity
(e.g. number of dwelling units, number of square
feet of commercial space, etc.) shall be submitted
for the facility management zone. The phasing
schedule shall ensure that development of one area
of the zone will not utilize more than the area's
pro rata share of facility or improvement capacity
within that zone unless sufficient capacity is
ensured for other areas of the zone at the time of
the first development.
-65-
Periods where facilities and improvements may not
meet the City standard shall be indicated, and the
plan shall either:
i. Provide a means for meeting the standard, or
ii. Suspend development in the zone for a period
of time until the standard is met.
The primary goal of the zone plan is to provide more
up front, longer term plannning for public
facilities. The phasing analysis and schedules are
primarily for planning and 'early alert. purposes.
It is recognized that when development will actually
take place relates to many variables that change
over time. Nevertheless, it is necessary to prepare
phasing assumptions in order to analyze facility
phasing, construction and financing plans. The
decision as to whether a specific project may
proceed will be made in relation to both the zone
plan and the actual project approval. In both cases
analysis will relate directly to assurances that the
Performance Standards can be met.
Both dwelling unit and non-residential land usage
should be projected on a year-by-year basis over a
twenty year time line similar to the analysis that was done in the Citywide Facilities and Improvements
Plan. Development projected beyond the 20 year
period should be shown in one remainder number. A
table for the specific zone should be included as
part of the plan. City staff will verify the
"reasonableness' of these projections based upon
regional growth predictions prepared by SANDAG,
projections made by the City in conjunction with the
Capital Improvements Program and actual historical
trends.
Specific facility phasing for each of the eleven
facilities should relate directly to these
projections. When considered helpful, alternative
phasing schedules may. be submitted. For example,
such schedules might document that facilities will
be adequate for variable rates of development within
the specific zone.
Additional instructions for specific facilities are
as follows:
-66-
SEWER COLLECTION SYSTEM
Any temporary pump station required, due to
phasing of facilities shall be clearly
identified.
Future development proposals requiring pump
stations that are not identified in the zone
plan will not be approved without amendments to
the zone plan.
D RAI NAG E
It should be shown that the proposed phasing
schedules will not create any onsite or
downstream problems in relation to erosion,
flooding or siltation.
IV. Financing Plan
A financing plan estabishing proposed methods to
fund all needed facilities shall be included: The
plan shall specifically indicate:
i. Which facilities are proposed to be funded and
built as an integral requirement of the
development projects located within the zone.
Where facilities are proposed to be
constructed in the future and the costs are to
be allocated to various properties or
developments within the zone, the plan shall
so indicate and a Facilities Management Fee
shall be proposed. The amount of the fee
shall be determined based upon the estimated
cost of the facilities spread to a specific
increment or level of development. The fee
shall be collected unit by unit in
relationship to the specific demand beginning
with the first unit of development. These
fees shall be held in deposit with the City in
order to assure funds will be available when
the facility is needed.
ii. Which facilities are proposed to be built by
the City, special District or State as part
of its normal capital improvement program.
The facilities should be shown on an approved
capital facilities program.
-67-
iii.
iv.
V.
vi.
Where the City or Special District proposes to
build a facility as part of its normal capital
improvements program but such facility is not
currently shown on an adopted capital
improvements program, supporting verification
and documentation should be included from the
city or special District.
Other funding sources such as assessment
districts or grants shall be discussed in
detail along with rationale as to why this
source is considered workable.
If developer reimbursement agreements are
anticipated in relation to financing they
should be so indicated. Detailed rationale as
to why reimbursement is reasonable, a
reference to the legal authority allowing such
an agreement, and how such reimbursement is to
be arranged shall be included in accordance
with the proposed construction schedule and
development phasing plans.
Where facilities or improvements are required
for more than one zone, the phasing plan shall
identify those other zones and the plan for
each zone shall be coordinated. coordination
shall not require identical funding methods,
as long as the plan assures that funds will be
available concurrent with need.
Additional instructions for specific facilities are
as follows:
OPEN SPACE
Open space will normally be reqqired as part of
the development. Any proposal to include open
space as part of a City-maintained program will
require extraordinary justification.
SCHOOLS
Please discuss here an understanding of the
school districts funding plan, particularly in
relation to developer agreements for
development approvals within the zone.
SEWER COLLECTION SYSTEM
If temporary pump stations are proposed, a
financing plan covering the operations of the
pump stations during the temporary period shall
-68-
be included. It will normally be assumed that
this operation will be funded by the related
development.
F. ADDITIONAL SUBMITTAL REQUIREMENTS
1. Property owners list and addressed stamped
envelopes (metered must be undated) - A) a
typewritten list of the names and addresses of all
property owners within the zone and within a 600
foot radius of the zone, The list shall include
the San Diego County Assessor's parcel number from
the latest assessment rolls. B) Two separate sets
of legal size (#lo), addressed stamped envelopes of
the property owners within the zone and within a
600 foot radius of the zone. Do not type
assessor's parcel number on envelopes. Leave
return address blank, C) A map to scale not less
than 1.=1000' showing each lot within the zone and
within 600 feet of the exterior boundaries of the
zone. Each of the lots shall be consecutively
numbered and correspond with the property owner's
list. The scale of the map may be reduced to a
scale acceptable to the Planning Department if the
required scale is impractical.
2. Number of copies of plan - Fifteen (15) copies of
the plan shall initially be submitted, Once the
plan has been reviewed by staff and is ready to be
scheduled for public hearing, an additional fifteen
(15) copies shall be submitted.
3. A deposit of $10,000 shall be submitted - All staff
and city consultant time and materials in reviewing
the plan shall be fully documented. If any of the
deposit is unexpended, it will be refunded following
the public hearing. If the deposit does not cover
the cost of reviewing the plan, an additional fee
will be charged before the plan is scheduled for
public hearing.
-69-
SECTION VII. FINANCING OPTIONS AND POLICIES
When the Work Plan for the Growth Management Ordinance was
adopted by the City Council on July 1, 1986, a detailed financing
plan and analysis was not requested for the facilities and
improvements which were to be addressed in the Citywide
Facilities and Improvements Plan. It was understood that
detailed financing plans would be required as part of the
preparation of the Local Facility Management Plans. Rowever,
this section does address available cost estimates and funding
sources for those citywide facilities under the City's control.
The table titled "Future Public Facilities List" at the end of
this section shows these facilities. Those citywide facilities
to be installed or financed through the operations of the various
special districts are referenced in the district's appropriate
master plans.
The capital facilities necessary to support the City of Carlsbad
generally fall into two categories -- those provided by
developers as a condition of development approvals, and those
provided by the City through a system of fees, taxes, or other
financing sources. The Growth Management Ordinance further
defines this division by listing the projects that qualify for
funding from one of the usual City sources.
It is the City's responsibility to plan for the construction
and maintenance of City projects and to finance these projects
in the best possible way. The following describes some of the
financing options available to the City.
A. Cash/Pay-as-you-qo financine. The City has used this
method of financing to pay for most capital
improvements constructed to date.
In concept, the City charges the development community
a series of fees which provide the source of income to
pay for capital projects. When enough cash has been
assembled, the City constructs the next capital project
in order of priority. This method forces the City to
delay construction of various projects until funds have
been collected. These fees include:
1. Public Facilities Fee
2. Park-In-Lieu Pees
3. Planned Local Drainage Fees
4. Traffic Impact Fees
5. Bridge and Thoroughfare Benefit District Fee
6. Sewer Fees
7. Water Fees
Special Districts collect their own various fees.
-70-
B. Reimbursement Agreements. In certain instances, a
developer may ask the City to move a project forward in
time and to construct a facility before funds have been
collected. When this occurs, the City could adopt the
policy of having the interested developer construct
the project based on a reimbursement agreement. The
City would pay the developer back for the portion of
the project that was to be funded by City resources
over a period of time. Payments would commence at the
time the City had originally scheduled construction.
Moving the project forward in time is for the benefit
of the developer. Therefore, the City's repayment would
be limited to the cost of the public portion of the
project and no interest would accrue to the developer.
The use of this method of project financing does not
eliminate the developer's obligation to pay City fees.
The developer must still pay all City fees associated
with a development.
C. credit for City Fees. When it is in the public
interest to construct certain public facilities earlier
than would be possible under a pay-as-you-go program,
the City can consider giving a developer credit for
fees that would otherwise be paid, up to the cost of the
public improvement. These credits would reduce the
amount of fees payable in future years from a certain
d eve 1 o pmen t .
Fee credits must be used carefully to avoid elimination of income from capital fees necessary to finance other
projects. Two alternatives exist for fee credits:
- Full fee credit immediately: Under this
option, the developer who builds a Fublic
improvement would be eligible to deduct 100% of the cost of the improvement from fees
payable. Once the fee credit is exhausted,
the developer begins paying fees as normally
assessed by the City. Under this option the
developer gets immediate credit for the total
cost of a project.
- Partial fee credit - credit over time: In
this option, the developer who builds a
public improvement receives a credit for the
cost of a public improvement. However, the use
of that credit is spread over a series of
years. This allows the City to continue to
receive at least a portion of fees
-71-
designated for capital projects while giving
the developer credit for the construction of
public improvements that would have otherwise
been paid for by the City. Yo interest would
accrue to the developer as a part of this
arrangement.
D. Debt Financing. A range of debt financing alternatives
are available to the City. If it is in the public
interest to push a project ahead and to construct an
improvement before funds are on hand, debt financing
may be the answer. If the project is being pushed
forward for the convenience or benefit of a developer,
that developer should bear the cost of issuance and
interest over the life of the debt issue. The actual
mechanics of a debt issue and how to determine the
developer's responsibility to support costs is yet to
be defined.
Some of the debt financing vehicles available are shown
below:
Assessment Districts:
Under Council Policy No. 33, the City may assist a
developer in the construction of various public
improvements that may be financed through the use of
assessment districts if there is significant public
benefits from the improvement. In cases where a City
contribution would be necessary to a district, the
City may ask a developer to pay the City contribution.
The developer could then be reimbursed at a later date
(i.e., in the year that the capital project had been
originally scheduled for construction) or through a
system of credits as described earlier.
Special Benefit Districts:
State law allows the formation of a variety of special
benefit districts. These districts may be used to fund
the construction of parks, libraries, Dolice or fire
facilities, and street lighting systems to name a few.
These districts may be formed by a vote of the property
owners who then assess themselves for the cost of
improvements.
The developer and/or land owner bears the burden of
debt service payments. City participation in a
district of this type is possible to the extent of
public improvements that would have otherwise been the
responsibility of the City. However, the movement of
capital improvements forward-in-time would require some
concession from the developer in offsetting interest,
-72-
debt issue, or other additional costs.
Revenue Bonds:
The City may elect to issue revenue bonds to finance
improvements related to utility functions or other City
services that generate a fee for service, although
other City functions could support the use of revenue
bonds. If public improvements are being installed ahead
of schedule to accommodate a developer, the City would
expect the developer to offset many of the costs of such
an issue as described above.
Tax Increment Bonds:
Public improvements in the City's redevelopment area
can be financed through the use of tax increment bonds.
The Redevelopment Agency has developed a plan for the
construction of public improvements using this method
of financing. A developer asking for public
improvements to be constructed ahead of schedule must
consider the agency's ability and willingness to defer
other projects.
Certificates of Participation:
certain public facilities such as buildings can be
financed through Certificates of Participation. This
is in effect a lease agreement between the City and
another agency. A developer wishing to push projects
forward might consider constructing facilities such as
a library or fire station using this financing tool.
The developer may be asked to bear certain costs or to
accept credit in lieu of payment for certain
improvements.
General Obligation Bonds:
The City has the ability to issue General Obligation
Bonds to fund the construction of public improvements.
This can only be done with the approval of 2/3 of the
voters in an election. It is unlikely that the City
will have the ability to use this method of funding
public projects which benefit specific developments.
-73-
In the course of developing the Citywide Facilities and
Improvements Plan, the following financing policies were
identified:
1.
2.
3.
4.
5.
6.
7.
Recognize that those projects identified in the Public
Facilities Fee Calculation are the ultimate
responsibility of the City to fund, however, the
priority for funding projects is at the discretion of
the City Council.
Recognize that the Capital Improvements Program will
play a significant role in helping to establish
compliance with the adopted preformance standards.
Priority for the funding of projects should go to infill
areas or areas of the city where existing deficiencies
exist.
Agree to consider assisting developers with credits
against future fees, reimbursement agreements, forming
assessment districts, etc. only when it is clearly in
the public interest to do so or to rectify public
facility deficiencies and not to induce growth by
prematurely upgrading public facilities.
Recognize that all credit or reimbursement arrangements
will be made based on the city's plans for timing of
certain public facilities. For example, if a developer
wanted to put in an improvement that the City had not
planned for 5 years and was not necessary to rectify an
existing deficiency, the City would not consider
beginning to provide credits or reimbursement until the
5th year, if at all.
Recognize that public facility improvements made up-
front or ahead of City plans by developers must provide
the funds necessary to cover annual operating costs for
the facility until the time the City had previously
planned to provide the facility.
With the recent reduction in residential densities and
overall restriction on residential development,
recognize that it may be necessary to start charging
fees to commercial and industrial land uses in cases
where they are not presently assessed. For example,
commercial and industrial developments do not pay school
or park fees although they will increasingly impact
these facilities. With the reduction in residential
land uses and density, it may be necessary to charge
commercial and industrial to make up the deficit.
At a future date, consider directing staff to conduct a
financial analysis of the Public Facilities Fee to determine
its adequacy in terms of cash flow and method of calculation
in light of the overall Growth Management Program.
-74-
CITY OF CARLSBAD
PROJECT
FUTURE PUBLIC FACILITIES LIST
COST EST. DESCRIPTION FUND (000 1s)
GOVERNMENT FACILITIES ------.-.-------------
*City Hall *FIRE STATION #3 Relocation - Calavera *FIRE STATION #5 Public Safety Center *FIRE STATION #6 Rancho Santa Fe *LIBRARY Additional 84,600 sq. *Public Safety Ctr
PARKS
Alga Norte *Calavera Hills Cannon Lake *Leo Carrillo *Macario Canyon NE Quadrant Non-Determined Sites *Senior Citizen Center Special Use Areas Additional 10.7 acres
*SW Quadrant
-----
PFF 4,000
425
11 1,950
590 ft. 11 10,593
3 , 400
$20,958
Hills I1
11
11 ------_--
PFF
11
11
I1
11
I1
I1
11
I1
11
DRAINAGE PROJECTS **
DISTRICT 1 DISTRICT 2 DISTRICT 3 DISTRICT 4 DISTRICT 5 DISTRICT 6
DISTRICT 7 DISTRICT 8 DISTRICT 9 DISTRICT 10 DISTRICT 11 DISTRICT 12 DISTRICT 13
----------I------
Drainage Fee/Gross Acre = $ 0 PLD
11
11
0
11 $ 3,808
$ I1
11 $ 1,686 I1
11 $ 2,658 I1
11 $ 200
11 $ 2,273 I1
I1 $ 1,196 11
I1 $ 1,630 11
I1 $ 4,445 11
I1 $ 2,858 11
11
11
11
0
I1 $ 2,878 $ 11
3 , 531
2,270
650
14 , 000
4 , 225
4 , 225
1,679
368
4,225
$37 , 173
2,000
---------
$30 , 387 ......................................................................... * Part or all of these projects are in the adopted five year Capital Improvement Program. See the 1986-91 CIP for details.
** SOURCE: Master Drainage Plan for the City of Carlsbad, June 1980 Costs have been adjusted to 1986 dollars per the Pipeline/Concrete Index (24.6%).
-75-
CITY OF CARLSBAD
FUTURE PUBLIC FACILITIES LIST
PROJECT DESCRIPTION COST EST.
FUND (000 1s)
SEWER PROJECTS ** --------------
*ENCINA TREAT. PLANT Phases IV h V *CALAVERA HILLS PLANT UPGRADE TRUNK LINES * Area 1 - BUENA VISTA * Area 2 - NORTHWEST CITY Area 3 - CALAVERA HILLS Area 4 - NORTH AGUA HEDIONDA * Area 5 - SOUTH AGUA HEDIONDA Area 6 - PALOMAR AIRPORT Area 7 - NORTH BATIQUITOS
Area 1 - BUENA VISTA Area 2 - NORTHWEST CITY Area 3 - CALAVERA HILLS * Area 4 - NORTH AGUA HEDIONDA Area 5 - SOUTH AGUA HEDIONDA Area 6 - PALOMAR AIRPORT Area 7 - NORTH BATIQUITOS
Area 2 - NORTHWEST CITY Area 3 - CALAVERA HILLS Area 4 - NORTH AGUA HEDIONDA Area 5 - SOUTH AGUA HEDIONDA Area 6 - PALOMAR AIRPORT Area 7 - NORTH BATIQUITOS
UPGRADE PUMP STATION
JOINT FACILITIES Area 1 - BUENA VISTA
(Carlsbadls share) Sewer
11
II
11
11
II
I1
II
11
I1
II
II
II
II
I1
11
I1
11
II
II
II
II
I1
I1
13,070
5,240
25
810
0
590
970
0
0
0
435
0
765
1,750
0
0
350
2,190
0
0
3,230
13 5
0
$29,560
--------_
NOTE : GRAND TOTAL
SAN MARCOS (WATER/SEWER) - Existing facilities are adequate to buildout.
LEUCADIA (SEWER) - Specific projects and costs are detailed in the Districts Master Plan.
OLIVENHAIN WATER - 11
COSTA REAL WATER - II ......................................................................... * Part or all of these projects are in the adopted five year Capital Improvement Program. See the 1986-91 CIP for details.
** SOURCE: City of Carlsbad Sewer Master Plan, April 1985.
-76-
CITY OF CARLSBAD
FUTURE PUBLIC FACILITIES LIST
PROJECT
CIRCULATION
FWY INTERCHANGE FWY INTERCHANGE FWY INTERCHANGE
CANNON ROAD BRIDGE CARLSBAD BLVD EL CAMINO REAL FARADAY JEFFERSON STR MIS CE LLANE OUS PALOMAR AIRPORT RD *PALOMAR AIRPORT RD PALOMAR AIRPORT RD *PALOMAR AIRPORT RD PALOMAR AIRPORT RD POINSETTIA TAMARACK *TAMARACK *TRAFFIC SIGNALS
-----------
*CANNON ROAD
ALGA ROAD ALGA ROAD *EL CAMINO REAL *EL CAMINO REAL *EL CAMINO REAL EL CAMINO REAL EL FUERTE STREET *LA COSTA AVENUE
LA COSTA AVENUE LA COSTA AVENUE *LA COSTA AVENUE *LA COSTA AVENUE OLIVENHAIN ROAD OLIVENHAIN ROAD OLIVENHAIN ROAD OLIVENHAIN ROAD
OLIVENHAIN ROAD OLIVENHAIN ROAD RANCHO SANTA FE RD RANCHO SANTA FE RD
@ Poinsettia Lane
@ Palomar Airport Rd
@ La Costa Avenue 1-5 to Faraday East of ECR Median, Tamarack to Elm Medians Cannon to Koll Property
1-5 to Marron
Railroad bridge widening College to Paseo del Norte West of ECR, median half East of ECR, Airport Intersection with Carlsbad Blvd Railroad Bridge Widening
1-5 to Carlsbad Blvd Adams to Highland
61 Intersections E/B right, W/B right turn lanes a
2 thru lanes W/O ECR to E/O Alica N/B left turn lane at La Costa S/B thru lane N & S of La Costa S/B thru lane, Alga to La Costa S/B left turn lane at Levante N & S/B left,N/B right lanes at A W/B right turn lane at 1-5
Upgrade signal at RSF Intersection at RSF E/B left turn lane at ECR
2 thru lanes, 1-5 to ECR
4 lanes from Leucadia Blvd to ECR Upgrade signal at ECR
2 thru lanes at ECR
Widen to 4 lanes, ECR to RSF
5 turn lanes at ECR Right turn lane at ECR
2 turn lanes at Melrose
3 turn lanes at C. Alvaro/Olivenh
COST EST. mJND (000 1 s)
BTD 5,740
11 5,870
6,261 PFF 3 , 128
I1 378
11 1,140
11 1,500
11 2,750
11 1,500
11 1,000
I1 3,000
I1 2,000
11 378
11 450
I1 3,000
11 900
I1 1,875
11 17 5
11 4,860 TIF 58
0 771
11 29
11 146
11 578
II 29
11 87
11 29
11 125
58
11 29
11 1,929
11 3,500
63
11 14 6
90
11 73
29
58
87
$53,818
II
II
11
I1
11
I1
11 ---------
......................................................................... * Part or all of these projects are in the adopted five year Capital Improvement Program. See the 1986-91 CIP for details.
-77-
SECTION VIII. GROWTH MANAGEMENT INFORMATION
SYSTEM
Concurrent with the creation of the Citywide Public Faciiities
and Improvements Plan and the overall Growth Management Program
for the City of Carlsbad, an information system was also ~
established to handle the wide variety of data that would be
generated. The Information System was designed to operate
initially on a stand-alone basis using the City’s personal
computer facilities. Bowever, in its ultimate configuration, it
would be operated as an element of a parcel-level Geographical
Information System, or Geobase, which is currently being
designed by the City’s Information Systems Department for
implementation within a one to two year time frame. The
relationship of the Growth Management Information System to the
Geobase is described later in this section.
Figure 20 provides a conceptual overview of the Growth
Management Information System. A variety of data would be
accepted as input into the system, such as Local Facility
Management Plans acreage and population data, capital
improvement information, and the ongoing status of development
activity throughout the City. Whenever possible, these data
would be supplied in computer-readible formats, however
initially, it is likely that much of this information would have
to be entered manually via the PC keyboard.
The information supplied to the system would be used to generate
long-term growth projections for the City and to estimate the
amount and type of public facilities that will be needed to
adequately support such growth. In addition, the system will
also be used for a number of other purposes. For example, it
will aid in analyzing each of the 25 Local Facility Management
Plans for compliance with the Citywide Plan; will maintain data
as to how specific facilities are scheduled to be phased over
time; and will store details as to how the proposed funding
mechanisms would function within and between zones.
Output would be made available in the form of reports, charts,
graphs and random inquiries, as well as via maps for each of the
eleven public facility categories addressed in the Citywide
Facilities and Improvements Plan.
Figure 21 depicts the geographical “entities. for which data
will be maintained within the system. At the highest level,
information will be maintained on a Citywide basis. At the next
level, the City has been divided for planning purposes into four
quadrants (Northwest, Northeast, Southwest and Southeast).
Geographically, these quadrants are defined by the intersection
of Palomar Airport Road and El Camino Real.
In addition, a number of Special Districts exist to provide
specific services to the area, and the Information System has
-78-
been designed to store and maintain information discretely for
those portions of the following Special Districts which lie
within the City:
Water: Costa .Real Municipal Water District
Olivenhain Municipal Water District
San Marcos County Water District
Sewer : Leucadia County Water District
San Marcos County Water District
Schools: Carlsbad Unified School District
Encinitas Union Elementary School District
San Dieguito Union High School District
San Marcos Unified School District
Information relative to the Special Districts was provided to
each District at the time that the City's overall Growth
Management Program and the Citywide Facilities and Improvements
Plan was presented and explained. In the future, updates will be
forwarded to the Districts on a regular basis so that long-range
facilities planning for the entire City can occur using
comparable data and assumptions.
Additionally, several other entities have also been defined
within Carlsbad for which the same types of data will be
maintained, including the following:
-- Sewer Master Plan Areas -- Drainage Districts -- Coastal Zone
At the lowest level of detail, the Growth Management Program has
divided the City into 25 Local Facility Management Zones for
which facilities and improvements plans will be prepared. These
zones represent the lowest level of information that will be
stored and maintained in the system. When the aforementioned
Geobase becomes operational, detailed information will be
available for each of the 19,000+ parcels that currently exist
within the City. until that time, however, the finest level of
geographical information that will be generated by the Growth
Management Information System will be for the 25 individual local
zones.
A host of information will be made available via the City's
Growth Management Information System. This information can be
grouped into two broad categories: land use projections and
-79-
public facility data. Land use projection data would include the
following:
-- Acreage Gross
Fully Constrained
25 - 40% Slopes
' Net Developable
-- Dwelling Units: Buildout
Existing
Approved
Remaining
-- Population: Buildout
Existing
Based on Approved Units
Based on Remaining Units
-- Indust./Coml.: Buildout
Existing
Approved
Remaining
The land use projection information listed above will be used
to determine the type and amount of public facilities that would
be required at buildout for each of the categories listed below:
-- Facilities: Sewer
Water
Drainage
Circulation
Fire
Administrative Facilities
Parks
Library
Schools
Open Space
The types of data that will eventually be available when Local
Facility Management Plans are submitted and approved for each of
the facilities within each of the geographical entities is as
follows:
-- Information: Existing Capacity/Status
Ultimate Demand
Existing Demand
Approved Demand
Remaining Demand versus Capacity
Some of this information can be most effectively displayed using
tables, charts, or graphs, while other portions of it would lend
itself most effectively to display using maps. Figure 22
-80-
provides a conceptual overview of how these data would be made
available, and Figure 23 shows the specific formats or media
types that would be suitable for displaying the information that
will be available via the system.
In its ultimate configuration, the Growth Management Information
System would operate as an element of a centralized Geographical
Information System, or Geobase, see Figure 24. The Geobase would
contain a file of information keyed to individual parcels within
the City. By combining these parcel files using different
geographical configurations, the parcel-level information can be
aggregated upward into Local Facility Management Zones, Special
Districts, quadrants, or Citywide reports. This concept, which
is shown in Figure 25, would represent no visible change to the
end user, in that the data and reports would be essentially the
same as those generated today via the Growth Management
Information System. With -a Geobase System, however, a much wider
array of information will be available, and the level of detail
will be at the most basic entity, namely individual parcels.
This capability will, in turn, make possible a number of other
applications, such as a Permit Tracking System, and will also
provide an opportunity to interact with other data bases or
systems.
-81-
FIGURE 20
SEPTEMBER 18, 108e
Zone Phasing Plans Q
Acreage and
Population Data
Capital Improvement Data
/ /
Developmental
ActMty Data
............ ............
f I n ..--*.*
Periodic Reports I( i \\ \. \ \
Annual
\mwth Monitoring Reportj I
i
!
I , I
i
I
i
!
i I
I I
I I
i I
\
city of Carlsbad -82-
FIGURE 21
SEPTEMBER 10. 1986
I
I 1 City
Quadrants (4)
1 Special Districts/Other 1 (34)
Management Zones I (25)
ENTITY LEVELS
City of Carkbad -83-
-
FIGURE 22
SEPTEMBER 16. ioee
&-Demand Reports
/-----71 /' WP8 \
/I/
............ ............
*----**
/ / /' e\ I \
Periodic Reporb li-
Charts/Qraphs I
!
I
,
I
\ Annual
\
SEPTEMBER 16, 1986
FIGURE 23
DATA AVAILABXLITY
Data Typ e Available Foxmats
LAND USE PROJECTIONS
Acreage :
Gross
Fully Constrained
25-40% Slopes
Net Developable
Dwelling Units:
Bu ildou t
Existing
Approved
Remaining
Population:
Buildout
Existing
Based on Appvd. Units
Based on Remain. Units
Indust./Coml. (sq. ft. 1 :
Buildout
Existing
Approved
Remaining
Tables
X
X
X
X
X
X
X
X
X x
X
X
X
X
X
X
Tables
CITYWIDE FACILITIES
City Awn. Facil. (sq ft):
Buildout X
Existing X
Standard Reqd. Today X
standard Reqd. 5 Yrs. X status Today -
Status in 5 Yrs. -
Library (sq ft) :
B uildou t X
Existing X
Standard Reqd. Today X
Standard Reqd. 5 Yrs. X Status Today -
Status in 5 Yrs. -
Charts/
Graphs
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Graphs
X
X
X
X
X
X
X
X
X
X
X
X
Reports
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Y
Reports
X
X
X
X
X
X
X
X
X
X
X
X
Inuuiry
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Inquiry
X
X
X
X - -
X
X
X
X - -
city of Carlsbad
-85-
Inauirv - Tables Graphs Maps Reports
Wastewater Treat. Capacity:
Buildout EDUs
Existing Flows (EDU)
Existing Capacity (EDU)
Flows in 5 Yrs. (EDU)
Status Today
X
X
X
X -
X
X
X
X - -
X
X
X
X
X
- X X -
X
X
X -
- -
QUADRANT FACILITIES
Parks (ac):
Buildout
E xi sting
Standard Reqd. Today
standard Reqd. 5 Yrs.
status Today
Status in 5 Yrs.
X
X
X
X
MANAGEMENT ZONE FACILITIES
Drainage:
Status Today
1 Circulation
(Road Seg. or Intsctn.):
Off-peak Service Level
Peak Service Level
Zones Involved
Status Today
Status in 5 Yrs.
X X X
X
X
X
X
X
X
X
X
X
X
X
Fire:
Stations at Buildout
Existing Stations
Status Today
Status in 5 Yrs.
X
X
X
X
X
X
X
X
X
X
X
X
Open Space (ac) :
Buildout
Existing
Status Today
X
X -
X
X
X
X
X
X
X
X
X
X
X -
SPECIAL DISTRICT FACILITIES
Schools :
Schools at Buildout
Existing Schools
Status Today
District OK?
X X X
X X X X
X X X X
X X
-
- -
X
X
X
-
' Available when Traffic Impact Fee Study is completed for entire City -
January 1987.
-86-
Tables
sewer Collection System
(Trunk Line Capacity-MGD):
Buildout X
Existing Flows X
Existing Capacity X
Status Today X
District OK? X
Water Distribution System
(Line Capacity 1 :
Buildout X
Existing Flows X
Existing Capacity X
Status Today X
Storage Cap. (days) X
D is t r ict OK? X
Graphs Maps Reports
X X X
X X X
X X X
X X X
X - -
Inquiry
-87-
FIGURE 24 SEPTEMBER 18, lgag
hwth Management Infomation System Pemit Tracking System
............ ............ ............ ............ *-. a *
Other Systems or Programs
RELATIONSHIP TO
-88- City of carlsbad
FIGURE 25 SEPTEMBER 16, 1986 1 City
Quadrants
I M8nagement Zones I
I
/ / \
-89- City of Carlsbad
SECTION IX. APPLICABILITY TO GROWTH MANAGEMENT
ORDINANCE (SECTION 21.90 OF THE CARLSBAD MUNICIPAL CODE)
AS stated in the overview, the Citywide Facilities and Improvements
Plan implements a portion of the City's Growth Managementnrdinance.
For more detailed information regarding the purpose and intent of the
citywide Facilities and Improvements Plan, exceptions to the plan and
preparation and processing requirements for Local Facility Management
Plane, Municipal Code Section 2190 should be referenced and reviewed.
Any request for amendment to the Citywide Facilities and Improvements
Plan shall be processed and considered in the same fashion as a
request to amend the City's General Plan. The provisions of State
Government Code Section 65358 regarding General Plan Amendments shall
also apply to amendments to the Citywide Facilities and Improvements
Plan. If any Local Facility Management Plan proposes a deviation to
the Citywide Plan, an amendment to the Citywide Plan must be
considered first along with an analysis of how such amendment would
impact the other twenty-four zones.
-90-
11
12
24
25 i
I
AN ORDINANCE OF 'WE CITY COUYCIL OF TuE CITY CF
CAFLSBAD, C.ALIPoFVIA APfEE:DI?:C. TTTLE 21 CF TU^
CAFLSPAD WNICIPAL CODE PY WE .mrrTroN CF
CHAPTEF 21.90 ESTABLISHING A GROKTP WKAGEE~F?;T PROCFAM FOR THE CITY
The City Council of the City of Carlsbad, California I
does ordain as follows:
SECTION 1: That Title 21 is amended by the addition cf
Chapter 21.90 to read as follows:
"Chapter 21.90
Growth Manaaerent
Sect ions:
21.90.010 21.90.020
21.90.030 21.90.031
21.90.032
21.90.033 21.90.040
21.90.050
21.90.060
21.90.070
21.90.080
21.90.090 21.90.100
21.90.110 21.90.120
21.90 . 125
21.90.130
21.90.140
21.90.150 21.90.160
21.90.170
21.90.180 21.90.190
Purnose and intent.
Definitions.
General prohibition, exceptions.
Tolling of time for consideration of
applications submitted before the effective
date of this chapter. Tollina of expiration of previou'sly issued development permits .
Extensions of prior approvals prohibited.
ComDliance with this chapter reauired. Establishment of local facilities manaaefient
fee. Special provisions for buildinq permits issued during temporary moratorium.
Finding of health, safety and welfare necessary for the fees imposed by sections 21.90.050 and 21.90.060. Performance standard. Citywide facilities and irprovements plan. Local facilities management zones. Contents of local facility manaqement plans.
Facilities management Dlan DreDartion. Facilities manaoement plan Drocessina. Implementation of facilities and
imDrovements reauirements. Obligation to Day fees or install
improvements reauired by any other law. Implementing guidelines. Exclusions .
Council actions, fees, not ice. Expiration of chapter. Severability.
1.
0 18 i/
20
21
22
23
24
25
26
27
28
21.90.010 PurDcse and intent. (a) It is the policy of the City of Carlsbad e:
1. (1) Provide cuality housina ODDortunities fzr
(2) Provide a balanced comunitv with adecLate
economic sectors of the comunity;
commercial, industrial, recreational and open space areas ts support the residential areas of the City;
meeting City standards are available concurre~t with the neec! created by new development;
(4) Balance the housina needs of the recion against the public service needs of Carlsbad residents and
available fiscal and environmental resources:
areas before allowina extensions of public facilities and
improvements to areas which have yet to be urbanized:
the Carlsbad qeneral plan:
facilities and imDrovements are provided in a phased and logical
fashion as reauired by the general plan;
development by tying the pace of development to the provision of
DUbliC facilities and improvements at the times established by
the citywide facilities and improvements plan.
determined despite previous City Council actions includina but not limited to, amendments to the land use, housinq, and parks
and recreation elements of the general plan, amendments to City
Council Policy No. 17, adoption of traffic imDact fees, and modification of park dedication and improvement reauirements,
that the demand for facilities and improvements has outpaced the supply resultina in shortages in public facilities and improvements, includinq but not limited to streets, parks, open space, schools, libraries, drainage facilities and general governmental facilities. The City Council has further determine
that these shortages are detrimental to the public health, safet
and welfare of the citizens of Carlsbad.
implementation of the policies stated in subsection (a), to
eliminate the shortages identified in subsection (b), to ensure
that no development occurs without providing for adeauate facilities and improvements, to requlate the pace of development
thereby ensuring a continued supply of housing over a period of years and to continue the auality of life for all economic sectors of the Carlsbad community.
(d) This chapter will further the policies, goals and objectives established herein by reauirina identification of al: public facilities and improvements reauired for development, by
prohibiting development until adeauate provisions for the public
facilities and improvements are made by developers of projects within the City, and by givina development priority to areas of
the City where public facilities and improvements are already ir place (infill areas).
(3) Ensure that public facilities and ivproverent
(5) Encourage infill developpent in urbanitec!
(6) Ensure that all development is consistent wit
(7) Prevent qrowth unless adeauate public
(8) Control of the timing and location of
(b) The City Council of the City of Carlsbad has
(c) This chapter is adopted to ensure the
2.
1 /i
I/
2 l~
5 18 1;
19 il
20
21
22
23
24
25
26
27
20
(e) This chanter replaces the temaorarv rorat3ril:- T-
processing and approval of developvent projects kposed sv ziti..
Council Ordinance KO. 9791.
21.90.020 Definitions. (a) Whenever the following terms are used in this chapter they shall have the meaning established by this secticr! unless from the context it is apparent that another reanina is
intended:
(1) "Citywide facilities and improverents plan" means a plan prepared and approved according to Section 21.90.091
identifying those facilities and improvements reauired on a
citywide basis to serve the projected population of the City 3s established by the general plan and providina an outline and budget for financing certain facilities and improverents which will be provided by the City.
entitlement or approval whether discretionary or ministerial issued under Title 20 or 21 of this code and any legislative
actions such as zone chanqes, qeneral plan amendments, or master plan approval or amendment.
put, building or other alteration of land and construction
incident thereto .
(4) "Facilities" means any schools, parks, open space, or recreational areas or structures providing for fire, library, or governvental services, identified in a facilities
management plan.
streets and highways, including curbs, gutters, and sidewalks,
bridges, overcrossinas, street interchanaes, flood control or storm drain facilities, sewer facilities, water facilities and lighting facilities.
(6) "Local facilities management plan" means a
facilities manaaement plan defined by Section 21.90.120 for a local facilities management zone which is established according to 'Section 21.90.100.
(2) "Development permit" means any pemit,
(3) "Development" means any use to which land is
(5) "Improvement" includes traffic controls,
21.90.030 General prohibition, exceptions.
(a) Unless exemDted by the provisions of this chapter no application for any building- permit or development permit
shall be accepted, processed or approved until a citywide facilities and improvements plan has been adopted and a local facilities management plan for the applicable local facilities management zone has been submitted and approved according to thi!
chapter .
(b) No zone change, general plan amendment, master plai amendment or specific plan amendment which would incease the
residential density or development intensity established by the
general plan in effect on the effective date of this chapter shall be approved unless an amendment to the citywide facilities
management plan and the applicable local facilities manaaement
plan has first been approved.
3.
L
subs
Deve
shal
faci
(c) The classes of projects or pernits listed I? ti's
ection shall be exemDt from the provisions of suDsecticr s .
lopment permits and buildinu permits for these DroJects 1 be subject to any fees established pursuant tc the cltvw:-+ lities and improverent plan and any applicable local
facilities management plan. (1) Redevelopment projects.
(2) Projects consisting of the construction or I
owned by the family intendinq to OCCUPY the structure, or nct to exceed one nonowner-OccuDied house -&r individual for one or more lots owned prior to July 20, 1986.
(3) Building permits and final maps €or proiects identified in Section 2(F) of Ordinance No. 9791 (Drojects fcr
which construction had commenced and were desiunated on the FZD
narked Exhibit A to Ordinance No. 9791 "as developina").
required development pernits were issued or approved on or befori January 21, 1986. If all reauired development permits were
issued for a portion of the project only, the exemption shall
apply to that portion.
(5) Building pemits for projects for which all required development permits were issued or approved before July
20, 1986 and for which building permits could .have been issued
under Ordinance No. 9791. If all required development permits were issued for a portion of the project only, the exemption
shall apply to that portion.
approved development permits or with a complete application on
file with the City prior to June 11, 1986 for such permits. New permits for commercial and industrial projects located within an
area that has been previously approved for such uses may also be
processed and approved.
' (7) Projects by nonprofit entities for structures and uses for youth recreational, educational or guidance prooram: such as boys and girls clubs or private schools.
necessary to accomplish consistency between the general plan and zoning, to implement the provisions of the Local Coastal Plan or which the City Council finds will not increase the public facilities or services and which are initiated by the City Council or Planning Comnission.
projects without accommodations for permanent employees are exempt from the provisions of this chapter unless the City
Council determines they are of sufficient size and scale to impact public facilities.
located in the northwest auadrant of the City as defined in
Ordinance No. 9791. Ruildina permits for commercial or industrial construction on lots in such subdivisions may be approved. Residential building permits will not be approved for lots in such subdivisions unless otherwise exempt under this
4.
(4) Ruilding permits for projects for which all
(6) Covrercial and industrial projects with
(8) Zone changes or general plan amendments
(9) Public utility facilities and improvement
(10) Adjustment plats. (11) Development permits for minor subdivisions
9 I1 I/
management plan is approved or, two years after the date the citywide plan is approved, whichever occurs first.
(2) If a tentative map or tentative parcel map was
approved after January 21, 1986 and before July 20, 1986, but the approv:; of final map or parcel map was prohibited by Ordinance
No. 9791 then approval of final maps and parcel maps is
prohibited until after preparation of the applicable local facilities management plan. The expiration period of those tentative maps and tentative parcel maps, and any other
development permits issued in conjunction with the maps shall be tolled until the local facilities management plan is approved, or two years after date the citywide facilities and improvements
plan is approved, whichever occurs first.
(e) The exemption for projects listed in subsection (c)
10 I1
date all development permits for those projects shall be fully subject to the provisions of this chapter. The exemptions for projects listed in subsection (c) (31, (41, (51, and (6) .shall apply only so long as the facilities and improvements required as a condition to the issuance of final development permits have been installed or are being installed pursuant to a secured
agreement. Any breach of such secured improvement agreement
shall subject any remaining building permits for the project to
the provisions of subsection (a).
subsection (c) (31, (41, (51, (6) and (7) which comply with all the requirements of the Subdivision Map Act and Title 20 of this
Code which were filed with the City before July 20, 1986 may be approved by the City Council, or City Engineer as appropriate, after July 20, 1986. Upon approval, those projects shall be subject to the exemption of subsection (c).
(9) The City Council may authorize the processing of and decision making on building permits and development permits
for a project with a master plan approved before July 20, 1986 subject to the following restrictions: (1) The City Council finds that the facilities anc
improvements required by the master plan are sufficient to meet
the needs created by the project and that the master plan developer has agreed to install those facilities and improvementsi to the satisfaction of the City Council.
(f) Final or parcel maps for projects listed in
5.
11
12
231 24 I
'I
1 /I
i
2 ii I
i 23
24
5
6
91 I'
10 /I
11
12
(2) The master plan developer shall acree :-
writing that all facilities and improvement reauirements,
including but not limited to the payment of fees established ;\'
the citywide facilities and manaqement plan and the ap?licab15 local facilities manaaement plan shall be apDlicable to
development within the master plan area and that the master pljn I
developer shall comply with those plans.
park and all uses within the park comprise an intearal part cf
the educational facility.
portion of Phase I of the project may be approved provided the applicant has provided written evidence that an educational
entity will occupy Phase I of the project which the City Council
finds is satisfactory and consistent with the goals and intent of
the approved master plan.
Phase I the master plan developer shall have aqreed to participate in the restoration of a siqnif icant lagoon and wetland resource area and made any dedications of property
necessary to accomplish the restoration.
(h) After making the findings in paragraph 1 the City Council may authorize the processing of and decision making on master plans subject to the reauirements of paragraph 2. After the grant of the easement required by subparagraph (h) (iv) the
tentative map for Phase I of the project, the site plan for the commercial development and the local coastal plan amendment may also be processed and approved. If such approvals are granted and, subject to all other provisions of this code, grading and building permits for construction of the golf course and first phase of the commercial portions of the project may be processed
and approved .
The processing and approval of all other developments
and building permits within the master plan shall not occur unti: after the citywide facilities plan and the local facilities management plan have been adopted by the City Council. (l)(i) That the master plan will provide all necessary public facilities for the project and will cure any facilities deficits in the area affected by the project. (ii) That the approval will not prejudice the preparation of the citywide facilities plan and will improve the level of public facilities and services in the area. (iii) That by the dedication of land and the
construction of public improvements the project will make a
significant contribution to the public facilities needs of the
city and provide for the preservation or enhancement of sianif icant environmental resources. (2)(i) The master plan shall include all of the information required by and implementing the provisions of Sections 21.90.090 and 21.90.110 for the area covered by the master plan.
facilities and improvement requirements, including but not
limited to the payment of fees established by the citywide
(3) The master plan establishes an educational
(4) Building pernits for the 129 unit residential
(5) Prior to the approval of the final map for
(ii) The applicant shall agree in writing that a1
6.
11 /i
12 il
23
24
5 18 !!
facilities and improvement plan and the applicable local
facilities manaqement plan shall be applicable to develoFv?-t
within the master plan area and that the master plan develcner
shall comply with those requirements.
participate in the restoration of a siqnificant laqoon and wetland resource area.
the applicant shall grant an easement over the proDerty necessary, for the lagoon restoration and the riqht-of-way necessary €or the' widening of La Costa Avenue and its intersection with El Camino
Real.
(iii) The master plan applicant shall acree to
(iv) Prior to any processing on the Faster plan
L
21.90.031 Tollina of time for consideration of applications submitted before the effective date of this chapter.
After approval of the citywide facilities and improvement plan and the applicable local facilities manaqement
plan applications for development permits which were accepted as complete before the effective date of this chapter shall have processing priority in relationship to the acceptance date. Until the approval of the plans all applicable time limits for processing the development permits shall be tolled.
21.90.032 Tollina of expiration of Dreviously issued development permits.
If a discretionary development permit, other than a development permit issued in conjunction with a subdivision map, issued prior to July 20, 1986 has an expiration period within
which building permits must be issued and the issuance of
building permits for the project is prohibited by this chapter then the expiration period shall be tolled until the aDplicable local facilities management plan is approved, or two years after the date the citywide plan is approved, whichever occurs first.
21.90.033 Extensions of prior approvals prohibited. After amroval of an applicable local facilities
management plan 'an extension of'the expiration date of any
development permit shall not be granted unless the extension is
found to be consistent with the plan. The decision makinq body considering an extension may condition the extension upon
compliance with the citywide plan and applicable local facilities management plan.
21.90.040 Compliance with this chapter. (a) No develoDment permit shall be approved unless the approving'authority finds that the permit is consistent with the
citywide facilities and improvements plan and the applicable local facilities management plan. To ensure consistency the approving authority may impose any condition to the approval necessary to implement the plans.
(b) No building permit shall be issued unless the fees
required by this chapter, and any applicable local facilities manaqement plan fees are first paid, and the permit is consisten
7.
5 18 1'
19 ' i
I
il 20 I!
with the applicable local facilities management plan. AS 3
condition to the issuance of any building permit pursuant to Section 2L.90.030(c) the applicant shall aaree to pay the appropriate fees within 30 days of the date each fee is
established. (c) The requirements of this chapter are imposed as a condition of zoning on the property to ensure implementation cf
and consistency with the general plan and to protect the public , health, safety and welfare by ensuring that public facilities and
improvements will be installed to serve new developrent prior tc or concurrently with need.
21.90.050 Establishment of local facilities manaaerrent - fee. (a) A local facilities managernent fee is hereby
established to pay for improvements or facilities identified in
local facilities management plan which are related to new development within the zone and are not otherwise financed by an
other fee, charge or tax on development, or are not installed by
a developer as a condition of a building permit or development permit. .The fee may also be used to pay for that portion of the facilities or improvements identified in the citywide facilities and improvements plan attributed to development within the local zone which are not financed by other means. The facilities management fee shall be paid before the issuance of a building
permit. The amount of the fee shall be determined based upon th
estimated cost of the facility or improvement designated as
necessary to accommodate additional development within the
applicable local facilities management zone plus the estimated cost of facilities and improvements identified in the citywide facilities and improvement plan attributable to the local zone.
The fee shall be fairly apportioned among the new development.
any other means of financing facilities or improvements
identified by a local facilities management plan or any other tax, fee, charge or improvement requirement which may be imposed on'the development of property under the provisions of state law
this code or City Council policy.
management zone shall be set by City Council resolution after a
public hearing, published notice of which shall be aiven
according to Carlsbad Municipal Code Section 21.54.060(2) and Government Code Section 54992.
permit application submitted after the effective date of this chapter the applicant shall agree to pay the fee established by
this section at the time a building permit is issued.
at the time of issuance of a building permit.
-
(b) The fee required by this section is in addition to
(c) The amount of the fee for a local facilities
(d) As a condition of any building or development
(e) The fee established by this section shall be levie
21.90.060 Special provisions for building permits
issued durinq temporary moratorium. (a) Applicants for projects for which building permits were issued after January 21, 1986 and before July 20, 1986 shal
8.
I
11 I;
li 12 j/
I 24 23 I
27 I!
pay the fee established by Section 21.90.050 within 30 cays aft~r
the amount of the fee is determined by the City Council. zay-e-:
shall be made according to the agreement executed by the
applicant-pursuant to Section 3 of Ordinance No. 9791.
21.90.070 Finding of health, safetv and welfare
necessary for the fees imposed by Sections 21.90.050 and 21.90.060. (a) The City Council hereby declares that payment of ~
the fee established and imposed by Sections 21.90.050 and 21.90.060 and installation of the facilities and improvements identified in a facilities management plan are necessary to achieve the policies established in Section 21.90.010 and to implement the City's general plan. If the fees are not Daid or the facilities or improvements are not installed the public
health, safety and welfare will suffer because there will be
insufficient facilities and improvements to accommodate any new development. This finding is based upon City Council Policy No. 17, City Council Ordinance No. 9791, and the evidence presented
at the public hearings on the ordinance adopting this chapter.
development permit or building permit pursuant to this chapter i protested then the permit shall be suspended during the period o the protest. (c) This section is adopted pursuant to Government Cod
Section 65913.5.
(b) If any condition imposed as a conditon of a
21.90.080 Performance standard.
The City Council shall adopt general performance
standards for each facility or improvement listed in Section
21.90.090(b) or 21.90.110(c). Specific performance standards fo
citywide facilities shall be adopted as part of the citywide
facilities and improvement plan. Specific performance standards for each zone shall be adopted as part of the local facilities management plan. If at any time after preparation of a local
facilities management plan the performance standards established
by a plan are not met then no development permits or building permits shall be issued within the local zone until the performance standard is met or arrangements satisfactory to the City Council guaranteeing the facilities and improvements have been made.
21.90.090 City wide facilities and improvements plan. (a) To implement the City's general plan by securing
provision of facilities and improvements, and to ensure that development does not occur unless facilities and improvements ar available the City Council shall adopt by resolution a citywide
facilities and improvements plan. The plan shall: Identify all facilities and improvements necessary to accommodate the land uses specified in the general plan and by the zoning: specify size, capacity and service level performance standards for the
identified facilities and improvements; establish specific time tables for acauisition, installation and operation of the
facilities and improvements correlated to projected population
9.
I
I'
of a development permit) or provided by the developer in order td
establish consistency with the general plan or Titles 18, 20 or
21 of this Code, and those facilities and improvements for which new funding methods which shall be sufficient to ensure sufficient funds are available to construct or provide facilities or improvements when required by the phasing schedule.
(d) The City Manager shall prepare and present the plar to the City Council not later than one year from the effective
date of this ordinance.
10 'i !
11 11
12 ll
26 11
27 [/
I!
28 /I 10.
(e) Amendments to this citywide facilities and
improvements plan shall be initiated by action of the P?a?.lni-.C
Commission or City Council.
21.90.100 Local facilities manaaement zones.
(a) The City Council shall divide the City into facilities management zones.
based upon logical facilities and improvements plannina, construction and service relationships to ensure the economically
efficient and timely installation of reauired facilities and
improvements. In establishing zone boundaries the City Council shall also be guided by the following considerations:
in place or available:
(b) The boundaries of the zones shall be established
I
(1) Service areas or drainage basins:
(2) Extent to which facilities or irnprovepents arc
(3) Ownership of property:
(4) Boundaries of existing zoning master plans:
(5) Boundaries of pendina zoning master plans:
(6) Boundaries of potential future zoning master plan areas:
(7) Boundaries of approved tentative maps: (8) Public facilities relationships, especially the relationship to the City's planned major circulation network :
(9) Special district service territories: (10) Approved fire, drainage, sewer, or other
(c) The zones shall be established by resolution after facilities or improvement master plans.
a public hearing notice of which is given pursuant to Section
21.54.060(2) of this code.
21.90.110 Contents of local facility manaqenent plans. (a) A local facilities management plan shall be
prepared for each facility zone and shall cover the entire zone. (b) The plan shall consist of maps, graphs, tables, an( narrative text and shall be based upon the general plan and zoning applicable within the local zone at the time of plan approval. The local facilities manaaement plan shall be consistent with the citywide facilities and improvements plan an(
shall implement the citywide facilities and improvements plan
within the zone.
when the following facilities and improvements necessary to
accommodate development within the zone will be installed or financed as specified in subsection (d).
(c) The facilities management plan shall show how and
(1) Sewer systems
(2) Water
(3) Drainage
(4) Circulation
(5) Fire facilities
(6) Schools (7) Parks and other recreational facilities
(8) Open space
11.
1:
capabilities or create facilities or improvements shortaues in other zones or reduce service capability in any zone below the performance standard which is established pursuant to Sect ion
21.90.080. The growth inducing impact of the out of zone improvements shall be assessed.
installation or provisions of facilities or improvements in relationship to the amount of development activity (e.g. number of dwelling units, number of square feet of commercial space, etc. 1 for the facilities management zone. The phasing schedule shall ensure that development of one area of the zone will not utilize more than the area's prorata share of facility or improvement capacity within that zone unless sufficient capacity is ensured for other areas of the zone at the time of the first development. The phasing schedule shall include a schedule of development within the zone and a market data and cash flow analysis for financing of facilities and improvements for the zone. The phasing schedule shall identify periods where the demand for facilities and improvements may exceed the capacity and provide a plan for eliminating the shortfall. In those situations when demand exceeds capacity and it is not feasible tc increase the capacity prior to development, no development shall occur unless a time schedule for and a means of increasing the capacity is established in the plan.
(3) A financing plan establishing various methods
of funding the facilities and improvements identified in the plar fairly allocating the cost to the various properties within the zone. The plan shall identify those facilities and improvements which would otherwise be provided as a requirement of processing a development project (i.e. requirements imposed as a condition
of a development permit) or provided by the developer in order tc
establish consistency with the general plan or Titles 18, 20 or
21 of this Code, and those facilities and improvements for which
new funding methods which shall be sufficient to ensure
sufficient funds are available to construct or provide
facilities or improvements when required by the phasing schedule,
Where facilities or improvements are required for more than one zone, the phasing plan shall identify those other zones and the plan for each zone shall be coordinated. Coordination, however,
shall not require identical funding methods.
(2) A phasing schedule establishing the timing for
!I 3 ':
4 /I
11
j;
22
91 I'
10 'I il
u
19 I! .I
I/ 20 I, !I
I 12.
(1
li
I' 2;
31 I'
11 4 'I
management plan for any zone. The City Council may assess the cost of preparing the plan to the owners within the zone after a hearing ten days written notice of which is given to the property
owners within the zone. The cost shall be spread prorata
according to acreage and development potential .
.(c) All owners within the zone may jointly submit a
facilities management plan .
(d) For zones in which joint submission of a facilities management plan is shown to be not feasible any owner or group of cooperating owners within the zone may petition the City Council to allow the owner or group of owners to prepare the plan. After
a meeting for which ten days prior written notice has been given
to the property owners within the zone, the City Council may permit the owner or group of owners to prepare and submit the
c 1, u 18 1,
I
I
23 I 24
(4) A list or schedule of facilities recuire-e-Es
correlated to individual development projects within tr.e zone.
establish the proportionate share of the cost of facilities 2~2
improvements identified in the citywide facilities and
improvement plan attributable to development of property on t!?e local facilities management zone.
(3) The local facilities management plan shall
21.90.125 Facilities management plan processinq. (a) Facilities manaaement plans shall be reviewed according to the following procedure:
complying with this chapter, and accompanied by a processing fee
in an amount established by City Council resolution, may be submitted to the Planning Director for processing. If the
(1) A completed facilities management plan
13.
/I !i 2 i(
City Council. The action of the Commission shall be filed with ' the City Clerk, and a copy shall be mailed to the owners within the facility zone.
(4) When the Planning Commission action is filed with the City Clerk, the Clerk shall set the matter for public hearing before the City Council. The hearing shall be noticed according to the provisions of Section 21.54.060(2).
(5) The City Council shall hear the matter, and after considering the findings and recommendations of the Planning Commission, may approve, conditionally approve or deny a
facilities management plan. The City Council may include in the resolution adopting the facilities management plan any fees or facilities improvement requirements which it deems necessary to impose on development projects within the zone in order to implement the citywide facilities and improvement plan and the
ll 4 ,I
(c) A local facilities management plan shall be considered a project for the purposes of Title 19 of this Code. Environmental documents should be processed concurrently with the plan.
Implementation of facilities and imorovehents, 21.90.130
(a) To ensure that the provisions of this chapter and reauirements.
the general plan are met the following shall apply:
development permit shall be approved unless the map or permit is consistent with the local facilities management plan and unless provision for all facilities and improvements related to the development project are provided or funded. (2) No building permit shall be issued unless all
applicable fees, including but not limited to, public facilities fees, bridge and thoroughfare fees, traffic impact fees, facilities management fees, school fees, park-in-lieu fees, sewer fees, water fees, or other development fees identified in the citywide facilities and improvements plan and local facilities management plan and adopted by the City Council have first been
paid or provision for their payment has been made to the satisfaction of the City Council.
(1) Except as otherwise provided in this chapter nc
I 10 \I ll
rd
27 ii
28 I/
27 1,
20 ii /I li
(b) The citywide facilities and improvercent i la^
the local facility manaaement plan process is part of :?.e C;:Y~S
ongoing pl-anning effort. It is anticipated that amendr.ents ta
the plans may be necessary. Adoption of a facilities manacenent plan does not establish any entitlement or riaht to any particular general plan or zoning designation or any particular ' development proposal. The citywide facilities and improvements
plan and the local facilities management plans are guides to
ensure that no development occurs unless adequate facilities or I improvements will be available to meet demands created by
development. The City Council may initiate an amendment to any
of the plans at any time if in its discretion it determines that an amendment is necessary to ensure adequate facilities and improvements.
the City Manager that facilities or improvements within a facilities management zone or zones are inadequate to accommodatc any further development within that zone or that the performance
standards adopted pursuant to Section 21.90.100 are not being wei he shall immediately report the deficiency to the Council. If the Council determines that a deficiency exists then no further building or development permits shall be issued within the
affected zone or zones and development shall cease until an
amendment to the citywide facilities and improvements plan or applicable local facilities management plan which addresses the deficiency is approved by the City Council and the performance
standard is met.
activity for each local facilities management zone and shall prepare an annual report to the City Council consisting of maps, graphs, charts, tables and text and which includes a developmental activity analysis, a facilities and improvements adequacy analysis, a facility revenue/expenditure analysis and recommendation for any amendments to the facilities management
plan. The content of the annual report shall be established by
the City Council.
facilities and improvements plan at the time it considers the
City's capital improvement budget.
I
(c) If at any time it appears to the satisfaction of
(d) The Planning Director shall monitor the developmen'
(e) The City Council shall annua1l.y review the citywidc
21.90.140 Obliqation to pay fees or install
Nothina in this chapter shall be construed as improvements rewired by any other law.
relieving a buiider, developer or subdivider from any public improvement requirement, dedication requirement or fee requirement which is imposed pursuant to Titles 13, 18, 20 or 21
of this code or pursuant to any City Council policy.
21.90.150 Implementinq guidelines. The City Council may adopt any guidelines it deems
necessary to implement this chapter .
21.90.160 Exclusions. (a) Development proposals which consist of facilities,
15.
or structures constructed by a city, county, special distrlc:,
state, or federal government or any agency, departnent, or
subsidiary thereof for governmental purposes are excluded frr
the provisions of this chapter. This exclusion shall not apo:I: to development proposals to which a possessory interest tax weL: -1
be applicable. I
accepted before August 6, 1985 Fay be approved without complyinz 1 with the plans adopted pursuant to this Chapter but any other 1
development permits or building permits for the project shall be
subject to the reauirements of the plans. The tentative map shall be subject to Section 21.90.030.
(b) Tentative maps the application for which was
21.90.170 Council actions, fees, notice. (a) Whenever this chapter requires or permits an action or decision of the City Council, that action or decision shall be accomplished by a resolution.
processing fees for the submission and processing of facilities management plans and for any other request made under Section 21.90.100, 21.90.120 or 21.90.140. (c) Whenever written notice is required to be given to property owners under this section the notice shall be mailed
by first class mail to the owners shown on the last equalized
assessment roll.
(b) The City Council shall establish application and
21.90.180 Expiration of chapter.
This chapter shall expire on June 30, 2001 unless it is
extended or reenacted on or before that date.
21.90.190 Severability. If any section, subsection,
sentence, clause or phrase of the ordinance codified in this chapter is for any reason held to be invalid or unconstitutional
by the decision of any court of competent jurisdiction, such
decision shall not affect the validity of the remaining portions of the ordinance codified in this chapter. The City Council
declares that it would have passed the ordinance codified in thi
chapter and each section, subsection, sentence , clause and phras thereof, irrespective of the fact that any part thereof be
declared invalid or unconstitutional.
SECTION 2: The City Council makes the following
’ findings:
1. Since January 1985, the City of Carlsbad has been
undertaking a comprehensive review of the Land Use Element of it General Plan. As part of that review a Council appointed
Citizens Committee prepared a comprehensive report and
recommendation to the City Council. That report was subject to public hearings by both the Planning Commission and City Council
Included in the recommendations of the Citizens Committee were
recommendations that no new development should occur unless
16.
adequate public facilities are available concurrently wit? neec
to serve the new development. -
2. On August 6, 1985, the City Council adopted Interir
Ordinance No. 9766, imposing certain temporary land use controls on property within the City, consistent with the recommendation
of the Citizens Committee. On September 3, 1985, the City Council adopted Interim Ordinance No. 9771 which extended the
December 10, 1985, the City Council approved in concept several
land use proposals not contained in the Citizens Committee report. On January 21, 1986 the City Council adopted Urgency
Ordinance No. 9791 imposing a temporary moratorium on developmen
approvals based on the findings contained in that ordinance. Cn
April 22, 1986 the City Council revised City Council Policy No.
17, based on the findings contained therein. On May 6, 1986 the City Council adopted Ordinance No. 8107 establishing a traffic inpact fee for the La Costa Area of the City. The City Council
finds that all of these actions plus the adoption of Chapter
21.90 of the Carlsbad Municipal Code are necessary to ensure adequate public facilities are available to serve any new development in the City. Without Chapter 21.90 and the requirements imposed by it, adeauate public facilities may not b
available to serve new development or building. Development or
building without public facilities is contrary to the City
General Plan and would be dangerous to the public health and
safety.
3. This action of the City Council is consistent with long standing policies and objectives of the City to ensure adequate public facilities within Carlsbad. This action will protect the public health, safety and welfare of the citizens of
Carlsbad by ensuring safe streets, adequate water, sewer and
drainage facilities, sufficient fire protection and recreation
facilities.
4. This action is consistent with the City's policy to
provide housing opportunities for all economic sectors of the
community, because sufficient opportunities for new housing
continue to exist within the City and Chapter 21.90 does not
affect the number of houses which may be built. In addition, development of housing for low and moderate income persons and
families would most likely occur in areas of the City which are
designated for highest development priority. By encouraging development of inf ill areas first , where the infrastructure is
already existing, the cost of housing may be reduced.
5. Because any new development affects public facility availability it is necessary to impose the fees and charges whic will be used to provide public facilities on any new building in the City. The Council finds that failure to impose the fees and
charges on any new building in the City will adversely affect th
public health and safety by reducing the safety of its City's streets, increasing the burden on water, sewer, drainage and fir
17.
1
2
3
4
5
6
7
0
9
10
11
12
the work program in Exhibit A which is hereby made a part of this
ordinance. The City Council may adjust the work program without
amending this ordinance as they determine necessary to accomplish
effective growth management for the City of Carlsbad.
EFFECTIVE DATE: This ordinance shall be effective
thirty days after its adoption, and the City Clerk shall certify
f I
0 18 I/
20 i j
21 11
facilities, and by overcrowding existing schools, parks and recreational facilities.
18.
I
3
4
5
6
7
a
9
10
11
12
22 i
23
19
20
24
25
I 21 I!
I I
PASSED - AND ADOPTED at a reuular meeting of said citt.
Council held on the 1st day of July , 1986, by the
following vote, to wit:
AYES: Council Members Casler, Lewis, Kulchin, Chick and Pettinr
NOES: None
ABSENT: None
City Attorney
/
U
ATTEST :
A. K- ALETHA L. RAUTENKRANZ, City Cl$rk
27 'I !I
2a 11
19.
CJLRLSBJLD CIT? COUlCfL GROWTH MABAGENXWT PLAlD
-Managing a Respon8ible and Progresaire Carlsbad Putare.
will PLU
I. Citywide Facilities and Improvement Plan
A. Growth Control Mapping and Planning Systems
1.
2.
3.
4.
The General Plan will be utilized as the overall
base map with a maximum residential utilization
i.e. mean density.
A citywide map will show all current and future -
public facilities and improvements. Each public
facility and improvement will also be shown
separately on a citywide map.
A citywide environmental constraints and open space
map will be prepared.
These maps will also be broken down into quadrants
to show greater area detail.
B. Management Performance Standards
1. Establish overall performance or adequacy standards
for each public facility and improvement.
2. Establish thresholds for each public facility and
improvement.
C. Citywide Financing Options
1. Financing options will be identified for each
facility and improvement.
2. Budgeting for citywide public facility and
improvement will be in conjunction with the City's
five year capital improvement budget.
D. Citywide Plan
1. A Citywide Facilities and Improvements Plan will be
prepared using growth control maps, performance
standards and financing options.
-1 -
E. Development of Local facility Management and ~1annlr.y
zones.
1. The 'City shall be divided into 25 specific zones.
2. The size of each zone shall depend upon major
circulation roads, lagoons, property ownership
boundaries, and ather identifiable characteristics.
3. The purpose of zones:
a. Requires landowners to work together in order to
present development plans in accordance with the
City's Growth Management Program.
b. Requires landowners to provide development glans
which adhere to the citywide facilities plan and
to relate development to adjacent zones.
c. Zones allow for greater citizen review prior to
development approval.
4. Each zone will have a maximum residential
utilization i.e. mean density. Specific densities
for individual development plana within the zone,
however, will be controlled through the normal
planning process.
5. Each zone must conform to the General Plan and the Growth Management Ordinance.
11. Facility Management Zone Procesaing
A. Landowners submit local facilities management plans for
procesaing concurrently with normal environmental
analysis.
8. Local facilitiea management plana shall conform to all
standard8 of the Growth Control Happing and Planning
ayatens and other existing City standards.
C. The local plan shall provide a detailed financing plan to as8ure adequate funding of all citywide facilities
and improvements identified in the citywide plan. The
local plan shall also provide a detailed financial plan
for all public facilitiea and improvements located within the local facilities management zone.
All development within the local facilities management
zone will be phased in accordance with the facility and improvement performance standarda.
D. A public hearing on the local facilities management plan
and environmental analyaia will be held concurrently.
Notice to all landowners within the zone as well as
surrounding adjacent zone landowners.
-2-
E. After the public hearing 1s completed on the local
facilities management zone and environmental analysis,
then the specific development plans will be processed 12
the normal method.
p. Each local facilities management plan will be reviewed
annually by the City to ensure that all performance
standards are being met. If they are not, development
will be stopped.
6/13/86
ad
-3-
APPENDIX II.
RESOLUTION NO. 8796
21
'/ 3 FACILITY AND SERVICE PERFORMANCE STANDARDS TO BE USED IY
4 1;
51 WHEREAS, on July 1, 1986, the City Council adopted
6 'Ordinance No. 9808 which established a Growth Management Ordinance
7 for the City of Carlsbad: and
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, ADOPTING MINOR REVISIONS TO THE PUBLIC
IMPLEMENTING THE GROWTH MANAGEMENT PROGRAM AS REQUIRED BY
ORDINANCE NO. 9808 (GROWTH MANAGEMENT ORDINANCE).
I,
I
it
I
WHEREAS, one of the primary purposes of Ordinance No. I1 a
I
9 9808 was to prevent growth unless adequate public facilities and
10 'services to serve the growth is provided when they are needed in a It
and logical way: and
WHEREAS, on July 8, 1986, the City Council adopted the
13 bublic Facility and Service Performance Standards to be used in
14ipreparing the Citywide Facilities and Improvements Plan as part of
11
'I ,
'I
11
15 //the Growth Management Program: and
I' 16 il WHEREAS, these standards are being redefined or rephased
1
clarify the specific meaning and purpose of each: and I
I
I 18 ' WHEREAS, the intent of the original standards will remain
19 intact and that the clarified standards are needed to be able to
20 /adequately determine the timing for public facilities and services
21 kind to assess whether they are being provided in a phased and
I8
22 11 kogical way; and
WHEREAS, standards are needed to provide a mechanism to !I
23 Ii
24 bontinually monitor the adequacy of public facilities and services
25las growth occurs: and
26 11 WHEREAS, Section 21.90.080 of Ordinance No. 9808 requires
I!
I
adoption by City Council Resolution of Performance Standards;
i
!
I
i
i
I,
NOW, THEREFORE, BE IT RESOLVED by the City Council of the
I 2 ilCity of Carlsbad, California, that the Public Facility and ser~ice
3 #;Performance Standards as contained on attached Exhibit .A' are
4 hereby adopted and shall be used in the implementation of
I
If
i;
I, 6'
7ICatlsbad City Council held on the 23rd
8,11986 by the following vote, to wit:
PASSED, APPROVED AND ADOPTED at a regular meeting of the
5 11 ,lOrdinance No. 9808 - The Carlsbad Growth Management Ordinance.
day of September , /I
I/
9' AYES: Council Members Casler, Lewis, Kulchin, Chick and Pettine ii 10 I1 NOES: None
ABSENT: None
I' 20 /I 1;
MARY H.JCASLER, Mayor
14 ;ATTEST: 1,
1511 I 2
16lkLETHA L. RAUTENKRANZ, City C1)rk ,I
21 I/
!I
23 I
24 11
22 1
25 ji
26 ((
-2-
Paci~ity/ScrPice
City Administrative Facilities
Library
wastewater Treatment Capacity
Parks
Drainage
Circulation
Fire
Open Space
Schools
Sewer Collection Systan
Water Distribution System
Standard
1500 square feet per 1,000 population must be
scheduled for construction within a five year
period.
800 square feet per 1,000 population must be
scheduled for construction within a five year
period.
Sewer plant capacity is adequate for at least a
five year period.
Three acres of canmunity park or special use park
per 1,000 population within the Park District, must
be scheduled tor construction within a five year
period..
Drainage facilities must be provided am required by
the City concurrent with development.
No road segment or intersection in the zone nor any
road segmcnt or intersection aut of the zona which
is impacted by development in the zone shall be
projected to exceed a service level C during off-
peak hours, nor service level D during peak hours.
Impacted mans where 208 or more of the traffic
generated by the local facility management zone
will use the road segment or intersection.
No mre than 1,500 dwelling units outside of a
five minute response time.
Fifteen percent of the total land area in the zone
exclusive of environmentally constrained non- ’
developable land must be set aside for permanent
open space and must be available concurrent with
development.
School capacity to met projected enrollment withir
the zone as determined by the appropriate school
district must he provided prior to projected
occupancy.
Trunk line capacity to meet demand as determined
by the appropriate sewer district must be provided
concurrent with development.
Line capacity to mtet demand as determined by the
appropriate water district must be provided am-
current with development.
A minimum 10 average day storage capacity must bs
provided concurrent with davelopatent.
APPENDIX 111.
RESOLUTION NO. 8797
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBA3,
IMPROVEMENTS PLAN TO BE USED WITH THE GROWTH MANAGEMENT
PROGRAM AS REQUIRED BY ORDINANCE NO. 9808 (GROWTH
MANAGEMENT ORDINANCE).
CALIFORNIA, ADOPTING THE CITYWIDE FACILITIES AND
WREREAS, on July 1, 1986, the City Council adopted
I 6 Ordinance No. 9808 which established a Growth Management Program
7,'for the City of Carlsbad; and
8
9 9808 was to prevent growth unless adequate public facilities and
10~Iservices to serve the growth is provided when they are needed in a
ll'iphased and logical way; and
i'
WHEREAS, one of the primary purposes of Ordinance Yo. !I
1 /I
WHEREAS, the Citywide Facilities and Improvement Plan is
I1
12 ii
13'Ithe first phase in the implementation of the Growth Management
14;Program and is needed to set the framework to allow Local Facility
15(panagement Plans to be submitted; and
16 11 WHEREAS, Section 21.90.090 of Ordinance No. 9808 requires
17ltthe adoption by City Council Resolution of a Citywide Facilities
li
//
I I
1;
18 and Improvements Plan;
I
19 I NOW, THEREFORE, BE IT RESOLVED by the City Council of the
20 /City of Carlsbad, California, that the Citywide Facilities and
dlmprovements Plan as contained on attached Exhibit *A* is hereby
22 lidopted and shall be used in the implementation of Ordinance No.
23 9808 - The Carlsbad Growth Management Ordinance.
24' I( ///
25 IT///
I
I/
11
I
27 26 //// v///
28 il////
I I
i i
I
~ I
I
I I !
i 1
I
I
I
I I
I
I i
I
4~
I/ I1
I AYES: Council Members Casler, Lewis, Kulchin, Chick and Pettine
MARY H,,/ CASLER, Mayor
jl I
-2-
I
APPENDIX IV.
RESOLUTION NO. 8’98
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
THE LOCAL FACILITY MANAGEMENT PLANS IN CONJUNCTION WITH
THE GROWTH MANAGEMENT PROGRAM AS REQUIRED BY ORDINANCE
NO. 9808 (GROWTH MANAGEMENT ORDINANCE).
CALIFORNIA, ADOPTING GUIDELINES FOR THE PREPARATION OF
WHEREAS, on July 1, 1986, the City Council adopted
I, I1 6 ‘Ordinance No. 9808 which established a Growth Management Program /I
the City of Carlsbad; and
g I/ WHEREAS, the Citywide Facilities and Improvements Plan
9,’has been completed as the first phase in the implementation of the I?
I
/I 1OIiGrowth Management Program; and
WHEREAS, the second phase of the Growth Management 11 !I 11
I
12i.r.g”. will be the preparation and submittal of the Local
13;bacility Management Plans for each of the 25 zones; and
I
WHEREAS, Section 21.90.150 of Ordinance No. 9808 allows
I
15‘/for the adoption of certain guidelines to assist in the
16 ,;implementation of the Growth Management Program;
17 NOW, THEREFORE, BE IT RESOLVED by the City Council of the
18;City of Carlsbad, California, that the Guidelines for the
19 ‘Preparation of the Local Facility Management Plans which are
20 /Incorporated in the Citywide Facilities and Improvements Plan are
‘I
I!
ereby adopted and shall be used in the implementation of
22 Iprdinance No. 9808 - The Carlsbad Growth Management Ordinance.
21 ip
23 p/
24 lY///
26 It !v///
‘I
25 I?///
27 I>/// ‘I
I
6 I’ ‘i
II 7 li
11
l2
13
PASSED, APPROVED AND ADOPTED at a regular meeting of the
Carlsbad City Council held on the 23rd day of September ,
1986 by the following vote, to wit:
JALETHA L. RAUTENKRANZ, City C\erk 1 I(SEAL)*
1
AYES: Council Members Casler, Lewis, Kulchin, Chick and Pettine
8 I!
[ATTEST: 9 I!
NOES: None
ABSENT: None
J,. e/. La.,_
19
MARY Hd CASLER, Mayor
20
21
22
23
24
25
26
27
28 -2-
APPENDIX V.
I
I
1 ,/ RESOLUTION NO. 8799
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, ADOPTING A LOCAL FACILITY MANAGEMENT FEE AS
1:
41 1
2 /I
3 AUTHORIZED IN ORDINANCE NO. 9808 (GROWTH MANAGEMENT
ORDINANCE).
WHEREAS, on July 1, 1986, the City Council adopted I' 51
6
/,Ordinance No. 9808
llfor the City of Carlsbad; and
11
has been completed as the first phase in the implementation
(process of the Growth Management Program; and
which established a Growth Management Program
WHEREAS, the Citywide Facilities and Improvements Plan
8
9 I'
10 I1
WHEREAS, the second phase of the Growth Yanagement
program will be the review and evaluation of Local Facility
lranagernent Plans as they are submitted for each of the 25 zones;
'and
11 11
12 /I
13
14 ' 11
15 11 WHEREAS, the review of the Local Facility Management
!blans will ensure adequate public facilities to serve the growth 16 ij
!uhen they are needed in a phased and logical way to comply with 17 11
the adopted performance standards; and 18
19 '4
20 1:
WHEREAS, the funds required from this fee will be used in
[relation to the cost of staff time, materials and supplies used,
II :and specific consultants costs necessary to review the Local 21 I/
ikacility Management Plan; and 22 /I
WHEREAS, the fee is established as a standard estimate 23
241blan, although, additional funds may be required or those funds
remaining following the review and approval of the plan will be 26 I:
refunded to the plan preparers;
phe anticipated costs of reviewing a Local Facility Management
25 I
27 I
I//// 28 I/
of
41
13
14
I
NOW, THEREFORE, BE IT RESOLVED by the City Council o€ the
15
16
NOES: None
ABSENT: None
17 IkTTEST:
l8 &&?L i( RdA 19 ALETHA L. RAUTENKRANZ, City Clebk
20
21
22
23
24
25
26
27
28
SEAL)
-2-
I
t
i I
I I
!
I
i
! I
i j
I
I
I
I I I 1 I
1
1 !
I
I I
I i
1
I
I !
i
APPENDIX VI.
1' jl ii
12
!I I
3
II
rowth Management Program; and
WHEREAS, the second phase of the Growth Management P I program will be the preparation and submittal of the Local
RESOLUTION NO.
23
24
8800
ontingencies Account.
///
///
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSRAD,
CALIFORNIA, DIRECTING STAFF TO PREPARE THE LOCAL PACILI?Y
MANAGEMENT PLANS FOR ZONES 1 THROUGH 6 AND APPROPRIATING
$25,000 PROM THE GENERAL FUND CONTINGENCIES ACCOUNT IN
PASSED, APPROVED AND ADOPTED at a regular meeting of the
day of September , 2 il i,Carlsbad City Council held on the 33rd 3 !I
111986 by the following vote, to wit:
4 11 I AYES : Council Members Casler,
NOES: None
ABSENT: None
21 11
I
Lewis, Kulchin, Chick and Pettine
7 I' !I 8 ii
I/ 9l
10 iJ
1kTTEST :
l2 ii( SEAL)
13 I !I
14
15 //
16 I'
I/
17 11
II
,I
25 1,
-2-
!
I
I
I
! I
I
!
I i
I
I !
I
I
I
1
i I
I
!
! I i I
I
I
I j
I I
I
I