HomeMy WebLinkAbout; ; Pacific Coast Shoreline Carlsbad Recon Report; 1994-01-01 (2)US Army Corps
of Engineers
Los Angeles District
RECONNAISSANCE REPORT
PACIFIC COAST SHORELINE, CARLSBAD
SAN DIEGO COUNTY, CALIFORNIA
INITIAL PROJECT MANAGEMENT PLAN
U.S. Army Corps of Engineers
Los Angeles District
300 North Los Angeles Street
Los Angeles, California 90053
January 1994
TABLE OF CONTENTS
PURPOSE AND SCOPE 1
DESCRIPTION OF THE STUDY AREA 1
FEASIBILITY STUDY COORDINATION 1
WORK TASKS AND RESPONSIBILITIES 2
FEASIBILITY STUDY MANAGEMENT 29
PLAN FORMULATION 30
PUBLIC INVOLVEMENT 31
COASTAL DESIGN 31
COST ENGINEERING 32
ECONOMIC STUDIES 32
ENVIRONMENTAL STUDIES 33
FISH AND WILDLIFE STUDIES 34
CULTURAL RESOURCES STUDIES 35
REAL ESTATE STUDIES 36
INSTITUTIONAL STUDIES 36
REPORT PREPARATION 37
ORGANIZATIONAL BREAKDOWN STRUCTURE (OBS) 37
RESPONSIBILITY MATRIX 37
FEASIBILITY STUDY COST ESTIMATE 55
FEASIBILITY STUDY SCHEDULE 55
COORDINATION BETWEEN THE CORPS AND THE SPONSOR 55
STATEMENT OF CERTIFICATION 58
APPENDIX A: FEASIBILITY COST SHARING AGREEMENT
LIST OF TABLES
TABLE 1. PROJECT MANAGEMENT 39
TABLE 2. COASTAL DESIGN SECTION 40
TABLE 3. COASTAL RESOURCES BRANCH 42
TABLE 4. ENVIRONMENTAL RESOURCES BRANCH 45
TABLE 5. COST ESTIMATING BRANCH 47
TABLE 6. ECONOMICS SECTION 48
TABLE 7. REAL ESTATE DIVISION 50
TABLE 8. GEOTECHNICAL BRANCH 51
TABLE 9. CITY OF CARLSBAD 52
TABLE 10. PROGRAM DEVELOPMENT BRANCH 53
TABLE 11. COST PER FISCAL YEAR 56
TABLE 12. MILESTONES 57
LIST OF FIGURES
FIGURE 1 WORK BREAKDOWN STRUCTURE ............... 3
FIGURE 2 PERT CHART ...................... 4
PURPOSE AND SCOPE
The purpose of this Initial Project Management Plan (IPMP) is to
establish a program to conduct the Feasibility Study for Pacific
Coast Shoreline, Carlsbad. This includes identification of work
items, effort required, schedules, and estimates of the cost and
funding schedules, and assignment of organization responsibilities
required to complete the feasibility phase of the Pacific Coast
Shoreline, Carlsbad Study. The feasibility study will contain
sufficient engineering and design to enable further refinement of
project features, prepare the baseline cost estimate, develop a
design and construction schedule, allow design on the selected plan
to start immediately following receipt of PED funds, and allow the
project to survive PED without need for reformulation, GDM, or
post-authorization changes. In order to clarify cost-sharing
responsibilities, the study obligations of the Corps of Engineers
(referred to as "The Corps" hereafter) and the non-Federal sponsor,
The city of Carlsbad (referred to as the "Local Sponsor" hereafter),
are identified in accordance with the Water Resources Development
Act of 1986 (WRDA, 1986).
DESCRIPTION OF THE STUDY AREA
A detailed description of the study area and the alternatives
examined for storm damage protection is contained in the
reconnaissance report. The feasibility study will focus on plans
found to be feasible and in the Federal interest for Reach 3 in the
City of Carlsbad. This includes providing storm damage protection to
Carlsbad Blvd and parking areas, and incidental recreation along the
area between the Agua Hedionda jetties.
FEASIBILITY STUDY COORDINATION
The feasibility studies will be managed by an Executive Committee
and a Study Management Team, as provided in the agreement. The
Executive Committee will be comprised of the District Conmander, the
Deputy District Engineer for Project Management, and Chief of
Planning, Los Angeles District, Corps of Engineers, and
representatives of the City of Carlsbad. The Executive Committee
will oversee the overall study by maintaining a working knowledge of
the feasibility study, 2) assisting in resolving emerging policy
issues, 3) assuring that evolving study results and policies are
consistent and coordinated, 4) directing the Study Management Team,
and 5) ratifying decisions made by the Study Management Team. The
Study Management Team will also ensure that the approved IPMP is
followed, the study schedule and budget maintained, and appropriate
policies and guidelines are followed.
The Study Management Team will consist of a Corps Planning
Manager, a Corps Project Manager, and a designated Study Manager
from the city of Carlsbad. The Study Management Team will oversee
the studies to ensure the establishment of desired mutual roles,
interests, and study objectives. The Study Management Team will
implement overall direction of the study provided by the Executive
Management Committee and work to ensure that Corps policy, Local
Sponsor objectives, and the framework provided by the IPMP is
followed. In addition, the Study Management Team will make sure
that the study schedule and budget are maintained, that sound
technical judgement is followed, and that multi-disciplinary studies
and decisions are made in accordance with applicable guidelines and
policies. The Study Management Team will ensure that adequate input
to the study process is received from the appropriate Federal,
State, and local agencies, interested organizations and individuals.
WORK TASKS AND RESPONSIBILITIES
The Pacific Coast Shoreline, Carlsbad Study will concentrate on
the storm damage protection alternatives described in the
reconnaissance study with the focus on formulating and optimizing
the alternatives. The feasibility study will include the following
study tasks which are reflected in the Workbreakdown Structure shown
in Figure 1: public involvement; environmental studies; study
management; institutional studies; plan formulation; economic
studies; coastal engineering and design studies; survey and mapping;
cost estimation; fish and wildlife studies; geotechnical studies;
cultural resource studies; real estate studies; report preparation;
and review. Study progress and intermediate results will be /-
reviewed and approved on a quarterly basis by the Executive
Committee. Actual meeting dates will be negotiated and agreed upon
at the first Executive Committee meeting. At the beginning of the
study, Engineering Service Requests (ESR's) will be issued by the
Study Management Team detailing specific study tasks, funding,
milestones, and the form and detail of the expected product. The
study Management Team will finalize a critical path network
detailing the start and finish times of each study element, in
conjunction with the actual funding schedule.
Figure 2 presents the Pert Charts laying out the Study Program
including major feasibility study tasks and the responsibilities for
accomplishing these tasks as well as schedule and cost. At the
beginning of each task, the non-initiating agency, either Corps or
Local Sponsor, may review any planned work or contract of the other
for adequacy. At the completion of each task, the non-initiating
agency may review and approve the results of the work before it is
considered complete. Review and assessment of the adequacy of the
work will be accomplished by the Study Management Team and its
technical staff. The term. "In-Kind" is defined as those tasks
completed by the local sponsor in substitution of a cash
contribution.
HEADQUARTERS WORK STRUCTURE
; lily He ton '.j le»el 5
!xr»i
H"'"
1
,«.».
I";1""
f 'unfits
I V r(D*IC*L
CR ...*«<«'
IU •*'
ttCIM.STUOltt «
mu
M
_u«'
- HOC
UHH
uuo
- UUf
_ w«ir
UUf
It OKUC'tl
H III4II PlM»l«
••MM"
4C
•lt«H Of (•<•'
M
1
M
WltS tfMtltii
•CH tftiri
. u«tt
uurt icMiino*. uriUlCO
ttt OM
. Tl ICDtstm
LUK.
Lid 0* VO•»
SS1"
nu«ci i OPTION
- aits
or
HL or>c* mt n
. UIO*
itft
\\
10
KttlHI
U1(U
C«W«{*(I VICIH
•IMIITum
IUK
tit ox rutti* or MI
ttlOO
XOWIMTItMDOCtMHTI MIN *TMflatciuaioc
nttt ua ikMiri
CHWIUIIOM tff
uior
- UlDt
Nt Hid UTII
. IWtH
MtMDUtiieit*c'in » 'BiteKiin M
an
KIM/*** HtllNlHUr
IttflVCMl
. UUI
. UUI
tminunai
. vuo
cu
onu
»
ii
UiO'f/
au
|t| «jiT(r ntiD
suit
MCSIW»ii» orritfi
ritnM !•• till
ID* K»0»f
Bill OLtCIIOH UC
Uiro
cu.tuu«. Kuuicts
•cuuctt. tnaift/ttwt
»r (vn
K
rt unit in l'iB>
CM' ttd't'l tMiK^
. UUI
. UtU
toe en* isn»ms
UUC
UI COIt ISUV1TIivMtn
ItMO CHI ISMwriimm
CKI tllUiU l«HIi
iKUtlt. aiu
iti
UIClIK lULU OKltO
, auM
«IICI V »\*IC
•iwtts or run it
. Ut*
.!«'
wwa
iu er<» PUM.IC
. auc
«„„/.,».VI
u
1*1 ft It
u
•twttt v'It! II It I" *f'il*
•UK.lt
U4JI
«HU
MUCI UIDMCI
UUC
riuimm <c»o*t
ttUO
fli**
HUOIlt/1<"fS|lttilD'
HI (MI Kit to* «n
1UOI
•a »ix«
[nlHMHHtll
. OOCUOUMOH
PACIFIC OUST SHORELINE. CARLSMAD fEnsrmi ITY pit
Z5-J*n-l»»4 2»-J*n-l»94 1 do. 00 D» V
FINAL RECON REPORT TO 1 SPDSPD 1 SPD REVIEW OP1 RECONNAISSANCE REPORT
40.00 Oy« >PH
NEGOTIATE IPHP * FCSA
0.00
— J| ,,c IIII II
T-M»r-l»»«RECONNAISSANCE REVtE*co»rt»tNcE
pi?00""'
APPROVAL Or IP HP 8Y CORPSAND CITY
0.00
. , 1 II I'20 00 DT» V 4 - Apr- 1 994
HO HQ CETFIES RCCON REPORTHCADqUARTCRS REVIEW OF AND FCSARECON REPORT
o no
10 00 Oft *
PH
COORDINATE SIGNING OFFCSA0 00
z-M*r-ie»4FCSA SIGNED AND
TRANSMITTED TO SPD
r*cirir COAST sn
CO.OO Off 1
PM
OBTAIN FEDERAL AND LOCAL
SPONSOR PUNDS FOR PY
0-00
FART-RECPT CM '
PREP POR STUDY. SET UPACCOUNTS, ISSUE ESWS»00
(GEOTtCH BAn |
130.00 fry* •GEOTECHCONDUCT DATA RCVK* ANDPttLD SURVEYS POR BEACH*15.00
DEVELOP f ITHOUT PROJECTCONDITIONS10.00
io.o! Ry* 1REALESDEFINE REAL ESTATE
OVNERSHr AND VALUES IN
3.00
CM
ARRANGE PUBLK MTC.MAILINC LIST. REPORTERS
1000
i&.bb oV» 1
ENVLANDUSE. RECREATION. ANDAESTHETIC BASELINEl.M
ENV
CONDUCT COORDINATION MTC• ITH AGENCIES300
4 00 B *• 1ECONCOMPLTU ECONOMICBASELINE or STVDV ART A
ttl*'l. OIKKINT10 W
.,, | \ ,'to. oo DTI > 1000 DM •GEOTECH ENVTESTING OP DORRO* SITE CONDUCT ELUTtttNT TESTINGOP DORRO* SITEtS 00 10 00
j 1 | mmmm _llBl tffft \' r" 1 110 W> 5ya • io 60 67* 1CRB CRR
PREPARE PUBLK NOTKE AND PREPARE POR PUBLKOTHER LTRS MEETING3 00 3 00
ENV ENV
FtTH AND VILDLrE SEW VICEPLANNING AID LETTER ID 005 00
10 00 Dr* *ENVAIR AND NOISE BASELINE
300
TbO Sy*"ENVCULTURAL RESOURCE STUDIES
OP BEACH *BORRO* INCL MA1000
«t^o Dr« 1
ECON
DEVELOP RECREATION MODfLTrt Pit INE DEMAND' * NICD10 00
«*>»-• t»tr' I''A-:.I.
ritrv fjitiHfLW! *V'tH'nt M'i:>>; yii.ivtUM t n*N*.t •C»*N':r, Ar'LMHCNT BI'HCI.TK- (-0 )(• K>
J *ATCR O.UAL 1
0.00 Dja W
WATER O.UAUTY STUDIESINCLUDING RESULTS OP ELU300
PUBLIC * OKI: SHOP * NOI roR
EIS
ENV ' • "ENDANGERED SPECIESBASELINE3 Mt
f. (•(•
-I ENV BASELINE I
5.00 Dy» •ENVPREPARE ENVIRONMENTAL
BASELINE * DCF ENV PROB*S 00
XH Oft byi •
CRBRECEIVE AND SUMMARIZEPUBLK COMMENTS
3 00
-
*
1-ii.l.r -^.u .. 1...« . |_
f ? ll!>»Att.~ IOH \*!'|:-t; - £*'" 1
10 (•(• 1
ruin r OUST •
«0 00 I
COASDES'CONDUCT SURVEYS AND
COMPILE SURVEY DAT*1060
PM PH
MANAGE AND REPORTING MAN!
*rilEDULE*C03Tfl * M'DCFT SCHfto oo
n4 (>t> by* i in-
CITY CITYCITY MCM1 OF COSTS. CITY
30 00
CRB CKRCOORDINATION AND REVIF* TECH
«c.oo
..H H> fit. * it.i- (
|fi 00
—.«.« f .... ...... ., 1
I I
PM
to oo
CITYMCMT INTIND SERVICES CITY
IS 00
1 1 rrni| 1
C*hHCT Of «nRt:. TECH
II' t*
to oo
MCMt 1Nt;lND SERVICES
t«.MCETINC3.COORDlN»^ oo
I1
MCMT or •o«i:
10 (•(•
$i\ rtt.n.:>iv
|M>(* 10 (•(•
f
f EiSRPT
5 oo DT» •
CUDDEFINE PROBLEMS ANDNEEDS3 00
5.00 Df« •
CRDDEFINE PUNNINCOBJKCTIVES AND EVALUATK)
3 00
V f
•ivitt MUiiim »M> r»tp»«e r-j «cro»T5erSt "ttRNMivt pu«3 00 ' »»
.w- [>>•
ECON
TOTAL DAM*CES BY EVtNT
AND AVERSE ANNUALS I'P
I (> IK> D> • *
ECONPREPARE DPT ECONOMIC*APPEND!!
ECONDEVELOP fUEQ DAMAGE
ANALYSIS IHCL EMEfcCtNCY3 OO
1000 DTI > »-M*r-IMS 10.00 D?i tSPB DIVISION CHECKPOINT 1 CRBSPD REVIEW OP r-3 REPORT REVISIONS TO RESPOND TO
SPD COMMENTS0 00 3 00
5.00 Djl V
CRBPREPARE AND PRESENT F-3CONFERENCE
5 00
40 00 67* WCRBDIRECT DEVELOPMENT OF
ALTERNATIVE PUNS ANB AS1000
10.00 Qjm WCEOTECH
DESIGN FOUNDATION *BORRO*SITE'PREPARE DPT APPEND)10.00
5.00 Dy* •COASDESUYOUT ALTERNATIVE PUNS
5 00
5.00 Oy» •COSTESTPREPARE COST ESTIMATE FORALTERNATIVE PUNS5.00
COASDEs' COASDES COASDESDEFINE IITH PROJECT RUNUP DETERMINE «ITH PR01CCT DESIGN ALTERNATIVE PUNS
500 300 1000
f • BBAI ft T t1 |H f>(i Bv* «CCON•ITM PROJECT STORM DAMAGEBENEFITS3 00
5.00 Dfi I
ECONRECREATION BENEFITANALYSIS300
4 "|
|
ZCi Of> Djr« •
ENVENV IMPACT ANALYSIS OFALTERNATIVE PUNS500
i
10.00 OCOASDESDEVELOP TOTAL PffiST COSTAND MAINTENANCE COST TOMft 00
3.00ICONBCONOHK ANALYSIS OfALTERNATIVE PLANSI 00
S.OO Of* VCUB
EVALUATE ALTERNATIVEPUNS COSTS. BENEFITS, I300
20.90 Dy» vCUBMftCCt REFINEMENT OP
PINAL PUNS AND HtTICATt900
PREPARE DRAFT PROJECTMANAGEMENT PUN1000
3.00 DT» *COASDES
UVOUT FINAL ALTERNATIVEPUNS
COMPLETE DRAFT SCHEDULEAND COST fOB PED AND CON10.00
ft.00 Dy« *COASDES
RUNUP ESTIMATES »ITNALTERNATIVE PUNS3 00
\ • PRO! DAMAC 1 DES FIN ALTS
3 00 D). ICOASDCS•ITN PROJECT DAMAGEESTIMATES
300
COASDES
DESIGN FINAL ALTERNATIVEPUNS300
I DH COA5 APR
100 Dr* *ECONRECREATION BENEFITS
REAL ES COST
' ft 06 6T. *—'REALCSDEFINE REAL ESTATEREQUIREMENTS AND COST FO
J RKAL E3 Al>P i .......
S.60 Dy« *RCALESCOMPLETE DRAFT REALESTATE APrCHOII
5 (•('
40 00 Djr» IENVf*»L DRAM CAR
5 00 Djra •tKVDRAM 404 (B)(l) EVAL ENVDRAFT COASTAL CONSISTtNCYDCTtRHINATION3 00
P*|« t S
1 ECON ANALYl \ rw EVAL PLS
J FIN COST EST
COSTtST
COST ESTIMATE FOR FINALALTERNATIVE PUNS3 00
1 MCACES EST L—-
I60P Dy» *COSTEST
DFT MCACES ESTIMATE
5.66 fry. 1 '«COMECONOMIC ANALYSIS OTFINAL ALTERNATIVESt 00
I DFT ICON APP l-
10 00 DT» •
CCON
DRAFT tCONOHICS APPENDIX
I DFT COST APP t
10 06 0V* *"COSTEST
DRAFT COST APPENDIX
5,00 &r> fCM
EVALUATt PUNS TtADKOPrs.NED PUN. E4 PUN. LOCAL300
.
CUBSELECT RECOMMENDED PUNAND DESCRIBE ALL REQUIRE300
j DEP COST SH
4.60 (y^b
CRB
DEFINE COST-SHARINGRE4VIEMENTS FIRST COST A3 PO
.CRBDEFINE LOCAL COOPERATIONREQUIREMENTS3 00
-I DPT A4 COW L-
1 )
(
-1 PRE CONftREC 1 ...
3.00 DVB VCRDPREPARE PREL CONCLUSIONSAND RECOMMENDATIONS
300
CRB SPD DIVISION CHECKPOINT 1COMPLETE PRELIMINARY SPD REVIEW PREL DFTDRAFT REPORT AND SEND TO REPORT
1000 000
LJ PREP P-4 CON
5.00 Of* •
CR*PREPARE AMD PRESENT F-4
CONFERENCEa.oo
10 OO Oyu •CRt
REVISIONS PER SPDCOMMENTS300
5.00 Dy» •ECONREVISIONS TO DFT APPENDIXPER SPD COMMENTS300
H I
10.00 Dr» wENY
FINALIZE DRAFT EA
3 OO
COASDES** COASDES™ COASDES*"OESKN OF RECOMMENDED CONSTRUCT ABILITY AND 0*M FINALIZE DFT COASTALPLAN ANALYSIS APPtNDIK
1000 30O 300
REALCS PNPREPARE REAL ESTATE PLAN FINALIZE PfT PMP SCHEDULE
t 00 ft (.0
4 1
r
REALES '*DRAFT REAL E>'1»TE
APPENDIX
r ( )
ZO.OO DT» •
CUBPREPAKt FINM, DRfcFI
REPORTID 00
c!iV "'* *OBntKi MVIII >m>conRtctiom or omrt in «w> «n» »e»it» or»»»TT uron
ncHHiai ntvrewcoxrimwi ritswum MVBIcoMrt»ti«t £"!„_... .. ......i.<-MtKirin m FUTMIIK
ntrut roil nc tm me
PMSCNTATWHS• 00
I FIN »rt rur
1(< (.(• !>*• «
MNAiizr DRAM PHP
» 00
to co DCUBPREPARE REVISIONS Pin PCM
GUIDANCE500
8.66INV
FINALIZE DTT EA FOR PUBREV INCLUDE RESp TO PCM
10 00CM
PINA1.IZE DRAFT REPORT FORPUBLIC REVIEW5 00
CR§
PREPARE LTRS, MTCARRANGEMENTS fOR PUBLIC19 00
| FIN CEOT APP I—" -••
10 oo Dy» •cconcHRESPOND TO PCM
COMMENTS *f INILIIC CEOTEC
300
t FIN ECON APP
.REAJ.ES
FINALIZE REAL ESTATEAPPENDIX
t 00
J FIN COST APP [ •• .
10 b(» Ov» •COSTESTFINALIZE COST APPENDIX
—I FIN F»«LCAR j—
ENVFINAL F»
REPORT
10 00 ICR»
PREPARE POR PUSUC
MEETIHC100
I 00 Dp* ICRBHOLD PUiLIC MCCTIHC
15 00
CRBRECEIVt AND RESPOND TO
PUBLIC COMMENTS&00
J COAS CONSIST
Pi nj*. I FFA<!RI'T
20 00 t>y* "
CRBPREPARE PINAL REPORT
IS 00
1 .... ......... 1J 1to oo Or* •ENV
PINAL EA INCL RESP TOCUTS * PONSI»00
10.00 OT» • 10 oo Dy. * 4 oo DT« •CRB CRB CRBDISTRICT REVIEW OP PINAL CORRECTIONS TO PINAL PRINT PINAL REPORT
REPORT REPORTS 00 5 00 10 00
t4-lMl-ltM 2000 DT« •SUBMIT PINkL REPORT TO SPDSPD SPD REVIEW OP PINAL
REPORT0 00
RESPOND TO COMMENTS PROM PREPARE DE NOTICE
5 00 * OP
l'.t>f" 1 FtASRrt
Ojm
PREPARE PIML RESPONSES
TO WLRC ASSESSMENT
1000
10.00 ICRPmrua ro«
-1"1"0,..
O
10 00 t
PREPARE CHIEFS REPORT
ASAPREPARE AS* REPORT
FEASIBILITY STUDY MANAGEMENT
This task will be accomplished primarily by the Corps, in
coordination with the Local Sponsor. It includes all management
activities, in accordance with current guidelines outlined in ER
1105-2-100, ER 5-7-1, and EC 5-1-48. This includes study sched-
uling, providing detailed information for the work done for others,
issuing Engineering Service Requests (ESR's), establishing study
milestones, developing networks to include work activities, task
schedules, critical path networks and funding schedules, directing,
monitoring, and modifying assigned work items and funds as required
and agreed upon by the Local Sponsor, reviewing results and reports
provided by the technical support staff, budget preparation for
current year and out years, correspondence, report preparation and
review, inter-organization coordination, conference preparation and
presentation, point-of-contact responsibilities, and the development
and negotiation of the LCA, MOA' s and other customer agreements.
Periodic meetings will be held between the Corps and the Local
Sponsor to report on the status of the study and possible in-kind
services. Monthly status reports covering selected financial and
performance measurements will be provided by the Corps. Study
Management Team meetings will be held on a quarterly basis, or more
frequently if necessary.
Study management will ensure that all required tasks and
coordination are performed, resulting in the production of a quality
feasibility report document. Study management will maintain
coordination with the multi-disciplinary study teams to ensure
effective and timely decision making. Study management will monitor
the scope and progress activities of study to ensure that the study
remains on track, within budget and on schedule, and that any
potential impacts on scope, schedule and cost are fully coordinated
with the Executive Committee and resolved.
If the feasibility study results in a plan recommended for
Federal participation, the plans and procedures required for project
implementation will be defined by a Project Management Plan (PMP).
The PMP will include any monitoring requirements and model testing
needs and the coordination of O&M studies that need to be completed.
Management activities will also include coordination and
documentation of all MCACES estimates and revisions to these
estimates. The Project Management Plan (PMP) will cover tasks,
schedules, costs and management framework and direction for the
project through construction.
Budgetary management responsibilities include tracking and
documenting the funds and budget (accounting) of the study,
document appropriations, interpretation of current and future
budgetary guidance; submittal of project data sheets and justifi-
cation sheets and other testimonial fact sheets as required; monitor
and reprogram study funds; execute current year and future funds ;
processing schedules of monthly obligations and expenditures;
29
monitor project financial performance; assess District manpower
allocations versus available funds; set up and document all cost key
accounts, and review of pre- and post-labor reports.
PLAN FORMULATION
This task will be primarily a Federal responsibility, with
input from the Local Sponsor. Plan formulation will be in accor-
dance with ER 1105-2-100, P&G, NEPA, and other pertinent
engineering, environmental, and economic guidance and regulations.
Plan formulation will identify the National Economic Development
(NED) Plan and its corresponding level of protection. The report
will identify and evaluate the locally preferred plan, if different
from the NED plan, and a higher level of protection plan if it is
determined that there is an overriding reason to recommend one which
offers a greater level of protection. Plan formulation also
includes reviewing and refining the plans selected for study during
the feasibility phase and other plans developed during the course of
study, and developing required plans such as the "no action" plan
and various non-structural plans. This task includes identifying
the NED plan, considering any environmental impacts and the views of
the public, and formulating mitigation measures. The costs and
benefits associated with each plan will be determined, and trade-
offs required to select the recommended plan for implementation will
be identified. Plan formulation includes application of
engineering, economic, environmental, and other criteria to the
specific problems, needs, and constraints of the study area to
develop and analyze various methods, measures, and plans and their
contributions to, and effectiveness in addressing the specific
problems. It is an iterative and constant review process that
requires team participation and constant review, reformulation, and
public support. Critical to the process of plan formulation will be
the development of the without-project condition as a basis for
comparison and evaluation of alternatives, and the recommendation of
any key project features and/or related mitigation requirements.
Plan formulation will also include an evaluation of advance
engineering and construction plans for applicability to Section 104
credit.
The annual and periodic activities and responsibilities for
operating and maintaining (O&M) the completed project will be
described and closely coordinated with other requirements (e.g. cost
estimates and environmental monitoring). The general magnitude of
these activities will be described for all alternatives in detail;
however, more detail will be provided for the alternative(s)
recommended for implementation. All requirements of 33 CFR 208 and
other Federal regulations specifying operation and maintenance
requirements will be clearly described so that the Local Sponsor's
future responsibilities will be known.
30
PUBLIC INVOLVEMENT
Responsibility for this task will be shared between the Corps and
the Local Sponsor, with the Local Sponsor performing most of the
work. This task primarily consists of coordinating the study scope
and results with the public; conducting public meetings and
workshops; and responding to public inquiries. Also included is
preparation of a public involvement plan upon initiation of the
feasibility study. This plan will guide activities throughout the
study .
The Corps will provide the Notice of Initiation of the
feasibility study, provide public information summaries toward the
end of the study, assist the Local Sponsor with local coordination,
prepare and conduct the final public meeting, and provide necessary
local, State and Federal coordination for the study.
The Local Sponsor will be responsible for hosting public
meetings, completing follow-up documentation and maintaining mailing
lists.
COASTAL DESIGN
The design task will include preliminary design, final design,
and cost estimate of the alternative plans.
The work includes design and cost estimates for the shoreline
stabilization and protection measures, environmental mitigation and
protection features. Also, a detailed analysis of the prevailing
coastal processes will be performed to determine the wave climate,
revise the sediment budget, perform hydrographic and topographic
surveys, and model shoreline change.
Preliminary construction procedures, construction sequencing,
operation and maintenance analysis, and water control and dust/noise
suppression plans will be developed. Construction hauling routes,
access and staging areas will be identified. Constructibility
reviews with USAGE construction elements will be conducted.
Preconstruction engineering and design and construction schedules
will be prepared.
Work will also include preparation of materials, including text
and plates, for inclusion in the appendix summarizing the coastal
processes and design studies, assisting in plan formulation,
in-house report review, response to comments, support to the Study
Manager and others during the study phase, and preparation of work
and cost estimates for the Project Management Plan. Activities for
the design work consist of the following:
31
COST ENGINEERING
This work will be accomplished by the Corps. Detailed first and
annual baseline costs, including operation and maintenance and
replacement, will be developed in the MCACES format. The estimates
will be prepared in accordance with EC 1110-2-538, EC 1110-2-263,
"civil Works Construction Cost Estimating", and EC 11-2-157, "Fully
Funded Estimate". A detailed basis of estimate and sensitivity
analysis will be developed. All estimates shall be prepared as both
first-cost (existing prices) and fully funded COSt.
ECONOMIC STUDIES
This element will be accomplished by both the City of Carlsbad
and the Corps. The work consists of evaluating inundation damage,
emergency/clean-up costs and revetment damage to Carlsbad Boulevard
fronting Agua Hedionda Lagoon for both with and without project
conditions. Detour time must also be determined. Parking
constraints and a regional recreational model must also be
developed. The economic data prepared during the reconnaissance
report will be used to its full extent when such data is consistent
with feasibility report requirements.
The extent of wave run-up influencing inundation damages to the
roadway and revetments along Carlsbad Boulevard fronting Agua
Hedionda Lagoon must be established in order to accurately calculate
the extent of roadway damages for a given event for both with and
without project conditions. The elevation-damage relationships will
be provided by Coastal Engineering. Using the EAD program, the
Economic Section will perform annualization of the elevation-damage
relationship.
Detour time required to travel the detour route at different
times of the day and during varying seasons. Detour time and
mileage will be obtained during a site visit.
Damages to Carlsbad Boulevard and the Tamarack parking lot will
be based on historical clean-up of sand debris deposited on the
roadway and emergency repairs to the parking lot.
Economics Section will perform survey and analysis to determine,
whether a parking constraint exists in relation to beach
recreational use. The survey will ask selected beach users on peak
days their parking location. Additionally, using aerial or street
mapping, the Economic Section will evaluate the total number of
parking spaces available.
In accordance with current policy, a regional recreation model is
required, since beach visitor days are expected to exceed 750,000
annually. The task includes definition of recreational market
32
creation of survey, survey mailing or personal interview,
determination of valid sample size, creation of database,
coordination of sample size and survey with IWR personnel, data
analysis, and benefits determination.
ENVIRONMENTAL STUDIES
Feasibility study tasks include collecting environmental data
that define existing and future (without project) conditions. The
various alternatives will be evaluated in detail, and potential
environmental impacts, environmental commitments, and mitigation
features will be identified. Most work will be performed by the
Corps, but some work will be contracted to the U.S. Fish and
Wildlife Service (USFWS), or to a private firm.
The Environmental Evaluation (EE) prepared in the reconnaissance
phase will be expanded into a Draft and Final Environmental Impact
Statement (EIS). Resource agencies and organizations will likely
view the construction of groins or breakwaters as a significant
impact, especially outside of an existing harbor. Potentially
controversial issues include impacts to biological habitat,
recreation (surfing), and aesthetics. The EIS will evaluate the
environmental effects of the alternative plans. This report will be
coordinated with Federal, State, and local governments and agencies
as well as interested groups and individuals.
If necessary, a plan will be developed for fish and wildlife
resources mitigation. Any land required for mitigation will be
identified. A monitoring plan would also be developed to record the
success of the mitigation measures. Monitoring of sensitive
habitats, especially the lagoons, may be required during
construction. The USFWS, and other wildlife agencies, would
probably request mitigation for impacts to marine habitats,
including benthic resources, kelp beds, and eelgrass. In the past,
Corps policy has been that replacement of sandy-bottom habitat with
rocky structures does not require mitigation. Adverse impacts to
endangered species and other sensitive resources would likely be
avoided. Construction time windows would probably be set to avoid
the nesting season of the least tern and the western snowy plover.
Impacts to existing eelgrass beds would require, at a minimum, 1:1
mitigation.
After a preferred plan is developed and before the EIS is
completed, any sites which may be eligible for the National Register
will be identified, and a mitigation plan, if needed, will be
developed in consultation with the state Historic Preservation
Officer (SHPO) and a Determination of Effect will be coordinated
with both the SHPO and, if needed, the Advisory Council on Historic
Preservation (see Cultural Resources).
In coordination with the USFWS, a Coordination Act Report (CAR)
33
will be prepared to determine a viable, environmentally preferred
plan. Requirements of Section 7 of the Endangered Species Act will
be completed during the Feasibility Study, including a Biological
Assessment and formal consultation with the USFWS, if necessary.
A Section 404(b)(l) Evaluation of water quality impacts will be
developed and coordinated with State and Federal water quality
agencies to ensure adequate consideration has been given to water
quality and in order to acquire water quality certification or, if
appropriate, an exemption. Dredged material will be mechanically
and chemically tested prior to its disposal on the beach or in the
nearshore environment.
A Consistency Determination will be prepared for review by the
California Coastal Commission, to ensure compliance with the
California Coastal Act of 1976.
Preparation of the EIS will include ecological and biological
support staff services, cultural resources support staff services,
field reconnaissance where required, and coordination of USFWS
funding for the CAR. Recreational support staff services, and a
Hazardous and Toxic Waste investigation, may also be required.
Environmental studies tasks include a literature search and
review of existing reports for archeological, historical, and
environmental resources; field surveys under NEPA and Section 106 to
establish base-line conditions; preparation of materials, including
text and plates, for inclusion in the appendix; establishment of
future "without-project" conditions; determination of impacts and
effects of the alternatives; ecological and cultural resources
coordination; analysis of necessary mitigation; assistance in plan
formulation; development and preparation of all appropriate NEPA
documents; in-house report review; response to comments; and support
to the Study Manager and others during the study phase.
Using data from coastal engineering modeling studies, the study
team would analyze potential impacts to surfing and other
recreational uses of the project area. Additional recreation
studies tasks (as necessary) would include determination of existing
recreational uses and facilities; determination of future
recreational uses within the project area; identification of
potential impacts to existing recreational uses and facilities;
preparation of materials, including text and plates, for inclusion
in the appendix; and assisting in plan formulation.
FISH AND WILDLIFE STUDIES
This task will primarily be done by the Corps, in coordination
with staff from other agencies. The work includes studies conducted
by USFWS in support of the above-mentioned environmental studies by
agreement with the Corps as required by the Fish and Wildlife
34
Coordination Act. This task also includes management of the USFWS
work agreement. A CAR will be prepared that will refine
environmental effects of the selected alternative, summarize study
findings, and incrementally analyze alternative mitigation
strategies acceptable to the USFWS for all alternative studies in
detail.
Either the USFWS, the National Marine Fisheries Service, or a
private contractor will be funded to conduct dive surveys and
benthic sampling of alternative construction sites. These studies
(and the CAR) will be used to determine baseline conditions, the
environmental impacts associated with the various alternatives, and
specific mitigation requirements.
The fish and wildlife studies will provide data to be included in
the environmental appendix. The data will be used in the
preparation of materials, including text and plates, for inclusion
in the appendix; for in-house review; in response to comments; and
in providing support to the Study Manager and others during the
study phase.
CULTURAL RESOURCES STUDIES
This task will be done by the Corps. The cultural resources
studies will determine the impacts of the alternative plans on
historical, architectural, and archeological resources. All studies
will be conducted in accordance with Section 106 of the National
Historic Preservation Act of 1966, as amended, 36 CFR 800
"Protection of Properties", and Corps Engineering Regulation 1105-2-
100.
In consultation with the SHPO, the Corps will conduct sufficient
archival and field surveys to identify cultural sites within the
study's Area of Potential Effect (APE) and will evaluate the
eligibility of all cultural sites for the National Register of
Historic Places. A detailed report will be prepared which will
describe all cultural resources within the APE and assess the
impacts of each project alternative on these resources for inclusion
in the environmental section of the appendix. The report will also
describe the range of additional future preservation or mitigation
efforts and the associated costs of these studies.
If project alternatives are determined to have an effect on sites
eligible for the National Register, the Corps will proceed with
further consultation with the SHPO and will afford the Advisory
Council on Historic Preservation (ACHP) and other interested parties
an opportunity to comment. If necessary, the Corps may enter into a
Memorandum of Agreement with the SHPO, ACHP and non-Federal sponsor
to stipulate ways to avoid or reduce the effects of project
alternatives on cultural resources. Preservation or mitigation of
cultural resources will be considered in more detail for the plan
35
recommended for construction in any advanced planning for the
proj ect.
REAL ESTATE STUDIES
This element will be conducted by the Corps. It will include
preparation of preliminary real estate cost estimates for project
right-of-way requirements, participation in pre-Local Cooperation
Agreement activities, preparation of real estate plan for inclusion
in the feasibility report, preparation of a gross appraisal in the
code of accounts format, and preparation of scope of work outlining
real estate input to the PMP.
The preparation ofpreliminary cost estimates includes the
development of preliminary cost estimate(s) for total Real Estate
Cost associated with proposed project scenarios. The Real Estate
Cost Estimate(s) will include a value estimate of the projects's
real property requirements, an estimate of any PL 91-646 relocation
on payments required as a result of the project's real property
acquisitions, an estimate of the local sponsor's administration cost
to accomplish the project's real property requirements and an
estimate of the corps' administration cost to assist and monitor the
local sponsor's real property acquisition program.
Real Estate Plan (REP), an over all plan describing the minimum
real estate requirements for the project requirements, will be
prepared.
A gross appraisal report, which provides a detailed estimate of
all Real Estate Cost associated with the acquisition of the proposed
project's real property requirements, will be prepared. There is a
possibility the will not be needed.
The preparation of baseline cost estimates real estate must be done.
This activity includes accounting for the project's total estimated
Real Estate Cost in code of accounts format as required by EC 111-2-
538 under Feature Codes 01, Lands and Damages. This estimate of
total Real Estate Cost should include estimated costs for all
Federal and local sponsor activities necessary for completion of the
proj ect.
Real Estate will provide input to the PMP.
INSTITUTIONAL STUDIES
This task will be accomplished by the Corps and consists
primarily of determining the financial and legal arrangements
required to implement the recommended plan, including methods of
financing the projects. A financial capability analysis will
examine whether or not the Local Sponsor has the organizational,
36
legal, and financial capability to undertake the required financial
obligations for implementation of the project after it is authorized
for construction by Congress. Studies include determining the
political and institutional arrangements of the study area and
identifying attitudes and customs regarding the management and use
of the resources. The results of the study will be provided in a
financial and cost recovery analysis section of the feasibility
report .
This task will also include estimating alternative repayment
options for any incidental project purposes.
REPORT PREPARATION
This work will be the responsibility of the Corps, in
coordination with the Local Sponsor. The Work will include
collection and assembly of pertinent data, writing, editing,
typing, drafting, reviewing, revising, reproducing, and distributing
the draft and final feasibility reports, environmental assessments,
and related technical documents and appendices.
This task also includes work items necessary to support the
review process from the signing of the feasibility report to the
request by the Assistant Secretary of the Army for Civil Works
(ASA(CW) ) to the Office of Management and the Budget (OMB) for the
views of the administration. These items could also include
answering comments, attending meetings of the Washington Level
Review Center.
ORGANIZATIONAL BREAKDOWN STRUCTURE (OBS)
The organizational breakdown structure (OBS) for the Los Angeles
District was also used in developing the Critical Path Network. The
OBS displays the hierarchy of the organizations responsible for the
performance of the work listed in the WBS. Interfacing organization
shaving authority and responsibility, are clearly defined and
identified in the OBS.
The list of organizations for the Los Angeles district was taken
directly from CESPL OM 18-1-2, dated 15 August 1990. This District
regulation provides the Budget element, Organization Codes, and
Payroll Location Codes used within the Los Angeles District.
Figure 3 is the general Organizational Breakdown Structure for the
U.S. Army Corps of Engineers, Los Angeles District.
RESPONSIBILITY MATRIX
Tables 1 through 10 show for each organization the expected work
activities they will be responsible for to complete the Feasibility
37
Study. The tables also shows the expected duration of each activity
and the expected start and completion schedule, as well as costs. It
is the responsibility of each organization to assure staff is
available for execution of the assigned activities within the
expected schedules and costs shown. Any changes in effort, schedule
or cost, particularly the critical path items, must immediately be
brought to the attention of the Technical Study Manager to determine
if adjustments can be made in the study program without changing
overall schedule and cost. If changes impact on overall schedule of
milestones and total study cost, the technical manager will resolve
problem with the project manager who will present the issue and
recommendations to the Executive Committee for approval as well as
Corps higher echelon.
38
3k & Milestone List
name Description
PROJECT MANAGEMENT
Planned duration Start date Finish date
Page 1
Pin other cost
X)T IPMP
^A APPROVD
^N FCSA
2UEST FUND
}J MGMTFY1
)J MGMTFY2
R DFT PMP
r SCH&COST
DJ MGMT F3
N SCH&COST
N DFT PMP
NALIZE PMP
NEGOTIATE IPMP & FCSA
APPROVAL OF IPMP BY CORPS AND
CITY
COORDINATE SIGNING OF FCSA
OBTAIN FEDERAL AND LOCAL
SPONSOR FUNDS FOR FY
MANAGE AND REPORTING
SCHEDULE&COSTS & BUDGET PREP
MANAGE AND REPORTING OF
SCHEDULE&COSTS, BUDGET
PREPARE DRAFT PROJECT
MANAGEMENT PLAN
COMPLETE DRAFT SCHEDULE AND
COST FOR PED AND CONSTRUCTION
MANAGE AND REPORT ON SCHEDULE
&COST, BUDGET
FINALIZE DFT PMP SCHEDULE AND
COST
FINALIZE DRAFT PMP
FINALIZE PROJECT MANAGEMENT
40
20
10
20
68
260
20
20
70
5
10
20
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
W
W
W
W
W
W
W
W
W
W
W
W
25-Jan-
22-Mar-
19-Apr-
3-May-
28-Jun-
1-Oct-
23-Jun-
21-Jul-
1-Oct-
15-Nov-
22-Nov-
27-Mar-
1994
1994
1994
1994
1994
1994
1995
1995
1996
1995
1995
1996
21-Mar-
18-Apr-
2-May-
30-May-
29-Sep-
29-Sep-
20-Jul-
17-Aug-
6-Jan-
21-Nov-
5-Dec-
23-Apr-
1994
1994
1994
1994
1994
1995
1995
1995
1997
1995
1995
1996
0
0
0
0
20
20
10
10
20
5
5
10
.00
.00
.00
.00
. 00
. 00
.00
.00
.00
.00
.00
. 00
PLAN
COASTAL DESIGN SECTION
sk & Milestone List
sk name Description Planned duration Start date
7E ANAL
RVEYS
TTORAL ANL
D SHLIN CH
VE RUNUP
RUC DAM ES
F ALTERN
•ASTAL APPD
: ,YOUT PLANS
PROJ RUNUP
PROJ DAMAG
iS ALT PLNS
>TAL COSTS
DEVELOP STATISTICAL WAVE,
TIDE, CURRENT
CONDUCT SURVEYS AND COMPILE
SURVEY DATA
PREP SHOREL I NE& VOLUME CHANGE
&SEDIMENT BUDGET
MODEL SHORELINE CHANGES
DEVELOP WAVE RUNUP FREQUENCY
AND SCOURING RELATIONS
DEVELOP STRUCTURAL DAMAGE
ESTIMATES FOR VARIOIUS EVENTS
DEVELOP CONCEPTUAL
ALTERNATIVES
PREPAR'E DRAFT COASTAL APPENDIX
LAYOUT ALTERNATIVE PLANS
DEFINE WITH PROJECT RUNUP FOR
ALTERNATIVE PLANS
DETERMINE WITH PROJECT
STRUCTURAL DAMAGE FOR ALT
DESIGN ALTERNATIVE PLANS AND
QUANTITY TAKEOFFS
DEVELOP TOTAL FIRST COST AND
20.
60.
20.
20.
10.
10.
5 .
10.
5.
5.
5.
20.
10.
00
00
00
00
00
00
00
00
00
00
00
00
00
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
W
W
W
W
W
W
W
W
W
W
W
W
W
28-Jun-
28- Jun-
20-Sep-
18-Oct-
15-Nov-
29-Nov-
13-Dec-
20-Dec-
4 - Apr-
il -Apr-
18-Apr-
25-Apr-
30-May-
1994
1994
1994
1994
1994
1994
1994
1994
1995
1995
1995
1995
1995
Finish
25-Jul-
19-Sep-
17-Oct-
Page 1
date Pin other cost
1994
1994
1994
14-Nov-1994
28-Nov-1994
12-Dec-
19-Dec-
2- Jan-
10-Apr-
17-Apr-
24-Apr-
22-May-
12-Jun-
1994
1994
1995
1995
1995
1995
1995
1995
10
50
10
10
5
10
3
5
5
5
3
10
5
.00
.00
.00
.00
.00
.00
. 00
. 00
.00
.00
.00
.00
.00
\
COASTAL DESIGN SECTION
-,k & Milestone List
3k name Description Planned duration Start date Finish date
Page 2
Pin other cost
I TOUT PLANS
PROJ RUNUP
PROJ DAMAG
S FIN ALTS
T COAS APP
S REC PL
NST&O&M AN
T COAS APP
N COAST AP
MAINTENANCE COST FOR ALT PL
LAYOUT FINAL ALTERNATIVE PLANS
RUNUP ESTIMATES WITH
ALTERNATIVE PLANS
WITH PROJECT DAMAGE ESTIMATES
DESIGN FINAL ALTERNATIVE PLANS
COMPLETE DFT COASTAL APPENDIX
DESIGN OF RECOMMENDED PLAN
CONSTRUCTABILITY AND O&M
ANALYSIS
FINALIZE DFT COASTAL APPENDIX
RESP TO PGM COMMENTS AND
FINALIZE COASTAL APPENDIX&PMP
3.00 Dys W
5.00 Dys W
3.00 Dys W
10.00 Dys W
10.00 Dys W
10.00 Dys W
5.00 Dys W
10.00 Dys W
15.00 Dys W
23-Jun-1995
28-Jun-1995
5-Jul-1995
10-Jul-1995
24-Jul-1995
18-0ct-1995
l-Nov-1995
S-Nov-1995
27-Mar-1996
27-Jun-1995
4-Jul-1995
7-Jul-1995
21-Jul-1995
4-Aug-1995
31-0ct-1995
7-Nov-1995
21-Nov-1995
16-Apr-1996
3 .00
3.00
3
5
00
00
10.00
10.00
3 .00
3 .00
10.00
COASTAL RESOURCES BRANCH
?k & Milestone List
ik name Description Planned duration Start date
PREP
lANG PM
3 PROJ DBS
! CH MGMTFY1
B NOT<R
EP PUB MTG
CEIVE CMTS
CH MGMTFY2i
F PROB&NDS
F PLN OBJ
| F ALT PLNS
»MP F3 RPT
'EP F-3 CON
PREP FOR STUDY, SET UP
ACCOUNTS, ISSUE ESR'S
ARRANGE PUBLIC MTG, MAILING
LIST, REPORTER, ETC &OTH MTGS
DEVELOP WITHOUT PROJECT
CONDITIONS
COORDINATION AND REVIEW OF
WORK PROGRESS AND RESULTS
PREPARE PUBLIC NOTICE AND
OTHER LTRS
PREPARE FOR PUBLIC MEETING
RECEIVE AND SUMMARIZE PUBLIC
COMMENTS
TECH MGT OF WORK, PROGRESS
REVIEW, REV STUDY PROGRAM
DEFINE PROBLEMS AND NEEDS
DEFINE PLANNING OBJECTIVES AND
EVALUATION CRITERIA
REVIEW MEASURES AND DEFINE
ALTERNATIVE PLANS
PREPARE F-3 REPORT
PREPARE AND PRESENT F-3
20.
30.
140.
68 .
10.
20 .
20.
260.
5.
5.
5.
10.
5.
00
00
00
00
00
00
00
00
00
00
00
00
00
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
W
W
W
W
W
W
W
W
W
W
W
W
W
31-May-
28-Jun-
28-Jun-
28-Jun-
9-Aug-
23-Aug-
20-Sep-
30-Sep-
31-Jan-
7-Feb-
14-Feb-
21-Feb-
7-Mar-
1994
1994
1994
1994
1994
1994
1994
1994
1995
1995
1995
1995
1995
Finish
27 -Jim-
s' Aug-
9-Jan-
29-Sep-
22-Aug-
19-Sep-
17-Oct-
28-Sep-
6-Feb-
13-Feb-
20-Feb-
6-Mar-
. 13-Mar-
Page 1
date Pin other cost
1994
1994
1995
1994
1994
1994
1994
1995
1995
1995
1995
1995
1995
5
10
10
20
3
3
3
20
3
3
3
5
5
.00
.00
.00
.00
.00
. 00
.00
.00
.00
.00
.00
.00
.00
sk & Milestone List
3k name Description
COASTAL RESOURCES BRANCH
Planned duration Start date Finish date
Page 2
Pin other cost
SP SPD CMT
V ALT PLNS
AL ALT PLS
F ALT PLNS
N EVAL PLS
L REC PL
F COST SH
F PL IMPL
E CON&REC
>M PRE DFT
CONFERENCE
REVISIONS TO RESPOND TO SPD
COMMENTS
DIRECT DEVELOPMENT OF
ALTERNATIVE PLANS AND
ASSESSMENTS
EVALUATE ALTERNATIVE PLANS
COSTS, BENEFITS, ENVIRON
DIRECT REFINEMENT OF FINAL
PLANS AND MITIGATION
EVALUATE PLANS TRADEOFFS, NED
PLAN, EQ PLAN, LOCAL PREF
SELECT, RECOMMENDED PLAN AND
DESCRIBE ALL REQUIREMENTS
DEFINE COST-SHARING
REQUIEMENTS FIRST COST AND O&M
DEFINE LOCAL COOPERATION
REQUIREMENTS
PREPARE PREL CONCLUSIONS AND
RECOMMENDATIONS
COMPLETE PRELIMINARY DRAFT
10 .00
40. 00
5.00
20.00
5. 00
3 . 00
5.00
5 .00
3 .00
20 . 00
Dys W
Dys W
Dys W
Dys W
Dys W
Dys W
Dys W
Dys W
Dys W
Dys W
21-Mar-1995
4-Apr-1995
16-Jun-1995
23-Jun-1995
3-Aug-1995
10-Aug-1995
15-Aug-1995
22-Aug-1995
29-Aug-1995
6-Sep-1995
3
29
22
20
9
14
-Apr-
-May-
- Jun-
-Jul-
-Aug-
-Aug-
21-Aug-
28
31
3
-Aug-
-Aug-
-Oct-
1995
1995
1995
1995
1995
1995
1995
1995
1995
1995
3 .00
10 .00
3 . 00
5.00
3 .00
3 . 00
3 . 00
3 . 00
3 . 00
10 . 00
COASTAL RESOURCES BRANCH
• >k & Milestone List4
k name Description Planned duration Start date Finish date
Page 3
Pin other cost
MGMTFY3
>^P F-4 CON
^P SPD CMT
:« DFT REP
V&COR DFT
EP TRC-FRC
R OF FRC
P PGM
S PGM
V DFT
EP PUB REV
EP PUB MTG
fB MTG
1C PUB CMTS
REPORT AND SEND TO SPD FOR F4
TECH MGMT OF WORK,PROGRESS
REVIEW,REV STUDY PROGRAM
PREPARE AND PRESENT F-4
CONFERENCE
REVISIONS PER SPD COMMENTS
PREPARE FINAL DRAFT REPORT
DISTRICT REVIEW AND
CORRECTIONS OF DRAFT REPORT
PREPARE FOR TRC AND FRC
PRESENTATIONS
PARTICIPATE IN PREPARING MFR
PARTICIPATE IN PREPARING PGM
PREPARE REVISIONS PER PGM
GUIDANCE
FINALIZE DRAFT REPORT FOR
PUBLIC REVIEW
PREPARE LTRS, MTG ARRANGEMENTS
FOR PUBLIC REVIEW
PREPARE FOR PUBLIC MEETING
HOLD PUBLIC MEETING
RECEIVE AND RESPOND TO PUBLIC
COMMENTS
70.00 Dys W
5.00 Dys W
10.00 Dys W
20.00 Dys W
10.00 Dys W
10.00 Dys W
10.00 Dys W
10.00 Dys W
10.00 Dys W
10.00 Dys W
5.00 Dys W
10.00 Dys W
1.00 Dys W
15.00 Dys W
29-Sep-1995
4-Oct-1995
18-Oct-1995
22-NOV-1995
20-Dec-1995
3-Jan-1996
14-Feb-1996
28-Feb-1996
13-Mar-1996
27-Mar-1996
4-Jan-1996
10-0ct-1995
31-0ct-1995
19-Dec-1995
2-Jan-1996
16-Jan-1996
27-Feb-1996
12-Mar-1996
26-Mar-1996
9-Apr-1996
10-Apr-1996 16-Apr-1996
17-Apr-1996
l-May-1996
2-May-1996
30-Apr-1996
l-May-1996
22-May-1996
20.00
5.00
3 .00
10.00
5.00
5.00
2 .00
2 .00
5.00
5.00
15 . 00
3 . 00
3 .00
5.00
\ 1 \ '
COASTAL RESOURCES BRANCH
1 sk & Milestone List
sk name
1 EP FIN RPT
. V FIN RPT
R FIN RPT
FIN RPT
SP CMT
! RC ASSESS
E RES ASSE
i D MTG
SP ASSESS
Description
PREPARE FINAL REPORT
DISTRICT REVIEW OF FINAL
REPORT
CORRECTIONS TO FINAL REPORT
PRINT FINAL REPORT
RESPOND TO COMMENTS FROM SPD
WLRC REVIEW AND ASSESSMENT
PREPARE PRELIM RESPONSES TO
ASSESSMENT & PREP FLD MTG
FIELD MTG WITH WLRC
PREPARE FINAL RESPONSES TO
Planned duration Start date
20
10
10
5
10
30
5
2
10
.00
.00
.00
.00
.00
.00
.00
.00
.00
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
W
W
W
W
W
W
W
W
W
23-May-
20-Jun-
4-Jul-
18-Jul-
22-Aug-
12-Sep-
24-Oct-
31-Oct-
4 - Nov -
1996
1996
1996
1996
1996
1996
1996
1996
1996
Finish
19-Jun-
3-Jul-
17-Jul-
24-Jul-
4-Sep-
23-Oct-
30-Oct-
1-Nov-
15-Nov-
date Pin
1996
1996
1996
1996
1996
1996
1996
1996
1996
1 1
Page 4
other cost
15.
5.
5.
10.
5.
5.
10.
5.
10.
00
00
00
00
00
00
00
00
00
EP SR REP
WLRC ASSESSMENT
PREPARE FOR SENIOR REPS
MEETING
10.00 Dys W 18-Nov-1996 29-Nov-1996 5.00
ENVIRONMENTAL BRANCH
: 'k & Milestone List
i
i ;k name Description Planned duration Start date Finish date
Page 1
Pin other cost
iRD MTG
ID,REC,AST
i
jTURAL RES
; ? & NOISE
•JL PL AID
3 STUDIES
:DANG SPEC
3UTR TEST
CONDUCT COORDINATION MTG WITH
AGENCIES
LANDUSE, RECREATION, AND
AESTHETIC BASELINE
CULTURAL RESOURCE STUDIES OF
BEACH &BORROW INCL MAGNETOM
AIR AND NOISE BASELINE
FISH AND WILDLIFE SERVICE
PLANNING AID LETTER
ENDANGERED SPECIES BASELINE
CONDUCT ELUTRIENT TESTING OF
5
10
5
10
40
40
10
10
.00
.00
.00
.00
.00
.00
.00
.00
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
W
W
W
W
W
W
W
W
28-Jun-
28- Jun-
5-Jul-
5-Jul-
5-Jul-
30-Aug-
25-Oct-
13-Dec-
1994
1994
1994
1994
1994
1994
1994
1994
4-Jul-
11-Jul-
11-Jul-
18-Jul-
29-Aug-
24-Oct-
7-Nov-
26-Dec-
1994
1994
1994
1994
1994
1994
1994
1994
3
3
10
3
5
10
3
10
.00
.00
.00
.00
.00
.00
.00
. 00
PER QUAL
V BASELINE
V IMP ANAL
V IMP ANAL
WL DFT CAR
E DFT EA
BORROW SITE
WATER QUALITY STUDIES
INCLUDING RESULTS OF ELUTRIENT
TESTING '
PREPARE ENVIRONMENTAL BASELINE
& DEF ENV PROB&NEEDS
ENV IMPACT ANALYSIS OF
ALTERNATIVE PLANS
IMPACT ANALYSIS
F&WL DRAFT CAR
PREPARE PRELIMINARY DFT EA
5.00 Dys W
5.00 Dys W
20.00 Dys W
10.00 Dys W
40.00 Dys W
10.00 Dys W
27-Dec-1994
3-Jan-1995
2-Jan-1995
9-Jan-1995
ll-Apr-1995 8-May-1995
28-Jun-1995
12-Jul-1995
12-Jul-1995
ll-Jul-1995
5-Sep-1995
25-Jul-1995
3 .00
5 .00
5.00
5.00
10 .00
10 . 00
3k & Milestone List
3k name Description
ENVIRONMENTAL BRANCH
Planned duration Start date Finish date
Page 2
Pin other cost
r
r
r
M
M
M
AS
404B1
CCD
AQ CONF
DFT EA
DFT EA
F&WLCAR
CONSIST
DRAFT 404 (B) (1) EVAL
DRAFT COASTAL CONSISTENCY
DETERMINATION
DRAFT AQ CONFORMANCE
DETERMINATION
FINALIZE DRAFT EA
FINALIZE DFT EA FOR PUB REV
INCLUDE RESP TO PGM CMTS
FINAL F&WL COORD ACT REPORT
OBTAIN COASTAL COMMISSION
5
5
3
10
5
20
40
.00
.00
.00
.00
.00
.00
. 00
Dys
Dys
Dys
Dys
Dys
Dys
Dys
W
W
W
W
W
W
W
26-Jul-1995
2-Aug-1995
9-Aug-1995
18-Oct-1995
27-Mar-1996
27-Mar-1996
17-Apr-1996
1-Aug-
8-Aug-
11-Aug-
31-Oct-
2-Apr-
23-Apr-
11-Jun-
1995
1995
1995
1995
1996
1996
1996
3
3
2
3
3
5
: 2
.00
.00
.00
.00
.00
.00
.00
N EA&FONSI
RESPONSE
FINAL EA INCL RESP TO CMTS &
FONSI
10.00 Dys W 23-May-1996 5-Jun-1996 3 . 00
COST ESTIMATE BRANCH
I 3k & Milestone List
3k name Description Planned duration Start date
Page 1
Finish date Pin other cost
COST EST PREPARE COST ESTIMATE FOR
ALTERNATIVE PLANS
COST EST COST ESTIMATE FOR FINAL
ALTERNATIVE PLANS
ACES EST DFT MCACES ESTIMATE
T COST APP DRAFT COST APPENDIX
M COST APP FINALIZE COST APPENDIX
5.00 Dys W
5.00 Dys W
10.00 Dys W
10.00 Dys W
10.00 Dys W
23-May-1995 29-May-1995
24-Jul-1995 28-Jul-1995
31-Jul-1995
14-Aug-1995
27-Mar-1996
ll-Aug-1995
25-Aug-1995
9-Apr-1996
5 . 00
3 .00
5 . 00
5.00
2 .00
& Milestone List
name Description
ECONOMICS SECTION
Planned duration Start date
Page 1
Finish date Pin other cost
)N BASELIN
.:REA MODEL
SQ- DAMAGE
ANSP IMPAC
TAL DAMAGE
T ECON AP
GREAT BENE
PROJ BENEF
ON ANAL
GREAT BEN
ORM DAM BE
ON ANAL Y I
T ECON APP
T ECO APP
COMPLETE ECONOMIC BASELINE OF
STUDY AREA
DEVELOP RECREATION MODEL TO
DEFINE DEMANDS & NEEDS
DEVELOP FREQ DAMAGE ANALYSIS
INCL EMERGENCY COST
DETERMINE TRANSPORTATION
DELAYS
TOTAL DAMAGES BY EVENT AND
AVERAGE ANNUAL
PREPARE DFT ECONOMICS APPENDIX
RECREATION BENEFIT ANALYSIS
WITH PROJECT STORM DAMAGE
BENEFITS
ECONOMIC ANALYSIS OF
ALTERNATIVE PLANS
RECREATION BENEFITS
DERIVE STORM DAMAGE BENEFITS
ECONOMIC ANALYSIS OF FINAL
ALTERNATIVES
DRAFT ECONOMICS APPENDIX
REVISIONS TO DFT APPENDIX PER
5
20
10
10
5
10
5
5
3
3
3
3
10
5
.00
.00
.00
.00
.00
.00
.00
.00
.00
. 00
.00
. 00
.00
.00
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
Dys
W
W
W
W
W
W
W
W
W
W
W
W
W
W
28-Jun-
5-Jul-
13-Dec-
27-Dec-
10-Jan-
17-Jan-
11-Apr-
25-Apr-
13-Jun-
28-Jun-
10-Jul-
31-Jul-
3 -Aug-
18-Oct-
1994
1994
1994
1994
1995
1995
1995
1995
1995
1995
1995
1995
1995
1995
4-Jul-
1-Aug-
26-Dec-
9-Jan-
16-Jan-
30-Jan-
17-Apr-
1-May-
15-Jun-
30-Jun-
12-Jul-
2-Aug-
16 -Aug-
24-Oct-
1994
1994
1994
1995
1995
1995
1995
1995
1995
1995
1995
1995
1995
1995
3
10
3
5
3
5
3
3
2
3
3
2
2
3
.00
. 00
.00
.00
.00
.00
. 00
.00
.00
. 00
.00
. 00
. 00
.00
SPD COMMENTS
:sk & Milestone List
f sk name Description
ECONOMICS SECTION
Planned duration Start date Finish date
Page 2
Pin other cost
ECON APP FINALIZE ECON APPENDIX 5.00 Dys W 27-Mar-1996 2-Apr-1996 3 .00
I ! ( ; 1
REAL ESTATE DIVISION
^k & Milestone List
3k name
AL ES BASE
AL ES COST
AL ES APP
AL EST PL
AL ES APP
FJ RE APP
Description
DEFINE REAL ESTATE OWNERSHIP
AND VALUES IN STUDY AREA
DEFINE REAL ESTATE
REQUIREMENTS AND COST FOR ALT
COMPLETE DRAFT REAL ESTATE
APPENDIX
PREPARE REAL ESTATE PLAN FOR
RECOMMENDED PROJECT
DRAFT REAL ESTATE APPENDIX
FINALIZE REAL ESTATE APPENDIX
Planned duration Start date
10
5
5
5
3
5
.00
.00
.00
.00
.00
. 00
Dys W
Dys W
Dys W
Dys W
Dys W
Dys W
28
28
5
8
15
27
-Jun-
- Jun-
-Jul-
-Nov-
-Nov-
-Mar-
1994
1995
1995
1995
1995
1996
Finish
11-Jul-
4-Jul-
11-Jul-
14-Nov-
17-Nov-
2-Apr-
date Pin
1994
1995
1995
1995
1995
1996
( )
Page 1
other cost
3
3
5
2
2
2
.00
.00
.00
. 00
. 00
. 00
3k & Milestone List
3k name Description
GEOTECHNICAL BRANCH
Planned duration Start date
Page 1
Finish date Pin other cost
"(TECH BASE
RROW TSTG
': JND&BORROW
GEOT APP
CONDUCT DATA REVIEW AND FIELD
SURVEYS FOR BEACH&BORROW
TESTING OF BORROW SITE
DESIGN FOUNDATION &BORROW
SITE*PREPARE DFT APPENDIX
RESPOND TO PGM
COMMENTS&FINALIZE GEOTECH
APPENDIX
30.00 Dys W
90.00 Dys W
20.00 Dys W
20.00 Dys W
28-Jun-1994
9-Aug-1994
4-Apr-1995
8-Aug-1994
12-Dec-1994
l-May-1995
27-Mar-1996 23-Apr-1996
25.00
25.00
10 .00
3 .00
CITY OF CARLSBAD
sk & Milestone List Page I
3k name Description Planned duration Start date Finish date Pin other cost
TY MGMTFY1 CITY MGMT OF COSTS, INKIND 68.00 Dys W 28-Jun-1994 29-Sep-1994 30.00
SERVICE,MTGS, REVIEW
[ TY MGMTFY2 CITY MGMT INKIND SERVICES, 260.00 Dys W 30-Sep-1994 28-Sep-1995 25.00
1 REVIEWS, MTGS, COORDINATION
? TY MGMTFY3 CITY MGMT INKIND 70.00 Dys W l-Oct-1996 6-Jan-1997 25.00
} SERVICES,REVIEW,MEETINGS, COORD
2 IN
k & Milestone ListI
I 3k name Description
PROGRAM DEVELOPMENT BRANCH
Planned duration Start date
Page 1
Finish date Pin other cost
>G DEV FY1 PROGRAM DEVELOPMENT SUPPORT
FOR BUDGET AND FUNDS MGMT
)G DEV FY2 PROGRAM DEVELOPMENT SUPPORT
FOR BUDGET AND FUNDS MGMT
~)G DEV FY3 PROGRAM DEVELOPMENT SUPPORT
BUDGET AND FUNDS MGMT
68.00 Dys W
260.00 Dys W
70.00 Dys W
28-Jun-1994 29-Sep-1994
30-Sep-1994
29-Sep-1995
28-Sep-1995
4-Jan-1996
10.00
15.00
10 .00
FEASIBILITY STUDY COST ESTIMATE
The feasibility study cost estimate for Pacific Coast Shoreline,
Carlsbad is $960,000, without contingencies. Adding 20% for
contingencies brings the cost to $1,152,000 (see Table 11). All
feasibility phase study costs are required to be cost-shared between
the Corps and the Local Sponsor on a 50-50 basis. Further, the
Local Sponsor will provide, at a minimum, half of its share as a
cash contribution. Tables 1 to 10 outline the tasks to be
performed, the estimated cost of each task, and study obligations
for the Corps and Local Sponsor. Supervision and administration is
covered under each task cost as overhead.
The feasibility study cost estimate is based on Jan 1994 price
levels, and is subject to revision for inflation for the out years.
Inflation adjustments will be administered to the appropriate,
tasks at the current year approved rate. Changes in costs due to
inflationary adjustments will not require a revision to the FCSA.
The cost estimate for the feasibility study is separated into
fiscal years and quarters. Table 11 outlines the costs for each q
fical year during the feasibility study. The Corps will provide
periodic reports to the Local Sponsor, which would include
"Selective F&A Data Base Record, Form 666". The Local Sponsor will
provide the Corps, on a quarterly basis, similar finance and
accounting data that would record the work-in-kind efforts by the
Local Sponsor. The value of in-kind services will be based on the
equivalent government cost.
FEASIBILITY STUDY SCHEDULE
The final feasibility report and Project Management Plan are
scheduled to be submitted to the South Pacific Division (SPD)
approximately twenty-eight (28) months after initiation of the
feasibility study. The signing of the FCSA is scheduled to take
place one (1) month prior to initiation of the Study. The Distict
Engineer's issuance of the public notice, which completes the
feasibility phase, is scheduled to occur one (1) month after the
final feasibility report is submitted. Table 12 gives the main
Milestones for the Feasibility Study.
COORDINATION BETWEEN THE CORPS AND THE SPONSOR
The Executive Committee is scheduled to meet, at a minimum, at
the signing of the FCSA, at the public meeting, and at the
concluding Feasibility Review Conference (FRC). The Committee will
also meet periodically to discuss the project status and to handle
changes in study scope that would result in an increase in total
study cost or major changes in study direction, and at required
Issue Resolution Conferences, if necessary. The Study Management
55
Team will meet approximately every 6-8 weeks.
Financial coordination will include quarterly financial
statements composed of expenditures and obligations. The Corps will
also provide quarterly reports to the Local Sponsor, which would
include "Selective F&A Data Base Record, Form 666". The Local
Sponsor will provide to the Corps, on a quarterly basis, similar
finance and accounting data that will record cash expenditures and
work-in-kind efforts by the Local Sponsor. Cost-sharing cash
payments will be made to the Corps approximately one (l) month after
feasibility study initiation. The first payment will be made upon
initiation of the study for the amount expected to be expended
during the time until the next scheduled payment as outlined above.
A final audit of the cost-sharing agreement and reconciliation of
cash payments will be made at the conclusion of the study. The
Corps will also furnish to the Local Sponsor a monthly progress
report, detailing the status of each study task.
TABLE 11 COST PER FISCAL YEAR
($1,000)
FY94 FY95 FY96 FY97 TOTALS
Cost Estimating
Plan Formulation
Public iavoLvmtat
Report Preparation/Processing
Technical Management
Program Development Branch
City of Carlibad
Economics Section
Environmental Re*<rcrce Branch
Coastal Engineering Section
Project Management Branch
Geotechnical Branch
Real Estate Section
TOTAL
TOTAL (W1TH10% CONTINGENCY)
10
19
0
25
10
30
13
19
60
20
25
3
244
292,8
18=
35
0
20
20
15
25
34
34
95
40
35
&
409
490,8
2
13
26
84
20 30
10
25
6
16
26
40
3
6
277 30
332.4 36
20
58
45
104
95
35
80
53
109
181
100
63
17
960
1152.
TABLE 12 PACIFIC COAST SHORELINE, CARLSBAD
FEASIBILITY STUDY
Milestone Description Date
Number
100 Initiation of F. S. (Fl) May 1994
101 Public Workshop (F2) APR 1993 Sep 1994
102 Division Checkpoint Conference #1 (F3) Mar 1995
103 Division Checkpoint Conference #2 (F4) Oct 1995
104 Submit Draft Feasibility Report (F5)Jan 1996
106 Feasibility Review Conference Feb 1996
161 Field Level Coordination (F6) Apr 1996
162 Public Meeting (F7) May 1996
163 Submit Final FR to SPD (F8) Jul 1996
170 DE Notice (F9) Sep 1996
180 WLRC Submission Sep 1996
Senior Representatives Briefing Nov 1996
Chief of Engineers Report Dec 1996
Asst Sec Army (CW) Report Jan 1997
57
Statement of Certification
Initial Project Management Plan
Pacific Coast Shorline, Carlsbad, San Diego County, California
Feasibility Phase
Los Angeles District, Corps of Engineers
This is to certify that the undersigned have reviewed, and concur
in the scope, structure, and cost estimate for the subject study in
the amount of $960,000.00 ($1,152,000 with 20% contingencies) based
on January 1994 price and salary levels.
Los Angeles District
ROBERT S. JOE
Chief, Planning Division
ROBERT S. KOPLIN
Chief, Engineering Division
CARL F. ENSON
Chief, Con-Ops Division
BRIAN M. MOORE
Deputy District Engineer
(Project Management)
BERNARD J. MEIROWSKY
Chief, Contracting Division
VIRGIL D. TAYLOR
Chief, Real Estate Division
MARTIN DENSE
Chief, Resource Management
Office
STEPHEN E. TEMMEL
Office of Counsel
58
APPENDIX A:
FEASIBILITY COST SHARING AGREEMENT
COST-SHARED AGREEMENT
BETWEEN THE UNITED STATES OF AMERICA
AND
THE CITY OF CARLSBAD
THIS AGREEMENT, entered into this 18th day, of January, 1993, by
and between the United States of America (herein after called the
"Government"), represented by the Contracting Officer executing
this agreement, and the City of Carlsbad (herein called the
"Sponsor").
WITNESSETH, that
WHEREAS, the House Committee on Public Works has authorized the
Corps of Engineers to study the Carlsbad shoreline, "with a view
to determining to the effects of beach erosion upon the
infrastructure and the cause of damage to public and private
property and determining solutions which are engineeringly,
economically and environmentally feasible"; and
WHEREAS, the Corps of Engineers conducted a reconnaissance study
of the Carlsbad shoreline, to develop and assess the Federal
interest in solutions to the problem pursuant to, this authority,
and has determined that further study in the nature of a
"Feasibility Phase Study" (hereinafter called the "Study") is
required to fulfill the intent of the study authority and to
complete the determination of the extent of Federal interest in
solving or reducing the problems of storm damage, navigation
hazard elimination, and related programs along the shoreline of
Carlsbad; and
WHEREAS, the Sponsor has the authority and capability to furnish
the cooperation hereinafter set forth and is willing to
participate in study cost-sharing and financing in accordance
with the terms of this agreement; and
WHEREAS, the Sponsor and the Government both understand that
entering into this agreement in no way obligates either party to
implement a project, and that whether a project is supported for
authorization and budgeted for implementation depends upon the
outcome of this feasibility study and whether the proposed
solution is consistent with the Principles and Guidelines and
with the budget priorities of the Administration and that at the
present time, favorable budget priority is being assigned to
projects providing primarily commercial navigation and flood or
storm damage reduction outputs; and
WHEREAS, the Water Resources Development Act of 1986 (P.L. 99-
662) specifies the cost sharing requirements applicable to the
study;
NOW THEREFORE,the parties agree as follows:
ARTICLE I - DEFINITIONS
For the purposes of this Agreement:
a. The term "Study Cost" shall mean all disbursements by the
Government pursuant to this Agreement, whether from Federal
appropriations or from funds made available to the Government by
the Sponsor, and all Negotiated Costs of work performed by the
Sponsor pursuant to this Agreement. Such costs shall include,
but not to be limited to: labor charges; direct costs; overhead
expense; supervision and administration costs; and contracts with
third parties, including termination or suspension charges; and
any termination or suspension costs (ordinarily defined as those
costs necessary to terminate ongoing contracts or obligations and
to properly safeguard the work already accomplished) associated
with this Agreement.
b. The term "Study Period" shall mean the time period for
conducting the Study, commencing with issuance of initial Federal
Feasibility funds following the execution of this Agreement, and
ending when the report is submitted to the Office of Management
and Budget (OMB) by the Assistant Secretary of the Army for Civil
Works (ASA(CW)) for review and consistency with the policies and
programs of the President; and
C. The term "Negotiated Cost" is the fixed fee for a work item
to be accomplished by the sponsor as in-kind services as
specified in the Scope of Studies incorporated herein and in the
Plan of Study and which is acceptable to both parties.
ARTICLE II - OBLIGATIONS OF PARTIES
a. The Sponsor and the Government, using funds contributed by
the Sponsor and appropriated by the Congress, shall expeditiously
prosecute and complete the Study, currently estimated to be
completed in 28 months from the initiation of work in each
region, substantially in compliance with Article II herein, and
in conformity with applicable Federal laws and regulations, the
Economic and Environmental Principles and Guidelines for Water
and Related Land Resources Implementation Studies, and mutually
acceptable standards of engineering practice; and
b. The Government and the Sponsor shall each contribute, in cash
and in-kind services, fifty (50) percent of all Study Costs,
which total cost is estimated to be $960,000 as specified in the
Initial Project Management Plan; provided that the Sponsor may,
consistent with applicable Federal statutes and regulations,
contribute up to 25 percent of the Study Costs as in-kind
services; provided further, the Government shall not obligate any
cash contribution by the Sponsor toward Study Costs until such
cash contribution has actually been made available to it by the
Sponsor.
c. The award of any contract with a third party for services in
furtherance of this Agreement which obligated Federal
appropriations shall be exclusively within the control of the
Government. The award of any contract by the Sponsor with a
third party for services in furtherance of this Agreement which
obligates funds of the Sponsor and does not obligate Federal
funds shall be exclusively within control of the Sponsor, but
shall be subject to applicable Federal statutes and regulations.
d. The Government and the Sponsor shall each endeavor to assign
the necessary resources to provide for the prompt and proper
execution of the Study and shall, within the limits of law and
regulation, conduct the Study with maximum flexibility as
directed by the Executive Committee established by Article V
herein.
e. The Government will not continue with the Study if it
determines it is not in accord with current policies and budget
priorities unless the Sponsor wishes it to continue under the
terms of this Agreement and the Department of the Army grants an
exception. If the Study is discontinued, it shall be concluded
according to Article XII and all data and information shall be
made available to both parties.
f. The Sponsor may wish to conclude the Study if it determines
it is not in accord with its current policies and budget
priorities. When such a case exists the Study shall be concluded
according to Article XII and all data and information shall be
made available to both parties.
ARTICLE III - SCOPE OF STUDIES
The Initial Project Management Plan (IPMP), is hereby
incorporated into this Agreement. The parties to this Agreement
shall substantially comply with the Scope of Studies in
prosecuting work on the Study. The following modifications, to
be approved by the Executive Committee, shall require an
amendment to this Agreement:
a. any modification which increases the total Study Costs by
more than 20%;
b. any modification in the estimated cost of a study work item
or any obligation for a Study work item, which changes the total
cost of that work item by more than 20% (see the IPMP);
C. any extension of the completion schedule for a Study work
3
item of more than thirty (30) days (see the IPMP);
d. any reassignment of work items between the Sponsor and the
Government (see the IPMP).
ARTICLE IV - METHOD OF PAYMENT
a. The Government shall endeavor to obtain during each fiscal
year the appropriation for that fiscal year at least in the
amounts specified in the Scope of Studies incorporated herein.
Subject to the enactment of Federal appropriations and the
allotment of funds to the Contracting Officer, the Government
shall then fund the Study at least in the amounts specified in
the Scope of Studies herein.
b. The Sponsor shall endeavor to obtain during each Government
fiscal year the cash contribution for that fiscal year at least
in the amounts specified in the Scope of Studies incorporated
herein and, once it has obtained such funds for a cash
contribution, shall make such funds available to the Government.
The Government shall withdraw and disburse funds made available
by the Sponsor subject to the provisions of this Agreement.
C. Funds made available by the Sponsor to the Government and not
disbursed by the Government within a Government fiscal year shall
be carried over and applied to the cash contribution for the
succeeding Government fiscal year; provided, that upon study
termination any excess cash contribution shall be reimbursed to
the Sponsor after a final accounting, subject to the availability
of appropriations, as specified in Article XII herein.
d. Should either party fail to obtain funds sufficient to make
obligations or cash contributions or to incur Study Costs in
accordance with the schedule included in the Scope of Studies
incorporated herein, it shall at once notify the Executive
Committee established under Article V herein. The Executive
Committee shall at once determine if the Agreement should be
amended, suspended, or terminated under Article XII herein.
ARTICLE V - MANAGEMENT AND COORDINATION
a. Overall study management shall be the responsibility of an
Executive Committee consisting of the District Engineer and Chief
of Planning Division for the Los Angeles District, U.S. Army
Corps of Engineers; and the Sponsor's counterparts.
b. To provide for consistent and effective communication and
prosecution of the items in the Scope of Studies, the Executive
Committee shall appoint a representative to serve on a Study
Management Team.
C. The Study Management Team will coordinate on all matters
relating to prosecution of the Study and compliance with this
Agreement, including cost estimates, schedules, prosecution of
work elements, financial transactions and recommendations to the
Executive Committee for termination, suspension, or amendment of
this Agreement.
d. The Study Management Team will prepare periodic reports on
the progress of all work items for the Executive Committee.
ARTICLE VI - DISPUTES
a. The Study Management Team shall endeavor in good faith to
negotiate the resolution of conflicts. Any dispute arising under
this Agreement which is not disposed of by mutual consent shall
be referred to the Executive Committee. The Executive Committee
shall resolve such conflicts or determine a mutually agreeable
process for reaching resolution or for termination under Article
XII herein.
b. Pending final decision of a dispute hereunder, or pending
suspension or termination of this Agreement under Article XII
herein, the parties hereto shall proceed diligently with the
performance of this Agreement.
ARTICLE VII - MAINTENANCE OF RECORDS
The Government and the Sponsor shall each keep books, records,
documents, and other evidence pertaining to Study Costs and
expenses incurred pursuant to this Agreement to the extent and in
such detail as will properly reflect total Study Costs. The
Government and Sponsor shall maintain such books, records,
documents and other evidence for inspection and audit by
authorized representatives of the parties to this Agreement.
Such material shall remain available for review for a period of
three (3) years following termination of this Agreement.
ARTICLE VIII - RELATIONSHIP PARTIES
a. The parties to this Agreement act in an independent capacity
in the performance of their respective functions under this
Agreement, and neither party is to be considered the officer,
agent, or employee of the other.
b. To the extent permitted by applicable law, any reports,
documents, data, findings, conclusions, or recommendations
pertaining to the Study shall not be released outside the
Executive Committee or the Study Management Team; nor shall they
be represented as presenting the views of either party unless
both parties shall indicate agreement thereto in writing.
ARTICLE IX - OFFICIALS NOT TO BENEFIT
No member of or delegate to Congress, or other elected official,
shall be admitted to any share or part of this Agreement, or to
any benefit that may arise therefrom.
ARTICLE X - FEDERAL AND STATE LAWS
In acting under its rights and obligations hereunder, the local
sponsor agrees to comply with all applicable Federal and state
laws and regulations, including section 601 of Title VI of the
civil Rights Act of 1964 (Public Law 88-352) and Department of
Defense Directive 5500.11 issued pursuant thereto and published
in Part 300 of Title 32, Code of Federal Regulations, as well as
Army Regulation 600-7, entitled "Nondiscrimination on the Basis
of Handicap in Programs and Activities Assisted or Conducted by
the Department of the Army".
ARTICLE XI - COVENANT AGAINST CONTINGENT FEES
The local sponsor warrants that no person or selling agency has
been employed or retained to solicit or secure this Agreement
upon agreement or understanding for a commission, percentage,
brokerage, or contingent fee, excepting bona fide employees or
bona fide established commercial or selling agencies maintained
by the local sponsor for the purpose of securing business. For
breach or violation of this warranty, the Government shall have
the right to annul this Agreement without liability, or, in its
discretion, to add to the Agreement or consideration, or
otherwise recover, the full amount of such commission,
percentage, brokerage, or contingent fee.
ARTICLE XII - TERMINATION OR SUSPENSION
a. This Agreement shall terminate at the completion of the Study
Period; that prior to such time and upon thirty (30) days written
notice, either party may terminate or suspend this Agreement
without penalty.
b. Within ninety (90) days upon termination of this Agreement
the Study Management Team shall prepare a final accounting of
Study Costs, which shall display disbursements by the Government
of Federal funds, cash contributions by the Sponsor, and credits
for the Negotiated Costs of the Sponsor. Subject to the
availability of funds, within thirty (30) days thereafter the
Government shall reimburse the Sponsor for the excess, if any, of
cash contributions and credits given over fifty (50) percent of
total Study Costs. Within thirty (30) days thereafter, the
Sponsor shall provide the Government any cash contributions
required so that the total Sponsor share equals fifty (50)
percent of total Study Costs.
IN WITNESS THEREOF, the parties hereto have executed this
agreement as of the day and year first above written.
THE UNITED STATES OF AMERICA
CARLSBAD
CITY OF
By By
R.L. VANANTWERP
Colonel, Corps of Engineers
District Engineer
Contracting Officer
City Manager
City of Carlsbad
APPROVED AS TO FORM:
City Attorney