HomeMy WebLinkAbout; Alta Mira & Zone 19 Park Biological Report; Alta Mira & Zone 19 Park Biological Report; 1992-01-31BIOLOGICAL RESOURCES TECHNICAL REPORT
FOR THE ALTA MIRA AND ZONE 19 PARKS
IN THE CITY OF CARLSBAD
Prepared for:
City of Carlsbad
2075 Las Pal mas Drive
Carlsbad, CA 92009-4859
Attention: Mr. Pat Entezari
Prepared by:
P&D TECHNOLOGIES
401 West A Street, Suite 2500
San Diego, CA 92101
Attention: Ms. Elyssa Robertson
January 31,1992
TABLE OF CONTENTS
Section Page
INTRODUCTION 1
Soils 4
SURVEY METHODS AND LIMITATIONS 5
EXISTING CONDITIONS 5
Vegetation/Habitats 5
Special Interest Plants and Habitats 10
Wildlife 13
Special Interest Wildlife Species 16
IMPACTS/CONSTRAINTS 20
MITIGATION RECOMMENDATIONS 21
LITERATURE CITED 24
LIST OF TABLES
Table Number Title page
1 Soils 4
2 Special Interest Plants Species 11
3 Special Interest Wildlife Species 17
LIST OF FIGURES
Figure Number
1
2
3
4
Title
Regional Map
Vicinity Map
Biological Resources of Alta Mira Park
Biological Resources of Zone 19 Park
Page
2
3
6
9
ATTACHMENTS
Number
A
B
C
Title
Floral Species List
Faunal Species List
California Native Plant Society Listing and
Sensitivity - Federal Candidate Species Designations
11
INTRODUCTION
The Alta Mira and Zone 19 park project sites were surveyed by P&D Technologies biological
resource team. The purpose of the biological assessment was to provide the City of Carlsbad
with a planning document which would enable the City to avoid, to the maximum extent feasible,
potentially significant effects to the site's special interest species and habitats. These proposed
park projects are part of the Carlsbad Parks Master Plan and are planned as active recreational
parks. Park design has not been completed; therefore, this report represents a constraints level
of analysis.
This biological report addresses the presence or absence of significant biological resources onsite
and the degree to which the proposed parks may affect such resources, if any. Significant
biological resources are defined herein as any plant or animal species listed as rare, threatened,
or endangered by State or Federal resource agencies, or is considered a depleted or declining
species, and/or any species or natural plant communities (habitat) considered as limited in
distribution or such habitat which typically supports special interest species.
The proposed park sites are generally located in north-coastal San Diego County in the City of
Carlsbad and are bounded by Palomar Airport Road to the north, Batiqiritos Lagoon to the south,
El Camino Real to the east, and Interstate 5 to the west (figures 1 and 2). More specifically, the
proposed Alta Mira park is situated immediately east of and adjacent to Paseo Del Norte Road
in the southern portion of the City of Carlsbad. It occupies approximately 42 acres of primarily
native habitat and lands in various stages of agricultural production. The site is situated on top
of the hills above and south of Canyon de las Encinas and is surrounded by on-going urban
development activity.
The proposed Zone 19 park is located south of the intersection of Palomar Airport Road and
Camino Vida Roble and occupies approximately 35 acres on the hills above and south of Encinas
Creek Canyon. The proposed Zone 19 park project site occupies lands predominantly disturbed
by agricultural production, although portions of the project site extend out onto a small mesa-like
Camp
Pendieton
Riverside County
O'NxffUMi>
PROJECT SITE AREAL
Oceanside
| Valley Center
LJ*t Wofiltora
San
Marcos «M«/VO» / j?*^
^3
Afut Ht&onat '
UfOOII
Carlsbad Wpp
* Ltgooo t
Encinitu \
Sin Ou«iwo
Rancho
Santa Fe
t.a*t A«mon«Rancho ,*
Bernardo tf
Del
Mira Mesa
Ll JOIH •10'I
San Diego
i Chula Vista
Imperial Beach
n/uj<n fjrujo-1
4 F No Scale Regional Map
Figure 2
Scale: r> 2000'
Source: Base Map. 2000* Encinitas Quadrangle 1975.Project Location
along the western margin of the site. Lands immediately to the south, east, and west are
currently proposed for residential development as part of the Aviara development project
SOILS
Eight soil types have been mapped by the U.S. Department of Agriculture (USDA), Soil
Conservation Service (SCS), for the proposed Alta Mira and Zone 19 park project areas. These
soils are listed and described in Table 1.
TABLE 1
SOIL TYPES IDENTIFIED FOR ALTA MIRA AND ZONE 19 PARK SITES
PROJECT SOIL TYPE DESCRIPTION/CHARACTERISTICS
Alta Mira
TeF Terrace escarpments; severe limitations for conversion from brush to grass; severe
credibility potential; Group D hydrologic soils.
LeE Las Flores loamy fine sand; 15-30% slopes; slight limitations for conversion from
brush to grass; severe credibility potential; Group D hydrologic soils.
MIC Marina loamy coarse sand; 2-9% slopes; slight limitation for conversion from brush
to grass; severe credibility potential; Group A hydrologic soils.
CfC Chesterton fine sandy loam; 5-9% slopes; slight limitations for conversion from brush
to grass; severe credibility potential; Group D hydrologic soils.
CfB Chesterton fine sandy loam; 2-5% slopes; slight limitations for conversion from brush
to grass; severe credibility potential; Group D hydrologic soils.
ScA Salinas clay, 0-2% slopes; slight limitations for conversion frombrush to grass; slight
credibility potential; Group C hydrologic soils.
Zone 19
LvF3 Loamy alluvial land, Huerhuero complex; 9-50% slopes; severe limitations for
conversion from brush to grass; severe credibility potential; Group D hydrologic soils.
RdC Redding gravelly loam; 2-9% slopes; moderate limitations for conversion from brush
to grass; severe credibility potential; Group D hydrologic soils.
CfB Chesterton fine sandy loam; 2-5% slopes; slight limitations for conversion from brush
to grass; severe credibility potential; Group D hydrologic soils.
ScA Salinas clay; 0-2% slopes; slight limitations for conversion frombrush to grass; slight
credibility potential; Group C hydrologic soils.
SURVEY METHODS AND LIMITATIONS
Both project sites were surveyed on foot by P&D Technologies biologist Ray Vizgirdas on
December 31, 1991 between the hours of 0800 and 1400. All native habitats were visited, and
all observed plants were identified. Animals were identified by their sign, including scat, tracks,
burrows, and vocalizations or by direct observation. Where particularly dense vegetation or steep
topographic relief was encountered, observations were made using binoculars.
The primary focus of the survey was to map all habitats and sensitive resources. Mapping was
conducted on orthotopographic maps at a 1 inch = 100 feet scale. No detailed plant transects or
animal trapping studies were conducted as part of this effort Further limitations to the
completeness of the faunal and floral inventory were imposed by seasonal and/or temporal
factors. Plants observed were identified and inventoried in the field or on the basis of
characteristic samples returned to P&D's offices. Nomenclature used throughout this report
conforms to Munz (1974) for plants, Holland (1986) for vegetative communities, AOU (1983)
for birds, Jennings (1983) for reptiles and amphibians, and Jones (1982) for mammals.
EXISTING CONDITIONS
The information presented below has been divided into two sub-sections and describes each park
site separately. This has been done to allow for ease of use when referencing the potential
biological effects of each park site.
VEGETATION/HABITATS
Alta Mira Park
Four plant communities are represented onsite: riparian scrub, Diegan coastal sage scrub,
floodplain (unvegetated, sandy wash), and disturbed vegetation (agricultural fields) (Figure 3).
A complete floral species list is included as Attachment A of this report
r. ^ Scale: 1"=167
Figure 3
Source: 100' Scale City of Carlsbad Orthophoto Map. 1988 BEST ORIGINAL A|ta Mjra parR Bjo(ogjca| Reso(jrces
''"""^ The riparian scrub habitat onsite occupies approximately 0.5 acres within the two acre floodplain
i^^located along the western margin of the site. This floodplain is located between coastal sage
scrub to the west and agricultural fields to the east This riparian scrub habitat is poorly
developed, and no well defined stream bank exists.
Riparian scrub is a class of wetland vegetation dominated by woody vegetation less than six
meters (20 feet) in height Typical species in this class are considered true shrubs, young trees,
and trees or shrubs that are small or stunted due to environmental conditions (wet soils). In
drainages where available water depends on seasonal and urban runoff, an open riparian scrub
community of wash-associated shrubs occurs. Two small patches of willows (Salix sp.) and one
small patch of mulefat scrub represent the dominant riparian scrub plant species onsite. This
riparian scrub habitat exists as isolated pockets of vegetation which have been disturbed to some
degree by surrounding development and adjacent agricultural activities. Though the willows are
large and usually offer excellent habitat, the small size of these habitats onsite, as well as their
isolated nature, diminishes their overall value to wildlife species. This riparian scrub habitat
,^8»SRV
.^ appears to be supported by intermittent water flow from surrounding development and from
agricultural runoff to this shallow drainage.
The floodplain area consists predominantly of numerous common weedy species such as
cocklebur Qtanthium strumarium), Russian thistle (Salsola ibericd), mustard (Brassica sp.), star
thistle (Centaurea melitensis) and tree tobacco Qficotiana glaucd). This habitat is considered
disturbed and, if left alone, would regenerate to riparian scrub habitat
The Diegan coastal sage scrub habitat represented onsite consists of approximately 8.5 acres and
is composed primarily of low, soft, woody subshrubs forming a nearly uniform height to
approximately three-to-four feet Many of these plants are facultatively drought deciduous. This
association is typically found on dry sites, such as steep, south and southeast-facing slopes or on
clay-rich soils that are slow to release stored water. The dominant shrub species observed onsite
include: California sagebrush (Artemisia californicd), chamise (Adenostomafasciculatwri), flat-
topped buckwheat (Eriogonwn fasciculatum), broom baccharis (Baccharis sarothroides), and
black sage (Salvia melliferd). The quality of this habitat type onsite is relatively high, exhibiting
minimal disturbance. The remainder of this site probably supported similar native vegetation
prior to the current agricultural activities.
The bulk of lands onsite have been heavily disturbed by on-going agricultural activities and dirt
access roads, and consist of approximately 30.5 acres. Disturbed areas of the project site are
dominated by weedy, introduced species, and plant cover is generally open due to frequent and/or
recent disturbance. Common species here include red-stem filaree (Erodium cicutariwn), fennel
(Foeniculum vulgare), Russian thistle, bull thistle (Cirsium vulgare), telegraph weed (Heterotheca
grandiflora), and flower crop species.
Approximately one acre of chaparral vegetation exists as a small, isolated patch in the
northwestern corner of the park site. Plant species which dominate this habitat consist of
chamise, scattered laurel sumac (Malosma laurina), California buckwheat (Eriogomun
fasciculatwri), and black sage.
Zone 19 Park
Two plant communities are represented onsite: chaparral and disturbed vegetation in the form of
agricultural fields (Figure 4). A complete floral species list is included as Attachment A of this
report
Although a majority of the site is dominated by historic agricultural activity, the northern and
western portion of the site encompass slopes of an adjacent canyon which contain chaparral
vegetation. This mixed chaparral community consists of approximately 10 acres and is
dominated by lemonade berry (Rhus integrefolia), laurel sumac, toyon (Heteromeles arbutifolid),
mission manzanita (Xylococcus bicolor), black sage, chamise, California buckwheat, and scattered
oak trees (Quercus agrifolia). Two large, specimen size coast live oak trees (Quercus agrifolia)
exist on the more level portions in the northeast corner of the site.
In general, agriculture and/or disturbed areas dominate the project site. Typical weedy,
introduced species similar to those present in non-native grassland habitats were observed here,
8
o
o
u
BEST ORIGIN/,
F ^ Scale: 1"=167'
Figure 4
Source: 100' Scale City of Carlsbad Orthophoto Map. 1988 Zone 19 Park Biological Resources ||
v, although plant cover is generally less evident due to frequent and/or recent disturbance. Common
species here include red-stem filaree, fennel, Russian thistle, and telegraph weed. The lands
onsite that have been heavily disturbed by historic agricultural activities and creation of dirt
access roads consist of approximately 25 acres.
SPECIAL INTEREST PLANTS AND HABITATS
Alta Mira Park
Special interest plant species and habitats are those which are considered rare within the region,
have been identified by the California Natural Diversity Data Base, or support plants or animals
considered sensitive by resource protection agencies (U.S. Fish and Wildlife Service and the
California Department of Fish and Game). Special interest plants and habitats are so called
because of their limited distribution, restricted habitat requirements, or particular susceptibility
to human disturbance, or a combination of these factors. Sources used for the determination of
sensitive biological resources include: U.S. Fish and Wildlife Service (USFWS, 1985 {a and b}),
California Department of Fish and Game (CDFG, 1987), and California Native Plant Society
(Smith, 1988). Table 2 lists the sensitive plant species known from the project area, legal status,
and the habitat in which they are generally found. These species were not observed onsite and
are not expected to occur onsite due to inappropriate habitat and soil conditions.
The special interest habitats onsite include riparian scrub and Diegan coastal sage scrub
associations. Riparian habitats, in general, are considered a particularly sensitive resource by the
California Department of Fish and Game. This habitat type is defined as a wetland by the U.S.
Fish and Wildlife Service (Cowardin eL al, 1979). Wetland habitat is specifically addressed by
the California Department of Fish and Game Code sections 1600-1606 (Streambed Alteration
Agreement). Wetlands may also fall under the jurisdiction of the U.S. Army Corps of Engineers,
Section 404 permit process. Wetland habitat is also considered a valuable but declining resource
locally.
10
TABLE 2
SPECIAL INTEREST PLANT SPECIES
KNOWN FROM THE PROJECT AREA
SPECIES
Acanlhamintha ilicifolia
San Diego thommint
Adolphia californica
California adolphia
Baccharis vanessae
Encinitas baccharis
Ceanothus verrucosus
Warty-stemmed ceanotbus
Corethrogyne filaginifolia
CNPS
IB
2
IB
2
IB
STATUS
Red Code CDFG USFWS
2-3-2 CE C2
1-2-1
2-3-3 CE C2
1-2-1
3-2-3 - C2
HABITAT
chap/css/grs/clay
chap
chap
chap
chap
var. UnifoUa
Del Mar Mesa sand aster
Harpogonella palmeri var. palmeri
Palmer's grappling-hook
1-2-1 chap/css/grs
chap = chaparral grs = grassland ess = coastal sage scrub clay = clay soils
Source: Refer to Appendix C for an explanation of the status designation
Under Section 404 of the Clean Water Act, wetlands are subject to permit provisions regulating
activities within their boundaries. These are enforced by the U.S. Army Corps of Engineers and
the U.S. Environmental Protection Agency, with technical input from the U.S. Fish and Wildlife
Service. Wetland habitat is naturally limited and remaining acreages are important islands for
migrant birds. Many bird species are restricted to riparian habitat and are dependent on it for
breeding. Overall wildlife diversity is normally substantially higher in riparian areas than in
surrounding habitats. Such habitats, by occupying natural drainages, also function to control
water quality and erosion, as well as serve as wildlife corridors.
11
Three factors are considered in the designation of wetlands: the presence of hydrophytic
vegetation, hydric soils, and site hydrology. A minimum of one positive wetland indicator from
each category must be found for the Corps to determine an area to be a wetland (U.S. Army
Corps of Engineers, 1986). Areas indicated as wetlands by all three factors during the rainy
season may lack the indicators of hydrology and/or vegetation during the dry season, or the
vegetation may have been altered or removed through human disturbance. Such areas may still
be regarded as wetlands by resource agencies. Wetlands on the project site include southern
riparian scrub totalling approximately 0.6 acres.
Coastal sage scrub is considered a sensitive habitat by the County of San Diego. Atwood (1990)
has estimated that as much as 80 percent of the original acreage of this habitat in the State has
been lost as a result of urban expansion in coastal areas. Attwood (1990) has called coastal sage
scrub one of the most endangered habitats in the nation. Additional evidence of the decline of
this once common habitat is the growing number of declining plant and animal species associated
with it The proposed Alta Mira project site contains approximately 8.5 acres of high quality
Diegan coastal sage scrub.
Zone 19 Park
No special interest plant species were observed onsite during the surveys and none are expected
due to the amount of disturbance. However, the onsite oak trees are considered an important
resource by state and federal agencies, as well as the City of Carlsbad and the County of San
Diego.
As an integral component of the chaparral habitat onsite, the coast live oak trees are scattered
among the slopes of the onsite canyons. Two large oak trees also exist near the northeast corner
of the site, where a small draw enters the project area from the north. These oaks, though
numerous, are scattered in such a way that they do not constitute a forest or woodland habitat,
in and of themselves. These tree, however, do offer opportunities for perching, roosting, and
nesting for a variety of raptor species.
12
WILDLIFE
Alta Mira Park
Due to the sparsity of native vegetation and a predominance of disturbed areas onsite, wildlife
is expected to consist of a limited representation of what normally would be expected in the
coastal foothills and valley grassland regions of San Diego County. The open character of much
of the site should attract a variety of raptors; however, wildlife species would not be especially
attracted to the riparian scrub areas onsite due to their limited size and isolated nature (not
contiguous with similar habitat).
Species either observed or indicated by direct evidence are listed in attachments B and C of this
report Wildlife species considered of high interest are discussed within the text of this report.
A relatively small number of reptile and mammal species were actually observed during the field
reconnaissance. This is due, in part, to a variety of factors including time of year and the
nocturnal and secretive habits of many species which may occur in the area. The observed and
expected fauna of the project site are discussed by taxonomic grouping below.
Amphibians - Though no amphibians were detected during the project survey, several species
could potentially occur in the wetland and adjacent upland habitats. These would include the
Pacific treefrog (Hyla regilla), garden slender salamander (Batracsops pacificus), and the
California toad (Bufo boreas). Several of these species are known to frequent a variety of
habitats from sea level to high into the mountains. They breed in marshes, lakes, ponds, roadside
ditches, reservoirs, and slow streams in woods, meadows, and grassland, and are primarily ground
dwellers found among low plant growth near a water source.
Reptiles - Only one reptile species, the western fence lizard (Sceloporus occidentalis), was
observed onsite during the surveys. Other reptile species expected to occur onsite include the
western rattlesnake (Crotalus viridis), striped racer (Masticophis laterlis), common kingsnake
(Lampropeltis getulus), and the gopher snake (Pituophis melanoleucus).
13
Mammals - Several mammal species were directly detected onsite. These include coyote (Canis
latrans), Audubon's cottontail (Syvilagus audubonii), California ground squirrel (Spermophilus
beecheyf), and raccoon (Procyon lotor). Runways of meadow mice (Microtis californicus) were
observed in areas of the project site containing annual grasses.
Birds - Approximately 27 species of birds were detected on this proposed park site during the
survey (attachment B). Most of these species are typical inhabitants of Diegan coastal sage scrub
and chaparral communities in Southern California. The following species were observed onsite:
greater roadrunner (Geococcyx californianus), NuttalTs woodpecker (Picoides nutallti), scrub jay
(Aphelocoma coerulescens). Brewer's blackbird (Euphagus cyanocephalus), northern mockingbird
(Mimus polyglottos), and song sparrow (Melospiza melodia). Typical coastal sage scrub species
which are residents of the site include the California quail (Callioeloa California*), Anna's
hummingbird (Calypte anna), California gnatcatcher (Polioptila californica), wrentit (Chamaea
fasciata), and California towhee (Pipilo crissalis). Although non-native grasses found on the
project site do not contain sensitive or unique floral resources, these grasses may be considered
important for wildlife species. This is due to the habitat and foraging area they provide for a
variety of animal species when in conjunction with nearby sage scrub and riparian resources, as
well as their proximity to intermittent water resources.
Two red-tailed hawks (Buteo jamaicensis), a turkey vulture (Cathartes aura), a raven (Corvus
corax) and an American kestrel (Falco sparverius) were observed flying over the site. Raptor
species observed onsite or overhead presumably forage on the project site and at nearby
properties.
Zone 19 Park
The small amount of native vegetation and the predominance of disturbed agricultural areas
onsite are expected to provide only modest opportunity for wildlife in the area. For this reason,
onsite wildlife consists of a limited representation of what normally would be expected in the
14
coastal foothills and valley grassland regions of San Diego County. The open character of much
of the site, however, should attract a variety of foraging raptors.
Wildlife species either observed or indicated by direct evidence are listed in attachments B and
C of this report Wildlife species considered of high interest are discussed within the text of this
report A relatively small number of reptile and mammal species were actually observed during
the field reconnaissance. This is due, in part, to a variety of factors including time of year and
the nocturnal and secretive habits of many species which may occur in the area, as well as the
amount of site disturbance. The observed and expected fauna of the project site are discussed
by taxonomic grouping below.
Amphibians - No amphibians were detected during the survey period and none are expected due
to a lack of appropriate habitat onsite. In general, amphibian species occur in wetland and
adjacent upland habitats.
Reptiles - Two reptile species were observed onsite during the surveys. These were the western
fence lizard (Sceloporus occidentalis) and the gopher snake (Pituophis melanoleucus). Other
reptile species expected to occur onsite include the western rattlesnake (Crotalus virldis), striped
racer (Masticophis laterlis), and the common kingsnake (Lampropeltis getulus).
Mammals - Four mammal species were directly detected onsite. These include coyote (Canis
latrans), Audubon's cottontail (Syvilagus audubonii), California ground squirrel (Spermophilus
beecheyi), and Botta's pocket gopher (Thomomys bottae),
Birds - Approximately 27 species of birds were detected on this proposed park site during the
survey (attachment B). Most of these species are typical inhabitants of chaparral and the coastal
sage scrub communities in Southern California. Species occuring onsite in these habitats include:
lesser goldfinch (Carduelis psaltria), morning dove (Zenaida macroura), greater roadrunner,
Nuttall's woodpecker, scrub jay, rufus-sided towhee (Pipilo erythrophthalmus\
15
savannah sparrow (Passerculus sandwichensis), and western meadowlark (Sturnella neglecta).
Also observed flying overhead were a turkey vulture and a red-tailed hawk. Other species
observed onsite, which may be residents, include the California quail (Callioeloa californica),
Anna's hummingbird (Calypte anna), wrentit (Chamaeafasciata'), and California towhee (Pipilo
crissalis).
Although non-native grasses are found on the project site scattered throughout the chaparral
vegetation and beneath the onsite oaks, they do not constitute a grassland, per se, and likely do
not contain special interest plant resources. However, they may be considered important for
some species of wildlife due to the habitat and foraging area they provide when in conjunction
with nearby chaparral resources. A proximity to intermittent water resources is also an important
aspect in the development of biological diversity for any site.
One red-tailed hawk and a turkey vulture were observed flying over this project site. Raptor
species observed onsite or overhead presumably forage on the project site and at nearby
properties. Also observed onsite was a great horned owl (Bubo virginianus), which was seen
roosting in one of the two large coast live oak trees located in the northeastern corner of the site.
No raptor nests were observed during the survey. However, these large owls are known to utilize
abandoned red-tailed hawk nests (Unitt 1984).
SPECIAL INTEREST WILDLIFE SPECIES
Alto Mira Park
No animal species listed as threatened or endangered by state or federal agencies were detected
during the survey and none are expected to occur onsite. However, two species considered
sensitive by state, federal, or local resource conservation agencies were detected within the
project boundary: California gnatcatcher and red-tailed hawk. Table 3 lists the special interest
wildlife species known from the area of the Alta Mira park project site. Other sensitive species
which may be expected, but were not observed onsite, include the San Diego homed lizard
16
TABLE 3
SPECIAL INTEREST WILDLIFE SPECIES
KNOWN FROM THE PROJECT AREA
SPECIES
Black-Shouldered Kite
California Gnatcatcher*
San Diego Homed Lizard
Cooper's Hawk
Least Bell's Vireo
Northern Harrier
Orange-throated Whiptail
Pacific Pocket Mouse
Red-tailed Hawk*
Willow Flycatcher
Great Horned Owl*
American Kestrel*
STATUS
Federal State
CFP
PFE CSC
2 CSC
CSC
FE CE
CSC
2 CSC
2 CSC
—
FSS CSC
—
—
* species observed onsite
Source: Refer to Appendix C for an explanation of the status designation
17
^ ^ (Phyrnosoma coronation blainvelli) and orange-throated whiptail (Cnemidophorus hyperythrus
beldingi).
Two California gnatcatchers were observed utilizing the coastal sage scrub onsite. This small,
sedentary bird is ecologically thought to be restricted to the sage scrub plant community of
Southern California. This species is currently under a proposal review by the U.S. Fish and
Wildlife Service for federal listing as endangered. The California gnatcatcher is a permanent
resident of the sage scrub community, a unique and diverse vegetation type that many experts
consider to be one of the most endangered habitats in the continental United States (Atwood,
1990). The precise ecological requirements of the California gnatcatcher are not well known, and
not all areas of sage scrub appear to be suitable habitat capable of supporting this species
(Atwood, 1990). Subtle differences in plant species composition, vegetative structure, fire
history, and geographic location may affect habitat suitability.
Liberal estimates of the number of California gnatcatchers presently occurring in the United
States range from 1,200 to 2,000 pairs (Atwood, 1990), with sizable and stable populations
persisting in Orange, Riverside, and San Diego counties. No reliable data on the territory size
of this bird in San Diego County have been published, although biologists working with the
California gnatcatcher in San Diego County in the last few years (Sweetwater Environmental
Biologist, 1986; WESTEC, 1987; ERCE, 1990) have indicated territories ranging from 2 to 14.5
acres. Extensive studies of color banded individuals by ERCE (1990) have indicated larger
territories by up to 75%. For example, a pair of California gnatcatchers that spends most of its
time within approximately 13 acres may, during the course of the breeding season use an area
as large as approximately 23 acres. A total of two individuals (one pair) were observed on the
project site. These two individuals limited their use of the site to the 8.5 acres of coastal sage
scrub in the western portion of the Alta Mira site (Figure 3).
Birds of prey (raptors) as a group are considered sensitive because of loss of foraging areas, their
vulnerability to human disturbance, their low population densities, and their position at the top
of the food chain. Raptor species observed flying over the site presumably forage there. Red-
18
tailed hawks are fairly common residents and winter visitors. They are most numerous around
agricultural fields and grassland, but wandering individuals are often seen over any habitat.
The San Diego homed lizard (Phrynosoa coronation blainvillei) is a candidate for federal listing
(Category 2), protected by the California Department of Fish and Game and considered
endangered by the San Diego Herpetological Society (SDKS, 1980) because of habitat destruction
and collecting for the pet trade. No individuals were observed on die project site; however,
habitat onsite (Diegan coastal sage scrub) may be appropriate.
The orange-throated whiptail (Cnemidophorus hypeythrus beldingi) is a candidate for federal
listing (Category 2), protected by the California Department of Fish and Game, and considered
threatened by the San Diego Herpetological Society (SDKS, 1980). The principal threat to this
species is the loss of open sage scrub, its preferred habitat No individuals were observed in the
various locations and habitats surveyed throughout the project site. This species may also be
expected to occur here.
Zone 19 Park
No animal species listed as threatened or endangered by state or federal agencies were detected
during the survey and none are expected to occur onsite. Two species considered sensitive by
stale, federal, and/or local resource conservation agencies were detected within the project
boundary: great homed owl (Bubo virginianus)and red-tailed hawk. Other sensitive species
which may be expected, but were not observed onsite, include the San Diego horned lizard
(Phyrnosoma coronation blainvelli) and orange-throated whiptail (Cnemidophorus hyperythrus
beldingi). Table 3 lists both the observed and expected wildlife species for the proposed Zone
19 park project site.
Birds of prey (raptors) as a group are considered sensitive because of loss of foraging areas, their
vulnerability to human disturbance, their low population densities, and their position at the top
of the food chain. The red-tailed hawk observed flying over the site presumably forages here.
19
Red-tailed hawks arc fairly common residents and winter visitors. They are most numerous
around agricultural fields and grassland, but wandering individuals arc often seen over any
habitat A great horned owl was observed in the group of two large oak trees near the northeast
corner of the site. This owl species is an uncommon resident of many different habitat types,
including mature oaks and agricultural areas. They may be found wherever there are tall trees
or buildings which provide cavities for nesting and/or daytime roosting.
IMPACTS/CONSTRAINTS
Alta Mira Park
Development of a park on this site would potentially result in alteration of nearly all 42 acres.
The following analysis is based on utilization of the entire area within the proposed park
boundary and, therefore, assumes a worst-case scenario.
The proposed project would result in the loss of approximately two acres of riparian scrub and
floodplain habitat It would not be considered a significant biological effect of project
implementation, in and of, itself because of its small size and isolated character. However, the
loss of this wetland habitat would be considered significant under the "no net loss" policy of the
California Department of Fish and Game. Mitigation at a ratio of at least 1:1 would be required
for any alteration of this habitat, pursuant to a California Department of Fish and Game Section
1601 Streambed Alteration Agreement Loss of this habitat would be a significant adverse,
cumulative impact, adding to the region-wide reduction of this habitat type. This habitat also acts
as a buffer between the California gnatcatcher (sage scrub habitat) and adjacent agricultural
activity onsite.
The proposed Alta Mira Park project would also result in the loss of approximately 8.5 acres of
Diegan coastal sage scrub. Loss of this habitat would be an adverse, cumulative impact, adding
to the region-wide reduction of this habitat type. In addition, impacts to the coastal sage scrub
supporting two California gnatcatchers would be considered significant due to the presence of
California gnatcatchers and their current status.
20
Zone 19 Park
No significant biological effects are anticipated to occur should development proceed at the
proposed Zone 19 project site.
Adverse, but not significant impacts which may be expected as a result of project implementation
include: 1) the loss of approximately 10 acres of mixed chaparral habitat; 2) the loss of
approximately 10-12 oak trees, two of which are of specimen size and are located near the
northeast corner of the project site. A specimen oak is defined here as having a crown spread
(diameter) of at least 10 feet; and 3) the loss of perching, roosting, and/or nesting opportunity
which may result from the removal of onsite oak resources. Loss of these resources would be
an adverse, cumulative impact, adding to the region-wide reduction in San Diego county.
MITIGATION AND RECOMMENDATIONS
It is generally recommended for each park site that excessive use of invasive landscape plant
material not be utilized. Numerous species are known to take over large areas of native lands
and out-compete the native wildlife species. Species such as ice plant, eucalyptus, and pampas
grass are examples of such "pest" landscape species. It is recommended that drought tolerant,
low invasive species be primarily utilized.
Alta Mira Park
Significant impacts at the Alta Mira Park site could potentially occur to coastal sage scrub
habitat, riparian habitat, and the California gnatcatcher. Therefore, the following mitigation
measures should be incorporated into the park design. The following mitigation measures are
discussed in order of recommended priority.
The significant impact to the onsite Diegan coastal sage scrub habitat and the two California
gnatcatcher which currently use this resource should be avoided to the maximum extent feasible.
Complete avoidance of these habitats will eliminate the need for any additional mitigation, park
21
development delays, andNor potential offsite mitigation land purchases. Once avoided, the area
should be deeded into permanent open space, allowing only minimal encroachment by those
potentially using the area. To avoid this sensitive resource, park design should include access
to the site from the eastern parcel edge. Conversations with City staff indicate a planned park
design which would allow site access from the east boundary of the parcel (Pers. Comm. P.
Entezari). Based on this tentative agreement, there would be no significant impacts to these
resources, and no further mitigation would be required.
If, however, some impacts occur within these resources, then mitigation measures will be
required. Mitigation measures for impacts to the coastal sage scrub and the one pair of California
gnatcatcher would take the form of offsite mitigation land purchases. Property purchased for
mitigating the coastal sage scrub impacts must support at least one pair of California gnatcatcher
(regardless of acreage) and be contiguous to offsite permanent open space. The City of Carlsbad
is currently preparing a City-wide Habitat Conservation Plan for the California gnatcatcher. Any
purchases or mitigation measures for this project should be consistent and in conformance with
the goals of that effort
Impacts to the riparian scrub habitat onsite would require consultation with the California
Department of Fish and Game for a Streambed Alteration Agreement (1600-1603). Revegetation
of riparian habitat at a minimum ratio of 1:1 replacement would be required. The revegetation
should take place within the same drainage onsite, if the entire drainage has not been impacted.
If, however, the entire area is impacted, then offsite purchases and mitigation measures would
be required. It should be noted that locations for wetland (riparian) revegetation efforts are
becoming more scarce throughout the San Diego region and location of a suitable size parcel
would be costly and time consuming.
Impacts to the disturbed areas including dirt roads and agriculture do not require mitigation
measures.
22
k „ Zone 19 Park
No significant impacts were identified for this proposed park site. Therefore, no mitigation
measures are required. It is recommended, however, that the canyon edges not be excessively
filled. Filling of these areas may have negative effects on the canyon bottom in the long term.
It is further recommended that the onsite oak trees be retained and incorporated into the park
design.
23
LITERATURE CITED
American Ornithologists' Union, committee on classification and nomenclature. 1986. Thirty-fourth supplement to the
AOU Checklist of North American birds. The Auk 99(3).
Attwood, J. 1990. Status Report of the California Gnatcatcher. USFWS, unpublished report.
Beanchamp, ILM. 1986. A Flora of San Diego County. Sweetwater River Press. 241 pp.
California Department of Fish and Game. 1990. Special Animals. Natural Diversity Data Base.
Cowardin, LJvL, F.C Golet, and E.T. LaRoe. 1979. Classification of wetlands and deepwater habitats of the United
States. U.S. Fish and Wildlife Service, U.S. Department of Interior, December.
Entezari, Pat 1992. Project Manager, City of Carlsbad. Personal communication with Elyssa Robertson, January 1992.
Holland, R-F. 1986. Preliminary descriptions of the natural communities of California. State of California, The
Resources Agency.
Jennings, MR. 1983. An annotated checklist of the amphibians and reptiles of California. California Department of Fish
and Game 69(3):151-171.
Munz, P.A. 1974. A flora of southern California. University of California Press, Berkeley. 1086pp.
San Diego Herpetological Society. 1980. Survey and status of endangered and threatened species of reptiles natively
occurring in San Diego County. Prepared for Fish and Wildlife Committee, San Diego Department of
Agriculture. 33 pp.
Smith, J.P., Jr. and K. Berg. 1988. Inventory of rare and endangered vascular plants of California. California Native
Plant Society, special publication no. 1 (4th edition).
Tate, J. Jr, and DJ. Tate. 1982. The Blue List for 1982. American birds 35(1)3-10.
United States Army Corps of Engineers (ACOE). 1986. The Federal Manual for Identifying and Delineating Jurisdictional
Wetlands.
United States Department of Agriculture (USDA). 1973. Soil Survey, San Diego area, California.
United States Fish & Wildlife Service. 1985a. Endangered and threatened wildlife and plants: Review of plant taxa for
listing as endangered and threatened species; .Notice of review; Federal Register, 50(188): 39526-39527,
September 27.
United States Fish & Wildlife Service. 1985b. Endangered and threatened wildlife and plants. Review of taxa for listing
as endangered or threatened species. Notice of review. Federal Register, 50(181), 37958-37967, September 18.
Unitt, P. 1984. The Birds of San Diego County.
24
ATTACHMENT A
Floral Species List
ALTA MIRA/ZONE 19 PARK PROJECT SITES
OBSERVED FLORAL SPECIES
SPECIES ALTA MIRA ZONE 19
Amaranthaceae-Amaranth Family
Amaranthus sp. XX
Amarylladaceae
Bloomeria crocea
Dichelostemma pulchella X
Anacardiaceae - Sumac Family
Malosma laurina X X
Rhus integrifolia X X
Asclepiadaceae - Milkweed Family
Asclepias sp. X
Boraginaceae - Borage Family
Heliotropiwn curassavicum X
Pectocarya sp. X
Cactaceae - Cactus Family
Opuntia littoralis X X
Caprifoliaceae - Honeysuckle Family
Sambucus mexicana X
Chenopodiaceae - Goosefoot Family
Salsola iberica X X
Compositae (Asteraceae) - Sun Flower
Achillea millefolium X X
Ambrosia psilostachya X
Artemisia californica . X X
Artemisia dracunculus X
Baccharis glutinosa X X
Baccharis sp. X X
Centaurea sp. XX
Circium sp. X X
Corethrogyne filaginifolia X
Haplopappus venetus X X
SPECIES ALTA MIRA ZONE 19
Hemizonia fasciclata X
Heterotheca grandifolora X X
Lactuca serriola X X
Malacothrix sp. X X
Picris echioides X
Xanthium strumarium X X
Brassicaceae (Cruciferae) - Mustard Family
Brassica sp. X X
Ericaceae - Heath Family
Xylococcus bicolor X
Euphorbiaceae -Spurge Family
Croton californicus X
Eremocarpus setigerus X
Euphorbia sp. X
Ricinus communis X X
Fagaceae - Oak Family
Quercus agrifolia
Geraniaceae - Geranium Family
Erodium sp. X X
Hydrophyllaceae - Waterleaf Family
Phacelia sp. X
Iridaceae -Iris Family
Sisyrinchium bellum X
Lamiaceae (Labiatae) - Mint Family
Marrubium vulgare X
Salvia mellifera XX
Polemoniaceae - Phlox Family
Navarretia sp. XX
Polygonaceae - Buckwheat Family
Eriogonum fasciculatum X X
Rwnex crispus X X
SPECIES ALTA MIRA ZONE 19
Rosaceae - Rose Family
Adenostoma fasciculatwn X
Heteromeles arbutifolia X
Salicaceae - Willow Family
Salix sp. X
Solanaceae - Nightshade Family
Nicotiana glauca X
Apiaceae (Umbelliferae) - Carrot Family
Foeniculwn vulgare X X
ATTACHMENT B
Faunal Species List
ALTA MIRA/ZONE 19 PARK PROJECT SITES
WILDLIFE LIST
SPECIES
BIRDS
Family Cathartidae
Turkey Vulture Cathartes aura
Family Accipitridae
Red-tailed Hawk Buteo jamaicensis
Family Falconidae
American Kestrel Falco sparverius
Family Phasianidae
California Quail Callipepla californica
Family Columbidae
Mourning Dove Zenaida macroura
Family Cuculidae
Greater Roadrunner Geococcyx californianus
Family Strigidae
Great Horned Owl Bubo virginianus
Family Trochilidae
Anna's Hummingbird Calypte anna
Family Picidae
Nuttall's Woodpecker Picoides nuttallii
Family Tyrannidae
Black Phoebe Sayornis nigricans
Cassin's Kingbird Tyrannus vociferans
Family Corvidae
Scrub Jay Aphelocoma coerulescens
American Crow Corvus brachyrhynchos
Common Raven Corvus corax
ALTA MIRA ZONE 19
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SPECIES ALTA MIRA ZONE 19
Family Paridae
Plain Titmouse Parus inornatus X
Family Aegithalidae
Bushtit Psaltriparus minimus X X
Family Troglodytidae
Bewick's Wren Thryomanes bewickii X X
Family Muscicapidae
California Gnatcatcher Polioptila californica X
Wrentit Chamaea fasciata X X
Family Mimidae
Northern Mockingbird Mimus polyglottos X X
Family Bombycillidae
Cedar Waxwing Bombycilla cedrontm X
Family Emberizidae
Subfamily Parulinae
Orange-crowned Warbler Vermivora celata X
Yellow-rumped Warbler Dendroica coronata X X
Subfamily Emberizinae
Rufous-sided Towhee Pipilo erythrophthalmus X
California Towhee Pipilo crissalis X X
Savannah Sparrow Ammodramus sandwichensis X X
Song Sparrow Melospiza melodia X
White-crowned Sparrow Zonotrichia leucophrys X
Dark-eyed Junco Junco hyemalis X
Subfamily Icterinae
Western Meadowlark Sturnella neglecta X
Brewer's Blackbird Euphagus cyanocephalus X
Brown-headed Cowbird Molothrus ater X
Family Fringillidae
House Finch Carpodacus mexicamis X X
Lesser Goldfinch Carduelis psaltria X X
SPECIES ALTA MIRA ZONE 19
MAMMALS
Coyote Cams latrans X X
California Ground Squirrel Spermophilis beecheyi X X
Botta's Pocket Gopher Thomomys bottae X X
Audubon's Cottontail Syvilagus audubonii X X
Raccoon Procyon lotor X
Meadow Mouse Microtis californicus X
REPTILES
Western Fence Lizard Sceloporus occidentalis X X
Gopher Snake Pituophis melanoleucus X
ATTACHMENT C
California Native Plant Society Listing and
Sensitivity - Federal Candidate Species Designations
CALIFORNIA NATIVE PLANT SOCIETY
LISTING AND SENSITIVITY
FEDERAL CANDIDATE SPECIES DESIGNATIONS
California Native Plant Society (1988)
List 1 = Plants of highest priority
1A = Plants presumed extinct in California
IB = Plants rare and endangered in California and
elsewhere
List 2 = Plants rare and endangered in California, but common
elsewhere
List 3 = Plants about which we need more information
List 4 = Plants of limited distribution (A watch list)
CNPS R-E-D Code
R (Rarity)
1 = Rare, but found in sufficient numbers and
distributed widely enough that the potential for
extinction or extirpation is low at this time.
2 = Occurrence confined to several populations or one
extended population.
3 = Occurrence limited to one or a few highly restricted
populations, or present in such numbers that it is
seldom reported.
E (Endangered)
1 = Not endangered
2 = Endangered in a portion of its range
3 = Endangered throughout its range
D (Distribution)
1 = More or less widespread outside California
2 = Rare outside California
3 = Endemic to California
FEDERAL CANDIDATE SPECIES DESIGNATIONS*
Cl = Enough data are on file to support the federal
listing.
Cl = Enough data are on file to support federal listing,
but the plant is presumed extinct.
C2 = Threat and/or distribution data are insufficient to
support federal listing.
C3a = Extinct
C3b = Taxonomically invalid
C3c = Too widespread and/or not threatened
*Source: Smith and Berg (1988)
GEOTECHNICAL REPORT
v,,,
GEOTECHNICAL ENGINEERING INVESTIGATION
AND GEOLOGIC RECONNAISSANCE
FOR
ALTA MIRA PARK
CARLSBAD, CALIFORNIA
PREPARED FOR
THE DIKE PARTNERSHIP
IRVINE, CALIFORNIA
PREPARED BY
GEOCON INCORPORATED
SAN DIEGO, CALIFORNIA
FEBRUARY 1992
GEOCON
INCORPORATED
Geotechnical Engineers and
Engineering Geologists
File No. 04786-54-01
February 5, 1992
The Dike Partnership
One Venture Suite 100
Irvine, California 92718
Attention: Mr. Jim Ridge
Subject: ALTA MIRA PARK
CARLSBAD, CALIFORNIA
GEOTECHNICAL INVESTIGATION
AND GEOLOGIC RECONNAISSANCE
Gentlemen:
In accordance with your authorization and our proposal dated November 7, 1991, we have
performed a geotechnical engineering investigation and geologic reconnaissance for the
subject park site development. The accompanying report presents the findings from our
study and our conclusions and recommendations relative to the proposed development of
park site improvements.
If you have any questions regarding this report, or if we may be of further service, please
do not hesitate to contact this office at your convenience.
Very truly yours,
David
RCE22527-/
EBR:JH:DFL:slc
(10) addressee
6960 Flanders Drive
San Diego, CA 92121-2974
619 558-6900
FAX 619 558-6159
Hoobs
CEG 1524
Eric B. Rehwoldt
Staff Engineer
CERTIFIEDENGINEERING
GEOLOGIST
TABLE OF CONTENTS
PURPOSE AND SCOPE 1
SITE AND PROJECT DESCRIPTIONS 2
SOIL AND GEOLOGIC CONDITIONS 4
Unsuitable Fill (Qusf) 5
Topsoil (unmapped) 5
Alluvium (Qat) 6
Terrace Deposits (Qt) 7
Delmar Formation (Td) 7
GROUNDWATER 9
GEOLOGIC HAZARDS 9
Faulting and Seismicity 9
Liquefaction 12
CONCLUSIONS AND RECOMMENDATIONS 13
General 13
Grading 14
Soil and Excavation Characteristics 17
Bulking and Shrinkage Factors 18
Slopes 19
Foundations 20
Concrete-Slabs-On-Grade 21
Retaining Walls 22
Lateral Loads 23
Corrosion Potential 24
Preliminary Pavement Recommendations 25
Site Drainage 28
Plan Review 28
LIMITATIONS AND UNIFORMITY OF CONDITIONS
MAPS AND ILLUSTRATIONS
Figure 1, Vicinity Map
Figure 2, Geologic Map (Map Pocket)
Figures 3a - 3b, Slope Stability Analysis
Figures 4a - 4b, Surficial Slope Stability Analysis
Figure 5, Wall/Column Footing Dimension Detail
Figure 6, Retaining Wall Drainage Detail
APPENDIX A
FIELD INVESTIGATION
Figures A-l through A-20, Logs of Trenches
TABLE OF CONTENTS (CONTINUED)
APPENDIX B
LABORATORY TESTING
Table B-I, Summary of In-place Moisture-Density and Direct Shear Test Results
Table B-II, Summary of Laboratory Maximum Dry Density and Optimum Moisture
Content Test Results
Table B-ITf, Summary of Expansion Index Test Results
Table B-IV, Summary of Water Soluble Sulfate and Chloride, pH and Resistivity
Test Results
Table B-V, Summary of R-Value and Sand Equivalent Test Results
Figure B-l, Consolidation Curve
APPENDIX C
RECOMMENDED GRADING SPECIFICATIONS
File No. 04786-54-01
February 5, 1992
GEOTECHNICAL ENGINEERING INVESTIGATION
PURPOSE AND SCOPE
This report presents the results of the geotechnical engineering investigation conducted for
the proposed Alta Mira Park, located adjacent to the east side of Paseo Del Norte and
north of Camino del las Ondas in the city of Carlsbad, California (see Figure 1, Vicinity
Map). The purpose of our investigation was to evaluate the surface and subsurface soil and
geologic conditions at the site and, based on the conditions encountered, to provide
preliminary recommendations pertaining to the geotechnical aspects of project development
as presently proposed.
The scope of the this geotechnical engineering investigation consisted of a field investigation,
laboratory testing and a data evaluation including review of the following:
1. Kennedy, M. P., Geology of the San Diego Metropolitan Area, California,
California Division of Mines and Geology, Bulletin 200. 1975.
2. On the Manner of Deposition of the Eocene Strata in Northern San Diego
County, edited by San Diego Association of Geologists, April 14, 1985.
3. Conceptual Plan and Access Study, Alta Mira Community Park, Carlsbad,
California, scale: 1 inch equals 100 feet, prepared by the City of
Carlsbad, dated February 1991 (Figure 2).
4. Alta Mira Park Topographic Map, Carlsbad, California, graphic scale: 1
inch equals 100 feet, prepared by Crosby Mead Benton & Associates,
dated December 13, 1991.
File No. 04786-54-01
February 5, 1992
The field investigation consisted of a site reconnaissance by representatives from our firm
and the excavation of twenty exploratory trenches. Laboratory tests were performed on
selected soil samples obtained at various depths in the exploratory trenches to evaluate
pertinent physical properties of the soils encountered. Details of our field exploration and
laboratory tests are presented in Appendices A and B, respectively.
The base map used for this study consisted of the referenced conceptual grading plan, dated
February, 1991. The location of exploratory trenches is depicted on the Geologic Map,
Figure 2 (Map Pocket).
The recommendations presented herein are based on an analysis of the data obtained from
the exploratory borings, laboratory tests and our experience with similar soil and geologic
conditions.
SITE AND PROJECT DESCRIPTIONS
The site encompasses approximately 42 acres of undeveloped land located on the east side
of Paseo del Norte and north of Camino del las Ondas. The proposed Kelley Road
delineates the eastern property boundary. The central and eastern portions of the site are
dominated by cultivated fields. The extreme western portions of the site are presently
undeveloped and support a dense cover of native grasses and shrubs. No permanent
structures exist on the site.
- 2-
File No. 04786-54-01
February 5, 1992
Topographically the site is characterized by a series of rounded ridges and narrow tributary
drainages which gently slope westward and intersect a broad, alluviated, north-draining
canyon course. Paseo del Norte marks the western property limits at the top of a steep
natural slope which descends eastward and intersects the broad, alluviated drainage within
the western portions of the property. The height of this existing slope is approximately 45
feet. Site elevations vary from a low of approximately 90 feet Mean Sea Level (MSL) within
the northwestern corner of the property to a high of approximately 190 feet MSL along the
eastern property limits. The elevation along the top of the slope adjacent to Paseo del
Norte at the western property limits is approximately 155 MSL.
It is anticipated that the general development and grading will be contained within the
property boundaries with no off-site grading or improvements planned at this time. Planned
improvements include a main community center building, tennis complex, soccer complex,
ball field complex, hardcourt complex, passive areas, and associated concession buildings and
restrooms. Retaining walls, hardscape areas and paved automobile parking and driveway
areas will also be constructed.
Based on review of the referenced conceptual grading plan, it is anticipated that cut and fill
depths will be on the order of 12 feet and 10 feet, respectively. Cut excavations will
generally occur within the ridge areas within the eastern portions of the property, while fills
will be placed within drainages and lower ridge areas in the central portions of the site. Cut
and fill slopes inclined at 2:1 (horizontalrvertical) with maximum heights on the order of 10
3
File No. 04786-54-01
February 5, 1992
feet are anticipated west of the main community center building. Based on conversations
with Jim Ridge of the Dike Partnership, and Pat Entezari of the City of Carlsbad, grading
and roadway improvements in the vicinity of the north-draining canyon course within the
western portions of the property, as depicted on the referenced grading plans, are no longer
being pursued. It is our understanding that project grading will be generally limited to areas
presently cultivated for agriculture use.
The descriptions contained herein are based upon a site reconnaissance, the conceptual
grading plans referenced and discussions with representatives of The Dike Partnership and
the City of Carlsbad. If project details vary significantly from those outlined, Geocon
Incorporated should be notified for review and possible revision of recommendations
presented herein.
SOIL AND GEOLOGIC CONDITIONS
Based on review of the available literature and evidenced by our field investigation, the soils
underlying the site consist of three surficial soil deposits, including unsuitable fill soils,
topsoils and alluvium, and two formational units, including Terrace Deposits and the Delmar
Formation. The areal distribution of these units is shown on the Geologic Map, Figure 2.
Each of the surficial soil types and representative geologic units encountered is described
below in order of increasing age. The symbols in parentheses following each soil type or
geologic unit correspond to the geologic abbreviation used for mapping purposes on
Figure 2. In addition, numbers shown adjacent to each trench excavation depicted on
- 4-
File No. 04786-54-01
February 5, 1992
Figure 2 indicate the approximate depth of surficial soils at that location requiring removal
and recompaction in proposed fill areas. Where surficial soils are less than 3 feet in
thickness, depth of surficial soils has not been indicated.
Unsuitable Fill (Ousft
Unsuitable fill consisting of trash debris imported to the site (wood, plastic, shoes, brush,
etc.) mixed with soil materials are not suitable for use in engineered fills and should be
exported from the site prior to the commencement of grading operations. Mounds of trash
debris and unsuitable fill soils encountered were generally confined to the northern limits
of the property. The approximate locations of these materials are shown on the Geologic
X*^ Map (Figure 2) where thicknesses are anticipated to exceed 3 feet. The maximum thickness
of unsuitable fill materials where indicated on Figure 2 is anticipated to be on the order of 6
feet.
Topsoil f unmapped)
A thin (1- to 3-foot-thick) veneer of loose, moist, dark brown to grayish brown, fine to
medium sand with some silt and clay was found to overlie the Terrace Deposits and Delmar
Formation within the higher profile ridge areas. Disturbed formational soils (Terrace
Deposits) were often found to be mixed with topsoils in areas which had been extensively
cultivated or graded for equipment access. Due to the porous and unconsolidated nature
of the topsoil deposits and disturbed formational soils, they are not suitable in their present
<****• condition for support of settlement-sensitive structures or additional fill. Remedial grading
w - 5-
File No. 04786-54-01
February 5, 1992
measures in the form of removal and recompaction of these materials within areas to
receive additional fill is recommended as discussed hereinafter.
Alluvium (Oaft
Alluvial deposits were encountered within the narrow tributary drainages in the central and
southern portions of the site, as well as the main, north-draining canyon area within the
western portions of the site. Alluvial soils were found to overlie formational soils of the
Terrace Deposits and Delmar Formation. Alluvial soils generally consisted of loose, moist
to wet, light brown medium sand with silt and gravel, and dark brown to grayish brown, silty
to clayey, fine to medium sand with little gravel. Lenses of subrounded gravel and cobble
deposits typically were encountered near the base of the alluvial deposits. Cobble material
encountered was on the order of 4 inches in maximum dimension. Groundwater was found
perched within the alluvial soils and within the upper, weathered portions of the underlying
formational deposits in Trench Nos. T-3 and T-10. Caving associated with the loose,
saturated conditions of the alluvial deposits were observed as well within the indicated
trenches. The maximum alluvial thicknesses encountered within the project site were on the
order of 6 feet.
Alluvial soils are considered unsuitable in their present condition to receive structural fill
or settlement sensitive improvements. Remedial grading measures in the form of removal
and recompaction of alluvial soils in areas to receive additional fill soils are recommended
as discussed hereinafter.
- 6-
File No. 04786-54-01
February 5, 1992
Terrace Deposits (Ot}
Quaternary-age Terrace Deposits generally consist of dense, rust brown, moist, silty to
clayey, fine to coarse-grained sandstone were encountered below surficial soil deposits above
an approximate elevation of 128 feet MSL across the project site. Terrace Deposit
sandstones encountered were weakly cemented and friable and characterized by isolated,
very dense, moderately-well cemented lenses. Occasional interbeds of greenish gray and rust
brown, clayey sands and sandy clays within the Terrace Deposits were encountered in
Trench Nos. T-l, T-2, T-7, T-ll, T-14, T-15 and T-20. Perched groundwater and caving
conditions were encountered within gravelly interbeds and highly weathered portions of the
Terrace Deposits within Trench Nos. 16, 18 an 19.
Based on laboratory test results and previous experience with similar soil material, the
Terrace Deposits generally possess a relatively high strength and low consolidation potential,
and provide suitable foundation support characteristics in either an undisturbed or properly
compacted condition. The clayey portion of the Terrace Deposits, however, possess a
"medium" expansion potential (Expansion Index less than 90 as determined by UBC
Standard 29-2) and will require special consideration during grading operations, as discussed
herein.
Delmar Formation (Td)
The Tertiary-age (probable middle Eocene-age) Delmar Formation underlies surficial
deposits and Terrace Deposits below an approximate elevation of 128 feet MSL within the
- 7-
File No. 04786-54-01
February 5, 1992
western portions of the site. According to cited references, the lithology (and thereby the
engineering characteristics) of the Delmar Formation has not been distinctly differentiated
from deposits of the younger Friars Formation at the project location.
Where encountered in exploratory trenches, the Delmar Formation consists of interbedded,
dense, light to medium gray, clayey, fine to coarse sandstone and very stiff to hard, grayish
brown to greenish gray, sandy claystone. Sandstone beds are typically weakly cemented and
friable, while claystone beds are fractured, blocky and exhibit shiny parting surfaces.
Perched groundwater was encountered within the upper, weathered portions of the Delmar
Formation below alluvial deposits within Trench Nos. T-3 and T-10.
Based on previous experience with similar materials, formational soils of the Delmar
Formation typically possess low consolidation characteristics; however, clayey portions of this
formation have been found to possess a "medium" to "high" expansion potential. Although
units of the Delmar Formation are not anticipated to be exposed at finish grade elevations
within proposed cut areas, it is likely that remedial grading operations may generate spoils
from the Delmar Formation within the central and western portions of the site. Remedial
grading operations should be planned so that the cuttings from the clayey portions of the
Delmar Formation are placed within deeper portions of proposed fills, as recommended
hereinafter.
- 8-
File NO 04786.54.01
February 5, 1992
GROUNDWATER
Perched groundwater was encountered within alluvial soils and within the upper, weathered
portions of the formational soils within Trench Nos. T-3, T-10, T-16, T-18 and T-19.
Perched groundwater conditions were generally encountered in the lower tributary drainages
and ridge areas in the central and western portions of the site. In addition to the perched
groundwater conditions encountered, topsoil and alluvial deposits were typically moist to wet
throughout the site. The wet surficial soils and perched groundwater conditions are believed
to reflect the periods of intense rainfall experienced shortly before the initiation of the field
investigation, as well as the constant infiltration of irrigation water into the site soils
generated from agricultural activity within the property. The presence and rate of
groundwater seepage into trench excavations varied significantly throughout the project site.
However, due to the limited extent and thickness of the alluvial soils present, groundwater
is not anticipated to significantly impact grading operations during the summer months, but
may be a consideration during the rainy season. In addition, consideration should be given
to terminating irrigation on the site several months before grading is initiated.
GEOLOGIC HAZARDS
Faulting and Seismicity
The results of our field investigation and a review of published geologic maps and reports
indicates the site is not traversed by any known fault traces. The seismicity of the site is
- 9-
File No. 04786-54-01
February 5, 1992
influenced by both local and regional fault systems within the southern California and
northern Baja California regions. The following table lists the fault zones which present the
majority of the seismic hazard to the site.
TABLE!
LOCAL AND REGIONAL FAULTS
FAULT
Rose Canyon
Coronado Banks*
Elsinore
San Diego Trough*
Newport-Inglewood*
San Clemente*
San Jacinto
San Miguel
San Andreas
DISTANCE FROM
SITE (MILES)
7
19
25
30
42
47
48
61
70
MAXIMUM CREDIBLE
EARTHQUAKE
MAGNITUDE
7.0
6.75
7.5
6.5
7.5
7.25
7.5
7.0
8.0
*Offshore Fault
-10-
File No. 04786-54-01
February 5, 1992
The Rose Canyon Fault is located approximately 7 miles west of the site. This fault is
classified as an active fault by the California Division of Mines and Geology (CDMG).
Portions of the fault are contained within an Alquist-Priolo Special Studies Zone. A series
of earthquakes occurred in 1985 within the southern portion of San Diego Bay which were
inferred to be along a strand of the Rose Canyon Fault. The largest earthquake recorded
was approximately Magnitude 4.7. Historically, the Rose Canyon Fault zone has exhibited
low seismicity with respect to earthquakes in excess of Magnitude 5.0.
The offshore faults have exhibited a higher level of seismicity with historical earthquake
magnitudes of 5.0 to 5.5. The more distant regional fault systems have historically
experienced relatively high levels of seismicity. The distance from the regional faults to the
site is such that the seismic hazard from those faults is considered low. The Rose Canyon,
Elsinore and offshore fault zones present the greatest seismic hazard to the property.
It is our opinion that the site would be subjected to moderate-to-severe ground shaking in
the event of a major earthquake along any of the active or potentially active faults in the
southern California or northern Baja California region. However, the seismic risk at the
site is not considered to be significantly different than that of the surrounding developments.
It is recommended that proposed structures be designed in accordance with the minimum
seismic requirements as designed by the most recent edition of the Uniform Building Code.
-11-
File No. 04786-54-01
February 5, 1992
Liquefaction
Soil liquefaction is generally limited to granular soils located below the water table which
are in a relatively loose, unconsolidated condition at the time of a moderate to large seismic
event. Due to the presence of near-surface, dense formational soils and the lack of a
permanent near-surface groundwater table, the potential for seismically-induced liquefaction
occurring within the site is considered low.
-12-
File No. 04786-54-01
February 5, 1992
CONCLUSIONS AND RECOMMENDATIONS
General
1. It is our opinion that no soil or geologic conditions were encountered which would
preclude the development of the property as currently proposed, provided the
recommendations of this report are followed.
2. The site is underlain by surficial soils consisting of unsuitable fill, topsoils, alluvium,
and by two formational soil deposits. The surficial soils are generally considered to
be unsuitable in their present condition to receive settlement sensitive improvements
and/or additional fill soils. Except for the unsuitable fill soils (mixture of soils and
trash debris), which should be exported from the site, the remaining material should
be removed and recompacted in the areas to be graded.
3. Laboratory testing indicates that clayey portions of the Terrace Deposits possess a
"medium" expansion potential (as determined by UBC Standard Table 29-2).
Expansive soils will require special consideration during site development as
recommended hereinafter.
4. Perched groundwater was encountered within alluvial soils and gravelly lenses of the
Terrace Deposits within the lower tributary drainage courses and ridge areas of the
central portion of the subject property. Heavy rains prior to the field investigation,
- 13-
File No. 04786-54-01
February 5, 1992
as well as infiltration of irrigation water into site soils are believed to be the source
of the observed groundwater condition. However, due to the relatively limited extent
and thickness of alluvial deposits present, as well as the cessation of agricultural
activities on the site prior to grading operations, groundwater is not anticipated to
significantly impact grading operations during the summer months, but may be a
consideration during the rainy season. Consideration should be given to
discontinuing site irrigation operations several months, or as soon as practical, before
grading is initiated.
Grading
5. All grading at the site should be performed in conformance with the Grading
Ordinance of the City of Carlsbad and the attached Recommended Grading
Specifications (Appendix C). If the recommendations of this section of the report
conflict with those of Appendix C, this section takes precedence. All earthwork
should be observed by, and all compacted fill tested by, representatives of Geocon
Incorporated.
6. Prior to commencing grading, a preconstruction conference should be held at the site
with the owner or developer, city representation, grading contractor, civil engineer
and geotechnical engineer in attendance. Special soil handling and/or the grading
plans can be discussed at that time.
-14-
File No. 04786-54-01
February 5, 1992
7. Site preparation should begin with the clearing of all vegetation and deleterious
debris of existing structures and utilities from the site. The depth of removal should
be such that material to be used in fills is generally free of organic matter. All trash,
metals, and other unsuitable fill materials, including material generated during
stripping operations should be exported from the site and should not be used in fills.
8. Potentially compressible surficial deposits including topsoil and alluvium should be
removed to firm natural ground and properly compacted prior to placing additional
fill and/or structures. Estimated depths of removal of surficial deposits where
observed within exploratory trench excavations are indicated on Figure 2. It should
be noted that surficial soil thicknesses indicated on Figure 2 are representative of
removal depths anticipated at the particular observation location. The actual extent
of removals should be determined in the field by the soil engineer or engineering
geologist.
9. Cut/fill transitions are anticipated beneath the proposed community center building
pad, as well as other outlying clubhouse and concession facilities. Where transitions
are encountered between compacted fill soils and formational soils within building
pads, formational soils should be excavated (undercut) to a depth of 3 feet below pad
grade. The excavated soils should then be compacted per the recommendations
presented in Paragraph 11. The formational soil overexcavation should extend at
least 10 feet horizontally beyond the building footprint and beyond the fill
- 15-
i^ File No. 04786-54-01
^•^ February 5, 1992
soil/formational soil contact such that a minimum 3-foot fill thickness is maintained
below the building. Representatives of Geocon Incorporated should evaluate the
finish grade soil conditions to verify and modify the areas requiring formational soil
undercut excavations.
10. Isolated, clayey portions of the Terrace Deposits and Delmar Formation exhibit a
"medium" expansion potential (Expansion Index less that 90), based on the results of
laboratory testing and experience with similar soil materials. To reduce the potential
for expansion-related movement within proposed buildings areas it is recommended
that a "low" expansive (Expansion Index less than 50), granular soil cap be placed
within the upper 3 feet of pad grade elevation for these areas. Where clayey Terrace
Deposits are exposed at building pad grade, or where less than 3 feet of additional
fill soil will be placed on clayey formational soil, it is recommended that the
formational soils be undercut to a depth that results in a 3-foot-thick layer of
granular, "low" expansive soil below building pad grade. This granular soil cap should
extend at least 10 feet beyond the building footprint. Excavated soils should be
replaced and compacted in overexcavations per the recommendations presented in
Paragraph 11. In addition, it is recommended that a "low" expansive, granular soil
cap be placed within 2 feet of subgrade elevations within hardscape and hardcourt
areas. This 2-foot granular soil cap should extend a minimum of 5 feet beyond the
hardscape and hardcourt areas. In our opinion, granular soil material suitable for
"capping" building pads and hardscape areas may be generated on-site and will likely
- 16-
File No. 04786-54-01
February 5, 1992
require no importation of additional granular materials; however, grading operations
should be carefully planned to place potentially expansive soils encountered during
cut operations and remedial grading operations into the deeper fill areas.
11. Areas to receive fill (including the bottom of undercut excavations) should be
scarified to a depth of 12 inches, properly moisture conditioned to at least 2 percent
above optimum moisture content and recompacted. Fill soils derived from on-site
cutting operations may then be placed and compacted in thin lifts until design
elevations are attained. Fill soils (including trench backfill and scarified ground
surfaces) should be compacted to a minimum 90 percent of the maximum dry density
as determined by ASTM Test Procedure D1557-78 at a moisture content of 2 percent
above the optimum moisture content.
12. Based on a review of the Conceptual Plan, canyon subdrains are not recommended
at this time. Once a finalized grading plan has been prepared, Geocon Incorporated
should review proposed grading to verify if canyon subdrains are required.
Soil and Excavation Characteristics
13. In general, the soil conditions encountered range from "low" to "medium" expansive,
silty and clayey, fine to medium sands derived from the Terrace deposits, clayey sands
and sandy plastic clays derived from the Delmar Formation, and 'Very low" to "low"
expansive, sandy alluvial soils.
- 17-
File No. 04786-54-01
February 5, 1992
14. In our opinion, the surficial soil deposits can be excavated with relatively light effort
with conventional grading equipment. Excavation of the formational soils should
require moderate to heavy effort.
Bulking and Shrinkage Factors
15. Estimates of bulking and shrinkage factors are based on comparing laboratory
maximum density test results with the density of the material in its natural state as
encountered in the excavations. It should be emphasized that variations in natural
soil density, as well as in compacted fill densities, render shrinkage value estimates
very approximate. As an example, the contractor can compact the fill soils to any
relative compaction of 90 percent or higher of the maximum laboratory density.
Thus, the contractor has approximately a 10 percent range of control over the fill
volume. Based on the limited work performed to date, the following earthwork
factors are recommended as a preliminary basis for estimating how much the on-site
soils may shrink or swell (bulk) when excavated from their natural state and placed
as compacted fills.
Soil Unit Shrink/Bulk Factor
Alluvium 10 to 15 percent shrink
Terrace Deposits 1 to 5 percent bulk
-18-
File No. 04786-54-01
February 5, 1992
Slopes
16. The stability of proposed cut slopes excavated within Terrace Deposit formational
soils, and fill slopes constructed of granular soils derived from the Terrace Deposits,
was analyzed utilizing the Janbu Dimensionless Parameter Analysis presented on
Figure 3, included herein. The maximum anticipated height of cut or fill slopes is 10
feet inclined at 2:1 (horizontal:vertical). Shear strength parameters implemented in
the slope stability analysis are based on laboratory tests performed on the Terrace
Deposit formational soils and our experience with similar soil materials. The results
of this analysis indicates that the calculated factor of safety against deep seated
failure within cut slopes is greater than 1.5.
17. Surficial stability of proposed cut and fill slopes was analyzed utilizing the infinite
slope analysis method and the shear strength parameters indicated above. The
surficial slope stability analysis is presented on Figure 4. Analysis results indicate that
the calculated factor of safety against surficial slope instability is greater than 1.5.
To reduce erosion of cut or fill slopes, slopes should be planted, drained and properly
maintained.
18. Cut slopes should be observed by the project engineering geologist during grading to
verify that the exposed soil and geologic conditions do not differ significantly from
those anticipated.
-19-
File No. 04786-54-01
February 5, 1992
Foundations
19. The following foundation recommendations are based on the assumption that "low"
expansive, granular soils are present within 3 feet of proposed building pads. In
addition, we have assumed that the maximum fill depth below proposed structures
shown on the Conceptual Plan is less than 20 feet and that the fill differential is less
than 10 feet. If grading plans or structure type change sufficiently to make our
assumptions invalid, then Geocon Incorporated should be contacted to modify the
following recommendations. Conventional continuous strip and/or isolated spread
footings having a minimum width and depth of embedment below lowest adjacent soil
pad grade of 12 inches and 18 inches, respectively, may be used for support of the
proposed buildings. Footings with the above minimum foundation dimensions may
be designed for an allowable soil bearing capacity of 2,500 psf when founded in
properly compacted fill or dense formational soils. The allowable bearing pressure
recommended may be increased up to one-third for transient loads such as wind or
seismic forces.
20. Isolated spread footings which are a minimum of 2-foot-square and founded 18 inches
below lowest adjacent pad grade in properly compacted fill soils or dense forma-
tional soils may be designed for an allowable soil bearing pressure of 3,000 psf. This
soil bearing pressure may be increased by 500 psf for each additional foot of
width or depth to .a maximum allowable soil bearing pressure of 5,000 psf.
Foundations located adjacent to slopes should be situated such that the lower outside
- 20-
File No. 04786-54-01
February 5, 1992
edge of the footing is at least 7 feet horizontally from the slope face. Figure 5
presents a detail of the above footing dimensions.
21. Continuous footings should be reinforced with two No. 4 reinforcing bars, one placed
near the top and one placed near the bottom. Reinforcement of spread footings
should be designed by the project structural engineer. Steel reinforcement is based
on soil support characteristics and is not intended to be in lieu of structural
requirements.
Concrete-Slabs-On-Grade
22. Concrete slabs-on-grade should have a thickness of at least 4 inches. It is
recommended that the minimum slab reinforcement consists of No. 3 steel reinforcing
bars place 24 inches on center in both directions and positioned within the upper one-
third of the slab. If the slabs are to receive additional concentrated loads such as
those from forklifts or other equipment, then consideration should be given to
increasing the slab thickness to at least 5 inches. The actual concrete slab thickness
should be designed by the project structural engineer based on a modulus of subgrade
reaction of 150 pci.
-21-
File No. 04786-54-01
February 5, 1992
23. The concrete slabs-on-grade should be underlain by at least 4 inches of clean sand,
and where moisture sensitive floor coverings are planned, a visqueen moisture barrier
placed at the midpoint of the sand cushion should also be provided.
24. The recommendations presented herein are intended to reduce the potential for
cracking of the slabs and foundations due to the presence of expansive soils and
differential fill thicknesses. However, even with the incorporation of the recom-
mendations presented herein, foundations and slabs-on-grade may still exhibit some
cracking. The occurrence may be reduced and/or controlled by limiting the slump
of the concrete, proper concrete placement and curing, and by the placement of crack
control joints at periodic intervals and, in particular, where re-entry slab corners
occur.
Retaining Walls
25. Continuous footings having a minimum width and depth of embedment below lowest
adjacent soil pad grade of 12 inches may be used for support of proposed retaining
walls. Footings with the above minimum foundation dimension may be designed for
an allowable soil bearing capacity of 2,000 psf when founded in properly compacted
fill or dense formational soils. Active earth pressures against walls will depend upon
backfill and restraint conditions. Unrestrained walls should be designed to resist an
active pressure equivalent to that generated by a fluid weighing 35 pcf. For rigid,
absolutely restrained walls, an additional uniform pressure of 7H psf (where H equals
- 22-
File No. 04786-54-01
February 5, 1992
the wall height in feet) should be added to the above loading. These values assume
that granular soil material will be used for backfill, the backfill surface will be level,
and that no surcharge loads or hydrostatic pressures are applied to the wall. For
sloping backfill inclined at 2:1 (horizontakvertical) behind the wall, an active earth
pressure equivalent to that exerted by a fluid weighing 45 pcf should be assumed.
Retaining walls subject to vehicle and light truck traffic surcharge within a horizontal
distance equal to or less than the height of the wall should be designed for an
additional uniform horizontal pressure of 75 psf. If a surcharge of moderate-to-heavy
truck traffic is anticipated, Geocon Incorporated should be contacted to possibly
modify retaining wall recommendations.
26. Retaining walls should be properly waterproofed in accordance with the requirements
of the project architect and provided with wall drainage systems to reduce the
potential for hydrostatic pressure buildup behind walls. Recommended wall drainage
details for a typical concrete or block masonry retaining wall which assumes a level
backfill and no surcharge loads is presented on Figure 6, included herein. Geocon
Incorporated should be contacted if additional recommendations for wall drainage
systems are required and/or if alternative retaining wall designs are being considered.
Lateral Loads
27. The pressure exerted by an equivalent fluid weight of 300 pcf should be used to
provide resistance to design lateral loads. This design value assumes that footings or
- 23-
File No. 04786-54-01
February 5, 1992
shear keys are poured neat against properly compacted fill soils and that the soil mass
extends at least 5 feet horizontally from the face of the footing or three times the
height of the surface generating passive pressures, whichever is greater. The
upper 12 inches of material not protected by floor slabs or pavement should not be
included in the design for passive resistance.
28. If friction is to used to resist lateral loads, a coefficient of friction between soil and
concrete of 0.35 may be utilized.
**•»* Corrosion Potential
\^S 29. The laboratory tests performed on the predominant soil types yielded maximum water
soluble sulfate and chloride contents of 0.03 percent. Based on these laboratory
results and Table 7-851.3D of the Caltrans Highway Design Manual, no special cement
requirements are considered necessary for concrete structures. It is recommended,
however, that a concrete materials engineer be consulted to provide additional
recommendations in order to minimize potential premature disintegration of concrete
due to chemical and physical agents.
30. Resistivity and pH tests were performed on representative soil samples utilizing Test
Method No. California 643, 1978, Department of Transportation, Division of
Construction, Method for Estimating the Service Life of Steel Culverts. Test results
yielded a pH of 6.8 and a minimum resistivity of 530 ohm-cm. This value of
- 24-
File No. 04786-54-01
February 5, 1992
resistivity is considered indicative of a potentially corrosive environment for steel pipe
and metal culverts. The above laboratory results correspond to a period of 14 years
to perforation for a 16-gauge metal culvert and 37 years to perforation for an 8-gauge
metal culvert, based on Figure 7851.3 of the Caltrans Highway Design Manual. It is
recommended that further tests be performed and evaluated by a cathodic engineer
once the final grading and underground plans are available to take the necessary
precautions to avoid premature corrosion on underground pipes and buried metal
structures. Laboratory test results performed to evaluate the corrosion potential of
the site soils on concrete and metal structures is summarized in Appendix B,
Table B-IV.
Preliminary Pavement Recommendations
31. The following pavement recommendations are based on R-value test results on soil
samples representative of the anticipated pavement subgrade materials. R-Value and
Sand Equivalent test results are presented in Appendix B, Tables B-V. For
preliminary design purposes, Traffic Index values of 4.5 for automobile parking areas
and 6.5 for driveways and areas subjected to occasional heavy truck traffic have been
assumed in pavement section design calculations. These pavement section designs
should be verified when samples of parking lot and driveway area subgrade soils have
-25-
File No. 04786-54-01
February 5, 1992
been obtained for R-value testing. Pavement calculations presented below are base
on Table 604.B of the Caltrans Highway Design Manual.
Location
Asphalt
Concrete
(inches)
Class II
Aggregate
Base
(inches)
Automobile Parking Areas 3 6
Driveways and Occasional Truck
Traffic Areas 4 8
32. Laboratory testing indicates that soils anticipated to be encountered at pavement
subgrade elevations within clayey portions of the Terrace Deposit formational soils
and fill soils derived from the Terrace Deposits are estimated to possess a "medium"
expansion potential (UBC Expansion Index less than 90). Where "medium" expansive
subgrade soils are determined to be of sufficient areal extent and thickness, it is
recommended that these soils be removed to a depth of 1 foot below subgrade
elevations and replaced with on-site granular soils possessing an Expansion Index less
than 50. Excavated removal bottoms should be scarified to a depth of 12 inches,
moisture conditioned and recompacted to 90 percent relative compaction. Soils
placed within excavated removals should be moisture conditioned and compacted to
a minimum of 95 percent relative compaction.
-26-
File No. 04786-54-01
February 5, 1992
33. Prior to placing base material, subgrade soils should be scarified, moisture
conditioned at optimum moisture content and recompacted to a minimum of 95
percent relative compaction. The depth of compaction should be at least 12 inches.
34. Class n base should conform to Section 200-2.3.2 of the Standard Specifications for
Public Work Construction (Green Book). The asphalt concrete should conform to
Section 203-6 of the Green Book.
35. Where trash bin enclosures are planned, the pavement sections should consist
of 6 inches of portland cement concrete placed on properly compacted subgrade soil
s*****' as recommended above. No Class II base will be required. The concrete should
extend into the roadway sufficiently so that the front wheels of the trash truck are on
the concrete when loading.
36. Planter areas adjacent to pavement areas are not recommended due to the potential
for the infiltration of water beneath the pavement. This can result in premature
pavement failure. Where landscaping planters are desired in pavement areas, it is
suggested that either subdrains, which collect excess irrigation water and transmit it
to drainage structures, or impervious, above-grade planter boxes be used. In addition,
it is recommended that consideration be given to providing a cutoff wall,
geocomposite strip drains, or a deepened curb along the edge of the pavement that
extends to at least 6 inches below the subgrade soil.w
- 27-
File No. 04786-54-01
February 5, 1992
Site Drainage
37. Adequate drainage provisions are imperative. Infiltration of irrigation water excess
and storm water runoff in supporting soils can adversely affect the performance of
the planned improvements. Under no circumstances should water be allowed to pond
adjacent to footings or pavement edges. The site should be graded and maintained
such that surface drainage is directed away from structures and the top of slopes into
swales or other controlled drainage devices. All roof and pavement drainage should
be directed onto splashblocks or into conduits which carry runoff away from proposed
structures or pavement areas.
38. Site irrigation should be monitored for a sufficient period after installation of
irrigation facilities to determine the appropriate amount of irrigation necessary to
maintain landscaping without over-watering.
39. Area drains, canyon subdrains, and other site drainage facilities should be properly
maintained.
Plan Review
40. Geocon Incorporated should review grading and foundation plans prior to the
submittal of the final design. Additional comments and recommendations can be
determined at that time.
-28-
File No. 04786-54-01
February 5, 1992
LIMITATIONS AND UNIFORMITY OF CONDITIONS
1. The recommendations of this report pertain only to the site investigated and are
based upon the assumption that the soil conditions do not deviate from those
disclosed in the investigation. If any variations or undesirable conditions are
encountered during construction, or if the proposed construction will differ from that
anticipated herein, Geocon Incorporated should be notified so that supplemental rec-
ommendations can be given. The evaluation or identification of the potential
presence of hazardous materials was not part of the scope of services provided by
Geocon Incorporated.
2. This report is issued with the understanding that it is the responsibility of the owner,
or of his representative, to ensure that the information and recommendations
contained herein are brought to the attention of the architect and engineer for the
project and incorporated into the plans, and the necessary steps are taken to see that
the contractor and subcontractors carry out such recommendations in the field.
3. The findings of this report are valid as of the present date. However, changes in the
conditions of a property can occur with the passage of time, whether they be due to
natural processes or the works of man on this or adjacent properties. In addition,
changes in applicable or appropriate standards may occur, whether they result from
legislation or the broadening of knowledge. Accordingly, the findings of this report
may be invalidated wholly or partially by changes outside our control. Therefore, this
report is subject to review and should not be relied upon after a period of three
years.
File No. 04786-54-01
REF. MAP i 1991 THOMAS GUIDESAN DIEQO COUNTY, CALIF.
PAGE 19 - C3
NO SCALE
VICINITY MAP
ALTA MIRA PARK
CARLSBAD, CALIFORNIA
Figure 1
File No. 04786-54-01
ASSUMED CONDITIONS:
Slope Height
Slope Inclination
Total Unit Weight of Soil
Angle of Internal Friction
Apparent Cohesion
No Seepage Forces
H = 10 feet
2:1 (Horizontal: Vertical)
Y = 130 pounds per cubic foot
4> =31 degrees
C = 500 pounds per square foot
ANALYSIS:
vH tan 6 Equation (3-3), Reference 1
C
FS
YH
X^ = 1.56
Nrf = 11
FS = 4.23
Equation (3-2), Reference 1
Calculated Using Eq. (3-3)
Determined Using Figure 10, Reference 2
Factor of Safety Calculated Using Eq. (3-2)
REFERENCES
(1) Janbu, N., Stability Analysis of Slopes with Dimensionless Parameters, Harvard Soil
Mechanics, Series No. 46, 1954.
(2) Janbu, N., Discussion of J.M. Bell, Dimensionless Parameters for Homogeneous Earth
Slopes, Journal of Soil Mechanics and Foundation Design, No. SM6, November
1967.
SLOPE STABILITY ANALYSIS (CUT SLOPES)
ALTA MIRA PARK
CARLSBAD, CALIFORNIA
Figure 3a
File No. 04786-54-01
ASSUMED CONDITIONS:
Slope Height
Slope Inclination
Total Unit Weight of Soil
Angle of Internal Friction
Apparent Cohesion
No Seepage Forces
H = 10 feet
2:1 (Horizontal: Vertical)
Y = 130 pounds per cubic foot
4> =31 degrees
C = 150 pounds per square foot
ANALYSIS:
FS
Nrf
FS
vH tan <b Equation (3-3), Reference 1
C
Equation (3-2), Reference 1
Calculated Using Eq. (3-3)
Determined Using Figure 10, Reference 2
Factor of Safety Calculated Using Eq. (3-2)
YH
= 5.21
= 20
= 2.31
REFERENCES
(1)Janbu, N., Stability Analysis of Slopes with Dimensionless Parameters, Harvard Soil
Mechanics, Series No. 46, 1954.
(2) Janbu, N., Discussion of J.M.Bett, Dimensionless Parameters for Homogeneous Earth
Slopes, Journal of Soil Mechanics and Foundation Design, No. SM6, November
1967.
SLOPE STABILITY ANALYSIS (FILL SLOPES)
ALTA MIRA PARK
CARLSBAD, CALIFORNIA
Figure 3b
File No. 04786-54-01
ASSUMED CONDITIONS:
Slope Height
Depth of Saturation
Slope Inclination
Slope Angle
Unit Weight of Water
Total Unit Weight of Soil
Angle of Internal Friction
Apparent Cohesion
H = Infinite
Z = 3 feet
2:1 (Horizontal: Vertical)
i = 26.6 degrees
Yw = 62.4 pounds per cubic foot
Yt = 130 pounds per cubic foot
<t> =31 degrees
C = 500 pounds per square foot
Slope saturated to vertical depth Z below slope face.
Seepage forces parallel to slope face.
ANALYSIS:
FS =C +) Z cos2 i tan<{>
Y, Z sin i cos i 3.83
REFERENCES
(1) Haefeli, R. The Stability of Slopes Acted Upon by Parallel Seepage, Proc. Second
International Conference, SMFE, Rotterdam, 1948, 1, 57-62.
(2) Skempton, A. W., and F. A. Delory, Stability of Natural Slopes in London Clay, Proc.
Fourth International Conference, SMFE, London, 1957, 2, 378-81.
SURFICIAL SLOPE STABILITY ANALYSIS (CUT SLOPES)
ALTA MIRA PARK
CARLSBAD, CALIFORNIA
Figure 4a
File No. 04786-54-01
'«*»!» I*-'
ASSUMED CONDITIONS:
Slope Height
Depth of Saturation
Slope Inclination
Slope Angle
Unit Weight of Water
Total Unit Weight of Soil
Angle of Internal Friction
Apparent Cohesion
H = Infinite
Z = 3 feet
2:1 (Horizontal: Vertical)
i = 26.6 degrees
Yw = 62.4 pounds per cubic foot
Yt = 130 pounds per cubic foot
4> =31 degrees
C = 150 pounds per square foot
Slope saturated to vertical depth Z below slope face.
Seepage forces parallel to slope face.
ANALYSIS:
FS =+ (yf - Yw ) Z cos2 i tan<}>
Yr Z sin j cos i 1.58
REFERENCES
(1) Haefeli, R. The Stability of Slopes Acted Upon by Parallel Seepage, Proc. Second
International Conference, SMFE, Rotterdam, 1948, 1, 57-62.
(2) Skempton, A. W., and F. A. Delory, Stability of Natural Slopes in London Clay, Proc.
Fourth International Conference, SMFE, London, 1957, 2, 378-81.
SURFICIAL SLOPE STABILITY ANALYSIS (FILL SLOPES)
ALTA MIRA PARK
CARLSBAD, CALIFORNIA
Figure 4b
File No. 04786-54-01
WALL FOOTING
CONCRETE SLAB
ao'.»..*«.-. " *•:
SANDS
VISQUEEN -
PAD GRADE
£
FOOTING *
WIDTH NO SCALE
COLUMN FOOTING
CONCRETE SLAB
SANDS
VISOUEEN -
M^ ••$?//&(&'
FOOTING WIDTH *NO SCALE
* SEE REPORT FOR FOUNDATION WIDTH AND DEPTH RECOMMENDATIONS
WALL / COLUMN FOOTING DIMENSION DETAIL
ALTA MIRA PARK
CARLSBAD, CALIFORNIA
Figure 5
File No. 04786-54-01
PROPERLY
RET WALL
///j^i/ ^^t
^»
i 12" i
*" ~~ MIN. ~~if
• A ' » '—-'4
^c>-\
^* COMPACTED BACKFILL
| '
r3"
r H \
3
^CRUSHED ROCK
4
— FILTER FABRIC ENVELOPE
OR EQUIVALENT
4" DIA. PERFORATED ABS
OR ADS PIPE
1. PREFABRICATED DRAINAGE PANELS SUCH AS MIRADRAIN 7000 OR EQUIVALENT MAY
BE USED IN LIEU OF PLACING GRAVEL TO A HEIGHT OF 2/3 THE TOTAL WALL
HEIGHT.
2. DRAIN SHOULD BE UNIFORMLY SLOPED AND MUST LEAD TO A POSITIVE GRAVITY
OUTLET OR TO A SUMP WHERE WATER CAN BE REMOVED BY PUMPING.
NO SCALE
RETAINING WALL DRAIN DETAIL
ALTA MIRA PARK
CARLSBAD, CALIFORNIA
Figure 6
APPENDIX A
File No. 04786-54-01
February 5, 1992
APPENDIX A
FIELD INVESTIGATION
The field investigation was performed on January 13 and 14, 1992, and consisted of the
excavation of twenty exploratory trenches. The approximate locations of the trenches are
shown on the Geologic Map, Figure 2.
Trench excavations were advanced to depths ranging from 7 to 15 feet below the existing
ground surface using a trackhoe equipped with a 24-inch-wide bucket. Disturbed bulk and
chunk samples were retrieved at selected depths within trench excavations. The soil
conditions encountered within the exploratory trenches were visually classified and logged
in general accordance with the American Society for Testing and Materials (ASTM) Practice
for Description and Identification of Soils (Visual-Manual Procedure D2844). Logs of the
exploratory trenches are presented on Figures A-l through A-20. The logs depict the
various soil types encountered and indicate the depths at which samples were obtained.
FILE NO. 04786-54-01
j»»4
»W
«IM>
* DEPTH
IN
reel
- n
-
- 2 -
- 4 -
~ ~"
- 6 -
- 8 -
- 10 -
SAMPLE
NO.
Tl-1
Tl-2
Tl-3
3
1
g51
&
1
i
1
(
<
i
H
13
:
j
y//%
1
^^iI
'%I
rrUJ
3
cra
SOIL
CLASS
(USCS)
SM
SC-SM
TRENCH T 1
ELEVATION 184 DATE COMPLETED 1/13/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
rOFSOUL/DlSlUKUJiD FORMA 1 ION AL SOIL
Medium dense, moist, dark brown, Clayey,
Occasional trash debris /
TERRACE DEPOSITS
Dense, moist, mottled greenish gray
and rust brown, Clayey to Silty, fine
to medium-grained SANDSTONE;
friable and weakly cemented. Occasional
interbeds of sandy lean clay
-Becomes very dense to hard and
moderately cemented below 9 feet
TRENCH TERMINATED AT 12 FEET
o u ^S"Hips
m <n °
^L ^
-
-
-
~
-
-
-
>
MO
>5
Q
115.5
113.4
~
feWO •*
Oo
11.4
14.9
Figure A-l, Log of Trench T 1 AMP
SAMPLE SYMBOLS D... SAMPLING UNSUCCESSFUL B... STANDARD PENETRATION TEST I... DRIVE SAMPLE (UNDISTURBED)
DISTURBED OR BAG SAMPLE ... CHUNK SAMPLE T. ... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
FILE NO. 04786-54-01
L
(••DEPTH
IN
FEET
- fiV
- 2 -
- 4 -
~ ~
- 6 -
-
SAMPLE
NO.
:
c
:
»
ff
33
:
HJ
1
11
(T
E
D
Q
IT0
SOIL
CLASS
(USCS)
SM
SC-SM
SM
TRENCH T 2
ELEVATION 159 DATE COMPLETED 1/13/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
TOFSOIL
Loose moist to wet dark brown Silty, rA fine to medium SAND with trace clay /
TERRACE DEPOSITS
Medium dense to dense, moist, greenish
gray with rust brown mottling, interbedded
Clayey to Silty, fine to medium-grained
SANDSTONE: friable and weaklv cemented
-Highly weathered in upper 2 feet
Dense to very dense, moist, rust brown,
Siltv. fine to coarse SANDSTONE with
trace of clay; friable; weakly to
\ moderately well cemented I
TRENCH TERMINATED AT 9 FEET
3g~H y K*!*
£"!?UJH0
IL v
_
-
™
-
~
1- _H'*
§!L
goo .
>i
a
^§"sSo ^oo
Figure A-2, Log of Trench T 2 AMP
SAMPLE SYMBOLS I... SAMPLING UNSUCCESSFUL B ... STANDARD PENETRATION TEST I... DRIVE SAMPLE (UNDISTURBED)
!... DISTURBED OR BAG SAMPLE 0 ... CHUNK SAMPLE ... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
FILE NO. 04786-54-01
DEPTH
IN
reel
- n -
- 2 -
- A
- 6 -
8 -
- in -
SAMPLE
NO.
T3-1
T3-2
[
7/
:
tt
j
H
J
\
4l
trui
Q
o
§
I
SOIL
CLASS
(USCS)
SP-SM
SC-SM
TRENCH T 3
ELEVATION 130 DATE COMPLETED 1/13/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
ALLUVIUM
Loose, wet, interbedded rust brown,
medium SAND with some silt and dark
gray, Silty, fine to medium SAND
with some clay. Occasional rootlets.
\ 1 to 5 feet /
DELMAR FORMATION
Medium dense, wet to moist, gray with
rust brown mottling, Clayey, fine to
medium SAND to Silty, fine to coarse
SAND. Occasional white carbonaceous
staining
TRENCH TERMINATED AT 10 FEET •RATIONSTANCEIS/FT. )C5°5 KJ mo. a •*,
-
-
-lENSITYC.F.)" .>£S
100.4
iu8
hQ) 2j
O •Spoa
16.1
Figure A-3, Log of Trench T 3 AMP
SAMPLE SYMBOLS D... SAMPLING UNSUCCESSFUL
Hi ... DISTURBED OR BAG SAMPLE
D ... STANDARD PENETRATION TEST • ... DRIVE SAMPLE (UNDISTURBED)
0 ... CHUNK SAMPLE I ... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
FILE NO. 04786-54-01
1
DEPTH
IN
FEET
-
- 2 -
-
- 4 -
- ft -
-
-
1
SAMPLE
NO.
T4-1
T4-2 Iaj|
88
0o
o
H
'wk
•fjg ' *J
« ' ^
' ^, Jj
^.£
Q;
UJ
Q
Q
g
SOIL
CLASS
(USCS)
SP-SM
CL
SC-CL
TRENCH T 4
ELEVATION 115 DATE COMPLETED 1/13/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
ALLUVIUM
Loose, moist, light brown, medium
SAND with little silt and gravel;
', micaceous »
1 Very stiff, moist, irayish" brown, Sandy
CLAY. Fissured
\
DELMAR FORMATION
Dense, damp, grayish brown, Clayey, fine-
grained SANDSTONE to a hard, fine Sandv
CLAYSTONE. Weathered: fractured and
blocky; shiny parting surfaces; moderately
well-indurated
TRENCH TERMINATED AT 9 FEET
|uj«
ir * (o
i^ H 5
ui ^ ma a ~
-
—
-
-
-
~
>
i"*•>t
Q
111.5
\
~iu g
in 7:
§1u
21.5
Figure A-4, Log of Trench T 4 AMP
SAMPLE SYMBOLS ... SAMPLING UNSUCCESSFUL D ... STANDARD PENETRATION TEST • ... DRIVE SAMPLE (UNDISTURBED)
... DISTURBED OR BAG SAMPLE Q ... CHUNK SAMPLE Z ... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
FILE NO. 04786-54-011
DEPTH
IN
FEET
- n -U
- 2 -
. 4 _
- 6 -
- 8
SAMPLE
NO.
8
o
H
GROUNDUATERSOIL
CLASS
(USCS)
SM
SM
TRENCH T 5
ELEVATION 140 DATE COMPLETED 1/13/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
TOPSOIL
fine to medium SAND. Numerous root I
fibers; porous i
lliRRACE DEPOSITS
Dense, damp to moist, dark reddish
brown, Silty, fine to medium grained
SANDSTONE with little clay. Numerous
root voids to 5 feet. Weakly cemented
and friable. Spotty black carbonaceous
staining
TRENCH TERMINATED AT 8 FEET PENETRATIONRESISTANCE(BLOWS/FT. )_
-DRY DENSITY(P.C.F.)MOISTURECONTENT (X)Figure A-5, Log of Trench T 5 AMP
SAMPLE SYMBOLS Q... SAMPLING UNSUCCESSFUL B... STANDARD PENETRATION TEST I... DRIVE SAMPLE (UNDISTURBED)
I ... DISTURBED OR BAG SAMPLE 0 ... CHUNK SAMPLE Z ... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
FILE NO. 04786-54-01
L
DEPTH
IN
- nu
-
*•
- 4 -
— ~
- 6 -
- 8 -
-
- 10 -
- 12 -
f 14 -
SAMPLE
NO.
T6-1
T6-2
T6-3
xliI\\\•^
7
>Oo
1-
H
: ' •:
il**.
ff
UJ
O
Qaa
SOIL
CLASS
(USuS;
SM
SP-SM
TRENCH T 6
ELEVATION 180 DATE COMPLETED 1/13/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
TOPSOIL/DISTURBED FORMATIONAL SOIL
Loose to medium dense, moist, dark reddishn brown, Silty. fine to medium SAND r
with little clay /
/TtRRACE DEPOSITS
Dense, moist, rust brown, fine to medium-
grained SANDSTONE with some silt and
trace of clay. Friable and weakly
cemented; localized, very dense,
moderately well cemented lenses.
Spotty black carbonaceous staining
-Becomes greenish gray mottled and less
cemented below 9 feet
TRENCH TERMINATED AT 15 FEET
Z QJ ~
Hiu ii
Q. a w
-
-
-
-
-
^H^
Q ^
a^0
123.6
117.1
^g-eg(0 if;
°|
O
7.2
7.1
Figure A-6, Log of Trench T 6
^•*K
AMP
SAMPLE SYMBOLS D... SAMPLING UNSUCCESSFUL C ... STANDARD PENETRATION TEST I... DRIVE SAMPLE (UNDISTURBED)
... DISTURBED OR BAG SAMPLE ... CHUNK SAMPLE ... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
FILE NO. 04786-54-01
I
j
DEPTH
IN
FEET
- 0
- 2 -
- A
- 6 -
- 8 -
- in -
SAMPLE
NO.LITHOLOQYa GROUNDUATER |i
SOIL
CLASS
(USCS)
SM
SC
SM
TRENCH T 7
ELEVATION 160 DATE COMPLETED 1/13/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
TOPSO1L
Loose, wet, dark brown, Silty, fine to
root fibers i
TERRACE DEPOSITS
1 gray and rust brown, Clayey, fine to ,
, medium SAND '
Becomes medium dense to dense, moist,
greenish gray and rust brown mottled,
Silty, fine to medium-grained
SANDSTONE with little clay. Weakly
cemented and friable
TRENCH TERMINATED AT 10 FEET PENETRATIONRESISTANCE(BLOWS/FT. )-
-
-DRY DENSITY(P.C.F.)MOISTURECONTENT (X)Figure A-7, Log of Trench T 7 AMP
SAMPLE SYMBOLS |... SAMPLING UNSUCCESSFUL E... STANDARD PENETRATION TEST • ... DRIVE SAMPLE (UNDISTURBED)
... DISTURBED OR BAG SAMPLE 0 ... CHUNK SAMPLE JL ... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
FILE NO. 04786-54-01
I
f
DEPTH
IN
- fiu
. —
- 2 -
-
- 4 -
- 6 -
Q- 8
SAMPLE
NO.
T8-1 *
|
\
T8-2 J
/
I
I
S
c
H
H
J
fV
JNDUATEO
a
SOIL
CLASS
(USC5)
SM
SM
TRENCH T 8
ELEVATION 133 DATE COMPLETED 1/13/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
ALLUVIUM
Loose to medium dense, wet, dark brown,
Siltv, fine to medium SAND with little
clay
-Thin gravel layer at 4.5 feet
DELMAR FORMATION
Medium dense to dense, moist, light
brownish gray, Silty, fine to medium
grained SANDSTONE with some clay.
Highly weathered in upper 2 feet.
Friable and weakly cemented. Occasional
A rust brown mottling 1
TRENCH TERMINATED AT 9 FEET •RATIONSTANCEJS/FT. )UJHO
n "• w )ENSITYC.F.)" *
>£
O
119.8
gg
<" mHHfgz
0
13.3
Figure A-8, Log of Trench T 8 AMP
SAMPLE SYMBOLS D ... SAMPLING UNSUCCESSFUL B ... STANDARD PENETRATION TEST
... DISTURBED OR BAG SAMPLE ... CHUNK SAMPLE
... DRIVE SAMPLE (UNDISTURBED)
... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
FILE NO. 04786-54-01I
DEPTH
IN
FEET
- 0 -
.
- 2 -
-
- 4 -
~ •"
- 6 -
-
-
SAMPLE
NO.
>O
LITHOLO:
auh-QROUNDbJASOIL
CLASS
(USCS)
SM
SM
TRENCH T 9
ELEVATION 148 DATE COMPLETED 1/14/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
TOPSOIL/DISTURBED FORMATIONAL SOIL
to medium SAND with little clay.
Numerous root fibers
JLtKRACE DEPOSITS
Medium dense to dense, moist, rust
brown with greenish gray mottling,
Silty, fine to medium-grained
SANDSTONE with little clav.
Weathered in upper 2 feet; becomes
weakly cemented and friable below
4 feet
TRENCH TERMINATED AT 9 FEET
U"*1 ^\PENETRATKRESISTANC(BLOWS/FT-
-
-
—
-
>
Lm
828«
>°-ir~Q
*•*... X'MOISTURECONTENT CFigure A-9, Log of Trench T 9 AMP
SAMPLE SYMBOLS D ... SAMPLING UNSUCCESSFUL C ... STANDARD PENETRATION TEST • ... DRIVE SAMPLE (UNDISTURBED)
... DISTURBED OR BAG SAMPLE ... CHUNK SAMPLE I ... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
FILE NO. 04786-54-01
t
DEPTH
IN
FEET
- 0 -
- 2 -
- A -
- ft -O
- 8 -
- 10 -
'
SAMPLE
NO.
e
3
H
1
1
1
1
Vj/
SS<%:
^
ff
JNDUATEOKCD
I
SOIL
CLASS
(USCS)
SM
SC
SC
SM
TRENCH T 10
ELEVATION 125 DATE COMPLETED 1/14/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
ALLUVIUM
Loose, wet, dark brown, Silty, fine to
medium SAND. Numerous root fibers
1 Medium dense, wet, reddish brown, Clayey,
_ fin** fn medium ^ANT") Of*f*aQinnflI Qiih— «
\ rounded gravels and cobbles to 4 inches /
DELMAR FORMATION
i Medium dense, wet, grayish brown with rust i1 brown mottling, Clayey, fine to medium \
SAND. Rapid seepage and caving into ,
i trench at 6 to 6.5 feet «i
Becomes dense, wet, light gray and rust
mottled, fine to medium grained SANDSTONE
with some clay; weathered, weakly cemented
and friable
-Becomes light gray and fresher below
9 feet
TRENCH TERMINATED AT 1 1 FEET •RATIONSTANCEIS/FT. )"" M •*
U> ^
-
-
-
-
|2
>t
a
"1
o
^Figure A-10, Log of Trench T 10 AMP
SAMPLE SYMBOLS D ... SAMPLING UNSUCCESSFUL B ... STANDARD PENETRATION TEST
... DISTURBED OR BAG SAMPLE CHUNK SAMPLE
... DRIVE SAMPLE (UNDISTURBED)
... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
FILE NO. 04786-54-01
1
DEPTH
IN
FEET
O —
- 2 -
- 4 -
- 6 -
- 8 -
- in -1U
SAMPLE
NO.LITHOLOQYI QROUNDUATERSOIL
CLASS
(USCS)
SM
sc
SP-SM
TRENCH Til
ELEVATION 161 DATE COMPLETED 1/14/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
ALLUVIUM
Loose to medium dense, moist to wet,
dark brown and dark grayish brown,
Siltv. fine to medium SAND. Numerous
root fibers in upper 2 feet
TERRACE DEPOSITS
Medium dense, moist to wet, greenish
' medium SAND; micaceous •
, „ ,'Becomes dense, moist, rust brown, fine
to medium grained SANDSTONE with some
•\ silt. Weakly cemented and friable r
TRENCH TERMINATED AT 10 FEET PENETRATIONRESISTANCE(BLOWS/FT. )-
-
-DRY DENSITY(P.C.F.)MOISTURECONTENT OO^Figure A-ll, Log of Trench T 11 AMP
SAMPLE SYMBOLS D... SAMPLING UNSUCCESSFUL B... STANDARD PENETRATION TEST I... DRIVE SAMPLE (UNDISTURBED)
... DISTURBED OR BAG SAMPLE ... CHUNK SAMPLE ... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
FILE NO. 04786-54-01
DEPTH
IN
FEET
- n -U _
- 2 -
- 4 -
_ ~.
- 6 -
-
- 8 -
- in -
SAMPLE
NO.
T12-1 7
£
i
:
*
5
J
4
J
^u
Q
OUa
SOIL
CLASS
(USCS)
SM
SM
TRENCH T 12
ELEVATION 181 DATE COMPLETED 1/14/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
TOFbUlL/UlSiUKBliD FORMATION AL SOIL
Medium dense, moist, dark brown, Silty,
TERRACE DEPOSITS
Dense to very dense, damp to moist, rust
brown, Silty, fine to medium grained
SANDSTONE with little clav. Micaceous.
Occasional moist, greenish gray mottled,
clayey sandstone interbeds; weakly
cemented and friable; localized lenses
of moderate cementation
TRENCH TERMINATED AT 10 FEET
og~
H|£
UJ H Q
jfji"on. "• ^
_
_
-
™
-
-
H>
SSli^ .>£a
115.8
£
IH
^O 7
u
7.4
Figure A-12, Log of Trench T 12 AMP
SAMPLE SYMBOLS D... SAMPLING UNSUCCESSFUL B... STANDARD PENETRATION TEST I... DRIVE SAMPLE (UNDISTURBED)
... DISTURBED OR BAG SAMPLE ... CHUNK SAMPLE f. ... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
FILE NO. 04786-54-01
1
DEPTH
IN
FEET
- 0 -
—
- 4 -
- 6 -
- 8 -
- 10 -
SAMPLE
NO.
T13-1 I
£
I
>
t~
J
•
•
.
(T111
Q
g
SOIL
CLASS
(USCS)
SM
SP-SM
TRENCH T13
ELEVATION 185 DATE COMPLETED 1/14/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
TOP5U1L/U1S1UKBEJLJ FORMA I ION AL SOIL
Medium dense, moist, brown, Silty, fine
SAND. Porous; occasional root fibers
TERRACE DEPOSITS
Dense, damp to moist, greenish gray
and rust brown mottled, medium-grained
SANDSTONE with some silt; weakly
cemented and friable; locally, mod-
erately well-cemented
TRENCH TERMINATED AT 1 1 FEET
z ~2 o tlM g t-
Ul m OT. (0 |• in ^
Q. "• ~
y
^%
ill
a^0
^
uj ia
Si0 *~iz
o
Figure A-13, Log of Trench T 13 AMP
SAMPLE SYMBOLS D ... SAMPLING UNSUCCESSFUL
... DISTURBED OR BAG SAMPLE
E... STANDARD PENETRATION TEST I... DRIVE SAMPLE (UNDISTURBED)
0 ... CHUNK SAMPLE JL ... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOUN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
FILE NO. 04786-54-01
1
DEPTH
IN
FEET
nU
- 2 -
- 4 -
- 6 -
SAMPLE
NO.LITHOLOQY\GROUNDUATERSOIL
CLASS
<USCS)
SP-SM
SM-SC
SM
TRENCH T14
ELEVATION 163 DATE COMPLETED 1/14/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
TOPSOIL
SAND with some silt. Abundant root
fibers
TERRACE DEPOSITS1 Medium dense, moist, greenish gray, '
i Silty to Clayey, fine to medium- J
i grained SANDSTONE: weakly cemented i
'( and friable '
Becomes dense to very dense, damp to
moist, greenish gray and rust brown
mottled, Silty, fine to medium-
grained SANDSTONE. Weakly to
moderately well cemented and friable
TRENCH TERMINATED AT 7 FEET PENETRATIONRESISTANCE<BLOUIS/FT. )-
-
-DRY DENSITY(P.C.F.)MOISTURECONTENT (X)^Figure A-14, Log of Trench T 14 AMP
SAMPLE SYMBOLS D... SAMPLING UNSUCCESSFUL B ... STANDARD PENETRATION TEST I... DRIVE SAMPLE (UNDISTURBED)
... DISTURBED OR BAG SAMPLE CHUNK SAMPLE I ... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
FILE NO. 04786-54-011
t
DEPTH
IN
FEET
- 0 -\J
-
- 4 -
- 6 -
8 _O
-
_ in
SAMPLE
NO.
C
:
h
I
i
4
J
1
/%£
(TU
iQ
—}naa
SOIL
CLASS
(USCS)
SP-SM
SM
SC
SM
TRENCH T IS
ELEVATION 145 DATE COMPLETED 1/14/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
ALLUVIUM
Loose, moist to wet, grayish brown,
medium SAND with little silt.
•' Abundant root fibers r
Loose, moist to wet, dark brown, Silty,
fine to medium SAND
TERRACE DKFUS1TS
Medium dense, moist, rust brown, Clayey,
fine to medium SAND
Becomes dense to very dense, moist, rust
brown with greenish gray mottling, Silty,
\
tine to medium-grained oAiN_yolUlNh.
Weakly cemented and friable
TRENCH TERMINATED AT 10 FEET
iuj":
M2 '-H * IL<r 5 \
£"!£
i"5i0, "• s^
-
_
—
-
>
|2
go
a. w
Q
Q
a^eg<n 2
°z
o
Figure A-15, Log of Trench T 15 AMP
SAMPLE SYMBOLS D ... SAMPLING UNSUCCESSFUL I] ... STANDARD PENETRATION TEST • ... DRIVE SAMPLE (UNDISTURBED)
... DISTURBED OR BAG SAMPLE ... CHUNK SAMPLE I ... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
FILE NO. 04786-54-01
1
DEPTH
IN
FEET
n -u
- 2 -
-
- 4 -
- 6 -
-
- 8 -
- 10 -
- 10 -1Z ~
SAMPLE
NO.
i
).f.
^i™
• I , >
i ri i ii i .*
i i' i i
!—*• i
i
i
4
J
1 i ' i1 1 i
rr
LJNDUATEOITa
*
SOIL
CLASS
(U5C5;
SM
SM
<sM
CL
TRENCH T 16
ELEVATION 134 DATE COMPLETED 1/14/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
ALLUVIUM
Loose, moist to wet, dark brown, Silty,
fine to medium SAND. Abundant root
"I fibers /"
TERRACE DEPOSITS
Medium dense, wet, rust brown, Silty,
fine to medium-grained SANDSTONE
with little clay. Micaceous; weakly
cemented and friable. Rapid seepage r1 and minor caving from 5.5 to 8 feet '
Dense, wet to moist, mottled rust brown
and greenish gray, fine to medium- grained
\ SANDSTONE. Weakly cemented and friable 1
DELMAR FORMATION
Very stiff to hard, moist, light gray,
fine Sandy CLAYSTONE Fractured
1 and blocky with shiny parting surfaces. 1
1 Highly weathered in upper 2 feet 1
TRENCH TERMINATED AT 12 FEET 'RATIONSTANCEJS/FT. )z"3uigmQ. °- ^
-
-
-
-
-
-JENSITYC.F. )" .
>i(E ~O
*Niu£
SfeW mH£0 t= iO
Figure A-16, Log of Trench T 16 AMP
SAMPLE SYMBOLS D ... SAMPLING UNSUCCESSFUL STANDARD PENETRATION TEST
... DISTURBED OR BAG SAMPLE 0 ... CHUNK SAMPLE
... DRIVE SAMPLE (UNDISTURBED)
... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
FILE NO. 04786-54-01
/J%M' DEPTH
IN
FEET
- n
- 2 -
- 4 -
- (\o
SAMPLE
NO.
a
.ITHOUO1
y/\
KUJ1-<I
|
O
o
SOIL
CLASS
(USCS)
SM
SM
TRENCH T17
ELEVATION 150 DATE COMPLETED 1/14/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
UNSUITABLE FILL
Loose, moist to dry, rust brown, Silty
to Clayey, fine to medium SAND mixed
with abundant trash debris (plastic,
wood, shoes, brush, etc..)
TERRACE DEPOSITS
Dense, damp to moist, rust brown with
• 1 1 1 1 * j O"1* t {" M n *j-«greeuisn gi<ty iiiuiiiiug, oiuy, mic lu
medium-grained SANDSTONE with some
clay. Weakly cemented and friable;
black carbonaceous staining
TRENCH TERMINATED AT 7 FEET
0 "^
UJ (A Q
?• UJ Mtil rl CDo. a ~
-
-
-
si
^ •
a w
a
Q
a w
= K
EZ
O
Figure A-17, Log of Trench T 17 AMP
SAMPLE SYMBOLS D... SAMPLING UNSUCCESSFUL
... DISTURBED OR BAG SAMPLE
D... STANDARD PENETRATION TEST
0 ... CHUNK SAMPLE
DRIVE SAMPLE (UNDISTURBED)
WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
FILE NO. 04786-54-011
DEPTH
IN
FEET
-fi-ll
- 2 -
- 4 -
- 6 -
- 8 -
- 10 -
SAMPLE
NO.LITHOLOQY•
^
•QROUNDUATER |»
SOIL
CLASS
(USCS)
SM
SP-SM
SW
SW
TRENCH T18
ELEVATION 133 DATE COMPLETED 1/14/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
TOPSOEL
fine to medium SAND. Abundant rootlets /
TERRACE DEPOSITS
Dense, damp to moist, rust brown, medium- (-1 grained SANDSTONE with some silt. i
, Weakly cemented and friable 'i ,'
Dense to medium dense, moist to wet,
rust brown, Gravelly, fine to coarse-
grained SANDSTONE. Subrounded gravels
and cobbles to 6 inches; weakly cemented n
and friable. Micaceous. Rapid seepage
minor caving into trench 6 to 8 feet
DELMAR FORMATION
Dense, wet to moist, light gray with
rust brown mottling, fine to coarse-
grained SANDSTONE with little clay,
weakly cemented and friable
TRENCH TERMINATED AT 1 1 FEET PENETRATIONRESISTANCE(BLOUS/FT. )-
-
-
-DRY DENSITY(P.C.F. )MOISTURECONTENT (X)Figure A-18, Log of Trench T 18 AMP
, SAMPLE SYMBOLS ... SAMPLING UNSUCCESSFUL U... STANDARD PENETRATION TEST •... DRIVE SAMPLE (UNDISTURBED)
... DISTURBED OR BAG SAMPLE E3 ... CHUNK SAMPLE T. ... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
FILE NO. 04786-54-01
DEPTH
IN
FEET
- 0 -u
- 9 -
- 4 -
- 6 -
-
- 8 -
i f\• iu -
SAMPLE
NO.rHOLOQYH_1
: : ;-
.»•»
^
•[''•""'
I lll.«l
IT
JNDUATEOa.o
T
SOIL
CLASS
(USCS)
SM
SP-SM
SW
SW/CL
TRENCH T 19
ELEVATION 132 DATE COMPLETED 1/14/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
TOPSOIL
Loose, moist to wet, dark brown, Silty,
~\ fine to medium SAND r
TERRACE DEPOSITS
Medium dense to dense, moist, rust brown
• and greenish gray mottled, fine to medium- ,~
, grained SANDSTONE with some silt. ,
i Weakly cemented and friable; micaceous 'i '
Medium dense, wet, rust brown, Gravelly,
fine to coarse SANDSTONE with little clay
Very weakly cemented and friable; micaceous;
subrounded gravels and cobbles to 6 inches.
Slow seepage into trench at 4.5 to 6.5 feet
DELMAR FORMATION
Interbedded, dense, moist, light gray,
fine to coarse SANDSTONE with some
clay and very stiff to hard, fine
Sandy CLAYSTONE. Claystone is blocky
with shiny parting surfaces. Sandstone
is weakly cemented and friable
TRENCH TERMINATED AT 10 FEET •RATIONSTANCEIS/FT. )1" u -»I" m OZ ft Jiti £ mQ. "• ^
-
-
-
-
-lENSITYC.F. )" .
N.O.a~o
/•s
iu;5
(0 j?SM[JJgz*-ou
Figure A-19, Log of Trench T 19 AMP
SAMPLE SYMBOLS D ... SAMPLING UNSUCCESSFUL B ... STANDARD PENETRATION TEST • ... DRIVE SAMPLE (UNDISTURBED)
I ... DISTURBED OR BAG SAMPLE 0 ... CHUNK SAMPLE I ... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
FILE NO. 04786-54-01
DEPTH
IN
- fl -U
-
- 4 -
- 6 -
SAMPLE
NO.
1
5
K
//
\
tr
JNDUATE0g
SOIL
CLASS
(USCS)
SM
SM-SC
TRENCH T 20
ELEVATION 152 DATE COMPLETED 1/14/92
EQUIPMENT TRACKHOE
MATERIAL DESCRIPTION
TOPSOIL
Loose, moist to wet, dark brown, Silty,
\
u fine to medium SAND with some clay. r
Numerous root fibers
rtRRACE DEPOSITS
Dense, damp to moist, rust brown with
greenish gray mottling, Silty to Clayey,
fine to medium-grained SANDSTONE.
Weakly cemented and friable. White
TRENCH TERMINATED AT 7 FEET •RATIONSTANCEIS/FT. )zS3iu £ mQ. "• w
-
-
-JENSITYC.F.)Q
!z 2in jjj
lz£oo
Figure A-20, Log of Trench T 20 AMP
SAMPLE SYMBOLS D ... SAMPLING UNSUCCESSFUL E ... STANDARD PENETRATION TEST • ... DRIVE SAMPLE (UNDISTURBED)
.. CHUNK SAMPLE I ... WATER TABLE OR SEEPAGEI ... DISTURBED OR BAG SAMPLE 0 ...
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
APPENDIX B
File No. 04786-54-01
February 5, 1992
APPENDIX B
LABORATORY TESTING
Laboratory tests were performed in substantial accordance with the generally accepted test
methods of the American Society for Testing and Materials (ASTM) or other suggested
procedures. Chunk samples of formational soil material were tested for their in-place dry
density, moisture content, shear strength, and consolidation characteristics. Selected bulk
soil samples were tested for their maximum density and optimum moisture content,
expansion and R-value characteristics, as well as pH (potential of Hydrogen) and resistivity
properties, and soluble sulfate and chloride content.
The results of our laboratory tests are presented on Tables B-I through B-V, and Figure B-l.
In-place density and moisture characteristics are also presented on the logs of trenches,
Figures A-l through A-20.
File No. 04786-54-01
February 5, 1992
TABLE B-I
Summary of In-Place Moisture-Density and Direct Shear Test Results
Angle of
Dry Moisture Unit Shear
Density Content Cohesion Resistance
Sample No. (pcf) (%) (psf) (degrees)
Tl-2 115.5 11.4
Tl-3 113.4 14.9
T3-2 100.4 16.1
T4-2 111.5 21.5
T6-2 123.6 7.2
T6'3 H7-l 7.1
T8-2 119.8 13.3
T12-1 115.8 7.4 1,000 31
File No. 04786-54-01
February 5, 1992
TABLE B-H
Summary of Laboratory Maximum Dry Density
and Optimum Moisture Content Test Results
ASTM D1557-78
Sample
No.Description
Maximum
Dry
Density
(pcf)
Optimum
Moisture
Content
(% Dry Weight)
Tl-1 Rust brown, Clayey to Silty, fine to
medium SAND
T3-1 Rust brown and dark gray, Silty, fine to
medium SAND
129.6
128.5
10J
8.8
TABLE B-III
Summary of Laboratory Expansion Index Test Results
Sample
No.
Tl-1
T3-1
Moisture
Before
Test
(%)
8.0
7.2
Content
After
Test
(%)
25.6
17.7
Dry
Density
(pcf)
117.0
121.8
Expansion
Index
60
1
File No. 04786-54-01
February 5, 1992
Table B-IV
Summary of Water Soluble Sulfate,
Chloride. oH and Resistivity Test Results
Sample
No.
T13-1
pH
9.8
Minimum
Resistivity
(ohm-cm)
530
Water Soluble
Sulfates
(percent)
.030
Water Soluble
Chloride
(percent)
.030
TABLE B-V
Summary of R-Value and Sand Equivalent Test Results
Sample
No.
Location R- Sand
Value Equivalent
(SE)
Tl-1 Proposed parking and driveway areas 4
T6-1 Proposed parking and driveway areas 30
8
19
File No. 04786-54-01
(0
ou
Iu0.
SAMPLE NO. T12-1
-4
18
14
161a.i lee
APPLIED PRESSURE (ksf)
Initial Dry Density (pcf)
Initial Water Content (%)
115.8
7.4
Initial Saturation (%)
Sample Saturated at (ksf)
12.4
0.5
CONSOLIDATION CURVE
ALTA MIRA PARK
CARLSBAD, CALIFORNIA
AMP Figure B-l
APPENDIX C
APPENDIX C
RECOMMENDED GRADING SPECIFICATIONS
FOR
"****" ALTA MIRA PARK
CARLSBAD, CALIFORNIA
File No. 04786-54-01
RECOMMENDED GRADING SPECIFICATIONS
GENERAL
1.1 These Recommended Grading Specifications shall be used in conjunction with the
Geotechnical Report for the project prepared by Geocon Incorporated. The
recommendations contained in the text of the Geotechnical Report are a part of
the earthwork and grading specifications and shall supersede the provisions
contained hereinafter in the case of conflict.
1.2 Prior to the commencement of grading, a geotechnical consultant (Consultant)
shall be employed for the purpose of observing earthwork procedures and testing
the fills for substantial conformance with the recommendations of the Geotech-
nical Report and these specifications. It will be necessary that the Consultant
provide adequate testing and observation services so that he may determine that,
in his opinion, the work was performed in substantial conformance with these
specifications. It shall be the responsibility of the Contractor to assist the
Consultant and keep him apprised of work schedules and changes so that
personnel may be scheduled accordingly.
1.3 It shall be the sole responsibility of the Contractor to provide adequate equipment
and methods to accomplish the work in accordance with applicable grading codes
or agency ordinances, these specifications and the approved grading plans. If, in
the opinion of the Consultant, unsatisfactory conditions such as questionable soil
materials, poor moisture condition, inadequate compaction, adverse weather, and
so forth, result in a quality of work not in conformance with these specifications,
the Consultant will be empowered to reject the work and recommend to the
Owner that construction be stopped until the unacceptable conditions are
corrected.
DEFINITIONS
2.1 Owner shall refer to the owner of the property or the entity on whose behalf the
grading work is being performed and who has contracted with the Contractor to
have grading performed.
2.2 Contractor shall refer to the Contractor performing the site grading work.
2.3 Civil Engineer or Engineer of Work shall refer to the California licensed Civil
Engineer or consulting firm responsible for preparation of the grading plans,
surveying and verifying as-graded topography.
2.4 Consultant shall refer to the soil engineering and engineering geology
consulting firm retained to provide geotechnical services for the project.
2.5 Soil Engineer shall refer to a California licensed Civil Engineer retained by the
Owner, who is experienced in the practice of geotechnical engineering. The Soil
Engineer shall be responsible for having qualified representatives on-site to
observe and test the Contractor's work for conformance with these specifications.
2.6 Engineering Geologist shall refer to a California licensed Engineering Geologist
retained by the Owner to provide geologic observations and recommendations
during the site grading.
2.7 Geotechnical Report shall refer to a soil report (including all addendums) which
may include a geologic reconnaissance or geologic investigation that was prepared
specifically for the development of the project for which these Recommended
Grading Specifications are intended to apply.
MATERIALS
3.1 Materials for compacted fill shall consist of any soil excavated from the cut areas
or imported to the site that, in the opinion of the Consultant, is suitable for use
in construction of fills. In general, fill materials can be classified as soil fills,
soil-rock fills or rock fills, as defined below.
3.1.1 Soil fllls are defined as fills containing no rocks or hard lumps greater than
12 inches in maximum dimension and containing at least 40 percent by
weight of material smaller than 3/4 inch in size.
3.1.2 Soil-rock fills are defined as fills containing no rocks or hard lumps larger
than 4 feet in maximum dimension and containing a sufficient matrix of soil
fill to allow for proper compaction of soil fill around the rock fragments or
hard lumps as specified in Paragraph 6.2. Oversize rock is defined as
material greater than 12 inches.
3.1.3 Rock fills are defined as fills containing no rocks or hard lumps larger than
3 feet in maximum dimension and containing little or no fines. Fines are
defined as material smaller than 3/4 inch in maximum dimension. The
quantity of fines shall be less than approximately 20 percent of the rock fill
quantity.
3.2 Material of a perishable, spongy, or otherwise unsuitable nature as determined by
the Consultant shall not be used in fills.
3.3 Materials used for fill, either imported or on-site, shall not contain hazardous
materials as defined by the California Code of Regulations, Title 22, Division 4,
Chapter 30, Articles 9 and 10; 40CFR; and any other applicable local, state or
federal laws. The Consultant shall not be responsible for the identification or
analysis of the potential presence of hazardous materials. However, if
observations, odors or soil discoloration cause Consultant to suspect the presence
of hazardous materials, the Consultant may request from the Owner the
termination of grading operations within the affected area. Prior to resuming
grading operations, the Owner shall provided a written report to the Consultant
indicating that the suspected materials are not hazardous as defined by applicable
laws and regulations.
3.4 The outer 15 feet of soil-rock fill slopes, measured horizontally, should be
composed of properly compacted soil fill materials approved by the Consultant.
Rock fill may extend to the slope face, provided that the slope is not steeper than
2:1 (horizontalrvertical) and a soil layer no thicker than 12 inches is track-walked
onto the face for landscaping purposes. This procedure may be utilized, provided
it is acceptable to the governing agency, Owner and Consultant.
3.5 Representative samples of soil materials to be used for fill shall be tested in the
laboratory by the Consultant to determine the maximum density, optimum
moisture content, and, where appropriate, shear strength, expansion, and gradation
characteristics of the soil.
3.6 During grading, soil or groundwater conditions other than those identified in the
Geotechnical Report may be encountered by the Contractor. The Consultant shall
be notified immediately to evaluate the significance of the unanticipated condition.
CLEARING AND PREPARING AREAS TO BE FILLED
4.1 Areas to be excavated and filled shall be cleared and grubbed. Clearing shall
consist of complete removal above the ground surface of trees, stumps, brush,
vegetation, man-made structures and similar debris. Grubbing shall consist of
removal of stumps, roots, buried logs and other unsuitable material and shall be
performed in areas to be graded. Roots and other projections exceeding 1-1/2
inches in diameter shall be removed to a depth of 3 feet below the surface of the
ground. Borrow areas shall be grubbed to the extent necessary to provide suitable
fill materials.
4.2 Any asphalt pavement material removed during clearing operations should be
properly disposed at an approved off-site facility. Concrete fragments which are
free of reinforcing steel may be placed in fills, provided they are placed in
accordance with Section 6.2 or 6.3 of this document.
4.3 After clearing and grubbing of organic matter or other unsuitable material, loose
or porous soils shall be removed to the depth recommended in the Geotechnical
Report. The depth of removal and compaction shall be observed and approved
by a representative of the Consultant. The exposed surface shall then be plowed
or scarified to a minimum depth of 6 inches and until the surface is free from
uneven features that would tend to prevent uniform compaction by the equipment
to be used.
4.4 Where the slope ratio of the original ground is steeper than 6:1
(horizontahverticai), or where recommended by the Consultant, the original
ground should be benched in accordance with the following illustration.
TYPICAL BENCHING DETAIL
FINISH GRADE
FINISH SLOPE SURFACE
REMOVE AS RECOMMENCED
BY SOIL ENGINEER
SLOPE TO BE SUCH THATSLOUGHING OR SLIDING
DOES NOT OCCUR
NO SCALE
NOTES: (1) Key width MB" should be a minimum of 10 feet wide, or
sufficiently wide to permit complete coverage with the
compaction equipment used. The base of the key should be
graded horizontal, or inclined slightly into the natural slope.
(2) The outside of the bottom key should be below the topsoil
or unsuitable surficial material and at least 2 feet into dense
formational material. Where hard rock is exposed in the bottom
of the key, the depth and configuration of the key may be
modified as approved by the Consultant.
4.5 After areas to receive fill have been cleared, plowed or scarified, the surface
should be disced or bladed by the Contractor until it is uniform and free from
large clods. The area should then be moisture conditioned to achieve the proper
moisture content, and compacted as recommended in Section 6.0 of these
specifications.
COMPACTION EQUIPMENT
5.1 Compaction of soil or soil-rock fill shall be accomplished by sheepsfoot or
segmented-steel wheeled rollers, vibratory rollers, multiple-wheel pneumatic-tired
rollers, or other types of acceptable compaction equipment. Equipment shall be
of such a design that it will be capable of compacting the soil or soil-rock fill to the
specified relative compaction at the specified moisture content.
5.2 Compaction of rock fills shall be performed in accordance with Section 6.3.
6 PLACING, SPREADING AND COMPACTION OF FILL MATERIAL
6.1 Soil fill, as defined in Paragraph 3.1.1, shall be placed by the Contractor in
accordance with the following recommendations:
6.1.1 Soil fill shall be placed by the Contractor in layers that, when compacted,
should generally not exceed 8 inches. Each layer shall be spread evenly and
shall be thoroughly mixed during spreading to obtain uniformity of material
and moisture in each layer. The entire fill shall be constructed as a unit in
nearly level lifts. Rock materials greater than 12 inches in maximum
dimension shall be placed in accordance with Section 6.2 or 6.3 of these
specifications.
6. 1.2 In general, the soil fill shall be compacted at a moisture content at or above
the optimum moisture content as determined by ASTM D 1557-78.
6.1.3 When the moisture content of soil fill is below that specified by the
Consultant, water shall be added by the Contractor until the moisture
content is in the range specified.
6.1.4 When the moisture content of the soil fill is above the range specified by
the Consultant or too wet to achieve proper compaction, the soil fill shall
be aerated by the Contractor by blading/mixing, or other satisfactory
methods until the moisture content is within the range specified.
6.1.5 After each layer has been placed, mixed, and spread evenly, it shall be
thoroughly compacted by the Contractor to a relative compaction of at least
90 percent. Relative compaction is defined as the ratio (expressed in
percent) of the in-place dry density of the compacted fill to the maximum
laboratory dry density as determined in accordance with ASTM D 1557-78.
Compaction shall be continuous over the entire area, and compaction
equipment shall make sufficient passes so that the specified minimum
density has been achieved throughout the entire fill.
6.1.6 Soils having an Expansion Index of greater than 50 may be used in fills if
placed at least 3 feet below finish pad grade and should be compacted at
a moisture content generally 2 to 4 percent greater than the optimum
moisture content for the material.
6.1.7 Properly compacted soil fill shall extend to the design surface of fill slopes.
To achieve proper compaction, it is recommended that fill slopes be over-
built by at least 3 feet and then cut to the design grade. This procedure is
considered preferable to track-walking of slopes, as described in the
following paragraph.
6.1.8 As an alternative to over-building of slopes, slope faces may be back-rolled
with a heavy-duty loaded sheepsfoot or vibratory roller at maximum 4-foot
fill height intervals. Upon completion, slopes should then be track-walked
with a D-8 dozer or similar equipment, such that a dozer track covers all
slope surfaces at least twice.
6.2 Soil-rock fill, as defined in Paragraph 3.1.2, shall be placed by the Contractor in
accordance with the following recommendations:
6.2.1 Rocks larger than 12 inches but less than 4 feet in maximum dimension
may be incorporated into the compacted soil fill, but shall be limited to the
area measured 15 feet minimum horizontally from the slope face and 5 feet
below finish grade or 3 feet below the deepest utility, whichever is deeper.
6.2.2 Rocks or rock fragments up to 4 feet in maximum dimension may either be
individually placed or placed in windrows. Under certain conditions, rocks
or rock fragments up to 10 feet in maximum dimension may be placed
using similar methods. The acceptability of placing rock materials greater
than 4 feet in maximum dimension shall be evaluated during grading, as
specific cases arise and shall be approved by the Consultant prior to
placement.
6.2.3 For individual placement, sufficient space shall be provided between rocks
to allow for passage of compaction equipment.
6.2.4 For windrow placement, the rocks should be placed in trenches excavated
in properly compacted soil fill. Trenches should be approximately 5 feet
wide and 4 feet deep in maximum dimension. The voids around and
beneath rocks should be filled with approved granular soil having a Sand
Equivalent of 30 or greater and should be compacted by flooding.
Windrows may also be placed utilizing an "open-face" method in lieu of the
trench procedure, however, this method should first be approved by the
Consultant.
6.2.5 Windrows should generally be parallel to each other and may be placed
either parallel to or perpendicular to the face of the slope depending on the
site geometry. The minimum horizontal spacing for windrows shall be
12 feet center-to-center with a 5-foot stagger or offset from lower courses
to next overlying course. The minimum vertical spacing between windrow
courses shall be 2 feet from the top of a lower windrow to the bottom of
the next higher windrow.
62.6 All rock placement, fill placement and flooding of approved granular soil
in the windrows must be continuously observed by the Consultant or his
representative.
6.3 Rock fills, as defined in Section 3.1.3, shall be placed by the Contractor in
accordance with the following recommendations:
63.1 The base of the rock fill shall be placed on a sloping surface (minimum
slope of 2 percent, maximum slope of 5 percent). The surface shall slope
toward suitable subdrainage outlet facilities. The rock fills shall be provided
with subdrains during construction so that a hydrostatic pressure buildup
does not develop. The subdrains shall be permanently connected to
controlled drainage facilities to control post-construction infiltration of
water.
63.2 Rock fills shall be placed in lifts not exceeding 3 feet. Placement shall be
by rock trucks traversing previously placed lifts and dumping at the edge of
the currently placed lift. Spreading of the rock fill shall be by dozer to
facilitate seating of the rock. The rock fill shall be watered heavily during
placement. Watering shall consist of water trucks traversing in front of the
current rock lift face and spraying water continuously during rock
placement. Compaction equipment with compactive energy comparable to
or greater than that of a 20-ton steel vibratory roller or other compaction
equipment providing suitable energy to achieve the required compaction or
deflection as recommended in Paragraph 63.3 shall be utilized. The number
of passes to be made will be determined as described in Paragraph 6.33.
Once a rock fill lift has been covered with soil fill, no additional rock fill
. lifts will be permitted over the soil fill.
6.33 Plate bearing tests, in accordance with ASTM D1196-64, may be performed
in both the compacted soil fill and in the rock fill to aid in determining the
number of passes of the compaction equipment to be performed. If
performed, a minimum of three plate bearing tests shall be performed in
the properly compacted soil fill (minimum relative compaction of 90
percent). Plate bearing tests shall then be performed on areas of rock fill
having two passes, four passes and six passes of the compaction equipment,
respectively. The number of passes required for the rock fill shall be
determined by comparing the results of the plate bearing tests for the soil
fill and the rock fill and by evaluating the deflection variation with number
of passes. The required number of passes of the compaction equipment
will be performed as necessary until the plate bearing deflections are equal
to or less than that determined for the properly compacted soil fill. In no
case will the required number of passes be less than two.
6.3.4 A representative of the Consultant shall be present during rock fill
operations to verify that the minimum number of "passes" have been
obtained, that water is being properly applied and that specified procedures
are being followed. The actual number of plate bearing tests will be
determined by the Consultant during grading. In general, at least one test
should be performed for each approximately 5,000 to 10,000 cubic yards of
rock fill placed.
63 J5 Test pits shall be excavated by the Contractor so that the Consultant can
state that, in his opinion, sufficient water is present and that voids between
large rocks are properly filled with smaller rock material. In-place density
testing will not be required in the rock fills.
6.3.6 To reduce the potential for "piping" of fines into the rock fill from overlying
soil fill material, a 2-foot layer of graded filter material shall be placed
above the uppermost lift of rock filL The need to place graded filter
material below the rock should be determined by the Consultant prior to
commencing grading. The gradation of the graded filter material will be
determined at the time the rock fill is being excavated. Materials typical of
the rock fill should be submitted to the Consultant in a timely manner, to
allow design of the graded filter prior to the commencement of rock fill
placement.
6.3.7 All rock fill placement shall be continuously observed during placement by
representatives of the Consultant.
OBSERVATION AND TESTING
7.1 The Consultant shall be the Owners representative to observe and perform tests
during clearing, grubbing, filling and compaction operations. In general, no more
than 2 feet in vertical elevation of soil or soil-rock fill shall be placed without at
least one field density test being performed within that interval. In addition, a
minimum of one field density test shall be performed for every 2,000 cubic yards
of soil or soil-rock fill placed and compacted.
7.2 The Consultant shall perform random field density tests of the compacted soil or
soil-rock fill to provide a basis for expressing an opinion as to whether the fill
material is compacted as specified. Density tests shall be performed in the
compacted materials below any disturbed surface. When these tests indicate that
the density of any layer of fill or portion thereof is below that specified, the
particular layer or areas represented by the test shall be reworked until the
specified density has been achieved.
7.3 During placement of rock fill, the Consultant shall verify that the minimum
number of passes have been obtained per the criteria discussed in Section 6.3.3.
The Consultant shall request the excavation of observation pits and may perform
plate bearing tests on the placed rock fills. The observation pits will be excavated
to provide a basis for expressing an opinion as to whether the rock fill is properly
seated and sufficient moisture has been applied to the material. If performed,
plate bearing tests will be performed randomly on the surface of the most-recentiy
placed lift. Plate bearing tests will be performed to provide a basis for expressing
an opinion as to whether the rock fill is adequately seated. The maximum
deflection in the rock fill determined in Section 6.3.3 shall be less than the
maximum deflection of the properly compacted soil fill. When any of the above
criteria indicate that a layer of rock fill or any portion thereof is below that
specified, the affected layer or area shall be reworked until the rock fill has been
adequately seated and sufficient moisture applied.
7.4 A settlement monitoring program designed by the Consultant may be conducted
in areas of rock fill placement. The specific design of the monitoring program
shall be as recommended in the Conclusions and Recommendations section of the
project Geotechnical Report or in the final report of testing and observation
services performed during grading.
7.5 The Consultant shall observe the placement of subdrains, to verify that the
drainage devices have been placed and constructed in substantial conformance
with project specifications.
7.6 Testing procedures shall conform to the following Standards as appropriate:
7.6.1 Soil and Soil-Rock Fills:
7.6.1.1 Field Density Test, ASTM D1556-82, Density of Soil In-Place By
the Sand-Cone Method.
7.6.1.2 Field Density Test, Nuclear Method, ASTM D2922-81, Density of
Soil and Soil-Aggregate In-Place by Nuclear Methods (Shallow
Depth).
7.6.13 Laboratory Compaction Test, ASTM D1557-78, Moisture-Density
Relations of Soils and Soil-Aggregate Mixtures Using 10-Pound
Hammer and 18-Inch Drop.
7.6.1 A Expansion Index Test, Uniform Building Code Standard 29-2,
Expansion Index Test.
7.6.2 Rock Fills:
7.6.2.1 Field Plate Bearing Test, ASTM Dl 196-64 (Reapproved 1977)
Standard Method for Nonrepresentative Static Plate Load Tests of
Soils and Flexible Pavement Components, For Use in Evaluation
and Design of Airport and Highway Pavements.
8 PROTECTION OF WORK
8.1 During construction, the Contractor shall properly grade all excavated surfaces to
provide positive drainage and prevent ponding of water. Drainage of surface
water shall be controlled to avoid damage to adjoining properties or to finished
work on the site. The Contractor shall take remedial measures to prevent erosion
of freshly graded areas until such time as permanent drainage and erosion control
features have been installed. Areas subjected to erosion or sedimentation shall
be properly prepared in accordance with the Specifications prior to placing
additional fill or structures.
8.2 After completion of grading as observed and tested by the Consultant, no further
excavation or filling shall be conducted except in conjunction with the services of
the Consultant.
CERTIFICATIONS AND FINAL REPORTS
9.1 Upon completion of the work, Contractor shall furnish Owner a certification by
the Civil Engineer stating that the lots and/or building pads are graded to within
0.1 foot vertically of elevations shown on the grading plan and that all tops and
toes of slopes are within 0.5 foot horizontally of the positions shown on the
grading plans. After installation of a section of subdrain, the project Civil
Engineer should survey its location and prepare an as-built plan of the subdrain
location. The project Civil Engineer should verify the proper outlet for the
subdrains and the Contractor should ensure that the drain system is free of
obstructions.
9.2 The Owner is responsible for furnishing a final as-graded soil and geologic report
satisfactory to the appropriate governing or accepting agencies. The as-graded
report should be prepared and signed by a California licensed Civil Engineer
experienced in geotechnical engineering and by a California Certified Engineering
Geologist, indicating that the geotechnical aspects of the grading were performed
in substantial conformance with the Specifications or approved changes to the
Specifications.
Geocon Incorporated Form. Revision date: 06/04/90
AGRONOMIC REPORT
SOIL AND PLANT LABORATORY, INC.
Orange Office
Lab No. 51760
February 6, 1992
The Dike Partnership
One Venture, Suite 100
Irvine, CA 92718
Attn: Jim Ridge
ALTA MIRA PARK - CARLSBAD
Following is a report on our inspection and soil sampling of the
above site on 1-22-91. Composite surface soil samples were
collected from the nine general areas designated on the enclosed
aerial photo. Also included are agricultural suitability and soil
fertility data on a subsoil sample received from Geocon
Incorporated that represents the terrace deposits anticipated at
final elevations throughout the majority of the site.
General Inspection
The reddish brown to brown colored surface soil varies from loamy
sand at locations 1 and 5 to sandy loam in texture at locations 6,
7 and 9. The location 1 soil area had not been planted recently,
locations 1, 3 and 6 represent the ridge areas, locations 2, 4 and
5 the lower areas, location 9 a slope, and location 7 and 8 the
upper portion.
Based on the sample received the subsoil is also loamy sand to
sandy loam in texture.
SOIL ANALYSIS
Surface Soil
Soil reaction is slightly alkaline at location 2. Slightly acid at
locations 3, 5 and 6 and slightly to moderately acid in remaining
areas sampled with lime content low throughout. With the exception
of location 6, which would restrict growth of salt sensitive
plants, salinity (ECe) levels are satisfactorily low throughout.
Based on the SAR values soluble sodium is adequately balanced by
calcium and magnesium in all nine surface soil areas sampled. In
summary, the location 6 soil area is slightly saline with remaining
areas non-saline and all areas non-sodic in nature. In addition,
boron concentrations which are adequate for nutritional purposes
are well below the toxic range and constitute no hazard to plant
P.O. Box 6566, Orange, California 92613-6566 / (714) 282-8777 FAX (714) 282-8575
P.O. Box 153, Santa Clara, California 95052-0153 / (408) 727-0330 FAX (408) 727-5125
P.O. Box 1648, Bellevue, Washington 98009-1648 / (206) 746-6665 FAX (206) 562-9531
Page 2
Dike Partnership
February 6, 1992
P.O. Box 6566, Orange, California 92613-6566/(714) 282-8777
FAX (714) 282-8575
P.O. Box 153, Santa Clara. California 95052-0153/(408) 727-0330
FAX (408) 727-5125
P.O. Box 1648 Bellevue. Washington 98009-1648^(206) 746-6665
FAX (206) 562-9531
growth.
Available nitrogen is moderately low to low with locations 2,3,6
and 8 optimum at locations 1, 4, 7 and 9 and fairly high at
location 5. Phosphorous, which is generally fairly high to high
varies from high optimum at location 5 to high at location 2.
Potassium, which is also generally fairly high varies from high
optimum at location 2 to high at location 4. Calcium and magnesium
levels are satisfactory throughout.
The unusually high surface soil, phosphorus and potassium levels
indicate that substantial quantities of complete chemical
fertilizers and/or manures had been applied in the past to all nine
areas sampled. However, it should be noted that this has not
resulted in excessively high surface soluble salts.
Subsoil
The subsoil zone represented by the sample received is neutral in
reaction and low in lime content. The salinity (ECe) level would
restrict growth of many plants and based on the SAR value soluble
sodium would adversely effect both soil structure and growth of
sodium sensitive plants. In summary, the subsoil zone represented
by the sample received is fairly saline and moderately sodic in
nature. In addition, the boron concentration is slightly but not
excessively high for satisfactory growth of most landscape plants.
The soil fertility data show available nitrogen and potassium
slightly low with phosphorus low. Calcium is slightly low with
magnesium well supplied.
Recommendations
As previously noted, based on the sample received the subsoil is
undesirably high in soluble salts. However, there are no
significant chemical problems in the nine surface soil areas
sampled. If feasible, the surface soil in both cut and fill areas
should be stockpiled during grading operations. If this approach
can be employed, we recommend the following.
The surface soil in both cut and fill areas should be removed to a
minimum 18" depth and stockpiled for future use. Following rough
grading the stockpile soil should be used for surface fill to the
18" depth in all areas to be landscaped again in both cut and fill
areas.
i£ and P.O. Box 6566, Orange, California 92613-6566/(714) 282-8777
FAX (714) 282-8575
P.O. Box 153, Santa Clara, California 95052-0153/(408) 727-0330
FAX (408) 727-5125
RO. Box 1648 Bellevue, Washington 98009-1648/(206) 746-6665
FAX (206) 562-9531
Page 3
Dike Partnership
February 7, 1992
The following preplant amendment and post plant maintenance
recommendations are based on using the current surface soil in all
areas to be landscaped.
For turf and ground cover planting the following amendments should
be uniformly broadcast and thoroughly incorporated to a depth of 4-
6" by means of rototiller or equal.
AM'T/1000 SO. FT.
4 cu. yds. nitrogen stabilized organic
amendment derived from redwood, fir or
cedar sawdust
5 Ibs. ammonium sulfate
The planting pits for container grown trees and shrubs should be
excavated twice the diameter and twice the depths of the root ball.
On-site surface soil should be used without amending for backfill
to the depths of the root ball. The backfill mix for use around
the root ball should be prepared as follows:
6 parts by volume on-site surface soil
4 parts by volume nitrogen stabilized
organic amendment
1 Ib. ammonium sulfate per cu. yd. of mix
2 Ibs. iron sulfate per cu. yd. of mix
The above material should be thoroughly blended at central on-site
locations prior to use for backfill purposes. Also, the iron
sulfate should not contact cement surfaces since severe staining
could occur.
Since both phosphorus and potassium are fairly high to high a
nitrogen-only maintenance fertilizer program can be employed for at
least the first two years. Beginning approximately 30 days after
planting ammonium nitrate should be applied at the rate of 3 Ibs.
per 1000 sq. ft. on a monthly basis. When plants have become well
established the frequency of fertilizer applications can be
decreased.
If unamended soil areas are to be hydroseeded, the following
material should be included in the hydromulch formula:
iC cwu ^K^attt ^taoo/iQto/iii, ^cic. p° B°X 6se6. °™a°- CM°'™ saiwswi™) 232-3777
FAX (714) 282-8575
P.O. Box 153, Santa Clara, California 95052-01537(408) 727-0330
FAX (408) 727-5125
RO. Box 1648 Bellevue, Washington 98009-16487(206) 746-6665
page 4 FAX ,206) 562-9531
Dike Partnership
February 7, 1992
AM'T/ACRE
200 Ibs. ammonium nitrate
300 Ibs. Ureaform 38-0-0 (with 287%
insoluble nitrogen)
Beginning approximately 60 days after planting the maintenance
fertilizer program outlined for general landscape areas can also be
employed in the hydroseeded portions.
Please call if^you have any questions.
7^)U/l2^
fORRES1:
FF:he
P.O. Box 6566, Orange, California 92613 | ^14) 282-8777
i-.. . (714)282-8575
P.O. Box 153, Santa Clara, California 95052-0153/(408) 727-0330
FAX (408) 727-5125
P.O. Box 1648 Bellevue, Washington 98009-1648/(206) 746-6665
FAX (206) 562-9531
Dike Partnership
One Venture, Suite 100
Irvine, CA 92718
Attn: Jim Ridge
SOIL FERTILITY AND AGRICULTURAL SUITABILITY
(A04)
Orange Office
Lab No. 51760
February 7, 1992
Alta Mira Park, Carlsbad soil sample taken 1-23-92
j Saturation Extract Values
Sam Half Parts Per Million Dry Soil 1
pie Sat. | N03-N
ft % 1
1 11 16
2 12 5
3 13 9
4 13 34
5 11 278
6 14 12
7 14 27
8 13 3
9 14 19
Half Saturation %
(1) Location 1 0-12"
(2) Location 2 0-12"
(3) Location 3 0-12"
(4) Location 4 0-12"
(5) Location 5 0-12"
(6) Location 6 0-12"
(7) Location 7 0-12"
(8) Location 8 0-12"
(9) Location 9 0-12"
NH4-N
11
7
8
6
7
6
12
7
7
P04-P K
88 250
138 240
87 460
103 420
61 1260
113 320
119 420
83 310
85 330
Ca
670
960
670
1020
4220
940
930
730
560
-approx. field moisture
SAR
Mg 1
1
168
323
199
195
920
192
213
213
115
capacity.
pH JECe
1
5.2 1.1
7.2 0.5
6.6 0.5
5.9 3.1
6.2 1.1
6.0 4.0
5.4 2.0
5.3 1.9
5.1 1.8
Salinity =
Ca Mg
Me/1 Me/1
3.7 2.1
1.4 0.8
1.3 0.9
14.4 7.4
3.5 1.8
15.1 7.8
7.0 3.8
5.7 4.0
5.7 3.1
ECe (mmhos/cm
Na
Me/1
4.7
2.2
1.1
10.3
3.7
8.2
8.3
8.5
5.8
at 25
K
Me/1
1.1
0.4
1.9
3.6
1.6
6.8
2.0
1.8
3.1
B | SAR QUAL
PPM 1
1
0.49
0.65
0.48
0.67
0.43
0.50
0.62
0.50
0.36
LIME
2.8 NONE
2.1 NONE
1.0 NONE
3.1 NONE
2.3 NONE
2.4 NONE
3.6 NONE
3.9 NONE
2.8 NONE
0
0
0
0
0
2
0
0
0
degrees C.) .
- Sodium Adsorption Ratio.
Dike Partnership
One Venture, Suite 100
Irvine, CA 92718
Attn: Jim Ridge
P.O. Box 6566, Orange, California 92613 " 14) 282-8777
r. v/14) 282-8575
P.O. Box 153, Santa Clara, California 95052-0153/(408) 727-0330
FAX (408) 727-5125
P.O. Box 1648 Bellevue, Washington 98009-1648/(206) 746-6665
FAX (206) 562-9531
SOIL FERTILITY AND AGRICULTURAL SUITABILITY Orange Office
(A04) Lab No. 51760
February 7, 1992
Alta Mira Park, Carlsbad soil sample taken 1-23-92
Saturation Extract Values
Sam
pie
#
1
Half
Sat.
12
Parts Per Milli
1 N03-N NH4-N P04-P
1
21 3 3
on Dry
K
80
Soil.
Ca
580
Mg I
. 1
639
1
pH |ECe
1
Ca
Me/1
Mg
Me/1
Na
Me/1
K B | SAR
Me/1 PPM |
!
Location
QUAL
LIME
Half Saturation %-approx. field moisture capacity. Salinity = ECe (mmhos/cm at 25 degrees C.).
SAR - Sodium Adsorption Ratio.
(1) Subsoil
TRAFFIC STUDY
O'ROURKE ENGINEERING
LETTER OF TRANSMITTAL
DATE: Mr. Michael W. NG, P.E.
TO: 5650 El Camino Real
JOB # TR02922.
Suite 200
Carlsbad, CA 92008
ATTN: Mr. Michael W. NG, P.E.2011 Palomar Airport Rd.
Suite 109
Carlsbad
California 92009
6194316763 THESE ARE TRANSMITTED VIA Hand Carried
FAX: 619 431 0672
FOR APPROVAL FOR YOUR USE AS REQUESTED
X FOR REVIEW AND COMMENT
COPIES
' 1
DESCRIPTION
Traffic Impact Analysis for Porposed Alta
Mira Park
REMARKS:
SIGNED O'Rourke Engineering
Carlsbad • Ontario • Tustin
0 ' R0URKE ENGINEERING
March 9, 1992
Mr. Michael w. NG, P.E.
5650 El Camino Real
Suite 200
Carlsbad, CA 92008
\Enclosed' is the Traffic Impact Analysis Report on the proposed
recreational park on Hidden Valley Road in the City of Carlsbad.
2oiiPaiomarAirPortRd. If there are any questions or comments please call me at (619)
suite 109 431-6763.
Carlsbad
California 92009
6194316763 VerV truly yours, ™"
FAX: 619 431 0672 O'Rourke Engineering
Susan E. O'Rourke, P.E.
President
Carlsbad • Ontario • Tustin
0 ' R 0 U R K E ENGINEERING
TRAFFIC IMPACT ANALYSIS
FOR
ALTA MIRA PARK
CITY OF CARLSBAD
\
2011 Palomar Airport Rd.
Suite 109
Carlsbad
California 92009
619 431 6763
FAX: 619 431 0672
INTRODUCTION
O'Rourke Engineering was retained by Crosby, Mead, Benton &
Associates to prepare the traffic impact analysis for Alta
Mira Park in the City of Carlsbad. Alta Mira Park is located
east of 1-5 between Palomar Airport Road and Poinsettia Lane.
The park site is bounded on the west by Paseo Del Norte,
Hidden Valley Road on the east and undeveloped lands on the
north and south boundary. The project location is shown as
Attachment A.
The park will provide recreational facilities at a community
park level for the City of Carlsbad. The facilities and
improvements will include tennis courts, ballfield, soccer
complexes and playground areas along with the attendant
parking. The park site contains approximately 42 acres.
The traffic impact analysis addresses the impact of the park
traffic and explores access and circulation associated with
the site. Steps in the analysis include an overview of
existing roadways and future roadways; assessment of project
impacts on existing conditions and recommendations to mitigate
impacts if necessary. The steps in the analysis and the
results are discussed herein.
Carlsbad • Ontario • Tuson
PROJECT DESCRIPTION
Alta Mira Park will provided a community park for Carlsbad
within the Zone 20 Specific Plan area. The park site
encompasses approximately 42 acres.
The recreational facilities and improvements planned for Alta
Mira Park include:
Tennis Courts Primary/Secondary Fields
Adult Soccer Field Enclosed Soccer Field
Basketball Courts Sand Volleyball Court
Tot Lots Horseshoe Pits
Batting Cages Golf Tee Cage
Stage Band Area Picnic Areas
Tennis Clubhouse Restrooms/Snack Bar
Gymnasium Maintenance Building/Yard
335 Parking spaces
The site plan for the proposed improvements is provided as
Attachment B.
EXISTING/FUTURE ROADWAY CONDITIONS
Existing conditions effecting the project were explored in
terms of existing roadway geometries and existing traffic
volumes. Each roadway is discussed below with the existing and
future lane geometries and traffic volumes highlighted.
Roadway Geometries
\
Existing' roadway geometries were surveyed surrounding the
proposed park site. Access to the site will be provided from
two streets. These streets are Paseo Del Norte and Hidden
Valley Road.
Paseo Del Norte contains two north and southbound traffic
lanes from Palomar Airport Road to Sea Gate Drive and one
north and southbound traffic lane from Sea Gate Drive to
Poinsettia Lane, along with a center two-way turn lane, bike
lanes and on-street parking on both sides of the street from
Palomar Airport Road to Poinsettia Lane. Currently, this
roadway carries 7,900 ADT north of Poinsettia Lane based on a
1990 count by the City of Carlsbad. The street is classified
as a four-lane secondary arterial north of Sea Gate Road and
two lane secondary arterial south to Poinsettia Lane. Future
traffic volumes are expected to be in the 7,600 to 10,200 ADT
range.
Hidden Valley Road does not exist in the field. It is proposed
to be a two lane collector street between Palomar Airport Road
and Camino De Las Ondas. The roadway geometries will include
within a 68' ROW, a north and southbound traffic lane, center
two-way 'left turn lane and bike lanes on both sides of the
street. Based on the Composite Land Use Map of Zone 20 SPA
dated March 1989, it is estimated that 520 residential units
would access Hidden Valley Road. With an average of 10 trips
per unit and a relatively equal north to south split, Hidden
Valley Road will have an average daily traffic volume of
approximately 2600 vehicles.
Camino De Las Ondas will provide the southern connection to
Hidden Valley Road. The roadway is a two lane road. It is
expected to remain a two lane road. Attachment C exhibits the
proposed roadway geometries and future PM peak hour traffic
volumes around the park, as stated in the Traffic Analysis for
the Zone 20 Specific Plan Area.
PROJECT IMPACTS
Park Site Trip Generation
Based on a 50 vehicle per acre rate, as stated in the San
Diego Traffic Generators Manual, January 1990, the Average
Week Day Traffic (AWDT) for the park site is estimated to be
2,100 vehicles. Based on the same manual, the AM peak hour
will generate 4 percent of the AWDT, while the PM peak hour
generates 8 percent of the AWDT. The AM peak hour and PM peak
hour will be 84 and 168 vehicles, respectively. Thus, the
project trips need to be assimilated into the adjoining
transportation network.
Roadway Access
Access to the park will be provided onto Hidden Valley Road.
The entire 2,100 vehicles per day will access the site via
Hidden Valley Road. These trips will be distributed from
Hidden Valley Road to the north onto Palomar Airport Road and
to the south via Camino De Las Ondas to Paseo Del Norte and
College Boulevard. Attachments D and E illustrate the daily
percent assignment and the PM peak hour trip assignment, of
trips with a single access onto Hidden Valley Road,
respectively. The roadway geometries proposed for Hidden
Valley Road will provide sufficient capacity to accommodate
the additional park traffic. A left turn lane should be
'striped out of the two way left turn lane at the northbound
park entrance on Hidden Valley Road.
Consideration has been given to vehicular access from Paseo
Del Norte. If vehicular access were provided directly on
Paseo De-1 Norte, approximately 50% of all traffic generated at
the park would use this access. With Paseo Del Norte as an
access route to the park site, several modifications to the
existing roadway would be necessary. These modifications
include removing some on-street parking along Paseo Del Norte.
In addition, the internal street from the park connecting to
Paseo Del Norte would need to traverse a 40 foot slope and
align with Caminito Estrada. It is unlikely that the
intersection of the park access with Paseo Del Norte would
have sufficient traffic to meet Caltrans warrants for
signalization. Attachments F and G illustrate the daily
percent assignment and the PM peak hour trip assignment,
respectively, of trips on the network assuming both access
points are in use.
ROADWAY NEEDS
The proposed park site and improvements do not create a major
traffic impact on the adjoining external transportation
system. Based on a review of the Zone 20 Specific Plan Area
Traffic Report Year 2010 Conditions, Palomar Airport Road,
College Boulevard, and Poinsettia Lane have the capacity to
handle the traffic generated by the park. The following table
summarizes the volume to capacity ratios associated with the
increase of park traffic and the corresponding level of
service. The PM peak hour traffic was used for the analysis,
consistent with zone 20 analysis.
No significant demands are placed on the roadway network as a
result of the park activities. No improvements to the external
network are required if the recommendations presented as Attachment
C from the Zone 20 Specific Plan Area Report are constructed.
CONCLUSION
The Alta Mira Park is an exciting addition to the City of Carlsbad
park system. The park will allow for greater participation for all
age groups with passive and active recreational facilities.
\
With the improvements recommended above, the project impacts will
be mitigated, and an efficient roadway network will be in place to
serve the park.
\PM Peak Hour
LEVEL OF SERVICE (LOS)
Access to Hidden Valley Road Only
Existing Future
Roadway Volume Caoacitv V/C LOS Volume Park Total Capacity V/C LOS
Palonar Airport Road
From: Paseo Del Norte
To:
Hidden
Frora:
To:
• Frora:
To:
Hidden Valley Road
Eastbound
Westbound
Valley Road
Palomar Airport Road
Park Entrance
Northbound
Southbound
Park Entrance
Poinsetta Lane
Northbound
Southbound
1132 5400 0.21
1924 3600 0.53
Not
Not
Not
Not
A
A
Constructed
Constructed
Constructed
Constructed
1544
2283
71
165
198
85
8
8
25
25
59
59
1552
2291
96
191
257
144
5400
5400
3600
3600
3600
3600
0
0
0
0
0
0
.29
.42
.03
.05
.07
.04
A
A
A
A
A
A
Paseo Del Norte
From:
To:
Palomar. Airport Road
Caraino De Las Ondas
Northbound
Southbound
582 3600
606 3600
0.16
0.17
A
A
531
571
13
13
544
584
3600
3600
0
0
.15
.16
A
A
V/C : Volume/Capacity
\PM Peak Hour
LEVa OF SERVICE (LOS)
Access to Hidden Valley Road and Paseo Del Norte
Existing
Roadway Volume Capacity V/C LOS Volume Park
Future
Total Capacity V/C LOS
Palomar Airport Road
From: Paseo Del Norte
To:
Hidden
From:
To:
From:
•To:
Hidden Valley Road
Eastbound
Westbound
Valley Road
Paloraar Airport Road
Park Entrance
Northbound
Southbound
Park Entrance
Poinsetta Lane
Northbound
Southbound
1132 5400 0.21 A
1924 3600 0.53 A
Not
Not
Not
Not
Constructed
Constructed
Constructed
Constructed
1544
2283
71
166
198
85
4
13
13
4
29
29
1548
2296
84
170
227
114
5400
5400
3600
3600
3600
3600
0
0
0
0
0
0
.29
.43
.02
.05
.06
.03
A
A
A
A
A
A
Paseo Del Norte
From:
From:
To:
Palomar Airport Road
Park Entrance
Northbound
Southbound
Park Entrance
Poinsetta Lane
Northbound
Southbound
582 3600
606 3600
369 1800
282 1800
0.16 A
0.17 A
0.21 A
0.16 A
531
571
426
319
17
25
25
25
548
596
451
344
3600
3600
0
0
.15
.17
1800 0.25
1800 0.19
A
A
A
A
V/C = Volume/Capacity
NTS
PARK SITE
O'ROURKE ENGINEERING
ATTACHMENT A
PROJECT LOCATION MAP
ALT A MIRA PARK
ALTA MIRA PARK
CITY PROPOSED SITE PLAN
O'ROURKE ENGINEERING
ATTACHMENT B
PROPOSED SITE PLAN
ALTA MIRA PARK
PARK SITE
O'ROURKE ENGINEERING
LEGEND:
6P - 6 LANE
ARTERIAL
4M -4 LANE
ARTERIAL
4SA - 4 LANE SECONDARY
ARTERIAL
2 LANE SECONDARY
ARTERIAL
2 LANE COLLECTOR
(XX) - AVERAGE DAILY TRAFFIC
XX - PM PEAK HOUR TRAFFIC
2SA -
— 2C -
ATTACHMENT C
ROADWAY GEOMETRICS &
FUTURE TRAFFIC VOLUMES
ALTA MIRA PARK
( r
O'ROURKE ENGINEERING
ATTACHMENT D
TRIP ASSIGNMENT PERCENT
SCENARIO 1: ACCESS TO HIDDEN
VALLEY ROAD ONLY
ALTA MIRA PARK
v
NTScm O'ROURKE ENGINEERING
ATTACHMENT E
PROJECT TRIP ASSIGNMENT
PM PEAK HOUR
SCENARIO 1: ACCESS TO HIDDEN
VALLEY ROAD ONLY
ALTA MIRA PARK |
O'ROURKE ENGINEERING
ATTACHMENT F
TRIP ASSIGNMENT PERCENT
SCENARIO 2: ACCESS TO PASEO DEL
NORTE & HIDDEN VALLEY ROAD
ALTAMIRAPARK
I
O'ROURKE ENGINEERING
ATTACHMENT G
PROJECT TRIP ASSIGNMENT
PM PEAK HOUR
SCENARIO 2: ACCESS TO PASEO DEL
NORTE & HIDDEN VALLEY ROAD
ALTA MIRA PARK
WATER DEMAND ANALYSIS
ALTA MIRA PARK
PRELIMINARY IRRIGATION WATER PROJECTIONS
March 24. 1992
INTRODUCTION
The purpose of this document is to estimate the site water requirements for Atta Mira Park
located in Carlsbad, California. All water projections are based on 3 schematic design
alternatives and anticipated area's of various turfgrasses and plantings determined by The Dike
Partnership.
IRRIGATION WATER PROJECTIONS
Preliminary estimates of irrigation water requirements were prepared utilizing schematic design
information provided by The Dike Partnership. Acreage for each area have been derived from
planimeter take-offs by ACI. Preliminary irrigation water projections and total season
requirements for each of the 3 design alternatives are summarized on the following page.
Irrigated areas within each design alternative are identified by anticipated allocation of
landscape approach, ie: turfgrass at playing fields, turfgrass at passive fields, and
ornamental/desert planting at planting areas. Total season requirements in acre ft. and peak
season flow demands in gallons per minute are also shown on the following summary page.
DETAILED MONTHLY PROJECTIONS
Each specific area and individual landscape approach within each area has been evaluated for
it's estimated water requirements. Each landscape approach is indicated and reflected in total
square feet.
The application rate for each month is calculated utilizing the average reference evapo-
transpiration rate (ETo) published for the area. Each landscape approach was then assigned
a crop coefficient utilizing data applicable to the area. Additionally, each resulting application
rate was adjusted for an average irrigation system water distribution efficiency of 65%.
Peak flow demands each month are based on a calculated watering schedule of six (6) hours
per day. Maximizing application efficiencies necessitates irrigation to occur during the hours
of 10:00 PM and 6:00 AM. The peak (summertime) daily flow rates have been indicated for
a six (6) hour watering "window." This will allow an additional two (2) hours each day for
minor adjustment to the irrigation program.
Peak flow demands each month are also based on a calculated watering schedule of six (6)
days per week. From time to time, repairs or maintenance is required to the irrigation system.
This work cannot always be accomplished during a single day. Consequently, portions of the
irrigation system may not be able to be operated within the normal irrigation schedule. In
addition, not all seasons are consistent; one summer may be particularly more windy or hotter
than others. To allow for these factors, it is necessary to allow peak weekly irrigation volumes
to be applied in (6) days per week. This provides the seventh day for use as a "catch-up" day,
to make up for time lost to repairs, to apply additional seasonal demands, or to reduce daily
irrigation watering time.
o
ALTA NIRA PARK
PRELIMINARY IRRIGATION WATER PROJECTIONS
TOTAL SEASON REQUIREMENTS AMD PEAK FLOW
MARCH 24, 1992
mmmmi
Area Description Total Area
(Acre)
Irrigated Area
(Acre)
Total Season
Req. (Ac. Ft.)
Peak Season
Flow(GPM)
ALTERNATIVE "A"
PLAYING FIELDS
Turfgrass
PASSIVE FIELDS
Turfgrass
PLANTING AREAS
Ornamental/Desert Planting
ALTERNATIVE "A" TOTALS
8.17
9.29
3.75
21.21
8.17
9.29
3.75
21.21
32.0
36.2
5.1
73.3
138
157
22
317
ALTERNATIVE "B"
PLAYING FIELDS
Turfgrass
PASSIVE FIELDS
Turfgrass
PLANTING AREAS
Ornamental/Desert Planting
ALTERNATIVE "B" TOTALS
9.41
7.30
4.23
20.94
9.41
7.30
4.23
20.94
36.9
28.4
5.8
71.1
159
123
25
308
ALTERNATIVE "C"
PLAYING FIELDS
Turfgrass
PASSIVE FIELDS
Turfgrass
PLANTING AREAS
Ornamental/Desert Planting
ALTERNATIVE "C" TOTALS
11.57
6.91
3.75
22.23
11.57
6.91
3.75
22.23
45.4
26.9
5.1
77.4
196
117
22
335
o
ALTA MXRA PARK
PRELIMINARY IRRIGATION WATER PROJECTIONS
MONTHLY REQUIREMENTS AND PEAK FLOW
FEBRUARY 27, 1992
Area Description Irrigated Area Month
(Square Foot)
ALTERNATIVE "A"
PLAYING FIELDS
Turf grass 355885 Jan.
Feb.
Mar.
Apr.
May.
Jun.
Jul.
Aug.
Sep.
Oct.
Nov.
Dec.
Sub Total
PASSIVE FIELDS
Turf grass 404672 Jan.
Feb.
Mar.
Apr.
May.
Jun.
Jul.
Aug.
Sep.
Oct.
Nov.
Dec.
Application
Rate
2.02
2.43
4.21
4.40
5.60
5.15
6.20
5.83
4.12
2.97
2.31
1.83
47.07
1.97
2.38
4.15
4.40
5.60
5.15
6.20
5.83
4.12
2.91
2.26
1.79
Monthly Req.
(Gallons)
447117
539520
934677
975904
1241679
1142877
1375463
1292360
913022
659413
512337
406470
10440840
497312
599860
1045656
1109687
1411897
1299551
1564021
1469526
1038185
733162
570464
452102
Peak Flow
(GPM)
48
58
100
104
133
122
147
138
98
71
55
43
53
64
112
119
151
139
167
157
111
78
61
48
Sub Total 46.75 11791424
o
Area Description Irrigated Area
(Square Foot)
PLANTING AREAS
Ornamental/Desert Planting 163350
Month
Jan.
Fab.
Mar.
Apr.
May.
Jun.
Jul.
Aug.
Sep.
Oct.
Nov.
Dec.
Application
Rat*
0.69
0.83
1.45
1.54
1.96
1.80
2.17
2.04
1.44
1.02
0.79
0.63
Monthly Req.
(Gallon*)
70261
84749
147731
156778
199474
183602
220966
207616
146676
103582
80596
63873
Peak Flow
(GPM)
8
9
16
17
21
20
24
22
16
11
9
7
Sub Total 16.36 1665904
ALTBKNAXXVB "A" TOTALS
Combined Grass & Plant Mixes 923908 Jan.
Feb.
Mar.
Apr.
May.
Jun.
Jul.
Aug.
Sep.
Oct.
Nov.
Dec.
1014690
1224129
2128064
2242369
2853051
2626030
3160450
2969502
2097883
1496157
1163396
922446
108
131
228
240
305
281
338
317
224
160
124
99
Total (Sq. Ft. / Gal.)
Total (Acres / Ac. Ft.)
923908
21.21
23898167
73.3
o f)
Area Description Irrigated Area Month
(Square Foot)
ALTERNATIVE "B"
PLAYING FIELDS
Turf grass 409900 Jan.
Feb.
Mar.
Apr.
May.
Jun.
Jul.
Aug.
Sep.
Oct.
Nov.
Dec.
Sub Total
PASSIVE FIELDS
Turfgrass 317988 Jan.
Feb.
Mar.
Apr.
May.
Jun.
Jul.
Aug.
Sep.
Oct.
Nov.
Dec.
Application
Rate
2.02
2.43
4.21
4.40
5.60
5.15
6.20
5.83
4.12
2.97
2.31
1.83
47.07
1.97
2.38
4.15
4.40
5.60
5.15
6.20
5.83
4.12
2.91
2.26
1.79
Monthly Req.
(Gallons)
514978
621406
1076537
1124021
1430135
1316337
1584224
1488508
1051596
759496
590097
468162
12025496
390784
471365
821667
871983
1109456
1021176
1228994
1154740
815797
576112
448265
355258
Peak Flow
(0PM)
55
66
115
120
153
141
169
159
112
81
63
50
42
50
88
93
119
109
131
123
87
62
48
38
Sub Total 46.75 9265597
Area Description Irrigated Area Month
(Square Foot)
PLANTING AREAS
Ornamental/Deeert Planting 184259 Jan.
Feb.
Mar.
Apr.
May.
Jun.
Jul.
Aug.
Sep.
Oct.
Nov.
Dec.
Application
Rate
0.69
0.83
1.45
1.54
1.96
1.80
2.17
2.04
1.44
1.02
0.79
0.63
Monthly Req.
(Gallon*)
79254
95597
166641
176845
225007
207103
249250
234191
165450
116840
90912
72049
Peak Flow
(0PM)
8
10
18
19
24
22
27
25
18
12
10
8
Sub Total 16.36 1879139
ALTERNATIVE "B" TOTALS
Combined Grace 6 Plant Mixee 912146 Jan.
Feb.
Mar.
Apr.
May.
Jun.
Jul.
Aug.
Sep.
Oct.
Nov.
Dec.
985016
1188367
2064845
2172849
2764598
2544616
3062468
2877439
2032843
1452448
1129274
895469
105
127
221
232
296
272
327
308
217
155
121
96
Total (Sq. Ft. / Gal.)
Total (Acrea / Ac. Ft.)
912146
20.94
23170232
71.1
o
Area Description Irrigated Area Month
(Square Foot)
ALTERNATIVE "C"
PLAYING FIELDS
Turfgraae 503989 Jan.
Feb.
Mar.
Apr.
May.
Jun.
Jul.
Aug.
Sep.
Oct.
Nov.
Dec.
Sub Total
PASSIVE FIELDS
Turfgraaa 301000 Jan.
Feb.
Mar.
Apr.
May.
Jun.
Jul.
Aug.
Sep.
Oct.
Nov.
Dec.
Application
Rate
2.02
2.43
4.21
4.40
5.60
5.15
6.20
5.83
4.12
2.97
2.31
1.83
47.07
1.97
2.38
4.15
4.40
5.60
5.15
6.20
5.83
4.12
2.91
2.26
1.79
Monthly Req.
(Gallon*)
633188
764045
1323649
1382033
1758413
1618493
1947871
1830184
1292982
933833
725549
575625
14785865
369906
446182
777770
825397
1050184
966620
1163335
1093049
772213
545334
424317
336278
Peak Flow
(0PM)
68
82
142
148
188
173
208
196
138
100
78
62
40
48
83
88
112
103
124
117
83
58
45
36
Sub Total 46.75 8770585
o f
Ar«a Description Irrigated Area
(Square Foot)
PLANTING AREAS
Ornamental /Desert Planting 163350
Month
Jan.
Fab.
Mar.
Apr.
May.
Jun.
Jul.
Aug.
Sep.
Oct.
Nov.
Dec.
Application
Rate
0.69
0.83
1.45
1.54
1.96
1.80
2.17
2.04
1.44
1.02
0.79
0.63
Monthly Req.
(Qalloni)
70261
84749
147731
156778
199474
183602
220966
207616
146676
103582
80596
63873
Peak Flow
(0PM)
8
9
16
17
21
20
24
22
16
11
9
7
Sub Total 16.36 1665904
AIiTBRKATIVB "C" XOXJtLS
Combined Graaa 6 Plant Mixea 968339 Jan.
Feb.
Mar.
Apr.
May.
Jun.
Jul.
Aug.
Sep.
Oct.
Nov.
Dec.
1073355
1294976
2249150
2364208
3008071
2768715
3332173
3130849
2211871
1582748
1230462
975777
115
138
240
253
322
296
356
335
236
169
132
104
Total (Sq. Ft. / Gal.)
Total (Acre* / Ac. Ft.)
968339
22.23
25222354
77.4
ALTA MIRA PARK
PRELIMINARY IRRIGATION CONSTRUCTION ESTIMATE
March 24, 1992
ALTERNATIVE "A" (21.21 ACRES)
Irrigation @ Turf
Small areas - pop-up sprays (2.93 AC) $ 89,000
Medium areas - pop-up sprays (2.93 AC) $ 51,000
Large areas - rotors (11.6 AC) $101,000
Turf Sub-Total $241,000
Irrigation <§> Planting Beds
Small areas - drip (1.0 AC) $ 43,500
Slope areas - drip (1.0 AC) $ 26,000
Large areas - drip (1.75 AC) $ 46,000
Planting Sub-Total $ 115,500
Booster Pump Allowance $ 30,000
Irrigation Sub-Total $386,500
Contingency (15%) $ 58,000
Alternative 'A' Total $444,500
ALTERNATIVE "B" (20.94 ACRES)
Irrigation @ Turf
Small areas - pop-up sprays (2.81 AC) $ 85,000
Medium areas - pop-up sprays (2.81 AC) $ 49,000
Large areas - rotors (11.1 AC) $ 97,000
Turf Sub-Total $231,000
Irrigation @ Planting Beds
Small areas - drip (1.0 AC) $ 43,500
Slope areas - drip (1.0 AC) $ 26,000
Large areas - drip (2.23 AC) $ 55,000
Planting Sub-Total $124,500
Booster Pump Allowance $ 30,000
Irrigation Sub-Total $385,500
Contingency (15%) $58,000
Alternative "B" Total $443,500
ALTERNATIVE "C" (27.23 ACRES)
Irrigation @ Turf
Small areas - pop-up sprays (3.0 AC) $ 91,500
Medium areas - pop-up sprays (3.0 AC) $ 52,000
Large areas - rotors (12.48 AC) $107,000
Turf Sub-Total $250.500
Irrigation @ Planting Beds
Small areas - drip (.94 AC) $ 40,500
Slope areas - drip (.94 AC) $ 24,500
Large areas - drip (1.87 AC) * 49,000
Planting Sub-Total $ 114,000
Booster Pump Allowance $ 30,000
Irrigation Sub-Total $394,500
Contingency (15%) $59,000
Alternative "C- Total $453,500