HomeMy WebLinkAbout; Encinas Creek Channel Paseo Del Norte to I-5; Encinas Creek Channel Paseo Del Norte to I-5; 1989-12-29HYDROLOGIC/HYDRAULIC ANALYSIS FOR THE ENCINAS CREEK CHANNEL BETWEEN FASEO DEL NORTE AND INTERSTATE HWY 5 DECEMBER 29, 1989 RECEIVED JUL 2 81992 CITY OF CARLSBAD DEFT. COOPER ENGINEERING ASSOCIATES CIVIL ENGINEERING PLANNING LAND SURVEYING TABLE OF CONTENTS PAGE I' . SUMMARY AND CONCLUSIONS 1 II. CHANNEL HYDRAULICS 3 A. BASIS OF STUDY 3 B. LIMITS OF THE 10O YEAR FLOOD PLAIN 4 C. CHANNEL VELOCITIES - SEDIMENT TRANSPORT 6 III. MAINTENANCE 8 APPENDIX I. PRINTOUT OF THE HEC-II HYDRAULIC ANALYSIS 1-12 APPENDIX II. CROSS-SECTION LOCATION MAPS I. SUMMARY AND CONCLUSIONS This report has been prepared to outline the findings of a hydraulic analysis for the reach of Encinas Creek between Paseo Del Norte and Interstate Highway 5. The analysis was conducted to 'examine the impact of the 1OO year rainfall discharges through the creek channel on the proposed improvements for the mini- warehouse/office complex on the southerly overbank, west of Paseo Del Norte. It has been determined that the 100 year peak flows in Encinas Creek, north of the project site, will have no direct impacts on the proposed improvements. The proposed grading is restricted to the southerly overbanks above the 47 contour line, which would keep the construction outside the 100 year flood plain. There have been no improvements proposed for the channel reach between Paseo Del Norte and Interstate 5. The channel dimensions are adequate to carry the 100 year frequency peak runoff and *therefore it would be kept in its natural condition. Channel velocities on the overbanks have been computed to be below the sediment carrying velocities. It is recommended to keep the channel in its natural conditions with respect to the topography and vegetation growth. The outlet of the triple box culverts across Paseo Del Norte and the inlet to the triple box culverts across Interstate Highway 5, however, should be inspected for structural integrity and maintained free of any obstructions or vegetation overgrowth. A yearly inspection and maintenance program is recommended to be adopted for this channel reach. The following chapters will present the basis and findings of the analysis in more detail. .'• 'V*xyV-S'''.' "'•:•••:, • •' • • , II. CHANNEL HYDRAULICS A. BASIS OF STUDY This study has been conducted to determine the impacts of the 100 year frequency runoff in the Encinas Creek Channel on the*..••'•, t • • proposed improvements on the channel southerly overbank between '.- Paseo Del Norte and Interstate Highway 5. The scope of study is the determination of flow characteristics in the channel adjacent to the project site which is generally from the outlet of the. triple culverts under Paseo Del Norte to the inlet of the triple culverts under 1-5. The hydraulic analysis for the study has been performed using the HEC-II computer software developed by the Hydrologic / Engineering Center. The 100 year frequency runoff values input to the computer program have been adopted from the 1989 Master Plan of Drainage for the City of Carlsbad - Encinas Creek Basin as follows: Upstream of Paseo Del Norte 1,750 cfs Upstream of 1-5 1,880 cfs Downstream of 1-5 1,910 cfs In order to obtain fairly accurate results for the flow characteristics between Paseo Del Norte and 1-5, the cross-sections input to the computer model were extended 5OO1 downstream of the triple culverts across 1-5 and 30O1 upstream of the triple culverts across Paseo Del Norte. Cross-sections number 1 and 2 model the 3O1 wide by 1O1 high concrete channel west of 1-5 at O.5% slope. Sections 3 and 4 model the triple culverts across 1-5. Sections 5 through 8 represent the channel between Paseo Del Norte and 1-5. These sections have been digitized using a 1"=4O' scale topography map. Sections 9 and 1O model the triple culverts across Paseo Del Norte. Cross-sections 11 and 12 represent the channel upstream of Paseo Del Norte. Roughness coefficients of .015 have been used for the concrete channel downstream of 1-5 and also the two triple concrete boxes along the reach. Roughness coefficients of .045 have been used for the natural channel of the creek upstream of 1-5. A printout of the input data and the computed results of the HEC-II computer run has been included in Appendix I of the report. Appendix II contains the ln=40'scale topography map showing the cross-sections, 100 year water surface elevations and limits of the 1OO year flood plain as it relates to the proposed grading on the southerly overbank between Paseo Del Norte and 1-5. A copy of the 1"=400' scale topography map of the project vicinity is also included in Appendix II showing the cross-sections downstream of 1-5 and upstream of Paseo Del Norte. B. LIMITS OF THE 10O YEAR FLOOD PLAIN The extents of the channel inundation by the 100 year flood have been delineated on the 1"=40'scale map in Appendix II. Delineation of the flood plain has been done utilizing the water surface elevations generated by the computer model. The following is a listing of these computed water surface elevations between Paseo Del Norte and 1-5: Section 4 - u/s face of the culverts across 1-5 28.6 5 - 30.3 ./• *• 6 v 30*5 • ' 7 -. 31.2 8 - 31.6 Section 9 - D/s face of the culverts across Paseo Del Norte 34.6 The water surface elevations range from 28.6 at the entrance to the triple culverts across 1-5 to 34.6 at the downstream face of the triple culverts across Paseo Del Norte. Note that the grading for the improvements on the southerly overbank is restricted to the 47' contour, keeping the project out of the flood plain with a freeboard of at least 12'. In the process of the hydraulic analysis it has been found that both the culvert crossings under Paseo Del Norte and Interstate Hwy. 5 are flowing under pressure. It has also been determined that no weir flow occurs as result of the road overtopping. There is adequate freeboard available at the inlet east of 1-5. The freeboard available at the culvert entrance east of Paseo Del Norte, however, is not sufficient. The culvert opening under Paseo Del Norte should be increased or, as a more economically feasible alternative, a berm could be constructed on the easterly shoulder of the road along the creek section in order to provide the necessary freeboard. Note that this improvement is upstream of the channel reach under this study and outside the project boundaries. C. CHANNEL VELOCITIES - SEDIMENT TRANSPORT Channel velocities have been determined as part of the; 1 , ' r hydraulic analysis. The following are velocities computed at cross-sections taken between Paseo Del Norte and 1-5: Section 4 - u/s face of the culverts across 1-5 9.2 fps 5 3.7 fps 6 4.7 fps 7 4.4 fps 8 7.4 fps Section 9 - d/s face of the culverts across Paseo Del Norte 12.2 fps The velocities of, sections 4 and 9 are restricted to the 3O1 wide opening of the culverts across 1-5 and Paseo Del Norte. Flow velocities at section 5 through 7 arc all less than 6 fps which is the minimum for sediment transport capabilities. The velocity of channel at section 8 is restricted to the effective flow area of the cross-section. The effective flow downstream of the outlet of bridges or culvert crossings follows a 4:1 expansion. (Refer to the HEC-II Water Surface Profiles User Manual by the Hydrologic Engineering Center) . That is for each 4 feet of channel length the flow width expands 1 foot on each side. Flow width is 30' at section 9. Section 8 is 70' from section 9. Thus the limit of the effective flow at section 8 will be approximately (3O/2) + (70/4) = 33' from the channel, center line. Therefore the limit of the effective flow is 25'away from the toe of the southerly channel bank. •';' Velocities of less than 6 fps all along the channel banks between Paseo Del Norte and 1-5 indicate that no erosion will occur due to the discharges of the 1OO year frequency rainfall. Almost all the sediment carried by the flow will be deposited upstream of Paseo Del Norte where the velocities are at a minimum. Therefore no deposition will occur along the reach between Paseo Del Norte and 1-5. III. MAINTENANCE Maintenance of storm drain facilities is a process which must be periodically implemented to insure that the system operates as designed and remains well preserved. The program of activities ,recommended merely establish a prescribed routine procedures and" inspections to be undertaken in order for the system to function as originally planned. Frequency of inspection varies depending upon experience. As an initial rule of thumb, the channel reach should be inspected once every year. All inspections should be made during the early summer months so that there is ample time to evaluate the reported deficiencies and have all the recommended work completed prior to the next rainy season. The entire channel reach should be inspected for floatable debris that can be carried downstream. Waterway area should be inspected for obstruction with vegetation overgrowth blocking more that half of the change! cross-section. The outlet of the triple box culverts across Paseo Del Norte and the inlet of the triple box culverts across 1-5 should also be inspected for deficiencies such as: - Trash and debris blocking more that 1/4 the height of the structure - Erosion around the headwalls - Settlement or movement in the structures - Vegetation I1-2' high within 2O1 of the structures - Failure of the structural concrete. All deficiencies noted by the inspector during the maintenance inspection shall be submitted to an engineer for evaluation and recommendations. APPENDIX I PRINTOUT OF THE HEC-II HYDRAULIC ANALYSIS SURFACE PROFILES VERSION OF IIOYEtICa l?7i IJPSAILC l!Ai IJiV! I EH-PC -T VtRSIO:! RUM DA 11 I2.0';/!tf I lilt M:50:5? •i U.S. WHY CORPS OF EHG1IIQEF.* . HIE l!iDf!QLOGlC EIIGlllF.Cn 1)10 ' iO'9 SECQHD SI REE I, SUM? '« « DnVIS, CftLIFORHIA 95616 « (916) iHO-2105 (FTSI HO 21 M' :MMil»3m mx x x x i s x x x xxmxx X xmxxx BEST ORIGINAL 12/07/09 11:51:08 PAGE i THIS RUII EKCU1ED 12/09/89 HiSllOO IIEC2 FILEASE OATH HO1.' Jh UPDA1ED llAi' 1961 ERROR CORK - 61,02,03,0,05,06 - 50,51,52,53,51,55,54 1985 BEST ORIGINALc Tl STUDV FOR: TiUOII DEVELOPIIEIIT - C/iRLSBfiD. JOS HO. 317-1. T2 BVs COOPER ENGINEERING ASSOCIATES. DEC 8?. T3 - EHCIHAS CRECK - CHAUMEL BETHEEIl'l-5 AND FASEO OEI. IKJRTE. M. J2 LIC 3f (1 >R (1 iR 1CKECK 0. HPftOF -1.000 ING IIIHV JQIR STRI 2.0.0. -1.000000 1PLOT PRFVS KSECV XSECII .000 •1.000 METRIC .00 Fll •000 .000 .000 • 000 .000 .1)15 .10.1 i. ooo 1910.000 .000 iooo D/S LIMIT. -NORMAL DEPTH ASSUMPTION. 30'M X i.OOO 2B.500 2.000 30.500 JO'H RECT. 5.000 4985.000 5.000 4535.000 0/S FACE OF 1-5 3 !| iR C T I B 1 2 r i F ir *\ i 3.000 31.000 5.000 1985.000 .000 .000 1.000 1880.000 .000 JJ10 1.000 1.400 U/S FACE OF 1-5 3- 1.000 .000 11.000 4971.100 19.000 22.000 5H3.000 11.000 22.000 40.000 11.000 .000 4795.000 49.000 27.000 5005.400 17.000 4795.000 4981.500 5090.000 .300 .000 IIV1HS .0 ftl.LDr; .000 .000 .000 u 0. IDW .000 .000 .000 HSEL 22.700 C1INIH FQ .COO IT RACE ,000 .OdO .000 15.000 .000 .000 .000 .000- f-roc. CHANNEL 1 .5! SLOPE. 1935.000 18.500 1985.000 20.500 5015.000 1985. 100 5015.000 4985.100 .OdO 13.500 * K'0. 000 20.500 .000 5000.000 WO. 000 5000,000 .000 13.500 •100.000 20.500 .000 5014.900 501-1 . 000 .900 .000 28.500 .000 30.500 .000 5015.000 .000 5015.000 10 -HH 'II CULVERTS. 4905.000 21.000 5015.000 1985.100 .015 .300 .000 .000 4984.500 W15.500 Z.iOO 30.000 10'HIS'H CULVERTS. 4795.000 1.000 49.000 27.000 5004.900 49.000 '15.000 40.000 22,000 35.000 5145.000 27.000 41.000 4994.500 19.000 27.000 .000 481-1.000 5000.000 51I5.000 100.000 21.000 .300 ,000 ,000 31,000 210.000 19.000 1984.500 19.000 27.000 5015. 400 .000 35.000 22,000 40.000 100.000 5000.000 ,OD(i .000 ,000 1.000 210.000 .000 49.000 22.000 5005.000 49.000 .000 4840.000 5015.500 5125.000 100. 000 21.000 .000 .000 .000 150.000 240.000 .000 22.000 4995.000 49.000 27.000 .000 30.000 27.000 45.00(i 5014 .000 .900 .000 .000 .000 .000 .000 1.330 4994.400 49.000 22.006 5015.500 .000 4890.000 5018.000 5145.000 .000 31.000 .000 .000 .000 22,000 .000 .000 49.000 22.000 5005.500 47.000 .000 25.000 20.000 .000 .000 5015.000 .000 .000 .000 21.000 .000 .000 27.000: 4995.100 17.000 22.000 .000 4968.000 5050.000 .000 12/09/89 14:51:08 PAGE 2 ET Kl 6R GR GR $| GR ET 11 GR 6R GR E! Kl GR 6R GR NCer ET .000 5.000 43,000 28.000 35.000 k >• WO ' PfraiOw 'v ' ifl.tioo ' 10.000 .000 7.000 45.000 27.300 45.000 .000 6.000 45.000 28.800 40.000 .000 . 1.000 .000 S.I 10 13.000 4930.000 4948.000 5068.000 12.000 'J854.000 4971. Md .TOS2.000 3.110 11.000 4971.000 5000.000 5180.000 3.110 12.000 4906.000 5000.000 5183.000 .000 1750.000 .3.110 0/S FACE OF f'ASEO Kl GR GR GR NC El SB 9.000 45.000 30.000 35.000 .000 .000 1.000 13. m 4917.000 5015.500 5170.COO ,000 3.110 1.600 U/S FACE OF PASES XI K2 3T BT BT PT BT GR GR 6R ET XI GR GR 10.000 .000 15.000 4984.600 40.000 31.000 3013.300 45.000 31.000 45.000 .000 11.000 45.000 40.000 31.000 .000 4677.000 40.000 31.000 f.005.500 10.000 167?. 00) 5000.000 5270.000 3.110 7.000 4650.000 5260.000 4<?IS.<X>0 4C80.000 40.000 25.000 40.000 4356.000 40.000 25.000 . 45.000 •I570.00? IB/1.000 40.000 28.000 .000 1950.000 1906.000 10.000 29.000 15.000 .015 .000 47C4.300 DEL HQRTE 1917.000 40.000 33.000 40.000 .045 4984.500 2.60:) DEI. NORfE 1677.000 1.000 50.000 35.000 4995.100 40.000 31.000 10,000 31.000 .000 4850.000 4650.00^ 10.000 45.010 5060.000 5I08.000- 4892.000 1994.000 5088.000 5102.000 4868.000 5000.000 5102.000 5055.000 5160.000 1882.000 5059.000 .000 5045.000 5203.000 4918.000 5006.000 5205.000 .100 .000 5015.500 .000 130.000 35.000 22.000 •tt.OOO 65.000 35.000 28.000 .000 .000 45.000 35.000 30.000 .000 .000 90.000 •35.000 29.000 ..000 .300 .600 .000 .000 25.000 4901.000 5000.000 5108.000 65.000 4378.000 5014.000 ' .000 .000 90.000 1591.000 5098.000 .000 .000 90.000 4927.000 5095.000 .000 .000 .000 .000 .000 75.000 30.000 25.000 • .000 63.000 30.000. 30.000 . .000 .000 130.000 30.000 35,000 .000 .000 90.000 30.000 30.000 .000 .000 .000 .000 .000 .000 4915.000 5013, ('00 .000 .000 4890.000 5042,000 .000 .000 . .000 •1901.000 5133.000 .000 .000 .000 1913.000 5140,000 .000 .000 .000 .000 .000 .000 28.000 30.000 .000 .000 28.000 35.000 .000 .000 .000 28.000 40.000 .000 .000 .000 29.000 35.000 .000 .000 .000 .000 .000 .000 4922.000 501B.OOO .000 .000 4900.000 5062.000 .000 .000 .000 4992.000 5151.000 .000 .000 .000 4961.000 5165.000 .000 .000 .000 .000 3-10 HJI'll CULVEPIS. 5205.000 4928.000 5025.000 5170.000 .300 5015.500 .000 '?<). 000 35.000 32.000 45.000 .500 .000 31.000 50. 000 4949.000 5052.000 5205.000 .000 .000 1.000 70.000 30.000 32.000 .000 .000 .000 120.000 .000 4984.500 5038.000 .000 .000 .000 .000 .000 30.000 33.000 .000 .OOP .000 31.000 .000 5000.000 5100.000 .000 .000 ,000 •{0.000 3-10 IKI'K CULVERTS. 5270.000 35.000 45.003 4994.400 40.000 31.000 5270.000 1725.000 5015.500 .000 5150.000 5270.000 4660.000 5270. 000 115.000 40.000 4870.000 Ki.OOO 35.000 5005.600 15.000 35.000 31.000 .000 .000 150.000 35.000 .000 115.000 .000 13.000 35. COO 5004.900 1C. 000 13.000 IB.'O.OOO 5024.000 .000 .000 60.000 1700.000 .000 115.000 .000 35.000 4794.500 10.000 35.000 .000 35.000 35.000 .000 .000 100.000 31.500 .000 .000 1.330 4984.500 40.000 35.000 5015. 400 '.000 4920.000 5225.. 000 .000 .000 .000 5000.000 .000 .000 .000 40.000 31.000 5005.000 10.000 .000 31.000 W.00.0 .000 .000 .000 35.000 .000 .000 .000 31.000 4995.000 40.000 35,000 .000 4984.500 5250.000 ,000 .000 .COO 5250.000 .000 !2/0?/89 PAGE U/S LIHI1. HI 12.000 7,00.0 6R 45.00;* 4*00.000 6ft 10.000 5290.000 EJ .000 ,000 4600.0')0 5326.000 200.000 200.000 40.000 4410,000 33.000 1700.000 <3.00C 5320.000 .000 .000 '•WO ,000 .000 .000 200.000 ,000 33.000 5000,000 .000 .000 .000 .000 .000 .000 35,000 5250.000 .000 , .000 ' ,000 .000 NAL 12/09/89 If(91:03 PAGE 1 1 SECNO 0 TIIIE SLOPE DEFIIi QL06 VLOP XLOW. CIJSEL QC!I VCII XI.CII CR1HS QROB VROB XL00K ttSELK ALilt XIIL IfRIAL EG fiCI! MICH IDC .HV ARDD MIR 1COIIT lit. VOL Ml CI1RAR QLOSS BANK ELEV IHA LEFT.'RIGHI EUI1U S3TA IOPHID EIIOSI IPMF J I I I I I i I I CCHV" 'MOOCEIIV* '.300 iSECNO'l.QOO 3720 CRITICAL DEPTH ASSUMED D/S LIHIT. NORMAL DEPltl ASSUMPTION. 30,'H 1.10'K P.ECT. CONG. CHANNEL I .5* SLOPE. .1.00 5.01 23.51 23.51 22.70 26.04 1910. 0. 1910. 0. 0. 150. *: .00 .00 12.7o .00 .000 .015 .002841 . 0. 0. 0. 0 10 FLOW DISTRIBUTION FOR oECNO* 1.00 STA* 1?85. 5013. PER 0* 100.0 AREA' H9.t VEL" I2.B JSECIJO 2.000 3685 20 TRIALS ATTESTED BSEL.C8SEL 3673 PROBABLE HINIHUH SPECIFIC ENERGY 3720 CRITICAL CEPIH ASSUMED 2.00 5.02 23.52 1910. 0. 1710, .01 .00 J7.?5 .002C33 400. -100. CMSEL« 2.53 0. .000 0 23.5J .00 0. .000 .00 .00 28.50 0. 28.50 13.50 4935.05 2-7.90 5014.95 25.52 0. .(•0 400. .(0 0. .000 20 28.01 * 150. .015 5 2.52 0. .000 0 I.i3 1. .00') .00 .00 0. 20.50 27.^0 30.50 30.50 4905.05 5014,95 FLOli DISTRIBUTION FDR SECtiO" 2.00 STA» 4985. 5015. PER Q> 100.0 AREA= 149.S . VEL« 12.8 JSECMO 3.000 3605 20 TRIALS AlTEIIPrEO i4SEL,CWSEI. 3693 PROBABLE 11 111!HUN SPECIFIC EtIEBC, 3720 CRITICAL CtPfll A55UIIEO D/S FACE OF 1-5 S-IO'HXS'H CULVERTS. 25.52 12/09/89 14:51:08 PAGE I I SECHO DEPTH CH5EL 0 OLOD C'CH T1HE VLOB VCM SLOPE KLOEL XLCH CRIWS HSF.LK EC IIV lit. QROfi ALOB ACH ARM VOL VROB ML -XIO MR HIM IIR1AI IDC ICOIir CORAR 01.055 DfillK ELEV fWA LEFT/HINT ELH1H 551(1 fOPHID ENPST I I I I 5,02 2i.<il 26.C2 ,-«' 3«. 19K>. 0. *'..,>iOQ 12.75 ,W '• ,"002,835 v* ' \W, 100. 10'). FLOW DISTRIBUTION FOR SECliO* STA* «9B5. 5015. PER 0« 100.0 AREA* H9.8 VEL« 12.8 ..00 28.51 :). 150. .000 20 .OJfi 5 2.53 0. .000 0 .29 .00 31. CO 2. 0. 31,00 .000 21.0..I i?C<5.0S .00 29.90 SOU. 95 CHSEL- 26.02 CCHV* .300 CEIIV" .500 SPECIAL BRIDGE • 5227 DONIISTRE.1M ELEV IS /5.?:> ,1101 BEST ORIQINAL HVPRnULIC JUHP OCCURS DOHNSTRE.AH (IF LON CLOH CONIROI.S) I I I SB XK m>R COrO RDLEII DWC BHP BAREA 1,00 I,o0 Z.60 30.00 31.00 1.00 150.00 «SECHO 4.000 3700. BRIDGE SfEIICL' 4934.50 S1EIO* 5015.50 3301 HV CHANGED HOF;E 1HAII HV1NS PRESSURE FLOW 5S ELCIIU ELCIID .00 ?2.00 21.00 E6PRS EBLHC 21.92 29.54 113 QHEIR QPR .00 0. 1680. TFeAPEIOID AREA fSO. 150. ELLC ELTRD 27.00 49.00 3470 ENCROACHHEliT STATIONS" 4984.5 5015.5 FYPE-I U/S FACE OF 1-5 3-10'WXS'H CULVERTS. 4.00 6.62 28.42 .00 .00 29.92 1980. 0. 1800. 0. 0. 205. 1 .02 .00 7.16 .00 .000 .0'I5 ,009934 210. 240. 240. 3 0 1 .1.30 0. .000 0 31.000 1,38 .00100000.00 3. 1. 100000,00 .000 22.03 -1981.50 .00 31.00 5015,50 12/09/8? HiShOB FACE SECHO CEFHI CHSF.L D OLQf! C!CH TIIIE VLOB VCII SLOPF. aOBI. ILCK FLOH DISIR1PUIICH FOR 3ECNQ* ifty^'/ttss. 5H5. '•'PER'B" 100.0 ' AftF> 205.3 - VEL* ?.i «SECIIO 5.000 Cf-.lHS HSELK Efi 117 IIL QKCC AL06 ACH ARQD VOL Vf'08 U'lL- XIICH M Hill KLOEiR KRliU IOC ICOIIf CORA 4.00 C«3El« 29.62 3301 HV CHANGED MORE THAtl H VI 113 3170 EHCROACIIMEIIf SFAriOMS" 5.00 6.34 30.34 1880. 0. 1880. .02 .00 3.72 .002198 I'O. 75. FLOW DlSTr<IBUfii)!l FOR RECHO' SIA« 49! 5. 5108. PER Q» 100.0 AREA' 506.0 VEL' 3. 7 tSECNO 6.000 6.00 5.4? JO. 4? 1880. 0. 1880. .03 .00 4.68 .005698 65. 65. 4915.0 5060.0 TYPE' 1 TARGE.!=- .00 .00 30.55 .21 0. 0. 506. 0. .00 .000 .045 .000 .: 25. 3 0 0 5.W CHSEL » 30.31 » .00 .00 30.83 .34 0. 0. 102. 0, .00 .000 .045 .000 65. 200 OLOSS BANK ELtLV THA LEFT/RIGHT ELM IN S31A fOTWO ENOST H5.0M .31 .33100000.00 3. 1. 100000.00 .000 22.00 4915.00 .00 131.35 5049.35 EST ORI .22 .06 45.00 4. 1. 45.00 .000 25.00 4858.82 .00 155.15 5043.97 FLOW DISTRIBUTION FOR SECMO» STA* 4889. 5102. PER .0- JOO.O AREA' 401.6 VEL- 4.7 tBECNO 7.000 3470 ENCROACHMENT STATIONS' 6.00 CHSEL- 30.49 4890.0 5055.0 Tl'PE*1 I'flRSET*165.000 12/07/89 14:5l!C6 PAGE SECHO Dc'rill CHSf:. Q DLOb 'Jill TIKE VLCfc '/CM SLOPE KLOfil. XICH ii^:A •••'•' «*••mfXffU ?' > f.M 4.45 "^MMf ' 45. 13ft. . "• * FLOH DIS1RIBUHOII Idi SECNO* STA« 4901. 5190. PER 0- 100.0 flR£A« 422.9 VEL* <•< ISECNO 8.000 QftOB WOB XLOBR ,00 0. .1)0 90. 7.0C HSEI.K E6 HV IIL fiLOP ACH AF;GB VOl. KtJL • '<IICH KIIR IJTII URIAL IDC I COH I CO^f! ,00 31.52 ,31 .60 0. 423. 0. 5. .000 .015 .COO .000 30 0 .00 CHSEL' 31.22 OLfiSS GAIIK ELF.V m LEFT/RIGHT Cl til II SS'A 10F«ID EMDST .01100000.00 1. 100000.00 .27.30 4900. 8i 154.17 5055.00 1 3301 HV CHANGED HO?:E THAN HVINS 3470 EHCROACHHENI S!ATIPNS= 8.00 2.85 31.65 1880. 0. IBHO. .04 .00 7.44 .OH701 50. 90. '1750.0 .00 0. .00 90. 5015.0 TYPE' 1 TARG£T= .00 32.51 .96 .71 0. 233. 0. 6. .000 .045 .000 .000 200 ..00 95.000 .28100000.00 2, 100000.00 28.80 4950.00 95.00 5045.00 BEST ORIGINAL FLOW DISTRIBUTION FOR SECfiQ- STft" 4950. 5205. PER Q* 100.0 AREA= 252.6 VEL* 7.4 B.OO CHSEL=31.65 CCilV* .lOOCtHV-- tSECNO 9.000 .300 3301 HV CHANGED NCRE fliiiN HVitlS 3635 20 TRIALS ft HEMP TED HStt.CUSEL 369! PROBABLE HlllillUN SPECIFIC EI1ERGY 3720 CRITICAL DEPIII ASSURED 3470 CNCftOACHHclir BTAHOM6" 49B4.5 5015.5 IVPE« I tflRDEf- D/S FACE OF PAStO DEL HORIE 5-IO'HH'll CUIVERJS. 31.000 12/09/89 14:51:08 PAGE SECII3 DEPTH Q QLD6 TIME VLOB SLOPE XLOOl CrtSEL I3CH VCH KICH Cfil'JS QROD VROD mm HSEli; EG AI.OB ACM Xfil ItlCII I TRIAL IDC HV AliQB KI:Ri coin III VOL WIN CORAR OL039 BANK ELEV TWA LEFT/RIGHT ELH1IJ SSTA IQF'HID F.IIDSI .9.00 4.61 31.jl. 34,61 ,00 . 36.91. 2.33 .39 .44100000.00 J750. 0. 0. 14J. 0. 6. 2. 100000.00 12.25 .00 .000 .015 .000 .000 30.00 4984.50 ?0. 50. 20 11 0 .00 31.00 5015.50 CliSEL' 31.61FLON DISTRIBUTION FOR SECHO- ?.00 STft» 1985. 5205, PER Q* 100.0 AREA* 142.9 VEL« 12.1 CCHV' .JOO CEKV» .50.3 SftClAL BRIDGE 3227 OOWISIREAH ELEV 15 J4.03 .HOT 51./,l HVDKAULIC JtlHP OCCURS DOHHSIREAH (IF LQ» FLOH COIIIftflLS) 61 XK XKOfi COFO RDLEfl BHC BMP BAREA 5S ELCHU ELCHD 1.00 1.60 ,?.W .00 31.00 1.00 120.00 .00 31.00 30.00 ISECHO 10.000 3700. BR1DCE STEtlCL* 4981.50 STENCH" 5015.50 3301 HV CHANGED HQF.E TliAtl HVIN5 *PRESSURE FLOW E6FRS EGLHC H3 QUEIR GF'R BAREA ffiAf'fZOlD ELl.C ELIRD AREA 39.89 38.17 .00 0. 1750. 120. 120. 35.00 40.00 BEST ORIGINAL 3470 ENCROACHMENT STATIONS* 198-1.5 5015.5 TYPE* I TARGEF-- U/S FACE OF PASEQ DEL HORTE 3-10'UM'H CULVERTS. 10.00^ 8.15 39.15 .00 .00 39.09 .71 2.<?5 1750. 0. 1750. 0. 0. 253. 0. /. .05 .00 6.92 .00 .000 .045 .000 .000 .004700 115. 115. 115. 2 0 0 .00 31.000 .00100000.00 2. 100000.00 31.00 4984.50 31.00 5015.50 12/07/89 I'll 51:09 PAGE 9 SECIIO DEFFH Q QL3B TIHE VI.OB SLOPE mm CHSEl OCX VCH (Li.ll CRIH3 QR06 '.'ROB XLOOR MSELK EG ALOB ACII ML • HIGH IIRIAL IDC HV ARQB 'KHR ICOI1I til. OL05G BANK EI.EV VOL [HA LEFT/RIGHT WW ELIIIN BSJA CORAR TOPHID ENBS1 FLQ« DlSTRIBiniull FOR E£CIIO» 1(1,00 CHSEL' 100.0 252.9 VEL- 4.9 13ECIIQ 11.000 3301 HV CHAIJSED MORE TIIAIi H'.'HIS 39.15 BEST ORIGINAL 3470 EHCROACHI1EUT 11.00 8.62 1750. 0. .08 .00 .000037 150. 40.12 1750. .7a 100. 4B50.0 5150.0 TYPE* 1 TARGET* 300.000 .00 .00 40.13 ,01 .01 .22100000.00 0. 0. 2296. 0. 10. 2. 100000.00 .00 .000 .045 .000 .000 31.50 4850.00 60. 2 0 0 .00 300.00 5150.00 FLOH DISTRIBUTION FOR SECI!0= 11.00 STft* 4f50. 5270. PER Q= 100.0 VEL* CIJSEL-40.12 ISECHO 12.000 * U/S 12.00 1750. .20 .000021 LIHII. 7.13 0. .00 2tC. •10. 13 1750. .17 200. .00 0. .00 200. .00 0. ,00.) 2 40.13 3713. .015 0 .00 0, .000 V .01 23. .000 .00 .00 1. 33.00 631.03 is. co 15.00 4609.74 5290.77 FLOH DISTRIBUTION FOR SEOIO* 3Ifl= 4610. 5320. PER 0= 100.0 AREfl» 3712.9 VEL- .5 12.00 -10.13 12/09/89 PAGE 10 THIS RIM EXECUIED 12/09/89 H«55:*6 HEC2 RCLEAji WED HOV 76 UfDAIED HAY ERROR COftR - 01,02,03,04,05,04 -, 5rt,51,32,53,54,55,56 APRIL 1985 BEST ORIGINAL IQ1E- ASTERISK («l Ar LEFT OF CROSS-SECIIGN HMBER INDICATES 11ES3A5E HI SUHHARV OF ERRORS LIST - EhCIHAS CREEK - 3UHMARY PRINTOUT TABLE 150 . 5ECIIO 1,000 2*000 3,000 4.000 5.000 6.000 7.000 8.000 9.000 10.000 11.000 12.000 XLCH '.00 400.00 100.00 240.00 75.00 &S.OO 130.00 ?0.0i) 70.00 115.00 100.00 200.00 ELIRD .00 .00 .00 49.00 .00 .00 .00 .00 ,00 10.W .00 .00 ELLC .00 .00 .00 27.00 .00 .00 .00 .00 .00 35.00 .00 .00 ELIHM 18.50 20,50 21.00 22.00 22.00 25.00 27.30 28.80 30.00 31.00 31.50 33.00 G 1910.00 1910.00 1910.00 1 080. 00 1360.00 loeo.oo 1G80.00 1830.00 1750.00 i;so.oo 1750.00 1750.00 CKSEl 23.51 25.52 26.02 26.6.2 30.31 50.19 31.22 31.65 3-1. i! 39.15 40.12 40.13 CRIUS 23.51 25.52 26.02 .00 .00 .00 .00 .00 34.il .00 .00 .00 EG 26.04 26.04 20.54 29.92 30.55 30.83 31.52 32.51 36.94 39,89 40.13 40.13 IOK*S 28.41 28.35 28. J5 99.36 21.98 56.78 48.61 147.01 28.21 47.00 .37 .21 VCH 12.74 12.75 12.75 9.16 3.72 1.68 4.45 7.44 12.25 6.92 .76 .47 AREA 149.65 149.79 149.76 205.29 505.98 401.62 422.89 252.63 142.86 252.87 2296.11 3712. B9 .011. 358.32 359. f 3 ;5B.72 ics.feo 400. 9? 24?. (i; 26-5.55 155.0J J27.51 255. ;•? 2840.31 1'U.ih l2""8' Nt „ 1 - EHCIIWS CREEK ••- [3UHHARY PRIIITQUT TAELE 1,. SEEIIO 0 v^;.c.--'':\^;:.''"-.'v :' •- ISO CHSEL DIF«SP g^^«W.:.'- ^i^y^ 23,51 | NpfF2,&Cr'<: WO.OO •':••'•:••: / .-"-•• . ••• » .- » 1 J i1 1 3.000 4.000 5.000 6.000 7.000 8.000 9.000 10.000 ll.OCO 12.000 1910,00 1P80.00 I860, IC80, 1880. 1880. 1750. 1750. 1750. 00 00 00 00 00 00 00 1750.00 25,52 • 26. 28. 30, .30, 31. 31. 34. 39. 40. 40. 02 62 34 «•' 22 65 61 15 12 13 .00 ,00 ,00 .00 ,00 ,00 .00 .00 .00 .00 .00 .00 DIFHSK DIFKHb ,00 2,00 ,50 2,60 1,72 ,1(5 .73 .43 ' 2.94 1.54 .97 .0! ,31 .00 .00 .00 ,00 ,00 .00 .00 .00 .00 .00 .00 TOPW1D 29,;w 29.90 2?. 31. 134. 155, 151. 95. 31. 31. 300. 681. ,90 00 35 15 17 00 00 00 00 03 H.CH .00 400.00 100.00 240.00 75.00 45.00 130.00 90. CO 70.00 115.00 100.00 200.00 BEo PAGE 12 I I ICAUttttf;SECttl)» CAUTION- SECNQ* CAUTION SEGNO' ICAUTION SECMO= ICAUtlOII SECHO* 6UW1ARY OF ERRORS AMD SPECIAL NOTES CAUTION SECNO* .1.000 PROFILE* I 2.000 PROFILE:- i2.000 2.000 3.000 3.000 3.000 PROFILED PROFILE" • FROFILE* PROFILED PROFILED CRITICAL DEPTH ASSUMED CRITICAL DEPTH ASSUMED PROBABLE MINIMUM SPECIFIC ENEF;Gi 20 TRIALS ATTEHPTED TO BALANCE• HSEL CRITICAL DEPTH ASSUMED PROBABLE I11HIHUH SPECIFIC ENERGY 20 TRIALS ATTEHPTED TO BALANCE HSEL jCAUflOH SECNO' 1.000 PROFILE- 1 HVDRAULIC JUftP D.S. CAUTIOtl SECIIO' 9,000 PROFILE" I CRITICAL DEP1II ASSUMED ICAUTION SECNO" 9.000 PROFILE- 1 PROBABLE MINIMUM SPECIFIC ENERGY CAUI10H SECHO" 9.000 PROFILED 1 20 TRIALS ATTEMPTED TO BALANCE HSEL CAUTION SECNO' 10.000 PROFILE* I HYDRAULIC JUMP D.S. I I I I I I VICINITY MAP SCALE 1»=400' rn CO ;o C5SB-J