HomeMy WebLinkAbout; Master Plan of Sewerage - Capacity Fee Update; Master Plan of Sewerage - Capacity Fee Update; 1990-06-01CITY OF CARLSBAD
CAPACITY FEE UPDATE TO THE
DECEMBER 1987, MASTER PLAN
OF SEWERAGE
June 1990
Wilson Engineering
Consulting Engineers
TABLE OF CONTENTS
PAGE NO.
LIST OF TABLES ii
CHAPTER 1. INTRODUCTION 1
Recommendations 1
Revisions from the December 1987, Master Plan
of Sewerage 2
CHAPTER 2. CAPITAL COSTS 3
Encina Water Pollution Control Facility Costs 3
Phase IV Project 3
Phase V 4
Solids Management . 4
Ocean Outfall 6
Vista/Carlsbad Interceptor 6
Other City of Carlsbad Capital Projects 6
CHAPTER 3. CITY WIDE CAPACITY FEE 9
Units .9
Bond Payments 9
Inflation and Interest 10
Sewer Construction Fund Obligations 10
Estimated Fees 10
EXHIBIT A Pocket
LIST OF TABLES
«M
•*"
to PAGE NO.
i»
to
P. Table 2-1 Improvements to the Encina Water Pollution Control
L Facility (All Figures in Thousands of Dollars) .............. 5
f*
^ Table 2-2 Improvements to the Vista/Carlsbad Interceptor
Sewage Drainage Basin 7
Table 2-3 Other City of Carlsbad Capital Projects (All
Costs in Thousands of Dollars) 8
Table 3-1 Sum of Expenses (All Costs in Thousands of Dollars) 11
Table 3-2 Sewer Capital Fund Cash Flow Projection 12
ii
CHAPTER 1
INTRODUCTION
In 1989, the City of Carlsbad elected to bond finance their portion of the Phase
IV construction at the Encina Water Pollution Control Facility. These bonds
obligate the City of Carlsbad to pay back principle and interest in future years.
The purpose of this report is to analyze the impact of these future bond
payments and other cost increases and adjustments on the sewer connection
fees.
The assumptions used for determining future flows are derived from the
December 1987, Master Plan of Sewerage. Sizing the facility and cost data are
obtained from the December 1987, Master Plan of Sewerage and the 1989-90
Encina Budget. All cost data has been revised to an ENR-CCI-LA of 5,800.
RECOMMENDATIONS
1. The City wide capacity fee should be changed to $1,610.
2. The City wide capacity fee should only cover costs for the Encina Water
Pollution Control Facility, the Vista/Carlsbad Interceptor, and the Home
Plant Pump Station.
3. A number of smaller sewer area fees should be established to fund
collection system improvements to bring a sewer line to each zone
subbasin as defined in the December, 1987, Master Plan of Sewerage and
the Benefit Area Fee for Conveyance System Improvements dated March
1990.
f
REVISIONS FROM THE DECEMBER 1987, MASTER PLAN OF SEWERAGE
1. Bond payments have been included as an expense.
2. All conveyance system improvements other than the Vista/Carlsbad
Interceptor and Home Plant Pump Station and Force Main have been
removed from the City wide capacity fee.
3. The Calavera Hills Water Reclamation Plant credit amount has been added
as an expense to the sewer construction fund and improvement costs for
the Calavera Hills Water Reclamation Plant have been removed.
CHAPTER 2
CAPITAL COSTS
All capital costs are based on information presented in the December 1987,
Master Plan of Sewerage and the Encina Water Pollution Control Facility 1989-90
Budget. All costs have been increased to reflect an ENR-CCI-LA of 5,800.
ENCINA WATER POLLUTION CONTROL FACILITY COSTS
Table 2-1 presents a summary of the City of Carlsbad share of improvements to
the Encina Water Pollution Control Facility over the next 30 years. The total
costs of these improvements is estimated to be $43,573,000.
Phase IV Project
Construction is currently underway on the Phase IV project. During the Phase
IV project, the City of Carlsbad's ownership in the plant will change. Because
the City of Carlsbad's ownership in the plant is changing, its share of project
costs will not be established until construction is completed. We are estimating
that the City of Carlsbad's share in the Phase IV plant and outfall projects will be
23.5 percent. The Phase IV operations building improvements have not been
designed or constructed. The City of Carlsbad's share in the operations building
improvements project will be based on their post-Phase IV ownership of 25.68
percent. The Phase IV operations building construction is scheduled to begin
near the end of the Phase IV plant and outfall projects.
Phase V
The Phase V project will not occur until after the year 2000. For the purpose of
establishing capacity fees we are estimating it will occur in approximately the
year 2005. The City of Carlsbad's share in this project will be based on their
needed capacity. Our cost estimate is based on the City of Carlsbad obtaining
an additional treatment capacity of 5.09 million gallons per day during the Phase
V project.
Solids Management
The solids management project will be done in two stages. The City of
Carlsbad's share of the solids management project will be 24.19 percent. We
have estimated the cost of land acquisition for this project at $5,000,000.
Table 2-1
Improvements to the Encirta Water Pollution Control Facility
(AH Figures in Thousands of Dollars)
Project
Phase IV Plant1
(Unit I)
Phase IV
Outfall1
(Unit J)
Phase IV
Operations
Building2
(Unit J)
Phase V3
(Unit I)
Solids
Management4
Stage 1
Solids
Management4
Stage 2
Ocean Outfall4
Rebalast (Unit
J)
Ocean Outfall4
Parallel (Unit J)
TOTAL
Year
1990
4,132
604
13
224
4,973
1991
4,710
704
13
1,840
7,267
1992
1,462
195
167
1,320
15
3,159
1993
353
1,320
314
1,987
1994
353
353
2005
16,342
1,035
8,457
25,834
Total
10,304
1,503
899
16,342
4,704
1,035
329
8,457
43,573
m
m "
Ocean Outfali
The City of Carlsbad's share of future ocean outfall costs will be 24.19 percent.
For the purposes of estimating capacity fees, a reballasting project is scheduled
for the year 1993. A parallel ocean outfall will have to be built in conjunction with
the Phase V expansion project and it is also scheduled for the year 2005.
VISTA/CARLSBAD INTERCEPTOR
Table 2-2 provides a list of improvements needed to the Vista/Carlsbad
Interceptor. The total estimated cost for these improvements is $6,863,000.
Exhibit A from the December 1987, Master Plan of Sewerage shows the location
of the reaches called out in Table 2-2. This exhibit is found in the pocket in the
back of this report.
OTHER CITY OF CARLSBAD CAPITAL PROJECTS
Table 2-3 lists the other City of Carlsbad capital projects included in the City
wide capacity fee. The projects total $1,137,000 and include the Home Plant Lift
Station and Force Main improvements.
In addition to these specific City of Carlsbad improvements, we have included
a category for miscellaneous City of Carlsbad capital improvement projects,
which is factored into the City wide capacity fee. The projected estimate of
costs for the miscellaneous projects is $70,000 for each year through the year
2020.
Table 2-2
Improvements to Vista/Carlsbad Interceptor Sewage Drainage Basin
IMPROVEMENTS TO EXISTING INTERCEPTORS
Reach
VC3
VC5
VC6
VC7
VC8
VC9
VC10
VC10A
VC11
VC13
VC14
VC15
Location
Highway 78 East to
Buena Vista Lagoon
Jefferson Street
Jefferson Street,
Arbuckle to Grand
Grand Avenue
Grand Avenue
Washington Street,
Grand to Oak
Washington Street,
Oak to Olive
Chestnut Lateral
AT & SF R.R. Olive to
Agua Hedionda Lagoon
AT & SF R.R. Agua
Hedionda Lagoon to
Cannon
AT & SF R.R. Cannon to
Palomar Airport Road
Avenida Encinas,
Palomar Airport Road to
Encina Water Pollution
Control Facility Entrance
Size,
in.
42
36
42
30
48
48
48
12
54
54
54
54
IMPROVEMENTS TO LIFT STATIONS
Buena Vista Lift Station
Add Fourth Pump
Add Fifth Pump and Force Main
Improvements
Agua Hedionda Lift Station
Add Third and Fourth Pump and
Miscellaneous Improvements
Relocate Station
Subtotal by Years
TOTAL
—
--
--
--
Length,
feet
3,170
2,500
1,180
760
720
1,940
4,330
1,800
1,370
3,520
5,080
1,760
Total Cost,
$
919,000
593,000
342,000
160,000
247,000
664,000
1 ,484,000
171,000
542,000
1,392,000
2,009,000
696,000
Carlsbad
Ownership, Cost,
% $
15.5
27.3
27.3
27.3
27.3
37.3
37.3
100
37.3
51.7
51.7
51.7
142,000
162,000
93,000
44,000
67,000
248,000
555,000
171,000
202,000
720,000
1,039,000
360,000
Year
Needed
2010
1992
1992
1992
1992
1992
1992
1992
2010
2010
1997
2010
..
--
--
-
1,250,000
1,500,000
1,200,000
5,000,000
15.5.
15.5
40.5
40.5
194,000
233,000
608,000
2,025,000
802,000
1,340,000
1,039,000
3,682,000
6,863,000
1990
2010
1990
2010
1990
1992
1997
2010
pit
ry
c
rL
Othef City of Carlsbad Capital Projects
(All Costs in Thousands of Dollars)
5SSSS55SSS
Year
Home Plant Lift Station
Home Plant Force Mam
TOTAL
fH
m
8
CHAPTER 3
CITY WIDE CAPACITY FEE
In order to assess the impact of bond payments on the sewer construction fund,
a year by year cash flow projection is needed. This year by year projection must
include estimated number of units, inflation rates and interest.
UNITS
On December 29, 1989, the City of Carlsbad had a total of 26,995 equivalent
dwelling units. The December 1987, Master Plan of Sewerage projects, at build
out, that the City will have a total of 60,935 equivalent dwelling units. For the
purpose of our capacity fee cash flow analysis, we have assumed that the City
of Carlsbad will build out in the year 2020. We have uniformly distributed the
dwelling units each year. Thus, for the years 1990 through 2019, 1,095
equivalent dwelling units per year are assumed to be connected and in the final
year of the projection 1,090 units are assumed to be connected to total 60,935
equivalent dwelling units.
Bond Payments
Bond payments for the Phase IV bonds are approximately $850,000 for the first
three years from 1990 to 1992, and $1,120,000 for the remaining 22 years of the
bond issuance. This bond payment provides $11,029,000 for the construction
of the Encina Phase IV projects. These same ratios were utilized for a projected
bond issuance in the year 2005 to cover the year 2005 expenses. Based on a
total construction cost need of $53,853,000, bond payments for the year 2005
through 2007 will be $4,150,000. For the remaining 22 years, bond payments
will be $5,469,000.
INFLATION AND INTEREST
Construction costs were projected to increase 5 percent per year. Interest
income on the sewer construction fund was estimated to be 8 percent per year.
mm
SEWER CONSTRUCTION FUND OBLIGATIONS
Table 3-1 provides a summary of the expenses to the sewer construction fund.
The expenses include construction, bond payments and the Lake Calavera Hills
Water Reclamation Plant credit. The City of Carlsbad is obligated by contract
to provide connection fee credits for the Lake Calavera Hills area. These credits
decrease the income to the sewer construction fund and show up as an expense
on this table.
ESTIMATED FEES
f* Table 3-2 shows a cash flow projection year by year needed to obtain a zero
** balance in the year 2029, and cover all estimated construction costs, bond
payments and credits. In order for the sewer construction fund to have a zero
P balance in the year 2029, the present sewer connection fees should be changed
* to $1,610.
10
PIu
w
m
m
S
Table 3-1
Sum of Expenses
(All Costs in Thousands of Dollars)
Yew
1990
1991
1992
1993
1994
1995
1996
1997
199S
1999
2000
2001
2002
2003
2004
2005
2008
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
Sum
5,845
6,212
5,706
2,057
423
70
70
1,109
70
70
70
70
70
70
70
25,904
70
70
70
70
3,752
70
70
70
70
70
70
70
70
70
70
0
0
0
0
0
0
0
0
0
Const
Cost
Index
1.00
1.05
1.10
1.16
1.22
1.28
1.34
1.41
1.48
1.55
1.63
1.71
1.80
1.89
1.98
2.08
2.18
2.29
2.41
2.53
2.65
2.79
2.93
3.07
3.23
3.39
3.56
3.73
3.92
4.12
4.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Const Cost
Future
Cost
5,845
6,523
6,291
2,381
514
89
94
1,560
103
109
114
120
126
132
139
53,853
153
160
168
177
9,955
195
205
215
226
237
249
261
274
288
303
0
0
0
0
0
0
0
0
0
Bond
Payment
Phase IV
850
850
850
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
1,120
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Bond
Payment
All 2005
Expenses
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4,150
4,150
4,150
5,469
5,469
5,469
5,469
5,469
5,469
5,469
5,469
5,469
5,469
5,469
5,469
5,469
5,469
5,469
5,469
5,469
5,469
5,469
5,469
5,469
5,469
Lake
CalaveraHHte
Credit
208
208
208
208
208
208
208
208
208
208
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
Expenses
6,903
7,581
7.349
3,709
1,842
1,417
1,422
. 2,888
1,431
1,437
1,234
1,240
1,246
1,252
1,259
59,123
5,423
5,430
6.757
6,766
16,544
6,784
6,794
6,804
6,815
5,706
5,718
5,730
5,743
5,757
5,772
5,469
5.496
5,496
5,469
5,469
5,469
5,469
5,469
5,469
11
I
•
m
•
m
«
•
i
«
i
•
i
i
i
!
I
i
I
i
i
i
i
i
i
•
i
i
1
i
i
i
i
i
•
Table 3-2
Sewer Capital Fund Cash Flow Projection
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
Total
Yearly
&cpenae
6,903
7,581
7,349
3,709
1,842
1,417
1,422
2,888
1,431
1,437
1,234
1,240
1,246
1,252
1,259
59,123
5,423
5,430
6,757
6,766
16,544
6,784
6,794
6,804
6,815
5,706
5,718
5,730
5.743
5,757
5,772
5,469
5,469
5,469
5,469
5,469
5,469
5,469
5,469
5,469
Number of
Yearly
Connections
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1.095
1,095
1,095
1,095
1,090
0
0
0
0
0
0
0
0
0
Connection
Fee
1.61
1.69
1.77
1.86
1.96
2.05
2.16
2.26
2.38
2.50
2.62
2.75
2.89
3.03
3.19
3.34
3.51
3.69
3.87
4.07
4.27
4.48
4.71
4.94
5.19
5.45
5.72
6.01
6.31
6.62
6.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Connection
Fee
tncoino
1,762
1,850
1.942
2,039
2,141
2,248
2,361
2,479
2,603
2,733
2,869
3,013
3,164
3,322
3,488
3,662
3,845
4,038
4,239
4,451
4,674
4,908
5,153
5.411
5,681
5,965
6.264
6,577
6,906
7,251
7,579
0
0
0
0
0
0
0
0
0
D«uw4Dona
Income
11,029
0
0
0
0
0
0
0
0
0
0
0
0
0
0
53,853
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Interest
Income
593
1,112
742
369
265
310
402
509
517
652
808
1,003
1,225
1,477
1,760
2,080
2.117
2.161
2,222
2,198
2,189
1,415
1,378
1,357
1,354
1,371
1,502
1,665
1,866
2,109
2,397
2,733
2,514
2,278
2,023
1,747
1,449
1,128
780
405
Total
Income
13,384
2,962
2.685
2,409
2,406
2,559
2,762
2,988
3,119
3,385
3,677
4,016
4,389
4,798
5,248
59,595
5,963
6,198
6,461
6,650
6,863
6,322
6,531
6,767
7,035
7.337
7,765
8,242
8,772
9,360
9,976
2,733
2,514
2,278
2,023
1,747
1,449
1,128
780
405
Net
6,481
(4,619)
(4,664)
(1,301)
564
1,141
1,341
99
1,688
1,948
2,443
2,776
3.143
3.546
3.990
472
540
768
(296)
(116)
(9.681)
(462)
(263)
(37)
220
1,630
2,047
2,512
3,029
3,602
4,204
(2,736)
(2,955)
(3.191)
(3,446)
(3,772)
(4,020)
(4.341)
(4,689)
(5.064)
Fund
Balance
13,899
9,280
4,616
3,315
3,879
5,020
6,361
6,460
8,148
10.096
12,539
15,316
18,459
22,005
25,995
26,467
27,007
27,775
27,479
27,362
17,681
17,220
16,956
16,920
17,140
18.770
20,818
23,329
26,358
29,960
34,164
31,429
28,474
25,283
21,836
18,114
14,094
9,753
5,064
0
1M
m
m
pi
Itf
Beginning Fund Balance $7,418,000