HomeMy WebLinkAbout; Rancho Santa Fe Road Realignment; Rancho Santa Fe Rd Realignment; 2001-12-041l.SD-O.CSD LB Corta Avenue ta Melrare Drive STPLF-5308(007) RANCH0 SANTA FE ROAD REALIGNMENT AND BRIDGE REPLACEMENT IN THE CITY OF CARLSBAD, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA SUBMITTED PURSUANT TO: 42 USC 4332(2)(C). National Envlronmental Policy Act of 1969 and Amendments US Department of Transportation, Federal Highway Administration AND State of California, Department of Transpottatlon lv5/0 \ DATE cltv Of carise DISTRICT DIRECTOR, DISTRICT 11 /2/7/O/ DATE ’ CITY OF CARLS~AD ENGINEERING DEPARTMENT The following person may be contacted for additional information concerning this document: Gary Vettese Mr. Jeff Lewis Ms. Carrie Loya Smalley Local Assist. Engineer, Dist. 1 I Sr. Transp. Engineer Sr. Civil Engineer Cal. Dept. of Transportation FHWA - California Division City of Carlsbad P.O. Box 85406 980 Ninth Street, Ste. 400 1635 Faraday Avenue San Diego, CA 92186 Sacramento, CA 95814-2724 Carlsbad, CA 92008 (619) 688-6778 (9 16) 498-5035 (760) 602-2746 ABSTRACT: The proposed action would widen and realign 3.2 kilometers (2 miles] Ranch0 Santa Fe Road from two lanes to on ultimate six lone prime arterial roodwoy from approximately 30 meters (100 feet) south of the La Costa Avenue/Ranch0 Santa Fe Road intersection to approximately 30 meters (100 feet) north of the Melrose DriveIRancho Santa Fe Rood intersection in the City of Callsbad. Northern San Diego County. The proposed widening and realignment project is part of the City of Corlsbod’s General Plan to upgrade Ranch0 Santa Fe Road to o Prime Arterial Roadway Designation. Potential benefits from this project will include reduced congestion. improved troftic flow and increased safety for travelers on the roodway. Additionally, this road realignment will provide o vital link in the region’s roadway network. The analySi5 in the Environmental Assessment concluder that upon implementation of enVirOnmental commitments, no substantial adverse effects will occur oP (1 result of the proposed project. TABLE or CONTENTS EXECUTIVE SUMMARY . . . . . ES-1 SUMMARY OF ENVIRONMENTAL COMMITMENTS . S-l 1.0 PURPOSE AND NEED FOR PROJECT ...... 1.1 Project Purpose and Need ............... 1.2 Proposed Action ...................... 1.3 Transportation and Circulation Plans ..... 1.4 Project History ....................... 1.5 Existing Facility ...................... 1.6 Project Funding ...................... 1.7 Traffic .............................. 1.8 Scope of the Environmental Review ...... 1.9 Comments and Coordination ........... 1 .lO Decisions to Be Made and Permits Required . . . . . . . . . . . . . 2.0 PROPOSED PROJECT DESCRIPTION AND COMPARATIVE ANALYSIS OF ALTERNATIVES .... 2.1 Project Location .................................... 2.2 Description of Proposed Project ........................ 2.2.1 Roadway Realignment ......................... 2.2.2 Bridge Improvements .......................... 2.2.3 Project Phasing ............................... 2.2.4 Construction Activities ........................ 2.2.5 Existing Roadway Vacation ..................... 2.3 Analysis of Alternatives .............................. 2.3.1 No Project Alternative ......................... 2.3.2 Alternatives Withdrawn from Further Consideration 3.0 ENVIRONMENTAL EVALUATION 3.1 Environmental Evaluation Checklist . . . . . . . . . . . . l-l l-l l-3 1-4 1-4 l-5 1-5 l-5 1-6 1-6 l-7 2-l . 2-l 2-l . 2-1 2-5 2-6 2-6 2-6 . . . 2-7 2-7 2-7 3-l . 3-2 December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement TABLE or CONTENTS 4.0 DISCUSSION OF ENVIRONMENTAL EVALUATION AND MITIGATION MEASURES ..................... 4-l 4.1 Physical Environment ......................................... 4-l 4.1.1 Topography/Visual Resources (#s 1,2,9,21,49,50) .......... 4-l 4.1.2 Geologic Features/Hazards/Paleontology (#s 2,3,4) ......... 4-24 4.1.3 Energy/Natural Resource/Water Demand (#s 5,6, 7, 12) ...... 4-25 4.1.4 Hazardous Materials (#s 8,45,56) ........................ 4-25 4.1.5 Floodplain Evaluation (#lo) ............................. 4-28 4.1.6 Water Quality (#s 11,14,51) ............................ 4-32 4.1.7 Air Quality (#s 15,16,17,18) ............................ 4-36 4.1.8 Noise (#s 19,20,51) ................................... 4-42 4.2 Biological Resources (#S 9, 13,22 - 29,49,52 - 54) ................ 4-57 4.2.1 Farmland (#25) ....................................... 4-69 4.3 Social and Economic ......................................... 4-69 4.3.1 Community Disruption/Land Use/Property Values (#s30-39,47) ........................................ 4-69 4.3.2 Public Services and Utilities (#s 8, 40,41) .................. 4-77 4.3.3 Historic and Archeological Resources (#48) ................. 4-77 4.4 The Relationship Between Short Term Uses of Man’s Environment and the Maintenance and Enhancement of Long Term Productivity ( # 54) .................. 4-82 4.5 Cumulative Impacts of Related Projects (#55) .................... 4-83 4.6 No Project Alternative Environmental Evaluation .................. 4-85 5.0 CONSULTATION AND COORDINATION . . . . 5-l 6.0 ENVIRONMENTAL EVALUATION PERSONNEL . . 6-l APPENDICES Appendix A USFWS Correspondence Appendix B Project Permits Appendix C ACOE Jurisdictional Wetlands and Project Impacts December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement ,, TABLE or CONTENTS Section LIST OF- ~lGURiZ3 Paae Figure 2-l Figure 2-2 Figure 2-3 Figure 4-1 Figure 4-2 Figure 4-3 Figure 4-4 Figure 4-5 Figure 4-6 Figure 4-7 Figure 4-8 Figure 4-9 Figure 4-10 Figure 4-l 1 Figure 4-12 RegionalMap ............................................. FinalAlignment ........................................... Typical Road and Bridge Cross Sections ........................ ViewshedBoundary ........................................ Bridge Replacement Visual Simulation ......................... View of Roadway and Bridge Looking Southbound OnRanchoSantaFeRoad ................................... View of Roadway and Manufactured Slopes Looking Southbound on Ranch0 Santa Fe Road ........................ View of Roadway and Bridge from Existing Residences ........... Project Area Drainage ....................................... Noise Measurement and Receptor Location ..................... Noise Measurement and Receptor Locations - Phase 2 ............ Sound Wall Location ....................................... Phase 2 Sound Wall Location. ................................ High Income Population .. :. ................................ Low Income Population ..................................... . 2-2 . 2-3 . 2-4 . 4-5 4-6 . . 4-7 4-8 4-9 4-29 4-45 4-47 4-52 4-55 . 4-74 4-75 LIST OP TABLES Table l-l Table 1-2 Table 4-l Table 4-2 Table 4-3 Ranch0 Santa Fe Road Present and Forecasted Traffic Conditions . . . . . . . . . l-2 Ranch0 Santa Fe Road Accident Rates & Reasons . . . l-2 Peak Flows + Existing Ranch0 Santa Fe Bridge . 4-30 Air Quality Ambient Air Quality Standards . . 4-38 Short-term Measured Average Noise Level and Concurrent Traffic Volumes . . . . . . . . . 4-44 Table 4-4 Existing Noise Levels . . . . . . 4-46 Table 4-5 Existing Noise Levels . . . . . . . . . . . 4-48 Table 4-6 Predicted Traffic Noise Impacts . . . . . . 4-50 Table 4-7 Predicted Traffic Noise Impacts . . . . . . . . . . . . . 4-53 December 2001 157603 Environmeotal Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement iii TABLE or CONTENTS Section Table 4-8 Table 4-9 Table 4-10 Table 4-l 1 Table 4-12 Table 4-13 Table 4-14 Table 4-15 Future Predicted Noise Levels with and Without Noise Abatement Wall .................. Summary of Sound Wall Reasonability and Feasibility .... Plant Community or Land Cover Acreages ............. Proposed Impacts by Plant Community ................ Ethnicity Comparison .............................. Existing and 2020 Conditions - Road Segments ......... Existing Conditions - Intersections ................... 2020 Conditions - Intersections ...................... Paae 4-56 4-57 4-59 4-61 4-76 4-80 4-80 4-81 December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement iv ItXlTUTIVE SUMMARY The City of Carlsbad (City) proposes to realign and widen approximately 3.2 kilometers (2 miles) of Ranch0 Santa Fe Road as well as replace the existing Ranch0 Santa Fe Bridge at San Marcos Creek. The proposed project would widen and realign Ranch0 Santa Fe Road from two lanes to an ultimate six-lane prime arterial roadway from approximately30 meters (100 feet) south of the La Costa Avenue/Ranch0 Santa Fe Road intersection to approximately 30 meters (100 feet) north of the Melrose Drive/Ranch0 Santa Fe Road intersection in the City of Carlsbad, Northern San Diego County. The proposed widening and realignment project is part of the City’s General Plan to upgrade Ranch0 Santa Fe Road to a Prime Arterial Roadway Designation. Potential benefits from this project will include reduced congestion, improved traffic flow and increased safety for travelers on the roadway. Additionally, this road realignment will provide a vital link in the region’s roadway network. The City as lead agency under the California Environmental Quality Act (CEQA) prepared and certified an Environmental Impact Report (EIR) on the project in 1992 and prepared and adopted an Addendum to the EIR addressing final design in March 2000. The EIR and Addendum are available for review at the City of Carlsbad, 1635 Faraday Avenue, Carlsbad, California 92008. Federal funding is proposed and asa result, the Federal Highway Administration (FHWA) is the federal lead agency responsible for ensuring National Environmental Policy Act (NEPA) compliance. The California Department of Transportation serves as an agent for FHWA and has oversight responsibility for the proposed project. This Environmental Assessment (EA) has been prepared for the NEPA compliance process. Separate technical studies addressing geotechnical, water quality, visual quality, hazardous waste, floodplain, acoustics, cultural and biological resources have been prepared to address specific environmental issues associated with the project. The results of these studies have been incorporated into the analysis completed in this EA. These technical studies are available for review at the City of Carlsbad and at the California Department of Transportation’s District 11 office, 2829 Juan Street, San Diego, California 92186. Additionally, the EA is also available for review at the Georgia Cole Library, 1250 Carlsbad VillageDrive, Carlsbad, CA 92008 (Tel. 760-434-2870); Carlsbad City Library, 1775 Dove Lane, Carlsbad, CA 92009 (Tel. 760-602-2049); City Hall Library, 1200 Carlsbad Village Drive, Carlsbad, CA 92008 (Tel. 760-434-2820); City of Encinitas Community Development Department, 505 S. Vulcan, Encinitas, CA 92024 and City of San Marcos Planning Department, One Civic Center Drive, San Marcos, CA 92069. As part of the proposed project, a number of measures have been incorporated to reduce or avoid potential environmental impacts associated with construction and operations of the December 2001 157603 Environmental Assessment l Rancha Sank Fe Road Realignment and Bridge Replacement ES-1 12XHlJTIV12 SUMMARY proposed action (see Summary ofEnvironmental Commitments section located at the beginning of this FA). As described below, the analysis conducted in the EA concludes that upon implementation of environmental commitments, no substantial adverse effects will occur as a result of the proposed project. Topographyflisual Resources: Phases 1 and 2 of the project would change the visual quality of the immediate area from medium-high to medium-low and would change the visual character of theviewshed from semi-rural to semi-urban. These changes would a result of the conversion of natural open space to human features including a substantial increase in paved roadway surface, cut and fill slopes, removal of mature riparian trees and eucalyptus, and the introduction of urban built forms such as the proposed bridge and sound wall. However, as provided in the “Summary ofEnvironmental Commitments’ section of this FA, the project has incorporated a number of measures to reduce impacts to visual resources. Incorporation of landscaping, step/contour grading and special architectural treatments will ensure that visual elements of the existing visual character of the project area will be carried forward. Therefore, overall impacts to visual resources from implementing both Phases 1 and 2 of the proposed project are considered to be moderate. Geologic Features/Hazards/Paleontology: The proposed project would not increase the exposure of people or property to substantial geologic or seismic hazards. Measures to avoid geologic hazards such as slope instability and erosion and other geologic hazards have been incorporated into the proposed project. The proposed project extends through the Santiago Formation considered to have a high potential for paleontological resources. Measures including themonitoring by a paleontologist duringconstructionhavebeenincorporatedinto the project. Hazardous Materials: Record searches and field assessments have revealed no hazardous waste sites. In the event that grading or construction encounters hazardous waste, the City shall ensure compliance with California State regulations and therefore, no impacts are anticipated. Floodplain Evaluation: The proposed bridge encroaches upon the base floodplain of the San Marcos Creek. The floodplain encroachment would be associated primarily with the bridge piers with only minimal effects on the floodplain. Water Quality: The proposed project is located in thewatersheds of the San Marcos Creek and Encinitas Creek. The proposed project includes measures to avoid or minimize impacts December 2001 157603 Environmental Assessment l Rancha Santa Fe Road Realignment and Bridge Replacement ES-2 EXlTlJTlVE SUMMARY to water quality from construction and operation including the provision of Best Management Practices (BMP’s) to control stormwater runoff during construction and rip-rap at stormdrain outlets. Air Quality: Regional air quality impacts were evaluated relative to the Regional Transportation Improvement Program (RTIP) which is a component of the Regional Air Quality Strategic/State Implementation Plan (RAQS/SIP). The 2020 Regional Transportation Plan (RTP) was adopted by SANDAG on February 25,200O. On April 13, 2000, FHWA and FTA made a joint air conformity determination on the 2020 RTP that the RTP complies with the Clean Air Act. On October 6,2000, FHWA and FTA approved the 2001-2004 Regional Transportation Improvement Program (RTIP). The Ranch0 Santa Fe Road Bridge Replacement and Realignment Project is included in the 2000-2020 Regional Transportation Plan (RTP) onpage A-17; the RTP was found to beconforming by FHWA and FTA on April 13, 2000. The project is also in the 2001-2004 Regional Transportation Improvement Program (RTIP); the RTIP was found to be conforming by FHWA and FTA on October 6, 2000. The design and scope of the project are also consistent with the project description in the above RTP and RTIP. Noise: Future noise levels would exceed FHWA/California Department of Transportation noise criteria at four homes located along Ranch0 Santa Fe Road. Mitigation measures~for the affected homes have been evaluated to provide noise abatement and design information. With a 2.4-meter (&foot) high sound wall located along western right-of-way, the future peak hour average noise level would be mitigated to 61 to 62 dBA and would not approach or exceed the FHWA/California Department of Transportation Noise Abatement Criteria (NAC). Biological Resources: The proposed project would result,in the total permanent impact to the following native habitats: 17.3 hectares (42.8 acres) of coastal sage scrub, including coyote brush scrub, 2.2 hectares (5.4 acres) of southern mixed chaparral, 0.04 hectare (0.1 acre) of Valley needlegrass grassland, 0.18 hectare (0.44 acre) of southern willow scrub and 0.11 hectare (0.27acre) of disturbed wetland. Additional temporaryimpacts would occur to the following native habitats: 17.1 hectares (17.5 acres) of coastal sage scrub, 0.6 hectare (1.5 acres) of southern mixed chaparral, 0.3 hectare (0.8 acre) of Valleyneedlegrass grassland and 0.39 hectare (0.97 acre) of southern willow scrub. No plant species, which are listed or proposed for listing as threatened or endangered by the California Department of Fish and Game (CDFG) or United States Fish and Wildlife Service (USFWS), was detected in the project impact area. One animal species listed as threatened by USFWS was determined to use habitat within the project footprint, the coastal California gnatcatcher. December 2001 157603 i?XHlJTlVIf SUMMARY Because of the project’s conformance with the guidelines of the City of Carlsbad’s Conservation Plan (HCP) including restricting vegetation clearing during the breeding season, dedication of habitat credits, restoration of temporary impact areas and placement of the project outside of planned conservation areas, impacts to upland habitat, sensitive plant and animal species, and wildlife linkages and corridors are not considered to be substantial. The project also includes avoidance and minimization of impacts towaters of the U.S., including wetlands, and mitigation for unavoidable impacts pursuant to permit requirements of the U.S. Army Corps of Engineers (ACOE), California Department of Fish and Game (CDFG) and Regional Water Quality Control Board (RWQCB). Therefore, impacts to jurisdictional areas are not considered to be substantial. Farmland: There are no agricultural soils or farmlands defined as prime or of statewide importance within the project impact area. The proposed project would extend through an area identified as farmland of local importance; however, no existing agricultural operations are present within the project area and therefore, impacts to farmland would not be substantial. Social and Economic: The proposed project would not disrupt an established community or adversely impact existing neighborhood character. The project is consistent with the City’s General Plan and Coastal Zone Management Plan. No minority or low-income populations have been identified that would be adversely affected by the proposed project. Historic and Archaeological Resources: No significant cultural resources occur within the project APE; therefore, no further culturalresourceevaluations, mitigations, or conditions are required in connection with this undertaking. Transportation and Circulation: The proposed project would implement the traffic congestion relief anticipated by the City Circulation Element of the General Plan and the FHWA and Federal Transit Administration (FTA) approved 2001-2004 Regional Transportation Improvements Program (RTIP), approved October 6, 2000. The proposed realignment and widening is approved as a part of the City General Plan and is alsoidentified within the SANDAG Regional Transportation Plan (RTP) adopted by SANDAG on February 25,200O. Community benefits from this proposed project will include reduced congestion, improved traffic flow and increased safety for travelers on the roadway. ! December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement ES-4 SUMMARY Oc’ ENVIRONMENTAL COMMITMENTS The City of Carlsbad (City), proposes to realign and widen approximately 3.2 kilometers (2 miles) of Ranch0 Santa Fe Road and truck bypass lane as well as replace the existing Ranch0 Santa Fe Bridge at San Marcos Creek. The City has incorporated as part of the proposed project a number of measures to reduce or avoid potential environmental impacts associated with construction and operations of the proposed project. All measures required for the project by the City’s Final Environmental Impact Report (EIR) - Ranch0 Santa Fe Road Realignment and Mass Grading (April 1992), as well as measures recommended by subsequent technical studieshave beenincorporatedinto theproject design. Thesemeasures are considered part of the project and are summarized in this section. The City and Federal Highway Administration (FHWA) have the ultimate approval and responsibility for ensuring that the measures listed below are implemented. The California Department of Transportation (Department) serves as an agent for FHWA and has oversight responsibility in ensuring the implementation of environmental commitments. Hazardous Materials 0 In the event that grading or construction during both Phases 1 and 2 encounters onsite underground storage tanks or hazardous waste, the City shall ensure compliance with Federal Regulations 40 CFR261-268 and 29 CFR 1910.120 and with the State of California CCR Title 23 Health and Safety Regulations as managed by the San Diego County Environmental Health Department, Hazardous Materials Management Division. Paleontological Resources l Prior to construction, the City shall provide certification that a qualified paleontologist and/or paleontological monitor have been retained toimplement the construction monitoring program within appropriate geologic formations (Santiago Formation). 0 The qualified paleontologist shall attend preconstruction meetings to make comments and/or suggestions concerning the construction monitoring program. 0 In the event that unanticipated resources are discovered, the paleontologist shall have the City divert or temporarily halt ground disturbance operations in the area of discovery to allow evaluation of resources. The paleontologist shall December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement S-1 SUMMARY OP IfNVlRONM~NTAL COMMITMENTS contact the City at the time of discovery. The importance of the discovered resources shall be determined by the paleontologist, in consultation with the City, Department and FHWA. The City, Department and FHWA shall concur with the evaluation before construction resumes. 0 A monitoring report and/or evaluation report, if appropriate, which describes the results, analysis, and conclusions to the paleontological monitoring program (withappropriategraphics) shall be submitted toandapproved bythe City, Department and FHWA. Air Quality Measures incorporated into the proposed project to minimize air quality impacts include: a 0 a 0 l 0 l 0 l l Using adequate water and/or other dust palliatives on all disturbed areas. Washing down or sweeping streets from which construction access is taken to remove dirt carried from the new alignment to the existing roadway to keep vehicles from pulverizing the dirt into fine particles. Terminating soil excavation, clearing or grading when wind speeds exceed 25 mph for an hourly average. Covering/tarping all vehicles hauling dirt or spoils on public roadways unless additional moisture is added to prevent material blow-off during transport. Requiring low-NO,-emission tuneups for all on-site construction equipment at a minimum of ninety (90) days. Providing rideshare incentives for construction personnel. Minimizing obstruction of through traffic lanes from construction equipment or activities. Prohibiting engine idling while waiting to load or unload if the expected wait exceeds ten (10) minutes. Scheduling partial of full street closures to off-peak traffic hours. The contractor will preform street sweeping should silt be carried over to adjacent public thoroughfares. December2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement s-2 SUMMARY OF WVIRONM~NTAL COMMITMENTS l During construction, the City shall require the contractor to: use water trucks or sprinkler systems to keep all areas where vehicles move damp enough to prevent dust raised when leaving the site wet down areas in the late morning and after work is completed for the day use low sulfur fuel (0.5% by weight) for construction equipment 0 Bikeways shall be provided along Ranch0 Santa Fe Road as required by the City standards; if required by the North County Transit District, bus shelters and benches and street pockets shall be installed on Ranch0 Santa Fe Road; bicycle storage facilities shall be provided at any park and ride sites as required by the Department, Earth Resources a All improvements proposed shall complywith the City Grading Ordinance and incorporate all requirements of the geotechnical analysis completed for the project (Woodward-Clyde 1989) and (Agra Environmental 1998) to avoid geotechnical hazards such as soil instability, erosion or dam instability from blasting. l The contractor shall utilize straw, hydroseeding, mulching, or other suitable materials or techniques during construction activities to reduce the erosion potential for uncovered soils. l Thecontractor shall install temporary culverts, ditches, cat&n-rent basins, and settling pools where needed during construction to collect excess water and sediments carried from the construction site. Sediments collected shall be disposed of onsite, unless contamination of sediment with hazardous material occurs, which would require disposal at an appropriate disposal site for hazardous materials. Water Resources l All erosion control measures required by the City Grading Ordinance for roadways shall be incorporated into the project. December2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement s-3 SUMMARY OF l!NVIRONMENTAL COMMITMENTS 0 l l a Project design shall ensure that no additional runoff will drain into Stanley Mahr Reservoir. All refuse generated during grading shall be contained and removed. Construction Phase: During the construction phase, the City’s Best Management Practices (BMPs) shall be applied to control storm water runoff and provide dust control. These measures include: - Gravel berms, filter fabric fences, lines of straw bales, to prevent erosion Surfacing of roadways shall occur as soon as possible Periodic watering of areas to keep dust down Prompt revegetation of surrounding areas to prevent erosion The Stormwater Pollution Prevention Plan (SWPPP) as identified in the construction activity permit from the California Regional Water Quality Control Board (RWQCB) shall be implemented and followed. To minimize water quality degradation by sedimentation of the river channel during construction, construction of the new bridge piers and demolition of existing piers shall be limited to the dry season (March to October). Operational Phase: The roadway design includes devices for storm water treatment. These devices capture and treat the storm water prior to discharge to San Marcos Creek. BMPs shall also be applied to reduce pollutant loads to San Marcos Creek. These BMPs shall include use of rip-rap at stormdrain outlets to reduce the velocity of runoff. The City shall follow all recommendations made pertaining to erosion control in the geotechnical analyses completed for the project (Woodward-Clyde 1989 and Agra Environmental 1998), thecityof Carl&ad’s, Grading Ordinance, and Landscape Manual. When feasible, hauling by the developer shall be accomplished in a manner that minimizes the spillage of soil onto roads in developed areas. Refuse material such as oil, grease, and broken equipment generated during grading shall be properly contained and removed offsite to a disposal site. December2001 157603 Environmental Assessment w Ranch0 Santa Fe Road Realignment and Bridge Replacement s-4 SUMMARY OF ENVIRONMENTAL COMMITMENTS Biological Resources l The City has recently obtained and shall comply with the necessary permits for wetland impacts. These permits, specifically obtained for the proposed project, include a Nationwide Permit in accordance with Section 404 of the Clean Water Act from the Army Corps of Engineers (ACOE), a Section 1600 Streambed Alteration Agreement from the California Department of Fish and Game (CDFG), and a Water Quality Certification from the RWQCB in accordance with Section 401 of the Clean Water Act. (AppendixB provides a copy of project permits.) l The new bridge and abutments have been designed to avoid and minimize impacts to jurisdictional wetlandsandwaterof theUnited States to theextent feasible. The proposed project impacts to southernwillow scrub wetlands and unvegetated stream channel shall be minimized as follows: - For impacts to wetlands habitats, the proposed project shall include habitat creation, restoration, enhancement or acquisition pursuant to permit requirements of the ACOE and CDFG. A ratio of 3:l will apply for permanent impacts to disturbed wetlands and southern willow scrub. Following demolition of the old bridge over SanMarcos Creek, this area shall be restored to support southern willow scrub habitat. Following temporary impacts necessary to construct the new bridge, pre-construction contours shall be restored and those areas that can support vegetation shall be revegetated with native riparian plants. 0 For permanent impacts to upland habitats associated with the roadway realignment, the City purchased habitat credits in conformance with the 1996 Fieldstone Habitat Conservation Plan (HCP). The City has contributed approximately two million dollars to the purchase of the mitigation property identified as a part of the HCP for impacts associated with proposed project. December 2001 157603 Environmental Assessment l Raocho Santa Fe Road Realignment and Bridge Replacement S-5 SUMMARY OP ENVIRONMENTAL COMMITMENTS l Noise 0 Vegetation removal that is needed to accomplish the proposed project shall be conducted between 15 September and 15 February immediately prior to construction. In compliance with the Executive Order on Invasive Species, E.O. 13112, and the subsequent guidance from the FI-IWA, the landscaping and erosion control included in the project will not use species listed as noxious weeds. In areas of particular sensitivity, such as San Marcos Creek, extra precautions will be taken if invasive species are found in or adjacent to the construction areas. These will include the inspection and cleaning of construction equipment and eradication strategies to be deployed should an invasion occur. All work will be conducted during the daytime hours; night lighting shall not occur except in an emergency situation. During construction of the bridge and removal of the existing bridge within the San Marcos Creek, an area approximately 3 meters (10 feet) wide and high with dry substrate, that has visual access from end to end, will be maintained to allow wildlife movement. A 2.4-meter (8-foot) high sound wall to be located along the western right-of- way north of Melrose Drive/Ranch0 Santa Fe Road intersection is proposed to be developed as part of the proposed project to abate noise for four residences. The proposed 2.4-meter (8-foot) wall height is based on the acoustical assessment prepared for the City of San Marcos to address the widening or Ranch0 Santa Fe Road at this location (DUDEK, July 2001). Development of this wall will ensure that future noise levels at sensitive receptors would not exceed FHWA noise abatement criteria as set forth in the Department’s Traffic Noise Analysis Protocol. Preliminary information on the physical characteristics of potential abatement measures (e.g., physical location, length, and height of barrier) is provided in this report. If pertinent parameters change substantially during the final project design, the preliminary noise abatement design may be changed or eliminated from th final project design. The final design of barrier, if included in the project, will be based on the final project design. The final design must also be independently checked to confirm that it meets the requirements of Chapter 1100 of the Department’s Highway Design Manual. In particular, December2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement S-6 SUMMARY OP ENVIRONMENTAL COMMITMENTS the minimum and maximum height requirements specified in Section 1102.3 of the manual must be independently checked as part of the final design. The decision to include barriers in the project design will be based on this information and other pertinent information received during the public review process. The City’s construction timing requirements (7 AM - 7 PM Monday through Saturday) shall be adhered to as a part of construction. Construction will not be allowed on Sundays and state and federal holidays. Stationary equipment shall be placed such that emitted noise is directed away from sensitive noise receivers such as residential areas. Stockpiling and vehicle staging areas shall be located as far as practical from occupied dwellings. Every effort shall be made to create the greatest distance betweennoise sources and receptors during construction operations. All construction equipment, including trucks used for hauling roadbed material, shall have exhaust and muffler systems in compliance with state standards for emission and noise control. Light and Glare 0 Directional street lighting shall be utilized to direct lightingawayfrom existing residences. l Medianlandscapingwithinspecificationsof theCity’sLandscapeManualshal1 be utilized to limit the effect of headlights to oncoming traffic. l All street lighting shall be street directed so as to limit excess light from intruding into sensitive areas, 0 Project design shall use low pressure sodium street lights for preservation of a “dark sky.” Visual Quality/Landform Alteration l All grading shall conform with recommendations of the Carlsbad Grading Ordinance and Hillside development regulations. December2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement s-7 SUMMARY OF ~NVIRONMlfNTAL COMMITMENTS Proposed manufactured slopes shall not exceed the maximum heights anticipated in the Environmental Impact Report (EIR) (maximum 30.5 meters [ 100 feet]). All temporary exposed manufactured slopes necessary to accommodate the roadway shall be landscaped immediately with a hydroseed mix and jute matting. Step grading techniques where feasible shall be used in the construction of the three cut slopes proposed south of the replacement bridge to simulate existing terrain, as well as to better accommodate hydroseeding and planting efforts. Grading techniques such as rounding the edges of the cut shall be used to blend the slopes in the existing terrain. All landscaping on manufactured slopes, as well as the roadway median shall comply with the guidelines of the City of Carlsbad Scenic Corridor Guidelines Manual. The Ranch0 Santa Fe Road Project includes hydroseeding all slopes with a native non-irrigated seed mix. Grading for the roadway project will occur prior to grading for the adjacent land development project referred to as thevillages of La Costa Development (VLC). The VLC grading operations will further impact and re-grade the majority of the slopes graded as part of the roadway project. The VLC developer is conditioned to meet the City’s Hillside Development Ordinance for all grading, and complete landscaping and irrigating of the roadway parkways and slopes after grading is completed. The VLC project is planned to be under construction by 2004. The City is currently plan-checking VLC development plans for the areas adjacent to Ranch0 Santa Fe Road whichis expected to be under construction concurrently with the Ranch0 Santa Fe Road project. The VLC developer is required to meet City standards; however, current plans show planting and irrigation that exceed City standards including replacement of impacted trees at a 5:l ratio within the project impact area. The VLC overall planting scheme will reflect a naturalized informal quality through the use of random groupings of trees and irregular ground plane treatments, with tree patterns near developed areas to provide a unique identity. In the parkways, formal rows of Jacaranda will be used adjacent to developments. Adjacent to the Jacaranda trees and farther away from the roadway on the slopes, pine groups will be planted including Torrey and Decamber2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement s-3 SUMMARY OP IZNVIRONMENTAL COMMITMIZNTS Mondale Pines. Where the roadway passes through the conserved habitat area, as identified in the Habitat Conservation Plan (HCP) associated with this project, native shrubs, grasses and trees such as Holly Oaks will be planted. Where Ranch0 Santa Fe Road crosses the San Marcos Creek, the City is required to mitigate impacts per the Army Corps of Engineers (ACOE) and California Department of Fish and Game (CDFG). These mitigations include restoring the areas directly impacted by construction at a ratio of 1:l and providing additional mitigations along the San Marcos Creek at a location approximately 1.5 miles northeast of the roadway project at ratios of 2:l and 3:l. Willow and sycamore trees will be planted at a 5:l ratio on the slopes graded adjacent to the San Marcos Creek between the planned VLC project and existing developments. This includes the east side of the roadway south of the creek to existing San Elijo Road; and also the west side of the roadway north to the existing residential area. Trees will be from 5 to 15gallon container stock. Irrigation will be provided to ensure the trees are established. l Planting and irrigation is included in all Ranch0 Santa Fe Road Project medians. Planting and irrigation for median south of La Costa Avenue is included in the Ranch0 Santa Fe Road plans and designed to City standards. Medians in Ranch0 Santa Fe Road north of La Costa Avenue will be planted and irrigated by adjacent developers conditioned to do so upon development of the project referred to as the Villages of La Costa (VLC). The VLC project was approved by the City Council on October 23,200l and is planned to be under construction by 2004. The City is currently plan-checking VLC development plans for the areas adjacent to Ranch0 Santa Fe Road which is expected to be under construction concurrently with the Ranch0 Santa Fe Road project. The VLC developer is required to meet City standards; however, current plans show planting and irrigation that exceed City standards. The City has closely coordinated with the VLC developer for many design issues including landscaping and irrigation. Ranch0 Santa Fe Road plans include underground sleeves in the roadway at each median to accommodate for irrigation piping and planting the developer is required to install. l Special attention will be given to the architectural style (color, texture and pilasters) of the sound wall to ensure compatibility with community values and guidelines and for graffiti abatement. Starting from theLa Costa Avenue intersection, the first 300 linear feet of the wall includes pilasters spaced approximately 30 feet apart. The slump block is planned to be an earth tone December200i 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement s-9 SUMMARY OP ENVIRONMENTAL COMMITMENTS light brown color. This section of masonry wall is limited to tree and vine planting only, on the east side of the wall adjacent to the roadway, due to the limited space between the sidewalk and the sound wall. Modifications to the sidewalk are required to accommodate the tree planters. The west side of the wall, adjacent to the existing residential area, includes the replacement of an existing 30-inch high wooden fence and grading along the 2:l slope. The existing slope is currently covered with iceplant and will be replaced if disturbed during construction. The remaining sound wall (approximately 550 feet) will consist of a masonry wall with pilasters spaced approximately28 feet apart with enclosures, or pop- outs, that will provide a niche setback from the sidewalk to provide room for planting trees on the east side of the wall adjacent to the roadway. This wall will also consist of an earth tone light brown colored slump block, and will also include vines trained to the wall. Additional ground cover and flower planting and irrigation will be provided between the sidewalk and the sound wall. On the west side of the sound wall adjacent to the existing residential area, additional irrigation and planting will be provided on the 3:l slope that will be graded with the roadway construction. Planting consists of trees, ground cover and flowering plants. The existing 30-inch wooden fence will be protected in place, or replaced wherever necessary. 0 Additional measures to restore native vegetation are provided under Biological Resources above. Traffic/Circulation l A configuration for the MelroseDrive/Rancho Santa Fe Road intersection has been established by the Final Alignment that is consistent with circulation element of the General Plan. l The project includes a signal at the Questhaven Road/Ranch0 Santa Fe Road intersection. l The project provides for full signalization at the Ranch0 Santa Fe Road/ Cadencia Street intersection. l A traffic control plan shall be prepared for approval by the City and Department. The traffic control plan shall show all signage, striping, delineate detours, flagging operations, and any other devices which will be used during construction to guide motorists safely through the construction zone. The December2001 157603 Environmental Assessment l Rancha Santa Fe Road Realignment and Bridge Replacement s-10 SUMMARY OP ENVIRONMENTAL COMMITMENTS traffic control plan shall also include provisions for coordinating with local emergency service providers regarding construction times and locations of lane closures as well as specifications for bicycle lane safety. The City’s construction contractors shall coordinate traffic diversions, street and lane closures, and obstruction of intersections with the City’s engineering department prior to commencing construction activities through the development of routing and detour studies. December2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement s-11 SECTION 1 .O PURPOSE AND NEED FOR PROJECT 1 .l PROJECT PURPOSE AND NEED The proposed widening and realignment project is part of the City’s General Plan to upgrade Ranch0 Santa Fe Road to a Prime Arterial roadway designation. Potential benefits from this project will include reduced congestion, improved traffic flow and increased safety for travelers on the roadway. Additionally, this road realignment will provide a vital link in the region’s roadway network and will replace the existing San Marcos Creek Bridge, which is currently submerged during a loo-year storm event, with a new bridge designed to withstand the loo-year storm event. Ranch0 Santa Fe Road serves as a vital regional transportation link for North San Diego County. Motorists from the inland areas, including the cities of San Marcos and Escondido, utilize Ranch0 Santa Fe Road to reach the beaches, coastal communities and Interstate Freeway 5. The existing road was designed and constructed as a two-lane road averaging approximately 9 meters (30 feet) in width. The County of San Diego originally constructed the road over 60 years ago. Since that time, the communities of North San Diego County have experienced sustained growth, resulting in a substantial increase in the amount of traffic using Ranch0 Santa Fe Road. Currently, Ranch0 Santa Fe Road handles in excess of 26,000 average daily trips (ADT) per daywith traffic congestion occurring Monday through Friday from 6:OOAM to 9:OOAM and 3:00 PM to 6:00 PM. As shown in Table I-f, Traffic Conditions, and further discussed in Section 4.3.4 of the EA, intersections and roadway segments within the proposed project area either currently operate at unacceptable levels of service (LOS) or are projected to operate at unacceptable LOS. The Ranch0 Santa Fe Road project is designed to accommodate buildout traffic, which is projected to occur in 2020. Based on City of Carlsbad projected growth and traffic impact fee analysis, the City is anticipated to be built out by the year 2020. Therefore, traffic rates projected for the year 2020 would be equivalent to 2025 traffic projections. Table f-2 provides existing accident rates along Ranch0 Santa Fe Road which are anticipated to increase as a result of forecasted traffic conditions under existing road conditions. Accident data for Ranch0 Santa Fe Road from January 1999 to December 2000 indicates that 2.41 accidents per million vehicle miles traveled have occurred from the Carlsbad northern city boundary to La Costa Avenue. The State average between 1997 and 1999 on two to three lane roads was 2.01 accidents per million vehicle miles traveled, and during 1999 the State average increased to 2.02 accidents per million vehicle miles traveled. As compared to December 2001 157603 Environmental Assessment. Ranch0 Santa Fe Road Realignment and Bridge Replacement l-1 Purpose and Need the State average, the accident rate on Ranch0 Santa Fe Road is approximately 17% higher than the State average, which is considered high. Table 1-Z indicates the primary collision factors within this segment. As shown in Table I-4, the 2020 No Project LOS projections on Ranch0 Santa Fe between Melrose and La Costa Avenue are F and it is expected that the occurrence and frequency of accidents, due to roadway deficiencies and severe congestion, could reasonably be expected to increase. TABLE l-l. RANCH0 SANTA FE ROAD PRESENT AND FORECASTED TRAFFIC CONDITIONS source: City of Carlsbad, March2001. Villages of La Costa Traffic Report. TABLE 1-2. RANCH0 SANTA FE ROAD ACCIDENT RATES & REASONS Improper turn Improper parking Following toa closely Driving on wrong side Unknown Total Accidents Accidents per million vehicle miles Source: City of C&bad Accident Records, March 2001. 4 1 1 1 I 11 0.33 December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 1-2 1 .o Purpose and Need Accident Concentrations/Discussion: Over half of the accidents on Ranch0 Santa Fe Road recorded from January 1999 to December 2000 occurred between the Melrose Drive and the San Elijo Road intersections. A higher rate of accidents in this 518-meter (1,700-foot) stretch of roadway cold be attributed to the combination of the following factors: 0 Three intersections are located within 1,000 feet or less from each other: Melrose Drive, La Costa Meadows Drive and San Elijo Road. 0 This stretch of roadway is located at a low point. Vehicles traveling southbound and northbound downhill tend to accelerate towards this section of roadway. l Melrose Drive and San Elijo Road intersect with Ranch0 Santa Fe Road at angles 45-degrees or less creating inadequate sight distance. How Project Will Reduce Accidents: Accidents caused by excessive speed and inadequate sight distances will be reduced with the widening and realignment of Ranch0 Santa Fe Road. Currently, Ranch0 Santa Fe Road is used as a regional link in North County. The new roadway will be constructed to current prime arterial standards more suited to regional link roadway purposes. These standards increase safety for higher traffic speeds. Standards include: l Multiple lanes traveling in each direction l A raised median to separate traffic traveling in opposite directions l Horizontal and vertical curves with adequate sight distance l Intersections spaced for adequate stopping and sight distance l Intersections configured at 90-degree intersections l Signalization of intersections 1.2 PROPOSED ACTION The City proposes to realign and widen approximately 3.2 kilometers (2 miles) of Ranch0 Santa Fe Road as well as replace the existing Ranch0 Santa Fe Road Bridge at San Marcos Creek. Ranch0 Santa Fe Road would be widened from two lanes to an ultimate six-lane Prime Arterial Roadway from the La Costa Avenue/Ranch0 Santa Fe Road intersection to just north of Melrose Drive. The City proposes to construct the project in two phases. Phase 1 will consist of the realignment of Ranch0 Santa Fe Road south of the San Marcos bridge crossing. Phase 2 will consist of the bridge replacement and intersection improvements north of the bridge. The project termini is based on tying into existing Ranch0 Santa Fe Road (a December 2001 Environmental Assessment l Rancho Santa Fe Fload Realignment and Bridge Replacement 157603 l-3 Section 1 .O Purpose and Need for Praiect six-lane facility) southerly of the intersection with La Costa Avenue at the south end and into the Ranch0 Santa Fe Road/Melrose Drive intersection on the north end. Melrose Drive is a six-lane prime arterial road in the City of Carlsbad. 1.3 TRANSPORTATION AND CIRCULATION PLANS The proposed project would implement the traffic congestion relief anticipated by the City Circulation Element of the General Plan (1994) and the FHWA and Federal Transit Administration (FTA) approved 2001-2004, RegionalTransportationImprovements Program (RTIP), approved October 6,200O. The proposed realignment and widening is approved as a part of the City General Plan and is also identified within the SANDAG Regional Transportation Plan (RTP) adopted by SANDAGonFebruary25,2000. Community benefits from the proposed project will include reduced congestion, improved traffic flow and increased safety for travelers on the roadway. Additionally, this road realignment will provide a vital link between the coastal and inland communities of Encinitas, Carlsbad and San Marcos in North San Diego County. Increasing the capacity of the roadway would bring LOS at intersections in the project vicinity to acceptable levels and improve air quality by reducing traffic congestion. The proposed project will also involve replacement of the existing bridge over San Marcos Creek which is currently hydraulically inadequate and cannot pass the loo-year storm without becoming submerged. 1.4 PROJECT HISTORY The City as lead agency under the California Environmental Quality Act (CEO& prepared and certified the 1992 Ranch0 Santa Fe Road Realignment and Mass Grading Environmental Impact Report (EIR) (SCH # 90010850) to satisfy the requirements oE CEOA for the proposed project. The proposed project evaluated in the EIR set the preliminary alignment and limits of grading for the roadway and the bridge replacement. Subsequently, the City completed the final design for the proposed project. Final design for the roadway realignment as well as the bridge replacement conform with the preliminary alignment and bridge replacement evaluated in the EIR. The City prepared and adopted an Addendum to the EIR evaluating the final design for the project in March 2000. The Addendum addressing the Einal alignment is incorporated by reference to this document and is available for review at the City. Separate technical studies were prepared by the City to address speciEic environmental issues associated with the project. The results of these studies have been incorporated into the December 2001 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 157603 1-4 Section 1 .O Purpose and Need for Project analysis completed for this Environmental Assessment (EA). A list of the separate technical studies completed for the proposed project are listed in the introduction to SECTION 3.0, Environmental Evaluation of this EA. 1.5 EXISTING FACILITY The existing Ranch0 Santa Fe Road consists of two paved lanes with curb and gutter on the west side and a combination of asphalt curb and gutter on the east side. A truck bypass route extends from La Costa Avenue northeast to the existing two lane road and eventually reconnects with the roadway immediately south of the existing bridge. 1.6 PROJECT FUNDING The City proposes to construct the project in two phases. Phase 1 will consist of the realignment of Ranch0 Santa Fe Road south oE the San Marcos bridge crossing with an estimated cost of $19 million. Phase 2 will consist of the bridge replacement and intersection improvements north of the bridge with an estimated cost oE $14 million. Federal-aid funding is proposed for a portion oE the proposed project. As a result, the FHWA is the federal lead agency responsible Eor ensuring National Environmental Policy Act (NEPA) compliance. The California Department of Transportation (Department) will act as an agent of FHWA and review/process NEPA documentation accordingly. The City has requested $6,100,000 Erom FHWA for construction of the Phase 1 portion of the project. Federal FHWA funding sources for the project will include the Special Projects and Regional SurEaceTransportation Program funds. The remaining funding for Phase 1 and 2 will be provided by the City through local funds. The proposed project is included in the 2001-2004 San Diego Association oE Governments RegionalTransportation Improvements Program (RTIP) (approved October 6,200O). Project elements addressed by the RTIP include the proposed realignment, widening, and bridge replacement. The project is accurately described in the cost constrained RTP/RTIP that was found to be in conformity with federal air quality standards. 1.7 TRAFFIC It was determined by the City as a part of the traffic analysis prepared for the EIR addressing the proposed project that under the No Project Alternative intersections and roadways in the December 2001 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 157603 1-5 Section 1 .O Purpose and Need for Project project vicinity would operate at unacceptable levels at the then buildout year (2010). A detailed discussion of the anticipated LOS at local intersections and roadway segments is contained in Section 4.3.4, Transportation and Circulation, of this EA. As discussed in Section 4.3.4, implementation of the proposed project would bring the local intersections and roadway segments to acceptable LOS at the buildout year 2020. 1.8 SCOPE OF THE ENVIRONMENTAL REVIEW This EA identifies, describes and evaluates the potential environmental impacts that could result from the proposed project. The EA identifies environmental permits relevant to the proposed project. As appropriate, this document describes, in terms of regional overview or a site-specific description, the affected environment and environmental consequences of the action. The EA also identifies measures that have been incorporated into the proposed project to prevent or minimize environmental impacts. The rationale for the determination of issues to be covered by the EA is included in SECTION 3.0, Environmental Evaluation and SECTION 4.0, Discussion ofEnvironmental Evaluation. 1.9 COMMENTS AND COORDINATION In accordance with the NEPA, a good faith effort has been made during the preparation of this EA to contact affected agencies, organizations and persons who may have an interest in this proposed project. Coordination with agencies completed for this FA is discussed in SECTION 5.0, Consultation and Coordination of this EA. During preparation of this EA, the City, Department and FHWA have coordinated with the appropriate state and federal agencies. Consultation with the ACOE, CDFG, RWQCB, and the National Resource Conservation Service (NRCS) was completed and permits received (see Section q.8) for impacts to wetlands in accordance with Section 1601 of the California Fish and Game Code and Section 401 and 404 of the federal Clean Water Act. Two lists of sensitive plants and animal species were obtained from the USFWS in 1999 and 2001 (~~~APPENDIxA). The City of Carlsbad has completed formal Section 10 consultation with the USFWS for the roadway project’s impacts to federally listed species (see APPENDIXB for Section lO[a] permit). With the addition of federal funds to the project, FHWA has initiated formal Section 7 consultation with the USFWS because the project may affect designated critical habitat for the coastal California gnatcatcher (see APPENDIX A, USFWS September 21, 2001 letter). Cultural resources surveys have been prepared to comply with the requirements of the State Historic December 2001 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 157603 l-6 Section 1 .O Purpose and Need for Project Preservation Officer (SHPO) (see APPENDIX B, SHPO letter dated February 15,200l). Based on the consultation with these agencies key issues were identified and evaluated in the EA. 1 .lO DECISIONS TO BE MADE AND PERMITS REQUIRED In the FHWA review of the proposed project, environmental considerations, economic and social factors will be weighed to determine the most appropriate course of action, which may include: (a) Approval of the proposed project (b) Approval of an alternative with specific conditions and mitigation measures (c) Denial of the project In addition to FHWA approval, additional state and local permits or approvals are expected to be required for the proposed project, including the following: l l l l l l l l California Regional Water Quality Control Board -water quality certification or waiver under Section 401 of the Clean Water Act (received January 2001). Army Corps of Engineers - Permit under Section 404 of the Clean Water Act (received authorization to use Nationwide Permit 14,8 and 33, August 2000). California Department of Fish and Game - Streambed Alteration Agreement Under Section 1600 of the California Department of Fish and Game Code (received January 2001). Compliance with Federal Fish and Wildlife Permit PRT-795759 pursuant to Section 10(l) (1) (a) of the Federal Endangered Species Act received (June 1995). Compliance with National Historic Preservation Act and SHPO requirements (completed February 2001). Compliance with National Pollution Discharge Elimination (NPDES) General Construction Activity Permit and dewatering certification from Regional Water Quality Control Board. Approval of Ranch0 Santa Fe Road Assessment District by City of Carlsbad. Completion of Section 7 consultation under the Endangered Species Act by USFWS. December 2001 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 157603 i-7 SECTION 2 .O PROPOSED PROJECT DESCRIPTION AND COMPARATIW ANALYSIS OP ALTlZRNATlWS 2.1 PROJECT LOCATION Approximately 3.2 kilometers (2 miles) of Ranch0 Santa Fe Road would be widened and realigned from two lanes to an ultimate six lane prime arterial roadway from approximately 30 meters (100 feet) south of the La Costa Avenue/Ranch0 Santa Fe Road intersection to approximately30 meters (100 feet) northof theMelroseDrive/Rancho Santa Fe Road within the City of Carlsbad in the County of San Diego. Figures 2-j and 2-Z illustrate the location of the proposed project in a regional and local context. Figure Z-2 also illustrates the project impact area for Phases 1 and 2. 2.2 DESCRIPTION OF PROPOSED PROJECT Final design developed by the City is illustrated in Figure Z-2. As shown in Figure 2-2, the final design includes specifics regarding grading including location and size of manufactured slopes. The realigned Ranch0 Santa Fe Road would be constructed to the full width on the east side of themedian, with sidewalks, curb and gutter, and street lights from the bridge to the north of Melrose Drive (see cross-section in Figure Z-3). The final design also includes drainage facilities and drainage outlets to be constructed as a part of the proposed project. Details of the final design are described further below: 2.2.1 Roadway Realignment The proposed widening and realignment of Ranch0 Santa Fe Road is part of the City’s General Plan to upgrade Ranch0 Santa Fe Road to meet its designation as a Prime Arterial Roadway. A Prime Arterial Roadway has a 38.4.meter (126 feet) right-of-way containing six 3.66-meter (12 feet) travel lanes, two 2.44-meter (8 feet) bike lanes, a 5.5meter (18 feet) raised median, curb and gutters and two3.05meter (10 feet) parkways which contain a 1.52- meter (5 feet) sidewalk. Figure Z-3 illustrates a typical road section. The design speed for a Prime Arterial Roadway is 96 kph (60 mph). The anticipated posted speed limit will be 89 kph (55 mph). Ranch0 Santa Fe Road is not a designated bike route. December 2001 157603 Environmental Assessment. Ranch0 Santa Fe Road Realignment and Bridge Replacement 2-1 n 0 0 m 9 - . z MiraM K il \ h Ranch0 Santa Fe Road Realignment & Bridge Replacement - Environmental Assessment Regional Map R/W -- ,“~~ R/W lS2n en SIDEWALK CURB 8. GUTTER AC PAVEMENT OVER MEDIAN J AGGREGATE BASE AC PAVEMENT OVER AGGREGATE BASE TYPICAL ROAD SECTION CO”C barrirr Type tvbulor hand v-db” CLPlPS cone box @rd.r. ty )I ;/ i j : ji ii :: :: :: :: ;; :i :i ii ~ . . . . . . . . . . . . . . . . . . . . . . . ,.....! . . . . . . . . . . . . . . . . . . .,................., :: :: f///j i . . . . . . . . . . 4 I I ..I ~ j . . . ..I. ..I........... j i i / :/ : TYPICAL BRIDGE SECTION UJRCE: Dokken Engineering, December 2001 Ranch0 Santa Fe Road Realignment & Bridge Replacement - Environmental Assessment Typical Road and Bridge Cross Sections 2.0 Proposed Project Description and Comparative Analysis of Alternatives As illustrated in Figure Z-2, the northerly roadway approach for the new bridge will be approximately 0.7 kilometer (0.4 mile) long and includes the reconstruction of the La Costa Meadows Drive/Ranch0 Santa Fe Road intersection, and reconstruction of approximately91 meters (300 feet) of La Costa Meadows Drive east of the intersection. As illustrated in Figure Z-2, the current alignment of Melrose Drive would be altered to accommodate the proposed widening of Ranch0 Santa Fe Road. The Melrose Drive/Ranch0 Santa Fe Road intersection would be moved approximately 122 meters (400 feet) to the north of the present intersection. Melrose Drive would be realigned from Cornita Drive/Melrose Drive intersection where Melrose Drive would extend to the northwest to the realigned Melrose Drive/Ranch0 Santa Fe Road intersection. Cornita Drive would be extended east to connect with the realigned Melrose Drive. As illustrated in Figure Z-2, the approach to the bridge from La Costa Avenue would consist of a realigned 3.1.kilometer (1.9 miles) section of Ranch0 Santa Fe Road. As shown in Figure 2-2, the impact area for this section of the roadway includes disturbance associated with construction staging areas as well as removal of the existing Ranch0 Santa Fe Road within the vicinity of the new roadway. 2.2.2 Bridge Improvements The new bridge over San Marcos Creek is planned to accommodate the Prime Arterial Roadway. This proposed bridge replacement project would involve construction of a new bridge in a location west of the existing bridge (see Figure Z-2) The existing bridge would be demolished. The bridge would consist of six lanes. The span over San Marcos Creek would extend for approximately 114 meters (375 feet) and would range in height from 4.6 meters (15 feet) to 6.1 meters (20 feet) from the creek bottom to the bridge. The bridge would be supported by manufactured fill slopes at the northern and southern termini of the bridge. A total of twelve piers would support the bridge span. Each pier would be constructed by excavating a pit and using driven iron piers to form and cast each individual concrete pier. Following construction of the piers, the excavation area would be refilled and returned to original grade. Each pier would include 1.2-meter (4-foot) x 1.8.meter (&foot) columns and 3.7-meter (12-foot) x 3.7- meter (12-foot) footings. Figure 2-3 illustrates a typical bridge cross section. December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 2-5 2.0 Proposed Project Description and Comparative Analysis of Alternatives 2.2.3 Project Phasing The proposed project is divided into two phases (see Figure Z-2). Both Phase 1 and 2 would be constructed by the City. Phase 1 includes the realigned 2.1 kilometers (1.3 miles) approach bridge from La Costa Avenue to immediately south of Questhaven Road as well as vacation of the existing Ranch0 Santa Fe Road. Phase 2 includes the proposed bridge improvements as well as the 0.7 kilometer (0.4 mile) approach from Melrose Drive to approximately 183 meters (600 feet) south of the Questhaven Road/Ranch0 Santa Fe Road intersection. 2.2.4 Construction Activities Construction of the project is scheduled to begin in 2002. Construction activities will begin with the Phase 1 portion of the project. Construction of Phase 1 will take approximately 19 months. Construction of the Phase 2 portion of the project will begin in 2002 or 2003 and will take approximately 18 months, The proposed earthwork will be balanced between cut and fill. The area of impact shown in Figure Z-2 will accommodate anticipated staging requirements during construction Blasting operations will be performed throughout the area where marginally rippable to non- rippable rock exists. 2.2.5 Existing Roadway Vacation In association with completion of Phases 1 and 2 segments of the realigned roadway, those portions of existing Ranch0 Santa Fe Road that are no longer required as roads will be vacated. Figure 2-2 illustrates the roadway vacation that will occur during construction. Roadway vacation illustrated in Figure 2-2 includes removal of the existing bridge. December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 2-6 2.0 Proposed Project Description and Comparative Analysis of Alternatives 2.3 ANALYSIS OF ALTERNATIVES 2.3.1 No Project Alternative The No Project Alternative would leave Ranch0 Santa Fe Road in its current location and would not widen or otherwise improve the road. The bridge over San Marcos Creek would not be replaced and would continue to be submerged during the loo-year storm event. Comparative Analysis This alternative would eliminate impacts to biological resources and landform alteration. However, as discussed in Section 4.4, Project Purpose and Need, under the No Project Alternative, the LOS would continue to decrease to unacceptable levels as traffic volume increases due to approved and planned development. Ranch0 Santa Fe Road is a major link between Encinitas, Carlsbad, and San Marcos and is planned as a prime arterial in the Circulation Element of the Carlsbad General Plan. The retention of the existing alignment as is (two-lane road) would directly conflict with this General Plan designation. As such, as the number of cars using the existing alignment increase from 26,000 ADT under existing conditions to 50,000 ADT in 2020, the flow of traffic (LOS) would decrease, causing such impacts as traffic jams, reduced ambient air quality from large numbers of cars traveling at slow speeds, increased noise levels, and reduced safety along Ranch0 Santa Fe Road. 2.3.2 Alternatives Withdrawn from Further Consideration The City of Carlsbad started planning this section of the Ranch0 Santa Fe Roadway corridor in the mid 1980’s and has completed several studies of the corridor over the last 15years. The studies include the 1986AcousticalAnalysis Study forAssessment District No. 86-5, the f98j’Noise Impact Analysis for the Widening of Ranch0 Santa Fe Road, the 1987 Ranch0 Santa Fe Road Alignment Study, the -I 992 Environmental Impact Report (EIR) per the California Environmental Quality Act, the 4996 Habitat Conservation Plan and the 2000 Amendment to the EIR. In 1986, the City Council appointed a committee to review various alignments for Ranch0 Santa Fe Road. The Committee reported their findings in the 4987 Ranch0 Santa Fe Road Alignment Study Committee Report. The committee consisted of major property owners in the area, residents adjacent to the roadway and City of Carlsbad Staff. Alignments were December 2001 157603 Environmental Assessment l Rancha SantaFe Road Realignment and Bridge Replacement 2-7 2.0 Proposed Project Description and Comparative Analysis of Alternatives developed and reviewed based on safety, environmental impacts, cost, community cohesion and quality of life, and land use interface. The committee utilized the 1986 noise study and prepared an additional noise study. An independent environmental consultant reviewed and assessed alignment impacts on archeological, biological and paleontological resources. The committee’s criterion focused on community issues, as well as, environmental, funding and safety issues. The community issues included community cohesion, quality of life, and land use issues. Community cohesion focused on minimizing the isolation of residential neighborhood, potential commercial areas and open space, and disruptions to the continuity of landforms such as canyons and hillsides. The committee established that the quality of life for residents in the area would be higher if community cohesionwas maintained as much as possible. The interface of land uses was also considered to be important to the quality of life for residents in the area. Land uses and existing zoning were reviewed. The committee considered severance of access to existing properties, buffer areas of open space between residential areas and the roadway alignment, views of the alignment and open space areas from residential areas, access to commercial areas, and the proximity of commercial areas and residential areas to each other and the roadway. Environmental, funding and safety issues and impacts were considered during and after the completion of construction. Environmental issues included noise and pollution impacts to residents from construction and also from projected traffic. Impacts to archeological, biological and paleontological resources were also reviewed. The committee review of funding for the various alignments considered the construction cost, mitigation costs, and impacts to existing homes adjacent to each alternative and financing mechanisms. Safety was considered for the drivers using the completed road and also for drivers and workers during construction. The Ranch0 Santa Fe Road Realignment and Mass Grading EIR was approved by City Council in 1992. The EIR further evaluated the alternative alignments presented in the 1987 Committee Report. City Council, the California Department of Fish and Game, the U.S. Fish and Wildlife Service, and adjacent property owners approved the Habitat Conservation Plan in 1996. During the studies performed for the HCP, the Ranch0 Santa Fe Road Realignment Alternatives were again scrutinized and modified. A 1,940-acre area surrounding and including the roadway alignment alternatives was studied to determine areas for conserved December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 2-8 2.0 Proposed Project Description and Comnarative Analvsis of Alternatives habitat for plant and wildlife species and mitigations of impacts of anticipated urbanization. The roadway alignments were slightly modified to reduce impacts to low quality wetland areas and high quality coastal sage scrub habitat. The location where the alignments cross the San Marcos Creek was reviewed confirming this location to be the best for minimizing impacts to the creek bed. An amendment to the EIR in March of 2000 reviewed the alternative alignments and compared their merits to current standards. The amendment is incorporated into this EA by reference. The City of Carlsbad has completed a thorough review and analysis of the alternative alignments for the Ranch0 Santa Fe Road project over the past 15 years. Criteria for the alignment studies have ranged from community and City defined concerns, to State and FederalAgencystandardsandrequirements. TheCityhas beencareful tore-assessalternative alignments as new laws and policies are adopted, and make modifications to the proposed alternative to reduce and eliminate impacts. 2.3.2.1 Wideninu Existina Alianment of Ranch0 Santa Fe Road The EIR and 1986 Committee Report evaluated widening the existing Ranch0 Santa Fe Road from La Costa Avenue to Melrose Drive to 38.4 meters (126 feet) right-of-way and to six lanes. Comparative Analysis The EIR concluded that for all environmental impacts except noise, widening the existing roadway would cause approximately the same level of impacts as the proposed project over the long term. The potential impacts to earth resources, air quality, water resources, biological resources (including sensitive habitat and sensitive species), light and glare, land use, traffic circulation, public services, utilities, and landform alternation/visual quality would be largely similar to those described for the proposed project. No significant reduction or elimination of potential impacts would be achieved by developing this alternative. The 1987 Committee Report found this alignment to have unacceptable noise impacts to existing residents and felt the natural topography would be divided isolating part of the community. The committee deemed the noise impacts unmitigable and unacceptable to December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 2-9 2.0 Proposed Project Description and Comparative Analysis of Alternatives residents adjacent to the roadway. These issues are discussed in more detail below. The Committee also felt that this alignment would sever the natural edge, or rim, of the series of hills in the area because the alignment is located between hillsides. Both the topography as well as the road alignment would isolate the area southeast of this alignment. The area would be bound by La Costa Avenue to the south and east and by the top of a ridge to the north and west. The committee valued the sense of “community” of the area and felt it was important to the quality of life for residents in the area. Isolated areas are not conducive to a cohesive community. The 1987 Committee Report rejected the widening of the existing roadway because it would result in increased levels of noise to nearby residents of the La Costa Vale subdivision. The increased noise levels would be due to increased traffic traveling on the facility and to the decrease in distance between the residential receptors and the roadway. Due to physical constraints and impacts to private residences, a sound wall is the only feasible mitigation and would not reduce the interior noise levels to below the 45 CNEL required by the City noise ordinance. The existing residential area is approximately3.1 meters (10 feet) lower than the roadway. A 2:l slope exists on private property between the roadway right-of-way and the residential structures. This area is approximately 1.5 meters (5 feet) wide and does not provide room for adequately sized natural sound barriers such as earthen berms without substantial regarding and impacts to private properties. The City determined that mitigations involving changes to existing homes was not cost effective due to liability. These mitigationswould includeimprovements and alterations to existing homes suchas insulation and the replacement of siding and windows. Therefore, this alternative was rejected. 2.3.2.2 Alternatives Evaluated for MinimizincUAvoidina Impacts to Biolouical Resources Wetland Resources During the preliminary alternative analysis completed in consultation with the ACOE, CDF&G, RWQCB, USFWS and NRCS, several alternative alignments were considered to avoid/minimize impacts to wetlands. An alternative alignment to the west would have resulted in reduced impacts to jurisdictional wetlands at the southern end of the alignment but would have created substantial noise December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement z-to 2.0 Proposed Project Description and ComDarative Analvsis of Alternatives impacts to a number of residents at the southern and northern end of the alignment. Based on noise studies conducted in 1986, it was determined that predicted traffic noise generated under this alternative could not be abated through the use of sound barriers to a level below the City’s standards for interior noise level (below 45 CNEL). The study found that exterior noise levels could be mitigated with a sound wall ranging from 1.8 meters (6 feet) high to 3.1 meters (10 feet) high in some locations. Noise levels predicted for build-out traffic range from 73.6 to 61.6 CNEL. A sound wall would reduce noise levels to approximately 58.0 to 62.6, however would not reduce interior noise levels below 45 CNEL. Sound walls were the only mitigation considered feasible for the western alternative alignment due to physical constraints at the site. The existing residential area is approximately 3.1 meters (10 feet) lower than the roadway. A 2:l slope exists on private property between the roadway right-of-way and the residential structures. This area is approximately 1.5 meters (5 feet) wide and does not provide room for adequately sized natural sound barriers such as earthen berms without substantial impacts to private properties. The City determined that mitigations involving changes to existing homes was not cost effective due to liability. These mitigations would include improvements and alterations to existing homes such as insulation and the replacement of siding and windows. Therefore, this alternative was rejected. An alternative alignment to the east was considered but would have resulted in direct impacts to adjacent existing industrial uses at the northern end of the alignment including access, existing parking and existing structures. There are approximately 100 - 200 businesses currently located in the La Costa Meadows Industrial Center located on the east side of Ranch0 Santa Fe Road at La Costa Meadows Drive. The southern end of an eastern alignment would bisect coastal sage scrub habitat identified as habitat for the endangered California Gnatcatcher, and result in habitat fragmentation. The proposed project alternative would skirt along the edge of the habitat, leaving more of the habitat in tact. Therefore, because of impacts to businesses and sensitive biological resources, this alternative was rejected. The proposed project alternative was designed, where feasible, to avoid and minimize impacts to jurisdictional wetlands. Impacts to wetlands are either associated with the bridge crossing, perpendicular crossings of unvegetated stream channels or temporary impacts associated with construction (see APPENDIX C, ACOE Jurisdictional Wetlands and Project December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement Z-11 2.0 Proposed Project Description and Comnarative Analvsis of Alternatives Impacts.) The bridge crossing location was chosen to minimize impacts to jurisdictional wetlands (San Marcos Creek is constricted at the proposed bridge location); to minimize the length of additional roadway required to access the new bridge; and to avoid direct impacts to adjacent existing industrial uses. Additionally, the proposed project alternative alignment minimizes impact to jurisdictional, ephemeral stream channels by crossing perpendicular to the stream channels were possible. These ephemeral stream cha,nnels are unvegetated and either disturbed and/or low quality habitat. The total area of ephemeral stream channel impacted by the proposed project alternative alignment was reduced to 0.09 hectare (0.22 acre) with slight adjustments to the alignment as suggested by the ACOE. The proposed project alternative alignment would result in permanent and temporary impacts to 0.85 hectare (2.11 acres; 0.93 acre permanent and 1.18 acres temporary) of wetlands. These impacts cannot be further minimized or avoided. Sensitive Species As discussed previously, widening of the existing alignment of Ranch0 Santa Fe Road was considered as an alternative to the proposed project. However, the EIR concluded that no significant reduction or elimination of potential impacts to biological resources will be achieved by developing this alternative. The 1987 Committee report also concluded that biological impacts would not be significantlyreduced with this alternative. The City rejected this alternative because it would result in increased levels of noise to nearby residents of the La Costa Vale Subdivision resulting from greater levels of traffic on Ranch0 Santa Fe Road. Consultationwith theUSFWS has beenongoing throughout the project for potentialimpacts to proposed, threatened or endangered species (see APPENDIX A, USFWS letters 1999 and 2001). No species of plant listed or proposed for listing as threatened or endangered by the CDFG or USFWS was detected in the project impact area. One animal species listed as threatened by USFWS was determined to use habitat within the project footprint, the coastal California gnatcathcer. The City has completed formal Section 10 consultation with the USFWS for proposed project’s impacts to the coastal California gnatcatcher (see Appendix B for Section lO[a] permit). As discussed in the USFWS’ September 21, 2001 letter (see APPENDIX A), the USFWS has confirmed that the City is meeting the requirements of the Incidental Take Permit No. PRT-795759, issued by the Service to the City, pursuant to Section 10(a)(l)(a) of the Endangered Species Act. The project’s conformance includes restricting vegetation clearing during the breeding season, dedication of habitat credits, December 2001 157603 Environmental Assessment l Rancha Santa Fe Road Realignment and Btidge Replacement 2-12 2.0 Proposed Project Description and Comparative Analysis of Alternatives restoration of temporary impact areas and placement of the m-oiect outside of planned conservation areas, pursuant to the City’s HCP. With the addition of federal funds to the proposed project, FHWA has initiated formal Section 7 consultation with the USFWS to address project impacts to the coastal California gnatcatcher. December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 2-13 SfXTlON 3.0 i!NVIRONMIfNTAL EVALUATION The EA is based on the Final EIR, Ranch0 Santa Fe Road Realignment and Mass Grading (SCH $?OOl0850), dated April 3,1992, the Addendum to the Final EIR dated February 2000 as well as a number of technical studies. The following technical study reports and documents are incorporated by reference to this Environmental Assessment and are available for review at the City of Carlsbad, 1635 Faraday Avenue, Carlsbad, California 92009. l Agra Environmental, 1998. Geotechnical Study. l Carlsbad, City of. 1992 as Addended, 1996 and 2000. Final Environmental Impact Report for the Ranch0 Santa Fe Road Realignment andMass Grading (SCH #90010850). l Dudek &Associates, Inc., March 24, 1997. Water Quality Study, Ran&o Santa Fe Bridge Replacement Project. l Dudek &Associates, Inc., November 2000. VisualAssessment ofRancho Santa Fe Road Bridge Replacement. l Dudek 8r Associates, Inc., April 7, 1997. Phase 4 Environmental Assessment, Ranch0 Santa Fe Bridge Replacement Project (Phase 2). l Dudek & Associates, Inc., January 12, 2000. Floodplain Evaluation Report, Ranch0 Santa Fe Bridge Replacement Project, l Dudek 8r Associates, July 2001. Acoustical Assessment Report Ranch0 Santa Fe Bridge Replacement Project -Phase 2. l Dudek & Associates, November 2001. Acoustical Assessment Report - Ranch0 Santa Fe Bridge Replacement Project -Phase q. l Dudek & Associates, November 2000. Biological Resources Report for Ranch0 Santa Fe Roadway Realignment and Bridge Replacement Project. l Gallegos & Associates, November 2000. Cultural Resources Report for Ranch0 Santa Fe Roadway Realignment and Bridge Replacement Project. l Giroux 8r Associates, March 2000,Air Quality Impact Analysis for Ranch0 Santa Fe Roadway Realignment and Bridge Replacement Project. l Vista Info, March 2000. Site Assessment - Special Project Ranch0 Santa Fe Road Realignment (Phase 4). December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 3-i Environmental Evaluation 3.1 ENVIRONMENTAL EVALUATION CHECKLIST The following Department Environmental Evaluation Checklist was used to identify physical, biological, social and economic factors which might be impacted by the proposed project. The FHWA Technical Advisory T6440.8a and the September 3, 1998 FHWA Environmental Checklist for Draft Documents was used to determine the environmental issues addressed in the EA. In many cases, the background studies performed in connection with this project clearly indicate the project will not affect a particular item. A “NO” answer in the first column documents this determination. The discussion in SECTION4.0 following the checklist provides the rationale for the determinations made in the checklist. 1. Appreciably change the topography or ground surface relief features? Yes NO 2. Destroy, cover, or modify any unique geologic, paleontologic. or physical features? Yes No 3. Result in unstable earth surfaces or increase the exposure of people or property to Yes NO oeolooic or seismic hazards? 4. Result in or be affected by soil erosion or siltation (whether by water or wind)? Yes No 5. Result in the increased use of fuel or energy in large amounts or in a wasteful manner? 1 No 6. Result in an increase in the rate of use of any natural resource? No 7. Result in the substantial depletion of any nonrenewable resource? No 8. Violate any published Federal, State, or local standards pertaining to hazardous waste, NO solid waste or litter control? 9. Modify the channel of a river or stream or the bed of the ocean or any inlet or lake? Yes No 10. Encroach upon a flood plain or result in or be affected by flood waters or tidal waves? Yes No 11. Adversely affect the quantity or quality of surface water, groundwater, or public water Yes No suoolv? 12. Result in the use of water in large amounts or in a wasteful manner? No 13. Affect wetlands or riparian vegetation? Yes NO 14. Violate or be inconsistent with Federal, State, or local water quality standards? No 15. Result in changes in air movement, moisture, or temperature, or any climatic No conditions? 16. Result in an increase in air pollutant emission, adverse effects on or deterioration of Yes No ambient air quality? 17. Result in the creation of objectionable odors? NO 18. Violate or be inconsistent with Federal, State, or local air standards or control studies? No 19. Result in an increase in noise levels or vibration for adjoining areas? Yes NO 20. Result in any Federal, State, or local noise criteria beino eoual or exceeded? Yes NO - 21. Produce new light, glare, or shadows? Yes NO December 2001 157603 EnVirOnmental Assessment l Rancha Santa Fe Road Realignment and Bridge Replacement 3-2 3.0 Environmental Evaluation shrubs, grass, micro flora, and aquatic plants)? 23. Reduction of the numbers of or encroachment the critical habitat of any unique, Yes NO threatened or endangered species or plants? 24. Introduction of new species of plants into an area, or result in a barrier to the normal Yes NO replenishment Of existing species? 25. Reduction in acreage of any agricultural crop or commercial timber stand, or affect Yes NO prime, unique, Or other farmland of State or local importance? 26. Removal or deterioration of existing fish or wildlife habitat? Yes NO 27. Change in the diversity of species, or numbers of any species of animals (birds, land Yes NO animals including reptiles, fish and shellfish, benthic organisms, insects or micro fauna)? 28. Reduction of the number of or numbers of or encroachment won the critical habitat of 1 Yes I No any unique, threatened or endangered species of animals? 29. Introduction of new species of animals into an area, Or result in a barrier to the migration Yes No or movement of animals? socml.,ANDECONOMid,-Wi!l,the,pmposal diIect!yorindjre’~y::;,,_::“:::~ 1~ 1:;:’ ‘1’ fI:‘; ‘::I’: :~:::’ ~:,: ;~_ :I:;: ,:, !,;;,‘:-I~’ ~:;!I; ~:~,:;~‘:i~:‘_!?:II 30. Cause disruption of orderly planned development? No 31. Be inconsistent with any elements of adopted community studies, policies or goals? NO 32. Be inconsistent with a Costal Zone Management Plan? No 33. Affect the location. distribution. density, or growth rate of the human population of an NO area? 34. Affect life-styles, or neighborhood character or stability? No 35. Affect minority, elderly, handicapped, transit-dependent, or other specific interest NO groups? 36. Divide ordisruot an established communitv? I No I 37. Affect existing housing, require the acquisition of residential improvements or the NO displacement of people or create a demand for additional housing? 30. Affect employment, industry or commerce, or require the displacement of businesses or Yes NO farms? 39. Affect property values or the local tax base? Yes NO 40. Affect any community facilities (including medical, educational, scientific, recreational, NO or religious institutions, ceremonial sites or sacred shrines)? 41. Affect public utilities, or police, fire, emergency or other public services? NO 42. Have substantial impact on existing transportation systems or alter present patterns of Yes NO circulation or movement of people and/or goods? 43. Generate additional traffic? 44. Affect or be affected by existing paking facilities or resuR in demand for new parking? 45. Involve asubstantial riskaf an explosion or the release of hazardous substances in the event of an accident or otherwise adversely affect overall public safety? NO NO No December ‘2001 Envimnmental Assessment l Rancha Santa Fe Road Realignment and Bridge Replacement 157603 3-3 3.0 Environmental baluation 46. Result in alterations to waterborne, rail orairtraffic? 47. Support large commercial or residential development? 48. Affect a significant archaeological or historic site, structure, object, or building? 49. Affect wild or scenic rivers or natural landmarks? 50. Affect any scenic resources or result in the obstruction of any scenic vista or view open to the public, or creation of an aesthetically offensive site open to public view? 51. Result in substantial impacts associated with construction activities (e.g., noise, dust, temporary drainage. traffic detours and temporary access. etc.)? 52. Result in the use of any publicly-owned land from a park, recreation area, or wildlife and waterfowl refuge? ~~~DATORy~F!ND!NG&:i::---::~-i:::::I,~~:i ;,:~::I/ _:~:~~~~i:ii::i__i~j_::::~i:i,:I,,:,~:,~i,~,~j:::,,i_:_,,,::::;::~:I:I~~ ,::;;: 53. Does the project have the potential to substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? 54. Does the project have the potential to achieve short-term, to the disadvantage of long- term, environmental goals? (A short-term impact on the environment is one which occurs in a relatively brief, definitive period of time while long-term impacts will endure well into the future.) 55. Does the project have environmental effects which are individually limited, but cumulatively considerable? Cumulatively considerable means that the incremental effects of an individual project are considerable when viewed in connection with the effects of other current proiects, and the effects of probable future projects. It includes the effects of other proiects which interact with this project and, together, are considerable. 56. Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly? Yes NO ~ NO No No No No December 2001 Environmental hsessment . Ranch0 Santa Fe Road Realignment and Bridge Replacement 157603 3-4 SlXTION 4.0 DISCUSSION OF ENVIRONMENTAL l3’ALUATION AND MITIGATION MEASURE3 This section describes the proposed project’s environmental impacts using the Department’s Environmental Checklist in SECTION 3.0, and the FHWA Technical AdvisoryT6440.8a and the September 3, 1998 FHWA Environmental Checklist for Draft Documents to focus the discussion. The number in parenthesis preceding each title refers to its number on the Department’s Environmental Checklist. 4.1 PHYSICAL ENVIRONMENT 4.1.1 Topography/Visual Resources (#s 1,2, 9, 21,49, 50) The purpose of this study is to assess the visual impacts of the proposed project and to propose measures to mitigate any adverse visual impacts associated with the construction of phase 1 and 2 on the surrounding visual environment. The evaluation of visual changes or impacts was based upon an assessment of the existing visual character of the landscape seen from selected key viewpoints and the degree to which the project would change those views. The existing quality or character of views was determined by evaluating three visual elements: vividness (the memorability of the visual impression received from contrasting landscape elements as they combine to form a striking and distinctive visual pattern); intactness (the integrity of visual order in the natural and built landscape, and the extent to which the landscape is free from visual encroachment); and unity (the degree to which the visual resources of the landscape join together to form a coherent, harmonious visual pattern, refers to the composition harmony or inter-compatibility between landscape elements). Bridge improvements and grading necessary to construct the bridge as well as intersections and roadways associated with Phase 2 will impact views from the roadway, existing residences, and planned land uses as discussed below. Project Description The City of Carlsbad proposes to realign and widen approximately 3.2 kilometers (2 miles) of Ranch0 Santa Fe Road as well as replace the existing Ranch0 Santa Fe Road Bridge at San Marcos Creek. Ranch0 Santa Fe Road would be widened from two lanes to an ultimate six- lane Prime Arterial Roadway from the La Costa Avenue/Ranch0 Santa Fe Road intersection to just north of Melrose Drive. The City proposes to construct the project in two phases. December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-I 4.0 Discussion of Environmental Evaluation and Mitigation Measures Phase 1 will consist of the realignment of Ranch0 Santa Fe Road south of the San Marcos bridge crossing. Phase2 will consist of the bridge replacement and intersection improvements north of the bridge. Applicable Planning Documents Environmental consequences of the proposed project on the existing visual quality have been evaluated for Phases 1 and 2 by the 1992 EIR and supplemented by additional visual analysis to address design level information associated with the final design (Dud& &Associates Visual Assessment ofRanch Santa Fe Road Bridge Replacement Project, November 2000). This study is incorporated by reference to this document and is available for review at the City of Carlsbad. The visual character of the area immediately surrounding the roadway will change with buildout of the City of Carlsbad General Plan. Natural hillsides are planned to be developed with a mixed-use development inclu~ding residential and commercial uses (referred to as Villages of La Costa). These uses would be developed adjacent to the roadway. Impacts of the mixed use development as well as the visual impacts of the roadway were evaluated in the EIR prepared by the City in 1992. These future developments are taken into consideration for this visual analysis. The Villages of La Costa development (VLC) project was approved by the City Council on October 23,200l and is planned to be under construction by 2004. The city is currently plan checking VLC development plans for the areas adjacent to Ranch0 Santa Fe Road which is expected to be under construction concurrently with the Ranch0 Santa Fe Road project. According to the City of Carlsbad General Plan, Ranch0 Santa Fe Road is considered to be a Community Scenic Corridor. Community scenic corridors interconnect major subareas of the present and planned Carlsbad community and are subject to the Carlsbad Scenic Corridor Guidelines Manual. Assessment Method The process used in this visual impact study generally follows the guidelines outlined in the publication “Visual Impact Assessment for Hinhwav Projects,” Federal Highway Administration (FHWA), March 1981. Six principal steps required to assess visual impacts were carried out: December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-2 4.0 Discussion of Environmental Evaluation and Mitigation Measures A. Define the project setting and viewshed. B. Identify key views for visual assessment. C. Analyze existing visual resources and viewer response. D. Depict the visual appearance of project alternatives. E. Assess the visual impacts of project alternatives. F. Propose methods to mitigate adverse visual impacts. Project Setting The regional landscape establishes the general visual environment of the project, but the specific visual environment upon which this assessment will focus is determined by defining landscape units and the project viewshed. landscape Units A landscape unit is a portion of the regional landscape and can be thought of as an outdoor room that exhibits a distinct visual character. A landscape unit will often correspond to a place or district that is commonly known among local viewers. Project Viewshed A viewshed is a subset of a landscape unit and is comprised of all the surface areas visible from an observer’s viewpoint. The limits of a viewshed are defined as the visual limits of the views located from the proposed project. Theviewshed alsoincludes thelocations of viewers likely to be affected by visual changes brought about by project features. FHWA Method of Visual Resource Analysis Identify Visual Character-Visual character is descriptive and non-evaluative which means it is based on defined attributes that are neither good nor bad in themselves. A change in visual character cannot be described as having good or bad attributes until it is compared with the viewer response to that change. If there is public preference for the established visual character of a regional landscape and a resistance to a project that would contrast that character, then changes in the visual character can be evaluated. December 2001 157603 Environmental Assessment. Rancho Saota Fe Road Realignment and Bridge Replacement 4-3 4.0 Discussion of Environmental Evaluation and Mitigation Measures Assess Visual Quafity -Visual quality is evaluated by identifying the vividness, intactness and unity present in theviewshed. The FHWA states that this method should correlate with public judgments of visual quality well enough to predict those judgments. This approach is particularly useful in highway planning because it does not presume that a highway project is necessarily an eyesore. This approach to evaluating visual quality can also help identify specific methods for mitigating specific adverse impacts that may occur as a result of a project. The three criteria for evaluating visual quality can be defined as follows: Vividness is the visual power or memorability of landscape components as they combine in distinctive visual patterns. Intactness is the visual integrity of the natural and man-built landscape and its freedom from encroaching elements. It can be present in well-kept urban and rural landscapes, as well as in natural settings. Unity is the visual coherence and compositional harmony of the landscape considered as a whole. It frequently attests to the careful design of individual components in the landscape. 4.1 .l .l Affected Environment Existing Visual Resources As shown in Figures 2-2 and 4-Z through 4-5, the existing Ranch0 Santa Fe Road consists of two paved lanes with an asphalt berm on the west side and a combination of asphalt berm and concrete curb on the east side. A truck by-pass route creates a three-plane paved road with asphalt berm on both sides in uphill areas of the stretch. San Marcos Creek is crossed by an existing bridge which is located between the Questhaven Road intersection and the Melrose Drive intersection. Ranch0 Santa Fe Road has two northbound lanes and one southbound lane across the San Marcos Creek Bridge. The following discussion provides a narrative accompanied by figures that describe the existing visual conditions for the Ranch0 Santa Fe Road study area. Existing Visual Character As shown in Figures 2-2 and 4-Y, the topography of the proposed project site is characterized by undulating terrain that partially drains to San Marcos Creek. Large hills surrounding the existing roadway range from 213 meters (700 feet) above mean sea level (msl) to 427 meters December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-4 Ranch0 Santa Fe Road Realignment & Bridge Replacement - Environmental Assessment Viewshed Boundary 4.0 Discussion of Environmental ITvaluation and Mitigation Measures (1,400 feet) above msl. The existing Ranch0 Santa Fe Road alignment extends through the lower elevations and level terrain 91-183 meters (300600 feet) above msl at the base of the larger hillsides. The hills and drainages in the proposed project vicinity are predominantly natural open space typically covered by dense chaparral vegetation. In 1996, a fire burned a majority of the area immediately to the east and southwest of the proposed project site leaving the hillsides generally clear of vegetation. Much of the burned vegetation has recovered, although it has not regained its former density, the vegetation does contribute to the natural character of the landscape. Existing urban land uses in the immediate vicinity of the proposed improvements include the existing Ranch0 Santa Fe Road alignment, an industrial park, and two single-family detached residential developments. The existing visual character of the project area is typified by natural open space with isolated pockets of semi-rural residential development and new semi-urban residential and commercial development. Thenatural landscape is the predominatevisual feature on the east side of Ranch0 Santa Fe Road within the project area. The landscape is composed of moderate to steep hillsides and shallow valleys supporting native vegetation. With few exceptions, development has occurred west of Ranch0 Santa Fe Road leaving the east side relatively untouched except for isolated features such as a transmission line corridor, the face of an earthen dam structure, and water tanks on distant hilltops. Various land uses have been superimposed on this overall landscape structure west of the existing Ranch0 Santa Fe Road. Older rural housing is adjacent to Ranch0 Santa Fe Road north of the Melrose intersection. Multi-story commercial/industrial buildings are present in the valley bottom in the vicinity of the existing bridge over San Marcos Creek. Newly- built housing occurs west of Melrose that have obscured views of the existing bridge. Additional housing was built in the 1990’s along the west side Ranch0 Santa Fe Road from the La Costa intersection extending north approximately I/J mile. Existing land use exhibits a semi-rural character that results from discontinuous development that is separated and surrounded by vacant lots and natural open space lands. December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-10 4.0 Discussion of Environmental Evaluation and Mitirration Measures Existing Visual Quality High ratings were assigned in areas where the landscape exhibits well-maintained, attractive urban developments or which exhibit distinctive rural landscapes and natural open space. This would include areas of existing undisturbed mature vegetation. Examples include undulating terrain associated with San Marcos Creek and surrounding hillsides. Moderate ratings were applied to areas which contain reasonably attractive development and natural features, but which are not visually distinctive or unusual within the region. These areas would have some degree of landscape vividness, intactness, or unity present and include single-family residential developments located adjacent to major roadways. Low visual quality ratings were not assigned to the study area. Visual quality throughout the viewshed is moderately-high due to the presence of extensive natural open space east of Ranch0 Santa Fe Road that gives the feeling of being on the edge of urban development within this Landscape Unit. Landscape vividness for the project area is rated moderate due to the lack prominent landmarks and natural features that standout in the landscape. Landscape intactness is rated moderate due to increased encroachment by tract homes, transmission towers, and the earthen dam associated with the Stanley Mahr reservoir. Landscape unity is rated high throughout the project area due to the large contiguous open space areas and compatible open space land uses along San Marcos Creek. Development within the project viewshed does not detract from the overall landscape character expressed by the sloping ridge lines, valleys, and native vegetation. Methods of Predicting Viewer Response Viewer response is composed of two elements: viewer sensitivity and viewer exposure. These elements combine to form a method of predicting how the public might react to visual changes brought about by a highway project. Viewers are defined as those individuals that are located inside the viewshed boundary for substantial periods of time. The sensitivity of viewers is dependent upon the duration of viewing time, i.e., resident populations are stationary and more sensitive to adverse visual change than are motorists who are mobile and experience visual resources for far more brief periods of time. Figure 4-t defines the viewshed boundary for the project area. December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-11 4.0 Discussion of Environmental bahation and Mitigation Measures Viewer sensitivity is defined both as the viewers’ concern for scenic quality and the viewers’ response to change in the visual resources that make up the view. Local values and goals may confer visual significance on landscape components and areas that would otherwise appear unexceptional in a visual resource analysis. Even when the existing appearance of a project site is uninspiring, a community may still object to projects that fall short of its visual goals. Analysts can learn about these special resources and community aspirations for visual quality through citizen participation procedures, as well as from local publications and planning documents. Viewer exposure is typically assessed by measuring the number of viewers exposed to the resource change, type of viewer activity, the duration of their view, the speed at which the viewer moves, and the position of the viewer. High viewer exposure heightens the importance of early consideration of design, art, and architecture and their roles in managing the visual resource effects of a project. Existing Viewer Sensitivity Viewer types in the project area viewshed include residents, recreationists, government institutions, public facilities workers, commercial/industrial workers, shoppers, and agricultural workers. Another viewer group is the Ranch0 Santa Fe Roadway user which would include local travelers, commuters, and tourists with regional destinations, Although open space views are highly valued by local residents, the City of Carlsbad General Plan anticipates additional residential development adjacent to the project area. The passage and implementation of the general plan indicates acceptance by a majority of the voting public for this level of development and the associated effects to visual resources. Additional development will convert natural open space to semi-urban environments. Not only will this alter the visual character of the area, such development will increase the number of project viewers. However, the response of future residential viewers cannot be determined because the change of visual quality is not observed by land users that arrive subsequent to project construction. December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-12 4.0 Discussion of Environmental baluation and Mitkation Measures Existing Viewer Exposure Approximately 80 residences are located near the project area and include varying degrees of visual access to the proposed project, Phase 1 contains 47 residences that are adjacent to the project area and Phase 2 contains approximately 32 residences. Residents that occupy these homes are engaged in everyday life and typically spend a large portion of their time in and around these dwelling units resulting in long duration viewing periods of the local environment. Phase 1 residential viewers are, for the most part, screened from the new road with the exception of 4 units that will have unobstructed views of the Phase 1 roadway. Two areas of residential units are present in the Phase 2 area. Approximately nine residences located between Ranch0 Santa Fe Road and Melrose Avenue are enclosed by an existing 5-foot concrete block wall and wood fence that limits direct viewing of Ranch0 Santa Fe Road. Approximately 14 residences located on Corintia Street will have distant views of the expanded Ranch0 Santa Fe Road and bridge. Approximately nine residences on Melrose Avenue have views of the proposed Ranch0 Santa Fe RoadlMelrose Avenue intersection. The only other viewers with substantial views of the proposed projects will be motorists that travel along the proposed roadway. Current daily traffic volume exceeds 26,000 average daily trips (ADT). Traffic volumes are projected to increase in 2020 to 50,200 ADT. Traffic speed is expected to minimize the duration of viewer observation of foreground features associated with Ranch0 Santa Fe Road within the landscape unit. Motorist attention is generally focused on traffic flow patterns and vehicle operation. However, a general sense of the landscape character and visual quality is achieved by motorists as these viewers pass through an area. 4.1.1.2 Environmental Evaluation Method of Assessing Project Impacts The visual impacts of project alternatives are determined by assessing the visual resource change due to the project and predicting viewer response to that change. Visual resource change is the sum of the change in visual character and change in visual December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-13 4.0 Discussion of hvironmental Evaluation and Mitigation Measures quality. The first step in determining visual resource change is to assess the compatibility of the proposed project with the visual character of the existing landscape. The second step is to compare the visual quality of the existing resources with projected visual quality after the project is constructed. The viewer response to project changes is the sum of viewer exposure and viewer sensitivity to the project as determined in the preceding section. The resulting level of visual impact is determined by combining the severity of resource change with the degree to which people are likely to oppose the change. Definition of Visual Impact levels Low - Minor adverse change to the existing visual resource, with low viewer response to change in the visual environment. May or may not require mitigation. Moderate - Moderate adverse change to the visual resource with moderate viewer response. Impact can be mitigated within five years using conventional practices. Moderately High - Moderate adverse visual resource change with high viewer response or highadversevisualresourcechangewithmoderateviewerresponse. Extraordinarymitigation practices may be required. Landscape treatment required will generally take longer than five years to mitigate. High - A high level of adverse change to the resource or a high level of viewer response to visual change such that architectural design and landscape treatment cannot mitigate the impacts. Viewer response level is high. An alternative project design may be required to avoid highly adverse impacts. Analysis of Key Views Because it is not feasible to analyze all the views in which the proposed project would be seen, it is necessary to select a number of key viewpoints that would most clearly display the visual effects of the project. Key views also represent the primary viewer groups that would potentially be affected by the project. Key view points were selected to provide a range of viewing experiences. Sites were selected that provided a balanced representation of the December 2001 157603 Environmental Assessment l Rancha Santa Fe Road Realignment and Bridge Replacement 4-14 4.0 Discussion of environmental haluation and Mitigation Measures project alignment in each area. Computer simulations have been prepared which show planting as part of the landscaped roadway right-of-way( Figures 4-Z through 4-5). Phase 1 The area immediately surrounding the length of the roadway within the Phase 1 impact area is planned for multi-use development by the City. As illustrated in Figures 4-3 and 4-4, the roadway is considered to be visually compatible with a mixed-use development planned for the project area. Planned mixed use development along with development of the Phase 1 portion of the Ranch0 Santa Fe Road project would change the existing visual character from semi-rural to semi-urban. The project will create a new 6-lane roadway through natural open space. Roadway construction requires several cut and fill slopes to cross uneven terrain. These features vary in height from 6 meters (20 feet) to 18 meters (60 feet). Incorporation of landscaping and step/contour grading into the Phase 1 portion of the project will ensure that some visual elements of the existing rural character of the project area will be carried forward. l Views from the Planned Roadway The existing Ranch0 Santa Fe Road offers views of the surrounding open space to the east in the foreground, middle ground, and background. Views of residential housing are available in the foreground to the west. Travel speeds vary from 72 kilometers (45 miles) per hour (mph) during of-peak hours to single-digit speeds during peak traffic hours. Foreground and middle ground views tend to be viewed at oblique angles. These views decrease in quality as travel speed increases. Background views of the natural open space create the overall setting for the project area and form the basis for the intactness and unity of this landscape unit. Uponimplementationof the proposed project, views from the road for north and southbound travelers would includemanufactured slopes that extend for approximately489 meters (1,600 feet) along the western portion of the right-of-way and 366meters (1,200 feet) of smaller (up to 5 meters [16 feet] in height) cut slopes along the eastern portion of the right-of-way (see Figure 2-2 for plan view of manufactured slopes). Travel speeds of 72 kilometers (45 miles) per hour will be achieved throughout all hours of the day through Phase 1 of this north-south highway. This increased road speed will make December 2001 157603 Environmental Assessment. Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-15 4.0 Discussion of Environmental Evaluation and Mitigation Measures detailed elements of foreground and middle ground views less visible. Oblique views of landscaped, contoured cut and fill slopes in the foreground and middle ground views will replace existing views of natural open space. Roadway realignment will remove views to residential housing, in the short term, to be replaced by future housing within the viewshed. Views to more distant natural open space will remain unchanged for this project. However, the planned conversion of natural open space to semi-urban land uses such as single-family residential housing, commercial and retails business will change background views and the overall character of the landscape as these developments proceed. Daily traffic volume on the existing Ranch0 Santa Fe Road is estimated to be 27,800 ADT between La Costa Avenue and Questhaven Road. Similar traffic volume can be expected to use the new road. Viewer response to the new roadway is expected to be low because most motorists using this road do not live within the project area and the project will ease traffic congestion and increase travel speed through all hours of the day. As described in the “Summary of Environmental Commitment” section of this EA, the proposed project designincorporates measures tominimize potential impacts to existing land forms and visual quality that are consistent with the Carlsbad Scenic Corridor Guidelines and Hillside Development Regulations. These measures include landscaping manufactured slopes and incorporating step/contour grading techniques to simulate natural terrain. The Project includes hydro seeding all slopes with a native non-irrigated seed mix. Grading for the roadway project will occur prior to grading for the adjacent land development project referred to as the Villages of La Costa Development (VLC). The VLC grading operations will further impact and re-grade the majority of the slopes graded as part of the roadway project. The VLC developer is conditioned to meet the City’s Hillside Development Ordinance for all grading, and complete landscaping and irrigating of the roadway parkways and slopes after grading is completed. The VLC developer is required to meet City standards for development adjacent to the project area. Current plans show planting and irrigation that exceed City standards. Trees impacted will be replaced at a 51 ratio. Traffic speed and landscape treatments will generally moderate adverse visual changes and viewer response from motorists. A moderate level of adverse change to visual resources and low viewer response are expected to occur from construction of the roadway. December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-16 4.0 Discussion of hvironmental Evaluation and Mitigation Measures + Views from Existing Residences As shown in Figures 2-Z and 4-q, the visual character of the area in the vicinity of the Phase 1 portion of the proposed project is characterized by natural open space east of the existing roadway and single family residential uses located west of and adjacent to the existing Ranch0 Santa Fe Road. The project is immediately surrounded by natural open space comprised of rugged topography and drainages that extend from a larger hill located to the east. The visual character of the hills as well as the drainages are characterized by native vegetation that has recently grown back from a 1997 fire. Unobstructed views of the area proposed for the roadway are available from these vegetated hillside areas as well as from northernmost residences located north of the Ranch0 Santa Fe Road/La Costa Avenue intersection. Most views of the project from residences extending north from the Ranch0 Santa Fe Road/La Costa Avenue intersection will be blocked by a low ridge line. Approximately 47 residences are located along the existing Ranch0 Santa Fe Road and have the potential for views to the Phase 1 roadway. An intervening low ridge line will block the views from 43 (92% of existing residences facing the Phase lproject area) of these residences to the new roadway as it climbs up the opposite valley. No adverse change of visual quality and a low viewer response from these residences is anticipated. Approximately four residences (8% of existing residences facing the Phase 1 project area) that occupy the highest land in the northernmost portion of this tract will have unobstructed views of the new roadway and cut and fill slopes. A high level of adverse change to visual resources and high viewer response is expected from these residences. The character of views from these vantage points will behighlyaltered by the roadway, visual traffic during daylight and nighttime hours, and land form alterations that will include cut slopes up to 18 meters (60 feet) high. The visual character of the area surrounding the southern portion of the proposed alignment will change as the City General Plan is built out. As discussed above, the southern portion of the roadway alignment is currently surrounded by natural open space. These natural open space areas will eventually be developed with single family residential uses in accordance with the City of Carlsbad General Plan, The General Plan designates Low Density Residential (O-1.5 DU/acre) for the area to the east of the roadway. The natural open space area immediately to the west of theroadwaywill eventually be developed with Low-Medium Density Residential (O-4 DU/acre) uses. December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-17 4.0 Discussion of Environmental Evaluation and Mitigation Measures With only eight percent of residential viewers that will experience an adverse change tovisual quality, the effect of Phase 1 on existing residential viewers will result in a moderate level of adverse change and low viewer response. Phase 2 Phase 2 includes the replacement of the bridge over San Marcos Creek, expansion of Ranch0 Santa Fe Road from a two-lane to six-lane road, and relocation of the Ranch0 Santa Fe Road/Melrose Avenue intersection. As illustrated in Figure 4-1, a majority of the area immediately surrounding the site consists of naturally vegetated hillsides. Generally unobstructed views of portions or all of the roadway are available from these hillsides. Views of the site from the more level San Marcos Creek area to the east of the site are partially to completely obscured by intervening topography, vegetation, and structures. As illustrated in Figure Z-2, the site is visible from the eastern units located within the residential development adjacent to Corintia Avenue. Unobstructed views of the site are available from the three industrial and office structures that are located adjacent to the existing roadway to the east as well as from a portion of the residential development located between Melrose Avenue and Ranch0 Santa Fe Road. The grading that is necessary to construct the bridge design as well as the intersections associated with Phase 2 would involve the use of fill and cut slopes. Two fill slopes ranging in height from 5 to 6 meters (15 to 20 feet) are proposed immediately to the south and north of the proposed bridge. Minor fill slopes (< 3 meters [lo feet] in height) are proposed in association with improvements to Questhaven and La Costa Meadows Drive. Grading along the western portion of the road alignment would involve construction of three cut slopes of 5, 12 and 15 meters (16,40 and 50 feet) in height. Bridge improvements would include replacement of the existing bridge with a single bridge. The new surface of the bridge would be approximately 2 to 4 meters (7-12 feet) taller than the existing facility. The appearance of the bridge as well as grading associated with bridge improvements is illustrated in Figure 4-Z. The bridge facility would be relocated east of the existing bridge and involve removal of existing mature trees. The existing bridge is approximately 14 meters (45 feet) wide and 3 meters (11 feet) higher than the elevation at the floor of San Marcos Creek drainage (approximately 100 meters [327 feet] above msl) at the lowest point. Based on the conceptual roadway design, the surface of the proposed facilities would be approximately38 meters (126 feet) wide and located at an elevation of 105 December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-18 4.0 Discussion of Environmental bahation and Mitirration Measures to 107 meters (345350 feet) msl, which is approximately 6 to 7 meters (18-23 feet) higher than the lowest elevation of the San Marcos Creek drainage. l Views from the Planned Roadway Views from the proposed roadway are illustrated in Figures 4-3 and 4-4. The vantage point for the simulation in Figure 4-3 is from the proposed roadway approximately 152 meters (500 feet) north of the bridge looking south. The vantage point for the simulation in Figure 4.4 is from the proposed roadway immediately south of the bridge looking south. The’existing visual character of Phase 2 is typified by the valley through which San Marcos Creek flows. This shallow valley is surrounded by low rolling hills that support native chaparral vegetation. The valley bottom is relatively wide and gently sloped. Commercial office buildings are present with associated ornamental landscaping. San Marcos Creek supports a band of mature riparian vegetation composed of native wetland trees (willow and sycamore) and eucalyptus trees that merges with existing ornamental landscape. Two residential developments of various ages occur in the valley near Melrose Avenue and Ranch0 Santa Fe Road within the project area. Two vacant lots of considerable size are present at the Melrose Avenue/Ranch0 Santa Fe Road intersection. The overall character of the area, is semi-rural. Vividness is low due to the lack of distinctive landforms and buildings. Intactness and unity are moderate base on the overall setting and the low density of development within the area. Views of the proposed bridge improvements and associated manufactured slopes from southbound travelers on Ranch0 Santa Fe Road are illustrated in Figure 4-3. Views of this area from the roadway currently include industrial structures and the bridge and roadway facilities. While the proposed bridge would represent an increase in scale from the existing structure, the bridge structure would not block or obscure any views of natural features such as the hillsides and the creek from motorists. As described in the “Summary of Environmental Commitment” section of this EA, measures have been incorporated into the design of the proposed project to reduce the impacts of fill slopes including landscaping in accordance with City standards, contour grading of slopes to simulate natural terrain and use of erosion control measures. The bridge design will increase the scale of the structure while preserving the character of adjacent riparian vegetation and valley topography. Installation of the bridgewould involve removal of mature trees primarily eucalyptus in vicinity of the bridge. Approximately 6-8 mature trees would be removed. All December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4.19 4.0 Discussion of Environmental Evaluation and Mitigation Measures trees removed would be replaced at a ratio of 5:l with willows and sycamore trees in accordance with City of Carlsbad standards. Trees will be planted on the slopes graded adjacent to the San Marcos Creek between the planned VLC project and existing developments. This includes the east side of the roadway south of the creek to existing San Elijo Road; and also the west side of the roadway north to existing residential area. Irrigation will be provided to ensure the trees are established. As shown on Figure 4-3, some existing mature trees surrounding the creek and located at the base of the hill to the northwest of the creek in the area would remain following bridge construction. By replacing impacted trees, some visual elements of the existing semi-rural character of the area will be carried forward. Motorists on Ranch0 Santa Fe Road will achieve speeds up to 72 kilometers (45 miles) per hour in Phase 2. Oblique views of cut and fill slopes and to more distant slopes surrounding the valley will define the motorist experience. Low viewer response is anticipated due to the high-speed character of the activity and level of visual changes adjacent to the roadway that will be discernable by motorists. Implementation of the bridge and slope improvements would have a moderate impact to visual resources, changing the existing visual quality and character from medium to medium- low. + Views from Existing Residences Two housing areas are present that have views of the Phase 2 area. Approximately 22 homes in the residential area north of Corintia (see FigureZ-2 for location of existing residences north of Corintia) overlooks the bridge and roadway. An additional 10 homes backed up to Ranch0 Santa Fe Road north of Melrose Avenue have views toward the roadway only. The visual character as viewed from these residences is a semi-rural landscape with vacant lots in the foreground, the creek vegetation running through the valley bottom forms the middle ground view, and open vegetated hillsides dominate background views. Five existing industrial and office buildings located near the bridge reduce landscape intactness and unity. The overall visual quality is moderate due to the presence of vacant, disced lots, and the urban forms of industrial/office buildings that distract from the overall natural open space landscape character. The existing view includes a bridge and roadway facilities that are similar but smaller than that proposed. Views of the bridge from the Corintia residential area would be partially December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-20 4.0 Discussion of Environmental Evaluation and Mitigation Measures obscured by existing project landscape trees, mature eucalyptus trees, and the riparian vegetation associated with San Marcos Creek. Road grades will remain essentially the same as the existing road through the valley resulting in no additional side slopes. Based on the distance of the residential area from the bridge facilities (approximately 305 to 457 meters [l,OOO to 1,500 feet]), the change would affect only middle ground views of the valley bottom. Views for homes backing up to Ranch0 Santa Fe Road are situated slightly below the existing roadway elevation. The road is partially screened from view by a wooden or concrete fence. The project will not alter views from these houses because the road grades would remain essentially unchanged and a new block wall would provide additional screening. Construction of the bridge and roadway expansion will change the semi-rural character of the valley to semi-urban. Moderate adverse effects to visual quality would result from the increased paved area and bridgewidth. Protection of riparianvegetation and tree replacement will preserve aspects of the rural character. Approximately 32 residential units have views that will be altered to varying degrees by the proposed project. Viewer response is expected to be moderatewithin Phase 2 residential areas due to the distance of viewers from the bridge and existing limited views of the roadway. The project would have a moderate impact to existing visual quality from medium to medium-low with a change to the visual character from semi-rural to semi-urban l Visual Impact to Planned Surrounding land Uses Planned residential uses northeast of the Ranch0 Santa Fe RoadlMelroseDrive intersections located in proximity to the roadway would have unobstructed views of the bridge replacement and roadway. However, the foreground views from the planned residences would be similar to the foreground and distant views from the residences and vehicles on the roadway (see Figures 4-3 and d-5). Viewer response cannot be established for viewers that are not present before changes to visual character and quality occur. However, a low viewer response to the roadway is likely because the roadway is compatible with the character of future proposed development that would house these viewers. December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-21 4.0 Discussion of Environmental baluation and Mitigation Measures + Noise Sound Wall According to the Noise Technical Report prepared for this project, a noise attenuation measure that may be used to reduce project-generated noise is the construction of a sound wall adjacent to three residences. The proposed location and height of the wall is described in Section 4.1.8 ‘Noise” of this EA and illustrated in Figure 4-8. The decision to construct a wall or other measures achieving equivalent noise mitigation will be made during the final approval of the project. Should the sound noise wall be incorporated into the project, special attention will be given to the architectural style of the sound wall and planting and irrigation, ensuring compatibility with community values and guidelines and for graffiti abatement. Tree and vine planting is included along the entire length of the wall and additional planting will be located in areas where room allows. Starting from the La Costa Avenue intersection, the first 91 meters (300 linear feet) of the wall includes pilasters spaced approximately 9 meters (30 feet) apart. The slump block is planned to be an earth tone light brown color. This section of masonrywall is limited to tree and vine planting only, on the east side of the wall adjacent to the roadway, due to the limited space between the sidewalk and the sound wall. Modifications to the sidewalk are required to accommodate the tree planters. The west side of the wall, adjacent to the existing residential area, includes the replacement of an existing 0.9 meter ( 3 feet) high wooden fence and grading along the 2: 1 slope. The existing slope is currently covered with iceplant and will be replaced if disturbed during construction. The remaining sound wall, approximately 168 meters (550 feet) will consist of a masonry wall with pilasters spaced approximately 8.5 meters (28 feet) apart with enclosures, or pop- outs, that will provide a niche set back from the sidewalk to provide room for planting trees on the east side of the wall adjacent to the roadway. This wall will also consist of an earth tone light brown colored slump block, and will also include vines trained to the wall. Additional ground cover and flower planting and irrigation will be provided between the sidewalk and the sound wall. Views immediately along the roadway would be obstructed should the sound wall be incorporated into the project for a distance of approximately 137 meters (450 feet). As shown in Figure 4-8, the proposed sound wall would represent a visual extension of existing sound walls along the alignment and therefore is considered to have a moderate impact to visual resources mainly due to the change of fence materials from wood to concrete block. December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-22 4.0 Discussion of Environmental Evaluation and Mitigation Measures Summary of Project Impacts Combined Evaluation for Phases 1 and 2 Phases 1 and 2 of the project would change the visual quality of the immediate area from medium-high to medium-low and would change the visual character of the viewshed from semi-rural to semi-urban. These changes would a result of the conversion of natural open space to human features including a substantial increase in paved roadway surface, cut and fill slopes, removal of mature riparian trees and eucalyptus, and the introduction of urban built forms such as the proposed bridge and sound wall. However, as provided in the “Summary ofEnvironmental Commitme& section of this EA, the project has incorporated a number of measures to reduce impacts to visual resources. Incorporation of landscaping, step/contour grading and special architectural treatments will ensure that visual elements of the existing visual character of the project area will be carried forward. Therefore, overall impacts to visual resources from implementing both Phases 1 and 2 of the proposed project are considered to be moderate. Visual Mitigation The Department and the FHWA mandate that a qualitative/aesthetic approach should be taken to mitigate for visual quality loss in the project area. This approach fulfills the letter and the spirit of FHWA requirements because it addresses the actual cumulative loss of visual quality that will occur in the project viewshed when the project is implemented. It also constitutes mitigation that can more readily generate public acceptance of the project. Visual mitigation for adverse project impacts addressed in the key view assessments and summarized in the previous section will consist of adhering to the mitigating design requirements in cooperation with the District 11 Landscape Architect. These requirements include contour grading, landscaped slopes and median, replacement trees at a 5:l ratio to those removed, preservation of riparian vegetation outside the bridge construction area, and the use of sound walls to screen undesirable views. All visual mitigation will be designed and implemented with the concurrence of the District 11 Landscape Architect. December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-23 4.0 Discussion of Environmental Evaluation and Mitigation Measures 4.1.2 Geologic Features/Hazards/Paleontology (#s 2,3,4) Affected Environment Phases 1 and 2 Geotechnical analysis have been completed for both Phase 1 (Geocon, Inc. January 1990) and Phase 2 (Agra Environmental, 1998). These studies are incorporated by reference to this EA and are available for review at the City of Carlsbad. Proposed project site topography is rolling terrain underlain by resistant volcanic rock on uplands and alluvium in canyons. The geology of the site ranges from Jurassic aged Santiago Peak Volcanics, Cretaceous-ages granitic rock and the Eocene-aged De1 Mar Formation as bedrock underlying a majority of the proposed project site. Terrace deposits, alluvium landslide debris and slope wash compromise local surficial deposits. The prominent soil association located in the area is the Exchequer, rocky Blasingame association, with the Diablo Altamont association existing in the northwestern portions of the proposed project. Environmental Evaluation Phases 1 and 2 Implementation of final design for both Phases 1 and 2 would not increase the exposure of people or property to substantial geologic or seismic hazards or result in any impacts to unique geologic features. The final design prepared for the proposed project complies with the City Grading Ordinance and incorporates all requirements of the geotechnical analysis completed for the project. Measures to avoid geotechnical hazards such as soil instability, erosion or dam instability from blasting have been incorporated into final design. Additionally, the contractor will utilize straw, hydroseeding, mulching, or other suitable materials or techniques during construction activities to reduce the erosion potential for uncovered soils. The contractor will also install temporary culverts, ditches, catchment basins, and settling pools where needed during construction to collect excess water and sediments carried from the construction site. Sediments collected will be disposed of onsite, unless contamination of sediment with hazardous material occurs, which would require disposal at an appropriate disposal site for hazardous materials. December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-24 4.0 Discussion of Environmental Evaluation and Mitigation Measures A majority of the Final Alignment for Phase 1 would extend through Tertiary Age Santiago Formation. The Santiago Formation is considered to be a high sensitivity formation that is known to contain paleontological localities with rare, well preserved, and critical fossil materials. As provided in the “Summary of Environmental Commitments” section of this EA, measures including the requirement that a qualified paleontologist be present onsite during construction have been incorporated into the project in order to avoid potential impacts to paleontological resources. 4.1.3 Energy/Natural Resource/Water Demand (#s 5, 6, 7, 12) Environmental Evaluation Phases 1 and 2 Implementation of the proposed project for Phases 1 and 2 would not generate any long term demand for energy, water, natural or nonrenewable resources. The proposed project involves the realignment and widening of an existing roadway to reduce traffic congestion in the proposed project area and to implement the Circulation Element of the General Plan. The Circulation Element provides for transportation elements necessary to accommodate both existing demand and planned growth within the City. Considering that the proposed project would not generate population growth no substantial demand for natural resources other than for materials required to construct the road would be created. Water would be required for construction activities including dust suppression. However, use of water during construction activities would be temporary (each phase would require an eighteen-month construction period), therefore implementation of the proposed project would not result in the use of large amounts of water in a wasteful manner. 4.1.4 Hazardous Materials (#s 8,45, 56) The following information was obtained from the Phase 1 Environmental Assessment Ranch0 Santa Fe Road Bridge Replacement Project (Dudek & Associates, 1997); Site Assessment (Vista Information Solutions, 2000) and the EIR completed by the City for the project. These reports are incorporated by reference to this EA and are available for review at the City of Carlsbad. December 2001 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 157603 4-25 4.0 Discussion of Environmental Evaluation and Mitigation Measures Affected Environment Phase 1 The Phase 1 project impact area with the exception of the existing roadway is vacant land characterized by native vegetation and rugged topography. Land uses in the proximity include single family residential uses to the west and south, and office professional and light industrial uses to the north of San Marcos Creek. Vacant land planned for permanent open space to the east. A total of (43) sites were identified in the database search within a 0.5 mile radius of the Phase 1 project area (Vista Information Solutions, 2000). These sites included primarily the light industrial uses north of San Marcos Creek. Many of the businesses have permits for hazardous materials or storage such as generators and underground tanks. No hazardous waste sites were identified within the Phase 1 project impact area. The complete database search document is available for review at the City of Carlsbad. Phase 2 The Phase 2 project impact area with the exception of the roadway, consists of vacant land. Existing urban land uses in the immediate vicinity of the project include the current Ranch0 Santa Fe Road alignment work and an industrial park along the eastern side of Ranch0 Santa Fe Road. Additional urban land use includes two single-family detached residential developments as well as vacant land associated with San Marcos Creek and the surrounding hills. The only industrial facility located with the western portion of the study area is the Vallecitos Water Reclamation Facility, which is located on La Costa Meadows Drive, approximately 335 meters (1,100 feet) west of Ranch0 Santa Fe Road. Historical aerial photos for the site were reviewed for the time period 1953-1997. A majority of the study area has remained undeveloped during this time period. Moderate to heavy development has occurred along the western and northwestern portions of the study area. In March 1997, a field site assessment was performed. There were no signs of illegal dumping onsite. Features which would suggest illegal dumping include stained soil or pavement, odors, or stressed vegetation. Stressed vegetation was observed onsite, however it was attributed to recent brush fires. There were no drums or containers observed onsite. There were no electrical impoundments observed onsite to suggest equipment containing PCBs. A majority of the study area is in the public roads easements. Although the northwestern December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-26 4.0 Discussion of Environmental baluation and Mitigation Measures portion of the study area exists out of the road easement, this area is unoccupied and does not contain any structures. There were no above or below ground storage tanks observed within the study area. The records search indicated ten facilities located along La Costa Meadows Drive identified as being located within one-quarter mile from the study area and listed on the San Diego County Department of Health Services database. These facilities have been identified as being in noncompliance with general hazardous waste handling regulations and/or as being small/large generators of hazardous waste. Two of these facilities are located within and adjacent to the project impact area. One of these facilities was identified as a non-tank permitted site, the other facility has no available specific information. Both of these sites have been closed. Environmental Evaluation Phase 1 It is not anticipated that development of the roadway within Phase 1 would subject people to impacts from hazardous materials. The site is currently characterized by vacant land with the exception of the existing roadway. Based on the regulatory database search completed for the Phase 1 project impact area, no hazardous waste site was identified and therefore, no impacts are anticipated. However, as provided in the ‘SummaryofEnvironmental Commitments” section of this EA, in the event grading or construction of the proposed project encounters hazardous materials, measures including compliance with federal and state regulations have been incorporated into the project to ensure that no impacts due to hazardous wastes will occur. Phase 2 According to the hazardous materials site assessment, no concerns appear to exist within the Phase 2 project impact area. Hazardous or potentially hazardous materials are not currently stored on site. According to interviews with previous and current owners, there has been no substantial land use within the northern portion of the study area. This suggests the potential for contamination to the soils or groundwater within the study area as a result of past use appears low to nonexistent. As the records search indicates, there are no active cases December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-27 4.0 Discussion of Environmental Evaluation and Mitigation Measures involving leaking underground storage tanks or contamination of the groundwater up gradient of the study area within one-half of a mile. As a result, no impacts due to hazardous materials are anticipated. However, as discussed above under Phase 1, measures have been incorporated into the project to ensure that no impacts due to hazardous wastes will occur during project construction. Combined Evaluation for Phases 7 and 2 Hazardous waste sites have not been observed within the project impact area. As a result, it is not anticipated that people or property would be exposed to hazardous materials with implementation of the proposed project. Furthermore, as provided in the ‘Summary of Environmental Commitments” section of this EA, measures have been incorporated into the project, to ensure that no impacts due to hazardous wastes will occur during project construction. 4.1.5 Floodplain Evaluation (#lo) Affected Environment Phase 1 Within the Phase 1 portion of the project, the loo-year floodplain as defined by FEMA is restricted to Encinitas Creek (see Figure 4-6). Encinitas Creek flows from the Stanly Mahr reservoir southeast to a culvert within La Costa Avenue. A study completed by the City in 1994 indicates that the box culvert in La Costa Avenue is unable to adequately convey 100 year flows in Encinitas Creek. Other flow control facilities in the vicinity of Encinitas Creek include the Stanly Mahr reservoir outlet works and emergency spillway. Phase 2 A study completed by the City in 1988 shows that the existing Ranch0 Santa Fe Road crossing over San Marcos Creek becomes completely submerged during the 100 year flood (see Figure 4-6) (Hydra&Report for the San Marcos Creek at Ranch0 Santa Fe Road, Rick Engineering April q988). The existing flooplain flows for San Marcos Creek are listed below in Table 4-1. December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-28 Ranch0 Santa Fe Road Realignment & Bridge Replacement - Environmental Assessment F’GURE Project Area Drainage 4-6 u 4.0 Discussion of Environmental baluation and Mitigation Measures TABLE 4-l PEAK FLOWS + EXISTING RANCH0 SANTA FE BRIDGE Flood Recurrence Interval Projected Peak Flows 25-war 127cnls~4.500cfsl I 50-year I IOO-vear I 368 ems 113~000 cfsl I Source: RickEngineering, 1988, 1996. Environmental Evaluation Phases 1 and 2 Executive Order 11988 (Floodplain management) directs all federal agencies to refrain from conducting, supporting, or allowing actions in floodplains unless it is the only practicable alternative. The FHWA requirements for compliance are outlined in 23 CFR650 Subpart A. The Phase 1 project impact area would not encroach within the loo-Year Floodplain of Encinitas Creek. Therefore, no impacts due to development in a floodplain are anticipated. The proposed bridge replacement (Phase 2 portion of the project) encroaches upon the base floodplain of San Marcos Creek as defined by the FEMA defined regulatory flood way. The floodplain encroachment would be associated primarily with the bridge piers. The bridge would consist of six lanes and an overall 38 meters (126 feet) right-of-way. The span over San Marcos Creek would extend for approximately 114 meters (375 feet) and would range in height from 5 to 6 meters (15 to 20 feet) from the creek bottom to the bottom of the bridge. The bridge would be supported by manufactured fill slopes at the northern and southern termini of the bridge. A total of twelve piers would support the bridge span. Each pier would be constructed by excavating a pit and using driven iron piers to form and cast each individual concrete pier. Following construction of the piers, the excavation area would be refilled and returned to original grade. Each pier would include 1.2-meter (4-foot) x 1.8- meter (6-foot) columns and 3.7-meter (12-foot) x 3.7-meter (12.foot) footings. December 2001 Environmental A~~e~~rnent l Rancho Santa Fe Road Realignment and Bridge Replacement 157603 4-30 4.0 Discussion of Environmental Evaluation and Mitigation Measures The City completed an analysis of potential impacts of the proposed bridge replacement on the loo-Year Floodplain of San Marcos Creek (Floodplain Evaluation Report, Ranch0 Santa Fe Bridge Replacement Project, Dudek &Associates, January2000). This report is incorporated by reference to this EA and is available at the City of Carlsbad. The results of the study are summarized below. + Risks Associated with Implementation of the Action Because only minor permanent intrusion into the base floodplain by supporting piers for the bridge structures will occur, the project would not substantially change the water surface elevation. There will be no increase in potential for upstream or downstream property damage from flooding. The project will not increase the risk of loss of life from flooding, and the highway operations will not be affected by flooding. + Impacts on Natural and Beneficial Floodplain Values Direct physical effects of the project on the floodplain at the San Marcos Creek crossing will be limited to temporary construction impacts and the permanent, but not substantial, effects of the placement of supporting piers in the floodway. For further discussion of impacts on natural and beneficial floodplain values, see discussion under Section 4.2, BiologicalResources. + Support of Probable Incompatible Floodplain Development The project will not support incompatible development. No new access and no direct access to the affected floodplain will be provided by the project. Access to Ranch0 Santa Fe Road will be controlled, and the road will cross the floodplain on a bridge above the floodplain elevation. l Measures to Minimize Floodplain Impacts The design of the San Marcos Creek bridge will result in only minimal effects on the floodplain. Routine construction procedures required by the City will minimize impacts during construction. These procedures include limiting the area affected by construction, using barriers or fences to protect sensitive areas, employing BMPs to control erosion and runoff, and designating and restricting access to designated environmentally sensitive areas (ESAs) where appropriate. No additional measures to minimize impacts are required. December 2001 157603 Environmental Assessment s Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-31 4.0 Discussion of Environmental Evaluation and Mitigation Measures l Measures to Restore and Preserve the Natural and Beneficial Floodplain Mitigation measures for impacts to natural and beneficial floodplain values from the project have been identified and are discussed in Section 4.2, Biological Resources, as well as the Summary of Environmental Commitments section of this EA and in supporting technical documents prepared for the project. 4.1.6 Water Quality (#s 11, 14, 51) Affected Environment Phase 1 Surface Water. As illustrated in Figure 4-6, the proposed project site is located in the watersheds of the San Marcos Creek and Encinitas Creek. Surface water drains through several tributary canyons and watercourses towards the south and the west. Encinitas Creek is located at the south end of the proposed project within Phase 1 and drains to the south. Both San Marcos Creek and Encinitas Creek enter the Batiquitos Lagoon before entering the Pacific Ocean. Groundwater. Groundwater basins exist primarily in the two largest valleys: 1) The San Marcos Creek Basin and, 2) in a tributary to Encinitas Creek that partially originates from the Stanly Mahr Reservoir and follows a southwesterly course. The groundwater table is 3 to 9 meters (lo-30 feet) deep in the Encinitas Creek Basin. Phase 2 The Phase 2 project impact area includes a San Marcos Creek crossing just south of the intersection of Ranch0 Santa Fe Road and La Costa Meadows Drive in the City of Carlsbad (see Figure 4-6). San Marcos Creek lies within Batiquitos Hydrologic Subarea (HSA) 4.51 of the San Marcos Hydologic Area (HA) 4.50, of the Carlsbad Hydrologic Unit (HU) 4.0. The most prominent water feature upstream of the proposed project area is San Marcos Lake. Surface Water. San Marcos Creek drains an approximately 119-square kilometer (46square mile) area north of the San Dieguito River Basin. The creek originates in the coastal range December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-32 4.0 Discussion of Environmental Evaluation and Mitigation Measures mountains north and east of San Marcos. The drainage basin ranges in elevation from sea level to slightly more than 518 meters (1,700 feet) in the Merriam Mountain range northeast of San Marcos. The creek drains to Batiquitos Lagoon approximately 4.2 kilometers (2.6 miles) into the Pacific Ocean. The stream gradient ranges from an average of 3 meters (10 feet) per mile near the mouth to about 183 meters (600 feet) per mile near the headwaters. The creek has a small, poorly defined channel up stream from Lake San Marcos. Downstream of Lake San Marcos, the channel is more defined, steep and rocky to the La Costa development where it changes from well-defined to small and ill-defined to the Batiquitos Lagoon. In the immediate area of the proposed project, the stream is broad and well-defined. Groundwater. San Marcos Creek is a perennial stream. The depth to groundwater in the alluvium area is between 0.6 to 2 meters (2 to 5 feet) below ground surface. The alluvium thickness generally ranges from 1 to 3 meters (4 to 10 feet) below ground surface. Environmental Evaluation Phase 1 The final design for the roadway includes the following measures to protect water quality. l Project design will ensure that no additional runoff will drain into Stanley Mahr Reservoir. l All refuse generated during grading will be contained and removed. a During the construction phase, BMPs will be applied to control storm water runoff and provide dust control. These measures include: - Gravel berms, filter fabric fences, lines of straw bales, to prevent erosion - Surfacing of roadways will occur as soon as possible - Periodic watering of areas to keep dust down - Prompt revegetation of surrounding areas to prevent erosion December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-33 4.0 Discussion of Environmental Evaluation and Mitigation Measures The SWPPP as identified in the construction activity permit from the RWQCB will be implemented and followed. To minimize water quality degradation by sedimentation of the river channel during construction, constructionof thenew bridge piers and demolitionof existingpierswill be limited to the dry season (March to October). The roadway design includes devices for storm water treatment. These devices capture and treat the storm water prior to discharge to San Marcos Creek. BMPs will also be applied to reduce pollutant loads to San Marcos Creek. These BMPs will include use of rip-rap at stormdrain outlets to reduce the velocity of runoff. The City will follow all recommendations made pertaining to erosion control in the geotechnical evaluation completed for the project, the City of Carlsbad’s, Grading Ordinance, and Landscape Manual. Refuse material such as oil, grease, and broken equipment generated during grading will be properly contained and removed offsite to a disposal site. A majority of the drainage from the roadway would be outletted to existing drainages adjacent to the roadway. All drainage outlets would contain rip-rap filters to slow the velocity of the runoff and minimize offsite erosion. Eventually all drainage outlets associated with the roadway would be connected to systems associated with planned urban development in the area. It is concluded, therefore, that with measures incorporated into the proposed project design the proposed Phase 1 portion of the proposed project would not result in substantial impacts to surface or groundwater quality. Phase 2 A separate technical study has been prepared by the City to evaluate potential effects of the bridge design on hydrology and water quality in San Marcos Creek (Water Quality Study, Ranch0 Santa Fe Bridge Replacement Project, Dudek & Associates, March 1997). This study is incorporated by reference to this EA and is available for review at the City of Carlsbad. The report concluded that with measures to protect water quality as described above (Phase 1 portion of the project) included~in the design of the bridge, that the hydrology and water quality of San Marcos Creek would not be substantially impacted. The conclusions of the Study are discussed further below. December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-34 4.0 Discussion of Environmental Evaluation and Mitigation Measures Construction Phase. The construction of the realignment of Ranch0 Santa Fe Road and bridge replacement, including grading and cut and fills, would entail the movement of approximately 202,607 cubic meters (265,000 cubic yards) of earth and the creation of manufactured cut and fills. The maximum height of cut slopes is estimated to be about 15 meters (50 feet) and the maximum amount fill slope is estimated to be 6 meters (20 feet). This movement of sediment and grading of the alignment will create potential for sediment increases to San Marcos Creek. The demolition of the existing bridge would most likely involve the removal of abutments and piers. The construction of the new bridge will also include the installation of new piers. The removal and installation of the piers will create disturbance of the river channel. Sediment loading to the river could be substantial, depending on the season when construction occurs. The report concludes that with implementation of BMPs to control the storm water runoff and to provide dust control construction of the bridge and associated roadway improvements would not create substantial adverse impacts to either ground or surface water quality. OperationalPhase. The proposed project would create approximately 3 hectares (8 acres) of paved surface area which is almost 3 times the amount of the current paved area of the roadway within the Phase 2 project impact area. Increases in surface runoff and pollutant loads may be expected. Pollutants associated with runoff from the roadway include lead, zinc, dissolved solids, and nitrogen. However, the amounts of pollutants from runoff associated with the increase in the capacity of the roadway are minimal and are well below the RWQCB objectives for the basin. In addition, measures have been incorporated into the design of the proposed project as previously described, including provision of BMP’s such as rip-rap at storm drain outlets. Considering that runoff from the proposed project would contain minimal pollutant load and that BMP’s have been incorporated into the proposed project design, implementation of the Phase 2 portion of the proposed project would not create substantial adverse impacts to water quality. Combined Evaluation for Phases J and 2 Measures required by the water quality study for Phase 2 as well as the City Grading Ordinance have been incorporated into Phases 1 and 2 the proposed project to avoid or minimize potential impacts to water quality from construction and operation. December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-35 4.0 Discussion of Environmental Evaluation and Mitigation Measures 4.1.7 Air Quality (#s 15, 16, 17, 18) Affected Environment Phases 1 and 2 l Meteorology and Climate The climate in Carlsbad is controlled by the semi-permanent, high pressure system near Hawaii and the moderating effects of the nearby oceanic thermal reservoir. The San Diego North County climate is characterized by cool summers, mild winters, infrequent rainfall, abundant sunshine, and comfortable humidities. Temperatures average 17 degrees Celcius (62 degrees Fahrenheit) annually. Rainfall within the area averages 28 centimeters per year (11 inches per year). Winds aregenerallylight until mid-afternoon, when the daily sea breeze reaches maximum strength. Unfortunately, the same factors that create a highly desirable living climate combine to limit the ability of the air to disperse the air pollution generated by the population attracted, in part by the climate. The daytime sea breeze typically has its origin over open waters and thus brings clean air across North County. This pattern does not allow locally generated emissions to undergo photochemical reactions and form smog. Similarly, the winter drainage winds blow down from nearby open higher terrain and thus arrive relatively “clean” in the local area. While daytimewinds are typically strong enough torapidlyventilate the local area, nocturnal winds often are nearly calm and thus do allow for the possible localized stagnation of air pollutants near traffic intensive sources such as Highway 78 or Interstate 5. With low background pollution levels and a relatively low overall emissions density in inland areas upwind of Carlsbad during nocturnal offshore flow, the potential for any air pollution “hot spots” under stagnation conditions is minimal in the Carlsbad area. One wind pattern that does lead to occasional unhealthful air quality is when offshore winds at night in the South Coast Air Basin (SCAB) blow onshore across North County the next day, containing day-old air pollutants that already contain high levels of ozone and other irritants. This pollution recycling which sometimes occurs in late summer and early fall, may create some of the most unhealthful air quality that is observed in the otherwise typically healthful North County air quality environment. December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-36 4.0 Discussion of Environmental Evaluation and Mitigation Measures + Ambient Air Quality Standards (AAQS) In order to assess the air quality impact of the proposed bridge reconstruction and roadway realignment, that impact, together with baseline air quality levels, must be compared to the applicable AAQS. These standards are the levels of air quality considered safe, with an adequate margin of safety, to protect the public health and welfare. They are designed to protect that segment of the public most susceptible to respiratory distress or infection such as asthmatics, the very young, the elderly, people weak from other illness or disease, or persons in heavy work or exercise called sensitive receptors. Healthy adults can tolerate occasional exposure to air pollution levels somewhat above these standards before adverse health effects are observed. The Clean Air Act amendments of 1970 established national AAQS with states retaining the option to adopt more stringent standards or to include other pollution species. Because California already had standards in existence before federal AAQS were established, and because of unique meteorological problems in California, there is considerable diversity between state and federal standards currently in effect in California, as shown in Table 4-Z. Further amendments to the Act promulgated in 1977 specified that all areas of the country must attain all national AAQS by 1982, with a possible extension to 1987 if reasonable further progress had been demonstrated by the 1982 interim deadline. By the end of 1987, national air quality standards for ozone (0,) and carbon monoxide (CO) were still being violated in San Diego County. State standards for nitrogen dioxide (NO,) and for respirable particulate matter (PM-lo) also exceeded their allowable maxima within the airshed. A new air quality planning cycle was initiated to develop an air quality plan for the San Diego Air Basin (SDAB) in response to an EPA call for a revision to the State Implementation Plan (SIP). Preparation of an air quality plan was also mandated by the California Clean Air Act (CCAA - AB-2595) which required completion of a plan to also meet State AAQS. The Clean Air Act Amendments of 1990 ordered EPA to periodically review all AA0.S in light of the most current health effects information. After extensive review, two additional national clean air standards were adopted in 1997. These standards included an 8-hour ozone exposure, and a new particulate standard for ultra-small diameter particulates of 2.5 microns or less called “PM-2.5.” EPA’s authority to promulgate national clean air standards without specific direction from the US. Congress was challenged as a “state’s rights” issue and enforcement of the new standards was stayed by a decision in the U.S. Court of Appeals. A December 2001 1.57603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-37 4.0 Discussion of environmental Evaluation and Mitigation Measures TABLE 4-2 AIR QUALITY AMBIENT AIR QUALITY STANDARDS Pollutant Averaging Crdifornia Standards Federal Standards Time Concentration Method Primary Secondary Method I Aaui 0.w pp (180 jqlm? ~‘-w ozone (OJ F?l~mx~ O.Uppmo3Jlylm’~ S-Y Rhuq smdud chm2ELcc 8 Ham - oaa ppm UJ7 wn’) Respirabk c&E% fO!e+ ‘arthlate mm Matter 24Hwr 10 Pdln’ (WJ &y;& _ Mun size sekztirr - sa” Y hcnial sepln,ion ad ~;;S;mm& 110 Mlm’ P~-YS~~ ‘G”rim&c P wm, M psh’ ANlyir A”= Pakticulate z4Hwr l-----i 65 PYm’ NO s~pmv smle surdnd smr al 1ntiri Matler hwd t----i ISPYm’ Rinwy Slldd SsgN&yd (PM,) “My A”lW Carbon Monoxide Visibility Reducing ~~0~ PZWtt&S m.m!n 6PnPm Hydrogen Sulfide NO Federal sknA..r(r 3 December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-38 4.0 Discussion of Environmental Evaluation and Mitigation Measures request for a rehearing by the Department of Justice on behalf of EPA was denied. Unless the issue is heard in the U.S. Supreme Court, or Congress modifies the Clean Air Act to specifically incorporate these standards, any planning efforts on behalf of these standards are indefinitely on hold. l Baseline Air Quality Air quality in Carlsbad is best documented from measurements made at a monitoring station in Oceanside operated by the San Diego Air Pollution Control District (APCD). Data from the last six years, as published by the California Air Resources Board show that the State standard for lo-microns diameter or less particulate matter is exceeded approximately 10 times per year. The State standard for ozone is exceeded approximately 6 days per year on average. The only federal standard exceeded in Oceanside in the last six years was an average of one day with ozone levels above the national clean air standard. Standards for carbon monoxide (CO), sulfur dioxide (SO,) and nitrogen dioxide (NO,) are not exceeded. l Air Quality Management Planning A plan to meet the federal standard for ozone was developed in 1994 during the process of updating the 1991 state plan. During the planning process and smog formation modeling, it was discovered that the San Diego Air Basin (SDAB) could meet the federal ozone standard by the year 1999 without the creation of any new control programs. All progress towards attainment, including offsetting the effects of growth, is expected to derive from existing local, state and federal rules and regulations. Environmental Evaluation Phases 1 and 2 An air quality impact analysis of the proposed project that covers both Phases 1 and 2 was completed for purposes of this EA (Air Quality Impact Analysis fir the Ranch0 Santa Fe Roadway Realignment andBridge Replacement Project, Giroux &Associates, March 2000). The air quality analysis is incorporated by reference to this EA and is available for review at the City of Carlsbad. The report concluded that implementation of the roadway is intended to implement the General Plan Circulation element and accommodate existing and planned December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement ‘l-39 4.0 Discussion of lkvironmental Evaluation and Mitigation Measures traffic generation in the area. As a result, widening the roadway would not generate traffic in the area and, therefore, would not cause a substantial long-term adverse impact to regional air quality. The results of the study are summarized further below. l Short-Term Construction Impacts Short-term impacts will result from dust generated by surface disturbance to construct the bridge and realigned roadway. Such dust will create potential soiling nuisance to parked cars, landscaping, vegetation and other surfaces. Heavy equipment (mainly diesel-powered) will generate exhaust emissions from on-site activity and on-road hauling of dirt, concrete and other construction materials. As described further below, the air quality analysis concluded thatwithimplementationof dust suppressionandemissionreductionmeasuresincorporated into the proposed project short-term air quality impacts would be avoided. Fugitive Dust. Dust emissions were calculated based on the California Air Resources Board (CARB) estimate that each acre under construction disturbance generates about 45 kilograms (100 pounds) of dust per day, if no dust control measures are implemented. Dust control measures incorporated into the proposed project design including frequent watering, paving of access roadways, and periodic street washing near construction access, as required by San Diego APCD rules, will reduce the dust generation rate by approximately 50 percent. Equipment Combustion Emissions. The maximum equipment activity level was assumed by the air quality analysis to occur during clearing, grading, delivery and dumping of base rock and compaction of the roadway subgrade. The study combined the equipment inventory with representative load factors during typical grading/compaction activities and determined the pollutant load per day generated by the construction equipment. According to the study, none of the pollutant loads generated by the proposed project would exceed the daily thresholds established by the San Diego APCD. Therefore, total daily construction activity impacts, from equipment exhaust and from fugitive dust, would not create a substantial air quality impact. Indirect emissions increases could result during construction in public roadways if lane closures, detours or other interference with local traffic measurably worsened congestion on already heavily traveled roadways. Through measures incorporated into the proposed project design including limited lane closures during the a.m. and p.m. peak travels periods, and use of the existing roadway for access during construction, substantial indirect impacts to air quality from detours and lane closures are not anticipated. December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-40 4.0 Discussion of Environmental baluation and Mitigation Measures + long-Term Operation Impacts Proposed project operations will create changes in the location of automotive pollution sources, in the number of vehicles using the roadway, and in the degree of congestion that will occur. Roadway improvements may also affect patterns of growth that were previously constrained by access limitations. Localized changes in air pollution patterns may create elevated levels of primary (unreacted) air pollutants such as carbon monoxide (CO). Localized violations of CO standards are often called “hot spots.” With low background CO levels in the proposed project vicinity, and with continuing reductions in CO emissions from the average vehicle, hot spot formation is highly unlikely. A screening level analysis was conducted to confirm this finding. Microscale Impact Analysis. In order to assess any microscale air quality implications of proposed project implementation, a roadway air pollution dispersion calculation was performed near threeintersections along Ranch0 Santa Fe Road. CarbonMonoxide (CO) was used to evaluate the potential for any microscale “hot spots.” Worst-case meteorology and peak hour traffic conditions were combined in a Department roadway air pollution screening model. People who are highly sensitive to air pollution exposure are called “sensitive receptors.” Typical sensitive receptor locations include residences, health care facilities, schools, parks, etc. Within the proposed project area, sensitive receptors consist predominantly of residential users. A description of the eight sensitive receptor locations selected for roadway emissions impact analysis include: l Child Care Facilities within Industrial Park (Phase 2) 0 Residence - Espera Court (Phase 1) 0 Residence - Cadencia (Phase 1) 0 Residence - Mulso/Fosca (Phase 1) 0 Residence - Cabo/Trigo (Phase 1) 0 Residence - De1 Rio Court (Phase 1) 0 Residence - Dorado Place (Phase 1) l Residence - Cuesta Place (Phase 1) The microscale air quality impact analysis demonstrated that the existing maximum local CO increments at the shoulder of any proposed project area roadway are well within acceptable standards. The maximum predicted one-hour CO concentration (7 ppm) would occur at Receptor 4, a single-family home on the corner of Fosca Way and Mulso Lane. The December 2001 157603 Environmental Assessment. Rancho Santa Fe Road Realignment and Bridge Replacement 4-41 4.0 Discussion of Environmental Evaluation and Mitigation Measures local exposure of 7 ppm does not exceed the most stringent California standard of 20 ppm and the federal standard of 35 ppm. Maximum eight-hour CO levels generated by the proposed project would also not exceed the State and/or federal; standard of 9 ppm. The maximum opening daily worst-case, eight-hour CO levels at buildout conditions would decrease to 4.1 ppm, or 46 percent of the standard. Air Quality Conformity Analysis. Regional air quality impacts were evaluated relative to the Regional Transportation Improvement Program (RTIP) which is a component of the Regional Air Quality Strategic/State Implementation Plan (PACWSIP). The 2020 Regional Transportation Plan (RTP) was adopted by SANDAG on February 252000. On April 13, 2000, FHWA and FTA made a joint air conformity determination on the 2020 RTP that the RTP complies with the Clean Air Act. On October 6,2000, FHWA and FTA approved the 2001-2004 Regional Transportation Improvement Program (RTIP). The Ranch0 Santa Fe Road Bridge Replacement and Realignment Project is included in the 2000-2020 Regional TransportationPlan (RTP) onpageA-17; theRTPwasfound to beconforming byFHWAand FTA on April 13, 2000. The project is also in the 2001-2004 Regional Transportation Improvement Program (RTIP); the RTIP was found to be conforming by FHWA and FTA on October 6, 2000. The design and scope of the project are also consistent with the project description in the above RTP and RTIP. Cumulutive. Construction activities for Phases 1 and 2 may briefly overlap. However, the peak equipment/soil disturbance level during the limited cumulative overlap period will be less intense than from mass grading during Phase 2 which was found to not create a substantial impact to air quality. 4.1.8 Noise (#s 19,20,5 1) Affected Environment Noise Criteria (Local, State and Federal) The City of Carlsbad required that the maximum acceptable exterior noise level for new residential development shall not exceed a CNEL of 60 dBA. The County of San Diego’s maximum acceptable exterior noise level for new residential development is that the CNEL should not exceed 60 dBA. However, proposed projects that are federally funded are to December 2001 157603 Environmental Assessment l Rancho Santd Fe Road Realignment and Bridge Replacement 4-42 4.0 Discussion of Environmental Evaluation and MitiPlation Measures comply with applicable FHWA standards. The FHWA/Department follows the noise abatement procedures established in the Code of Federal Regulations (23 CFR 772). The Department also follows the noise abatement procedures as well as policies established in the Department’s Highway Design Manual Chapter 1100. For purposes of the following analysis, the Department’s 1998 Noise Protocol was used. The FHWA considers that a traffic noise impact occurs when the predicted traffic noise levels approach or exceed the Noise Abatement Criteria (NAC) shown below. Noise abatement criteria for sensitive receptors such as residential and school uses is 67 dBA for Category B. The FHWA specifies that the NAC, when approached, exceeded, or when there is a substantial increase (2 12 dBA), requires the consideration of traffic noise abatement measures. The FHWA indicates that local State Highway Agencies should use a definition of approach that is at least one dBA less than the NAC. The Department defines approach as being one dBA lower than the NAC. NOISE ABATEMENT CRITERIA HOURLY A-WEIGHTED AVERAGE SOUND LEVEL - DECIBEL (dBA) Activity Categorv L(h) Dascriotion of Activitv Cateaorv A 57 Lands on which serenity and quiet are of extraordinary significance and serve an important public need and (Exterior1 where the preservation of those qualities is essential if the area is to continue to serve its intended purpose. B 67 Picnic areas, recreation areas, playgrounds. active.sports areas, parks, residences. motels, hotels, schools, (Exterior1 churches, libraries and hospitals. C 72 Developed lands, properties, or activities not included in Categories A or B above. (Exterior) 0 -- Undeveloped lands. E 52 Residences, motels. hotels, public meeting rooms, schools, churches, libraries, hospitals and auditoriums. Existing Conditions - Phase 1 Sensitive Noise Receptors. Existing noise sensitive receivers in the project vicinity include approximately 50 residences located along the western portion of the project site along Ranch0 Santa Fe Road. Existing noise levels currently exceed the Federal Highway Administration’s Noise Abatement Criteria at some of the residences along Ranch0 Santa Fe Road. December 2001 15760.3 Environmental Assessment . Rancho Santa Fe Road Realignment and Bridge Replacement 4-43 Discussion of Environmental Evaluation 4.0 and Mitigation Measures Noise Measurements. Three noise measurements were conducted at the residential area located along the western portion of Ranch0 Santa Fe Road (Sites Ml, M2 and M3, Figure 4- 7). The primary noise source at the measurement sites is traffic on Ranch0 Santa Fe Road. The noise measurement sites were selected to provide an unobstructed view of the Ranch0 Santa Fe Road (i.e., no intervening walls, buildings, topography etc.). The measured average sound levels were 73 dBA at Site 1, 70 dBA at Site 2 and 71 dB at Site 3. Table 4-3 depicts the results of the noise measurements adjacent to Ranch0 Santa Fe Road. TABLE 4-3 Short-Term Measured Average Noise Level and Concurrent Traffic Volumes Site Ml L M2 M3 Description DatelTime C’ Cars MT’ HT* Approximately 3o’to center line of road 10118101 73 dBA 446 7 1 1250.1:lD PM Approximately 45’to center line of road lDllBlD1 70 dBA 466 9 3 12:ZD .12:4D PM Approximately 40’ to center line of road 1DflBfDl 71 dBA 505 7 1 1 I:40 AM. 12:OO PM Notes: ’ Equivalent continuous Aweighted sound pressure level (time-average sound level) ’ Medium trucks ’ Heaw trucks The existing noisiest hourly average sound level was determined based on the existing peak hour traffic volume (City of Carlsbad, 2001a). When adjusted to the peak hourly average noise level, the modeled noise level ranges from approximately 53 to 73 dBA at the backyards of the existing homes (Le., Sites 4.14). The existing (noisiest) one-hour average sound levels for various receiver locations are depicted in Table 4-4. The noise level at the homes adjacent to Ranch0 Santa Fe Road varies due to factors such as the amount of noise attenuation associated with intervening topography (i.e., graded slopes) as well as the distances from the homes to the road. The intervening topography is generally more effective at shielding the traffic noise for the homes located at the bottom of the slopes. December 2001 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 157603 4-44 Ranch0 Santa Fe Road Realignment & Bridge Replacement - Environmental Assessment Phase 1 - Noise Measurement and Receptor locations u ‘y; - 4.0 Discussion of Environmental Evaluation and Mitigation Measures TABLE 4-4 Existing Noise Levels M2 M3 Rancho Santa Fe Road (Utility easement) Rancho Santa Fe Road (Undeveloped Land) 73 0 i--l None 73 D f-4 NOM 4 / Cuesta PI. (Backvardl I 2 I 53 I B(67) 1 None 5 1 Cuesta PI. (Backyard) I 2 I 54 ( B(671 1 None 6 Oehesa Ct. (Backyard1 4 54 6 I671 NOM 7 I Condo PI. IBackvardl 3 55 B (67) NOIN 6 1 DulceCt. (Backyard) I 3 I 57 I B(67) j None (Backyard) I” / I I ngu ~lr,,e (Backyard) 1 I 1 Triao Lane (Backvardl 6 65 B (671 NOM 5 66 6 (671 NOM 6 73 B 1671 NOW 12 Muslo Lane (Backyard) 6 70 6 I671 NOM? 13 Casca Way (6ackyard) 5 67 B (67) NOM 14 Esfera Ct. iBackvardl 3 64 B (671 NOIE 15 I lJndeveloped(Zoned Residential1 / I 51 1 0 (--I 1 None 16 / Undeveloped (Zoned Residential) / I 51 / D(-) 1 None 17 Undeveloped (Zoned Residential) 49 D l-1 NON 16 I Undevelooed bned Residential1 / I 48 / II i-4 1 None Existing Conditions - Phase 2 Sensitive Receptor Locations. Adjacent to the project site are approximately 18 residences located within three residential areas (see Figure 4-g). One residential area is located along the western portion of the site near the intersection of Melrose Drive and Corintia Street. These residences are located within the City of Carlsbad. The second residential area consists of four homes located on the west side of Ranch0 Santa Fe Road immediately south of Meadowlark Ranch Road. These homes are located within the County of San Diego. The December 2001 Environmental Assessment l Rancha Santa Fe Road Realignment and Bridge Replacement 157603 4-46 ! / , &.$p!$ $:~. ;i:,:: :,,;,5~ ; ~.;i>~~S/ Specific alignment plans in this orea have been prepared bv City of Son Marcos. :qiy, ,;&;\ /.: &sting Me~dowk#@$+q Residences E .;~:+,” Pi{ !fi Sou,,d-Wa,, ~:~~~~~~~~~‘1’ oise Measurement Location oise Modeling Receptor Location 11 m 1 n 1. Existing Sound Wall ‘ROJECT ALIGNMENT SOURCE: okken Enqineerinq, Oct. 1998 Ranch0 Santa Fe Road Realignment & Bridge Replacement - Environmental Assessment Phase 2 - Noise Measurement and Receptor locations FIGURE r-l 4-8 4.0 Discussion of Environmental Evaluation and Mitigation Measures third residential area is the Meadowlands single-family development located in the City of Carlsbad near the northwest intersection of Ranch0 Santa Fe Road and Melrose Drive. Noise Measurements. The following is taken from the Acoustical Assessment Report prepared for the Ranch0 Santa Fe Road Project (Dudek & Associates, July 2001). The acoustical study has been incorporated by reference to this document and is available for review at the City of Carlsbad. Figure 4-8 illustrates the location where noise measurements were taken and Table 4-5 provides existing noise levels at these locations. A 24-hour noise measurement was taken at Site A, located near the southeast corner of the La Costa Meadows/Ranch0 Santa Fe Road intersection. Site A was chosen as an existing conditions measurement site because it provided an unobstructed view of Ranch0 Santa Fe Road. The peak (noisiest hour) average noise level was 70 dBA and occurred both during the morning commute and the evening commute hours. As seen in Table 4-5, existing noise levels range from 56 dBA to 71 dBA within the residential areas measured. The majority of the sites are below the FHWA/ Department NAC threshold of 67 DBA with the exception of three sites which have an existing noise level of 70 and 71 dBA along Meadowlark. The child care facility (Site 7) and the outside office lunch area (Site 8) have existing noise levels of 61 dBA and 66 dBA, respectively. Both sites are below the FHWA/Department NAC requirements for their land use category. TABLE 4-5. EXISTING NOISE LEVELS December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-43 4.0 Discussion of Environmental Evaluation and Mitigation Measures A short-term noise measurement (Site B) was also conducted at the residential area located at the northwest intersection of Melrose Drive and Corintia Street. The traffic noise at these residences is primarily associated with Melrose Drive, and to a lesser extent, Ranch0 Santa Fe Road. The homes at this area have existing sound walls approximately 1 to 2 meters (3 to 6 feet) in height. The noise measurement, conducted approximately 3 meters (10 feet) in front of the sound wall (i.e., the sound level meter was positioned between the road and sound wall) resulted in an average sound level of 63 dBA. The Meadowlands residential project has been recently constructed with single family homes adjacent to the northwest intersection of Ranch0 Santa Fe Road and Melrose Drive. The single-family development is surrounded by approximately 1.8-meter (Qfoot) high sound walls along Ranch0 Santa Fe Road and Melrose Drive. Environmental Evaluation - Future Conditions Phase 1 To determine future noise levels and the significance of potential noise impacts at land uses adjacent to the project site, future peak hour buildout (assumed to occur in the year 2020) noise levels were calculated using the SOUND32 model. The noise modeling included the future peak hour buildout traffic information (City of Carlsbad, 2001b) and the physical improvements shown on the design plan for the road widening and realignment improvements. The proposed project would realign the road away from the existing homes, thereby reducing the traffic noise exposure at the residences. With implementation of the project, the future peak one-hour average noise level is projected to range from approximately 49 to 58 dBA at the backyards of the existing residences located along the west side Ranch0 Santa Fe Road. This noise level would comply with the FHWANoise Abatement Criteria. The predicted future buildout peak one-hour average noise levels at the receivers is depicted in Table 4-6. Future residential development has been approved for single family homes along the east side of Ranch0 Santa Fe Road (Sites 15-18). The tentative map for these homes indicates that the residences would be located approximately 15 to 30 feet below the elevation of Ranch0 Santa Fe Road. The future peak hour average noise level at these future residences would range from approximately 53 to 58 dBA. December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-49 4.0 Discussion of Environmental baluation and Mitigation Measures TABLE 4-6 Predicted Traffic Noise Impacts 11 1 Trigo Lane (Backyard) Yes 73 1 56 .I7 / B (67) NolIe 12 1 Muslo Lane (Backvardl Yes 70 53 -17 1 BE71 1 None 13 1 Casca Way (Backyard) Yes / 67 53 .14 1 BP371 / NOM 14 1 Esfera Ct. (Backyard) Yes 64 53 .ll 1 B 167) / NOM 15 Undeveloped (Zoned Residential1 51 57 +6 0 I--) NOW 16 Undeveloped (Zoned Residential1 51 55 +4 D lk.1 NOM 17 Undeveloped (Zoned Residential) 49 53 +4 0 (-1 NOW 18 llndevelooed 17aned Residential\ 4R 54 +fi 0 I-.) NOW The future worst-case one-hour average noise level at the homes located near the northwest corner of Ranch0 Santa Fe Road and La Costa Avenue (Sites 4-7) would range from approximately51 to55 dBA. Thisnoiselevel complieswithFHWA/Caltrans NoiseA&utement Criteria of 67 dBA, Leq(h) for Activity Category B land uses. Future noise levels would comply with the FHWA/Caltrans noise criteria at all the existing homes located along Ranch0 Santa Fe Road Phase 1 project area. Therefore, noise abatement features are not required to complywith theNoise Abatement Criteria. However, as part of the December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-50 4.0 Discussion of Environmental Evaluation and Mitigation Measures engineering design plans for the project, the City will construct a six-foot high sound wall along the west side of Ranch0 Santa Fe Road at the southern portion of the project site. The location of the proposed noise barrier is depicted on Figure 4-9. The homes adjacent to the proposed privacy wall are located at the bottom of a slope and would be approximately25 to 50 feet below the elevation of realigned Ranch0 Santa Fe Road. The intervening slope will provide significant noise attenuation at the adjacent residences. As previously stated, the proposed privacy wall is not required to comply with the FHWA/Caltrans criteria, but, is a design feature of the project. The Cityrecognizes that the privacy wall is not required per FHWA/Caltrans criteria. Therefore, the City will not seek reimbursement from the FHWA for construction of this sound wall (City of Carlsbad 2001). Phase 2 The acoustical report prepared for the proposed project analyzed 14 receptor sites within the Phase 2 area of the project. Table 4-7 summarizes the results of the acoustical report. As Table 4-7 shows, no receptor sites would experience noise increases greater than or equal to 12 dBA, and therefore, no receptors would experience a substantial increase in noise as defined by 23 CFR 772. For all receptor sites, except 4, 5, and 6, the predicted noise level would not approach or exceed the FHWA/Department NAC, meaning that these sites will not be impacted by noise. As Table 4-7 shows, the existing noise levels at sites 4,5 and 6 (70 - 71 dBA) already exceed the NAC (67 dBA). While the proposed project will not increase the noise level currently existing in the Meadowlark area, the residences represented by receptor sites 4, 5 and 6 would be considered impacted by noise. The conclusions of the acoustical report and proposed noise abatement measures are discussed below. The peak hour average noise level at the homes located on the west side of Melrose Drive would be approximately 60 to 64 dBA associated with traffic noise (Sites 1,2 and 3, Figure 4-S). This includes the noise attenuation associated with the existing 1.5 to 1 .&meter (five to six-foot) high sound wall at these residences. This noise level complies with the FHWA/ Department NAC of 67 dBA for residential uses; therefore, no noise impact to this residential area would occur. December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-51 B hoposed 6’ Sound Wall GRADING P&N SOURCE: Dokkm Enqheerhq, February 2OW Ranch0 Santa Fe Road Realignment & Bridge Replacement - Environmental Assessment F’GURE Phase 1 - Sound Wall location 4-g Ll 4.0 Discussion of Environmental Evaluation and Mitigation Measures TABLE 4-7. PREDICTED TRAFFIC NOISE IMPACTS 4 Meadowlark (Backyard) Yes 71 71 0 B (671 AIE’ 5 Meadowlark (Backyard) Yes 70 71 +1 B 167) AIE” 6 Meadowlark (Backyard) Yes 70 71 +1 B f67) A/E’ 7 1 RanchoSanta FeAd.lChildren / Yes 1 61 ) 62 1 +l / Bl671 1 None Play Area) 8 1 Aancho Santa Fe Road (Office 1 Yes 1 66 1 66 I 0 1 C(721 I None lunch Area) 9 Cute Ramon IBackyard NO 58 62 +4 B I671 None 10 Cute Ramon (Backvard) NO 60 63 +3 B (67) NLl”C? 11 / Cute Ramon (Backyard) NO 61 64 +3 1 B (671 ( None 12 1 Carte Ramon (Backyard) NO ( 60 1 65 +5 / B (671 1 None A Rancho Santa Fe Rd. (Office) Yes 1 70 j 69 -1 ( C (72) 1 None B 1 Melrose Or. (Landscape Easement) / / 66 / 70 +4 0 l-1 None * AIE - ApproachlExceed The future worst-case one-hour average noise level at the homes located within the Meadowlands residential development would range from approximately 62 to 65 dBA (Sites 9-12, Figure 4-8). This noise level includes the noise attenuation associated with the existing sound wall along the backyards of the homes. The future noise level complies with FHWA/ Department NAC of 67 dBA for residential uses; therefore, no noise impact to the Meadowlands residential area would occur. The business industrial park includes several outdoor lunch areas. Most of the lunch areas are located along the east sides of the buildings which provide noise attenuation from the traffic noise. However, a lunch area is located on the south side of the southern most building in the industrial complex. The peak one-hour average noise level at this location would be approximately 66 dBA, which is no change from the existing conditions. This noise December 2001 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 157603 4-53 4.0 Discussion of Environmental baluation and Mitigation Measures level does not approach or exceed the FHWA/Department NAC of 72 dBA for commercial uses; therefore, no noise impact to the business industrial park would occur. A child care facility is located at the business industrial park along La Costa Meadows Drive east of Ranch0 Santa Fe Road. The facility is partially shielded from traffic noise by intervening buildings. The future peak hour average noise level at this location would be approximately 62 dBA. This noise level does not approach or exceed the FHWA/Department NAC of 67 dBA; therefore, no noise impact to the child care facility would occur. Future noise levels would exceed FHWA/Department noise criteria at four homes located along Ranch0 Santa Fe Road (see Figure 4-f@. Mitigation measures for the affected homes have been evaluated to provide noise abatement and design information. With a 2.4-meter @-foot) high sound wall located along western right-of-way, the future peak hour average noise level would be mitigated to 61 to 62 dBA. The location of the proposed noise barrier is depicted on Figure 4-10. The length of the sound wall including the wrap around would be approximately 146 meters (480 feet). A comparison of the noise reduction provided by various barrier heights is shown in Table 4-8 A l&meter (6-foot) high sound wall would attenuate the noise so that traffic noise would comply with the NAC. However, it should be noted that a 2.4-meter (8-foot) high sound wall has been included in the project (see Environmental Commitments section of this EA). With the 2.4-meter (8.foot) high and 146.meter (480foot) long sound wall proposed by the project to be located along the western right-of-way north of Melrose Drive/Ranch0 Santa Fe Road intersection, the future peak hour average noise level would be 61 to 62 dBA and therefore would not exceed FHWA/Department NAC of 67 dBA at the four homes located along Ranch0 Santa Fe Road. Reasonable/Feasible Analysis The proposed 2.4-meter (8-foot) high and 146.meter (480-foot) long noise barrier are subject to review under FHWA and Department “reasonable and feasible” criteria. These criteria involve analysis of economic and engineering considerations to determine if the barrier will be constructed with Federal funds. The “reasonable” portion of this analysis includes a cost December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-54 : I\, ‘j , \ J<,~.i :.1 ,’ “~. /..., & ,., >,A, :.- \ .$ -‘I’: x ‘..~... ~.~ .;~. ,:i .:;c,: i ._. “~,..,, .Yj ‘_. ‘j . . . . ~’ ‘.-.. ._ ,,~~“~~~~~~.~~ ” ., ~‘,. ., 1.;,; ,_ ..~..::,,..~~...i w Ranch0 Santa Fe Road Realignment & Bridge Replacement - Environmental Assessment Phase 2 - Sound Wall location 4.0 Discussion of Environmental baluation and Mitigation Measures TABLE 4-8. FUTURE PREDICTED NOISE LEVELS WITH AND WITHOUT NOISE ABATEMENT WALL 9 / 62’ 62 NIA 62 NIA 62 N/A 10 63' 63 NIA 63 NIA 63 NIA 11 64' 64 NIA 64 NIA 64 NIA 12 65' 65 NIA 65 NIA 65 NfA A ) 69 69 NIA 69 NIA 69 NIA R I 711 I 711 I NIP I 7n I NIA I 711 I NIA Notss: * *. NIA Bold LL. With existing sound wall Brsaks lins of sigh! bstwesn truck stack and 1.5 m (5’1 rscsiwr Not applicabls (no barrisr considsred) Achieves minimum 5 dBA rsduction lnsorfion Loss per allowance per benefitted residence, and has been calculated based on the noise attenuation associated with a 2.4-meter (8-foot) high barrier. The total reasonableallowance for abatement is $132,000. Utilizing a $14 per square foot construction cost for a noise barrier results in a total cost of approximately $53,760 for the noise barrier. The estimated cost of the noise barrier is within the allotted total reasonable allowance. Therefore, the cost of the noise barrier is considered reasonable. The barrier is feasible because it attenuates the noise by at least five dBA. Table 4-9 summarizes the feasibility and reasonability of the 2.4- meter (8-foot) high barrier. December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-56 4.0 Discussion of Environmental Laluation and Mitigation Measures TABLE 4-9 SUMMARY OF SOUND WALL REASONABILITY AND FEASIBILITY Combined Evaluation for Phases 1 and 2 As discussed above, measures have been incorporated into phases 1 and 2 to ensure that noise impacts will not approach or exceed the FHWA/Department NAC. 4.2 BIOLOGICAL RESOURCES (#S 9,13,22 - 29,49,52 - 54) Coordination with the USFWS, the CDFG, the ACOE, and other agencies regarding the road realignment and bridge replacement has been ongoing since 1990 (see APPENDIX A, USFWS Correspondence, and APPENDIX B for approved permits). On June 6,1995, the USFWS issued a Finding of No Significant Impact (FONSI) for the incidental take of the coastal California gnatcatcher, least Bell’s vireo, southwestern willow flycatcher, and 60 other species due to the City of Carlsbad’s Fieldstone/La Costa Housing development and Ranch0 Santa Fe Road project. Simultaneously, an incidental take permit pursuant to Section 10(a) (1) (B) was also issued. These prior actions were supported by field surveys and studies conducted for the City of Carlsbad Habitat Conservation Plan/Ongoing Multi-species Plan (HCP/OMSP); the studies and environmental documentation for the HCP/OMSP were completed in 1994. On June 7,1995, the USFWS issued an incidental take permit for the project pursuant to Section W4(l)@). On August 25,1999, an updated species list was received from the USFWS (see APPENDIX A). Biological surveys addressing the USFWS species list have been conducted within the proposed road realignment area and adjacent development areas. The results of these surveys (1997 to 2000) are discussed extensively in the Biological Resources Report and Impact Analysis December 2001 157603 Environmental Assessment. Rancho Santa Fe Road Realignment and Bridge Replacement 4-57 4.0 Discussion of Environmental Evaluation and MitigCation Measures for the Ranch0 Santa Fe Road Realignment and Bridge Replacement Project (Dudek & Associates, November 2000) and are summarized below. This report is incorporated by reference and concludes that there have been no newly listed species in the project area or changes in the proposed project since the issuance of the Section 10(a)(l)(B) permit. With the addition of federal funds to the project, FHWA has initiated formal Section 7 consultation with the USFWS because the project may affect the coastal California gnatcatcher and its designated critical habitat (~~~APPENDIXA, USFWS letter dated September 2!,2001). The USFWS issued a letter on September 21,200l that acknowledged the start of formal Section 7 Consultation and stated that the City of Carlsbad is meeting the requirements of their Section 10(a)(l)(B) permit (see APPENDIX A). Affected Environment Phases 1 and 2 Prior to the October 1996 fire, according to the Carlsbad HMP/North County MHCP, the project impact area supported six vegetation communities/land cover types: Diegan coastal sage scrub, southern mixed chaparral, southern willow scrub, annual (non-native) grassland, disturbed habitat, and developed. The current survey mapped five additional habitat types in the project impact area: disturbed coyote brush scrub, Valley needlegrass grassland, freshwater marsh, disturbed wetland and eucalyptus woodland. The existing vegetative conditions in the proposed project studyareawhichincludes the proposed project impact area and adjacent habitat, and the acreage of each type is presented in Table 4-10. No wild or scenic rivers as defined by the USFWS are located within the project study area. + Floral Diversity A total of 205 plant species was detected in the surrounding area including 133 (65%) native species and 72 (35%) non-native species. Many of the species detected in the project impact area are annual forbs that have flourished as a result of the October 1996 fire. December 2001 157603 Environmental Assessment. Rancho Santa Fe Road Realignment and Bridge Replacement 4-58 4.0 Discussion of Environmental Evaluation and Mitigation Measures TABLE 4-l 0 PLANT COMMUNITY OR LAND COVER ACREAGES Natural Plant Communities Coastal Sage Scrub (burned) 14.2 hectares (35.1 acres) Coastal Sage Scrub (disturbed) 9.5 hectares (23.5 acres) Coyote Brush Scrub (disturbed) 0.8 hectare (1.9 acres) Total Coastal Sage Scrubs 24.4 hectares (60.4 acres) Southern mixed chaparral 0.6 hectare (1.4 acres) Southern Mixed chaparral (burned) 5.8 hectares (14.4 acres) Total Southern Mixed Chaparrals 6.4 hectares (15.8 acres) Valley Needlegrass Grassland 0.04 hectare (0.1 acre) Valley Needlegrass Grassland/CSS 0.9 hectare (2.2 acres) Total Valley Needlegrass GrassIands 0.94 hectare (2.3 acres) Freshwater Marsh 0.17 hectare (0.43 acre) Southern Willow Scrub 0.69 hectare (1.72 acres} Disturbed Wetland 0.11 hectare (0.27 acre) Total Wetland Habitats 0.98 hectare (2.42 acres) Altered Land Covers Eucalyptus Woodland Annual Grassland (Ruderal) Disturbed habitat Developed Total Altered Land Covers 1.09 hectares (2.7 acres) 6.96 hectares (17.2 acres) 4.98 hectares (12.3 acres) 10.20 hectares (25.2 acres) 23.23 hectares (57.4 acres) GRAND TOTAL 55.97 hectares (138.3 acres) NOTE: The biological resources map contained in the Biological Resources Survey Report (Dudek &Associates, November 2000) illustrates plant communities and project impacts. December 2001 157603 4.0 Discussion of Environmental Evaluation and Mitigation Measures l Wildlife Habitats Wildlife habitats of greatest value are those that are (1) rare in San Diego County, (2) highly productive, or (3) capable of supporting sensitive species. Wildlife habitats present onsite include shrublands, riparian habitat, annual grassland, eucalyptus woodland and disturbed habitat. A total of 134 wildlife species were observed or detected in the project impact area, including 84 birds, 14 mammals, three amphibians, nine reptiles, and 24 butterflies. A complete list of wildlife species observed is contained in the Biological Resources Survey Report (Dudek &Associates, November 2000). + Sensitive Biological Resources Sensitive plants, wildlife and habitats within the project impact area are discussed in the Biological Resources Survey Report (Dudek &Associates, November 2000). For purposes of the EA, resources are considered sensitive if they have been: (1) species that have been given special recognition by federal, state, or local conservation agencies and organizations due to limited, declining, or threatened population sizes; (2) species and habitat types recognized by local and regional resource agencies as sensitive; (3) habitat areas or plant communities that are unique, are of relatively limited distribution, or are of particular value to wildlife; and (4) wildlife corridors and habitat linkages. Sources used for determination of sensitive biological resources are as follows: wildlife -- USFWS (USFWS 1989, 1991), California Natural Diversity Data Base (CNDDB), CDFG (CDFG 1980, 1986), Remsen (1978), and Murphy (1990); plants -- USFWS (1990), CDFG (1987), CNDDB, and Skinner and Pavlik (1994); and habitats -- CNDDB and Hix (1990). The USFWS provided a list of federally-listed threatened and endangered species and proposed species that may occur in the project impact area. The USFWS letter has been addressed in the biological resources analysis for the proposed project and is included in APPENDIX A to this EA. Environmental Evaluation Phases 1 and 2 l Impacts to Plant Communities This analysis assumes direct, permanent impacts to all habitats within the limits of grading for Phases 1 and 2, including connecting access roads, storm drains, detention basins, etc. December 2001 157603 Discussion of Environmental Evaluation 4.0 and Mitigation Measures Implementation of the proposed project will result in direct and indirect impacts to native and non-native plant communities and habitats. Direct impacts are the primary result of the activity, such as grading or filling, whereas indirect effects are the secondary result, such as noise effects, changes in drainage, etc. and therefore are difficult to quantify. Temporary impacts would also occur in Phases 1 and 2 of the project. These temporary impact areas include staging areas, rock-crushing areas and demolition of the old bridge. Permanent impacts cause a permanent removal of habitat, such as by filling or the “shade effect” of the new bridge, whereas temporary impacts will allow habitat function or species to return after thoseareas arerestored. Table 4-Y{ summarizes the permanent and temporary impacts of the proposed project for each phase and the proposed project as a whole TABLE 4-11 PROPOSED IMPACTS BY PLANT COMMUNITY Total Project Area burned CSS disturbed CSS disturbed coyote brush scrub Southern Mixed Chaparral (Total) SMC burned SMC Valley Needlegrass Grassland (Total) VGL VGL’CSS lKw5.5 6.2/15.4 0.7/1.9 2.215.4 0.08/0.2 2.1152 0.04/0.1 0.04/0.1 0.04/<0.1 Southern Willow Scrub 1 0.18/0.44 Freshwater Marsh I - Disturbed Wetland 1 0.11/0.27 Waters (unvegetated waters of the U.S.) 0.09/0.22 Annual Grassland 2.2l5.5 Eucalvotus Woodland I 0.411.0 Disturbed Habitat 3.w. 1 Developed Land / 5.1112.7 Temp. (hdac) 7.1075 3.8l9.4 3.3KJ.i 0.02/0.04 3.017.5 1.513.6 1.012.5 14.0/34.5 Phase 1 Phase 2 Perm. Temp.. (ha/at) (ha/a@ 0.8/1.9 - 0.04/<0.1 - 0.7n.9 - 2J5.4 - 0.08/0.2 - 2.115.2 - 0.04/0.1 - 0.04/0.1 - 0.04/<0.1 - 0.1810.44 0.39/0.97 0.06/0.15 0.01/0.03 1.112.7 1.914.7 0.411.0 - 0.4ll.O 0.04/0.1 3.418.4 0.6/1.4 8.5/21.0 3.017.3 December 2001 157603 4.0 Discussion of Environmental Evaluation and Mitigation Measures The USFWS, as part of the Section lo(a)(l)(B) process, has approved a HCP proposed by the City of Carlsbad, in associationwith Fieldstone/La Costa Associates, that covers 785 hectares (1,940.2 acres) of land in southeast Carlsbad including the proposed project. The HCP provides conservation and mitigation requirements that complywith the California Natural Communities Conservation Plan (NCCP). The NCCP is a state-wide habitat conservation program aimed at planning future development so as to preserve threatened habitats and species. Impacts to upland habitats associated with the realignment and expansion of Ranch0 Santa Fe Road as well as a bridge replacement over San Marcos Creek were addressed as a part of the HCP. It is not anticipated that any additional mitigation will be required for impacts to upland habitats under the Section 7 consultation process. Diegan Coastal Sage Scrub and Coyote Brush Scrub: Implementation of the proposed project will result in the permanent loss of 16.6 hectares (40.9 acres) of coastal sage scrub and 0.8 hectare (1.9 acres) of disturbed coyote brush scrub and temporary impacts to 7.1 hectares (17.5 acres) of coastal sage scrub. The City has purchased habitat credits and will restore impacts to construction staging areas in order to conform with the HCP requirements for upland habitats. Southern Mixed Chaparral: Implementation of the proposed project will result in the permanent loss of approximately 2.2 hectares (5.4 acres) and temporary loss of 0.6 hectare (1.5 acres) of southern mixed chaparral. This represents an incremental reduction of the habitat in the region. Measures have been incorporated into the proposed project design to conform with the HCP requirements for upland habitats (see SuNzrnary of Enviromzental Commitments section of this PA). Valley Needlegrass Grassfand: Implementation of the proposed project will result in the permanent loss of 0.04 hectare (0.1 acre) and temporary loss of 0.3 hectare (0.8 acre) of Valley needlegrass grassland. Valley needlegrass grassland is recognized locally as important to the maintenance of raptor populations, other sensitive wildlife and sensitive plants, and is a declining habitat type within the coastal areas of southern California. Within the project impact area, the patch of Valley needlegrass grassland north of the creek is very small in extent, isolated from other grasslands, and does not represent an important botanical or wildlife resource. The larger area of grassland along Questhaven Road probably would be isolated by the deveIopment of the proposed University Commons project. Measures have been incorporated into the proposed project design to conform with the HCP requirements for upland habitats (see Summary ofEnvironmental Commitments section of this EA). December 2001 157603 4.0 Discussion of Environmental Evaluation and Mitigation Measures Annual (Non-native) Grassland: Implementation of the proposed project will result in the permanent loss of 2.2 hectares (5.5 acres) and temporary loss of 3.0 hectares (7.5 acres) of annual grassland. Although non-native grasslands typically do not support sensitive plant orwildlife species, theymayrepresent important raptor foraging habitat. The overall acreage of non-native grassland is diminishing regionally, but non-native grassland remains a relatively abundant habitat type in San Diego County. The permanent and temporary loss of non-native grassland resulting from proposed project implementation would have a minor local impact. Eucalyptus Woodland: Implementation of the proposed project will result in the permanent loss of 0.5 hectare (1.1 acres) and temporary loss of less than 0.04 hectare (0.1 acre) of eucalyptus woodland. Although eucalyptus woodlands typically do not support sensitive plant or wildlife species, they may represent important raptor nesting habitat. The overall acreage of eucalyptus woodland is diminishing regionally, but eucalyptus woodland remains a relatively abundant habitat type in San Diego County. The permanent and temporary loss of eucalyptus woodland resulting from proposed project implementationwould have a minor local impact. Disturbed Habitat/Developed Land: Disturbed habitat and developed land do not support a substantial number of native plants and therefore proposed impacts wouId have minor local impact to biological resources. l Impacts to Wetland/Riparian Habitats The proposed project would affect 0.85 hectare (2.11 acres) of wetlands and waters through construction of the road and bridge. Construction of the road and associated slopes would result in the permanent impacts to disturbed wetland and unvegetated channel as well as temporary impacts to unvegetated channel (see APPENDIX C, ACOE JURISDICTIONAL WETLANDS, and project impacts). These temporaryimpacts are associated with construction activity necessary to construct the road and associated slopes. Replacement of the bridge over San Marcos Creek would impact wetlands and waters in the following ways: permanently by filling and dredging for construction of abutments arid bridge piers; permanently by the “shading effect” of the bridge structure; permanently by construction of a storm drain outfall structure southeast of the new bridge; and temporarily by certain construction activities December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Repkcemenf 4-63 4.0 Discussion of Environmental Evaluation and Mitigation Measures within the streambed adjacent to the bridge including demolition of the old bridge. Total permanent impacts to wetlands include 0.18 hectare (0.44 acre) to southern willow scrub, 0.11 hectare (0.27acre) disturbed wetland, and 0.09 hectare (0.22 acre) to unvegetated waters of the U.S. Total temporary impacts to wetlands include 0.39 hectare (0.97 acres) to southern willow scrub and 0.02 hectare (0.04 acre) to unvegetated waters of the U.S. Permits in accordance with Section 1601 of the CDFG, Section 401 of the federal Clean Water Act and Section 404 of the federal Clean Water Act are required in association with project impacts to wetlands. A Section 1601 Streambed Alteration Agreement has been obtained from the CDFG and a Section 401 Certification or Waiver has been obtained from the RWQCB. Authorization to use Nationwide Permit 14,8 and 33 has been obtained from the ACOE. For impacts to wetland habitats, the proposed project will include habitat creation, restoration, enhancement or acquisition pursuant to permit requirements of the ACOE, CDFG, and RWQCB. The following ratios will apply for permanent impacts: 3:l for disturbed wetlands and 3: 1 for southernwillow scrub. Following demolition of the old bridge over San Marcos Creek, this area will be restored to support southern willow scrub habitat. Following temporary impacts necessary to construct the new bridge and road, pre- construction contours will be restored and, wherewetlands currently exist, southernwillow scrub will be revegetated. In view of proposed mitigation and receipt of regulatory permits, both permanent and temporary project impacts to wetlands are considered to be fully mitigated. Additionally, the proposed project alternative was designed, where feasible, to avoid and minimize impacts to jurisdictional wetlands. The bridge crossing location was chosen to minimize impacts to jurisdictional wetlands (San Marcos Creek is constructed at the proposed bridge location); to minimize the length of additional roadway required to access the new bridge; and to avoid direct impacts to adjacent existing industrial uses. Additionally, the proposed project alternative alignment minimizes impact to jurisdictional ephemeral stream channels by crossing perpendicular to the stream channels where possible. These ephemeral stream channels are unvegetated and either disturbed and/or low quality habitat. The total area of ephemeral stream channel was reduced to 0.09 hectare (0.22 acre) with slight adjustments to the alignment as suggested by the ACOE. December 2001 157603 Environmental Assessmenl l Rancha Santa Fe Road Ftealiioment and Bridge Replacement 4-M 4.0 Discussion of Environmental Evaluation and Mitigation Measures + Impacts to Sensitive Plant Species No state or federally-listed rare, threatened or endangered specieswere observed onsite. Three species recognized as locally sensitive by the California Native Plant Society (Skinner and Pavlik 1994) were detected in San Marcos Creek: San Diego golden-star, California adolphia and southwestern spiny rush. A small population of spiny rush occurs within the project impact area and could be affected by provision of temporary access and construction of bridge abutments, Potential impacts to this portion of the large San Marcos Creek populationwould not be considered substantial This species is widespread in San Diego County and Baja California, Mexico, and is under no threat of extinction at this time. It is locally common in alkaline wetlands, many of which are either in permanent open space or in areas where activities are regulated by the ACOE and CDFG. Spiny rush is frequently used successfully in wetland revegetation schemes. An undetermined number of California adolphia and approximately 1,500 individuals of San Diego golden-star would be permanently impacted by the proposed project. This impact is mitigated through provisions of the HCP. l Impacts to Listed and Sensitive Wildlife Species Wildlife species recognized as threatened by the USFWS and several species recognized as USFWS “sensitive species” and/or as “species of special concern” by CDFG occur or could potentially occur in the project impact area. Direct and indirect impacts to each of these species are discussed below. It should be noted that based on focused field surveys conducted for the project in 1995 and USFWS’ZOO! FinalCritical Habitat Map for the Southwestern Arroyo Toad, the arroyo toad is not located within the project vicinity. The CaliEornia gnatcatcher, a threatened species, is known in the project vicinity; several historic locations (pre-fire) locations are present in the coastal sage scrub east of Ranch0 Santa Fe Road. No gnatcatchers were detected during the eight site visits for the least Bells vireo and southwestern willow flycatcher in the northern portion of the project study area. [Note: focused field surveys conducted for the least Bell’s vireo and southern willow flycatcher determined that these species are not present within the project study area.] Recent vegetation surveys in other portions of the project study area fail to produce anecdotal observations of December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Real!nment and Bridge Replacement 4-65 4.0 Discussion of Environmental Evaluation and Mitigation Measures gnatcatchers. However, due to the presence of recovering coastal sage scrub and the number of historical locations, it must be assumed that the species is present within the coastal sage scrub habitat. Impacts to the California gnatcatcher have been mitigated by the City’s purchase of mitigation credits in conformance with the HCP and timing of construction outside of the gnatcatcher breeding season in order to avoid disruption of nesting and rearing. Vegetation removal will be conducted between 15 September and 15 February. APPENDIX B contains all project permits received from the permitting agencies, including the 10a permit. A pair of Cooper’s hawks was observed foraging within the project study area. Their nest was located in the southern willow scrub approximately 15 meters (50 feet) outside the project study area to the east. Two pairs of loggerhead shrike were observed within the project study area. Impacts of the proposed project to the Cooper’s hawk and loggerhead shrike would not be considered substantial. These species are still relatively widespread and common nesting species in many types of woodlands and grasslands in San Diego County, including suburban environments. As described in the proposed project description, vegetation removal that is needed to accomplish the proposed project will be conducted between about 15 September and 15 February immediately prior to construction; therefore, direct loss of a nesting site would not occur. Prior to the fire in 1996, 13 to 20 pairs of Bell’s sage sparrows were observed within the project study area; the southern California rufous-crowned sparrow was common within the coastal sage scrub as well. Impacts to Bell’s sage sparrow and southern California rufous- crowned sparrow are not considered substantial due to their low sensitivity. In addition, adequate habitat for these species would be conserved per the HCP and construction would not take place during the breeding season. Potential impacts to two-striped gartersnake, San Diego horned lizard, western spadefoot, coastal whiptail, red-diamond rattlesnake and rosy boa would not be considered substantial. These species are still relativelywidespread species. It is anticipated that the bridge structure would allow continued movement and persistence of species currently in San Marcos Creek. In addition, the HCP allows for conservation of habitat occupied by these species. December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Repkcement 4-60 4.0 Discussion of Environmental Evaluation and Mitigation Measures Potential impacts to the Dulzura California pocket mouse, northwestern pocket mouse, desert woodrat and San Diego black-tailed jackrabbit would not be considered substantial. These are relatively widespread and common species in southern California and adequate habitat is conserved for these species per the HCP. Construction activity is expected to reduce wildlife use in the areas contiguous with the proposed project. Elevated noise levels are anticipated to occur as a result of grading, excavation, and driving piles. The wildlife agencies typically find that noise levels in excess of 65 dBA Les are detrimental to wildlife, and for example, result in “take” of endangered or threatened bird species. Because no endangered or threatened wildlife species are known.to occur in the proposed project vicinity or onsite, the indirect effects of construction activity, including noise, are not expected to be substantial provided all habitat removal is conducted between 15 September and 15 February as discussed above. + Summary of Impacts to listed Species No state or federally-listed plants would be impacted by the proposed project. One federally- listed threatened animal species was determined to use habitat within the project impact area: California gnatcatcher. In compliance with the Section 10a permit, impacts to the California gnatcatcher have been mitigated by the City’s purchase of mitigation credits in conformance with the City’s HCP and timing of construction outside of the gnatcatcher breeding season. The FHWA and USFWS are in formal Section 7 Consultation. l Impacts to Local and Regional Wildlife Corridors and Habitat linkages San Marcos Creek at Ranch0 Santa Fe Road serves as a regionally-important habitat linkage/wildlife corridor for a variety of wildlife, including larger species such as mule deer and mountainlion, between the UniversityCommons/San Elijo Ranch proposed project areas in the City of San Marcos and the Bank of America property in Carlsbad. The linkage that facilitates access across University Commons/San Elijo Ranch has been identified by the resource agencies as essential to connectivity through the San Marcos Landfill area and eventually to the San Dieguito River near Lake Hodges. Construction of the proposed bridge as a part of Phase 2, followed by demolition of the existing bridge and road section, will temporarily affect wildlife usage of the San Marcos December 2001 157603 Environmental Assessment l Raocho Santa Fe Road Realignment and Bridge Replacement 4-67 4.0 Discussion of bvironmental Evaluation and Mitigation Measures Creek. However, the project has committed that during construction, an area approximately 3 meters (10 feet) wide and high with dry substrate, that has visual access from end to end, will bemaintained to allow for wildlife movement. Upon completion of the project, wildlife would be expected to resume patterns of travel through the area in the manner and at levels that existed before, resulting in no net impact to wildlife movement. Realignment of the roadway would not substantially affect wildlife movement because of the lack of important habitat west of Ranch0 Santa Fe Road and therefore limited wildlife usage of this area as a linkage or corridor. + Invasive Species On February3,1999, President Clinton signed Executive Order (EO) 13112 requiring Federal agency action to combat the introduction or spread of invasive species in the United States. The order defines invasive species as “any species, including its seeds, eggs, spores, or other biological material capable of propagating that species, that is not native to that ecosystem whose introduction does or is likely to cause economic or environmental harm or harm to human health.” FHWAguidanceissued August lo,1999 directs the use of the state’s noxious weed list to define the invasive plants that must be considered as part of the NEPA analysis for a proposed project. None of the species on the California list of noxious weeds is currently used by the City of Carlsbad for erosion control or landscaping. However, a number of invasive exotic species are present within the project APE ( see Biological Resources Report - Appendix A, Dudek &Associates, Inc., November 2000). No invasive exotic species will be allowed to become established in the project APE following construction. Invasive exotic species to be prohibited are listed in Exotic Pest Plant Species of Greatest Ecological Concern in California (CalEPPC 1999). In compliance with E.O. 13112 and the subsequent guidance from the FHWA, the landscaping and erosion control included in the Ranch0 Santa Fe Road project will not use species listed as noxious weeds. In areas of particular sensitivity, such as San Marcos Creek, extra precautions will be taken if invasive species are found in or adjacent to the construction areas. These may include the inspection and cleaning of construction equipment and eradication strategies to be deployed should an invasion occur. As a result, no adverse impacts associated with invasive species impacts to sensitive habitat are anticipated as a result of the project. December 2001 157603 Environmental Assessment l Rancha Santa Fe Road Realignment and Bridge Replacement 4-68 4.0 Discussion of hvironmental Evaluation and Mitigation Measures 4.2.1 Farmland (#25) Environmental Evaluation Phase 1 and 2 There are no prime agricultural soils as defined by the Soil Conservation Service or any Farmlands defined as prime or statewide importance as defined by the California Department of Conservation important farmland mapping program. The proposed roadway would extend through approximately 244 meters (800 linear feet) of area identified as farmland of local importance by California Department of Conservation. However, no existing agricultural operations are present within the project impact area for either Phase 1 or 2. As a result, implementation of the proposed project would not reduce the acreage of,important farmland or impact any existing agricultural operations. 4.3 SOCIAL AND ECONOMIC 4.3.1 Community Disruption/Land Use/ Property Values (#s 30 - 39,47) Affected Environment Phase 1 Existing land uses within the Phase 1 project impact area consist of vacant land with the exception of the existing roadway (see Figure 2-Z). Single family residential uses are located approximately 244 to 305 meters (800-1,000 feet) to the west and south of the Phase 1 project impact area. The area to the east also consists of vacant land associated with a large hill. Existing land uses to thenorthwest of the Phase 1 project impact area include the San Marcos Creek and light industrial uses. The City is currently processing a planned development within the Phase 1 project impact area (referred to as Carlsbad Village). The mixed use development would consist of December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-69 4.0 Discussion of Environmental Evaluation and Mitirration Measures residential, commercial and office uses that would be developed throughout the Phase 1 project impact area. The development studies currently being processed at the City incorporate the realigned and widened Ranch0 Santa Fe Road as approved by the City General Plan circulation element. Phase 2 As shown in Figure Z-2, existing land uses within the Phase 2 project impact area include the existing roadway and a mix of urban uses. Residential uses are located approximately 244 meters (800 feet) to the west of the existing roadway and immediately adjacent to the roadway at the northern border of the project impact area. Light industrial uses are located adjacent to the east of the roadway. Residential units have recently been constructed to the west of the existing roadway within the Phase 2 project impact area (referred to as the Meadowlands Development). The single family residential uses are located immediately to the north and south of the existing Melrose Drive/Ranch0 Santa Fe Road intersection. Environmental Evaluation Phases 1 and 2 + Impacts to Existing Land Uses/Property Values Construction of the roadway would not disrupt an established community or adversely impact existing neighborhood character. The final design and roadway realignment for the Phase 1 portion of the project would extend throughvacant land. In addition, the City chose the alignment within Phase 1 to maximize the distance from existing residences located immediately north of La Costa Avenue. No business or any special interest groups including elderly, handicapped or transit dependent would need to be relocated with implementation of the Phase 1 portion of the project. No extensive realignment of the roadway within Phase 2 portion of the project is proposed. Improvements within the Phase 2 portion of the project would involve intersection and December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-70 4.0 Discussion of hvironmental Evaluation and Mitigation Measures widening improvements to the existing roadway. As a result, no businesses or residences or any special interest groups would need to be relocated with implementation of the Phase 2 portion of the proposed project. Realignment of the roadway within the Phase 1 portion of the project may improve property values of existing residences located north of La Costa Avenue by increasing the distance of these properties from the roadway and associated noise issues. The bridge replacement and roadway widening proposed within the Phase 2 portion of the project adjacent to existing light industrial uses is not anticipated to adversely impact these industrial uses considering that industrial uses are not typically considered to be sensitive receptors to increased noise, and traffic associated with a roadway widening project. In addition, the area surrounding both the Phase 1 and 2 portion of the project has been anticipated by the City as a part of the General Plan to change from primarily vacant land to a mixed use urban development area. Consequently, theproposedroadwayrealignment andwideningisnecessarytoaccommodate planned growth in the area and no General Plan land use designations or zoning restrictions on adjacent vacant properties that may affect property values would change with implementation of the proposed project. l impacts to Planned land Uses/Growth Inducement The proposed project is necessary to implement the alignment approved by the Circulation Element of the City General Plan. The Circulation Element provides for transportation elements necessary to accommodate both existing demand and planned growth within the City. Therefore, the proposed project would not induce growth other than that anticipated by the General Plan or create any inconsistencies with policies, elements or goals of relevant land use planning documents. Implementation of the proposed project would not adversely affect planned lifestyles or planned neighborhood character. The planned mixed use development within Phase 1 has accommodated the alignment for the roadway called for in the City General Plan. Considering that the final design for Phase 1 would implement the alignment approved in the City General Plan, implementation of the proposed project would be consistent with the planned development and neighborhood character. Improvementswithin the Phase2 portion of the project include roadway widening and intersection improvements and do not involve a realignment that would disrupt any existing development or the planned Meadowlands residential development. December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-71 4.0 Discussion of Environmental Evaluation and Mitigation Measures + Coastal Zone Management Plan Both Phases 1 and 2 are located outside of the Coastal Zone. Therefore, the proposed project would not be inconsistent with a Coastal Zone Management Plan. + Environmental Justice In 1994, President Clinton signed E.O. 12898: “Federal Actions to Address Environmental Justice in Minority Populations and Low Income Populations.” The executive Order requires that each federal agency, to the greatest extent allowed by law, will administer and implement its programs, policies, and activities that affect human health or the environment soas toidentifyandavoid”disproportionatelyhighand adverse” effectsonminorityandlow- income populations. The U.S. Department of Transportation is committed to,embracing the objectives of EO 12898 and Title VI of the Civil Rights Act of 1964 by promoting enforcement of all applicable planning and environmental regulations and by promoting non- discrimination in its programs, policies and activities that affect human health and the environment. The final strategy for implementation of E.O. 12898 was published in the Federal Register on June 29, 1995. The objectives can be summarized as: (1) improve the environment and public health and safety in the transportation of people and goods, and the development and maintenance of transportation systems and services; (2) harmonize transportation policies and investments with environmental concerns, reflecting an appropriate consideration of economic and social interests; (3) consider the interests, issues, and contributions of affected communities, disclose appropriate information, and give communities an opportunity to be involved in decision making. The primary elements of the Department of Transportation strategy include: (1) public outreach for implementation of the strategy; (2) creation of a DOT Order on Environmental Justice which [a] will review existing policies and programs, [b] develop guidelines for determining whether or not an action is likely to have a disproportionately high and adverse human health or environmental effects on low income and minority communities, and [c] develop consistency between Environmental Justice objectives and the requirements of other statutes; and (3) train program managers to incorporate the Environmental Justice policies. December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-72 4.0 Discussion of Environmental Evaluation and Mitigation Measures TheDepartment of Transportation and FHWA have subsequently issued the Department of Transportation Actions to Address Environmental Justice in Minority Population and Low- Income Populations (published in the April 15, 1997 Federal Register, Vol. 62, No. 72) and FHWA Actions to address Environmental Justice in Minority Populations and Low-Income Populations (6640.23, December 2, 1998) to ensure compliance with E.O. 12898. “Low-income” and “minority populations” are defined as any readily identifiable group of low-income or minority persons who live in geographic proximity, and, if circumstances warrant, geographically dispersed/transient persons who would be similarly affected by a proposed FHWA program, policy, or activity. The City of Carlsbad must collect and evaluate dataonminorityandincomecharacteristics,increasepublicparticipationindecisionmaking, and provide mitigation and enhancement measures to avoid or minimize the adverse effects of the federal action. Census and recent SANDAG data collected establishes that the entire project corridor has an income far above the County’s median income, and a far lower percentage below the poverty level as well as a low percentage of “minority populations.” Field observations were conducted in March 2001 to validate census and SANDAG data. Field observations determined that land surrounding the project consist primarily of vacant ,land proposed for newer housing, single-family residences and light industrial uses, typical of census and SANDAG demographic data describing the social and community-related characteristics of the City of Carlsbad. The proposed Ranch0 Sante Fe Road widening project would take place in areas that have been identified as having a high income (see Figure 4-f{), e.g., 22 to 100% of the surrounding population (SANDAG 1998). According to SANDAG, high income population is defined as any household whose annual income exceeds $75,000 (average household size in San Diego County is approximately 3 persons). Further analysis indicated that within areas immediately adjacent to the proposed roadway widening, 0 to 21% of the population was categorized as having a low income. Immediately northeast of the proposed project location, households categorized as having a low income increases slightly to 21 to 31% of the total population. Low income population is defined by SANDAG as a household whose annual income does not exceed $25,000 (see Figure 4-12). The percentages are based on the entire polygon and not solely on the population immediately adjacent to the proposed project location. According to the Department of Health and Human Services definition, which December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 673 Ranch0 Santa Fe Road Realignment & Bridge Replacement - Environmental Assessment High Income Population ................ ................ ... . ................... ..::.:.:.:.:. .......... .................. ..:j:::.:.:.: .: ................. ::::.::_: ................. :::fi.:i::::i:j:j ................. :::::.: ::: ................. i i : ....... ........... ..... ........ ...... ..... ........ ......... ....... ....... . ................ ...... ........ 2 ...... ........... /::::::::j:::l ......... .... ./TY -1 : : : : : -/ : ,-b ........ ......... ......... ...... 4 ............. T... .7. /.I ....... ....... ....... ....... ....... ....... .................. Low Income Peculation: m O-21% a m 21-31% m 31-40% m i 40-48% / 48-100% . . . . . . . . . . ................. ... \ .................. . ................... ............. ............. ............. ............. ............. ............. ............. ............. ............. ............. ........... .. ............. ............. ............. ............. ............. ............. ............. ............. .A . .fl............................. SOURCE: SANOAG Interactive Atlas 1998; SANOAG Census Tract 1990 GIS Coverage ’ ’ 1” - 400 Ranch0 Santa Fe Road Realignment & Bridge Replacement - Environmental Assessment low Income Population 4.0 Discussion of hvironmental Evaluation and Mitigation Measures FHWA uses to define low-income for purposes of environmental justice, a three-member household with an annual income of $13,003 or less is considered to be living in poverty. Therefore, the SANDAG definition of low-income would include more of the population as low-income. No low income populations were identified in the project area. Overall, the median household income for the City of Carlsbad is $60,107, while the County of San Diego’s median household income is $46,503. The median price for homes that were for sale during the 1999-2000 fiscal year within the City of Carlsbad was $370,000. Census data regarding ethnicity of the population living immediately adjacent to the proposed project location was unavailable. However, census data regarding ethnicity for the City of Carlsbad as a whole was available. Table 4-U shows a comparison of ethnicity between the City of Carlsbad and San Diego County. TABLE 4-12 ETHNICI-IY COMPARISON Population Percent of Population i 3,871/722,377 669/173,551 3,276/276,876 62,214/1,738,664 82,030/2,911,468 1712.5 l/6 4110 78160 100/l 00 1 Median Aae 1 29.W25.3 / 31.U27.3 1 35.U31.5 / 41.4/3&l 1 39/33.6 ’ CB = City of Carlsbad SD Co. = San Diego County Review of census data as well as field observations show that no minority or low income populations have been identified that would be adversely affected by the proposed project as specifically required by E.O. 12898 regarding environmental justice. December 2001 157tw3 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-76 4.0 Discussion of Environmental Evaluation and Mitigation Measures 4.3.2 Public Services and Utilities (#s 8,40, 41) Environmental Evaluation Phases 1 and 2 Adoption of the proposed project would not generate demand for sewer, water, natural gas, electrical utilities or for public services such as fire, police, schools or solid waste disposal. It is anticipated that utilities such as sewer, water, gas and electricity necessary to serve future development would be located within the alignment proposed for the roadway. However, adoption and construction of the roadway itself for both Phases 1 and 2 would not include any utility connections. In addition, the proposed project would implement the Circulation Element of the General plan and, therefore, would not generate population growth that would increase demand for public services or any new utilities. Disposal of solid waste would be required during construction activities for both Phases 1 and 2. As discussed in SECTION2.0, the proposed grading quantities would be balanced between cut and fill materials. As a result, soil or rock would not need to be exported from the site. Solid waste would consist primarily of some construction materials for the roadway. These materials would be taken to a local landfill. Considering that no export of soil is required, disposal of construction materials would be minimal and would not adversely impact local landfills. 4.3.3 Historic and Archeological Resources (#48) The following analysis is abstracted from the following primary documents: HistoricProperty Survey Report -Negative Findings (December 1997), and First Supplemental: Ranch0 Santa Road Bridge Replacement Project, Historic Property Survey Report [HPSR] (November 2000). Both documents were prepared by Gallegos & Associates. These studies involved literature reviews, record searches, and field surveys to document cultural resources that might be located within the Area of Potential Effects (APE) for Phases 1 and 2 of the proposed project. Because of federal involvement in this project, the cultural resources studies were done to comply with the requirements of Section 106 of the National Historic Preservation Act, and its regulations, as promulgated in 36CFR§800. The purpose of these studies under federal law is to determine whether there are any resources located within the project APE that are listed December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-77 4.0 Discussion of Environmental Evaluation and Mitigation Measures on or eligible for listing on the National Register of Historic Places, and under state law, for the California Register of Historical Resources. No resources listed on or eligible for listing on either Register were identified within the project APE, Phases 1 or 2, for this undertaking. The HPSR is incorporated by reference to this EA and is available for review at the City of Carlsbad. Affected Environment Phase 1 Studies conducted for Phase 1 were completed in September 1997. No resources were identified within the Phase 1 project APE other than the existing San Marcos Creek Bridge, numbered 57C-278 in the statewide inventory. The bridge was built in 1978 and was determined by the Department in 1987 to be not significant and not eligible for the National Register. Under normal circumstances, a bridge must be at least 50 years old before it can be considered eligible for the National Register. As the San Marcos Creek Bridge will not reach 50 years of age until 2028, it falls well short of the minimum criterion for evaluation, and it does not qualify under any of the categories for exceptional significance. The Section 106 process for Phase 1 was completed on December 23, 1997, when Federal Highway Administration Senior Transportation Engineer, Jeffery S. Lewis, reviewed and signed the documentation. Phase 2 Two archaeological sites were noted within or adjacent to the APE for Phase 2: Prehistoric archaeological site CA-SDI-11,440 was identified as a lithic scatter. Lithic scatters generally represent areas where raw materials were either gathered for stone tool production elsewhere, or where tools were made or roughed out for immediate use or for transport for later use. These sites lack subsurface deposits, diagnostic artifacts, tool variability, and Native American heritage values. And because they cannot be precisely data, lack research potential because they cannot be placed within the prehistoric context for San Diego County. The site was evaluated for its significance to the California Register through an evaluation program conducted for a proposed Questhaven housing development. The studies for that project were conducted by ERC Environmental and Energy Co. in 1990. Based on their December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-78 4.0 Discussion of Environmental Evaluation and Mitigation Measures findings, site CA-SDI-11,440 was determined to be not important under CEQA. Those findings were also used to provide the significance evaluation for the current project. Archaeological site CA-SDI-942 has been known for over 60 years, and consists of an prehistoric habitation or campsite. Extensive tests conducted at the resource over the years for various adjacent development projects ultimately resulted in its being determined not important under CEQA. As originally plotted in the files at the San Diego Museum of Man the site was shown extending into the APE for the Phase 2 project. A review of the previous site evaluations, and field survey conducted specifically for this project, however, showed that the site did not extend into the project APE. Even though the site was previously evaluated in 1991 by RECON and determined to be not significant, it was subsequently shown to be outside the project APE for this bridge replacement project. The Section 106 process for Phase 2 was completed on March 2,2001, when the Federal Highway Administration transmitted the State Historic PreservationOfficer’s (SHPO’s) concurrence (dated February 15,200l) that there are no sites located within the Phase 2 APE that are listed on or qualify for listing on either the National or California Registers. SHPO’s concurrence letter is included in Appendix B to this EA. Environmental Evaluation Phases 1 and 2 No significant cultural resources occur within the project APE for either Phase 1 or 2, therefore, no further cultural resource evaluations, mitigations, or conditions are required in connection with this undertaking. 4.3.4 Transportation and Circulation (#s 42,43,44,46, 51) A traffic analysis was completed for the project that addressed existing conditions and evaluated the impacts of the proposed roadway realignment and widening on roadway and intersection LOS. The traffic study is included as an Appendix to the EIR and is available for review at the City of Carlsbad. The City has updated projected traffic conditions for the year 2020 as provided below. December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-79 4.0 Discussion of Environmental Evaluation and Mitigation Measures Affeded Environment Phase 1 and 2 Under existing conditions and planned 2020 buildout traffic levels, roadway segments within the proposed project area either currently operate at unacceptable levels or are projected to operate at unacceptable LOS in 2020 (Table 4-{3). Existing conditions at affected roadway segments and intersections are summarized in Tables e-f3 and 4-44. TABLE 4-13 EXISTING AND 2020 CONDITIONS - ROAD SEGMENTS Melrose Drive Between Ranch0 Santa Fe Road and Alga Road 11000 0.12(A) N/A 031(A) 0.42(A) Rancho Santa Fe Road s/o La Costa Avenue. Source: City of Carlsbad, March 2001. Wages of La Costa Traffic Report. 22900 0.33(A) 41300 0.34(A) 0.37(A) TABLE 4-14 December 2001 157603 Environmental Assessment. Ranch0 Santa Fe Road Realignment and Bridge Replacement 4.80 4.0 Discussion of Environmental Evaluation and Mitigation Measures Environmental Evaluation Phases 1 and 2 Phases 1 and 2 of the proposed project would implement the traffic congestion relief anticipated by the City circulation element of the General Plan and the FHWA and FTA approved 2001-2004 RTIP (October 6,200O). The proposed realignment and widening is approved as a part of the City General Plan and is also identified within the SANDAG RTP (February 2000). Community benefits from this proposed project will include reduced congestion, improved traffic flow and increased safety for travelers on the roadway. Additionally, this road realignment will provide a vital link in the regions roadway network. Increasing the capacity of the roadway would decrease the average delay that a vehicle would expect to experience at each signalized intersection in the project vicinity (in seconds as shown in Table 4-15). Any decrease in delay indicates an improvement to the level of service of the intersection. Final design includes signals at the Ranch0 Santa Fe Road/Questhaven and Ranch0 Santa Fe Road/Cadencia intersections as well as the final configuration for the Melrose Drive/Ranch0 Santa Fe Road intersection. In addition, as shown in Tables 4-43 and 4-15, implementation of the proposed roadway realignment, widening and bridge replacement are necessary to bring service at roadway segments and intersections within the project vicinity to acceptable levels. As shown in Table 4-15, with implementation of the project, all roadway segments would operate at a LOS of A at the 2020 buildout traffic volumes; whereas without the project, three segments analyzed would operate at LOS F and one segment at LOS E. TABLE 4-15. 2020 CONDITIONS - INTERSECTIONS Source: City of C&bad, March 2001 December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4-81 4.0 Discussion of Environmental Evaluation and Mitigation Measures During construction, the City will implement a traffic control plan to avoid adverse short term impacts to traffic. The traffic control plan will show all signage, striping, delineate detours, flagging operations, and any other devices which will be used during construction to guide motorists safely through the construction zone. The traffic control plan will also include provisions for coordinating with local emergency service providers regarding construction times and locations of lane closures as well as specifications for bicycle lane safety. The City’s construction contractors will coordinate traffic diversions, street and lane closures, and obstruction of intersections with the City’s engineering department prior to commencing construction activities through the development of routing and detour studies. Construction of the proposed project would not affect existing parking facilities or require extensive use of detours. During each phase the existing roadway and the existing bridge would remain open for traffic. Considering that with Phase 1 the road would be realigned to vacant land and Phase 2 would involve primarily road widening, existing parking structures and lots would not be affected. All staging areas would be accommodated within the Phase 1 and 2 impact area shown in Figure Z-2 and no existing parking lots or structures would be impacted. In addition, no alterations to airborne, rail or air traffic would be required. Implementation of the proposed project would not result in adverse impacts to the availability of bicycle or pedestrian facilities. The realigned roadway within Phases 1 and 2 would incorporate a designated bicycle lane, designed in conformance with City standards. Although the realigned roadway would not include a designated pedestrian access lane, existing pedestrian access opportunities would not be adversely impacted considering that the existing roadway does not include a designated pedestrian trail. In addition, signals will be provided at the Questhaven and Melrose Drive intersections to accommodate pedestrian access. 4.4 THE RELATIONSHIP BETWEEN SHORT TERM USES OF MAN’S ENVIRONMENT AND THE MAINTENANCE AND ENHANCEMENT OF LONG TERM PRODUCTIVITY (# 54) The short-term effects of the proposed project are those associated with the construction of the proposed project. As discussed in SECTIONS 4.1 through 4.3, construction issues are related to noise, air quality, traffic and water quality. However, as discussed in SECTIONS 4.1 December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-82 4.0 Discussion of Environmental Evaluation and Mitigation Measures through 4.3, measures have been incorporated into the design of the proposed project in accordance with City, State and federal requirements to avoid or minimize these short term construction impacts. Implementation of the proposed project would, however, enhance thelong term productivity of the region. As discussedin SECTION2.0, the proposed realignment, bridge replacement and widening are intended to implement City General Plan and regional transportation plans. The proposed project would implement the realignment and widening approved for the roadway as a part of the City General Plan Circulation Element and the SANDAG Regional Transportation Improvement Plan. All improvements incorporated into the City Circulation Element are necessary to address existing traffic congestion issues and accommodate planned growth in the City. Considering the proposed project would implement the Circulation Element of the General Plan, the local short term effects from construction would be consistent with the maintenance and enhancement of long term productivity for the local area. 4.5 CUMULATIVE IMPACTS OF RELATED PROJECTS (#55) Cumulative effects associated with the development of the proposed project have been evaluated in the Rancho Santa Fe Realignment and Mass Grading Project EIR. The EIR’s cumulative project list contains over 50 projects, covering an approximately 30 square-mile area. As concluded in the previous discussion for each environmental category, no substantial environmental impactswould occur with implementation of the proposed project. Measures are incorporated into the proposed project in accordance with that required by the EIR to avoid adverse impacts to air quality, earth resources, water resources, biological resources, noise, light and glare, visual quality/landform alteration and traffic/ circulation. Therefore, in the absence of substantial impacts, the proposed project would not substantially contribute to cumulative impacts associated with ongoing development. The Ranch0 Santa Fe Road Realignment and Mass Grading Project EIR as well as the University Commons Specific Plan Supplemental EIR (City of San Marcos, 2001) and the Final Program EIR for the Villages of La Costa Master Plan (City of Carlsbad, 2001) provide an updated overview of numerous proposed, approved or approval-pending projects in the project vicinity that would contribute to the cumulative regional loss of biological resources including effects to coastal California gnatcatcher habitat. In addition to the proposed December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-83 4.0 Discussion of hvironmental Evaluation and Mitigation Measures project, development projects that are proposed or approved to be constructed within the project vicinity, would result in approximately 640 acres of impacts to coastal sage scrub and other sensitive upland vegetation communities. It is anticipated that the above-mentioned projects would extend into undeveloped areas characterized by coastal sage scrub habitat which is potential habitat for the coastal California gnatcatcher. Implementation of the proposed project would contribute to the cumulative loss of sensitive biological resources, including 17.3 hectares (42.8 acres) of coastal sage scrub, in addition to the loss of habitat associated with the development of the above- mentioned projects. Cumulative impacts to coastal California gnatcatcher habitat as well as other biological resources within the region are most effectively mitigated by a comprehensive plan that addresses regional growth onwildlife and habitat. The cumulative loss of sensitive biological resources within the City of Carlsbad is addressed through the City’s Habitat Management Program (HMP) for Natural Communities. The City’s HMP establishes a framework to develop a preserve system that provides for the continued existence of sensitive species and the maintenance of natural diversity. As stated in the HMP, the purpose of the plan is to identify how the City of Carlsbad, in cooperation with federal and state wildlife agencies, can preserve the diversity of habitat and protect sensitive biological resources within the City while allowing for additional development consistent with the City’s General Plan and its Growth Management Plan. The HMP also serves to define the City’s contribution to regional efforts to conserve coastal sage scrub habitat and species under California’s Natural Communities Conservation Planning (NCCP) Program. As discussed in Section 4.2 of the EA and in the Summary of Environmental Commitments, mitigation for the proposed project’s impacts to the California gnatcatcher would be consistent with the HMP. Mitigation will include dedication of habitat credits and timing of construction outside the California gnatcatcher breeding season in order to avoid disruption of nesting and rearing. The cumulative loss of sensitive biological resources within the City of San Marcos is currently being addressed through the development of the City of San Marcos’ NCCP/ Subarea Plan. The NCCP/Subarea Plan identifies focused planning areas where preservation December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-84 4.0 Discussion of Environmental Evaluation and Mitigation Measures of habitat for conserved wildlife and plant species will be concentrated in the City of San Marcos. The focused planning areas will provide for conservation of sensitive habitat, including coastal sage scrub, as well as sensitive plant and wildlife species on a citywide basis. Participation in regional conservation planning such as the City of Carlsbad’s HMP or the NCCP is recommended to coordinate regional resource conservation efforts, and to reduce cumulative impacts to sensitive species and habitats. Preservation of significant vegetative associations in the project vicinity in a configuration that links these habitats to other open space areas is necessary to reduce these cumulative impacts to vegetation. The project is in conformance with the City of Carlsbad’s HMP planning efforts. 4.6 NO PROJECT ALTERNATIVE ENVIRONMENTAL EVALUATION Topography/Visual Resources Under the No Project Alternative, the existing character of Ranch0 Santa Fe Road and the view present from surrounding viewsheds would not be altered. The existing bridge over San Marcos Creek would remain unchanged. Existing views from the industrial establishment located at the junction of Melrose Drive and Ranch0 Santa Fe Road would remain unchanged. The existing views of the creek present to travelers on both north and southbound Ranch0 Santa Fe Road would remain. The No Project Alternative would not require concurrence with the City of Carlsbad’s Scenic Corridor Guidelines Manual. Hazardous Materials Under the No Project Alternative, the existing roadway would be utilized. As a result, no change to existing conditions would occur and no exposure of people or property to hazardous materials would occur. Floodplain Under the No Project Alternative the existing bridge would remain. Water surface elevations as well as calculated peak flows for 25, 50 and, 100 year floods would remain under the No Project Alternative. During a loo-year storm event, the existing bridge would be completely submerged. December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bridge Replacement 4-85 4.0 Discussion of Environmental Evaluation and Mitigation Measures The structural integrity of the existing bridge would remain in jeopardy in the event of a 100. year storm event. However, under the No Project Alternative, no impacts to the existing floodplainwould occur. No further benefits or liabilities would exist to natural and beneficial floodplain uses. Water Quality Under the No Project Alternative, existing Ranch0 Santa Fe Road run-off quantity and quality would continue to flow into San Marcos Creek. Expanding the surface area of the roadway associated with phases 1 and 2 and the resulting increase in stormwater runoff would not occur. Air Quality The No Project Alternative will leave the existing roadway in place. Long-term impacts to air quality will result with or without roadway widening and realignment, due to increased emissions over time. The No Project Alternative will eliminate air pollution emissions generated by construction of the project. However, due to the poor circulation expected on the existing roadway, the No Project Alternative will result in more traffic-generated air pollution emissions being contributed to the basin than with widening and realignment of the roadway as proposed. Noise Under the No Project Alternative, existing noise conditions would remain. The area near the junction of La Costa Meadows Drive and Ranch0 Santa Fe Road would continue to have a peak average noise level of 70 dBA during both the morning and evening commutes. The residential area located at the northwest intersection of Melrose Drive and Corintia Street would continue to have an average sound level of 63 dBA approximately 3 meters (10 feet) from existing noise attenuation walls. Ranch0 Santa Fe Road traffic noise levels would continue to range between 52 and 58 dBA within the vicinity of this residential area. Under this alternative, no noise related impacts would occur. Adverse traffic noise levels at the La Costa Avenue/Ranch0 Santa Fe Road intersection would remain under the No Project Alternative. Existing residences currently are subjected to traffic noise from the existing alignment which extends adjacent to the existing subdivision. The December 2001 157603 Environmental Assessment l Rancho Santa Fe Road Realignment and Bddge Replacement 4.86 4.0 Discussion of hvironmental baluation and Mitigation Measures proposed project would involve realignment of the roadway and an increase in the distance of the roadway and subsequent traffic noise from these residences. Biological Resources Under the No Project Alternative, no impacts to plant communities or to sensitive wildlife species such as the Cooper’s Hawk, two-striped garter snake and Dulzura California Pocket Mouse would occur. Additionally, short-term impacts to wildlife movement during construction within the San Marcos Creek would not occur. Historic Resources Under the No Project Alternative, no grading or disturbance would occur. Therefore, no impacts to cultural resources would occur. December 2001 157603 Environmental Assessment l Ranch0 Santa Fe Road Realignment and Bridge Replacement 4.37 SECTION 5.0 CONSULTATION AND COORDINATION Coordination During Preparation of the EA Issues raised by the public and interested agencies during the proposed project development process have been given consideration which is reflected in the proposed project features listed in the Summary of Environmental Commitments section of this EA. Environmental commitments included into the final design have resulted from comments and concerns raised during public review of the EIR prepared for the project as well as coordination with local, state and federal agencies in obtaining regulatory agency permits and approval (see Section 1.8 for list of permits). The following agencies, organizations and/or individuals were consulted and coordinated with during proposed project development. United States Federal Highway Administration Fish and Wildlife Service Department of Agriculture, Soil Conservation Service Department of Housing and Urban Development Army Corps of Engineers State of California Department of Fish and Game Regional Water Quality Control Board State Office of Historic Preservation Local Agencies City of Carlsbad: Doug Helming, City Project Manager Don Rideout, Planning Department In accordance with the requirements of NEPA and the Federal Endangered Species Act, the Department, acting as agents for FHWA and the City, requested a list of threatened and endangered species present in the proposed project area from the USFWS. The concerns of the USFWS were incorporated into the biological resources report prepared for this document (USFWS letter dated August 1999 included in APPENDIX A). December 2001 157603 Environmental Assessment l Rancho Santa Fe Road ReaIignment 8 Bridge Reconstruction 5-1 5.0 Consultation and Coordination With the addition of federal funds to the project, FHWA has initiated formal Section 7 consultation with the USFWS because the project may affect designated critical habitat for the coastal California gnatcatcher (USFWS letter dated September ~004 included in APPENDIX 4. TheCityofCarlsbadEngineeringand PlanningDepartments wereconsultedonissuesrelated to ongoing and planned development projects within the vicinity. The City of Carlsbad also provided information on the appropriate statutes and planning documents relevant to the proposed project. The cultural resources report prepared for the proposed project was prepared in accordance with the requirements of the SHPO and Section 106 of the Historic Preservation Act. The FHWA and SHPO signed off on the HPSR documenting completion of the Section 106 process in March 2001. The cultural resources report concluded that the proposed project would not contribute to the loss of cultural resources. As discussed in Section 4.3, Historic Resources, implementation of the proposed project would not directly impact any known cultural sites of importance. In addition, environmental commitments of the proposed project allow the proposed project to be postponed in order to accommodate the testing and study of any cultural resource discovered during construction. The City has also consulted with the ACOE, the NRCS, CDFG and the RWQCB related to wetland impacts in accordance with Section 404 and 401 of the Federal Clean Water Act and Section 1600 of the CDFG Code and has received regulatory permits as discussed in Sectioti 1.8 of this EA. December ‘2001 Environmental Assessment l Ranch0 Santa Fe Road Realignment&Bridge Reconstruction 157603 5-2 SIXTION 6.0 ENVIRONMENTAL IZVALUATION PERSONNEL The following people were principally responsible for preparing the EA or significant background papers: D. Gallenos - Cultural Study Contract Archaeologist; Gallegos & Associates; B.A. and M.A. in Anthropology H. Giroux - Air Studies Contract Air Quality Specialist; Giroux &Associates; M.S J. Harry - Environmental Planner/Document Preparation Contract Environmental Planner, Dudek & Associates, Inc. ; B.S. in Environmental Planning D. Helming - Proiect Manager Project Manager, City of Carlsbad; P.E., B.S. M. Komula - Noise Study Contract Acoustician; Dudek &Associates, Inc.; B.A. Geography, M.S. Acoustics G. Masutani. Ph.D. - Water Quality Contract Water Quality Specialist, Ph.D., Engineering Registered P.E. S. Miller - Biolow Study Contract Biologist; Dudek &Associates, Inc., B.S. and M.S. in Biology J. Porteous - Senior Proiect Manager Contract Environmental Planner, Dudek &Associates, Inc.; B.A. Environmental Studies and Geography; M.A. in Geography P. Quinlan - Hazardous Materials Contract Hazardous Materials Specialist; Dudek &Associates, Inc.; M.S. Hydrogeology M. Sweesv - Visual Resources Contract Landscape architect; Dudek & Associates, Inc., MS. Landscape Architecture; Registered Landscape Architect ASLA. December 2001 157603 Environmental Assessment l Rancha Santa Fe Road Realignment&Bridge Replacement 61 fwY%m!~L~ 14 UMWS Correspondence -. . . . United States Department of the Interior FISHANDWlLDLTFBSERVICE l?‘2&eidsavioes _ ;: Z.,.,~ , ,,. ,~, - caasb.dFi-dwildlifeOffice 273O&&xAvmaeWest cadshk-92008 pi23685 JimHany,~0~Plann~ DUDEK & k.isOcbiT& Ii%. 605 Third Street’ )3minih, cawomia 92024 R.E: ieqoe& for Candidet~, Propor+& Threatened, or Endangered Species for the Ran&o Santa Fe Road Bridge Replacement RcaIigmnent in the City of C&bad, Northxkskrn San Diego County, California (l-6-99-TA-71) Dear Mr, Hmy: The U.S. Fish and Wildlife Service (Service) has reviewed the iuformation prckided in your letter &ted July 21,1999, which requested ioformation on the potentiaLfor federa!@ listed threatened or endangered species at the proposed project site. We do not &we site-specitic biformation for the project area, consequ&tly the attached f$t is a general list of species that have the potential to oc& in the vicinity of the San& Fe Road Bridge Re$aczment Realignment in the Cii of Carlsbad, Northwestern San Diego’CounQ, CaIifom& We re&nmend that you seek as&stance from a biologist fktoi& with the project site and with the listed species in assessing the actual potential for dire@ kiirect atid wmdative impacts likely to result *om the proposed activity. YOU should also contact the CaMomia Department of Fish and Game for State listed species which may occor in the area of the proposed project State listed species arc protected under t$e provisions of the CalZomia Endangered Species Act. In addition to the attached list of protected specie the Service is concerned about the following species, which have the potential to occur in the area of the proposed proje& ‘and fo? which current scientific evidence suggests are &Iioing in nombeks: hMMMAL.S: San Diego bIack- tailed jackrabbit (Lepus caliyomicus beketti& San Diego desk Woodrat (Neotoma kpiida interme&z), mule deer (OdocoiIeus hemionzs$diginakz), northwestem SanDiego pocket mouse (Perognathus fdhx falux), American badger (T&a tarus); BIRDS: Cooper’s hawk (Accipiter cooperiz], sout@m California rufous-crowned sparrow @imophika ruficeps Canescens), 0xistal cactus wren (CampyIo+dus b7wrieicapiIhi.S sdegoense), no&q harrier (ahzs cyanars), white-t$ed kite (Elarms @curus), Belding’s s?vaMah sparrow (Paxwrculus sandwicheenris beldingi); INSECTS: oblivious tiger beetle (Cicidela kzfestignat obliviosa),,monarchbutter& (&nawpZex@.qwj; REPTILES: n?rtherp &diamond rattlesnake (Crotiw nrberrubm), orange-throated &@td (~i&p?zo~~~), coastal western whipta3 (Cnemidophoncs tigrinmdtis~), San DiegO banded gecko (Coleonyx variegatus abbom), coastal rosy boa (Lichanurti b&tr@&.&s~~, Sk Diego Mr. Jii Harry (I-6-99-TA-71) homed lizard (Phrynosoma coronahmt blutnvilIez), coast-patch nosed snake (Sea hexilepis virgultea), and two-striped garter make .(%qr~.~ophis hammondi~. Although these spicies are atForded nip federal protection, conservation measures could help maintain stabIe populations and preclude the need for fixture list&s. The Service is al.4 wncemed for the’foffowing habitat commm&y types: southem maritime chaparral, southern willow scrub, southem r@ian scrub, south&n riparian forest, southern cottonwood widow riparian forest, south= sycamore alder riparian woodland, and Sail Diego mesa bardpan vernal pools, which could potentkdly occur in the project area end are becoming rarerdue to developnient, distorbance $-om hi-, foot traflc, water impoundments, b-r&ion ronofF, dmnping, gmzing, and 0th~ natm-al and homan induced impacts. The following plant species may ocw in the area of the proposed project and are considered to ,be sensitive by the CaMxnia Native Plant Societp- (CWS). Ca%ornia adolphia (AaXptia wl@mziw), San Diego ambrosia (AmbrosiapumiZa), Blo&man’s dodleya (Dudlqya blochmnniae ssp bZochrmmia+ war-stemmed ceanothus (ceanothus verruwsus), summer holly (Comarostap?zyZis a?ver.@Zia ssp. aFvers$Wa), sticky dudleya (Dux&ya visciak), cliff spurge (Euphorbia miser-u), Palmer’s grapplinghook (HurpugoneUupub~~erz~, southern tarp&t (Hemizoniaponyi ssp. at&&s), smooth ta&& (Hemizoniapungens cisp laevis)> mud nama (Nma skmwpm), coast woo&-heads (NemocmJis demrdata var dekokta), and Nuttal’s scrob oak @uercus *OXI). Plauts found on the’CNPS Ii& tie also considered sensitive fiorn a federal standpoir& State listed and those semitive species which meet criteria for isting reqoire &II considera?on under the 0+fornia E&rq~&al Qua& Act (CEQA). Ifit is determined that the proposed project may af&t a Iisted species the fbdcral agency should initiate consultation with the Service pmmant to section 7 of the Endmgered Species Act of 1973, as amended. I&ormal coMonmay be used to exchange information and reso!x& co$Iicts with reqiect to listed species prior to 5 written request fir formal wnsokation. Our goal would be to provide technical assistance that identifies specilic featores that could be incorporated iota the project descriptien toavoid a+rse impacts to.listed species. Should you bave any questions regarding the species.Iisted or h reqonsiies under the Act; please contact Beveriee Reilly of my stafF e (760) 43 l-9440. .,C^T~.;. j-y ,I ‘2,::. - ! , !..::.., .:: ..! .;~: :i,:i .: :,;’ ,k::.: I I ,:- 4 1 , ..;.. -. :: ., 3 < L,,; ~.. ‘j / I I m. J’I’I Hany (l -6-99-TA-71) Listed Endangered, Threatened and Proposed Species that have pot&M to Occur in Cadsbad SanDiego, csliforIlia. Common Name 2lIm.s southwestem wiliow flycatcher coastal Califomia gnatcatcher lea@BelL’svireo .pLANTs SatrDiego thorn-mint DelMarolaIlZaUitZl ,Encinitas baccharis &read-lea& brodiaea San Diego button-celery Scientific Name EmoidonsxtraiUiitraiW PolioDtila~~ Virio bellii oosiks Bacchsrkvankssae km&.. :. Erpnsirrm’&&&gvar.. &g&i 3 StatnS Endaugered Threatened Endangered KECHVE United. States Department of the Int@Qr2 5 2,,,,, FISH AND WILDLIFE SERVICE Ecological Services Carlsbad Field Office 2730 Laker Avenue West Carlsbad. California 92008 In Reply Refer To: FWS-SDG-2015.2 Mr. Michael G. Ritchie, Division Administrator U.S. Department of Transportation Federal Highway Administration California Division 980 Ninth Street, Suite 400 Sacramento, California 95814-2724 SEP 2'1~2001 Attention: Mr. Jeff Lewis RE: Initiation of Formal Section 7 Consultation on the Ranch0 Santa Fe Road Realignment and Widening project, Carlsbad, California (1-6-01-F-2015.2) Dear Mr. Ritchie: This letter acknowledges the U.S. Fish and Wildlife Service’s (Service) August 21.2001, receipt of your August 15,200l letter requesting initiation of formal section 7 consultation under the Endangered Species Act (Act). We initiated consultation upon the date of receipt of the letter. The consultation~concems the possible effects of the proposed realignment and widening of Ranch0 Santa Fe Road on the federally threatened coastal California gnatcatcher (Polioptila califomicn califomica). Section 7 allows the Service up to 90 calendar days to conclude formal consultation with your agency and an additional 45 calender days to prepare our biological opinion (unless we mutually agree to an extension). Therefore, we expect to provide you with our biological opinion no later than January 10,2002. We have assigned log # FWS-SDG-2015 to this consultation. Please refer to that number in future correspondence regarding this consultation. We would like to confirm for you that the City of Carlsbad (City) is meeting the requirements of the Incidental Take Permit No. PRT-795759, issued by the Service to the City and Fieldstone/La Costa Associates, pursuant to section IO(a)(l)(a) of the Act. The City has been coordinating with the Service throughout the planning process for this project, and we anticipate that we will continue to work together to ensure compliance with the permit, and implementation of all conservation measures associated with the Ranch0 Santa Fe Road realignment and widening project described in the Habitat Conservation Plan associated with the aforementioned permit, throughout the execution of this project. Mr. Michael G. Ritchie (FWS-SDG-2015.2) 2 If you have any questions or concerns about this consultation or the consultation process in general, please feel free to contact John Martin of my staff at (760) 431-9440. Sincerely, cc: Carrie Loya-Smalley, City of Carlsbad g@ Nak-“;I--:, Assistant Field Supervisor United States Department of the Interior FISH AND WILDLIFE SERVICE Ecological Services Carlsbad Field Office 2730 Laker Avenue West Carlsbad, California 92008 In Reply Refer To: FWS-SDG-2015.1 SEP 212001 Chris White, Chief Environmental Resource Studies California Department of Transportation District 11 P.O. Box 85406 ‘f” ‘:; ~_( ;f” ““:I~‘$ -;.,- 1 I.~, : ,, i’“~, / San Diego, California 92186~5406 I’..““-. I :.,, ; >, ? :, \ b, “,‘.;‘),,,+‘rr;’ I $1 Re: Request for list of Candidate, Proposed, Threatened, or Endangered Species for the Ranch0 Santa Fe Road Bridge Replacement Realignment in the City of Carlsbad, Northwestern San Diego County, California Dear Mr. White: The U.S. Fish and Wildlife Service (Service) has reviewed the information provided in your August 17, 2001, letter to assess the potential presence of federally listed threatened, endangered, or proposed species at the proposed project site. Focused:surveys for federally listed species were conducted in the area of potential impact in 1990-1992 by Helix Environmental, Inc., and in 1997-1999, and 2001, by Dudek and Associates. These surveys confirmed the presence of the coastal California gnatcatcher (Polioptila cdifomica califomica; gnatcatcher) on the project site. The site also contains an area of designated critical habitat for the gnatcatcher. No other federally listed species were detected on the site in the course of focused surveys or other biological reconnaissance. Should you have any questions regarding the species listed or your responsibilities under the Act, please call John Martin of my staff at (760) 431-9440. Sincerely, ,& 4- m Nancy Gilbert Assistant Field Supervisor cc: Carrie Loya-Smalley, City of Carlsbad Planning Department Project Permits USrWS 1 Oa permit ACOE 404 Permit RWQCB 40 1 Permit CDeg 1601 Agreement SHPO 106 Concurrence Letter m. ,~:,. I’ j . ! Ii I ,.. II L: I t, - .._-_. -. ..- . . . . W.“” -- k3J us-urn --I? ‘.. _. I FEDERAL FISH AND WILDLIFE PERMIT I. l C”mn-cw Fieldstone/LaCosta Associates l 5&65 Morehouse Drive, #250 San Diego, California 92121 and City of Carlsbad 2975 Las Palmas Drive Carlsbad. California 92009 . 16-W 1539(a) 50 CFR 17.22 3. WY.," PRT-795759 4. *mcvv.m,E *zs L I'."6 ! fil ! 1. cmcnvc I 7. LXPn 6/7/1995 j 6/T, ~UU.*O-OCr"UClLLLO-E(1,,,'I.-l ,. nn OF ,CIII Fieldstone: John Barone, Asst. Secretary City: Claude A. Lewis, !layor Incidental Take PRT-795759 L - I"l?"L Amw"ucD Aclmn (uv me -0 k'ithin the southeast quadr,ant.of the City of Carlsbad, California, as described : accompanying Habitat Conservation Plan/On-going Multi-species Plan. ..T*E”*mwMSClltmUAls4 calmwwED “ro* srmcr OIIEWAWCE oc 1l.A WmJC.(ILL mm3G*. s1.m LOCAL 0” OlnE” *EDEmL yu c.vAmRmysLC*CCItm-m*1YeD- SEE ATTACHED .:. G Mam0u.c caNano*f .w *m or4 “lnar wa .m, z -*G “EOWICICNn See Habitat Conservation Plan/On-going Multi-species Plan and Implementation Agreement. Also see permit Condition-1 n/\ -” d~f iy /*Y/ I- Regional Director /=rrg/7/95 I ‘ - ORIGINAL I' Y r PRT-795759 Condirions. cont'd. - p .I. A copy of this permit must be in the possession of the permittees and designated agents while conducting caking activities. Please refer to the permit number in all correspondence and reports concerning permit activities. Any questions you may have about this permit should be~directed to the Field Supervisor, Carlsbad Field Office. United States Dephrnent of the Interior - FISH AND WLDUFE SERVICE 91,I NEllchArnu. Ponirnd orcgon ,7’12,14,9, Imol.m*ntd Seowmbn 199d GENERAL CONDITIONS FOR NATIVE ENDA~NGERED AND THREATENED WILDLIFE SPECIES PERMITS .I 1. Ail sections of Title 50 Code of Federal Regularions Part 13 are conditions oft the permit. 1. All aoplicable foreign, State, tocal. or Otner Federaf laws. including trespass laws and otner laws requiring permits. must be observed. 3. The permittee must carry a copy of the perr’t%t while conducting authorised activities. 4. The permit number must be legibly printed on all documents and advertisements involving activities conducted under a permit. 5. Unless otherwise authorised on the faCa of the permit. the wildlile must be immediately released at or near the capture site after the permnted activity. 6. Living specimens must be handled and shipped so as to mtnrmite nsk of infury. damage to health or cruel treatment. 7. The container in which authorised wildlife is shipped must be plainlY marked with names and addresses of shipper and .consignee and an accurate description at the contents including common and scientific name and number of each within. a. Any dead or injured specimens of the authorised wildlife found may be salvaged or cared for. 9. BIRO BANDING. marking, radio tagging. etc.., must be Conducted in accordance with a Federal Bird Marking and Salvage Permit. 10. At the discretion of the Service, a Serwce employee may inspect the facilities or accompany the permittee during any activity conducted pursuant to thus permit. The permittee shall allow Service personnel complete and immediate access to any materials and information generated as a result-of this permit. Any refusal. obstruction. or hindrance of Service participation in such work shall be grounds for suspension or revocation of this permit in accordance with 50 CFR 13.27 or 50 CFR 13.28. respectively. THE FOLLOWING CONOfTlONS APPLY UNTIL AUTHORIZEO DISPOSAL OF THE WlLOLlFE (LIVE OR DEADI. AND THEIR PROGENY, REGARDLESS OF THE EXPIRATION DATE OF THE PERMIT: 11. The authorised wildlife may NOT be sold. donated. or transferred without written authorizatlon from the Service. 12. Any dead authorised wildlife shall be preserved according to standard museum practices and held for scientific purposes whenever practical. 13. Any live SEA TURTLES held must be maintained in accordance witn the ‘Standards for Care and. Maintenance of Sea Turtles Held in Captivity’ specified by the Service. . ====:9E::S . -.. 0 m 111 B s 111 -P 2, % a E I 3 2 El c 0 d u. z . . _ Office of the Chief Regulatory Branch DEPARTMENT OF THE ARMY LOS ANGELES DISTRICT, CORPS OF ENGINEERS SAN DIEGO RELO OFFICE .I9989 WEST BERNARD0 DRIVE, SUITE 3WA SAN DIEGO. CALIFOFUW 92127 August 24,200O - City of Carlsbad AlTNz Mr. Dave Hansen Deputy City Engineer Engineering Department 2075 Las Palmas Court Carlsbad, California 92009 File Number: 200001251 Gentlemen: This is in reply to your May 19,200O letter concerning your proposal to widen and realign a section of Ranch0 Santa Fe Road from approximately 100 feet south of the La Costa Avenue/Ranch0 Santa Fe Road intersection to approximately 100 feet north of the Melrose Drive/Ranch0 Santa Fe Road intersection. This project is part of the City of Carlsbad’s General Plan to upgade Ranch0 Sata Fe Road to meet its designation as a Prime Arterial Roadway and affects a portion of San Marcos Creek and its tributaries in the City of San Marcos, San Diego County, California. This project includes the relocation of a sanitary sewer line from the old bridge structure to a location under San Marcos Creek in the footprint of the construction disturbance area for the new bridge. The Corps has determined that your proposed activity complies with the terms and conditions of nationwide permit NW14 for fills for roads crossing waters of the United States (including wetlands and other special aquatic sites) and encompasses three separate locations with permanent impacts of 0.5,0.27 and 0.15 respectively. Additionally, the Corps has determined that your proposed activity complies with the ‘terms and conditions of the nationwide permits NW 12 for utility line discharges (0.04 of an acre of impact) lying within the foot print at the San Marcos Creek Bridge site, NW 18 for minor discharges (0.01 acre of permanent impact) and NW 33 temporary constxuction.access and dewatering for roads crossing waters of the United States (including wetlands and other, special aquatic sites) encompasses two separate desc?i@ions with temporary impacts of 1.18 acres. You must comply with all terms and applicable conditions (regional, general, 404 only, and 401 conditions) described in Enclosure 1 and complete the compliance statement (Enclosure 2). -2- - Furthermore, you must comply with the following Special Condition(s): 1. The permittee shall abide by any special conditions stated in the Section 401 Water Quality Certification or waiver from the California Regional Water Quality Board and/or the Section 1601 Streambed Alteration Agreement from the California Depar’ment of Fish and Game. 2. The permittee shall compensate for impacts to waters of the US, including wetlands by restoring and/or enhancing at least 2.31 acres of riparian habitat within the San Marcos Creek watershed as close to the impact area as is feasible. This acreage is estimated using a minimum ratio of 3:l for impacts to Southern Willow Scrub and disturbed wetlands and a 1:l ratio for impacts to unvegetated ephemeral waters. Prior to initiating construction of Ranch0 Santa Fe Road Realignment and widening project, the permit& shall submit to the Corps a mitigation plan consistent with the Los Angeles District Habitat Mitigation and Mmitoring Proposal Guidelines, dated June 1993. The permittee shall obtain final written approval of their mitigation plan from the Corps prior to construction of the Ranch0 Santa Fe Road Realignment and widening project. 3. The permittee shall develop a Biological Mitigation and Monitoring Plan, which identifies the location, duration, and method for a monitoring program, success standards, and contingency measures. The permittee shall obtain written approval of this plan from the Corps of Engineers prior to initiation of consbuction. 4. The permittee shall submit to the Corps annual written progress reports on the mitigation area in accordance with the approved plan. These reports shall include photographic documentation of the mitigation area. Five years after the project is completed, the permittee shall submit to the Corps a report documenting the degree of revegetation of the site. If the mitigation area(s) have not achieved the criteria stated in the approved mitigation plan the permittee shall reevaluate the soil, vegetative, and hydrologic conditions of the mitigation area to determine what remedial actions need to be taken. Following implementation of appropriate corrective actions, the permittee shall replant the project site with native wetland and riparian vegetation and monitor until the stated success aiteria are achieved. 5. The permittee shall employ all standard Best Management Practices to ensure that toxic material, silt, debris or excessive erosion do not enter San Marcos Creek during project construction. .;. 6. The permittee shall ensure that all vehicles maintenance, staging, storage and dispensing of fuel occurs in designated upland areas. The permittee shall ensure that these designated upland areas are located in such a manner as to prevent any runoff from entering waters of the U.S. -3- - 7. The permittee shall remove all excess fill and/or construction debris, temporary fill or structures used for access and dewatering for construction purposes, and equipment from the site immediately upon completion of construction. 8. Prior to onset of construction/excavation, the permittee sl+ provide the contractor(s) with a copy of this permit. The contractor shall read and agree to comply with all conditions herein. 9. Disturbed slope areas in the vicinity of any jurisdictional waters of the U.S. Shall be stabilized using jute netting or other appropriate means, and revegetated with native vegetation prior to the onset of the~first winter rams following construction, so as to rnmimire sedimentation and related impacts to the drainage. 10. The permit-tee shall provide notification, either written or verbal, to the Corps of Engineers at least one week prior to the start of work as to the anticipated beginning and ending dates of construction. 11. A copy of the permit shall be on the job site at all times during construction. The permittee shall provide a copy of this permit to all onsite contractor(s), subcontractor(s) and forepersons( The permittee shall require that all such contractor(s), subcontractor(s) and forepersons read this authorization in its entirety prior to initiation of the project and ensure that all appropriate permit conditions are implemented as intended. 12. Implementation of the mitigation plan shall be initiated as a point when the continued development of the site would not impinge upon the potential viability of the installed mitigation. Implementation of the mitigation should be timed to take advantage of the cool winter wet season. 13. Within 45 days of completion of the project, the permittee shall submit to the Corps of Engineers: a. Photographs taken at the project site before, during and after construction for those aspects significant to impacts to waters of the U.S.; and b. One copy of “as built” drawings. This letter of verification is valid for a period not to exceed two years unless the nationwide permit is modified, reissued, or revoked before that time. It is incumbent upon you to remain informed of changes to the nationwide permits. A nationwide permit does not grant any property rights or exclusive privileges. Also, it does not author-ire any injury to the property or rights of others or author-ire interference with any existing or proposed Federal project. Furthermore, it does not obviate the need to obtain other Federal, state, or local authorizations required by law. , 4 - _~. (~ ..I e Thank you for participating in our regulatory program. If you have questions, please contact Karen M Marzec at (858) 674-5384. Sincerely, “17,1,.$ gJbw Mark Durham Chief, South Coast Section Regulatory Branch -l- - i. LOS ANGELES DISTRICT U.S. ARh4Y CORPS OF ENGINEERS CERTIFICATION OF COMPLIANCE WITH ” DEPARTMENT OF THE ARMY NATIONWIDE PERMIT Permit Number: 2oMlo1251 Date of Issuance: August 24,200O Name of Permittee: City of Carlsbad City of Carlsbad Engineering Department 2075 Las Palmas Court Carlsbad, California 92009 Upon completion of the activity authorised by this permit, sign this certification and return it with an original signature to the following address: U.S. Army Corps of Engineers AITBNTION Regulatory Branch (200001251) P.O. Box 532711 Los Angeles, California 900532325 Please note that your permitted activity is subject to a compliance inspection by a Corps of Engineers’ representative. If you fail to comply with these Nationwide permits you may be subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced Nationwide permit has been completed in accordance with the terms and conditions of said permit. Signature of Permittee Date / ?~ \,;,, .~j - NATIONWIDE PERMIT NUMBER NW12 NW14, NwlS, and NW33 TERMS AND CONDITIONS 1. Nationwide Permit NW12, NWZ4, hWls, and NW33 Terms: Your activity is authorized underMV12, hW14, NW18 ,nndiVW33 subject to the following terms: (’ Nationwide Number 12: Utilitv Lien Discharges. Discharges of dredged of fill material associated with excavation, backfill or bedding for utility lines, including outfall and intake structures, provided there is no change in preconstruction contours. A “utility line “is defined as any pipe or pipeline for the transportation of any gaseous, liquid, liquefiable, or slurry substance, for the purpose, and any cable, line, or wire for the transmission for any purpose of electrical energy, telephone and telegraph messages, and radio and television communication. The term “utility line” does not apply to pipes conveying drainage from another area. This NWP authorizes mechanized land,clearing necessary for the installation of utility lines, including overhead utility lines, provided the cleared area is kept to the minimum necessary and preconstruction contours are maintained. However, access roads, temporary or permanent, or foundations associated with overhead utility lines, are not authorized by this NWP. Material resulting from trench excavation may be temporarily sidecast (up to three months) into waters of the United States, provided that the material is not placed in such a manner that it is dispersed by currents or other forces. ‘Ihe DE may extend the period of temporary side-casting not to exceed a total of 180 days, where appropriate. The area of waters of the United States that is disturbed must be limited to the minimum necessary to construct the utility line. In wetlands the top 6” to 12” of the trench should generally be backfilled with topsoil from the trench. Excess material must be removed to upland areas immediately up completion of construction. Any exposed slopes and stream banks must be stabilized immediately upon completion of the utility line. (See 33 CFR Part 322). Notification: The permittee must notify the district engineer in accordance with the “Notification” general condition, if any of the following criteria are net: a. Mechanized land clearing in a forested wetland; b. A Section 10 permit is required for the utility line; c. The utility line is waters of the united States exceeds 500 feet; or, d. The utility line is placed within a jurisdictional area (i.e., a water of the United States), and it runs parallel to a streambed that is within that jurisdictional area. (Section 10 and 404) Nationwide Number 14: Road Crossings. Fills for roads crossing waters of the United States (including wetlands and other special aquatic sites) provided the activity meets all of the following criteria: a. The width of the fill is limited to the minim um necessary for the actual crossing; - b. The fill placed in non-tidal waters of the United States is limited to a filled area of no more than l/2 acre for each separate and distinct crossing. c. The crossing is culverted, bridged or otherwisedesigned to prevent the restriction of, and to withstand, expected high flows and tidal~flows, and to prevent the restriction of low flows and the movement of aquatic organisms; d. The crossing, including all attendant features, both temporary and permanent, is part of a single and complete project for crossing of a water of the United States;~and, e. For fills in special aquatic sites, including wetlands, the permittee notifies the District Engineer in accordance with the “Notification” general condition. The notification must also include a delineation of affected special aquatic sites, including wetlands. This NWP may not be combined with NWP 18 or NWP 26 for the purpose of increasing the footprint of the road crossing. Some road fills may be eligible for an exemption from the need for a Section 404 permit altogether (see 33 CFR 323.4). Also, where local circumstances indicate the need, District Engineers will define the term “expected high flows” for the purpose of establishing applicability of this NWP. (Sections 10 and 404) (:,. Nationwide Number 18: Minor Discharges. Minor discharges of dredged or fill material into all waters of the United States provided that the activity meets all of the following criteria: a. The quantity of discharged material and the volume of excavated area does not exceed 25 cubic yards below the plane of the ordinary high water mark or the high tide line; b. The discharge, including any excavated area, will not cause the loss of more than l/10 acre of a special aquatic site, including wetlands. For the purposes of this NWP, the acreage limitation includes the filled area and excavated area plus special aquatic sites that are adversely affected by flooding and special aquatic sites that are drained so that they would no longer be a water of the United States as a result of the project; c. If the discharge, including any excavated area, exceeds 10 cubic yards below the plane of the ordinary high water mark or the high tide line or if the discharge is in a special aquatic site, including wetlands, the permittee notifies, the District Engineer in accordance with the “Notification” general condition. For discharges in special aquatic sites, including wetlands, the notification must also include a delineation of affected special aquatic sites, including wetlands (Also see 33 CFR 330.1(e)); and d. The discharge, including all attendant features, both temporary and permanent, is part of a single and complete project and is not placed for the purpose of a stream diversion. e. This NWP cannot be used in conjunction with NWP 26 for any single and complete project. (Sections 10 and 404) Nationwide Number 33: Temoorarv Construction, Access and Dewaterinc Temporary structures, work and discharges, incluclmg cofferdams, necessary for construction activities or access fills or dewateting of construction sites; provided that the,associated primary activity is authorized by the Corps of Engineers or the U.S. Coast Guard, or for other construction activities not subject to the Corps or U.S. Coast Guard regulations. Appropriate measures must be taken to maintain near normal downstream flows and to minimize flooding. Fill must be of materials, and placed in a marmer, that will not be eroded by expected high flows. The use of dredged material may be allowed if it is determined by the District Engineer that it will not cause more than minim al adverse effects on aquatic resources. Temporary fill must be entirely removed to upland areas, or dredged material returned to its original location, following completion of the construction activity, and the affected areas must be restored to the pre-project conditions. Cofferdams cannot be used to dewater wetlands oi’other aquatic areas so as to change their use. Structures left in place after cofferdams are removed require a Section 10 permit if located in navigable waters of the United States. (See 33 CPR Part 322). The permittee must notify the District Engineer in accordance with the “Notification” general condition. The notification must also include a restoration plan of reasonable measures to avoid and minimise adverse effects to aquatic resources. The District Engineer wilt add special conditions, where necessary, to ensure that adverse environmental effects are minimal. Such conditions may include: limiting the temporary work to the minimum necessary; requiring seasonal restrictions; modifying the restoration plan; and requiring alternative construction methods (e.g., construction mats in wetlands where practicable.). (Sections 10 and 404) 2. Nationwide Permit General Conditions A. The following general conditions must be followed in order for any autborization by a NWP to be valid: ‘5 1. 2. 3. Navigation. I$ activity may cause more than a minimal adverse effect on navigation. l’ropez Maintenance. Any strwture or fill author&d shaU be properly maintained, including maintenance to ensure public safety. Soil Erosion and Sediment Controls. Appropriate soil erosion and sediment controls must be used and maintained in effective operating condition during construction, and all exposed soil and other fills, as well as any work below the ordinary high water mark or high tide line, must be permanently stabilized at the earliest practicable date. Aquatic Lie Movements. No activity may substantially disrupt the movement of those species of aquatic life indigenous to the waterbody, including those species that normally migrate through the area, unless the activity’s primary purpose is to impound water. Culverts placed in streams must be installed to maintain low flow conditions. Equipment. Heavy equipment~working in wetlands must be placed cn mats, or other rneasu~es must be taken to minim& soil disturbance. 4. 5. 6. 8. 9. Regional and Case-By-Case Conditions. The activity must comply with any regional conditions that may have been added by the division engineer (see 33 CFR 330.4(e)) and with any case specific conditions added by the Corps or by the State or tribe in its Section 401 water quality certification and Coastal Zone Management Act consistency determination. Wild and Scenic Rivers. No activity may occur in a comporient of the National Wild and Scenic River System; or in a river officially designated by Congress as a “study river” .for possible inclusion in the system, while the river is in an official study stahrs; unless the appropriate Federal agency, with direct management responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and Scenic River designation, or study staw. information on Wild and Scenic Rivers may be obtained from the appropriate Federal land management agency in the area (e.g., National Park Service, U.S. Forest Service, Bureau of Land Management, U.S. Fish and Wildlife service). Tribal Rights. No activity or its operation may impair reserved tribal rights, including, but not limited to, reserved water rights and treaty fishing and hunting rights. Water Quality. (a) In certain States and tribal lands an individual 401 water quality certification must be obtained or waived (See 33 CFR 330,4(c)). (b) For NWF’s 12,14,17,~8,32,39,40,42,43, and 44, where the State or tribal 401 certification (either generically or individually) does not require or approve a water quality management plan, thp permittee must include design criteria and techniques that wilI ensure that the authorized work does not result in more than minim al degradation of water quality. An important component of a water quality management plan includes stormwater management that minimizes degradation of the downstream aquatic system, including water quality. .Refer to General Condition 21 for stormwater management requirements. Another important component of a water quality management plan is the establishment and maintenance of vegetated buffers next to open waters, including streams. Refer to General Condition 19 for vegetated buffer requirements for the NWPs. 10. Coastal Zone Management. In certain states, an individual state coastal zone management consistency concurrence must be obtained or waived (see Section 330.4(d)). 11. EndangeredSpecies. (a) No activity is authorized under any NWP which is likely to jeopardize the continued existence of a threatened or endangered species or a species proposed for such designation, as identified under the Federal Endangered Species Act, or which will destroy or adversely modify the critical habitat of such species. Non-federal permittees shall notify the District Engineer if any listed species or designated critical habitat might be affected or is in the vicinity of the project, or is located in the designated critical habitat and shall not begin work on the activity until notified by the District Engineer that the requirements of the Endangered Species Act have been satisfied and that the activity is author&d. For activities that may affect Federally-listed endangered or threatened species or d&gnated critical habitat, the notification must include the name(s) of the endangered or threatened species that may be affected by the proposed work or that utiliie the designated critical habitat that may be affected by the proposed work. As a result of formal or informal consultation with the FWS or NMFS, the District Engineer may add species-specific regional endangered species conditions to the NWF’s. @) Authorization of an activity by a nationwide permit does not authorize the “take” of a threatened or endangered species as defined under the Federal Endangered Species Act. In the absence of separate authorization (e.g., an ESA Section 10 Permit, a Biological Opinion with “incidental take” provisions, etc.) from the U.S. Fish and Wildlife Service or the National Marine Fisheries Service, bdth lethal and non-lethal “takes” of protected species are in violation of the Endangered Species Act. Information on the location of threatened and endangered species and their critical habitat can be obtained directly Cl:.’ from the offices of the U.S. Fish and Wildlife Service and National Marine Fisheries Service or their world wide web pages at http://www.fws.gov/r9endspp/endspp.hhnl and hnp://www.nmfs.gov/prot_res/esahome.html, respectively. 12. Historic Properties. No activity which may affect historic properties listed, or eligible for listing, in the National Register of Historic Places is authorized, until the DE has complied with the provisions of 33 CFR Part 325, Appendix C. The prospective permittee must notify the District Engineer if the authorized activity may affect any historic properties listed, determined to be eligible, or which the prospective permittee has reason to believe may be eligible for listing on the National Register of Historic Places, and shall not begin the activity until notified by the District Engineer that the requirements of the National Historic Preservation Act have been satisfied and that the activity is authorized. Information on the location and existence of historic rwxrces can be obtained from the State Historic Preservation Office and the National Register of Historic Places (see 33 CFR 330.4(g)). For activities that may affe+ historic properties listed in, or eligible for listing in, the National Register of Historic Places, the notification must state which historic property may be affected by the proposed work or include a vicinity map indicating the location of the historic property. * 13. Notification. (a) Timing: Where &uired by the terms of the Nwp, the prospxtive permittee must notify the District Engineer with a preconstruction notification (PCN) as early as possible. The District Engineer must detamine if the PCN is compLzte within 30 days of the date of receipt and can request the additional infcmnation necessary to make the PCN ,p,mplete only once. However, if the prospective permittee does not provide all of the requested info&nation, then the District Engineer will notify the, prospective permittee that the PCN is still incomplete and the PCN review process will not commence until all of the requested information has been received by the District Engbwer. The prospective permittee shall not begin the activity: (1) Until notified in writing by &District Engineer that the activity may proceed under the NWP with any special conditions imposed by the District or Division Engineer; or (2) If notified in writing by the District or Division Engineer that an individual permit is required; or (3) Unless 45 days have passed from the District Engineer’s receipt of the complete notification and the prospeaive permittee has not received written notice from the District or Division Engineer. Subsequently, the pemittee’s right to proceed under the NWP may be modifiee suspended, or revoked only in accordance with the procedure set forth in 33 CFR 330.5(d)(Z). @) Contents of Notification: The notification must be in writing and include the following i”f0”-“?.ii0*: (1) Name, address, and telephone numbers of the prospective permittee; (2) Location of the proposed project; (3) Brief description of the proposed project; the project’s purpose; direct and indirect adverse environmental effects the project would cause; any other NWP(s), iegional general permit(s), or’ individual permit(s) used or intended to be used to author& any part of the proposed project or any related activity; and (4) For NWPs 7,X. 14,18,X, 34,38,39,40,42, and 43, the PCN must also include a delineation of affected special aquatic sites, including wetlands, vegetated shallows (e.g., submerged aquatic vegetation, seagrass beds), and riffle and pool complexes (see paragraph 13(f)); (5) For NWP 7, Outfall Struchnes and Maintenance, thePCN must include information regarding the original design capacities and configurations of those areas of the facility where maintenance dredging or excavation is proposed. (6) For NWP 14, Linear Transportation Crossings, the PCN must include a compensatory mitigation proposal to offset permanent losses of waters of the United States and a statement describing how temporary losses of waters of the United States will be minimized to the maximum extent practicable. (7) For NWP 21, Surface,Coal Mining Activities, the PCN must include an Office of Surface Mining (OSM) or state-approved mitigation plan. (8) For NWP 27, Stream and Wetland Restoration, the PCN must include documentation of the prior condition of the site that will be reverted by the permittee. (9) For NWP 29, Single-Family Housing, the PCN must also include: (i) Any past use of this NWP by the individual permittee and/or the permittee’s spouse; (ii) A statement that the single-family housing activity is for a personal residence of the permittee; (iii) A description of the entire parcel, including its size, and a delineation of wetlands. For the purpose of this NV/P, parcels of land measuring l/4 acre or less will not require a formal on-site delineation. However, the applicant shall provide an indication of where the wetlands are and the amount of wetlands that exists on the property. For parcels greater than l/4 acre in size. a formal wetland delineation must be prepared in accordance with the current method required by the Corps. (See paragraph 13(f)); (iv) A written description of all land (including, if available, legal descriptions) owned by the prospective permittee and/or the prospective permittee’s spouse, within a one mile radius of the parcel, in any form of ownership (including any land owned as a partner, corporation, joint tenant, co-tenant, or as a tenant-by-theentirety) and any land on which a purchase and sale agreement or other contract for sale or purchase has been executed; (10) For NWP 31, Maintenance of Existing Flood Control Projects, the prospective permittee must either notify the District Engineer with a PCN prior to each maintenance activity or submit a five year (or less) maintenance plan. In addition, the PCN must include all of the following: (i) Sufficient baseline information so as to identify the approved channel depths and configurations and existing facilities. Minor deviations are authorized, provided the approved flood control protection or drainage is not increased; (ii) A delineation of any affected special aquatic sites, including wetlands; and, (iii) Location of the dredged material disposal site. (11) For NWP 33, Temporary Constnxtion, Access, and Dewatering, t&s PCN must alsd include a restoration plan of reasonable measures to avoid and n-himize adverse effects to aquatic resources. (12) For NWPs 39,43, and 44, the PCN must aL&include a written statement to the District Engineer explaining how avoidance and minimization of losses of waters of the United States were achieved on the project site. 13) For NWP 39, Residential, Commerdal, and Institutional Developments, the PCN must include a compensatory mitigation proposal that offsets unavoidable losses of waters of the United States or justification explaining why compensatory mitigation should not be required (14) For NWP 40, Agricultural Activities, the PCN must include a compensatory mitigation proposal to offset losses of waters of the United States. (15) For NWP 43, Stormwater Management Facilities, the PCN must include, for the construction of new stormwater management facilities, a maintenance plan (in accordance with State and local requirements, if applicable) and a compensator mitigation proposal to offset losses of waters of the United States. (16) For NWP 44, Mining Activitiff, the PCN must include a description of all waters of the United States adversely affected by the project, a desaiption of measures taken to minir&e adverse effects to waters of the United States, a description of measures taken to comply with the criteria of the NWP, and a reclamation plan (for aggregate mining activities in isolated waters end non-tidal wetlands adjacent to headwaters and any hard rock/mineral mining activities). ‘(17) For activities that may adversely affect Federally-listed endangered or threatened species, the PCN must include the name(s) of those endangered or threatened species that may be affected by the proposed work or utilize the designated critical habitat that may be affected by the proposed work. (18) For activities that may affect historic properties listed in, or eligible for listing in, the National Register of Historic Places, the PCN must state which historic prbperty may be affected by the proposed work or include a vicinity map indicating the.location of the historic property. (19) For NWPs 12,14,29,39,40,42,43, and 44, where the proposed work involves discharges of dredged or fill material into waters of the United States realting in permanent, above-grade fills within X&year floodplains (as identified on FEMA’s Flood Insurance Rate Maps or FEMA- approved local floodplain maps), the notification must include documentation demonstrating that the proposed work complies with the appropriate FEMA or FEMA-approved local floodplain construction requirements. (c) Form of Notification: The standard individual permit application form (Form ENG 4345) may be used as the notification but must clearly indicate that it is a PCN and must include all of the information required in (IT) (l)-(19) of General Condition 13. A letter containing the requisite information may also be used. (d) District Engineer’s Decision: In reviewing the PCN for the proposed activity, the District Engineer will determine whether the activity authorised by the NWP will result in more than minimal individual or cumulative adverse environmental effects or may be contrary to the public interest. The prospec!ive permittee may, optionally, submit a proposed mitigation plan with the PCN to expedite the process and the District Engineer will cowider any proposed compensatory mitigation the applicant has included in the proposal in determining whether the net adverse environmental effects to the aquatic environment or the prbposed work are minimal. If the District Engineer determines that the activity complies with the terms and conditions of the NWP and that the adverse effects on the aquatic environment are minimal, the District Engineer will notify the permittee and include any conditions the District Engineer deems necessary. Any compensatory mitigation proposal must be approved by the District Engineer prior to commencing work. If the prospective permittee is required to submit a compensatory mitigation proposal with the PCN, the proposal may be either conceptual or detailed. If the prospective permittee elects to submit a compensatory mitigation plan with the PCN, the District Engineer will expeditiously review the proposed compensatory mitigation plan. The District Engineer must review the plan within 45 days of receiving a complete PCN and determine whether the conceptual or specific proposed mitigation would ensure no more than minimal adverse effects on the aquatic environment. If the net adverse effects of the project on the aquatic environment (after consideration of the compensatory mitigation proposal) are determined by the District Engineer to be minimal, the District Engineer wiIl provide a timely written response to the applicant stating that the project can proceed under the terms and conditions of the nationwide permit. If the District Engineer determines that the adverse effects of the proposed work are more than minimal, then he will notify the applicant either: (1) that the project does not qualify for authotition under the NWP and inshuct the applicant on the procedures to seek authorization under an individual permit; (2) that the project is author&d under the NWP subject to the applicant’s submission of a mitigation proposal that would reduce the adverse’~ffects on the aquatic environment to the minimal level; or (3) that the project is authorized under the NWP with specific modifications or conditions. Where the District Engineer determines that mitigation is required in order to ensure no more than minimal adverse effects on the aquatic environment, the activity will be authortied within the 45-day PCN period, including the necessary conceptual or specific mitigation or a requirement that the applicant submit a mitigation proposal that would reduce the adverse effects on the aquatic environment to the minimal level. When conceph~al mitigation is included, or a mitigation plan is required under item (2) above, no work in waters of the United States will occur until the District Engineer has approved a specific mitigation plan. (e) Agency Coordination: The District Engineer will consider any comments from Federal and State agencies concerning the proposed activity’s compliance with the terms and conditions of the NW& and the need for mitigation to reduce the project’s adverse effects on the aquatic environment to a minimal level. For activities requiring notification to the District Engineer that result in the loss of greater than l/2 acre of waters of the United States, the District Engineer will, upon receipt of a notification, provide immediately (e.g., via facsimile b-ansmission, overnight mail, or other expeditiousmanner), a copy to the appropriate offices of the Fish and Wildlife Service; State natural resource or water quality agency, EPA, State Historic Preservation Officer (SHPO), and, if appropriate, the National Marine Fisheries Service. With the exception of NWP 37, these agencies will then have 10 calendar days from the date the material is transmitted to telephone or fax the District Engineer n&ice that they intend to provide substantive, site-specific comments. If so contacted by an agency, the District Engineer will wait an additional 15 calendar days before making a decision on the notification. The District Engineer will fully consider agency comments received within the specified time frame, but will provide no response to the resource agency, except as provided below. The District Engineer will indicate in the administmtive record associated with eachnotification that the resource agencies’ concerns were considered. As required by Section 305@)(4)(B) of the Magnuson-Stevens Fishery Conservation and Management Act, the District Engineer will provide a response to National Marine Fisheries Service within 30 days of receipt of any Essential Fish Habitat conservation recommendations. Applicants are encouraged to provide the Corps multiple copies of notifications to expedite agency notification: (f) Wetlands Delineations: Wetland delineations must be prepared in accordance with the current method required by the Corps. For Nwp 29 see paragraph (b)(9)@) for parcels less than l/4 acre in size. The permittee may ask the Corps to delineate the special aquatic site. There may be some delay if the Corps does the delineation. Furthermore, the 45day period will not start until the wetland delineation has been completed and submitted to the Corps, where appropriate. 14. Compliance Certification. Every permittee who has received a Nationwide permit verification from the Corps will submit a signed certification regarding the completed work and any required mitigation The certification will be forwarded by the Corps with the authorization letter. The certification will include: a.) A statement that the authorized work was done in accordance with the Corps authorization, including any general or specific conditions; b.) A statement that any required mitigation was completed in accordance i with the permit conditions; and c.) The signature of the permittee certifying the completion of the work end c mitig*ti**. 15. Use of Multiple Nationtiide Permits. The use of more than one Nwp for a single and complete project is prohibited, except when the acreage loss of waters of the United Statesauthorized by the NWPs does not exceed the acreage limit of the NWP with the highest specified acreage limit. For example, if a road crossing over tidal waters is constructed under NWP 14, with associated bank stabilization authorized by NWP 13, the maximum acreage loss of waters of the United States for the total project cannot exceed l/3 acre. 16. Water Supply Intakes. No activity, including structures and work in navigable waters of the United States or discharges of dredged or fill material, may occur in the-proximity of a public water supply intake except where the activity is for repair of the public water supply intake struch~res or adjacent bank stab&&ion. 17. Shellfish Beds. No activity, including struchmes and work in navigable waters of the United States or discharges of dredged or fill material, may occur in areas of concentrated shellfish populationa, unless the activity is directly related to a shellt%.h harvesting activity author&d by NWP 4. 18. Suitable Material. No activity, including structures and work in navigable waters of the United States or discharges of dredged or fill material, may consist of unsuitable material (e.g., trash, debris, car bodies, asphalt, etc.) and material used for construction or discharged must be free fmm toxic pollutants in toxic m~ounts (see Section 307 of the Clean Water Act). 19. Mitigation. The project must be designed and constructed to avoid and minimize adverse effects to waters of the United States to the maximum extent practicable at the project site (i.e., on site). Mitigation will be required when necessary to ensure that the adverse effe& to the aquatic environment are minimal. The District Engineer will consider the factors discussed below when determining the acceptability of appropriate and practicable mitigation necesay to offset adverse effects on the aquatic environment that are more than minimal. (a) To be practicable, the mitigation must be available and capable of being done considering costs, existing technology, and logistics in light of the overall projwt purposes. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferably in the same watershed; ( ,’ 20. 21. 22. 23. 24. 25. @) The Distri~ Engineer WilI require restoration, creation, enhancement, or preservation or other aquatic resources in order to offset the authorkzed impacts to the extent neceszay to ensure that the adverse effects on the aquatic environment are minimal. An important element of any compensatory mitigation plan for projects in or near streams or other openwaters is the establishment and maintenance, to the maximurn extent practicable, of vegetated buffers next to open waters on the project site. The vegetated buffer should consist of native spedes. The District Engineer will determine the appropriate width of the vegetated buffer and in which ca it will be required. Normally, the vegetated buffer will be 25 to 50 feet wide on each side of the stream, but the District Engineer may require wider vegetated buffers to address documented water quality concerns. If there are open waters on the project site and the District Engineer requires compensatory mitigation for wetland impacts~to ensure that the net adverse effects on the aquatic enviromnent are minimal, any vegetated buffer will comprise no more than l/3 of the remainin g compensatcJry mitigation acreage after the permanently filled wetlands have been replaced on a one-to-one acreage basis. In addition, compensatory mitigation must address adverse effects on wetland functions and values and can”o’be used to offset the acreage of wetland lossevthat would occur in order to meet the acreage limits of some of the NWPs (e.g., for NWP 39,1/4 ame of wetlands cannot be created to change a l/2 acre loss of wetlands to a l/4 acre loss; however, l/2 acre of created wetlands can be used to reduce the impacts of a l/3 acre loss of wetlands). If the prospective permittee is required to submit a &npensatory mitigation proposal with the PCN, the proposal may be either conceptual or detailed. (c) To the extent appropriate, penhittees should consider mitigation banking and other appropriate forms of compensatory mitigation. If the District Engineer determines that compensatory mitigation is necessary to offset losses of waters of the United States and ensure that the net adverse effects of the authorized work on the aquatic environment are minimal, consolidated mitigation approaches, such as mitigation banks, wilI be the preferred method of providing cornpensatoly mitigation, unless the District Engineer determinea that activity-specific compensatory mitigation is more appropriate, based on which is best for the aquatic environment. These types of mitigation are preferred because they involve iarger blocks of protected aquatic environment, are more likely to meet the mitigation goals, and are more easily checked for compliance. If a mitigation bank or other consolidated mitigation approach is not available in the watershed, the District Engineer will consider other appropriate forms of compensatory mitigation to offset the losses of waters of the United States to ensure that the net adverse effects of the authorized work on the aquatic environment are minimal. Spawziing Areas. Activities, including structures and work in navigable waters of the United States or discharges of dredged or fill material, in spawning areas during spawning seasons must be avoided to the maximum extent practicable. Activities that result in the physical destruction (e.g., excavate, fill, or smother downstream by substantial turbidity) of an important spawning area are not author&d. Management of Water Flows. To the maximum extent practicable, the activity must be designed to maintain preconstruction downstream flow conditions (e.g., location, capacity, and flow rates). Furthermore, the activity must not permanently restrict or impede the passage of normal or expected high flows (unless the primary purpose of the fill is to impound waters) and the shuchxre or discharge of dredged or fill material must withstand expected high flows. The activity must, to the maximum extent practicable, provide for retaining excess flows frmn the site, provide for maintaining surface flow rates from the site similar to preconstruction conditions, and must not increase water flows from the project site, relocate water, or redirect water flow beyond premnskwtion conditions. In addition, the activity must, to the maximum extent practicable, reduce adverse effects such as flooding or erosion downstream and upstream of the project site, unless the activity is part of a larger systw designed to manage water flows. Adverse Effects From Impoundments. If the activity, including shuchnes and work in navigable waters of the United States or discharge of dredged or fill material, creates an impamdment of water, adverse effects on the aquatic system caused by the accelerated passage of water and/or the restriction of its flow shall be minim&d to the maximum extent practicable. Waterfowl Breeding Areas. Activities, including s!nv&& and work in navigable waters of the United States or discharges of dredged or fill material, into breeding areas for migratory waterfowl must be avoided to the maximum extent practicable. Removal of Temporary Fills. Any temporary fills must be removed in their entirely and the.affected areas retimed to their preexisting elevation. Designated Critical Resource Waters. Gitical resource waters include, NOAA-designated marine sanctuaries, National Estarine Research Reserves,National Wild and Scenic Rivers, critical habitat for Federally listed threatened and endangered species, coal reefs, Stare natural heritage sites, and outstanding national resource waters or other waters officially designated by a State as having particular environmental or ecological significance and identified by the District Engineer after notice and opportunity for public comment. The District Engineer may also designate additional critical resource waters after notice and opporhmity for comment. (a) Except as noted below, discharges of dredged or fill material into waters of the United States are not authorized by NWPs 7,12,14,16,17,21,29,31,35,39,40,42,43, and 44 for any activity within, or directly affecting, critical resource waters, including wetlands adjacent to such waters. Lkcharges of dredged or fill materials into waters of the United States ,may be authorized by the above NWF’s in National Wild and Scenic Rivers if the activity complk with General Condition 7. Further, such discharges may’be author&d in designated critical habitat for Federally listed threatened or endangered species if the activity complies with General Condition 11 and the U.S. Fish and Wildlife Service or the National Marine Fisheries Service has concurred in a determination of compliance with this condition. @) For NWF’s 3,8,10,13,15,18,19,22,23,25,27,28,30,33,34,36,37, and 3&xwtification is required in accordance with General Condition 13, for tiy activity proposed in the designated critical resource waters including wetlands adjacent to those waters. The District Engineer may author& activities under these NWPs only after he determines that the impacts to the critical resource waters will be no more than minimal. 26. Fills With+ K&Year Floodplains. For purposes of this general condition, XX-year floodplains will be identified through the Federal Emergency Management Agency’s (FEMA) Flood Insurance Rate Maps or FEMA-approved lo~+l floodplain maps. (a) Discharrres Below Headwaters. Discharges of dredged or fill material into waters of the United States resulting in permanent, above-grade fil!s within the K&year floodplain at or below the point on a stream where the average annual flow is five cubic feet per second (i.e., below headwaters) are not authorized by NWPs 29,39,40,42,43, and 44. For NWF’s 12 and 14, the prospective permittee must notify the District Engineer in accordance with General Condition 13 and the notification must include documentation that any permanent, above-grade fills in waters of the United States within the XX-year floodplain below headwaters comply with FEMA or FEMA-approved local flcodpiain mnstruction requirements. @) Discharees in Headwaters (i.e., above the point on a stream where the average annual flow is five cubic feet per second). (1) Flood Frinze. Discharges of dredged or fill material into waters of the United States resulting in p=%manent,‘a~v~grade fills within the flood fringe of the lC%-year floodplain of headwaters are not author&d by NWF’s 12,14,29,39,40,42,43, and 44, unless the prospective permittee notifies the District Engineer in accordance with General Condition 13. The notification must include documentation that such discharges comply with FEMA or FEMA-approved local floodplain construction requirements. (2) Floodway. Discharges of dredged or fill material into waters of the United States resulting in permanent, above- grade fills within the floodway of the 10%year floodplain of headwaters are not authorized by NWF’s 29,39,&I, 42, 43, and 44. For NWPs 12 and 14, the permittee must notify the District Engineer in accordance with General Condition 13 and the notification must include documentation that any permanent, above grade tIl.s proposed in the floodway comply with FEMA or FEMA-approved local floodplain construction requirements. i a l ‘Q cllf ornia Regional Water Quality- Control Board San Diego Region y$z?,i-(g;; Internet **dress: h~,,/lwww.s~b.a.gov/-rwqcWI 9771 CLairemoot Mesa Bwkvad. Suite A, San Diego, California 92124-1324 Governor Phone (858) 467-2952 t FAX (858) 571-6972 PXJ,~CdO” JAN i o zooi Action on Request for Clean Water Act section 401 Water Quality Certification for Discharge of Dredged and/or Fill Materials ENGINEFF;ING DEPART~~~~~ PROJECT: APPLICANT: Ranch0 Santa Fe Road (File No. OOC-045) Mr. David Hauser City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 ACTION: 1. 0 Order for Standard Certification .., i’ i.~ 2. n Order for Technically-conditioned Certification 3. 0 Order for Denial of Certification \.i STANDARD CONDITIONS: The following three standard conditions apply to 4 certification actions, except as noted under Condition 3 for denials (Action 3). 1. 2. 3. # \ This certification action is subject to modification or revocation upon administrative or judicial review, in.cluding review and amendment pursuant to section 13330 of the California Water Code and section 3867 of Title 23 of the California Code of Regulations (23 CCR). This certification action is not intended armshall not be construed to apply to any discharge from any activity involving a hydroelectric facility requiring a Federal Energy Regulatory Commission (FERC) license or an amendment to a FERC license unless the pertinent certification application was tiled pursuant to 23 CCR subsection 3855@) and the application specifically identified that a FERC license or amendment to a FERC license for a hydroelectric facility was being sought. The validity of any non-denial certification action (Actions 1 and 2) shall be conditioned upon total payment of the full fee required under 23 CCR section 3833, unless otherwise stated in writing by the certifying agency. California Environmental Protection Agency Recycled Paper a File No. ClKX4.5 - ($3 ADDITIONAL CONDITIONS: In addition to the three standard conditions, the applicant shall satisfy the following: 1. The project shall be implemented as described in the application submitted on April 26, 2000. Any deviation from the proposed project, as described in File No. OOC-045, shall require additional 401 Water Quality Certification. 2. All storm drain inlets shall have storm dram inlet filters (elg., Fossil filters or their equivalent) to treat urban runoff. Maintenance of these filters shall be conducted per the manufacturers specifications by the City of Carlsbad. REGIONAL WATER QUALITY CONTROL~BOARD CONTACT PERSON: Stacey Baczkowski California Regional Water Quality Control Board, San Diego Region 9771 Clairemont Mesa Blvd:, Suite A San Diego, CA 92124 858-637-5594 ,. ., WATER QUALITY CERTIFICATION: L I hereby certify that the proposed discharge from the Ranch0 Santa Fe Road project will comply with the applicable provisions of sections 301 (“Effluent Limitations”), 302 (“Water Quality Related Effluent Limitations”), 303 (‘Water Quality Standards and Implementation Plans”), 306 (“National Standards of Performance”), and 307 (“Toxic and Pretreatment Effluent Standards”) of the Clean Water Act. Although we anticipate no further regulatory involvement, should new information come to our attention that indicates a water quality problem, we may issue waste discharge requirements at that time. Regional Water Quality Control Board Attachments 1 and 2 Attachment 1 File No. OCC-045 Applicant: Applicant Representatives: Project Name: Project Location: - A’ITACHMENT 1 PROJECT INFORMATION Mr. David Hauser City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 760-602-2739 760-602-8562 (t) Ms. Sherri Miller Dudek and Associates, Inc. 605 Third Street Emcinitas, CA 92024 760-942-5 147. 760-632-8710 (f) Ranch0 Santa Fe Road (OOC-045) The proposed project .site is located in the eastern portion of the City of Carlsbad, in nordtern San Diego County. The project footprint lies within the northwestern portion of the Ranch0 Santa Fe United States Geological Survey 7.5 minute quadrangle; sections 1,6,19,24 29.30.31.32; Townships 12 and 13 South, Range 3 and 4 West. Type of Project: Project Description: Road realignment and sewer pipeline. The proposed widening and realignment project is part of the City of Carlsbad’s General Plan to upgrade Ranch0 Santa,Fe Road to a Prime Arterial Roadway Designation. A Prime Arterial Roadway has a 126-foot right-of-way containing six travel lanes, a bike lane, an 18 foot raised median, sidewalks, curb, and gutter. The northerly approach for. the new bridge(s) would be approximately 2,200 feet long and include the reconstruction of the La Costa Meadows Drive/Rancho Santa Fe Road intersection, and the~reconstrucrion of approximately 300 feet of La Costa Meadows Drive east of the intersection. The realigned Ranch0 Santa Fe Road would be constructed to the full width on the east side of the median, with sidewalks, curb and gutter, and street lights from ,the bridge to north of Melrose Drive. .,. The Melrose DriveJRancho Santa Fe Road intersection would be moved appmxhnately 400 feet to the north of the present intersection. Melrose Drive would be realigned from the Comita DriveJMelrose Drive intersection northwest to the realigned Melrose Drive/Ranch0 Santa Fe Road intersection. Cornita Drive would be extended to connect with the realigned Melrose Drive. A 24-inch sewer pipeline would also be installed by the Vallecitos Water Attachment 1 File No. CX-045 - ‘@ Federal Agency/Petit: Other Required Regulatory Approvals: California Environmental Quality Act (CEQA) Compliance: Receiving Water: <‘I:,: Impacted Waters of the United States: Dredge Volume: Related Projects Implemented/to be Implemented by the Applicant(s): Compensatory Mitigation’: Best Management Practices: District during conStruction of the bridge. The pipeline would be within the limits of temporarydisturbance associated with.the bridge and would not result in any additional impacts. The pipeline will be encased with concrete and riprap, with a slope of 1.5:1, will be placed around the pipe. The pipeline, concrete. and riprap will be placed below.grade with a minimum of 1 foot of cover over the top. U.S. Army Corps of Engineers Nationwide~Permit 14,18, and 33 . California Department of Fish and Gk Streambed Alteration Agreement In 1992, the City of C&bad approved the preliminary alignment for the Ranch0 Santa.Fe Road real&nment and Mass Grading Project; the EIR for this project was certified by the City of Carlsbad on April 3,1992. An addenduti to the final EIR was prepared in March 2000 to address the final alignment of Ranch0 Santa Fe Road. San Marcos Creek, unnamed ephemeral drainages The proposed project will permanently impact 0.42 acre of southern willow scrub, 0.27 acre of disturbed wetlands, and 0.24 acre of unvegetated ephemeral waters of the U.S. Temporary impacts include 0.97 acre of southern willow scrub. 1,227 cubic yards. The City of Carlsbad has implemented two projects in the past five years that have resulted in temporary impacts to San Marcos Creek. The first project consisted of emergency access to repair a dip section of the Gibralter Street bridge. The second project replaced and/or repaired pedestrian and golf cart bridges at La Costa. Temporary impacts for both of these projects are estimated at 0.1 to 0.3 acre. The proposed mitigation program will include a total of 2.2 acres of offsite creation and 1.4 acres of offsite enhancement of jurisdictional southern willow scrub and freshwater marsh. The proposed mitigation area is located immediately east of the project area within University Commons along San MarcosCreek. The mitigation area will be preserved as an element of the Fieldstone HCP. In addition, 0.54 acre of jurisdictional southern willow scrub will be restored onsite within the area of impact along San Marcos Creek. All storm drain inlets shall have storm drain inlet filters (e.g., Fossil filters or their equivalent) to treat urban runoff. Maintenance of these filters shall be conducted per the manufacturers specifications by the City of Carlsbad. I. File No. OOC-045 I - ATTACHMENT 2 DISTRIBUTION LIST Mr. Terry Dean Amy Corps of Engineers Regulatory Branch 16885 West Bemardo Drive, Suite 300A San Diego, CA 92127 Ms. Sheni Miller Dud&k and Associates, Inc. 605 Thiid Street Encinitas, CA 92024 State Water Resources Control Board Division of Water Quality STATE OF CALIFORNIA-THE RESOURCES AGENCY : DEPARTMENT OF FISH AND GAME South Coast Region GRAY DAVl~ow,,or RECEIVED 4949 Viewridge Avenue San Disgo, California 92123 ,858,467-4201 FAX (8581 4674235 JUN 07 2001 ENGINEERING; DEPARTMENT June 05, 2001 City of C&bad At&t: David Hauser 163 5 Faraday Avenue Carlsbad, CA 92009 Dear Mr. Hauser: Enclosed is Streambed Alteration Agreement 5-142-00 that authorizes work on the Ranch0 Santa Fe Road Realignment and Mass Grading project impacting San Marcos Creek in San Diego County. This action is authorized under Section 1600 of the Fish and Game Code and has been approved by the California Department of Fish and Game. Pursuant to the requirements of the California Environmental Quality Act (CEQA) the Department filed a Notice of Determination (NOD) on the project on 06 /k/O, ! Under CEQA regulations, the project has a 30-day statute of limitations on court challenges of the DepartmentYs approval under CEQA. The Department believes that the project tirlly meets the requirements of the Fish and Game Code and CEQA. However, if court challenges on the NOD are received during the 30- day period, then an additional review or even modification of the project may be required. If no comments are received during the 30-day period, then any subsequent comments need not be responded to. This information is provided to you so that if you choose to undertake the project prior to the close of the 30-day period, you do so with the knowledge that additional actions may be required based on the results of any court challenges that are tiled during that period. Please contact Tamara Spear at (858) 467-4223 if you have any questions regarding the Streambed Alteration Agreement. Sincerely, Regional Manager Enclosure cc: Tamara Spear CALIFORNIA DEPARTMENT OF FISH AND GAME 4949 Viewridge Avenue San Diego, California .92123 Notification No.5142-00 AGREEMENT REGARDING PROPOSED STREAM OR LAKE ALTERATION THIS AGREEMENT, entered into between the State of California, Department of Fish and Game, hereinafter called the Department, and David Hauser. reoresentino the Citv of Carlsbad. a municipal corporation State of California , hereinafter called the Operator, is as follows: WHEREAS, pursuant to Section 1601 of California Fish and Game Code, the Operator, on theEday of Mav. 2000, notified the Department that they intend to divert or obstruct the natural flow of, or change the bed, channel, or bank of, or use material from.the streambed of, the following water(s): thirteen unnamed ephemeral drainaaes, tiibutades to San Marcos Creek and San Marcos Creek, San Diego County, California, Sections 1.6.19.20,29.30.31.32 Township 125.13s Range.3W. 4W WHEREAS, the Department (represented by Tamara Spear through a site visit on them WHEREAS, the Department (represented by Tamara Spear through a site visit on them day ofJune. 2000) has determined that such operations may substantially adversely affect day ofJune. 2000) has determined that such operations may substantially adversely affect those existing fish and wildlife resources within the streambed of thirteen unnamed thdse existing fish and wildlife resources within the streambed of thirteen unnamed eohemeral drainaoes, tributaries to San Marcos Creek and San Marcos Creek, specitically eohemeral drainaoes, tributaries to San Marcos Creek and San Marcos Creek, specitically identified as follows: Birds: least Bell’s vireo Wht?o be//ii DUsilloS). southwestern willow identified as follows: Birds: least Bell’s vireo Wht?o be//ii ausillos). southwestern willow tlvcatcher (Emoidonax trailii exfimus).Caiifomia onatcatcher (PoliopfiLa californica califomical tlvcatcher (Emoidonax trailii exfimus).Caiifomia onatcatcher (PoliopfiLa californica califomical northern harrier lCircus cvaneusl white-tailed kite (E/anus leucurus). Coobeer’s hawk northern harrier lCircus cvaneus). white-tailed kite (E/anus leucurus). Coobeer’s hawk [AcciDiter cooDen> red-tailed hawk (Buteo iari?aicensis). red-shouldered hawk Bufeo [AcciDiter cooDen> red-tailed hawk (Buteo iaHraicensi.9. red-shouldered hawk Bufeo plafwferus p/aryoterus).southem California rufous-crowned soarrow (AimoDhila ~ruficeDs), plafwferus p/aryoterus).southem California rufous-crowned soarrow (AimoDhila ~ruficeDs), Bell’s saae sparrow (AmDhiSDiza be//i be//& loaaerhead shtike (Lanius ludovicianusl; Bell’s saae sparrow (Amphisciza be//i be//& loaaerhead shtike (Lanius ludovicianusl; Reptiles and Amphibians: arrovo southwestern toad (Bulb miCItXCaDhuS califomicusl. San Reptiles and Amphibians: arrovo southwestern toad (Bulb miCItXCaDhuS califomicusl. San Dieoo homed lizard (Phrvnosoma coronaturn blainvilleh. western spadefoot toad (ScaDhiODUS Dieoo homed lizard (Phrvnosoma coronaturn blainvilleh. western spadefoot toad (ScaDhiODUS hammond0. red-diamond rattlesnake ICrotalus rubeti. coastal rosv boa Kichatiura fiivimata). hammond0. red-diamond rattlesnake ICrotalus rubeti. coastal rosv boa Kichatiura fiivimata). two-striped garter snake (Thamnoohis hammondih: Mammals: San Dieao Docket mouse. two-striped garter snake (Thamnoohis hammondih: Mammals: San Dieao Docket mouse. LChaefodiDus fallax fallax). Dulzura~ California pocket mouse (ChaetodiDus calhbrnicus LChaefodiDus fallax fallax). Dulzura~ California pocket mouse (ChaetOdiDuS calhbrnicus femoralis). San Dieoo black-tailed iack rabbit (LeDus califwnicus). desert woodrat (Neofoma femoralis). San Dieoo black-tailed iack rabbit (LeDus califwnicus). desert woodrat (Neofoma /eDid& Invertebrates: auino checkersoot butterfly (EuDh!fdrvas. editha auinOl. monarch /eDid& Invertebrates: auino checkersoot butterfly (EuDh!fdrvas. editha auinOl. monarch buttetitv (Danaus DlexiDusk buttetitv (Danaus DlexiDusJ; Plants: San.Dieao aolden star~(Mui//a Clevelandi& San Dieao Plants: San.Dieao aolden star~(Mui//a Clevelandi& San Dieao thommint (Acanfhominfha ilicitilia). Nevin’s barbenv Berberis nevinik thread-leaved thommint (Acanfhominfha ilicitilia). Nevin’s barbenv (Berberis nevinik thread-leaved brodiaea (Bmdiaea filifolial. coast woollv-heads INetiacauks denudafa var. denudafa), brodiaea (Bmdiaea fiMo/ial. coast woollv-heads INetiacauks denudafa var. denudafa), smooth tarolant (Hemizonia Dunoens SSD. laevis) mud nama INama sfenocamum) including smooth tarolant (Hemizonia Dunoens SSD. laevis) mud nama (Nama sfenocafnum) including the south~qn willow scrub, freshwater marsh., and surroundina Dieaartcoastal saae scrub, the southern willow scrub, freshwater marsh., and surrounding Dieaartcoastal saoe scrub, southern mixed chaparral, vallev needlearass orassland. annual arassland and eucalvotus southern mixed chaparral, vallev needlearass orassland. annual arassland and eucalvotus grassland which provide habitat for such species in the area. THEREFORE, the Department hereby proposes measures to protect fish and wildlife resources during the Operator’s work. The Operator hereby agrees to accept the following measures/conditions as part of the proposed work. If the Operator’s work changes from that stated in the notification specified above, this Agreement is no longer valid and a new notification shalt be submitted to the Department of Fish and Game. Failure to comply with the provisions of this Agreement and with other pertinent code sections, including but not limited to Fish and Game Code Sections 5650, 5652, 5937, and 5948, may result in prosecution. Page 1 of 6 STREAMBED ALTERATION AGREEMENT #5-142-00 Nothing in this Agreement authorizes the Operator to trespass on any land or property, nor does it relieve the Operator of responsibility for compliance with applicable federal, state, or local laws or ordinances. A consummated Agreement does not constitute Department of Fish and Game endorsement of the proposed operation, or assure the Department’s concurrence with permits required from other agencies. This Aareement becomes effective the date of Department’s signature and terminates December 31. 2004 for proiect construction onlv. This Agreement shall remain in effect for that time necessatv to satisfv the terms/conditions of this Aqreement. 1. The following provisions constitute the limit of activities agreed to and resolved by this Agreement. The signing of this Agreement does not imply that the Operator is precluded from doing other activities at. the site. However, activities not specifically agreed to and resolved by this Agreement shall be subject to separate notification pursuant to Fish and Game Code Sections 1600 et seq. 2. The Operator proposes to alter the streambed of thirteen unnamed ephemeral drainages, tributaries to San Marcos Creek and San Marcos Creek to accommodate the roadway reakgnment, widening and bridge replacement improvements to Ranch0 Santa Fe Road. A 24-inch sewer pipeline will also be installed within the limits of temporary disturbance at the proposed bridge footprint by Vallecitos Water District during the bridge construction. The project is located from approximately 100 south of the La Costa AvenuelRancho Fe Road intersection to approximately 100 feet north of the Melrose Drive/Ranch0 Santa Fe Road within the City of Carlsbad, San Diego County impacting 2.1 I acres of streambed. 3. The agreed work includes activities associated with No. 2 above. The project area is located in the streambed of thirteen unnamed ephemeral drainages, tributaries to San Marcos Creek and San Marcos Creek, San Diego County. Specific work areas and mitigation measures are described on/in the plans and documents submitted ~by the Operator, including an Addendum to the Final Environmental Impact Reoort for the Ranch0 Santa Fe Road Reationment and Mass Gradino, SCH#90010850 dated March 2000; Conceotual Wetland Mitioation and Monitorinq Plan for the Ranch0 Santa Fe Road Realignment. dated December 2000; Bioloaical Resources Report and Impact Analysis for the Ranch0 Santa Fe Road Realiqnmentdated November 2000 ~andshali be implemented as proposed unless directed differently by this agreement. 4. The Operator shall not impact more than 2.11 acres of jurisdictional habitat comprised of 1.39 acres southern willow scrub, 0.27 acres disturbed freshwater marsh, 0.45 unvegetated ephemeral streambed. of these impacts, 0.93 are permanent and 1 .I 8 are temporary. Permanent impacts caused by the project include 0.42 acres of southern willow scrub, 0.27 of disturbed wetland and 0.24 acres unvegetated streambed. Mitigation for permanent impacts to southern willow scrub shall occur at a 3:l ratio of creation. Disturbed freshwater marsh shall be mitigated at a 1: 1 ratio of creation and 2: 1 ratio of enhancement, and unvegetated streambed shall be mitigated at a I:1 ratio of creation. All mitigation for permanent impacts shall be in-kind, occur off-site, and include I .77 acres creation and 0.54 acres enhancement for a total of 2.31 acres, Temporary impacts caused by the project include 0.97 acres of southern willow scrub and Page 2 of 6 STREAMBED ALTERATION AGREEMENT #5-142-00 0.21 acres unvegetated streambed. 0.54 acres of southern willow scrub shall be restored on-site at a 1: 1 ratio. 0.47 acres of southern willow scrub shall be mitigated at a 1: 1 ratio of creation and 2:l ratio of enhancement. 0.21 acres of unvegetated streambed shall also be restored on-site. 1.29 acres of mitigation for temporary impacts shall occur off-site including 0.43 acres of creation and 0.86 enhancement and shall be in-kind. The off-site mitigation ~area of 3.60 acres for the project is located along San Marcos Creek in the City of SanMarcos, within the University Commons Specific Plan. 5. The Operator shall submit a Final RevegetatiorVMonitoring Plan for both the 3.60 acres . of.mitigation off-sate and the 0.54 acres on-site to the Department for review within’ 30 days of signing this Streambed Alteration Agreement. The plan shall specify a non-native plant control program, plant palette and include a long-term maintenance provision for the on-site mitigation and a plant palette for the on-site revegetation. The Operator shall receive Department approval prior to project initiation/impacts. All mitigation shall be installed no later than March 31, 2003. 6. The Operator shall not remove vegetation within the stream from March 15 to July 31 to avoid impacts to nesting birds. 7. The Operator shall have a qualified biologist onsite daily during any impacts to vegetation for the purpose of monitoring and enforcing condition numbers 6, 9, 14, and 21 of this agreeement. 8. No equipment shall be operated in ponded or flowing areas. 9. Disturbance or removal of vegetation shall not exceed the limits approved by the Department. The disturbed portions of any stream channel shall be restored. Restoration shall include the revegetation of stripped or exposed areas with vegetation native to the area. 10. Installation of bridges, culverts, or other structures shall be such that water flow is not impaired. Bottoms of temporary culverts shalt be placed at stream channel grade; bottoms of permanent culverts shall be placed at or below stream channel grade. 11. Preparation shall be made so that runoff from steep, erodible surfaces will be diverted into stable areas with little erosion potential. Frequent water checks shall be placed on dirt roads, cat tracks, or other work trails to control erosion. 12. Water containing mud, silt or other pollutants from aggregate washing or other activities shall not be allowed to enter a lake or flowing stream or placed in locations that may be subjected to high storm flows. 13. Structures and associated materials not designed to withstand high seasonal flows shall be removed to areas above the high water mark before such flows occur. 14. The perimeter of the work site shall be adequately flagged to prevent damage to adjacent riparian habitat, 15. Staging/storage areas for equipment and materials shall be located outside of the stream. Page 3 of 6 STREAMBED ALTERATION AGREEMENT s-142-00 16. The Operator shall comply with all litter and pollution laws. All contractors, subcontractors and employees shall also obey these laws and it shall be the responsibility of the operator to ensure compliance. 17. If a stream’s low flow channel, bed or banks/lake bed or banks have been altered, these shall be returned as nearly as possible to their original configuration and width, without creating future erosion problems. ,’ 18. All planting shall have a minimum of 100% sutiivtil the first year, based on the original quantity planted and 90% survival for container trees and 80% survival for container shrubs thereafter~ and/or shall attain 75% native wetland cover after 3 years and 90% native wetland cover after 5 years for the life of the project. If the survival and cover requirements have not been met, the Operator is responsible for replacement planting to achieve these requirements. Replacement plants shall be monitored with the same survival and growth requirements for 5 years of planting. 19. All planting shall be done between October 1 and April 30 to take advantage of the winter rainy season. 20. An annual report shall be submitted to the Department by January 1 of each ye& for 5 years after planting. This report shall include the survival , percent cover, and height of both tree and shrub species. The number by species of plants replaced, an overview of the revegetation effort, and the method used to assess these parameters shall also be included. Photos from designated photo stations shall be included. 21. Access to the work site shall be via existing roads and access ramps, 22. Spoil,sites shall not be located within a stream/lake, where spoil shall be washed back into a stream/lake, or where it will cbver aquatic or riparian vegetation. 23. Raw cement/concrete or washings thereof, asphalt, paint or other coating material; oil or other petroleum products, or any other substances which could be hazardous to aquatic life, resulting from project related activities, shall be prevented from contaminating the soil and/or entering the waters of the state. These materials, placed within or where they may enter a stream/lake, by Operator or any, party working under contract, or with the permission of the Operator, shall be removed immediately. 24. No debris, soil, silt, sand, bark, slash, s&wdust; rubbish, cement or concrete or washings thereof,. oil or petroleum prdducts or other organic or earthen material from ariy construction, or associated activity of whatever nature shall be allowed to enter into or placed where it may be washed by rainfall or runoff into, waters of the State. When operations are corn area. No rubbish s f:~- I~ leted any excess materisIs or debris shall be removed from the work all be deposited within 150 feet of the high water mark of any stream or lake. 25., No equipment maintenance shall be done within or near any stream channel where petroleum products or other pollutants from the equipment may enter these areas under any flow. 26. The Operator shall provide a copy of this Agreement to all contractors, subcontractors, atid the Operator’s project supervisors. Copies of the Agreement shall be readily available at work sites at all times during periods of active work and must be presented to any Department personnel, or personnel from another agency upon Page 4 of 6 STRBAMBED ALTERATION AGREEMENT #5-142-00 demand. 27. The Department reserves the right to enter the project site at any time to ensure compliance with terms/conditions of this Agreement. 28. The Operator shall notify the Department, in writing, at least five (5) days prior to initiation of construction (project) activities and,at least five (5) days prior to completion of construction (project) activities. Notification shall be sent to the Department at 4949 Viewridge Avenue, San Diego, CA 92123 Attn: Tamara A. Spear 29. It is understood the Department has entered into this Streambed Alteration Agreement for purposes of establishing protective features for fish and wildlife. The decision to proceed with the project is the sole responsibility of the Operator, and is not required by this agreement. It is further agreed all liability and/or incurred cost related to or arising out of the Operator’s project and the fish and wildlife protective -conditions of this agreement; remain the sole responsibility of then Operator. .The .‘~ Operator agrees to hold harmless the State of California and the Department of Fish and Game against any related claim made by any party or parties for personal injury or any other damages. 30. The Operator shall request an extension of this agreement prior to its termination. Extensions may be granted for up to 12 months from the date of tennination of the agreement and are subject to Departmental approval. The extension request and fees shall be submitted to the Department’s Region 5 office at the above address. If the Operator fails to request the extension prior to the agreement’s termination, then the Operator shall submit a new notification with fees and required information to the Department, Any activities conducted under an expired agreement are a violation of Fish and Game Code Section 1600 et. seq. The Operator may request a maximum of one extension of this agreement. 31. The Department reserves the right to suspend or cancel this Agreement for other reasons, including but not limited to the following: a. The Department determines that the information provided by the Operator in support of the NotificationIAgreement is incomplete or inaccurate; b. The Department obtains new information’that was not known to it in preparing the terms and conditions of the Agreement; c. The project or project activities as described in the Notification/Agreement have changed; d. The conditions affecting fish and wildlife resources change or the~Department determines that project activities will result in a substantial adverse effect on the environment. 32. Before any suspension or cancellation of the Agreement, the Department will notify the Operator in writing of the circumstances which the Department believes warrant suspension or cancellation. The Operator will have seven (7) working days from the date of receipt of this notification to respond in writing to the circumstances described in the Department’s notification. During the seven (7) day response period, the Operator shall immediately cease any project activities which the Department specified in its notification. The Operator shall not continue the specified activities until that time when the Department notifies the Operator in writing that adequate methods and/or measures have been identified and agreed upon to mitigate or eliminate the significant adverse effect. Page 5 of 6 STREAMBED ALTERATION AGREEMENT #5-142-00 CONCURRENCE (David Hauser) California Dept. of Fish and Game 2 e 0~1 (date) 6/ (date) Yew-y Q-ry -wfi,#z?~ (title) C.F. Ravsbrook. Regional Manager (title) Page 6 of 6 February 152001 Repty To: FHWAOiOll6A Mr. Michael G. Ritchie Division Administrator Federal Highway Administration 980 Ninth Street, ,Suite 466 Sacramehio, CA 95614-2724 Project: Ranch0 Santa Fe Bridge Replac~ment,(Il-GD-O-Carlsbad), Carlsbad, San Diego County, California Dear Mr. Ritchie: In accordance with 36 CFR Part 800, regulations implemeriti,ng Section 106 of the National Historic Preservation Act, the Federal Highway Administration (FHWA) has made findings of,National Register eligibility and effect for properties located within the Area of Potential Effects (APE) of the undertaking cited above. You have asked for my commenb on these findings. UNDERTAKING APE AND IDENTIFYING HISTORIC PROPERTIES FHWA’s delineation of the undertaking’s APE and its efforts to identify historic properties within this APE are satisfactory. I agree that archaeologi@ site CA- SDI-942, originally recorded as within the APB, which through recent te&ing efforts (as reported in Attachment 5 of the First Supplemental Historic Properties Study Report) has been redefined as actually being outside the APE, requires no further consideration in connection with the undertaking cited above. PUBLIC PARTlClPATlON FHWA’s efforts to involve Native Americans ,and other members of the interested public in the consultation process for the undertaking are satisfactory. DETERMlNATtONS OF NATIONAL REGISTER ELIGIBILITY CA-SDI-11.440: I agree that this archaeological site is ineligible for inclusion in the National Register of Historic Places (NRHP) because it meets none of the criteria set forth at 36 CFR Part 60.4. San): I agree that this existing bridge, built in 1976, is NRHP-ineligible because it is less than 50 years old and ,WBS designated Category 5 in the Caitrans Local Bridge Survey (1967). . MRR-12-2001 ~~839 CRLTFSWS Dll LOCN ~5~15~ .pr. Michael Ritchie February IS, 2001’ Page 2 of 2 ..: 619 688 8114 P. 03i05 FHWAOlO116A FINDING OF EFFECT Because efforts to identify historic properties within the unde&king’s APE conform to applicable standards and the documentation provided is consistent with the requirements of 5800.7 l(d) for a finding of ‘no historicproperties affected’ and, in aaordance with 5800.4(d)(l), since I do not object to this adequately documented finding, FHWA’s responsibilities under Section 106 are now fulfilled. Your consideration of historic properties in the project planning process is appreciated. If you have any questions, please contact staff archaeologist Charles Whatford at (916) 653 - 2718 or mhat&ohaoarlts.oa.aov Dr. Knox Mellon. Y State Historic Preservation Gf&rr - . ACOE Jurisdictional Wetlands and Project Impacts NOTE: Figures from Permit Application for Ranch0 Santa Fe Road Realignment Project Pre- Construction Notification for Nationwide Permit submitted to ACOE on April 7, 2000. Note: Figures from PermitApplication for Rnncho Santa Fe Road Realignment Project - Pre-Construction NotiJication for Nationwide Permit submitted to ACOE on ApriI 7,ZOOO. cansm 0 cl m ‘p I ach \ i M&O Tliuana Ranch0 Santa Fe Rd. Realignment & Bridge Replacement - Joint Permit Application Regional Map q ‘lGyRE . . ~;: Note: Figures from Permit Application for Rancho Santa Fe Road Realignment Project - Pre-Construction Notification for Nationwide Permit submitted to ACOE on April 7,ZOOO. I BASE MAP SOURCE: USGS 7.5 Minute Series, Ranch0 Santa Fe iluadrangle 1 oa - 2001 I - Ranch0 Santa Fe Rd. Realignment & Bridge Replacement - Joint Permit Application APE I Vicinity Map i Jj .,‘.~: i, 1 ..,,) .I’ ..: :.:~ I>, Y..: .:: 1~~ ~-1 1 1 I “, ., \ .-; t -m Note: Figuresfrom Permit Application for Rancho Santa Fe Road Realignment Project - Pre-Constnrction Notification for Nationii;ide Permit submitted to ACOE on April 7, 2000. ACOE Jurisdictional Wetlands: Temporary Wetland Impact Permanent Wetland Impact ------- Ephemeral Waters NOTE Numbers indicate channel width in feet at that location. Habitat Types: FWM -Freshwater Marsh SWS - Southern Willow Scrub : 2& ::;,;~.,~ ~::~.j:j ,Y&$ .;-;;j.: .:y,‘,.~ ,.,,‘,, ~~~ \- ;:. i ,;.::; .‘:%g;: : ~,) ,)A,, .:I :::,;~... Ranch0 Santa Fe Rd. Realignment & Bridge Replacement -Joint Permit Application Impact Areas 1 and 2 Permanent Wetland Impact _-----_ Ephe : NOTE: Numbers indicate channel width in feet at that location. ‘i/ /, I, .:;. ’ .,: : ;‘..~.. Habitat Types: DW - Disturbed Wetland Ranch0 Santa Fe Rd. Realignment & Bridge Replacement - Joint Permit Application Impact Areas 3,4 and 5 L! FIG; ADING PM SDIJRCE D&km Engineming. F&wry 2ooO ;.;:. Scale in Feet _ Ranch0 Santa Fe Rd. Realignment & Bridge Replacement -Joint Permit Application F’GURE Impact Area 6 u 5 ! ------- Ephemeral Waters ~ NOTE: Numbers indicate channel width In feet at that location. ?:!I?: Note: Figuresfrom Permit Application for Rancho Santa Fe fl:.‘,‘,:{:;; RoadR I’ Fy.<t;~; .:: ,,,. 1.;:: ,,,, ;~~~~~~:;~_~~~ Nab’ ea rgnment Project - Pm-Construction Notification for :,j;::~:{,;~ j ;,j~y onwide Permit submitted to ACOE on April 7,ZOOO. GWDING PIAN SOURCE Ddcksn Enginwring. Febfuary 2030 Ranch0 Santa Fe Rd. Realignment & Bridge Replacement - Joint Permit Application Impact Areas 7 and 6 1 ------- Ephemeral Waters 3?Q+:. ::: ~~>~$&;,:C ~_.’ ‘ I “~~.~~~~:~.~~~~~~~~~~~?~~~~~~,~~ ‘-;, ,, y;- ; : (. ,,:~ ,.;” ,.:+;; ,. : / I 1. . ~ ,“::.~-::~~~.~~~ :.,, /.’ ! ?., ‘: NOTE: Numbers indicate channel width in feet : ‘!., ,. ,; \-: ;z:::-: :; :::y ,i,-; I;<..’ )“.~~I. “:i.:t\~ . :‘i +<, ~.‘~~~>:&!$; :, ,,,. !,,I: :~E~” q . . . . I..~,-,, ,,,. :;;y; .si; at that location. :f;;,p;.;:& , I /;j, .~.., ~. ‘:.I:’ y< ,,I’> .:,, ,,..:” ‘:‘i ‘,.**j~,;.:;,.iIi~ ..,. ._: :: :?:‘.. ‘. ‘,., .->.:;:; ::j ,,: ,,,“:., x:::,,., ,.... /;. ,) ” ~‘::;::$~;y$& ,~~.~~;:,;=~,: .._~ ,; .,;.,zz. ‘i.i.. ,. ,“’ ..,~. y:, ,: “:.‘~/ “_i. : ~( q ,;,I-: ;,. . -:--. .+ ~.~ .~:,.:i:;;g*. ~,:. .,: 1’: ;.1”” ..~, c ::. .1 I < ,; Figuresfrom Permit Application for Ranch Road Realignment Project _ Pr~-&~~ction No@c&onfor Nationwide Permit submitted to ACOE on April 7,2000. Ranch0 Santa Fe Rd. Realignment & Bridge Replacement - Joint Permit Application Impact Area 12