PROGRESS REPORT NO. 1
OLIVENHAIN/LAKE HODGES PUMPED-STORAGE
WATER POWER PROJECT
FERC PROJECT NO. 11460-000 CA
SUBMITTED BY:
San Diego County Water Authority
3211 Fifth Avenue
San Diego, California 92103-5718
October 1994
San Diego County Wafer Authority
A Public Agency
3211 Fifth Avenue • San Diego, California 92103-5718
(619) 297-3218 FAX (619) 297-0511
October 26, 1994
m
Ms. Lois Cashell, Secretary •
Federal Energy Regulatory Commission
825 North Capitol Street, N.E.
Washington, D.C. 20426
Subject: Olivenhain/Lake Hodges Pumped-Storage Water Power Project
FERC Project No. 11460-000 California
Progress Report No. 1
(1 May 1994 through 30 October 1994)
Dear Ms. Cashell:
m
m
We hereby submit four copies of the first six month progress report for the
Olivenhain/Lake Hodges Pumped-Storage Water Power Project.
mm
m
M
Pb
m
If there are questions or if additional information is needed about this report,
please contact the undersigned at (619) 682-4135.
Sincerely,
KAS:jz
Attachments
Kenneth A. Steele
ESP Project Manager
CITIES
' [>' Mor • Eitondido • Nnliona
• OtfonMdr • fowuy - Scin Dw
COUNTY
• San Diego
MEMBER AGENCIES
IRRIGATION DISTRICTS
WATER DISTRICTS
• Helu • O'ay
• San DieovHo
COUNTY WATER DISTRICT
PUBLIC UTILITY DISTRICT
FEDERAL AGENCY
MUNICIPAL WATER DISTRICTS
PRINTED ON RECYCLED PAPER
y TABLE OF CONTENTS
U Page
CERTIFICATE OF SERVICE ii
1.0 PROGRESS DURING THE REPORTING PERIOD 2
m 1.1 General 2
tal 1.2 Agency Consultation 2
1.3 Operating Agreement 3
|p| 1.4 Public Participation Program 3
M 1.5 Environmental Studies 3
1.6 Engineering Study 3
M 2.0 PROGRESS PLANNED FOR THE NEXT SIX-MONTH PERIOD 4
2.1 General 4
P 2.2 Agency consultation 4
™ 2.3 Operating Agreement 4
2.4 Public Outreach and Participation 4
^ 2.5 Environmental Studies 5
" 2.6 Engineering Study 5
E 3.0 PROJECT FEASIBILITY ASSESSMENT 5
~ 4.0 PROJECT SCHEDULE 5
c
»
Igjji
I
C
ATTACHMENT
A Summary of Environmental Findings
at Olivenhain and Lake Hodges Reservoir Sites
B FERC License Activity Schedule
-i-
CERTIFICATE OF SERVICE
I hereby certify that I have this day served by first class mail, prepaid, a copy of the following
documents upon the persons listed below:
mit
Dept of Parks and Recreation
Office of Historic Preservation
P.O. Box 942896
Sacramento, CA 94296-0001
Harriet L. Hill
USEPA, Region IX
75 Hawthorne Street - llth Floor
San Francisco, CA 94105
(415) 744-1969
National Park Service Rivers,
Trails and Conservation
Attn: Ms Linda Stonier
600 Harrison Street, Suite 600
San Francisco, CA 94107
U.S. Army Corps of Engineers
Attn: Elizabeth White
9868 Scranton Road, Suite 130
San Diego, CA 92121
(619) 455-9406
U.S. Army Corps of Engineers
L.A. District Regulatory Branch
Attn: Jonathan Freedman
P.O. Box 2711
Los Angeles, CA 90053
U.S. Army Corps of Engineers
Chief of Environmental Resources Branch
L.A. District
P.O. Box 2714
Los Angeles, CA 90053
U.S. Fish and Wildlife Service
Carlsbad Field Office
2730 Loker Avenue W.
Carlsbad, CA 92008
(619) 431-9440
U.S. Dept of Agriculture
Soil Conservation Service
332 S. Juniper Street, Suite 110
Escondido, CA 92023
U.S. Bureau of Land Management
El Centre Resource Area Office
33 S. Waterman Avenue
El Centra, CA 92244
(619) 352-5842
U.S. Bureau of Land Management
California Desert District
6221 Box Springs Blvd.
Riverside, CA 92507-0714
California Air Resources Board
P. O. Box 2815
Sacramento, CA 95812
California Dept. of Fish & Game
1350 Front Street, Room 2041
San Diego, CA 92101
(619) 525-4215
Caltrans - District 11
P. O. Box 85406
San Diego, CA 92186-5406
I
-11-
*
m
Dept of Agriculture
5-D County District
7845 Lemon Grove Way, Suite A
Lemon Grove, CA 91945
Dept. of Health & Human Services
Federal Housing Admin.
San Diego Insuring Office
Attn: Edwin J. Helmlich
P. O. Box 2648
San Diego, CA 92101
Dept. of Parks and Recreation
Southern Regional Office
8885 Rio San Diego Dr., Suite 270
San Diego, CA 92108
Dept. of Water Resources
Southern District
P. O. Box 6598
Los Angles, CA 90055
Native American Heritage Commission
915 Capitol Mall, Room 288
Sacramento, CA 95814
Regional Water Quality Control Board
9771 Claremont Mesa Blvd., Suite B
San Diego, CA 92124-1331
State Water Resources Control Board
Attn: Walt G. Pettit
901 "P" Street
Sacramento, CA 95814
State Lands Commission
1807 13th Street
Sacramento, CA 95814
County of San Diego
Lari Sheehan
Deputy Chief Admin. Officer
1600 Pacific Highway
San Diego, CA 92101
(619) 531-5700
San Diego Air Pollution Control District
9150 Chesapeake Drive
San Diego, CA 92125-9015
County of San Diego
Dept. of Environmental Health Services
P. O. Box 85261
San Diego, CA 92186-5261
County of San Diego
Dept. of Planning & Land Use
Attn: Lauren Waserman, Director
5201 Ruffin Road, Suite B
San Diego, CA 92123
City of Escondido
Planning Dept.
201 N. Broadway
Escondido, CA 92025
City of San Diego
Planning Dept.
202 "C" Street
San Diego, CA 92101
Milton Mills Jr.
Water Utilities Director
City of San Diego Water Utilities Dept.
202 C Street
San Diego, CA 92101
City of Vista
Planning Department
P. O. Box 1958
Vista, CA 92085-1988
(619) 726-1340
General Manager
California American Water Company
1019 Cherry Avenue
Imperial Beach, CA 91932
-ui-
c
^
Robert Greaney, General Manager
Carlsbad Municipal Water District
5950 El Camino Real
Carlsbad, CA 92008
Lauranie Brekke-Esparza, City Manager
City of Del Mar
1050 Camino Del Mar
Del Mar, CA 92014
George Lohnes, Utilities Engineer
City of Escondido
Water Utilities Department
201 N. Broadway
Escondido, CA 92025
Gordon W. Tinker, General Manager
Fallbrook Public Utility District
P.O. Box 2290
Fallbrook, CA 92088
General Manager
Helix Water District
P. O. Box 518
La Mesa, CA 91944-0518
James Turner, Water Utilities Director
City of Oceanside
300 N. Hill Street
Oceanside, CA 92054
David McCollum, General Manager
Olivenhain Municipal Water District
1966 Olivenhain Road
Encinitas, CA 92024
August A. Calres, General Manager
Padre Dam M. W. D.
P. O. Box 719003
Santee, CA 92072-9003
James R. Williams, Dir. Public Services
City of Poway
P. O. Box 789
Poway, CA 92064-0120
Jim Maneus, General Manager
Rainbow Municipal Water District
P.O. Box 2500
Fallbrook, CA 92088
Kevin P. Walsh, General Manager
Ramona Municipal Water District
105 Earlham Street
Ramona, CA 92065-1599
Fred Adjarian, General Manager
Rincon Del Diablo Water District
1920 N. Iris Lane
Escondido, CA 92027
Joe Palmer, Operations Manager
San Dieguito Water District
P.O.Box 231010
Encinitas, CA 92023-1010
Geoff Poole, General Manager
Santa Fe Irrigation District
P. O. Box 409
Rancho Santa Fe, CA 92067
William Rucker, General Manager
Vallecitos Water District
788 W. San Marcos Blvd.
San Marcos, CA 92069
John Amodeo, Acting General Manager
Vista Irrigation District
202 W. Connecticut Ave.
Vista, CA 92083-3596
Richard A. Reynolds, General Manager
Sweetwater Authority
P.O. Box 2328
Chula Vista, CA 91912-2328
Gary Arant, General Manager
Valley Center Municipal Water District
P. O. Box 67
Valley Center, CA 92082
-iv-
m
P
Susan Collins, General Manager
Yuima Municipal Water District
P. O. Box 177
Pauma Valley, CA 92061
Audubon Society of San Diego
4901 Morena Blvd., Suite 703
San Diego, CA92117
San Diego Association of Governments
401 B Street, Suite 800
San Diego, CA 92101
San Diego Historical Society
Attn: Richard Crawford
P. O. Box 81825
San Diego, CA 92138
Sierra Club San Diego Chapter
3820 Ray Street
North Park, CA 92104
San Diego Assn. of Envir. Biologists
c/o Mr. Cam Patterson, RECON
7460 Mission Valley Road
San Diego, CA 92108
San Diego County Archaeological Society
Inc., EIR Review Committee
P. O. BoxA-81106
San Diego, CA 92138
Manager, City of Solano Beach
380 Stevens Avenue, Suite 120
Solano Beach, CA 92075
(619) 755-2998
Ray Patchett, City Manager
City of Carlsbad
1200 Elm Avenue
Carlsbad, CA 92008
(619)434-2820
City of San Marcos
Planning Department
570 Rancheros Drive
San Marcos, CA 92069
Rancho California Water District
Attn: Andy Webster
42135 Winchester Road
Temecula, CA 92590
(909)676-4101
San Diego Gas & Electric Co.
Attn: Mike Tierney
101 Ash Street
San Diego, CA 92101
(619)699-5033
San Diego Gas & Electric Co.
Attn: Mary Duffy
101 Ash Street
San Diego, CA 92101
(619)696-4961
SOCAL Energy Limited Partnership
Attn: E. Robert Mooney
1555 Shoreline Drive, Suite 200
Boise, ID 83702
San Pasqual Reservation
P. O. Box 365
Valley Center, CA 92082
(619)749-3200
Del Dios Town Council
9764 Cabrillo Place
Escondido, CA 92029
Pat Limpus
(619)489-8045
Olivenhain Town Council
P.O. Box 3005
Olivenhain, CA 92024
(619)436-0322
-v-
E
p
m
Dated this "Z7W day of October, 1994
Kenneth A. Steele
-vi-
OLIVENHAIN/LAKE HODGES PUMPED-STORAGE WATER POWER PROJECT
FERC PROJECT NO. 11460-000 CALIFORNIA
PROGRESS REPORT NO. 1
(Reporting Period: 1 May 1994 through 30 October 1994)
This first six-month progress report for the Olivenhain/Lake Hodges Pumped-Storage Water
Power Project (the Project) is prepared to satisfy the requirements and conditions set forth in the
preliminary permit issued to the San Diego County Water Authority (Permittee) on May 20,
1994. In particular, the report, to conform with Article 8 requirements of the permit, presents
a summary of the Project activities including agency consultation, operating agreement
negotiation, public participation, and continuing project environmental, engineering and
economic studies conducted during this reporting period. A summary of activities planned for
the next six-month term is also provided.
The Permittee has designated a liaison officer for the Project during this reporting period. The
exact name and business address of the liaison officer who acts for the Permittee to satisfy the
Article 7 requirements of the permit are:
Kenneth A. Steele, Project Manager
San Diego County Water Authority
3211 Fifth Avenue
San Diego, CA 92103-5718
(619) 682-4135, Fax (619) 291-8975
** H:\WP51\DOC\PUMPSTRG.001 -1-
P»
M
* 1.0 PROGRESS DURING THE REPORTING PERIOD
PC|B 1.1 General
E During the first six-month term of the preliminary permit, the Permittee performed a broad•range of activities including agency consultation, operating agreement negotiation, community
P outreach effort, and preliminary feasibility studies that would meet the FERC licensing
II requirements.
<•*
i These preliminary investigations and activities were accomplished in conjunction with the studies
conducted for the Permittee's Emergency Storage Project (ESP). The ESP includes proposed
f" construction of new and/or expansion of existing reservoirs to provide emergency water storage
'** needs in San Diego County. The proposed Olivenhain/Lake Hodges interconnection is a portion
IP* of one of the four ESP alternatives. A pumped-storage development between the two reservoirs
IM would provide water transfer between the existing Lake Hodges and the proposed Olivenhain
Reservoir during emergencies, as well as during weekly hydroelectric peaking operations. The
Project is, therefore, compatible with the ESP's alternatives. Joint study for the ESP and the
Project is the most practical and cost effective approach to investigate technical, economic and
** environmental viability of the Project.
*»
*»» 1.2 Agency Consultation
w
The Permittee consulted with federal and state agencies on various environmental and water
quality impact issues of the Project. These agencies included
*" • U.S. Fish & Wildlife Service (USFWS)
"" • U.S. Army Corps of Engineers (USCOE)
** • California Department of Fish & Game (CDFG)
m • California Water Resources Control Board (CWRCB)
• U.S Environmental Protection Agency (USEPA)
rl^^
li
The State of California Division of Safety of Dams (DSOD) was consulted during the
f* preliminary engineering evaluation of the Project. The California Energy Commission (CEC)
^was also notified of the Project. A CEC Form R-l 1 and the Preliminary Permit were submitted
** to the CEC. The San Pasqual Reservation was contacted to obtain their views and concerns on
'_ *fcw cultural, environmental and social issues related to the Project.
H:\WP51\DOC\PUMPSTRG.001 -2-
to 1.3 Operating Agreement
pn1^ The Permittee has begun negotiations with the City of San Diego (the City) on the joint use of
Lake Hodges and with the Olivenhain Municipal Water District (OMWD) on proposed
P Olivenhain Reservoir for use as the upper reservoir. The negotiations, conducted hi conjunctioniy• with the on-going ESP negotiations with the City and OMWD, will continue into the next six-
p month period.
1.4 Public Participation ProgramcThe Permittee is evaluating the necessity and benefits of initiating a project specific Public
f Participation Program (PPP) for the Project in 1995. A similar PPP was set up for the
^" Permittee's on-going ESP. The Emergency Storage Project PPP has worked effectively to
p inform the public and allow the public to educate the Permittee on concerns and issues specific
IM to the local area. A pumped-storage project PPP, if necessary and implemented, may include
activities such as community group briefing, speakers bureau, community "open house"
presentation, publication of newsletters, public comment and suggestion, and a hotline telephone
service, All of these efforts are implemented for the ESP.
*" 1.5 Environmental Studies
h. The Permittee completed comprehensive biological resource surveys (including a spring survey),
land use studies, and cultural resource surveys and analyses during this reporting term. These
field investigations were performed hi conjunction with the ESP environmental studies. A
summary of the study findings is included as Attachment A of this report. Based upon the
** environmental study results, mitigation and avoidance strategies will be identified. The OMWD
m has a certified Environmental Impact Report (EIR) for construction of a 24,000 acre-foot
PI reservoir at the Olivenhain site.
m
The Permittee also participates hi the Multiple Species Conservation Program (MSCP) and
jQ Multiple Habitats Conservation Program (MHCP) activities in the San Diego region.
f1 1.6 Engineering Studyto
§The Permittee began the preliminary engineering investigations hi February 1994, and performed
the preliminary evaluation for the Project, including core drilling, sampling and test pits, borrow
material investigations, and dam and associated facilities configuration studies. These activities
H:\WP51\DOC\PUMPSTRG.001 -3~
«•" are consistent with the level of detail required for feasibility studies needed to support an
*• application for license to construct a major water power project.
m
m
2 . 0 ACTIVITIES PLANNED FOR THE NEXT SIX-MONTH PERIODm
M 2.1 General
PI
i* During the second six-month reporting period of the preliminary permit, the Permittee will
m continue preliminary engineering and environmental studies that are required to support filing
jy a license application. Agency consultation, public participation, and operating agreement
negotiations will continue in parallel with the Permittee's on-going ESP permitting activities.*»
tw 2.2 Agency Consultation
*•
«* The Permittee will continue consulting with FERC, USFWS, USEPA, USCOE, CDFG,
^ CWRCB, DSOD, the City of San Diego, Santa Fe Irrigation District, San Dieguito Water
^ District, OMWD, and other federal, state and local agencies and private entities and interested
groups on the environmental, engineering, economic and legal issues of the Project.
«M
^^2.3 Operating Agreement
<•»•
** During the next six-month period, the Permittee plans to continue the negotiation process with
„. the City and OMWD to share the storage of existing Lake Hodges and the proposed Olivenhain
to reservoir for the Project. Agreement guidelines shall be drafted for review in the next term, and
final agreements are planned to be approved in mid 1995.*•*
m
2.4 Public Outreach and Participation
p»
• The Permittee will continue putting effort into the public outreach and involvement activities as
m part of the ESP. Public comments and suggestion received will be used to assist in finalizing
W-H the ESP and the Project studies and design. Native Americans potentially affected by the Project
will be kept informed of the progress whenever information becomes available. The Permittee
will evaluate the options for an independent Public Participation Program for the Project after
the on-going ESP studies are completed in 1995.
P
b
; H:\WP51\DOC\PUMPSTRG.001 -4-
p
to
2.5 Environmental Studies
The Permittee will continue studying and evaluating environmental aspects of the Project. The
Environmental Impact Report and Environmental Impact Statement (EIR/EIS) for the ESP is
near completion hi the next six months. The ESP's environmental study results at Lake Hodges
and Olivenhain reservoir sites will be incorporated into the license application of the Project.
2.6 Engineering Study
Preliminary engineering evaluations will continue hi the next six months. The investigations
may include tunnel alignment, facility sizing, preliminary hydraulics analysis, inlet/outlet and
powerhouse layout, construction quantity and cost estimates.
3.0 PROJECT FEASIBILITY ASSESSMENT
Based on preliminary results of environmental, engineering and economic investigations
accomplished to date, the Project appears feasible when combined with the alternatives being
studied for the ESP. The Project may not be cost-effective if developed independently of the
ESP function.
4.0 PROJECT SCHEDULE
In 1995, the Permittee will continue environmental, engineering and economic and financial
feasibility investigations for the Project in conjunction with the ESP. Final operating agreements
are planned to be executed with the City of San Diego and OMWD in mid 1995. The draft
license application is planned to be distributed for agency review hi late 1996 and early 1997.
Attachment B of this report details the preliminary project schedule.
H:\WP51\DOC\PUMPSTRG.001 -5-
ATTACHMENT A
SUMMARY OF ENVIRONMENTAL FINDINGS
AT OLIVENHAIN AND LAKE HODGES RESERVOIR SITES
Biological Resources
i*****
w • Habitats at the Olivenhain site include southern coast live oak riparian forest,
coast live oak woodland, eucalyptus riparian forest, Diegan coastal sage scrub,
*"* southern mixed chaparral, and baccharis scrub.
*w
• Sensitive plants include wart-stemmed ceanothus, Del Mar manzanita, sticky stone
crop, sea dalia, California adolphi, Encinitas baccharis, Englemann oak, spiny
"* rush, Ashy spike moss, and coast spice brush.
f • Sensitive animals include California gnatcatcher, blue-gray gnatcatcher, Bewick's
* wren, great blue heron, red-shouldered hawk, Cooper's hawk, turkey vulture, San
Diego horned lizard, orange-throated whiptail, and the two-striped garter snake.*
Land Use
• The study area consists predominantly of vacant land with the exception of some
limited residential development (Del Dios to the east, Mount Israel to the south,
Elfin Forest to the northwest, and Harmony Grove to the north).
Cultural Resources
• Potential impacts to cultural resource sites were determined not to be significant
in the Olivenhain Reservoir EIR/EA prepared for the OMWD in November 1991 .
E
P'm
m
t i r i f i r i t i i i r r i r r i i i i i i i c i t
ATTACHMENT B
FERC LICENSE ACTIVITY SCHEDULE - OLIVENHAIN/LAKE HODGES PUMPED STORAGE PROJECT
ID
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Name
FILE PRELIMINARY PERMIT APPLICATION
FERC REVIEW OF PERMIT APPLICATION
FERC APPROVAL AND ISSUE OF THE PERMIT
PRELIMINARY INVESTIGATIONS
1ST PROGRESS REPORT
FINALIZE ESP CONFIGURATION
2ND PROGRESS REPORT
FEASIBILITY INVESTIGATIONS
Study Plans
Engineering Studies
Environmental Studies
Economic/Financial Studies
3RD PROGRESS REPORT
4TH PROGRESS REPORT
DRAFT LICENSE APPLICATION
5TH PROGRESS REPORT
FERC/AGENCY REVIEW OF LICENSE APPLICATION
FINALIZE LICENSE APPLICATION
SUBMIT LICENSE APPLICATION
1994
Qtr1 Qtr 2 Qtr 3 Qtr 4
• :
j^^^^^^^^ ^j^Jj^j^
1995
Qtr1 Qtr 2 Qtr 3 Qtr 4
^S$^$^^J
^SS^S^^^^: * ;
V !
gg$$g^gj$jg^ggjg^ggg§js
1996
Qtr1 Qtr 2 Qtr 3 Qtr 4
§$j$§jS§SjJS^$5JJ^^$5J53
fsssssssssMsm"sssssasssssssssssssssss^
(sssssssssssssssssa
i E^
1997
Qtr 1 Qtr 2 Qtr 3
^
Ei{Sg^gjgj ;
Kissjsa i
Project: Olivenhain/Lake Hodges Pumped Storage Project.
Date: 1 0/1 1/94 Note: Duration is in working days.MILESTONE *
SSI %>UMMMKT V V
r.DMPI FTFn •iimmiiimiiiiimimiiiiiiimi