Loading...
HomeMy WebLinkAbout1210-47; correspondence; AIRPORT WATER SERVICE; 1977-09-16sl R J MASSMAN DireClor Officei ot County Engineer & Road Commissioner County Surveyor County Arrporti September 16, 1977 COUNTY OF SAN DIEGO DEPARTMENT OF TRANSPORTATION COMMUNITY SERVICES AGENCY Bldg 2, 5555 Overland Ave, Son Diego. CoVifoinio 92Wj Telephone: (7U) 565-5177 San Diego Gas & Electric Company Pacific Telephone Company Carlsbad Municipal Water District Sanitation & Flood Control Dept. Attn: Mr. Larry Smith A^^n: Right-of-Way Liaison Attn: Mr. John Henley Attn: Mr. Darwin Drake Gentlemen: Subject: Construction of Transient Parking Apron at Palomar Airport, Project No. KJ7823 A preconstruction conference on the above project will be held at 11 :00 A.M./'R:(5t. on September 29 , 197_7, in the Construction Engineering Group Conference Room. Building 5, Department of Transportation; County Operations Center, 5555 Overland Avenue, San Diego Califomia. Very truly yours, R. J. t4ASSMAN Director of Transportation 0^ ^C^^i '^g^'^^'^ R. E. BUNCH Controls Engineer and Utilities Coordinator R.IM:P£B:my xc: R. J. -'assman: Contract Admin. R. Walsh nrfs»n CARLSBAD MUNICIPAL cpp O n'yy rtLll U. WATER DISTRICT OUT U / / iti! WOODSIDE/KUBOTA A ASSOCIATES, INC. 2465 Pio Pico DrivB • P.O. Box 1095 • Carlsbad, California 92008 • (714) 729-1194 September 20, 1977 Richard E. Bunch Utility Coordinator County of San Diego Department of Transportation 5555 Overland Avenue San Diego, CA 92123 Subject: Palomar Airport Expansion Program - Carlsbad Municipal Water District Dear Mr, Bunch: Responding to your request made to the Carlsbad Municipal Water District, we are submitting, under separate cover, the following plans for the public water system that are at the Palomar Airport: 1. 16" Water Main in Palomar Airport Road (5 sheets). 2. Line "E" - North of Palomar Airport Road (3 sheets). 3. Palomar Airport Road Conduit Crossing (1 sheet). 4. Palomar Airport Road Water Main Extension (4 sheets). There is also one additional pipeline project, namely the original 6" water main extension designed and constructed by the County of San Diego. We ask that you checlc with your own Department for the original drawings of this 6" line. Please contact this office if you have any questions regarding the information that we have given you, or if you have need of additional assistance. :y truly yours. /Jack Y. Kubota) District Engineer Carlsbad Municipal Water District cc: Carlsbad Municipal. Water District JYK/skb CMWD 74-115 Trr orange Countv, Santa Ana COL':slTY OF SAN DIEC D ^^•*f] R J WASSMAN DwTo, DEPARTMENT OF TRANSPORTATION '"'J "c!,°"'° '.m Office of COMMUNITY SERVICES AGENCY T.I.PW. (7U) =65 5.77 County Engineer i Rood Commiisioner County Sufveyor tounty Airporti September 7, 1977 Mr. John P. Henley- Assistant Manager Carlsbad Municipal Water District 5950 El Camino Real Carlsbad, CA 92008 SUBJECT: August 4, 1977, meeting at Palomar Airport. Attendees: Philip R. Safford, Airports Division Lovell C. Htirlbut, Airports Division John Henley, Carlsbad Municipal Water District Jack Kubota, Carlsbad Municipal Water District Dear Mr. Henley: With respect to subject meeting the following is my understanding of the items discussed: 1. Airport Water Service a) Existing Airport Development. Water service to the existing aviation areas of the airport appears to be adequate for the existing and anticipated future requirements. Development of this area is essentially complete with only minor expansion possible on the few remaining lease areas. No action is indicated at this time. b) Undeveloped Airport Land. Water service requirements of undeveloped County owned property south of Palomar Airport Road can probably be met from existing Water District distribution lines. County did not participate in cost of construction for these lines. The Water District will require County to pay a share of said costs and any additional construction which may be required when the property is developed. Approximately eight or nine acres of land are available for development in this area. nrpin CARLSBAD MUNICIPAL Qrp G'77 htU U. WATER DISTRICT '^L.T i) ( ( Mr. Henley , -2- . .-igust 8, 1977 c) Future Expansion. If the Water District is to provide timely and adequate water service to the proposed second runway airport expansion area the County needs to take action to identify requirements at this time. This will advise that funds for design of the second runway area are included in this year's budget- Design for the second runway is currently in progress. It is anticipated that design will be complete next year with actual construction commencing in late 1978 or in 1979, depending on availability of Federal grant funds. This schedule should allow adequate time for coordination of water service requirements. 2. Impact of Proposed Second Runway on Water District Offices Management of the Water District is of the opinion that the second runway will adversely impact the existing offices on El Camino Real. Funds have been budgeted to develop plans for relocation of their offices outside of the airport impact areas. In conjunction with this relocation the District representatives stated that since the relocation would be a direct result of second runway construction the County should purchase the existing facility. Airport representatives agreed to initiate preliminary studies for possible County acquisition of the property in conjunction with construction of the second runway. Very truly yours. R. SAFFORD,VChi P. R. SAP'FORDJVChief Operations % Development PRS:kjw cc: Real Property Jack Kubota