HomeMy WebLinkAbout3190; Rancho Santa Fe Road Improvement Project; Rancho Santa Fe Road Improvement Project; 1998-06-01PRELIMINARY DRAINAGE REPORT
FOR
RANCHO SANTA FE ROAD
IMPROVEMENT PROJECT
SAN MARCOS, CALIFORNIA
JUNE 1998
* Prepared For:
CITY OF SAN MARCOS
1 Civic Center
* San Marcos, CA 92069
Prepared By:
PROJECT DESIGN CONSULTANTS
- 701 B Street, Suite 800
SanDiego, CA92101
Document No. 1344.00
DavidB. Ragland, PE, PLS RCE 35985 PreparedBy: JQZ
Registration Expires 6/30/2000 Checked By: SB
6
File: 1344.00
June 1998
TABLE OF CONTENTS
Page Section
1 INTRODUCTION ^
2 EXISTING CONDITIONS ^
3 DEVELOPED CONDITIONS 5
4 HYDROLOGY METHODOLOGY 6
5 FLOOD ROUTING CALCULATIONS 29
DETENTION BASIN DESIGN 42
7 APPENDIX A - HYDROLOGY DESIGN CHARTS
Runoff Coefficients (Rational Method) A-l
Rainfall Intensity - Duration - Frequency Curves A-2
Nomograph - Time of Concentration for Natural Watersheds A-3.1
Urban Areas Overland Time of Flow Curves A-3.2
APPENDIX B - DETENTION BASIN COMPUTER OUTPUT B-1
REP/1 S'MHJR.DOC
LIST OF FIGURES
Figure Description
1 Vicinity Map
2 Hydrologic Soil Groups Map
1
LIST OF TABLES
Table Description
Predevelopment Hydrology Calculations.
2 Postdevelopment Hydrology Calculations - 1
3 Postdevelopment Hydrology Calculations - 2
4 Flood Routing Calculations
File: 1344.00
June 1998
ATTACHMENTS
Exhibft A Drainage Area Map - Predeveloped Conditions
Exhibit B Drainage Area Map - Developed Condftions
Ul
IIEP/1344PDR.DOC
Page
2
3
age
10
14
22
31
File: 1344.00
June 1998
SECTION 1
INTRODUCTION
This prehminary drainage report has been prepared to document the design and calculations for
the storm drain system associated with the Rancho Santa Fe Road improvement project design.
The project sfte is located along Rancho Santa Fe Road, between Melrose Drive and Island Drive,
m the City of San Marcos. It is approximately 5 miles east of Interstate Route 5 and is about
3 miles south of State Route 78. Please refer to the vicinity map on Page 2.
The project is located within the City of San Marcos and City of Carisbad Hmfts and is subject to
City standards of both cities. The drainage subbasin layout and the storm drainage system are
shovm on Exhibfts 'A' and 'B' attached to this report.
REP/1344PDR.DOC
File: 1344.00
June 1998
PALOMAR
LA COSTA
AVENUE
VICINITY MAP
NOT TO SCALE
Figure 1. Vicinity Map
REP/1344PDR.DOC
File: 1344.00
June 1998
R.3 W. I I TOO OOQ FCgr
m Figure 2. Hydrologic Soil Groups Map
REP/1344PDR.tXX;
m
m
m
File: 1344.00
June 1998
SECTION 2
EXISTING CONDITIONS
The most runoff comes from offsite areas, especially fi-om the hill located on the east side of
Rancho Santa Fe Road. The Existing Condition Hydrology Map indicates the storm water in the
north area (Basins A B, C, and D), collected by natural channel and brow ditch, vwll be conveyed
via cross-street culverts to the west side of Rancho Santa Fe Road, then join the existing storm
drain system in the City of Carisbad and County of San Diego.
Storm water fi^om Basin E will be collected into an open channel located on the south side of
Basin E.
All mnofF fi-om project hydrology subbasins eventually discharges into San Marcos Creek.
REPA344H>RJXX;
m
File: 1344.00
June 1998
SECTION 3
DEVELOPED CONDITIONS
Since the project improvements are basically in an existing street area, the developed condition of
surface mnofif (from watersheds) is similar to the existing condftion.
In the north area (Basins A B, C, and D; refer to Exhibft 'B'), the storm water either fi-om the
east hill or Rancho Santa Fe Road will be collected on the east side of the road and conveyed via
culverts to join the existing storm drain system on the west side of Rancho Santa Fe Road.
Drainage fi-om Basin E is collected into two curb inlets, which connect to the Rancho Santa Fe
Road major drainage system through underground pipes.
There are two conditions of University Commons (Basin F) that have been analyzed in this report.
For the developed condition, the storm drain system in the improvement area of University
Commons will join the major 42-inch-diameter underground pipe along East Melrose Drive. The
hydrology data fi-om the University Commons Hydrology Report has been used in this report.
For the predevelopment condition, the mnofif from Subbasin F will be concentrated to brow
dftches, then conveyed via underground pipe to join the 42-inch-diameter pipe. (Refer to
Exhibft B.)
Drainage from Basins G and H will be collected into the Meadowland development storm
dramage system.
REP/1344PDR.DOC
m
File: 1344.00
June 1998
SECTION 4
HYDROLOGY METHODOLOGY
This drainage system has been designed in general conformance with the County of San Diego
Hydrology Manual. Drainage basins are less than 0.5 square mile; therefore, the Rational and
Modified Rational Methods were utilized to calculate storm mnofif The storm drain system is
designed to convey the lOO-year-frequency storm water. Pipes are sized for nonpressurized flow.
The hydrological analysis utilized to determine the mnofif at each design point was the Rational
Method (Q ~ C x I X A). The following pages describe the methods used to determine each
component of the Rational Method equation, in which
Q = Runoff (CFS),
C = Runoff coefificient,
IA = Rainfall intensity (in/hr), and
A - Area (acres).
4.1 Determination of Runoff Coeflicient
Runoflf coefficients are dependent on the proposed land use of the basin. Coefificients for this
project were obtained from the County of San Diego Hydrology Manual (see Appendix A-l).
Accordmg to the Hydrologic Soils Group Map (Figure 2), most project subbasins are located in
the Soil Group B area, and the rest are in the Soil Group C area. Based on these criteria, the
following mnofif coefificients were used:
REP/1344PDR.DOC
File: 1344.00
June 1998
Soil Group B Soil Group C
Natural Undisturbed Area 0.35 0.40
Single-Family Unfts 0.45 0.50
Commercial Area 0.85 0.90
The weighted values of "C will be used on the basins with dififerent land uses.
4.2 Determination of Intensity
Ramfall intensity (7) is based on the "Intensity-Duration-Frequency" curves in the County of San
Diego Hydrology Manual (see Appendix A-2).
4.3 Time of Concentration
Tune of concentration is the time required for mnofif to flow from the most remote part of the
watershed to the outlet point or design point under consideration. The time of concentration {Tc)
at any point within the drainage area is given by:
Tc = Ti+T,,
where
Ti = Inlet time and
Tt - Travel time.
Inlet time is broken down into two components: overiand time (7^) and gutter time {Tg):
therefore,
Tc^To+Tg+T,.
The following paragraphs further define the individual components of the time of concentration
and the methods used to quantify those components.
REP/1344PDR.D0C
File: 1344.00
June 1998
4.3.1 Overland Time (To)
Overland time is the period required for mnofif to travel from the farthest edge ofa drainage basin
to the street gutter. The method of determining overiand time is dependent on the type of
watershed. For natural watersheds, overiand time is determined using the Appendix A-3.1 (taken
from the San Diego County Hydrology ManualV
4.3.2 Gutter Time (Tg)
The gutter time is determined by assuming an initial time of concentration, Tj (may use To for the
parkway or a lot) and calculating an inftial g,. To determine the velocity in the gutter, divide Qi by
2 to obtain an average flow. Use this average flow with the graph in the Appendix to determine an
average velocity, V, for this gutter length, L.
Tg = Ll{Vx60).
Add this gutter time to To to obtain a new time of concentration, Tc. Use this new Tc to calculate a
new Q/2 and determine a new Va^e, in order to calculate a new Tg. Repeat procedure until
assumed Tc = To + Tg.
4.3.3 Travel Time (T,)
Travel time is the time required for flow to travel the length of the storm drain to the point in
question. Travel time is calculated by using the following formula:
where
Travel Time = Z,/(Kx 60),
L = Pipe length (feet) and
V = Velocity of flow in pipe (ft/sec).
REP/1344PDR-DOC
File: 1344.00
June 1998
4.4 Determination of Areas
The area (A) of each drainage basin was determined from the Drainage Area Map. See the
Developed Drainage Basins Exhibit.
4.5 Modified Rational Method
The Modified Rational Method was utilized to calculate peak storm water flows and route the
calculated flows through the proposed drainage system.
When two flows combine at a junction point, the smaller of the flows has been decreased by using
the Modified Rational Method. This procedure accounts for the differing times of concentration
for the flows upstream of the junction point. The smaller Q is reduced by efther the ratio of the
intensfties or the ratio of the times of concentration, according to the following procedure:
• Let Q, T, and / conespond to the tributary with the largest discharge.
• Let q, t, and / correspond to the tributary wfth the smallest discharge.
• Let Q and T correspond to the peak discharge and the time of concentration
when peak flow occurs.
If 7'> /, the peak discharge is conected by the ratio of the intensfties:
Q = 2 + QiJ^i) and T = 7.
If r< /, the peak discharge is corrected by the ratio of the times of concentration:
Q = Q + q{Tlt) and T = T
RBP/1344PDR-DOC
File: 1344.00
June 1998
I
I
i
I
E
I
I
Table 1. Prede\'elopment Hydrology Calculations
Surface Runoflf for lOO-Year/6-Hour Storm
REP/1344PDR.DOC 10
LJ t-J l-J * > i I t i t I t > i I I I « i_t • » » « 19-May-98
Proj.Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00
File Name: IOO-PRE.WQI
DETAILED DRAINAGE CALCULATIONS 9 S 3
Frequency
P6=
100 yrs.
2.9
DSND by: JQZ
CHKD by: SB
From
Node
To
Node
Typeof
Travel
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Revised
Tc
Intensity
(ui/hr)
A
(ac)
CA Sum
Ca
Total Q
(cfs)
Al
Natural Ovrlnd 1950 86 0.044 8.9 18.9 3.24 0.35 14.8 5.2 5.2 16.8
SUBBASIN A2
Natural Ovrlnd 2250 143 0.064 8.6 18.6 3.27 0.35 37.6 13.2 13.2 43.2
SUBBASIN 1 2A
Flood Route Al and A2 18.6 3.27 59.7
SUBBASIN A3
Natural Ovrlnd 3150 161 0.051 12.1 22.1 2.93 0.35 84.5 29.6 29.6 86.7
SUBBASIN 1 3A
Flood Route 1 2A and A3 22.1 2.93 140.2
SUBBASIN A4
Natural Ovrlnd 700 16.5 0.024 5.1 15.1 3.75 0.85 0.9 0.8 0.8 3.0
19-May-98 DETAILED DRAINAGE CALCULATTONS '
Proj.Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00 Frequency 100 yrs. DSND by: JQZ
File Name: 100-PRE.WQl P6= 2.9 CHK] Dby: SB
From To Typeof L H Pipe Slope Velocity Tc Revised Intensity C A CA Sum Total Q
Node Node Travel (ft) (ft) Dia(in) (ft/ft) (ft/s) (min) Tc (in/hr) (ac) Ca (cfs)
SUBBASIN A
Flood Route 1 3A and A4 22.1 2.93 142.5
Pipe Flow 120 3 60 0.025 19.1 0.1 22.2 2.92 0 0 142.5
D/d Calculated = 0.41
SUBBASIN B
Natural Ovrlnd 1100 178 0.162 3.5 13.5 4.03 0.35 8.5 3 3 12.1
Pipe Flow 125 2.5 18 0.02 9.4 0.2 13.7 3.99 0 3 12.1
D/d Calculated = 0,69
SUBBASIN C
Natural Ovrlnd 1200 184 0.153 3.8 13.8 3.97 0.35 14.2 5 5 19.9
Drainage Ditch 650 24.1 0.037 10.83 1 14.8 3.79 0 5 19,9
Dn= 0.96 ft.
Pipe Flow 115 11.5 18 0.1 19.6 0.1 14.9 3.78 0 5 19,9
D/d Calculated= 0.56
SUBBASIN D
Natural Ovrlnd 2100 244 0.116 6.5 16.5 3.54 0.35 46.5 16.3 16.3 57.7
Pipe Flow 85 11.9 18 0.14 32.7 0 16.5 3.54 0 16.3 57,7
D/d Calculated = Full
1 i—^1 *—i I—ft i k I I I I I I I.
23-May-98
Proj.Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00
File Name: IOO-PRE.WQI
Jl i 1 1 I- i i-
DETAILED DRAINAGE CALCULATIONS
Frequency 100 yrs. DSND by: JQZ
From To
Node Node
Type of
Travel
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Revised
Tc
Intensity
(in/hr)
C A
(ac)
u uy :
CA Sum
Ca
Total Q
(cfs)
SUBBASIN E
Natural Ovrlnd 2000 206 0.103 6.5 16.5 3.54 0.4 77.4 31 31 109.7
Trap Chn b=3.0 1000 56 0.056 18.96 0.88 17.38 3.42 0 31 109.7 Dn = 1.11 ft.
Pipe Flow 120 2.4 42 0.02 16.3 0.1 17.48 3.41 0 31 109.7
D/d Calculated = 0.66
File: 1344.00
June 1998
m
•m
m
Table 2. Postdevelopment Hydrology Calculations - 1
Surface Runoflf for lOO-Year/6-Hour Storm
Wfth University Commons Predevelopment Condition
REP/1344n3B.DOC 14
J_J LJ i—i Ll L J !L_l_i-_l l_J r_l l_JI L I I
29-May-98 DETAILED DRAINAGE CALCULATIONS
Proj. Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00 Frequency 100 yrs.
File Name: POST-I.WQI P6= 2.9
I 1 !-
DSND by: JQZ
From To
Node Node
Type of
Travel
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Revised
Tc
Intensity
(in/hr)
C A
(ac)
CA Sum
Ca
Total Q
(cfs)
SUBBASIN Al
Natural Ovrlnd 1900 85 0.045 8.6 18.6 3.27 0.35 13.7 4.8 4.8 15.7
SUBBASIN Ala
Natural Ovrlnd 750 71 0.095 3.2 13.2 4.09 0.35 2.9 1 1 4.1
SUBBASIN Alb
Natural Ovrlnd 450 45 0.1 2.1 12.1 4.32 0.35 0.85 0.3 0.3 1.3
SUBBASIN Ale
Urban Overland 39 0.78 0.02 2.2 2.2 12.98 0.85 0.85 0.7 0.7
Gutter 950 38 0.04 4.4 3.6 5.8 6.94 0.85 0.85 0.7 0.7 4.9
(Avg flow depth = 0.3 ft. Avg Flo w Widt 10 ft.)
SUBBASIN A2
Natural Ovrlnd 2300 145 0.063 8.8 18.8 3.25 0.35 30 10.5 10.5 34.1
SUBBASIN A3
Natural Ovrlnd 3150 161 0.051 12.1 22.1 2.93 0.35 70 24.5 24.5 71.8
vn
-I i—I I i 1 » I t I I i.
29-May-98
Proj. Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00
File Name: POST-I.WQI
-i I—I I—I i I a I t
DETAILED DRAINAGE CALCULATIONS
Frequency
P6-
100 yrs.
2.9
DSND by: JQZ
From To
Node Node
Type of
Travel
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Revised
Tc
Intensity
(in/hr)
C A
(ac)
CA Sum
Ca
Total Q
(cfs)
SUBBASIN A3a
Natural Ovrlnd 150 75 0.5 0.5 10.5 4.73 0.35 1.2 0.4 0.4 1.9
Drainage Ditch 230 4.6 0.02 4.78 0.8 11.3 4.52 0 0.4 1.9
Dn = 0.45 ft.
SUBBASIN A4
Urban Overland 39 0.78 0.020 2.2 2.2 12.98 0.85 0.9 0.8 0.8
Gutter 1000 40 0.040 4.5 3.7 5.9 6.87 0.85 0.9 0.8 0.8 5.5
(Avg flow depth = 0.31 ft. Avg Flo w Widt 10.5 ft.)
SUBBASIN A5
Urban Overland 39 0.78 0.020 2.2 2.2 12.98 0.85 1.75 1.5 1.5
Gutter 1950 78.8 0.040 5 6.5 8.7 5.35 0.85 1.75 1.5 1.5 8
(Avg flow depth= 0.38 ft. Avg Flo w Widt 14 ft-)
SUBBASIN Bl
Natural Ovrlnd 1100 178 0.162 3.5 13.5 4.03 0.35 9 3.2 3.2 12.9
SUBBASIN B2
Natural Ovrlnd 1200 184 0.153 1 3.8 1 13.8 3.97 0,35 7.2 2.5 2.5 9.9
_J 1 I I I i i i i I I i_
29-May-98
Proj.Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00
File Name: POST-I.WQI
J t—I i—I i-I I—I I—I
DETAILED DRAINAGE CALCULATIONS
Frequency 100 yrs.
P6= 2.9
DSND by: JQZ
From To
Node Node
Type of
Travel
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Revised
Tc
Intensity
(in/hr)
C A
(ac)
CA Sum
Ca
Total Q
(cfs)
SUBBASIN Cl
Natural Ovrlnd 1100 150 0.136 3.7 13.7 3.99 0.35 5 1.8 1.8 7.2
-
SUBBASIN C2
Urban Overland 39 0.78 0.020 3.6 3.6 9.44 0.7 2.37 1.7 1.7
Gutter 1800 43.4 0.024 3.9 7.7 11.3 4.52 0.7 2.37 1.7 1.7 7.7
(Avg flow depth -0.38 ft. Avg Flo w Widt 14 ft.)
SUBBASIN C3
Urban Overland 39 0.78 0.020 2.2 2.2 12.98 0.85 1.61 1.4 1.4
Gutter 1800 43.4 0.024 4 7.5 9.7 4.98 0.85 1.61 1.4 1.4 7
(Avg flow depth = 0.4 ft. Avg Flo w Widt 15 ft.)
SUBBASIN D
Natural Ovrlnd 2100 244 0.116 6.5 16.5 3.54 0.35 44.5 15.6 15.6 55.2
SUBBASIN El
Natural Ovrlnd 800 160 0.200 2.5 12.5 4.23 0.35 6.3 2.2 2.2 9.3
Drainage Ditch 350 7 0.020 7.11 0.82 13.32 4.06 0 2.2 9.3
Dn-0.81 ft.
J i—t i—I I—1 i-
29-May-98
Proj.Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00
File Name: POST-I.WQI
4 J—t ^
DETAILED DRAINAGE CALCULATION
Frequency
P6=
100
2.9
yrs.
t i i i i i i J
DSND by: JQZ
CHKD by: SB
From To
Node Node
Type of
Travel
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Revised
Tc
Intensity
(in/hr)
C A
(ac)
CA Sum
Ca
Total Q
(cfs)
SUBBASIN E2
Urban Overland 39 0.78 0.020 2.2 2.2 12.98 0.85 1.2 1 1
Gutter 1450 49.5 0.034 4.4 5.5 7.7 5.78 0.85 1.2 1 1 5.8
(Avg flow depth = 0.34 ft. Avg Flo w Widt 12 ft.)
SUBBASIN E3
Urban Overland 39 0.78 0.020 2.2 2.2 12.98 0.85 1 0.9 0.9
Gutter 1150 44.1 0.038 4.5 4.3 6.5 6.45 0.85 1 0.9 0.9 5.8
(Avg flow depth = 0.32 ft. Avg Flo w Widt 11 ft.)
SUBBASIN Fl
Natural Ovrlnd 1800 226 0.126 5.6 15.6 3.67 0.4 11.9 4.8 4.8 17.6
Trap Chn b =2.0 100 2 0.020 8.11 0.21 15.81 3.64 0 4.8 17.6
Dn = 0.66 ft.
Pipe Flow 70 13 18 0.185 24 0 15.81 3.64 0 4.8 17.6
D/d Calculated = 0.43
SUBBASIN F2
Urban Overland 31 0.62 0.02 1.6 1.6 15.93 0.9 0.85 0.8 0.8
Gutter 1100 37.5 0.034 4.3 4.3 5.9 6.87 0.9 0.85 0.8 0.8 5.5
(Avg flow depth = 0.34 ft. Avg Flo w Widt 12 ft.)
^ _ I—I i—i I—i I—• I—I I I I I I t I i l_l J I I I
DETAILED DRAINAGE CALCULATIONS 29-May-98
Proj.Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00
File Name: POST-I.WQI
Frequency
P6 =
100
2.9
yrs.
i—• I 1 i—f I—I
DSND by: JQZ
From To
Node Node
Type of
Travel
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Revised
Tc
Intensity
(in/hr)
C A
(ac)
CA Sum
Ca
Total Q
(cfs)
SUBBASIN F3
Urban Overland 31 0.62 0.02 1.6 1.6 15.93 0.9 0.85 0.8 0.8
Gutter UOO 37.5 0.034 4.3 4.3 5.9 6.87 0.9 0.85 0.8 0.8 5.5
(Avg flow depth = 0.34 ft. Avg Flo w Widt 12 ft.)
SUBBASIN F4
Natural Ovrlnd 2000 266 0.133 5.9 15.9 3.62 0.4 25.1 10 10 36.2
Trap Chn b=2.0 350 7 0.02 9.86 0.59 16.49 3.54 0 10 36.2
Dn = 0.94 ft.
SUBBASIN F5
Natural Ovrlnd 2500 296 0.118 7.3 17.3 3.43 0.4 19.9 8 8 27.4
Trap Chn b=2.0 100 2 0.02 9.15 0.18 17.48 3.41 0 8 27.4
Dn= 0.82 ft.
SUBBASIN F6
Natural Ovrlnd 1900 224 0.118 6 16 3.61 0.4 18.5 7.4 7.4 26.7
Trap Chn b=2.0 550 U 0.02 9.08 1.01 17.01 3.47 0 7.4 26.7
Dn= 0.81 ft.
.XJ L-J L_i_i i t I I %
29-May-98
Proj.Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00
File Name:
J—I J—e S 1 l—t I 1 r—J
DETAILED DRAINAGE CALCULATIONS
H J I I B f
Frequency
P6 =
100 yrs.
2.9
DSND by: JQZ
CHKD by: SB
From To
Node Node
Type of
Travel
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Revised
Tc
Intensity
(in/hr)
C A
(ac)
CA Sum
Ca
Total Q
(cfs)
SUBBASIN Gl
Urban Overland 39 0.78 0.020 2.2 2.2 12.98 0.85 1.1 0.9 0.9
Gutter 1100 58.5 0.053 5.1 3.6 5.8 6.94 0.85 1.1 0.9 0.9 6.2
(Avg flow depth == 0.31 ft. Avg Flo w Widt 10.5 ft.)
SUBBASIN G2
Urban Overland 220 11 0.05 3.9 3.9 8.97 0.85 0.4 0.3 0.3
Gutter 200 9.5 0.048 4 0.8 4.7 7.95 0.85 0.4 0.3 0.3 2.4
(Avg flow depth = 0.21 ft. Avg Flo w Widt 5.5 ft.)
SUBBASIN G3
Urban Overland 53 1.06 0.02 2.6 2.6 11.65 0.85 0.8 0.7 0.7
Gutter 650 19.5 0.03 3.8 2.9 5.5 7.19 0.85 0.8 0.7 0.7 5
(Avg flow depth = 0.3 ft. Avg Flo w Widt 10 ft.)
I
Nl
2 ^
o u
>1
ON
cs
o c
I II
i i §
I z s
L. I-l ."Z:
CL. a, tl.
1
3 n
< ^ rt
§ .5
Pi
>
CO t:
o o H 2
s I
tl. 2
u-1
d
in
d
d un
d
d
vo
d
CO un
00
00
CN
U-1
ON
CS
CS
CS
u-^
cs'
<s' un
d
o cs o
U-J
o
d
T3
o E
>
CO 00
u-i
ON
m, cn
d
c _rt
c rt
3
o
CL (U T3
o
>
<
c/5 < CQ CO D
00
ON
d
vo
0\
d
ON
d
o\
d
00
o
oo o
00 un oo
oo
ON
CS
u-1
cs
cs U-i
CS
CN
cn
<s
un
u-1
d
o cs o
vo wn o
o
OJO >
00 u-1
cn u-1
ON cn o un
ON cn
6
c rt
l-I D
3
o
CL
0)
o tn
oa >
<
c/3
<
CQ
CQ D
c/5
File: 1344.00
June 1998
^ Table 3, Postde\^elopment Hydrology Calculations - 2
m
Surface Runoflf for lOO-Year/6-Hour Storm
•m
^ Wfth University Commons Postdevelopment Condition
BBP/1344n)R.DOC 22
J_l l-J LJI l- I i i 1 i f ! 1 I—e 3—t i 1 J—I 3 J
Ol-Jun-98 DETAILED DRAINAGE CALCULATIONS
Proj.Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00 Frequency 100 yrs.
File. Name: PO.<:T-I WOI P6= 2.9
"t 1"
DSND by: JQZ
From To
Node Node
Type of
Travel
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Revised
Tc
Intensity
(in/hr)
C A
(ac)
CA Sum
Ca
Total Q
(cfs)
SUBBASIN Al
Natural Ovrlnd 1900 85 0.045 8.6 18.6 3.27 0.35 13.7 4.8 4.8 15.7
SUBBASIN Ala
Natural Ovrlnd 750 71 0.095 3.2 13.2 4.09 0.35 2.9 1 1 4.1
SUBBASIN Alb
Natural Ovrlnd 450 45 0.1 2.1 12.1 4.32 0.35 0.85 0.3 0.3 1.3
SUBBASIN Ale
Urban Overland 39 0.78 0.02 2.2 2.2 12.98 0.85 0.85 0.7 0.7
Gutter 950 38 0.04 4.4 3.6 5.8 6.94 0.85 0.85 0.7 0.7 4.9
(Avg flow depth = 0.3 ft. Avg Flo w Widt 10 ft.)
SUBBASIN A2
Natural Ovrlnd 2300 145 0.063 8.8 18.8 3.25 0.35 30 10.5 10.5 34.1
r» « » I—• i—• i 1 I 1 I 1 I 1 I 1 I I I I I I i I
DETAILED DRAINAGE CALCULATIONS Ol-Jun-98
Proj.Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00
File Name: POST-I.WQI
Frequency
P6 =
100
2.9
yrs. DSND by: JQZ
From To
Node Node
Type of
Travel
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Revised
Tc
Intensity
(in/hr)
C A
(ac)
CA Sum
Ca
Total Q
(cfs)
SUBBASIN A3
Natural Ovrlnd 3150 161 0.051 12.1 22.1 2.93 0.35 70 24.5 24.5 71.8
SUBBASIN A3a
Natural Ovrlnd 150 75 0.5 0.5 10-5 4.73 0.35 1.2 0.4 0.4 1.9
Drainage Ditch 230 4.6 0.02 4.78 0.8 11.3 4.52 0 0.4 1.9
Dn = 0.45 ft.
SUBBASIN A4
Urban Overland 39 0.78 0.020 2.2 2.2 12.98 0.85 0.9 0.8 0.8
Gutter 1000 40 0.040 4.5 3.7 5.9 6.87 0.85 0.9 0.8 0.8 5.5
(Avg flow depth = 0.31 ft. Avg Flo w Widt 10.5 ft.)
SUBBASIN A5
Urban Overland 39 0.78 0.020 2.2 2.2 12.98 0.85 1.75 1.5 1.5
Gutter 1950 78.8 0.040 5 6.5 8.7 5.35 0.85 1.75 1.5 1.5 8
(Avg flow depth = 0.38 ft. Avg Flo w Widt 14 ft.)
r-t I 1 I 1 * oVjun-9? I—i I—t D^A!LE^ DfclftA^E^LtuifAlloNS ^ ^
Proj .Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00
File Name: POST-I.WQI
Frequency 100 yrs.
P6= 2.9
DSND by: JQZ
From To
Node Node
Type of
Travel
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Revised
Tc
Intensity
(in/hr)
C A
(ac)
CA Sum
Ca
Total Q
(cfs)
SUBBASIN Bl
Natural Ovrlnd 1100 178 0.162 3.5 13.5 4.03 0.35 9 3.2 3.2 12.9
SUBBASIN B2
Natural Ovrlnd 1200 184 0.153 3.8 13.8 3.97 0.35 7.2 2.5 2.5 9.9
SUBBASIN Cl
Natural Ovrlnd 1100 150 0.136 3.7 13.7 3.99 0.35 5 1.8 1.8 7.2
SUBBASIN C2
Urban Overland 39 0.78 0.020 3.6 3.6 9.44 0.7 2.37 1.7 1.7
Gutter 1800 43.4 0.024 3.9 7.7 11.3 4.52 0.7 2.37 1.7 1.7 7.7
(Avg flow depth = 0.38 ft. Avg Flo w Widt 14 ft.)
SUBBASIN C3
Urban Overland 39 0.78 0.020 2.2 2.2 12.98 0.85 1.61 1.4 1.4
Gutter 1800 43.4 0.024 4 7.5 9.7 4.98 0.85 1.61 1.4 1.4 7
(Avg flow depth = 0.4 ft. Avg Flo w Widt 15 ft.)
'A
t I—t I—t ^l-!un-^ -t I 1 Jt ^T^iL^D ^RAfN AGE f:AtciJLA?ioSs ' '
Proj.Name:
Proj. Num:
File Name:
RANCHO SANTA FE ROAD
1344.00
POST-I.WQl
Frequency
P6 =
100 yrs.
2.9
f i t I I I I ^1 i i
DSND by: JQZ
From To
Node Node
Type of
Travel
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Revised
Tc
Intensity
(in/hr)
C A
(ac)
CA Sum
Ca
Total Q
(cfs)
SUBBASIN D
Natural Ovrlnd 2100 244 0.116 6.5 16.5 3.54 0.35 44.5 15.6 15.6 55.2
SUBBASIN El
Natural Ovrlnd 800 160 0.200 2.5 12.5 4.23 0.35 6.3 2.2 2.2 9.3
Drainage Ditch 350 7 0.020 7.11 0.82 13.32 4.06 0 2.2 9.3
Dn = 0.81 ft.
SUBBASIN E2
Urban Overland 39 0.78 0.020 2.2 2.2 12.98 0.85 1.2 1 1
Gutter 1450 49.5 0.034 4.4 5.5 7.7 5.78 0.85 1.2 1 1 5.8
(Avg flow depth = 0.34 ft. Avg Flo w Widt 12 ft.)
SUBBASIN E3
Urban Overland 39 0.78 0.020 2.2 2.2 12.98 0.85 1 0.9 0.9
Gutter 1150 44.1 0.038 4.5 4.3 6.5 6.45 0.85 1 0.9 0.9 5.8
(Avg flow depth = 0.32 ft. Avg Flo w Widt 11 ft.)
i i i i > 1 fc i 1 I i I—I I—• I—t^!—jbrr*. »
Proj.Name:
Proj. Num:
File Name:
23-May-98
RANCHO SANTA FE ROAD
1344.00
POST-2.WQI
DETAILED DRAINAGE CALCULAT '{ONS
Frequency
P6=
100 yrs.
2.9
From
Node
To
Node
SUBBASIN
Input Flow
SUBBASIN
SUBBASIN
SUBBASIN
SUBBASIN
Type of
Travel
Fl
F2
Urban Overland
L
(ft)
Gutter
(Avg flow depth =
F3
Urban Overland
Gutter
(Avg flow depths
F4
Natural Ovrlnd
Drainage Ditch
Dn
Gl
Urban Overland
Gutter
(Avg flow depth =
31
1190
H
(ft)
0.62
Pipe
Dia(in)
Slope
(ft/ft)
42
0.34 ft
31
1100
0.34
0.62
37.5
ft.
Avg Flo
Avg Flo
0.02
Velocity
(ft/s)
Tc
(min)
Tc=
-t I—t I—I I ^1 r
DSND by: JQZ
CHKD by: SB
Revised
Tc
15.93
0.035
w Widt
0.02
0.034
w Widt
4.4
10
950
0.35
0.5
19
ft.
39
1100
0.31
0.05
0.02
0.78
58-5
ft. Avg Flo
0.020
0.053
w Widt
12
1.6
4.5
ft.)
4.3
12
1.6
4.3
1.6
6.1
Intensity
(in/hr)
3.62
15.93
6.72
1.6
5.9
ft.)
4.07
5.1
10.5
0-1
3.89
15.93
6.87
10.1
0.9
0-9
A
(ac)
CA
0.85
4.85
13-99
2.2
3.6
ft-)
2.2
5.8
3.93
0.9
0.9
0.35
0.85
0.85
0.85
Sum
Ca
Total Q
(cfs)
0-8
0.8
0.8
0.8
0.8
0.8
0.54
12.98
6.94
0.85
0-85
1.1
1.1
0-2
0
0-9
0.9
0.8
0.8
0.2
0.2
0.9
0.9
92.8
5.4
5.5
6.2
23-May-98 DET/VILED DRAINAGE CALCULATIONS
Proj.Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00 Frequency 100 yrs.
Flip. Name: POST-2.WOI .—— • r
DSNE
CHKI
)by:
>by:
JQZ
SB
From To
Node Node
Type of
Travel
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Revised
Tc
Intensity
(in/hr)
C A
(ac)
CA Sum
Ca
Total Q
(cfs)
SUBBASIN G2
Urban Overland 220 11 0.05 3.9 3-9 8.97 0.85 0.4 0.3 0-3
Gutter 200 9.5 0.048 4 0.8 4.7 7.95 0.85 0.4 0.3 0.3 2.4
(Av2 flow depth = 0.21 ft. Avg Flo w Widt 5.5 ft.)
SUBBASIN G3
Urban Overland 53 1.06 0.02 2.6 2.6 11.65 0.85 0.8 0.7 0.7
Gutter 650 19.5 0.03 3.8 2.9 5.5 7-19 0.85 0.8 0.7 0.7 5
(Avg flow depth = 0.3 ft. Avg Flo w Widt 10 ft.)
SUBBASIN H
Urban Overland 39 0.78 0.020 2.2 2.2 12.98 0.85 0-6 0.5 0.5
Gutter 400 5.8 0.015 2.7 2.5 4.7 7-95 0-85 0.6 0.5 0.5 4
(Avg flow depth = 0.31 ft-Avg Flo w Widt 10.5 ft-)
SUBBASIN J
Urban Overland 39 0.78 0.020 2.2 2.2 12.98 0.85 1.08 0.9 0.9
Gutter 950 53.5 0-056 5.2 3 5.2 7.45 0.85 1.08 0.9 0.9 6.7
(Avg flow depth = 0.31 ft. Avg Fic w Widt 10.5 ft.)
File: 1344.00
June 1998
SECTION 5
FI OOP ROUTING CALCULATIONS
The stonn drain pipes for the proposed systems were designed based on Manning's equation:
Q=={\.m/n)xAxr^xs^^,
where
n = Roughness coefificient,
A = Cross-sectional area of flow,
r = Hydraulic radius, and
s = Slope of culvert.
5.1 Flood Routing Method
The Modified Rational Method was utilized to calculate peak storm water flows and route the
calculated flows through the drainage system.
When two major basins combine at a junction point, the smaller ofthe flows has been decreased
by using the Modified Rational Method. This procedure accounts for the diflfering times of
concentration for the flows upstream of the junction point. The smaller Q is reduced by either the
ratio of the intensfties or the ratio of the times of concentration, according to the following
procedure:
• Let Q, T, and / conespond to the tributary with the largest discharge.
• Let q, t, and ; conespond to the tributary with the smallest discharge.
• Let Q and T correspond to the peak discharge and the time of concentration
when peak flow occurs.
29
REP/1344PDR.DOC
File: 1344.00
June 1998
- If r> ^, the peak discharge is conected by the ratio of the intensfties:
m
Q = Q + q{Ili) and T = T.
If r< the peak discharge is conected by the ratio of the times of concentration:
- Q = 2 + ^(7^/0 and T=r.
*• 5.2 Pipe Flow
m Travel time has been considered between the nodes of the flood-routed system. Travel time is
^ calculated by using the following formula:
m
Travel Time = Z,/(Fx 60),
^ where
L = Pipe length (feet) and
m
^ V= Velocity of flow in pipe (fl/sec).
m
* 5.3 Flood Routing Tables
^ A flood routing table for each pipe system has been prepared, using a hydrology program which
consists of a system of macros developed wfthin the QuattroPro software. A printout for each
19 pipe system for the developed condition has been included in Table 3.
m
«• 5.4 Roughness Coefficients
'm
^ The dififerent pipes and channels that carry storm water have varying degrees of roughness
associated with them. This roughness value is used in the equations to size the pipe or channel.
^ Manning's n for reinforced concrete pipe is 0.013, CMP is 0.022, and improved channels is 0.015.
Naturally occurring inegular channels have a Manning's w of approximately 0.040.
REPA344PDR.DOC 30
m
File: 1344.00
June 1998
Table 4. Flood Routing Calculations
Flood Routing for lOO-Year/6-Hour Storm
4*
m
"* RBP/1344ra)R.DOC 31
1 1 f Ililii
30-May-98
1 1 1 i 1 -A i • 1 f 1 • 1 i 1 1 lu
DETAILED DRAINAGE CALCULATIONS
—1 } t J— —4
Proj.Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00 Frequency 100 yrs. DSND by: JQZ
File Name: lOO-P-l.WQl P6 = 2.9 CHKD by: SB
From To Type of L H Pipe Slope Velocity Tc Revised Intensity C A CA Sum Total Q
Node Node Travel (ft) (ft) Dia(in) (ft/ft) (ft/s) (min) Tc (in/hr) (ac) Ca (cfs)
SUBBAS IN Al
Input Flow Tc = 18.6 3.27 15.7
01 02 Pipe Flow 286.1 25.5 24 0.089 17.5 0.3 18.9 3.24 0 0 15.7
D/d Calculated = 0.33
SUBBASIN Alb
Input Flow Tc== 12.1 4-32
Gutter 400 16 0.040 3.5 1.9 14 3.93 0-0
(Avg flow depth = 0.17 ft. Avg Flo w Widt 3.5 ft.)
SUBBASIN Ale
Input Flow Tc = 5.8 6.94 4.9
SUBBASIN Al bc
Flood Route Alb and Ale 5.8 6.94 4.9
SUBBASIN A Ibc
Flood Route Al and Al bc 18.9 3.24 18.0
02 03 Trap Chn b = 10.0 115 4.9 0.043 7.4 0.26 19.16 3.21 0 0 18-0
Dn= 0.23 ft.
rl I I I I *~3^Mai^ * * * * *^lA*[LEBl^AlRAft¥?ALCuffAi!orS ^
Proj-Name: RANCHO SANTA FE ROAD
If I i t I it I i
Proj. Num: 1344.00 Frequency 100 yrs.
P6= 2.9
DSND by: JQZ
From To
Node Node
Type of
Travel
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Revised
Tc
Intensity
(in/hr)
C A
(ac)
CA Sum
Ca
Total Q
(cfs)
SUBBASIN Ala
Input Flow Tc = 13.2 4-09 4.1
SUBBASIN Alabc
Flood Route Albc and Ala 19.16 3.21 21.2
03 04 Pipe Flow 20 0.9 18 0.043 14 0 19-16 3.21 0 0 21.2
D/d Calculated = 0-8
04 05 Trap Chn b-20.0 60 0-3 0.005 1.71 0.58 19.74 3.15 0 0 21.2
Dn = 0.57 ft.
05 06 Pipe Flow 35 1.8 18 0.050 15 0 19.74 3.15 0 0 21.2
D/d Calculated = 0.74
SUBBASIN A2
Input Flow Tc= 18.8 3.25 34.1
11 06 Pipe Flow 30 1.5 24 0.050 17-3 0 18.8 3.25 0 0 34.1
D/d Calculated = 0.6
SUBBASIN Al 2
Flood Route Alabc and A2 18.8 3.25 54.3
06 07 Trap Chn b=20.0 350 20 0.057 5-22 1.12 19.92 3.13 0 0 54.3
Dn = 0.49 ft.
i i i i i * i-i Ll I t
30-May-98
Proj.Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00
t i fc • ft_t. J I..
DETAILED DRAINAGE CALCULATIONS
Frequency 100 yrs.
P6= 2.9
DSND by: JQZ
From To
Node Node
Type of
Travel
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Revised
Tc
Intensity
(in/hr)
C A
(ac)
CA Sum
Ca
Total Q
(cfs)
SUBBASIN A3
Input Flow Tc= 22.1 2-93 71.8
SUBBASIN Al 3
Flood Route Al 2 and A3 22.1 2-93 122.6
07 08 Pipe Flow 81.4 4 60 0-049 23.3 0.1 22.2 2.92 0 0 122.6
D/d Calculated = 0-31
SUBBASIN A3a
Input Flow Tc= 11.3 4.52 1.9
21 08 Pipe Flow 29.6 0.9 18 0.030 6.7 0.1 11.4 4.49 0 0 1-9
D/d Calculated = 0.22
SUBBASIN Al 3a
Flood Route Al 3 and A3a 22.2 2.92 123.8
08 09 Pipe Flow 90 2.3 60 0.025 18.4 0.1 22-3 2.91 0 0 123.8
D/d Calculated = 0.38
SUBBASIN A4
Input Flow Tc = 5.9 6.87 5.5
31 32 Pipe Flow 76 1.5 18 0.019 7.7 0.2 6.1 6.72 0 0 5.5
D/d Calculated = 0.42
J I i I i I K i I—i i—fc J—fc J—I
30-May-98
Proj.Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00
File Name: IOO-P-I.WQI
DETAILED DRAINAGE CALCULA AorA
Frequency
P6 =
100 yrs.
2.9
From
Node
To
Node
SUBBASIN
Input Flow
Type of
Travel
A5
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Tc=
Revised
Tc
8.7
Intensity
(in/hr)
5.35
DSND by: JQZ
CHKD by: SB
A
(ac)
CA Sum
Ca
Total Q
(cfs)
8
SUBBASIN
Flood Route
32 09
SUBBASIN
Flood Route
A4 5
A4 and A5 8.7
Pipe Flow 141.9 2.8 18 0.020 9.4 0.3
D/d Calculated = 0.69
A-TOTAL
Al 3a and A4 5 22.3
5.35
5.23
2-91
0 0
12.3
12.3
130.6
^n
I i t I t 1 • i tti mi fc< fci fci fci fc l fc J i i 1 I 1 i i r
30.May-98 ^ DETAILED DRAINAGE CALCULATIONS
Proj.Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00
File Name: IOO-P-2.WQI
1—t J
Frequency 100 yrs-
P6= 2-9
DSND by: JQZ
CHKD by: SB
From
Node
To
Node
SUBBASIN
Input Flow
41 42
Type of
Travel
Cl
Pipe Flow
D/d Calculated =
L
(ft)
H
(ft)
15.5
0.23
SUBBASIN
Input Flow
SUBBASIN
C2
Cl 2
Flood Route
42 43
SUBBASIN
Input Flow
SUBBASIN
Flood Route
Cl
Pipe Flow
D/d Calculated =
C3
and
74.34
0.42
43 44
Cl 2
Pipe Flow
D/d Calculated =
5.2
Pipe
Dia(in)
18
Slope
(ft/ft)
0.336
Velocity
(ft/s)
23.1
C2
8-8 18
and
24-3
0.53
C3
2.9
Tc
(min)
Tc =
0
Revised
Tc
Tc =
0.119 19-0 0-1
0.120 21.1
Tc =
13.7
13.7
11.3
11.3
11.4
9.7
11.4
11.4
ntensity
(in/hr)
3.99
3-99
4.52
4.52
4.49
4.98
4.49
4.49
A
(ac)
CA
0
Sum
Ca
Total Q
(cfs)
0
0
0
0
7-2
7-2
7.7
13.6
13.6
7.0
19.9
19.9
30-May-98 DETAILED DRAINAGE CALCULATIONS
Proj.Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00 Frequency 100 yrs.
FJIP Mamp- inn-p.9 wol P6= 2.9
DSNE
CHKE
» by:
)by:
JQZ
SB
From To
Node Node
Type of
Travel
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Revised
Tc
Intensity
(in/hr)
C A
(ac)
CA Sum
Ca
Total Q
(cfs)
SUBBASIN D
Input Flow Tc = 16.5 3.54 55.2
51 52 Pipe Flow 13 0.8 30 0.065 21.6 0 16.5 3.54 0 0 55.2
D/d Calculated = 0.52
52 53 Pipe Flow 101.8 16 30 0.157 29.9 0.1 16.6 3.52 0 0 55.2
D/d Calculated = 0.4
SUBBASIN El
Input Flow Tc = 13.32 4.06 9.3
61 62 Pipe Flow 14 5 18 0.360 25.5 0 13.32 4.06 0 0 9-3
D/d Calculated = 0.26
SUBBASIN E2
Input Flow Tc = 7.7 5.78 5.8
SUBBASIN El 2
Flood Route El and E2 13.32 4.06 13.4
62 63 Pipe Flow 81.5 0.5 24 0.006 6.1 0.2 13-52 4.02 0 0 13.4
D/d Calculated = 0.66
SUBBASIN E3
Input Flow Tc = 6.5 6.45 5.8
1 i I I 1^ J fc t
Ol-Jun-98
Proj .Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00
File Name: IOO-P-2.WQI
J i fc i K I—fc i—fc I—I J—e 3
DETAILED DRAINAGE CALCULATIONS
Frequency 100 yrs.
P6= 2.9
DSND by: JQZ
CHKD by: SB
From
Node
To
Node
SUBBASIN
Flood Route
63 64
64 65
Type of
Travel
El 2
Pipe Flow
D/d Calculated =
65 66
66 67
SUBBASIN
Input Flow
71 72
SUBBASIN
Input Flow
81 72
Pipe Flow
D/d Calculated =
Pipe Flow
D/d Calculated =
Pipe Flow
D/d Calculated =
Fl
Pipe Flow
D/d Calculated =
F4
Pipe Flow
D/d Calculated =
L
(ft)
and
296.8
0.38
296.3
0.4
296.3
0.41
260.4
0.39
647.4
0.26
87.86
H
(ft)
E3
18.1
Pipe
Dia(in)
24
14.5
13
14.1
9.7
24
24
24
Slope
(ft/ft)
0.061
0.049
Velocity
(ft/s)
15.6
Tc
(min)
0.3
0.044
0.054
42
0.54
31.6 18
0.015
0.360
14.4
13.9
14.9
9.1
36.9
0.3
0.4
0-3
Tc=
1-2
Tc =
0
Revised
Tc
13.52
13.82
14.12
14.52
14-82
15.91
Intensity
(in/hr)
4-02
3.97
3.91
3.84
3.79
3.62
17-11
16.49
16.49
3-46
3.54
3.54
A
(ac)
CA
0
0
0
0
Sum
Ca
0
0
Total Q
(cfs)
0
0
0
0
0
0
17
17
17
17
17
17.6
17.6
36.2
36.2
^ I—( I—t I—ft n-i-
30-May-98
Proj.Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00
4 J—I s—fc i—fc i—1 i—ft J—t
DETAILED DRAINAGE CALCULATIONS
Frequency
P6-
IOO yrs-
2.9
DSND by: JQZ
CHKD by: SB
From To
Node Node
Type of
Travel
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Revised
Tc
Intensity
(in/hr)
C A
(ac)
CA Sum
Ca
Total Q
(cfs)
SUBBASIN Fl 4
Flood Route Fl and F4 16-49 3.54 53.2
72 73 Pipe Flow 584-6 32.2 42 0.055 19-8 0.5 16-99 3-47 0 0 53.2
D/d Calculated = 0.32
SUBBASIN F5
Input Flow Tc = 17-48 3.41 27.4
SUBBASIN F6
Input Flow Tc = 17.01 3.47 26.7
SUBBASIN F5 6
Flood Route F5 and F6 17-48 3-41 53.6
91 73 Pipe Flow 36.24 10 24 0-275 36-8 0 17.48 3.41 0 0 53.6
D/d Calculated = 0.47
SUBBASIN Fl 6
Flood Route Fl 4 and F5 6 17.48 3.41 105.9
SUBBASIN F2
Input Flow Tc = 5-9 6.87 5.5
I I I ^ i I fc i fc i fc i • i fc > fc_i LJ l-J LJ i-J l_l l_i •_ I—i
30-May-98
Proj.Name: RANCHO SANTA FE ROAD
Proj. Num: 1344.00
DETAILED DRAINAGE CALCULATIONS
Frequency
P6 =
100 yrs.
2-9
DSND by:
CHKD by:
JQZ
SB
From To
Node Node
Type of
Travel
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Revised
Tc
Intensity
(in/hr)
C A
(ac)
CA Sum
Ca
Total Q
(cfs)
SUBBASIN F2 6
Flood Route Fl 6 and F2 17.48 3.41 108.6
73 74 Pipe Flow 88-97 1.8 42 0.020 16.3 O.I 17.58 3.4 0 0 108-6
D/d Calculated = 0.65
SUBBASIN F3
Input Flow Tc = 5.9 6.87 5.5
SUBBASIN F
Flood Route F2 6 and F3 17.58 3.4 111.3
74 67 Pipe Flow 186.2 5-6 42 0.030 19.2 0.2 17.78 3.37 0 0 111-3
D/d Calculated= 0-58
SUBBASIN E F
Flood Route E and F 17.78 3-37 126.4
67 68 Pipe Flow 42.95 1.3 42 0.030 19.7 0 17.78 3-37 0 0 126.4
D/d Calculated = 0.63
SUBBASIN G2
Input Flow Tc = 4.7 7.95 2.4
92 93 Pipe Flow 112-8 5.1 18 0.045 8.2 0.2 4.9 7.74 0 0 2.4
D/d Calculated= 0.22
rl 1—t 1—1 i—t I—* I—fc 3—« i—1^1 -t i-
30-May-98
Proj.Name: RANCHO SANTA FE ROAD
Proj- Num: 1344.00
DETAILED DRAINAGE CALCULATIONS
4 3 1 3 1 ^ 1 3
Frequency
P6 =
100 yrs.
2-9
DSND by: JQZ
CHKD by: SB
From To
Node Node
Type of
Travel
L
(ft)
H
(ft)
Pipe
Dia(in)
Slope
(ft/ft)
Velocity
(ft/s)
Tc
(min)
Revised
Tc
Intensity
(in/hr)
C A
(ac)
CA Sum
Ca
Total Q
(cfs)
SUBBASIN Gl
Input Flow Tc = 5.8 6.94 6.2
SUBBASIN Gl 2
Flood Route G2 and Gl 5.8 6.94 8.4
SUBBASIN G3
Input Flow Tc-5.5 7.19 5
SUBBASIN G
Flood Route Gl 2 and G3 5.8 6.94 13.2
93 94 Pipe Flow 31.66 1.1 24 0.034 11.8 0 5.8 6.94 0 0 13.2
D/d Calculated = 0.39
File: 1344.00
June 1998
SECTION 6
DETENTION BASIN DESIGN
6.1 Design Data
A small detention basin. Pond D, will be designed to reduce the peak flow from Basin D. The
detention basin will be regraded to make the minimum water surface elevation 449.00 and the
maximum elevation 454.50. The total available storage volume is 26,884 cubic feet. A 24-mch
concrete culvert will be used.
6.2 Software of Design Calculations
PONDPACK, a software package designed by Haestad Methods, routes inflow hydrographs
through detention basins with user-defined stage-storage characteristics. The software has several
options for outiet stmcture configurations, in order to accurately model the proposed design. The
computer-generated output includes graphical presentations of the inflow and outflow
hydrographs, as well as the input characteristics of the detention basins and outiet stmctures in
tabular form.
6.3 Summarv of Computation
For a lOO-year/6-hour storm, the detention basin reduces the flow from 55.2 CFS to 37.4 CFS.
The peak water surface is 453.90. The peak storage is approximately 21,314 cubic feet. (Refer to
Appendix B for computer output.)
RBP/1344ra)R.DOC 42
File: 1344.00
June 1998
APPENDIX A
HYDROLOGY DESIGN CHARTS
REPA344PDR.DOC A-l
m
RUNOFF COEFFICIENTS (RATIONAL METHOD)
nFVFI nPFH ARgAS (URBAN}
Land Use
Residential:
Single Family
Mutti-Units
Mobile Homes
Rural (lots greater than 1/2 acre]
Commercial
80% Impervious
Industrial
90% Impervious
Coefficient, C
Soil Group ' 11
A B Q D
.40 .45 .50 .55
.45 .50 .60 -70
.45 .50 .55 .65
.30 .35 .40 .45
.70 .75 .80 .85
.80 .85 .90 .95
NOTES;
m
(21
Soil Group maps are available at the offices of the Department of Public Works.
Where actual conditions deviate significantiy from the tabulated imperviousness
values of 80% or 90%, the values given for coefficient C, may be revised by
multiplying 80% or 90% by the ratio of actual imperviousness to the tabulated
imperviousness. However, in no case shall the final coefficient be less than 0.50,
For example: Consider commerctal property on D soii group.
Actual imperviousness = 50%
Tabulated imperviousness = 80%
Revised C = 50 x 0.85 = 0.53
80
A-l
IV-A-9
APPENDIX IX
Updated 4/93
11 Kill 11 ilfcl fcl fci till
INTENSITY-DURAT- DtSIGN CHART
lift I I f I
rrrajrh" Directions for Application:
1) From precipitation naps determine 6 hr. and
24 hr. amounts for the selected frequency.
These maps are printed in the County Hydro!ony
Manual (10, 50 and TOO yr. maps included in th
Design and Procedure Manual),
2) Adjust 6 hr. precipitation (if necessary) so
that it is within the range of 45% to 65% of
the 24 hr. precipitation. (Not nrplicable
to Desert)
3) Plat 6 hr. precipitation on the right side
of the chart.
4) Drav/ a Hne through the point parallel to the
plotted lines.
5) This line is the intensity-duration curve for
the location being analyzed.
Application Form:
0) Selected Frequency yr
1) P.
2) Adjusted *Pg=
3) t„ -
24
in.
min.
4) I In/hr.
*Not Applicable to Desert Region
A-Z.
APPENDIX XI
IV-A-14
Revised 1/85
£QU/?r/OAJ
, • (^)
I - Leng//} of tva/^rs/7ed
e/fiTcf/re s/ooe ///7£ CSee Appendix ^ B)
I
A4//es
^ /OOO
900
- BOO
- 700
- £00 \
SOO
400
\
'—400
300
200 \
3'—
4-
3-
Z-
\
\
\
//ours
/OO
\ -
— SO
• 30
I— ZD
as —
'—4^0
\
\—3000
M//ti//es
— UO
/so
. /20
/DO
SO
80
70
-60
-SO
— 40
— 30
- 20
/8
/£
/4
NOTE
poT^ATuS'T WATERSHE
5 ADD TEN MINUTES TO J
! COMPUTED TIME OF CON- \
J^ENTRATION.
— /D
— 2000
— /800
— /600
— /400
— /200
— /DOD
— 900
— 800
— 700
— 600
-SOO
— 400
— 300
\
\
— /2
/O
9
8
7
6
_ 4
— 3
200
H I A-3
SAN DIEGO COUNTY
DEPARTMENT OF SPECIAL DISTRICT SERVICES
DESIGN MANUAL
NOMOGRAPH FOR DETERMINATION
OF TIME OF CONCENTRATION (Tc)
FOR NATURAL WATERSHEDS
a^S/PA/ /9/?£/?S Oi^£^L/PA/D T/M£ O/^ FLOW CU/^i/SS
A-4
SAN DIEGO COUNTY
DEPARTMENT OF SPECIAL DISTRICT SERVICES
URBAN AREAS OVERLAND TIME
OF FLOW CURVES
DESIGN MANUAL^ • DESIGN MANUAL^
APPENDIX X-C
File: 1344.00
June 1998
APPENDIX B
DETENTION BASIN COMPUTER OUTPUT
REP/1344PDR.DOC B-l
POND-2 Version: 5,20 S/N:
»»> HYDROGRAPH PRINTOUT ««<
06-02-1998 13:46:25
Hydrograph file: c:\pond\1344\100YR-D .HYD
Time
Minutes
HYDROGRAPH ORDINATES (cfs)
Time increment = 1-50 Minutes
Time on left represents time for first Q in each row.
0.00
10.50
21.00
31.50
42.00
0.00
35.11
47.69
30.10
12.51
5.02
40.11
45.19
27.60
10.01
10.01
45.19
42.69
25.10
7.51
15.09
50.20
40.11
22.60
5.00
20.09
55.20
37.61
20.09
2.50
25.10
52.70
35.11
17.59
0.00
30.10
50.20
32.60
15.09
m
POND-2 Version: 5.20 S/N:
Plotted: 06-02-1998
Flow (cfs)
0
m
4.5 —
S.O m -
7.5 -
^.0 -
-^0.5 -
«ri.2.0 -
-^3.5 -
ns-o -
•-16.5 -
*18.0 -
"^9.5 —
m
21.0 -
"'22.5 m -
24.0 -
^5.5 -
27.0 -
«28.5 -
•30.0 -
»31.5 -
*33.0 -
*34.5 -
'Tje.o -
37.5 -
TIME
(min)
* File: c:\pond\1344\100YR-D .HYD Qmax = ,55.2 cfs
mt
POND-2 Version: 5.2 0
S/N:
RANCHO SANTA FE ROAD
BASIN 'D' PONDING STUDY
CALCULATED 06-02-1998 11:42:57
DISK FILE: c:\pond\1344\POND-D .VOL
Planimeter scale: 1 inch = 40 ft.
Volume Volume Sum Elevation Planimeter Area Al-f-A2-i-sqr (A1*A2)
449.00
450.00
451.00
452.00
453.00
454.00
454.50
0.65
1.27
2.08
3.16
4.32
5.61
6. 09
1,040
2,032
3,328
5,056
6,912
8,976
9,744
0
4,526
7,960
12,486
17,880
23,765
28,072
0
1,509
2,653
4,162
5,960
7,922
4,679
0
1,509
4,162
8,324
14,284
22,205
26,884
IA = (sq.rt(Areal) 4- ((Ei-El) / (E2-E1) )* (sq. rt (Area2)-sq. rt (Areal)))
where- El E2 = Closest two elevations with planimeter data
* Ei' = Elevation at which to interpolate area
Areal,Area2 = Areas computed for El, E2, respectively
IA = Interpolated area for Ei
* Incremental volume computed by the Conic Method for Reservoir Volumes.
Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Area2))
where- ELl, EL2 = Lower and upper elevations of the increment
Are4l,Area2 = Areas computed for ELl, EL2, respectively
Volume = Incremental volume between ELl and EL2
outlet Structure File: POND-D .STR
POND-2 Version: 5.20 S/N:
Date Executed: Time Executed
***********************
RANCHO SANTA FE ROAD
BASIN 'D' PONDING STUDY
***********************
***** COMPOSITE OUTFLOW SUMMARY ****
Contributing Structures Elevation (ft) Q (cfs) Cor
449.00
449.25
0.0
0.0
449.50 0.1 1
449.75 0.6 1
m 450.00 1.5 1
450.25 3.0 1
m 450.50 4.7 1
450.75 6.9 1
m 451.00 9.2 1
451.25 12.0 1
m 451.50 15.1 1
451.75 17.9 1
452.00 21.2 1
452.25 24.0 1
•Wl 452.50 26.5 1
m 452.75 28.8 1
453.00 30.9 1
•m 453.25 32.8 1
453.50 34.7 1
m 453.75 36.4 1
454.00 38.1 1
m 454.25 39.8 1
454.50 0.0
(^UTue-'T ^T(^u6-ri/^e file-
Outlet Structure File: POND-D -STR
POND-2 Version: 5.20 S/N:
Date Executed: Time Executed
***********************
RANCHO SANTA FE ROAD
BASIN 'D' PONDING STUDY
***********************
Outlet Structure File: c:\pond\1344\POND-D .STR
Planimeter Input File: c:\pond\1344\POND-D .VOL
Rating Table Output File: c:\pond\1344\POND-D .PND
Min. Elev.(ft) = 449 Max. Elev.(ft) = 454.5 Incr.(ft) = .25
Additional elevations (ft) to be included in table:
**************************
m **********************************************
SYSTEM CONNECTIVITY
**********************************************
Structure No. Q Table Q Table
CULVERT-CR 1 -> 1
Outflow rating table summary was stored in file:
c:\pond\1344\POND-D .PND
outlet Structure File: POND-D .STR
POND-2 Version: 5.20 S/N:
Date Executed: Time Executed:
***********************
RANCHO SANTA FE ROAD
BASIN 'D' PONDING STUDY
***********************
* »»» Structure No. 1 «««
(Input Data)
^ CULVERT-CR
Circular Culvert (With Inlet Control)
m> El elev. (ft)? 449.0
E2 elev.(ft)? 454.5
Diam. (ft)? 2.0
Inv. el.(ft)? 449.4
* Slope (ft/ft)? 0.07
Tl ratio?
* T2 ratio?
^ K Coeff.? 0.534
M coeff.? 0.555
c Coeff.? 0.0196
* Y Coeff.? 0.89
m Form 1 or 2? 2
Slope factor? -0.5
m
Outlet Structure File: POND-D .STR
POND-2 Version: 5.20
Date Executed:
S/N:
Time Executed;
m
***********************
RANCHO SANTA FE ROAD
BASIN 'D' PONDING STUDY
***********************
Outflow Rating Table for Structure #1
CULVERT-CR Circular Culvert (With Inlet Control)
***** INLET CONTROL ASSUMED *****
Elevation (ft) Q (cfs) Computation Messages
449.00 0.0 E < Inv.El.= = 449.4
449.25 0.0 E < Inv.El.= = 449.4
449.50 0.1 Equ.2: HW = .1
449.75 0.6 Equ.2: HW = .35
450.00 1.5 Equ.2: HW = .6
450.25 3.0 Equ.2: HW = .85
m 450.50 4.7 Equ.2: HW = 1.1
m 450.75 6.9 Equ.2: HW =1.35
451.00 9.2 Equ.2: HW =1.6
451.25 12.0 Equ.2: HW = 1.85
451.50 15.1 Equ.2: HW =2.1
451.75 17.9 Submerged: HW =2.35
452.00 21.2 Submerged: HW =2.6
452.25 24.0 Submerged: HW =2.85
452 .50 26.5 Submerged: HW =3.1
jH 452.75 28.8 Submerged: HW = 3.35
453.00 30.9 Submerged: HW =3.6
-m 453.25 32.8 Submerged: HW =3 .85
453.50 34.7 Submerged: HW =4.1
453.75 36.4 Submerged: HW =4.35
454.00 38.1 Submerged: HW =4.6
454.25 39.8 Submerged: HW =4.85
m 454.50 0.0 E = or > E2 =454.5
Used Unsubmerged Equ. Form (2) for elev. less than 451.54 ft
Used Submerged Equation for elevations greater than 451.74 ft
HW=Headwater (ft)
Transition flows interpolated from the following values:
El=451.54 ft; Ql=15.55 cfs; E2=451.74 ft; Q2=17.77 cfs
— POND-2 Version: 5.2 0 S/N:
EXECUTED: 06-02-1998 13:44:02
Page 1
*****************************
* *
* RANCHO SANTA FE ROAD *
* BASIN 'D' PONDING STUDY *
* *
* *
* *
*****************************
Inflow Hydrograph: c:\pond\1344\100YR-D
Rating Table file: c:\pond\1344\POND-D
INITIAL CONDITIONS
Elevation = 449.00 ft
Outflow = 0.00 cfs
Storage = 0 cu-ft
HYD
PND
GIVEN POND DATA
m ELEVATION OUTFLOW STORAGE
<m (ft) (Cfs) (cu-ft)
m 449.00 0.0 0
449.25 0.0 287
449.50 0.1 630
449.75 0.6 1,036
450.00 1.5 1,508
450.25 3.0 2,053
m 450.50 4.7 2,673
m 450.75 6.9 3,375
451.00 9.2 4,162
451.25 12.0 5,043
451.50 15.1 6,027
M 451.75 17.9 7,119
452.00 21.2 8,324
m 452.25 24.0 9,642
452.50 26.5 11,072
M 452.75 28.8 12,618
453.00 30.9 14,284
m 453.25 32.8 16,073
m 453.50 34 .7 17,987
453.75 36.4 20,029 «• 454.00 38.1 22,206
454.25 39.8 24,497
m
INTERMEDIATE ROUTING
COMPUTATIONS
2S/t 2S/t + 0
(cfs) (cfs)
0.0 0.0
6.4 6.4
14 . 0 14.1
23.0 23.6
33.5 35.0
45.6 48.6
59.4 64.1
75.0 81.9
92.5 101.7
112.1 124.1
133.9 149.0
158.2 176.1
185.0 206.2
214.3 238.3
246.0 272.5
280.4 309.2
317.4 348.3
357.2 390.0
399.7 434.4
445.1 481.5
493.5 531.6
544.4 584.2
Time increment (t) = 1.5 min
POND-2 Version: 5.20 S/N:
"EXECUTED: 06-02-1998 13:44:02
""pond File: c:\pond\1344\POND-D .PND
«Inflow Hydrograph: c:\pond\1344\100YR-D .HYD
Outflow Hydrograph: c:\pond\1344\0UT .HYD
Page 2
INFLOW HYDROGRAPH
m
TIME
(min)
0.0
1.5
3
4
6
7
9
10
12.0
13.5
15.0
16.5
18.0
19.5
21.0
22.5
24.0
25.5
27.0
28.5
30.0
31.5
33 . 0
34.5
36.0
37.5
39.0
40.5
42 . 0
43.5
45.0
46 . 5
48.0
49.5
INFLOW
(Cfs)
0. 00
5. 02
10.01
15.09
20. 09
25.10
30.10
35.11
40.11
45.19
50.20
55.20
52.70
50.20
47 . 69
45.19
42. 69
40.11
37 .61
35.11
32 . 60
30.10
27. 60
25.10
22.60
20. 09
17 . 59
15.09
12.51
10.01
7.51
5. 00
2. 50
0.00
ROUTING COMPUTATIONS
11+12 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION
(Cfs) (Cfs) (Cfs) (Cfs) (ft)
0.0 0.0 0.00 449,00
5.0 5.0 5.0 0.00 449.20
15.0 19.2 20.1 0.41 449.66
25.1 39.3 44.3 2.53 450.17
35. 2 62.5 74.5 5.98 450.65
45.2 87.8 107.7 9.95 451.07
55.2 114.3 143.0 14.35 451.44
65. 2 142.9 179.5 18.27 451.78
75. 2 173.7 218.2 22.25 452.09
85.3 208.0 259.0 25.51 452.40
95.4 246.5 303.3 28.43 452,71
105,4 289.8 351.9 31.06 453.02
107.9 331.4 397.7 33.13 453.29
102 .9 364.9 434.3 34.70 453.50
97.9 391.3 462.8 35.72 453.65
92.9 411.2 484.2 36.49 453.76
87.9 425.1 499.1 37.00 453.84
82 .8 433.3 507.9 37.30 453.88
77.7 436.2 511.1 37 .40 453.90
72.7 434.3 509.0 37.33 453.89
67.7 427.8 502.0 37.10 453.85
62.7 417.1 490,5 36.71 453.80
57.7 402 .5 474.8 36.16 453.71
52.7 384.3 455.2 35.45 453.61
47.7 362.8 432.0 34.60 453.49
42.7 338.6 405. 5 33.46 453.34
37.7 311.9 376.2 32.17 453.17
32.7 283.2 344.6 30.70 452.98
27.6 253. 0 310.8 28.88 452.76
22.5 222.1 275.5 26.69 452.52
17.5 191.5 239.7 24.10 452.26
12.5 162 . 1 204 . 0 20.96 451.98
7.5 135.1 169. 6 17 . 22 451.69
2.5 110.2 137.6 13,68 451.39
Pacfe 3
POND-2 Version: 5.20 S/N:
EXECUTED: 06-02-1998 13:44:02
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File: c:\pond\1344\POND-D -PND
inflow Hydrograph: c:\pond\1344\100YR-D .HYD
Outflow Hydrograph: c:\pond\1344\OUT -HYD
Starting Pond W.S. Elevation = 449.00 ft
***** Summary of Peak Outflow and Peak Elevation *****
Peak Inflow = 55.20 cfs
Peak Outflow = 37.40 cfs
Peak Elevation = 453.90 ft
***** Summary of Approximate Peak Storage *****
initial Storage = 0 cu-ft
Peak Storage From Storm = 21,314 cu-tr
Total Storage in Pond = 21,314 cu-ft
POND-2 Version: 5.20 S/N:
Pond File: c:\pond\1344\POND-D .PND
?n?iow Hydrograph: c:\pond\1344\100YR-D .HYD
outflow Hydrograph: c:\pond\1344\OUT .HYD
Peak Inflow
Peak Outflow =
Peak Elevation =
Page 4
EXECUTED: 06-02-1998
13:44:02 55.20 Cfs
37.40 cfs
453.90 ft
Flow (cfs)
0.0 6.0 12.0 18.0 24.0 30.0 36 0 42 0 48.0__54 0__60 0__66 0
4.5 -
'^e.o -
7.5 -
9.0 -
10.5 -
m
^12.0 -
,^13.5 -
^15.0 -
M.16.5 -
-•18.0 -
->19.5 -
*21.0 -I
*22.5 -
m
24.0 -«•
25.5 -m
21.0 -
mm
^28.5 -
30.0 -
^31.5 -
-33.0 -
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X *
X *
X*
*x
* X
* X
* X
* X
* X
* X
* X
TIME
(min)
* File: c:\pond\1344\100YR-D .HYD Qmax = 55.2 cfs
X File: c:\pond\1344\OUT .HYD Qmax = 37.4 cfs