HYDROLOGY STUDY
for
POINSETTIA LANE
(DEJONG PROPERTY)
in the City of Carlsbad
Prepared for: City of Carlsbad
2075 Las Palmas Drive
Carlsbad, CA 92008
W.O. 2322-1
March 25, 1999
Revised June 18, 1999
DAX'E HAMMAR
IACK HILL
LEX VVILLIMAN
10171 Huwinpkens St.
Suite 200
S.in Diq;o, CA '12121
(619)558-4500 PH
(619)558-1414 FX
www.lujnsaker.rom
lnto@HunsakerSD.com
Hunsaker & Associates
San Diego, Inc.
Raymond L. Martin, R.C.E.
Project Manager
DB:kd msword\kA2322U999\a05.doc
wo 2322-1 06/30/99
Poinsettia Lane
Hydrology Study
TABLE OF CONTENTS
References
Introduction
Existing Conditions
Proposed Development
Conclusions
Vicinity Map
Criteria and Methodology
100-year Hydrology Study
Hydraulics
Curb Inlet Sizing
Rip Rap Energy Dissipator
Headwall Calculation
Reference Data
Hydrology Map
SECTION
I
I
IV
V
V
V
VI
(pocket)
OB:kd msword\k:\2322\1999\a05.doc
wo 2322-1 07/01/99
Poinsettia Lane
Hydrology Study
References
Introduction
Existing
Conditions
1) Standards for Design and Construction of Public Works
Improvements in the City of Carlsbad, 1993
2) The County of San Diego Drainage Design & Procedure
Manual
3) Hydrology Study for Aviara Phase III CT 85-35 in the City of
Carlsbad, Revised April 2, 1996
4) Hydrology Study for DeJong Property in the City of Carlsbad,
Revised July 30, 1998
This hydrology report was prepared in conjunction with the
submittal of grading and improvement plans for Poinsettia Lane
within the City of Carlsbad. This report includes:
• Hydrology calculations to determine the 100-year peak
discharge from the proposed site.
• Inlet calculations to determine the type and size of inlets
needed to intercept 100% of the 100-year peak discharge
developed within Poinsettia Lane.
• Preliminary pipe sizing for the proposed storm drainage
system.
The proposed construction of Poinsettia Lane is located on the
southerly boundary of the DeJong property within Local Facilities
Management Plan Zone 20 in the City of Carlsbad. This
construction will link the two existing portions of Poinsettia Lane for
an approximate length of 1,350 feet. Black Rail Road is located
directly west of the proposed construction site. This existing road
conveys drainage from the south 0.6 acres.
This drainage will then flow easterly over Poinsettia Lane to a storm
drain system. Undeveloped property, south of the proposed site
contributes to a tributary area of approximately 10.9 acres.
Proposed
Development
This project proposes construction of Poinsettia Lane, a 102-foot
major arterial. Runoff from south of the road will be intercepted by
a brow ditch running along the toe of slope and conveyed to the
storm drain system crossing Poinsettia. The DeJong Property,
north of the road, proposes development of 20 single family homes.
This subdivision is to have a portion of its drainage collected and
conveyed through the proposed storm drain system. This storm
drain system discharges to an existing, northeasterly trending
canyon. The flows from the subdivision used in this study were
obtained from the "Hydrology Study for DeJong Property" (see
Reference No. 4). A portion of this study has been included in
Section VI for easy reference.
DB:kd msword\k:\2322\1999\a01.doc
wo 2322-1 06/15/99
Poinsettia Lane
Hydrology Study
East of the site is existing Aviara Phase 3. The hydrology report
approved with Aviara Phase 3 assumed accepting drainage from
approximately 160 feet of the most eastern portion of proposed
Poinsettia Lane, therefore this study does not include that portion of
road. For reference, the drainage map from the Aviara report
"Hydraulic Study for Aviara Phase III" (see Reference
No. 3), has been included in Section VI.
The DeJong Tentative Map proposes a series of check dams to
mitigate potential adverse impacts due to concentration of drainage
from that subdivision. This project stubs an 18-inch pipe for use by
the subdivision, but the culvert will remain empty until the time of
development. Therefore, analysis of the check dam system is
deferred. The drainage report of the DeJong project should include
this work in the future.
Preliminary hydraulics indicate a velocity of 38 ft./sec. May be
attained in the 24-inch RCP outfall to the canyon. During final
design, this velocity will need to be mitigated. We will propose
velocity control rings to reduce the outletting velocity to below 20
ft./sec. This will allow use of a D-40 energy dissipator at the outlet.
Conclusion A 24-inch culvert is recommended to convey drainage within the
project. Curb inlets have been sized and are being constructed to
collect drainage from the road.
DB:kd msword\k:\2322\1999\a01.doc
wo 2322-1 06/15/99
Poinsettia Lane
Hydrology Study
VICINITY MAP
NO SCALE
FIGURE 1
VICINITY MAP
POINSETTIA LANE
DB:kd m«ronft\y>csanw\coiretpndnc\2322M 999\i01.doc
wo 2322-1 03/18/99
Poinsettia Lane
Hydrology Study
Drainage Criteria
and Methodology
Design Storm 100-year storm
Land Use Single-family, per General Plan Map
Soil Type A hydrologic soil group "D" was consistently used for this
entire study.
Runoff Coefficient "C" values were based on the County of San Diego Drainage
Design & Policy Manual. The site is single-family residential,
therefore a "C" value of 0.55 was used for these areas.
Where subareas are composed almost entirely of street, a
"C" value of 0.95 was used.
Rainfall Intensity The rainfall intensity values were based on the criteria
presented in the County of San Diego Drainage Design &
Policy Manual.
DB:kd msword\k:\2322M 999\a01.doc
wo 2322-1 06/15/99
Poinsettia Lane
Hydrology Study
HYDROLOGY
METHOD OF ANALYSIS
The computer generated analysis for this watershed is consistent with current
engineering standards and requirements of the City of Carlsbad. This report also
contains calculations for the proposed storm drain within the project limits.
RATIONAL METHOD
The most widely used hydrologic model for estimating watershed peak runoff rates is
the rational method. The rational method is applied to small urban and semi-urban
areas of less than 0.5 square miles. The rational method equation relates storm rainfall
intensity, a selected runoff coefficient, and drainage area to peak runoff rate. This
relationship is expressed by the equation: Q = CIA. Where:
Q = The peak runoff rate in cubic feet per second at the point of analysis.
C = A runoff coefficient representing the area - averaged ratio of runoff to
rainfall intensity.
I = The time-averaged rainfall intensity in inches per hour corresponding to
the time of concentrations.
A = The drainage basin area in acres.
NODE-LINK STUDY
In performing a node-link study, the surface area of the basin is divided into basic areas
which discharge into different designated drainage basins. These "sub-basins" depend
upon locations of inlets and ridge lines.
SUBAREA SUMMATION MODEL
The rational method modeling approach is widely used due to its simplicity of
application, and its capability for estimating peak runoff rates throughout the interior of a
study watershed analogous to the subarea model. The procedure for the Subarea
Summation Model is as follows:
(1) Subdivide the watershed into subareas with the initial subarea being less
than 10 acres in size (generally 1 lot will do), and the subsequent
subareas gradually increasing in size. Assign upstream and downstream
nodal point numbers to each subarea in order to correlate calculations to
the watershed map.
(2) Estimate a Tc by using a nomograph or overlaid flow velocity estimation.
DB:kd msword\k:\2322\1999\a01.doc
wo 2322-1 06/15/99
Ill
*************************************************
**»
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
* Reference: SAN DIEGO COUNTY FLOOD CONTROL DISTRICT
1985,1981 HYDROLOGY MANUAL
(c) Copyright 1982-93 Advanced Engineering Software (aes)
Ver. 1.5A Release Date: 7/10/93 License ID 1239
** Analysis prepared by:
*"" HUNSAKER & ASSOCIATES
Irvine, Inc.
Planning * Engineering * Surveying
Three Hughes * Irvine , California 92718 * (714) 538-1010
************************** DESCRIPTION OF STUDY **************************
,-,.* POINSETTIA LANE *
* 100-YEAR HYDROLOGY STUDY *
-* WO#2322-1 *
**************************************************************************
, FILE NAME: H:\AES92\2322\1\100.RAT
TIME/DATE OF STUDY: 12:23 3/25/1999
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:v-n»
„ 1985 SAN DIEGO MANUAL CRITERIA
- USER SPECIFIED STORM EVENT(YEAR) = 100.00
6-HOUR DURATION PRECIPITATION (INCHES) = 2.600
** SPECIFIED MINIMUM PIPE SIZE (INCH) = 18.00
„ SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = .90
SAN DIEGO HYDROLOGY MANUAL "C"-VALUES USED
•- NOTE: ONLY PEAK CONFLUENCE VALUES CONSIDERED
****************************************************************************
FLOW PROCESS FROM NODE 100.00 TO NODE 105.00 IS CODE = 21
»>»RATIONAL METHOD INITIAL SUBAREA ANALYSIS<««
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = .5500
INITIAL SUBAREA FLOW-LENGTH = 450.00
UPSTREAM ELEVATION = 383.50
DOWNSTREAM ELEVATION = 363.92
ELEVATION DIFFERENCE = 19.58
URBAN SUBAREA OVERLAND TIME OF FLOW(MINUTES) = 12.865
*CAUTION: SUBAREA SLOPE EXCEEDS COUNTY NOMOGRAPH
DEFINITION. EXTRAPOLATION OF NOMOGRAPH USED.
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.724
SUBAREA RUNOFF(CFS) = 1.23
TOTAL AREA(ACRES) = .60 TOTAL RUNOFF(CFS) = 1.23
M» ******************************************************************:
^ FLOW PROCESS FROM NODE 105.00 TO NODE 110.00 IS CODE = 6
>»»COMPUTE STREETFLOW TRAVELTIME THRU SUBAREA<««
UPSTREAM ELEVATION = 363.92 DOWNSTREAM ELEVATION = 318.08
. STREET LENGTH(FEET) = 1119.60 CURB HEIGHT(INCHES) = 6.
STREET HALFWIDTH(FEET) = 42.00«•
DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK = 21.00
INTERIOR STREET CROSSFALL(DECIMAL) = .020
- OUTSIDE STREET CROSSFALL(DECIMAL) = .020
"" SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 1
**TRAVELTIME COMPUTED USING MEAN FLOW(CFS) = 3.25
STREETFLOW MODEL RESULTS:
STREET FLOWDEPTH(FEET) = .29
HALFSTREET FLOODWIDTH(FEET) = 8.14
AVERAGE FLOW VELOCITY(FEET/SEC.) = 4.16
PRODUCT OF DEPTH&VELOCITY = 1.20
m STREETFLOW TRAVELTIME(MIN) = 4.49 TC(MIN) = 17.35
*» 100 YEAR RAINFALL INTENSITY (INCH/HOUR) = 3.070
- SOIL CLASSIFICATION IS "D"
INDUSTRIAL DEVELOPMENT RUNOFF COEFFICIENT = .9500
„ SUBAREA AREA(ACRES) = 1.40 SUBAREA RUNOFF(CFS) = 4.08
SUMMED AREA(ACRES) = 2.00 TOTAL RUNOFF(CFS) = 5.31
* END OF SUBAREA STREETFLOW HYDRAULICS:
DEPTH(FEET) = .33 HALFSTREET FLOODWIDTH(FEET) = 10.04
" FLOW VELOCITY(FEET/SEC.) = 4.71 DEPTH*VELOCITY = 1.54
•*
,!*•***************************************************************************
FLOW PROCESS FROM NODE 105.00 TO NODE 110.00 IS CODE = 1m
»>»DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<««
«* TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
* TIME OF CONCENTRATION(MIN.) = 17.35
m RAINFALL INTENSITY(INCH/HR) = 3.07
TOTAL STREAM AREA(ACRES) = 2.00
.« PEAK FLOW RATE (CFS) AT CONFLUENCE = 5.31
«•
*********************************************************************
FLOW PROCESS FROM NODE 115.00 TO NODE 120.00 IS CODE = 21. .j»
>»»RATIONAL METHOD INITIAL SUBAREA ANALYSIS<««
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = .5500
INITIAL SUBAREA FLOW-LENGTH = 400.00
UPSTREAM ELEVATION = 383.50
DOWNSTREAM ELEVATION = 350.00
ELEVATION DIFFERENCE = 33.50
URBAN SUBAREA OVERLAND TIME OF FLOW(MINUTES) = 9.751
*CAUTION: SUBAREA SLOPE EXCEEDS COUNTY NOMOGRAPH
DEFINITION. EXTRAPOLATION OF NOMOGRAPH USED.
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.453
SUBAREA RUNOFF(CFS) = 3.18
TOTAL AREA(ACRES) = 1.30 TOTAL RUNOFF(CFS) = 3.18
****************************************************** **********************
,„ FLOW PROCESS FROM NODE 120.00 TO NODE 125.00 IS CODE = 51
*" >»»COMPUTE TRAPEZOIDAL CHANNEL FLOW<««
>»»TRAVELTIME THRU SUBAREA<««
- UPSTREAM NODE ELEVATION =350.00
DOWNSTREAM NODE ELEVATION = 330.00
"- CHANNEL LENGTH THRU SUBAREA (FEET) = 330.00
^ CHANNEL SLOPE = .0606
CHANNEL BASE(FEET) = 2.00 "Z" FACTOR = 2.000
-. MANNING'S FACTOR = .030 MAXIMUM DEPTH (FEET) = 2.00
CHANNEL FLOW THRU SUBAREA(CFS) = 3.18
*" FLOW VELOCITY (FEET/SEC) = 4.45 FLOW DEPTH (FEET) = .28
TRAVEL TIME(MIN.) = 1.24 TC(MIN.) = 10.99
•A*
****************************************************************************
- FLOW PROCESS FROM NODE 120.00 TO NODE 125.00 IS CODE = 8
*"* >»»ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<««
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.123
• SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = .5500
" SUBAREA AREA(ACRES) = 2.50 SUBAREA RUNOFF(CFS) = 5.67
. TOTAL AREA(ACRES) = 3.80 TOTAL RUNOFF(CFS) = 8.85
TC(MIN) = 10.99
f»
'*****************************************************************************
FLOW PROCESS FROM NODE 125.00 TO NODE 130.00 IS CODE = 51
• >»»COMPUTE TRAPEZOIDAL CHANNEL FLOW<««
»»>TRAVELTIME THRU SUBAREA<««• ______________________________________________________________________
„ UPSTREAM NODE ELEVATION = 330.00
DOWNSTREAM NODE ELEVATION = 311.00
. CHANNEL LENGTH THRU SUBAREA(FEET) = 520.00
CHANNEL SLOPE = .0365
" CHANNEL BASE(FEET) = 2.00 "Z" FACTOR = 2.000
MANNING'S FACTOR = .030 MAXIMUM DEPTH(FEET) = 2.00
CHANNEL FLOW THRU SUBAREA(CFS) = 8.85
• FLOW VELOCITY(FEET/SEC) = 5.05 FLOW DEPTH(FEET) = .56
TRAVEL TIME(MIN.) = 1.72 TC(MIN.) = 12.70
•
*****************************************************************************
, FLOW PROCESS FROM NODE 125.00 TO NODE 130.00 IS CODE = 8
• >»»ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<««
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.754
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = .5500
SUBAREA AREA(ACRES) = 7.10 SUBAREA RUNOFF(CFS) = 14.66
TOTAL AREA(ACRES) = 10.90 TOTAL RUNOFF(CFS) = 23.51
TC(MIN) = 12.70
r*************'**************************
,„ FLOW PROCESS FROM NODE 130.00 TO NODE 110.00 IS CODE =
>»»COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<««
»»>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)
DEPTH OF FLOW IN 24.0 INCH PIPE IS 15.0 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 11.4
UPSTREAM NODE ELEVATION = 308.12
DOWNSTREAM NODE ELEVATION = 307.64
FLOWLENGTH(FEET) = 20.30 MANNING'S N = .013
ESTIMATED PIPE DIAMETER(INCH) = 24.00 NUMBER OF PIPES
PIPEFLOW THRU SUBAREA(CFS) = 23.51
TRAVEL TIME(MIN.) = .03 TC(MIN.) = 12.73
r*************************************************** ************
FLOW PROCESS FROM NODE 130.00 TO NODE 110.00 IS CODE = 1
»>»DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<««
>»»AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<««
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM
TIME OF CONCENTRATION(MIN.) = 12.73
RAINFALL INTENSITY(INCH/HR) = 3.75
TOTAL STREAM AREA(ACRES) = 10.90
PEAK FLOW RATE(CFS) AT CONFLUENCE = 23.51
2 ARE
** CONFLUENCE DATA **
STREAM RUNOFF Tc
NUMBER (CFS) (MIN.)
1 5.31 17.35
2 23.51 12.73
INTENSITY
(INCH/HOUR)
3.070
3.749
AREA
(ACRE)
2 .00
10.90
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc
NUMBER (CFS) (MIN.)
1 27.86 12.73
2 24.57 17.35
INTENSITY
(INCH/HOUR)
3.749
3.070
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS
PEAK FLOW RATE(CFS) = 27.86 Tc(MIN.) =
TOTAL AREA(ACRES) = 12.90
12 .73
****************************************************************************
• FLOW PROCESS FROM NODE 110.00 TO NODE 160.00 IS CODE = 3
»»>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA«<«
>»»USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)
DEPTH OF FLOW IN 21.0 INCH PIPE IS 17.1 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 13.3
UPSTREAM NODE ELEVATION = 307.31
DOWNSTREAM NODE ELEVATION = 304.75
^ FLOWLENGTH(FEET) = 73.25 MANNING'S N = .013
ESTIMATED PIPE DIAMETER(INCH) = 21.00 NUMBER OF PIPES = 1
„, PIPEFLOW THRU SUBAREA(CFS) = 27.86
TRAVEL TIME(MIN-) = .09 TC(MIN.) = 12.82«•
******************************************************************************
- FLOW PROCESS FROM NODE 110.00 TO NODE 160.00 IS CODE = 1
>»»DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<««
*** TOTAL NUMBER OF STREAMS = 2
,. CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) = 12.82
"" RAINFALL INTENSITY (INCH/HR) = 3.73
TOTAL STREAM AREA(ACRES) = 12.90
*" PEAK FLOW RATE(CFS) AT CONFLUENCE = 27.86
«•
,m****************************************************************************
FLOW PROCESS FROM NODE 155.00 TO NODE 155.00 IS CODE = 7•urn
_ >»»USER SPECIFIED HYDROLOGY INFORMATION AT NODE<««
*• USER-SPECIFIED VALUES ARE AS FOLLOWS:
TC(MIN) = 12.16 RAIN INTENSITY(INCH/HOUR) = 3.86
"" TOTAL AREA (ACRES) = 5.70 TOTAL RUNOFF (CFS) = 12.35
m
FLOW PROCESS FROM NODE 155.00 TO NODE 160.00 IS CODE = 3m
>»»COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<««
- »>»USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW) <««
DEPTH OF FLOW IN 18.0 INCH PIPE IS 13.1 INCHES
•'* PIPEFLOW VELOCITY (FEET/SEC.) = 8.9
- UPSTREAM NODE ELEVATION = 314.74
DOWNSTREAM NODE ELEVATION = 305.23
„ FLOWLENGTH(FEET) = 482.23 MANNING'S N = .013
ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES = 1- PIPEFLOW THRU SUBAREA(CFS) = 12.35
TRAVEL TIME(MIN.) = .90 TC(MIN.) = 13.06••
m
****************************************************************************
<* FLOW PROCESS FROM NODE 155.00 TO NODE 160.00 IS CODE = 1
"* >»»DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<««
„ »>»AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<««
*" TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
**" TIME OF CONCENTRATION (MIN. ) = 13.06
m RAINFALL INTENSITY(INCH/HR) = 3.69
TOTAL STREAM AREA(ACRES) = 5.70
« PEAK FLOW RATE(CFS) AT CONFLUENCE = 12.35
""* ** CONFLUENCE DATA **
,_ STREAM RUNOFF Tc INTENSITY AREA
^ NUMBER
1
2
(CFS)
27.86
12.35
(MIN.;
12.82
13.06
(INCH/HOUR)
3.731
3.688
(ACRE)
12.90
5.70
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc
NUMBER (CFS) (MIN.)
1 40.07 12.82
2 39.89 13.06
INTENSITY
(INCH/HOUR)
3.731
3.688
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS
PEAK FLOW RATE(CFS) = 40.07 Tc(MIN.) =
TOTAL AREA(ACRES) = 18.60
12.82
*************************
- FLOW PROCESS FROM NODE 160.00 TO NODE
**************************
135.00 IS CODE = 3
»>»COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<««
>»»USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)
DEPTH OF FLOW IN 24.0 INCH PIPE IS 15.1 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 19.2
UPSTREAM NODE ELEVATION = 304.42
DOWNSTREAM NODE ELEVATION = 304.07
FLOWLENGTH(FEET) = 5.25 MANNING'S N =
ESTIMATED PIPE DIAMETER(INCH) = 24.00
PIPEFLOW THRU SUBAREA(CFS) = 40.07
TRAVEL TIME(MIN.) = .00 TC(MIN.) = 12.83
.013
NUMBER OF PIPES
[I*******************************-
FLOW PROCESS FROM NODE 160.00 TO NODE
**************** ***********
135.00 IS CODE = 1
»>»DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<««
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM
TIME OF CONCENTRATION(MIN.) = 12.83
RAINFALL INTENSITY(INCH/HR) = 3.73
TOTAL STREAM AREA(ACRES) = 18.60
PEAK FLOW RATE(CFS) AT CONFLUENCE = 40.07
1 ARE:
****************************************************************************
FLOW PROCESS FROM NODE 140.00 TO NODE 145.00 IS CODE = 21
•
>»»RATIONAL METHOD INITIAL SUBAREA ANALYSIS<««
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = .5500
INITIAL SUBAREA FLOW-LENGTH = 425.00
UPSTREAM ELEVATION = 363.92
DOWNSTREAM ELEVATION = 356.25
ELEVATION DIFFERENCE = 7.67
URBAN SUBAREA OVERLAND TIME OF FLOW(MINUTES) =
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.139
16.764
SUBAREA RUNOFF(CFS) =
TOTAL AREA(ACRES) =
1.29
.75 TOTAL RUNOFF(CFS) =1.29
********************************•*********:
FLOW PROCESS FROM NODE 145.00 TO NODE 135.00 IS CODE =
>»»COMPUTE STREETFLOW TRAVELTIME THRU SUBAREA«<«
UPSTREAM ELEVATION = 356.25
STREET LENGTH(FEET) = 694.60
STREET HALFWIDTH(FEET) = 42.00
DOWNSTREAM ELEVATION =
CURB HEIGHT(INCHES) = 6
318.08
DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK =
INTERIOR STREET CROSSFALL(DECIMAL) = .020
OUTSIDE STREET CROSSFALL(DECIMAL) = .020
21.00
*. SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 1
**TRAVELTIME COMPUTED USING MEAN FLOW(CFS) =
STREETFLOW MODEL RESULTS:
STREET FLOWDEPTH(FEET) = .26
„ HALFSTREET FLOODWIDTH(FEET) = 6.88
AVERAGE FLOW VELOCITY(FEET/SEC.) = 4.48
* PRODUCT OF DEPTH&VELOCITY = 1.18
STREETFLOW TRAVELTIME(MIN) = 2.59 TC(MIN) = 19.35•*>
.m 100 YEAR RAINFALL INTENSITY (INCH/HOUR) = 2.862
SOIL CLASSIFICATION IS "D"
* INDUSTRIAL DEVELOPMENT RUNOFF COEFFICIENT = .9500
SUBAREA AREA(ACRES) = 1.00 SUBAREA RUNOFF(CFS) =
** SUMMED AREA (ACRES) = 1.75 TOTAL RUNOFF (CFS) =
m END OF SUBAREA STREETFLOW HYDRAULICS:
DEPTH(FEET) = .29 HALFSTREET FLOODWIDTH(FEET) =
* FLOW VELOCITY(FEET/SEC.) = 5.14 DEPTH*VELOCITY =
2 .65
2 .72
4.01
14
1.49
************************************************************
FLOW PROCESS FROM NODE 145.00 TO NODE 135.00 IS CODE = 1
>»»DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<««
* >»»AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<«-
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM
TIME OF CONCENTRATION(MIN.) = 19.35
RAINFALL INTENSITY(INCH/HR) = 2.86
TOTAL STREAM AREA(ACRES) = 1.75
PEAK FLOW RATE(CFS) AT CONFLUENCE = 4.01
2 ARE:
** CONFLUENCE DATA **
STREAM RUNOFF Tc
NUMBER (CFS) (MIN.)
1 40.07 12.83
2 4.01 19.35
INTENSITY
(INCH/HOUR)
3.730
2.862
AREA
(ACRE)
18.60
1.75
<* RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM
NUMBER
1
2
RUNOFF
(CFS)
43 .15
34.75
Tc
(MIN. )
12.83
19.35
INTENSITY
(INCH/HOUR)
3.730
2.862
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS
PEAK FLOW RATE(CFS) = 43.15 Tc(MIN.) =
TOTAL AREA(ACRES) = 20.35
12 .83
****************************************************************************
FLOW PROCESS FROM NODE 135.00 TO NODE 165.00 IS CODE = 3
»>»COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<««
" »>»USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW) <«« .
DEPTH OF FLOW IN 18.0 INCH PIPE IS 11.4 INCHES
PIPEFLOW VELOCITY(FEET/SEC.)
UPSTREAM NODE ELEVATION =
DOWNSTREAM NODE ELEVATION =
FLOWLENGTH(FEET) = 107.11
= 36.6
303.74
265.87
MANNING'S
ESTIMATED PIPE DIAMETER(INCH) = 18.00
PIPEFLOW THRU SUBAREA(CFS) = 43.15
TRAVEL TIME(MIN.) = .05 TC(MIN.) =
N = .013
NUMBER OF PIPES
12.88
END OF STUDY SUMMARY:
PEAK FLOW RATE(CFS) =
TOTAL AREA(ACRES) =
43.15
20.35
Tc(MIN.) = 12.88
END OF RATIONAL METHOD ANALYSIS
IV
LA COUNTY PUBLIC WORKS STORM DRAIN ANALYSIS REPT: PC/RD4412.1
(INPUT) DATE: 07/01/99
« PAGE 1
PROJECT: POINSETTIA LANE REACH C
DESIGNER: DAB,;«*#
,.,CD L2 MAX Q ADJ Q LENGTH PL 1 FL 2 CTL/TW D W S KJ KE KM LC LI L3 L4 Al A3 A4 J N
""* 8 1 268.37
<«w
2 2 43.1 43.1 107.11 265.87 303.74 0.00 30. 0. 3 0.05 0.00 0.00 1 3 0 0 0. 0. 0. 4.00 0.013
-•*«
2 3 31.9 31.9 5.25 304.07 304.42 0.00 24. 0. 3 0.05 0.00 0.00 0 4 20 0 90. 0. 0. 4.00 0.013
^2 4 12.4 12.4 270.13 305.23 312.85 0.00 18. 0. 3 0.05 0.00 0.00 0 5 0 0 15. 0. 0. 4.00 0.013
«, 2 5 12.4 12.4 211.59 313.18 314.24 0.00 18. 0. 1 0.00 0.20 0.00 0 0 0 0 0. 0. 0. 0.00 0.013
"** 2 20 27.9 27.9 73.25 304.75 307.31 0.00 24. 0. 3 0.05 0.00 0.00 3 21 0 0 5. 0. 0. 4.00 0.013
m
2 21 23.5 23.5 20.30 307.64 311.20 0.00 24. 0. 1 0.00 0.20 0.00 0 0 0 0 0. 0. 0. 0.00 0.013
4*
LA COUNTY PUBLIC WORKS STORM DRAIN ANALYSIS
(INPUT)
KEPT: PC/RD4412.1
DATE: 07/01/99
PAGE 1
"PROJECT: POINSETTIA LANE REACH C
DESIGNER: DAB
• CD L2 MAX Q ADJ Q LENGTH FL 1 FL 2 CTL/TW D W S KJ KE KM LC LI L3 L4 Al A3 A4 J
8 1 268.37
2 2 43.1 43.1 107.11 265.87 303.74 0.00 30. 0. 3 0.05 0.00 0.00 1 3 0 0 0. 0. 0. 4.00 0.013
2 3 31.9 31.9 5.25 304.07 304.42 0.00 24. 0. 3 0.05 0.00 0.00 0 4 20 0 90. 0. 0. 4.00 0.013
2 4 12.4 12.4 270.13 305.23 312.85 0.00 18. 0. 3 0.05 0.00 0.00 0 5 0 0 15. 0. 0. 4.00 0.013
2 5 12.4 12.4 211.59 313.18 314.24 0.00 18. 0. 1 0.00 0.20 0.00 0 0 0 0 0. 0. 0. 0.00 0.013
2 20 27.9 27.9 73.25 304.75 307.31 0.00 24. 0. 3 0.05 0.00 0.00 3 21 0 0 5. 0. 0. 4.00 0.013
2 21 23.5 23.5 20.30 307.64 311.20 0.00 24. 0. 1 0.00 0.20 0.00 0 0 0 0 0. 0. 0. 0.00 0.013
LA COUNTY PUBLIC WORKS STORM DRAIN ANALYSIS
(INPUT)
REPT: PC/RD4412.1
DATE: 07/01/99
PAGE 1
*• PROJECT: POINSETTIA LANE REACH C
DESIGNER: DAB
f«M
^ CD L2 MAX Q ADJ Q LENGTH FL 1 FL 2 CTL/TW D W S KJ KE KM LC LI L3 L4 Al A3 A4 J
8 1 268.37
2 2 43.1 43.1 107.11 265.87 303.74 0.00 30. 0. 3 0.05 0.00 0.00 1 3 0 0 0. 0. 0. 4.00 0.013
2 3 31.9 31.9 5.25 304.07 304.42 0.00 24. 0. 3 0.05 0.00 0.00 0 4 20 0 90. 0. 0. 4.00 0.013
2 4 12.4 12.4 270.13 305.23 312.85 0.00 18. 0. 3 0.05 0.00 0.00 500 15. 0. 0. 4.00 0.013
2 5 12.4 12.4 211.59 313.18 314.24 0.00 18. 0. 1 0.00 0.20 0.00 0 0 0 0 0. 0. 0. 0.00 0.013
2 20 27.9 27.9 73.25 304.75 307.31 0.00 24. 0. 3 0.05 0.00 0.00 3 21 0 0 5. 0. 0. 4.00 0.013
2 21 23.5 23.5 20.30 307.64 311.20 0.00 24. 0. 1 0.00 0.20 0.00 0 0 0 0 0. 0. 0. 0.00 0.013
INTERNAL ENERGY DISSIPATOR RING
DESIGN FOR 30" RCP
PIPE DIAMETER = 30 INCHES
SELECT RING HEIGHT FOR THE THREE DOWNSTREAM ELEMENTS:
0.06*D < Kd < 0.09*D D = pipe diameter (inches)
Kd = ring height of downstream elements (inches)
1.44 <Ku <2.16
| SELECT Kd = 2.0 inches |Use 3" ring height as standard size
SELECT A RING HEIGHT FOR THE SINGLE UPSTREAM ELEMENT:
0.12*D<Ku <0.18*D
2.88 <Ku <5.00
| SELECT Ku = 2Kd = 4 inches |Use 3" ring height as standard size
SELECT THE SPACING. Ld. FOR THE THREE DOWNSTREAM ELEMENTS:
1.5*D<Ld<2.5*D
3.00 < Ld < 5.00
Ld = spacing from downstream elements (feet)
SELECT Ld = 4 feet
SELECT THE SPACING. Lu. FOR THE SINGLE UPSTREAM ELEMENT:
2 Ld < Lu < 2 Ld
6.00 <Lu< 10.00'
| SELECT Lu = 2*Ld = 8 feet [where Lu = spacing from upstream
elements (feet)
OUTLET PIPES LENGTH = 24 feet (assuming width of each ring = 2 ft)
DETERMINE CROSS SECTIONAL AREA AT LAST DOWNSTREAM ELEMENT:
Dd = D - 2(3") = 24 inches
Area = 3.14 ftA2
DETERMINE THE REDUCED OUTLET VELOCITY. Vd:
STORM LINE
B
DESIGN FLOWRATE Q (cfs)
43.1
VELOCITY Vd(FPS)
13.7
V
POINSETTIA LANE
CURB INLET SIZING
BASED ON THE CITY OF SAN DIEGO DRAINAGE DESIGN MANUAL
INLET
TYPE
FLOW-BY
FLOW-BY
INLET #
1
2
NODE
110
135
STREET
SLOPE
6.3%
6.3%
Q(CFS)
5.3
4.0
a(in.)
0.33
0.33
y(in.)
0.29
0.27
L(ft.)
(INLET SIZE)
15.5
12.3
USE
(ft.)
17
14
SAMPLE FLOW-BY CALCULATION
Q=11.3CFS
SLOPE=4.0%
Y=.39
USING EQUATION Q=0.7L(0.33+DEPTH)A3/2
DEPTH=Y(FROM CITY OF SAN DIEGO CHART 1-104.12)
SOLVING FOR L L=17'
ADD LOFT FOR DESIGN CONSIDERATIONS L=18'
FROM CITY OF SAN DIEGO CHART 1-103.6C
SAMPLE SUMP CALCULATIONS
Q=3.6 CFS
H= PONDED DEPTH=10 IN.
h= HEIGHT OF CURB=6 in
SOLVING FOR L
H/h=1.7
L = 5.0 feet
Q\L=H\h
:DB H:\EXCEL\2322\INLETS.XLS
WO 2322-1 3/18/99
50 100
Discharge, ft3/sec
0.1 0.2 0.3.0.4 0.6 0.8 .1 2 3 4 5 6 7 8 10 15 2025
Discharge, m-Vsec
Fig. 7.45 Design of riprap outlet protection from a round pipe flowing full; minimum
tailwater conditions. (6,14)
to find the riprap size and apron length. The apron width at the pipe end should
be 3 times the pipe diameter. Where there is a well-defined channel immediately
downstream from the apron, the width of the downstream end of the apron
should be equal to the width of the channel. Where there is no well-defined chan-
nel immediately downstream from the apron, minimum tailwater conditions
apply and the width of the downstream end of the apron should be equal to the
pipe diameter plus the length of the apron.
EXAMPLE 7.4 Riprap Outlet Protection Design Calculation for Minimum
Tailwater Condition
Given: A flow of 6 ft'Vsec (0.17 mVsec) discharges from a 12-in (30-cm) pipe onto a 2
percent grassy slope with no defined channel.
Find: The required length, width, and median stone size d5Q for a riprap apron.
HE/40 W/)LL CALCULATION AT MODE 130
co
UJ
Xoz
(CUJ
3O
rr
UJ
H
UlZ<
O
I80
I68
I56
144
I32
I20
(08
- 96
- 84
- 72
- 60
- 54
- 48
- 21
- 18
- 15
"- 12
IO.OOO
8,000
6.0OO
5,000
4,000
3,000
r- 2.000
I.OOO
800
HV = 311.71
EXAMPLE
0*42 Inch** (3.5 foat)
0*120 c<i
(I)
(2)
O)
us *o
Z.5
2.1
2.2
*D In ftat
MW
'Mi
s.s
7.4
7.7
6
5
4
- 3
r 2
*- I.O
Ta til* teal* (2) «r (3) pra)*et
hor|j»ntdllj le ictl* (l),th«n
HI* tlralad* Inclifltd tin* thravfd
0 and -0 iealt*,or r**art« •«
iltuitrottd.
CHART 1
(I) (2) (3)
O
t
— '- -
s
%tr
UJ
UJ2
2
z
Q.
U.'Ci
euj
HEAOWJ-6.
- 5.
— 4.
-3.
- 2.
- I.5
- I.O
- .9
- .8
- .7
- .5
— b.
- 5.
- 4.
:5-
-
-
-I.5
-
- I.O
- .9
- .8
- .6
-.5
- 6.
- 5.
74.
-3.
— 2.
-I.5
_ i.o
- .9
- .8
— .7
- .6
-.5
BUREAU OF PUBLIC *OAOS JAN 1963
HEADWATER SCALES 263
REVISED MAY 1964
HEADWATER DEPTH FOR
CONCRETE PIPE CULVERTS
WITH INLET CONTROL
181
VI
REFERENCE DATA
NOTE: Some reference data that has typically been included in support of
hydrologic calculations done by hand are incorporated into the
Rational Method Hydrology Computer Program Package (by AES).
These include:
a Intensity-Duration Design Chart
a Nomograph for Determination of Time of Concentration (Tc) for Natural
Watersheds
a Urban Areas Overland Time of Flow Curves
a Runoff Coefficients (Rational Method)
Since these references are incorporated into the AES software, they are not
needed to support this study and are therefore not included in this report.
Soils maps are also not included, as Hydrologic Soil Group "D" was used for this
study.
COVrtt'Y OF SAN DIEGO
DEPARTMENT OF SANITATION
FLOOD CONTROL
33'
100-YEAR 6-HOUR PRECIPITATION
OF 100-YEAR 6-HOURISOPLUVIALS
PRECiPiTATIOf! JM KMTHS OF AM liiCi
U.S. DEPARTMEN
NATIONAL OCt'ANIC AMD AT:
SPECIAL STUDIES URANCH. OTFICn OF If
27.o£fr^¥£
<f by
C OF COMMERCE
OSJ'IIEHIC ADMINISTRATION
DROLOCV. NATIONAL WEATHER SERVICE
30'_
RESIDENTIAL STREET
ONE SIDE ONLY
0.4 —
I I I I I I I I
5 6 7 8 9 10
DISCHARGE (CFS)
20 30 40 50
EXAMPLE:
Given: Q= 10 S= 2.5%
Chart gives; Depth = 0.4, Velocity = 4.4 f.p.s.
SAN DIEGO COUNTY
DEPARTMENT OF SPECIAL DISTRICT SERVICES
APPROVED
DESIGN MA NUAL
ft,
GUTTEf: AND ROADWAY
DISCHARGE-VELOCITY CHART
DATE APPENDIX X-D
PORTION OF HYDRDLO&Y 5TI/OY FOR D£ J0/M£ PROPERTY £HT 1
*****************************************************************************
„ FLOW PROCESS FROM NODE 21.00 TO NODE 22.00 IS CODE = 6
- »»>COMPUTE STREETFLOW TRAVELTIME THRU SUBAREA<««
*" UPSTREAM ELEVATION = 335.00 DOWNSTREAM ELEVATION = 328.00
- STREET LENGTH(FEET) = 290.00 CURB HEIGHT(INCHES) =6.
STREET HALFWIDTH(FEET) = 18.00
DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK = 9.00
*** INTERIOR STREET CROSSFALL (DECIMAL) = .020
_ OUTSIDE STREET CROSSFALL(DECIMAL) = .020
- SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 1
**TRAVELTIME COMPUTED USING MEAN FLOW(CFS) = 4.42
STREETFLOW MODEL RESULTS:
STREET FLOWDEPTH(FEET) = .34
HALFSTREET FLOODWIDTH(FEET) = 10.52
AVERAGE FLOW VELOCITY(FEET/SEC.) = 3.61
PRODUCT OF DEPTH&VELOCITY = 1.21
. STREETFLOW TRAVELTIME(MIN) = 1.34 TC(MIN) = 12.09
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.876
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = .5500
,„ SUBAREA AREA (ACRES) = 2.20 SUBAREA RUNOFF (CFS) = 4.69
SUMMED AREA(ACRES) = 3.10 TOTAL RUNOFF(CFS) = 6.76
- END OF SUBAREA STREETFLOW HYDRAULICS:
DEPTH(FEET) = .38 HALFSTREET FLOODWIDTH(FEET) = 12.59
"*"" FLOW VELOCITY(FEET/SEC.) = 3.97 DEPTH*VELOCITY = 1.50
*******************************************************************************
FLOW PROCESS FROM NODE 22.00 TO NODE 13.00 IS CODE = 3
,, >»»COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<««
>»»USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW) <««
ESTIMATED PIPE DIAMETER(INCH) INCREASED TO 18.000
"""" DEPTH OF FLOW IN 18.0 INCH PIPE IS 9.9 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 6.8
UPSTREAM NODE ELEVATION = 322.40
— DOWNSTREAM NODE ELEVATION = 322.00
FLOWLENGTH(FEET) = 30.00 MANNING'S N = .013
•" ESTIMATED PIPE DIAMETER (INCH) = 18.00 NUMBER OF PIPES = 1
,, PIPEFLOW THRU SUBAREA (CFS) = 6.76
TRAVEL TIME(MIN.) = .07 TC(MIN.) = 12.16
:***************FLOW PROCESS FROM NODE 22.00 TO NODE 13.00 IS CODE = 1
>»»DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<««
>»»AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<«« SEE $tf££T rGZ. RE5I/IT.5
TOTAL NUMBER OF STREAMS = 2 1/5 ED IN TblS STL/DY
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN.) = 12.16
P0RT10M OF l\1DR.OLD£,1 5T(/DY FOR. Df Jflflfi PROPERTY
RAINFALL INTENSITY(INCH/HR) = 3.86
*" TOTAL STREAM AREA (ACRES) = 3.10
PEAK FLOW RATE(CFS) AT CONFLUENCE = 6.76
- ** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
"" NUMBER (CFS) (MIN.) (INCH/HOUR) (ACRE)
1 5.65 12.35 3.823 2.60
2 6.76 12.16 3.861 3.10
**»
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
*" CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
- STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN.) (INCH/HOUR)
1 12.35 12.16 3.861
2 12.34 12.35 3.823
- COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 12.35 Tc(MIN.) - 12.16
~" fOTAL AREA (ACRES) = 5.70
ilNlFOiUYvATlOlV L/S£D F0R. CODE7 AT N0DE 1ST
M* ***************************************************************************
FLOW PROCESS FROM NODE 13.00 TO NODE 14.00 IS CODE = 3
»>»COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<««
>»»USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW) <««
DEPTH OF FLOW IN 21.0 INCH PIPE IS 15.2 INCHES
"" PIPEFLOW VELOCITY (FEET/SEC.) = 6.6
UPSTREAM NODE ELEVATION = 322.00
DOWNSTREAM NODE ELEVATION = 317.90
— FLOWLENGTH(FEET) = 460.00 MANNING'S N = .013
ESTIMATED PIPE DIAMETER(INCH) = 21.00 NUMBER OF PIPES = 1
"" PIPEFLOW THRU SUBAREA(CFS) = 12.35
_ TRAVEL TIME(MIN.) = 1.15 TC(MIN.) = 13.32
* FLOW PROCESS FROM NODE 13.00 TO NODE 14.00 IS CODE = 1
m »>»DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE««<
TOTAL NUMBER OF STREAMS = 3
*» CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
m TIME OF CONCENTRATION(MIN.) = 13.32
RAINFALL INTENSITY(INCH/HR) = 3.64
.„ TOTAL STREAM AREA (ACRES) = 5.70
PEAK FLOW RATE(CFS) AT CONFLUENCE = 12.35
•m
*** ***************************************************************************
* FLOW PROCESS FROM NODE 30.00 TO NODE 31.00 IS CODE = 21
- >»»RATIONAL METHOD INITIAL SUBAREA ANALYSIS««<
- SOIL CLASSIFICATION IS "D"
, SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = .5500
MASTGR
NOT A
(PARK