HomeMy WebLinkAbout3907; University Commons in the City of San Marcos; Letter of Map Revision (LOMR); 2007-07-08CHANG (Dec
Hydrology«Hydraulics»Sedimentation
P.O. Box 9492 (required for regular mail)
6001 Avenida Alteras
Rancho Santa Fe, CA 92067-4492
(858) 756-9050, (858) 692-0761, FAX: (858) 756-9460
E-mail: changh@mail.sdsu.edu Web Page: http://chang.sdsu.edu/
July 8,2007
Engineering Department
City of Carlsbad
1635 Faraday Avenue
Carlsbad, CA 92008
ATTN: John O'Donnell
RE: APPLICATION FOR FEMA LETTER OF MAP REVISION (LOMR) FOR SAN
MARCOS CREEK AT UNIVERSITY COMMONS
IN THE CITY OF SAN MARCOS AND CITY OF CARLSBAD
Dear City Engineer:
This submittal is a request for a LOMR from the Federal Emergency Management
Agency (FEMA). This package includes two copies of the application package for FEMA LOMR
by Howard H. Chang dated June 2007. Within this document are a series of FEMA forms that
make up the application request. This application for LOMR is to update the floodplain
boundaries for San Marcos Creek upstream from Rancho Santa Fe Road. Since the bridge is
located in the City of Carlsbad, a community acknowledgement by the City of Carlsbad is
therefore required. It should be pointed out that the LOMR application it to change the
floodplain boundary delineations east of the Rancho Santa Fe Road Bridge. The proposed
floodplain boundaries are tied-in with the effective floodplain boundaries west of the bridge. The
tie-in is by lines under the bridge. There are no changes to the effective delineations west of the
Rancho Santa Fe Road Bridge in the City of Carlsbad.
Note that on FEMA Form 1 page 2 there is a signature block for a Community Official of
Carlsbad to complete and sign. Please return a signed copy to me and keep another copy for
City's file. A detailed technical review will be made by FEMA. It is our understanding that the
City does not need to review and comment on the application at this stage.
Thank you for your prompt attention to this submittal.
Very truly ropurs,
Howard H. Chang
Ph.D., P.E.
CC. Meg Carroll
APPLICATION FOR FEMA
LETTER OF MAP REVISION
(LOMR) FOR SAN MARCOS CREEK AT
UNIVERSITY COMMONS IN THE CITY OF SAN MARCOS
SAN DIEGO COUNTY, CALIFORNIA
\Q
44O
420
400
380
360
340
32O
Water-surface and channel-bed profiles -As-built conditions
RIVER-1 Reach-1
3OO
Legend
W3 PF 1
Ground
6.O 6.2 7.26.4 6.6 6.8 7.O
Main Channel Distance (rri)
Prepared for Prepared by
O'Day Consultants, Inc. Howard H. Chang, Ph.D., P.E.
2710 Loker Avenue West, Suite 100 June 2007
Carlsbad, CA 92010
Chang Consultants
Hydraulic and Hydrologic Engineering
Erosion and Sedimentation
P. O. Box 9492
Rancho Santa Fe, CA 92067
TEL: (858) 756-9050
FAX: (858) 756-9460
TABLE OF CONTENTS
FEMA Forms (MT-2 Forms 1, 2, and 3)
COPY OF APPROVED CLOMR ISSUED BY FEMA
REASONS FOR LOMR APPLICATION
HYDRAULIC STUDY FOR FEMA CONDITIONAL LETTER OF MAP
REVISION (LOMR) FOR SAN MARCOS CREEK AT UNIVERSITY
COMMONS
C. REVIEW FEE
Has the review fee for the appropriate request category been included? D Yes
X No, Attach Ex
Please see the DHS-FEMA Web site at http://www.fema.gov/fhm/frm fees.shtm for Fee Amounts and
D.
Fee amount: $
planation. Please bill us
Exemptions.
SIGNATURE
All documents submitted in support of this request are correct to the best of my knowledge. 1 understand that any false statement may be punishable
by fine or imprisonment under Title 18 of the United States Code, Section 1001.
Name: Howard H. Chang
Mailing Address:
P.O. Box 9492, Rancho Santa Fe, CA 92067
Signature of Requester (required) J K
Company: Chang Consultants
Daytime Telephone No.:
858 756-9050
Fax No.:
858 756-9460
E-Mail Address: changh@mail.sdsu.edu
Date: June 10, 2007
As the community official responsible for floodplain management, I hereby acknowledge that we have received and reviewed this Letter of Map
Revision (LOMR) or conditional LOMR request. Based upon the community's review, we find the completed or proposed project meets or is designed
to meet all of the community floodplain management requirements, including the requirement that no fill be placed in the regulatory floodway, and that
all necessary Federal, State, and local permits have been, or in the case of a conditional LOMR, will be obtained. In addition, we have determined that
the land and any existing or proposed structures to be removed from the SFHA are or will be reasonably safe from flooding as defined in 44CFR
65.2(c), and that we have available upon request by FEMA, all analyses and documentation used to make this determination.
Community Official's Name and Title:,
J<3*T.> ^ iLnS lt^*^ (
Community Name: City of Carlsbad Community Official'&'SigYiature (required):
Telephone No.:
Date:
^7/'"3/£~7
CERTIFICATION BY REGIST/RED PROFESSIONAL ENGINEER AND/OR LAND SURVEYOR
This certification is to be signed and sealed by a licensed land surveyor, registered professional engineer, or architect authorized by law to certify
elevation information. All documents submitted in support of this request are correct to the best of my knowledge. I understand that any false
statement may be punishable by fine or imprisonment under Title 18 of the United States Code, Section 1001.
Certifier's Name: Howard H. Chang License No.: C 22,609
Company Name: Chang Consultants Telephone No.
Signature^ 1 / J\ ) f\v^&\ry/-^f^
858 756-9050
Ensure the forms that are appropriate to your revision request are included in your submittal.
Form Name and (Number) Required if ...
Expiration Date:
December 31, 2009
Fax No.:
858 756-9460
Date: June 10,2007
X Riverine Hydrology and Hydraulics Form (Form 2) New or revised discharges or water-surface elevations
X Riverine Structures Form (Form 3) Channel is modified, addition/revision of bridge/culverts,
addition/revision of levee/floodwall, addition/revision of dam
D Coastal Analysis Form (Form 4) New or revised coastal elevations
D Coastal Structures Form (Form 5) Addition/revision of coastal structure Seal (Optional)
D Alluvial Fan Flooding Form (Form 6) Flood control measures on alluvial fans
DHS- FEMA Form 81-89, FEB 06 Overview & Concurrence Form MT-2 Form 1 Page 2 of 2
U.S. DEPARTMENT OF HOMELAND SECURITY - FEDERAL EMERGENCY MANAGEMENT AGENCY
RIVERINE HYDROLOGY & HYDRAULICS FORM
O.M.BNo. 1660-0016
Expires: August 31, 2007
PAPERWORK REDUCTION ACT
Public reporting burden for this form is estimated to average 3.25 hours per response. The burden estimate includes the time for reviewing
instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You
are not required to respond to this collection of information unless a valid OMB control number appears in the upper right corner of this form. Send
comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management,
U.S. Department of Homeland Security, Federal Emergency Management Agency, 500 C Street, SW, Washington DC 20472, Paperwork Reduction
Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not
send your completed survey to the above address.
Flooding Source: San Marcos Creek
Note: Fill out one form for each flooding source studied
A. HYDROLOGY
1. Reason for New Hydrologic Analysis (check all that apply)
X Not revised (skip to section 2) D No existing analysis D Improved data
D Alternative methodology Q Proposed Conditions (CLOMR) D Changed physical condition of watershed
2. Comparison of Representative 1 %-Annual-Chance Discharges
Location Drainage Area (Sq. Mi.) FIS (cfs) Revised (cfs)
3. Methodology for New Hydrologic Analysis (check all that apply)
Statistical Analysis of Gage Records D Precipitation/Runoff Model [TR-20, HEC-1, HEC-HMS etc.]
Regional Regression Equations D Other (please attach description)
Please enclose all relevant models in digital format, maps, computations (including computation of parameters) and documentation to support
the new analysis. The document, "Numerical Models Accepted by FEMA for NFIP Usage" lists the models accepted by DHS-FEMA. This
document can be found at: http://www.fema.gov/fhm/en_modl.shtm.
4. Review/Approval of Analysis
If your community requires a regional, state, or federal agency to review the hydrologic analysis, please attach evidence of approval/review.
5. Impacts of Sediment Transport on Hydrology
Was sediment transport considered? D Yes D No If yes, then fill out Section F (Sediment Transport) of Form 3. If No, then attach
your explanation for why sediment transport was not considered.
B. HYDRAULICS
1. Reach to be Revised
Description Cross Section Water-Surface Elevations (ft.)
Effective Proposed/Revised
Downstream Limit A section below Rancho Santa Fe 6.047 324.5 324.5
Road
Upstream Limit Property boundary of University 7.363 436 436.1
Commons
2. Hydraulic Method Used
Hydraulic Analysis HEC-RAS [HEC-2 , HEC-RAS, Other (Attach description)]
DHS - FEMA Form 81-89A, FEB 06 Riverine Hydrology & Hydraulics Form MT-2 Form 2 Page 1 of 2
B. HYDRAULICS (CONTINUED)
3. Pre-Submittal Review of Hydraulic Models
DHS-FEMA has developed two review programs, CHECK-2 and CHECK-RAS, to aid in the review of HEC-2 and HEC-RAS hydraulic models,
respectively. These review programs verify that the hydraulic estimates and assumptions in the model data are in accordance with NFIP
requirements, and that the data are comparable with the assumptions and limitations of HEC-2/HEC-RAS. CHECK-2 and CHECK-RAS identify
areas of potential error or concern. These tools do not replace engineering judgment. CHECK-2 and CHECK-RAS can be downloaded from
http://www.ferna.gov/fhm/frm_soft.shtm. We recommend that you review your HEC-2 and HEC-RAS models with CHECK-2 and CHECK-RAS.
If you disagree with a message, please attach an explanation of why the message is not valid in this case. Review of your submittal and
resolution of valid modeling discrepancies will result in reduced review time.
HEC-2/HEC-RAS models reviewed with CHECK-2/CHECK-RAS? D Yes x No
4. Models Submitted X Diskette Submitted Natural Run Floodwav Run Datum
Duplicate Effective Model* File Name: Plan Name: File Name: Plan Name: NGVD29
Corrected Effective Model* File Name: Plan Name: File Name: Plan Name:
Existing or Pre-Project Conditions Model File Name: Plan Name: File Name: Plan Name:
Revised or Post-Project Conditions Model File Name: Plan Name: File Name: Plan Name:
Other - (attach description) File Name: Plan Name: File Name: Plan Name:
'Not required for revisions to approximate 1 %-annual-chance floodplains (Zone A) - for details, refer to the corresponding section of the instructions.
The document "Numerical Models Accepted by FEMA for NFIP Usage" lists the models accepted by DHS-FEMA. This document can be found at:
http://www.fema.gov/fhm/en_modl.shtm.
C. MAPPING REQUIREMENTS
A certified topographic map must be submitted showing the following information (where applicable): the boundaries of the effective, existing, and
proposed conditions 1 %-annual-chance floodplain (for approximate Zone A revisions) or the boundaries of the 1%- and 0.2%-annual-chance
floodplains and regulatory floodway (for detailed Zone AE, AO, and AH revisions); location and alignment of all cross sections with stationing control
indicated; stream, road, and other alignments (e.g., dams, levees, etc.); current community easements and boundaries; boundaries of the
requester's property; certification of a registered professional engineer registered in the subject State; location and description of reference marks;
and the referenced vertical datum (NGVD, NAVD, etc.).
Note that the boundaries of the existing or proposed conditions floodplains and regulatory floodway to be shown on the revised FIRM and/or FBFM
must tie-in with the effective floodplain and regulatory floodway boundaries. Please attach a copy of the effective FIRM and/or FBFM, annotated
to show the boundaries of the revised 1%- and 0.2%-annual-chance floodplains and regulatory floodway that tie-in with the boundaries of the
effective 1%- and 0.2%-annual-chance floodplain and regulatory floodway at the upstream and downstream limits of the area of revision.
X Annotated FIRM and/or FBFM Included D Digital Mapping (GIS/CADD) Data Submitted (Recommended)
D. COMMON REGULATORY REQUIREMENTS*
1. For CLOMR requests, do Base Flood Elevations (BFEs) increase? D Yes D No
For CLOMR requests, if either of the following is true, please submit evidence of compliance with Section 65.12 of the NFIP regulations:
• The proposed project encroaches upon a regulatory floodway and would result in increases above 0.00 foot.
• The proposed project encroaches upon a SFHA with or without BFEs established and would result in increases above 1.00 foot.
2. Does the request involve the placement or proposed placement of fill? D Yes X No
If Yes, the community must be able to certify that the area to be removed from the special flood hazard area, to include any structures or
proposed structures, meets all of the standards of the local floodplain ordinances, and is reasonably safe from flooding in accordance with the
NFIP regulations set forth at 44 CFR 60.3(a)(3), 65.5(a)(4), and 65.6(a)(14). Please see the MT-2 instructions for more information.
3. For LOMR/CLOMR requests, is the regulatory floodway being revised? D Yes X No
If Yes, attach evidence of regulatory floodway revision notification. As per Paragraph 65.7(b)(1) of the NFIP Regulations, notification is required
for requests involving revisions to the regulatory floodway. (Not required for revisions to approximate 1 %-annual-chance floodplains [studied
Zone A designation] unless a regulatory floodway is being added. Elements and examples of regulatory floodway revision notification can be
found in the MT-2 Form 2 Instructions.)
4. For LOMR/CLOMR requests, does this request have the potential to impact an endangered species? D Yes X No
If Yes, please submit documentation from the community to show that they have complied with Sections 9 and 10 of the Endangered Species
Act (ESA). Section 9 of the ESA prohibits anyone from "taking" or harming an endangered species. If an action might harm an endangered
species, a permit is required from U.S. Fish and Wildlife Service or National Marine Fisheries Service under Section 10 of the ESA.
For actions authorized, funded, or being carried out by Federal or State agencies, please submit documentation from the agency showing its
compliance with Section 7(a)(2) of the ESA.
5. For LOMR requests, does this request require property owner notification and acceptance of BFE increases? D Yes X No
If Yes, please attach proof of property owner notification and acceptance (if available). Elements of and examples of property owner notification
can be found in the MT-2 Form 2 Instructions.
* Not inclusive of all applicable regulatory requirements. For details, see 44 CFR parts 60 and 65.
DHS - FEMA Form 81-89A, FEB 06 Riverine Hydrology & Hydraulics Form MT-2 Form 2 Page 2 of 2
U.S. DEPARTMENT OF HOMELAND SECURITY - FEDERAL EMERGENCY MANAGEMENT AGENCY
RIVERINE STRUCTURES FORM
O.M.BNo. 1660-0016
Expires: August 31,2007
PAPERWORK REDUCTION ACT
Public reporting burden for this form is estimated to average 7 hours per response. The burden estimate includes the time for reviewing instructions,
searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not
required to respond to this collection of information unless a valid OMB control number appears in the upper right corner of this form. Send
comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management,
U.S. Department of Homeland Security, Federal Emergency Management Agency, 500 C Street, SW, Washington DC 20472, Paperwork Reduction
Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not
send your completed survey to the above address.
Flooding Source: San Marcos Creek
Note: Fill out one form for each flooding source studied
A. GENERAL
Complete the appropriate section(s) for each Structure listed below:
Channelization complete Section B
Bridge/Culvert complete Section C
Dam complete Section D
Levee/Floodwall complete Section E
Sediment Transport complete Section F (if required)
Description Of Structure
1. Name of Structure: Rancho Santa Fe Road Bridge
Type (check one): D Channelization
Location of Structure:
Downstream Limit/Cross Section:
Upstream Limit/Cross Section:
2. Name of Structure: Melrose Drive Bridge
Type (check one): D Channelization
Location of Structure:
Downstream Limit/Cross Section:
Upstream Limit/Cross Section:
3. Name of Structure:
Type (check one) D Channelization
Location of Structure:
Downstream Limit/Cross Section:
Upstream Limit/Cross Section:
X Bridge/Culvert D Levee/Floodwall D Dam
X Bridge/Culvert D Levee/Floodwall DDam
D Bridge/Culvert D Levee/Floodwall D Dam
NOTE: For more structures, attach additional pages as needed.
DHS - FEMA Form 81-89B, FEE 06 Riverine Structures Form MT-2 Form 3 Page 1 of 2
C. BRIDGE/CULVERT
Flooding Source: San Marcos Creek
Name of Structure: Rancho Santa Fe Road Bridge
1. This revision reflects (check one):
D New bridge/culvert not modeled in the FIS
D Modified bridge/culvert previously modeled in the FIS
X New analysis of bridge/culvert previously modeled in the FIS
2. Hydraulic model used to analyze the structure (e.g., HEC-2 with special bridge routine, WSPRO, HY8): HEC-RAS
If different than hydraulic analysis for the flooding source, justify why the hydraulic analysis used for the flooding source could not analyze the
structures. Attach justification.
3. Attach plans of the structures certified by a registered professional engineer. The plan detail and information should include the following
(check the information that has been provided):
X Erosion Protection
X Low Chord Elevations - Upstream and Downstream
X Top of Road Elevations - Upstream and Downstream
X Structure Invert Elevations - Upstream and Downstream
X Stream Invert Elevations - Upstream and Downstream
X Cross-Section Locations
X Dimensions (height, width, span, radius, length)
D Shape (culverts only)
D Material
D Beveling or Rounding
D Wing Wall Angle
X Skew Angle
D Distances Between Cross Sections
4. Sediment Transport Considerations
Was sediment transport considered? D Yes X No If yes, then fill out Section F (Sediment Transport).
If No, then attach your explanation for why sediment transport was not considered.
C. BRIDGE/CULVERT
Flooding Source: San Marcos Creek
Name of Structure: Melrose Drive Bridge
3. This revision reflects (check one):
X New bridge/culvert not modeled in the FIS
D Modified bridge/culvert previously modeled in the FIS
New analysis of bridge/culvert previously modeled in the FIS
4. Hydraulic model used to analyze the structure (e.g., HEC-2 with special bridge routine, WSPRO, HY8): HEC-RAS
If different than hydraulic analysis for the flooding source, justify why the hydraulic analysis used for the flooding source could not analyze the
structures. Attach justification.
3. Attach plans of the structures certified by a registered professional engineer. The plan detail and information should include the following
(check the information that has been provided):
X Erosion Protection
X Low Chord Elevations - Upstream and Downstream
X Top of Road Elevations - Upstream and Downstream
X Structure Invert Elevations - Upstream and Downstream
X Stream Invert Elevations - Upstream and Downstream
X Cross-Section Locations
X Dimensions (height, width, span, radius, length)
D Shape (culverts only)
D Material
D Beveling or Rounding
D Wing Wall Angle
X Skew Angle
D Distances Between Cross Sections
4. Sediment Transport Considerations
Was sediment transport considered? D Yes X No If yes, then fill out Section F (Sediment Transport).
If No, then attach your explanation for why sediment transport was not considered.
DHS - FEMA Form 81-89B, FEB 06 Riverine Structures Form MT-2 Form 3 Page 2 of 2
Federal Emergency Management Agency
Washing-on, D.C. 20472
JUl 03 2003
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
The Honorable Claude A. "Bud" Lewis
Mayor, City of Carlsbad
1200 Carlsbad Village Drive
Carlsbad, CA 92008
Dear Mayor Lewis:
IN REPLY REFER TO:
Case No.: 03-09-0424R
Community: City of Carlsbad, CA
Community No.: 060285
104
This responds to a request that the Federal Emerge ncy Management Agency (FEMA) comment on the
effects that a proposed project would have on the < ffective Flood Insurance Rate Map (FIRM) and Flood
Insurance Study (FIS) report for San Diego Count;', California and Incorporated Areas (the effective FIRM
and FIS report for your community), in accordant with Part 65 of the National Flood Insurance Program
(NFIP) regulations. In a letter dated January 16,2 )03, Dr. Howard H. Chang, Ph.D., P.E., Howard H.
Chang Consultants, requested that FEMA evaluate the effects that the proposed University Commons
development, a replacement bridge for Rancho Sai ita Fe Road Bridge, and updated topographic
information along San Marcos Creek, would have an the flood hazard information shown on the effective
FIRM and FIS report. The proposed University C >mmons development will include a new bridge for
Melrose Drive and re-grading along San Marcos C reek just upstream of Rancho Santa Fe Road to
approximately 1,700 feet upstream of a private roa d. The effective Special Flood Hazard Area (SFHA),
the area that would be inundated by the flood havi ig a 1 -percent chance of being equaled or exceeded in
any given year (base flood), along this reach is des ignated Zone A, an SFHA with no Base Flood
Elevations (BFEs) determined.
All data required to complete our review of this re luest for a Conditional Letter of Map Revision
(CLOMR) were submitted with letters from Dr. Cl tang.
Because this revision request also affects the City > >f San Marcos, a separate CLOMR for that community
was issued on the same date as this CLOMR.
We reviewed the submitted data and the data used to prepare the effective FIRM for your community and
determined that the proposed project meets the mil timum floodplain management criteria of the NFIP. The
submitted existing conditions HEC-RAS hydraulic computer model dated November 14, 2002, based on
updated topographic information, was used as the >ase conditions model in our review of the proposed
conditions model. We believe that, if the propose* project is constructed as shown on the submitted
undated plans entitled "Rancho Santa Fe Road Bri ige Over San Marcos Creek," prepared by Dokken
Engineering; the undated plans entitled "Melrose I >rive Bridge General Plan," prepared by Simon Wong
Engineering; the topographic work map entitled "(Conditional Letter Of Map Revision Exhibit For
University Commons, San Marcos Creek," prepare d by O'Day Consultants, dated October 2002; and the
data listed below are received, a revision to the FIIM would be warranted. *
Our comparison of the proposed conditions model to the effective information revealed that, as a result of
the proposed bridges, the proposed grading along! .an Marcos Creek, and the updated topographic
information, the width of the SFHA will decrease i broughout the revised reach. The maximum decrease in
SFHA width, approximately 300 feet, will occur ji st upstream of Rancho Santa Fe Road Bridge.
Upon completion of the project, your community r lay submit the data listed below and request that we
make a final determination on revising the effectiv: FIRM and FIS report.
• Detailed application and certification form s, which were used in processing this request, must be
used for requesting final revisions to the rr aps. Therefore, when the map revision request for the
area covered by this letter is submitted, Fo m 1, entitled "Overview & Concurrence Form," must
be included. (A copy of this form is enclo ied.)
• The detailed application and certification 1 arms listed below may be required if as-built conditions
differ from the preliminary plans. If requi ed, please submit new forms (copies of which are
enclosed) or annotated copies of the previ< >usly submitted forms showing the revised information.
Form 2, entitled "Riverine Hydrology & H ydraulics Form"
Form 3, entitled "Riverine Structures Fora i"
Hydraulic analyses for as-built conditions if the base flood and a topographic work map showing
the revised floodplain must be submitted \ dth Form 2.
• Effective September 1,2002, FEMA revis 3d the fee schedule for reviewing and processing
requests for conditional and final modifies tions to published flood information and maps. In
accordance with this schedule, the current fee for this map revision request is $3,800 and must be
received before we can begin processing ti ic request. Please note, however, that the fee schedule is
subject to change, and requesters are requi red to submit the fee in effect at the time of the
submittal. Payment of this fee shall be me de in the form of a check or money order, made payable
in U.S. funds to the National Flood Insura ice Program, or by credit card. The payment must be
forwarded to the following address:
Federal Emergent y Management Agency
Fee-Charge S 'stem Administrator
P.CXBox3173
Merrifield, VA 22116-3173
• As-built plans, certified by a registered pn fessional engineer, of all proposed project elements
• Community acknowledgment of the map r ivision request
• The proposed conditions floodplain bound ay delineations do not tie into the floodplain boundary
delineations shown on the effective PERM at the upstream limits of the revision. Please extend the
study upstream until an adequate tie-in to 1 ae effective floodplain boundary delineations is
achieved. Please submit a topographic wo 'k map, certified by a registered professional engineer,
and revised hydraulic models for the revis< d study.
After receiving appropriate documentation to show that the project has been completed, FEMA will initiate
a revision to the FIRM and FIS report
The basis of this CLOMR is, in whole or in part, a :ulvert project. NFEP regulations, as cited in
Paragraph 60.3(b)(7), require that communities ass ire that the flood-carrying capacity within the altered or
relocated portion of any watercourse is maintained. This provision is incorporated into your community's
existing floodplain management regulations. Cons iquently, the ultimate responsibility for maintenance of
the culvert rests with your community.
This CLOMR is based on minimum floodplain mai lagement criteria established under the NFIP. Your
community is responsible for approving all floodpl lin development and for ensuring all necessary permits
required by Federal or State law have been receivet I. State, county, and community officials, based on
knowledge of local conditions and in the interest o! safety, may set higher standards for construction in the
SFHA. If the State, county, or community has ado rted more restrictive or comprehensive floodplain
management criteria, these criteria take precedence over the minimum NFIP criteria.
If you have any questions regarding floodplain mai lagement regulations for your community or the NFIP in
general, please contact the Consultation Coordinati on Officer (CCO) for your community. Information on
the CCO for your community may be obtained by < ailing the Chief, National Flood Insurance Program
Branch, Federal Insurance and Mitigation Division of FEMA in Oakland, California, at (510) 627-7184. If
you have any questions regarding this CLOMR, pi ase call our Map Assistance Center, toll free, at
1-877-FEMAMAP (1-877-336-2627).
Sincerely,
/v
Max H. Yuan, P.E., Project Engineer
Hazard Study Branch
Federal Insurance and
Mitigation Administration
Enclosures
cc: The Honorable F.H. "Corky" Smith
Mayor, City of San Marcos
Mr. Lloyd Hubbs
Public Works Director
Department of Public Works
City of Carlsbad
Mr. Alan Schuler
City Engineer
Development Services
City of San Marcos
Mr. David Hulse
Chief of Current Planning
San Diego County
Dr. Howard. H. Chang, Ph.D., P.E.
Howard H. Chang Consultants
For: Doug Bellomo, P.E., Acting Chief
Hazard Study Branch
Federal Insurance and
Mitigation Administration
HYDRAULIC STUDY FOR FEMA
LETTER OF MAP REVISION (LOMR)
FOR SAN MARCOS CREEK AT
UNIVERSITY COMMONS IN THE CITY OF SAN MARCOS
SAN DIEGO COUNTY, CALIFORNIA
SECTION I
SECTION II
SECTION III
TABLE OF CONTENTS
HYDRAULIC STUDY FOR FEMA CONDITIONAL LETTER OF MAP
REVISION (LOMR) FOR SAN MARCOS CREEK IN SAN DIEGO
COUNTY, CALIFORNIA
SAN MARCOS CREEK CROSS-SECTIONAL PROFILES FOR
PRE-PROJECT AND AS-BUILT CONDITIONS
HEC-RAS REPORT FOR PRE-PROJECT AND AS-BUILT
CONDITIONS
LIST OF EXHIBITS
EXHIBIT A
EXHIBIT B
EXHIBIT C
EXHIBIT D
EXHIBIT E
TOPOGRAPHIC MAPS OF SAN MARCOS CREEK AT UNIVERSITY
COMMONS WITH CROSS SECTION LOCATIONS AND
FLOODPLAIN BOUNDARIES
FLOOD PROFILES OF SAN MARCOS CREEK NEAR RANCHO
SANTA FE ROAD FROM THE CORPS OF ENGINEERS REPORT
ENGINEERING PLANS FOR PREVIOUS AND AS-BUILT RANCHO
SANTA FE ROAD BRIDGE
ENGINEERING PLANS FOR AS-BUILT MELROSE DRIVE BRIDGE
EFFECTIVE AND REVISED FLOOD INSURANCE RATE MAP
PANEL 1051, 1052
SECTION I
HYDRAULIC STUDY FOR FEMA LETTER OF MAP REVISION (LOMR)
FOR SAN MARCOS CREEK AT UNIVERSITY COMMONS
IN THE CITY OF SAN MARCOS, SAN DIEGO COUNTY, CALIFORNIA
REASONS FOR LOMR APPLICATION
The hydraulic study was prepared to apply for a Letter of Map Revision (LOMR) for San
Marcos Creek at University Commons in the City of San Marcos, San Diego County, California.
This application for LOMR covers the channel reach of San Marcos Creek from the Rancho
Santa Fe Road Bridge at river mile 6.28 to river mile 7.307. The river miles are measured from
the stream mouth. This study was made for the as-built University Commons development
project located just east of Rancho Santa Fe Road along the south bank of the main channel.
This channel reach was covered in a CLOMR, which was approved by FEMA on July 3,
2003. A copy of the CLOMR is attached in this application.
In connection with the development project, a new bridge at Melrose Drive on San
Marcos Creek has been completed. Its location is between channel sections 6.896 and 6.913 as
shown in Exhibit A; its as-built hydraulic geometry is shown in Exhibit D.
The old bridge at Rancho Santa Fe Road (see Exhibit C) did not have the capacity for the
100-yr flood. As a replacement for the existing bridge, a new bridge financed by the City of
Carlsbad has been completed; it is located just downstream of and parallel to the old bridge. The
new bridge has two separate parts (see Exhibit C). One part is for the southeast bound lanes
while the other is for the northwest bound lanes. Each part has a width of 51 feet 9 inches. The
bridge has a total span of 368 feet supported by two sets of bridge piers. The bridge alignment is
not normal to the stream flow but it has a skew angle. The new bridge low chord is above the
100-yr flood level.
The U. S. Army Corps of Engineers computed water-surface profiles for San Marcos
Creek in 1971 (see Exhibit B). The hydraulic data for the study is no longer available. The
effective Flood Insurance Rate Map (FIRM), panel numbers 1051 and 1052, for San Marcos
Creek were published by FEMA in June 1997. The special flood hazard areas inundated by the
100-yr flood in the FIRM map are consistent with the water-surface elevations in the Corps
study. Since the 1971 Corps study, there have been changes in San Marcos Creek. Such
changes include increased vegetation growth, a new bridge at Rancho Santa Fe Road, and
grading on north side of the main channel for the Rancho Santa Fe Industrial Park development.
Because of these changes, there exists the need to update the floodplain information.
This application for LOMR is to update the floodplain boundaries for San Marcos Creek
upstream from Rancho Santa Fe Road. The study channel reach starts from river mile 6.047
downstream of Ranch Santa Fe Road. Updating of floodplain boundaries was only made for San
Marcos Creek upstream from Rancho Santa Fe Road.
In summary, the application for LOMR is to incorporate the following changes:
(1) Replacement of the Rancho Santa Fe Road Bridge,
(2) New bridge at Melrose Drive,
(3) Improvements of the stream channel in connection with the Melrose bridge project,
(4) Grading in connection with the existing Rancho Santa Fe Industrial Park development along
the north bank of the main channel,
(5) Changes in channel roughness due to increased vegetation growth, and
(6) As-built University Commons development along the south channel bank - It should be noted
that the University Commons development stays outside the proposed floodplain
boundaries of the creek.
FLOOD DISCHARGES
According to the 1971 Corps of Engineers study, the peak discharge for the intermediate
regional flood is 13,000 cfs. This discharge was used as the 100-yr flood in this study. Flood
discharges for the 10-, 25-, and 50-yr floods are not available for San Marcos Creek.
For subcritical flow, the computation starts from downstream and proceeds toward
upstream. For this study, the water-surface elevation at Section 6.047 provides the downstream
boundary conditions. Computed water-surface elevations (CWSEL) of 324.5 feet for the 100-yr
flood at this section from the Corps study is used.
HYDRAULIC ANALYSIS FOR THE LOMR
Hydraulic analysis for the LOMR is based on the HEC-RAS computer program
developed by the U. S. Army Corps of Engineers. Locations of cross sections used in this study
are shown in the topographic map attached to the report as Exhibit A. Cross-sectional data for
those sections downstream of Ranch Santa Fe Road are based on the 1998 field survey; those
upstream of Rancho Santa Fe Road are from the topographic information of May 1990. The
cross-sectional data area updated recently to reflect the as-built conditions of the stream channel
and hydraulic structures. Cross-sectional plots are included in Section II of the report.
The study covers the two following models:
(1) The pre-project model: This model pertains to the physical conditions of San Marcos Creek
before the Rancho Santa Fe Road Bridge replacement, the Melrose Drive, and the University
Commons development project.
(2) The as-built model: This model pertains to the channel conditions with the new Rancho Santa
Fe Road Bridge together with the Melrose Drive Bridge and University Commons development.
The University Commons development includes grading along the south bank of the main
channel outside the proposed floodplain boundary. The Melrose Drive Bridge is within the
floodplain boundaries. In order to satisfy the federal and local requirements, the increases in
flood level due to the dip crossing will not result in increases in flood level and flow velocity on
neighboring properties.
Input/output listings of the HEC-RAS runs are included in Sections III and IV of the
report. Fig. 1 shows the computed water-surface profile together with the channel bed profile for
the pre-project conditions. Fig. 2 shows the computed water-surface profile and the channel bed
profile for the as-built conditions. A comparison of the water-surface profiles for the pre-project
and as-built conditions is shown in Fig. 3. Computed water-surface elevations for the existing
and proposed models are summarized in Table 1. The floodplain boundaries are delineated on
the map in Exhibit A. It can be seen that the completed Rancho Santa Fe Road Bridge results in
generally lower water-surface elevations for the 100-yr floodplain. The completed Melrose
Drive Bridge results in flood level rises on its upstream side. However, such rises are within the
property owned by University Commons.
Flood plain boundaries are delineated as shown on the topographic map in Exhibit A.
The Melrose Drive Bridge causes a larger floodplain area in the upstream vicinity of Melrose
Drive. However, the increase in floodplain is totally within the property of University
Commons.
Water-surface and channel-bed profiles - Pre-project conditions
LLJ
440
420
400
380
360
340
320
300
6.0 6.2
RIVER- 1 Reach- 1
Legend
WS PF1•
Ground
7.26.4 6.6 6.8 7.0
Main Channel Distance (rri)
Fig. 1. Water-surface and channel bed profiles for pre-project conditions
8
I
UJ
440
420
400
380
360
340
320
300
Water-surface and channel-bed profiles -As-built conditions
RIVER-1 Reach-1
Legend,^____1
WS PF1
•
Ground
6.0 6.2 7.2
Fig,
6.4 6.6 6.8 7.0
Main Channel Distance (rri)
2. Water-surface and channel bed profiles for as-built conditions
'to$
LU
440
420
400
380
360
340
320
Water-surface and channel-bed profiles - Pre-project conditions
RIVER-1 Reach-1
300
Legend
WS PF 1 - Pre-project
WS PF 1-As-built
•
Ground
6.0 6.2 7.26.4 6.6 6.8 7.0
Main Channel Distance (rri)
Fig. 3. Comparison of water-surface profiles for pre-project and as-built conditions
Table 1. Summary of hydraulic parameters for the pre-project and as-built conditions
River Sta Profile Plan Q MinChEl
(cfs) (ft)
7.363 Pre-project 13000 423.20
7.363 As-built 13000 423.20
W.S. Elev Vel Chnl Top Width Froude #
(ft) (ft/s) (ft)
436.20 8.20 174.11 0.45
436.14 8.08 173.78 0.43
7.307 Pre-project 13000 421.20 434.71
7.307 As-built 13000 421.20 434.63
7.61 168.91 0.37
7.68 168.39 0.38
7.286 Pre-project 13000 420.90 434.35
7.286 As-built 13000 420.90 434.40
7.38 161.54 0.37
6.89 199.14 0.35
7.259 Pre-project 13000 419.50 431.49
7.259 As-built 13000 419.50 431.48
12.83 119.54 0.68
12.83 119.52 0.68
7.232 Pre-project 13000 416.60 426.73
7.232 As-built 13000 416.60 426.74
16.22 101.36 0.96
16.21 101.37 0.95
7.203 Pre-project 13000 409.40 420.71
7.203 As-built 13000 409.40 419.68
15.16 130.08 0.80
15.16 115.97 0.84
7.161 Pre-project 13000 392.00 404.11 17.20 86.65
7.161 As-built 13000 392.00 404.10 17.22 86.63
0.93
0.93
7.128 Pre-project 13000 375.80 381.99
7.128 As-built 13000 375.90 381.71
9.60 387.59 0.71
10.49 396.85 0.80
7.102 Pre-project 13000 373.00 381.66
7.102 As-built 13000 372.00 381.53
4.76 392.79 0.31
4.27 392.41 0.27
7.087 Pre-project 13000 371.70 379.84
7.087 As-built 13000 371.70 379.51
i.37 193.44
1.80 192.30
0.52
0.56
7.066 Pre-project 13000 369.10 378.60
7.066 As-built 13000 368.00 379.33
9.04 190.89 0.54
7.00 222.20 0.38
7.051 Pre-project 13000 366.00 377.67
7.051 As-built 13000 366.00 377.67
10.33 145.23 0.55
10.33 145.23 0.55
7.023
7.023
6.981
6.981
6.938
6.938
6.922
6.913
6.896
6.888
6.875
6.875
6.836
6.836
6.745
6.745
6.667
6.667
6.599
6.599
6.523
6.523
6.457
6.457
6.387
6.387
Pre-project
As-built
Pre-project
As-built
Pre-project
As-built
As-built
As-built
As-built
As-built
Pre-project
As-built
Pre-project
As-built
Pre-project
As-built
Pre-project
As-built
Pre-project
As-built
Pre-project
As-built
Pre-project
As-built
Pre-project
As-built
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
13000
365.
365.
359.
359.
351.
351.
350.
350.
350.
349.
346.
346.
345.
345.
341.
341.
339.
339.
332.
332.
328.
328.
331.
331.
324.
324.
00
00
00
00
00
00
70
30
00
00
20
20
00
00
00
00
00
00
00
00
00
00
00
00
80
80
377
377
374
374
363
365
365
364
361
359
357
356
353
353
350
350
347
347
342
342
342
341
341
340
341
339
.95
.95
.54
.53
.98
.22
.07
.88
.40
.45
.00
.88
.73
.72
.60
.55
.49
.48
.92
.91
.20
.27
.79
.63
.09
.16
6.
6.
14
14
16
14
12
12
17
15
8.
10
13
13
9.
9.
10
10
14
14
5.
7.
4.
5.
6.
8.
04
04
.30
.31
.24
.58
.99
.61
.24
.42
47
.62
.26
.96
53
63
.54
.39
.43
.44
80
53
98
98
38
47
217
217
169
169
96.
95.
106
91.
82.
118
207
205
218
181
362
360
313
292
227
226
344
275
416
393
348
298
.64
.64
.00
.00
87
56
.85
64
51
.83
.22
.36
.09
.17
.47
.73
.36
.36
.05
.93
.40
.43
.79
.00
.52
.39
0.30
0.30
0.65
0.65
0.81
0.69
0.66
0.66
1.01
0.98
0.48
0.61
0.85
0.90
0.57
0.58
0.66
0.65
0.83
0.83
0.28
0.38
0.28
0.36
0.31
0.45
6.342 Pre-project 13000 324.80 340.85 5.84 354.37 0.27
6.342 As-built 13000 324.80 338.46 :.36 303.46 0.43
6.305 Pre-project 13000 325.20 340.56
6.305 As-built 13000 325.20 337.62
5.92 296.88 0.29
8.74 255.58 0.48
6.28
6.28
Pre-project 13000 325.80 340.09
As-built 13000 323.20 335.86
7.35 434.14 0.34
11.34 201.08 0.63
6.27 Bridge
6.26 Pre-project 13000 325.80 339.50 8.07 409.53 0.39
6.259 Pre-project 13000 325.70 339.65
6.259 As-built 13000 326.00 335.70
4.35 353.94 0.22
7.49 204.71 0.45
6.221 Pre-project 13000 321.80 335.10
6.221 As-built 13000 326.00 335.53
15.31 120.47 0.83
7.65 203.77 0.47
6.191 Pre-project 13000 322.70 334.85
6.191 As-built 13000 322.70 334.85
5.64 287.98 0.32
5.64 287.97 0.32
6.157 Pre-project 13000 321.30 334.02
6.157 As-built 13000 321.30 334.02
6.32 383.20 0.35
6.32 383.20 0.35
6.117 Pre-project 13000 319.80 330.88
6.117 As-built 13000 319.80 330.88
1.71 191.48
1.71 191.48
0.53
0.53
6.083 Pre-project 13000 316.90 329.13
6.083 As-built 13000 316.90 329.13
10.29 150.35 0.57
10.29 150.35 0.57
6.047 Pre-project 13000 312.10 324.50
6.047 As-built 13000 312.10 324.50
16.30 91.94 O.i
16.30 91.94 O.f
UPSTREAM TIE-IN
The computed base flood elevation at the upstream end of the study channel reach is
closely similar to the water-surface elevation given in the 1970 Corps report.
MATERIALS SUBMITTED WITH THIS APPLICATION
Supporting materials for the hydraulic study are submitted with this application, including
the following items:
(1) Profiles of the 100-yr water-surface of San Marcos Creek for the pre-project model as well as
for the as-built model
(2) Cross-sectional profiles covering all sections for the pre-project and as-built conditions. Each
cross-sectional profile also has the flood level for the 100-yr flood.
(4) HEC-RAS report for the pre-project and as-built models.
(6) As-built engineering plans for the Rancho Santa Fe Road Bridge project
(7) As-built engineering plan for Melrose Drive Bridge
(8) As-built grading plan for the University Commons development project
(9) Flood Insurance Rate Map Panels 1051 and 1052
REFERENCES
U. S. Army Corps of Engineers, 1971, "Floodplain Information, San Marcos Creek", prepared for
San Diego County.
10
SECTION II SAN MARCOS CREEK CROSS-SECTIONAL PROFILES FOR
PRE-PROJECT AND AS-BUILT CONDITIONS
RS = 7.363 Cross-sectional profile -Pre-project condtions
.04 « .07 *-e- .04 —J
4SO
445
44O
435
43O
425
RS = 7.363 Cross-sectional profile -As-built conditions
.04 *H .07 »<•*-- .04 —H
42O
350
Uogond
WSPF 1
Ground
BankSta
400 450 500
Station (ft)
550 600 650
RS = 7.3O7 Cross-sectional profile - Pre-project condtions
-= -O4 ~-« .07 «—« - .04 »J
CBrcxjnd
BankSta
440
435
430
425
450 500 550 6OO
Station (ft)
RS = 7.3O7 Cross-sectional profile -As-built conditions
.04 ~*i* .07 « - .04 —
42O
Logond
WSPF1•Ground
BankSta
400 45O 5OO 55O 6OO 65O
Station (ft)
II
440
435
43O
425
RS = 7.286 Cross-sectional profile - Pre-project condtions
- .04 .07 —* .
42O25O SCO 35O 4OO 450
Station (ft)
5OO 550 6OO
440
RS = 7.286 Cross-sectional profile -As-built conditions
.04 ^ - .07 =- .
435
430
425
420
Legend
W3PF1
Ground
BankSta
250 3OO 4OO 45O
Station (ft)
550
440
435
43O
425
42O
RS = 7.259 Cross-sectional profile -Pre-project condtions
*-« .07 »r« .04 -.04
41535O
Legend
44O
435
43O
425
42O
4OO 45O 5OO 55O
Station (ft)
RS = 7.259 Cross-sectional profi le - As-built conditions
- .04 — —~r«— .07 *k .04 *
415J
35O
Legend
VVSPF1
C3round
BankSta
400 45O 5OO
Station (ft)
550 6OO
RS = 7.232 Cross-sectional profile - Pre-project condtions
.04 « .07
600
44O
435
430
425
420
RS = 7.232 Cross-sectional profi le - As-bu i It cond itions
-*— .04 —*t«— 07 —- .
4153OO
Legend
WSPF 1
Ground
BankSta
43O
425
42O
415
410
405
45O
Station (ft)
RS = 7.2O3 Cross-sectional profile - Pre-project condtions
04 ^t Q7 »•«— .04 *•
Legend
VVSPF1
C3round
BankSIa
42O 44O 48O 5OO
Station (ft)
520 54O 560 580
43O
425
42O
415
410
RS = 7.2O3 Cross-sectional profile -As-built conditions
.04 — —« .07 *-* - .04 '
4O5
Legend
WSPF1
Ground
BankSta
4OO 42O 44O 46O 48O 5OO
Stab on (ft)
52O 54O 56O 58O
13
42O
415
410
4O5
400
395
RS = 7.161 Cross-sectional profile
.04 ~ .07 - «
Pre-pnoject condtions
« - - .04 — - *
380
44O
Legend
V\SPF 1
Ground
BankSta
460 48O 500 520
Stab on (ft)
540 SGQ 580
RS = 7.161 Cross-sectional profile - As-built conditions
.04 "**- .07 >~= .04 =-
42O
415
410
4O5
4OO
395
39OJ
44O
Legend
\ASPF1
Ground
BankSta
48O 5OO 52O
Stad on (ft)
540 56O 58O
4OO
395
390
385
380
RS = 7.128 Cross-sectional profile - Pre-project condtions
O4 »}< .07 »•< .04 »
375
2OO
Legend
WBPF1
Ground
BankSta
300 4OO 5OO
Station (ft)
8OO
RS = 7.128 Cross-sectional profile -As-built conditions
O4 —«-«- .07 x .04 "
800
14
4OO
395
39O
385
38O
375
RS = 7.1O2 Cross-sectional profile - Pre-project oondtions
; .04 *< .07 »t<- .04 -»|
37O3OO
Legend
\A/SPF1
Ground
BankSta
4OO 5OO 6OO
Station (ft)
7OO 8OO
4OO
395
390
385:
38O
375
RS = 7.1 O2 Cross-sectional profile -As-built conditions
.04>-« .07 - -»r«- .04^^
37O -'
300
Legend
XA/SPF 1
Ground•BankSta
5OO 6OO
Station (ft)
800
39O
385
38O
375
RS = 7.O87 Cross-sectional profile - Pre-project condtions
O4 ** .07 *!« .04 »-
37O
Legend
\ASPF1
Ground
BankSta
35O 400 45O 5OO
Station (ft)
55O 600
390
385
38O
375
RS = 7.O87 Cross-sectional profile -As-built conditions
.04 >!c — .07 — >* .04
37O
Legend
WSPF1
CSround
BankSta
35O 40O 45O 5OO
Station (ft)
550 6OO
15
39O
385
38O
375
37O
RS = 7.O66 Cross-sectional profile - Pre-project condtions
.04 ^* .07 »j* 04 H
365
Legend
WSPF1
Ground
BankSta
350 4OO 45O 5OO 55O
Station (ft)
600 65O 700
39O
385
38O
375
370
RS = 7.O66 Cross-sectional profi le - As-bui It conditions
.04 « .07 H^ .04 —»~
365
XA/SPF 1
Ground
BankSta
350 4OO 450 500 550
Stab on (ft)
GOO 650 7OO
390
380
370
RS = 7.O51 Cross-sectional profile - Pre-project condtions
.04 — »T« .07 •-•-»-s- .04 -»
38536O
Legend
VVSPF1
Ground
BankSta
39O
385
38O
375
370
38O 4OO 42O 44O 46O 48O 5OO 52O 54O SBO
Stab on (ft)
RS = y.O51 Cross-sectional profile - As-bui It conditions
.04 .07 *-< .04 •*!
36536O
Legend
WSPF 1
Ground
BankSta
38O 4OO 42O 44O 46O 48O
Station (ft)
5OO 520 54O 56O
16
39O
RS = 7.O23 Cross-sectional profile -Pre-project condtions
.04 *•< .07 >—* .04 *
65O
RS = 7.023 Cross-sectional profile -As-built conditions
O4 ** .07 »-< .04 *
385
400 450 5OO
Station (ft)
550 600 85O
376
374
372
37O
368
366
364
362
360
35836O
RS = 6.981 Cross-sectional profile -Pre-project condtions
O4 ^ Q7 »-* .04 *
Legend
WBPF1
Ground
BankSta
376
374
372
37O
368
366
364
362
36O
38O 4OO 42O 44O 46O 48O 5OO 52O 54O 56O
Station (ft)
RS = 6.981 Cross-sectional profile -As-built conditions
" .04 *< .07 « .04 H
35836O
Legend
WSPF1
CBround
BankSta
38O 4OO 42O 44O 46O 48O 5OO 52O 54O 56O
Station (ft)
17
380
375
37O
365
36O
355
RS = 6.938 Cross-sectional profile -Pre-project condtions
.04 *~* .07 -+»"« .04 »-
35O3OO
Legend
WBPF 1
Ground
BankSte
35O 4OO 45O 5OO
Station (ft)
55O 6OO 65O
375
370
365
360
355
RS = 6.938 Cross-sectional profile -As-built conditions
.04 ** .07 .04 *•
35044O
Legend
WSPF1
Ground
BankSta
4SO 48O 5OO 52O
Station (ft)
54O 56O 58O
370
365
360
355
350
RS = 6.888 Cross-sectional profile -As-built conditions
-.04=-' .045 .04 -^
345
Legend
W6PF1
Ground
BaikSta
420 440 460 480 500 520
Station (ft)
54O 560 580 600
18
375
370
365
360
RS = 6.9O45 BR Cross-sectional profile - As-built conditions
k— .035 —H
350
Legend
WSPF1
5960 5980 6000 6020 604O
Station (ft)
6060 6080 6100
RS = 6.9045 BR Cross-sectional profile - As-built conditions
<— .035 —*|
5980 6000 6020 604O
Station (ft)
6060 6080 6100
RS = 6.896 Cross-sectional profile - As-built conditions
.035 —*|
350596O 598O 6OOO 6O2O 6O4O
Station (ft)
6060 6080 61OO
19
36O
358:
356
354
352
35O
348
RS = 6.875 Cross-sectional profile - Pre-project condtions
.04 **« .07 *^ .04 —H
346
35O
380
350
Legend
VVBPF1
Ground
BankSta
4OO 45O 5OO
Station (ft)
55O 6OO 65O
RS = 6.875 Cross-sectional profile -As-built conditions
- .04 — >-~ .06 —**— .04 >-
S50
8
365
355
35O
345
3OO
RS = 6.836 Cross-sectional profile -Pre-project condtions
.04 ** .OS >—' .04
Logon d
WSPF 1
Ground
3OO 4OO 5OO BOO TOO
Station (ft)
RS = 6.836 Cross-sectional profile -As-built conditions
.04 *^ .05 >-< .04
Legend
WSPF1
Ground
BankSta
4OO 5OO 6OO
Station (ft)
7CO 8OO
20
360
355
350
345
34O
RS = 6.745 Cross-sectional profile -Pre-project condtions
.04 «.O5=-« .04 >•
Legend
XA/SPF-I
Ground
BankSta
200 4OO 6OO
Station (ft)
e
365
360
355
350
345
RS = 6.745 Cross-sectional profile -As-built conditions
.04 >-< .05 >-< - .04 *
34O
Legend
XA/SPF1
Ground
BankSta
2OO 3OO 4OO 500 600
Stati on (ft)
700 800 9OO
360
335
35O
345
34O
RS = 6.667 Cross-sectional profile - Pre-project condtions
-< O4 >-*.O5>-« .04
3351OO
\ASRF 1
Ground
BankSta
36O
355
35O
345
34O
335
3OO
400 500 600
Stati on (ft)
700
RS = 6.667 Cross-sectional profile -As-built conditions
-< .04 *-< .OS =-* .04
Legend
WBPF1
CBround
BaikSta
4OO 5OO 6OO
Stati on (ft)
700 800 9OO
21
355
350
345
340
RS = 6.599 Cross-sectional profile - Pre-project condtions
O4 « OS *-*•- .04 «-
3304OO
Logond
Qround
BankSta
7OO 8OO
Stab on (ft)
355
RS = 6.599 Cross-sectional profile -As-built conditions
eoo 7OO 8OO
Station (ft)
300
355
35O
345
34O
335
33O
RS = 6.523 Cross-sectional profile - Pre-project condtions
-* .04 *H .05 «- .04 —*•
325
1OO
Log end
\ASPF1
CBround
BankSta
2OO 3OO 4OO 500 6OO
Station (ft)
7OO 800 900
355
35O
345
34O
335
33O
RS = 6.523 Cross-sectional profile -As-built conditions
.04 »-*- .05 4«— .04 —
3252OO
Legend
WBPF1
<3round
BankSta
3OO 4OO 500 6OO
Station (ft)
TOO 8OO 900
22
350
345
34O
335
RS = 6.457 Cross-sectional profile - Pre-project condtions
-,— .04 *- .05 *^ - .04 —
33O
Leg and
WBPF1
Ground
BankSta
1OO 200 3OO 40O
Station (ft)
500 600 700
35O
RS = 6.457 Cross-sectional profile -As-built conditions
.04 —*H— -os "H-- - .04
345
34O
335
33O
1OO
Legend
W3PF1
Ground
BankSta
2OO 30O 4OO
Station (ft)
50O 6OO 7OO
345
34O
335
33O
325
RS = 6.387 Cross-sectional profile - Pre-project condtions
•*•— .04 **« .OS ** .04 —H
32O200
Legend
VVSPF 1
Gfound
BankSta
300 4OO 5OO
Station (ft)
60O 70O
345
340
335
33O
325
RS = 6.387 Cross-sectional profile -As-built conditions
L— .04 —"4*— .os —>t-— .04 — —»J
32O2OO
WSPF1
CSround
BankSta
300 4OO 5OO
Station (ft)
600 700
23
g
35O
345
34O
335
33O
325
RS = 6.342 Cross-sectional profile - Pre-project condtions
O4 —*T*— -OS -^»K- .04 —H
32O1
2OO
Legend
VVSPF1
Ground
BankSta
3OO 4OO SCO
Station (ft)
6OO 7OO 8OO
35O
345
34O
335
33O
325
RS = 6.342 Cross-sectional profile -As-built conditions
h— .04 T«- .05 -^°~r* .04 —H
32O2OO
\ASPF 1
CBround
BankSta
3OO 400 5OO
Station (ft)
60O 7OO 8OO
350
345
340
335
330
RS = 6.3O5 Cross-sectional profile - P re-project condtions
-=.04=—— - .OS *t« .04
3254OO
Log on d
\ASPF 1
CSround
BankSta
•45O SCO 55O SOO 85O 7OO 75O
Stadon(ft)
RS = 6.3O5 Cross-sectional profile -As-built conditions
:.O4;~* .OS ^^ .04
75O SOO
24
345
34O
335
RS = 6.28 Cross-sectional profile - Pre-project condtions
.04 H* .os —4s— .04 —
TOO
RS = 6.28 Cross-sectional profile - As-built conditions
O4 >-c os *i< - 04 a-
35O
345
34O
335
33O
325
e
32O
4OO
345
34O
335
33O
Legend
W3PF 1
Ground
BankSta
45O 5OO 55O BOO 65O 7OO 75O 8OO
Stadon(ft)
RS = 6.27 BR Cross-sectional profile - Pre-project condtions
' O4 *< .05 « .04 *
325
1OO 7OO
345
340
335
330
RS = 6.27 BR Cross-sectional profile - Pre-project condtions
- .04 — 4« .05 *-»- - .04 — H
3251OO 700
25
345
34O
33S
330
RS = 6.26 Cross-sectional profile - Pre-project condtions
.04 »-<— .05 —>t« .04 -»
325
100 7OO
35O
345
34O
335
33O
RS = 6.259 Cross-sectional profile - Pre-project condtions
-< .04 -**— .08 —*^ -O4 ~
325
Legend
WSPF1
Ground
100 20O 3OO 4OO
Station (ft)
500 60O
3BO .04
RS = 6.259 Cross-sectional profile -As-built conditions
- .06 — —**.
355J
35O
345
34O
335
330-
325
Legend
WSPF1
Ground
BankSla
SO 1OO 15O
Station (ft)
200 25O 3OO
26
365
RS = 6.2.4 BR Cross-sectional profile -As-built conditions
.06
325
365
3OO
.04
RS = 6.24 BR Cross-sectional profile -As-built conditions
**- - - .06 — ^<.
3OO
.0435O
345
34O
335
33O
325
RS = 6.221 Cross-sectional profile - Pre-project condtions
.08 —4«— .04
32O
Legend
XA/SPF 1
Ground
BankSta
42O 44O 48O 5OO
Station (ft)
520 560
.0436O
355
35O
345
340
335
330
325
RS = 6.221 Cross-sectional profile -As-built conditions
.06 —*<.
\ASPF1
Ground
BankSta
5O 15O
Station (ft)
2OO 25O 3OO
27
350
345
34O
335
33CH
325
RS = 6.191 Cross-sectional profile - Pre-project condtions
-*— .04 —« .OB »•* .04
32O35O
WSPF1
Ground
BankSta
400 450 50O 55O 6OO
Station (ft)
65O 7OO 750 8OO
35O
345
34O
335:
33O
325
RS = 6.157 Cross-sectional profile -Pre-project condtions
* .04 *-6 .08 .04 «•
32O
300
Legend
VX/BPF 1
Ground
BankSta
4OO 50O 600
Station (ft)
7OO 800
345
34O
335
33O
325
320
RS = 6.117 Cross-sectional profile -Pre-project condtions
w .04 >-<- .08 -»f« .04
Legend
WSPF1
Ground
BankSte
315300 35O 4OO 45O
Stalion (ft)
500 55O
345
340
335
33O
325
320
RS = 6.O83 Cross-sectional profile - Pre-project condtions
* .04 =-< .OS - .04 — *
315
35O
Legend
\ASPF1
Ground
•
BankSta
4OO 500
Station (ft)
55O 6OO
28
g
34O
335
33O
325
320
315
310
RS = 6.O47 Cross-sectional profile - Pre-project condtions
.04 .06 .04
Legend
WSPF1
Ground
BankSta
4OO 45O 500 55O
StaBon(ft)
650
29
SECTION III HEC-RAS REPORT FOR PRE-PROJECT AND AS-BUILT
CONDITIONS
HEC-RAS Version 3.1.3 May 2005
U.S. Army Corp of Engineers
Hydrologic Engineering Center
609 Second Street
Davis, Cal ifornia
X X XXXXXX XXXX XXXX XX XXXX
X
X
X
X
xxxxxxx
X
X
X
X
X
X
XXXX
X
X
X
X
X
X
X
X
X
X X
X X
XXX XXXX
X X
X X
X X
X X
XXXXXX
X X
X X
X
X
XXXX
X
X
X XXXXXX XXXX XXXX XXXXX
PROJECT DATA
Project Title: San Marco Creek at UC
Project File : smcuc.prj
Run Date and Time: 5/26/2007 1:06:26 PM
Project in English units
Project Description:
SAN MARCOS CREEK AT UNIVERSITY COMMONS, EXISTING MODEL
THROUGH O'DAY CONSULTANTS, 100-YR FLOODPLAIN
SAN MARCOS CREEK AT
UNIVERSITY COMMONS, PROPOSED MODEL
THROUGH O'DAY CONSULTANTS
WITH NEW RSF ROAD BRIDGE AND UNIVERSITY COMMONS GRADING
PLAN DATA
PI an Title: As-bu i11 cond i t i ons
Plan File : C:WHECWRASWsmcuc.p03
Geometry Title: As-built Geom 01
Geometry File : C:WHECWRASWsmcuc.g02
Flow Title : Imported Flow 02
FIow F iIe : C:WHECWRASWsmcuc.f 02
Plan Summary Information:
Number of: Cross Sections = 37 Multiple Openings = 0
Culverts = 0 Inl ine Structures = 0
Bridges = 2 Lateral Structures = 0
30
Computational Information
Water surface calculation tolerance = 0.01
Critical depth calculation tolerance = 0.01
Maximum number of iterations = 20
Maximum difference tolerance = 0.3
Flow tolerance factor = 0.001
Computation Options
Critical depth computed only where necessary
Conveyance Calculation Method: At breaks in n values only
Friction Slope Method: Average Conveyance
Computational Flow Regime: Subcritical Flow
FLOW DATA
Flow Title: Imported Flow 02
Flow File : C:WHECWRASWsmcuc.f02
Flow Data (cfs)
River
RIVER-1
Reach
Reach-1
RS
7.363
PF 1
13000
Boundary Conditions
River Reach Profile
RIVER-1 Reach-1 PF 1
Upstream Downstream
Known WS = 324.5
GEOMETRY DATA
Geometry Title:
Geometry File :
CROSS SECTION
As-built Geom 01
C:WHECWRASWsmcuc.g02
RIVER: RIVER-1
REACH: Reach-1 RS: 7.363
INPUT
Descript ion:
Station Elevation Data num=
Sta Elev Sta Elev
370 450 393 440
500 423.2 530 424
Manning's n Values
Sta n Val
370 .04
num=
Sta n Val
450 .07
10
Sta
435
572
Elev
428
432
Sta
450
588
Elev
426
440
Sta
476
606
Elev
424
450
3
Sta
572
n Val
.04
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
450 572 297 297 297 .1 .3
31
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 7.307
INPUT
Description:
Station Elevation Data num=
Sta Elev Sta Elev
409 440 413 436
522 422 550 426
Sta
445
606
Elev
422
440
Sta
470
Elev
422.4
Sta Elev
510 421.2
Manning's n Values num= 3
Sta n Val Sta n Val Sta n Val
409 .04 445 .07 522 .04
Bank Sta: Left Right
445 522
Lengths: Left Channel Right Coeff Contr. Expan.
118 112 109 .1 .3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 7.286
INPUT
Descript ion:
Station Elevation Data num=
Sta Elev Sta Elev
262 440 320 438
438 422 441 421.7
570 424 578 434
Manning's n Values num=
Sta n Val Sta n Val
262 .04 438 .07
Bank Sta: Left
438
Right
570
13
Sta
364
500
583
3
Sta
570
Elev
436
422
440
n Val
.04
eft Channel
145 142
Sta
383
520
Right
132
Elev
434
420.9
Coeff
Sta
416
530
Contr.
.1
Elev
430
422
Expan
.3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1
INPUT
Description:
Station Elevation Data
Sta Elev Sta
360 437.5 422
515 419.5 523
Manning's n Values
Sta n Val
RS: 7.259
Sta
num=
Elev
436
420
num=
n Val
10
Sta
438
532
3
Sta
Elev
430
422
n Val
Sta
458
550
Elev Sta Elev
422 500 419.8
430 574 440
32
360 .04 458 .07 532 .04
Bank Sta: Left Right Lengths: Left Channel Right
458 532 150 145 140
Coeff Contr. Expan.
.1 .3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 7.232
INPUT
Descr ipt ion:
Station Elevation Data
Sta Elev
337 436.5
524 418
Manning's n Values
Sta n Val
337 .04
Bank Sta: Left Right
466
:a
Sta
378
547
Sta
466
it
[7
num=
Elev
434.7
420
num=
n Val
.07
Lengths:
8
Sta
442
563
3
Sta
547
Left
165
Elev
432
440
n Val
.04
Channel
152
Sta
466
Right
140
Elev Sta
418 500
Coeff Contr.
.1
Elev
416.6
Expan
.3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 7.203
INPUT
Descr iption:
Station Elevation Data num= 9
Sta Elev Sta Elev Sta Elev
401 430 412 422 434 420
500 409.4 522 410 552 420
Sta Elev Sta Elev
468 410 476 409.4
575 430
Manning's n Values num= 3
Sta n Val Sta n Val Sta n Val
401 .04 468 .07 522 .04
Bank Sta: Left Right
468 522
CROSS SECTION
Lengths: Left Channel Right Coeff Contr. Expan.
230 220 210 .1 .3
RIVER: RIVER-1
REACH: Reach-1
INPUT
Descr ipt ion:
Stat ion Elevation
Sta Elev
440 420
500 394
Data
Sta
450
528
RS: 7.161
num=
Elev
410
394.2
9
Sta
457
550
Elev
402
410
Sta
462
565
Elev
400
418
Sta Elev
468 392
33
Manning's
Bank
Sta
440
Sta:
n Values
n Val
.04
Left
468
Sta
468
Right
528
num=
n Val
.07
Lengths:
3
Sta
528
n Val
.04
Left Channel
180 175
Right
175
Coeff Contr. Expan.
.1 .3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 7.128
INPUT
Description:
Stat ion Elevat ion Data
Sta
250
396
583
Manning's
Bank
Sta
250
Sta:
Elev
388
383.2
376
Sta
260
422
640
n Values
n Val
.04
Left
520
Sta
520
Right
698
num=
Elev
383.2
380
375.9
num=
n Val
.07
Lengths:
15
Sta
273
440
698
3
Sta
698
Elev
382
380.3
376
n Val
.04
Left Channel
145 140
Sta
318
483
731
Right
140
Elev
380
380
390
Coeff
Sta
350
520
746
Contr.
.1
Elev
380.2
378
400
Expan
.3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 7.102
INPUT
Description:
Stat ion Elevat ion Data
Sta
334
423
600
735
Manning's
Sta
334
Elev
400
374
374.5
378
n Values
n Val
.04
Sta
353
462
634
760
Sta
368
num=
Elev
378
376
374
390
num=
n Val
.07
18
Sta
358
480
656
778
3
Sta
722
Elev
376
372
372.8
400
n Val
.04
Sta
368
530
702
Elev
374
372
373
Sta
400
551
722
Elev
373.6
373.2
374
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
368 722 50 75-110 .1 .3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 7.087
34
INPUT
Descr ipt ion:
Stat ion Elevation Data
Sta
351
500
Mann ing's
Bank
Sta
351
Sta:
Elev
390
371.9
Sta
377
530
n Values
n Val
.04
Left
435
Sta
435
Right
530
num=
Elev
376
372
num=
n Val
.07
Lengths:
10
Sta
385
543
3
Sta
530
Left
90
Elev
374
374
n Val
.04
Channe I
115
Sta
435
557
Right
140
Elev
371.7
376
Coeff
Sta
460
580
Contr.
.1
Elev
372
390
Expan
.3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 7.066
INPUT
Description:
Station Elevation Data num=
Sta Elev Sta Elev
363 390 393 374
528 369 533 368
616 380 644 382
Manning's n Values num=
Sta n Val Sta n Val
363 .04 458 .07
13
Sta
412
554
661
3
Sta
554
Elev
372
368
386
n Val
.04
Sta
458
574
Elev Sta Elev
370 500 369.1
376 584 378
Bank Sta: Left Right Lengths: Left Channel Right
458 554 50 80 105
Coeff Contr. Expan.
.1 .3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 7.051
INPUT
Descr ipt ion:
Stat ion Elevat ion Data
Sta
367
475
Manning's
Bank
Sta
367
Sta:
Elev
390
368
Sta
384
500
n Values
n Val
.04
Left
475
Sta
475
Right
523
num=
Elev
380
366.4
num=
n Val
.07
Lengths:
9
Sta
395
523
3
Sta
523
Elev
374
366
n Val
.04
Left Channel
160 147
Sta
414
541
Right
140
Elev
372
386
Coeff
Sta
450
Contr.
.1
Elev
370
Expan
.3
CROSS SECTION
35
RIVER: RIVER-1
REACH: Reach-1 RS: 7.023
INPUT
Description:
Station Elevation Data num=
Sta Elev Sta Elev
350 390 363 380
456 368 475 366
588 380 610 390
Manning's n Values num= 3
Sta n Val Sta n Val Sta n Val
350 .04 456 .07 568 .04
12
Sta
376
500
Elev
374
365
Sta
398
536
Elev
372
365.2
Sta
426
568
Elev
370
366
Bank Sta: Left Right
456 568
Lengths: Left Channel Right
210 220 230
Coeff Contr. Expan.
.1 .3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 6.981
INPUT
Descript ion:
Station Elevation Data num=
Sta Elev Sta Elev
373 374 425 372
511 360 542 374
Manning's n Values num=
Sta n Val Sta n Val
373 .04 485 .07
Bank Sta: Left
485
CROSS SECTION
Right
511
7
Sta
465
3
Sta
511
Elev
370
n Val
.04
ift Channel
ISO 220
Sta
485
Right
210
Elev Sta
360 500
Coeff Contr.
.1
Elev
359
Expan
.3
RIVER: RIVER-1
REACH: Reach-1
INPUT
Description:
RS: 6.938
Stat ion Elevation Data
Sta
452
571
Manning's
Bank
Sta
452
Sta:
Elev
372
370
Sta
476
n Values
n Val
.04
Left
Sta
476
Right
num=
Elev
352
num=
n Val
.07
Lengths:
6
Sta
500
3
Sta
509
Elev
351
n Val
.04
Left Channel
Sta
509
Right
36
Elev Sta Elev
352 539 360
Coeff Contr. Expan
476 509
CROSS SECTION
85 85 85 .1 .3
RIVER: RIVER-1
REACH: Reach-1 RS: 6.922
INPUT
Descript ion:
Stat ion Elevation Data
Sta Elev Sta
430 370 459
541 360 561
num=
Elev
360
370
7
Sta
475
Elev
352
Sta
500
Elev
350.7
Sta
525
Elev
352
Manning's n Values
Sta n Val
430 .04
num=
Sta n Val
459 .045
3
Sta
541
n Val
.04
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
459 541 72 52 33 .2 .4
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 6.913
INPUT
Description: This is a REPEATED section.
Station Elevation Data num= 5
Sta Elev Sta Elev Sta
5973.499 374.36007.944 350.36032.845
Elev Sta
350.36057.745
Elev Sta
350.36092.189
Elev
374.3
Manning's n Values
Sta n Val Sta
5973.499 .045973.499
num= 3
n Val Sta
.0356092.189
n Val
.04
Bank Sta: Left Right
5973.4996092.189
Lengths: Left Channel Right Coeff Contr. Expan.
85 85 85 .2 .4
BRIDGE
RIVER: RIVER-1
REACH: Reach-1 RS: 6.9045
INPUT
Description: Bridge #2
Distance from Upstream XS = .1
Deck/Roadway Width = 84.8
Weir Coefficient = 2.6
Upstream Deck/Roadway Coordinates
num= 2
Sta Hi Cord Lo Cord Sta Hi Cord Lo Cord
5973.499 374.1 368.16092.189 374.1 368.1
37
Upstream Bridge Cross Section Data
Station Elevation Data num= 5
Sta Elev Sta Elev Sta
5973.499 374.36007.944 350.36032.845
Elev Sta
350.36057.745
Elev Sta
350.36092.189
Elev
374.3
Manning's n Values
Sta n Val Sta
5973.499 .045973.499
num= 3
n Val Sta
.0356092.189
n Val
.04
Bank Sta: Left Right
5973.4996092.189
Coeff Contr.
.2
Expan.
.4
Downstream Deck/Roadway Coordinates
num= 2
Sta Hi Cord Lo Cord Sta Hi Cord Lo Cord
5973.499 374.1 368.16092.189 374.1 368.1
Downstream Bridge Cross Section Data
Station Elevation Data num= 5
Sta Elev Sta Elev Sta
5973.499 3746007.944 3506032.845
Manning's n Values
Sta n Val Sta
5973.499 .045973.499
num= 3
n Val Sta
.0356092.189
Elev Sta
3506057.745
n Val
.04
Elev Sta
3506092.189
Elev
374
Bank Sta: Left Right
5973.4996092.189
Coeff Contr.
.2
Expan.
.4
Upstream Embankment side slope = 0 horiz.
Downstream Embankment side slope = 0 horiz.
Maximum allowable submergence for weir flow = .95
EIevat i on at wh i ch we i r fIow beg i ns = 374
Energy head used in spillway design
Spillway height used in design
Weir crest shape = Broad Crested
to 1.0 vertical
to 1.0 vertical
Number of Piers = 2
Pier Data
Pier Station Upstream=5994.999
Upstream num= 2
Width Elev Width Elev
4 360 4 368
num= 2
Elev Width Elev
360 4 368
3
20
Downstream=5994.999
Downstream
Width
4
Debris Width =
Debr is Height =
Pier Data
Pier Station Upstream=
Upstream num= 2
Width Elev Width Elev
4 360 4 368
Downstream num= 2
6073 Downstream= 6073
38
Width Elev Width
4 360 4
Debris Width = 3
Debris Height = 20
Elev
368
Number of Bridge Coefficient Sets = 1
Low Flow Methods and Data
Energy
Selected Low Flow Methods = Energy
High Flow Method
Pressure and Weir flow
Submerged Inlet Cd
Submerged Inlet + Outlet Cd =.7738233
Max Low Cord = 367.7
Additional Bridge Parameters
Add Friction component to Momentum
Do not add Weight component to Momentum
Class B flow critical depth computations use critical depth
inside the bridge at the upstream end
Criteria to check for pressure flow = Upstream energy grade line
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 6.896
INPUT
Descr ipt ion:
Stat ion Elevat ion Data
Sta Elev Sta
5973.499 3746007.944
num= 5
Eiev Sta
3506032.845
Elev Sta
3506057.745
Elev Sta
3506092.189
Elev
374
Manning's n Values
Sta n Val Sta
5973.499 .045973.499
num= 3
n Val Sta
.0356092.189
n Val
.04
Bank Sta: Left Right
5973.4996092.189
Lengths: Left Channel Right Coeff Contr. Expan.
40 56 65 .2 .4
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 6.888
INPUT
Descript ion:
Stat ion Elevation Data
Sta Elev Sta
437 366 449
525 350 535
num=
Elev
360
354
10
Sta
470
558
Elev
349.5
356
Sta
500
565
Elev
349
358
Sta
520
592
Elev
349.5
368
Manning's n Values num=
39
Sta n Val
437 .04
Sta n Val
449 .045
Sta n Val
558 .04
Bank Sta: Left Right
449 558
Lengths: Left Channel Right Coeff Contr. Expan.
62 62 62 .2 .4
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 6.875
INPUT
Description:
Station Elevation Data num= 15
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
359 360 388 356 398 354 410 350 458 348
468 348.3 480 347.8 500 348 531 346.2 538 346.4
544 348 560 354 580 356 596 358 602 360
Manning's n Values num= 3
Sta n Val Sta n Val Sta n Val
359 .04 458 .06 544 .04
Bank Sta: Left Right Lengths: Left Channel
458 544 208 208
Ineffective Flow num= 1
Sta L Sta R Elev Permanent
359 430 360 F
Right
208
Coeff Contr.
.1
Expan.
.3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach- 1
INPUT
Descr ipt ion:
Stat ion Elevation Data
Sta
350
466
592
800
Mann i ng ' s
Bank
Sta
350
Sta:
Elev
365
346.7
357.5
365
Sta
360
500
620
n Values
n Val
.04
Left
466
Sta
466
Right
541
RS: 6.836
num=
Elev
360
345
360
num=
n Val
.05
Lengths:
16
Sta
370
515
665
3
Sta
541
Elev
355
345
361.2
n Val
.04
Left Channel
480 480
Sta
400
541
710
Right
480
Elev
350
350
362.5
Coeff
Sta
433
565
755
Contr.
.1
Elev
348.3
355
363.7
Expan
.3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 6.745
40
INPUT
Descript ion:
starion Elevat ion Data
Sta
230
339
527
688
Mann i ng ' s
Bank
Sta
230
Sta:
Elev
361
347.5
343
355
Sta
238
383
555
728
n Values
n Val
.04
Left
464
Sta
464
Right
527
num=
Elev
357
346.2
345
356.2
num=
n Val
.05
Lengths:
20
Sta
248
428
583
769
3
Sta
527
Elev
352
345
347.5
357.5
n Val
.04
Left Channel
450 410
Sta
250
464
611
809
Right
380
Elev
351
343
350
358.7
Coeff
Sta
294
500
649
850
Contr.
.1
Elev
348.7
341
352.5
360
Expan
.3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 6.667
INPUT
Description:
Stat ion Elevation Data
Sta
373
500
710
Manning's
Bank
Sta
373
Sta:
Elev
357.2
342.1
350
Sta
393
540
760
n Values
n Val
.04
Left
420
Sta
420
Right
470
num=
Elev
347.2
342.3
352
num=
n Val
.05
Lengths:
13
Sta
420
580
850
3
Sta
470
Elev
340
342.6
354
n Val
.04
Left Channel
400 360
Sta
450
620
Right
320
Elev
339
343.8
Coeff
Sta
470
660
Contr.
.1
Elev
340
345
Expan
.3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1
INPUT
Descript ion:
Stat ion Elevat ion Data
Sta
405
560
770
986
Mann i ng ' s
Sta
405
Elev
355
337.5
350
354.2
n Values
n Val
.04
Sta
437
590
813
1030
Sta
470
RS: 6.599
num=
Elev
345
340
350.8
355
num=
n Val
.05
17
Sta
470
636
856
3
Sta
530
Elev
335
341.7
351.7
n Val
.04
Sta
500
682
899
Elev
332
343.3
352.5
Sta
530
728
943
Elev
335
345
353.3
41
Bank Sta: Left Right
470 530
CROSS SECTION
Lengths: Left Channel Right Coeff Contr. Expan.
400 400 400 .1 .3
RIVER: RIVER-1
REACH: Reach-1
INPUT
Description:
RS: 6.523
Station Elevation Data
Sta
284
450
585
732
Manning's
Sta
284
Elev
351
331
335
352.5
n Values
n Val
.04
Sta
323
460
595
773
Sta
460
num=
Elev
342
330
340
353.7
num=
n Val
.05
18
Sta
345
500
640
815
3
Sta
525
Elev
340
328
345
355
n Val
.04
Sta
374
525
650
Elev
338
329
350
Sta
440
550
691
Elev
336
330
351.2
Bank Sta: Left Right
460 525
Lengths: Left Channel Right
330 350 370
Coeff Contr. Expan.
.1 .3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1
INPUT
Description:
Stat ion Elevation Data
Sta
152
340
475
630
Manning's
Bank
Sta
152
Sta:
Elev
350
334
334
342.5
Sta
180
383
500
675
n Values
n Val
.04
Left
340
Sta
340
Right
455
RS: 6.457
num=
Elev
344
332
334.5
345
num=
n Val
.05
Lengths:
18
Sta
200
420
530
695
3
Sta
455
Elev
342
331
335
350
n Val
.04
Left Channel
330 370
Sta
205
445
552
Right
410
Elev
340
332
336
Coeff
Sta
225
455
585
Contr.
.1
Elev
336
334
340
Expan
.3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 6.387
INPUT
Descr iption:
Station Elevation Data num=
Sta Elev Sta Elev
14
Sta Elev Sta
42
Elev Sta Elev
296
508
605
Mann i ng ' s
Bank
Sta
296
Sta:
342
324.8
338.3
409
511
640
n Values
n Val
.04
Left
469
Sta
469
Right
537
331.5
326.4
339.8
num=
n Val
.05
Lengths:
469
519
661
3
Sta
537
329.7
330.3
341.7
n Val
.04
Left Channel
235 235
471
537
691
Right
235
327
333
343
.7
.2
.6
Coeff
488
581
Contr.
.1
326.1
337.7
Expan
.3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1
INPUT
Descr ipt ion:
Stat ion Elevat ion Data
Sta
275
367
473
537
645
740
Manning's
Bank
Sta
275
Sta:
Elev
346
336
328.5
327.1
338.5
345.1
Sta
295
398
474
540
651
744
n Values
n Val
.04
Left
464
Sta
464
Right
537
RS: 6.342
num=
Elev
344
334
326.7
329.4
338.5
345.4
num=
n Val
.05
Lengths:
27
Sta
313
419
480
581
671
3
Sta
537
Elev
342
333
324.8
332.6
339.3
n Val
.04
Left Channel
195 195
Sta
327
442
502
608
681
Right
195
Elev
340
331.5
325.9
336
342.8
Coeff
Sta
345
464
511
636
705
Contr.
.1
Elev
338
330.4
327.4
338
344.1
Expan .
.3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 6.305
12
Sta
482
543
Elev
327.1
327.8
Sta
487
564
Elev
325.7
329.2
Sta
497
698
Elev
325.2
338
INPUT
Descript ion:
Station Elevation Data num=
Sta Elev Sta Elev
433 339 460 328.9
500 326.5 512 327.5
764 343.3 800 346
Manning's n Values num= 3
Sta n Val Sta n Val Sta n Val
433 .04 460 .05 543 .04
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
460 543 80 135 200 .1 .3
CROSS SECTION
43
RIVER: RIVER-1
REACH: Reach-1 RS: 6.28
INPUT
Description:
Stat ion Elevat ion Data
Sta
420
506
555
672
Manning's
Bank
Sta
420
Sta:
Elev
350
325.9
328.1
338
Sta
460
511
568
685
n Values
n Val
.04
Left
460
Sta
460
Right
535
num=
Elev
330
326.4
330
340
num=
n Val
.06
Lengths:
19
Sta
470
520
581
730
3
Sta
535
Elev
327.2
325.4
332
342
n Val
.04
Left Channel
20 90
Sta
478
535
615
762
Right
210
Elev
324.9
326.7
334
344
Coeff
Sta
498
547
652
Contr.
.1
Elev
323.2
327.5
336
Expan .
.3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 6.259
INPUT
Description: DOWNSTREAM FACE OF PROPOSED RSF BRIDGE
PROPOSED
CONDITIONS
DOWNSTREAM FACE OF PROPOSED RSF BRIDGE
Station Elevation Data num= 10
Sta Elev Sta Elev Sta Elev Sta
0 355.5 22.627 350 86.267 326 106.066
176.777 326 226.274 326 239.356 326 282.843
Elev Sta Elev
326 141.421 326
342.3299.106 348
Manning's n Values num= 3
Sta n Val Sta n Val Sta n Val
0 .04 22.627 .06 282.843 .04
Bank Sta: Left Right
22.627 282.843
Skew Angle = 45
BRIDGE
Lengths: Left Channel Right Coeff Contr. Expan.
200 200 200 .3 .5
RIVER: RIVER-1
REACH: Reach-1 RS: 6.24
INPUT
Description: Bridge #1
Distance from Upstream XS =
Deck/Roadway Width
Weir Coefficient
.1
199.8
3
44
Bridge Deck/Roadway Skew = 45
Upstream Deck/Roadway Coordinates
num= 6
Sta Hi Cord Lo Cord Sta Hi Cord Lo Cord
0 361.5 340 22.627 361.48 340
282.843 353.8 342.3 283.55 353.8 330
Sta Hi Cord Lo Cord
23.335 361.48 350
305.47 353.7 330
Upstream Bridge Cross Section Data
Station Elevation Data num= 10
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 355.5 22.627 350 86.267 326 106.066 326 141.421 326
176.777 326226.274 326239.356 326282.843 342.3299.106 348
Manning's n Values
Sta n Val Sta
0 .04 22.627
num= 3
n Val Sta
.06 282.843
n Val
.04
Bank Sta: Left Right
22.627 282.843
Skew Angle = 45
Coeff Contr.
.3
Expan.
.5
Downstream Deck/Roadway Coordinates
num= 6
Sta Hi Cord Lo Cord Sta Hi Cord Lo Cord
0 361.5 340 22.627 361.48 340
282.843 353.8 342.3 283.55 353.8 330
Sta Hi Cord Lo Cord
23.335 361.48 350
305.47 353.8 330
Downstream Bridge Cross Section Data
Station Elevation Data num= 10
Sta Elev Sta Elev Sta
0 355.5 22.627 350 86.267
176.777 326 226.274 326 239.356
Elev Sta Elev Sta Elev
326 106.066 326 141.421 326
326282.843 342.3299.106 348
Manning's n Values
Sta n Val Sta
0 .04 22.627
num= 3
n Val Sta
.06 282.843
n Val
.04
Bank Sta: Left Right
22.627 282.843
Skew Angle = 45
Coeff Contr.
.3
Expan.
.5
Upstream Embankment side slope = 0 horiz.
Downstream Embankment side slope = 0 horiz.
Maximum allowable submergence for weir flow = .95
Elevation at which weir flow begins = 342.5
Energy head used in spillway design =
Spillway height used in design =
Weir crest shape = Broad Crested
Number of Piers = 3
to 1.0 vertical
to 1.0 vert ical
Pier Data
Pier Station Upstream= 104.652
Upstream num= 2
Width Elev Width Elev
5 322 5 350
Downstream num= 2
Downstream= 104.652
45
Width Elev Width Elev
5 322 5 350
Debris Width = 3
Debris Height = 20
Pier Data
Pier Station Upstream= 193.747 Downstream= 193.747
Upstream num= 2
Width Elev Width Elev
5 322
Downstream num=
Width Elev
5 322
Debris Width =
Debris Height =
Pier Data
5
2
Width
5
3
20
Pier Station Upstream=
Upstream num=
Width Elev
5 327
Downstream num=
Width Elev
5 327
Debris Width =
Debris Height =
2
Width
5
2
Width
5
3
20
350
Elev
350
342.947
Elev
341
Elev
341
Downstream= 342.947
Number of Bridge Coefficient Sets = 1
Low Flow Methods and Data
Yarnell KVal = 1.1
Selected Low Flow Methods = Yarnell
High Flow Method
Pressure and Weir flow
Submerged Inlet Cd
Submerged Inlet + Outlet Cd =.6900656
Max Low Cord = 340
Additional Bridge Parameters
Add Friction component to Momentum
Do not add Weight component to Momentum
Class B flow critical depth computations use critical depth
inside the bridge at the upstream end
Criteria to check for pressure flow = Upstream energy grade line
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1 RS: 6.221
INPUT
Description: DOWNSTREAM FACE OF PROPOSED RSF BRIDGE
PROPOSED
CONDITIONS
DOWNSTREAM FACE OF PROPOSED RSF BRIDGE
46
Stat ion
176.
Sta
0
,777
Mann i ng '
Bank
Sta
0
Sta
Elevat ion
Elev
355.5
326
Data
22
226
Sta
.627
.274
s n Values
n Val
.04
: Left
22
Sta
.627
Right
22.627 282
num=
Elev
350
326
num=
n Val
.06
Lengths
.843
10
Sta
86.267
239.356
3
Sta
282.843
Elev
326
326
n Val
.04
: Left Channel
250 170
Sta
106.066
282.843
Right
110
Elev Sta
326 141.421
342.3 299.106
Coeff Contr.
.3
Elev
326
348
Expan .
.5
Skew Angle = 45
CROSS SECTION
RIVER: RlVER-1
REACH: Reach-1
INPUT
Descr ipt ion:
Stat ion Elevation Data
Sta
391
491
603
705
Mann i ng ' s
Bank
Sta
391
Sta:
Elev
348
324.2
327.1
334
Sta
413
499
604
732
n Values
n Val
.04
Left
451
Sta
451
Right
557
RS: 6.191
num=
Elev
341
325.2
327.2
336
num=
n Val
.08
Lengths:
18
Sta
451
520
612
760
3
Sta
557
Elev
325.9
323.8
328
338
n Val
.04
Left Channel
160 178
Sta
476
528
660
Right
190
Elev
324.6
325.4
330
Coeff
Sta
479
557
684
Contr.
.1
Elev
322.7
326.4
332
Expan
.3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1
INPUT
Descr ipt ion:
Stat ion Elevat ion Data
Sta
367
497
521
612
Manning's
Bank
Sta
367
Sta:
Elev
346
322
324.4
327.7
Sta
410
503
533
641
n Values
n Val
.04
Left
443
Sta
443
Right
556
RS: 6.157
num=
Elev
332
321.3
325.2
329.3
num=
n Val
.08
Lengths:
20
Sta
414
509
556
644
3
Sta
556
Elev
332.5
321.6
327
329.6
n Val
.04
Left Channel
180 210
Sta
443
510
587
671
Right
225
Elev
325
322.2
326.9
332
Coeff
Sta
466
516
601
787
Contr.
.1
Elev
324.2
322.4
327.1
334
Expan
.3
47
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1
INPUT
Description:
RS: 6.117
Stat ion Elevation Data
Sta
336
463
512
571
Manning's
Bank
Sta
336
Sta:
Elev
344
322.6
321.1
331
Sta
382
479
519
598
n Values
n Val
.04
Left
463
Sta
463
Right
543
num=
Elev
330
321.7
320.7
342
num=
n Val
.08
Lengths:
17
Sta
423
496
526
3
Sta
543
Elev
323.8
321
325.4
n Val
.04
Left Channel
180 180
Sta
428
503
543
Right
180
Elev
323.
319.
326,
.5
.8
,9
Coeff
Sta
449
510
557
Contr.
.1
Elev
323
320
326.9
Expan
.3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1
INPUT
Descr ipt ion:
Station Elevation Data
Sta
398
465
482
520
570
Mann i ng ' s
Bank
Sta
398
Sta:
Elev
340
319.1
317.8
318.6
332
Sta
411
467
486
523
577
n Values
n Val
.04
Left
454
Sta
454
Right
523
RS: 6.083
num=
Elev
330
316.9
317.9
320.1
333.8
num=
n Val
.06
Lengths:
24
Sta
440
472
488
537
592
3
Sta
523
Elev
322.7
317
319.1
319.7
333.8
n Val
.04
Left Channel
210 193
Sta
450
477
508
548
636
Right
175
Elev
321
319.5
320
319.4
344
Coeff
Sta
454
480
510
561
Contr.
.1
Elev
319.5
319.4
318.8
327
Expan
.3
CROSS SECTION
RIVER: RIVER-1
REACH: Reach-1
INPUT
Description:
Station Elevat ion Data
Sta Elev Sta
424 338 441
475 312.1 481
RS: 6.047
num=
Elev
330
312.2
17
Sta
448
485
Elev
327.9
313.6
Sta
460
511
Elev
318.7
313.3
Sta
469
526
Elev
314.6
314.3
48
555 330.4 558 331.1
623 328 644 340
559 327.4 571 328 590 327.8
Manning's n Values
Sta n Val
424 .04
num=
Sta n Val
460 .06
Bank Sta: Left Right Lengths:
460
SUMMARY OF MANNING1
River :RIVER-1
Reach
Reach- 1
Reach-1
Reach- 1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
526
S N VALUES
River Sta.
7.363
7.307
7.286
7.259
7.232
7.203
7.161
7.128
7.102
7.087
7.066
7.051
7.023
6.981
6.938
6.922
6.913
6.9045
6.896
6.888
6.875
6.836
6.745
6.667
6.599
6.523
6.457
6.387
6.342
6.305
6.28
6.259
6.24
6.221
6.191
6.157
6.117
6.083
6.047
3
Sta n Val
526 .04
Left Channel
250 350
n1
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
Bridge
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
Bridge
.04
.04
.04
.04
.04
.04
Right
450
n2
.07
.07
.07
.07
.07
.07
.07
.07
.07
.07
.07
.07
.07
.07
.07
.045
.035
.035
.045
.06
.05
.05
.05
.05
.05
.05
.05
.05
.05
.06
.06
.06
.08
.08
.08
.06
.06
Coeff Contr. Expan
.1 .3
n3
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
.04
49
SUMMARY OF REACH LENGTHS
River: RIVER-1
Reach River Sta.Left Channel Right
Reach- 1
Reach-1
Reach- 1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
7.363
7.307
7.286
7.259
7.232
7.203
7.161
7.128
7.102
7.087
7.066
7.051
7.023
6.981
6.938
6.922
6.913
6.9045
6.896
6.888
6.875
6.836
6.745
6.667
6.599
6.523
6.457
6.387
6.342
6.305
6.28
6.259
6.24
6.221
6.191
6.157
6.117
6.083
6.047
297
118
145
150
165
230
180
145
50
90
50
160
210
230
85
72
85
Br idge
40
62
208
480
450
400
400
330
330
235
195
80
20
200
Bridge
250
160
180
180
210
250
297
112
142
145
152
220
175
140
75
115
80
147
220
220
85
52
85
56
62
208
480
410
360
400
350
370
235
195
135
90
200
170
178
210
180
193
350
297
109
132
140
140
210
175
140
110
140
105
140
230
210
85
33
85
65
62
208
480
380
320
400
370
410
235
195
200
210
200
110
190
225
180
175
450
SUMMARY OF CONTRACTION AND EXPANSION COEFFICIENTS
River: RIVER-1
Reach
Reach-1
River Sta. Contr. Expan.
7.363 .1 .3
50
Reach- 1
Reach- 1
Reach- 1
Reach- 1
Reach- 1
Reach-1
Reach- 1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
Reach-1
7.307
7.286
7.259
7.232
7.203
7.161
7.128
7.102
7.087
7.066
7.051
7.023
6.981
6.938
6.922
6.913
6.9045
6.896
6.888
6.875
6.836
6.745
6.667
6.599
6.523
6.457
6.387
6.342
6.305
6.28
6.259
6.24
6.221
6.191
6.157
6.117
6.083
6.047
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.2
.2
Br idge
.2
.2
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.3
Br idge
.3
.1
.1
.1
.1
.1
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.4
.4
.4
.4
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.5
.5
.3
.3
.3
.3
.3
51
Profile Output Table - Standard Table 1
River Sta Plan
7.363 As-built
7.363 Pre-project
7.307 As-built
7.307 Pre-project
7.286 As-built
7.286 Pre-project
7.259 As-built
7.259 Pre-project
7.232 As-built
7.232 Pre-project
7.203 As-built
7.203 Pre-project
7.161 As-built
7.161 Pre-project
7.128 As-built
7.128 Pre-project
7.102 As-built
7.102 Pre-project
7.087 As-built
7.087 Pre-project
7.066 As-built
7.066 Pre-project
7.051 As-built
7.051 Pre-project
Q Total
(cfs)
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
Min Ch El
(ft)
423.20
423.20
421.20
421.20
420.90
420.90
419.50
419.50
416.60
416.60
409.40
409.40
392.00
392.00
375.90
375.80
372.00
373.00
371.70
371.70
368.00
369.10
366.00
366.00
W.S. Elev Grit W.S.
(ft) (ft)
436.14
436.20
434.63
434.71
434.40
434.35
431.48
431.49
426.74 426.74
426.73 426.73
419.68 419.68
420.71 420.71
404.10 404.10
404.11 404.11
381.71 381.71
381.99 381.65
381.53
381.66
379.51
379.84
379.33
378.60
377.67
377.67
E.G. Elev
(ft)
437.21
437.31
435.66
435.73
435.11
435.19
433.99
433.99
430.77
430.77
423.35
424.15
408.56
408.56
383.29
383.34
381.82
382.03
381.33
381.49
380.30
380.41
379.74
379.74
E.G. Slope
(ft/ft)
0.006182
0.006571
0.004403
0.004290
0.003719
0.004297
0.015113
0.015099
0.031456
0.031509
0.023320
0.020819
0.028339
0.028245
0.025888
0.020139
0.002524
0.003683
0.011531
0.009845
0.004848
0.009940
0.009746
0.009749
Vel Chnl
(ft/s)
8.08
8.20
7.68
7.61
6.89
7.38
12.83
12.83
16.21
16.22
15.16
15.16
17.22
17.20
10.49
9.60
4.27
4.76
8.80
8.37
7.00
9.04
10.33
10.33
Flow Area
(sq ft)
1579.27
1549.91
1609.32
1623.22
1930.74
1770.56
1024.34
1024.65
808.85
808.42
846.24
884.78
769.81
770.63
1305.66
1403.45
3018.53
2691.82
1259.73
1322.83
1703.94
1271.19
1144.88
1144.77
Top Width
(ft)
173.78
174.11
168.39
168.91
199.14
161.54
119.52
119.54
101.37
101.36
115.97
130.08
86.63
86.65
396.85
387.59
392.41
392.79
192.30
193.44
222.20
190.89
145.23
145.23
Froude # Chi
0.43
0.45
0.38
0.37
0.35
0.37
0.68
0.68
0.95
0.96
0.84
0.80
0.93
0.93
0.80
0.71
0.27
0.31
0.56
0.52
0.38
0.54
0.55
0.55
52
f.(V3 As-built 13000.00
'.023 Pre-project 13000.00
6-981 As-built 13000.00
b.981 Pre-project 13000.00
6.938 As-built 13000.00
b.938 Pre-project 13000.00
6- 922 As-built 13000.00
6.913 As-built
6.9045
6.896 As-built
6.888 As-built
13000.00
13000.00
13000.00
6. 875 As-built 13000.00
b-875 Pre-project 13000.00
6.836 As-built 1300000
6.836 Pre-project 13000.00
6-745 As-built 130oo.OO
o. '45 Pre-project 13000.00
6. 667 As-built 13000.00
6.667 Pre-project 13000.00
6.599 As-built 13000.00
b.599 Pre-project 13000.00
6.523 As-built 1300000
6.523 Pre-project 13000.00
6.457 As-built 13000.00
6.457 Pre-project 13000.00
365.00
365.00
359.00
359.00
351.00
351.00
350.70
350.30
350.00
349.00
346.20
346.20
345.00
345.00
341.00
341.00
339.00
339.00
332.00
332.00
328.00
328.00
331.00
331.00
377.95
377.95
374.53
374.54
365.22
363.98
365.07
3fi4 RflWL'*T . OO
Bridge
361.40
35Q 4^*-J>JC7 . *rO
356.88
357.00
353.72
353.73
350.55
350.60
347.48
347.49
342.91
342.92
341.27
342.20
340.63
341.79
378.57 0.002853
378.57 0.002854
37453 377.23 0.012294
374.54 377.23 0.012275
?S'o« 368'65 °-014403363-98 368.10 0.020275
367.63
361.70 367.35
O O i Ar\ f^nnoDl.40 366.01
359.45 363.11
355.09 358.98
358.37
353.72 356.47
353.63 356.14
351.58
351.61
348.79
348.83
342.91 345.41
342.92 345.41
342.00
342.60
341 . 12
342.13
0.006048
0.003976
0.009651
0.014826
0.009315
0.007922
0.015247
0.013737
0.006025
0.005847
0.007677
0.007889
0.011966
0.011943
0.002224
0.001201
0.002366
0.001378
6-04 2068.60
6-04 2068.43
14-31 1036.09
14.30 1036.64
14.58 877.74
16.24 799.15
12.99
12.61
17.24
15.42
10.62
8.47
13.96
13.26
9.63
9.53
10.39
10.54
14.44
14.43
7.53
5.80
5.98
4.98
1039.26
1030.74
753.85
854.67
1174.69
1425.66
990.82
1076.24
1659.26
1677.60
1434.27
1440.62
1108.54
1109.40
1998.56
2649.91
2344.26
2814.15
217.64
217.64
169.00
169.00
95.56
96.87
106.85
91.64
82.51
118.83
205.36
207.22
181.17
218.09
360.73
362.47
292.36
313.36
226.93
227.05
275.43
344.40
393.00
416.79
0.30
0.30
0.65
0.65
0.69
0.81
0.66
0.66
1.01
0.98
0.61
0.48
0.90
0.85
0.58
0.57
0.65
0.66
0.83
0.83
0.38
0.28
0.36
0.28
53
6.387 As-built
6.387 Pre-project
6-342 As-built
6.342 Pre-project
6.305 As-built
6.305 Pre-project
6.28 As-built
6.28 Pre-project
6.26 Pre-project
6.259 As-built
6.259 Pre-project
6.24
6.221 As-built
6.221 Pre-project
6.191 As-built
6.191 Pre-project
6. 157 As-bui It
6.157 Pre-project
6.117 As-built
6.117 Pre-project
6.083 As-built
6.083 Pre-project
6.047 As-built
6.047 Pre-project
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
13000.00
324.80
324.80
324.80
324.80
325.20
325.20
323.20
325.80
325.80
326.00
325.70
326.00
321.80
322.70
322.70
321.30
321.30
319.80
319.80
316.90
316.90
312.10
312.10
339.16
341.09
338.46
340.85
337.62
340.56
335.86
340.09
339.50
335.70
339.65
Bridge
335.53
335.10
334.85
334.85
334.02
334.02
330.88
330.88
329.13
329. 13
324.50
324.50
333.76
333.76
331.84
335.18
335.10
324.07
324.08
340.06
341.59
339.28
341.24
338.59
341.00
337.61
340.74
340.30
336.58
340.06
336.43
338.68
335.54
335.54
334.63
334.63
332.86
332.86
330.97
330.97
328.47
328.47
0.003387
0.001552
0.003068
0.001172
0.003860
0.001270
0.009749
0.001805
0.002302
0.005407
0.002128
0.005765
0.030752
0.004385
0.004385
0.005407
0.005403
0.013155
0.013155
0.008248
0.008248
0.019002
0.019002
8.47
6.38
8.36
5.84
8.74
5.92
11.34
7.35
8.07
7.49
4.35
7.65
15.31
5.64
5.64
6.32
6.32
8.71
8.71
10.29
10.29
16.30
16.30
1792.15
2423.35
1898.92
2706.76
1694.99
2510.47
1247.51
2261.13
2049.79
1736.21
2622.66
1699.77
859.14
2006.06
2006.15
2067.66
2068.07
1234.25
1234.25
1212.49
1212.49
821.49
821.49
298.39
348.52
303.46
354.37
255.58
296.88
201.08
434.14
409.53
204.71
353.94
203.77
120.47
287.97
287.98
383.20
383.20
191.48
191.48
150.35
150.35
91.94
91.94
0.45
0.31
0.43
0.27
0.48
0.29
0.63
0.34
0.39
0.45
0.22
0.47
0.83
0.32
0.32
0.35
0.35
0.53
0.53
0.57
0.57
0.88
0.88
54