Loading...
HomeMy WebLinkAbout66061; Kelly Drive Channel Repairs; Kelly Drive Channel Hydrology Study; 2007-09-17KELLY DRIVE CHANNEL MAINTENANCE PROJECT PRELIMINARY ALTERNATIVE ANALYSIS Job Number 15369 September 17,2007 KELLY DRIVE CHANNEL MAINTENANCE PROJECT PRELIMINARY ALTERNATIVE ANALYSIS Job Number 15369 R.C.E. # 32838 Exp. 06/08 PREPARED FOR: City of Carlsbad 1635 Faraday Avenue Carlsbad, California 92008 PREPARED BY: Rick Engineering Company Water Resources Department 5620 Friars Road San Diego, California 921 10-2596 (619) 291 -0707 September 17,2007 Table of Contents Project Description ............................................................................................................... 1 Hydraulic Methodology ....................................................................................................... 2 ..................... ................................................ Table 1: 6-hr Precipitation Summary .. 2 Existing Condition (No Action Alternative) ....................................................................... 4 . . ......................................................................................................................... Descnptlon 4 . . ........................................................................................................... Antlc~pated Impacts 4 .... Table 2: Existing Condition (No Action Alternative) Anticipated Impact Summary 4 HEC-RAS Results .............................................................................................................. 6 Table 3: Existing Condition WSEL Summary for the 100-year and 2-year Storm Event ....................................... ; ................................................................................. 6 . . Ant~cipated Benefits ........................................................................................................... 6 Opinion of Probable Cost ................................................................................................... 6 Alternative A . Restore Earthen and Concrete Channel to Construction Plans ........... 7 . . Descript~on ........................... .. ............................................................................................. 7 . . Ant~cipated Impacts ............................................................................................................ 7 .................................................... Table 4: Alternative A Anticipated Impact Summary 8 ................................................ ............................................................. HEC-RAS Results ; 8 ...... Table 5: Alternative A WSEL Summary for the 100-year and 2-year Storm Event 9 . . Antlc~pated Benefits ........................................................................................................... 9 . . Oplnion of Probable Cost ................................................................................... 10 Table 6: Alternative A . Opinion of Probable Cost Summary ..................................... 10 Alternative B -Restore Earthen Channel North of Concrete Channel Entrance to Construction Plans ..................................................................................... 11 . . Descr~ptlon ..................................................................................................................... 11 . . .......................................................................................................... Anticipated Impacts 11 .................................................. Table 7: Alternative B Anticipated Impact Summary 12 HEC-RAS Results ......................................................................................................... 12 Table 8: Alternative B WSEL Summary for the 100-year and 2-year Storm Event .... 13 . . Ant~c~pated Benefits ........................................................................................................ 13 . . Opin~on of Probable Cost ................................................................................................ 14 Table 9: Alternative B - Opinion of Probable Cost Summary ..................................... 14 Alternative C . Maintained Concrete Channel with Earthen Low-Flow Channel along Western Slope Protection (Preferred Alternative) .................................. 15 . . Description ........................................................................................................................ 15 ......................................................................................................... Anticipated Impacts 15 ................................................ Table 10: Alternative C Anticipated Impact Summary 16 HEC-RAS Results ............................................................................................................ 16 Table 11 : Alternative C WSEL Summary for the 100-year and 2-year Storm Event .. 17 Prepared By: DCB.HM.ns/Reportll5369.001 Rick Engineering Company . Water Resources Division 9-17-07 . . Antlc~pated Benefits 17 Opinion of Probable Cost 18 Table 12: Alternative C . Opinion of Probable Cost Summary ................................... 18 .......... Alternative D . Maintained Concrete Channel and Replaced Slope Protection 19 . . Descr~pt~on ........................................................................................................................ 19 . . Ant~c~pated Impacts .......................................................................................................... 20 Table 13: Alternative D Anticipated Impact Summary ................................................ 20 HEC-RAS Results ........................................................................................................... 21 Table 14: Alternative D WSEL Summary for the 100-year and 2-year Storm Event .. 21 . . ................................................................. Ant~c~pated Benefits .................................... .... 21 Opinion of Probable Cost ............................................................................................... 22 Table 15: Alternative D - Opinion of Probable Cost Summary ................................... 22 Alternative E . Proposed LeveelFloodwall along Kelly Drive Channel ........................ 23 . . Descr~pt~on .............................. 1 ......................................................................................... 23 . . Ant~c~pated Impacts .......................................................................................................... 24 Table 16: Alternative E Anticipated Impact Summary ................................................ 24 HEC-RAS Results ............................................................................................................ 25 Table 17: Altemative E WSEL Summary for the 100-year and 2-year Storm Event .. 25 . . Antlc~pated Benefits ........................................................................................................ 26 Opinion of Probable Cost ............................................................................................... 26 Table 18: Alternative E - Opinion of Probable Cost Summary ................................... 26 Alternative F . Proposed Diversion Culvert under Kelly Drive .................................... 27 . . Descr~pt~on ........................................................................................................................ 27 . . ......................................................................................................... Ant~c~pated Impacts 28 Table 19: Alternative F Anticipated Impact Summary ................................................. 28 HEC-RAS Results ............................................................................................................ 29 Table 20: Alternative F WSEL Summary for the 100-year (Diverted) Storm Event ... 30 . . Ant~c~pated Benefits ......................................................................................................... 30 Opinion of Probable Cost ................................................................................................. 31 Table 21: Alternative F - Opinion of Probable Cost Summary .............................. ..... 31 Summary .................................................................................................................... i ........ 32 Table 22: Anticipated Impact and Anticipated Benefit Comparison Chart .................. 33 Future Considerations ........................................................................................................ 34 Prepared By: DCB.HM.ns/Reportll5369.001 Rick Engineering Company . Water Resources Division 9-17-07 .- List of en end ices Appendix 1 -Vicinity Map Appendix 2 -Reduced Hard Copies of Construction Plans for Kelly Drive Channel Appendix 3 -Kelly Drive Channel Maintenance Project Existing Condition (No Action Alternative) Kelly Drive Channel Maintenance Project Alternative A HEC-RAS Workmap - Restore Earthen and Concrete Channel to Construction Plans Kelly Drive Channel Maintenance Project Alternative B HEC-RAS Workmap - Restore Earthen Channel North of concrete Channel Entrance to Construction Plans Kelly Drive Channel Maintenance Project Alternative C HEC-RAS Workmap - Maintained Concrete Channel with Earthen Low Flow Channel along Western Slope Protection (Preferred Alternative) Kelly Drive Channel Maintenance Project Alternative D HEC-RAS Workmap - Maintained Concrete Channel and Replaced Slope Protection Kelly Drive Channel Maintenance Project Alternative E HEC-RAS Workmap - Proposed Levee along Kelly Drive Channel Kelly Drive Channel Maintenance Project Alternative F HEC-RAS Workmap - Proposed Diversion Culvert under Kelly Drive Appendix 4 -Existing Condition HEC-RAS Model Summary and Output (On enclosed CD) Appendix 5 - Alternative A HEC-RAS Model Summary and Output (On enclosed CD) Appendix 6 -Alternative B HEC-RAS Model Summary and Output (On enclosed CD) Appendix 7 - Alternative C HEC-RAS Model Summary and Output (On enclosed CD) Appendix 8 - Alternative D HEC-RAS Model Summary and Output (On enclosed CD) Appendix 9 -Alternative E HEC-RAS Model Summary and Output (On enclosed CD) Appendix 10 -Alternative F HEC-RAS Model Summary and Output (On enclosed CD) Appendix 11 -Alternative F WSPGW Model Summary and Output (On enclosed CD) Prepared By: DCB:HM:nslRepori/l5369.001 Rick Engineering Company - Water Resources Division 9-17-07 Project Description This document provides preliminary alternatives analyses for the proposed Kelly Drive Channel Maintenance Project. The proposed project location is east of, and parallel to, Kelly Drive. Kelly Drive is bounded by El Camino Real to the north and Park Drive to the south, and is within the City of Carlsbad, California. The existing Kelly Drive Channel outlets into the Agua Hedionda Lagoon downstream of Park Drive. Refer to the exhibit titled Vicinifv Mar, located in Appendix 1 for the project location and approximate project limits. Between El Camino Real and Park Drive, the existing Kelly Drive Channel consists of approximately 1100 linear feet of earthen channel and approximately 950 linear feet of concrete channel. The existing concrete channel begins at the upstream face of Park Drive. The earthen channel begins approximately 950 feet upstream of Park Drive and extends upstream to the downstream face of El Camino Real. Portions of the slope along the western channel bank is lined with concrete to protect existing properties and structures along Kelly Drive. The concrete channel in its current condition is in fair condition with some accumulated sediment and vegetation. The existing earthen channel contains accumulated sediment and vegetation. Concrete slope protection failure along a portion of western earthen channel bank and riprap slope protection failure at the entrance to the concrete channel has occurred since construction of the channel circa the early 1970s. The accumulated sediment as well as the slope protection failure is threatening the private properties and residences adjacent to the channel with potential for both flooding and erosion. The main purpose of the Kelly Drive Maintenance Project is to restore the channel's flood conveyance capacity, and maintain and replace the concrete and riprap slope protection, which has failed along the western side of the earthen channel, and at the entrance to the concrete channel. The objective of this alternative analysis is to assess the flood control benefits, identify potential project footprint, and to assist with determining the potential environmental impacts for - - Prepared By: Rick Engineering Company - Water Resources Division 1 9-1 7-07 this project. Opinions of probable cost for each channel maintenance alternative has also been included. All calculated flood control benefits, potential project footprint, and opinions of probable cost are approximate and based on preliminary design. Results are subject to change during final design of the selected alternative. Hydraulic Metlrodology The U.S. Army Corps of Engineers' Hydraulic Engineering Center River Analysis System (HEC-RAS)(Version 3.1.3) was used to prepare the open channel hydraulic models for Kelly Drive Channel within the study limits. HEC-RAS calculates water surface elevations (WSELs) and velocities for natural or engineered channels in supercritical and subcritical flow regimes. HEC-RAS models existing and proposed hydraulic structures such as culverts and bridges. Each proposed maintenance alternative models both the 2-year and 100-year flow rates. 100- year flow rates through all of the Kelly Drive Channel hydraulic models are based on flow rates from the GIs Based Master Drainage Plan (MDP) for the City of Carlsbad (dated May 4, 2005), prepared by Rick Engineering Company. Flow rates for the 2-year storm event are estimated as a percentage of the MDP discharges based on the ratio of the 2-year and 100-year 6-hour Precipitation Isopluvials from the 2003 San Diego County Hydrology Manual. Table I: 6-lrr Precipitation Summary Storm Event Rainfall Depth (in) 2-year 100-year There are locations along the Kelly Drive Channel where the flow rates, change within the channel, due to outlets from a brow ditch or storm drain. Seven HEC-RAS hydraulic analyses were prepared for this alternative analysis. Each of the HEC-RAS models extends for approximately 830 linear feet downstream of Park Drive and approximately 560 linear feet upstream of El Camino Real. No maintenance activities are Prepared By: Rick Engineering Company - Water Resources Division 2 9-17-07 proposed upstream of El Camino Real or downstream of Park Drive. The following channel maintenance alternatives are analyzed in this report. Existing Condition (No Action Alternative) A) Restore Earthen and Concrete Channel to Construction Plans B) Restore Earthen Channel North of Concrete Channel Entrance to Construction Plans C) Maintained Concrete Channel with Earthen Low Flow Channel along Slope Protection (Preferred Alternative) D) Maintained Concrete Channel and Replaced Slope Protection E) Proposed Levee/Floodwall Along Kelly Drive F) Proposed Diversion Culvert under Kelly Drive A detailed description of each alternative is included in subsequent sections. Prepared By: Rick Engineering Company - Water Resources Division 3 Existing Condition (no Action Alternative) Description The existing condition HEC-RAS hydraulic analysis is based on available city wide topography obtained from the City of Carlsbad (dated 2005) and additional project specific topography prepared by Melchoir Land Surveying Inc. (dated 2007). Existing culvert information, channel geometry, and alignments are based on the following plan sets obtained from the City of Carlsbad. 8 Plan and Profiles for Street Improvements Storm Drain and Water - Laguna Riviera Unit No. 1, City of Carlsbad (Dwg. 152-8 Sheet 1 through 6)(Proj. 67-3) Approved March 21, 1967 Grading Plan - Laguna Riviera Tract Unit No. 1, City of Carlsbad @wg. B-4-1 Sheet 1 of 2)(Job 1-67) Dated March 21, 1967 Plan and Profiles for Street Improvements Storm Drain and Water - Laguna Riviera Unit No. 3, City of Carlsbad (Dwg. 157-4 Sheet 1 through 3)Proj. 68-18) Approved October 25, 1968 El Camino Real - Road Survey 1800-1 As-built (County of San Diego ~~1800- l)(Sht. 42 of 128) As Built Date December 13, 1971 Refer to Appendix 2 for reduced scale hard copies of the plan sets listed above. Anticipated Impacts The following table summarizes the anticipated impacts associated with the Existing Condition (No Action Alternative). All quantities are estimates, and are subject to change with more detailed future studies. Table 2: Existing Condition (No Action Alternative) Anticipated Impact Summary Prepared By: DCB:HM:ns/Report/l5369.001 Rick Engineering Company - Water Resources D~vision 4 9-17-07 Approximate Limits of Impact Approximate Impact Footprint (sq. ft.) Estimated Export Quantity (cubic yards) NIA NIA NIA The hydraulic analyses indicate Park Drive is subject to overtopping and flooding with flow depths of approximately 1.5 feet during the 100-year storm, and approximately 0.5 feet during the 2-year storm. The hydraulic analyses indicate El Camino Real is subject to overtopping and flooding with flow depths of approximatelyl.2 feet during the 100-year storm, and approximately 0.5 feet during the 2-year storm. A portion of Kelly Drive between Park Drive and Hillside Drive is subject to flooding with flow depths of approximately 2.0 feet for the 100-year storm, and 1.0 feet for the 2-year storm. Approximately 14 properties along Kelly Drive could be subject to flooding during the 100- year storm. Accumulated sediment, debris, and vegetation within the earthen channel results in increased flooding potential to properties and structures adjacent to the concrete slope protection along the western earthen channel bank. Private properties along the western earthen channel bank could be subject to erosion due to the failed concrete slope protection along the western earthen channel bank and failed riprap at the entrance to the concrete chamel. Prepared By: Rick Engineering Company - Water Resources Division 5 HEC-RAS Results Water surface elevations for the 100-year and 2-year storm event are summarized below. The existing condition will be the basis of comparison for each maintenance alternative. Refer to the exhibit titled Kellv Drive Channel Maintenance Project Existina Condition HEC- RAS Workmap located in Appendix 3 for the 100-year and 2-year floodplain and profile for the Existing Condition vo Action Alternative). Table 3: Existing Condition WSEL Summary for the 100-year and 2-year Storm Event Anticipated Benefits No impact to existing wildlife or vegetation habitats within the Kelly Drive Channel. Opinion of Probable Cost There are no anticipated construction costs associated with the Existing Condition (No Action Alternative) Prepared By: Rick EngineeriFg Company - Water Resources Division 6 Alternative A -Restore Earthen and Concrete Channel to Construction Plans Description Alternative A proposes to maintain the Kelly Drive Channel, between the upstream face of Park Drive and the downstream face of El Camino Real, to the original channel design shown on the construction plans. Horizontal alignment, vertical alignment, and channel geometry are based on information found on the construction plans listed previously, and included in Appendix 2. The existing concrete channel would be maintained by removing accumulated sediment and vegetation, and restoring the concrete channel flowline to the original channel design. The original concrete channel design is a trapezoidal channel with a 5'-6" bottom width and 1.5:l (H:V) side slopes. The earthen portion of the channel would be maintained by removing the accumulated sediment and vegetation, and restoring the channel flowline, and geometry to the original channel design. The original earthen channel design is a trapezoidal channel with an approximate bottom with of 43' and a varying side slope from 1.5:l (H:V) to 2:l (H:V). Concrete slope protection along the western channel bank as well as riprap slope protection at the entrance to the concrete channel would be replaced per the original construction plans. Anticipated Impacts The following table summarizes the anticipated impacts associated with Alternative A. All quantities are estimates, and are subject to change with more detailed future studies. Prepared By: Rick Engineering Company - Water Resources Division 7 Table 4: Alternative A Anticipated Impact Summary The hydraulic analyses indicate Park Drive will remain subject to overtopping and flooding with flow depths of approximately 115 feet during the 100-year storm, and approximately 0.4 feet during the 2-year storm. a The hydraulic analyses indicate El Camino Real will remain subject to overtopping and flooding with flow depths of approximatelyl.3 feet during the 100-year storm, and approximately 0.5 feet during the 2-year storm. a A portion of Kelly Drive between Park Drive and Hillside Drive will remain subject to flooding with flow depths of approximately 2.0 feet for the 100-year storm. Approximately 1 property along Kelly Drive is could be subject to flooding during the 100- year storm. a Proposed channel maintenance within Kelly Drive channel may require processing through environmental resource agencies and the California Coastal Commission. Approximate Limits of Impact Approximate Impact Footprint Estimated Export Quantity HEC-RAS Results Water surface elevations for the 100-year and 2-year storm event are summarized below. 2050 linear feet 2.3 acres 9500 cubic yards Refer to the exhibit titled Kellv Drive Maintenance Project Alternulive A HEC-RAS Workrnau located in Appendix 3 for the approximate 100-year and 2-year floodplain and profile for Alternative A, Existing Condition (No Action Alternative) 100-year floodplain, and proposed grading. - -- - - Prepared By: Rick Engineering Company - Water Resources Division 8 Table 5: Afternative A WSEL Summary for the 100-year and 2-year Storm Event Anticipated Benefits The removal of accumulated sediment, debris, and vegetation within the earthen and concrete channels result in a decrease in flooding potential to properties and structures adjacent to the concrete slope protection along the western earthen channel bank. Approximately 13 of the 14 properties currently subject to flooding along Kelly Drive would be removed from the 100-year floodplain limits. WSELs decrease up to 4.7 feet within the Kelly Drive Channel between the upstream face of Park Drive and the downstream face of El Camino Real during the 100-year storm. Kelly Drive would no longer be subject to'flooding during the 2-year stonn. Replacing the concrete slope protection along the western earthen channel bank would reduce the potential for erosion to the properties along Kelly Drive. Prepared By: DCB:HM:ns/Report/l5369.001 Rick Engineering Company - Water Resources Division 9 9-17-07 Opinion of Probable Cost Preliminary opinion of probable construction cost provided within this alternative analysis is approximate and is based on preliminary channel design. This estimate is based on unit costs from the San Diego Unit Price List (2006). Opinion of probable cost may be subject to change during final design. Table 6: Alternative A - Opinion of Probable Cost Summary BOND ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL COST Clearing & Grubbing AC 2.3 $20,000.00 $46,000 Excavate and Export Sediment CY 9500 $16.50 $1 56,750 Remove Concrete Slope Protection CY 80 $135.00 $10,800 114 Ton Rip-Rap CY 100 $60.00 $6,000 Concrete Slope Protection LF 640 $325.00 $208,000 Traffic Control LS 1 $20,000.00 $20,000 SUBTOTAL $447,550 10% Mobilization $44,760 20% Contingency $89,510 TOTAL $582,000 * Based on City of San Diego Unit Price List, January 2006 Prepared By: Rick Engineering Company - Water Resources Division 10 Alternative B - Restore Earthen Channel North of Concrete Channel Entrance to Construction Plans Description Alternative B proposes to maintain the earthen channel and slope protection between the entrance to the concrete channel to the downstream face of El Camino Real to the original channel design shown on the construction plans listed previously, and included in Appendix 2. Restoring the riprap slope protection at the concrete channel entrance is also proposed. Horizontal alignment, vertical alignment, and channel geometry are based on information found on the construction plans listed previously. The earthen portion of the channel would be maintained by removing accumulated sediment and vegetation restoring the channel flowline to the original channel design. The original earthen channel design is a trapezoidal channel with an approximate bottom width of 43' and a varying side slope from 1.5: 1 (H:V) to 2: 1 (H:V) Concrete slope protection along the western channel bank as well as riprap slope protection at the entrance to the concrete channel would be replaced per the original construction plans. The existing concrete channel would remain in its current condition. Anticipated Impacts The following table summarizes the anticipated impacts associated with Alternative B. All quantities are estimates, and are subject to change with more detailed future studies. Prepared By: Rick Engineering Company- Water Resources Division 1 1 Table 7: Alternative B Anticipated Impact Summary The hydraulic analyses indicate Park Drive will remain subject to overtopping and flooding with flow depths of approximately 1.5 feet during the 100-year storm, and approximately 0.4 feet during the 2-year storm. The hydraulic analyses indicate El Camino Real will remain subject to overtopping and flooding with flow depths of approximatelyl.3 feet during the 100-year storm, and approximately 0.5 feet during the 2-year storm. A portion of Kelly Drive between Park Drive and Hillside Drive will remain subject to flooding with flow depths of approximately 2.0 feet for the 100-year storm, and 1.0 feet for the 2-year storm. Approximately 5 properties along Kelly Drive could remain subject to flooding during the 100-year storm. Proposed channel maintenance within Kelly Drive channel may require processing through environmental resource agencies and the California Coastal Commission. Approximate Limits of Impact Approximate Impact Footprint Estimated Export Quantity HEC-RAS Results Water surface elevations for the 100-year and 2-year storm event are summarized below. 1 160 linear feet 1.7 acres 9300 cubic yards Refer to the exhibit titled KeNv Drive Maintenance Project Alternative B HEC-RAS Workmaa located in Appendix 3 for the approximate 100-year and 2-year floodplain and profile for Alternative B compared to the Existing Condition (No Action Alternative) 100-year floodplain, and proposed grading. Prepared By: Kick Engineering Company - Water Resources Division 12 Table 8: Alternative B WSEL Summary for the 100-year and 2-year Storm Event Anticipated Benefits a The removal of accumulated sediment, debris, and vegetation within the earthen channel results in a decrease in flooding potential to properties and structures adjacent to the concrete slope protection along the western earthen channel bank. a Approximately 9 of the 14 properties currently subject to flooding along Kelly Drive would be removed from the 100-year floodplain limits. WSELs decrease up to 4.7 feet within the Kelly Drive Channel between the upstream face of Park Drive and the downstream face of El Camino Real during the 100-year storm. Replacing the concrete slope protection along the western earthen channel bank would reduce the potential for erosion to the properties along Kelly Drive. Prepared By: DCB:HM:ns/Repon/l5369.001 Rick Engineering Company - Water Resources Division 13 9-17-07 Opinion of Probable Cost Preliminary opinion of probable construction cost provided within this alternative analysis is approximate and is based on preliminary channel design. This opinion of probable cost is based on unit costs from the San Diego Unit Price List (2006). Opinion of probable cost may be subject to change during final design. Table 9: Alternative B - Opinion of Probable Cost Summary * Based on City of San Diego Unit Price List, January 2006 Prepared By: DCB:HM:ns/Reportll5369.001 Rick Engineering Company - Water Resources Division 14 9-17-07 Alternative C - Maintained Concrete Channel with Earthen Low-Flow Channel along Western Slope Protection (Preferred Alternative) Description Alternative C proposes to maintain the concrete channel located upstream of Park Drive by removing accumulated sediment and debris, and replacing the riprap slope protection at the concrete channel entrance to the original channel design shown on the construction plans listed previously, and included in Appendix 2. A portion of the earthen channel would also be maintained upstream of the concrete channel entrance (approximately HEC-RAS cross-section 2010) and adjacent to the concrete slope protection located along the western bank (approximately HEC-RAS cross-section 2580). The concrete channel would be maintained by removing accumulated sediment and vegetation, restoring the concrete channel flowline to the original channel design. The original concrete channel design is a trapezoidal channel with a 5'4" bottom width and 1.5:l (H:V) side slopes. A proposed low-flow earthen channel is proposed in this alternative which involves removing a portion of the accumulated sediment located upstream of the concrete channel to improve drainage. The proposed low-flow earthen channel would be aligned adjacent to the western slope protection, with an approximate bottom width of 20' and a 1.5:l (H:V) side slopes. The proposed low-flow channel begins at the concrete channel entrance and extends upstream at approximately 2% and daylights with the existing ground approximately 5 10 linear feet upstream of the concrete channel entrance. Concrete slope protection along the western channel bank as well as riprap slope protection at the entrance to the concrete channel would be replaced per the original construction plans. Anticipated Impacts The following table summarizes the anticipated impacts associated with Alternative C. All quantities are estimates, and are subject to change with more detailed future studies. Prepared By: DCB:HM:nslReport/l5369.001 Rick Engineering Company - Water Resources Division 15 9-17-07 Table 10: Alternative CAnticipated Impact Summary Approximate Limits of Impact Approximate Impact Footprint The hydraulic analyses indicate Park Drive will remain subject to overtopping and flooding with flow depths of approximately 1.5 feet during the 100-year storm, and approximately 0.4 feet during the 2-year storm. The hydraulic analyses indicate El Camino Real will remain subject to overtopping and flooding with flow depths of approximatelyl.2 feet during the 100-year storm, and approximately 0.5 feet during the 2-year storm. A portion of Kelly Drive between Park Drive and Hillside Drive will remain subject to flooding with flow depths of approximately 2.0 feet for the 100-year storm. Approximately 7 properties along Kelly Drive could remain subject to flooding during the 100-year storm. . Proposed channel maintenance within Kelly Drive channel may require processing through environmental resource agencies and the California Coastal Commission. 1540 linear feet 1.2 acres Estimated Export Quantity HEC-RAS Results Water surface elevations for the 100-year and 2-year storm event are summarized below. 1700 cubic yards Refer to the exhibit titled Kellv Drive Maintenonce Project Alternative C HEC-RAS Workmar, located in Appendix 3 for the approximate 100-year and 2-year floodplain and profile for Alternative C compared to the Existing Condition (No Action Alternative) 100-year floodplain, and proposed grading. ~ - Prepared By: Rick Engineering Company - Water Resources Division 16 9-17-07 Table 11: Alternative C WSEL Summary for the 100-year and 2-year Storm Event Anticipated Benefits The removal of accumulated sediment, debris, and vegetation within a portion of the earthen and concrete channel results in a decrease in flooding potential to properties and structures adjacent to the concrete slope protection along the western earthen channel bank. Approximately 7 of the 14 properties currently subject to flooding along Kelly Drive would be removed from the 100-year floodplain limits. WSELs decrease up to 1.6 feet within the Kelly Drive Channel between the upstream face of Park Drive and the downstream face of El Camino Real during the 100-year storm. w Kelly Drive would no longer be subject to flooding during the 2-year stom. Prepared By: DCB:HM:nsReport/l5369.001 Rick Engineering Company - Water Resources Division 1 7 9-17-07 Replacing the concrete slope protection along the western earthen channel bank would reduce the potential for erosion to the properties along Kelly Drive. Opinion of Probable Cost Preliminary opinion of probable construction cost provided within this alternative analysis is approximate and is based on preliminary channel design. This opinion of probable cost is based on unit costs from the San Diego Unit Price List (2006). Opinio'n of probable cost may be subject to change during final design. Table 12: Alternative C- Opinion of Probable Cost Summary * Based on City of San Diego Unit Price List, January 2006 Prepared By: Rick Engineering Company - Water Resources Division 18 Alternative D -Maintained Concrete Channel and Replaced Slope Protection Description Alternative D proposes to maintain the concrete channel located upstream of Park Drive to remove accumulated sediment and debris, and replace the riprap slope protection at the concrete channel entrance to the original charinel design shown on the construction plans listed previously, and included in Appendix 2. The slope protection along the western channel bank upstream of the concrete channel entrance would also be replaced per the original construction drawings listed previously, and included in Appendix 2. The concrete channel would be maintained by removing accumulated sediment and vegetation, restoring the concrete channel flowline to the original channel design. The original concrete channel design is a trapezoidal channel with a5'-6" bottom width and 1.5:l (H:V) side slopes. The slope protection along the western channel bank would be replaced between the concrete channel entrance (approximately HEC-RAS cross-section 2010) and upstream edge of the slope protection (approximately HEC-RAS cross-section 2580). Horizontal alignment, vertical alignment, and channel geometry are based on information found on the construction plans listed previously. The maintenance of the slope protection along the western channel bank will require removal of some material within the channel, due to the required key down depth. However, this alternative assumes the material removed from the earthen channel would be reused to return the earthen channel to its current geometry. Concrete slope protection along the western channel bank as well as riprap slope protection at the entrance to the concrete channel would be replaced per the original construction plans. - - - Prepared By: Rick Engineering Company - Water Resources Division 19 Anticipated Impacts The following table summarizes the anticipated impacts associated with Alternative C. All quantities are estimates, and are subject to change with more detailed future studies. Table 13: Alternative D Anticipated Impact Summary The hydraulic analyses indicate Park Drive will remain subject to overtopping and flooding with flow depths of approximately 1.5 feet during the 100-year storm, and approximately 0.4 feet during the 2-year storm. The hydraulic analyses indicate El Camino Real will remain subject to overtopping and flooding with flow depths of approximately 1.2 feet during the 100-year storm, and approximately 0.5 feet during the 2-year storm. A portion of Kelly Drive between .Park Drive and Hillside Drive will remain subject to flooding with flow depths of approximately 2.0 feet for the 100-year storm. Approximately 11 properties along Kelly Drive could remain subject to flooding during the 100-year storm. Accumulated sediment, debris, and vegetation within the earthen channel will remain, which currently results in increased flooding potential to properties and structures adjacent to the concrete slope protection along the western earthen channel bank. Proposed channel maintenance within Kelly Drive channel may require processing through environmental resource agencies and the California Coastal Commission. Approximate Limits of Impact Approximate Impact Footprint Estimated Export Quantity - ~ Prepared By: Rick Engineering Company - Water Resources Division 20 1540 linear feet 1.2 acres 200 cubic yards HEC-RAS Results Water surface elevations for the 100-year and 2-year storm event are summarized below. Refer to the exhibit titled Kellv Drive Maintenance Proiect Alternative D HEC-RAS Workmau located in Appendix 3 for the approximate 100-year and 2-year floodplain and profile for Alternative D compared to the Existing Condition (No Action Alternative) 100-year floodplain, and proposed grading. Table 14: Alternative D WSEL Summary for tlre 100-year and 2-year Storm Event Anticipated Benefits The removal of accumulated sediment, debris, and vegetation within the concrete channel results in a decrease in flooding potential to properties and structures along the concrete slope protection along the western earthen channel bank. Prepared By: DCB:HM:ns/Repo~t/l5369.001 Rick Engineering Company - Water Resources Division 2 1 9-1 7-07 Approximately 3 of the 14 properties currently subject to flooding along Kelly Drive would be removed from the 100-year floodplain limits. WSELs decrease up to 0.7 feet within the Kelly Drive Channel between the upstream face of Park Drive and the downstream face of El Camino Real during the 100-year storm. Kelly Drive would no longer be subject to flooding during the 2-year storm. Replacing the concrete slope protection along the western earthen channel bank would reduce the potential for erosion to the properties along Kelly Drive. Opinion of Probable Cost Preliminary opinion of probable construction cost provided within this alternative analysis is approximate and is based on preliminary channel design. This opinion of probable cost is based on unit costs from the San Diego Unit Price List (2006). Opinion of probable cost may be subject to change during final design. Table IS: Alternative D - Opinion of Probable Cost Summary Clearing & Grubbing Excavate and Fill Excavate and Export Sediment Remove Concrete Slope Protection * Based on City of San Diego Unit Price List, January 2006 Prepared By: DCB:HM:ns/Report~l5369.001 Rick Engineering Company - Water Resources Division 22 9-17-07 Alternative E - Proposed Levee/Floodwoll along Kelly Drive Channel Description Alternative E proposes to maintain the concrete channel located upstream of Park Drive by removing accumulated sediment and debris, and replace the riprap slope protection at the concrete channel entrance to the original channel design shown on the construction plans listed previously, and included in Appendix 2. The slope protection along the western channel bank upstream of the concrete channel entrance would also be replaced per the original construction drawings listed previously, and included in Appendix 2. In addition, a proposed levee/floodwall would also be constructed along the Kelly Drive Channel to prevent inundation of Kelly Drive and properties adjacent to the channel. The leveelfloodwall would begin at approximately 100 feet upstream of Park drive along the western edge of Kelly Drive Channel and extend upstream for approximately 1400 linear feet. The concrete channel would be maintained by removing accumulated sediment and vegetation, restoring the concrete channel flowline to the original channel design. The original concrete channel design is a trapezoidal channel with a 5'-6" bottom width and 1.5: 1 (H:V) side slopes. The slope protection along the western channel bank would be replaced and the remaining portions of the earthen channel would remain in its current condition. Concrete slope protection along the western channel bank as well as riprap slope protection at the entrance to the concrete channel would be replaced per the original construction plans. For purposes of this analysis, the proposed levee is assumed to be a concrete floodwall rather than an earthen berm due to footprint co~straints from the existing roadway and the existing properties located along Kelly Drive Chamel. The levee/floodwall will protect the properties along Kelly Drive but will not prevent flows from overtopping Park Drive. Prepared By: DCB:HM:ns/Report/l5369.001 Rick Engineering Company - Water Resources Division 23 9-17-07 Anticipated Impacts The following table summarizes the anticipated impacts associated with Alternative E. All quantities are estimates, and are subject to change with more detailed future studies. Table 16: Alternative E Anticipated Impact Summary The hydraulic analyses indicate Park Drive will remain subject to overtopping and flooding with flow depths of approximately 1.4 feet during the 100-year storm, and approximately 0.5 feet during the 2-year storm. The hydraulic analyses indicate El Camino Real will remain subject to overtopping and flooding with flow depths of approximatelyl.2 feet during the 100-year storm, and approximately 0.5 feet during the 2-year storm. A portion of Kelly Drive near Park Drive will remain subject to flooding with flow depths of approximately 2.2 feet for the 100-year storm. Proposed channel maintenance within Kelly Drive channel may require processing through environmental resource agencies and the California Coastal Commission. Proposed levee could create a new public safety hazard by blocking visibility into the channel. Further structural calculations would be required to design the levee/floodwall to qualify as a flood control structure, and to comply with design requirements set forth by applicable state andlor federal agencies. Local drainage issues may need to be addressed with the construction of the proposed levee/floodwall, and further hydraulic analysis may be required during final design. Approximate Limits of Impact Approximate Impact Footprint Estimated Export Quantity Prepared By: DCB:HM:ns/Report/l5369.001 Rick Engineering Company - Water Resources Division 24 9-17-07 1540 linear feet 1.2 acres 200 cubic yards HEC-RAS Results Water surface elevations for the 100-year and 2-year stom event are summarized below. Refer to the exhibit titled Kelly Drive Maintenance Project Alternative E HEC-RAS Workmap located in Appendix 3 for the approximate 100-year and 2-year floodplain and profile for Altemative E compared to the Existing Condition (No Action Altemative) 100-year floodplain, and proposed grading. Table 17: Alternative E WSEL Summary for the 100-year and 2-year Storm Event Prepared By: Rick Engineering Company - Water Resources Division 25 Anticipated Benefits All 14 of the properties currently subject to flooding along Kelly Drive would be removed from the 100-year floodplain limits. Changes in WSELs range from an increase of 0.2 feet to a decrease of 0.5 feet within the Kelly Drive Channel between the upstream face of Park Drive and the downstream face of El Camino Real, however the increases in WSELs are within the proposed leveelfloodwall and do not negatively affect private properties or structures adjacent to Kelly Drive Channel. Replacing the concrete slope protection along the western earthen channel bank would reduce the potential for erosion to the properties along Kelly Drive. Opinion of Probable Cost Preliminary opinion of probable construction cost provided within this alternative analysis is approximate and is based on preliminary channel design. This opinion of probable cost is based on unit costs from the San Diego Unit Price List (2006). Opinion of probable cost may be subject to change during final design. Table IS: Alternative E - Opinion of Probable Cost Summary - BOND ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL COST Clearing & Grubbing AC 1.2 $20,000.00 $24,000 Excavate and Export Sediment CY 200 $27.50 $5,500 Levee wall SF 16000 100.00 $1,600,000 Remove Concrete Slope Protection CY 80 $135.00 $10,800 114 Ton Rip-Rap CY 100 $60.00 $6,000 Concrete Slope Protection LF 640 $325.00 $208,000 Traffic Control LS 1 $30,000.00 $30,000 SUBTOTAL $1,884,300 10% Mobilization $188,430 20% Contingency $376,860 L TOTAL $2,450,000 Based on City of San Diego Unit Price List, January 2006 Prepared By: Rick Engineering Company - Water Resources Division 26 Alternative F - Proposed Diversion Culvert under Kelly Drive Description Alternative F proposes to maintain the concrete channel located upstream of Park Drive by removing accumulated sediment and debris, and replacing the riprap slope protection at the concrete channel entrance to the original channel design shown on the construction plans listed previously, and included in Appendix 2. The slope protection along the western channel bank upstream of the concrete channel entrance would also be replaced per the original construction drawings listed previously, and included in Appendix 2. The remaining portions of the earthen channel would remain in its current condition. The concrete channel would be maintained by removing accumulated sediment and vegetation, restoring the concrete channel flowline to the original channel design. The original concrete channel design is a trapezoidal channel with a 5'4" bonom width and 1.5:l (H:V) side slopes. To prevent inundation of Kelly Drive and properties adjacent to Kelly Drive Channel during large storm flows, a proposed diversion culvert, consisting of a 9'W x 3'H triple-box culvert would be constructed under Kelly Drive Channel. The box culvert inlet would be located at the upstream side of El Camino Real and the outlet would be located at the downstream side of Park Drive. The horizontal alignment would be similar to the horizontal alignment of Kelly Drive. Based on the flowlines of the existing terrain at the inlet and outlet locations, the longitudinal slope of the culvert was assumed to be 1.2%. Water Surface Pressure Gradient for Windows (WSPGW) was used to model the proposed diversion culvert under Kelly Drive Channel within the study limits. WSPGW is intended for calculating WSELs and velocities for natural or engineered channels in addition to closed conduits such as culverts. The proposed diversion box would be designed to only intercept high flow. Low flows would remain in the existing channel. This alternative will also involve modifications to the existing storm drain outlet at Hillside Drive to discharge to the box culvert, and not the channel. Prepared By: Rick Engineering Company - Water Resources Division 27 Concrete slope protection along the western channel bank as well as riprap slope protection at the entrance to the concrete channel would be replaced per the original construction plans. Anticipated Impacts The following table summarizes the anticipated impacts associated with Alternative F. All quantities are estimates, and may be subject to change with more detailed future studies. The hydraulic analyses indicate Park Drive is subject will remain overtopping and flooding with flow depths of approximately 1.0 feet during the 100-year storm. Table 19: Alternative F Anticipated Impact Summary The hydraulic analyses indicate El Camino Real will remain subject to overtopping and flooding with flow depths of approximately 0.3 feet during the 100-year storm. Proposed channel maintenance within Kelly Drive channel may require processing through Approximate Limits of Impact * Approximate Impact Footprint * Estimated Export Quantity * environmental resource agencies and the California Coastal Commission. WSELs increase up to 0.4 feet at the'downstream side of Park Drive as a result of the diversion culvert outlet location. Based on the results fiom the HEC-RAS analysis, to remove Kelly Drive and existing 1540 linear feet 1.2 acres 200 cubic yards properties along the Kelly Drive Channel from the 100-year floodplain, approximately 60% of the 100-year flow rate, approximately 1090 cfs would need to be diverted at the upstream side of El Camino Real. Based on the preliminary WSPGW analysis, to convey this diverted flow rate under Kelly Drive it would require a triple 9' by 3' (WxH) box culvert. Additional grading would be required upstream of El Camino Real and downstream of Park Drive to accommodate construction of the diversion culvert. *excludes impact limits within Kelly Drive The proposed diversion box would require special structural design considerations due to the size of the box culverts required. - -- Prepared By: Rick Engineering Company - Water Resources Division 28 The proposed diversion box would follow the alignment of Kelly Drive, which is an existing street with existing utilities underlying the roadway. There is a high potential for utility conflicts with the proposed diversion alternative. The proposed diversion box would directly discharge to Agua Hedionda Lagoon. HEC-RAS Results Water surface elevations for the 100-year storm event are summarized below. Due to the impact of the diversion culvert proposed with this alternative, the 100-year flow rates between El Camino Real and Park Drive would be reduced to lower than the existing flow rates for the 2- year storm event, therefore the 2-year storm event has been excluded from the proposed condition hydraulic analysis for this alternative. Refer to the exhibit titled Kelly Drive Maintenance Project Alternative F HEC-RAS Workmau located in Appendix 3 for the approximate 100-year floodplain and profile for Alternative F compared to the Existing Condition (No Action Alternative) 100-year floodplain, and proposed grading. Prepared By: Rick Engineering Company - Water Resources Division 29 Table 20: Alternative F WSEL Summary for the 100-year (Diverted) Storm Event Anticipated Benefits The removal of accumulated sediment, debris, and vegetation within the earthen and concrete channels result in a decrease in flooding potential to properties and structures along the concrete slope protection along the western earthen channel bank. All 14 properties ciurently subject to flooding along Kelly Drive would be removed from the 100-year floodplain limits. WSELs decrease up to 3.1 feet within the Kelly Drive Channel between the upstream face of Park Drive and the downstream face of El Camino Real. Replacing the concrete slope protection along the western earthen channel bank would reduce the potential for erosion to the properties along Kelly Drive. Prepared By: Rick Engineering Company - Wafer Resources Division 30 HEC-RAS Cross-section 100 360 560 710 940 Park Drive I100 1190 1360 1500 1670 1790 1890 2010 2220 2370 2580 2720 2880 3070 El Camino Real 3590 1770 3790 53.2 1770 56.0 Min. Channel Elev. (A) 10.0 12.0 14.0 15.0 16.0 14.8 15.8 17.5 19.0 20.6 21.2 22.0 24.5 29.7 33.6 36.1 39.2 41.2 42.0 100-year Q (cfs) 205 1 205 1 2051 2051 2037 887 887 887 887 887 887 864 864 864 864 864 864 725 725 (Diverted) WSEL (ft) 16.0 16.1 16.6 18.2 21.0 22.2 21.7 23.3 24.7 26.3 26.9 27.7 29.3 33.7 37.5 40.0 42.1 44.0 45.4 Opinion of Probable Cost Preliminary opinion of probable construction cost provided within this alternative analysis is approximate and is based on preliminary channel design. This opinion of probable is based on unit costs from the San Diego Unit Price List (2006). Opinion of probable cost may be subject to change during final design. Table 21: Alternative F - Opinion of Proboble Cost Summary BOND ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL COST Clearing & Grubbing AC 1.2 $20,000.00 $24,000 Excavate and Export Sediment CY 200 $27.50 $5,500 Relocate existing Sewer, Water Mains & Lateral: LF 2200 400.00 $880,000 Triple box culvert LF 2400 $1,000.00 $2,400,000 Remove Concrete Slope Protection CY 80 $135.00 $10,800 114 Ton Rip-Rap CY 100 $60.00 $6,000 Concrete Slope Protection ' LF 640 $325.00 $208,000 Pavement SF 84000 $2.00 $168,000 Traffic Control LS 1 S50,OOO.OO $50,000 SUBTOTAL $3,752,300 10% Mobilization $375,230 20% Contingency $750,460 TOTAL $4,878,000 * Based on City of San Diego Unit Price List, January 2006 Prepared By: Rick Engineering Company - Water Resources Division 3 1 Summary The concrete channel portion of the Kelly Drive Channel is currently in fair condition, based on visual inspection of the channel, with some accumulated sediment and vegetation. The existing earthen channel contains accumulated sediment and vegetation. Concrete slope protection failure along a portion of western earthen channel bank and riprap slope protection failure at the entrance to the concrete channel has occurred since construction of the channel circa the early 1970s. The accumulated sediment as well as the slope protection failure is threatening the private properties and residences adjacent to the channel with potential for both flooding and erosion. Based on hydraulic analysis performed within this preliminary alternatives analysis, the 100-year flow rate within the Kelly Drive Channel exceeds the capacity of the concrete channel and portions of the earthen channel based on current geometry, resulting in an increased potential for flooding to properties and structures along Kelly Drive Channel, and Kelly Drive. The failure of the existing slope protection has resulted in increased exposure to erosion for the adjacent private properties. Seven alternatives were explored within this preliminary alternative analysis, each having unique combination of flood control, impacted area, and cost benefits, to address the erosion potential and the flooding impacts associated with each maintenance alternative. A summary of anticipated impacts and anticipate benefits is located below. Prepared By: R~ck Engineering Company - Water Resources Division 32