Subject: Floor Level Survey
Cameo Road Storm Drain and Water Main Replacement
Carlsbad, California
Dear Ms. Howard:
In accordance with your authorization, we have prepared this letter to present the results of our
floor level surveys for 2277 and 2283 Cameo Road in Carlsbad, California. Floor level surveys
were conducted inside the subject homes along the walls adjacent to the storm drain and water
main alignments. One survey was performed prior to construction on March 17, 2008, and the
second survey was performed after the construction was completed on May 15, 2008. Based on
the attached results of our floor level surveys it is our opinion that there is no evidence that det-
rimental soil movement has occurred as a result of the construction process. No additional floor
or wall cracks were observed in the homes during our second visit.
We appreciate the opportunity to be of service on this project.
Sincerely,
NINYO & MOORE
Andres Bernal, G.E.
Senior Project Engineer
ABS/FOM/kh
Attachment: Floor Level Survey Results
Francis O. Moreland, C.E.G.
Senior Geologist
5710RuffinRoad • San Diego, California 92123 • Phone (858) 576-1000 • Fax (858) 576-9600
San Diego • Irvine • Ontario • Los Angeles • Oakland • Las Vegas • Carson City • Phoenix • Centennial
Geotechnical and Environmental Sciences Consultants
March 19, 2008
Project No. 106328001RECEIVED
'MAH V I M.
Ms. Sherri Howard, RE.
Associate Engineer ENGINEERS
City of Carlsbad DEPARTM^
1635 Faraday Avenue
Carlsbad, California 92008-7314
Subject: Limited Geotechnical Recommendations
Cameo Road Storm Drain Replacement
Carlsbad, California
Reference: Vinje & Middleton Engineering, Inc., "Preliminary Geotechnical Investigation,
Proposed Residential Development, El Camino Real, Carlsbad, California," dated
June 13, 2005.
Civil Engineering Design Group, Plan Set, "Buildable Pad and Driveway for
Worsch Residence, 167-080-35, Carlsbad, California," Sheets 2 through 5 of 7,
undated.
Dear Ms. Howard:
In accordance with your authorization, we have prepared limited geotechnical recommendations
for the Cameo Road storm drain replacement in Carlsbad, California. This letter presents our
geotechnical findings, conclusions, and recommendations regarding the construction of the pro-
posed storm drain replacement. Our recommendations are based on a reconnaissance of the site
and a review of a geotechnical report and plans by others for the proposed residence along the
eastern portion of the alignment.
BACKGROUND
Based on our discussions, the project will include the replacement of approximately 400 feet of
15-inch diameter corrugated metal pipe (CMP) storm drain that has corroded and is leaking. We
anticipate that the CMP will be replaced with an 18-inch PVC or RCP pipe. The storm drain ex-
tends from Cameo Road eastward between residential properties to El Camino Real. An existing
5710 Ruffin Road • San Diego, California 92123 • Phone (858) 576-1000 • Fax (858) 576-9600
San Diego • Irvine • Rancho Cucamonga • Los Angeles • Oakland • Las Vegas • Phoenix • Denver • El Paso
Cameo Road Storm Drain Replacement March 19, 2008
Carlsbad, California Project No. 106328001
water main is located about 6 feet south of the storm drain alignment. The water main parallels
the storm drain.
OBSERVATIONS
We performed a reconnaissance of the site on March 13, 2008. During our reconnaissance water
was noted seeping out of the lower portion of the alignment. The observed seepage is surfacing
above the existing storm drain. According to City personnel, the volume of seepage increases
when water is entering the storm drain above. The source of the seepage is unknown.
RECOMMENDATIONS
Based on our review of the referenced report and the observations noted, we offer following
comments and recommendations for the storm drain construction.
• The proposed residence will be approximately 7 feet away from the proposed storm drain
alignment. The portion of the home adjacent to the storm drain alignment consists of a main
level of the home at a finish floor elevation of approximately 274 feet above mean sea level
(MSL), and a garage level with a finish floor elevation of approximately 257.5 feet MSL.
Assuming a 24-inch deep foundation, the bearing level for the main floor is expected to be at
an elevation of approximately 272 feet MSL. The depth of the proposed storm drain pipe
along the main level portion of the home ranges from 10 to 15 feet below the foundation
bearing level. At this depth the storm drain will be within the foundation bearing zone. In
order to protect the storm drain pipe from foundation surcharge loads and potential damage
during remedial grading for the adjacent home, we recommend that the storm drain pipe be
encased in concrete to 6 inches above the pipe in the section located within 10 feet of the
proposed home. Alternatively, the homeowner should found the home at a depth such that it
does not impose a load on the storm drain.
• Excavation of the portion of the storm drain alignment east of approximately Station 3+00 is
likely to encounter saturated conditions that can not be adequately supported by shoring. We
recommend that where saturated conditions are encountered and where conventional cut-
and-cover excavations are performed the trench side walls be sloped back at 2:1 (horizontal
to vertical).
• Seepage is likely to be encountered in the eastern portion of the storm drain trench during
construction. Unstable bottom conditions may be mitigated by over-excavating the excava-
tion bottom to suitable depths and replacing the unstable material with gravel and/or a
geotextile fabric.
106328001 R.doc
Cameo Road Storm Drain Replacement
Carlsbad, California
March 19, 2008
Project No. 106328001
LIMITATIONS
The field evaluation and geotechnical analyses presented in this report have been conducted in
accordance with current engineering practice and the standard of care exercised by reputable
geotechnical consultants performing similar tasks in this area. No warranty, implied or ex-
pressed, is made regarding the conclusions, recommendations, and professional opinions
expressed in this report. Variations may exist and conditions not observed or described in this
report may be encountered. Our preliminary conclusions and recommendations area based on an
analysis of the observed conditions and the referenced background information.
We appreciate the opportunity to be of service on this project.
Sincerely,
NINYO & MOORE
Andres Bernal, G.E.
Senior Project Engineer
ABS/FOM/JG/atf
Distribution: (1) Addressee
Francis O. Moreland, C.E.G
Senior Geologist /c?.
' FRANCIS OJ
No 2
CERTIFIED
106328001 R.doc
oore
Geotechnical and Environmental Sciences Consultants
June 27, 2008
Project No. 106328002
; Nfc-L.Ms. Sherri Howard
City of Carlsbad
1635 Faraday Avenue
Carlsbad, California 92008
Subject: Summary of Compaction Test Results
Cameo Road Storm Drain
Carlsbad, California
Dear Ms. Howard:
In accordance with your request, Ninyo & Moore has provided geotechnical testing services dur-
ing construction of the Cameo Road Storm Drain project located in Carlsbad, California.
Construction generally occurred between March 25, 2008 and April 16, 2008. Our services con-
sisted of on-call testing during the placement of storm drain backfill. This letter summarizes our
services and presents the results of our field and laboratory testing.
Laboratory testing was performed on representative samples of material used for storm
drain backfill to evaluate modified Proctor density and optimum moisture content. Labora-
tory testing of the samples was conducted in general accordance with American Society for
Testing and Materials (ASTM) D 1557 and the results are presented in Table 1, Modified
Proctor Density Test Results.
Field density testing of the storm drain backfill was performed in general accordance with the
ASTM D 6938 (Nuclear Method). The specified relative compaction for the storm drain back-
fill was 90 percent of the modified Proctor density. During the earthwork operations, when a
field density test was performed that resulted in less than the specified relative compaction, the
area was generally reworked and a retest was performed. The results of the field density tests
are presented in Table 2, Summary of Field Density Tests. The approximate locations of the
field density tests are shown on Figure 1, Field Density Test Location Map. The field density
5710 Ruffin Road • San Diego, California 92123 • Phone (858) 576-1000 • Fax (858J 576-9600
San Diego • Irvine • Ontario • Los Angeles • Oakland • Las Vegas • Carson City • Phoenix • Denver
Cameo Road Storm Drain
Carlsbad, Californa
June 27, 2008
Project No. 106328002
tests performed during the placement of storm drain backfill indicated the specified relative
compaction after testing the reworked areas.
The geotechnical services outlined in this report have been conducted in accordance with current
practice and the standard of care exercised by geotechnical consultants performing similar tasks
in this area. No warranty, expressed or implied, is made regarding the observations and conclu-
sions expressed in this report. The reported test results represent the relative compaction and
moisture content at the locations tested. It is important to note that the precision of field density
tests and the maximum dry density test is not exact and variations should be expected. The re-
ported locations and elevations of the density tests are estimated based on correlations with the
site plans. Further accuracy is not implied.
Respectfully submitted,
NINYO & MOORE
/>&/'Francis O. Moreland, C.E.G.
Senior Geologist
FOM/MC/gg
Mark Cuthbert, RE.
Principal Engineer
Attachments: Table 1 - Modified Proctor Density Test Results
Table 2 - Summary of Field Density Tests
Figure 1 - Field Density Test Location Map
Distribution: (3) Addressee
106328002 L Storm Drain.doc
Cameo Road Storm Drain
Carlsbad, California
June 27 2008
Project No. 106328002
Table 1 - Modified Proctor Density Test Results
Soil
Type No.
1
2
3
Description
Yellowish tan silty SAND
Reddish brown silty SAND
Brown silty SAND
Laboratory
Dry Density
(pcf)
125.0
130.5
126.5
Optimum
Moisture Content
(%)
10.5
7.5
9.5
106328002 L Storm Drain.doc 1 ofl
rv TESTSN BACKFILLW <s Q
0 | g
9 * 21*^0
fa i-l {«
o o
| |S
5 O cfl
P tf W
t/5 SL, H
rs
J
^-4
H
04
6g»g"i•sifc^v
^^i^
^^RemarksE
•o « .2
°O .2 o. e~-
B
•— U ^-*
2 o,^-o c — '
OS 1
U
| ||_
>, •—•2^e?
1 ° ^ "
0
^ *W yS S 3£0
*G
*" C °C5 4> ,^j
2 °
3 1 T.2 E ^O O ' — '
g U
'"S 1- o
W H Z
c0
1§
S
Test Locationi-s
0>
Q
(A O
H ^
oON
oON
VI
o
o
v->(N
(N
m
o
o
r-
o
+
o
co
3co
Q
CO
000
V~l
(Sm
*
oON
o
ON
o
o
VIr)
o
m
(N
ON
O
ONv~t
om
o
co
CO
Qco
00o
VI
M
*
O
ON
o
ON
v>
o
oVIrs
(N
o
o
(N
O
o
co
3CO
QCO
ooo
(N
ro
*Retest on 5oON
ON00
V-I
o
o
v>(N
(S
—
O
o
NOr-l
0
o
co
3CO
Q
CO
ooo
JQ
m
*
«
O
ON
•n
o
o
!Q
fS
(N
O
0
NO
o
T
o
co
3
QCO
ooo
!Qf>
<n
«
oON
o
o
IQ
(N
ON
O
f-
NO(N
f
O
CO
3CO
Q
ooo
(N
">
*
0ON
o
o
o
(N
ON
—
O
o
o
(S
oo
o
co
1
Q
oo0
IQ
ro
*
«
ON
O
O
(N
^NO
**ON
0
or-(N
O
Co
CO
QCO
00o
!Qn
oo
g
(S
ON
o
o
fS
>n
o
VI
fS
o
NO
o
co
3CO
Q
ooo
(N
ON
OON
fSON
o
ON
ON
OS
o
+
o
co
co
Q
CO
oo0
NOCJ
ro
O
«
(S
r-'
VI
o
o
o
t—
oo
o
JQ
o
co
co
Qco
000
NO(V)
m
*
^
(N
ON
VI
o
o
(N
V%
O
ON
o
1—fN
f
o
co
3CO
QCO
00o
NOJS
ro
=«:
«
ON
O
o
(N
00
ro
^
Op(S
rj-ON
O
co
3CO
QCO
oop
NO(N
f)
*Retest on 15oON
Tf
00
o
o
IN
•*
(S
00
o
J5
V")
+
o
Go
CO
Q
CO
ooor-
(N
m
5
oON
o
ON
o
o
fN
o
ts
'
oo
o
f5
o
co
300
QCO
00
n
ro
=«:
V%
«
00
ON
o
o
(N
(N
O
VI
tsoo(S
o
o
co
CO
Q
CO
00o
t—
ro
NO
OON
«
VI
O
o
!Q
<N
' '
00
V,
ONfS
O
o
co
3oo
Q
CO
00o
t-(N
f>
t-
oON
ON
O
O
(S
v-»
NO
0
»n
m
O
o
co
CO
QCO
000
00(N
rn
=tt
00
oON
oON
V")
o
o
VI
r-
(S* '
p
o
NO
(N
O
Co
3CO
QCO
oo0
oo
m
ON Retest on 21oON
NO
OO
v->
O
o
"0
t~
ON
rn
o
o
0v-i
o
co
5CO
Q
CO
00o
mn
o
oON
o
ON
VI
o
o
VI
fS
VI
CN
'
(N
O
o
oVI
o
co
cd
CO
QCO
ooo
m
ro
*
OON
oON
O
O
v->fS
ON
—' '
~
VI
Tt(N
O
Co
CO
Q
CO
00o
m
m
fN Retest on 24§
00
V)
o
o
(N
ON
m
p
o
o
(N
0
Oc0
CO
Q
CO
00o
m
f>
*
oON
m
ON
VI
O
o
IQ
>n
NO
'
ro
00
o
o
(S
o
o
co
3CO
Q
CO
ooo
m
m
*Retest on 26oON
00
ON
V~l
NO
N
v>
fS
o
rno
f
o
co
CO
Q
CO
ooo
"*
*
«
O
ON
ON
VI
VO
CO1
(N
O
o
oNO
oco
CO
Q
CO
00
(N
Tj-
=«:
NO
OON
OON
ON
V)
NOts
(N
m
•
5
VI
8
o00
o
0
CO
oCO
ooo
is
"*
t—
TY TESTSN BACKFILLO5 ••£
H <s Q
g | |
^^ f^i ^_}
£»J ^O r^
fe 2 05
ta .
** z
* u o
S 0 feD C^ W
O5 PH N
r<
w
CQ
H
0
^5£p
^^8^•&
^^IH
^^^
^Remarksc•o » .2
'0 ^ 0. o"*
^0 ^^ OU
eQ
l|g
U
|I|-E "K " N?^ •.- .S g £,
1 ° S U
i-o
« 0-0o £ o2 S S£ Q
Q ? Q.
2
11?O O s->-
^ **• 0
«« H Z
c
to
1"Test Location•+•*s **"*
«
I eH z
oOs
O
V,
SOcs
ro
2
0cso
ion 01+95oo
Q
ooo
ro
Tf
00
0Os
oOS
Os
,0
CM
SO
OS
>n
o
0
o)Ocos
Q00
00o
ro
'*
=«:
OS
O
OOs
OS
VI
SOtN
ro
<S
O
roO
O
o
co
oo
Qoo
00o
ro
"*
O
OOS
roOs
Os
tN
?
so
OS
o
o
<NOco
a
Q
00
00o
ro
^1'
*
OOS
§
Os
fS
5
O
0cso
ion 02+351
Q00
oo0
T*
M
oOS
OS
OS
V,
so(N
O
Os
06
O
Oro
0
f
Oco
00
Q
00o
ro
^
roro
OOs
OS
V)
Os
^
SO
5
OSr-'
o
roOro
VITI-
CSOco
60
Q00
00o
ro
Tt
=tt:
ro
OOS
roOs
Os
so
-
mo
V,
Oro
OSO
S
co
B00
Q
00
00o
Tf
ro
OOs
roOs
Os
SOCS
v>
VI
OS
ooOSCN
ion 02+75oo
Q
00
oo0
Tf
soro
0Os
OOs
Os
,0
SO
Os
Os
Os
Oooro
Ooo
CNO
Co
oo
o
Cfl
ooo;j
"•
ro
OOS
«
VI
OS
V,
soCN
ro
00
O
OsOs
vsoo
o
co
3oo
Q00
00o
^
•t
ooro
OOS
«
VI
OS
V,
soCN
Os
00
0
ooOscs
o
o
co
00
Qoo
ooo
Tf
^
Osro
OOS
OS
V)
o
>nCN
OS
-
VI
CN
o
o
co
3oo
Q
00
ooo
SO
^
o
oOS
CNOS
VI
o
VICN
SO
oo
CN
o
cs
ion 05+10300
Doo
oo0
SO
^
=tt
oOS
s
•n
o
cs
vS
OS
OS
0oo
oOsH-
o
co
3Sri
Q00
00o
so
^
=»:
OOS
Vl
OS
Vl
o
CN
00
so
Os
0
cs
Tl
"+
o
co
3
Qoo
ooo
SO
^
ro
•of
%
u1
u
Q
•b"
1
1•o
C/5
c
(N
•-•
o
auge Test Method; (*) - Sand Cone Test fvi Trench Backfillb ^ra /">
"o E
I I
S- Q
• • 1/5b g_:Z o
VI ffl
Soz
o
(N
W
55-z.LLJ
o: o:
0-1-< w
ro
Ul
K
13
O
LL
gh-
oo_i
H
V)
HI
(0
UJ
Q
O
UJ
oru-
°iwo
i1
o
ow
Ul
Xo
a.D.
00O5
oooo
CMn<Do
LU
LULL
OO
OS IPi K)08Z£9m I
Geotechnical and Environmental Sciences ConsuJtants
June 27, 2008
Project No. 106328002
Ms. Sherri Howard
City of Carlsbad
1635 Faraday Avenue
Carlsbad, California 92008
Subject: Summary of Compaction Test Results
Cameo Road Storm Drain
Carlsbad, California
Dear Ms. Howard:
In accordance with your request, Ninyo & Moore has provided geotechnical testing services dur-
ing construction of the Cameo Road Storm Drain project located in Carlsbad, California.
Construction generally occurred between March 25, 2008 and April 16, 2008. Our services con-
sisted of on-call testing during the placement of storm drain backfill. This letter summarizes our
services and presents the results of our field and laboratory testing.
Laboratory testing was performed on representative samples of material used for storm
drain backfill to evaluate modified Proctor density and optimum moisture content. Labora-
tory testing of the samples was conducted in general accordance with American Society for
Testing and Materials (ASTM) D 1557 and the results are presented in Table 1, Modified
Proctor Density Test Results.
Field density testing of the storm drain backfill was performed in general accordance with the
ASTM D 6938 (Nuclear Method). The specified relative compaction for the storm drain back-
fill was 90 percent of the modified Proctor density. During the earthwork operations, when a
field density test was performed that resulted in less than the specified relative compaction, the
area was generally reworked and a retest was performed. The results of the field density tests
are presented in Table 2, Summary of Field Density Tests. The approximate locations of the
field density tests are shown on Figure 1, Field Density Test Location Map. The field density
5710 Ruffin Road • San Diego, California 92123 • Phone (858) 576-1000 • Fax (858J 576-9600
San Diego • Irvine • Ontario • Los Angeles • Oakland • Las Vegas • Carson City • Phoenix • Denver
Cameo Road Storm Drain
Carlsbad, Californa
June 27, 2008
Project No. 106328002
tests performed during the placement of storm drain backfill indicated the specified relative
compaction after testing the reworked areas.
The geotechnical services outlined in this report have been conducted in accordance with current
practice and the standard of care exercised by geotechnical consultants performing similar tasks
in this area. No warranty, expressed or implied, is made regarding the observations and conclu-
sions expressed in this report. The reported test results represent the relative compaction and
moisture content at the locations tested. It is important to note that the precision of field density
tests and the maximum dry density test is not exact and variations should be expected. The re-
ported locations and elevations of the density tests are estimated based on correlations with the
site plans. Further accuracy is not implied.
Respectfully submitted,
NINYO & MOORE
Francis O. Moreland, C.E.G.
Senior Geologist
FOM/MC/gg
Mark Cuthbert, RE.
Principal Engineer
Attachments: Table 1 - Modified Proctor Density Test Results
Table 2 - Summary of Field Density Tests
Figure 1 - Field Density Test Location Map
Distribution: (3) Addressee
106328002 L Storm Drain doc
Cameo Road Storm Drain
Carlsbad, California
June 27 2008
Project No. 106328002
Table 1 - Modified Proctor Density Test Results
Soil
Type No.
1
2
3
Description
Yellowish tan silty SAND
Reddish brown silty SAND
Brown silty SAND
Laboratory
Dry Density
(pcf)
125.0
130.5
126.5
Optimum
Moisture Content
(%)
10.5
7.5
9.5
106328002 L Storm Drain.doc 1 of 1
TY TESTSN BACKFILL1 iW <s Q
g | 1
J fj Q
fa S to
fan .
0 0
^ ^ 03 O rf*i
to P* h^
fS
sCQ
H
0
t*j
f*j
t^
gfi
•^^5^^^
^
T
li
'!<ei/
au0
aJ
2 RemarksRelativeCompaction(%)RelativeCompaction(%)| .B B S?
§|u
2-^0u S5 o2 S 3£ a
x-^O
a g o.
IK" E S?O O ^
^ §• o
B^o
5
Test LocationCA t*^
£aQ
I °H ^
o
ON
«
m
o
o
m01
ol
2
ro
O
0
r-«n01
o
oco
3CO
Q
CO
00o
m01
ro
*
OON
O
ON
in
O
o
m01
o
ro
01
ON
O
ONin01
oro+
Oco
3oo
Poo
oo
0
in
Ol
ro
01
oON
O
ON
in
O
oin01
01
ro
O
O
01
o01
oco
300
Qoo
oo0
in
Ol
ro
ro
in
co
t/D
&
OON
ONOO
in
o
0
m
Ol
ol
—
o
o
roNO01
O
~
oco
300
Q
CO
000
in01
ro
!
«
O
ON
in
O
omOl
^01
01
o
o
in
ion 04+ 10CO
Q
ooo
m01
ro
in
O
ON
o
ON
in
o
oin
ro
01
•n
ON
Or-ND01
O
ON
roO
Co
3CO
Qoo
000
01
ro
NO
O
ON
OON
m
o
o
in01
ON
--
•<*•
O
o
00-01
inoo
roOco
oo
Q
CO
000
in01
ro
*
OON
roON
in
o
0
in01
f~
£
ON
0
O
0-
01
Oco
1
Q
CO
ooo
Ol
ro
oo
oON
01ON
0
O
01
2
o
m
01
01
o
roO
Co
3CO
Q00
00o
01
ON
OON
OlON
in
oro
NO
ON
ON
r-'
o
inol
ion 04+70300
Q
00
00o
NO
ro
0
«
ol
ON
Oro
O
Ool
r-
00
0
01
ion 04+55rl
Q
CO
000
NO01
ro
—
OON
ON
O
o-
01
2
o
ON
Os
0-
"+3co
3CO
QCO
ooo
ol
ro
01
oON
ON
O
O
ol
00
ro
^
O
8
Tj-
ON
O
CO
00
QCO
oo
0
NO
ro
ro
eo
to
1
OON
00
O
O
01
ins
oo
0
01
+
oco
3CO
Q
CO
oo0
01
ro
•t
O
ON
oON
O
O
01
O
ol
ro
00
o
r-
01
oco
3CO
QCO
ooo
r-
ro
=
OON
00ON
O
O
m01
ro
Olol
o
•n
oo01
o
oco
3CO
Qoo
000
ol
ro
2
o
ON
oON
O
O
01
2
00
ON01
ion 03+051300
Q
CO
000
M
ro
0-
OON
roON
m
O
o
in
in
NO
01
O
in
ro
01
ion 05+20a
CO
Q
ooo
0001
ro
=tt
00
oON
0ON
m
0
o
01
0-
01
0
o
VO
m01
inOco
3CO
QCO
000
00
ro
ON Retest on 2 1oON
NO
OO
in
0
o
m01
ro
O
ON
ro
0
0
Oin
inOco
3CO
Q
CO
ooo
ro
ro
O
OON
OON
in
O
o
inol
m
01
01
0
o
Ol
om
in0co
1200
Q
00
00o
ro
ro
=tt
ol
OON
OON
m
o
o
mol
ON
»
~
in
ol
01
r-
•nOco
300
Q
00
00o
ro
ro
0101 Retest on 24oON
roOO
m
o
o
m01
ON
roO
O
O
o
•"3-01
O
mOco
300
Q
00
ooo
ro
ro
roOl
OON
ro
ON
in
O
oin01
in
NO
ro
OO
O
O
Ol
oTt-
inOc0
3
CO
Q
CO
00o
ro
ro
•3-
01
NO01
co
53
oON
ro00
ON
m
NOOl
01in
O
01
oi
o
roOro
ion 01 +603CO
Qoo
ooo
C?
"*
m
01
OON
O
ON
ON
m
NO01
in
ro
01
ro
0
ro0ro
0NO
oco
3CO
aCO
00
"*
NOol
oON
0ON
ON
in
NOOl
Ol
ro
5
m
ol
Oro
O00
o
co
3
00
Q
00
00
"*
=«:
O<
TY TESTSN BACKFILLNH "2
05 •<55 «W IN QQ § 2
Q 00 S
si£
ft, ^H t/5
fa .° i>< z
ft* N ••
* S§
1 ^HS o 5& 05 W
05 PLi H
r*
W
M•<H
0)
£
4
««fes1*sS-<^RemarksB•o « .2O> > -Wis •« « -r-•w TL w 09W .2 O. o^S.,3 E ~
M« o
» .1
£ o ^15 a >?2 a. 51-
Si~U
E « -M
SU?. ~ .2 C o^
£? 0. £ * ~5 0 S UMt-O3 |£GtS j£ o2 § 3£ Q
ȣ<*u !3 oOS B.
2 °a>
fc 1 =If 2?o o ^^
S <->
l|M
c0
1§0>
UJ
Test Location(A t,^£ °
sOS
*rf .
H
oO\
O
ON
»O
ON
>0
V£>r-4
Ovm
<Nvd
m
0Mom
ion 01+953t/3
QCO
ooo
m
•*
*
oo(N
OOS
OOS
VI
OS
«-l\ofS
VO
f^
OS
rn
m
>n
Om
ion 02+ 10Son
QVI
00o
m??
=tt
CT\(N
Oa\
0o\
>n
o\
V~t
\D(N
v^
m
es>n
ro
O
mom
»TiO
fSoco
3w
QGO
000
m•*)=
%
oro
OO
rr,
O\
>no'
>n>o(N
•*
r^
\o
ON
r»1
O
C-)om
»rjts
fSOco
rt55
Qon
00o
r*S
•^
^t
ro
«
OOS
m
Os
>n
VOfS
VOm
r~o
m
Ocsor«^
•/Im+(So
co
3</}
QCO
ooo
rn
•*
=a
<Nm
§
Os
v~>
Os
10
sofS
o
v~t
OS
oo
m
o
om
o>riAoco
5oo
QCO
ooo
ro
"*
%
mm
§
Os
m
Os
>n
SO(Nt
«->
»O
Os
K
m
Om0m
ion 02+453on
QCO
1ro
^
%
"3-ro
OON
mOS
»n
Os
>n
NO(N
r-
r«^
0
m
»n
or^
0SO
sco
*2CO
Q
CO
00o
^?
•*
*
V~lm
oOs
r^Os
>o
Os
>o
VD(N
»T>
r~
V~i
OS
fl
»o
ooOs(S
<nr-~
S
co
5co
Q
t/D
OOo
^Tf
^t
som
oOS
0Os
V~l
OS
V)sots
OSm
OS
Os
m
oo0r*1
ion 02+803CO
QCO
ooo
^rt
%
r-m
oOs
0Os
W"l
Os
VI
SO(N
m•*
V~i
oo'
m
O
OsOs(N
ion 02+85Soo
QCO
oo5tfr
•*
%
oom
oOS
OOs
vn
Os
VJ
SO(Nl
OSm
oo
m
oooOs(N
o?(N
Oco
3CO
QCO
00o^?
Tf
=tt
OSm
oOs
OS
Vl
o
in<N
OS
m
^
-
«->r~
S
oo
>noco
3oo
Q
CO
00o
SO
i?
%
oTj-
oOS
(NOs
V~i
0
WN(N
so*r
OOr4
-
oSOTf(S
oVV~lo
co
3CO
Qoo
oo5
so
•«*•
%
5-
oOS
<sOs
>n
o
U~l
fS
>n
v^
Os
OS
-
O
00-*fN
OOS+•^~O
co
3CO
QCO
oo5
so
Tt
%
<N•*
OOS
u-iOs
VIo
ov>fS
r-~
00
so
Os"
-
or~-
Tj-(S
«n
~TlOco
^3oo
QCO
ooo
so
•*t
%
m•<*•
•o
JS.
1
V•g
&<u>S•
•b*nd Cone Meths1/3
|
(N
+"
•aoj=i>auge Test Method; (*) - Sand Cone Test tvi Trench Backfillh 'S« Q
1 Ii CO
?£< Q. . c/5
° «Z o
|2 [2
is
1
CO
•"7" Q
'CO
Q
^W
LUQ
Q
-i m
OSa:tr
££< w
V)
LUo:
g
LL
oo
HWHI
UJ
Q
Q
UJ
z
*log
20KLL
£icoo
01 c/3
2^<°o
LU
oCO
o:Q.Q_<
o00CMCOCDO
LU
LLJ
oin
KJ08ZE9CH i
fljinyo
o-Project Name
Project Number
Calculated By
Checked By
Scale
)
o ^
O •=-
S
P
O
4
&^
\ &
Ie\
5 9
•s #
o
^
TT-
o
I if.VJ—
P
-V
cvrs
M
* (S
oore
Geotechnical and Environmental Sciences Consultants
June 27, 2008
Project No. 106328002
Ms. Sherri Howard
City of Carlsbad
1635 Faraday Avenue
Carlsbad, California 92008
Subject: Summary of Compaction Test Results
Cameo Road Water Main
Carlsbad, California
Dear Ms. Howard:
In accordance with your request, Ninyo & Moore has provided geotechnical testing services dur-
ing construction of the Cameo Road Water Main project located in Carlsbad, California.
Construction generally occurred between April 11, 2008 and April 21, 2008. Our services con-
sisted of on-call testing during the placement of water main backfill. This letter summarizes our
services and presents the results of our field and laboratory testing.
Laboratory testing was performed on representative samples of material used for water
main backfill to evaluate modified Proctor density and optimum moisture content. Labora-
tory testing of the samples was conducted in general accordance with American Society for
Testing and Materials (ASTM) D 1557 and the results are presented in Table 1, Modified
Proctor Density Test Results.
Field density testing of the water main backfill was performed in general accordance with the
ASTM D 6938 (Nuclear Method). The specified relative compaction for the water main back-
fill was 90 percent of the modified Proctor density. During the earthwork operations, when a
field density test was performed that resulted in less than the specified relative compaction, the
area was generally reworked and a retest was performed. The results of the field density tests
are presented in Table 2, Summary of Field Density Tests. The approximate locations of the
field density tests are shown on Figure 1, Field Density Test Location Map. The field density
5710 Ruffin Road • San Diego, California 92123 • Phone (858) 576-1000 • Fax (858) 576-9600
San Diego • Irvine • Ontario • Los Angeles • Oakland • Las Vegas • Carson City • Phoenix • Denver
Cameo Road Water Main
Carlsbad, California
June 27, 2008
Project No. 106328002
tests performed during the placement of water main backfill indicated the specified relative
compaction after testing the reworked areas.
The geotechnical services outlined in this report have been conducted in accordance with current
practice and the standard of care exercised by geotechnical consultants performing similar tasks
in this area. No warranty, expressed or implied, is made regarding the observations and conclu-
sions expressed in this report. The reported test results represent the relative compaction and
moisture content at the locations tested. It is important to note that the precision of field density
tests and the maximum dry density test is not exact and variations should be expected. The re-
ported locations and elevations of the density tests are estimated based on correlations with the
site plans. Further accuracy is not implied.
Respectfully submitted,
NINYO & MOORE
Francis O. Moreland, C.E.G.
Senior Geologist
FOM/MC/gg
Mark Cuthbert, RE.
Principal Engineer
Attachments: Table 1 - Modified Proctor Density Test Results
Table 2 - Summary of Field Density Tests
Figure 1 - Field Density Test Location Map
Distribution: (3) Addressee
FRANC1SO.MORELAND
No 2071
CERT1RED
NGINEERIN
GEOLOGIST
106328002 L Water Main.doc
Cameo Road Water Main
Carlsbad, California
June 27, 2008
Project No. 106328002
Table 1 - Modified Proctor Density Test Results
Soil
Type No.
1
2
3
Description
Yellowish tan silty SAND
Reddish brown silty SAND
Brown silty SAND
Laboratory
Dry Density
(pcf)
125.0
130.5
126.5
Optimum
Moisture Content
(%)
10.5
7.5
9.5
106328002 L Water Main.doc 1 of 1
TY TESTSVCH BACKFILL1/3 §
W rs h*
Q § «Q oo WJ S H^^ r*! ~j
S 0 >ta ^ ^
fe .0 0
^ F|V PH ••< G §
S 0 £
P 04 W
t/5 OH H
(Sswj(
H
0)
|
^^s&&^5^
^N5r
Ti
I
'iC
1
0
O
uo
2 RemarksRelativeCompaction(%)RelativeCompaction(%)E u **
•§ .2 c o--o. ° ° ^o S ^
S&Gu g u£ S &a- Q
^
u" g *SS £:
Q
|| £
'o o ^^
3|l
eo
!§_w
Test LocationV) (»*
V
nQ
It
^
ON
in
ON
in
NO(N
00•*
s
m
0
(NO
Oin
Oco
3oo
1
00o
—^
=tt
§
o
ON
(S
ON
m
NO
(S
„
om0
o
oco
300
£
oo0
—^
(N
co
C/3
(2
o
0000
s
—
•*'
„
0
o
r-
oco
$
1
00o
—
^
=tt
«
ON
ON
NOCN!
oin
(N
•n
O
fS0
r-
oco
00
1
oo0
—^
^
.
oON
NO
cn
p
-
or^O
oo
(Soco
3
&
000
—^
%
oON
0ON
ON
NO
m
ON
0
ro
O
O
m
Sco
oo
1
00o**•
^
NO
OON
ON
in
ON
m
NO(N
0m
ino
ro
O
fM0
m
~fMO
§
3
|
so0•*
^
%
oON
«
in
ON
in
NO
Tj-
r-
00
«
tr>
Om
O
sco
1
1
00oTf
^
00
oOS
ON
in
ON
in
NO
ON
in
00
ON
-
O
OO
o
sco
00
1
ooo
Tl-
^
:Reteston 11 |S
NO00
•n
ON
in
NO
fS
ON
00
ro
O
Om
o
NO
(Soco
00
s
00oin
T?
0
OON
%
in
ON
m
NO(N
TJ-
'
2
ro
0
o
o
NOsco
00
£
oooin
^
^tfc
oON
ON
in
ON
in
NO
NOr»1
in
ON
„
O
(N
Oin
oco
00
1
00ot-~
^
M
oON
ON
m
O
o
infS
00
ro
' '
ON
-
O
ON(N
ion 03+1000
s
ooor-~
^
*
oON
ON
in
oin(S
NOm'
00
ON
-
O
O
(N
Ooo
8co
300
1
ooor-
^
=tt
o
ON
0ON
in
ON
m
NO(N
Tj-
'
O
ON
ro
O
O00(N
O
tooco
300
£
00or-
^
m
0ON
inON
•n
ON
in
NO(S
in
O
o
ON
„
OOin
ion 04+75300
1
00o
—••^
NO
oON
ON
•n
ON
m
NO(N
r-
m•
00
-
p
o
NO(N
in(N
•n-oco
300
s
00
—
^
oON
ON
ino
o
in(N
m
Tj-
' '
in
-
o
^ion 05+ 1000
s
ooo
—
=tt
oo
•oojr
1
"O
§ "ii CO
< -^c
nd Cone Methslaimed Waterri u
T~ S• • .N<
-b" CQ1 -s(O C
auge Test Method; (*) - Sand Cone Test hral Trench Backfill; WM - Water Main TrO S!a 203 *-J
"a 33 a
o .• •Z o
>S1 VI
H H
So
I
wUJ
zQOa
oo;g_i
UJ CL
O QiUJ
CO
o
ZgH
oo
V)
UJ
z
UJo
Q
UJ
U.
0
6
J>
p£t< —i<><
Q .
°m
O W
UJ a;
<0o
UJ
UJUJn'
oa:
Q.<
lyinyo
Project Name
Project Number
Calculated By
Checked By
Scale
o
I
.5_r
CN
T O
6-
O
G
\
|4-l^
s_
$1
M
' /^,
oore
Geotechnical and Environmental Sciences Consultants
June 27, 2008
Project No. 106328002
Ms. Sherri Howard
City of Carlsbad
1635 Faraday Avenue
Carlsbad, California 92008
Subject: Summary of Compaction Test Results
Cameo Road Water Main
Carlsbad, California
Dear Ms. Howard:
In accordance with your request, Ninyo & Moore has provided geotechnical testing services dur-
ing construction of the Cameo Road Water Main project located in Carlsbad, California.
Construction generally occurred between April 11, 2008 and April 21, 2008. Our services con-
sisted of on-call testing during the placement of water main backfill. This letter summarizes our
services and presents the results of our field and laboratory testing.
Laboratory testing was performed on representative samples of material used for water
main backfill to evaluate modified Proctor density and optimum moisture content. Labora-
tory testing of the samples was conducted in general accordance with American Society for
Testing and Materials (ASTM) D 1557 and the results are presented in Table 1, Modified
Proctor Density Test Results.
Field density testing of the water main backfill was performed in general accordance with the
ASTM D 6938 (Nuclear Method). The specified relative compaction for the water main back-
fill was 90 percent of the modified Proctor density. During the earthwork operations, when a
field density test was performed that resulted in less than the specified relative compaction, the
area was generally reworked and a retest was performed. The results of the field density tests
are presented in Table 2, Summary of Field Density Tests. The approximate locations of the
field density tests are shown on Figure 1, Field Density Test Location Map. The field density
5710 Ruffin Road • San Diego, California 92123 • Phone (858) 576-1000 • Fax (858) 576-9600
San Diego • Irvine • Ontario • Los Angeles • Oakland • Las Vegas • Carson City • Phoenix • Denver
Cameo Road Water Main
Carlsbad, California
June 27, 2008
Project No. 106328002
tests performed during the placement of water main backfill indicated the specified relative
compaction after testing the reworked areas.
The geotechnical services outlined in this report have been conducted in accordance with current
practice and the standard of care exercised by geotechnical consultants performing similar tasks
in this area. No warranty, expressed or implied, is made regarding the observations and conclu-
sions expressed in this report. The reported test results represent the relative compaction and
moisture content at the locations tested. It is important to note that the precision of field density
tests and the maximum dry density test is not exact and variations should be expected. The re-
ported locations and elevations of the density tests are estimated based on correlations with the
site plans. Further accuracy is not implied.
Respectfully submitted,
NINYO & MOORE
Francis O. Moreland, C.E.G.
Senior Geologist
FOM/MC/gg
Mark Cuthbert, RE.
Principal Engineer
Attachments: Table 1 - Modified Proctor Density Test Results
Table 2 - Summary of Field Density Tests
Figure 1 - Field Density Test Location Map
Distribution: (3) Addressee
106328002 L Water Main.doc
Cameo Road Water Main
Carlsbad, California
June 27, 2008
Project No. 106328002
Table 1 - Modified Proctor Density Test Results
Soil
Type No.
1
2
3
Description
Yellowish tan silty SAND
Reddish brown silty SAND
Brown silty SAND
Laboratory
Dry Density
(pci)
125.0
130.5
126.5
Optimum
Moisture Content
(%)
10.5
7.5
9.5
106328002 L \VaterMain.doc 1 Of 1
IT TESTS^CH BACKFILL& 9^~jf Qu
W <N H
Q § <&
3 SNH-J f> nW NO •<
HH O >
tt, TH !>
fe .° i
£ H »HH £T FT,-< w Si s£S o 5^ s* at/5 OH H
fS
wJCQ
^^H
0)4•a^^.&
1)•5^<Remarkse
T5 ? JS 1 S 3-o S Q. e^
8.1 B ~M« o
c
a .2> +*.£ u /».*i « v?.S a. 5s*r
MI-^ -a •- c •"•
1 JI<5~2
0
3 s£eu J2 u£ 5 -S>£ o
*£Gu <» «5 S0
0>ta es3 § ^s « *o o ^S «
1JM
co
>£
Id
Test Location2 =
O)
re
ll
oO
ON
V~>
OX
w^
vO(S
CO
•*
rn
m
f)
0
(NOm
o<o+
oco
S00
£
oo0
Tf
%
oON
oON
•n
ON
"0
NO<s
ON
f^
ND
<N
ro
O
r»1Or^
0>r>+
Oco
SV)
S£
00o
•t
^t
(N
TJ-
eo
Q>o!
oON
0000
>o
ON
>o
NOfS
— •
•o
•*
r^
0
(NOm
>or-+_
oco
3C/3
J
000
•*
^t
m
o
ON
ON
in
ON
W"!
NO(S
o>n
M
ro
m
o
Sm
10r~
oco
S<n
S
£
00o
•*
=tt•*
oON
oON
U~l
ON
«o
NOfS
v-t
ro
q
<ri
r<">
0csoro
ion 02+003V)
S
ooo
TT
%
>n
OON
oON
V~t
ON
•n
NOts
r-
ro
ON
O
m
o
oCO
ion 02+25ISC/)
S£
000•*
-!f
=»:
NO
O
ON
ON
VI
ON
>n
NOcs
o
V~t
>n
0
m
O
fSoro
ion 02+ 15a(/3
^OOo
Tf
TJ-
=ftr-
oON
OON
>n
ON
•O
NO(N
•*
r-
od
m
IAV
Or*1
O•*+tsoc0
SC/3
S£
oo0•*
TT
%
OO
o
ON
fS
ON
<n
ON
v>
NO(S
ON
«1
00
ON
m
o
0of>
0r-+<NO
Co
3
C/3
^OOi
Tl-
51:
ON Reteston 11 |oON
NO00
>n
ON
v>
NO(N
(S<r>
oo"
m
0
om
oNO+
(NOco
3oo
S£
000>n
=st
o
g
oON
<f)
ON
«~>
NOCS
mTJ-
•*
m
O
Om
O
NO
fNO
C0
3C/3
S^
ooo>rv
=tt
OON
mON
m
ON
>n
NO(N
NO
K
U-l
ON
m
0•*r-fN
oV}
mOco
31/2
S£
000(^
%
fS
oON
ON
V~i
o>oCM
00M
ON
-
0
ON
fNl
O
Tmoc0
HC/3
S£
ooot-~
=tt
m
§
ON
>r>
o
>nr-4
NO
rn
00
ON
-
O
0f~rs
ooo+mOco
3oo
S
ooot^
=tt
Tt-
0
ON
oON
V~l
ON
>n
NOcs
Tj-
t
o
ON
rn
0
O00rs
om
m0c0
300
2£
ooor-
=tt
V~l
§
<n
ON
w->
ON
m
NOr~l
ino
o
ON
m
O
Oin(N
in
t—
Sc:o
3oo
S£
ooo
"*
=«:
NO
OON
ON
in
ON
in
NO(S
f~in1 '
m
00
r^i
O
OmNO(N
inrs
TtOc0
3oo
S
ooo
t
%
r~
oON
(NON
in
o
in(S
inf• '
in
-
oi^
Tj-(N
O
+inOco
3t>0
2£
OO
O
"t
=tt
00
T3oJHu
<u•o
">>o
> «•c •*Q «i 03
£ "5c<u•S f-nd Cone Methclaimed WaterCO u00 Q^
y(N •*
+: 1s•a CQ
1 -50 C
auge Test Method; (*) - Sand Cone Test IVral Trench Backfill; WM - Water Main TrO Si_ ^S3 J
73 a3 M? ^
° t;Z o
fS £
t/j
SO"Z.
co i!'
[T
iT^*°
' I
wLU
zQOQ
OCO_i
LU LL^523sx CO§K
[T UJ
gi-
oo
toUJh-
c/>z111
Q
Q
LJJ
f<
Q -<QO<or CQ
mo:
LU
gttQ.CL
s
M IP* jooszesm i B|J