CHESTNUT AVENUE STORM DRAIN
Caltrans Contract Number:
Prepared for:
CITY OF CARLSBAD
1635 FARADAY AVENUE
CARLSBAD, CALIFORNIA 92008
Submitted by:
HARRIS & ASSOCIATES
750 B STREET, SUITE 1800
SAN DIEGO, CA 92101
(619) 236-1778
ROBERT SUTHERLIN JR., PE
Project Site Address
CHESTNUT AVENUE BENEATH THE INTERSTATE 5
Contractor's Water Pollution Control Manaeer
Shawnetta Grandberry
(760) 602 2780 ext 7111
Contractor's Desisnated Water Pollution Control Insyector (if different from WPCM)
TO BE DETERMINED
WPCP Prepared bv:
HARRIS & ASSOCIATES
750 B STREET, SUITE 1800
SAN DIEGO, CA 92101
(619) 236-1778
ROBERT SUTHERLIN JR., PE - ASSOCIATE
WPCP Preparation Date
07/23/09
'I -
Water PolluHon Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
Contents
Section 10 WPCP Certification and Approval 10-1
10.1 Contractor's Certification and Approval by the Resident Engineer 10-1
Section 20 Project Information 20-1
Section 30 Pollution Sources and Control Measures ..30-1
30.1 Soil Stabilization (Erosion Control) and Sediment Control 30-1
30.1.1 Soil Stabilization BMPs 30-1
30.1.2 Sediment Control BMPs 30-4
30.1.3 Tracking Control BMPs 30-7
30.1.4 Wind Erosion Control BMPs 30-9
30.2 Construction Site Management 30-11
30.2.1 Non-Stormwater Management BMPs 30-11
30.2.2 Waste Management and Materials Pollution Control BMPs.30-14
30.3 Water Pollution Control Drawings (WPCDs) 30-17
30.4 Construction BMP Maintenance, Inspection, and Repair 30-17
30.5 Training 30-17
Section 40 Amendments 40-1
Section 50 Reporting .50-1
50.1 Discharge Reporting 50-1
WPCP Attachments
Attachment A Water Pollution Control Drawings
Attachment B Maintenance, inspection, and Repair of Construction Site BMPs
Attachment C Stormwater Quality Construction Site Inspection Checklist
Attachment D Amendments
Attachment E Notice of Discharge
Attachment F Discharge Reporting Log
Attachment G Trained Contractor Personnel Log
l:\Projects\Cahsbad\Norlhw«st Quad Storm Drains\Ches(nut AvenueVCaltrans Permit InformationVCaltrans WPCP forms\WPCP\WPCP_Chestnut Stomi Drain 7-23ra a.doc
WPCP Template 07-17-07 Page i
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
Section 10
WPCP Certification and Approval
10.1 Contractor's Certification and Approval by the Resident
Engineer
CONTRACTOR'S CERTIFICATION OF WPCP
"I certify under a penalty of law that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to ensure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the information,
the information submitted, to the best of my knowledge and belief is true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the
possibility of fine and imprisonment for knowing violations."
Signature Date
Name and Title Telephone Number
Is a Local Agency / Private Entity administering the project?
Yr No
For Use by Local Agency / Private Entity Only
LOCAL AGENCY / PRIVATE ENTITY RESIDENT ENGINEER'S APPROVAL OF WPCP
I, and/or personnel acting imder my direction and supervision, have reviewed this WPCP and find
that it meets the requirements set forth in the Special Provisions, the Caltrans SWPPP and WPCP
Preparation Manual, and the Standard Specifications Section 7-l.OlG - Water Pollution.
's Signafiire \ Date of WPCP Approval
Robert Sutherlin Jr. (619) 236-1778
Resident Engineer's Name (printed) Resident Engineer's Phone Number
For Use by Caltrans Only
CALTRANS OVERSIGHT ENGINEER'S CONCURENCE OF WPCP
I, and/or personnel acting under my direction and supervision, have reviewed this WPCP and concur
with the Resident Engineer's findings that it meets the requirements set forth in the Special
IAProfects\Carlsbad\Northwest Quad Stom Drains\Ctiestnut Avenue\Caltrans Peimit InformationVCallrans WPCP fonns\WPCP\WPCP_Ctieslnut Storm Drain 7-2*09 a.doc
WPCP Template 07-17-07 Page 10-1
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
Provisions, the Caltrans SWPPP and WPCP Preparation Manual, and the Standard Specifications
Section 7-l.OlG - Water Pollution.
Caltrans Oversight Engineer's Signature Date of WPCP Concurrence
Caltrans Oversight Engineer's Name Caltrans Oversight Engineer's Phone Number
PermltNo. j V ' C7g-|0?>D- C^TT
Reviewed By:
NPDES Route ManagBr Approval
^2 flddltonel {ximments
[~[ Incorporate comments as noted, no resubmit
Revise and Resubmit
l:\Pro)ecls\Carlsb3(i\Nonhwesi Quad Stomi Drains^ Chest nut Avenue\Caltrans Permit lnformation\Callrans WPCP formE\WPCP\WPCP_Chestnut Stomi Drain 7-23-09 a doc
WPCP Template 07-17-07 p^g^ ^
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
Section 20
Project Information
1. Introduction and Project Description:
The intent of this WPCP document is for it to be utilized as a starting point for tire Contractor to
develop a custom set of Best Management Practices (BMP's) that match \
construction operations. The City of Carlsbad will provide an electronic copy of this WPCP fo. the
Corctor's use and once finalized, printed and signed it is to be adhered to during construction.
The project consists of installing a stornr dram at the undercrossmg of Chestnut Avenue and
Mersia4 5 The work consists of construction of a new 18" ston. dram withm the street roadway.
2. Unique Site Features:
We are maintaining minimum cover over the pipe to minimize impacts to the existing roadway
prism.
3. Project Schedule (gi-aphical):
The City of Carlsbad will require the successful construction Contractor to finalize this "Baseline"
WPCP to ensure that the responsibility of its' continuous implementation rests with him or h . A
Z of the project start up, the Contractor will be required to prepare a detai ed project schedule that
outline! all of the major tasks m chronological order and all related BMP's shall be scheduled
accordingly.
The Contractor is required to eontmously maintain the project area in a clean and orderly
A ptt 0 he daily inspection routine, the City's Consti-uction Representative shall resei-ve the light
fo iCest enforeemei/of any BMP that ,s required in his or her oj.mon to ^--^^^^^^^^^
for pollution. The required erosion and sediment control materials, such as giavel bags, stieet
sweepers, etc., shall be accessable and available at all times.
Construction is expected to start in Aj^ril 2010 and be completed by October of 2010.
4. Potential Pollutant Sources:
Existing AC materials removed from the site, exposed native material as a result of removal and
placement of existing sidewalk and eurb/gutter and pipe trenching. Construction equipment fluids
(gas, oil, etc.) and tracking of debris and dust at the site.
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
INSERT GRAPHICAL WATER POLLUTION CONTROL SCHEDULE
THE SCHEDULE WILL BE PROVIDED BY THE CONTRACTOR ONCE THE PROJECT HAS
BEEN AWARDED.
l:\Projects\Carlsbad\Northwest Quad Storm Drains\Cheslnut Avenue\Caltrans Permit lnformation\Caltrans WPCP forms\WPCP\WPCP_Chestnut Storm Drain 7-Z3-09.doc
WPCP Template 07-17-07 Page 20-2
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
Section 30
Pollution Sources and Control Measures
30.1 Soil Stabilization (Erosion Control) and Sediment Control
30.1.1 Soil Stabilization BMPs
The following soil stabilization BMP implementation table indicates the BMPs that shall be
implemented to control erosion on the construction site. Implementation and locations of temporary
soil stabilization BMPs are shown on the WPCDs in Attachment A and described in this section. The
BMP working details can also be found in Attachment A of this WPCP. The following list of BMPs
and narrative explain how the selected BMPs will be incorporated into the project.
l:\Projects\CarlsbatftNofthwest Quad Stomn DrainsVChestnut Avenue\Caltrans Permit lnformation\CaHrans WPCP forms\WPCP\WPCP_Chestnut Storm Drain 7-23-09 a.doc
WPCP Template 07-17-07 Page 30-1
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
TEMPORARY SOIL STABILIZATION BMPs
CONSTRUCTION
BMP ID NO BMP NAME
MINIMUM
REQUIRE-
MENT
CONTRACT BMP USED CONSTRUCTION
BMP ID NO BMP NAME
MINIMUM
REQUIRE-
MENT BID ITEM YES NO IF NOT USED, STATE REASON
SS-1 Scheduling X m • • SS-2
Preservation of
Property/
Preservation of
Existing Vegetation
X X •
SS-3
Temporary
Hydraulic Mulch
(Bonded Fiber
Matrix)
• • X N/A
SS-3
Temporary
Hydraulic Mulch
(Polymer Stabilized
Fiber Matrix)
• • M N/A
SS-4
Temporary Erosion
Control (With
Temporary Seeding) • • M N/A
SS-5 Temporary Soil
Stabilizer • • X N/A
SS-6
Temporary Erosion
Control (Straw
Mulch with
Stabilizing
Emulsion)
• • X N/A
SS-7
Temporary Erosion
Control Blanket (On
Slope) • • X N/A
SS-7 Temporary Erosion
Control Blanket (In
swale or ditch) • • M N/A
SS-7 Temporary Cover
(Plastic Covers) •"(2) • • X N/A
SS-8 Temporary Mulch
(Wood) • • X N/A
SS-9
Earth Dikes /
Drainage Swales &
Lined Swales • • N/A
SS-10
Outlet Protection /
Velocity Dissipation
Devices • • X N/A
l:\Prqject5\Carlsbad\Northwest Quad Stomi Drains\Chestnut Avenue\Caltrans Permit lnformation\Caltrans WPCP forms\WPCP\WPCP_Ctiestnul Storm Drain 7-23-09 a.doc
WPCP Template 07-17-07 Page 30-2
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
TEMPORARY SOIL STABILIZATION BMPs
CONSTRUCTION BMP NAME
MINIMUM
REQUIRE-
MENT
CONTRACT BMP USED
IF NOT USED, STATE REASON BMP ID NO BMP NAME
MINIMUM
REQUIRE-
MENT BID ITEM YES NO IF NOT USED, STATE REASON
SS-11 Slope Drains • • m N/A
SS-12 Streambank
Stabilization • • m N/A
ALTERNATIVE SOIL STABILIZATiON BMPs USED"'
r Yes (I" No
IF USED, STATE REASON
^^^^^^^^^^
Notes:
The BMP designations (SS-1, SC-3, etc.) are solely for maintaining continuity with existing Caltrans documents and are not provided
to imply that the Construction Site BMP Reference Manual is a required contract document.
The Contractor shall ensure implementation of one of the two measures listed or a combination thereof to achieve and maintain the
contract's rainy and non-rainy season requirements.
Not all minimum requirements may be applicable to every project. Apphcabiltty to a specifc project shall be determined by the
Contractor and approved by the Resident Engineer.
Use of alternative BMPs will require written approval by the Resident Engineer.
No slopes are created with this project. The project removes and replaces concrete or AC pavement.
SS-1 - The contractor will prepare a schedule showing the duration for all necessary BMP measures.
SS-2 - Although work is entirely within the street, the contractor is responsible for maintaining any
existing vegetated slopes in their current conditions.
l:VProjects\Carisbaci\Nofthwesl Quad Stomi Dfains\Chestnut AvenueVCaltrans Permit lnforma(ion\Caltrans WPCP forTns\WPCP\WPCP_Chestnut Storm Drain 7-23-09 a.doc
WPCP Template 07-17-07 Page 30-3
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
30.1.2 Sediment Control BMPs
The following sediment control BNdP implementation table indicates the BMPs that shall be
implemented to control sediment on the construction site. Implementation and locations of
temporary sediment control BMPs are shown on the WPCDs in Attachment A and described in this
section. The BMP working details can also be found in Attachment A of this WPCP. The following
list of BMPs and narrative explain how the selected BMPs will be incorporated into the project.
l:\Projects\Carlsbad\Nonhwest Quad Storm Drains\CheslnuI Avenue\Catlrans Pemiit InformatiortCaltrans WPCP forms\WPCP\WPCP_Chestnut Stomn Drain 7-23-09 a.cJoc
WPCP Template 07-17-07 Page 30-4
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
TEMPORARY SEDIMENT CONTROL BMPs
CONSTRUCTION
BMP ID NO'^^ BMP NAME
MINIMUM
REQUIRE-
MENT
CONTRACT BMP USED
IF NOT USED. STATE REASON
CONSTRUCTION
BMP ID NO'^^ BMP NAME
MINIMUM
REQUIRE-
MENT BID ITEM YES NO IF NOT USED. STATE REASON
SC-1 Temporary Silt
Fence • • m N/A
SC-2 Temporary
Sediment Basin • • N/A
SC-4 Temporary Check
Dam • • X N/A
SC-5 Temporary Fiber
Rolls • • N/A
SC-6 Temporary Gravel
Bag Berm • • N/A
SC-7 Street Sweeping •
SC-8 Temporary
Sandbags • • m N/A
SC-9 Temporary Straw
Bale Barrier • • N/A
sc-ia Temporary Drain
Inlet Protection • •
ALTERNATIVE SEDIMENT CONTROL BMPs USED'''
C Yes <* No IF USED. STATE REASON
Notes:
The BMP designations (SS-1, SC-3, etc.) are solely for maintaining continuity with existing Caltrans documents and are not provided
to imply that the Construction Site BMP Reference Manual is a required contract document.
*^ The Contractor shall ensure implementation of one of the two measures listed or a combination thereof to achieve and maintain the
contract's rainy and non-rainy season requirements.
Not all minimum requirements may be applicable to every project. Applicability to a specific project shall be detennined by the
Contractor and approved by the Resident Engineer.
Use of alternative BMPs will require written approval by the Resident Engineer.
SC-7 - Street sweeping will be used to minimize tracking of exposed soils to any surrounding streets.
SC-10 - Storm drain inlet protection will be used at all operational internal inlets to the storm drain
system during the rainy season.
IAProjects\Car1sbad\hlorttTwest Quad Storm DrainsVCtieslnut Avenue\Caltrans Permit !ntofmation\Caltrans WPCP fcMms\WPCRWPCP_Chestnut Storm Drain 7-23-09 a.doc
WPCP Template 07-17-07 Page 30-5
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
l:\Projects\CarlsbatflNorthwest Qijad Stonn Drains\Ct>estnut AvenueVCaltrans Permit InformalionVCaltrans WPCP forms\WPCP\WPCP_ChestnLit Stomi Drain 7-23-09 a.doc
WPCP Template 07-17-07 Page 30-6
Water Pollution Control Program (WPCP)
CHESTNUT A VENUE STORM DRAIN
Contract No.
30.1.3 Tracking Control BMPs
The following tracking control BMP implementation table indicates the BMPs that shall be
implemented to reduce sediment tracking from the construction site onto private or public roads.
Implementation and locations of tracking control BMPs are shown on the WPCDs in Attachment A
and described in this section. The BMP working details can also be found in Attachment A of this
WPCP. The following list of BMPs and narrative explain how the selected BMPs will be
incorporated into the project.
l:\PrQfecJs\Caf1sbatftNorthwest Quad Storm Drains\Chestnut Avenue\Caltrans Pemiit lnfomiation\CaHrans WPCP forms\WPCP\VWCP_Chestnut Storm Drain 7-23-09 a.doc
WPCPTemplate07-17-07 Page 30-7
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
TEMPORARY TRACKING CONTROL BMPs
CONSTRUCTION
BMP ID NO'^' BMP NAME
MINIMUM
REQUIRE-
MENT
CONTRACT
BID ITEM
BMP USED
IF NOT USED, STATE REASON
CONSTRUCTION
BMP ID NO'^' BMP NAME
MINIMUM
REQUIRE-
MENT
CONTRACT
BID ITEM YES NO IF NOT USED, STATE REASON
SC-7 Street Sweeping M • •
TC-1
Temporary
Construction
Entrance • • X N/A
TC-2
Stabilized
Construction
Roadway • • m N/A
TC-3
Temporary
Entrance / Outlet
Tire Wash • • X N/A
ALTERNATIVE TRACKING CONTROL BMPs USED*"
r Yes r No
IF USED, STATE REASON
Notes:
The BMP designations (SS-1, SC-3, etc.) are solely for maintaining continuity with existing Caltrans documents and are not provided
to imply that the Construction Site BMP Reference Manual is a required contract document.
Use of afternative BMPs will require written approval by the Resident Engineer.
SC-7 - Street sweeping will be implemented to minimize tracking of exposed soils to any
surrounding streets.
l:\Proiects\CartsbacflNofthwesl Quad Storm Drains\Chestnut Avenue\Caltrans Permit InformationVCaltrans WPCP forms\WPCP\WPCP__Ctiestnut Storm Drain 7-23-09 a.doc
WPCP Template 07-17-07 Page 30-8
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
30.1.4 Wind Erosion Control BMPs
The following wmd erosion control BMP implementation table mdicates the BMPs that shall be
implemented to control wind erosion on the construction site. Implementation and locations of wind
erosion control BMPs are shown on the WPCDs in Attachment A and/or described in this section.
The BMP working details can be found in Attachment A. The following list of BMPs and narrative
explain how the selected BMPs shall be mcorporated into the project.
l:\Projects\Carlsbad\Northwesl Quad Storm DrainsVCheslnul AvenueVCaltrans Pemiit InformationVCallrafis WPCP fMms\WPCP\WPCP_Chestnu( Stomi Drain 7-23^D9 a.doc
VifPCP Template 07-17-07 PagS 30-9
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
TEMPORARY WIND EROSION CONTROL BMPs
CONSTRUCTION
BMP ID N0'^> BMP NAME
MINIMUM
REQUIRE-
MENT*^'
CONTRACT
BID ITEM
BMP USED
IF NOT USED, STATE REASON CONSTRUCTION
BMP ID N0'^> BMP NAME
MINIMUM
REQUIRE-
MENT*^'
CONTRACT
BID ITEM YES NO IF NOT USED, STATE REASON
WE-1 Wind Erosion
Control • • X N/A
TC-1
Temporary
Construction
Entrance
• • N/A
TC-2
Stabilized
Constnjction
Roadway
• • m N/A
All Soil
Stabilization
Measures
included in
Section 500.3.4
• • X N/A
ALTERNATIVE WIND EROSION CONTROL BMPs USED''
r Yes r No
IF USED, STATE REASON
Notes:
The BMP designations (SS-1, SC-3, etc.) are solely for maintaining continuity with existing Caltrans documents and are not provided
to imply that the Construction Site BMP Reference Manual is a required contract document.
Not all minimum requirements may be applicable to every project. Applicability to a specific project shall be detennined by the
Contractor and approved by the Resident Engineer.
Use of alternative BMPs will require written approval by the Resident Engineer.
l:\Projects\CarIstiad\Nofttiwest Quad Stomi Drains\Ctiestnut AvenueVCaltrans Pemiit Information\Caltrans WPCP fomis\WPCP\WPCP_Ctiestnut Storm Drain 7-23-09 a.doc
WPCP Template 07-17-07 Page 30-10
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
30.2 Construction Site Management
30.2.1 Non-Stormwater Management BMPs
The following BMP implementation table indicates the BMPs that have been selected to control non-
stormwater pollution on the construction site. Implementation and locations of non-stormwater
control BMPs are shown on the WPCDs in Attachment A and described in this section. The BMP
working details that will be adhered to are found in Attachment A of this WPCP.
l:\Projects\Carlsbad\NontiwestQuacl Storm DrainsVChestnut AvenueVCaltrans Permit lnformation\CaltrarsWPCPfomis\WPCP\WPCP_ClTestnut Slorm Drain 7-23^)9 a.doc
WPCP Template 07-17-07 Page 30-11
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
CONSTRUCTION SITE MANAGEMENT
NON-STORMWATER MANAGEMENT POLLUTION CONTROL BMPs
CONSTRUCTION
BMP ID NO BMP NAME
MINIMUM
REQUIRE-
MENT
CONTRACT
BID ITEM
BMP USED
IF NOT USED, STATE REASON
CONSTRUCTION
BMP ID NO BMP NAME
MINIMUM
REQUIRE-
MENT
CONTRACT
BID ITEM YES NO IF NOT USED, STATE REASON
NS-1 Water Control and
Conservation • • N/A
NS-2 Dewatering • • N/A
NS-3
Paving, Sealing,
Sawcutting, and
Grinding
Operations
X •
NS-4 Temp Stream
Crossing • • N/A
NS-5 Clear Water
Diversion • • X N/A
NS-6
Illegal Connection
and Illegal
Discharge
Detection
Reporting
• X •
NS-7 Potable Water/
Irrigation • • X N/A
NS-8
Vehicle and
Equipment
Cleaning • • N/A
NS-9
Vehicle and
Equipment
Fueling • • N/A
NS-10
Vehicle and
Equipment
Maintenance • • X N/A
NS-11 Pile Driving
Operations • • N/A
NS-12 Concrete Curing • •
NS-13
Material and
Equipment Used
Over Water
• • N/A
NS-14 Concrete
Finishing • •
l:VProjects\Carlsbad\Nortfwest Quad Storm Drains\Ctiestnut AvenueVCaltrans Pemiit InformatiortCaltrans WPCP fomns\WPCP\WPCP_Chestnut Storm Drain 7-23-09 a.doc
WPCPTemplate07-17-07 Page 30-12
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
CONSTRUCTION SITE MANAGEMENT
NON-STORMWATER MANAGEMENT POLLUTION CONTROL BMPs
CONSTRUCTION
BMP ID NO BMP NAME
MINIMUM
REQUIRE-
MENT
CONTRACT
BID ITEM
BMP USED
IF NOT USED, STATE REASON
CONSTRUCTION
BMP ID NO BMP NAME
MINIMUM
REQUIRE-
MENT
CONTRACT
BID ITEM YES NO IF NOT USED, STATE REASON
NS-15
Structure
Demolition /
Removal Over or
Adjacent to Water
• • N/A
ALTERNATIVE NON-STORMWATER CONTROL BMPs USED'*'
r Yes C No IF USED, STATE REASON
Notes:
The BMP designations (SS-1, SC-3, etc.) are solely for maintaining continuity with existing Caltrans documents and are not provided
to imply that the Construction Site BMP Reference Manual is a required contract document.
*^ Not all minimum requirements may be applicable to every project. Applicability to a specific project shall be detennined by the
Contractor and approved by the Resident Engineer.
The BMPs listed above are incidental and do not include operations included as separate line items in the contract.
*** Use of alternative BMPs will require written approval by the Resident Engineer.
NS-3 - Saw-cutting operations shall not be conducted during or immediately prior to rainfall events.
Dried and cured concrete wastes shall be disposed offsite during concrete washout maintenance
activities.
NS-6 - The contractor will implement the Illegal Connection/Illegal Discharge Detection Reporting
BMP throughout the duration of the project.
NS-12 , NS-14 - Protect drain inlets prior to the application of curing compounds. Excess cure water
and water from high pressure blasting will be collected and disposed of, and will not be allowed to
runoff to inlets or swales. Wet blankets will be used wherever possible to eliminate excess cure
water.
I:\P^ojec^s\Carisbad\^4o^thwest Quad Storm DrainsVCtiestnul AvenueVCaltrans Pennil tnfomiationVCaltrans WPCP fonns\WPCP\WPCP_Cheslnut Storm Drain 7-23-09 a.doc
WPCPTemplate07-17-07 Page 30-13
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
30.2.2 Waste Management and Materials Pollution Control BMPs
The following BMP implementation table indicates the BMPs that have been selected to control
construction site wastes and materials. Implementation and locations of materials handling and waste
management BMPs are shown on the WPCDs in Attachment A. The BMP working details that will
be adhered to are found in Attachment A of this WPCP. The following list of BMPs and narrative
explain how the selected BMPs will be incorporated into the project.
l:VProjects\Carlsbad\Nortiwest Quad Storm DrainsVChestnut AvenueVCaltrans Permit InfomiationVCaltrans WPCP forms\WPCP\WPCP_Chestnut Storm Drain 7-23-09 a.doc
WPCP Template 07-17-07 Page 30-14
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
CONSTRUCTION SITE MANAGEMENT
WASTE MANAGEMENT AND MATERIALS POLLUTION CONTROL BMPs
CONSTRUCTION
BMP ID NO BMP NAME
MINIMUM
REQUIRE-
MENT
CONTRACT
BID ITEM
BMP USED
IF NOT USED, STATE REASON CONSTRUCTION
BMP ID NO BMP NAME
MINIMUM
REQUIRE-
MENT
CONTRACT
BID ITEM YES NO IF NOT USED, STATE REASON
WM-1 Material Delivery
and Storage / • • N/A
WM-2 Material Use • • N/A
WM-3 Stockpile
Management • • N/A
WM-4 Spill Prevention and
Control • m •
WM-5 Solid Waste
Management • m •
WM-6 Hazardous Waste
Management • • m N/A
WM-7 Contaminated Soil
Management • • m N/A
WM-8
Concrete Waste
Management •
WM-8 Temporary Concrete
Washout Facility • • N/A WM-8
Temporary Concrete
Washout (Portable) • • m N/A
WM-9 Sanitary/Septic
Waste Management • • N/A
WM-10 Liquid Waste
Management • • N/A
ALTERNATIVE WASTE MANAGEMENT AND
MATERIALS POLLUTION CONTROL BMPs USED''*
r Yes r No
IF USED, STATE REASON
Notes:
The BMP designations (SS-I, SC-3, etc.) are solely for maintaining continuity with existing Caltrans documents and are not provided
to imply that the Construction Site BMP Reference Manual is a required contract document.
Not all minimum requirements may be applicable to every project. Applicability to a specific project shall be verified by the Contractor
or detemiined by Caltrans.
The BMPs listed above are incidental and do not include operations included as separate line items in the contract.
Use of alternative BMPs will require written approval by the Resident Engineer.
WM-4 - Spill Prevention and Control shall be implemented to contain and clean-up spills and
prevent material discharges to the storm drain system.
l:\Proiects\Carlsbad\Norttiwest Quad Storm Drains\Chestnut Avenue\Caltrans Permit InformationVCaltrans WPCP forms\WPCP\WPCP_Ctiestnul Stomi Drain 7-23-09 a.doc
WPCP Template 07-17-07 Page 30-15
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
WM-5 -Solid wastes shall be loaded directly onto trucks for offsite disposal. When onsite storage is
necessary, solid wastes shall be stored in watertight dumpsters in the general storage area of the
contractor's yard.
WM-8 - Concrete Waste Management shall be implemented in accordance with contract documents.
l:\Projects\Carist>atJ\Nor1hwest Quad Stomi Drains\Ctiestnut Avenue\Caltrans Permit lnformation\Caltrans WPCP forTTs\WPCP\WPCP_Ctiestniit Storm Drain 7-23-09 a.doc
WPCP Template 07-17-07 Page 30-16
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
30.3 Water Pollution Control Drawings (WPCDs)
The WPCDs are included as Attachment A to this Water Pollution Control Program.
30.4 Construction BMP Maintenance, Inspection, and Repair
A completed Inspection, Maintenance, and Repair Program shall be provided in Attachment B of the
WPCP.
Site inspections shall be conducted by the Contractor's WPCM or other Caltrans approved 24-hoiir
trained staff at the following minimum frequencies:
• Prior to a forecast storm.
• After a rain event that causes runoff from the construction site.
• At 24-hour intervals during extended rain events.
• Daily inspections within the Lake Tahoe Hydrologic Unit.
• Weekly during the rainy season.
• Every 2 weeks during the non-rainy season; and
• At any other time(s) or intervals of time specified in the Contract Special Provisions.
Completed inspection checklists (Attachment C) will be submitted to the Resident Engineer within
24 hours of inspection. Copies of the completed checklists will be kept with the WPCP. A tracking
or follow-up procedure shall follow any inspection that identifies deficiencies in BMPs.
30.5 Training
The Water Pollution Control Manager (WPCM) assigned to this project is:
WPCM'sName-
Telephone Number(s)-
Contractor's Company Name-
Contractor's Address -
City, State, Zip-
The WPCM shall have primary responsibility and significant authority for the implementation,
maintenance, inspection and amendments to the approved WPCP. The WPCM will be available at
all times throughout duration of the project. Duties of the Contractor's WPCM include but are not
limited to:
- Ensuring jEuU compliance with the WPCP and the Permit; and
- Implementing all elements of the WPCP.
The WPCM shall have the authority to mobilize crews in order to make immediate repairs to the
water pollution control measures.
l:\Proiecls\Carlst)ad\Nonhwest Quad Storm DrainsVCtiestnut AvenueVCaltrans Permit lnformation\Caltrans WPCP forms\WPCP\WPCP_Ctiestnut Storm Drain 7-23-09 a.doc
WPCP Template 07-17-07 Page 30-17
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
The training log showing formal and informal training of various personnel is shown in Attachment
G. A copy of all training certificate(s) (e.g., Caltrans 24 Hour Training Class, etc.) for the WPCM
and the WPCP Preparer are included in Attachment G. Training records shall be updated,
documented and reported in the WPCP quarterly. Documentation of new training shall be submitted
to the Resident Engineer within 24-hours of training.
This WPCP was prepared by Harris & Associates, Robert Sutheriin Jr., PE, RCE 38819, exp 3-31-
11.
l:\Projects\Carlsbad\Nonhwest Quad Storm DrainsVCtiestnut AvenueVCaltrans Pemiit InformationVCaltrans WPCP forms\WPCP\WPCP_Chestnut Stom Drain 7-23-09 a.doc
WPCP Template 07-17-07 Page 30-18
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
Section 40
Amendments
The WPCP shall be amended whenever there is a change in construction or operations that may
cause the discharge of significant quantities of pollutants to surface waters, ground waters, municipal
storm drain systems, or when deemed necessary by the Resident Engineer. All WPCP amendments
shall be documented in letter format and include revised WPCD sheets, as appropriate. WPCP
amendments shall be certified by the contractor and require approval by the Caltrans or Local
Agency / Private Entity Resident Engineer (and Caltrans Oversight Engineer if applicable).
Approved amendments and log shall be attached to the Contractor's on-site WPCP in Attachment D.
Project Name: CHESTNUT AVENUE STORM DRAIN
Caltrans Contract Number:
Amendment
No. Date Brief Description of Amendment Prepared By
I.VProjects\Car1sbad\NortlTwesl Quad Stonn DrainsVChestnut AvenueVCaltrans Pemiit lnfonnation\Caltfans WPCP forms\WPCP\WPCP_Chestnul Slorm Drain 7-23-09 a.doc
WPCP Template 07-17-07 Page 40-1
Water Pollution Control Program (WPCP)
CHESTNUT AVENUE STORM DRAIN
Contract No.
Section 50
Reporting
50.1 Discharge Reporting
If a discharge occurs or if the project receives a written notice or order fi-om any regulatory agency,
the contractor will immediately notify the Engineer and will file a written report to the Resident
Engineer within 7 days (3 days for Districts 7 and 11) of the discharge event, notice, or order.
Corrective measures will be implemented immediately following the discharge, notice or order. A
Notice of Discharge form is provided in Attachment E. All discharges shall be documented on a
Discharge Reporting Log in Attachment F.
The report to the Resident Engineer will contain the following items;
• The date, time, location, nature of operation, and type of discharge, including the cause or
nature of the notice or order.
• The BMPs deployed before the discharge event, or prior to receiving notice or order.
• The date of deployment and type of BMPs deployed after the discharge event, or after
receiving the notice or order, including additional BMPs installed or planned to reduce or
prevent re-occurrence.
• An implementation and maintenance schedule for any affected BMPs.
Discharges requiring reporting include:
• Stormwater from a DSA discharged to a waterway without treatment by a temporary
construction BMP.
• Non-stormwater, except conditionally exempted discharges, discharged to a waterway or a
storm drain system, without treatment by an approved control measure (BMP).
• Stormwater discharged to a waterway or a storm drain system where the control measures
(BMPs) have been overwhelmed or not properly maintained or installed.
• Discharge of hazardous substances above the reportable quantities in 40 CFR 117.3 or 302.4.
• Stormwater runoff containing hazardous substances from spills discharged to a waterway or
storm drain system.
• Discharges that may endanger health or the environment.
• Other discharge reporting as directed by the Resident Engineer.
l:\Projects\CarlsbacflNortfwest Quad Storm DrainsVCtiestnut Avenue\Caltrans Permit Information\Callrans WPCP forms\WPCP\WPCP_Ctiestnul Stomi Drain 7-23-09 a.doc
WPCP Template 07-17-07 Page 50-1
Attachment A
Water Pollution Control Drawings
Caltrans Stormwater Quality Handbooks
SWPPP/WPCP Preparation Manual Water Pollution Control Drawings
March 1,2007 1 of 1
storm Drain Inlet Protection SC-10
Geotextile Blanket
600 m
Silt Fence per SC-01
SECTION A-A
Sheet flow
Less than
0.4 ha (1 ac)
150 mm Min
overlap at ends
of silt fence.
— Geotextile Blanket
Silt Fence per SC-01
PI PROTECTION TYPE 1
NOT TO SCALE
NOTE-S:
1. ^or use in areas where grading has been completed and final soil stabilization
and seeding are pending,
2. Not applicable in paved areas,
3. i^ot applicable with concentrated flows.
man^^ Caltrans Storm Water Quality Handbooks
mS^S Construction Site Best Management Practices Manual
March 1,2003
Section 4
Storm Drain Inlet Protection SC-10
5 of 7
Concrete Waste Management WM-8
SANDBAG
IQ mil PLASTIC LINiNG
T"
1 m
LATH MiD
FLAGGING ON x
5 SIDES \
VARIES
•
•
n
BERU
NOT TO SCALE
• ODD
3m MINiUUW
SANDBAG
/
10 mil PUSTIC LINING
WODD FRAME SECURELY
FASTTENED AROUND
WITH TU'O STAKES
D
•
•
a • • •
PLAH
NOT TO SCALE
TYPE "BELOW GRADE"
BERM
NOTES:
1, ACTUAL LAYOUT DETERMINED IN THE RELD.
2 THE CONCRETE WAShOUT SIGN (SEE PAGE 6; SHALL
BE INSTALLED WITHIN tO m OF THE TEMPOR^yRY
CONCRETE WASHOUT FACILITY.
A'
rWO-STACKED
2xT2 ROUGH
WOOD FRAME
VARIES
-10 mil PLASTIC UNING
SECTIDH B-B-
NOT TO SCALE
3m MINIMUM
10 mil PLASTIC UNiNG
7
PLAH
NOT TO SCALE
nPE "ABOVE GRADE"
WITH WOOD PUNKS
i-i
STAKE
(TYP-)
Caltrans Storm Water Quality Handbooks
Construction Site Best Management Practices Manual
OATI^ March 1,2003
Section 8
Concrete Waste Management WM-8
6 of 7
Concrete Waste Management WM-8
STAPLES
(2 PER BALE)
WOOD OR METAL
STAKES (2 PER BALE)
VARIES
STRAW BALE
BINDING WIRE
/ •• 10 mil PLASTIC LINING
NATIVE MATERIAL
(OPTIONAL)
/
SECTION B"B'
NOT TO SCALE
.r— 3m MINIMUM —
10 mil PLASTIC UNING -
NOT TO SCALE
TYPE "ABOVE GRADE"
WITH STRAW BALES
NOTES:
1. ACTUAL LAYOUT DETERMINED IN THE FIELD.
2. THE CONCRETE WASHOUT SIGN (SEE F!G. 4-15)
SHALL BE INSTALLED WITHIN 10 m OF THE
TEMPORARY CONCRETE WASHOUT FACILITIY,
STAKE
(TYP.) R FT
CONCRETE 11
WASHOUT -j-f-
B' I 915 mm
915 mm t
1' CONCRHE WASHOUT
SIGN DETAIL
(OR EQUIVALENT)
50 mm
PLWOOD
1200 mm x 610 mm
PAINTED WHITE
BLACK LETTERS
150 mm HEIGHT
L*.G SCREWS
(12,5 mm)
WOOD POST
(89 mm x 89 mm x 2.4 m)
STRAW BALE
(TYP.) 200 mm 3.05 mm DIA.
STEEL WIRE
STAPLE DETAIL
CALTRANSAtC*-1 *.DWG SAC 8-14-02
MjSMgf Caltrans Storm Water Quality Handbooks
mSS^S Construction Site Best Management Practices Manual
^a™^ March 1,2003
Section 8
Concrete Waste Management WM-8
7 of 7
Attachment B
Maintenance, Inspection and Repair of Construction Site BMPs
PROJECT NOT YET UNDER
CONSTRUCTION
Attachment B
Maintenance, Inspection, and Repair of Construction Site BMPs
SWPPP Inspection, Maintenance and Reoair Proaram
BEST MANAGEMENT INSPECTION FREQUENCY
PRACTICES (BMPs) Rainy Non-Rainv MAINTENANCE/REPAIR PROGRAM
TEMPORARY SOIL STABILIZATION BMPs
SS-1 Scheduling
SS-2 Preservation of
Property/Preservati
on of Existing
Vegetation
•
TEMPORARY SEDIMENT CONTROL BMPs
SC-7 Street Sweeping
• SC-10 Temporary Drain
inlet Protection
WIND EROSION CnNTROt RMP«
TRACKINO CONTROI RMPc
SC-7 Street Sweeping • • NON-STORM WATER MANAGEMENT BMPs
NS-3 Paving, Sealing,
Sawcutting, and
Grinding Operations • NS-6 Illegal Connection and
Illegal Discharge
Detection Reporting • NS-12 Concrete Curing • iEMnms
Caltrans Stormwater Quality Handbooks
SWPPP/WPCP Preparation Manual
March 1. 2007 Maintenance, Inspection and Repair of Construction Site BMPs
1 of 2
Attachment B
Maintenance, Inspection and Repair of Construction Site BMPs
SWPPP Inspection, Maintenance and Reoair Proaram
BEST MANAGEMENT
PRACTICES (BMPs)
INSPECTION FREQUENCY MAINTENANCE/REPAIR PROGRAM BEST MANAGEMENT
PRACTICES (BMPs) Rainy Non-Rainy MAINTENANCE/REPAIR PROGRAM
NS-14 Concrete Finishing
•
WASTE MANAGEMENT AND MATERIALS POLLUTION CONTROL BMPs
WM-4 Spill Prevention and
Control • • WM-5 Solid Waste
Management
• •
WM-8 Concrete Waste
Management • •
Site inspections shall be conducted by the Contractor's WPCM or other Caltrans approved 24-hour
trained staff at the following minimum frequencies: O v
• Prior to a forecast stonn;
• After a rain event that causes runoff from the construction site; • ^
• Al 24-hour intervals during extended rain events;
• Daily inspections within the LakeTahoe: Hydrologic Unit;
• Weekly during the rainy season;
• Every 2 weeks during the non-rainy season; and
• At any other time(s) or intervals of time specified in the Contract Special Provisions.
Completed inspection ehecklists, shall he submitted to the Resident Engineer within 24 hours of
inspection. Copie&sof the; completed checklists will be kept with the WPCP. A tracking or follow-
up procedure shall follow any inspection that identifies deficiencies in BMPs.
Caltrans Stormwater Quality Handbooks
SWPPPAWPCP Preparation Manual
March 1, 2007
Maintenance, Inspection and Repair of Construction Site BMPs
2 of 2
Attachment C
stormwater Quality Construction Site Inspection Checklist
GENERAL INFORMATION
Project Name Chestnut Avenue - City of Carlsbad
Caltrans Contract No.
Contractor Not Known as of yet
Inspector's Name Not Known as of yet
Inspector's Title Not Known as of yet
Signature
Date of Inspection Not Known as of yet
Inspection Type
(Check Applicable)
n Prior to forecast rain • After a rain event
n 24-hr intervals durinq extended rain G Other
Season
(Check Applicable) • Rainy • Non-Rainy
Storm Data
Storm Start Date & Time: Storm Duration (hrs):
Storm Data Time elapsed since last
storm (Circle Applicable Units) Min. Hr. Days
Approximate Rainfall
Amount (mm)
PROJECT AREA SUMMARY AND
DISTURBED SOIL AREA (DSA) SIZE LIMITS FROM SPECIAL PROVISIONS
Total Project Area
Rainy Season DSA Limit
Field Estimate of Non-Active DSAs
Field Estimate of Active DSAs
Hectares
Hectares
Hectares
Hectares
0.004 Acres
Less than 0,004 Acres
Acres
Acres
Note: This will be done during construction
Caltrans Stonmvrater Quality Handbooks
SWPPP/WPCP Preparation Manual
March 1,2007
Stormwater Quality Construction Site Inspection Checklist
1 of 7
Attachment C
Stormwater Quality Construction Site Inspection Checklist
OTHER REQUIREMENTS
Requirement Yes No N/A Corrective Action
Preservation of Existing Vegetation
Is temporary fencing provided to preserve vegetation in areas
wtiere no construction activity is planned?
Location
Location
Location
Location
Temporary Soil Stabilization
Does the applied temporary soil stabilization provide 100%
coverage for the required areas?
Are any non-vegetated areas that may require temporary soil
stabilization?
Is the area where temporary soil stabilization required free from
visible erosion?
Location
Location
Location
Location
Temporary Linear Sediment Barriers
Are temporary linear sediment barriers properly installed in
accordance with the details, functional and maintained?
Are temporary linear sediment barriers free of accumulated litter?
Is the built-up sediment less than 1/3 the height of the barrier?
Are cross barriers installed where necessary and properly
spaced?
Are fiber rolls installed and maintained on required slopes in
accordance with the details, functional and maintained?
Location:
Location:
Location:
Location:
Location:
Storm Drain Inlet Protection
Are storm drain inlets internal lo the project properly protected
with either Type 1, 2 or 3 inlet protection?
Are storm drain inlet protection devices in working order and
being properly maintained?
Location:
Location:
Location:
Location:
Stormwater Quality Construction Site Inspection Check List
2 of 7
Caltrans Stormwater Quality Handbooks
SWPPP/WPCP Preparation Manual
March 1, 2007
Attachment C
Stormwater Quality Construction Site Inspection Checklist
OTHER REQUIREMENTS
Requirement Yes No N/A Corrective Action
Location:
Desilting Basins
Are basins maintained to provide the required
retention/detention?
Are basin controls (inlets, outlets, diversions, weirs, spillways,
and racks) in wori<inq order?
Location:
Location;
Location:
Location:
Stockpiles
Are all locations of temporary stockpiles, including soil,
hazardous waste, and constnjction materials in approved areas?
Are stockpiles protected from run-on, run-off from adjacent areas
and from winds?
Are stockpiles located at least 50 ft from concentrated flows,
downstream drainage courses and storm drain inlets?
Are required covers and/or perimeter controls in place?
Location:
Location:
Location:
Location:
Concentrated Flows
Are concentrated flow paths free of visible erosion?
Location
Location
Location
Location
Tracking Control
Are points of ingress/egress to public/private roads inspected,
swept, and vacuumed daily?
Are all paved areas free of visible sediment tracking or other
particulate matter?
Is rock at Temporary Construction Entrance(s) 12-inches or more in
thickness?
Does sediment need to be removed from the rock, or does the rock need
to be replaced?
For Type 2 Construction Entrance, does sediment need to be removed
from ribbed plates?
Location:
Location:
Location;
Location;
Caltrans Stormvrater Quality Handbooks
SWPPPAWPCP Preparation Manual
March 1, 2007
Stormwater Quality Construction Site Inspection Checklist
3 of 7
Attachment C
Stormwater Quality Construction Site Inspection Checl<list
OTHER REQUIREMENTS
Requirement Yes No N/A Corrective Action
Wind Erosion Control
Is dust control implemented in conformance with Section 10 of
the Standard Specifications?
Location:
Location:
Location:
Location:
Dewatering Operations
Is dewatering handled in conformance witti the dewatering permit
issued by the RWQCB?
Is required treatment provided for dewatering effluent?
Location:
Location:
Location:
Location:
Vehicle & Equipment Fueling, Cleaning, and Maintenance
Are vehicle and equipment fueling, cleaning and maintenance
areas reasonably clean and free of spills, leaks, or any other
deleterious material?
Are vehicle and equipment fueling, cleaning and maintenance
activities performed on an impermeable surface in dedicated
areas?
If no, are drip pans used?
Are dedicated fueling, cleaning, and maintenance areas located
at least 15 m away from downstream drainage facilities and
watercourses, and protected from run-on and runoff?
Is wash water contained for infiltration/ evaporation and disposed
of outside the hiqhway right of way?
Is on-site cleaning limited to washing with water (no soap, soaps
substitutes, solvents, or steam}?
On each day of use, are vehicles and equipment inspected for
leaks and if necessary, repaired?
Location:
Location:
Location:
Location:
Waste Management & Materials Pollution Control
Are material storage areas and washout areas protected from
run-on and runoff, and located at least 50 ft from concentrated
flows and downstream drainage facilities?
Are all material handling and storage areas clean; organized; free
of spills, leaks, or any other deleterious material; and stocked
with appropriate clean-up supplies?
Are liquid materials, hazardous materials, and hazardous wastes
stored in temporary containment facilities?
Stormwater Quality Construction Site Inspection Check List
4 of 7
Caltrans Stormwater Quality Handbooks
SWPPPA/VPCP Preparation Manual
March 1, 2007
Attachment C
Stormwater Quality Construction Site Inspection Checl<list
OTHER REQUIREMENTS
Requirement Yes No N/A Corrective Action
Are bagged and boxed materials stored on pallets?
Are hazardous materials and wastes stored in appropriate,
labeled containers?
Are proper storage, clean-up, and spill-reporting procedures for
hazardous materials and wastes posted in open, conspicuous
and accessible locations adiacent to storage areas?
Are temporary containment facilities free of spills and rainwater?
Are temporary containment facilities and bagged/boxed materials
covered?
Are temporary concrete washout facilities designated and being
used?
Are temporary concrete washout facilities functional for receiving
and containing concrete waste and are concrete residues
prevented from entering the drainaqe system?
Do temporary concrete washout facilities provide sufficient
volume and freeboard for planned concrete operations?
Are the temporary concrete washout facilities' PVC liners free
from punctures and holes?
Are concrete wastes, including residues from cutting and
grinding, contained and disposed of off-site or in concrete
washout facilities?
Are spills from mobile equipment fueling and maintenance
properiy contained and cleaned up?
Is the site free of litter?
Are trash receptacles provided in the Contractor's yard, field
trailer areas, and at locations where workers congregate for lunch
and break periods?
Is litter from work areas within the construction limits of the
proiect site collected and placed in watertight dumpsters?
Are waste management receptacles free of leaks?
Are the contents of waste management receptacles properiy
protected from contact with storm water or from being dislodged
by winds?
Are waste management receptacles filled at or beyond capacity?
Location:
Location:
Location:
Location:
Temporary Water Body Crossing or Encroachment
Are temporary water body crossings and encroachments
constructed as shown on the plans or as approved by the
engineer?
Does the project conform to the requirements of the 404 permit
and/or 1601 agreement?
Location:
Location:
Location:
Location:
Caltrans Stormwater Quality Handbooks
SWPPP/WPCP Preparation Manual
March 1, 2007 Stormwater Quality Construction Site Inspection Checklist
5 of 7
Attachment C
Stormwater Quality Construction Site Inspection Checklist
OTHER REQUIREMENTS
Requirement Yes No N/A Corrective Action
Illicit Connection/Illegal Discharge Detection and Reporting
Is there any evidence of illicit discharges or illegal dumping on
the project site?
if yes, has the Engineer been notified?
Location:
Location:
Location;
Location:
Discharge Points
Are discharge points and discharge flows free from noticeable
pollutants?
Are discharge points free of any significant erosion or sediment
transport?
Location:
Location:
Location:
Location:
WPCP/SWPPP Update
Do the WPCP/SWPPP, Project Schedule/Water Pollution Control
Schedule and WPCDs adequately reflect the current site
conditions and contractor operations?
Are all BMPs shown on the WPCDs installed in the proper
location(s) and accordinq to the details for the plan?
Location:
Location:
Location;
Location;
General
Are there any other potential water pollution control concerns at
the site?
Location:
Location;
Location:
Location:
Storm Water Monitoring
Does storm water discharge directly to an water body listed as
Impaired for sediment/sedimentation or turbidity in the General
Construction Activity Permit?
If yes, were samples for sediment/sedimentation or turbidity
collected pursuant to the sampling and analysis plan, if required,
durinq rain events?
Does storm water discharge directly to an water body listed as
Impaired for sediment/sedimentation or turbidity in the General
Construction Activity Permit?
If yes, were samples for sediment/sedimentation or turbidity
collected pursuant to the sampling and analysis plan, if required,
durinq rain events?
Stormwater Quality Construction Site inspection Check List
6 of 7
Caltrans Stormwater Quality Handbooks
SWPPP/WPCP Preparation Manual
March 1,2007
Attachment C
Stormwater Quality Construction Site Inspection Checklist
OTHER REQUIREMENTS
Requirement Yes No N/A Corrective Action
Were there any BMPs not properly implemented, or breaches,
malfunctions, leakages or spills observed, which could result in
the discharge of pollutants to surface waters that would not be
visually detectable in storm water?
If yes, were samples for non-visually detectable pollutants
collected pursuant to the sampling and analysis plan during rain
events?
Were there any BMPs not properly implemented, or breaches,
malfunctions, leakages or spills observed, which could result in
the discharge of pollutants to surface waters that would not be
visually detectable in storm water?
If yes, were samples for non-visually detectable pollutants
collected pursuant to the sampling and analysis plan during rain
events?
Were soil amendments (e.g., gypsum) used on the project?
If yes, were samples for non-visually detectable pollutants
collected pursuant to the sampling and analysis plan during rain
events?
Were soil amendments (e.g., gypsum) used on the project?
If yes, were samples for non-visually detectable pollutants
collected pursuant to the sampling and analysis plan during rain
events?
Did storm water contact stored materials or waste and resulted in
a discharge from the construction site? (Materials not in
watertight containers, etc.)
If yes, were samples for non-visually detectable pollutants
collected pursuant to the sampling and analysis plan during rain
events?
Did storm water contact stored materials or waste and resulted in
a discharge from the construction site? (Materials not in
watertight containers, etc.)
If yes, were samples for non-visually detectable pollutants
collected pursuant to the sampling and analysis plan during rain
events?
Caltrans Stomiwater Quality Handbooks
SWPPP/WPCP Preparation Manual
March 1, 2007 Stormwater Quality Construction Site Inspection Checklist
7 of 7
Attachment D
Amendments
WPCP Amendment No.
Project Name: CHESTNUT AVENUE STORM DRAIN
Caltrans Contract Number:
To Be Completed by Contractor
"I certify under a penalty of law that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to ensure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system or those persons directly responsible for gathering the information,
to the best of my knowledge and belief, the information submitted is true, accurate, and complete. I
am aware that there are significant penalties for submitting false infomiation, including the
possibility of fme and imprisonment for knowing violations."
Contractor's Signature Date
Contractor's Name and Title Contractor's Telephone Number
Caltrans Stomiwater Quality Handbooks
SWPPP/WPCP Preparation Manual Amendments
March 1,2007 lot 3
Attachment D
Amendments
For Use When Caltrans is Administering Project
For Caltrans Use Only
Resident Engineer's Approval and
Caltrans Certification of the
Water Pollution Control Program
Amendment
"I certify under a penalty of law that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to ensure that qualified personnel
properly gather and evaluate the infonnation submitted. Based on my inquiry of the person or
persons who manage the system or those persons directly responsible for gathering the information,
to the best of my knowledge and belief, the infomiation submitted is true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the
possibility of fine and imprisonment for knowing violations."
Resident Engineer's Signature Date
Resident Engineer's Name Resident Engineer's Telephone
Number
Caltrans Stomivrater Quality Handbooks
Amendments SWPPP/WPCP Preparation Manual
'^^'•^ March 1,2007
Attachment D
Amendments
For Use Wfien Local Agency / Private Entity
is Administering Project
For Local Agency /Private Entity Use Only
Resident Engineer's Approval and
Local Agency / Private Entity Certification of the
Water Pollution Control Program
Amendment
"I cettify under a penalty of law that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to ensure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system or those persons directly responsible for gathering the information,
to the best of my knowledge and belief, the information submitted is true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the
possibility of fine and imprisonment for knowing violations."
Resident Engineer's Signature Date
Resident Engineer's Name Resident Engineer's Telephone
Number
For Caltrans Use Only
Caltrans Oversight Engineer's Approval and
Caltrans Certification of the
Water Pollution Control Program Amendment
"I certify under a penalty of law that this document and all attachments were prepared under my
direcfion or supervision in accordance with a system designed to ensure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system or those persons directly responsible for gathering the information,
to the best of my knowledge and belief, the information submitted is true, accurate, and complete. I
am aware that there are significant penalties for submitfing false information, including the
possibility of fine and imprisonment for knowing violations."
Oversight Engineer's Signature Date
Oversight Engineer's Name Oversight Engineer's Telephone
Number
Caltrans Storm Water Quality Handbooks
SWPPPA/VPCP Preparation Manual Amendments
March 1, 2007 3 of 3
Attachment E
Notice of Discharge
To; Date:
Subject: Notice of Discharge
Project Name: Chestnut Avenue Storm Drain - City of Carisbad
Caltrans Contract Number:
In accordance with the Caltrans NPDES Statewide Permit for Storm Water Discharges Associated
with Construction Acfivity, the following instance of discharge is noted:
Date, time, and location of discharge
Nature of the operation that caused the discharge
Initial assessment of any impact caused by the discharge
Existing BMP(s) in place prior to discharge event
Date of deployment and type of BMPs deployed after the discharge.
Steps taken or planned to reduce, eliminate and/or prevent recurrence of the
discharge
Implementation and maintenance schedule for any affected BMPs
Caltrans Stormwater Quality Handbooks
SWPPP/WPCP Preparation Guide Notice of Discharge
March 1, 2007 2
Attachment E
Notice of Discharge
If further information or a modificafion to the above schedule is required, notify the contact person
below.
Name of Contact Person Title
Company Telephone Number
Signature Date
Notice of Discharge
2 of 2
Caltrans Stonnwater Quality Handbooks
SWPPP/WPCP Preparation Guide
March 1, 2007
Attachment F
Discharge Reporting Log
Project Name: Chestnut Avenue Storm Drain - City of Carisbad
Caltrans Contract Number:
Date Material(s) Discharged Estimated Quantity Observed By
Caltrans Stormwater Quality Handbooks
SWPPP/WPCP Preparation Manual
March 1, 2007 Discharge Reporting Log
1 of 1
Attachment G
Trained Contractor Personnel Log
stormwater Management Training Log
Project Name: Chestnut Avenue Storm Drain - City of Carisbad
Caltrans Contract Number: ^_
Storm Water Management Topic: (check as appropriate)
• Temporary Soil Stabilizafion • Temporary Sediment Control
• Wind Erosion Control • Tracking Control
• Non-storm water management • Waste Management and Materials Pollution Control
• Storm Water Sampling
Specific Training Objective:
Location: Date:
Instructor: Telephone:
Course Length (hours);
Caltrans Stormwater Quality Handbooks
SWPPP/WPCP Preparation Manual
March 1, 2007
Trained Contractor Personnel Log
1 of 2
Attachment G
Trained Contractor Personnel Log Sheet
Attendee Roster (attach additional forms if necessary)
j Name Company Phone
1 1
COMMENTS:
Trained Contractor Personnel Log
2 of 2
Caltrans Stormwater Quality Handbooks
SWPPP/WPCP Preparation Manual
March 1, 2007