HomeMy WebLinkAboutCT 01-16; CASA LAGUNA; STORM WATER MANAGEMENT PLAN; 2002-08-01FRASER
ENGINEERING^ 1NC» 2191 El Camino Real, Oceanside, 920S4 . ^750; 722-3495 . FAX (760) 722-3490
. . <e)
storm Water Management Plan
FOR
Casa Laguna
Merit Group, Inc.
2171 El Camino Real
Suite 202
Oceanside, CA. 92056
August, 2002
JOB NO. 088-03-24
Storm Water Management Plan
For
Casa Laguna Development
Carisbad, CA.
General:
Casa Laguna is a proposed single-family residential development within the
City of Carisbad on the northerly side of Laguna Drive at the intersection with
Madison Street.
The site is approximately 50,400 square feet (210' x 240'), or
approximately1.16 acres of gently sloping ground (northeasterly to
southwesterly). The site is currently undeveloped, but will consist of six (6)
duplex units with an asphalt-paved drive and concrete sidewalks upon full
developmenL
The paved driveway will convey ainoff overland via curb and gutter to a
proposed inlet at the southwest corner of the driveway at Laguna Drive. This
inlet will convey the runoff to the existing City of Carlsbad stonn drain system
via buried stomri drain piping. The development also proposes small diameter
(6") stomi drain pipe along the westerly and easterly boundaries to collect
surface runoff from the lots and roof drains. These smaller drains will also
convey runoff into the City of Carisbad stonn drain system near the above-
mentioned inlet.
Best Management Practices:
The Best IVIanagement Practices for this project are separated into two (2)
categories: Construction-Related BMP's, and Post-Construction BMP's.
The construction-related BMP's will be utilized throughout the construction-
related activities on the site and will be the responsibility of the general
contractor for the site construction. Mr. Bill Seward of Merit Group, Inc. will
function as owner's representative.
The post-construction BMP's will be utilized upon completion of construction.
Responsibility for these BMP's will be through the Homeowners Association.
The BMP's for the Construction-Related activities are shown on the
attached "Storm Water Management Plan" and described as follows:
• Construction and maintenance of a rock construction entrance at the
entry to the site;
• Installation and maintenance of a straw bale barrier along the
perimeter of the site;
• Installation and maintenance of hay bale silt barriers at all minor drain
inlets (see plan for locations);
• Installation and maintenance of block screen gravel silt basins at all
major drain inlets (see plan for locations);
• Installation and maintenance of graded swales along easteriy and
westeriy property lines;
• Installation and maintenance of gravel bag barriers in the graded
swales mentioned above;
• Installation and maintenance of gravel bag barriers on the graded
private drive at the 1/3 points (approximately 60' on center);
• Installation of hydroseed on "padded" lots where slope is less than 6%;
• Good housekeeping including inspection and maintenance of BMP
facilities before and after stomns and at regular intervals.
The Post-Construction BMP's are described as follows:
• Ongoing education of the Homeowners Association for awareness,
inspection, and maintenance requirements;
I • Roof drains remain as surface flow to the existing inlets. No illicit
connections from the roof drains to the storm drain piping will be
allowed;
• Ongoing inspection and maintenance of BMP facilities;
• Minimizing land disturbances;
• Minimizing impervious areas such as additional concrete for patios,
etc.;
• Use of effective irrigation systems and practices;
• Good Housekeeping practices.
t WCMK
I. tamtMKt tm acNKExs RM oaMBner MMr ami. m HMK Avummz AT AIL
SmaavEBOit sic AT ooMsnrr LOMnmt 10 FMMmie nmt
X amcBt awm M pum »yiu. MOT K uam m luam tmcuT Tm Affmm.
OF IWi
TO me sMHWcnoN or »c enraiaNHii Afia EACH mtt-crr maeuam
HAtTAlL.
iCUUtnNCB MCH Mr >MBE
fmoffivmxmaM am A/KAS WHBK MKUNMD miai CNEME A
7. Aa EMMNN ocHmoL mAmjK$ tmarnio pa-OK Afmem euem HAH WAIL
A OMin AiKASAMHND ffCMuBn-PoicTRMm'aM^ er
MJOKAT TNE OONCLUMW OF GUN HOmW OAK
a AU. iBimmr mmeeme BeMca SHom SHALL ac 11 HAHZ ATWE BP OTBMH •miSSMr MM 7HC me?»My MM wwyggr WWEBWE^ Hncmr {409. a.r AW oMM saMS ai«i at IBMMS AHR EMH MMFAU.
«a AU. oMvo. Mat amu. ac mmuf TW WM 4/« MOM I—an AstRBOMic
tt. amut uamtAVtm or Hnmaaana auns mc, TO MOWC amnr eowMac
TwemaHN AM iBiaeir eoNiML
tl»1E or CAUPOHNM.
nOfPOBABT EROSION CONTROL
yr-fwriNP. km TRKICATTOW
AIL pamAmm Am TsawMwr awaww eowwat >M»n»w AW. iijwwTWt anwu. ac aSrAuBTAW MAamMMB) A» ani—p at aesiw ata OF THE SBWBWW
L'TSraum^rAVOMDatt (MaooNm. TD tenniU Mi
WCtf THCT >M&
—rffEraRM)ReNNE»rrAWAaMcarrroAiuucMU.OT h, AIL ajoPB 4 fter <m mm M HBan.
2. AKAS mum RAimt IWM art MN A«nr OF TNE FOUMMB oaanMMt
fc. aENii«D0?^Ticm*sAwaEoniiaMiiicciB*ASMaa.r
a. mtcAwrancMLoaMrocNiwnnDarncomraMMn «Mr wmAtm aaoMTC TNEAMSII:
: NMMB> at AOCIMMNCC M1H INC fOUMM
nvtr Mm mABa mi <m smai tm -mr tm m. wmm 10 OQHT m mmn wiAiL m mmmt ir m._^ tan HMt aaar amanMar aaa « A^oawsmaML jmoi OF uar pmxmTATKH JtmSummAespr _ ^ k. aNBiiBt THAN a fBT n HBOfT aMjuac wnRD ar A J AL stsm OF UNT MBanrnm anwMj^
ANEW ajom i£B TMAN»t«Au.ac mMOTAa mmmm wc onr , mm TO mmcaBBwa jm pemj^wM^^gt A E>C TO mowc MMMMN TO TIC Omr BWMEPL TK iL ac apcDFR aeBMOM TNC waawiftFTi AW cans OF INC oaens OF INC morcaD stsiBL
AimWAaMaiTiMWTWIMWWgtnaOFTNEWArTHE
opiauf (£«. rar TNC awNrM OF TIC NMMBaEEBCD amm.
HHwriwHiaw w( SHAU. oBNaw OFAjL OF TIC mxtmn 1. SBO mt SHAIL OaaST CF MO i£SS THAIt a. aa»».PBt ACHC OF mac ooiet k. aote mACRCflFzaRwraaoc a 3te MR ACNEOFEaCHOOL CM CSHJRMMBA dl * mtL pat MOK CF Aami£A mttPouA . a. 3 m ACNC OF ALWH flAigCT OF atMO a, nibs««« AW rOFTMsaaaBBiKMMracoMTTD ON LocMTMNa MecmE ANE«aBNa Hnmnmmi a mr mm Biwa A Mjc sBiEEr aw aewatnAL snaiciwEi h. nai a OF TMS aMSBiMN MUST ac aMCUAia mm AjtmaeBi WW awcwM AW tmm att emmt me amuMm mt nanAtiTAsmm BBom mnmmmm M1BMLS SMIL aC TaANJFUaitli TO UC JOMTC M IMORND OBNTWNaS WW TIC CWWWM OgiWraPtr or: WBP AW AOWULTIME OBmnMHOM TA8 ATliUHD m Ot PmUO ON
L ALL
1 M3N-m«1»-TISgC JRTMO AflDrlS Mr BE ADDS TO UC NHMUaUU
auaarr AT TNE oaoKiMN OF TIC ooNimcRR
Twe r MULCM AgmMD AT TIC MTEOF W US> THAW am to rat ACHC Twc a mjun^mAm MAY ac awsinuna AU. OR PAKT, ffm HynMuucMiLr AmEDflBBtMiBMi. MnsnMirsuapfrMarac^ ANCHOrCD TD TICaLOFEBriCDMMDULrWMNNeWl£STHAN<
TNC smAW fro TNE SOL
1 ranunOGNSBTIWOFAMHONUWmomATCsuMTEfa-ao-a MTH tax auL/wur APPtm AT INC MTC OF aoo *K n* AMC
AMIS TO BC HYOMaBBXD aHAU aC IWlMU PMOR TO HliWiailXI VK
TwouBHtwwncwACETeaEWANTParANroRAOBW^ * TWACK WtUaW aUFB STtirat THAN atf _ , t>. lUAMOmm APEAS »t OR fUTTEH THAT ABE aUffCBmr
a aaiwu AMEAs THAr mu. nor mmAK im umm nam • OR a AWte
Z OOWflMNMe THE sou 90 THAT ITS SUTAaiE FOR PLANUM att
« AajuaTMeTNEsuNKMEaaiiioBiMETomoMaEAaAMPBurwr MTUMTED SES BOX b. TIC ADOrTRW OF SOL AMNDMBIKm AIMgllBIS.tjMgflW OR .
coiewe swac sots TO motttD viMic oowmoM RN OROWIK
NMMOaEBXD AREAS 9MU. BE MM1WCD TO PISffJ.X^SSSIP.SSSSiJSS!;. im PHOjecT s pommnLY umsBAfa ai rm AKAS mae mimaaBiMm m im pomAMBa umaeAPmak umi. me pm»mcT m carteao Am r- ——
UtHJOEHOU
samuBD caamtetKm ooMnec
smwmue
-OBOPaur
flL(Xy-SCTEBV-flff><VEL SILT BAS»I
WTTOaCME
SHEET
1 CITY OF CARLSBAD
ENONEEnNG OEPARnCNT
SHEETS
1
SHEET
1 CITY OF CARLSBAD
ENONEEnNG OEPARnCNT
SHEETS
1
STDBU •wimsR lURMannr mir roK
CASA LAGUNA
STDBU •wimsR lURMannr mir roK
CASA LAGUNA
STDBU •wimsR lURMannr mir roK
CASA LAGUNA
STDBU •wimsR lURMannr mir roK
CASA LAGUNA
STDBU •wimsR lURMannr mir roK
CASA LAGUNA
APPROVED APPROVED
CTTY ENQNEER PE EXP. OATE
DAIE M1UL
REVISION DESCRtPTION
DA1C MnUL DATE iCnAl. CHKO PROJECT Na IIDRAIMNG NO.
02-1013 II ENOMEXll or MRK REVISION DESCRtPTION OIHER trntCNM. OTY APPROVAL CHKO f:
PROJECT Na IIDRAIMNG NO.
02-1013 II
a'\088\03\24\ER[E.DVC 8-12-02 I'tSOt pn EST