MEMORANDUM
Date: September 8, 2003
To: John Maashoff, City of Carlsbad
From: Anabella Hedman
Subject: The Oaks South - Neighborhoods 3.12 and 3.13
Attached you will find all supporting documents and calculations for the proposed
construction change in the Oaks South- Neighborhoods 3.12 and 3.13 project
site. The proposed construction change recommends the removal of a Type "F"
catch basin located west of Sitio Lima. All runoff which was conveyed by the
catch basin (drainage area shown in red on the attached hydrology map) will be
re-routed into an existing headwall located northeast of the La Costa Avenue-
Paseo Tamarindo intersection (drainage area shown in green in the attached
hydrology map.) All hydrology date was obtained from the "/Wass Grading
Hydrology Study for Villages of La Costa, Neighborhoods 3.10-3.15 and Avenida
Junipero," dated December 24, 2001. All calculations supporting the proposed
construction change are also included.
DAVE HAMMAR
LEX WILLIMAN
ALISA VIALPANDO
Thank you very much for your attention to this matter.
10179 Huennekens St.
San Diego, CA 92121
(858) 558-4500 PH
(858) 558-1414 FX
www.HunsakerSD.com
lnfo@HunsakerSD.com
AH:smm k:\2352\2003\e64.doc
W.O. 2352-40 9/8/03 11:04 AM
I
CHART 1 o {«) (2) (3)
p-«.
•URIM or I^MUe MAM JM. IM3
HSAOWATER SCAUCS 2a3
Rcvtsao. kuer a«4
HEADWATER DEPTH FOR
CONCRETE PIPE CULVERTS
WITH INLET CONTROL
181
u BEARING/DELTA RADIUS LENGTH REMARKS
/ 90'38'47" 30.00' 47.46' 6" TYPE G C&G
2 N 54*40'00" W 165.87' 6" TYPE G C&G
' J ^ N 54-40'00" W 158.53' 6" TYPE G C&G
4 99'05'00" 30.00' 51.88' 6" TYPE G C&G
5 82'49'09" 30.00' 43.36' 6" TYPE G C&G
N 16'45'00'' W 17.64' 6" TYPE G C&G
7 N 16'45'00" W 43.01' 6" TYPE G C&G
^"'a2'59'^3''~" 30.00' 43.46' 6" TYPE G C&G
SEWER DATA
O BEARING/DELTA RADIUS LENGTH REMARKS
1 N 5a'57'33" W 34.11' 8" PVC
2 4'17'33'' 200.00' 14.98' 8" PVC
J N 54*40'00" W 200.79' 8" PVC
4 N / 6*45'00 ' W 93.75' 8" PVC
STORM DRAIN
o BEARING/DELTA RADIUS LENGTH REMARKS
7 N 54*40'00" W 65.76' 36" RCP 1350-D*
2 N 54*40'00" W 161.87' 24" RCP 1350-D*
3 N 54'4d'00'' W 26.06' 18" RCP 1350-D
4 N 35'20'00" E 5.25' 24" RCP 1350-D*
5 N 20'15'54" E 28.22 18" RCP 1350~D*
6 N 17'58'43.5" W 92.60' 24" CMP (TEMP)*
7 84'42'58" 22.50' ** 33.27' 24" RCP 1350-D
""'a' N ? 6*45'00" W 28.58' 24" RCP 1350-D
g N 16'45'gO''W ..,55.56' , 24",^RCP 1350-D*
no N 7J'?5'0d" E ' IS' RCP 1350-0^
hJ /J^'S'OO" £ 1 S O ' iVP'/c .
WATER DATA
"a BEARING/DELIA RADIUS LENGTH REMARKS
N 60 06'20" W 20.00' 10" PVC CL 150
2 ^~WW40'43"'W 18.04' 10" PVC CL 150
N 54'40'cd'' W 162.33' 10" PVC CL 150
4 N 16'45'00'' W 47.60' 8" PVC CL 150
5 N f6"45'00" W 24.72' 10" PVC CL 150
^ <5 '~'N^16'45'00'' W 37. 16' 10" PVC CL 150
54+63.26 CIRCULO SEQUOIA
20+00.00
66+32.92
AH NO 35
10+14.19 =
54+51.26 CIRCULO SEQUOIA
10+34.10
(ANGLE= 2'25'38")
10+52.11
(ANGLE= 3'00'43")
USE WATER TIGHT JOINTS
'"0
OK
C> 1.JJ
+ + 5
O Ql
PROJECT Nt/^Me ' THT. OAK5 ::>O\ATH - HHG|HK)RHOOD:> 3.rZ V
A=3.80AC. (sWovvr\ as ) . -^5^ Q -1--01 c-Ts)
fT^OM "MASS G|R-r^-DiviG^ -HyD^iJoqy M/cf -fo^ ViLL^qts o-f LA OC^STA
Ni-Er\^Vibc5R\->oods 3.10-5.1^ Y T^veiold-a Tuio»pe,<?.c>*^ •
Use. X=4.2."^2.5 (-fRoM sv^baftjis zxo-;i:2.l)
Us-e. c= 0.4-5 CUNavs+ufJ^bed ^ ls[a.4vi^al Te(LR.aiKi)
Q - CXA.
»I» - •
Q= c-fs
: • i
—~ ^ O-
waAei^ 4iojW+ Jdihi'TS.
PLANNING
ENGINEERING
SURVEYING
IRVINE
RIVERSIDE
SAN DIEGO
HUN SAKE R
^ASSOCIATES
SAN DIEGO, INC.
MASS GRADING
HYDROLOGY STUDY
VIUfAGES OF LA COSTA
Neigl;jJ^brhoods 3.1^-3.15 & Avenida Junipero
City of Carlsbad, California
Prepared for:
Real Estate Collateral Management Company
c/o Morrow Development
1903 Wright Place
Suite 180
Carlsbad, CA 92008
W.O. 2352-10
December 24, 2001
DAVE HAMMAR
LEX WILLIMAN
ALISA VIALPANDO
DANASEGUIN
10179 Huennekens St.
San Diego, CA 92121
(858) 5S8-4S00 PH
(858) 558-1414 FX
www.HunsakerSD.com
lnfo@HunsakerSD.com
Raymond L. Martin, R.C.E.
Project Manager
Hunsaker & Associates San Diego, Inc.
ESMsmm liArepoftsV23S2\010\a03.doc
w.a. 23S2-10 3/28/2002 4:30 PM
STREM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN.) (INCH/HOUR)
1 11.31 13.25 4.074
2 11.38 13.42 4.041
3 11.67 14.39 3.864
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS;
PEAK FLOW RATE(CFS) = 11.67 Tc(MIN.) =
TOTAL AREA (ACRES) = 5.20
FLOW PROCESS FROM NODE 97.00 TO NODE 110.00 IS CODE = 3
»»>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA««<
>»»USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)««<
DEPTH OF FLOW IN 18.0 INCH PIPE IS 13.0 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 8.6
UPSTREAM NODE ELEVATION = 440.80
DOWNSTREAM NODE ELEVATION = 436.30
FLOWLENGTH(FEET) = 247.20 MANNING'S N = 0.013
ESTIMATED PIPE DIAMETER (INCH) = 18.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUaAREA(CFS) - 11.67
TRAVEL TIME(MIN.) - 0.48 TC(MIN.) = 14.87
******************************************************************
FLOW PROCESS FROM NODE 101.00 TO NODE 102.00 IS CODE = 21
>»»RATIONAL METHOD INITIAL SUBAREA ANALySlS<««
*USER SPECIFIED (SUBAREA) :
RURAL DEVELOPMENT RUNOFF COEFFICIENT = .4500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 11. 65 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH - 360.00
UPSTREAM ELEVATION " 523.00
DOWNSTREAM ELEVATION - 480.00
ELEVATION DIFFERENCE = 43.00
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.429
SUBAREA RUNOFF (CFS) " 2.51
TOTAL AREA(ACRES) - 1.26 TOTAL RUNOFF(CFS) - 2.51
FLOW PROCESS FROM NODE 102.00 TO NODE 103.00 IS CODE = 52
»»>COMPUTE NATURAL VALLEY CHANNEL FLOW«<«
»»>TRAVELTIME THRU SUBAREA««<
UPSTREAM NODE ELEVATION = 480.00
DOWNSTREAM NODE ELEVATION - 430.00
CHANNEL LENGTH THRU SUBAREA(FEET) = 670.00
CHANNEL SLOPE = 0.0746
CHANNEL FLOW THRU SUBAREA(CFS) = 2.51
FLOW VELOCITY(FEET/SEC) = 4.93 (PER PLATE D-6.1)
TRAVEL TIME(MIN.) = 2.25 TC(MIN.) =• 13.91
FLOW PROCESS FROM NODE 102.00 TO NODE 103.00 IS CODE =
»»>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<««
100 YEAR RAINFALL INTENSITY(INCH/HOUR) " 3.950
•USER SPECIFIED(SUBAREA):
RURAL DEVELOPMENT RUNOFF COEFFICIENT = .4500
SUBAREA AREA(ACRES) = 4.30 SUBAREA RUNOFF(CFS) =• 7.64
TOTAL AREA(ACRES) = 5.56 TOTAL RUNOFF(CFS) - 10.15
TC(MIN) = 13.91
I I
I STORM DRAIN LINE D |
I I
FLOW PROCESS FROM NODE 218.<)e(^T0 NODE 221.00 IS CODE « 21
»>»RATIONAL METHOD INITIAL SUBAREA ANALYSIS««<
*USER SPECIFIED(SUBAREA):
RURAL DEVELOPMENT RUNOFF COEFFICIENT = .4500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED - 12.21(MINUTES)
INITIAL SUBAREA FLOW-LENGTH « 570.00
UPSTREAM ELEVATION = 428.00
DOWNSTREAM ELEVATION = 349.00
ELEVATION DIFFERENCE = 7 9.00
100 YEAR RAINFALL INTENSITY (INCH/HOUR) " 4.295
SUBAREA RUNOFF(CFS) = 5.03
TOTAL AREA(ACRES) - 2.60 TOTAL RUNOFF(CFS) = 5.03
FLOW PROCESS FROM NODE 221.00 TO NODE 222.00 IS CODE = 53
»»>COMPUTE NATURAL MOUNTAIN CHANNEL FLOW««<
»>»TRAVELTIME THRU SUBAREA««<
UPSTREAM NODE ELEVATION = 349.00
DOWNSTREAM NODE ELEVATION = 287.00
CHANNEL LENGTH THRU SUBAREA(FEET) = 610.00
CHANNEL SLOPE - 0.1016
CHANNEL FLOW THRU SUBAREA(CFS) = 5.03
SLOPE ADJUSTMENT CURVE USED: EFFECTIVE SLOPE - 0.1012 (PER PLATE D-6.2)
FLOW VELOCITY I FEET/SEC) - 3.05 (PER PLATE D-6.3)
TRAVEL TIME(MIN.) = 3.33 TC(MIN.) = 15.55
***************************************************************
FLOW PROCESS FROM NODE 221.00 TO NODE 222.00 IS CODE - 8
»»>ADDIT10N OF SUBAREA TO MAINLINE PEAK FLOW««<
100 YEAR RAINFALL INTENSITY (INCH/HOUR) - 3.676
*USER SPECIFIED (SUBAREA) :
RURAL DEVELOPMENT RUNOFF COEFFICIENT = .4500
SUBAREA AREA (ACRES) = 1.20 SUBAREA RUNOFF (CFS) = 1.98
TO^AL AREA (ACRES) - 3.80 ipM. Rt^j^lCFS) « 7.0|
FLOW PROCESS FROM NODE 222.00 TO NODE 225.00 IS CODE - 3
»»>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<««
»»>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW) ««<
ESTIMATED PIPE DIAMETER(INCH) INCREASED TO 18.000
DEPTH OF FLOW IN 18.0 INCH PIPE IS 8.1 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 9.2
UPSTREAM NODE ELEVATION = 286.60
DOWNSTREAM NODE ELEVATION - 285.00
FLOWLENGTH(FEET) = 55.00 MANNING'S N - 0.013
ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) - 7.01
TRAVEL TIME(MIN.) = 0.10 TC(MIN.) - 15.65
**********************************************************
FLOW PROCESS FROM NODE 225.00 TO NODE 225.00 IS CODE
»»>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE««<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) = 15.65
RAINFALL INTENSITY (INCH/HR) = 3.66
TOTAL STREAM AREA (ACRES) = 3.80
PEAK FLOW RATE(CFS) AT CONFLUENCE = 7.01
FLOW PROCESS FROM NODE 223.00 TO NODE 224.00 IS CODE = 21
»»>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<««
SOIL CLASSIFICATION IS "D"
RURAL DEVELOPMENT RUNOFF COEFFICIENT - .4500
NATURAL WATERSHED NCMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED =• 11. 37 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 300.00
UPSTREAM ELEVATION = 420.00
DOWNSTREAM ELEVATION = 380.00
ELEVATION DIFFERENCE = 40.00
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.498
SUBAREA RUNOFF (CFS) - 5.51
TOTAL AREA(ACRES) » 2.72 TOTAL RUNOFF(CFS) = 5.51
****************************************************************
FLOW PROCESS FROM NODE 224.00 TO NODE 226.00 IS CODE - 52
»»>COMPUTE NATURAL VALLEY CHANNEL FLOW««<
»»>TRAVELTIME THRU SUBAREA««<
UPSTREAM NODE ELEVATION - 380.00
DOWNSTREAM NODE ELEVATION - 286.00
CHANNEL LENGTH THRU SUBAREA (FEET) = 800.00
CHANNEL SLOPE - 0.1175
CHANNEL FLOW THRU SUBAREA(CFS) = 5.51
NOTE: CHANNEL SLOPE OF .1 WAS ASSUMED IN VELOCITY ESTIMATION
FLOW VELOCITY(FEET/SEC) = 6.83 (PER PLATE D-6.1)
TRAVEL TIME(MIN.) - 1.95 TC(MIN.) = 13.32
HEADWATER DEPTH CALCULATION
THE OAKS SOUTH - NEIGHBORHOODS 3.12 AND 3.13
(CONSTRUCTION CHANGE)
Data obatained from: Drawing No. 397-1B (Slieet 19)
Storm Drain Profile No. 10
Given:
Diameter:
Discliarge:
Freeboard:
D= 18 in
Q = 8.69 cfs
f= 2.00 ft
(From storm drain profile)
(From AES output)
(Minimum requirement)
Per Hydraulic Design of Highway Culverts:
Appen(Jix D - Design Charts, Tables, and Forms
Chart 1 - Headwater Depth for Concrete Pipe Culverts with Inlet Control
HW/D =
HW =
HW =
1.30
23.4 in
1.95 ft
Ground Surface Elevation = 295.20 ft
U/S Culvert Invert (Entrance) = 284.98 ft
HW Elevation (w/o freeboard) = 286.93 ft
(From storm drain profile)
(From storm drain profile)
Actual freeboard: f= 8.27 ft
HWEIev= 286.93 ft < Ground Surface Elev = 295.20 ft
9/5/2003 1 of 1 H:\EXCEL\2352W0\HW DEPTH CALC
or PUttlC TOAOa JAM. n«3
HEADWATER SCALES 2*3
REVISED MAT 1964
HEADWATER DEPTH FOR
CONCRETE PIPE CULVERTS
WITH INLET CONTROL
131
10
PROPOSED FINISHED "
SURF/^E (MR STORM
z Bl
^8^E)x6'(\!fl
1/4 TON ROCK-
PROFILE SCALES
HORIZ.
VERT.
1"=40'
1"=8'
'EFRO}^I}}M::M
ENGINEER OF WORK
AYM:^ND L. MARTIN
R.C.E. NO. 48670 EXP. 6/30/04
/ /8/dSL
DATE
"AS BUILT
RCE EXP. DATE
REVIEWED BY:
INSPECTOR DATE
SHEET
19 CITY OF CAFILSBAD
ENGINEERING DEPARTMENT
SHEETS
28
IMPROVEMENT AND UTILITY PLANS FOR:
VILLAGES OF LA COSTA
DEVELOPER IMPROVEMENTS
NEIGHBORHOOD 3.10-3.15
APPROVED LLOrO HUBBS ^Z"
CITY ENGINEER^^CE_2Jfia EXP. 12/J1/OS DATE
DWN BY:
CHKD BY:_5-S3l.
RVWD BY:
PROJECT NO.
CT 99-04
DRAWING NO.
397-lB
W.O. No. 2352-16
•868 S.f.l
• « " ^V.' HOA I -'/
'Sj. J82.4\
fmO^TCH AS ^Qlfk-^
AFN UNE ,4
/(jT)
P 324.9
\^ 'AS'/? '
322.9 U5 •
275' S/GHT-
' DISTANCl UNE fit/ ,
• / /AN
- V /
P 323,4
P 314.5
^ P 326.6
o /
- o /
7 V;;;;^ / lU./ 7 ^~;zrc V ' DRAIN m 7<Jjr^%. P 336.6 X<&?2ie>/,
/ P 309.t *//^^/ P 309.6 X. , /?C^Vjp / • V^jWOVy
PROPOSED STORM DRAIN/
TCTEXISVNG SYSTEM / / O / / /m^..
F.H. AS SHOWNlOlf 'a • •SHOmJOli'a/ L .__J%!sjr#'>^^^^
p u^ufiEhrrAViiN /1 ' "
IMlBSa^Pe PjiANS)/ /
P 324.5
P 327.5
/'// w IMPROVEMENT
'PLANS NO 397-1B
S>.//PROPOSED INL£TS,-
V//''/ pE TO Exismc
«^ IMPRl&miENT PLAN
; Dm.pi6. J97-1B; / / ^
•'^ RECLA»i^D WATER A$ Si^Oy^y
PROJECT BOOftDARY
.OT^ 173
/CLEAN OUT
FADING TO MATCH-'EIGHBORHOOD 3.15
LOT 181
-S7Rf£f1/GHr AS SHOm
Of IMPROVEMEf^T
PLANS NO 3&7--1B
- F.H AS SHQi^
IMPRJMMENT
PLANyOWG.
NO. 397-lB ' PROJECl
BOUNDAI
/
NEJQH
SEE TEMTATJVE JMAP
/ / / /