WATER QUALITY TECHNICAL REPORT
BRESSI RANCH RESIDENTIAL PLANNING AREA 8
CITY OF CARLSBAD, CA
MARCH 2004
PROJECT NUMBER: CT 02-14(3)
DRAWING NUMBER: 413-8A
Prepared For:
GREYSTONE HOMES
1525 Faraday, Suite 300
Carlsbad, CA 92008
PROJECTDESIGN CONSULTANTS
PLA.VNLN'G • EW1R0N.MENT.41 • E.VGWEERING • SURVll/d'PS
701 B Sirool, Suite 800, San Diego, CA 92101
619-2:iS-6471 FAX 619-2.?4-0.349
Job No. 2407.40
lames M. Kllgore, ^ RCE 4669
Ition Expires 06/30/07
w
TABLE OF CONTENTS
1. INTRODUCTION 1
2. PROJECT DESCRIPTION 2
3. POLLUTANTS AND CONDITIONS OF CONCERN 3
Anticipateci and Potential Pollutants from the Project Area 3
Pollutants of Concem in Receiving Waters 3
Beneficial Uses 3
Impaired Water Bodies 5
Watershed Pollutants of Concern 5
Conditions of Concem 5
4. STORM WATER BEST MANAGEMENT PRACTICES 7
Site Design BMPs 7
Source Control BMPs 7
Project-Specific BMPs 9
Structural Treatment BMPs 9
Detention Basins 11
Filtration Systems 11
Hydrodynamic Separator Systems 14
BMP Selection 15
BMP Plan Assumptions 16
5. PROJECT BMP PLAN IMPLEMENTATION 18
Construction BMPs 18
Recommended Post-Construction BMP Plan 18
Operation and Maintenance Plans 19
6. PROJECT BMP COSTS AND FUNDING SOURCES 20
TABLES
Table 1. Anticipated Conditions - Anticipated Pollutants and Sources 3
Table 2. Beneficial Uses for Inland Surface Waters 4
Table 3. Beneficial Uses for Groundwater 4
Table 4. Structural BMP Selecfion Matrix 10
Table 5. BMP Design Criteria ]7
Table 6. Post-Construction BMP Summary 19
Table 7. BMP Costs 20
APPENDICES
1. Storm Water Requirements Applicability Checklist
2. Project Maps
3. Drainage Calculafions
4. Supplemental BMP Informafion
5. References
1. INTRODUCTION
This Water Quality Technical Report (WQTR) was prepared to define recommended project
Best Management Practice (BMP) options that satisfy the requirements identified in the
following documents:
• City of Carlsbad Standard Urban Storm Water Mitigation Plan, Storm Water Standards,
• County of San Diego Watershed Protection, Storm Water Management and Discharge
Control Ordinance (County Ordinance),
• Standard Specificafions for Public Works Construcfion,
• NPDES General Permit for Storm Water Discharges Associated with Construcfion
Activity, and
• San Diego Municipal NPDES Storm Water Permit (Order Number 2001-01).
Specifically, this report includes the following:
• Project description and location with respect to the Water Quality Control Plan for the
San Diego Basin (Basin Plan);
• BMP design criteria and water quality treatment flow and volume calculations;
• Recommended BMP options for the project;
• BMP device information for the recommended BMP options; and
• Operation, maintenance, and funding for the recommended BMPs.
Aq!r-pa8-doc
2. PROJECT DESCRIPTION
This WQTR is provided for Bressi Ranch Residential Planning Area 8. The project is located in
the City of Carlsbad and is part of the Bressi Ranch development. The project site is bounded by
Open Space 2 and Gardenlane Way to the north, Planning Area 11 to the west and south, and
Planning Area 9 to the east and south. The vicinity and site maps are available in Appendix 2.
The total project site consists of 22.2 acres.
The project consists of the construction of 95 single family homes and associated roadways,
utilities, and landscaping. The project area currently consists of mass graded pads per the Bressi
Ranch Mass Grading project.
wqir-paS doc
2-
3. POLLUTANTS AND CONDITIONS OF CONCERN
Anticipated and Potential Pollutants from the Project Area
Based on land use, potenfial pollutants from the site under existing conditions include sediment,
nutrients, trash and debris, and pesticides. Anticipated pollutants from the site under proposed
conditions include bacteria, sediment, nutrients, trash and debris, oil and grease, oxygen
demanding substances, and heavy metals.
TABLE 1. ANTICIPATED CONDITIONS - ANTICIPATED POLLUTANTS AND SOURCES
Area Anticipated Pollutants
Landscaped areas Sediment, nutrients, oxygen demanding substances, pesticides
Rooftops Sediment, nutrients, trash and debris
Parking/driveways Sediment, heavy metals, trash and debris, oil and grease
General use Sediment, trash and debris, bacteria and viruses
Trash storage areas Sedjment, trash and debris, bacteria and viruses
Pollutants of Concern in Receiving Waters
The Bressi Ranch Residential Planning Area 8 Project is located m the Carlsbad Watershed
(Hydrologic Unit 904.51) and is tributary to San Marcos Creek.' The sections below provide
the beneficial uses and identification of impaired water bodies within the project's hydrologic
area.
Beneficial Uses
The beneficial uses of the inland surface waters and the groundwater basins must not be
threatened by the project. Tables 2 and 3 list the beneficial uses for the surface waters and
groundwater within the project's hydrologic area.
Water Quality Control Plan for the San Diego Basin. San Diego Regional Water Quality Control Board
A. qlr-pa8.doc
TABLE 2. BENEFICIAL USES FOR INLAND SURFACE WATERS
Surface
Water MUN AGR IND RECl REC2 WARM WILD
San Marcos
Creek -1-• • • • •
TABLE 3. BENEFICIAL USES FOR GROUNDWATER
Hydrologic Unit, Hydrologic Area MUN AGR IND
904.51 • • •
Source: Water Quality Control Plan for Ihe San Diego Basin, September 1994
Notes for Tables 2 and 3:
• = Existing Beneficial Use
o = Potential Beneficial Use
+ = Excepted from Municipal
MUN - Municipal and Domestic Supply: Includes use of water for community, miliiary. or individual water
supply systems including, but not limited to, drinking water supply.
AGR - Agricultural Supply: Includes use of water for farming, horticulture, or ranching mcluding, but not limited
J to, irrigation, stock watering, or support of vegetation for range grazing.
IND - Industrial Services Supply: Includes use of water for industrial activities that do not depend primarily on
water quality including, but not limited to, mining, cooling water supply, hydraulic conveyance, gravel washing, fire
protection, or oil well re-pressurization.
RECl - Contact Recreation: Includes use of water for recreational activities involving body conlact with water
where ingestion of water is reasonably possible. These uses include, but are not limited to. swimming, wading,
water-skiing, skin and SCUBA diving, surfing, white water activities, fishing, or use of natural hot springs.
REC2 - Non-Contact Recreation: Includes use of water for recreation involving proximity to water, but not
normally involving body contact with water wbere ingestion of water is reasonably possible. These uses include,
but are not limited to. picnicking, sunbathing, hiking, camping, boating, tide pool and marine life study, hunting,
sightseeing, or aesthetic enjoyment in conjunction with the above activities.
WARM - Warm Freshwater Habitat: Includes uses of water that support warm water ecosystems including, but
not limited to, preservation or enhancement of aquatic habitats, vegetation, fish or wildlife, including invertebrates.
WILD-Wildlife Habitat: Includes uses of water that support terrestrial ecosystems including but not limited to,
preservation and enhancement of terrestrial habitats, vegeiation. wildlife, (e.g.. mammals, birds, reptiles,
amphibians, invertebrates), or wildlife and food sources.
w qlr pa8 doc
Impaired Water Bodies
Section 303(d) of the Federal Clean Water Act (CWA, 33 USC 1250, et seq., at 1313(d)),
requires States to identify and list waters that do not meet water quality standards after applying
certain required technology-based effluent limits (impaired water bodies). The list is known as
the Section 303(d) list of impaired waters.
The proposed project is not directly tributary to a 303(d) listed water body. The closest impaired
water body is the Pacific Ocean Shoreline, San Marcos HA. The Pacific Ocean Shoreline, San
Marcos HA is 303(d) listed for bacteria.
In addifion to the Section 303(d) list of impaired waters, the State of California also identifies
waters of concern that may be included on the 303(d) list in the very near future. These waters
have some indications that they are impaired, but there is currently insufficient data to meet the
requirements for inclusion on the 303(d) list of impaired waters. This list is known as the
Monitoring List (2002).
The proposed project is not directly tributary to a Monitoring List (2002) water body. The
closest Monitoring List (2002) water body is the Aqua Hedionda Lagoon. The Aqua Hedionda
Lagoon is listed for dissolved copper and selenium.
Watershed Pollutants of Concern
The proposed project is located within the Carlsbad Watershed. According to the Carlsbad
Watershed Urban Runoff Management Program, the pollutants of concern for the Carlsbad
Watershed are bacteria, diazinon, sediment, total dissolved solids, and nutrients.
Conditions of Concern
A drainage study was conducted by a California Registered Civil Engineer (RCE) to identify the
conditions of concem for this project. The drainage calculations are available in Appendix 3.
Following is the summary of findings from the study:
• Drainage Pattems:
wqitpaSdoc
-5-
Under existing conditions, mnoff from the project area sheet flows to the southwest and
into desilting basins before entering the backbone storm drain system for the Bressi
Ranch development. The backbone storm drain system discharges into a detention basin
before entering an unnamed creek which eventually reaches San Marcos Creek.
Under proposed conditions, the majority ofthe storm water sheet flows to the south and
west and into the onsite storm drain system for Planning Area 8, except for the lots on the
east side of Leighton Lane (the westem edge of PA 8), which flow to the west and into
the onsite storm drain system for Planning Area 11. Both onsite storm drain systems
connect directly to the backbone storm drain for the Bressi Ranch development.
Soil Conditions and Imperviousness: The project area consists of soil group D. Under
existing conditions, the project area is under 5% impervious and the mnoff coefficient is
0.45. Under the proposed conditions, the project area will be 69.5% impervious and the
overal] runoff coefficient is expected to be 0.55.
Rainfall Runoff Characteri.stics: Under exisfing conditions, the project area generates
approximately 16.9 CFS (2-year storm) and 22.7 CFS (10-year storm) of storm water
mnoff. Under the proposed conditions, the site will generate approximately 27.9 CFS (2-
year storm) and 35.2 CFS (10-year storm) of storm water mnoff.
Downstream Conditions: There is no expected adverse impact on downstream conditions
as existing drainage pattems will be maintained. The detention basins at the southem
ends ofthe Alicante Street and El Fuerte Street storm drains will reduce the impact ofthe
increase in storm water flows due to the development. The water quality will be
improved by the development through the implementation of site design, source control,
and treatment BMPs. The outfall from the existing pipes is designed to protect against
high velocity erosion in the proposed condition.
wqlr-pa8.doc
-6-
4. STORM WATER BEST MANAGEMENT PRACTICES
The City Storm Water Standards Manual (Section III.2) requires the implementation of
applicable site design, source control, project-specific, and stmctural treatment control BMPs.
Site Design BMPs
The following BMPs were considered in the project design process:
• Reduce impervious surfaces,
• Conserve natural areas,
• Minimize directly connected areas, and
• Protect slopes and channels.
Some ofthe specific site design BMPs incorporated into this project indude:
• Protect slopes and channels
o All slopes will be stabilized with hydroseed or equivalent erosion control
measures.
o The outfalls are equipped with a D-41 energy dissipater and/or a riprap pad to
prevent high velocity erosion.
• Water quality feature
o The water quality feature will direct a portion of the storm water from Village
Green Dnve into a grass swale. The storm water will be directed to the Town
Garden Road storm drain system at the end ofthe swale, but it is not adequate to
provide treatment to the level required by the City Storm Water Standards.
Source Control BMPs
The following BMPs were considered in the project design process:
• Inlet stenciling and signage.
wqtj paS doc
• Materials storage,
• Trash storage,
• Efficient irrigafion, and
• Integrated pest management principles.
Some ofthe specific source control BMPs incorporated into this project include:
• Inlet stenciling and signage
o All inlets within the project boundaries will be stenciled or stamped with "No
Dumping - I Live Downstream," or as approved by the City Engineer.
• Covered trash storage
o All trash storage is covered due to the design of the standard-issue residentia] City
of San Diego automated refuse containers.
• Efficient irrigation
o All Home Owners' Association (HOA) maintained landscaped areas will include
rain shutoff devices to prevent irrigation during and after precipitation, and the
irrigation will be designed for the area specific water requirements. Flow reducers
and shutoff valves triggered by pressure drop will be used to control water loss
from broken sprinkler heads or lines.
• Storm water education
o Educational materials on storm water issues and simple ways to prevent storm
water pollution will be made available to residents.
• Integrated pest management principles
o Residents and groundskeepers will be educated on pest management principles.
wqn-paS-doc
o In HOA areas, only professional pest controllers will be used for the application
of pesticides. Materials on how to control pests using non-toxic methods will be
made available to maintenance personnel.
Project-Specific BMPs
The City Storm Water Standards Manual requires specific BMPs if the project includes private
roads, residential driveways and guest parking, dock areas, maintenance bays, vehicle and
equipment wash areas, outdoor processing areas, surface parking areas, non-retail fueling areas,
or steep hillside landscaping. The Bressi Ranch Residenfial Planning Area 8 Project has
residential driveways and private roads. The City Storm Water Standards Manual lists five
options for residential driveways and three options for private roads. The Bressi Ranch
Residentiai Planning Area 8 Project does not indude any of these options. However, the intent
of the Storm Water Standards is to reduce the discharge of pollutants from storm water
conveyance systems to the Maximum Extent Practicable (MEP statutory standard) throughout
the use of a devdoped site. The Bressi Ranch Residential Planning Area 8 Project meets this
objective by including treatment BMPs before discharging to the unnamed creek.
[Structural Treatment BMPs
The target pollutants, removal efficiendes, expected flows, and space availability determine the
sdection of stmctural treatment BMP options. Table 4 is a sdection matrix for stmctural
treatment BMPs based on target pollutants and removal efficiendes.
'vqir paS doc
TABLE 4. STRUCTURAL BMP SELECTION MATRIX
I Treatment Control BMP Cateeories
W Pollutant
Categories Biofilters Detention
Basins
Infiltration
Basins*'^
Wet
Ponds or
Wetlands
Drainage
Inserts Filtration
Hydrodynamic
Separator
Systems*^^
Sediment M H H H L H H
Nutrients L M M M L M L
Heavy
Metals M M M H L H L
Organic
Compounds U U U U L M L
Trash &
Debris L H U U M H H
Oxygen
Demanding
Substances
L M M M L M L
Bacteria U U H U L M L
Oil &
Grease M M U u L H L
pesticides U U U u U L
Notes for Table 4:
(1) Including trenches and porous pavement
(2) Also known as hydrodynamic devices and baffle boxes
L: Low removal efficiency
M: Medium removal efficiency
H: High removal efficiency
U: Unknown removal efficiency
The target pollutants for this project in order of general priority are sediment (with attached
materials such as bacteria and virases, nutrients, pestiddes, and metals), oxygen demanding
substances, trash and debris, and oil and grease. Based on the target pollutants and typical
removal effidendes, the treatment BMP options to consider indude detention basins, infiltration
basins, wet ponds, filtration and hydrodynamic separator systems.
The soil characteristics and the onsite drainage patterns for Planning Area 8 make infiltration
basins and wet ponds infeasible for this project.
wqtr-paS doc
10
Detention Basins
Detention basins (a.k.a. dry extended detention ponds, dry ponds, extended detention basins,
detention ponds, extended detention ponds) are basins with controlled outlets designed to detain
storm water mnoff, allowing particles and associated pollutants to settle. Detention basins may
be designed to include vegetation, allowing for further pollutant removal through infiltration and
natural pollutant uptake by vegetation.
Detention basins are among the most widely applicable storm water management practices. They
should be used for drainage areas of at least 10 acres, and they can be used with almost all types
of soils and geology. Detention basins for improving water quality can also be designed and used
as flood control devices.
Based on the size ofthe Bressi Ranch devdopment and proposed site plan, detention basins are a
feasible option for treating the storm water mnoff from this project. However, the detention
basin for Bressi Ranch will not be used for water quality purposes since the basin was designed
for detention purposes only.
^Filtration Systems
Flitration systems indude bioretention, sand and organic filters, and proprietary devices.^
Biorelenlion
Bioretention areas are landscape features designed to provide treatment of storm water mnofL
These areas are typically shallow, landscaped depressions, located within small pockets of
residentia] land uses. During storms, the mnoff ponds above the mulch and soil of the
bioretention system. The mnoff filters through the mulch and soil mix, typically being collected
in a perforated underdrain and returned to the MS4.
National Menu of Best Management Practices for Storm Water Phase II. US EPA.
v.qtr-pa8 doc
- I I -
Sand and Organic Filters
For sand and organic filtration systems, there are five basic storm water filter designs:
• Surface sand filter: This is the original sand filter design with the filter bed and sediment
chamber placed aboveground. The surface sand filter is designed as an offline system that
receives only the smaller water quality events.
• Underground filter: This is the original sand filter design with the filter bed and sediment
chamber placed underground. It is an offline system that receives only the smaller water
quality events.
• Perimeter filter: This is the only filtering option that is an online system with an overflow
chamber to accommodate large storm events.
• Organic media filter: This is a slight modification to the surface sand filter, with the sand
medium replaced with or supplemented by an organic medium to enhance pollutant
removal of many compounds.
• Multi-Chamber Treatment Train: This is an underground system with three filtration
chambers designed to achieve very high pollutant removal rates.
Proprietary Devices
Proprietary filtration devices indude offline filtration systems, online filter units, and filtration
based inlet inserts. Proprietary catch basin insert devices contain a filtering medium placed
inside the stormwater system's catch basins. The insert can contain one or more treatment
mechanisms, which include filtrafion, sedimentafion, or gravitafional absorption of oils. The
water flows into the inlet, through the filter, where pollutants and contaminants are removed, and
then into the drainage system.
There are two primary designs for inlet inserts. One design uses fabric filter bags that are
suspended in place by the grate or by retainer rods placed across the catch basin. The fabric filter
design includes a skirt that directs the storm water flow to a pouch that may be equipped with
rt qrr pa8 doc
- 12 -
oil-absorbing pillows. These inlet inserts are typically equipped with "Bypass Ports" to prevent
flooding during large storm events. Maintenance on the fabric filter inserts includes periodic
inspection and replacement of the entire insert when it becomes clogged with captured
pollutants. The other design for inlet inserts uses stainless steel, High-Density Polyethylene
(HDPE), or other durable materials to form a basket or cage-like insert placed inside the catch
basin. This basket contains the filter medium and absorbent materials that treat the storm water
as it passes through. These inlet inserts are also equipped with bypass pathways to allow normal
operation of the storm drain system during large storm events. Maintenance on the basket-type
inlet inserts indudes periodic inspection and removal and replacement of the filter medium and
absorbent materials (not the enfire inlet insert).
There are several types of proprietary inlet inserts for both design types:
• Fabric Filter Bag Design
o Stream Guard: Stream Guard works by initially capturing sediment and trash and
debris, and then combats dissolved oil, nutrients and metals through a filter media.^
o Ultra-Drainguard: Ultra-Drainguard works by initially capturing sediment and trash
and debris, and then combats dissolved oil, nutrients and metals through a filter
media. The Ultra-Drainguard has an oil absorbent pillow that can be replaced separate
from the filter during times of large free-oil mnoff. ^
• Basket-type Inlet Inserts
o AbTech Ultra-Urban Filter: The Ultra-Urban Filter is a cost-effective BMP designed
for use in storm drains that experience oil and grease pollution accompanied by
sediment and trash and debris. The oil is permanently bonded to a SmartSponge,
while sediment and trash and debris are captured in an internal basket.
URL: http://www.epa.gov/regionl/assistance/ceitts/stormwater/techs/
wqtr paS doc
- 13-
o AquaGuard: AquaGuard works by initially capturing sediment and trash and debris,
and then combats dissolved oil, nutrients and metals through a filter media.
AquaGuard compares to others by being easy to handle, i.e. no special lifting
equipment for filter removal.^
o FloGard: FloGard uses catch basin filtrafion, placing catch basin insert devices with a
filter medium just under the grates of the stormwater system's catch basins. FloGard
handles non-soluble solids such as sediment, gravel, and hydrocarbons, which are all
potential pollutants originating from the roof and parking lot. FloGard is available for
standard catch basins and for roof downspouts.
Recommended Fillration System Option
Sand, media, and bioretention filters require large amounts of land and have extremely high
maintenance costs compared to proprietary filtration designs. Of the two types of filtration based
inlet insert designs, experience within Southem California has shown the basket-type inlet inserts
to be more reliable and less cumbersome for maintenance and proper operation.^ Therefore, the
best type of filtration system for this project is one of the basket-type proprietary filtration based
I inlet inserts.
Hydrodvnamic Separator Systems
Hydrodynamic separator systems (HDS) are flow-through stmctures with a settling or separation
unit to remove sediments and other pollutants that are widely used in storm water treatment. No
outside power source is required, because the energy of the flowing water allows the sediments
to efficiently separate. Depending on the type of unit, this separation may be by means of swirl
acfion or indirect filtration.
" 2003 KriStar Enterprises. Inc.
^ Correspondence with the City of Dana Point, the City of Encinitas, and the City of Santa Monica
\vqtr-pa8-doc
- 14 -
Hydrodynamic separator systems are most effective where the materials to be removed from
mnoff are heavy particulates that can be settled or floatables that can be captured, rather than
solids with poor settleability or dissolved pollutants.
For hydrodynamic separator systems, there are four major proprietary types:
• Continuous Deflective Separation (CDS): CDS provides the lowest cost overall when
compared to other HDS units. A sorbent material can be added to remove unattached oil
and grease.^
• Downstream Defender™: Downstream Defender traps sediment while intercepting oil
and grease with a small head loss.^
• Stormceptor®: Stormceptor traps sediment while intercepting oil and grease.^
• Vortechs™: Vortechs combines baffle walls, circular grit chambers, flow control
chambers, and an oil chamber to remove settleable solids and floatables from the storm
water mnoff.^
Recommended Hydrodynamic Separalor System Option
All of the abovementioned devices suffidentiy remove the pollutants of concem from this site.
The best hydrodynamic separator for this project is the CDS unit; it has a relativdy low cost and
has been widely used in San Diego County.
BMP Sdecfion
Basket-type proprietary filtration-based inlet inserts and CDS units are feasible options for this
project. The recommended treatment BMP is a CDS Unit. The CDS Unit will be able to treat
multiple planning areas in the Bressi Ranch Development, induding Planning Area 8. The CDS
* CDS Technologies Inc 2002
'' 2003 Hydro International
* Stormceptor 2003
^ hltp://www.epa.gov/owm/mtb/hydro.pdf
wqif paS.doc
15 -
Unit will have lower maintenance frequency and costs than the inlet inserts due to the large
number of inlets in the planning areas.
BMP Plan Assumptions
The following assumptions were made in calculating the required BMP sizes:
• Flows generated on Leighton Lane will be treated, as well as storm water flows from the
northern portion ofPlanning Area 11 (PA Ila). A mnoff coefficient, 'C value, of 0.55
was used in the mnoff calculafions for this tributary treatment area, since it is strictly
residential and will average 50% impervious.
• Flows generated onsite (majority of PA 8) will be treated, as well as storm water flows
from Bressi Ranch Planning Areas 5, 7b, 9, 12, 13, 14 and 15b. A mnoff coefficient, 'C
value, of 0.65 was used in the mnoff calculafions for this tributary treatment area. The
treatment area includes industrial and residential areas; therefore the 'C value reflects the
proportions of each for the BMP design.
Table 5 summarizes the criteria that should be implemented in the design of the recommended
'project BMP.
wqtr-pa8.doc
16-
Table 5. BMP Design Criteria
BMP Hydrology Treatment
AreaA'^oIume Design Constraints
• Locate outside public right-of-way
C = 0.55 • Facilitate access for maintenance
A = 25.7 acres • Avoid utility conflicts
Flow-based: Q=CIA Qlreaiment— 2.8 CFS • Treatment Area/Volume from
C= mnoff coefficient Leighton Lane & PA Ila
A = acreage • Locate outside public right-of-way
I = 0.2 in/hour C = 0.65 • Facilitate access for maintenance
A = 144.8 acres • Avoid utility conflicts
Qirealment= 18.8 CFS • Treatment Area//Vo]ume from PA
5,7b, 8,9, 12, 13, 14, & 15b
Aqir paS.doc
17
5. PROJECT BMP PLAN IMPLEMENTATION
This section identifies the recommended BMP options that meet the applicable storm water and
water quality ordinance requirements. This includes incorporating BMPs to minimize and
mitigate for mnoff contamination and volume from the site. The plan was developed per the
proposed roadway and lot layout/density associated with the site.
Construction BMPs
During constmction, BMPs such as desilting basins, silt fences, sand bags, gravel bags, fiber
rolls, and other erosion control measures may be employed consistent with the NPDES Storm
Water Pollution Prevention Plan (SWPPP). The objectives ofthe SWPPP are to:
• Identify all pollutant sources, including sources of sediment that may affect the water
quality of storm water discharges associated with constmction activity from the
constmction site;
• Identify non-storm water discharges;
• Identify, constmct, implement in accordance with a time schedule, and maintain BMPs to
reduce or eliminate pollutants in storm water discharges and authorized non-storm water
discharges from the constraction site during constmction; and
• Develop a maintenance schedule for BMPs installed during constraction designed to
reduce or eliminate pollutants after constraction is completed (post-constmction BMPs).
Recommended Post-Construction BMP Plan
PDC has identified a recommended water quality BMP plan for the Bressi Ranch Residential
Planning Area 8 Project. The following BMP plan is preliminary and is subject to change
pending City review and implementation of future policy requirements, and final engineering
design.
wqir paS doc
ne recommended post-construction BMP plan includes site design, source control, and
treatment BMPs. The site design and source control BMPs include protection of slopes and
channels, inlet stenciling and signage, covered trash storage, efficient irrigation, storm water
education, and integrated pest manageinent principles. The treatment BMP selected for this
project is a CDS Unit.
TABLE 6. POST-CONSTRUCTION BMP SUMMARY
Pollutant Pollutant Sources Mitigation Measures
Sediment and attached
pollutants (nutrients, peslicides. tieavy
melals)
Landscaping, driveways,
rooftops
Inlet stenciling and signage,
education of residents, CDS Unit
Trash and debris
Littering, trash storage
areas, swimming pool
deck, rooftop
Inlet stenciling and signage,
covered trash storage, education of
residents, CDS Unit
Bacteria and virases Trash storage areas, pets Covered trash storage, education
of residents
^ Oxygen demanding substances Landscaping, driveways
and roadways
Inlet stenciling and signage,
regular City of San Diego yard
waste pickup, education of
residents, detention basin, CDS
Unit
Oil and grease Driveways, roadways Inlet stenciling and signage,
education of residents, CDS Unit
Operation and Maintenance Plans
The City Storm Water Standards require a description of the long-term maintenance
requirements of proposed BMPs and a description of the mechanism that will ensure ongoing
long-term maintenance. Operation and maintenance plans for the recommended post-
constraction BMP for this project are located in Appendix 4. The Project BMP costs and the
maintenance funding sources are provided in the following section.
.\ qtr- pa 8 doc
- 19
6. PROJECT BMP COSTS AND FUNDING SOURCES
Table 7 below provides the anticipated capital and annual maintenance costs for the CDS Unit.
TABLE?. BMP COSTS
BMP OPTION
1. Single CDS Unit
Modd PMSU 70 70
Equipment Cost
$64,900=*
Installation Cost
$55,900
Annual Maintenance
Cost
$1,000
*CDS Units are a proprietary BMP and may vary in cost at the manufacturer's discretion.
The developer will incur the capital cost for the BMP installation. The responsible party for
long-term maintenance and funding is the Home Owners' Assodation (HOA) for Bressi Ranch.
wqir-paS doc
-20-
APPENDIX 1
Storm Water Requirements Applicability Checklist
storm Water Standards
4/03/03
VI. RESOURCES & REFERENCE^*^- ' ^
* 1,
rAPPENDIX A
STORM WATER REQUIREMENTS APPLICABILITY CHECKLIST
Complete Sections 1 and 2 of the following checklist to determine your project's
permanent and construction storm water best management practices requirements.
This form must be completed and submitted with your permit application.
Section 1. Permanent Storm Water BMP Requirements:
If any answers to Part A are answered "Yes," your project is subject to the "Priority
Project Permanent Storm Water BMP Requirements," and "Standard Permanent Storm
Water BMP Requirements" in Section III, "Permanent Storm Water BMP Selection
Procedure" in the Sform Waler Standards manual.
If all answers to Part A are "No," and any answers to Part B are "Yes," your project is
only subject to the "Standard Permanent Storm Water BMP Requirements". If every
question in Part A and B is answered "No," your project is exempt from permanent
storm water requirements.
Part A: Determine Priority Project Permanent Storm Water BMP Requirements.
Does the project meet the definition of one or more of the priority project
categories?* Yes No
1. Detached residential development of 10 or more units
2. Attached residential development of 10 or more units
3. Commercial development greater than 100,000 square feet
4. Automotive repair shop
5. Restaurant
6. Steep hillside development greater than 5,000 square feet
7. Project discharging to receiving waters within Environmentally Sensitive Areas
Parking lots greater than or equal to 5,000 fr or with at least 15 parking spaces, and
potentially exposed to urban runoff
Streets, roads, highways, and freeways which would create a new paved surface that is
5,000 square feet or greater
* Refer to the definitions section in the Storm Wafer Standards for expanded definitions of the priority
project categories.
Limited Exclusion: Trenching and resurfacing work associated with utility projects are not considered
priority projects. Parking lots, buildings and other structures associated with utility projects are
priority projects if one or more of the criteria in Part A is met. If all answers to Part A are "No",
continue to Part B.
30
Storm Water Standards
4/03/03
Part B: Determine Standard Permanent Storm Water Requirements
Does the project propose: Yes No
1. New impervious areas, such as rooftops, roads, parking lots, driveways, paths and
sidewalks?
2. New pervious landscape areas and irrigation systems?
3. Permanent structures within 100 feet of any natural water body?
4. Trash storage areas? V
5. Liquid or soiid material loading and unloading areas?
6. Vehicle or equipment fueling, washing, or maintenance areas?
7. Require a General NPDES Permit for Storm Water Discharges Associated with
Industrial Activities (Except construction)?*
8. Commercial or industrial waste handling or storage, excluding typical office or
household waste?
9. Any grading or ground disturbance during construction?
10. Any new storm drains, or alteration to existing storm drains?
*To find out if your project is required to obtain an individual General NPDES Permit for Storm Water
Discharges Associated with Industrial Activities, visit the State Water Resources Control Board web site
at, www.swrcb.ca.gov/stormwtr/industrial.html
Section 2. Construction Storm Water BMP Requirements:
If the answer to question 1 of Part C is answered "Yes," your project is subject to
Section IV, "Construction Storm Water BMP Performance Standards," and must prepare
a Storm Water Pollution Prevention Plan (SWPPP). If the answer to question 1 is "No,"
but the answer to any of the remaining questions is "Yes," your project is subject to
Section IV, "Construction Storm Water BMP Performance Standards," and must prepare
a Water Pollution Control Plan (WPCP). If every question in Part C is answered "No,"
our project is exempt from any construction storm water BMP requirements. If any of
he answers to the questions in Part C are "Yes," complete the construction site
prioritization in Part D, below.
Part C: Determine Construction Phase Storm Water Requirements.
Would the project meet any of these criteria during construction? Yes No
1. Is the project subject to California's statewide General NPDES Permit for Storm Water
Discharges Associated With Construction Activities? \/
2. Does the project propose grading or soil disturbance? y
3. Would storm water or urban runoff have the potential to contact any portion of the
construction area, including washing and staging areas?
4. Would the project use any construction materials that could negatively affect water
quality if discharged from the site (such as, paints, solvents, concrete, and
stucco)?
/
31
t>torm water Standards
4/03/03
Part D: Determine Construction Site Priority
In accordance with the Municipal Permit, each construction site with construction storm
water BMP requirements must be designated with a priority: high, medium or low.
' This prioritization must be completed with this form, noted on the plans, and included in
the SWPPP or WPCP. Indicate the project's priority in one of the check boxes using the
criteria below, and existing and surrounding conditions of the project, the type of
activities necessary to complete the construction and any other extenuating
circumstances that may pose a threat to water quality. The City reserves the right to
adjust the priority of the projects both before and during construction. [Note:
The construction priority does NOT change construction BMP requirements that apply
to projects; all construction BMP requirements must be identified on a case-by-case
basis. The construction priority does affect the frequency of inspections that will be
conducted by City staff. See Section IV.1 for more details on construction BMP
requirements.]
A) Higii Priority
1) Projects where the site is 50 acres or more and grading will occur during the
rainy season
2) Projects 5 acres or more. 3) Projects 5 acres or more within or directly
adjacent to or discharging directly to a coastal lagoon or other receiving water
within an environmentally sensitive area
Projects, active or inactive, adjacent or tributary to sensitive water bodies
Q B) Med/t/m Priority
1) Capital Improvement Projects where grading occurs, however a Storm Water
Pollution Prevention Plan (SWPPP) is not required under the State General
Construction Permit (i.e., water and sewer replacement projects, intersection
and street re-alignments, widening, comfort stations, etc.)
2) Permit projects in the public right-of-way where grading occurs, such as
installation of sidewalk, substantial retaining walls, curb and gutter for an
entire street frontage, etc. , however SWPPPs are not required.
3) Permit projects on private property where grading permits are required,
however, Notice Of Intents (NOIs) and SWPPPs are not required.
• C) Low Priority
1) Capital Projects where minimal to no grading occurs, such as signal light and
loop installations, street light installations, etc.
2) Permit projects in the public right-of-way where minimal to no grading occurs,
such as pedestrian ramps, driveway additions, small retaining walls, etc.
3) Permit projects on private property where grading permits are not required,
such as small retaining walls, single-family homes, small tenant
improvements, etc.
32
APPENDIX 2
Project Maps
VICINITY MAP
NOT TO SCALE