MEMORANDUM
To: Chris Bergh
MDS Consulting
From: Nancy E. Baker
Date: November 1, 2004
Subject: La Costa Resort and Spa (LCR&S) Master Plan
Sewer Facility Study
Job No. 164-04
TNTRODUCTION
The ouroose ofthis study is to analyze the on-site existing and proposed sewer facilities for the
devebpment ofthe LCR&S Master Plan (Master Plan). The Master Plan '^7-ts of remod^^^^^^
several of the existing LCR&S facilities and the construction of 165 villas. .The foll^;."^
analysis ofthe LCR&S sewer facilities is based on discussions with and data received firom Mike
CuJcV KSL Resorts Steve Deering, Dudek and Associates and Frank Reynaga, Leucadia
Wa'^^a^e" and the LWD Sewer Master Plan (LWD MP), dated July 1999.
ANALYSIS
The LCR&S is located within the LWD service area. The LCR&S sewer facilities consist of
both private and public sewers. The flows generated by the LCR&S gravity feed into the La
Costa Lift Station located in LWD Drainage Basin #11. The lift station is owned and operated
bv the LWD The La Costa Lift Station existing / ultimate capacity and existmg / ultimate
average day and peak flows tributary to the station shown m Table 1 were obtained from the
LWD MP.
Table 1
T a rosta T ift Station Capacity and Flows
Station Capacity
(gpm)
Average Day
Flow (gpm)
Peak Flow
(gpm)
Existing 3,000 700 1,400
Ultimate 3,000 920 1,800
Per LWD it has been determined that the existing public sewer facilities (including the La Costa
Lift Station are sufficient to convey the additional sewer flows generated by the Master Planned
facihties However, LWD has requested that an on-site sub-area sewer master plan be developed
traccLt r all ixistmg and proposed EDU's and develop existing and proposed/ultimate
flows generated by the LCR&S facilities along with a map showing all existmg and future sewer
facilities. The attached Exhibit A, LCR&S Sewer Facility Map shows the existmg and proposed
sewer facilities for the LCR&S.
SAE
\
Page 1
CTo3 ^01-oz
La Costa Resort and Spa November 1, 2004
Sewer Facility Study
allotments. The current EDU count mcludes altotmenK ,f ^,„iQyy These
EDU's added 12/18/02) and <^'^fZ^,^^^ZS^\i^^^iii,ion.Aeounc^iEDV
improvements are •-'f-^f;t^^^^XT:^^^^^^ ' -"^std'^rr^ rtiSrrmfSCndrr^^^^
Plan.
Xhe ulttmate EDU's for the Master ^^^;^^^f2::^^^^"^^^^^
November 1,2004
Table 3
LCR&S Sewer EDU Breakdown
Facility
Description
Existing
Unit
Existing
EDU per
Unit
Existing
EDU's
Ultimate
Unit
Revised
EDU per
Unit
Ultimate
EDU's
Net EDU
Gain
/(Loss)
Gas Pumps 3 Pumps
2.0 for 4 or
less pumps 2.00 3 Pumps
2.0 for 4 or
less pumps
2.0
2.00
4.00
0
0
Floor drains
Ballroom
Homes
2 Drains
962 seats
6
2.0
1 per 40 seats
1
4.00
24.05
6.00
L urams
2162 seats
0
1 per 40
seats 54.05
0
30.00
(6.00)
TOTAL
EDU'S 452.79 550.32 97.53
Table 4 shows the estimated existing and ultimate average sewage flows Pe'" l^^^a^^^ °"
the EDU's shown in Table 3 and an average flow factor of 215 gpd/EDU per the LWD Standard
Spec Book, dated October 13, 1999.
SAE
Page 3
\
La Costa Resort and Spa
Sewer Facility Study
November 1, 2004
,.„e 5 shows the estimated exrstms and ultimate pea. no.s perVaclllt, hased on the EDU's
Shown in Table 3 and a peak flow factor of 2.
Page 4
SAE
\
La Costa Resort and Spa
g^w^r Facility Study
November_L2004
A .r.A neak sewage flows generated by
\
La Costa Resort and Spa
Q.wf^r Facility Study
Novemberl^2004
NEB\LCR&S_Sewer_Study.doc
Page 6
SAE \
f