Loading...
HomeMy WebLinkAboutCT 15-08; Carlsbad Ranch PA 5; Hydrology Study; 2015-10-29Table of Contents I. Project Overview .............................................................................................................. 3 Purpose .................................................................................................................................................. 3 J,ocation ................................................................................................................................................. 3 Existing Conditions ............................................................................................................................. 3 Proposed facilities ............................................................................................................................... 4 II. Methodology ..................................................................................................................... 4 Hydrology .............................................................................................................................................. 4 Hydraulics .............................................................................................................................................. 4 III. Calculations ...................................................................................................................... 5 Determine the Watershed that the Project Effects ......................................................................... 5 Determine the Runoff Coefficients for the Site .............................................................................. 5 Calculate Q11111 using the Rational Method ......................................................................................... 6 Detention Calculations ........................................................................................................................ 7 Design of Proposed Storm Drain Facilities ..................................................................................... 7 IV. Conclusion ........................................................................................................................ 7 V. Declaration of Responsible Charge ................................................................................. 8 VI. Attachments ........................................................................... Error! Bookmark not defined. EXCEL ENGINEERING 440 STATE PLACE, ESCONDIDO CA 92029 PHONE: 760-745-8118 PAGE 1 OF 8 Attachments Attachment A Vicinity Map Attachment B San Diego County Drainage Manual Graphs and Tables Soils Group Map Attachment C Pre-Development Hydrologic Maps (From Phases 1 & 2) Post-Development Hydrologic Map Attachment D Civil-D Pre-Development Hydrology Calculations (From Phases 1 & 2) Attachment E Civil-D Post-Development Hydrology Calculations Attachment F Storm Drain Calculations EXCEL ENGINEERING 440 STATE PLACE, ESCONDIDO CA 92029 PHONE: 760-745-8118 PAGE 2 OF 8 Project Overview Purpose This report is in support of the Tentative Map and Preliminary Grading Plan for phase 3 of the Carlsbad Ranch, Planning Area 5 project also referred to as Marbrisa Phase III. The purpose of this report is to describe the procedures used in the hydrologic and hydraulic models, estimate peak discharge magnitudes and to size the proposed storm drain pipes in order to preserve the water quality and channel stability of the downstream watershed. Location The proposed development is located in the City of Carlsbad, County of San Diego, CA. The majority of the project is located at the south eastern comer of the intersection of Cannon Road and Grand Pacific Drive, while a small portion of the project is located at the South West of the aforementioned intersection. Existing Conditions The site is approximately 21.160 acres. The site was graded during phase I of the project (Drawing #428-9A). During Phase II, Drawing #428-9G, of the project villas 60-64 were permitted. This project proposes to re-grade Phase III for construction of villas 7 5-79 as well as change the size of these buildings approved under SDP 03-02 and to construct a revised plan for the hotel. Villas 60-64 will be built on the existing graded pads per drawing #428-96 Therefore this analysis includes these areas. Villa 67 has also been included in this site plan submittal. However the storm drains and treatment for this area were designed and installed per drawing no. 428-9G. The runoff for the current site is discharged into 2 separate outfalls: Outfall-A-The southern portion of the project drains to a de-silting pond. After the flow is collected in the pond it is then discharged via a storm drain pipe into a bio-flltration swale that leads to the southernmost comer of the project where it is then discharged to a 42" public storm drain. Outfall-B-Currendy the portion of the project to the Northeast of Grand Pacific Drive drains to 2 different de-silting ponds. From these ponds the runoff is discharged to a public storm drain in Cannon Rd. (See the pre-development drainage map for this portion of the project in Attachment C) The pre developed condition for this portion of the project was taken from the post-developed condition for the mass grading condition for this project (Drawing# 428-9A) and the precise grading plans for the areas around Villas 60-64 (Drawing# 428-9G). EXCEL ENGINEERING 440 STATE PLACE, ESCONDIDO CA 92029 PHONE: 760-745-8118 PAGE 3 OF 8 Proposed Facilities The proposed site plan includes a combination of parking areas, time share villas, swimming pools, landscaping, and hotel buildings with associated structures. Infrastructure improvements are proposed to include new storm-drains as well as water and sewer main extensions and new dry utilities runs/ extensions to service the lots. In the post-development conditions the runoff for the site will still be discharged through 2 separate outfalls: Outfall-A-The area contributing to this outfall is currendy in a mass graded condition. The proposed project proposes to introduce 5.03 Acres of impermeable surface (driveways, buildings, etc.). For the post-developed condition the runoff will be routed through 4 of 6 new hie-retention ponds, from where it will then be discharged to the existing bio-swale to the South of project. From the existing bio-swale the runoff leaves the site via an existing 42" storm drain that then connects to an existing 60" RCP at Lego Drive. Outfall-B-For the post-developed condition the contributory area will become only slighdy smaller as a pad footprint will infringe upon this area and divert the runoff to different outfalls. This basin will have an increase in impermeable area with the addition of three timeshare buildings, 1 parking lot and new proposed flatwork. Flow from this outfall will be routed through 2 new bio-retention ponds before it will be discharged to the existing tie-in to the public Storm Drain Line in Cannon Road. Methodology Hydrology The Rational Method as oudined in the San Diego County Hydrology Manual 2003 Edition was followed in this study. The CIVILCADD/CIVILDESIGN software version 7.9 was used to calculate the Stormwater peak flows. San Diego 2013 rational method module was selected so that - the changes from 2013 manual has taken into account such changes as time concentration and urban area runoff coefficient. Also in 2013, the program updated the slope input for initial basin's with steep slope greater than 30%. The hydrology analysis was done only for 100 year storm event. The 2 and 10 year storm events were covered in the Hydromodification Analysis using Continuous Hydrologic Simulation. The - hydrologic model, USEPA Storm Water Management Model (SWMM), was used to perform the simulation of continuous water movements through various patterns of land uses in the watershed. The SWMM analysis is included in Attachment G of this report. - Hydraulics The Hydra flow storm Sewers version 8.0 software was used in the hydraulic calculations to size the proposed storm drain pipes. Said software uses the energy-based Standard step method when computing the hydraulic proftle. This methodology is an iterative procedure that applies Bernoulli's energy equation between the downstream and upstream ends of each line in the system. It uses Manning's equation to determine head losses due to pipe friction. EXCEL ENGINEERING 440 STATE PLACE, ESCONDIDO CA 92029 PHONE: 760-745-8118 PAGE4 OF8 Thus the average C value used to calculate the Q100 for the Post-Developed condition around the hotel and villas 75-79 was found to be C = .9 *(59)+ .25 * (41)= .63 And, the average C value used to calculate the Q100 for the Post-Developed condition around villas 60-64 was found to be C = .9 *(SO)+ .25 *(SO)= .58 • Note-In the civil D-Program the calculation for the initial areas does not allow for the user-defined selection for the C-Factor. In order to select the correct C-factor the following options had to be chosen to essentially "trick" the program into choosing the correct c- value. For a C-value of .63 the MDR 14.5 with typeD soil option was selected. For a C- Value of .58 the MDR 14.5 with type B soil was selected. These selections were determined from Table 3-1 of the san Diego County Hydrology Manual (Attachment B). • See Attachment B for coefficient of runoff (C) calculations. Calculate Q10o using the Rational Method Hydrologic calculations were computed using CivilD based on 2 basins Oabeled as Basin A, and B) for pre-development, and post-development. The layout of the drainage areas for both Pre and Post development are shown in Attachment C of this report. The Pool and Spa areas were not considered in the calculation because the runoff captured in these facilities will be treated by the pools ftltration system. The CivilD printouts of these calculation can be found in Attachment D, & E as part of this report. The 1 00-year on-site developed peak storm flows (CFS) have been calculated and are summarized in the table below. These values were used to size the proposed storm drain pipes later in this report. PRE-DEVELOPMENT NODE/OUTFALL QJOo TRIBUTARY (CFS) AREA (AC) Node #103 Outfall A 62.85** 21.725** Node# 103 Outfall B 18.05* 4.360* *Taken from phase I (Drawing #428-9A). **Taken from phase II (Drawing #428-9G). Tc (MIN) 9.83** 7.33* POST-DEVELOPMENT QJOo TRIBUTARY Tc (CFS) AREA (AC) (MIN) 60.78 22.021 14.67 12.61 4.220 8.84 EXCEL ENGINEERING 440 STATE PLACE, ESCONDIDO CA 92029 PHONE: 760-745-8118 PAGE 6 OF8 - .... - - Attachment A Vicinity Map Attachment B San Diego County Drainage Manual Graphs and Tables Soils Group Map 10.0 9.0 8.0 7.0 N.N.~N ..... ~ I I II :; I l IJ i I I ;-... 1'-J. ~ ..... """-1"-o . I II I J I I l j I K 1 N ~ )'.._~""~i""l"' too rl ' ' J I ' i"'s.. ~ ~ l"oo.-.., '!'-too I EQUATION -g ~ <f) Q) ~ 1 , l ..... r--. f' · ~'-1'-"" l 1 1 = 7.44P6D·0.645 I 1""' . ~ ~ ~. I'-"'! !'o 1 I = Intensity (in/hr) I 1 ~ t'l~ I' 1'-J , I P6 = 6-Ho~rPre~ipitation (in) ~ 1 ; 1 r" , \ '-h I"' 1 . D = DuratiOn (m1n) INJ~~J~'-~-H,l ; lj' i ! I I ' ,..., ' 'l' "" : I ' t' 'I' : I .... ,. ' I i l . "' ,~ ' ' 6.0 5.0 4.0 3.0 "'l. i ; 1 :....., I : ! I I -'~ l ; i i ~ ,..~ i 'i'-1'-I . ! ! ! I i I ! ! ! l'~l I I ' ll ' I i i'-1'-i'o~~ ' II I II 1 I t I ~"' _l [l : I , I"' r-...~ !•""~'-i 2.0 1 ; j 1'-. I I' ' t' r"" "" I I l L i : r-... ~l"o l"o 1, .£ 1. ;o. -~0 ; i ' ' ! ~"""" I I I 1 .. i'or-. I•"""" ~ l j ; ! 11 l r-...1" i"oo I !""!" · I . ' i , ""- 9 ' ~ ' ~ I ~ ~ ! ' w_ : \,. I l ' ' I ' II ! t"oo l"o I I : i ! ! I I I r-... l ll Q) £0 0. 7 I I l I !' 1 I ! I ~L I "" I . I ' i ' I ! i . i IL I N. I : : l: l t ·I i I ll I 1.. l """" 1 I I I i I i I I i I I i"\1 I I : : I I i ' l I ,_ I ! i J i I ' l j ''J"' IJ 4 i : i r i i 1 1 ! ' r-...1' i , 0. 0 0. -·=:_::_ --. ._ _.. __,_ ' -==:.:t::t-::t= p:·· ··-'--+-- , ++ i + c ··II , · · -~ ·· · i ~·..!, t I l . -~l-1- 0. J I I . ' ' II ···--r-+-i ~~~~~+-~~~~~~~~~~~~~~~~~~ .. ~~~~~~4 0. 5 6 7 8 9 10 15 20 30 40 50 2 3 4 5 6 Minutes Hours Duration q. :I: g ..., , a 0 6.0 -g 5.5 21. 5.0 g· 4.5 g 4.0 i 3.5.!!!. 3.0 2.5 2.0 1.5 1.0 Intensity-Duration Design Chart· Template Directions for Application: ( 1) From precipitation maps determine 6 hr and 24 hr amounts for the selected frequency. These maps are included in the County Hydrology Manual (10, 50, and 100 yr maps induded in the Design and Procedure Manual). (2) Adjust 6 hr precipitation (if necessary) so that it is within the range of 45% to 65% of the 24 hr precipitation (not applicaple to Desert). (3) Plot 6 hr precipitation on the right side of the chart. (4) Draw a line through the point parallel to the plotted lines. (5) This line is the intensity-duration curve for the location being analyzed. Application Fonn: (a) Selected frequency~-year p (b) P6 = -~in., p24 = -~ P 6 = -~ %(2l 24 (c) Adjusted P6(2l = __ in. (d) tx = __ min. (e) I = __ in./hr. Note: This chart replaces the Intensity-Duration-Frequency curves used since 1965. P6 1 1.5 2 . 2.5 . 3 3.5 4 4.5 5 5.5 6 Duration', I I I I I I I I I I I 5 2.63 .3.95:5.27 6.59 7.90·9.22 10.54 11.86 13.17 14.49 15.81 7 2.12 ;3.18t4.24.5.30:6.36 7.421 8.48' 9.54:10.60:11.66.12.72 .-,.0 1.68'i2.53i3.37: 4.21 :5.05:5.90! 6.74. 7.58' 8.42. 9.27 '10 11 15 1.30 :1.95i2.59 -3.24~·3.89; 4.54; 519. 5.84 ·-6.49'-7.13 :7.78 --20 1:08 --,_62:-2.ts:-2.69:3.23,.3n: 4.31 · 4.85 · 5.39 · 5.93 :·6.46 25 0.93 1.40:1.87:2.33 i2.80i327:·3.73 --4.20 ~ 4.67. 5.13. 5.60 30 0.83 :1.24: 1.66: 2.07:2.49:2.90: 3.32: 3.73: 4.15: 4.56: 4.98 40 0.69 ;1.031 1.38. 1.72 :_2 07:2.41' 2.76 . 3.10 : 3.45 ' 3.79' 4.13 50 0.60 10.90!1.191 1.49 1.79,2.09! 2.39 2.69 2.98 3.28 ·. 3.58 so o.53 :o.8o'1.oo: 1.33:-1.59: 1.s6:·2.12 · 2.39 ·· 2.65 · 2.92 : 3.18 IMi 0.41 i0.61~0.82i 1.02.1.23:1.43:1.63' 1.84. 2.04. 2.25' 2.45 12o 0.34 \o.51:(fsa; ti.85:1:o2tl.t9r1.36' 1.53: 1.10 · 1.87:204 ... ,50 0.29 i0.44i0.59i 0.73:0.88) 1,03:1.18: 1.32: 1.47. 1.62' 1.76 --,80 .. o:2s l(f39: o:s2 : o.ss :o. 78: 0.91 ; 1.04 ' 1.18 · 1.31 · 1.44 '-1.57 -·2..0 o.22 lo.33:o:43; o.54 ~-0.65: o.r6 · o.87 · ·o98 ·· 1.oa ·-1.19 · 1.3o · 300 ·o.19 jo:2aTo.38 :o.47 ).ss 1o.6(-o.7s : o.8s (ti.94 :_1-03 : u3 360 0.17 '0.25! 0.33! 0.42 '0.50 0.58; 0.67 0.75 : 0.84 0.92 ' 1.00 FIGURE ~ San Daego County Hydro[,)gy 'tv[anual Dak. Junt" ~003 l I i Tabl~ 3-1 I ! • ! ' • SectKlO · Pag~ Rl}NOFI' COI<:FJ:<'ICIE~'J'S I<'OR t: RRAN AREAS Land lh;e I Runoff Codfi.:i..:nt ·-c .. ~oil Typl· :\RCS Elcm~:nt~ Co\lfltv F.lcmcnL-s a o I:\o'IPER. .-'\ 8 \-nda::>rumed :\a tum I T crrain (Natural) Permanent Open Space fl* o.::;n {) 25 Low Den~lty Re~idential (l.DR) R'l!sidentia], I .0 f)O:'A or less 10 o.;7 () .1::! J,nw [)en.sJty R esidenti~ I (LDR) R~~id.;ntial 2.0 DU!A \lT less ':'(I ... l) 34 () 3~ Low Density Residential (LOR) Residentia], 2.9 Dl}:A or less ::5 0.38 0 -II Medium f~nsity R~sidential (:viDR) Residential 4.3 DV•A nr lo:ss 30 0 41 0-15 McJmm Dcnstty ResJd.::nt~al CvlDR) Rcstdcntml 7.3 DU/A or less 4(J 0.48 (J5 1 \lcdiwn Dcnstty Residential Cvlf"JR) Restdcntial 10.9 DU/A or less 45 0.52 () :'i4 Medium Dcn.-;tty Residential (\.fDR) R.estdential, 14.5 DC/A or less :"(! 0.55 058 High D~nsity Restdentinl (HDR) Rc!stdential, 24.0 DU/A or less ti:'\ \) 66 () 67 High n~nsity Res1d~ntinl (HDR) R-esidential, 43 .n DU/A or less 8(1 o. 76 ()]7 (\1mmercialilnJw;trial CN C'om) N~ighborhood c._,mmeroeial 80 o. 7(1 1177 Cumm~rcmHndu.strial (G. Com) G .:n~ral C urnm ere 1al 85 0.81J 0.80 Commcrctal'lndu.strial (O.P. Com) Oilicc ProfcssionaliCommcrcial 9(1 0.83 0.84 C'ommcrctal/lndlL-;trial (Lmntcd J) LLmitL~d Industnal 9(1 0.83 1)84 CommcrcmJIJndlL-;trial (Gcn<!ral J ) Gcncrnllndustnal 95 0.87 run • c tJ.3n ll,36 1)4~ 1).45 l.l,4:S 0.54 tl.S7 ll.60 ll.69 tl.Tii IllS 1).8] U.84 1).84 run .1 6 ()f26 D 0, .l5 tl-ll () 4() () 49 0 5:2 ll.5 7 () t)l) 0. td () 71 0 79 () 7') u.:s: 0.85 0.85 run *The values assocmt.:d with fl0 o JnlflCI"\'I'>lL<; may be u<J.ed for direct calculatJon of the runoff coe!Ttc1ent as descnhed in Sect1on 3 ] 2 (representmg the pcn'lous runotl weffit.:ient. Cp. for the St)il type). or for areas that will remain undisturbed in perpetuity Justification 111ust be g.ircm that the area will remain natural forever (e.g .. the <Jrea 1s locat~d m Cit:\ eland :>iatmnal }·urcst). Dll.'/>. '~ d'"'ellmg umts per acre 1\1\C~ ... 1\mionnl Resources Cons~rration S-ervice 3-6 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/portal/ nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center {http:// offices.sc.egov.usda.govllocator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nrcs.usda.gov/wps/portallnrcs/detaillsoils/contactus/? cid=nrcs 142p2_ 053951 ). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means 2 for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 {TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface .................................................................................................................... 2 How Soil Surveys Are Made .................................................................................. 5 Soil Map .................................................................................................................. ? Soil Map ................................................................................................................ 8 Legend .................................................................................................................. 9 Map Unit Legend ................................................................................................ 10 Map Unit Descriptions ........................................................................................ 1 0 San Diego County Area, California ................................................................. 12 CbS-Carlsbad gravelly loamy sand, 2 to 5 percent slopes ....................... 12 LeE-Las Flores loamy fine sand, 15 to 30 percent slopes ........................ 13 MIG-Marina loamy coarse sand, 2 to 9 percent slopes ............................. 14 References ............................................................................................................ 16 - - - - 4 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil scientists classified and named the soils in the survey area, they compared the 5 Custom Soil Resource Report individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil- landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. 6 ·- - "'"" - - - - Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 7 "' --- Custom Soil Resource Report MAP LEGEND Area of Interest (AOI) D Area of Interest (AOI) Soils __J Soil Map Unit Polygons Soil Map Unit Unes ll Soil Map Unit Points Special Point Features ~ Blowout 181 Borrow Pit • Clay Spot 0 Closed Depression ;x; Gravel Pit . Gravelly Spot .. Landfill -A Lava Flow Marsh or swamp ~ Mine or Quarry 0 Miscellaneous Water 0 Perennial Water y Rock Outcrop + Saline Spot .. Sandy Spot . . . @ Severely Eroded Spot 0 Sinkhole lt Slide or Slip p SodicSpot --- ~ Spoil Area G Stony Spot 4} Very Stony Spot ~ Wet Spot 6 Other --· Special Une Features Watar Features Streams and Canals Transportation +-H Rails ,., Interstate Highways ~ USRoutes Major Roads Local Roads Background • Aerial Photography -- - 9 -- MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1 :24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Survey Area Data: San Diego County Area, California Version 8, Sep 17, 2014 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Data not available. The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. ---- - Custom Soil Resource Report Map Unit Legend San Diego County Area, California (CA638) Map Unit Symbol Map Unit Name Acres inAOI Percent of AOI CbB Carlsbad gravelly loamy sand, 2 8.4 to 5 percent slopes LeE Las Flores loamy fine sand, 15 to 0.4 30 percent slopes MIC Marina loamy coarse sand, 2 to 18.8 9 percent slopes Totals for Area of Interest 27.6 Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that hav.e similar use and management requirements. The delineation of such segments 10 30.5% 1.5% 68.0% 100.0% Custom Soil Resource Report on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha- Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 11 Custom Soil Resource Report San Diego County Area, California CbS-Carlsbad gravelly loamy sand, 2 to 5 percent slopes Map Unit Setting National map unit symbol: hb98 Elevation: 30 to 300 feet Mean annual precipitation: 1 0 to 16 inches Frost-free period: 330 to 350 days Farmland classification: Farmland of statewide importance Map Unit Composition Carlsbad and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Carlsbad Setting Landform: Hillslopes Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Convex Across-slope shape: Convex Parent material: Ferruginous sandstone Typical profile H1 -0 to 21 inches: gravelly loamy sand H2-21 to 36 inches: loamy sand H3-36 to 50 inches: indurated Properties and qualities Slope: 2 to 5 percent Depth to restrictive feature: 24 to 40 inches to duripan Natural drainage class: Moderately well drained Runoff class: Very low Capacity of the most limiting layer to transmit water (Ksat): High (1.98 to 5.95 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Very low (about 2.4 inches) Interpretive groups Land capability classification (irrigated): 2e Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Ecological site: Sandy (1975) (R019XD035CA) Minor Components Chesterton Percent of map unit: 5 percent Marina Percent of map unit: 5 percent 12 .... - - - - - - - Custom Soil Resource Report Unnamed, ponded Percent of map unit: 4 percent Landform: Depressions Unnamed Percent of map unit: 1 percent Landform: Swales LeE-Las Flores loamy fine sand, 15 to 30 percent slopes Map Unit Setting National map unit symbol: hbdd Elevation: 700 feet Mean annual precipitation: 12 inches Mean annual air temperature: 61 degrees F Frost-free period: 300 to 340 days Farmland classification: Not prime farmland Map Unit Composition Las flares and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Las Flores Setting Landform: Hillslopes Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Convex Across-slope shape: Convex Parent material: Residuum weathered from siliceous calcareous sandstone Typical profile H1-0 to 16 inches: loamy fine sand H2-16 to 28 inches: sandy clay, clay H2-16 to 28 inches: sandy clay, clay H3 -28 to 38 inches: loamy coarse sand H3 -28 to 38 inches: weathered bedrock H4 -38 to 48 inches: H5 -48 to 52 inches: Properties and qualities Slope: 15 to 30 percent Depth to restrictive feature: 40 to 60 inches to paralithic bedrock Natural drainage class: Moderately well drained Runoff class: Very high Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately low (0.00 to 0.06 in/hr) Depth to water table: More than 80 inches 13 Custom Soil Resource Report Frequency of flooding: None Frequency of ponding: None Sodium adsorption ratio, maximum in profile: 30.0 Available water storage in profile: Low (about 4.2 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6e Hydrologic Soil Group: D Ecological site: Claypan (1975) (R019XD061CA) Minor Components Huerhuero Percent of map unit: 5 percent Linne Percent of map unit: 5 percent Diablo Percent of map unit: 5 percent MIC-Marina loamy coarse sand, 2 to 9 percent slopes Map Unit Setting National map unit symbol: hbdz Mean annual air temperature: 57 to 61 degrees F Farmland classification: Prime farmland if irrigated Map Unit Composition Marina and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Marina Setting Landform: Ridges Down-slope shape: Linear Across-slope shape: Linear Parent material: Eolian sands derived from mixed sources Typical profile H1-0 to 10 inches: loamy coarse sand H2-10 to 57 inches: loamy sand, loamy coarse sand H2-10 to 57 inches: sand, coarse sand H3 -57 to 60 inches: H3 -57 to 60 inches: Properties and qualities Slope: 2 to 9 percent Depth to restrictive feature: More than 80 inches 14 - - - - Custom Soil Resource Report Natural drainage class: Somewhat excessively drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Salinity, maximum in profile: Nonsaline (0.0 to 2.0 mmhos/cm) Available water storage in profile: Moderate (about 8.7 inches) Interpretive groups Land capability classification (irrigated): 3s Land capability classification (nonirrigated): 4e Hydrologic Soil Group: 8 Minor Components Carlsbad Percent of map unit: 5 percent Chesterton Percent of map unit: 5 percent Corralitos Percent of map unit: 5 percent 15 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/soils/?cid=nrcs 142p2_ 054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcs 142p2 _ 053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http://www.nrcs.usda.gov/wps/ portal/nrcs/detail/national/soils/?cid=nrcs 142p2 _ 053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcs 142p2_05337 4 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ deta i 1/nationa Ill and use/ra ngepastu ref? cid =stel prd b 1 043084 16 - - - - - Custom Soil Resource Report United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/soils/scientists/?cid=nrcs 142p2 _ 054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/? cid=nrcs142p2_ 053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/lnterneUFSE_DOCUMENTS/nrcs142p2_052290.pdf 17 Attachment C Pre-Development Hydrologic Maps (From Phases I and II) Post-Development Hydrologic Maps c ~ 1 Attachment D I I I I Civil D Pre-Development Hydrology Calculations (From Phases I & II) I ~ I I ; I E I I I I I ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 51.000 to Point/Station 53.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation-186.500(Ft.) Downstream point/station elevation 185.430(Ft.) Pipe length 37.00(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 0.656(CFS) Given pipe size= 12.00(In.) Calculated individual pipe flow 0.656(CFS) Normal flow depth in pipe= 2.67(In.) Flow top width inside pipe= 9.98(In.) Critical Depth= 4.05(In.) Pipe flow velocity= 5.05(Ft/s) Travel time through pipe= 0.12 min. Time of concentration (TC) = 9.24 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 53.000 to Point/Station 53.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 0.224(Ac.) Runoff from this stream 0.656(CFS) Time of concentration Rainfall intensity = 9.24 min. 4. 611 ( In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 52.000 to Point/Station 53.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1.000 [MEDIUM DENSITY RESIDENTIAL (14.5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 202.000(Ft.) Highest elevation= 190.870(Ft.) Lowest elevation= 189.800(Ft.) Elevation difference 1.070(Ft.) Slope= 0.530 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 50.00 (Ft) for the top area slope value of 0.53 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 7.39 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(l/3)] TC = [1.8*(1.1-0.6300)*( 50.000A.5)/( 0.530A(1/3)]= 7.39 The initial area total distance of 202.00 (Ft.) entered leaves a remaining distance of 152.00 (Ft.) Using Figure 3-4, the travel time for this distance is 2.81 minutes for a distance of 152.00 (Ft.) and a slope of 0.53 % with an elevation difference of 0.81(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 2.810 Minutes Tt=[(11.9*0.0288A3)/( 0.81)]A.385= 2.81 Total initial area Ti 7.39 minutes from Figure 3-3 formula plus 2.81 minutes from the Figure 3-4 formula 10.20 minutes Rainfall intensity (I) = 4.324(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.630 Subarea runoff= 1.89l(CFS) Total initial stream area = 0.694(Ac.) Outfall A Continued TAKEN FROM HYDROLOGY STUDY PHASE II Page 2 of 18 I I I I I I I I I I I I I I I I I I I I E I I I I I I I I I I I I I I I I I ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 53.000 to Point/Station 53.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 0.694(Ac.) Runoff from this stream 1.891(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 10.20 min. 4.324(In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 0.656 9.24 4. 611 2 1. 891 10.20 4.324 Qmax(1) 1. 000 * 1.000 * 0. 656) + 1. 000 * 0.905 * 1. 8 91) + 2.368 Qmax(2) 0.938 * 1.000 * 0. 656) + 1.000 * 1.000 * 1.891) + 2.506 Total of 2 streams to confluence: Flow rates before confluence point: 0.656 1.891 Maximum flow rates at confluence using above data: 2.368 2.506 Area of streams before confluence: 0.224 0.694 Results of confluence: Total flow rate = 2.506(CFS) Time of concentration 10.202 min. Effective stream area after confluence 0.918(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 53.000 to Point/Station 55.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 185.430(Ft.) Downstream point/station elevation 185.140(Ft.) Pipe length 32.70(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 2.506(CFS) Given pipe size= 18.00(In.) Calculated individual pipe flow 2.506(CFS) Normal flow depth in pipe= 6.18(In.) Flow top width inside pipe= 17.09(In.) Critical Depth= 7.19(In.) Pipe flow velocity= 4.67(Ft/s) Travel time through pipe= 0.12 min. Time of concentration (TC) = 10.32 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 55.000 to Point/Station 55.000 **** SUBAREA FLOW ADDITION **** User specified 'C' value of 0.630 given for subarea Time of concentration = 10.32 min. Rainfall intensity= 4.293(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.747 Subarea runoff 0.701(CFS) for 0.268(Ac.) Total runoff= 3.208(CFS) Total area= 1.186(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 55.000 to Point/Station 58.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Outfall A Continued TAKEN FROM HYDROLOGY STUDY PHASE II Page 3 of 18 Upstream point/station elevation= 185.140(Ft.) Downstream point/station elevation 183.920(Ft.) Pipe length 187.60(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 3.208(CFS) Given pipe size= 18.00(In.) Calculated individual pipe flow 3.208(CFS) Normal flow depth in pipe= 7.68(In.) Flow top width inside pipe= 17.80(In.) Critical Depth= 8.18(In.) Pipe flow velocity= 4.46(Ft/s) Travel time through pipe= 0.70 min. Time of concentration (TC) = 11.02 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 58.000 to Point/Station 58.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area = 1.186(Ac.) Runoff from this stream 3.208(CFS) Time of concentration 11.02 min. Rainfall intensity= 4.115(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 56.000 to Point/Station 57.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A -0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1. 000 [MEDIUM DENSITY RESIDENTIAL (14.5 DU/A or Less Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 168.000(Ft.) Highest elevation= 190.200(Ft.) Lowest elevation= 189.330(Ft.) Elevation difference 0.870(Ft.) Slope= 0.518 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 50.00 (Ft) for the top area slope value of 0.52 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 7.45 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(l/3)] TC = [1.8*(1.1-0.6300)*( 50.000A.5)/( 0.518A(l/3)]= 7.45 The initial area total distance of 168.00 (Ft.) entered leaves a remaining distance of 118.00 (Ft.) Using Figure 3-4, the travel time for this distance is 2.33 minutes for a distance of 118.00 (Ft.) and a slope of 0.52 % with an elevation difference of 0.61(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 2.333 Minutes Tt=[(ll.9*0.0223A3)/( 0.6l)]A.385= 2.33 Total initial area Ti 7.45 minutes from 2.33 minutes from the Figure 3-4 formula Rainfall intensity (I) = 4.444(In/Hr) Effective runoff coefficient used for area Subarea runoff= 0.677(CFS) Figure 3-3 formula plus 9.78 minutes for a 100.0 year storm (Q=KCIA) is C = 0.630 Total initial stream area = 0.242(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 57.000 to Point/Station 57.000 **** SUBAREA FLOW ADDITION **** User specified 'C' value of 0.630 given for subarea Time of concentration 9.78 min. Rainfall intensity= 4.444(In/Hr) for a 100.0 year storm Outfall A Continued TAKEN FROM HYDROLOGY STUDY PHASE II Page 4 of 18 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.307 Subarea runoff 0.686(CFS) for 0.245(Ac.) Total runoff= 1.363(CFS) Total area= 0.487(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 57.000 to Point/Station 58.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 185.770(Ft.) Downstream point/station elevation 183.920(Ft.) Pipe length 6.30(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 1.363(CFS) Given pipe size = 12.00(In.) Calculated individual pipe flow 1.363(CFS) Normal flow depth in pipe= 2.16(In.) Flow top width inside pipe= 9.22(In.) Critical Depth= 5.93(In.) Pipe flow velocity= 14.19(Ft/s) Travel time through pipe= 0.01 min. Time of concentration (TC) = 9.79 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 58.000 to Point/Station 58.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 0.487(Ac.) Runoff from this stream 1.363(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 9.79 min. 4.441(In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 3.208 11.02 4.115 2 1. 363 9.79 4.441 Qmax(1) 1. 000 * 1. 000 * 3. 208) + 0.926 * 1. 000 * 1.363) + 4.471 Qmax(2) 1. 000 * 0.888 * 3.208) + 1. 000 * 1.000 * 1.363) + 4.213 Total of 2 streams to confluence: Flow rates before confluence point: 3.208 1.363 Maximum flow rates at confluence using above data: 4.471 4.213 Area of streams before confluence: 1.186 0.487 Results of confluence: Total flow rate= 4.471(CFS) Time of concentration 11.020 min. Effective stream area after confluence 1.673(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 58.000 to Point/Station 61.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 183.920(Ft.) Downstream point/station elevation 183.610(Ft.) Pipe length 62.00(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 4.471(CFS) Given pipe size= 18.00(In.) Calculated individual pipe flow 4.47l(CFS) Normal flow depth in pipe= 10.07(In.) Outfall A Continued TAKEN FROM HYDROLOGY STUDY PHASE II Page 5 of 18 Flow top width inside pipe 17.87(In.) Critical Depth= 9.75(In.) Pipe flow velocity= 4.40(Ft/s) Travel time through pipe = 0.24 min. Time of concentration (TC) = 11.26 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 61.000 to Point/Station 61.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 1.673(Ac.) Runoff from this stream 4.47l(CFS) Time of concentration 11.26 min. Rainfall intensity= 4.059(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 59.000 to Point/Station 60.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A-0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group C Decimal fraction soil group D [MEDIUM DENSITY RESIDENTIAL (14.5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 0.000 1.000 Initial subarea total flow distance llO.OOO(Ft.) Highest elevation= 190.600(Ft.) Lowest elevation= 189.650(Ft.) Elevation difference 0.950(Ft.) Slope= 0.864 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 65.00 (Ft) for the top area slope value of 0.86 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 7.16 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(l/3)] TC = [1.8*(1.1-0.6300)*( 65.000A.5)/( 0.864A(l/3)]= 7.16 The initial area total distance of 110.00 (Ft.) entered leaves a remaining distance of 45.00 (Ft.) Using Figure 3-4, the travel time for this distance is 0.91 minutes for a distance of 45.00 (Ft.) and a slope of 0.86 % with an elevation difference of 0.39(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 0.912 Minutes Tt=[(ll.9*0.0085A3)/( 0.39)]A.385= 0.91 Total initial area Ti 7.16 minutes from 0.91 minutes from the Figure 3-4 formula Rainfall intensity (I) = 5.029(In/Hr) Effective runoff coefficient used for area Figure 3-3 formula plus 8.07 minutes for a 100.0 year storm (Q=KCIA) is C = 0.630 Subarea runoff= 0.783(CFS) Total initial stream area = 0.247 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 60.000 to Point/Station 61.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 186.300(Ft.) Downstream point/station elevation 183.610(Ft.) Pipe length 89.00(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 0.783(CFS) Given pipe size= 12.00(In.) Calculated individual pipe flow 0.783(CFS) Normal flow depth in pipe= 2.88(In.) Flow top width inside pipe= 10.25(In.) Critical Depth= 4.43(In.) Outfall A Continued TAKEN FROM HYDROLOGY STUDY PHASE II Page 6 of 18 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Pipe flow velocity = 5.40(Ft/s) Travel time through pipe Time of concentration (TC) = 0.27 min. 8.35 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 61.000 to Point/Station 61.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 0.247(Ac.) Runoff from this stream 0.783(CFS) Time of concentration= 8.35 min. Rainfall intensity= 4.922(In/Hr) Summary of stream data: Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 4. 471 11.26 4.059 2 0.783 8.35 4.922 Qmax(l) 1. 000 * 1. 000 * 4.471) + 0.825 * 1. 000 * 0.783) + 5.116 Qmax(2) 1. 000 * 0.742 * 4. 471) + 1. 000 * 1. 000 * 0.783) + 4.098 Total of 2 streams to confluence: Flow rates before confluence point: 4.471 0.783 Maximum flow rates at confluence using above data: 5.116 4.098 Area of streams before confluence: 1.673 0.247 Results of confluence: Total flow rate= 5.116(CFS) Time of concentration 11.255 min. Effective stream area after confluence 1.920(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 61.000 to Point/Station 64.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 183.610(Ft.) Downstream point/station elevation 183.540(Ft.) Pipe length 13.20(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 5.116(CFS) Given pipe size= 18.00(In.) Calculated individual pipe flow 5.116(CFS) Normal flow depth in pipe= 10.77(In.) Flow top width inside pipe= 17.65(In.) Critical Depth= 10.45(In.) Pipe flow velocity= 4.64(Ft/s) Travel time through pipe = 0.05 min. Time of concentration (TC) = 11.30 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 64.000 to Point/Station 64.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 1.920(Ac.) Runoff from this stream 5.116(CFS) Time of concentration Rainfall intensity = 11.30 min. 4.048(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Outfall A Continued TAKEN FROM HYDROLOGY STUDY PHASE II Page 7 of 18 Process from Point/Station 62.000 to Point/Station 63.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1.000 [MEDIUM DENSITY RESIDENTIAL (14.5 DU/A or Less Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 207.000(Ft.) Highest elevation= 198.700(Ft.) Lowest elevation= 190.420(Ft.) Elevation difference 8.280(Ft.) Slope= 4.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 14.5 DU/A or Less In Accordance With Figure 3-3 4.00 %, in a development type of Initial Area Time of Concentration 5.33 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(l/3)] TC = [1.8*(1.1-0.6300)*( 100.000A.5)/( 4.000A(l/3)]= 5.33 The initial area total distance of 207.00 (Ft.) entered leaves a remaining distance of 107.00 (Ft.) Using Figure 3-4, the travel time for this distance is for a distance of 107.00 (Ft.) and a slope of 4.00 % 0.98 minutes with an elevation difference of 4.28(Ft.) from the end of the top Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 0.985 Minutes Tt=[(ll.9*0.0203A3)/( 4.28)]A.385= 0.98 Total initial area Ti 5.33 minutes from 0.98 minutes from the Figure 3-4 formula Rainfall intensity (I) = 5.893(In/Hr) Effective runoff coefficient used for area Subarea runoff= 0.79l(CFS) Figure 3-3 formula plus 6.31 minutes for a 100.0 year storm (Q=KCIA) is C = 0.630 Total initial stream area = 0.213(Ac.) area ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 63.000 to Point/Station 64.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 185.420(Ft.) Downstream point/station elevation 183.540(Ft.) Pipe length 15.00(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 0.791(CFS) Given pipe size= 12.00(In.) Calculated individual pipe flow 0.79l(CFS) Normal flow depth in pipe= 2.04(In.) Flow top width inside pipe= 9.0l(In.) Critical Depth= 4.45(In.) Pipe flow velocity= 8.95(Ft/s) Travel time through pipe= 0.03 min. Time of concentration (TC) = 6.34 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 64.000 to Point/Station 64.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 0.213(Ac.) Runoff from this stream 0.791(CFS) Time of concentration = 6.34 min. Rainfall intensity= 5.876(In/Hr) Summary of stream data: Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) Outfall A Continued TAKEN FROM HYDROLOGY STUDY PHASE II Page 8 of18 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 5.116 11.30 4.048 2 0.791 6.34 5.876 Qmax(l) 1. 000 * 1. 000 * 5.116) + 0.689 * 1. 000 * 0. 791) + 5.661 Qmax(2) 1. 000 * 0.561 * 5.116) + 1. 000 * 1. 000 * 0.791) + 3.662 Total of 2 streams to confluence: Flow rates before confluence point: 5.116 0.791 Maximum flow rates at confluence using above data: 5.661 3.662 Area of streams before confluence: 1.920 0.213 Results of confluence: Total flow rate= 5.661(CFS) Time of concentration 11.303 min. Effective stream area after confluence 2.133 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 64.000 to Point/Station 66.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 183.540(Ft.) Downstream point/station elevation 182.820(Ft.) Pipe length 161.50(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 5.66l(CFS) Given pipe size= 18.00(In.) Calculated individual pipe flow 5.661(CFS) Normal flow depth in pipe= 12.26(In.) Flow top width inside pipe= 16.78(In.) Critical Depth= ll.Ol(In.) Pipe flow velocity= 4.42(Ft/s) Travel time through pipe= 0.61 min. Time of concentration (TC) = 11.91 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 66.000 to Point/Station 66.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 2.133(Ac.) Runoff from this stream 5.661(CFS) Time of concentration 11.91 min. Rainfall intensity= 3.913(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 7.000 to Point/Station 65.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A Decimal fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [MEDIUM DENSITY RESIDENTIAL (14.5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 0.000 0.000 0.000 1.000 Initial subarea total flow distance 101.000(Ft.) Highest elevation= 190.600(Ft.) Lowest elevation= 189.800(Ft.) Elevation difference 0.800(Ft.) Slope= 0.792 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 65.00 (Ft) for the top area slope value of 0.79 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Outfall A Continued TAKEN FROM HYDROLOGY STUDY PHASE II Page 9 of 18 Initial Area Time of Concentration= 7.37 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)] TC = [1.8*(1.1-0.6300)*( 65.000A.5)/( 0.792A(1/3)]= 7.37 The initial area total distance of 101.00 (Ft.) entered leaves a remaining distance of 36.00 (Ft.) Using Figure 3-4, the travel time for this distance is 0.79 minutes for a distance of 36.00 (Ft.) and a slope of 0.79% with an elevation difference of 0.29(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 0.794 Minutes Tt=[(11.9*0.0068A3)/( 0.29)]A.385= 0.79 Total initial area Ti 7.37 minutes from 0.79 minutes from the Figure 3-4 formula Rainfall intensity (I) = 4.992(In/Hr) Effective runoff coefficient used for area Figure 3-3 formula plus 8.17 minutes for a 100.0 year storm (Q=KCIA) is C = 0.630 Subarea runoff= 0.887(CFS) Total initial stream area = 0.282 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 65.000 to Point/Station 66.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 186.360(Ft.) Downstream point/station elevation 182.820(Ft.) Pipe length 32.00(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 0.887(CFS) Given pipe size= 12.00(In.) Calculated individual pipe flow 0.887(CFS) Normal flow depth in pipe= 2.22(In.) Flow top width inside pipe= 9.32(In.) Critical Depth= 4.73(In.) Pipe flow velocity = 8.86(Ft/s) Travel time through pipe = 0.06 min. Time of concentration (TC) = 8.23 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 66.000 to Point/Station 66.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 0.282(Ac.) Runoff from this stream 0.887(CFS) Time of concentration = 8.23 min. Rainfall intensity= 4.969(In/Hr) Summary of stream data: Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 5.661 11.91 3.913 2 0.887 8.23 4.969 Qmax(1) 1. 000 * 1.000 * 5.661) + 0.788 * 1. 000 * 0.887) + 6.359 Qmax(2) 1.000 * 0.691 * 5.661) + 1.000 * 1. 000 * 0.887) + 4.796 Total of 2 streams to confluence: Flow rates before confluence point: 5.661 0.887 Maximum flow rates at confluence using above data: 6.359 4.796 Area of streams before confluence: 2.133 0.282 Results of confluence: Total flow rate= 6.359(CFS) Time of concentration 11.912 min. Effective stream area after confluence 2.415(Ac.) Outfall A Continued TAKEN FROM HYDROLOGY STUDY PHASE II Page 10 of 18 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 66.000 to Point/Station 68.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation-182.820(Ft.) Downstream point/station elevation 182.780(Ft.) Pipe length 8.50(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 6.359(CFS) Given pipe size= 18.00(In.) Calculated individual pipe flow 6.359(CFS) Normal flow depth in pipe= 13.13(In.) Flow top width inside pipe= 16.00(In.) Critical Depth= 11.70(In.) Pipe flow velocity= 4.60(Ft/s) Travel time through pipe = 0.03 min. Time of concentration (TC) = 11.94 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 68.000 to Point/Station 68.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 2.415(Ac.) Runoff from this stream 6.359(CFS) Time of concentration Rainfall intensity = 11.94 min. 3.907(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 7.000 to Point/Station 67.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1. 000 [MEDIUM DENSITY RESIDENTIAL (14. 5 DU/A or Less Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 120.000(Ft.) Highest elevation= 190.600(Ft.) Lowest elevation= 189.640(Ft.) Elevation difference 0.960(Ft.) Slope= 0.800 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 65.00 (Ft) for the top area slope value of 0.80 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 7.35 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(l/3)] TC = [1.8*(1.1-0.6300)*( 65.000A.5)/( 0.800A(l/3)]= 7.35 The initial area total distance of 120.00 (Ft.) entered leaves a remaining distance of 55.00 (Ft.) Using Figure 3-4, the travel time for this distance is 1.10 minutes for a distance of 55.00 (Ft.) and a slope of 0.80 % with an elevation difference of 0.44(Ft.) from the end of the top area Tt = [ll.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 1.096 Minutes Tt=[(11.9*0.0104A3)/( 0.44)]A.385= 1.10 Total initial area Ti 7.35 minutes from 1.10 minutes from the Figure 3-4 formula Rainfall intensity (I) = 4.886(In/Hr) Effective runoff coefficient used for area Subarea runoff= 0.532(CFS) Figure 3-3 formula plus 8.44 minutes for a 100.0 year storm (Q=KCIA) is C = 0.630 Total initial stream area = 0.173(Ac.) Outfall A Continued TAKEN FROM HYDROLOGY STUDY PHASE II Page 11 of 18 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 67.000 to Point/Station 68.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 186.640(Ft.) Downstream point/station elevation 182.780(Ft.) Pipe length 8.00(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 0.532(CFS) Given pipe size= 12.00(In.) Calculated individual pipe flow 0.532(CFS) Normal flow depth in pipe= 1.22(In.) Flow top width inside pipe= 7.25(In.) Critical Depth= 3.63(In.) Pipe flow velocity= 12.76(Ft/s) Travel time through pipe = 0.01 min. Time of concentration (TC) = 8.45 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 68.000 to Point/Station 68.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 0.173(Ac.) Runoff from this stream 0.532(CFS) Time of concentration = 8.45 min. Rainfall intensity= 4.882(In/Hr) Summary of stream data: Stream No. Flow rate (CFS) TC (min) Rainfall Intensity ( In/Hr) 1 6.359 11.94 3.907 2 0.532 8.45 4.882 Qmax(1) 1. 000 * 1. 000 * 6.359) + 0.800 * 1. 000 * 0.532) + 6.785 Qmax(2) 1. 000 * 0.708 * 6. 359) + 1. 000 * 1.000 * 0.532) + 5.034 Total of 2 streams to confluence: Flow rates before confluence point: 6.359 0.532 Maximum flow rates at confluence using above data: 6.785 5.034 Area of streams before confluence: 2.415 0.173 Results of confluence: Total flow rate= 6.785(CFS) Time of concentration 11.943 min. Effective stream area after confluence 2.588(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 68.000 to Point/Station 71.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 182.780(Ft.) Downstream point/station elevation 181.950(Ft.) Pipe length 165.50(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 6.785(CFS) Given pipe size= 18.00(In.) Calculated individual pipe flow 6.785(CFS) Normal flow depth in pipe= 13.50(In.) Flow top width inside pipe= 15.59(In.) Critical Depth= 12.09(In.) Pipe flow velocity= 4.77(Ft/s) Travel time through pipe = 0.58 min. Time of concentration (TC) = 12.52 min. Outfall A Continued TAKEN FROM HYDROLOGY STUDY PHASE II Page 12 of18 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I! I I I ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 71.000 to Point/Station 71.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 2.588(Ac.) Runoff from this stream 6.785(CFS) Time of concentration Rainfall intensity = 12.52 min. 3.789(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 7.000 to Point/Station 70.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1.000 [MEDIUM DENSITY RESIDENTIAL (14. 5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 133.600(Ft.) Highest elevation= 190.600(Ft.) Lowest elevation= 189.500(Ft.) Elevation difference= 1.100(Ft.) Slope= 0.823% Top of Initial Area Slope adjusted by User to 0.850 % Bottom of Initial Area Slope adjusted by User to 0.850 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 65.00 (Ft) for the top area slope value of 0.85 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 7.20 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)] TC = [1.8*(1.1-0.6300)*( 65.0~0A.5)/( 0.850A(1/3)]= 7.20 The initial area total distance of 133.60 (Ft.) entered leaves a remaining distance of 68.60 (Ft.) Using Figure 3-4, the travel time for this distance is 1.27 minutes for a distance of 68.60 (Ft.) and a slope of 0.85 % with an elevation difference of 0.58(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 1.270 Minutes Tt=[(11.9*0.0130A3)/( 0.58)]A.385= 1.27 Total initial area Ti 7.20 minutes from 1.27 minutes from the Figure 3-4 formula Rainfall intensity (I) = 4.876(In/Hr) Effective runoff coefficient used for area Figure 3-3 formula plus 8.47 minutes for a 100.0 year storm (Q=KCIA) is C = 0.630 Subarea runoff= 0.596(CFS) Total initial stream area = 0.194(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 70.000 to Point/Station 71.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 185.950(Ft.) Downstream point/station elevation 185.570(Ft.) Pipe length 38.30(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 0.596(CFS) Given pipe size= 12.00(In.) Calculated individual pipe flow 0.596(CFS) Normal flow depth in pipe= 3.33(In.) Flow top width inside pipe= 10.74(In.) Critical Depth= 3.84(In.) Pipe flow velocity= 3.36(Ft/s) Travel time through pipe= 0.19 min. Time of concentration (TC) = 8.66 min. Outfall A Continued TAKEN FROM HYDROLOGY STUDY PHASE II Page 13 of 18 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 71.000 to Point/Station 71.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 0.194(Ac.) Runoff from this stream 0.596(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 8.66 min. 4.807(In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 6.785 12.52 3.789 2 0.596 8.66 4.807 Qmax (1) 1. 000 * 1. 000 * 6.785) + 0.788 * 1. 000 * 0. 596) + 7.255 Qmax(2) 1. 000 * 0.692 * 6.785) + 1. 000 * 1. 000 * 0. 596) + 5.289 Total of 2 streams to confluence: Flow rates before confluence point: 6.785 0.596 Maximum flow rates at confluence using above data: 7.255 5.289 Area of streams before confluence: 2.588 0.194 Results of confluence: Total flow rate= 7.255(CFS) Time of concentration 12.521 min. Effective stream area after confluence 2.782(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 71.000 to Point/Station 76.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation-181.950(Ft.) Downstream point/station elevation 180.960(Ft.) Pipe length 99.20(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 7.255(CFS) Given pipe size= 24.00(In.) Calculated individual pipe flow 7.255(CFS) Normal flow depth in pipe= 9.35(In.) Flow top width inside pipe= 23.41(In.) Critical Depth= 11.48(In.) Pipe flow velocity= 6.41(Ft/s) Travel time through pipe = 0.26 min. Time of concentration (TC) = 12.78 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 76.000 to Point/Station 76.000 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 1 Stream flow area= 2.782(Ac.) Runoff from this stream 7.255(CFS) Time of concentration= 12.78 min. Rainfall intensity= 3.740(In/Hr) Program is now starting with Main Stream No. 2 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 72.000 to Point/Station 73.000 **** INITIAL AREA EVALUATION **** Outfall A Continued TAKEN FROM HYDROLOGY STUDY PHASE II Page 14 of 18 I I I I I I I I I I I I I I I I I I I I I I I I I! • I I I I I Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1.000 [MEDIUM DENSITY RESIDENTIAL (14. 5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 63.000(Ft.) Highest elevation= 190.500(Ft.) Lowest elevation= 189.800(Ft.) Elevation difference 0.700(Ft.) Slope= 1.111% INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 65.00 (Ft) for the top area slope value of 1.11 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 6.59 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)] TC = [1.8*(1.1-0.6300)*( 65.000A.5)/( 1.111A(1/3)]= 6.59 Rainfall intensity (I) = 5.735(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.630 Subarea runoff= 1.142(CFS) Total initial stream area = 0.316(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 73.000 to Point/Station 75.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 187.000(Ft.) Downstream point/station elevation 183.200(Ft.) Pipe length 306.00(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 1.142(CFS) Given pipe size= 8.00(In.) Calculated individual pipe flow 1.142(CFS) Normal flow depth in pipe= 5.65(In.) Flow top width inside pipe = 7.28(In.) Critical Depth= 6.08(In.) Pipe flow velocity= 4.33(Ft/s) Travel time through pipe = 1.18 min. Time of concentration (TC) = 7.76 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 73.000 to Point/Station 75.000 **** SUBAREA FLOW ADDITION **** User specified 'C' value of 0.630 given for subarea Time of concentration= 7.76 min. Rainfall intensity= 5.158(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.437 Subarea runoff 1.113(CFS) for 0.378(Ac.) Total runoff= 2.255(CFS) Total area= 0.694(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 75.000 to Point/Station 75.000 **** SUBAREA FLOW ADDITION **** User specified 'C' value of 0.630 given for subarea Time of concentration= 7.76 min. Rainfall intensity= 5.158(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.704 Subarea runoff 1.374(CFS) for 0.423(Ac.) Total runoff= 3.629(CFS) Total area= 1.117(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Outfall A Continued TAKEN FROM HYDROLOGY STUDY PHASE II Page 15 ofl8 Process from Point/Station 75.000 to Point/Station **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 183.200(Ft.) Downstream point/station elevation 181.380(Ft.) Pipe length 186.00(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 3.629(CFS) Given pipe size = 12.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is 0.607(Ft.) at·the headworks or inlet of the pipe(s) Pipe friction loss= 1.930(Ft.) Minor friction loss= 0.497(Ft.) K-factor = 1.50 Pipe flow velocity= 4.62(Ft/s) Travel time through pipe 0.67 min. Time of concentration (TC) = 8.43 min. 76.000 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 76.000 to Point/Station 76.000 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 2 Stream flow area = 1.117(Ac.) Runoff from this stream 3.629(CFS) Time of concentration = 8.43 min. Rainfall intensity= 4.889(In/Hr) Summary of stream data: Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 7.255 12.78 3.740 2 3.629 8.43 4.889 Qmax(l) 1.000 * 1. 000 * 7.255) + 0.765 * 1. 000 * 3. 629) + 10.032 Qmax(2) 1. 000 * 0.660 * 7.255) + 1. 000 * 1.000 * 3. 629) + 8.418 Total of 2 main streams to confluence: Flow rates before confluence point: 7.255 3.629 Maximum flow rates at confluence using above data: 10.032 8.418 Area of streams before confluence: 2.782 1.117 Results of confluence: Total flow rate= 10.032(CFS) Time of concentration 12.779 min. Effective stream area after confluence 3.899(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 76.000 to Point/Station 106.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 181.380(Ft.) Downstream point/station elevation 180.640(Ft.) Pipe length 45.00(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 10.032(CFS) Given pipe size= 24.00(In.) Calculated individual pipe flow 10.032(CFS) Normal flow depth in pipe= 9.74(In.) Flow top width inside pipe= 23.57(In.) Critical Depth = 13.59(In.) Pipe flow velocity = 8.39(Ft/s) Outfall A Continued TAKEN FROM HYDROLOGY STUDY PHASE II Page 16 of 18 I I I I I I I I I I I I I I I I I I I I I I I I I I I r .. I I I I I I I Travel time through pipe Time of concentration (TC) 0.09 min. 12.87 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 106.000 to Point/Station 106.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in no~mal stream number 1 Stream flow area= 3.899(Ac.) Runoff from this stream 10.032(CFS) Time of concentration Rainfall intensity = 12.87 min. 3. 723 ( In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 106.000 to Point/Station 106.000 **** USER DEFINED FLOW INFORMATION AT A POINT **** User specified •c• value of 0.630 given for subarea Rainfall intensity (I) = 4.865(In/Hr) for a 100.0 year storm User specified values are as follows: TC = 8.50 min. Rain intensity = 4.86(In/Hr) Total area= 17.600(Ac.) Total runoff= 56.220(CFS) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 106.000 to Point/Station 106.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 17.600(Ac.) Runoff from this stream 56.220(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 8.50 min. 4.865(In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 10.032 12.87 3. 723 2 56.220 8.50 4.865 Qmax (1) 1. 000 * 1. 000 * 10.032) + 0.765 * 1. 000 * 56.220) + 53.057 Qmax(2) 1. 000 * 0.661 * 10.032) + 1. 000 * 1.000 * 56.220) + 62.846 Total of 2 streams to confluence: Flow rates before confluence point: 10.032 56.220 Maximum flow rates at confluence using above data: 53.057 62.846 Area of streams before confluence: 3.899 17.600 Results of confluence: Total flow rate= 62.846(CFS) Time of concentration 8.500 min. Effective stream area after confluence 21.499 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 106.000 to Point/Station 107.000 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel = Depth of flow= 1.717(Ft.), Average velocity= ******* Irregular Channel Data *********** 62.887(CFS) 4.004(Ft/s) Outfall A Continued TAKEN FROM HYDROLOGY STUDY PHASE II Page 17 of 18 Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 3.70 2 10.30 0.00 3 15.30 0.00 4 27.40 5.90 Manning's 'N' friction factor 0.035 Sub-Channel flow 62.887(CFS) flow top width= 13.299(Ft.) velocity= 4.004(Ft/s) area= 15.706(Sq.Ft) Froude number = 0.649 Upstream point elevation = Downstream point elevation Flow length= 320.000(Ft.) Travel time 1.33 min. 1 7 5 . 7 0 0 ( Ft . ) 17 3 • 2 6 0 (Ft. ) Time of concentration= 9.83 min. Depth of flow= 1.717(Ft.) Average velocity= 4.004(Ft/s) Total irregular channel flow = 62.887 (CFS) Irregular channel normal depth above invert elev. Average velocity of channel(s) 4.004(Ft/s) Adding area flow to channel User specified 'C' value of 0.630 given for subarea The area added to the existing stream causes a a lower flow rate of Q 60.617(CFS) 1. 717 (Ft.) therefore the upstream flow rate of Q = 62.846(CFS) is being used Rainfall intensity = 4.429(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 13.687 Subarea runoff= O.OOO(CFS) for 0.226(Ac.) Total runoff = 62.846(CFS) Total area = 21.725(Ac.) 4.003(Ft/s) 21.725 (Ac.) Depth of flow= 1.716(Ft.), Average velocity End of computations, total study area = Outfall A Continued TAKEN FROM HYDROLOGY STUDY PHASE II Page 18 of 18 I I I I I I I I I I I I I I I I I I I I r • I I I I I [ II I I I I I I I San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software, (c)l991-2004 Version 7.4 Rational method hydrology program based on San Diego County Flood Control Division 2003.hydrology manual Rational Hydrology Study Date: 10/03/11 CT 03-02 CARLSBAD RANCH PLANNING AREA 5 -MARBRISA SITE PHASE III 100 YEAR STORM, Pre-DEVELOPMENT OUTFALL A -NODES 1 TO 40, NODES 100 TO 106 ********* Hydrology Study Control Information ********** Program License Serial Number 4012 Rational hydrology study storm event year is English (in-lb) input data Units used Map data precipitation entered: 6 hour, precipitation(inches) = 24 hour precipitation(inches) = P6/P24 = 57.8% 2.600 4.500 San Diego hydrology manual 'C' values used 100.0 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.000 to Point/Station 2.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1.000 [MEDIUM DENSITY RESIDENTIAL (14. 5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance Highest elevation= 199.000(Ft.) Lowest elevation= 194.500(Ft.) 139.000 (Ft.) Elevation difference 4.500(Ft.) Slope= 3.237% INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 90.00 (Ft) for the top area slope value of 3.24 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 5.43 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(l/3)] TC = [1.8*(1.1-0.6300)*( 90.000A.5)/( 3.237A(l/3)]= 5.43 The initial area total distance of 139.00 (Ft.) entered leaves a remaining distance of 49.00 (Ft.) Using Figure 3-4, the travel time for this distance is 0.59 minutes for a distance of 49.00 (Ft.) and a slope of 3.24 % with an elevation difference of 1.59(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 0.586 Minutes Tt=[(ll.9*0.0093A3)/( 1.59)]A.385= 0.59 Total initial area Ti 5.43 minutes from 0.59 minutes from the Figure 3-4 formula Rainfall intensity (I) = 6.083(In/Hr) Effective runoff coefficient used for area Subarea runoff= 0.383(CFS) Figure 3-3 formula plus 6.01 minutes for a 100.0 year storm (Q=KCIA) is C = 0.630 Total initial stream area = O.lOO(Ac.) Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page I of21 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.000 to Point/Station 101.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 190.500(Ft.) Downstream point/station elevation 181.130(Ft.) Pipe length 10.00(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 0.383(CFS) Given pipe size= 12.00(In.) Calculated individual pipe flow 0.383(CFS) Normal flow depth in pipe= 0.89(In.) Flow top width inside pipe = 6.29(In.) Critical Depth= 3.07(In.) Pipe flow velocity= 14.55(Ft/s) Travel time through pipe = 0.01 min. Time of concentration (TC) = 6.02 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 101.000 to Point/Station 101.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 0.100(Ac.) Runoff from this stream 0.383(CFS) Time of concentration 6.02 min. Rainfall intensity = 6.076(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 100.000 to Point/Station 100.000 **** USER DEFINED FLOW INFORMATION AT A POINT **** User specified 'C' value of 0.770 given for subarea Rainfall intensity (I) = 6.850(In/Hr) for a 100.0 year storm User specified values are as follows: TC = 5.00 min. Rain intensity= 6.85(In/Hr) Total area= 10.160(Ac.) Total runoff= 45.050(CFS) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 100.000 to Point/Station 101.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 182.660(Ft.) Downstream point/station elevation 181.130(Ft.) Pipe length 35.00(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 45.050(CFS) Given pipe size= 36.00(In.) Calculated individual pipe flow 45.050(CFS) Normal flow depth in pipe = 14.07(In.) Flow top width inside pipe= 35.13(In.) Critical Depth= 26.24(In.) Pipe flow velocity= 17.60(Ft/s) Travel time through pipe = 0.03 min. Time of concentration (TC) = 5.03 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 101.000 to Point/Station 101.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 10.160(Ac.) Runoff from this stream 45.050(CFS) Time of concentration = 5.03 min. Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page 2 of21 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Rainfall intensity= 6.82l(In/Hr) Summary of stream data: Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 0.383 6.02 6.076 2 45.050 5.03 6.821 Qmax(l) 1. 000 * 1.000 * 0. 383) + 0.891 * 1. 000 * 45.050) + 40.508 Qmax(2) 1. 000 * 0.836 * 0. 383) + 1.000 * 1. 000 * 45.050) + 45.370 Total of 2 streams to confluence: Flow rates before confluence point: 0.383 45.050 Maximum flow rates at confluence using above data: 40.508 45.370 Area of streams before confluence: 0.100 10.160 Results of confluence: Total flow rate= 45.370(CFS) Time of concentration 5.033 min. Effective stream area after confluence 10.260(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 101.000 to Point/Station 102.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 181.130(Ft.) Downstream point/station elevation 180.300(Ft.) Pipe length 165.34(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 45.370(CFS) Given pipe size= 36.00(In.) Calculated individual pipe flow 45.370(CFS) Normal flow depth in pipe= 28.3l(In.) Flow top width inside pipe= 29.5l(In.) Critical Depth= 26.32(In.) Pipe flow velocity= 7.6l(Ft/s) Travel time through pipe = 0.36 min. Time of concentration (TC) = 5.40 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 102.000 to Point/Station 102.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 10.260(Ac.) Runoff from this stream 45.370(CFS) Time of concentration 5.40 min. Rainfall intensity= 6.522(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 3.000 to Point/Station 4.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group Decimal fraction soil group Decimal fraction soil group Decimal fraction soil group [MEDIUM DENSITY RESIDENTIAL (14.5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 A 0.000 B 0.000 c 0.000 D 1.000 Initial subarea total flow distance 204.000 (Ft.) Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page 3 of21 Highest elevation= 196.000(Ft.) Lowest elevation= 190.100(Ft.) Elevation difference 5.900(Ft.) Slope = 2.892 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 90.00 (Ft) for the top area slope value of 2.89 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 5.63 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)] TC = [1.8*(1.1-0.6300)*( 90.000A.5)/( 2.892A(1/3)]= 5.63 The initial area total distance of 204.00 (Ft.) entered leaves a remaining distance of 114.00 (Ft.) Using Figure 3-4, the travel time for this distance is 1.17 minutes for a distance of 114.00 (Ft.) and a slope of 2.89 % with an elevation difference of 3.30(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 1.172 Minutes Tt=[(11.9*0.0216A3)/( 3.30)]A.385= 1.17 Total initial area Ti 5.63 minutes from 1.17 minutes from the Figure 3-4 formula Rainfall intensity (I) = 5.615(In/Hr) Effective runoff coefficient used for area Figure 3-3 formula plus 6.81 minutes for a 100.0 year storm (Q=KCIA) is C = 0.630 Subarea runoff= 0.520(CFS) Total initial stream area = 0.147(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 4.000 to Point/Station 102.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 190.100(Ft.) Downstream point/station elevation 180.300(Ft.) Pipe length 6.70(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 0.520(CFS) Given pipe size= 12.00(In.) Calculated individual pipe flow 0.520(CFS) Normal flow depth in pipe= 0.92(In.) Flow top width inside pipe= 6.40(In.) Critical Depth= 3.59(In.) Pipe flow velocity= 18.64(Ft/s) Travel time through pipe = 0.01 min. Time of concentration (TC) = 6.81 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 102.000 to Point/Station 102.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 0.147(Ac.) Runoff from this stream 0.520(CFS) Time of concentration = 6.81 min. Rainfall intensity= 5.612(In/Hr) Summary of stream data: Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 45.370 2 0.520 Qmax(1) 1.000 * 1. 000 * Qmax(2) 0.860 * 1.000 * Total of 2 streams 5.40 6.522 6.81 5.612 1.000 * 45.370) + 0.792 * 0.520) + 1. 000 * 45.370) + 1.000 * 0.520) + to confluence: 45.782 39.558 Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page4 of21 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Flow rates before confluence point: 45.370 0.520 Maximum flow rates at confluence using above data: 45.782 39.558 Area of streams before confluence: 10.260 0.147 Results of confluence: Total flow rate= 45.782(CFS) Time of concentration 5.395 min. Effective stream area after confluence 10.407(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 102.000 to Point/Station 103.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 180.300(Ft.) Downstream point/station elevation 179.860(Ft.) Pipe length 88.00(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 45.782(CFS) Given pipe size= 36.00(In.) Calculated individual pipe flow 45.782(CFS) Normal flow depth in pipe= 28.59(In.) Flow top width inside pipe= 29.10(In.) Critical Depth= 26.47(In.) Pipe flow velocity= 7.60(Ft/s) Travel time through pipe= 0.19 min. Time of concentration (TC) = 5.59 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 103.000 to Point/Station 103.000 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 1 Stream flow area= 10.407(Ac.) Runoff from this stream 45.782(CFS) Time of concentration = 5.59 min. Rainfall intensity = 6.376(In/Hr) Program is now starting with Main Stream No. 2 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 11.000 to Point/Station 12.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1.000 [MEDIUM DENSITY RESIDENTIAL (14.5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 327.000(Ft.) Highest elevation= 198.200(Ft.) Lowest elevation= 189.400(Ft.) Elevation difference 8.800(Ft.) Slope= 2.691 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 90.00 (Ft) for the top area slope value of 2.69 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 5.77 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(l/3)] TC = [1.8*(1.1-0.6300)*( 90.000A.5)/( 2.691A(l/3)]= 5.77 The initial area total distance of 327.00 (Ft.) entered leaves a remaining distance of 237.00 (Ft.) Using Figure 3-4, the travel time for this distance is 2.12 minutes for a distance of 237.00 (Ft.) and a slope of 2.69 % Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page 5 of21 with an elevation difference of 6.38(Ft.) from the end of the top Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 2 .117 Minutes Tt=[(11.9*0.0449A3)/( 6.38)]A.385= 2.12 Total initial area Ti 5.77 minutes from 2.12 minutes from the Figure 3-4 formula Rainfall intensity (I) = 5.106(In/Hr) Effective runoff coefficient used for area Subarea runoff= 0.708(CFS) Figure 3-3 formula plus 7.89 minutes for a 100.0 year storm (Q=KCIA) is C = 0.630 Total initial stream area = 0.220(Ac.) area ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 12.000 to Point/Station 103.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 185.400(Ft.) Downstream point/station elevation 184.900(Ft.) Pipe length 47.00(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 0.708(CFS) Given pipe size= 12.00(In.) Calculated individual pipe flow 0.708(CFS) Normal flow depth in pipe= 3.57(In.) Flow top width inside pipe= 10.97(In.) Critical Depth= 4.21(In.) Pipe flow velocity= 3.61(Ft/s) Travel time through pipe = 0.22 min. Time of concentration (TC) = 8.10 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 103.000 to Point/Station 103.000 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 2 Stream flow area= 0.220(Ac.) Runoff from this stream 0.708(CFS) Time of concentration = 8.10 min. Rainfall intensity= 5.017(In/Hr) Program is now starting with Main Stream No. 3 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 20.000 to Point/Station 21.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A Decimal fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [MEDIUM DENSITY RESIDENTIAL (14.5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 0.000 0.000 0.000 1.000 Initial subarea total flow distance 60.000(Ft.) Highest elevation= 200.000(Ft.) Lowest elevation= 196.000(Ft.) Elevation difference 4.000(Ft.) Slope= 6.667 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 6.67 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 4.49 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)] TC = [1.8*(1.1-0.6300)*( 100.000A.5)/( 6.667A(1/3)]= 4.49 Rainfall intensity (I) = 7.337(In/Hr) for a 100.0 year storm Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page 6 of21 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I . I I I I I I Effective runoff coefficient used for area (Q=KCIA) is C 0.630 Subarea runoff= 0.092(CFS) Total initial stream area = 0.020(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 21.000 to Point/Station 22.000 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel Depth of flow= 0.146(Ft.), Average velocity= ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate •y• coordinate 1 0.00 0.50 2 0.00 0.00 3 13.00 0.20 Manning's 'N' friction factor 0.015 Sub-Channel flow 1.228 (CFS) flow top width= 9.495(Ft.) velocity= 1.77l(Ft/s) area= 0.693(Sq.Ft) Froude number= 1.155 Upstream point elevation = Downstream point elevation Flow length= 480.000(Ft.) Travel time 4.52 min. 196.000(Ft.) 190.870(Ft.) Time of concentration = 9.01 min. Depth of flow= 0.146(Ft.) Average velocity= 1.77l(Ft/s) Total irregular channel flow = 1.228 (CFS) Irregular channel normal depth above invert elev. Average velocity of channel(s) 1.77l(Ft/s) Adding area flow to channel Decimal fraction soil group A Decimal fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [MEDIUM DENSITY RESIDENTIAL (14.5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 0.000 0.000 0.000 1. 000 1.228 (CFS) 1. 771 (Ft/s) 0.146 (Ft.) Rainfall intensity= 4.685(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.484 2.174(CFS) for 0.748(Ac.) Subarea runoff = Total runoff = Depth of flow = 2.267(CFS) Total area= 0.184(Ft.), Average velocity= 0. 768 (Ac.) 2.064(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 22.000 to Point/Station 23.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 186.000(Ft.) Downstream point/station elevation 185.600(Ft.) Pipe length 39.10(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 2.267(CFS) Given pipe size= 12.00(In.) Calculated individual pipe flow 2.267(CFS) Normal flow depth in pipe = 6.90(In.) Flow top width inside pipe = 11.86(In.) Critical Depth= 7.73(In.) Pipe flow velocity= 4.85(Ft/s) Travel time through pipe = 0.13 min. Time of concentration (TC) = 9.15 min. Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page 7 of21 I I I I I I I I I I I I I I I I I Average Adding Decimal Decimal velocity of channel(s) = area flow to channel fraction soil group A fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [MEDIUM DENSITY RESIDENTIAL (14.5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 1.234(Ft/s) 0.000 0.000 0.000 1. 000 Rainfall intensity= 3.975(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.209 0.304(Ac.) Subarea runoff = Total runoff = Depth of flow = 0. 717 (CFS) for 0.829(CFS) Total area = 0.110(Ft.), Average velocity= 0.331(Ac.) 1.394(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 23.000 to Point/Station 23.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 3 in normal stream number 2 Stream flow area= 0.331(Ac.) Runoff from this stream 0.829(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 11.63 min. 3.975(In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 2.267 9.15 4.640 2 0.829 11.63 3.975 Qmax(1) 1.000 * 1. 000 * 2. 267) + 1. 000 * 0.787 * 0. 829) + 2.919 Qmax(2) 0.857 * 1. 000 * 2.267) + 1. 000 * 1. 000 * 0. 829) + 2.771 Total of 2 streams to confluence: Flow rates before confluence point: 2.267 0.829 Maximum flow rates at confluence using above data: 2.919 2.771 Area of streams before confluence: 0.768 0.331 Results of confluence: Total flow rate = 2.919(CFS) Time of concentration 9.146 min. Effective stream area after confluence 1.099(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 23.000 to Point/Station 31.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 185.600(Ft.) Downstream point/station elevation 182.730(Ft.) Pipe length 110.00(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 2.919(CFS) Given pipe size= 12.00(In.) Calculated individual pipe flow 2.919(CFS) Normal flow depth in pipe= 6.05(In.) Flow top width inside pipe= 12.00(In.) Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page 9 of21 Critical Depth= 8.78(In.) Pipe flow velocity 7.35(Ft/s) Travel time through pipe = 0.25 min. Time of concentration (TC) = 9.40 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 31.000 to Point/Station 31.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 182.730(Ft.) Downstream point/station elevation 181.550(Ft.) Pipe length 236.00(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 2.919(CFS) Given pipe size= 24.00(In.) Calculated individual pipe flow 2.919(CFS) Normal flow depth in pipe= 6.94(In.) Flow top width inside pipe= 21.77(In.) Critical Depth= 7.14(In.) Pipe flow velocity= 3.87(Ft/s) Travel time through pipe= 1.02 min. Time of concentration (TC) = 10.41 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 32.000 to Point/Station 32.000 **** SUBAREA FLOW ADDITION **** Decimal fraction soil group A-0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1.000 [MEDIUM DENSITY RESIDENTIAL (14. 5 DU/A or Less Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Time of concentration= 10.41 min. Rainfall intensity= 4.268(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 3.028 Subarea runoff 10.005(CFS) for 3.707(Ac.) Total runoff= 12.924(CFS) Total area= 4.806(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 32.000 to Point/Station 33.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 181.550(Ft.) Downstream point/station elevation 181.110(Ft.) Pipe length 88.50(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 12.924(CFS) Given pipe size= 24.00(In.) Calculated individual pipe flow 12.924(CFS) Normal flow depth in pipe= 16.38(In.) Flow top width inside pipe= 22.34(In.) Critical Depth= 15.51(In.) Pipe flow velocity= 5.65(Ft/s) Travel time through pipe = 0.26 min. Time of concentration (TC) = 10.67 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 33.000 to Point/Station 33.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 3 in normal stream number 1 Stream flow area= 4.806(Ac.) Runoff from this stream 12.924(CFS) Time of concentration 10.67 min. Rainfall intensity= 4.201(In/Hr) Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page 10 of21 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 7.000 to Point/Station 15.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1. 000 [MEDIUM DENSITY RESIDENTIAL (14.5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 128.000(Ft.) Highest elevation= 190.600(Ft.) Lowest elevation= 189.550(Ft.) Elevation difference 1.050(Ft.) Slope= 0.820% INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 65.00 (Ft) for the top area slope value of 0.82 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 7.29 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(l/3)] TC = [1.8*(1.1-0.6300)*( 65.000A.5)/( 0.820A(l/3)]= 7.29 The initial area total distance of 128.00 (Ft.) entered leaves a remaining distance of 63.00 (Ft.) Using Figure 3-4, the travel time for this distance is 1.21 minutes for a distance of 63.00 (Ft.) and a slope of 0.82 % with an elevation difference of 0.52(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 1.206 Minutes Tt=[(ll.9*0.0119A3)/( 0.52)]A.385= 1.21 Total initial area Ti 7.29 minutes from 1.21 minutes from the Figure 3-4 formula Rainfall intensity (I) = 4.867(In/Hr) Effective runoff coefficient used for area Figure 3-3 formula plus 8.49 minutes for a 100.0 year storm (Q=KCIA) is C = 0.630 Subarea runoff= 0.4ll(CFS) Total initial stream area = 0.134(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 15.000 to Point/Station 33.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 185.550(Ft.) Downstream point/station elevation 185.020(Ft.) Pipe length 53.00(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 0.4ll(CFS) Given pipe size= 12.00(In.) Calculated individual pipe flow 0.41l(CFS) Normal flow depth in pipe= 2.75(In.) Flow top width inside pipe= 10.09(In.) Critical Depth= 3.18(In.) Pipe flow velocity= 3.02(Ft/s) Travel time through pipe = 0.29 min. Time of concentration (TC) = 8.78 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 33.000 to Point/Station 33.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 3 in normal stream number 2 Stream flow area= 0.134(Ac.) Runoff from this stream 0.4ll(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 8.78 min. 4. 762 (In/Hr) Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page 11 of21 Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 12.924 10.67 4.201 2 0.411 8.78 4.762 Qmax(1) 1. 000 * 1. 000 * 12.924) + 0.882 * 1. 000 * 0.411) + 13.286 Qmax(2) 1. 000 * 0.823 * 12.924) + 1. 000 * 1. 000 * 0. 411) + 11.050 Total of 2 streams to confluence: Flow rates before confluence point: 12.924 0.411 Maximum flow rates at confluence using above data: 13.286 11.050 Area of streams before confluence: 4.806 0.134 Results of confluence: Total flow rate = 13.286(CFS) Time of concentration 10.672 min. Effective stream area after confluence 4. 940 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 33.000 to Point/Station 35.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 181.110(Ft.) Downstream point/station elevation 180.300(Ft.) Pipe length 162.20(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 13.286(CFS) Given pipe size= 30.00(In.) Calculated individual pipe ~low 13.286(CFS) Normal flow depth in pipe= 14.26(In.) Flow top width inside pipe = 29.96(In.) Critical Depth= 14.70(In.) Pipe flow velocity= 5.78(Ft/s) Travel time through pipe = 0.47 min. Time of concentration (TC) = 11.14 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 35.000 to Point/Station 35.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 3 in normal stream number 1 Stream flow area= 4.940(Ac.) Runoff from this stream 13.286(CFS) Time of concentration 11.14 min. Rainfall intensity= 4.086(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 34.000 to Point/Station 13.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A -0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1.000 [MEDIUM DENSITY RESIDENTIAL (14. 5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 119.000(Ft.) Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page 12 of21 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 I I I I I Highest elevation= 190.640(Ft.) Lowest elevation= 189.200(Ft.) Elevation difference 1.440(Ft.) Slope= 1.210 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 65.00 (Ft) for the top area slope value of 1.21 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 6.40 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(l/3)] TC = [1.8*(1.1-0.6300)*( 65.000A.5)/( 1.210A(1/3)]= 6.40 The initial area total distance of 119.00 (Ft.) entered leaves a remaining distance of 54.00 (Ft.) Using Figure 3-4, the travel time for this distance is 0.92 minutes for a distance of 54.00 (Ft.) and a slope of 1.21 % with an elevation difference of 0.65(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 0.922 Minutes Tt=[(11.9*0.0102A3)/( 0.65)]A.385= 0.92 Total initial area Ti 6.40 minutes from 0.92 minutes from the Figure 3-4 formula Rainfall intensity (I) = 5.356(In/Hr) Effective runoff coefficient used for area Figure 3-3 formula plus 7.32 minutes for a 100.0 year storm (Q=KCIA) is C = 0.630 Subarea runoff= 0.337(CFS) Total initial stream area = 0.100 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 13.000 to Point/Station 35.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 185.200(Ft.) Downstream point/station elevation 180.300(Ft.) Pipe length 48.00(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 0.337(CFS) Given pipe size= 12.00(In.) Calculated individual pipe flow 0.337(CFS) Normal flow depth in pipe= 1.42(In.) Flow top width inside pipe= 7.74(In.) Critical Depth= 2.87(In.) Pipe flow velocity= 6.46(Ft/s) Travel time through pipe = 0.12 min. Time of concentration (TC) = 7.45 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 35.000 to Point/Station 35.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 3 in normal stream number 2 Stream flow area= 0.100(Ac.) Runoff from this stream 0.337(CFS) Time of concentration Rainfall intensity = 7.45 min. 5.298(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.000 to Point/Station 6.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A Decimal fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [MEDIUM DENSITY RESIDENTIAL (14.5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value= 0.630 0.000 0.000 0.000 1.000 Initial subarea total flow distance Highest elevation= 191.000(Ft.) Lowest elevation= 189.200(Ft.) 221.000 (Ft.) Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page 13 of21 Elevation difference 1.800(Ft.) Slope= 0.814 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 65.00 (Ft) for the top area slope value of 0.81 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 7.30 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)) TC = [1.8*(1.1-0.6300)*( 65.000A.5)/( 0.814A(1/3)]= 7.30 The initial area total distance of 221.00 (Ft.) entered leaves a remaining distance of 156.00 (Ft.) Using Figure 3-4, the travel time for this distance is 2.43 minutes for a distance of 156.00 (Ft.) and a slope of 0.81 % with an elevation difference of 1.27(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.)))A.385 *60(min/hr) 2.431 Minutes Tt=[(11.9*0.0295A3)/( 1.27))A.385= 2.43 Total initial area Ti 7.30 minutes from 2.43 minutes from the Figure 3-4 formula Rainfall intensity (I) = 4.457(In/Hr) Effective runoff coefficient used for area Figure 3-3 formula plus 9.74 minutes for a 100.0 year storm (Q=KCIA) is C = 0.630 Subarea runoff= 0.702(CFS) Total initial stream area = 0.250 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 6.000 to Point/Station 35.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation-185.200(Ft.) Downstream point/station elevation 180.300(Ft.) Pipe length 5.60(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 0.702(CFS) Given pipe size= 12.00(In.) Calculated individual pipe flow 0.702(CFS) Normal flow depth in pipe= 1.21(In.) Flow top width inside pipe= 7.22(In.) Critical Depth= 4.19(In.) Pipe flow velocity= 17.07(Ft/s) Travel time through pipe = 0.01 min. Time of concentration (TC) = 9.74 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 35.000 to Point/Station 35.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 3 in normal stream number 3 Stream flow area= 0.250(Ac.) Runoff from this stream 0.702(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 9.74 min. 4.455(In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 13.286 11.14 2 0.337 7.45 3 0.702 9.74 Qmax (1) 1.000 * 1. 000 * 0. 771 * 1.000 * 0.917 * 1. 000 * Qmax(2) 1.000 * 0.668 * 1.000 * 1. 000 * 1. 000 * 0.764 * Qmax(3) 1. 000 * 0.874 * 4.086 5.298 4.455 13.286) + 0.337) + 0.702) + 13.286) + 0.337) + 0.702) + 13.286) + 14.190 9.756 Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page 14 of21 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0.841 * 1.000 * 1. 000 * 1. 000 * Total of 3 streams to confluence: 0.337) + 0.702) + Flow rates before confluence point: 13.286 0.337 0.702 12.604 Maximum flow rates at confluence using above data: 14.190 9.756 12.604 Area of streams before confluence: 4.940 0.100 0.250 Results of confluence: Total flow rate= 14.190(CFS) Time of concentration 11.140 min. Effective stream area after confluence 5.290 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 35.000 to Point/Station 103.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 180.300(Ft.) Downstream point/station elevation 179.860(Ft.) Pipe length 88.50(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 14.190(CFS) Given pipe size= 30.00(In.) Calculated individual pipe flow 14.190(CFS) Normal flow depth in pipe= 14.84(In.) Flow top width inside pipe= 30.00(In.) Critical Depth= 15.21(In.) Pipe flow velocity= 5.86(Ft/s) Travel time through pipe= 0.25 min. Time of concentration (TC) = 11.39 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 103.000 to Point/Station 103.000 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 3 Stream flow area= 5.290(Ac.) Runoff from this stream 14.190(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 11.39 min. 4.028(In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 45.782 5.59 6.376 2 0.708 8.10 5.017 3 14.190 11.39 4.028 Qmax(1) 1.000 * 1. 000 * 45.782) + 1. 000 * 0.690 * 0. 708) + 1. 000 * 0.491 * 14.190) + 53.231 Qmax(2) 0.787 * 1. 000 * 45.782) + 1. 000 * 1. 000 * 0. 708) + 1. 000 * 0. 711 * 14.190) + 46.826 Qmax(3) 0.632 * 1. 000 * 45.782) + 0.803 * 1. 000 * 0.708) + 1. 000 * 1.000 * 14.190) + 43.678 Total of 3 main streams to confluence: Flow rates before confluence point: 45.782 0.708 14.190 Maximum flow rates at confluence using above data: 53.231 46.826 43.678 Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page 15 of21 Area of streams before confluence: 10.407 0.220 5.290 Results of confluence: Total flow rate= 53.231(CFS) Time of concentration 5.588 min. Effective stream area after confluence 15.917(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 103.000 to Point/Station 104.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 179.860(Ft.) Downstream point/station elevation 179.460(Ft.) Pipe length 80.20(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 53.231(CFS) Given pipe size= 48.00(In.) Calculated individual pipe flow 53.231(CFS) Normal flow depth in pipe= 24.70(In.) Flow top width inside pipe= 47.98(In.) Critical Depth= 26.29(In.) Pipe flow velocity= 8.17(Ft/s) Travel time through pipe = 0.16 min. Time of concentration (TC) = 5.75 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 104.000 to Point/Station 104.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 15.917(Ac.) Runoff from this stream 53.231(CFS) Time of concentration Rainfall intensity = 5.75 min. 6.259 (In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 36.000 to Point/Station 37.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A Decimal fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [MEDIUM DENSITY RESIDENTIAL (14.5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 0.000 0.000 0.000 1.000 Initial subarea total flow distance 120.000(Ft.) Highest elevation= 194.000(Ft.) Lowest elevation= 192.800(Ft.) Elevation difference 1.200(Ft.) Slope= 1.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 65.00 (Ft) for the top area slope value of 14.5 DU/A or Less 1.00 %, in a development type of In Accordance With Figure 3-3 Initial Area Time of Concentration 6.82 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)] TC = [1.8*(1.1-0.6300)*( 65.000A.5)/( 1.000A(1/3)]= 6.82 The initial area total distance of 120.00 (Ft.) entered leaves a remaining distance of 55.00 (Ft.) Using Figure 3-4, the travel time for this distance is 1.01 minutes for a distance of 55.00 (Ft.) and a slope of 1.00 % with an elevation difference of 0.55(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 1.006 Minutes Tt=[(ll.9*0.0104A3)/( 0.55)]A.385= 1.01 Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page 16 of21 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Total initial area Ti = 6.82 minutes from Figure 3-3 formula plus 1.01 minutes from the Figure 3-4 formula 7.83 minutes Rainfall intensity (I) = 5.13l(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.630 Subarea runoff= 0.420(CFS) Total initial stream area = 0.130 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 37.000 to Point/Station 38.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation-192.800(Ft.) Downstream point/station elevation 187.400(Ft.) Pipe length 158.00(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 0.420(CFS) Given pipe size= 8.00(In.) Calculated individual pipe flow 0.420(CFS) Normal flow depth in pipe = 2.35(In.) Flow top width inside pipe= 7.29(In.) Critical Depth= 3.63(In.) Pipe flow velocity= 4.91(Ft/s) Travel time through pipe = 0.54 min. Time of concentration (TC) = 8.36 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 37.000 to Point/Station 38.000 **** SUBAREA FLOW ADDITION **** User specified 'C' value of 0.630 given for subarea Time of concentration= 8.36 min. Rainfall intensity= 4.916(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.208 Subarea runoff 0.602(CFS) for 0.200(Ac.) Total runoff= 1.022(CFS) Total area= 0.330(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 38.000 to Point/Station 104.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 187.400(Ft.) Downstream point/station elevation 104.000(Ft.) Pipe length 192.50(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 1.022(CFS) Given pipe size= 8.00(In.) Calculated individual pipe flow 1.022(CFS) Normal flow depth in pipe= 1.94(In.) Flow top width inside pipe= 6.85(In.) Critical Depth= 5.76(In.) Pipe flow velocity= 15.67(Ft/s) Travel time through pipe = 0.20 min. Time of concentration (TC) = 8.57 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 38.000 to Point/Station 104.000 **** SUBAREA FLOW ADDITION **** User specified 'C' value of 0.630 given for subarea Time of concentration= 8.57 min. Rainfall intensity= 4.840(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.476 Subarea runoff 1.280(CFS) for 0.425(Ac.) Total runoff= 2.302(CFS) Total area= 0.755(Ac.) Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page 17 of21 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 104.000 to Point/Station 104.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 0.755(Ac.) Runoff from this stream 2.302(CFS) Time of concentration Rainfall intensity = 8.57 min. 4.840(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 39.000 to Point/Station 40.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1. 000 [MEDIUM DENSITY RESIDENTIAL (14.5 DU/A or Less Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 95.000(Ft.) Highest elevation= 190.000(Ft.) Lowest elevation= 189.000(Ft.) Elevation difference 1.000(Ft.) Slope= 1.053 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 65.00 (Ft) for the top area slope value of 1.05 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 6.70 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)] TC = [1.8*(1.1-0.6300)*( 65.000A.5)/( 1.053A(1/3)]= 6.70 The initial area total distance of 95.00 (Ft.) entered leaves a remaining distance of 30.00 (Ft.) Using Figure 3-4, the travel time for this distance is for a distance of 30.00 (Ft.) and a slope of 1.05 % 0.62 minutes with an elevation difference of 0.32(Ft.) from the end of the top Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 0.619 Minutes Tt=[(11.9*0.0057A3)/( 0.32)]A.385= 0.62 Total initial area Ti 6.70 minutes from 0.62 minutes from the Figure 3-4 formula Rainfall intensity (I) = 5.356(In/Hr) Effective runoff coefficient used for area Subarea runoff= 0.648(CFS) Figure 3-3 formula plus 7.32 minutes for a 100.0 year storm (Q=KCIA) is C = 0.630 Total initial stream area = 0.192 (Ac.) area ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 40.000 to Point/Station 41.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 186.050(Ft.) Downstream point/station elevation 184.970(Ft.) Pipe length 108.00(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 0.648(CFS) Given pipe size= 8.00(In.) Calculated individual pipe flow 0.648(CFS) Normal flow depth in pipe= 4.17(In.) Flow top width inside pipe= 7.99(In.) Critical Depth= 4.55(In.) Pipe flow velocity= 3.52(Ft/s) Travel time through pipe = 0.51 min. Time of concentration (TC) = 7.83 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 40.000 to Point/Station 41.000 Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page 18 of21 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I **** SUBAREA FLOW ADDITION **** User specified 'C' value of 0.630 given for subarea Time of concentration= 7.83 min. Rainfall intensity= 5.128(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.231 Subarea runoff 0.535(CFS) for 0.174(Ac.) Total runoff= 1.182(CFS) Total area= 0.366(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 41.000 to Point/Station 104.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 184.970(Ft.) Downstream point/station elevation 183.040(Ft.) Pipe length 195.00(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 1.182(CFS) Given pipe size= 8.00(In.) Calculated individual pipe flow 1.182(CFS) Normal flow depth in pipe= 6.44(In.) Flow top width inside pipe= 6.34(In.) Critical Depth= 6.18(In.) Pipe flow velocity= 3.93(Ft/s) Travel time through pipe = 0.83 min. Time of concentration (TC) = 8.66 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 41.000 to Point/Station 104.000 **** SUBAREA FLOW ADDITION **** User specified 'C' value of 0.630 given for subarea Time of concentration = 8.66 min. Rainfall intensity= 4.806(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.451 Subarea runoff 0.986(CFS) for 0.350(Ac.) Total runoff= 2.168(CFS) Total area= 0.716(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 104.000 to Point/Station 104.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 3 Stream flow area= 0.716(Ac.) Runoff from this stream 2.168(CFS) Time of concentration= 8.66 min. Rainfall intensity= 4.806(In/Hr) Summary of stream data: Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 53.231 5.75 2 2.302 8.57 3 2.168 8.66 Qmax(1) 1. 000 * 1. 000 * 1. 000 * 0. 671 * 1. 000 * 0.664 * Qmax(2) 0.773 * 1. 000 * 1.000 * 1. 000 * 1. 000 * 0.989 * Qmax (3) 0.768 * 1.000 * 6. 259 4.840 4.806 53.231) + 2.302) + 2 .168) + 53.231) + 2.302) + 2.168) + 53.231) + 56.216 45.611 Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page 19 of21 0.993 * 1. 000 * 1.000 * 1. 000 * Total of 3 streams to confluence: 2.302) + 2.168) + Flow rates before confluence point: 53.231 2.302 2.168 45.331 Maximum flow rates at confluence using above data: 56.216 45.611 45.331 Area of streams before confluence: 15.917 0.755 0.716 Results of confluence: Total flow rate= 56.216(CFS) Time of concentration 5.752 min. Effective stream area after confluence 17.388(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 104.000 to Point/Station 105.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 179.430(Ft.) Downstream point/station elevation 179.240(Ft.) Pipe length 37.40(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 56.216(CFS) Given pipe size= 48.00(In.) Calculated individual pipe flow 56.216(CFS) Normal flow depth in pipe= 25.38(In.) Flow top width inside pipe= 47.92(In.) Critical Depth= 27.04(In.) Pipe flow velocity= 8.34(Ft/s) Travel time through pipe = 0.07 min. Time of concentration (TC) = 5.83 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 105.000 to Point/Station 106.000 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Depth of flow = 1.215(Ft.), Average velocity ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 1.64 2 6.00 0.00 3 11.00 0.00 4 24.98 1.04 5 44.34 10.26 Manning's 'N' friction factor 0.035 Sub-Channel flow 56.217(CFS) flow top width= 23.790(Ft.) velocity= 3.036(Ft/s) area= 18.514(Sq.Ft) Froude number= 0.607 Upstream point elevation = Downstream point elevation Flow length= 488.800(Ft.) Travel time 2.68 min. 17 9. 2 4 0 (Ft. ) 175.700(Ft.) Time of concentration= 8.51 min. Depth of flow= 1.215(Ft.) Average velocity = 3.036(Ft/s) Total irregular channel flow = 56.216 (CFS) Irregular channel normal depth above invert elev. Average velocity of channel(s) 3.036(Ft/s) 3.036(Ft/s) 1.215 (Ft.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 105.000 to Point/Station 106.000 **** SUBAREA FLOW ADDITION **** Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page 20 of21 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I User specified 'C' value of 0.630 given for subarea The area added to the existing stream causes a a lower flow rate of Q = 53.897(CFS) therefore the upstream flow rate of Q = Time of concentration = 8.51 min. 56.216(CFS) is being used Rainfall intensity= 4.861(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 11.087 Subarea runoff= O.OOO(CFS) for 0.210(Ac.) Total runoff= 56.216(CFS) Total area End of computations, total study area = 17.598(Ac.) 17.598 (Ac.) Outfall A TAKEN FROM HYDROLOGY STUDY PHASE II Page 21 of21 San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software, (c)1991-2012 Version 7.9 Rational method hydrology program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 10/29/15 CT 03-02, CARLSBAD RANCH, PLANNING AREA NO. 5 -RESORT SITE PHASE 1 100 YEAR STORM POST-DEVELOPMENT NODES 100 TO 110 ********* Hydrology Study Control Information ********** Program License Serial Number 6312 Rational hydrology study storm event year is English (in-lb) input data Units used 100.0 Map data precipitation entered: 6 hour, precipitation(inches) = 2.600 24 hour precipitation(inches) = 4.500 P6/P24 = 57.8% San Diego hydrology manual 'C' values used ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 100.000 to Point/Station 101.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 1.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 0.000 [COMMERCIAL area type (Neighborhod Commercial ) Impervious value, Ai = 0.800 Sub-Area C Value = 0.770 Initial subarea total flow distance 539.000(Ft.) Highest elevation= 208.900(Ft.) Lowest elevation = 188.300(Ft.) Elevation difference 20.600(Ft.) Slope= 3.822% INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 85.00 (Ft) for the top area slope value of 3.82 %, in a development type of Neighborhod Commercial In Accordance With Figure 3-3 Initial Area Time of Concentration 3.50 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)) TC = [1.8*(1.1-0.7700)*( 85.000A.5)/( 3.822A(1/3))= 3.50 The initial area total distance of 539.00 (Ft.) entered leaves a remaining distance of 454.00 (Ft.) Using Figure 3-4, the travel time for this distance is 3.05 minutes for a distance of 454.00 (Ft.) and a slope of 3.82 % with an elevation difference of 17.35(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.)))A.385 *60(min/hr) 3.050 Minutes Tt=[(11.9*0.0860A3)/( 17.35))A.385= 3.05 Total initial area Ti = 3.50 minutes from 3.05 minutes from the Figure 3-4 formula Rainfall intensity (I) = 5.754(In/Hr) Effective runoff coefficient used for area Subarea runoff= 2.570(CFS) Figure 3-3 formula plus 6.55 minutes for a 100.0 year storm (Q=KCIA) is C = 0.770 Total initial stream area = 0.580 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 101.000 to Point/Station 102.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 100 YR PRE-DEVELOPMENT CALC (NODES 100 THROUGH 110) TAKEN FROM HYDROLOGY STUDY PHASE I Page 1 of6 J l I I I I I I I I I I I I I I I I I I I I I I I I p • I I I I I I I Upstream point/station elevation = Downstream point/station elevation Pipe length 77.37(Ft.) Slope No. of pipes = 1 Required pipe flow Given pipe size= 18.00(In.) 184.300(Ft.) 163.540(Ft.) 0.2683 Manning's N 2.570(CFS) Calculated individual pipe flow 2.570(CFS) Normal flow depth in pipe= 2.66(In.) Flow top width inside pipe= 12.78(In.) Critical Depth= 7.28(In.) Pipe flow velocity= 15.77(Ft/s) Travel time through pipe = 0.08 min. Time of concentration (TC) = 6.63 min. 0.013 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 104.000 to Point/Station 102.000 **** SUBAREA FLOW ADDITION **** Rainfall intensity (I) = Decimal fraction soil group A Decimal fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [COMMERCIAL area type (Neighborhod Commercial ) Impervious value, Ai = 0.800 Sub-Area C Value= 0.770 5.708(In/Hr) for a 0.000 1. 000 0.000 0.000 Time of concentration= 6.63 min. 100.0 year storm Rainfall intensity= 5.708(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.770 CA = 1.016 Subarea runoff 3.232(CFS) for 0.740(Ac.) Total runoff= 5.801(CFS) Total area= 1.320(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 102.000 to Point/Station 102.000 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 1 Stream flow area= 1.320(Ac.) Runoff from this stream 5.801(CFS) Time of concentration= 6.63 min. Rainfall intensity= 5.708(In/Hr) Program is now starting with Main Stream No. 2 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 105.000 to Point/Station 106.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 1. 000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 0.000 [COMMERCIAL area type (Neighborhod Commercial ) Impervious value, Ai = 0.800 Sub-Area C Value = 0.770 Initial subarea total flow distance 234.000(Ft.) Highest elevation= 192.000(Ft.) Lowest elevation= 184.000(Ft.) Elevation difference 8.000(Ft.) Slope= 3.419% INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 85.00 (Ft) for the top area slope value of 3.42 %, in a development type of Neighborhod Commercial In Accordance With Figure 3-3 Initial Area Time of Concentration 3.64 minutes 100 YR PRE-DEVELOPMENT CALC (NODES 100 THROUGH 110) TAKEN FROM HYDROLOGY STUDY PHASE I Page 2 of6 TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)] TC = [1.8*(1.1-0.7700)*( 85.000A.5)/( 3.419A(1/3)]= 3.64 The initial area total distance of 234.00 (Ft.) entered leaves a remaining distance of 149.00 (Ft.) Using Figure 3-4, the travel time for this distance is 1.35 minutes for a distance of 149.00 (Ft.) and a slope of 3.42 % with an elevation difference of 5.09(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 1.350 Minutes Tt=[(ll.9*0.0282A3)/( 5.09)]A.385= 1.35 Total initial area Ti 3.64 minutes from Figure 3-3 formula plus 1.35 minutes from the Figure 3-4 formula= 4.99 minutes Calculated TC of 4.985 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 6.850(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.770 Subarea runoff = 1.582(CFS) Total initial stream area = 0.300(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 106.000 to Point/Station 107.000 **** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION **** Top of street segment elevation= 184.000(Ft.) End of street segment elevation= 173.900(Ft.) Length of street segment 165.000(Ft.) Height of curb above gutter flowline 6.0(In.) Width of half street (curb to crown) 30.000(Ft.) Distance from crown to crossfall grade break 28.000(Ft.) Slope from gutter to grade break (v/hz) = 0.020 Slope from grade break to crown (v/hz) 0.020 Street flow is on [1] side(s) of the street Distance from curb to property line 10.000(Ft.) Slope from curb to property line (v/hz) 0.020 Gutter width= 1.500(Ft.) Gutter hike from flowline= 1.500(In.) Manning's N in gutter = 0.0150 Manning's N from gutter to grade break 0.0150 Manning's N from grade break to crown= 0.0150 Estimated mean flow rate at midpoint of street = Depth of flow= 0.242(Ft.), Average velocity= Streetflow hydraulics at midpoint of street travel: Halfstreet flow width= 7.358(Ft.) Flow velocity = 4.57(Ft/s) Travel time = 0.60 min. TC = 5.59 min. Adding area flow to street Rainfall intensity (I) = Decimal fraction soil group A Decimal fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [COMMERCIAL area type (General Commercial ) Impervious value, Ai = 0.850 Sub-Area C Value = 0.800 6.377(In/Hr) 0.000 1.000 0.000 0.000 for a 2.801(CFS) 4.571(Ft/s) 100.0 year storm Rainfall intensity= 6.377(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.788 CA = 0.615 Subarea runoff 2.339(CFS) for 0.480(Ac.) Total runoff= 3.922(CFS) Total area= 0.780(Ac.) Street flow at end of street = 3.922(CFS) Half street flow at end of street 3.922(CFS) Depth of flow= 0.265(Ft.), Average velocity= 4.940(Ft/s) Flow width (from curb towards crown)= 8.500(Ft.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 107.000 to Point/Station 107.000 **** CONFLUENCE OF MINOR STREAMS **** 100 YR PRE-DEVELOPMENT CAlC (NODES 100 THROUGH 110) TAKEN FROM HYDROlOGY STUDY PHASE I Page 3 of6 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I! I I I I I I Along Main Stream number: 2 in normal stream number 1 Stream flow area= 0.780(Ac.) Runoff from this stream 3.922(CFS) Time of concentration Rainfall intensity = 5.59 min. 6.377(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 108.000 to Point/Station 109.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 1.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 0.000 [COMMERCIAL area type (Neighborhod Commercial ) Impervious value, Ai = 0.800 Sub-Area C Value = 0.770 Initial subarea total flow distance 572.000(Ft.) Highest elevation= 200.000(Ft.) Lowest elevation= 179.500(Ft.) Elevation difference = 20.500(Ft.) Slope = 3.584 % Top of Initial Area Slope adjusted by User to 3.671 % Bottom of Initial Area Slope adjusted by User to 3.671 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 85.00 (Ft) for the top area slope value of 3.67 %, in a development type of Neighborhod Commercial In Accordance With Figure 3-3 Initial Area Time of Concentration 3.55 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)] TC = [1.8*(1.1-0.7700)*( 85.000A.5)/( 3.671A(1/3)]= 3.55 The initial area total distance of 572.00 (Ft.) entered leaves a remaining distance of 487.00 (Ft.) Using Figure 3-4, the travel time for this distance is 3.27 minutes for a distance of 487.00 (Ft.) and a slope of 3.67% with an elevation difference of 17.88(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 3.270 Minutes Tt=[(11.9*0.0922A3)/( 17.88)]A.385= 3.27 Total initial area Ti = 3.55 minutes from Figure 3-3 formula plus 3.27 minutes from the Figure 3-4 formula 6.82 minutes Rainfall intensity (I) = 5.607(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.770 Subarea runoff = 5.354(CFS) Total initial stream area = 1.240(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 109.000 to Point/Station 107.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = Downstream point/station elevation Pipe length 195.48(Ft.) Slope No. of pipes = 1 Required pipe flow Given pipe size= 12.00(In.) 177.400(Ft.) 168.330(Ft.) 0.0464 Manning's N 5.354(CFS) Calculated individual pipe flow 5.354(CFS) Normal flow depth in pipe= 7.38(In.) Flow top width inside pipe= 11.68(In.) Critical Depth= 11.20(In.) Pipe flow velocity= 10.57(Ft/s) Travel time through pipe = 0.31 min. Time of concentration (TC) = 7.13 min. 0.013 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 107.000 to Point/Station 107.000 100 YR PRE-DEVELOPMENT CALC (NODES 100 THROUGH 110) TAKEN FROM HYDROLOGY STUDY PHASE I Page 4 of6 I I I I I I I I I I I I I I I I E 2 8.705 7.26 5.386 Qmax(l) 1.000 * 1. 000 * 5.801) + 1.000 * 0.914 * 8.705) + 13.757 Qmax(2) 0.944 * 1.000 * 5.801) + 1.000 * 1. 000 * 8.705) + 14.180 Total of 2 main streams to confluence: Flow rates before confluence point: 5.801 8.705 Maximum flow rates at confluence using above data: 13.757 14.180 Area of streams before confluence: 1.320 2.020 Results of confluence: Total flow rate = 14.180(CFS) Time of concentration 7.260 min. Effective stream area after confluence 3.340(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 102.000 to Point/Station 103.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = Downstream point/station elevation Pipe length 37.46(Ft.) Slope No. of pipes = 1 Required pipe flow Given pipe size= 18.00(In.) 163.210(Ft.) 162.500(Ft.) 0.0190 Manning's N 14.180(CFS) Calculated individual pipe flow 14.180(CFS) Normal flow depth in pipe= 14.44(In.) Flow top width inside pipe= 14.34(In.) Critical Depth= 16.64(In.) Pipe flow velocity = 9.33(Ft/s) Travel time through pipe = 0.07 min. Time of concentration (TC) = 7.33 min. 0.013 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 110.000 to Point/Station 103.000 **** SUBAREA FLOW ADDITION **** Rainfall intensity (I) = Decimal fraction soil group A Decimal fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [COMMERCIAL area type (Neighborhod Commercial ) Impervious value, Ai = 0.800 Sub-Area C Value= 0.770 5.354(In/Hr) for a 0.000 100.0 year storm 1.000 0.000 0.000 Time of concentration= 7.33 min. Rainfall intensity = 5.354(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.773 CA = 3.372 Subarea runoff = 3.872(CFS) for 1. 020 (Ac.) Total runoff = 18.052(CFS) Total area 4. 360 (Ac.) 4. 360 (Ac.) End of computations, total study area = 100 YR PRE-DEVELOPMENT CALC (NODES 100 THROUGH 110) TAKEN FROM HYDROLOGY STUDY PHASE I Page 6 of6 I I I I I I I • I t I • • t I I I I I I Attachment E Civil D Post-Development Hydrology Calculations I I I I I I I I I I I I I I I I I I San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software, (c)l991-2004 Version 7.4 Rational method hydrology program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 05/02/05 ********* Hydrology Study Control Information ********** Program License Serial Number 4012 Rational hydrology study storm event year is English (in-lb) input data Units used Map data precipitation entered: 6 hour, precipitation(inches) = 24 hour precipitation(inches) = P6/P24 = 57.8% 2.600 4.500 San Diego hydrology manual 'C' values used 100.0 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 227.000 to Point/Station 228.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 1. 000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 0.000 [COMMERCIAL area type (Neighborhod Commercial ) Impervious value, Ai = 0.800 Sub-Area C Value = 0.770 Initial subarea total flow distance 204.000(Ft.) Highest elevation= 242.500(Ft.) Lowest elevation= 226.000(Ft.) Elevation difference= 16.500(Ft.) Slope= 8.088% Top of Initial Area Slope adjusted by User to 30.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 30.00 %, in a development type of Neighborhod Commercial In Accordance With Figure 3-3 Initial Area Time of Concentration 1.91 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)] TC = [1.8*(1.1-0.7700)*( 100.000A.5)/( 30.000A(1/3)]= 1.91 The initial area total distance of 204.00 (Ft.) entered leaves a remaining distance of 104.00 (Ft.) Using Figure 3-4, the travel time for this distance is 0.73 minutes for a distance of 104.00 (Ft.) and a slope of 8.09 % with an elevation difference of 8.41(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 0.735 Minutes Tt=[(11.9*0.0197A3)/( 8.41)]A.385= 0.73 Total initial area Ti 1.91 minutes from Figure 3-3 formula plus 0.73 minutes from the Figure 3-4 formula 2.65 minutes Rainfall intensity (I) = 10.326(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.770 Subarea runoff= 1.590(CFS) Total initial stream area = 0. 200 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 228.000 to Point/Station 229.000 **** IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 226.000(Ft.) Downstream point elevation 193.100(Ft.) Channel length thru subarea 623.000(Ft.) Channel base width 2.000(Ft.) Slope or 'Z' of left channel bank = 3.000 Outfall B TAKEN FROM HYDROLOGY PHASE II Page 1 of13 Slope or 'Z' of right channel bank = 3.000 Estimated mean flow rate at midpoint of channel Manning's 'N' = 0.035 Maximum depth of channel 3.000(Ft.) Flow(q) thru subarea = 15.857(CFS) Depth of flow= 0.689(Ft.), Average velocity Channel flow top width= 6.137(Ft.) Flow Velocity= 5.65(Ft/s) Travel time 1.84 min. Time of concentration = 4.48 min. Critical depth= 0.844(Ft.) Adding area flow to channel Decimal fraction soil group A 0.000 Decimal fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [COMMERCIAL area type (Neighborhod Commercial ) Impervious value, Ai = 0.800 Sub-Area C Value= 0.770 1. 000 0.000 0.000 15.857(CFS) 5.653(Ft/s) Rainfall intensity= 7.350(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.770 CA = 4.089 Subarea runoff = 28.460(CFS) for 5.110(Ac.) Total runoff = 30.050(CFS) Total area = Depth of flow= 0.935(Ft.), Average velocity = 5.310 (Ac.) 6.689(Ft/s) Critical depth= 1.156(Ft.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 229.000 to Point/Station 229.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 5.310(Ac.) Runoff from this stream 30.050(CFS) Time of concentration Rainfall intensity = 4.48 min. 7.350(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 231.000 to Point/Station 229.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 1.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 0.000 [COMMERCIAL area type (General Commercial ) Impervious value, Ai = 0.850 Sub-Area C Value = 0.800 Initial subarea total flow distance 829.000(Ft.) Highest elevation= 230.600(Ft.) Lowest elevation = 193.300(Ft.) Elevation difference 37.300(Ft.) Slope = 4.499 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 90.00 (Ft) for the top area slope value of 4.50 %, in a development type of General Commercial In Accordance With Figure 3-3 Initial Area Time of Concentration 3.10 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(l/3)] TC = [1.8*(1.1-0.8000)*( 90.000A.5)/( 4.499A(l/3)]= 3.10 The initial area total distance of 829.00 (Ft.) entered leaves a remaining distance of 739.00 (Ft.) Using Figure 3-4, the travel time for this distance is 4.17 minutes for a distance of 739.00 (Ft.) and a slope of 4.50% with an elevation difference of 33.25(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 4.169 Minutes Tt=[(ll.9*0.1400A3)/( 33.25)]A.385= 4.17 Total initial area Ti 3.10 minutes from Figure 3-3 formula plus Outfall B TAKEN FROM HYDROLOGY PHASE II Page 2 of 13 ... • 1111 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 4.17 minutes from the Figure 3-4 formula 7.27 minutes Rainfall intensity (I) = 5.380(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.800 Subarea runoff= 3.486(CFS) Total initial stream area = 0. 810 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 229.000 to Point/Station 229.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 0.810(Ac.) Runoff from this stream 3.486(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 7.27 min. 5.380(In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 30.050 4.48 7.350 2 3.486 7.27 5.380 Qmax(1) 1. 000 * 1. 000 * 30.050) + 1. 000 * 0.617 * 3.486) + 32.200 Qmax(2) 0.732 * 1.000 * 30.050) + 1.000 * 1. 000 * 3.486) + 25.484 Total of 2 streams to confluence: Flow rates before confluence point: 30.050 3.486 Maximum flow rates at confluence using above data: 32.200 25.484 Area of streams before confluence: 5.310 0.810 Results of confluence: Total flow rate = 32.200(CFS) Time of concentration 4.483 min. Effective stream area after confluence 6.120(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 229.000 to Point/Station 230.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 185.320(Ft.) Downstream point/station elevation 185.010(Ft.) Pipe length 15.85(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 32.200(CFS) Given pipe size = 24.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is 2.458(Ft.) at the headworks or inlet of the pipe(s) Pipe friction loss= 0.321(Ft.) Minor friction loss= 2.447(Ft.) K-factor = 1.50 Pipe flow velocity = 10.25(Ft/s) Travel time through pipe 0.03 min. Time of concentration (TC) = 4.51 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 230.000 to Point/Station 230.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 6.120(Ac.) Runoff from this stream 32.200(CFS) Time of concentration Rainfall intensity = 4.51 min. 7.322(In/Hr) Outfall B TAKEN FROM HYDROLOGY PHASE II Page 3 of 13 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 231.000 to Point/Station 232.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 1.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 0.000 [COMMERCIAL area type (General Commercial ) Impervious value, Ai = 0.850 Sub-Area C Value = 0.800 Initial subarea total flow distance 840.000(Ft.) Highest elevation= 230.600(Ft.) Lowest elevation= 193.300(Ft.) Elevation difference 37.300(Ft.) Slope = 4.440 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 90.00 (Ft) for the top area slope value of 4.44 %, in a development type of General Commercial In Accordance With Figure 3-3 Initial Area Time of Concentration 3.12 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)] TC = [1.8*(1.1-0.8000)*( 90.000A.5)/( 4.440A(1/3)]= 3.12 The initial area total distance of 840.00 (Ft.) entered leaves a remaining distance of 750.00 (Ft.) Using Figure 3-4, the travel time for this distance is 4.24 minutes for a distance of 750.00 (Ft.) and a slope of 4.44 % with an elevation difference of 33.30(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 4.238 Minutes Tt=[(11.9*0.1420A3)/( 33.30)]A.385= 4.24 Total initial area Ti = 3.12 minutes from Figure 3-3 formula plus 4.24 minutes from the Figure 3-4 formula 7.35 minutes Rainfall intensity (I) = 5.341(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.800 Subarea runoff = 3.504(CFS) Total initial stream area = 0.820(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 232.000 to Point/Station 230.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 185.520(Ft.) Downstream point/station elevation 185.010(Ft.) Pipe length 51.15(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 3.504(CFS) Given pipe size= 18.00(In.) Calculated individual pipe flow 3.504(CFS) Normal flow depth in pipe = 7.17(In.) Flow top width inside pipe= 17.62(In.) Critical Depth= 8.56(In.) Pipe flow velocity = 5.34(Ft/s) Travel time through pipe = 0.16 min. Time of concentration (TC) = 7.51 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 230.000 to Point/Station 230.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 0.820(Ac.) Runoff from this stream 3.504(CFS) Time of concentration = Rainfall intensity = Summary of stream data: Stream No. Flow rate (CFS) 7.51 min. 5.267(In/Hr) TC (min) Rainfall Intensity (In/Hr) Outfall B TAKEN FROM HYDROLOGY PHASE II Page4of 13 I I I I I I I I I I I I I I I I I I I I I li I I I I I I I I I I I I I I 1 32.200 4.51 7.322 2 3.504 7.51 5.267 Qmax ( 1) 1.000 * 1. 000 * 32.200) + 1. 000 * 0.600 * 3.504) + 34.302 Qmax(2) 0.719 * 1. 000 * 32.200) + 1. 000 * 1. 000 * 3.504) + 26.666 Total of 2 streams to confluence: Flow rates before confluence point: 32.200 3.504 Maximum flow rates at confluence using above data: 34.302 26.666 Area of streams before confluence: 6.120 0.820 Results of confluence: Total flow rate = 34.302(CFS) Time of concentration 4.509 min. Effective stream area after confluence 6. 940 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 230.000 to Point/Station 233.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 184.670(Ft.) Downstream point/station elevation 182.990(Ft.) Pipe length 115.65(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 34.302(CFS) Given pipe size= 24.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is 3.755(Ft.) at the headworks or inlet of the pipe(s) Pipe friction loss= 2.658(Ft.) Minor friction loss= 2.777(Ft.) K-factor = 1.50 Pipe flow velocity = 10.92(Ft/s) Travel time through pipe 0.18 min. Time of concentration (TC) = 4.69 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 233.000 to Point/Station 233.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 6.940(Ac.) Runoff from this stream 34.302(CFS) Time of concentration Rainfall intensity = 4.69 min. 7.143(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 234.000 to Point/Station 235.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 1.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 0.000 [COMMERCIAL area type (Neighborhod Commercial ) Impervious value, Ai = 0.800 Sub-Area C Value = 0.770 Initial subarea total flow distance 146.000(Ft.) Highest elevation = 242.000(Ft.) Lowest elevation= 230.500(Ft.) Elevation difference 11.500(Ft.) Slope= 7.877 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 7.88 %, in a development type of Neighborhod Commercial Outfall B TAKEN FROM HYDROLOGY PHASE II Page 5 of13 In Accordance With Figure 3-3 Initial Area Time of Concentration 2.99 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)] TC = [1.8*(1.1-0.7700)*( 100.000A.5)/( 7.877A(1/3)]= 2.99 The initial area total distance of 146.00 (Ft.) entered leaves a remaining distance of 46.00 (Ft.) Using Figure 3-4, the travel time for this distance is 0.40 minutes for a distance of 46.00 (Ft.) and a slope of 7.88% with an elevation difference of 3.62(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 0.396 Minutes Tt=[(11.9*0.0087A3)/( 3.62)]A.385= 0.40 Total initial area Ti 2.99 minutes from 0.40 minutes from the Figure 3-4 formula Rainfall intensity (I) = 8.816(In/Hr) Effective runoff coefficient used for area Figure 3-3 formula plus 3.38 minutes for a 100.0 year storm (Q=KCIA) is C = 0.770 Subarea runoff = 0.475(CFS) Total initial stream area = 0. 070 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 235.000 to Point/Station 236.000 **** IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation= 230.500(Ft.) Downstream point elevation 197.700(Ft.) Channel length thru subarea 727.000(Ft.) Channel base width 2.000(Ft.) Slope or 'Z' of left channel bank= Slope or 'Z' of right channel bank= 4.000 4.000 Estimated mean flow rate at midpoint of channel Manning's 'N' = 0.035 Maximum depth of channel 3.000(Ft.) Flow(q) thru subarea = 7.591(CFS) Depth of flow= 0.472(Ft.), Average velocity Channel flow top width= 5.773(Ft.) Flow Velocity = 4.14(Ft/s) Travel time 2.93 min. Time of concentration = 6.31 min. Critical depth= 0.539(Ft.) Adding area flow to channel Decimal fraction soil group A Decimal fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [COMMERCIAL area type (Neighborhod Commercial ) Impervious value, Ai = 0.800 Sub-Area C Value= 0.770 0.000 1.000 0.000 0.000 7.591(CFS) 4.142(Ft/s) Rainfall intensity = 5.897(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.770 CA = 2.479 Subarea runoff= 14.147(CFS) for 3.150(Ac.) Total runoff = 14.622(CFS) Total area = Depth of flow= 0.646(Ft.), Average velocity= 3.220(Ac.) 4.932(Ft/s) Critical depth= 0.750(Ft.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 236.000 to Point/Station 233.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 190.000(Ft.) Downstream point/station elevation 182.990(Ft.) Pipe length 72.54(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 14.622(CFS) Given pipe size= 18.00(In.) Calculated individual pipe flow 14.622(CFS) Normal flow depth in pipe= 8.44(In.) Flow top width inside pipe= 17.96(In.) Critical Depth= 16.76(In.) Pipe flow velocity= 17.97(Ft/s) Travel time through pipe= 0.07 min. Outfall B TAKEN FROM HYDROLOGY PHASE II Page 6 of 13 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I II I I I I ' I I Time of concentration (TC) 6.37 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 233.000 to Point/Station 233.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 3.220(Ac.) Runoff from this stream 14.622(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 6.37 min. 5.857(In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 34.302 4.69 7.143 2 14.622 6.37 5.857 Qmax(l) 1.000 * 1.000 * 34.302) + 1. 000 * 0.735 * 14.622) + 45.050 Qmax(2) 0.820 * 1. 000 * 34.302) + 1. 000 * 1. 000 * 14.622) + 42.748 Total of 2 streams to confluence: Flow rates before confluence point: 34.302 14.622 Maximum flow rates at confluence using above data: 45.050 42.748 Area of streams before confluence: 6.940 3.220 Results of confluence: Total flow rate = 45.050(CFS) Time of concentration 4.686 min. Effective stream area after confluence 10 . 16 0 ( Ac . ) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 233.000 to Point/Station 237.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 182.660(Ft.) Downstream point/station elevation 179.000(Ft.) Pipe length 440.77(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 45.050(CFS) Given pipe size= 30.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is 3.617(Ft.) at the headworks or inlet of the pipe(s) Pipe friction loss = 5.315(Ft.) Minor friction loss= 1.962(Ft.) K-factor = 1.50 Pipe flow velocity= 9.18(Ft/s) Travel time through pipe 0.80 min. Time of concentration (TC) = 5.49 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 237.000 to Point/Station 238.000 **** IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation= 179.000(Ft.) Downstream point elevation 175.100(Ft.) Channel length thru subarea 639.000(Ft.) Channel base width 2.000(Ft.) Slope or 'Z' of left channel bank = Slope or 'Z' of right channel bank = Estimated mean flow rate at midpoint 2.000 2.000 of channel Manning's 'N' = 0.015 Maximum depth of channel Flow(q) thru subarea = 3.000(Ft.) 45.896(CFS) 45.896(CFS) Outfall B TAKEN FROM HYDROLOGY PHASE II Page 7 of 13 Depth of flow= 1.408(Ft.), Average velocity Channel flow top width= 7.633(Ft.) Flow Velocity= 6.77(Ft/s) Travel time 1.57 min. Time of concentration= 7.06 min. Critical depth = 1.578(Ft.) Adding area flow to channel Decimal fraction soil group A Decimal fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [COMMERCIAL area type (Neighborhod Commercial ) Impervious value, Ai = 0.800 Sub-Area C Value= 0.770 0.000 1.000 0.000 0.000 6. 766 (Ft/s) Rainfall intensity = 5.484(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.774 CA = 8.511 1.621(CFS) for 0.830(Ac.) Subarea runoff = Total runoff = Depth of flow = Critical depth = 46.672(CFS) Total area = 1.419(Ft.), Average velocity= 10.990(Ac.) 6.796(Ft/s) 1. 594 (Ft.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 238.000 to Point/Station 238.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 1Q.990(Ac.) Runoff from this stream 46.672(CFS) Time of concentration 7.06 min. Rainfall intensity = 5.484(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 239.000 to Point/Station 240.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 1.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 0.000 [COMMERCIAL area type (Neighborhod Commercial ) Impervious value, Ai = 0.800 Sub-Area C Value = 0.770 Initial subarea total flow distance 175.000(Ft.) Highest elevation= 230.000(Ft.) Lowest elevation= 194.500(Ft.) Elevation difference = 35.500(Ft.) Slope = 20.286 % Top of Initial Area Slope adjusted by User to 30.000 % Bottom of Initial Area Slope adjusted by User to 2.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 30.00 %, in a development type of Neighborhod Commercial In Accordance With Figure 3-3 Initial Area Time of Concentration 1.91 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)] TC = [1.8*(1.1-0.7700)*( 100.000A.5)/( 30.000A(1/3)]= 1.91 The initial area total distance of 175.00 (Ft.) entered leaves a remaining distance of 75.00 (Ft.) Using Figure 3-4, the travel time for this distance is 0.98 minutes for a distance of 75.00 (Ft.) and a slope of 2.00 % with an elevation difference of 1.50(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 0.978 Minutes Tt=[(11.9*0.0142A3)/( 1.50)]A.385= 0.98 Total initial area Ti 1.91 minutes from 0.98 minutes from the Figure 3-4 formula Rainfall intensity (I) = 9.756(In/Hr) Effective runoff coefficient used for area Figure 3-3 formula plus 2.89 minutes for a 100.0 year storm (Q=KCIA) is C = 0.770 Outfall B TAKEN FROM HYDROLOGY PHASE II PageS of13 I I I I I I I I I I I I I I I I I I I r I I I I I I I " I I I I I I Subarea runoff = 2.254(CFS) Total initial stream area = 0. 300 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 240.000 to Point/Station 241.000 **** IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation= 194.500(Ft.) Downstream point elevation 181.700(Ft.) Channel length thru subarea 620.000(Ft.) Channel base width 2.000(Ft.) Slope or 'Z' of left channel bank = Slope or 'Z' of right channel bank = 4.000 4.000 Estimated mean flow rate at midpoint of channel Manning's 'N' = 0.035 Maximum depth of channel 3.000(Ft.) Flow(q) thru subarea = 27.433(CFS) Depth of flow= 1.031(Ft.), Average velocity Channel flow top width= 10.247(Ft.) Flow Velocity= 4.35(Ft/s) Travel time 2.38 min. Time of concentration = 5.27 min. Critical depth= 1.016(Ft.) Adding area flow to channel Decimal fraction soil group A Decimal fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [COMMERCIAL area type (Neighborhod Commercial ) Impervious value, Ai = 0.800 Sub-Area C Value= 0.770 0.000 1.000 0.000 0.000 27.433(CFS) 4.345(Ft/s) Rainfall intensity= 6.623(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.770 CA = 7.931 Subarea runoff= 50.277(CFS) for 10.000(Ac.) Total runoff = 52.530(CFS) Total area = Depth of flow= 1.370(Ft.), Average velocity= 10 . 3 0 0 ( Ac . ) 5.127 (Ft/s) Critical depth= 1.375(Ft.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 241.000 to Point/Station 238.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 177.000(Ft.) Downstream point/station elevation 175.100(Ft.) Pipe length 76.35(Ft.) Manning's N = 0.013 No. of pipes= 1 Required pipe flow 52.530(CFS) Given pipe size= 30.00(In.) Calculated individual pipe flow 52.530(CFS) Normal flow depth in pipe = 20.53(In.) Flow top width inside pipe = 27.89(In.) Critical Depth= 27.96(In.) Pipe flow velocity= 14.69(Ft/s) Travel time through pipe = 0.09 min. Time of concentration (TC) = 5.35 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 238.000 to Point/Station 238.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 10.300(Ac.) Runoff from this stream 52.530(CFS) Time of concentration = Rainfall intensity = Summary of stream data: Stream No. Flow rate (CFS) 5.35 min. 6.554(In/Hr) TC (min) Rainfall Intensity (In/Hr) Outfall B TAKEN FROM HYDROLOGY PHASE II Page 9 of13 1 46.672 7.06 5.484 2 52.530 5.35 6.554 Qmax(1) 1.000 * 1. 000 * 46 .672) + 0.837 * 1.000 * 52.530) + 90.622 Qmax(2) 1.000 * 0.758 * 46 .672) + 1.000 * 1. 000 * 52.530) + 87.928 Total of 2 streams to confluence: Flow rates before confluence point: 46.672 52.530 Maximum flow rates at confluence using above data: 90.622 87.928 Area of streams before confluence: 10.990 10.300 Results of confluence: Total flow rate= 90.622(CFS) Time of concentration 7.060 min. Effective stream area after confluence 21.290(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 238.000 to Point/Station 242.000 **** IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation= 175.100(Ft.) Downstream point elevation 175.000(Ft.) Channel length thru subarea 316.000(Ft.) Channel base width 6.000(Ft.) Slope or 'Z' of left channel bank = Slope or 'Z' of right channel bank = 2.000 2.000 Estimated mean flow rate at midpoint of channel Manning's 'N' = 0.025 Maximum depth of channel 4.000(Ft.) Flow(q) thru subarea= 90.65l(CFS) Depth of flow= 3.740(Ft.), Average velocity Channel flow top width= 20.958(Ft.) Flow Velocity = 1.80(Ft/s) Travel time 2.93 min. Time of concentration = 9.99 min. Critical depth= 1.594(Ft.) Adding area flow to channel Decimal fraction soil group A Decimal fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [COMMERCIAL area type (Neighborhod Commercial ) Impervious value, Ai = 0.800 Sub-Area C Value= 0.770 0.000 1.000 0.000 0.000 The area added to the existing stream causes a a lower flow rate of Q 73.567(CFS) 90.65l(CFS) 1.798(Ft/s) therefore the upstream flow rate of Q = 90.622(CFS) is being used Rainfall intensity = 4.384(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.772 CA = 16.781 O.OOO(CFS) for 0.440(Ac.) Subarea runoff = Total runoff = Depth of flow = Critical depth = 90.622(CFS) Total area = 3.739(Ft.), Average velocity= 21.730(Ac.) 1. 798 (Ft/s) 1.594(Ft.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 242.000 to Point/Station 222.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation= 168.610(Ft.) Downstream point/station elevation 167.920(Ft.) Pipe length 33.95(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 90.622(CFS) Outfall B TAKEN FROM HYDROLOGY PHASE II Page 10 of13 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Given pipe size 36.00(In.) Calculated individual pipe flow 90.622(CFS) Normal flow depth in pipe= 28.08(In.) Flow top width inside pipe= 29.83(In.) Critical Depth= 34.20(In.) Pipe flow velocity = 15.31(Ft/s) Travel time through pipe= 0.04 min. Time of concentration (TC) = 10.03 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 222.000 to Point/Station 222.000 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 1 Stream flow area= 21.730(Ac.) Runoff from this stream 90.622(CFS) Time of concentration = 10.03 min. Rainfall intensity = 4.374(In/Hr) Program is now starting with Main Stream No. 2 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 243.000 to Point/Station 222.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 1.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 0.000 [COMMERCIAL area type (Neighborhod Commercial ) Impervious value, Ai = 0.800 Sub-Area C Value = 0.770 Initial subarea total flow distance 1045.000(Ft.) Highest elevation= 227.000(Ft.) Lowest elevation= 176.500(Ft.) Elevation difference = 50.500(Ft.) Slope = 4.833 % Top of Initial Area Slope adjusted by User to 30.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 30.00 %, in a development type of Neighborhod Commercial In Accordance With Figure 3-3 Initial Area Time of Concentration TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% TC = [1.8*(1.1-0.7700)*( 100.000A.5)/( 1.91 minutes slope (1/3) l 30.000A(l/3)]= 1. 91 The initial area total distance of 1045.00 (Ft.) entered leaves a remaining distance of 945.00 (Ft.) Using Figure 3-4, the travel time for this distance is 4.90 minutes for a distance of 945.00 (Ft.) and a slope of 4.83% with an elevation difference of 45.67(Ft.) from the end of the top area Tt = [11.9*length(Mi)A3)/(elevation change(Ft.))]A.385 *60(min/hr) 4.901 Minutes Tt=[(ll.9*0.1790A3)/( 45.67)]A.385= 4.90 Total initial area Ti = 1.91 minutes from Figure 3-3 formula plus 4.90 minutes from the Figure 3-4 formula 6.81 minutes Rainfall intensity (I) = 5.61l(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.770 Subarea runoff= 10.283(CFS) Total initial stream area = 2. 380 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 222.000 to Point/Station 222.000 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 2 Stream flow area= 2.380(Ac.) Runoff from this stream 10.283(CFS) Time of concentration = 6.81 min. Outfall B TAKEN FROM HYDROLOGY PHASE II Page 11 of 13 Rainfall intensity= 5.611(In/Hr) Program is now starting with Main Stream No. 3 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 222.000 to Point/Station 222.000 **** USER DEFINED FLOW INFORMATION AT A POINT **** User specified 'C' value of 0.760 given for subarea Rainfall intensity (I) = 6.472(In/Hr) for a 100.0 year storm User specified values are as follows: TC = 5.46 min. Rain intensity = 6.47(In/Hr) Total area= 12.780(Ac.) Total runoff= 65.167(CFS) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 222.000 to Point/Station 222.000 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 3 Stream flow area= 12.780(Ac.) Runoff from this stream 65.167(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 5.46 min. 6.472(In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 90.622 10.03 4.374 2 10.283 6.81 5.611 3 65.167 5.46 6.472 Qmax(l) 1.000 * 1. 000 * 90.622) + 0.779 * 1. 000 * 10.283) + 0.676 * 1. 000 * 65.167) + 142.673 Qmax(2) 1. 000 * 0.680 * 90.622) + 1. 000 * 1. 000 * 10.283) + 0.867 * 1. 000 * 65.167) + 128.360 Qmax(3) 1.000 * 0.545 * 90.622) + 1.000 * 0.801 * 10.283) + 1.000 * 1. 000 * 65.167) + 122.763 Total of 3 main streams to confluence: Flow rates before confluence point: 90.622 10.283 65.167 Maximum flow rates at confluence using above data: 142.673 128.360 122.763 Area of streams before confluence: 21.730 2.380 12.780 Results of confluence: Total flow rate = 142.673(CFS) Time of concentration 10.025 min. Effective stream area after confluence 36.890(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 222.000 to Point/Station 244.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 167.590(Ft.) Downstream point/station elevation 167.270(Ft.) Pipe length 15.73(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow 142.673(CFS) Given pipe size= 36.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is Outfall B TAKEN FROM HYDROLOGY PHASE II Page 12of13 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 9.889(Ft.) at the headworks or inlet Pipe friction loss= 0.720(Ft.) Minor friction loss= 9.489(Ft.) Pipe flow velocity= 20.18(Ft/s) Travel time through pipe 0.01 min. Time of concentration (TC) 10.04 min. End of computations, total study area = of the pipe(s) K-factor = 1.50 36.890 (Ac.) Outfall B TAKEN FROM HYDROLOGY PHASE II Page 13 of13 I I I I I I I E I I I San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software, (c)l991-2012 Version 7.9 Rational method hydrology program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 10/28/15 PLANNING AREA N0.5 -RESORT SITE PHASE III 100 YEAR STORM EVENT -POST DEVELOPED CALCS OUTFALL A FILE:14100POSTA.RD3 ********* Hydrology Study Control Information ********** Program License Serial Number 6312 Rational hydrology study storm event year is English (in-lb) input data Units used Map data precipitation entered: 6 hour, precipitation(inches) = 24 hour precipitation(inches) = P6/P24 = 57.8% 2. 600 4.500 San Diego hydrology manual 'C' values used 100.0 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 301.000 to Point/Station 301.100 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1.000 [MEDIUM DENSITY RESIDENTIAL (14. 5 DU/A or Less Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 99.000(Ft.) Highest elevation= 217.000(Ft.) Lowest elevation= 213.500(Ft.) Elevation difference= 3.500(Ft.) Slope= 3.535% Top of Initial Area Slope adjusted by User to 8.333 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 8.33 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration TC = [1.8*(1.1-C)*distance(Ft.)A.S)/(% TC = [1.8*(1.1-0.6300)*( 100.000A.5)/( 4.17 minutes slopeA (1/3)] 8.333A(1/3)]= 4.17 Calculated TC of 4.173 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 6.850(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.630 Subarea runoff= 0.328(CFS) Total initial stream area = 0.076(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 301.100 to Point/Station 301.200 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel 0.576(CFS) 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 1 of37 Depth of flow = 0.013(Ft.), Average velocity= ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 0.50 2 0.00 0.00 3 24.00 0.00 4 24.00 0.50 Manning's 'N' friction factor 0. 011 Sub-Channel flow 0.576(CFS) flow top width= 24.000(Ft.) velocity= 1.870(Ft/s) area= 0.308(Sq.Ft) Froude number= 2.908 Upstream point elevation = Downstream point elevation Flow length= 95.000(Ft.) Travel time 0.85 min. 213.500(Ft.) 207.440(Ft.) Time of concentration = 5.02 min. Depth of flow= 0.013(Ft.) Average velocity= 1.869(Ft/s) Total irregular channel flow = 0. 576 (CFS) Irregular channel normal depth above invert elev. Average velocity of channel(s) 1.869(Ft/s) Adding area flow to channel Rainfall intensity (I) = Decimal fraction soil group A Decimal fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [MEDIUM DENSITY RESIDENTIAL (14.5 DU/A or Less Impervious value, Ai = 0.500 Sub-Area C Value= 0.630 6.833(In/Hr) 0.000 0.000 0.000 1.000 for a 1.869(Ft/s) 0. 013 (Ft.) 100.0 year storm Rainfall intensity= 6.833(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.120 Subarea runoff = Total runoff = Depth of flow = 0.494(CFS) for 0.115(Ac.) 0.822(CFS) Total area= 0.016(Ft.), Average velocity= 0.191(Ac.) 2.155(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 301.200 to Point/Station 301.300 **** PIPEFLOW TRAVEL TIME (User specified size) **** 204.000(Ft.) 203.270(Ft.) Upstream point/station elevation - Downstream point/station elevation Pipe length 145.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0050 Manning's N 0.822(CFS) 0.013 Given pipe size= 12.00(In.) Calculated individual pipe flow 0.822(CFS) Normal flow depth in pipe= 4.71(In.) Flow top width inside pipe= 11.72(In.) Critical Depth= 4.55(In.) Pipe flow velocity= 2.88(Ft/s) Travel time through pipe= 0.84 min. Time of concentration (TC) = 5.86 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 301.300 to Point/Station 301.300 **** SUBAREA FLOW ADDITION **** Rainfall intensity (I) = 6.184(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea Time of concentration= 5.86 min. 100 YR POST-DEVELOPMENT CAlC (OUTFAll A) 10/28/15 Page 2 of37 I I I I I I I I I I I I I I I I I I I I I I I I I I I . I I I Rainfall intensity= 6.184(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.268 Subarea runoff 0.837(CFS) for 0.235(Ac.) Total runoff= 1.660(CFS) Total area= 0.426(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 301.300 to Point/Station 302.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 203.270(Ft.) 202.740(Ft.) Upstream point/station elevation - Downstream point/station elevation Pipe length 120.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0044 Manning's N 1.660(CFS) 0.013 Given pipe size= 12.00(In.) Calculated individual pipe flow 1.660(CFS) Normal flow depth in pipe= 7.41(In.) Flow top width inside pipe= 11.67(In.) Critical Depth= 6.57(In.) Pipe flow velocity= 3.26(Ft/s) Travel time through pipe = 0.61 min. Time of concentration (TC) = 6.47 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 302.000 to Point/Station 302.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 0.426(Ac.) Runoff from this stream 1.660(CFS) Time of concentration Rainfall intensity = 6.47 min. 5.800(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 302.100 to Point/Station 302.200 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1.000 [MEDIUM DENSITY RESIDENTIAL (14. 5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 58.000(Ft.) Highest elevation= 214.500(Ft.) Lowest elevation= 212.350(Ft.) Elevation difference 2.150(Ft.) Slope= 3.707% INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 90.00 (Ft) for the top area slope value of 3.71 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 5.19 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(l/3)] TC = [1.8*(1.1-0.6300)*( 90.000A.5)/( 3.707A(l/3)]= 5.19 Rainfall intensity (I) = 6.69l(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.630 Subarea runoff= 0.152(CFS) Total initial stream area = 0.036(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 302.200 to Point/Station 302.300 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 3 of37 Estimated mean flow rate at midpoint of channel = Depth of flow= O.lOO(Ft.), Average velocity= ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 1 'X' coordinate 0.00 18.00 46.00 'Y' coordinate 0.45 2 0.00 3 0.68 Manning's 'N' friction factor 0.014 Sub-Channel flow 0. 725 (CFS) flow top width= 8.079(Ft.) velocity= 1.804(Ft/s) area= 0.402(Sq.Ft) Froude number= 1.425 Upstream point elevation= 212.350(Ft.) Downstream point elevation 209.270(Ft.) Flow length= 195.000(Ft.) Travel time 1.80 min. Time of concentration= 6.99 min. Depth of flow= O.lOO(Ft.) Average velocity= 1.804(Ft/s) Total irregular channel flow= 0.725(CFS) 0. 725 (CFS) 1.804(Ft/s) Irregular channel normal depth above invert elev. O.lOO(Ft.) Average velocity of channel(s) 1.804(Ft/s) Adding area flow to channel Rainfall intensity (I) = 5.52l(In/Hr) for a 100.0 year storm Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group C 0.000 Decimal fraction soil group D 1.000 [MEDIUM DENSITY RESIDENTIAL (14.5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value= 0.630 Rainfall intensity= 5.52l(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.223 1.079(CFS) for 0.318(Ac.) Subarea runoff = Total runoff = Depth of flow = 1.23l(CFS) Total area= 0.12l(Ft.), Average velocity= 0.354(Ac.) 2.059(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 302.300 to Point/Station 302.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 205.000(Ft.) 202.740(Ft.) Upstream point/station elevation = Downstream point/station elevation Pipe length 51.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0443 Manning's N 1.23l(CFS) 0.013 Given pipe size = 12.00(In.) Calculated individual pipe flow 1.23l(CFS) Normal flow depth in pipe= 3.29(In.) Flow top width inside pipe= 10.70(In.) Critical Depth= 5.62(In.) Pipe flow velocity= 7.05(Ft/s) Travel time through pipe= 0.12 min. Time of concentration (TC) = 7.11 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 302.000 to Point/Station 302.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area 0.354(Ac.) Runoff from this stream= 1.23l(CFS) 100 YR POST-DEVELOPMENT CALC (OUTFAll A) 10/28/15 Page4 of37 I I I I I I I I I I I I I I I I I I I I I I I I I I I I E I • I I I Time of concentration= 7.11 min. Rainfall intensity= 5.460(In/Hr) Summary of stream data: Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 1.660 6.47 5.800 2 1.231 7.11 5.460 Qmax(l) 1.000 * 1.000 * 1.660) + 1.000 * 0. 911 * 1.231) + 2.781 Qmax(2) 0.941 * 1.000 * 1.660) + 1.000 * 1.000 * 1. 231) + 2. 794 Total of 2 streams to confluence: Flow rates before confluence point: 1.660 1.231 Maximum flow rates at confluence using above data: 2.781 2.794 Area of streams before confluence: 0.426 0.354 Results of confluence: Total flow rate= 2.794(CFS) Time of concentration 7.108 min. Effective stream area after confluence 0.780(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 302.000 to Point/Station 303.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = Downstream point/station elevation Pipe length 78.00(Ft.) Slope No. of pipes = 1 Required pipe flow Given pipe size= 12.00(In.) 202.740(Ft.) 202.340(Ft.) 0.0051 Manning's N 2.794(CFS) 0.013 NOTE: Normal flow is pressure flow in user The approximate hydraulic grade line above 0.374(Ft.) at the headworks or inlet selected pipe size. the pipe invert is of the pipe(s) Pipe friction loss= 0.479(Ft.) Minor friction loss= 0.295(Ft.) K-factor = 1. 50 Pipe flow velocity= 3.56(Ft/s) Travel time through pipe 0.37 min. Time of concentration (TC) = 7.47 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 303.000 to Point/Station 303.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 0.780(Ac.) Runoff from this stream 2.794(CFS) Time of concentration Rainfall intensity = 7.47 min. 5.286(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 303.100 to Point/Station 303.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A Decimal fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [HIGH DENSITY RESIDENTIAL (43.0 DU/A or Less ) 0.000 0.000 0.000 1.000 100 YR POST-DEVELOPMENT CALC {OUTFALL A) 10/28/15 Page 5 of37 Impervious value, Ai = 0.800 Sub-Area C Value= 0.790 Initial subarea total flow distance 144.000(Ft.) Highest elevation= 211.050(Ft.) Lowest elevation= 207.500(Ft.) Elevation difference 3.550(Ft.) Slope= 2.465% INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 75.00 (Ft) for the top area slope value of 2.46 %, in a development type of 43.0 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% TC = [1.8*(1.1-0.7900)*( 75.000A.5)/( 3.58 minutes slopeA (1/3)] 2.465A(l/3)]= Calculated TC of 3.577 minutes is less than 5 minutes, 3.58 resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 6.850(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.790 Subarea runoff= 1.52l(CFS) Total initial stream area = 0.28l(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 303.000 to Point/Station 303.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 0.28l(Ac.) Runoff from this stream 1.52l(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 3.58 min. 6.850(In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 2. 794 7.47 5. 286 2 1.521 3.58 6.850 Qmax (1) 1.000 * 1.000 * 2. 794) + 0. 772 * 1.000 * 1. 521) + 3.967 Qmax(2) 1.000 * 0.479 * 2. 794) + 1.000 * 1.000 * 1.521) + 2.858 Total of 2 streams to confluence: Flow rates before confluence point: 2.794 1.521 Maximum flow rates at confluence using above data: 3.967 2.858 Area of streams before confluence: 0.780 0.281 Results of confluence: Total flow rate= 3.967(CFS) Time of concentration 7.473 min. Effective stream area after confluence 1.06l(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 303.000 to Point/Station 304.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 202.340(Ft.) 201.300(Ft.) Upstream point/station elevation = Downstream point/station elevation Pipe length 48.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0217 Manning's N 3.967(CFS) 0.013 Given pipe size= 12.00(In.) Calculated individual pipe flow 3.967(CFS) Normal flow depth in pipe= 7.80(In.) 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 6of37 I I I I I I I I I I I I I I I I I I I I I I I I I I I I! I I I I Flow top width inside pipe 11.44(In.) Critical Depth= 10.13(In.) Pipe flow velocity= 7.34(Ft/s) Travel time through pipe = 0.11 min. Time of concentration (TC) = 7.58 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 304.000 to Point/Station 304.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 1.06l(Ac.) Runoff from this stream 3.967(CFS) Time of concentration Rainfall intensity = 7.58 min. 5.237(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 304.100 to Point/Station 304.200 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1. 000 [MEDIUM DENSITY RESIDENTIAL (14. 5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 73.000(Ft.) Highest elevation = 213.000(Ft.) Lowest elevation= 210.000(Ft.) Elevation difference 3.000(Ft.) Slope = 4.110 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 14.5 DU/A or Less 4.11 %, in a development type of In Accordance With Figure 3-3 Initial Area Time of Concentration 5.28 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(l/3)) TC = [1.8*(1.1-0.6300)*( 100.000A.5)/( 4.110A(l/3)]= 5.28 Rainfall intensity (I) = 6.613(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.630 Subarea runoff= 0.187(CFS) Total initial stream area = 0.045(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 304.200 to Point/Station 304.000 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel - Depth of flow= O.llO(Ft.), Average velocity= ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 1 2 3 'X' coordinate 0.00 18.00 36.00 'Y' coordinate 0.45 0.00 0.45 Manning's 'N' friction factor 0.014 Sub-Channel flow 0.910(CFS) flow top width= 8.802(Ft.) velocity= 1.879(Ft/s) area= 0.484(Sq.Ft) Froude number= 1.411 Upstream point elevation = 210.000(Ft.) 0.910(CFS) 1. 878 (Ft/s) 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 7 of37 Downstream point elevation= 206.900(Ft.) Flow length= 207.000(Ft.) Travel time 1.84 min. Time of concentration= 7.12 min. Depth of flow= 0.110(Ft.) Average velocity= 1.878(Ft/s) Total irregular channel flow= 0.910(CFS) Irregular channel normal depth above invert elev. 0.110(Ft.) Average velocity of channel(s) 1.878(Ft/s) Adding area flow to channel Rainfall intensity (I) = 5.455(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea Rainfall intensity = 5.455(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.284 1.359(CFS) for 0.405(Ac.) Subarea runoff = Total runoff = Depth of flow = 1.546(CFS) Total area = 0.134(Ft.), Average velocity= 0. 450 (Ac.) 2.145 (Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 304.000 to Point/Station 304.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 0.450(Ac.) Runoff from this stream 1.546(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 7.12 min. 5.455(In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity ( In/Hr) 1 3.967 7.58 5.237 2 1.546 7.12 5.455 Qmax (1) 1. 000 * 1. 000 * 3. 967) + 0.960 * 1.000 * 1. 546) + 5.452 Qmax(2) 1.000 * 0.939 * 3.967) + 1.000 * 1.000 * 1. 546) + 5.271 Total of 2 streams to confluence: Flow rates before confluence point: 3.967 1.546 Maximum flow rates at confluence using above data: 5.452 5.271 Area of streams before confluence: 1.061 0.450 Results of confluence: Total flow rate= 5.452(CFS) Time of concentration 7.582 min. Effective stream area after confluence 1. 511 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 304.000 to Point/Station 305.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 201.300 (Ft.) 194. 050 (Ft.) Upstream point/station elevation - Downstream point/station elevation Pipe length 47.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.1543 Manning's N 5.452(CFS) 0.013 Given pipe size= 24.00(In.) Calculated individual pipe flow 5.452(CFS) Normal flow depth in pipe= 4.03(In.) Flow top width inside pipe= 17.94(In.) Critical Depth= 9.88(In.) 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 8 of37 I I I I I I I I I I I I I I I I I I I I I I I I r • " I I I I I ' I I I Pipe flow velocity = 15.66(Ft/s) 0.05 min. Travel time through pipe Time of concentration (TC) = 7.63 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 305.000 to Point/Station 306.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 194.050(Ft.) 193.500(Ft.) Upstream point/station elevation = Downstream point/station elevation Pipe length 105.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0052 Manning's N 5.452(CFS) 0.013 Given pipe size= 24.00(In.) Calculated individual pipe flow 5.452(CFS) Normal flow depth in pipe= 9.54(In.) Flow top width inside pipe= 23.49(In.) Critical Depth= 9.88(In.) Pipe flow velocity= 4.69(Ft/s) Travel time through pipe= 0.37 min. Time of concentration (TC) = 8.01 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 306.000 to Point/Station 306.000 **** SUBAREA FLOW ADDITION **** Rainfall intensity (I) = 5.057(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea Time of concentration = 8.01 min. Rainfall intensity= 5.057(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.648 CA = 1.609 Subarea runoff 2.686(CFS) for 0.972(Ac.) Total runoff= 8.137(CFS) Total area= 2.483(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 306.000 to Point/Station 306.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 2.483(Ac.) Runoff from this stream 8.137(CFS) Time of concentration Rainfall intensity = 8.01 min. 5.057(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 306.100 to Point/Station 306.200 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1.000 [MEDIUM DENSITY RESIDENTIAL (14. 5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 84.000(Ft.) Highest elevation= 211.000(Ft.) Lowest elevation= 208.000(Ft.) Elevation difference 3.000(Ft.) Slope= 3.571% INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 90.00 (Ft) for the top area slope value of 3.57 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 5.25 minutes 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page9 of37 TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(l/3)] TC = [1.8*(1.1-0.6300)*( 90.000A.5)/( 3.571A(l/3)]= 5.25 Rainfall intensity (I) = 6.637(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.630 Subarea runoff = 0.213(CFS) Total initial stream area = 0. 051 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 306.200 to Point/Station 306.300 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel Depth of flow= 0.078(Ft.), Average velocity= ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 1 2 3 'X' coordinate 0.00 0.00 26.00 'Y' coordinate 0.50 0.00 0.50 Manning's 'N' friction factor 0.011 Sub-Channel flow 0.533(CFS) flow top width= 4.034(Ft.) velocity= 3.407(Ft/s) area= 0.156(Sq.Ft) Froude number = 3.048 Upstream point elevation = Downstream point elevation Flow length= 161.000(Ft.) Travel time 0.79 min. 208.000(Ft.) 200.000(Ft.) Time of concentration = 6.04 min. Depth of flow= 0.078(Ft.) Average velocity= 3.407(Ft/s) Total irregular channel flow = 0.533(CFS) Irregular channel normal depth above invert elev. Average velocity of channel(s) 3.407(Ft/s) Adding area flow to channel 0.533(CFS) 3.407(Ft/s) 0.078(Ft.) Rainfall intensity (I) = 6.065(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea Rainfall intensity= 6.065(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.129 Subarea runoff = Total runoff = Depth of flow = 0.566(CFS) for 0.153(Ac.) 0.780(CFS) Total area= 0.089(Ft.), Average velocity= 0.204 (Ac.) 3.746(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 306.300 to Point/Station 306.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 194.000(Ft.) 193.500(Ft.) Upstream point/station elevation - Downstream point/station elevation Pipe length 57.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0088 Manning's N 0.780(CFS) 0. 013 Given pipe size= 18.00(In.) Calculated individual pipe flow 0.780(CFS) Normal flow depth in pipe= 3.43(In.) Flow top width inside pipe= 14.14(In.) Critical depth could not be calculated. Pipe flow velocity= 3.33(Ft/s) Travel time through pipe 0.29 min. Time of concentration (TC) = 6.32 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 306.000 to Point/Station 306.000 100 YR POST-DEVELOPMENT CAlC (OUTFAll A) 10/28/15 Page 10 of37 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 0.204(Ac.) Runoff from this stream 0.780(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 6.32 min. 5.887(In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 8.137 8.01 5.057 2 0.780 6.32 5.887 Qmax (1) 1.000 * 1.000 * 8. 137) + 0.859 * 1.000 * 0.780) + 8.807 Qmax(2) 1.000 * 0.790 * 8.137) + 1.000 * 1.000 * 0.780) + 7.208 Total of 2 streams to confluence: Flow rates before confluence point: 8.137 0.780 Maximum flow rates at confluence using above data: 8.807 7.208 Area of streams before confluence: 2.483 0.204 Results of confluence: Total flow rate= 8.807(CFS) Time of concentration 8.005 min. Effective stream area after confluence 2. 687 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 306.000 to Point/Station 324.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 190.280(Ft.) 190. 000 (Ft.) Upstream point/station elevation = Downstream point/station elevation Pipe length 54.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0052 Manning's N 8.807(CFS) 0.013 Given pipe size= 18.00(In.) NOTE: Normal flow is pressure flow in user The approximate hydraulic grade line above 0.678(Ft.) at the headworks or inlet Pipe friction loss= 0.379(Ft.) Minor friction loss 0.579(Ft.) Critical depth could not be calculated. Pipe flow velocity= 4.98(Ft/s) Travel time through pipe 0.18 min. Time of concentration (TC) = 8.19 min. selected pipe size. the pipe invert is of the pipe(s) K-factor = 1.50 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 324.000 to Point/Station 324.000 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 1 Stream flow area= 2.687(Ac.) Runoff from this stream 8.807(CFS) Time of concentration = 8.19 min. Rainfall intensity= 4.984(In/Hr) Program is now starting with Main Stream No. 2 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 313.000 to Point/Station 314.000 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 11 of 37 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1. 000 [MEDIUM DENSITY RESIDENTIAL (14. 5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 107.000(Ft.) Highest elevation= 240.000(Ft.) Lowest elevation= 222.000(Ft.) Elevation difference 18.000(Ft.) Slope= 16.822 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 16.82 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% TC = [1.8*(1.1-0.6300)*( 100.000A.5)/( 3.30 minutes slopeA (1/3)] 16.822A(1/3)]= Calculated TC of 3.302 minutes is less than 5 minutes, 3.30 resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 6.850(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.630 Subarea runoff= 0.561(CFS) Total initial stream area = 0.130 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 314.000 to Point/Station 315.000 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel Depth of flow= 0.201(Ft.), Average velocity= ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 0.31 2 16.50 0.13 3 18.00 0.00 4 19.50 0.13 5 44.00 0.63 Manning's 'N' friction factor 0.014 Sub-Channel flow 2.048(CFS) flow top width= 12.993(Ft.) velocity= 2.684(Ft/s) area= 0.763(Sq.Ft) Froude number= 1.951 Upstream point elevation = Downstream point elevation Flow length= 214.000(Ft.) Travel time 1.33 min. 222.000(Ft.) 216.000(Ft.) Time of concentration= 4.63 min. Depth of flow= 0.201(Ft.) Average velocity= 2.684(Ft/s) Total irregular channel flow = 2.048(CFS) Irregular channel normal depth above invert elev. Average velocity of channel(s) 2.684(Ft/s) Adding area flow to channel 2.048(CFS) 2.684(Ft/s) 0. 201 (Ft.) Calculated TC of 4.631 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 6.850(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea Rainfall intensity= 6.850(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 12 of37 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I • I ' I I I (Q=KCIA) is C = 0.630 CA = 0.516 2.974(CFS) for 0.689(Ac.) Subarea runoff = Total runoff = Depth of flow = 3.535(CFS) Total area= 0.229(Ft.), Average velocity= 0.819(Ac.) 3. 007 (Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 315.000 to Point/Station 316.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 213.070(Ft.) 208.970(Ft.) Upstream point/station elevation = Downstream point/station elevation Pipe length 132.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0311 Manning's N 3.535(CFS) 0.013 Given pipe size= 12.00(In.) Calculated individual pipe flow 3.535(CFS) Normal flow depth in pipe= 6.44(In.) Flow top width inside pipe= 11.97(In.) Critical Depth= 9.63(In.) Pipe flow velocity= 8.23(Ft/s) Travel time through pipe = 0.27 min. Time of concentration (TC) = 4.90 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 316.000 to Point/Station 316.000 **** SUBAREA FLOW ADDITION **** Calculated TC of 4.898 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 6.850(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea Time of concentration= 4.90 min. Rainfall intensity= 6.850(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.671 Subarea runoff Total runoff = 1.062(CFS) for 0.246(Ac.) 4.596(CFS) Total area= 1.065(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 316.000 to Point/Station 321.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 208.970(Ft.) 203.200 (Ft.) Upstream point/station elevation = Downstream point/station elevation Pipe length 145.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0398 Manning's N 4.596(CFS) 0.013 Given pipe size= 12.00(In.) Calculated individual pipe flow 4.596(CFS) Normal flow depth in pipe= 7.03(In.) Flow top width inside pipe= 11.82(In.) Critical Depth= 10.72(In.) Pipe flow velocity= 9.62(Ft/s) Travel time through pipe = 0.25 min. Time of concentration (TC) = 5.15 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 321.000 to Point/Station 321.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 2 in normal stream number 1 Stream flow area= 1.065(Ac.) Runoff from this stream 4.596(CFS) Time of concentration Rainfall intensity = 5.15 min. 6. 722 (In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 100 VR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 13 of37 Process from Point/Station 317.000 to Point/Station 318.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A Decimal fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [MEDIUM DENSITY RESIDENTIAL (14.5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value= 0.630 0.000 0.000 0.000 1. 000 Initial subarea total flow distance 124.000(Ft.) Highest elevation= 228.000(Ft.) Lowest elevation= 224.800(Ft.) Elevation difference 3.200(Ft.) Slope= 2.581 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 90.00 (Ft) for the top area slope value of 2.58 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 5.85 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(l/3)] TC = [1.8*(1.1-0.6300)*( 90.000A.5)/( 2.581A(l/3)]= 5.85 Rainfall intensity (I) = 6.190(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.630 Subarea runoff= 0.714(CFS) Total initial stream area = 0.183(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 318.000 to Point/Station 319.000 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel Depth of flow= 0.096(Ft.), Average velocity= ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 1 2 3 'X' coordinate 0.00 100.00 200.00 'Y' coordinate 0.50 0.00 0.50 Manning's 'N' friction factor 0.014 Sub-Channel flow 2.820(CFS) flow top width= 38.358(Ft.) velocity= 1.533(Ft/s) area= 1.839(Sq.Ft) Froude number= 1.234 Upstream point elevation = Downstream point elevation Flow length= 293.000(Ft.) Travel time 3.18 min. 224.800(Ft.) 221.290 (Ft.) Time of concentration= 9.04 min. Depth of flow= 0.096(Ft.) Average velocity= 1.533(Ft/s) Total irregular channel flow= 2.820(CFS) 2.820(CFS) 1.533(Ft/s) Irregular channel normal depth above invert elev. 0.096(Ft.) Average velocity of channel(s) 1.533(Ft/s) Adding area flow to channel Rainfall intensity (I) = 4.677(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea Rainfall intensity= 4.677(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 1.041 Subarea runoff = Total runoff = Depth of flow = 4.154(CFS) for 1.469(Ac.) 4.867(CFS) Total area= 0.118(Ft.), Average velocity= 1. 652 (Ac.) 1.757(Ft/s) 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 14of37 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 319.000 to Point/Station 320.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = Downstream point/station elevation Pipe length 112.00(Ft.) Slope No. of pipes = 1 Required pipe flow Given pipe size= 9.00(In.) 215 . 19 0 ( Ft . ) 204.160(Ft.) 0.0985 Manning's N 4.867(CFS) Calculated individual pipe flow 4.867(CFS) Normal flow depth in pipe= 6.91(In.) Flow top width inside pipe= 7.60(In.) Critical depth could not be calculated. Pipe flow velocity= 13.36(Ft/s) Travel time through pipe 0.14 min. Time of concentration (TC) = 9.18 min. 0.013 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 320.000 to Point/Station 320.000 **** SUBAREA FLOW ADDITION **** Rainfall intensity (I) = 4.631(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea Time of concentration= 9.18 min. Rainfall intensity= 4.631(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 1.188 Subarea runoff 0.632(CFS) for 0.233(Ac.) Total runoff= 5.499(CFS) Total area= 1.885(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 320.000 to Point/Station 321.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 204.160(Ft.) 203.200(Ft.) Upstream point/station elevation - Downstream point/station elevation Pipe length 47.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0204 Manning's N 5.499(CFS) 0.013 Given pipe size= 18.00(In.) Calculated individual pipe flow 5.499(CFS) Normal flow depth in pipe= 7.54(In.) Flow top width inside pipe= 17.76(In.) Critical Depth= 10.84(In.) Pipe flow velocity= 7.84(Ft/s) Travel time through pipe = 0.10 min. Time of concentration (TC) = 9.28 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 321.000 to Point/Station 321.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 2 in normal stream number 2 Stream flow area= 1.885(Ac.) Runoff from this stream 5.499(CFS) Time of concentration = Rainfall intensity = Summary of stream data: Stream Flow rate 9.28 min. 4.598(In/Hr) TC No. (CFS) (min) 1 4.596 5.15 2 5. 4 99 9.28 Qmax(l) Rainfall Intensity ( In/Hr) 6.722 4.598 1.000 * 1.000 * 4.596) + 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 15 of37 Qmax(2) 1.000 * 0.684 * 1.000 * 0.555 * 1.000 * 1.000 * Total of 2 streams to confluence: 5.499) + 4.596) + 5.499) + Flow rates before confluence point: 4.596 5.499 7.649 8.644 Maximum flow rates at confluence using above data: 7.649 8.644 Area of streams before confluence: 1.065 1.885 Results of confluence: Total flow rate= 8.644(CFS) Time of concentration 9.276 min. Effective stream area after confluence 2. 950 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 321.000 to Point/Station 322.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = Downstream point/station elevation Pipe length 50.32(Ft.) Slope No. of pipes = 1 Required pipe flow Given pipe size = 12.00(In.) 203.190(Ft.) 201.190(Ft.) 0.0397 Manning's N 8. 644 (CFS) 0.013 NOTE: Normal flow is pressure flow in user The approximate hydraulic grade line above 3.782(Ft.) at the headworks or inlet selected pipe size. the pipe invert is of the pipe(s) Pipe friction loss= 2.96l(Ft.) Minor friction loss= 2.82l(Ft.) K-factor = 1. 50 Pipe flow velocity= ll.Ol(Ft/s) Travel time through pipe 0.08 min. Time of concentration (TC) = 9.35 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 322.000 to Point/Station 322.000 **** SUBAREA FLOW ADDITION **** Rainfall intensity (I) = 4.574(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea Time of concentration = 9.35 min. Rainfall intensity= 4.574(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 2.624 Subarea runoff 3.359(CFS) for 1.215(Ac.) Total runoff= 12.003(CFS) Total area = 4.165(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 322.000 to Point/Station 323.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = Downstream point/station elevation Pipe length 27.00(Ft.) Slope No. of pipes = 1 Required pipe flow 201.190(Ft.) 199.500(Ft.) 0.0626 Manning's N 12.003(CFS) 0.013 Given pipe size= 12.00(In.) NOTE: Normal flow is pressure flow in user The approximate hydraulic grade line above 6.813(Ft.) at the headworks or inlet Pipe friction loss = 3.063(Ft.) Minor friction loss = 5.440(Ft.) Pipe flow velocity= 15.28(Ft/s) Travel time through pipe 0.03 min. Time of concentration (TC) = 9.38 min. selected pipe size. the pipe invert is of the pipe(s) K-factor = 1.50 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 16of 37 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 323.000 to Point/Station 323.000 **** SUBAREA FLOW ADDITION **** Rainfall intensity (I) = 4.565(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea Time of concentration = 9.38 min. Rainfall intensity= 4.565(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 2.891 Subarea runoff 1.195(CFS) for 0.424(Ac.) Total runoff= 13.198(CFS) Total area= 4.589(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 323.000 to Point/Station 324.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 196.500(Ft.) 190.000(Ft.) Upstream point/station elevation = Downstream point/station elevation Pipe length 41.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.1585 Manning's N 13.198(CFS) 0.013 Given pipe size= 18.00(In.) Calculated individual pipe flow 13.198(CFS) Normal flow depth in pipe= 6.95(In.) Flow top width inside pipe= 17.53(In.) Critical Depth= 16.30(In.) Pipe flow velocity= 20.98(Ft/s) Travel time through pipe = 0.03 min. Time of concentration (TC) = 9.41 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 324.000 to Point/Station 324.000 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 2 Stream flow area= 4.589(Ac.) Runoff from this stream 13.198(CFS) Time of concentration = 9.41 min. Rainfall intensity= 4.555(In/Hr) Program is now starting with Main Stream No. 3 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 307.000 to Point/Station 308.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1.000 [MEDIUM DENSITY RESIDENTIAL (14. 5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 74.000(Ft.) Highest elevation= 234.000(Ft.) Lowest elevation= 231.770(Ft.) Elevation difference 2.230(Ft.) Slope= 3.014 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 90.00 (Ft) for the top area slope value of 14.5 DU/A or Less 3.01 %, in a development type of In Accordance With Figure 3-3 Initial Area Time of Concentration 5.56 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)] TC = [1.8*(1.1-0.6300)*( 90.000A.5)/( 3.014A(1/3)]= 5.56 Rainfall intensity (I) = 6.400(In/Hr) for a 100.0 year storm 100 YR POST-DEVELOPMENT CALC (OUTFAll A) 10/28/15 Page 17 of 37 Effective runoff coefficient used for area (Q=KCIA) is C 0.630 Subarea runoff= 0.194(CFS) Total initial stream area = 0.048(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 308.000 to Point/Station 309.000 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel - Depth of flow= 0.173(Ft.), Average velocity= ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 0.31 2 16.50 0.13 3 18.00 0.00 4 19.50 0.13 5 44.00 0.63 Manning's 'N' friction factor 0.014 Sub-Channel flow 1.103(CFS) flow top width= 9.006(Ft.) velocity= 2.445(Ft/s) area= 0.45l(Sq.Ft) Froude number= 1.925 Upstream point elevation = Downstream point elevation Flow length= 270.000(Ft.) Travel time 1.84 min. 231.770 (Ft.) 224.000(Ft.) Time of concentration= 7.40 min. Depth of flow= 0.173(Ft.) Average velocity= 2.445(Ft/s) Total irregular channel flow = 1. 103 (CFS) Irregular channel normal depth above invert elev. Average velocity of channel(s) 2.445(Ft/s) Adding area flow to channel 1.103(CFS) 2.445(Ft/s) 0.173(Ft.) Rainfall intensity (I) = 5.32l(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea Rainfall intensity= 5.32l(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.360 Subarea runoff = Total runoff = Depth of flow = 1. 721 (CFS) for 0. 523 (Ac.) 1.914(CFS) Total area= 0.197(Ft.), Average velocity= 0. 571 (Ac.) 2. 677 (Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 309.000 to Point/Station 310.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 221.980(Ft.) 2 21 . 8 0 0 ( Ft . ) Upstream point/station elevation = Downstream point/station elevation Pipe length 50.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0036 Manning's N 1.914(CFS) 0.013 Given pipe size= 12.00(In.) Calculated individual pipe flow 1.914(CFS) Normal flow depth in pipe = 8.86(In.) Flow top width inside pipe= 10.55(In.) Critical Depth= 7.08(In.) Pipe flow velocity= 3.08(Ft/s) Travel time through pipe= 0.27 min. Time of concentration (TC) = 7.67 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 310.000 to Point/Station 310.000 **** SUBAREA FLOW ADDITION **** 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 18 of37 il I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I --------------~---------------- Rainfall intensity (I) = 5.199(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea Time of concentration= 7.67 min. Rainfall intensity= 5.199(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.689 Subarea runoff 1.666(CFS) for 0.522(Ac.) Total runoff= 3.580(CFS) Total area= 1.093(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 310.000 to Point/Station 311.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 218.800(Ft.) 213.040(Ft.) Upstream point/station elevation = Downstream point/station elevation Pipe length 228.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0253 Manning's N 3.580(CFS) 0.013 Given pipe size= 12.00(In.) Calculated individual pipe flow 3.580(CFS) Normal flow depth in pipe= 6.93(In.) Flow top width inside pipe= 11.86(In.) Critical Depth= 9.68(In.) Pipe flow velocity= 7.63(Ft/s) Travel time through pipe = 0.50 min. Time of concentration (TC) = 8.17 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 311.000 to Point/Station 311.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 3 in normal stream number 1 Stream flow area= 1.093(Ac.) Runoff from this stream 3.580(CFS) Time of concentration Rainfall intensity = 8.17 min. 4.993(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 325.000 to Point/Station 312.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1.000 [MEDIUM DENSITY RESIDENTIAL ( 14. 5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 118.000(Ft.) Highest elevation= 224.000(Ft.) Lowest elevation= 222.000(Ft.) Elevation difference 2.000(Ft.) Slope= 1.695 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 80.00 (Ft) for the top area slope value of 1.70 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 6.35 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(l/3)] TC = [1.8*(1.1-0.6300)*( 80.000A.5)/( 1.695A(l/3)]= 6.35 Rainfall intensity (I) = 5.874(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.630 Subarea runoff= 1.710(CFS) Total initial stream area = 0. 4 62 (Ac.) 100 YR POST-DEVELOPMENT CALC {OUTFALL A) 10/28/15 Page 19 of 37 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 312.000 to Point/Station 311.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = Downstream point/station elevation Pipe length 74.00(Ft.) Slope No. of pipes = 1 Required pipe flow Given pipe size= 12.00(In.) 219.000(Ft.) 213.040(Ft.) 0.0805 Manning's N 1.710(CFS) Calculated individual pipe flow 1.710(CFS) Normal flow depth in pipe= 3.34(In.) Flow top width inside pipe= 10.76(In.) Critical Depth= 6.67(In.) Pipe flow velocity = 9.59(Ft/s) Travel time through pipe = 0.13 min. Time of concentration (TC) = 6.48 min. 0. 013 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 311.000 to Point/Station 311.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 3 in normal stream number 2 Stream flow area= 0.462(Ac.) Runoff from this stream 1.710(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 6.48 min. 5.798(In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 3.580 8.17 4.993 2 1. 710 6.48 5.798 Qmax (1) 1.000 * 1.000 * 3.580) + 0.861 * 1.000 * 1. 710) + 5.052 Qmax(2) 1.000 * 0.793 * 3.580) + 1.000 * 1.000 * 1. 710) + 4.549 Total of 2 streams to confluence: Flow rates before confluence point: 3.580 1.710 Maximum flow rates at confluence using above data: 5.052 4.549 Area of streams before confluence: 1.093 0.462 Results of confluence: Total flow rate= 5.052(CFS) Time of concentration 8.165 min. Effective stream area after confluence 1. 555 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 311.000 to Point/Station 324.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 213.040(Ft.) 190.000(Ft.) Upstream point/station elevation = Downstream point/station elevation Pipe length 495.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0465 Manning's N 5.052(CFS) 0.013 Given pipe size= 18.00(In.) Calculated individual pipe flow 5.052(CFS) Normal flow depth in pipe= 5.78(In.) Flow top width inside pipe= 16.81(In.) Critical Depth= 10.38(In.) Pipe flow velocity= 10.33(Ft/s) Travel time through pipe= 0.80 min. 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 20of37 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I . I I Time of concentration (TC) 8.96 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 324.000 to Point/Station 324.000 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 3 Stream flow area= 1.555(Ac.) Runoff from this stream 5.052(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 8.96 min. 4. 701 (In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (ln/Hr) 1 8.807 8. 19 4.984 2 13.198 9.41 4.555 3 5.052 8.96 4.701 Qmax (1) 1.000 * 1.000 * 8.807) + 1.000 * 0.870 * 13.198) + 1.000 * 0.913 * 5.052) + 24.897 Qmax(2) 0.914 * 1.000 * 8.807) + 1. 000 * 1.000 * 13.198) + 0. 969 * 1.000 * 5.052) + 2 6. 141 Qmax(3) 0.943 * 1.000 * 8.807) + 1.000 * 0.952 * 13.198) + 1.000 * 1.000 * 5.052) + 25.926 Total of 3 main streams to confluence: Flow rates before confluence point: 8.807 13.198 5.052 Maximum flow rates at confluence using above data: 24.897 26.141 25.926 Area of streams before confluence: 2.687 4.589 1.555 Results of confluence: Total flow rate = 25.926(CFS) Time of concentration 8.964 min. Effective stream area after confluence 8. 831 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 324.000 to Point/Station 233.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 190.000(Ft.) 182.830(Ft.) Upstream point/station elevation - Downstream point/station elevation Pipe length 75.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0956 Manning's N 25.926 (CFS) 0.013 Given pipe size= 30.00(In.) Calculated individual pipe flow 25.926(CFS) Normal flow depth in pipe= 9.20(In.) Flow top width inside pipe= 27.67(In.) Critical Depth= 20.84(In.) Pipe flow velocity= 20.29(Ft/s) Travel time through pipe = 0.06 min. Time of concentration (TC) = 9.03 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 233.000 to Point/Station 233.000 100 YR POST-DEVELOPMENT CALC {OUTFALL A) 10/28/15 Page 21 of37 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 1 Stream flow area= 8.83l(Ac.) Runoff from this stream 25.926(CFS) Time of concentration = 9.03 min. Rainfall intensity= 4.680(In/Hr) Program is now starting with Main Stream No. 2 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 231.000 to Point/Station 231.100 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1.000 [MEDIUM DENSITY RESIDENTIAL (14. 5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 141.000(Ft.) Highest elevation= 230.600(Ft.) Lowest elevation= 225.000(Ft.) Elevation difference 5.600(Ft.) Slope= 3.972 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 90.00 (Ft) for the top area slope value of 14.5 DU/A or Less 3.97 %, in a development type of In Accordance With Figure 3-3 Initial Area Time of Concentration 5.07 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(l/3)] TC = [1.8*(1.1-0.6300)*( 90.000A.5)/( 3.972A(l/3)]= 5.07 Rainfall intensity (I) = 6.79l(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.630 Subarea runoff= 2.340(CFS) Total initial stream area = 0.547(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 231.100 to Point/Station 229.000 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel - Depth of flow= 0.162(Ft.), Average velocity= ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 0.50 2 0.00 0.00 3 28.00 0.50 Manning's 'N' friction factor 0.014 Sub-Channel flow 3.118(CFS) flow top width= 9.095(Ft.) velocity= 4.222(Ft/s) area= 0.739(Sq.Ft) Froude number= 2.611 Upstream point elevation = Downstream point elevation Flow length= 688.000(Ft.) 225. 000 (Ft.) 193.300(Ft.) Travel time 2.72 min. Time of concentration= 7.78 Depth of flow= 0.162(Ft.) Average velocity=· 4.222(Ft/s) Total irregular channel flow = min. 3.118(CFS) 3.118 (CFS) 4.222(Ft/s) 100 YR POST-DEVElOPMENT CALC (OUTFALL A) 10/28/15 Page 22 of37 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I i I I Irregular channel normal depth above invert elev. 0.162(Ft.) Average velocity of channel(s) 4.222(Ft/s) Adding area flow to channel Rainfall intensity (I) = 5.149(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea Rainfall intensity= 5.149(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.740 1.47l(CFS) for 0.628(Ac.) Subarea runoff = Total runoff = Depth of flow = 3.812(CFS) Total area= 0.175(Ft.), Average velocity= 1. 175 (Ac.) 4.439(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 229.000 to Point/Station 230.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 185.320(Ft.) 18 4 . 6 7 0 ( Ft . ) Upstream point/station elevation = Downstream point/station elevation Pipe length 15.85(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0410 Manning's N 3.812(CFS) 0.013 Given pipe size= 18.00(In.) Calculated individual pipe flow 3.812(CFS) Normal flow depth in pipe= 5.16(In.) Flow top width inside pipe= 16.28(In.) Critical Depth= 8.96(In.) Pipe flow velocity= 9.ll(Ft/s) Travel time through pipe = 0.03 min. Time of concentration (TC) = 7.81 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 230.000 to Point/Station 230.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 2 in normal stream number 1 Stream flow area= 1.175(Ac.) Runoff from this stream 3.812(CFS) Time of concentration Rainfall intensity = 7.81 min. 5.137 (In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 231.000 to Point/Station 231.200 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1.000 [MEDIUM DENSITY RESIDENTIAL (14. 5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 159.000(Ft.) Highest elevation= 230.600(Ft.) Lowest elevation= 225.000(Ft.) Elevation difference 5.600(Ft.) Slope = 3.522 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 90.00 (Ft) for the top area slope value of 3.52 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 5.28 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)) TC = [1.8*(1.1-0.6300)*( 90.000A.5)/( 3.522A(1/3))= 5.28 Rainfall intensity (I) = 6.618(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.630 Subarea runoff= 0.554(CFS) Total initial stream area = 0. 133 (Ac.) 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 23 of 37 I I I I I I I I I I I I I I i I I Rainfall intensity= 4.854(In/Hr) Summary of stream data: Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 3.812 7.81 5.137 2 2.477 8.53 4.854 Qmax(1) 1.000 * 1.000 * 3.812) + 1.000 * 0.916 * 2.477) + 6.080 Qmax(2) 0.945 * 1.000 * 3.812) + 1.000 * 1.000 * 2.477) + 6.078 Total of 2 streams to confluence: Flow rates before confluence point: 3.812 2.477 Maximum flow rates at confluence using above data: 6.080 6.078 Area of streams before confluence: 1.175 0.806 Results of confluence: Total flow rate= 6.080(CFS) Time of concentration 7.813 min. Effective stream area after confluence 1. 981 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 230.000 to Point/Station 233.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 184. 67 0 (Ft.) 182.990(Ft.) Upstream point/station elevation - Downstream point/station elevation Pipe length 115.65(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0145 Manning's N 6.080(CFS) 0.013 Given pipe size= 24.00(In.) Calculated individual pipe flow 6.080(CFS) Normal flow depth in pipe= 7.70(In.) Flow top width inside pipe= 22.4l(In.) Critical Depth= 10.46(In.) Pipe flow velocity= 6.99(Ft/s) Travel time through pipe = 0.28 min. Time of concentration (TC) = 8.09 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 233.000 to Point/Station 233.000 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 2 Stream flow area= 1.981(Ac.) Runoff from this stream 6.080(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 8.09 min. 5.023(In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity ( In/Hr) 1 25.926 9.03 4.680 2 6.080 8.09 5.023 Qmax (1) 1.000 * 1.000 * 25.926) + 0.932 * 1.000 * 6.080) + 31.591 Qmax(2) 1.000 * 0.896 * 25.926) + 100 YR POST-DEVELOPMENT CALC (OUTFAll A) 10/28/15 Page 25 of 37 1.000 * 1.000 * 6.080) + 29.314 Total of 2 main streams to confluence: Flow rates before confluence point: 25.926 6.080 Maximum flow rates at confluence using above data: 31.591 29.314 Area of streams before confluence: 8.831 1.981 Results of confluence: Total flow rate= 31.59l(CFS) Time of concentration 9.026 min. Effective stream area after confluence 10.812(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 233.000 to Point/Station 101.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 182.990(Ft.) 180.860(Ft.) Upstream point/station elevation = Downstream point/station elevation Pipe length 200.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0106 Manning's N 31.59l(CFS) 0.013 Given pipe size = 30.00(In.) Calculated individual pipe flow 31.59l(CFS) Normal flow depth in pipe= 19.3l(In.) Flow top width inside pipe= 28.73(In.) Critical Depth= 22.97(In.) Pipe flow velocity= 9.45(Ft/s) Travel time through pipe = 0.35 min. Time of concentration (TC) = 9.38 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 101.000 to Point/Station 101.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 10.812(Ac.) Runoff from this stream 31.59l(CFS) Time of concentration Rainfall intensity = 9.38 min. 4.566(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 101.000 to Point/Station 101.000 **** USER DEFINED FLOW INFORMATION AT A POINT **** User specified 'C' value of 0.630 given for subarea Rainfall intensity (I) = 6.077(In/Hr) for a 100.0 year storm User specified values are as follows: TC = 6.02 min. Rain intensity= 6.08(In/Hr) Total area= O.lOO(Ac.) Total runoff= 0.383(CFS) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 101.000 to Point/Station 101.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 0.100(Ac.) Runoff from this stream 0.383(CFS) Time of concentration = Rainfall intensity = Summary of stream data: Stream No. Flow rate (CFS) 6.02 min. 6.077(In/Hr) TC (min) Rainfall Intensity ( In/Hr) 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 26of37 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 31.591 9.38 4.566 2 0.383 6.02 6.077 Qmax (1) 1.000 * 1.000 * 31.591) + 0.751 * 1.000 * 0.383) + 31.878 Qmax (2) 1.000 * 0.642 * 31.591) + 1.000 * 1.000 * 0.383) + 20.661 Total of 2 streams to confluence: Flow rates before confluence point: 31.591 0.383 Maximum flow rates at confluence using above data: 31.878 20.661 Area of streams before confluence: 10.812 0.100 Results of confluence: Total flow rate= 31.878(CFS) Time of concentration 9.379 min. Effective stream area after confluence 10.912 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 101.000 to Point/Station 102.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 180.860(Ft.) 180.160(Ft.) Upstream point/station elevation = Downstream point/station elevation Pipe length 166.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0042 Manning's N 31.878(CFS) 0.013 Given pipe size= 36.00(In.) Calculated individual pipe flow 31.878(CFS) Normal flow depth in pipe= 22.97(In.) Flow top width inside pipe= 34.60(In.) Critical Depth= 21.97(In.) Pipe flow velocity= 6.70(Ft/s) Travel time through pipe = 0.41 min. Time of concentration (TC) = 9.79 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 102.000 to Point/Station 102.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 10.912(Ac.) Runoff from this stream 31.878(CFS) Time of concentration Rainfall intensity = 9.79 min. 4.441(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 102.000 to Point/Station 102.000 **** USER DEFINED FLOW INFORMATION AT A POINT **** User specified 'C' value of 0.630 given for subarea Rainfall intensity (I) = 5.613(In/Hr) for a 100.0 year storm User specified values are as follows: TC = 6.81 min. Rain intensity= 5.61(In/Hr) Total area= 0.157(Ac.) Total runoff= 0.520(CFS) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 102.000 to Point/Station 102.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 0.157(Ac.) 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 27 of 37 Runoff from this stream Time of concentration = Rainfall intensity = Summary of stream data: 0.520(CFS) 6.81 min. 5.613(In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity ( In/Hr) 1 31.878 9. 79 4.441 2 0.520 6.81 5.613 Qmax(l) 1. 000 * 1.000 * 31.878) + 0.791 * 1. 000 * 0.520) + 32.290 Qmax(2) 1.000 * 0.696 * 31.878) + 1.000 * 1.000 * 0. 520) + 22.691 Total of 2 streams to confluence: Flow rates before confluence point: 31.878 0.520 Maximum flow rates at confluence using above data: 32.290 22.691 Area of streams before confluence: 10.912 0.157 Results of confluence: Total flow rate = 32.290 (CFS) Time of concentration 9.792 min. Effective stream area after confluence 11.069(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 102.000 to Point/Station 103.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 180.160(Ft.) 179.780(Ft.) Upstream point/station elevation - Downstream point/station elevation Pipe length 91.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0042 Manning's N 32.290(CFS) 0.013 Given pipe size= 36.00(In.) Calculated individual pipe flow 32.290(CFS) Normal flow depth in pipe= 23.25(In.) Flow top width inside pipe= 34.43(In.) Critical Depth= 22.13(In.) Pipe flow velocity= 6.69(Ft/s) Travel time through pipe = 0.23 min. Time of concentration (TC) = 10.02 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 103.000 to Point/Station 103.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 11.069(Ac.) Runoff from this stream 32.290(CFS) Time of concentration 10.02 min. Rainfall intensity= 4.376(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 103.000 to Point/Station 103.000 **** USER DEFINED FLOW INFORMATION AT A POINT **** User specified 'C' value of 0.630 given for subarea Rainfall intensity (I) = 5.018(In/Hr) for a 100.0 year storm User specified values are as follows: TC = 8.10 min. Rain intensity= 5.02(In/Hr) Total area= 0.220(Ac.) Total runoff= 0.708(CFS) 100 YR POST-DEVELOPMENT CALC {OUTFALL A) 10/28/15 Page 28 of37 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 103.000 to Point/Station 103.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 0.220(Ac.) Runoff from this stream 0.708(CFS) Time of concentration Rainfall intensity = 8.10 min. 5.018(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 103.000 to Point/Station 103.000 **** USER DEFINED FLOW INFORMATION AT A POINT **** User specified 'C' value of 0.630 given for subarea Rainfall intensity (I) = 4.028(In/Hr) for a 100.0 year storm User specified values are as follows: TC = 11.39 min. Rain intensity= 4.03(In/Hr) Total area= 5.290(Ac.) Total runoff= 14.190(CFS) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 103.000 to Point/Station 103.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 3 Stream flow area= 5.290(Ac.) Runoff from this stream 14.190(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 11. 39 min. 4.028(In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 32.290 10.02 4.376 2 0.708 8.10 5.018 3 14.190 11.39 4.028 Qmax (1) 1.000 * 1.000 * 32.290) + 0.872 * 1.000 * 0.708) + 1.000 * 0.880 * 14.190) + 45.388 Qmax(2) 1.000 * 0.809 * 32.290) + 1.000 * 1.000 * 0. 708) + 1.000 * 0.711 * 14.190) + 3 6. 906 Qmax (3) 0.921 * 1.000 * 32.290) + 0.803 * 1.000 * 0.708) + 1.000 * 1.000 * 14.190) + 44.483 Total of 3 streams to confluence: Flow rates before confluence point: 32.290 0.708 14.190 Maximum flow rates at confluence using above data: 45.388 36.906 44.483 Area of streams before confluence: 11.069 0.220 5.290 Results of confluence: Total flow rate = 45.388(CFS) Time of concentration 10.018 min. Effective stream area after confluence 16.579(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 103.000 to Point/Station 104.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 29 of 37 17 9 . 7 8 0 ( Ft . ) 179.430(Ft.) Upstream point/station elevation - Downstream point/station elevation Pipe length 84.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0042 Manning's N 45.388(CFS) 0.013 Given pipe size = 48.00(In.) Calculated individual pipe flow 45.388(CFS) Normal flow depth in pipe= 23.70(In.) Flow top width inside pipe= 48.00(In.) Critical Depth= 24.19(In.) Pipe flow velocity= 7.34(Ft/s) Travel time through pipe= 0.19 min. Time of concentration (TC) = 10.21 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 104.000 to Point/Station 104.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 16.579(Ac.) Runoff from this stream 45.388(CFS) Time of concentration Rainfall intensity = 10.21 min. 4. 323 (In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 330.000 to Point/Station 331.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A 0.000 Decimal fraction soil group B 0.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 1.000 [MEDIUM DENSITY RESIDENTIAL (14. 5 DU/A or Less Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 Initial subarea total flow distance 49.000(Ft.) Highest elevation= 196.000(Ft.) Lowest elevation= 195.000(Ft.) Elevation difference 1.000(Ft.) Slope= 2.041% INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 80.00 (Ft) for the top area slope value of 2.04 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 5.97 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)] TC = [1.8*(1.1-0.6300)*( 80.000A.5)/( 2.041A(1/3)]= 5.97 Rainfall intensity (I) = 6.113(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.630 Subarea runoff= 0.304(CFS) Total initial stream area = 0.079(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 331.000 to Point/Station 332.000 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel Depth of flow= 0.286(Ft.), Average velocity= ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 1 2 3 4 'X' coordinate 0.00 0.00 1.00 1.00 'Y' coordinate 0.50 0.00 0.00 0.50 0.742(CFS) 2.595(Ft/s) 100 YR POST-DEVELOPMENT CALC {OUTFAll A) 10/28/15 Page 30 of37 I I I I I I I I I I I I I I I I I I I I I I I I I I I • II ., I I r • Manning's 'N' friction factor = 0.013 Sub-Channel flow 0.742(CFS) flow top width= l.OOO(Ft.) velocity= 2.595(Ft/s) area= 0.286(Sq.Ft) Froude number= 0.855 Upstream point elevation = Downstream point elevation Flow length= 122.000(Ft.) Travel time 0.78 min. 195.000(Ft.) 194.390(Ft.) Time of concentration= 6.75 min. Depth of flow= 0.286(Ft.) Average velocity= 2.595(Ft/s) Total irregular channel flow = 0.742(CFS) Irregular channel normal depth above invert elev. Average velocity of channel(s) 2.595(Ft/s) Adding area flow to channel 0.286(Ft.) Rainfall intensity (I) = 5.645(In/Hr) for a 100.0 year storm User specified 'C' value of 0.580 given for subarea Rainfall intensity= 5.645(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.592 CA = 0.194 0.792(CFS) for 0.249(Ac.) Subarea runoff = Total runoff = Depth of flow = 1.096(CFS) Total area= 0.378(Ft.), Average velocity= 0.328(Ac.) 2.902(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 332.000 to Point/Station 333.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation - Downstream point/station elevation Pipe length 232.00(Ft.) Slope No. of pipes = 1 Required pipe flow Given pipe size= 12.00(In.) 186.740(Ft.) 181.370(Ft.) 0.0231 Manning's N 1.096(CFS) Calculated individual pipe flow 1.096(CFS) Normal flow depth in pipe = 3.66(In.) Flow top width inside pipe = 11.05(In.) Critical Depth= 5.29(In.) Pipe flow velocity= 5.4l(Ft/s) Travel time through pipe= 0.72 min. Time of concentration (TC) = 7.46 min. 0.013 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 333.000 to Point/Station 333.000 **** SUBAREA FLOW ADDITION **** Rainfall intensity (I) = 5.290(In/Hr) for a 100.0 year storm User specified 'C' value of 0.580 given for subarea Time of concentration= 7.46 min. Rainfall intensity= 5.290(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.585 CA = 0.446 Subarea runoff 1.266(CFS) for 0.435(Ac.) Total runoff= 2.362(CFS) Total area= 0.763(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 333.000 to Point/Station 104.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = Downstream point/station elevation Pipe length 13.00(Ft.) Slope No. of pipes = 1 Required pipe flow Given pipe size= 12.00(In.) 181.370(Ft.) 179.430(Ft.) 0.1492 Manning's N 2.362(CFS) 0.013 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 31 of37 Calculated individual pipe flow 2.362(CFS) Normal flow depth in pipe= 3.36(In.) Flow top width inside pipe= 10.78(In.) Critical Depth= 7.89(In.) Pipe flow velocity= 13.10(Ft/s) Travel time through pipe = 0.02 min. Time of concentration (TC) = 7.48 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 104.000 to Point/Station 104.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 0.763(Ac.) Runoff from this stream 2.362(CFS) Time of concentration Rainfall intensity = 7.48 min. 5.283(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 338.000 to Point/Station 339.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A -0.000 Decimal fraction soil group B 1.000 Decimal fraction soil group c 0.000 Decimal fraction soil group D 0.000 [MEDIUM DENSITY RESIDENTIAL (14.5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.580 Initial subarea total flow distance 94.000(Ft.) Highest elevation= 192.000(Ft.) Lowest elevation= 190.500(Ft.) Elevation difference 1.500(Ft.) Slope= 1.596 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 80.00 (Ft) for the top area slope value of 1.60 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 7.16 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)] TC = [1.8*(1.1-0.5800)*( 80.000A.5)/( 1.596A(1/3)]= 7.16 Rainfall intensity (I) = 5.432(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.580 Subarea runoff= 0.416(CFS) Total initial stream area = 0.132(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 339.000 to Point/Station 337.000 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel Depth of flow= 0.357(Ft.), Average velocity= ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 0.50 2 0.00 0.00 3 0.50 0.00 4 0.50 0.50 Manning's 'N' friction factor 0.013 Sub-Channel flow 0. 681 (CFS) flow top width= 0.500(Ft.) velocity= 3.808(Ft/s) area = 0.179(Sq.Ft) 0.681(CFS) 3.808(Ft/s) 100 YR POST-DEVELOPMENT CALC (OUTFAll A) 10/28/15 Page 32 of37 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I [ Froude number = 1.122 Upstream point elevation = Downstream point elevation Flow length= 35.000(Ft.) Travel time 0.15 min. 190.500(Ft.) 190.000(Ft.) Time of concentration= 7.32 min. Depth of flow= 0.357(Ft.) Average velocity= 3.808(Ft/s) Total irregular channel flow = 0.681(CFS) Irregular channel normal depth above invert elev. Average velocity of channel(s) 3.808(Ft/s) Adding area flow to channel 0. 357 (Ft.) Rainfall intensity (I) = 5.359(In/Hr) for a 100.0 year storm User specified 'C' value of 0.580 given for subarea Rainfall intensity= 5.359(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.580 CA = 0.174 Subarea runoff= 0.517(CFS) for 0.168(Ac.) Total runoff= 0.932(CFS) Total area= Depth of flow= 0.459(Ft.), Average velocity= 0.300(Ac.) 4. 059 (Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 337.000 to Point/Station 340.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = Downstream point/station elevation Pipe length 196.00(Ft.) Slope No. of pipes = 1 Required pipe flow Given pipe size= 12.00(In.) 186.080(Ft.) 184.120(Ft.) 0.0100 Manning's N 0.932(CFS) Calculated individual pipe flow 0.932(CFS) Normal flow depth in pipe= 4.19(In.) Flow top width inside pipe= 11.44(In.) Critical Depth= 4.86(In.) Pipe flow velocity= 3.82(Ft/s) Travel time through pipe = 0.86 min. Time of concentration (TC) = 8.17 min. 0.013 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 340.000 to Point/Station 340.000 **** SUBAREA FLOW ADDITION **** Rainfall intensity (I) = 4.990(In/Hr) for a 100.0 year storm User specified 'C' value of 0.580 given for subarea Time of concentration = 8.17 min. Rainfall intensity= 4.990(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.580 CA = 0.418 Subarea runoff 1.151(CFS) for 0.420(Ac.) Total runoff= 2.084(CFS) Total area= 0.720(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 340.000 to Point/Station 104.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 184.120(Ft.) 179.430(Ft.) Upstream point/station elevation = Downstream point/station elevation Pipe length 110.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0426 Manning's N 2.084(CFS) 0.013 Given pipe size= 12.00(In.) Calculated individual pipe flow 2.084(CFS) Normal flow depth in pipe= 4.37(In.) Flow top width inside pipe= 11.55(In.) Critical Depth= 7.40(In.) Pipe flow velocity= 8.06(Ft/s) Travel time through pipe = 0.23 min. 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 33 of37 Time of concentration (TC) 8.40 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 104.000 to Point/Station 104.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 3 Stream flow area= 0.720(Ac.) Runoff from this stream 2.084(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 8.40 min. 4.902(In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 45.388 10.21 4.323 2 2.362 7.48 5.283 3 2.084 8.40 4.902 Qmax (1) 1.000 * 1.000 * 45. 388) + 0.818 * 1.000 * 2. 362) + 0.882 * 1. 000 * 2.084) + 49.158 Qmax(2) 1.000 * 0.733 * 45.388) + 1.000 * 1.000 * 2. 362) + 1.000 * 0.891 * 2.084) + 37.475 Qmax(3) 1.000 * 0.823 * 45.388) + 0.928 * 1.000 * 2.362) + 1.000 * 1.000 * 2.084) + 41.620 Total of 3 streams to confluence: Flow rates before confluence point: 45.388 2.362 2.084 Maximum flow rates at confluence using above data: 49.158 37.475 41.620 Area of streams before confluence: 16.579 0.763 0.720 Results of confluence: Total flow rate= 49.158(CFS) Time of concentration 10.209 min. Effective stream area after confluence 18.062(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 104.000 to Point/Station 105.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** 17 9. 4 3 0 ( Ft . ) 179.240(Ft.) Upstream point/station elevation = Downstream point/station elevation Pipe length 37.40(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0051 Manning's N 49.158(CFS) 0.013 Given pipe size= 48.00(In.) Calculated individual pipe flow 49.158(CFS) Normal flow depth in pipe= 23.44(In.) Flow top width inside pipe= 47.99(In.) Critical Depth= 25.24(In.) Pipe flow velocity= 8.06(Ft/s) Travel time through pipe= 0.08 min. Time of concentration (TC) = 10.29 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 105.000 to Point/Station 106.000 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Depth of flow = 1.149(Ft.), Average velocity 2.899(Ft/s) 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 34 of37 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I . I I I I I I I ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 1.64 2 6.00 0.00 3 11.00 0.00 4 24.98 5 44.34 Manning's 'N' friction factor 1.04 10.26 0.035 Sub-Channel flow 49.158(CFS} flow top width= 23.411(Ft.} velocity= 2.899(Ft/s} area= 16.958(Sq.Ft} Froude number= 0.600 Upstream point elevation = Downstream point elevation Flow length= 488.000(Ft.} Travel time 2.81 min. 179.240(Ft.} 175.700(Ft.} Time of concentration= 13.09 min. Depth of flow= 1.149(Ft.} Average velocity= 2.899(Ft/s} Total irregular channel flow = 49.158(CFS} Irregular channel normal depth above invert elev. Average velocity of channel(s} 2.899(Ft/s} 1.149(Ft.} ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 106.000 to Point/Station 106.000 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 1 Stream flow area= 18.062(Ac.} Runoff from this stream 49.158(CFS} Time of concentration= 13.09 min. Rainfall intensity= 3.682(In/Hr} Program is now starting with Main Stream No. 2 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 75.000 to Point/Station 75.000 **** USER DEFINED FLOW INFORMATION AT A POINT **** User specified 'C' value of 0.630 given for subarea Rainfall intensity (I} = 5.159(In/Hr} for a 100.0 year storm User specified values are as follows: TC = 7.76 min. Rain intensity= 5.16(In/Hr} Total area= 0.694(Ac.} Total runoff= 2.255(CFS} ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 75.000 to Point/Station 75.000 **** SUBAREA FLOW ADDITION **** Rainfall intensity (I} = 5.159(In/Hr} for a 100.0 year storm User specified 'C' value of 0.580 given for subarea Time of concentration= 7.76 min. Rainfall intensity= 5.159(In/Hr} for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA} is C = 0.611 CA = 0.685 Subarea runoff 1.281(CFS} for 0.428(Ac.} Total runoff= 3.536(CFS} Total area= 1.122(Ac.} ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 75.000 to Point/Station 76.000 **** PIPEFLOW TRAVEL TIME (User specified size} **** 100 YR POST-DEVELOPMENT CALC (OUTFAll A) 10/28/15 Page 35 of37 ------------··-----~------------------------------- 183.240(Ft.) 181.380(Ft.) Upstream point/station elevation = Downstream point/station elevation Pipe length 190.00(Ft.) Slope No. of pipes = 1 Required pipe flow 0.0098 Manning's N 3.536(CFS) 0.013 Given pipe size= 12.00(In.) NOTE: Normal flow is pressure flow in user The approximate hydraulic grade line above 0.484(Ft.) at the headworks or inlet selected pipe size. the pipe invert is of the pipe(s) Pipe friction loss= 1.871(Ft.) Minor friction loss= 0.472(Ft.) K-factor = 1.50 Pipe flow velocity= 4.50(Ft/s) Travel time through pipe 0.70 min. Time of concentration (TC) = 8.46 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 76.000 to Point/Station 76.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 2 in normal stream number 1 Stream flow area= 1.122(Ac.) Runoff from this stream 3.536(CFS) Time of concentration Rainfall intensity = 8.46 min. 4.878(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 76.000 to Point/Station 76.000 **** USER DEFINED FLOW INFORMATION AT A POINT **** User specified 'C' value of 0.630 given for subarea Rainfall intensity (I) = 3.740(In/Hr) for a 100.0 year storm User specified values are as follows: TC = 12.78 min. Rain intensity= 3.74(In/Hr) Total area= 2.782(Ac.) Total runoff= 7.255(CFS) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 76.000 to Point/Station 76.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 2 in normal stream number 2 Stream flow area= 2.782(Ac.) Runoff from this stream 7.255(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 12.78 min. 3.740(In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 3.536 8.46 4.878 2 7.255 12.78 3.740 Qmax (1) 1. 000 * 1.000 * 3. 536) + 1.000 * 0.662 * 7. 255) + 8.341 Qmax(2) 0.767 * 1.000 * 3. 536) + 1.000 * 1.000 * 7.255) + 9.966 Total of 2 streams to confluence: Flow rates before confluence point: 3.536 7.255 Maximum flow rates at confluence using above data: 8.341 9.966 Area of streams before confluence: 1.122 2.782 Results of confluence: 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 36 of 37 I I I I I I I I I I I I I I I I I I I I I I I I I I I r .. Total flow rate= 9.966(CFS) Time of concentration 12.780 min. Effective stream area after confluence 3. 904 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 76.000 to Point/Station 106.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = Downstream point/station elevation Pipe length 45.00(Ft.) Slope No. of pipes = 1 Required pipe flow Given pipe size= 24.00(In.) 181.380(Ft.) 180.640(Ft.) 0.0164 Manning's N 9. 966 (CFS) Calculated individual pipe flow 9.966(CFS) Normal flow depth in pipe= 9.70(In.) Flow top width inside pipe = 23.56(In.) Critical Depth= 13.56(In.) Pipe flow velocity= 8.37(Ft/s) Travel time through pipe = 0.09 min. Time of concentration (TC) = 12.87 min. 0.013 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 106.000 to Point/Station 106.000 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 2 Stream flow area= 3.904(Ac.) Runoff from this stream 9.966(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 12.87 min. 3. 723 (In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 49.158 13.09 3.682 2 9.966 12.87 3.723 Qmax(1) 1.000 * 1.000 * 49.158) + 0.989 * 1.000 * 9. 966) + 59.015 Qmax(2) 1.000 * 0.983 * 49.158) + 1.000 * 1.000 * 9. 966) + 58.289 Total of 2 main streams to confluence: Flow rates before confluence point: 49.158 9.966 Maximum flow rates at confluence using above data: 59.015 58.289 Area of streams before confluence: 18.062 3.904 Results of confluence: Total flow rate= 59.015(CFS) Time of concentration = 13.092 min. Effective stream area after confluence End of computations, total study area = 21.966(Ac.) 21.966 (Ac.) 100 YR POST-DEVELOPMENT CALC (OUTFALL A) 10/28/15 Page 37 of 37 I I I I I I I I I I I I San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software, (c)1991-2012 Version 7.9 Rational method hydrology program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 04/28/15 PLANNING AREA NO. 5 -RESORT SITE PHASE III 100 YEAR STORM POST-DEVELOPMENT Outfall A Continued Program License Serial Number 6312 Rational hydrology study storm event year is English (in-lb) input data Units used 100.0 Map data precipitation entered: 6 hour, precipitation(inches) = 24 hour precipitation(inches) = P6/P24 = 57.8% 2.600 4.500 San Diego hydrology manual 'C' values used ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 106.000 to Point/Station 106.000 **** USER DEFINED FLOW INFORMATION AT A POINT **** User specified 'C' value of 0.630 given for subarea Rainfall intensity (I) = 3.640(In/Hr) for a 100.0 year storm User specified values are as follows: TC = 13.33 min. Rain intensity= 3.64(In/Hr) Total area= 21.795(Ac.) Total runoff= 60.784(CFS) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 106.000 to Point/Station 107.000 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel Depth of flow= 1.678(Ft.), Average velocity= ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 1 0.00 2 10.30 3 15.40 4 27.40 'Y' coordinate 3.70 0.00 0.00 5.90 Manning's 'N' friction factor 0.035 Sub-Channel flow 60.823(CFS) flow top width= 13.183(Ft.) velocity= 3.965(Ft/s) area= 15.338(Sq.Ft) Froude number= 0.648 Upstream point elevation = Downstream point elevation Flow length= 320.000(Ft.) 17 5 . 7 0 0 (Ft. ) 173.260(Ft.) Travel time 1.34 min. Time of concentration= 14.67 Depth of flow= 1.678(Ft.) Average velocity= 3.965(Ft/s) min. 60.823(CFS) 3.965(Ft/s) 100 YR POST-DEVELOPMENT CALC (Outfall A continued) 4-28-15 Page 1 of2 I I I I I I I I I I I I [ Effective runoff coefficient used for area (Q=KCIA) is C 0.630 Subarea runoff= 0.735(CFS) Total initial stream area = 0.197(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 401.000 to Point/Station 402.000 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel Depth of flow= 0.204(Ft.), Average velocity= ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 0.31 2 16.50 0.13 3 18.00 0.00 4 19.50 0.13 5 44.00 0.63 Manning's 'N' friction factor 0.015 Sub-Channel flow 2.060(CFS) flow top width= 13.359(Ft.) velocity= 2.584(Ft/s) area= 0.797(Sq.Ft) Froude number= 1.864 Upstream point elevation = Downstream point elevation Flow length= 225.000(Ft.) Travel time 1.45 min. 193.000(Ft.) 186.430(Ft.) Time of concentration= 7.72 min. Depth of flow= 0.204(Ft.) Average velocity= 2.584(Ft/s) Total irregular channel flow = 2. 060 (CFS) Irregular channel normal depth above invert elev. Average velocity of channel(s) 2.584(Ft/s) Adding area flow to channel 2.060 (CFS) 2.584(Ft/s) 0. 204 (Ft.) Rainfall intensity (I) = 5.177(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea Rainfall intensity= 5.177(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.642 2.589(CFS) for 0.822(Ac.) Subarea runoff = Total runoff = Depth of flow = 3.324(CFS) Total area= 0.228(Ft.), Average velocity= 1.019(Ac.) 2.856(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 402.000 to Point/Station 403.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = Downstream point/station elevation Pipe length 133.00(Ft.) Slope No. of pipes = 1 Required pipe flow Given pipe size= 12.00(In.) 182.680(Ft.) 181.370 (Ft.) 0.0098 Manning's N 3.324(CFS) Calculated individual pipe flow 3.324(CFS) Normal flow depth in pipe= 9.25(In.) Flow top width inside pipe = 10.09(In.) Critical Depth= 9.37(In.) Pipe flow velocity= 5.12(Ft/s) Travel time through pipe = 0.43 min. 0.013 100 YR POST-DEVELOPMENT CALC (Outall B) 4-28-15 Page2of7 ----------------~-----------~------~-------------------------- Time of concentration (TC) 8.15 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 403.000 to Point/Station 403.000 **** SUBAREA FLOW ADDITION **** Rainfall intensity (I) = 4.998(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea Time of concentration = 8.15 min. Rainfall intensity= 4.998(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.820 Subarea runoff 0.776(CFS) for 0.283(Ac.) Total runoff= 4.100(CFS) Total area= 1.302(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 403.000 to Point/Station 404.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = Downstream point/station elevation Pipe length 88.00(Ft.) Slope No. of pipes = 1 Required pipe flow Given pipe size= 12.00(In.) 181.370 (Ft.) 180.000 (Ft.) 0.0156 Manning's N 4.100(CFS) Calculated individual pipe flow 4.100(CFS) Normal flow depth in pipe = 9.09(In.) Flow top width inside pipe= 10.28(In.) Critical Depth= 10.27(In.) Pipe flow velocity= 6.42(Ft/s) Travel time through pipe= 0.23 min. Time of concentration (TC) = 8.38 min. 0.013 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 404.000 to Point/Station 404.000 **** SUBAREA FLOW ADDITION **** Rainfall intensity (I) = 4.910(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea Time of concentration = 8.38 min. Rainfall intensity= 4.910(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 1.130 Subarea runoff 1.446(CFS) for 0.49l(Ac.) Total runoff= 5.546(CFS) Total area= 1.793(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 404.000 to Point/Station 107.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = Downstream point/station elevation Pipe length 167.00(Ft.) Slope No. of pipes = 1 Required pipe flow Given pipe size= 12.00(In.) 177.000(Ft.) 168.000(Ft.) 0.0539 Manning's N 5. 546 (CFS) Calculated individual pipe flow 5.546(CFS) Normal flow depth in pipe= 7.20(In.) Flow top width inside pipe= 11.76(In.) Critical Depth= 11.29(In.) Pipe flow velocity= 11.29(Ft/s) Travel time through pipe = 0.25 min. 0.013 100 YR POST-DEVELOPMENT CALC (Outall B) 4-28-15 Page3of7 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Time of concentration (TC) 8.63 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 107.000 to Point/Station 107.000 **** SUBAREA FLOW ADDITION **** Rainfall intensity (I) = 4.819(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea Time of concentration= 8.63 min. Rainfall intensity= 4.819(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 1.363 Subarea runoff 1.024(CFS) for 0.37l(Ac.) Total runoff= 6.570(CFS) Total area= 2.164(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 107.000 to Point/Station 102.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = Downstream point/station elevation Pipe length 98.00(Ft.) Slope No. of pipes = 1 Required pipe flow Given pipe size= 18.00(In.) 168.000 (Ft.) 163.380(Ft.) 0.0471 Manning's N 6.570(CFS) Calculated individual pipe flow 6.570(CFS) Normal flow depth in pipe= 6.62(In.) Flow top width inside pipe= 17.36(In.) Critical Depth= 11.90(In.) Pipe flow velocity= 11.16(Ft/s) Travel time through pipe = 0.15 min. Time of concentration (TC) = 8.77 min. 0.013 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 102.000 to Point/Station 102.000 **** SUBAREA FLOW ADDITION **** Rainfall intensity (I) = 4.767(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea Time of concentration= 8.77 min. Rainfall intensity= 4.767(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 1.715 Subarea runoff 1.608(CFS) for 0.559(Ac.) Total runoff= 8.177(CFS) Total area= 2.723(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 102.000 to Point/Station 102.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area= 2.723(Ac.) Runoff from this stream 8.177(CFS) Time of concentration Rainfall intensity = 8.77 min. 4.767(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 406.000 to Point/Station 407.000 **** INITIAL AREA EVALUATION **** 100 YR POST-DEVELOPMENT CALC (Outall B) 4-28-15 Page4of7 Decimal fraction soil group A Decimal fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [MEDIUM DENSITY RESIDENTIAL (14.5 DU/A or Less ) Impervious value, Ai = 0.500 Sub-Area C Value = 0.630 0.000 0.000 0.000 1. 000 Initial subarea total flow distance 59.000(Ft.) Highest elevation= 197.000(Ft.) Lowest elevation = 192.300(Ft.) Elevation difference 4.700(Ft.) Slope= 7.966% INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 7.97 %, in a development type of 14.5 DU/A or Less In Accordance With Figure 3-3 Initial Area Time of Concentration 4.24 minutes TC = [1.8*(1.1-C)*distance(Ft.)A.5)/(% slopeA(1/3)] TC = [1.8*(1.1-0.6300)*( 100.000A.5)/( 7.966A(1/3)]= 4.24 Calculated TC of 4.236 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 6.850(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.630 Subarea runoff= 0.324(CFS) Total initial stream area = 0.075(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 407.000 to Point/Station 408.000 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel Depth of flow= 0.377(Ft.), Average velocity= ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 0.50 2 1.50 0.00 3 3.00 0.50 Manning's 'N' friction factor 0.035 Sub-Channel flow 1.208(CFS) flow top width= 2.260(Ft.) velocity= 2.839(Ft/s) area = 0.426(Sq.Ft) Froude number = 1.153 Upstream point elevation = Downstream point elevation Flow length= 63.000(Ft.) Travel time 0.37 min. 192.300(Ft.) 189.500 (Ft.) Time of concentration = 4.61 min. Depth of flow= 0.377(Ft.) Average velocity = 2.839(Ft/s) Total irregular channel flow = 1.208 (CFS) Irregular channel normal depth above invert elev. Average velocity of channel(s) 2.839(Ft/s) Adding area flow to channel 1.208 (CFS) 2.839(Ft/s) 0.377(Ft.) Calculated TC of 4.606 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 6.850(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea 100 YR POST-DEVELOPMENT CALC (Outall B) 4-28-15 PageS of7 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I . I I I I Rainfall intensity= 6.850(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 0.306 1.769(CFS) for 0.410(Ac.) Subarea runoff = Total runoff = Depth of flow = 2.093(CFS) Total area = 0.463(Ft.), Average velocity= 0.485(Ac.) 3.257(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 408.000 to Point/Station 102.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = Downstream point/station elevation Pipe length 249.00(Ft.) Slope No. of pipes = 1 Required pipe flow Given pipe size= 12.00(In.) 186.500(Ft.) 163.380 (Ft.) 0.0929 Manning's N 2. 093 (CFS) Calculated individual pipe flow 2.093(CFS) Normal flow depth in pipe= 3.57(In.) Flow top width inside pipe= 10.97(In.) Critical Depth= 7.42(In.) Pipe flow velocity= 10.68(Ft/s) Travel time through pipe = 0.39 min. Time of concentration (TC) = 4.99 min. 0.013 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 102.000 to Point/Station 102.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area= 0.485(Ac.) Runoff from this stream 2.093(CFS) Time of concentration = Rainfall intensity = Summary of stream data: 4.99 min. 6. 850 (In/Hr) Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 8.177 8.77 4.767 2 2.093 4.99 6.850 Qmax(l) 1. 000 * 1. 000 * 8.177) + 0.696 * 1. 000 * 2.093) + 9.634 Qmax(2) 1. 000 * 0.569 * 8.177) + 1. 000 * 1. 000 * 2.093) + 6.749 Total of 2 streams to confluence: Flow rates before confluence point: 8.177 2.093 Maximum flow rates at confluence using above data: 9.634 6.749 Area of streams before confluence: 2.723 0.485 Results of confluence: Total flow rate= 9.634(CFS) Time of concentration 8.773 min. Effective stream area after confluence 3.208(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 100 YR POST-DEVELOPMENT CALC (Outall B) 4-28-15 Page6of7 Process from Point/Station 102.000 to Point/Station **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = Downstream point/station elevation Pipe length 37.46(Ft.) Slope No. of pipes = 1 Required pipe flow Given pipe size= 18.00(In.) 163.210(Ft.) 162.500(Ft.) 0.0190 Manning's N 9.634(CFS) Calculated individual pipe flow 9.634(CFS) Normal flow depth in pipe= 10.73(In.) Flow top width inside pipe= 17.66(In.) Critical Depth= 14.39(In.) Pipe flow velocity= 8.76(Ft/s) Travel time through pipe = 0.07 min. Time of concentration (TC) = 8.84 min. 103.000 0.013 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 103.000 to Point/Station 103.000 **** SUBAREA FLOW ADDITION **** Rainfall intensity (I) = 4.742(In/Hr) for a 100.0 year storm User specified 'C' value of 0.630 given for subarea Time of concentration= 8.84 min. Rainfall intensity= 4.742(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.630 CA = 2.659 Subarea runoff= 2.973(CFS) for 1.012(Ac.) Total runoff= 12.607(CFS) Total area End of computations, total study area = 4.220 (Ac.) 4.220 (Ac.) 100 YR POST-DEVELOPMENT CALC (Outall B) 4-28-15 Page7of7 I I I I I I I I I I I I I I I I I I I I I 1 Attachment F I I I I I I I E I E I I I t E t Storm Drain Calculations Hydraulic Grade Line Computations Page 1 Line Size Q Downstream Len Upstream Check JL Minor coeff loss Invert HGL Depth Area Vel Vel EGL Sf Invert HGL Depth Area Vel Vel EGL Sf Ave Enrgy elev elev head elev elev elev head elev Sf loss (in) (cfs) (ft) (ft) (ft) (sqft) (ftls) (ft) (ft) (%) (ft) (ft) (ft) (ft) (sqft) (ftls) (ft) (ft) (%) (%) (ft) (K) (ft) 1 30 25.93 182.99 188.10 2.50 3.63 5.28 0.43 188.53 0.400 75.540 190.00 191 .73j 1.73** 3.63 7.14 0.79 192.53 0.584 0.492 n/a 1.00 0.79 2 18 13.20 194.48 195.29 0.81* 0.97 13.62 0.96 196.25 0.000 40.770 196.50 197.86 1.36** 1.68 7.85 0.96 198.82 0.000 0.000 n/a 1.00 0.96 3 18 8.81 190.02 191.73 1.50 1.77 4.99 0.39 192.12 0.704 51 .140 190.28 192.09 1.50 1.77 4.99 0.39 192.48 0.704 0.704 0.360 1.00 0.39 4 18 5.05 190.03 191 .73 1.50 1.05 2.86 0.13 191.86 0.231 369.77 0209.12 209.98j 0.86** 1.05 4.79 0.36 210.34 0.582 0.406 n/a 1.00 0.36 5 12 5.05 209.16 209.98 0.82 0.69 7.29 0.69 210.68 0.000 18.270 209.75 210.67 0.92** 0.76 6.69 0.69 211.36 0.000 0.000 n/a 0.44 0.31 6 12 5.05 209.75 210.67 0.92* 0.76 6.69 0.69 211.36 0.000 100.82 0212.46 213.38 0.92** 0.76 6.69 0.69 214.07 0.000 0.000 n/a 1.00 0.69 7 12 1.71 213.04 213.40 0.36* 0.25 6.71 0.23 213.63 0.000 72.660 215.22 215.78 0.56** 0.45 3.82 0.23 216.00 0.000 0.000 n/a 1.00 n/a 8 12 3.58 212.46 213.38 0.92 0.68 4.74 0.43 213.81 0.000 81 .250 214.72 215.53 j 0.81** 0.68 5.27 0.43 215.96 0.000 0.000 n/a 0.75 0.32 9 12 3.58 214.72 215.53 0.81* 0.68 5.27 0.43 215.96 0.000 118.93 P218.02 218.83 0.81** 0.68 5.27 0.43 219.26 0.000 0.000 n/a 0.75 0.32 10 12 3.58 218.02 218.83 0.81* 0.68 5.27 0.43 219.26 0.000 27.990 218.80 219.61 0.81** 0.68 5.27 0.43 220.04 0.000 0.000 n/a 1.00 0.43 . Storm Line B I Number of lines: 10 I Run Date: 10/30/2015 Notes: * Normal depth assumed.; **Critical depth.; j-Line contains hyd. jump. ; c = cir e = ellip b = box 1::1 -Storm Sewers v1 0 · Hydraulic Grade Line Computations Page 1 Line Size Q Downstream Len Upstream Check JL Minor coeff loss Invert HGL Depth Area Vel Vel EGL Sf Invert HGL Depth Area Vel Vel EGL Sf Ave Enrgy elev elev head elev elev elev head elev Sf loss (in) (cfs) (ft) (ft) (ft) (sqft) (ftls) (ft) (ft) (%) (ft) (ft) (ft) (ft) (sqft) (ftls) (ft) (ft) (%) (%) (ft) (K) (ft) 1 24 5.45 193.50 195.00 1.50 1.22 2.16 0.31 195.31 0.000 105.42 0194.03 194.85 0.82** 1.22 4.47 0.31 195.16 0.000 0.000 nla 0.90 0.28 2 24 5.45 194.05 194.85 0.80 1.18 4.62 0.31 195.16 0.000 47.130 201 .28 202.10 0.82** 1.22 4.47 0.31 202.41 0.000 0.000 nla 0.41 0.13 3 12 3.97 201.30 202.10 0.80 0.68 5.87 0.49 202.59 0.000 47.130 202.32 203.16 0.84** 0.71 5.61 0.49 203.65 0.000 0.000 nla 0.55 0.27 4 12 2.79 202.34 203.43 1.00 0.79 3.55 0.20 203.63 0.614 78.020 202.73 203.91 1.00 0.79 3.55 0.20 204.11 0.614 0.614 0.479 1.00 0.20 5 12 1.23 202.75 204.11 1.00 0.36 1.57 0.04 204.15 0.119 51 .100 205.00 205.47 j 0.47** 0.36 3.41 0.18 205.65 0.601 0.360 nla 1.00 0.18 6 12 1.66 202.74 204.11 1.00 0.79 2.11 0.07 204.18 0.217 104.82 203.28 204.34 1.00 0.79 2.11 0.07 204.41 0.217 0.217 0.228 1.00 0.07 7 12 0.84 203.28 204.41 1.00 0.28 1.07 0.02 204.42 0.056 30.690 206.98 207.36 j 0.38** 0.28 3.03 0.14 207.51 0.574 0.315 nla 1.00 0.14 8 12 0.82 203.28 204.41 1.00 0.79 1.04 0.02 204.42 0.053 15.000 203.36 204.41 1.00 0.79 1.04 0.02 204.43 0.053 0.053 0.008 1.00 0.02 9 12 0.82 203.37 204.43 1.00 0.79 1.04 0.02 204.45 0.053 85.000 203.80 204.47 0.67 0.56 1.46 0.03 204.51 0.084 0.068 0.058 1.00 0.03 10 12 0.82 203.82 204.51 0.69 0.57 1.43 0.03 204.54 0.080 36.830 204.00 204.53 0.53 0.42 1.95 0.06 204.59 0.177 0.128 0.047 1.00 0.06 Project File: Storm Line C.stm I Number of line_s: 10 I Run Date: 10/30/2015 Notes: ; •• Critical depth.; j-Line contains hyd. jump. ; c = cir e = ellip b = box --------------Storm Sewers v1 0 · -- --,-----~ • Line Size Q Downstream Len Upstream Check JL Minor coeff loss Invert HGL Depth Area Vel Vel EGL Sf Invert HGL Depth Area Vel Vel EGL Sf Ave Enrgy elev elev head elev elev elev head elev Sf loss (in) (cfs) (ft) (ft) (ft) (sqft) (ft/s) (ft) (ft) (%) (ft) (ft) (ft) (ft) (sqft) (ft/s) (ft) (ft) (%) (%) (ft) (K) (ft) 1 18 4.10 180.00 182.00 1.50 1.77 2.32 0.08 182.08 0.153 35.800 180.18 182.05 1.50 1.77 2.32 0.08 182.14 0.152 0.152 0.055 0.45 0.04 2 18 4.10 180.18 182.09 1.50 1.77 2.32 0.08 182.18 0.153 45.200 180.41 182.16 1.50 1.77 2.32 0.08 182.24 0.152 0.152 0.069 0.56 0.05 3 12 3.32 180.42 182.21 1.00 0.79 4.23 0.28 182.49 0.869 76.020 180.80 182.87 1.00 0.79 4.23 0.28 183.15 0.869 0.869 0.661 0.75 0.21 4 12 3.32 180.80 183.08 1.00 0.79 4.23 0.28 183.36 0.869 54.290 181.07 183.55 1.00 0.79 4.23 0.28 183.83 0.869 0.869 0.472 1.00 0.28 Project File: Storm Line E.stm I Number of lines: 4 I Run Date: 10/30/2015 ; c = cir e = ellip b = box -- Storm Sewers v1 0 • Hydraulic Grade Line Computations Page 1 Line Size Q Downstream Len Upstream Check JL Minor coeff loss Invert HGL Depth Area Vel Vel EGL Sf Invert HGL Depth Area Vel Vel EGL Sf Ave Enrgy elev elev head elev elev elev head elev Sf loss (in) (cfs) (ft) (ft) (ft) (sqft) (ft/s) (ft) (ft) (%) (ft) (ft) (ft) (ft) (sqft) (ftls) (ft) (ft) (%) (%) (ft) (K) (ft) 1 12 2.09 180.25 182.00 1.00 0.79 2.66 0.11 182.11 0.345 12.660 180.69 182.04 1.00 0.79 2.66 0.11 182.15 0.344 0.345 0.044 0.70 0.08 2 12 2.09 180.69 182.12 1.00 0.51 2.66 0.11 182.23 0.345 169.94 186.50 187.12 j 0.62** 0.51 4.11 0.26 187.38 0.701 0.523 n/a 1.00 0.26 LINEF I Number of lines: 2 I Run Date: 10/30/2015 Notes: ; •• Critical depth.; j-Line contains hyd. jump. ; c = cir e = ellip b = box -- - - --- ---1:::11 Storm Sewers v10.· Hydraulic Grade Line Computations Page 1 Line Size a Downstream Len Upstream Check JL Minor coeff loss Invert HGL Depth Area Vel Vel EGL Sf Invert HGL Depth Area Vel Vel EGL Sf Ave Enrgy elev elev head elev elev elev head elev Sf loss (in) (cfs) (ft) (ft) (ft) (sqft) (ft/s) (ft) (ft) (%) (ft) (ft) (ft) (ft) (sqft) (ft/s) (ft) (ft) (%) (%) (ft) (K) (ft) 1 12 0.78 193.50 195.00 1.00 0.79 0.99 0.02 195.02 0.048 56.470 194.00 195.03 1.00 0.79 0.99 0.02 195.04 0.048 0.048 0.027 1.00 0.02 LINE G I Number of lines: 1 I Run Date: 10/30/2015 ; c = cir e = ellip b = box --. -- ---Storm Sewers v10 · Hydraulic Grade Line Computations Page 1 Line Size Q Downstream Len Upstream Check JL Minor coeff loss Invert HGL Depth Area Vel Vel EGL Sf Invert HGL Depth Area Vel Vel EGL Sf Ave Enrgy elev elev head elev elev elev head elev Sf loss (in) (cfs) (ft) (ft) (ft) (sqft) (ft/s) (ft) (ft) (%) (ft) (ft) (ft) (ft) (sqft) (ft/s) (ft) (ft) (%) (%) (ft) (K) (ft) 1 12 1.91 221 .80 223.00 1.00 0.79 2.44 0.09 223.09 0.289 37.790 221 .98 223.11 1.00 0.79 2.44 0.09 223.20 0.289 0.289 0.109 1.00 0.09 LINE H I Number of lines: 1 I Run Date: 10/30/2015 ; c = cir e = ellip b = box -- -- - .1orm SEtll(ers '1.10.·