Loading...
HomeMy WebLinkAboutCT 80-38; Paseo Del Lago; Drainage Study; 1989-03-23DKFI I NAGE STUDY MFIDISWN SUeRE DEVELWPMENT HENRY WORLEY ASSOCIATES, INC. :3/2:3/89 CIVIL ENGINEERING 0 SURVEYING 0 PLANNING 7875 CONVOY COURT. SUITE A-2 SAN DIEGO. CA 92111 6l!4 S71.779R METHODS USED """""" - THE RATIONAL METHOD WAS USED FOR HYDROLOGY CALCS., WITH THE LATEST CHARTS GIVEN BY THE HYDROLOGY MANUAL OF 'THE COUN'TY OF SAN DIEGO. - AT THIS SITE SOIL .TYPE RANGES FROM "C" TO "D". - PIPE CAPACITIES WERE COMPUTED USING THE MANNING'S EDUATION. SUMMARY OF FLOW RATES AT INLETS: AREA 8 8A 8B €IC 8D 8E 9A 10 Hl 12 H 14 10 A 10 H D 50 (cfs) 1.6 2.5 d. 1 1.2 1.1 0.4 4.1 1.2 1.6 0. 7 2.3 1.6 E PAGE 1 OF 6 SUMMARY OF PIPE FLOW RATES: POINT TO POINT A - HDWL El-c C-n E-F F-G H-I I-J J - K a 96 (cfs) -I. 1 1.2 2.2 4.1 5.2 1.6 2.3 4.b c TIMES OF CONCENTRATION: ""--"""~""""- OFFSITE AREAS: (CHART FOR NATURAL WATERSHEDS) (MINIMUM TC = S MIN.) AREA L H TC 8 fro(:, i 05 2 9 1 1 00 150 3. 5 -7 AREA 86 8 c 8n 8E ONS I TE AREAS: (CHART FOR URBAN AREAS) L S% C TC 280 6.5 6.9 8 270 0. 8 0. 9 7 200 i 0. 9 5 i io 1 0. 9 4 PAGE 2 OF 6 ONSI'TE AREAS: (CHART FOR URBAN AREAS) TC FOR DRAINAGE SYSTEMS: TC = Ti + Tf Ti (inlet time) (county charts) Tf (travel time) = (length)/(vel.) (min.) PAGE 3 OF 6 APPEND I X - 1 CHARTS GRAFHS 1 DEPARTMENT OF SPECIAL DISTRICT SERVICES SAN DlEGO COUNTY I URBAN AREAS OVERLAND TIME OF FLOW CURVES al r L c, 2 c 0 OI 01 ar +a L VI a a r n 0 c, .al < c > > C i u C t c !.. <" a 'W 8- 6-Hour Precipitation (inches)' I a -0 r;l e w 0 a 3 -0 .lo - .., .. .. L XATION MAP pEZ?.S?,O~ I i I i