HomeMy WebLinkAboutLFMP 13; LOCAL FACILITIES MANAGEMENT PLAN ZONE 13; LOCAL FACILITIES MANAGEMENT PLAN ZONE 13; 1995-10-01Zone 73 Local Facilities Management Plan October 1995 Prepared For: The Carltas Company Prepared By: Hofman Planning Associates O'Day Consultants KAKU Associates, Inc. CITY OF CARLSBAD GROWTH MANAGEMENT PROGRkM LOCAL FACILITIES MANAGEMENT PLAN ZONE 13 Prepared For: City of Carlsbad Growth Management Division 2075 Las Palmas Drive Carlsbad, California 92009 Prepared By: Hofman Planning Associates O’Day Consultants KAKU Associates, Inc. October 1995 INDIVIDUALS RESPONSIBLE FOR THE PREPARATION OF THIS PLAN CONSULTANTS: HOFMAN PLANNING ASSOCIATES 2386 Faraday Ave. Suite 120 Carlsbad, CA 92008 (619) 438-1465 Bill Hofman Lisa King Dan King O'DAY CONSULTANTS 7220 Avenida Encinas Second Floor Carlsbad, CA 92009 Pat O'Day Jeffrey L. Mitchell KAKU ASSOCIATES, INC. 1453 Third Street, Suite 400 Santa Monica, CA 90401 Patrick Gibson Brian Mayeda CITY OF CARLSBAD: Marty Orenyak. Community Development Director Don Rideout, Senior Management Analyst Don Neu, Senior Planner Bob Johnson, Traffic Engineer SPONSORING LAND OWNER: CARLSBAD RANCH COMPANY 5600 Avenida Encinas Suite 100 Carlsbad, CA 92008 TABLE OF CONTENTS Thapter Page # I . EXECUTIVE SUMMARY ..................................... 1 I1 . INTRODUCTION ......................................... 22 I11 . BUILD OUT PROJECTIONS ................................. 27 IV . PHASING PROJECTIONS ................................... 35 V . ZONE 13 REQUIREMENTS FOR PUBLIC FACILITIES AND SERVICES . . 46 CITY ADMINISTRATIVE FACILITIES .......................... 48 PERFORMANCE STANDARD ............................ 48 FACILITY PLANNING AND ADEQUACY ANALYSIS ........... 48 MITIGATION ........................................ 53 FINANCING ........................................ 53 LIBRARY FACILITIES ..................................... 55 PERFORMANCE STANDARD ............................ 55 MITIGATION ........................................ 61 FINANCING ........................................ 61 FACILITY PLANNING AND ADEQUACY ANALYSIS ........... 55 WASTEWATER TREATMENT CAPACITY ....................... 64 PERFORMANCE STANDARD ............................ 64 FACILITY PLANNING AND ADEQUACY ANALYSIS ........... 64 MITIGATION ........................................ 68 FINANCING ........................................ 68 PARK FACILITIES ........................................ 74 PERFORMANCE STANDARD ............................ 74 FACILITY PLANNING AND ADEQUACY ANALYSIS ........... 74 MITIGATION ........................................ 76 FINANCING ........................................ 76 DRAINAGE FACILITIES .................................... 77 PERFORMANCE STANDARD ............................ 77 FACILITY PLANNING AND ADEQUACY ANALYSIS ........... 77 MITIGATION ........................................ 81 FINANCING ........................................ 82 i October 1995 Zone 13 LFMP TABLE OF CONTENTS Chapter Page # CIRCULATION FACILITIES ................................. 85 PERFORMANCE STANDARD .... ....................... 85 FACILITY PLANNING AND ADEQUACY ANALYSIS ........... 85 MITIGATION ....................................... 102 FINANCING ....................................... 112 FIRE FACILITIES ........................................ 115 PERFORMANCE STANDARD ........................... 115 FACILITY PLANNING AND ADEQUACY ANALYSIS .......... 115 MITIGATION ....................................... 117 FINANCING ....................................... 117 OPEN SPACE FACILITIES ................................. 118 PERFORMANCE STANDARD ........................... 118 FACILITY PLANNING AND ADEQUACY ANALYSIS .......... 118 MITIGATION ....................................... 120 FINANCING ....................................... 120 SCHOOL FACILITIES ..................................... 122 PERFORMANCE STANDARD ........................... 122 FACILITY PLANNING AND ADEQUACY ANALYSIS .......... 122 MITIGATION ....................................... 124 FINANCING ....................................... 125 SEWER FACILITIES ...................................... 126 PERFORMANCE STANDARD ........................... 126 FACILITY PLANNING AND ADEQUACY ANALYSIS .......... 126 MITIGATION ....................................... 139 FINANCING ....................................... 140 WATER FACILITIES ..................................... 143 PERFORMANCE STANDARD ............................ 143 FACILITY PLANNING AND ADEQUACY ANALYSIS .......... 143 MITIGATION ....................................... 156 FINANCING ....................................... 157 FACILITY FINANCING .................................... 160 VI . REFERENCES .......................................... 218 APPENDICES ........................................... 219 a October 1995 Zone 13 w;MP A-1. A-2. A-3. A-Q. A-5. A-6. A-7, A-8. CONSTRAINTS MAP LIBRARY - PARKS - DRAINAGE - CIRCULATION - -. - SEWER WATER - OWNERSHIP - AGENDA BILL 8867 AGENDA BILL 10,578 PARKS INVENTORY CITY MEMO FROM PLANNING DIRECTOR TO CITY MANAGER DATED AGENDA BILL 9122-1 WIATTACH. 7-30-87 DRAINAGE COST ESTIMATES TRAFFIC REPORT COST ESTIMATES CANNON ROAD WEST FEE PROGRAM SEWER COST ESTIMATES WATER COST ESTIMATES LIST OF PROPERTY OWNERS Zone 13 LFMP iii October 1995 Exhibit # LIST OF EXHIBITS Page # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 ~ Map Zone 13 Location Map ............................... 2 Table Zone 13 Existing Public Facilities Summary ................. 5 Table Zone 13 Build Out Public Facilities Summary ................ 6 Table General Conditions for Zone 13 ......................... 7 Table Special Conditions For Zone 13 ......................... 9 Map Landowners .................................... 24 Map General Plan Designations ........................... 25 Map Land Use Zoning ................................. 26 Map Constraints Map .................................. 28 Table Existing Constraints Analysis ......................... 29 Table Existing Non-Residential Build Out Projections .............. 33 Table Proposed Non-Residential Build Out Projections ............. 34 Table Citywide Residential Phasing .......................... 36 Table Citywide Non-Residential Phasing ...................... 41 Table Zone 13 Non-Residential Phasing ....................... 45 Map City Administrative Facilities ......................... 49 Table Northwest Quadrant Residential Phasing .................. 39 Table NW Quadrant Non-Residential Phasing ................... 44 Table City Administrative Phasing Projections .................. 52 Table City administrative Financing Matrix .................... 54 Table Library Phasing Projections .......................... 60 Map Wastewater Facilities ............................... 65 Table Carlsbad Projections ............................... 68 Table Wastewater Financing Matrix ......................... 69 Map Drainage Basins .................................. 78 Table Drainage Financing Matrix ........................... 83 Map Existing Circulation Network ......................... 87 Map 2000 Circulation Trip Distribution ...................... 88 Map Build Out Circulation Trip Distribution ................... Table Circulation Financing Matrix ......................... Map Existing Fire Response Time ......................... 116 Map Open Space Locations ............................. 119 Table Open Space Inventory ............................. 121 Map School District Locations ........................... 123 Map Sewer Districts .................................. 127 Map Sewer Basin Boundaries ............................ 128 Table Existing BSMINCI ............................... 129 Map Library Facilities ................................. 56 Table Library Financing Matrix ............................ 63 Table Encina WPCF Capacity Analysis ....................... 64 Map Park Districts ..................................... 75 Map Major Drainage Facilities ............................ 79 89 113 iv October 1995 Zone 13 LFMP LIST OF EXHIBITS Exhibit # Page # 43 44 45 46 47 48 49 50 51 52 53 Map Existing Major Sewer Facilities ....................... 132 Table Zone 13 Yearly Sewer Demand ....................... 135 Table Equivalent Dwelling Units for Zone13 .................. 136 Map EDU per Land Use ............................... 138 Table Sewer Financing Matrix ............................ 141 Map Water District Boundaries ........................... 144 Map Potable Water System ............................. 147 Map Reclaimed Water System ....... ................... 148 Table Water Financing Matrix ............................ 158 Map Finance Area Boundaries ........................... 164 Table Finance Summary Matrix ........................... 165 Zone 13 LFMP V October 1995 I. EXECUTIVE SUMMARY The purpose of this document is to provide a plan fx supplying the public facilities that will be needed to accommodate development within the Zone 13 area of the City of Carlsbad, as shown in Exhibit 1 on page 2. The plan has been prepared in accordance with the City's Growth Management Program, as outlined in Chapter 21.90 of the Carlsbad Municipal Code and the Citywide Facilities and Improvements Plan of 1986.' This document is the second amendment to the original Zone 13 Local Facilities Management Plan (LFMP), adopted June 6, 1992 and amended March 16, 1993 by the City of Carlsbad. This document supersedes the previously approved plans. The purpose of this amendment is to reflect proposed refinements in land use and adjustments to the Zone 13 boundary. The boundary adjustment incorporates an area which was formerly within Zone 5. As a result of the more detailed land use information, the public facility requirements and timing for Zone 13 have been refined. These changes do not result in any significant changes in public facilities requirements. Development Assumptions The first step in developing such a plan is to estimate the amount of development, both residential and nonresidential, that will be allowed in the zone. All development within Zone 13 will be nonresidential. The types of land uses assumed for the zone are consistent with the Carlsbad General Plan. In addition, a General Plan Amendment and Specific Plan 207(A) are being prepared concurrently with this LFMP, addressing the major portion of Zone 13. The Specific Plan land use descriptions are more detailed, and they have been used to analyze facility needs for the area covered by Specific Plan 207(A). These land use assumptions are discussed and their location is shown in the introductory chapter of this plan. To estimate the amount of development that could occur within Zone 13, a density yield factor is applied to all vacant, developable land. Developable acreage is determined by deducting the following constrained lands from the gross acreage of the zone: Major (2 69 kv) power-line easements Future Right-of-way for Circulation Element Roads Railroad Right-of-way Slopes Greater Than 40% Riparian Woodland Wetlands Floodways Permanent Bodies of Water Other Environmental Features ' The 1986 CFIP was adopted by City Council on 9-23-86 (CC Resolution No. 8797). Zone 13 WIMP 1 October 1995 Oceanside Vista 4 I LEGEND I Encindas Ky Zone 13 lr'] Existing Roadways I:] Proposed Roadways . . . . .** Zone Boundaries Hofman Planning Associates Zone 13 - Location Map EXHIBIT 1 2 For nonresidential development, it is typically assumed that building coverage would be 30% of the net developable acreage. This method yields an ultimate nonresidential development estimate of 4,214,691 square feet. Given the large amount of unconstrained acreage in Zone 13 (approximately 531' net acres) and the limitations of the surrounding circulation network, a lower overall building coverage assumption of 20% was used for Zone 13. This lower coverage results in a more realistic estimate of 3,398,430 square feet. These assumptions are used for facility planning purposes only. Future development will likely yield more than these assumptions over a given area and less than these assumptions in others, however, future development applications must demonstrate that the facility impacts generated by the proposed development do not exceed the overall build out projections and facility impacts reflected in this zone plan. The plan includes phasing schedules which estimate the property owners' proposed amount of development for each year from 1995 to 2019. The property owners are not required to adhere to this phasing, and it is intended for facility planning purposes only. The phasing schedules, (Exhibits 13-17), also include the projections for other zones with adopted Local Facilities Management Plans. The schedules are used to determine approximate threshold years for constructing or upgrading various public facilities to maintain compliance with the Performance Standards in the Growth Management Program. The threshold years arrived at in this way are only projections for facility planning purposes. The actual thresholds must be monitored as development takes place in this zone. Facilities may be needed sooner or later than the threshold years shown in this plan, depending upon the actual timing of development. Zone 13 Requirements for Public Facilities The development assumptions outlined above are used to estimate the demand for public facilities generated by development in Zone 13 based on the eleven adopted Performance Standards in the Growth Management Program. Exhibit 2 on page 5 shows the current status of each facility with respect to the Performance Standard, given the existing amount of development in the zone. Because there is currently a limited amount of developed land in Zone 13 the public facility demands are presently minimal and all eleven Performance Standards are currently being met. Exhibit 3 on page 6 provides a summary of public facilities adequacy through build out for Zone 13. In order to assure compliance with the Performance Standards as development occurs in the zone, the Plan contains specific conditions of approval which are listed in the following exhibits. Exhibit 4 on page 7 contains the General Conditions which are applicable to all zones of the City. Exhibit 5 on page 9 contains Special Conditions for Zone 13. The Special Conditions state each facility which must be provided, whether it must be financed or constructed, and when it must be provided. 2From Exhibit 10 on page 28 3 October 1995 Zone 13 LFMP The following list indicates the public facilities required to serve the nonresidential development in Zone 13. This chart shows whether the facility would otherwise be provided as a condition of approval of a development project or whether a special funding mechanism is needed. City Administration Libraries Wastewater Treatment Capacity: Park Facilities: Drainage Facilities: Circulation Facilities: Fire Facilities: Open Space Facilities: Schools: Sewer Collection System: Water Distribution System: Funding provided by Community Facilities District (CFD) No. I Funding provided by CFD No. 1 Funding provided by sewer connection fees. Funding mechanism is required. As non-residential development in Zone 13 occurs. prior to issuance of a building permit, a growth management fee of 4OC per square foot park impact fee will be collected. The City will use this fee to construct recreational facilities within the industrial corridor of the City to offset demand created by employees within Zone 13. Condition of approval of development project and CFD No. 3. Combination of condition of approval of development projects and special funding, including CFD No. 1, CFD No. 3, and Cannon Road West Fee Program. No special funding required. No special funding required. Funding provided by school fees Condition of approval of development project and CFD No. 3. Condition of approval of development project and CFD No. 3. Ocrobet 1995 Zone 13 LFMP 4 EXHIBIT 2 Zone 13 Existing Public Facilities Summary LFMP 87-13(B) Facility Conformance with adopted Performance Standard Citywide: City Administrative Facilities Library Wastewater Treatment Capacity Yes, existing facilities meet the adopted performance standard. Yes, existing facilities meet the adopted performance standard. Yes, existing facilities meet the adopted performance standard. Park District #1: Parks Yes, existing facilities meet the adopted , performance standard. Zone 13: Drainage Circulation Fire Open Space Schools Sewer Collection System Water Collection System Yes, existing facilities meet the adopted performance standard. Yes, existing facilities meet the adopted performance standard. ' Yes, existing facilities meet the adopted performance standard. Yes, existing facilities meet the adopted performance standard. Yes, existing facilities meet the adopted performance standard. Yes, existing facilities meet the adopted performance standard. Yes, existing facilities meet the adopted performance standard. Zone 13 LFMP 5 October 1995 EXHIBIT 3 Zone 13 Build Out Public Facilities Summary LFMP 87-13(C) Facility Conformance with adopted Performance Standard City Administrative Library Existing and planned facilities meet the adopted performance standard through build out. Existing and planned facilities meet the adopted performance standard through bclild out. Wastewater Treatment Facilities Existing and planned facilities meet the adopted performance standard through buildout. Parks Drainage Circulation Fire Open Space Schools Sewer Collection Water Distribution Park facilities meet the adopted performance standard with proposed mitigation through build out. Drainage facilities meet the adopted performance standard with the proposed mitigation measures through build out. Circulation facilities meet the adopted performance standard with the proposed mitigation measures through build out. Existing fire facilities meet the adopted performance standard through build out. Existing and proposed open space meets the adopted performance standard through build out. School facilities will meet the adopted performance with mitigation through build out. Sewer collection facilities meet the adopted performance standard with the proposed mitigation measures through build out. Water distribution facilities meet the adopted performance standard with the proposed mitigation measures through build out. Zone 13 LJMP 6 October 1995 EXHIBIT 4 General Conditions for Zone 13 LFMP 87-13(B) 1. All development within Zone 13 shall conform with the provisions of Section 21.90 of the Carlsbad Municipal Code and to the provisions and conditions of this Local Facilities Management Plan. 2. All development within Zone 13 shall be required to pay a public facilities fee pursuant to the standards adopted by the City Council on July 28, 1987, and as amended from time to time and all other applicable fees. Development in Zone 13 shall also be responsible for any additional fees to be incorporated into this plan that are found to be necessary to enable facilities to meet the adopted performance standards. 3. The City of Carlsbad shall monitor all facilities in Zone 13 pursuant to Subsections 21.90.130(c), (d) and (e) of the Carlsbad Municipal Code. 4. All development in Zone 13 shall be in conformance with the adopted Citywide Facilities and Improvements Plan as adopted by City Council Resolution 8797 on September 23, 1986. 5. Periodic amendment to the Zone 13 Local Facilities Management Plan is anticipated to incorporate newly acquired data, to amend conditions and upgrade standards as determined through the required monitoring program. Amendment to this Plan may be initiated by action of the Planning Commission, City Council or property owners at any time. 6. If a public facility or service is found not to be in conformance with an adopted performance standard during the yearly monitoring, or at any other time, the matter will be immediately brought before the City Council. If the City Council determines that a non-conformance does exist then no future building or development permits which would impact the facility shall be issued unless an amendment to the CFIP or the LFMP for this zone is approved by the City Council which addresses those facility shortfalls and brings those facilities into conformance with the adopted performance standards. 7. After adoption of this Plan by the City Council, no building permits will be allowed unless the performance standards are complied with. 8. Approval of this LFMP does not constitute prior environmental review for projects within Zone 13. All future projects within Zone 13 shall undergo environmental review per Title 19 of the Carlsbad Municipal Code. Any mitigation measures 7 October 1995 Zone 13 LFMP determined during a project's environmental review shall be complied with in their entirety unless findings of overriding consideration are made by the City Council. 9. Approval of this plan does not constitute prior discretionary review for projects within Zone 13. All future projects shall undergo review per Title 21 of the Carlsbad Municipal Code. 10. Approval of any discretionary permit within Zone 13 shall be contingent upon the provision of adequate public facilities to satisfy the Public Facilities Element of the General Plan. At this time a Mello-Roos Community Facilities District has been formed to finance the construction of several Citywide facilities necessary to serve new development. If Zone 13 properties are not participants within that district, the required General Plan Consistency finding cannot be made. Therefore. no discretionary approvals, Building Permits, Grading Permits, Final Maps, or development permits will be issued or approved unless the subject property annexes into the CFD or an alternate financing mechanism is provided by the developer and approved by the City Council to finance the facilities legally applicable to Zone 13 that are included in the Community Facilities District. The following activities are exempt from this: grading, minor planning entitlements or minor construction as part of ongoing agricultural operations, minor subdivisions and lot line adjustments for financing purposes or a Planned Community Master Plan or a Specific Plan. Any exemption is solely at the City's discretion. Zone 13 LFMP 8 October 1995 EXHIBITS . Special Conditions For Zone 13 LFMP 87-13(B) The following Special Conditions apply specifically to development in Zone 13 and must be complied with in addition to the General Conditions for Zone 13. These conditions are also listed separately under the analysis discussion of each facility. City Admtrati ve F- .. ... No special conditions. No special conditions. Wastewater Treatment Ce The following actions shall be pursued jointly by each sewer district to ensure adequate wastewater treatment capacity through buildout: A. Monitor Encina treatment plant flows on a monthly basis to determine actual flow rates and to have an early warning of capacity problems. Parks A growth management park fee of 40 cents per square foot of non-residential development will be collected at the time of building permit issuance. This fee will be used to construct recreational facilities to offset the demand created by employees within Zone 13. A. All future development in Zone 13 will be required to construct any future Zone 13 storm drain facilities identified in the adopted Drainage Master Plan or acceptable alternate facilities, as determined by the City Engineer. Any facilities necessary to accommodate future development must be guaranteed prior to the recordation of any final map, issuance of a grading permit or building permit, for any development requiring future storm drain facilities in Zone 13. B. Prior to the recordation of any 'final map, issuance of grading permit or building permit, whichever occurs first for any specific watershed within Zone 13, the developers of that project are required to: Zone 13 LFMP 9 October 1995 C. D. Circulation A. B. 1. Pay the required drainage area fees established in the adopted Drainage Master Plan Prior to the recordation of any final map, issuance of grading permit or building permit, whichever occurs first for any project within the Agua Hedionda Creek Watershed (Watershed B) of Zone 13, the developers of that project are required to financially guarantee the construction of the following storm drain facilities, or alternative facilities deemed acceptable by the City Engineer: 1. 5 1 'I storm drain; the double 60-inch storm drain and channel grading; collectively referred to as line BAA Prior to the recordation of any final map, issuance of grading permit or building permit, whichever occurs first for any project within the Canyon de las Encinas Watershed (Watershed C) of Zone 13, the developers of that project are required to financially guarantee the construction of the following storm drain facilities, or alternative facilities deemed acceptable by the City Engineer: 1. 42" - 48" storm drain line CB 2. 42" - 51" storm drain line CC A portion of Zone 13 is included in the proposed Cannon Road (west) Fee Program. That portion required to participate in the proposed fee program is identified in the fee study dated August '1994 contained in Appendix A-5. Prior to issuance of a building permit for any project required to participate in fee program, the applicant shall pay the fee as determined for that project in the Cannon Road West Fee Program. The following improvements are anticipated to be required during the build out of Zone 13. Prior to development within each of the identified General Plan land use sub-areas, if determined to be needed by the City Engineer, the construction of the following circulation improvements shall be financially guaranteed, as set forth in the finance chapter of this plan: 1. IMPROVEMENTS NEEDED NOW a. n Road/I-5 Nortl~hwAmd Southboundhmps Install traffic signals. Also, at the Southbound Ramps widen the ramps and add a southbound left-turn lane. Restripe the westbound through lane for an additional left-turn lane. Zone 13 WIMP 10 October 1995 ed Cost - $232,000 2. The 1-5 Ramps at Cannon Road are not within the City of Carlsbad's jurisdiction, however, Carlsbad's adopted Capital Improvement Program has scheduled TIF and PFF funds for the City's share of the improvements to the ramps. The timing for these improvements is controlled by CalTrans, the responsible jurisdiction for completing the work. This dedication of funds guaranteed the specific improvement needed to bring this intersection into conformance with the City's adopted Performance standard. For these reasons, no further action is required prior to development within Zone 13. INTERIM YEAR IMPROVEMENTS a. ad from 1-5 to Car Couw Drive Add an additional westbound through lane for a total of three westbound lanes. - $150,000 Timing: Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2, TR-3, O/PI-1, 0-PI-2 of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. b. fi Construction of Cannon Road to two lanes in each direction. ed Cost - $8,467,000 Timing: Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2, TR-3; O/PI-1, or O/PI-2 of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall 11 October 1995 Zone 13 LFMP financially guarantee its construction as set forth in the Finance section of this plan. C. Armada D rive/Leeo Drive from Canno n Road to Pa lomar A irport Road Construction of Armada Drivekgo Drive to two lanes in each direction. Estimated Cost - $2,573,000 Timirg: Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-2, TR-3, O/PI-1, O/PI-2, TR/C or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. d. : / - Install Traffic Signal. Also, provide an exclusive left-turn lane and a shared throughhight-turn lane in the southbound direction. In the northbound direction, add a left-turn lane and restripe the exclusive right-turn lane for a shared throughkight-turn lane. Also, add an eastbound left-turn lane and westbound shared through/right- turn lane. ted Cost - $169,000 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2, O/PI-1, OIPI-2 or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. e. Drive/C- - Install Traffic Signal. Provide an exclusive left-turn lane and two through lanes in the westbound direction. In the northbound direction, add an exclusive right-turn lane. d Cost - $1 10,OOO Zone 13 LFMP 12 October 1995 Prior to recordation of a final map, issuance of a grading or building permit. whichever occurs first for any project within subarea TR- 1, TR-2. O/PI-1, O/PI-2 or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. f. Paseo del Norte /Palomar mort Road - Provide a westbound exclusive right-turn lane. Estimed Cos? - $185,000 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-3,0/PI-2, TWC or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. g. Le20 Dr ive/Cannon Road - Install traffic signal. Provide two left-turn lanes and an exclusive right-turn lane in the northbound direction; two through lanes and an exclusive right-turn lane in the eastbound direction; and two left-turn lanes and two through lanes in the westbound direction. . ted Cost - $5,000 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2, TR-3, O/PI-1 or O/PI-2 of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. ' h. da Dri ve/Palowort Road - Install traffic signal modifications as necessary. Restripe the northbound approach for two left-turn lanes and a shared througwright-turn lane. In the southbound direction, provide two Zone 13 LFMP 13 October 1995 left-turn lanes, one shared throughhight-turn lane, and an exclusive right- turn lane. Also, add an eastbound left-turn lane and a westbound exclusive right-turn lane. Estimated Cost - $205,000 Timing: Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea O/PI-2, TR-3 or TWC of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. 1. Hidden Valley Road /Palm Aimort Road - Construction of intersection to include two through lanes, one shared righthhrough lane and one left turn lane in the eastbound and westbound directions. Provide one shared southbound left/right/through lane. Provide a shared right-turnlthrough lane and one left-turn lane in the northbound direction. ted Cost - $155,000 Prior to recordation of a final map, issuance of a grading or building permit. whichever occurs first for any project within subarea O/PI-2, TR-3 or TWC of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. j,. One of the following two groups of improvements dependent upon whether Cannon Road is constructed between Zone 13 and El Camino Real: Cow if Cannon Road is not Extended: .. 1. ort Road/I-5 Northbound €bu&~ - Restripe the westbound Palomar Airport Road approach for the following: two through lanes, one shared throughlright-turn lane, and one exclusive right-turn lane. d Cost - $1,725 October 1995 Zone 13 w;MP 14 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea O/PI-2. TR-3, TWC or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. .. 11. College Boule vard/Palomar Aimort - Provide two left-turn lanes, one through lane, and one shared throughhight-turn lane in the northbound direction, Restripe the southbound College Boulevard approach for the following: one left-turn lane, one shared throughkight-turn lane, and one exclusive right-turn lane. Estimated Cost - $1,150 Prior to recordation of .a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR- 1, TR-2, TR-3,0/PI- 1 , O/PI-2. TWC or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. n Road IS Extended: 1. - Widen the northbound on ramps and restripe the westbound Cannon Road approach to provide one through lane, one shared throughhight-turn lane, and one exclusive right-turn lane. ed Cost - $1,150 Timing: Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2, O/PI-1, O/PI-2 or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. October 1995 Zone 13 LFMP 15 .. 11. Palomar Airport Road /I-5 Northbound Ram - Restripe the westbound Palomar Airport Road approach to provide two through lanes, one shared throughiright-turn lane, and one exclusive right turn lane. Estimated Cost - $1,725 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-3, O/PI-2, TWC or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. iii. e Boule v&/Palomar Aimort && - Provide two left-turn lanes, one through lane, and one shared throughlright lane in the northbound direction. Restripe the southbound approach for a left- turn lane, a through lane and a shared throughhight-turn lane - $1,150 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-3, O/PI-2, TWC or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. iv . in0 Red Construction of Cannon Road to two lanes in each direction. -$3,247,000 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2, TR-3, O/PI-1 or O/PI-2 of Zone 13, if the 16 October I995 Zone 13 LFMP 3. City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. V. El Cam' ino Real /Cannon Road - Provide three through lanes, one exclusive right-turn, and two exclusive left-turn lanes in the southbound direction. Provide two through lanes, one shared throughhight-turn lane, and two exclusive left-turn lanes in the northbound direction. In the eastbound direction, provide one through lane, one shared througwright-turn lane and two exclusive left-turn lanes. In the westbound direction, provide one through lane, one shared throughhight-turn lane, and two exclusive left-turn lanes. Install a traffic signal. Estimated Cost - $340,000 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2, TR-3, O/PI-l or O/PI-2 of Zone 13, if the City Engineer determines that this improvement is 'necessary to maintain the Growth Management .Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. IMPROVEMENT NEEDED BY BUILD OUT a. orthbound - Restripe the westbound Cannon Road approach to provide one through lane, one shared throughkight-turn lane, and one exclusive right-turn lane. In addition, widen the on ramp and provide an additional eastbound Cannon Road left-turn lane. Also, widen the off ramp and add a northbound exclusive right-turn lane. ed Cost - $4,600 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2, O/PI-1, O/PI-2 or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. Zone 13 LFMP 17 October 1995 b. Palomar A irport/I-5 Northbound Ramps - Restripe the westbound approach for two through lanes, one shared throughhight-turn lane and one exclusive right turn. Estimated Cost - $1,725 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-3, O/PI-2, TR/C or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. C. Paseo del Norte /- - Construction of an additional eastbound left-turn lane for a total of two exclusive left-turn lanes, one through lane, and one throughiright-turn lane. In addition, at a point east of the intersection, an additional westbound Cannon Road through lane would be required. At the intersection, this would result in the following lane configuration in the westbound direction: one exclusive left-turn lane, two through lanes, and a shared throughhight-turn lane. Estimated Cost - $27,000 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea' TR-1, TR-2, O/PI-l, O/PI-2 or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. d. Paseo del Norte/P- Airport Road - Restripe the northbound and southbound Paseo del Norte approaches to provide two exclusive left-turn lanes, one shared throughlright-turn lane, and one exclusive right-turn lane. Provide an eastbound exclusive right-turn lane. ted Cost - $2,300 Zone 13 LFMP 18 October 1995 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-3, O/PI-2. TWC or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. e. no Real/CannM Road - Restripe the southbound El Camino Real approach to provide for two left-turn lanes, two through lanes, one shared throughhight turn lane, and on exclusive right-turn lane. In addition, provide an exclusive right-turn lane on the eastbound Cannon Road approach. [Note: Improvements listed in condition 2.i.v (Cannon Road extended), may be built prior to the above improvements. If they are not built, they must be constructed with the above improvements.) ed Cost - $6.325 Timing: Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2, O/PI-1, O/PI-2 or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. f. ary to El Camino Rstarl Construction of Cannon Road to full major arterial standards from the eastern Zone boundary to El Camino Real. d Cw - $3,247,000 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2, O/PI-1 or O/PI-2 of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. Zone 13 LFMP 19 October 1995 No special conditions. 4EJmax No special conditions. Schools No special conditions. Sewer Collection Svstem A. ALL WATERSHEDS All development within Zone 13 will be required to pay the appropriate sewer connection fee prior to issuance of any building permit. B. Basin A Basin A is located within the South Agua Hedionda sewer drainage basin. No improvements are required to this system for Zone 13, other than the extension of the 10" sewer pipeline in Cannon Road. C. Basin B Basin B is located within the Buena/Vallecitos Interceptor sewer drainage basin. No improvements are required to this system for Zone 13. .. . Water Distribution Svstem A. All future development in Zone 13 shall pay a major facilities fee based on EDU's to the Carlsbad Municipal Water District and a capacity charge to the San Diego County Water Authority. In addition, all development in Zone 13 shall be required to provide any water reclamation facilities identified in the Water Reclamation Master Plan as determined by the District Engineer. Any water reclamation facilities necessary to accommodate future development must be guaranteed prior to the recordation of a final map, issuance of a grading permit or building permit, whichever occurs first. These guarantees shall be based upon the requirements for the service area within which the proposed development is located to the extent that the demand is created by future development. Zone 13 LFMP 20 October 1995 B. Service Area A Water facilities will be provided at the time of development within Service Area A, to the satisfaction of the Carlsbad Municipal Water District. 1. 2. 3. 4. 5. 6. 7. The proposed minimum 12-inch diameter water pipeline in future Cannon Road. The proposed pressure regulating station in Cannon Road east of Car Country Drive. The proposed 8-inch reclaimed water lines in future Armada Drive and future Leg0 Drive. The proposed 16-inch water main in future Armada Drive. The proposed 10-inch water main in future Leg0 Drive. The proposed 12-inch water main extending from Hidden Valley Road to Cannon Road. The proposed minimum 8-inch water main in future D Street. C. Service Area B The following water facilities will be required as a condition to the approval of future development within Service Area B to the satisfaction of CMWD. 1. The proposed relocation of the existing 16-inch water line from existing reservoir to the existing 16-inch water line in Palomar Airport Road. 2. The proposed 16-inch water line in future Armada Drive 3. Financing for Facilities The proposed 8 -inch reclaimed water lines in future Armada Drive, future Leg0 Drive and Paseo Del None. Financing of the above listed facilities are discussed at length in the Finance Chapter of this document. Zone 13 MMP 21 October 1995 11. INTRODUCTION This Local Facilities Management Plan [LFMP 87-13(B)] completes the second phase of Carlsbad's overall Growth Management Program for Zone 13. Phase One of the Growth Management Program was completed with the adoption of the 1986 Citywide Facilities and Improvements Plan (CFIP 86). For purposes of public facilities analysis, the '86 CFIP separated the City into 25 Local Facilities Management Zones as shown on Exhibit 1 on page 2. A. PLAN OVERVIEW follows: 1- I1 - I11 - IV - v- VI - VI1 - This LFMP provides a detailed description and analysis of how facilities will be provided in Zone 13 from now until build out of the zone. The plan is divided into seven parts as Executive Summary: Summarizes the plan and highlights all conditions proposed by the plan. Introduction: Provides an introduction to the format and content of the plan. Build Out Projections: Projects the ultimate amount of development in Zone 13, along with itemizing existing, developing, and future land uses. Phasing: Attempts to project how and when development will be phased in Zone 13. Analysis of Public Facilities Requirements: Provides a complete description and analysis of when and how each facility will be provided and financed based on build out projections and phasing assumptions. Finance: Provides a summary of the financial alternatives available to fund each facility and a discussion of the LFMP's impact on City finances. Appendices: Provides the technical materials used in preparation of this plan. The most detailed part of the plan is Part V. This part is divided into eleven separate sections, one for each facility. Each section provides a detailed analysis of the facility. Each facility section will contain adequacy findings. Adequacy findings summarize whether or not the public facility conforms with the adopted performance standard. If a facility does not conform with the adopted performance standard, there will be a discussion describing this situation, a description of mitigation or alternatives, and a financing discussion. Zone 13 LFMP 22 October 1995 B. OVERVIEW OF MANAGEMENT ZONE 13 Management Zone 13 is located within the northwest quadrant of the City of Carlsbad as shown on Exhibit 1 on page 2. The zone is bounded generally by Agua Hedionda Lagoon on the north, Palomar Airport Road to the south, the Car Country mall and Paseo Del Norte to the west and Macario Canyon and Hidden Valley Road to the east. Zone 13 is one of six management zones in the northwest quadrant of the City. The zones which comprise this quadrant are also shown in Exhibit 1 on page 2. Exhibit 6 on page 24 identifies property ownership in Zone 13 by Assessor Parcel Number and the respective acreage. These acreages were provided by the San Diego County Assessors Office and differ slightly from the environmental constraints analysis shown on Exhibit 9 on page 28.' Concurrent with the adoption of this LFMP amendment, a General Plan amendment and a Specific Plan amendment are being approved for a majority of the Zone 13 properties. These Carlsbad General Plan designations, as shown on Exhibit 7, page 25 specify five land uses within Zone 13: Regional Retail (R), TraveVRecreation Commercial (TR), TraveVRecreation Commercial/Community Commercial(TR/C) , Office/Planned Industrial (O/PI), and Open Space (OS). For the purpose of analyzing public facility requirements for Zone 13, specific land use assumptions as stated in SP 207(A) were utilized for the amount and type of future development within the specific plan area. These uses are described in detail in the build out projections chapter of this plan. As discussed on page 1 of this document, with this amendment to the Zone 13 LFMP. an adjustment .is being made to the eastern zone boundary. The boundary adjustment incorporates an area which was formerly within Zone 5 (see parcel 212-041-05 on Exhibit 6 on page 24.) The Carlsbad Land Use Zoning within Zone 13 is shown on Exhibit 8. ' The gross acreage calculations per sub-area shown on Exhibit 10 may differ slightly from those shown per parcel on Exhibit 6. This is because the acreage on Exhibit 6 is taken from assessor parcel maps whereas the acreage on Exhibit 10 was determined by planimeter measurement at 200' scale accuracy. 23 October 1995 Zone 13 LFMP 10.00 1.84 56.50 23.27 TR-3 14.82 13.01 5.84 5.84 I SDGE 21 2-010-14 OS-1 Ecke, Paul Sr. TR 212-0414J5, TR-2 f- Note: This analysis was based on Assessor's Parcel information. This information is a different level of detail than found on the constraints analysis or the tentative maps associated with SP 207 (A), therefore acreage totals will not match. SDGE' = San Diego Gas and Electric CRC = Carisbad Ranch Company GIA' = Gemological Institute of America NAMM = National Association of Music Merchants (1) BecauSe SDGE is not a part of SP 207 (A), this area's analysis was not revised at this time. This area will be subject to further analytis when SDGE submits improvement plans. Zone 13 - Property Ownership EXHIBIT6 24 LEGEND SDGE - San Diego Gas and Electric CRC - Carlsbad Ranch Company GIA - Gemological Institute of America NAMM - National Association of Music Merchants .\ --Jr Hofman Planning -AS s o c i ate s I Agua Hedionda Palomar Airport Road LEGEND [Rl Regional Retail kl Openspace [TRICI TravellRecreation Commercial/Comrnunity Office/Planned Industrial 1;n-n No XAU NOTE ML LOCATIONSAWROIIWTE kl Travel/Recreation Commercial Zone 13 - General Plan EXHIBIT 7 Hofman Planning Associates 25 Agua Hedionda LEGEND I p-u I Public Utility I c-T I Commercial Tourist Palomar Airport Road I P-M I Planned Industrial ~~~~ ~~ p] General Commercial I Q I Qualified Development Overlay .," .. NO SCALE WTE *LL LOCATIONS APPROIIWIE 4 Hofman Planning 4 P ~ssociates Zone 13 - Zoning EXHIBIT 8 26 111. BUILD OUT PROJECTIONS To properly assess and plan for facilities to serve Zone 13 ,it is necessary to project the type and intensity of land use as the zone builds out. These build out projections define land use intensity and corresponding facilities demands. Build out projections are based on the existing Carlsbad General Plan as amended concurrent with this Local Facilities Management Plan Amendment and the Carlsbad Ranch Specific Plan SP 207(A). As discussed in the Executive Summary, for the purpose of preparing this Local Facilities Management Plan. a reasonable non-residential land use mix consistent with the Carlsbad Ranch Specific Plan (SP 207(A)) was used for analyzing the public facility impacts generated by development in this zone through build out. This specific land use mix is clearly defined in Exhibit 12 on page 34, and is used consistently throughout this document. This reduced amount of development more accurately reflects the type and amount of development that is compatible with the surrounding area. Actual development may vary from these projection, however, future development applications must demonstrate that the facility impacts generated by the proposed development do not exceed the overall build out projections and facility impacts reflected in this zone plan. The methodology used in compiling the build out projections is consistent with that used in the 1986 CFIP. The methodology is briefly described as follows: A. GENERAL PLAN LAND USE General Plan Land Use Designations were plotted on a 1 I' = 200' base map. A reduction of this map is shown on Exhibit 9 on page 28. These designations were divided into sub- areas to aid in facility analysis. The gross acreage of each sub-area was determined by planimeter measurement. Exhibit 10 on page 29 summarizes the acreage calculations for the existing General Plan.' ' The gross acreage calculations per sub-area shown on Exhibit 10 may differ slightly from those shown per parcel on Exhibit 6. This is because the acreage on Exhibit 6 is taken from assessor parcel maps whereas the acreage on Exhibit 10 was determined by planimeter measurement at 200' scale accuracy. It should also be noted that the gross and net acreages contained in this LFMP are not the same as those in SP 207(A) or as cited in subsequent tentative maps because of differences in the geographical areas and in areas considered constrained, such as streets . October 1995 Zone 13 LFMP 27 Zone 13 Constraints EXHIBIT9 28 ..’ General Plan Land Use Designation TR-1 14) TR-2 TU-3 OIPI-1 OIPI-2 TRIC R os-1 os-2 OS-3 OS-4 OS-5 EXHIBIT 10 Contraints Analysis (as of 1/1195)13l Full Constraints (1) Gross 10.001 3.15 53.75 133.63 32.42 46.51 12.20 26.65 47.24 55.63 29.37 NOTES: (1 CONSTRAINTS A - Major Powerline Easement B - Circulation C - Railroad ROW D - Slopes > 40% 1.97 23.78 D 2.47 0.22 4.34 0.12 0.08 15.13 0.70 2.09 5.01 30.16 E - Riparian F - Wetlands G - Floodplain E - 0.32 - 0.32 - I - Other Envir. Feature J - Slopes 25% to 40% K ~ School Site Overlay H - Permanent Body of Water (2) Slope areas of 25% to 40% are constrained for residential uses only. (3) The acreages by subarea shown in this table may vary from those shown in SP 207 (A) or on subsequent tentative maps due to differences in geographic areas and in constraints considered, such as streets other than General Plan Circulation Element roadways. (4) Because SDGE IS not a part of SP 207 (A), this area's analysts was not revised at this time. This area will be sublect to further analysis when SDGE submits improvement plans. r Developable 53.53 125.67 28.81 41.90 10.48 26.65 83.33 44.91 51.33 27.40 Zone 13 LFMP 29 October 1995 B. GENERALIZED CONSTRAINTS ANALYSIS Consistent with adopted City policies and ordinances, development constraints within each sub-area were identified5. Constraints that may have existed on land that is developed or has land use approvals were not included in this analysis. Constraints fall into two basic categories: 1) full and 2) partial. Fully constrained areas cannot be used to calculate density and are considered undevelopable. Fifty percent of partially constrained residential areas can be used in residential density calculations; however, 100% credit is given to non- residential development. As Zone 13 is completely non-residential, only fully constrained areas were excluded when calculating future development. Since fully constrained areas may overlap each other, for accounting purposes, constraints are organized in a hierarchy beginning with 'A' - major powerline easements and ending with 'J' - slopes between 25% - 40%. When this occurs, only the area of the highest level constraint is calculated for build out projection purposes. It is recognized that underlying constraints exist and that these constraints as well as others will be defined by specific environmental review for individual development projects. Full developmental constraints are as follows: A. B. C. D. E. F. G. H. I. Major (2 69 kv) power-line easements Proposed circulation element roadways Railroad track beds or R-0-W Slopes of 40% or more in grade Significant riparian, or woodland habitats Significant wetlands Floodways Permanent bodies of water Other significant environmental features as determined by the Environmental Review process. Partial Developmental Constraints include: J. Slopes between 2540% in grade: only 1/2 of the area within slopes between 25- 40% in grade can be used in residential density calculations. Slopes between 25- 40% in grade are not constrained for nonresidential density calculations. Also included in the constraints analysis is the programming of K. Planned school facilities The acreages by subarea shown in this table may vary from those shown in SP 207 (A) or on subsequent tentative maps due to differences in geographic areas and in constraints considered, such as streets other than General Plan Circulation Element roadways. 5 30 October 1995 Zone 13 LFMP The approximate area and location of school facilities are indicated in the General Plan. The beneficial and efficient provision of these facilities require a minimum area of land free of development constraints. Consistent with City and school district policy, the minimum acreage identified by the General Plan for school facilities was subtracted from the developable acreage in the applicable sub-area's residential density calculations. There are no designated school sites located within Zone 13 boundaries. C. EXISTING LAND USE Existing land uses within each sub-area as of 1/1/95 were identified. All land within Zone 13 is either in active agricultural use, open space, or vacant Office/Planned Industrial, Community Commercial/Office/P1anned Industrial, Community Commercial, TraveVRecreation Commercial or in an Unplanned Area. Concurrent with, this Local Facilities Management Plan Amendment, a General Plan Amendment is being processed, which will revise these land use designations. The analyses contained in the Local Facilities Management Plan Amendment assumes the revised land uses identified in the General Plan Amendment are existing. These land uses are Regional Retail, Office/Planned Industrial, Travel/Recreation Commercial, TraveVRecreation CommerciaVCommunity Commercial or Open Space. D. DEVELOPING LAND USE Developing land use is a category which defines the status or stage of a land use proposal or project in the development process. The development process begins when a development application is submitted to the City. Various procedures are followed depending on the type of application submitted. In all cases. applications are reviewed to ensure that all City standards are met and there is conformance with all previous discretionary approvals prior to finalizing the projects and issuing building permits. Once a project has received final occupancy, the development process ends, and the land use is identified as an existing land use. E. NON-RESIDENTIAL BUILD OUT PROJECTION CALCULATIONS Previous zone plans calculated build out square footage by multiplying net-developable acreage of each non-residential land use sub-area by either a factor of 0.3 or 0.4. The Growth Management Program uses the 0.3 factor to estimate building square footage yields on either 1) unapproved and unimproved vacant, unconstrained land or on 2) urbanized, underdeveloped, non-residential sites. The 0.4 factor is used to estimate building square footage yields on unconstrained lots which have approved land use projects and have all infrastructure in. place. When the 0.3 factor was applied to the net developable acreage in Zone 13 the resulting development, as identified in Exhibit 11 on page 33, could not be adequately accommodated by future public facilities (specifically circulation). Therefore, more Zone 13 WMP 31 October 1995 specific land use assumptions were used which results in a lower overall coverage factor, as shown in Exhibit 12 on page 34. These assumptions are used for facility planning purposes only. Future development will likely yield more than these assumptions over a given area and less than these assumptions in others, however, future development applications must demonstrate that the facility impacts generated by the proposed development do not exceed the overall build out projections and facility impacts reflected in this zone plan. F. BUILD OUT POPULATION PROJECTION There is no residentially designated land within Zone 13, therefore no population is projected. Zone 13 LFMP 32 October 1995 EXHIBIT 11 General Plan Land Use Build Out Projections Based on 30% Yield (As of 1/1/95)fl) General Plan Land Use Desi nation 1- TR-2 TR-3 OIPI-1 O/PI-2 TR/C R .. TOTAL Developable 53.53 125.67 28.81 41.90 10.48 26.65 General Plan Build Out Projections in Acres 10.64 16.06 37.70 8.64 12.57 3.14 8 .OO 96.76 General Plan Build Out Projections in-Sq.Ft. 463,653 699,530 1,642,256 376,489 547,549 136,953 348,262 4,214,691 (1) The acreages by subarea shown in this table may vary from those shown in SP 207 (A) or on subsequent tentative maps due to differences in geographic areas and in constraints considered, such as streets other than General Plan Circulation Element roadways. (4) Because SDGE is not a part of SP 207 (A), this area's analysis was not revised at this time. This area will be subject to further analysis when SDGE submits improvement plans. Zone 13 LFMP 33 October 1995 Exhibit 12 Build Out Projections Based on Specific Land Use Mix and Modified Yield (As of 1 /I /95)( 1) 26.65 394.83 General Plan Land Use Designation rR-i (2) TR-2 Subtotal TR-3 3/PL 1 Subtotal 3/PI-2 Subtotal rR/c Subtotal 3 0.2( I 0.2( Projected Land Use Mix rravel/Recreational Commercial lesort Hotel Suites Retail Conference Facilities Meeting/Ballrooms Restaurant Golf Course (3) Restaurant in Club House :amily Park ;emological Institute Office/R&D/Lab Light Manufacturing Warehouse Vocational School/Library Cafeteria/Museum/Auditoriun lffice qesearch and Development iotel qetail Specialty Retail TOTAL Net Developable Acres 35.48 125.84 125.67 28.81 41.90 10.4E Modified .U Intensity Estimate 0.30 0.1 1 O.OE 0.4L 0.4d 0.4( Build Out 'rojections in Acres 10.64 14.85 9.77 12.6: 18.3; 4.8; 6.8! 78.0: Build Out Projections in Sq. Ft. 463,600 576,000 6,000 16,000 24,000 19,000 0 6,000 647,000 425,750 414,600 38.600 40,000 550,000 300,000 500,000 800,OOC 192.08C 20,ooc 2 1 2,08C 300,OOC 3,398,43C 18,300 38,500 (1 1 The acreages by subarea shown in this table may vary from those shown in SP 207 (A) or on subsequent tentative maps due to differences in geographic areas and in constraints considered, such as streets other than General Plan Circulation Element roadways. (2) Because SDGE is not a part of SP 207 (A), this area's analysis was not revised at this time. This area will be subject to further analysis when SDGE submits improvement plans. (3) Golf course acreage included in total for this subarea. Golf course includes acreage for OS-2, 4. Zone 13 LFMP 34 October 1995 IV. PHASING PROJECTIONS Phasing projections estimate when, where and how much development will occur in Zone 13 between now and build out. Although difficult to predict exactly, phasing projections begin to make possible advance planning and programming of public facilities to assure adopted performance standards are continually met. Specifically, phasing projections: 1. Project estimated demands for public facilities on a yearly basis until build out. 2. Project and establish thresholds which indicate when and where public facilities improvements are needed. 3. By projecting facility thresholds, allow sufficient lead time for facility programming to assure performance standards are continually met. 4. Through threshold identification. allow the City to implement public facility improvements. Citywide residential phasing is included here for analysis of facilities that are based on residential development. However, the analysis of City Administrative, Library, Park. and School Facilities is provided for informative purposes only, as the performance standards do not apply to non- residential development. A. ZONE 13 LAND USE PHASING 1. Residential The projected residential phasing schedule is intended to be used for projecting future need and timing of public facilities. It is a tool to allow the city to anticipate future public facility needs and to budget monies for their improvement. The projected residential phasing schedule is not absolute. There is no residential development either existing or planned within Zone 13. Exhibit 13 on page 36 shows the latest yearly residential phasing schedules of the adopted LFMP's as updated by city staff. The adopted LFMP's include Zones 1-9, 11, 12, 14, 15, 16, 18, 19, 20, 21, 22 and 24. Exhibit 14 on page 39 shows a 'similar phasing schedule for the zones located within the northwest quadrant of the City. The northwest quadrant phasing projections are provided to make the review and future update and monitoring of quadrant specific facilities more manageable and easier to understand. 35 October 1995 Zone I3 LFMP EXHIBIT 13 YEARS as of 1/1 1995 1995 1996 1997 1998 1999 2000 200 1 2002 2003 2004 2005 2006 2007 2008 2009 201 0 201 1 201 2 201 3 201 4 201 5 201 6 201 7 201 8 201 9 TOTAL CITY WIDE RESIDENTIAL PHASING PROJECTIONS LOCAL FACILITY MANAGEMENT ZONES 1 2 3 4 5 6 7 8 (1 1 (2) (3) (4) (5) (6) (7) (8) 10,277 2.488 235 3,065 0 7,992 1,101 1 31 0 0 0 0 56 0 0 21 0 0 0 0 53 0 0 31 0 0 0 0 53 50 0 50 0 0 0 0 53 50 0 50 5 1 0 0 53 50 0 50 5 1 0 0 53 50 3 90 5 1 0 0 53 50 3 90 5 1 0 0 53 71 3 90 5 1 0 0 53 71 71 90 5 1 0 0 53 71 71 90 5 1 0 0 53 71 71 90 5 1 0 0 73 71 71 90 5 1 0 0 81 71 71 90 5 1 0 0 81 71 71 90 5 1 0 0 81 71 71 90 5 1 0 0 81 71 71 90 5 1 0 0 81 71 71 90 5 1 0 0 81 71 72 90 5 1 0 0 81 71 72 90 5 1 0 0 0 70 79 90 5 1 0 0 0 60 72 90 5 0 0 0 0 0 72 90 0 0 0 0 0 0 74 90 0 0 0 0 0 0 74 90 0 0 0 0 0 0 7; 12,220 2,578 252 3,065 0 9,218 2,333 1,225 * FORFACILITY PLANNING PURPOSESONLY * * STATUS Existinc 'rojectec 3uild Oul I Notes NOTES: (1 1 Zone 1 LFMP, adopted September 1, 1987, C.C. Reso. No. 9221. (2) Zone 2 LFMP, adopted June 16, 1987, C.C. Reso. No. 91 23. (3) Zone 3 LFMP, adopted May 19, 1987, C.C. Reso. No. 9084. (4) Zone 4 LFMP, adopted June 16, 1987, C.C. Reso. No. 91 22. (5) Zone 5 LFMP, adopted August 4, 1987, C.C Reso. No. 9188. (6) Zone 6 LFMP, adopted November 10, 1987, C.C. Reso. No. 9291. (7) Zone 7 LFMP, adopted December 5, 1989, C.C. Reso. No. 89-424. (8) Zone 8 LFMP, adopted February 7, 1989, C.C. Reso. No. 89-33. Zone I3 L FMP 36 October I995 EXHIBIT 13 (page 2 of 3) As of 1/1 1995 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 201 1 201 2 201 3 2014 201 5 201 6 201 7 201 8 201 9 TOTAL LOCAL FACILITY MANAGEMENT ZONES 9 10 11 12 13 14 15 16 17 18 (9) (10) (1 1) (1 2) (1 3) (141 (1 5) (16) 459 0 1,058 589 0 2 520 0 0 1 16 0 30 0 0 0 0 0 0 16 16 16 20 32 32 32 32 32 32 32 32 32 32 32 32 32 32 32 0 0 0 0 0 0 87 0 131 0 131 0 131 0 131 0 131 0 131 0 131 0 131 0 131 0 131 0 1 40 0 194 0 194 0 194 48 194 80 194 170 0 170 0 170 0 170 0 170 0 170 0 170 0 0 0 0 0 0 0 0 0 70 105 105 105 105 105 105 105 105 105 105 0 0 0 0 0 0 0 0 0 0 40 48 120 120 120 120 120 150 -1 50 150 150 150 150 180 180 180 180 180 0 0 0 0 0 0 0 0 0 0 0 0 0, 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16 0 16 0 16 0 16 0 32 0 32 0 32 0 32 0 32 0 32 0 32 0 32 0 32 0 53 0 53 0 53 CI 82 0 85 0 85 0 85 0 85 0 106 0 - - 106 0 1,023 1,318 3,595 1,734 0 1,122 3,008 0 0 2,091 NOTES: (9) Zone 9 LFMPA, adopted January 18, 1994 C.C. Reso. No. 94-27. (1 0) From Zone 10 LFMP draft, not approved. (1 1) Zone 1 1 LFMP, adopted February 23, 1988, C.C. Reso. No. 88-46. (1 2) Zone 12 LFMP, adopted August 21, 1990, C.C. Reso. No. 90-264. (1 3) Zone 14 LFMP, adopted February 6, 1990, C.C. Reso. No. 90-24. (14) Zone 15 LFMP, adopted April 10, 1990, C.C. Reso. No. 90-101. (15) Zone 16 LFMP, adopted April 7, 1992, C.C. Reso. No. 92-94. (1 6) Zone 18 LFMP, adopted March 5, 1991, C.C. Reso. No. 91 -76. 0 38 38 59 115 115 115 115 115 115 115 115 115 115 115 115 115 115 115 115 115 0 0 0 0 Zone 13 L FMP 37 October 1995 YEARS As of 111 c I 1995 1995 1996 1997 1998 1999 2000 200 1 2002 2003 2004 2005 2006 2007 2008 2009 201 0 201 1 201 2 201 3 201 4 201 5 201 6 201 7 201 8 201 9 TOTAL 0 70 105 105 123 123 123 123 123 123 123 123 123 123 123 123 123 139 139 139 139 139 139 139 EXHl8lT 13 (page 3 of 31 LOCAL FACILITY MANGEMENT ZONE 19 20 21 22 23 24 25 (1 7) (18) (1 9) (20) (21 1 (22) 28 1 28 181 268 0 115 1 0 0 0 0 15 0 0 15 15 15 15 15 150 150 150 150 150 150 132 170 170 170 170 170 170 165 160 0 0 0 0 0 0 0 8 0 0 0 0 0 0 0 50 50 50 50 50 50 50 50 50 50 0 0 0 16 16 26 54 54 54 54 54 54 54 54 54 54 0 0 0 0 0 0 0 0 0 0 0 15 40 45 50 50 50 50 50 50 0 0 0 0 0 0 0 0 0 0 33 33 33 33 33 33 33 33 33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 139 0 86 0 0 0 0 3.272 2.480 775 866 400 427 0 ALS OF ADOPttV LFMPs AL TU IAL TOTAL ADOPTED CITYWIDE CITY WIDE PHASED D. U. ’ S POPULATION DU’S AS OF 1/1 28,662 28,662 66.433 148 28,662 66,433 31 8 488 528 628 658 797 986 1,131 1,201 1,203 1,223 1,240 1,306 1,344 1,365 1,413 1,408 1,333 1,284 1,132 951 786 807 28,810 29,128 29.,616 ‘30,144 30,772 31,430 32,227 33,213 34,344 35,545 36,748 37,971 39,211 40,517 41,861 43,226 44,639 46,047 47,380 48,664 49,796 50,747 51,533 66,776 67,513 68,644 69,868 71,324 72,849 74,696 79,603 82,387 85.1 75 88.01 0 90,884 93,911 97,026 100,190 103,465 106,728 109,818 1 12,794 115,418 11 7,622 1 19,444 . 76,982 663 52,340 121,314 53.003 53.003 122.851 Notes: (1 7) Zone 19 LFMP, adopted December 8, 1987, C.C. Reso. No. 9322. (18) Zone 20 LFMPA, adopted December 14, 1993 C.C. Reso. No. 93-260. (19) Zone 21 LFMP, adopted September 17, 1991, C.C. Reso. No. 91-307. (20) Zone 22 LFMP, adopted December 13, 1988, C.C. Reso. No. 88-428. (21 t From Zone 23 LFMP draft, not approved. (22) Zone 24 LFMPA, adopted January 18, 1994 C.C. Reso. No. 94-25. Zone I3 LFMP 38 October 1995 EXHIBIT 14 NORTHWEST QUADRANT RESIDENTIAL PHASING PROJECTIONS 201 9 rOTAL FOR FACILITY PLANNING PURPOSES ONLY 90 0 0 72 0 0 I 12.220 252 0 1,225 0 427 YEARS 1s of 1/1 1995 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 201 0 201 1 201 2 201 3 2014 201 5 201 6 201 7 201 8 LOCAL FACILITY MANAGEMENT ZONES 1 3 5 8 13 24 (1) (2) (31 (41 (5) 10,277 235 0 1 0 115 31 0 0 0 0 15 21 31 50 50 50 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 3 3 71 71 71 71 71 71 71 71 71 72 72 72 72 72 72 72 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 33 33 33 33 33 33 33 33 33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (1 1 Zone 1 LFMP, adopted September 1, 1987, C.C. Reso. No. 9221. (21 Zone 3 LFMP, adopted May 19, 1987, C.C. Reso. No. 9084. (31 Zone 5 LFMP, adopted August 4, 1987, C.C Reso. No. 91 88. (41 Zone 8 LFMP, adopted February 7, 1989, C.C. Reso. No. 89-33. (5) Zone 24 LFMPA, adopted January 18, 1994 C.C. Reso. No. 94-25. ADOPTED LFMP'S DTAL TOTAL UADRANT QUADRANT .U.'S POPULATION S OF 1/1 ~~ 10,628 24,634 10,628 24.634 10,674 10,728 10,792 10,875 10,959 1 1,046 11,173 11,300 1 1,495 11,690 11,852 12'01 4 12,176 12,338 12,500 12,662 12,824 12,987 13,150 13.31 3 13,476 13,638 13,800 24,741 24,866 25,014 25,207 25,401 25,603 25,897 26,192 26,644 27,096 27,471 27,847 28,222 28,598 28,973 29,348 29,724 30,102 30,480 30,857 31,235 31,611 31,986 13,962 32,362 14,124 32,737 Zone I3 LFMP 39 October I995 2. Non-Resideu The citywide non-residential phasing projections, including Zone 13, are shown on Exhibit 15 on page 41. Similar to residential phasing, these projections are estimated for purposes of public facility planning. Exhibit 16 on page 44 indicates the northwest quadrant non-residential phasing projections and Exhibit 17 on page 45 shows the Zone 13 non-residential phasing projections. Comparable to residential phasing projections, these exhibits are provided to facilitate future monitoring of this Local Facilities Management Plan. 3. su- Both residential and non-residential phasing projections are provided in order to plan for public facilities. The plan provides these projections to establish thresholds which indicate the need for additional facilities. The Growth Management Program and the Zone 13 LFMP anticipate that the actual phasing of development in this zone will vary from these projections. In no instance, however, will phasing be modified to the point that the performance standard will not be met. The public facility thresholds established in this plan will ensure that compliance with the adopted performance standards is maintained, or no development will be allowed until compliance is reached. October 1995 Zone 13 LFMP 40 EXHIBIT 15 CITY WIDE NON-RESIDENTIAL PHASING PROJECTIONS FORFACILITY PLANNINGPURPOSESONLY I STATUE I 20191 96,542 0 0 0 545,653 0 0 0 I TOTALI 4,578.980 423.314 2.224.767 89.21 1 22,196,299 1.778.434 119,212 399.440 Extstinc 'rojecte( luild Ou Notes I YEARS I LOCAL FACILITY MANAGEMENT ZONES asof 1/1 1 2 3 4 5 6 7 8 11) (2) (3) (41 (5) 16) 17) 181 1995 2.768.773 272.589 2.082.41 5 0 8.210.006 1.000.870 1.600 0 1995 0 0 0 0 363.768 49,705 0 0 1996 0 0 0 0 181.884 42.303 0 0 1997 12.078 0 0 0 181.884 42,303 0 0 1998 12,078 0 6,434 0 345,096 42.303 0 0 1999 12.078 0 7,551 0 363,768 42,303 0 0 200 1 24,139 15.000 7,551 0 363,768 30,373 10.000 0 2002 96,542 15.000 7,551 0 363,768 30,373 10,000 0 2003 96,542 15,000 7,551 0 727,527 30,373 10,000 0 2005 96,542 15,000 7,551 0 727,527 30,373 10,000 0 2006 96,542 15,000 7,551 11,161 727,527 30,373 10.000 0 2007 96,542 15,000 7.551 11,150 727.527 30,373 10,000 19,000 2008 96,542 15,000 7,551 11,150 727.527 30,373 10,000 0 2009 96,542 15,000 7,551 11,150 727,527 30,373 10,000 109.400 2010 96,542 0 7,551 11,150 727,527 30,373 10,000 49.975 201 1 96,542 0 7,551 11,150 727.527 30,373 10,000 4,725 201 2 96,542 0 7,551 11,150 727.527 30.373 7.61 2 4,725 201 3 96,542 0 7,551 11,150 727,527 30.373 0 0 2014 96.542 0 7.551 0 727,527 30,373 0 0 201 5 96,542 0 7,551 0 545,653 30,373 0 0 2016 96,542 0 7,551 0 545.653 30.373 0 0 201 7 96.542 0 0 0 545,653 30,373 0 0 201 8 96.542 0 0 0 545.653 0 0 0 2000 12.078 15,725 7,551 0 363,768 42,298 0 79,715 2004 96,542 15,000 7,551 0 727,527 30,373 10,000 1 3 1,900 NOTES: (1) Zone 1 LFMP, adopted September 1, 1987, C.C. Reso. No. 9221. (2) Zone 2 LFMP, adopted June 16, 1987, C.C. Reso. No. 9123. (3) Zone 3 LFMP, adopted May 19, 1987, C.C. Reso. No. 9084. 14) Zone 4 LFMP, adopted June 16, 1987, C.C. Reso. No. 9122. 15) Zone 5 LFMP. adopted August 4. 1987, C.C Reso. No. 9188. 16) Zone 6 LFMP, adopted November 10, 1987, C.C. Reso. No. 9291. (7) Zone 7 LFMP, adopted December 5, 1989, C.C. Reso. No. 89-424. 18) Zone 8 LFMP, adopted February 7, 1989, C.C. Reso. No. 89-33. Zone I3 LFMP Ocrok 1995 EXHIBIT 15 lpage 2 of 31 As of 1/1 1995 I YEARS I LOCAL FACILITY MANAGEMENT ZONES 9 10 11 12 13 14 15 16 17 18 (91 (10) (11) (121 113) 114) (15) i16) 190.695 0 0 0 0 0 0 0 0 0 _. 201 8 201 9 TOTAL 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 201 1 201 2 201 3 2014 201 5 201 6 201 7 0 0 0 0 0 0 52.214 0 0 C 0 0 0 0 0 0 52,219 3,615,916 0 2,702,463 523,295 0 904.252 167,658 3.398.430 0 835,429 3,615,916 0 2.702.463 0 0 0 0 0 0 0 0 0 0 0 12,600 40.000 40.000 40.000 40,000 40,000 40,000 40,000 40,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100,000 1 00,000 100.000 100,000 100,000 100,000 100,000 100,000 104.252 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 38,000 0 0 80,000 49,658 0 0 0 0 0 0 0 0 0 0 0 0 0 283.400 80.000 276,040 1,365,390 200,000 140,000 390,000 40.000 40,000 40,000 40,000 40,000 40.000 40,000 383.600 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 52.214 52.214 52,214 52,214 52,214 52,214 52,214 52,214 52,214 52,214 52,214 52.214 52,214 52.214 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C a NOTES: 19) Zone 9 LFMPA, adopted January 18. 1994 C.C. Reso. No. 94.27 I1 0) From Zone 10 LFMP draft. not adopted. I1 1) Zone 11 LFMP, adopted February 23. 1988. C.C. Reso. No. 88-46. 112) Zone 12 LFMP, adopted August 21, 1990, C.C. Reso. No. 90-264. I1 31 Zone 14 LFMP, adopted February 6. 1990. C.C. Reso. No. 90-24. 114) Zone 15 LFMP, adopted April 10, 1990. C.C. Reso. No. 90-101 115) Zone 16 LFMP, adopted April 7. 1992. C.C. Reso. No. 92-94. 116) Zone 18 LFMP, adopted March 5. 1991. C.C. Reso. No. 91-76. ZoncIJLFMP EXHIBIT 15 Ipago 3 of 31 YEARS As of til 1995 I 1995 LOCAL FACILITY MANGEMENT ZONE 19 20 21 22 23 24 25 I1 71 I1 81 1191 120) (21) 1221 748.725 0 0 248.461 0 0 0 0 0 0 0 0 n n 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 201 0 201 1 201 2 201 3 2014 201 5 2016 201 7 2018 0 0 51,275 50,000 50.000 50.000 50,000 50,000 50,000 50,000 50,000 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 107.874 107.870 107,870 107.870 107.870 107,870 107.870 107.870 107.870 107.870 107.870 0 0 0 0 100,000 100.000 100,000 100,000 100,000 100,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2019) 0 0 0 0 0 0 0 TOTAL1 1,250,000 0 0 1,435,035 600.000 0 0 Notes: I1 71 Zone 19 LFMP. adopted December 8. 1987. C C. Reso. No 9322. 1181 Zone 20 LFMPA. adopted December 14, 1993 C.C Reso. No. 93-260 1191 Zone 21 LFMP. adopted September 17. 1991. C C. Reso. No. 91-30?, 1201 Zone 22 LFMP. adopted December 13. 1988, C C. Reso. No. 88-428. 121) From Zone 23 LFMP draft, not adopted. 1221 Zone 24 LFMPA. adopted January 18. 1994 C.C Reso. No. 94-25. =Y!mr- CITYWIDE SQUARE FOOTAGE 15.524.142 41 3,473 607.587 416,265 933,226 2,041,090 1,009,135 840.831 1.063.234 1,156.993 1.418.639 1,237,077 1,252,490 1,179.827 1,138.227 1,247.627 1.5 1 6.802 1.087.952 1,085,564 1,073,227 1.062.077 772,333 732,333 724.782 694.409 7.012.793 47,242.1 35 Zone I3 LFMP 43 EXHIBIT 16 NORTHWEST QUADRANT NON-RESIDENTIAL PHASING PROJECTIONS STATUS FORFACILITY PLANNINGPURPOSESONLY YEARS LOCAL FACILITY MANAGEMENT ZONES QUADRANT as of lil 1 3 5 8 13 24 SQ. FT 1995 1995 Notes Existing Projected 11) (2) 13) (4) (5) 2.768.773 2.082.415 8,210,006 0 0 0 0 0 363,768 0 0 0 Build Out 1996 1997 1998 1999 2000 200 1 2002 2003 2004 2005 2006 2007 2008 2009 201 0 201 1 201 2 201 3 201 4 201 5 201 6 201 7 201 8 I 20191 96,542 0 545.653 0 0 0 12,078 12.078 12,078 12.078 24,139 96.542 96.542 96,542 96,542 96,542 96,542 96,542 96.542 96,542 96,542 96,542 96,542 96,542 96,542 96,542 96,542 96,542 0 0 6,434 7,551 7,551 7,551 7,551 7,551 7,551 7,551 7,551 7,551 7,551 7,551 7,551 7,551 7,551 7,551 7,551 7,551 7,551 0 0 181,884 ‘I 81,884 345.096 363.768 363,768 363,768 363,768 727.527 727.527 727,527 727.527 727.527 727.527 727.527 727,527 727.527 727.527 727.527 727,527 545,653 545,653 545,653 545.653 0 0 0 0 79,715 0 0 0 131,900 0 0 19,000 0 109,400 49,975 4,725 4.725 0 0 0 0 0 0 283,400 ao.000 276,040 1.365.390 200.000 140.000 3 90,000 40,000 40,000 40,000 40,000 40,000 40,000 40.000 383,600 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 AS OF 111 13,061,194 13,061,194 13,424,962 13,890,246 14,164,208 14,803,056 16,552,643 17,215,755 17,751,213 18.609.074 19.4ao.694 20.4a4.214 23.1 I 8.074 21,355,834 22,227,454 23,989,694 24,970,714 26,235,909 27.072.254 27,908,599 28.740.21 9 29,571,839 30.221.585 31,513,526 ‘ 30.a71.331 11) Zone 1 LFMP. adopted September 1, 1987, C.C. Reso. No. 9221. (2) Zone 3 LFMP, adopted May 19, 1987, C.C. Reso. No. 9084. (3) Zone 5 LFMP. adopted August 4, 1987, C.C Reso. No. 91 88. (4) Zone 8 LFMP. adopted February 7, 1989, C.C. Reso. No. 89-33. (5) Zone 24 LFMPA, adopted January 18, 1994 C.C. Reso. No. 94-25. Zone I3 LFMP 44 October 1995 EXHIBIT 17 Zone 13 Non-Resdential Phasing FOR FACILITY PLANNING PURPOSES ONLY * STATUS ixisting Vojected 3uild Out YEARS as of 1/1 1995 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 201 0 201 1 201 2 201 3 201 4 201 5 201 6 201 7 201 8 201 9 TOTAL Zone 13 Sq. Ft. 0 0 283,400 80,000 276,040 1,365,390 200,000 1 40,000 390,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 383,600 0 0 0 0 0 0 0 0 0 3,398,430 Zone 13 L FMP 45 October 1995 V. ZONE 13 REQUIREMENTS FOR PUBLIC FACILITIES AND SERVICES The Local Facilities Management Plan for Zone 13 addresses eleven separate facilities at three levels of analysis. Level of Analysis Facility Citywide Quadrant Zone City Admin. Facilities 0 Library 0 Wastewater Treatment Capacity 0 Park Drainage Circulation Fire Open Space Schools Sewer Collection Water Distribution 0 Each of these facilities is evaluated to determine conformance with the adopted performance standard. For each facility analysis the following is provided: a. An illustrative map showing facilities discussed in the section and district boundaries; b. The adopted service level performance standard which must be complied with at all times as development occurs; c. A detailed facility adequacy and planning analysis; d. A list of conditions necessary to ensure conformance with the adopted performance standard; e. A discussion of mitigation measures and financing mechanisms. Citywide facilities (City Administrative, Library, and Wastewater Treatment) have been analyzed in the 1986 CFIP. Analyses of these facilities are also included in this Local Facilities Management Plan to verify compliance with the 1986 CFIP or to suggest alternatives that assure conformance with the adopted performance standard. Zone 13 LFMP 46 October 1995 This plan shows how each adopted performance standard will be complied with as development occurs within Zone 13. This plan includes financing of all public facilities and services. The plan also includes a complete facility phasing schedule which is linked to public facility demands within the zone. Zone 13 LFMP 47 October 1995 CITY ADMINISTRATIVE FACILITIES I. PERFORMANCE STANDARD 1,500 square feet per 1,000 population must be scheduled for construction within a five year period. 11. FACILITY PLANNING AND ADEQUACY ANALYSIS Since Zone 13 will be entirely non-residential, the above performance standard does not apply. However, an analysis of City Administrative Facilities is provided to show its current status within the City. This analysis provides an inventory of existing and programmed City Administrative Facilities owned and leased by the City of Carlsbad. These facilities include both permanent and'temporary structures. This analysis projects the build out demand for City Administrative Facilities and determines compliance with the adopted performance standard. Exhibit 18 on page 49 shows the location of the existing and future City Administration Facilities. A. INVENTORY .. .. 1. xisting - and Build Out Citv qamUllSUative Demand: Citywide projected population comes from Exhibit 13. on page 36. Zone 13 has no projected population. Projected Population Performance Standard Demand ( Sq. Ft.) Existing (1/1/95): Citywide Zone 13 Build Out: Citywide (2019) Zone 13 (2019) 66,433 0 122,851 0 99,650 0 184,277 0 Zone 13 LFMP 48 October 1995 LEGEND KI civic Center FI Housing & Redevelopment Oceanside I I Water District IT] Community Development 131 Central Maintenance & Warehouse - Proposed 141 Fire & Police Safety Center Encinitas fi Hofman Planning Associates Zone 13 - City Administration Facilities EXHIBIT 18 49 .. .. 2. hventorv of E- Citv Administrati ve Fac il i t ies : The existing City Administrative Facilities owned and leased by the City of Carlsbad as of January 1, 1995 are: Permanent Temporary Leased (Sq. Ft.) (Sq. Ft.) (Sq. Ft.) City Hall (1200 Carlsbad Village Dr.) Main Building 12,899 Finance Modular 2.700 hrchasing/Personnel Modular 1,800 Redevelopment (2965 B Roosevelt) 3,200 Community Development 22,627 (2075 Las Palmas Dr.) Public Safety and Service Center (I) (2560 Orion Way) Police and Fire 53,700 Vehicle Maintenance 10,358 Water District Office 18,000 Total 117.584 4.500 3.200 Total Existing Facilities 125,284 Existing City Administrative Facilities as of January 1, 1995 exceed the performance standard. However, 2.6 percent of the total square footage is leased and another 3.6 percent is in temporary modular units. If the leases are terminated or temporary facilities are no longer used, thereby reducing existing City Administrative Facilities, this analysis would need to be redone to assess compliance with the adopted performance standard. .. ... 3. InventQLv of Appro ved Future City Awlstrati ve Facib: The adopted 1994-1995 Capital Improvement Program (CC Reso. No. 240) funds the following City Administrative Facilities for construction within 5 years (199): October 1995 Zone 13 LJMP 50 Facility Square Feet Funding Year cost Source Central Maintenance and 62,000 1999-2004 $3,455,000 PFF6 warehouse facility New City Hall 96,000 1999-2004 $23,100,000 PFF No other City Administrative Facilities are identified within the City's adopted CIP. Existing City Administrative Facilities plus those scheduled for construction within five years in the adopted 1994-95 CIP are as follows: Permanent Temporary Leased (Sq. Ft.) (Sq. Ft.) (Sq. Ft.) Existing 117,584 4,500 3,200 Central Maintenance and warehouse facility 62,000 New City Hall 96,000 Subtotal 275,584 4,500 3,200 Total Existing Facilities 283,284 B. PHASING The citywide residential phasing projections on Exhibit 13 on page 36 are incorporated into Exhibit 19 on page 52. Exhibit 19 projects the adequacy of City Administrative Facilities on a Citywide basis by comparing the projected facility demand with existing and funded facilities . PFF = Public Facilities Fee October 1995 Zone 13 LJMP 51 EXHIBIT 19 ZONE 13 - PHASING OF CITY ADMINISTRATION FACILITIES (1,500 SQUARE FEET PER 1,000 POPULATlONl STATUS EXISTING PROJECTED RESIDENTIAL D\ IN OTHER ADOPTED 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 201 1 201 2 201 3 2014 201 5 2016 201 7 201 8 28,810 29,128 29,616 30,144 30,772 31,430 32,227 33,213 34,344 35,545 36,748 37,971 39.21 1 40,517 41,861 43,226 44,639 46,047 47,380 48,664 49,796 50,747 51,533 LLING UN IN ZONE 13 (2' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 IN TOTAL ADOPTED PLANS (31 28.662 28,662 28,810 29,128 29.61 6 30,144 30,772 31,430 32,227 33,213 34,344 35,545 36,748 37,971 39.21 1 40,517 41,861 43,226 44.639 46,047 47,380 48,664 49,796 50,747 51,533 52,340 53,003 ADOF ADOPTED ZONES PO PU LATlO N (41 66.433 66,433 66.776 67.51 3 68,644 69,868 71,324 72.849 74,696 76,982 79,603 82,387 85,175 88,010 90,884 93.91 1 97,026 100,190 103,465 106,728 109.81 8 11 2,794 1 15,418 11 7,622 1 19,444 121,314 122,851 iD PHASINC ADOPTED ZONES DEMAND 99,650 99,650 100,164 101,270 102,966 104,802 106,986 109,274 1 12,044 11 5,473 1 19,405 123.581 127,763 132.01 5 136,326 140.867 145,539 150,285 155,198 160,092 164,727 169,191 173.1 27 176,433 179.1 66 181,971 184,277 (DEQUACY AP PROJECTED CITYWIDE ADMlN SUPPLY 125,284 125,284 125,284 125,284 125,284 283.284 283.284 283,284 283,284 283,284 283,284 283,284 2 83,284 2 83,284 283,284 283.284 283,284 283,284 283,284 283,284 283,284 283,284 283,284 283,284 283,284 283.284 283,284 LYSIS PROJECTED ADOPTED ADEQUACY: IINADEQUACY) 25.634 25,634 25,120 24.01 4 22,318 178.482 176,298 174,010 171,240 167,81 1 163,879 159.703 155,521 151,269 146,958 142.41 7 137.745 132,999 128,086 123,192 11 8.557 1 14,093 110,157 106,851 104,118 101,313 99.007 NOTES (1 ) Dwelling units in Other Adopted Zone Plans are those projected in the LFMP for Zones 1-1 2, 14-1 6, 18-24 (2) Source - Exhibit 14. (3) Total adopted dwelling units include the adopted zones 1-1 3, 14-1 6, 18-24 (4) Existing citywide population is the base population used for projecting Adopted Zone Plan Populations. (5) Central Maintenance and Warehouse Facilities. (6) 96,000 sq ft for New City Hall. Zone 13 L FMP 52 October I995 111. IV. C. ADEQUACY FINDINGS Zone 13 is wholly comprised of non-residential development and therefore does not impact City Administrative Facilities per the adopted performance standard. MITIGATION Special Conditions No special conditions. FINANCING .. A combination of pub,,^ Facilities Fees (PFF), Sewer Fees, and the CitywIU< Mello Roos Community Facilities District (CFD) will be used to fund the following projects: Facility Cost Source Las Palmas Facility $2,500,000 (PFF) Central Maintenance and Warehouse Facilities $3,700,000 (CFD) Citv Hall - Future $23.100.000 (CFD). Total $29,300,000 . Zone 13 will contribute to the funding of City Administration Facilities through the payment of Mello Roos Taxes. Other than these standard contributions, no special financing mechanisms for City Administrative Facilities will be required as a condition of development within Zone 13. Exhibit 20 on page 54 shows a facility financing matrix for this facility. This matrix summarizes the individual facility to be financed, its estimated cost and timing of construction, the existing budgeted CIP monies available for the facility and the future funding options. 53 October 1995 Zone 13 LFMP EXHIBIT 20 ZONE 13 - CITY ADMINISTRATION FACILITY FINANCING AS OF 1 I1 195 ILITY CI fY ADMINISTRATION 1. Las Palmas Debt Service 2. Central Maintenance and Warehouse Facility - Design - Construction 3. New City Hall Total City Administration Costs AMOUNT 22,627 sf NA 62,000 sf 96,000 sf ESTIMATED COST $2,500,000 $500,000 $3,700,000 $23,100,000 $29.800.000 TIMING 1990-1 998 1999-2004 1999-2004 1999-2004 FU FIRST City - PFF Sewer Citywide Mello Roos Citywide Mello Roos I DING OPTIC SECOND I IS THIRD Notes: (1) Zone 13 does not impact City Administration Facilities per the adopted performance standard. There are no special conditions required of Zone 13 and other than the payment of the City's Public Facility Fee (PFF), Sewer Fee and participation, in the Citywide Mello Roos District, no special funding is required. (2) Annexation of properties in Zone 13 into the Mello Roos CFD will occur on a project by project basis prior to discretionary approval. Zone 13 LFMP October 1995 LIBRARY FACILITIES I. PERFORMANCE STANDARD 800 square feet per 1,OOO population must be scheduled for construction within a five year period. 11. FACILITY PLANNING AND ADEQUACY ANALYSIS Since Zone 13 will be entirely non-residential, the above performance standard does not apply. However, an analysis of Library Facilities is provided to show its current status within the City. This analysis provides an inventory of existing and approved library facilities owned and leased by the City of Carlsbad. This analysis projects the build out demand for library facilities and determines compliance with the adopted performance standard. Future citywide library facility demand is projected based on the 1994-95 Capital Improvement Program, the adopted LFMP's and Zone 13. Exhibit 21 on page 56 shows the location of existing and future library facilities. A. INVENTORY 1. Build Out 1.ibrary Demand: Citywide projected population comes from Exhibit 13 on page 36. Zone 13 has no projected population. Projected Population Performance Standard Demand ( Sq. Ft.) Existing (1/1/95): Citywide 66,433 . 53,147 Zone 13 0 0 Build Out: Citywide (2019) Zone 13 (2019) 122.85 1 0 98,281 0 Zone 13 LFMP 55 October 1995 Oceanside LEGEND Encinitas 171. Civic Center Library I-?-( Warehouse 131 South Carlsbad Library - Proposed 151 Centro de lnformacion h:nTM How NoE MLLOUTK)HI~~O~*UTE 141 La Costa Branch Library Zone 13 - Library Facilities EXHIBIT 21 a Hofman Planning MA s s oc i at e s 56 .. ... 2. Inventory of Existinp Libraw Fac 1lm: 3. Existing library facilities owned and leaseti by the City of Carlsbad as of January 1, 1995 are the following: Facility Owned (Sq. Ft.) Leased (Sq. Ft.) Civic Center Library - 24,600 (1200 Carlsbad Village Drive) Adult Learning Center (1207 Carlsbad Village Drive) La Costa Area Library’ (7750 El Camino Real) Warehouse (2075 Corte De Nogal) 400 5,600 2,060 Centro De Informacion 900 (3333 Harding St. Pine School, Room 11) Total 24,600 8,960 Total Existing Facilities 33.560 ... InVentOW Of ADDrO ved Future 1 ,ibrarv Facilitia: South Carlsbad Library: A six acre City owned site has been identified and designed for the South Carlsbad Library. This library is projected to be 64,OOO square feet in size. According to City staff, the 8,060 square feet of existing leased library space will expire and be vacated when the South Carlsbad library is constructed. The 1994- 95 CIP allocates funds for construction of the new library in the 1996-97 fiscal year. The South Carlsbad library site was approved by the City Council on July 7, 19878. The site is near the northwest corner of El Camino Real and Alga Road, shown on Exhibit 21 on page 56. ’ The existing 8,060 square feet of leased library space will expire when the new South Carlsbad Library is constructed. The staff report for this action is contained in Appendix A-2, Agenda Bill No. 8867. October 1995 Zone 13 LFMP 57 North Carlsbad Library Expansion: The 1994-95 Capital Improvements program shows funds for construction of the North Carlsbad Library Expansion in 2004+. This expansion will provide approximately 8,000 square feet of additional library space. Build Out Library: Funds for an additional 17,331 square feet of Library space for Build Out are shown in 2004+ in the 1994-95 Capital Improvements Program. The following is a summary of the 1994-95 Capital Improvement Program funding allocation for library facilities: South Carlsbad Library: DescriDtion Funding Year Cost Construction Bonds 1996- 1997 $1 1,200,000 Total $1 1,200,000 North Carlsbad Library Expansion: Description Funding Year Cost Construction 2004 + $4.000.o00 Total $4,000,000 October 1995 Zone 13 LFMP 58 Build Out Library: Description Cost Construction 2000+ 98,666.000 Total $8,666, 000 B. PHASING Existing library facilities plus those budgeted in the adopted 1994-95 CIP for construction are as follows: Square Feet of Library Space Added Subtracted . Total 1995: Existing: Civic Center Library Adult Learning Center La Costa Area Library Centro De lnformacion Warehouse 33.560 1%: S. Carlsbad Library 64,000 97,560 Adult Learning Center 400 La Costa Area Library 5,600 Warehouse 2.060 89.500 2004+ : N. Carisbad Librarv ExDansion 8.000 97.500 ~~ ~~ Build Out Library 17,331 114,831 To assess when the threshold for future library facilities will be reached, the phasing projections on Exhibit 13 on page 36 are used. These phasing projections are incorporated into Exhibit 22 on page 60. Exhibit 22 projects the adequacy of library facilities on a citywide basis by comparing the projected facility demand with existing and funded facilities. Zone 13 UMP 59 October 1995 EXHIBIT 22 (800 SQUARE FEET PER 1,000 POPULATION) ZONE 13 - PHASING OF LIBRARY FACILITIES 20191 52,340 0 52.340 TOTAL1 53,003 0 I 53,003 STATUS EXISTING PROJECTEC BUILD OUl 121,314 1 122,851 ADOPTED 97,052 98,281 1996 28,810 1997 29,128 1998 29,616 1999 30,144 2000 30,772 2001 31.430 2002 32.227 2003 33,213 2004 34,344 2005 35.545 2006 36,748 2007 37,971 2008 39.211 2009 40,517 2010 41.861 2011 43,226 2012 44,639 2013 46.047 2014 47,380 2015 48.664 2016 49,796 2017 50.747 2018 51,533 114,831 I 114,831 tL DWELL IN ZONE 13 (21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 G UNITS IN TOTAL 4DOPTED PLANS 131 28.662 28,662 28.810 29.128 29,616 30.144 30,772 31,430 32,227 33,213 34,344 35,545 36.748 37,971 39.21 1 40.51 7 41,861 43.226 44,639 46,047 47.380 48,664 49,796 50,747 51,533 ADOPT ADOPTED ZONES POPULATION (4) 66,433 66,433 66,776 67,513 68,644 69,868 71,324 72.849 74,696 76,982 79.603 82,387 85,175 88.01 0 90.884 93,911 97.026 100,190 103.465 106.728 109.81 8 112.794 115,418 11 7.622 1 19.444 PHASING ADOPTED ZONES DEMAND 53,147 53,147 53,421 54.01 1 54,916 55,895 57.060 58,280 59,757 61.586 63,683 65,910 68,140 70.408 72.708 75,129 77,621 80.152 82,772 85.383 87,855 90,236 92,335 94,098 95,556 DEQUACY AI 'ROJECTED CITYWIDE LIBRARY SUPPLY 89.500 89,500 89.500 89,500 89,500 89.500 89,500 89,500 89.500 89,500 114,831 114,831 114,831 114,831 114,831 114.831 114,831 114,831 114,831 114,831 114,831 114,831 114,831 114,831 114,831 4LYSIS PROJECTED ADOPTED ADEQUACY/ NADEQUACY 36,353 36.353 36.079 35,489 34,584 33,605 32,440 31,220 29,743 27,914 51,148 48,921 46,691 44.423 42,123 39,702 37,210 34,679 32.059 29.448 26,976 24.595 22,496 20.733 19,275 17.779 16,550 NOTES. (1) Dwelling units in Other Adopted Zone Plans are those projected in the LFMP for Zones 1-12. 14-16, 18--24 (2) Source - Exhibit 14. (3) Total adopted dwelling units include the adopted zones 1-13, 14-16, 18-24. (4) Existing citywide population is the base population used for prolecting Adopted Zone Plan Populations. (5) 31,560 square feet existing, plus 64,000 square feet expansion of South Carkbad Library minus 6.960 leased space. (6) 8,000 square feet expansion of North Carlsbad Library. (7) 17,731 square feet additional library for build out. Zonr13LFMP 60 October 1995 C. ADEQUACY FINDINGS Analysis of Zone 13's demand on library facilities as of 1/1/95 indicates no mitigation is needed at this the. The performance standard is currently being conformed with and is projected to conform until build out. The yearly monitoring program will assure that the adopted performance standard is complied with through build out. Since there is no residential development planned for Zone 13, no special conditions are required. 111. MITIGATION Special Coruium .. No special conditions. IV. FINANCING South Carlsbad Library: On July 7, 1987, the City Council took action for the acquisition, grading, design and construction of the 58,000 square foot South Carlsbad Library. On April 10, 1990, the City Council approved expansion of this facility from 58,000 square feet to 64,OOO square feet. Although the City Council has guaranteed the needed funds, the long term financing mechanisms may be modified at some time in the future. The South Carlsbad Library will be funded by the Citywide Mello-Roos Community Facilities District. North Carlsbad Library: The Citywide Mello-Roos Community Facilities District includes !§4,O0O,O0O for the construction of the North Carlsbad.Library expansion in 2004. This will provide an additional 8,000 square feet of library space at the existing library on 1250 Carlsbad Village Drive for a total of 32,600 square feet. Build Out Library: The 1994-95 CIP indicates that $5,060,000 for an additional 17,331 square feet of library facilities will be funded in 2004+ to fulfill the demand for libraries at build out. This space will likely be added to existing facilities. The primary source of funding will be Public Facility Fees. This fee is collected at the time building permits are issued for all residential, commercial and industrial developments. Zone 13 w;MP 61 October 1995 Exhibit 23 on page 63 shows a facility financing matrix for this facility. This matrix summarizes the individual facility to be financed, its estimated cost and timing of construction, the existing budgeted CIP monies available for the facility and the fuu-e funding options. Zone 13 LFMP 62 October 1995 EXHISIT 23 ZONE 13 - LIBRARY FACILITIES FINANCING MATRIX AS OF 1 11 195 FACILITY ' 'WARY FACILITIES AMOUNT I. Library Expansion 8,000 sf 2. Library - For Build 17,331 sf Out Population 3. Library - Renovate Cole N/A 4. Library - South Carlsbad 64,000 sf Land, Design, Construction TOTAL LIBRARY COSTS ESTIMATED COST $4,000,000 $8,660,000 $1,575,000 $1 1,200,000 $25,435,000 TIMING 2004 + 2004 + 998-99 996-97 FL -FIRST Citywide Mello Roos City - PFF City - PFF Citywide Mello Roos DING OPTIC SECOND THIRD NOTES 12) I i (1 ) Zone 13 does not impact Library Facilities per the adopted performance standard. There are no special conditions required of Zone 13 and other than the payment of the City's Public Facility Fee (PFF) and participation in the Citywide Mello Roos District, no special funding is required. (2) Annexation of properties in Zone 13 into the Mello Roos CFD will occur on a project by project basis prior to discretionary approval. Zone 13 LFMP - 63 October 1995 WASTEWATER TREATMENT CAPACITY I. PERFORMANCE STANDARD Sewer treatment plant capacity is adequate for at least a five year period. 11. FACILITY PLANNING AND ADEQUACY ANALYSIS A. INVENTORY Wastewater Treatment in the City of Carlsbad is provided by three independent agencies: The City of Carlsbad Municipal Water District, Leucadia County Water District (LCWD) and Vallecitos Water District as shown on Exhibit 25 on page 65. Wastewater Treatment is provided primarily at the Encina Water Pollution Control Facility (WPCF) and also at satellite treatment facilities. Ownership as well as wastewater treatment capacity of the Encina WPCF is shared on a percentage basis by six independent sewer districts. Exhibit 24 lists the six agencies and . their permitted treatment capacity to the Encina WPCF as follows: Exhibit 24 Encina WPCF Capacity Analysis Agency Percent Capacity Capacity Satellite Available Existing Remaining Ownership at Encina Adjusted for Treatment Treatment Flow Treatment WPCF Leases Capacity Capacity (MGD) Capacity . (MGD) (MGD) (MGD) (MGD) Notes. 12) (3) Vista Carlsbad 22.36 8.05 8.05 _. 8.05 5.49 2.56 25.67 9.24 9.24 1.20 (I) 9.24 5.48 3.76 Buena 6.28 2.26 2.26 1.16 3.42 1.21 2.21 Vallecitos 20.94 1.54 7.54 2.00 9.54 4.35 5.19 Lrucadia 19.75 7.11 7.11 0.75 7.86 3.40 4.46 Encinitas 5.15 I .80 1 .m __ 1.80 1.12 0.68 TOTAL 100.00 36.00 36.00 5.11 39.91 , 21.05 18.86 NOTES: 1. Currently not operational. 2. Summary of Leases: 3. Three month average as of February. 1995 1) Encinitas to LCWD 0.15 MGD October 1995 Zone 13 LFMP 64 Oceanside Carlsbad Municipal Water District **S.r.r.-.r.. Water District I 1 LEGEND Encinitas 1 2 3 Meadowlark Reclamation Facility . Calavera Hills ReclamationlTreatment Facility Encina Water Pollution Control Facility Y?RTH nom 4 Gafner Wastewater Reclamation Facility mTE IUL Lourn APPROlPYITE Hofman Planning Zone 13 -Wastewater Facilities Associates EXHIBIT25 Vista 3 65 Currently, the Encina WPCF has capacity to treat 36.0 million gallons per day (MGD). Ultimately, this facility will be able to treat up to 45 MGD. As shown below, Carlsbad Sewer Service District owns limited treatment capacity in a smaller localized satellite treatment facility: Carlsbad Municipal Water District: Percentage of Encina Capacity (25.67 %) Calavera Hills Treatment Facility (Currently not operational) 9.24 MGD 1.20 MGD 9.24 MGD TOTAL AVAILABLE TREATMENT CAPACITY Capacity at the Encina WPCF is separated into two categories: Treatment capacity and outfall capacity. This analysis will deal primarily with treatment capacity. The Encina Ocean Outfall is a drainage line that transports the treated sewage (effluent) from the Encina WPCF and satellite facilities and discharges approximately 8.900 feet into the Pacific Ocean.. Currently, the Encina Ocean Outfall has a design capacity of 38.0 million gallons per day (MGD) capacity. The outfall capacity is shared by six sewer districts and is projected to provide sufficient capacity to the year 2000. Outfall capacity just as treatment capacity, is shared on a percentage basis by the six sewer service districts . .. ... 1. xlstl-: The City of Carlsbad has capacity available at two wastewater treatment plant facilities. Primary treatment capacity is provided through Encina WPCF which is a regional facility owned by six member agencies. The current rate of capacity of Encina WPCF is 36.0 MGD of which Carlsbad retains ownership of 25.67 percent or 9.24 MGD. The City of Carlsbad also holds title to the Calavera Hills Wastewater Treatment Plant which has a capacity of 1.2 MGD. The Calavera Hills Facility is not operational at this time and would require approximately $2.33 million to make it operational. Operation at the Calavera Hills Plant is estimated to cost $360,000 per year. Comparable treatment at the Encina WPCF is estimated at $135,000 per year. The Calavera Hills Plant is not economical to operate for treatment capacity except in the absence of needed capacity at Encina WPCF. Zone 13 LFMP 66 October 1995 B. PHASING Exhibit 26 on page 68 shows the existing and projected demand and treatment capacity for Carlsbad Sewer Service District. Existing demand is 5.63 MGD with current capacity at the Encina WPCF at 9.24 MGD. Additional expansion to accommodate increased flow in the future is being planned for by the Encina Wastewater Authority. According to Encina WPCF's 2020 Facility Plan Update Report, dated February 1993, projected future flow could reach 53.7 MGD. To accommodate this projected flow, additional phases are outlined in the 2020 Facility Plan Update Report that will provide Encina with the capacity to handle 56.0 MGD. 1. Phasa and Service Demand Wastewater treatment service area ultimate flow projections for the Encina WPCF service district is depicted in the following chart: ENCINA WPCF TIER TWO PROJECTED ULTIMATE FLOWS Member Agency EWPCF Influent (MGD) Vista Carlsbad Leucadia Vallecitos Buena Encinitas 10.50 13.40 8.85 15.72 3.47 1.80 TOTAL 53.74 C. ADEQUACY FINDINGS Exhibit 26 on page 68 estimates the necessary treatment capacity needed to accommodate growth within the Carlsbad sewer service area to the year 2010. Zone 13 WMP 67 October 1995 Exhibit 26 Carlsbad Projections Carlsbad Service Area Demand and Available Treatment Capacity Status End of Year Service Area Flow (MGD) Encina Adequacy EDU Capacity (MGD) (MGD) Existing Projected Projected Projected 1994 25,620 5.63 9.24 3.61 I995 25,924 5.70 9.24 3.54 2000 30,423 6.69 9.24 2.55 20 10 33,478(a) 7.37 9.24 1.87 ~ ~ ~~ (a) Ultimate projection for City of Carlsbad according to 1994 General Plan. 111. MITIGATION .. ecial Conditiom The following action shall be pursued jointly by each sewer district to ensure adequate wastewater treatment capacity through the year 2010: 1. Monitor Encina treatment plant flows on a monthly basis to determine actual flow rates and to have an early warning of capacity problems. IV. FINANCING Sewer connection fees provide the primary source of funding for both sewer line upgrades and expansion of treatment plant capacity. The timing of sewer facilities upgrades and the mechanism of financing are critical to analysis of the adequacy of funding for plant expansion. Carlsbad Sewer Service District has projected Capital Improvement funds to provide for needed facilities. Exhibit 27 on page 69 shows a facility financing matrix for this facility. This matrix summarizes the individual facility to be financed, its estimated cost and timing of construction. the existing budgeted CIP monies available for the facility and the future funding options. Zone 13 LFMP 68 October 1995 EXHIBIT 27 ESTIMATED FACILITY COST TIMING 3TEWATER FACILITIES Encina Solids Management $10,609,746 1990-2000. TOTAL WASTEWATER COSTS $10,609,746 ZONE 13 - WASTEWATER FINANCING MATRIX AS OF 1/1/95 FUNDING OPTIONS FIRST SECOND THIRD NOTES Sewer Fees (1) Notes: (1) No special funding is required at this time. Zone 13 will contribute to the funding of wastewater facilities through the payment of sewer connection fees at time of development Zone 13 LFMP 69 October 7995 (This page intentionally left blank) Zone 13 LFMP 70 October 1995 (This page intentionally left blank) Zone 13 LFMP 71 October 1995 (This page intentionally left blank) Zone I3 LFMP 72 October 1995 (This page intentionally left blank) Zone 13 LFMP 73 October 1995 PARK FACILITIES I. PERFORMANCE STANDARD Three acres of Community Park or Special Use Area per.1 ,OOO population within the Park District must be scheduled for construction within a five year period. 11. FACILITY PLANNING AND ADEQUACY ANALYSIS Zone 13 is located within Park District 1 as shown on Exhibit 28 page 75. However, Zone 13 is composed exclusively of non-residential uses. The Growth Management Program does not identify a parks performance standard for non-residential uses. Currently, non-residential uses are required to pay Public Facilities Fees. A percentage of all Public Facilities Fees collected are allocated for the construction and improvements of City parks. In addition, residential development pays a Park-In-Lieu fee to pay for the acquisition of City park land. Nonresidential development is not required to pay Park-In-Lieu fees. The issue of recreational facilities for non-residential zones was addressed by the City with the adoption of the Zone 5 Local Facilities Management Plan and subsequently the Zone 16 Local Facilities Management Plan. Because of the large projection of employees in these entirely non- residential zones and the employees use of City parks, the City felt it appropriate to provide recreational facilities for non-residential zones. In order to pay for these park facilities, the City has adopted a fee of 40 cents per square foot of nonresidential development within Zones 5 and 16. The purpose of the fee is to fund recreational facilities located within the industrial corridor of the City of Carlsbad. The use to which the fee will be put is the purchase and improvement of 8 to 15 acres on one or more sites within the industrial corridor that may include but is not limited to the following improvements; fitness center, swimming pool, lighted ball fields, lighted tennis courts. and lighted outdoor racquetball/handball courts. The determination of the reasonable relationship between the fee use and the industrial development on which the fee is imposed is based upon needs assessments surveys carried out by the San Diego Association of Governments for the City of Carlsbad and Analysis/Research Limited working for the development community as reviewed by the Parks and Recreation Commission Sub-committee on Park Fees for Local Facilities Management Plan Zone 5.9 The same needs assessment surveys combined with the Park and Recreation Element of the General Plan recognition via policy statement specifically encouraging industrial development to provide recreational facilities for their day use population provides the reasonable relationship between the need for the public facility, and the industrial corridor upon which it is imposed. The determination of the reasonable relationship between the amount of the fee and the cost of the public facility or portion of the public facility attributable to the development on which the fee is imposed is a See Agenda Bill 9122-1 with attachments and memo from planning director to city manager dated 7-30-87, located in Appendix A-4, Parks. 74 October 1995 Zone 13 LFMP Oceanside Vista 4 ~ LEGEND Encinitas ~ r1 , Northwest Quadrant - District 1 FI Northeast Quadrant - District 2 [jl Southwest Quadrant - District 3 13RTH NOTE MLLOUTHW*PPROXIMTE Nosas 141 Southeast Quadrant - District 4 Hofman Planning Associates Zone 13 -Park Districts EXHIBIT 28 75 product of the equitable relationship between the estimated cost of the facility and the fees collected at building permit issuance from zones 5, 13, and 16. At build out of Zone 13, there will be approximately 3,398,430 square feet of non-residential development. If a ratio of one employee per 544 square feet is used, the buildout square footage corresponds to a potential workday population of 6,248 employees. In order to serve the needs of future employees, recreational facilities should be provided for Zone 13. Similar to Zones 5 and 16, a fee per square foot of non-residential development could be collected at time of building permit issuance. These fees would be earmarked for the acquisition and construction of recreational amenities within the industrial corridor of Carlsbad. If a fee of 40 cents per square foot, comparable to Zones 5 and 16, is adopted in Zone 13, the projected development in Zone 13 would generate approximately $1.36 million through build out. 111. MITIGATION A growth management park fee of 40 cents per square foot of non-residential development will be collected at the time of building permit issuance. This fee will be used to construct recreational facilities to offset the demand created by employees within Zone 13. IV. FINANCING Non-residential development will be required to pay a Public Facility Fee at building permit issuance and a portion of the fee shall contribute to the construction and improvement of City parks. In addition, a park fee of 40 cents per square foot shall be collected at building permit issuance to provide for recreational amenities within the industrial corridor of Carlsbad. 76 October 1995 Zone I3 LFMP DRAINAGE FACILITIES I. PERFORMANCE STANDARD Drainage facilities must be provided as required by the City concurrent with development. 11. FACILITY PLANNING AND ADEQUACY ANALYSIS Management Zone 13 is located within two watersheds, the Agua Hedionda Creek Watershed (Watershed B) and the Canyon De Las Encinas Watershed (Watershed C). The natural drainage boundary between these watersheds is shown on Exhibit 29 on page 78. The information contained in this report was obtained from the adopted "Master Drainage and Storm Water Quality Management Plan" for the City of Carlsbad, California, dated March, 1994, prepared by the City of Carlsbad Engineering Department. This Master Plan sets forth the comprehensive drainage systems necessary to meet the long-term needs of the City. Additional information was obtained from the "As Built" records of existing improvements and the City of Carlsbad Engineering Department. As was indicated in the Citywide Facilities and Improvements Plan, drainage is distinguished from all other public facilities and improvements because by its very nature it is more accurately assessed as specific development plans are finalized. However, certain facilities may be necessary which are larger than those required from a single development project and, therefore, need to be identified so that the proper funding can be collected for the construction of these facilities. A. INVENTORY 1. Existing major drainage facilities within the boundaries of Zone 13 include 2 18!'storm drains, one 24" storm drain, one 60" storm drain and one 72" storm drain crossing under Palomar Airport Road along the Southern boundary of Zone 13. There are two 60" storm drains and an existing channel crossing under the San Diego Northern right-of-way. Exhibit 30 on page 79 shows these facilities. The proposed major drainage facilities for the ultimate build out of Management Zone 13 are shown according to the Master Drainage Plan. Exhibit 30 on page 79 shows the Master Plan's major drainage facilities proposed for the development of Management Zone 13. Zone 13 LFMP 77 October 1995 LEGEND . Basin Boundary . ~ 1- If* *'I Creek Flow Line ~ I I Direction of Flow Zone 13 - Drainage Basins EXHIBIT 29 78 9 % ---p Existing Channel - - 2-60" 3' Canyon de las \ \ Encinas Watershed \ 9, i \" -0 : 51" Existi{g Existing 18 24" LEGEND PI. Basin Boundary I_] Direction of Flow Existing Channel Creek Flow Line Existing Storm Drain IT] Storm Drain CC F] Storm Drain CB u:niH NOM Proposed Storm Drain 171 Storm Drain BAA NOTE MLLOCITIMISAFPROXJYE 44 Hofman Planning 44~ s s o c i a t e s Zone 13 - Major Drainage Facilities EXHIBIT 30 79 All proposed facilities shown in Exhibit 30 are listed below. All facilities are located in Canyon de las Encinas and Agua Hedionda Creek Watersheds. Item Facility I A 42-inch and 5 1-inch storm drain flowing into an existing 72" storm drain in Palomar Airport Road. (Storm Drain CC) A 42-inch and 48-inch storm drain flowing into an existing 60" storm drain in Palomar Airport Road. (Storm Drain CB) A 51-inch storm drain flowing into an existing 96-inch storm drain west of Interstate 5. The 51-inch storm drain will parallel and alleviate an existing undersized 66-inch storm drain. Also a double 60-inch storm drain to replace an existing undersized 30- inch storm drain under San Diego Northern Railway and associated channel grading, erosion control measures and revegetation measures. Construction of the double 60- inch culverts and associated grading has begun and is scheduled to be completed by early 1995. (Storm Drain BAA) 2 3. The location and size of the proposed storm drain facilities have been approximated for the purposes of this plan. The future storm drain facilities may vary from the facilities shown in this zone plan due to the unknown size and geometrics of the future development planned for the surrounding area. The actual location, size and types of these storm drain facilities will be determined as the area develops and the storm runoff is analyzed according to current design standards. The City has recently revised the Drainage Master Plan. The updated version analyzes the adequacy of the existing storm drain facilities and proposes the construction of specific major storm drain facilities so that future development will continue to conform with the adopted performance standard as development occurs. The Drainage Master Plan, dated March 1994, was approved by City Council September 13, 1994. B. PHASING The approach to phasing taken by this Local Facilities Management Plan is based on ensuring that needed facilities are in place prior to or commensurate with development. Watershed boundaries are shown on Exhibit 29 on page 78 and correlate with the natural drainage basins of the proposed facilities within the Zone. There are two separate watersheds, the Agua Hedionda Creek Watershed and the Canyon de las Encinas Watershed. Thresholds for the major drainage facilities within each watershed can be easily established, thereby determining the appropriate mitigation measures. The watershed boundaries allow for independent review and development for the drainage facilities within each boundary. However, the City may require improvements outside of the watershed boundaries if deemed necessary to serve development. Zone 13 w;MP 80 October 1995 C. ADEQUACY FINDINGS Presently, there are no existing major storm drain facilities within Zone 13 other than the existing facilities crossing under Palomar Airport along the Zone's Southern boundary. Also. there will be no need for such facilities until development occurs. Major drainage facilities will be a condition to the approval of future development in Zone 13 so that conformance with the adopted performance standard will be maintained. 111. MITIGATION .. ecial Condltlons A. All future development in Zone 13 will be required to construct any future Zone 13 storm drain facilities identified in the current Drainage Master Plan and revised Drainage Master Plan, or acceptable alternate facilities, as determined by the City Engineer. Any facilities necessary to accommodate future development must be guaranteed prior to the recordation of any final map, issuance of a grading permit or building permit, for any development requiring future storm drain facilities in Zone 13. B. Prior to the recordation of any final map, issuance of grading permit or building permit, whichever occurs first for any specific watershed within Zone 13, the developers of that project are required to: 1. Pay the required drainage area fees established in the current Drainage Master Plan C. Prior to the recordation of any final map, issuance of grading permit or building permit. whichever occurs first for any project within the Agua Hedionda Creek Watershed (Watershed B) of Zone 13, the developers of that project are required to financially guarantee the construction of the following storm drain facilities, or alternative facilities deemed acceptable by the City Engineer: 1. 5 1 " storm drain; the double 60-inch storm drain and channel grading; collectively referred to as line BAA D. . Prior to the recordation of any final map, issuance of grading permit or building permit, whichever occurs first for any project within the Canyon de las Encinas Watershed (Watershed C) of Zone 13, the developers of that project are required to financially guarantee the construction of the following storm drain facilities, or alternative facilities deemed acceptable by the City Engineer: 1. 42" - 48" storm drain line CB 2. 42" - 51" storm drain line CC October 1995 Zone 13 LFMP 81 111. FINANCING A. Agua Hedionda Creek Watershed: The cost of the proposed storm drains within the Agua Hedionda Creek Watershed is estimated to be $873,439. These storm drains are anticipated to be financed by the developers within the Agua Hedionda Creek Watershed, and through Planned Local Drainage Area (PLDA) fees, collected at the time of development. B. Canyon de las Encinas Watershed: The cost of the proposed storm drains within the Canyon de las Encinas Watershed is estimated to be $1,651,612 These storm drains are anticipated to be financed by the developers within the Agua Hedionda Creek Watershed. An itemized cost estimate of these facilities is contained in Exhibit 3 1 on page 83. This estimate should only be used as a guide to approximate costs for preliminary planning purposes. Further cost analysis should be made as planning and design progress in Zone 13. Zone 13 LFMP 82 October 1995 EXHIBIT 31 ZONE 13 - DRAINAGE FINANCING MATRIX AS OF 1/1/95 FACILITY ton de Ias Encinas Watershed: Storm Drain CB 42" RCP 48" RCP Cleanouts Catch Basins Headwalls Subtotal Area C8 15% Contingency 20% Engr. and Admin Storm Drain CB Total Storm Drain CC 42" RCP 51" Cleanouts Catch Basins Headwalls Subtotal Area CC 15% Contingency 20% Enqr. and Admin Storm Drain CC Total Total Canyon de las Encinas Cost Agua Hedionda Creek Watershed: Storm Drain BAA 51" RCP Repaving 5 1 " Cleanouts 60" RCP 50' RCP Jack and Bonng me1 Grading on Control Rip Rap I ,,degetation - Planting Headwalls Subtotal Area BAA 15% Contingency 20% Enar. and Admin Storm Dyain BAA Total Total Agua Hedionda Creek Cost Total Drainage Facilities Cost Notes: AMOUNT 1,100 LF 2,700 LF 13 EA 8 EA 1 EA 3,450 LF 700 LF 15 EA 10 EA 1 EA 1200 LF 1200 LF 2 EA 106 LF 106 LF 14.000 CY 8,250 SF 52,800 SF 2 EA ESTIMATED COST $1 29,800 $348.300 539.650 $56,320 $2,500 $576.570 $86.486 $132.61 1 $795.667 $407.100 $94.500 $45.750 $70.400 $2.500 $620.250 $93,038 $1 42,658 $855.945 $1,651,612 $1 62,000 $29.940 56,100 $20,034 $25,440 51 36,500 $49.913 $1 98,000 55.000 $632.927 $94.939 $145.573 $873.439 $2,525.051 $873,439 TIMING Concurrent w/Development FU FIRST Developer .1 . 31NG OPTIC SECOND S THIRD NOTES (1 I (1 Developer(s) within the respective watersheds shall construct the necessary drainage facilities concurrent with development The City shall be guaranteed of this construction by imposing the appropriate conditions on the pertinent tentative maps or site development plans, as the case may be. Zone 13 LFMP 83 This page intentionally Left Blank Zone 13 w;MP a4 October 1995 CIRCULATION FACILITIES I. 11. PERFORMANCE STANDARD No road segment or intersection in the zone nor any road segment or intersection out of the zone which is impacted by development in the zone shall be projected to exceed a Level of Service C during off-peak hours, nor Level of service D during peak hours. Impacted is when twenty percent or more of the traffic generated by the Local Facilities Management Zone will use the road segment or intersection. FACILITY PLANNING AND ADEQUACY ANALYSIS This analysis determines whether or not the circulation system within Zone 13 conforms to the adopted performance standard. It will also address all circulation element road segments and intersections outside of Zone 13 impacted by twenty percent or more of the traffic generated by Zone 13 to ensure conformance with the adopted performance standard. This section is based on the "Transportation Analysis For The Carlsbad Local Facilities Management Plan - Zone 13" report prepared by KAKU Associates, Inc., dated August 1994. In order to determine the transportation related impacts which are likely to result from land uses within Zone 13 and to develop the off-site transportation improvements phasing plan, KAKU obtained and evaluated existing traffic flow data for the area. Projections for future short-term and long-term traffic flow were provided by the San Diego Association of Governments (SANDAG) in their City of Carlsbad Year 2010 General Plan Traffic Forecast of February. 1994. A SANDAG forecast for the year 2000, including Zone 13 land uses as proposed was also used. A. INVENTORY 1. nt Roads Within Zone 13 a. Cannon Road Cannon Road presently extends approximately 1900 feet east of Interstate 5. Eventually Cannon Road will extend east, through Zones 13 and 8 to El Camino Real and extend through Zone 15 to the easterly city limits. b. Palomar Airport Road Palomar Airport Road is currently a partially improved primary arterial street. It extends from the easterly city limit, intersecting El Camino Real, to Interstate 5 south of Zone 13. Palomar Airport Road is currently improved to six lane primary arterial standards between Avenida Encinas and Yarrow Drive. Between Yarrow Drive and El Camino Real the road Zone 13 LJMP 85 October I995 exists as four lanes. West of Avenida Encinas the road exists as two lanes. C. Paseo Del Norte Paseo Del Norte is currently a four lane secondary arterial which parallels Interstate 5 to the east and extends from Cannon Road south to Poinsettia Lane. d. Leg0 DriveIArmada Drive Leg0 Drive/Armada Drive is a hture Circulation Element Road which will extend from Cannon Road to Palomar Airport Road through Zone 13. Drive Leg0 Drive will begin at Cannon Road and will change names to Armada Drive southward from the point it intersects with Leg0 Drive leading to the Leg0 project site, as shown on Exhibit 32 on page 87. The City has determined that with the addition of Lego/Armada Drive, Hidden Valley Road/Kelly Drive north of Palomar Airport Road will no longer be needed. Hidden Valley Road will instead serve as a service entrance to the Leg0 Family Park project site. e. College Boulevard College Boulevard is currently a four lane major arterial through Zone 5 between Palomar Airport Road and El Camino Real. Eventually it will extend northerly through Zones 7, 14 and 15 to an existing interchange with State Route 78. The existing circulation roadway network is shown on Exhibit 32 on page 87. 2. Tdentlficatlonacted R-rsectio nS As stated in the performance standard, impacted road segments and intersections are those that have 20% or more of the Zone 13 traffic using them. Exhibits 33 and 34 on pages 71 and 89 show the estimated percentage of traffic leaving Zone 13, impacted road segments and intersections for the year 2000 and build out under the proposed land use conditions. Zone 13 LFMP 86 October 1995 LEGEND h\y. Zone 13 Existing Roadways Proposed Roadways Hofman Planning A~A s s o c i a t e s Zone 13 - Existing Circulation EXHIBIT32 a7 0 0 9 LEGEND h\y. Zone 13 Existing Roadways Proposed Roadways Trip Distribution Percentage 1-1 a Hofman Planning Zone 13 - 2000 Circulation Trip Distribution -AS s o c i at e s EXHIBIT33 aa LEGEND LFJ. Zone 13 Existing Roadways Proposed Roadways Trip Distribution Percentage Hofman Planning Zone 13 - Buildout Circulation Trip Distribution U~ssociates EXHIBIT 34 89 The road segments and intersections that are impacted by Zone 13 are as follows: Road Segment Circulation Element Road Classification Cannon Road 1-5 N/B Ramp - Paseo Del Norte Major Arterial Paseo Del Norte - Lego Drive West of El Camino Real Major Arterial Major Arterial Lego/Armada Drive Cannon Road - Palomar AirDon Road Secondarv Arterial Palomar Airport Road 1-5 NIB Ramp - Paseo Del None Paseo Del None - Armada Drive Armada Drive - College Blvd.” Paseo Del Norte Cannon Road - Car Country Drive Car Country Drive - Palomar Airport Road Prime Arterial Prime Arterial Prime Arterial Secondary Arterial Secondary Arterial Intersections Cannon Road/l-5 Southbound Off Ramp Cannon Road/I-5 Southbound On Ramp Cannon Road/l-5 Northbound Off Ramp Cannon Road/I-5 Northbound On Ramp El Camino ReaKannon Road Cannon Road/Faraday Avenue College Boulevard/Palomar Airport Road Car Country Drive/Cannon Road Armada Drivel Price Club Driveway/Palomar Airport Road Palomar Airport Road/[-5 Southbound Off Ramp Palomar Airport Road/I-5 Southbound On Ramp Palomar -Airport Road/I-5 Northbound Off Ramp Palomar Airport Road/I-5 Northbound On Ramp Paseo del NorteXannon Road Paseo del None/Palomar Airport Road Leg0 DriveKannon Road Hidden Valley Road/Palomar Airport Road lo The KAKU traffic study analyzes the road segment from College Boulevard to Camino Vida Roble which is equivalent to an analysis of this road segment per Brian Mayeda, report preparer. The segments east of College Boulevard are not impacted by Zone 13 and therefore are not included in this chapter. Zone I3 LFMP 90 October 1995 B. PHASING The traffic analysis prepared by KAKU Associatzs is a detailed study dealing with the specific traffic generated from within the boundaries of Zone 13. This study analyzes the impacts of traffic on existing and proposed road segments and intersections impacted by Zone 13. The traffic analysis uses the proposed roadway system and intersection geometries for existing conditions and the years 2000 and build out as outlined in the City of Carlsbad's Arterial Phasing Plan. The report also proposes a mitigation plan to ensure conformance with the adopted performance standard through build out of Zone 13. The purpose of the analysis contained in the KAKU Associates report and this LFMP is to evaluate impacted road segments and intersections serving Zone 13 and propose mitigation if these facilities are determined to operate below the adopted performance standard. For the analysis, a yearly phasing schedule is assumed for development in ZOni: 13. Based on those assumptions, a year is estimated when the facility improvements wiii be needed (e.g. year 1998 or 2000). Although the KAKU Associates report identifies benchmark years for improvements based on the assumed phasing schedule, the mitigation conditions should not be specifically tied to a year since construction of improvements will be triggered by the rate at which development actually occurs in the hture as monitored yearly. The mitigation conditions can, however, be generally broken down into the following categories: Improvements needed now Interim Year Improvements Improvements needed by 2010/Build Out The schedule noted above shall not limit needed traffic improvements to the years mentioned. The time increments are used more as bench marks than actual completion dates. The actual timing for construction of these improvements will be dictated by the rate at which development in Zone 13 and the surrounding region occurs in the future. The rate of development and associated traffic impacts on the road network will be monitored on an annual basis to determine the exact timing for road improvements needed to serve Zone 13. If a future traffic analysis indicates that the timing of the necessary improvements needs to be accelerated, the required improvements must also be adjusted to guarantee that conformance with the adopted performance standard will be maintained. 1. ersec tiow Existing peak hour counts for study intersections and road segments were provided by the City'of Carlsbad. Since the data was from 1992, 1993, and 1994, an incremental regional growth rate was applied to data from the years 1992 and 1993 to arrive at existing traffic counts. The years 2000 and build out were evaluated Zone 13 LFMP 91 October 1995 using data developed from the SANDAGKity of Carlsbad computer traffic forecast model for these years. Peak hour analyses were utilized to determine the operating conditions of road segments. An assumption was made, based on existing peak hour and daily volumes, that peak hour volumes represent 10 percent of daily volumes. Once a peak hour volume is established, it is divided by the number of lanes to determine the peak hour volumes per lane. Each lane is assumed to have an hourly volume capacity of 1,800 vehicles per hour. The Level of Service is determined by taking the peak hour volume per lane and dividing it by the 1,800 vehicle per lane per hour figure to arrive at a volume to capacity ratio. The volume to capacity ratio is then measured against Level of Service Definitions as set forth in the Transportation Research Board's Highway Capacity manual. Potential Levels of Service range from A through F with the lowest volume to capacity ratios in the "A" (Excellent) range and the highest volume to capacity ratios in the "F" (Failure) range. C. ADEQUACY FINDINGS This section will analyze the existing and proposed intersections and road segments affected by the traffic generated from Zone 13. In accordance with the adopted performance standard, the existing and proposed traffic facilities within and surrounding Zone 13 will be identified by an evaluated level of service. The performance standard determines that during peak hours a level of service A-D as acceptable and a level of service of E or worse to be unacceptable. If a facility is determined to fail to meet the standard. a mitigation program must be prepared so that the facility will operate at an acceptable level of service. The proposed mitigation program will be discussed more thoroughly later in this report. Traffic conditions for existing, 2000 and build out are shown below. The level of service for impacted roadways and intersections are indicated and, if needed, recommended circulation improvement needs are identified. Exlstlnp Traffic Vobes and C;aDacitv .. 1. The existing roadway volumes and capacity of impacted road segments are as follows : Zone 13 LFMP 92 October 1995 Existing - Impacted Road Segments AM Peak Hour PM Peak Hour Capacity Roadway Dir. (VPHPL)ll Vol v/c LOS Vol v/c LOS Cannon Road 1-5 - Paseo Del WB 3,600 912 .25 A 379 .ll A None EB 3,600 309 .09 A 624 .17 A Paseo del None - WB 3,600 NA'* NA NA NA NA NA Leg0 Drive EB 3,600 NA NA NA NA NA NA West of El WB 3,600 NA NA NA NA NA NA Camino Real EB 3.600 NA NA NA NA NA NA Lego/Armada Drive Cannon Road - NB 3,600 NA NA NA NA NA NA PalomarAirpon SB 3,600 NA NA NA NA NA NA Road Palomar Aimn Road ~~~~ ~~ ~ 1-5 - Paseo del WB 5,400 1,058 .20 A 1,058 .20 A None EB 5,400 848 .16 A 1,846 .34 A Paseo del Norte - WB 5,400 1,668 .31 A 974 .18 A Armada Drive EB 5,400 732 .14 A 1,700 .31 A ArmadaDrive- WB 5,400 599 .ll A 1,640 .30 A College Blvd. l3 EB 5,400 1.220 .23 A 860 .16 A Paseo del Norte Cahnon Road - NB 3,600 85 0.02 A 530 0.15 A CarcountryDr. SB 3,600 580 0.16 A 185 0.05 A CarC0~nVyDr.- NB 3,600 200 0.06 A 330 0.09 A PalomarAirport SB 3,600 420 0.12 A 395 0.11 A Road e (VPHPL) = vehicles per hour per lane. Capacity based on 1,800 vehicles per lane per hour II NA = Not constructd. 12 l3 The KAKU traffic study analyzes the road segment from College Boulevard to Camino Vi& Roble which is equivalent in traffic volume and capacity to the analysis from Armada Drive to College Boulevard. pet rcport prcparer Brian Mayeda. The segments east of College Boulevard are not impactedby Zone 13. October 1995 Zone 13 LFMP 93 As indicated, all road segments impacted by Zone 13 currently meet the performance standard of level of service I'D" for street segments during the peak hour. The existing intersection level of service for impacted intersections are as follows: Existing - Impacted Signalized Intersections Location AM LOS PM LoS Palomar Airport Road/I-5 Southbound Ramps Palomar Airport Road/I-5 Northbound Ramps Paseo del None/Palomar Airport Road Car Country Drive/Cannon Road Armada DrivelPrice Club Driveway/Palomar Airport Road Hidden Valley Road/Palomar Airport Road College Boulevard/Palomar Airport Road El Camino Real/Cannon Road Cannon/Faraday Leg0 Drive/Cannon Road A A A NA" A NA" A NA NA NA A B A NA A NA A NA NA NA ~~ '' Ninety degree two legged intersection; LOS not applicable. NA = Not constructed. IS Zone I3 w;MP 94 October 1995 Existing - Impacted StopControlled Intersections Location Movement AM LoS PM LoS Cannon Road/I-5 Southbound Ramps SB LT SB RT WB LT Cannon Road/I-5 Northbound Ramps NB LT NB RT EB LT Paseo del None/Cannon Road NB LT NB RT WB LT E A A E A A A A A D A A E A B D A A The 1-5 Ramps at Cannon Road are not within the City of Carlsbad's jurisdiction, however, Carlsbad's adopted Capital Improvement Program has scheduled TIF and PFF funds for the City's share of the improvements to the ramps. The timing for these improvements is controlled by CalTrans, the responsible jurisdiction for completing the work. This dedication of funds guaranteed the specific improvement needed to bring this intersection into conformance with the City's adopted performance standard. With these improvements, all intersections will operate at an acceptable Level-of-Service. 2. Circulation Immo vements Needed For Year 2000 For the year 2000 analysis, the KAKU report analyzed the need for construction of Cannon Road from the eastern zone boundary to El Camino Real. The analysis indicates that if improvements are made at the intersection of Palomar Airport Road and College Boulevard, the extension of Cannon Road to El Camino Real will not be necessary until prior to build out. The following tables indicate the projected level of service for the impacted road segments and intersections if Cannon Road is not extended in the year 2000: Zone 13 w;MP 95 October 1995 Year 2000 - Impacted Road Segments wlo Cannon Road extension to El Camino Real AM Peak Hour PM Peak Hour Capacity Roadway Dir cVpHpL)l6 VOl v/c Los VOl v/c Los Cannon Road 1-5 - Paseo Del WB 3,600 461 .13 A 1,683 .47 A None EB 3,600 1.192 .33 A 816 .23 A Paseo del None - WB 3,600 219 .06 A 1,017 .28 A Leg0 Drive EB 3,600 4% .14 A 429 .12 A West of El Camino WB NA" NA NA NA NA NA NA Real EB NA NA NA NA NA NA NA Leg0 Drive Cannon Road - NB 3,600 30 0.01 A 685 0.19 A Armada Drive SB 3.600 295 0.08 A 180 0.05 A Armada Drive Leg0 Drive - NB 3,600 870 0.24 A 490 0.14 A Palomar Airport Rd SB 3,600 215 0.06 A 735 0.20 A Palomar Airport Road 1-5 - Paseo del WB 5,400 1,436 .27 A 3,069 '.57 A None EB 5,400 1,763 .33 A 1,798 .33 A Paseo del None - WB 5,400 1,587 .29 A 3.071 .57 A Armada Drive EB 5,400. 2,377 .44 A 1.854 .34 A Armada Drive - WB 5,400 1,053 .20 A 1,%5 .36 A College Blvd. I* EB 5.400 1.313 .24 A 1.236 .23 A Paseo del None Cannon Road - NB 3,600 165 0.05 A 600 0.17 A car country Dr. SB 3,600 635 0.18 A 365 0.10 A Car Country Dr.- NB 3.600 495 0.14 A 680 0.19 A A 810 0.23 A a (VPHPL) = vehicles per hour per lane. Capacity based on 1,800 vehicles per lane per hour. 16 NA = Not constructed. 17 The KAKU traffic study analyzes the road segment from College Boulevard to Camino Vi& Roble which is equivalent in capacity and volume to an analysis of the segment from Armada Drive to College Boulevard. per report preparer Brian Mayeda. The segments east of College Boulevard are not impacted by Zone 13. 18 Zone 13 LFMP 96 October 1995 It is anticipated that Cannon Road between 1-5 and Car Country Drive will require an additional lane in the westbound direction for a total of three westbound lanes. The above analysis also assumes that Cannon Road is constructed to two lanes in each direction from Car Country Drive to the eastern zone boundary concurrent with development in Zone 13. Armada' Drivekgo Drive from Cannon Road to Palomar Airport Road is also assumed to be constructed concurrent with development in the zone. As indicated, with these improvements, the road segments impacted by Zone 13 meet all performance standards. The intersection level of service for impacted intersections in the year 2000, without the extension of Cannon Road, are shown on the following table: Year 2000 - Impacted Intersections w/o Cannon Road extension Location AMLoS PMLoS Cannon Road/I-5 Southbound Ramps A A Cannon Road/I-5 Northbound Ramps A D Palomar Airport Road/I-5 Southbound Ramps A A Palomar Airport Road/I-5 Northbound Ramps A F Paseo del NortelCannon Road A. C Paseo del Norte/Palomar Airport Road C D Car Country Drive/Cannon Road A A Lego Drive/Cannon Road A A Armada Drive/Price Club Driveway/Palomar Airport Road A C Hidden Valley Road/Palomar Airport Road College Boulevard/Palomar Airport Road El Camino Real/Cannon Road B C C F NAI9 NA Cannon Road /Faraday Avenue NA NA For the above analysis, it is assumed that the intersection of Paseo del Norte/Cannon Road is signalized and that an exclusive left-turn lane and a shared throughkight-turn lane are provided in the southbound direction. In the northbound direction, a left-turn lane and restriping for an exclusive right-turn lane for a shared throughhight-turn lane are required. In the westbound direction, a The KAKU traffic study analyzes the road segment from College Boulevard to Camino Vida Roble which is equivalent in volume and capacity to an analysis of the segment from ArmaddLego Drive to College Boulevard, per report preparer Brian Mayeda. 21 October 1995 Zone I3 LFMP !I7 shared throughhight-turn lane is required and in the eastbound direction a left turn lane is required. At Car Country Drive/Cannon Road, it is assumed that the intersection is signalized and that an exclusive left-turn lane and two through lanes in the westbound direction are provided. In the northbound direction, an exclusive right- turn lane is assumed. The analysis also assumes that the following improvements are made: Paseo del Norte/Palomar Airport Road - Provide a westbound exclusive' right-turn lane. o Drive/Cannon Road - Install a traffic signal. Provide two left-turn lanes and an exclusive right-turn lane in the northbound direction; two through' lanes and an exclusive right-turn lane in the eastbound direction; and two left-turn lanes and two through lanes in the westbound direction. da Dri ve/Palomar Aim - Installation of traffic signal modifications. Restripe the northbound approach for two left-turn lanes and a shared throughhight-turn lane. In the southbound direction, provide two left-turn lanes, one shared throughhight-turn lane, and an exclusive right-turn lane. Also, add an eastbound left-turn lane and a westbound exclusive right-turn lane. Hidden Valley Road /Palomar Airport Road - Construction of intersection to include two through lanes, one shared righthhrough lane and one left turn lane in the eastbound and westbound directions. Provide one shared southbound left/right/through lane. Provide a shared right-turdthrough lane and one left-turn lane in the northbound direction. As indicated in the above analysis, if Cannon Road is not extended to El Camino Real, two additional intersections are anticipated to operate at unacceptable levels of service in the year 2000. In order to operate at acceptable levels, the westbound leg of the Palomar Airport Road/I-5 Northbound Ramps should be restriped for the following: two through lanes, one shared throughhight-turn lane, and one exclusive right turn lane. In addition, the southbound leg of the College BoulevardlPalomar Airport Road intersection should be restriped to provide the following: one left-turn lane, one shared throughlright-turn lane, and one exclusive right-turn lane. Also, in the northbound direction, two left-turn lanes, one through lane, and one shared throughhight-turn lane should be provided. ' If Cannon Road is extended from Leg0 Drive to El Camino Real by the year 2000, then the improvements to Palomar Airport Road/I-5 and College Zone 13 LFMP 98 October 1995 Boulevard/Palomar Airport Road are not required. However, based on the KAKU Associates report, other improvements would instead be required in addition to those assumed, as follows: - Restripe the westbound leg of the Cannon Road/I-5 Northbound Ramps, widen the northbound ramps and provide the following: one through lane, one shared through/right-turn lane, and one exclusive right-turn lane. - Restripe the Palomar Airport Road/I-5 Northbound Ramps in the At College Boulevard/Palomar Airport Road, provide two left-turn lanes, westbound direction to provide the following: two through lanes, one shared throughlright-turn lane, and one exclusive right turn lane. one through lane, and one shared throughhight-turn lane in the northbound direction. Restripe the southbound approach for a left-turn lane, a shared througwright-turn lane, and an exclusive right-turn lane. - - At El Camino ReaUCannon Road, construct this intersection to provide three through lanes, one exclusive right-turn, and two exclusive left-turn lanes in the southbound direction, provide two through lanes, one shared througwright-turn lane, and two exclusive left-turn lanes in the northbound direction. In the eastbound direction, provide one through lane, one shared through/right-turn lane and two exclusive left-turn lanes. In the westbound direction, provide one through lane, one shared throughhight-turn lane, and two exclusive left-turn lanes. Install a traffic signal. With the above mitigation measures, all intersections impacted by Zone 13 in 2000 are projected to meet the performance standard. Out Condm .. 3. Future long-term traffic volumes at build out of the City were provided by SANDAG in their "City of Carlsbad Year 2010 General Plan Traffic Forecast", (February, 1994). The KAKU Associates report assumes that Cannon Road will be constructed to El Camino Real prior to Build Out. With construction of Cannon Road, the Build Out projected roadway volumes and capacity of impacted road segments are as follows: Zone 13 LFMP 99 October 1995 Buildout - Impacted Road Segments AM Peak Hour PM Peak Hour Capacity Roadway Dir. (VPHPL)zo Vol v/c LOS Vol VIC LOS Cannon Road 1-5 - Paseo Del WB 3,600 1,169 .32 A 2,662 .74 C None EB 3.600 2,367 .66 B 2,100 .58 A Paseo del None - WB 3,600 1,068 .30 A 1.809 SO A Leg0 Drive EB 3.600 1,587 .44 A 1,640 .46 A West of El WB 3.600 2,286 .64 B 1,378 .38 A Camino Real EB 3,600 1,712 .48 A 936 .26 A Leg0 Drive Cannon Road - NB 3,600 105 0.03 A 1,525 0.42 A Armada Drive SB 3.600 1,280 0.36 A 655 0.18 A Armada Drive Leg0 Drive - NB 3,600 945 0.26 A 305 0.08 A PalornarAirpon SB 3.600 390 0.11 A 960 0.27 A Rd Palornar Airport Road 1-5 - Paseo del WB 5,400 1,752 .32 A 3.544 .66 B None EB 5.400 2,548 .47 A 1,800 .33 A Paseo del None - WB 5.400 1,611 .30 A 3,309 .61 B Armada Drive EB 5,400 3,173 .59 A 1.800 .33 A Armada Drive - WB 5,400 NIU NI NI N1 NI NI College Ave" EB 5,400 NI NI NI NI NI NI Paseo Del None Cannon Road - NB 3,600 275 0.08 A 670 0.19 A car counuy SB 3,600 875 0.24 A 425 0.12 A Drive car counuy NB 3,600 330 0.09 A 550 0.15 A Drive-Palomar SB 3.600 615 0.17 A 840 0.23 A Airport Road (VPHPL) = vehicles per hour per lane. Capacity based on 1,800 vehicles per lane per hour. 20 The KAKU traffic study analyzes the road segment from College Boulevard to Camino Vida Roble which is equivalent in volume and capacity to an analysis of the segment from Armada/Lego Drive to College Boulevard; per report preparer Brian Mayeda. NI = Not Impacted. 21 Zone 13 LFMP 100 October 1995 As shown above, with the construction of Cannon Road to El Camino Real. the projected road segments impacted by Zonc 13 at build out meet all performance standards. The intersection level of service for impacted intersections at build out are the following : Buildout - Impacted Intersections Location AMLOS PMLoS Cannon Road/I-5 Southbound Ramps Cannon Road/I-5 Northbound Ramps Palomar Airport Road/I-5 Southbound Ramps C A F A Palomar Airport Road/[-5 Northbound Ramps B F Paseo del Norte/Cannon Road E F Paseo del Norte/Palomar Airport Road E E Car Country DriveKannon Road A B Leg0 Drive/Cannon Road B D Armada DrivelPrice Club Driveway/Palomar Airport Road A D Hidden Valley Road/Palomar Airport Road B C College Boulevard/Palomar Airport Road NIZ’ NI El Camino ReallCannon Road F D Cannon Road /Faraday Avenue A B For the above analysis, it is assumed that the ramp is widened with an exclusive right-turn lane provided in the northbound direction at the Cannon Road/I-5 Northbound Ramps. It is also assumed that an eastbound exclusive right-turn lane is provided at the Paseo del Norte/Palomar Airport Road intersection. The intersection of Cannon Road/El Camino Real is assumed to be signalized and improved to the level described under the Year 2000 scenario conditions with Cannon Road extended. As shown above, in addition to the assumed improvements five intersections are anticipated to require mitigation to operate at acceptable levels at build out. These improvements are as follows: 23 NI = Not Impacted 101 October 1995 Zone 13 LFMP n Road/I-5 Northbound Ramps - Restripe the westbound Cannon Road approach to provide one through lane, one shared througwright-turn lane. and one exclusive right-turn lane. In addition, provide an additional eastbound Cannon road left-turn lane. Palomar Airport/I-5 Northbo und Ramps - Restripe the westbound approach for two through lanes, one shared through/right-turn lane and one exclusive right turn. Paseo del NorteK- - Construction of an additional eastbound left-turn lane for a total of two exclusive left-turn lanes, one through lane, and one throughhight-turn lane. In addition, at a point east of the intersection, an additional westbound Cannon Road through lane would be required. At the intersection, this would result in the following lane configuration in the westbound direction: one exclusive left-turn lane, two through lanes, and a shared throughhight-turn lane. Paseo del Norte/Palomar Airport Road - Restripe the northbound and southbound Paseo del Norte approaches to provide two exclusive left-turn lanes, one shared throughhight-turn lane, and one exclusive right-turn lane. 1 - Restripe the southbound El Camino Real approach to provide for one left-turn lane, two through lanes, one shared throughkight turn lane, and on exclusive right-turn lane. In addition, provide an exclusive right-turn lane on the eastbound Cannon road approach. (Note: these improvements are in addition to those assumed to be completed for the Year 2000 with Cannon Road Extended conditions. ) With these improvements, all intersections impacted by Zone 13 at build out are projected to meet the performance standard. 111. MITIGATION Special Conditiom: .. The proposed mitigation is divided into the categories established under the phasing portion of this section. It should be understood that all cost estimates presented in this plan are preliminary in nature and will need further refinement as the actual scope of work, utility needs and right-of-way dedications are determined. A. A portion of Zone 13 is included in the proposed Cannon Road (west) Fee Program. That portion required to participate in the proposed fee program is identified in the fee study dated August 1994 contained in Appendix A-5. Prior to issuance of a building permit for any project required to participate in fee program, the applicant shall pay the fee as determined for that project in the Cannon Road West Fee Program. Zone 13 LFMP 102 October 1995 B. The following improvements are anticipated to be required during the build out of Zone 13, Prior to development within each of the identified General Plan land use sub-areas. if determined to be needed by the City Engineer, the construction of the following circulation improvements shall be financially guaranteed, as set forth in the finance chapter of this plan: 1. IMPROVEMENTS NEEDED NOW a. Cannon Road/I -5 Northbound and Southbo und Ramps Install traffic signals. Also, at the Southbound Ramps widen the ramps and add a southbound left-turn lane. Restripe the westbound through lane for an additional left-turn lane. Estimated Cost - $232,000 The 1-5 Ramps at Cannon Road are not within the City of Carlsbad's jurisdiction, however, Carlsbad's adopted Capital Improvement Program has scheduled TIF and PFF funds for the City's share of the improvements to the ramps. The timing for these improvements is controlled by CalTrans, the responsible jurisdiction for completing the work. This dedication of funds guaranteed the specific improvement needed to bring this intersection into conformance with the City's adopted Performance standard. For these reasons, no further action is required prior to development within Zone 13. 2. INTERIM YEAR IMPROVEMENTS a. n Road from 1-5 to Car Country Drive Add an additional westbound through lane for a total of three westbound lanes. - $150,000 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2, TR-3, O/PI-1, 0-PI-2 of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. Zone 13 LFMP 103 October 1995 b. Cannon Road from Car Countrv Dri ve to the eastern Zone Boundary Construction of Cannon Road to two lanes in each direction. Estimated Cost - $8,467,000 Timing: Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2, TR-3, O/PI-1, or O/PI-2 of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. C. da Dr ive/Ixgo Dri ve from won Road to Palomar Aimort Road Construction of Armada Drivekgo Drive to two lanes in each direction. Estimated Cost - $2,573,000 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-2. TR-3, O/PI-1, O/PI-2, TWC or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. d. @ - Install Traffic Signal. Also, provide an exclusive left-turn lane and a shared throughkight-turn lane in the southbound direction. In the northbound direction, add a left-turn lane and restripe the exclusive right-turn lane for a shared throughhight-turn lane. Also, add an eastbound left-turn lane and westbound shared throughlright- turn lane. - $169,000 Zone 13 LFMP 104 October 1995 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2. O/PI-1, O/PI-2 or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. e. Car Country Drive/Cuon Road - Install Traffic Signal. Provide an exclusive left-turn lane and two through lanes in the westbound direction. In the northbound direction, add an exclusive right-turn lane. d CO&- $1 10,OOO Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2, O/PI-1, O/PI-2 or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. - Provide a .westbound exclusive Paseo del NortelPalomar A' mort Road right-turn lane. f. ed Cog - $185,000 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-3, O/PI-2, TWC or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. g. o Dri ve/Cmn Road - Install traffic signal. Provide two left-turn lanes and an exclusive right-turn lane in the northbound direction; two through lanes and an exclusive right-turn lane in the eastbound direction; and two left-turn lanes and two through lanes in the westbound direction. d Cost - $5,000 Zone I3 LFMP 105 October 1995 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2, TR-3, O/PI-1 or O/PI-2 of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard. the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. h. Armada Dr ive/Palomr Aimort RoA - Install traffic signal modifications as necessary. Restripe the northbound approach for two left-turn lanes and a shared throughhight-turn lane. In the southbound direction, provide two left-turn lanes, one shared throughhight-turn lane, and an exclusive right- turn lane. Also, add an eastbound left-turn lane and a westbound exclusive right-turn lane. ted Cost - $205,000 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea O/PI-2, TR-3 or TR/C of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. 1. Hidden Valley Road/Palomarort Rod - Construction of intersection to include two through lanes, one shared right/through lane and one left turn lane in the eastbound and westbound directions. Provide one shared southbound left/right/through lane. Provide a shared right-turdthrough lane and one left-turn lane in the northbound direction. - $155,000 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea O/PI-2, TR-3 or TFUC of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. 106 October 1995 Zone 13 w;MP j. One of the following two groups of improvements dependent upon whether Cannon Road is constructed between Zone 13 and El Camino Real: .. Conditions if Cannon Road is not Ex tended: 1. Palomar Airport Road /I-5 Northbound Ram - Restripe the westbound Palomar Airport Road approach for the following: two through lanes, one shared throughhight-turn lane, and one exclusive right-turn lane. Estimated Cos1 - $1,725 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea O/PI-2, TR-3, TR/C or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. Colleee Boule vard/-r mort Road - Provide two left-turn lanes, one through lane, and one shared. throughhight-turn lane in the northbound direction. Restripe the southbound College Boulevard approach for the following: one left-turn lane, one shared throughiright-turn lane, and one exclusive right-turn lane. .. 11. - $1,150 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2, TR-3,O/PI-l , O/PI-2, TR/C or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. Cond&ms if Cmon Road is Extended: .. 1. -on RdII-5 Northbo- - Widen the northbound on ramps and restripe the westbound Cannon Road approach to provide 107 October 1995 Zone 13 LFMP one through lane, one shared throughhight-turn lane, and one exclusive right-turn lane. Estimated Cost - $1,150 Timing: Prior to recordation of a final map, issuance of a grading or building permit. whichever occurs first for any project within subarea TR-1, TR-2, O/PI-l, O/PI-2 or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction' as set forth in the Finance section of this plan. .. 11. Palomar Airport Road /I-5 Noabound Ram - Restripe the westbound Palomar Airport Road approach to provide two through lanes, one shared throughlright-turn lane, and one exclusive right turn lane. ted Cost - $1,725 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-3, O/PI-2, TWC or R of Zone 13. if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. Collw Boulevard /Palow Airport Road - Provide two left-turn lanes, one through lane, and one shared throughkight lane in the northbound direction. Restripe the southbound approach for a left- turn lane, a through lane and a shared throughhight-turn lane ... 111. mt - $1,150 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-3, O/PI-2, TWC or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Zone I3 w;MP 108 October 1995 Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. iv. Cannon Road from eastern Zwe boundarv to El Cam' in0 Red Construction of Cannon Road to two lanes in each direction. ted Cos? -$3,247,000 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2, TR-3, O/PI-1 or O/PI-2 of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. "&no Real/C- - Provide three through lanes, one ive right-turn, and two exclusive left-turn lanes in the s,~ und direction. Provide two through lanes, one shared thro: ieht-turn lane, and two exclusive left-turn lanes in the nom* 1 direction. In the eastbound direction, provide one through lane, one shared througwright-turn lane and two exclusive left-turn lanes. In the westbound direction, provide one through lane, one shared througwright-turn lane, and two exclusive left-turn lanes. Install a traffic signal. ted Cost - $340,000 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2, TR-3, O/PI-1 or O/PI-2 of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. Zone 13 LFMP 109 October 1995 3. IMPROVEMENTS NEEDED BY BUILD OUT a. Cannon Road/I-5 Northbound R amD s - Restripe the westbound Cannon Road approach to provide one through lane, one shared throughhight-turn lane, and one exclusive right-turn lane. In addition, widen the on ramp and provide an additional eastbound Cannon Road left-turn lane. Also. widen the off ramp and add a northbound exclusive right-turn lane. ed Cost - $4,600 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2, O/PI-1 , O/PI-2 or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. b. Airport/1-5 No- - Restripe the westbound approach for two through lanes, one shared throughhight-turn lane and one exclusive right turn. ted Cost - $1,725 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-3, O/PI-2, TR/C or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. c. Paseo delon Road - Construction of an additional eastbound left-turn lane for a total of two exclusive left-turn lanes, one through lane, and one througwright-turn lane. In addition, at a point east of the intersection, an additional westbound Cannon Road through lane would be required. At the intersection, this would result in the following lane configuration in the westbound direction: one exclusive left-turn lane, two through lanes, and a shared throughlright-turn lane. d Cost - $27,000 Zone 13 UMP 110 October 1995 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2. O/PI-1, O/PI-2 or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. d. Paseo del NortelPahar Aimort Road - Restripe the northbound and southbound Paseo del Norte approaches to provide two exclusive left-turn lanes, one shared throughhight-turn lane, and one exclusive right-turn lane. Provide an eastbound exclusive right-turn lane. - $2,300 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-3, O/PI-2, TWC or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. e. E1 Camino Real/Cwn Road - Restripe the southbound El Camino Real approach to provide for two left-turn lanes, two through lanes, one shared throughjright turn lane, and on exclusive right-turn lane. In addition, provide an exclusive right-turn lane on the eastbound Cannon Road approach. [Note: Improvements listed in condition 2.i.v (Cannon Road extended), may be built prior to the above improvements. If they are not built, they must be constructed with the above improvements.) ed Cost - $6,325 Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2, O/PI-1, O/PI-2 or R of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. f. n Zone boundu to El Camlno Real Zone 13 LFMP 111 October 1995 Construction of Cannon Road to full major arterial standards from the eastern Zone boundary to El Camino Real. Estimated Cost - $3,247,000 Timing: Prior to recordation of a final map, issuance of a grading or building permit, whichever occurs first for any project within subarea TR-1, TR-2. O/PI-1 or O/PI-2 of Zone 13, if the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that subarea shall financially guarantee its construction as set forth in the Finance section of this plan. IV. FINANCING Exhibit 35 on page 113 shows a facility financing matrix for this facility. This matrix summarizes the individual project to be financed, its estimated cost and timing of construction, the existing budgeted CIP monies available for the facility and the future funding options. Zone 13 LFMP 112 October I995 . .- . E<'> __ ZONE 13 . CIRCULATION FINANCING MATRIX AS OF 1/1/95 Cannon Rd eastern zone bound to El Camino Real 'Tot@ Circulation costs wio Cannon ~0.d ITotaI Circulation Costs with Camon Road AClLlTY . Improvements Needad Now 5 NE & SB ramps wgnals and improvements 1-5 southbound ofl.ramp . Interim Year fmprovemmncs annon Road 1-5 IO Car Countrv Drive Car Countrv Or . east zone bound rrnadarLego Orwe Cannon Rd Palomar Airoort Rd aseo del NoftelCannon Rd sognals and improvements ar Countrv Dr.1Cannon Rd. slgnals and improvements aseo Del NorteiPalomar Airport Rd turn lane ego DriveiCannon Rd signals and improvements rmada DrivelPalornar Airport Rd. signals and improvements ldden ValleyiPalomar Airport Ad intersection construction WIO Cannon Road Extmnaion Palomar Alrport Rdll-5 Northbound Ramp - Restriping College BlvdlPalomar A#rport Rd Restriping With Cannon Road Eatemion Cannon Rdll.5 Northbound Ramp . Restrlpmg Palomar Atrport Adil-5 Northbound Ramp Restriping College ElvdiPalornaf Atrport Rd Restriping Cannon Road Eastern zone bound. El Camino Real El Camino RealiCannon Rd Sfgnal and tmprovements Improvements Needad a1 Build OuI annon Rdol.5 Northbound Ramp Restrtpmg Ilomar Anrporl Rdll-5 Northbound Ramp Restriping iseo Del NortetCannon Rd Lane construction. east and wesI iseo Del NortegPalomar Airport Rd ReStrWng El Camino Reahcannon Rd , - Restripmg 915,~z.m 919.130.975 AMOUNT 2 LS 1 lane 4 lanes 4 lanes 1 LS 1 LS 1 lane 1 LS 1 LS 1 inter. nia nla nia n1a nia 4 Lanes 1 LS nia nla 2 Lanes nla nla 4 Lanes ESTIMATED COST 1232.000 5 150.000 $8.467.000 12.573.000 11 69.000 $1 10.000 $185.000 $5.000 $205.000 5155.000 $1.725 11,150 $1.150 $1.725 $1,150 5 3.247.0DO $340.000 $4.600 $1.725 $27.000 S2.300 $6.325 $3.247.000 llMlNG 11) FUNDING OPTlOP FIRST C~tv . PFFiTlF C>tv - PFF'TIF TIFiCFD a3 ZFD Xl ITransnetiCFD r3iFee Prop CFD X3 PFFiDevelooer Developer CFD N3 CFD 13 CFD 13 CFD 13 Developer Developer TlFlOeveloper Developer Developer TransnetiCFDNll Fee Pgm /Developer TlFiPFFiDeveloper TlFtPFFlDeveloper Developer Developer Developer Developer TransnetiCFDRl I ~~~ .~ Fee Pgm IDeveloDer SECOND )eveloper )eveloper Notes 1 The timeframer for these omprovemenis are generallv grouped as needed now. under mterim conditions. and at build out Actual timing wdf vary dependent upon the rate of development within Zone 13 and the surrounding region See text of Caculation chapter for a detailed explanation of phasing assumptions and benchmark years 2 The hrst development directly impacting the respective IaciIiIies as determined by the City Engineer. shall construct the needed improvements The C~ty shall be guaranteed 01 this construction by impo%ng apDroDriate conditions on the applicable tentative map The dcveloper(sl may be eligible IO recaive lee credit or rembursemsnt for costs directly related to the construction of mprovements to the extent that lunds are avadable from future Public Facility Fee IPFFI and Traffic Impact Fee ITIF) revenues The schedule for reimbursement shall be based on the City's Capital Improvement Rogrrm - OTES - 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 - - 113 This page intentionally Left Blank Zone I3 LFMP 114 October 1995 FIRE FACILITIES I. PERFORMANCE STANDARD No more than 1500 dwelling units outside of a five minute response time. A. Zone 13 is comprised exclusively of nonresidential uses. Since it does not include any residential uses, the performance standard does not apply. The Growth Management Program does not identify a fire-service performance standard for nonresidential uses. The Citywide facilities and improvement plans identified the need for six fire stations to service the City through buildout. All six stations are in operation. Two stations will be relocated in the future to optimize response times. At this time, it is not anticipated that additional stations will be needed. 11. FACILITY PLANNING AND ADEQUACY ANALYSIS A. INVENTORY At the present time Fire Station No. 4 serves Zone 13. Fire Station No. 4 is located at 6885 Batiquitos Road, and is shown on Exhibit 36 on page 116. This exhibit also shows the five minute fire response time within this area. A 30 mph average driving rate is used to determine the five minute response time. The five minute response time begins when the fire truck leaves the fire station. This is equivalent to a 2.5 mile driving distance from the fire station. B. PHASING Based on the phasing program that has been developed for Zone 13, future projects will create an average of 226,562 square feet of additional development per year. This will result in an increased work-force population of 416 people on an annual basis. At build out of Zone 13, there will be approximately 3,398,430 square feet of non- residential development. If a ratio of one employee per 544 square feet is used, the buildout square footage corresponds to a potential workday population of 6,247 employees. C. ADEQUACY FINDINGS Existing fire facilities will adequately serve Zone 13 through buildout. Zone 13 LFMP 115 October 1995 Oceanside LEGEND 11. Fire Station Location l;-'l Five Minute Response Area - Station #2 - IJ '1 Five Minute Response Area - Station #4 I-! dl Five Minute Response Area - Station #5 I 3 Encinitas Hofman Planning Associates Zone 13 -Fire Response Time EXHIBIT36 116 111. MITIGATION SPECIAI. CONDITIONS FOR ZONE 13 No special conditions are necessary at this time. IV. FINANCING Non-residential development will be required to pay a Public Facilities Fee of 3.5 percent of building valuation. This fee is collected at the time building permits are issued. Zone 13 WMP 117 October I995 OPEN SPACE FACILITIES I. 11. PERFORMANCE STANDARD Fifteen percent of the total land area in the zone exclusive of environmentally constrained non- developable land must be set aside for permanent open space and must be available concurrent with development. FACILITY PLANNING AND ADEQUACY ANALYSIS Exhibit 37 on page 119 shows graphically the existing, approved and future performance standard open space within Zone 13. Performance standard open space consists of 1) developed open space areas within existing and approved projects and 2) unconstrained, undeveloped open space throughout the remainder of the zone. Unconstrained, undeveloped open space is land that will remain as permanent open space and is free of environmental constraints. Environmental constraints include: beaches, permanent bodies of water, floodways, slopes greater that 40%, significant wetlands, significant riparian . habitats, significant woodland habitats, major power line easements, railroad track beds, and other significant environmental features as determined by the environmental review process. Slopes 25- 40% and major powerline easements that are improved for open space purposes (as permitted in the Open Space and Conservation Resource Management Plan) may count toward the open space performance standard. A. INVENTORY 1. Inventorv of ODen %ace De&: The performance standard open space required to be provided for Zone 13 is 15 percent of the total land area that is exclusive of environmentally constrained non- developable land. The total land area within Zone 13 that falls under this definition is 531.33 acresz4. Zone 13's build out performance standard requirement for open space, therefore, is 79.70 acres. .. 2. hventorv of E-Dro ved Own SDace SUD& An inventory of the existing and approved performance standard open space supply is shown on Exhibit 38 on page 121 and is summarized below. The total existing performance standard open space supply is 119.03 acres. Therefore, the open space performance standard in Zone 13 is currently being met. 24 See Exhibit 10 on page 29. Zone 13 L.FMP 118 October 1995 LEGEND 1\u. Performance Standard Open Space Area Notes: Performance Standard Open Space provided = 119.03 acres. Excludes constraints noted in Exhibit 10 and golf course areas OS-1, OS-2 and OS4 final and is subject to change.) Nonrm The golf course area in OS-1 is estimated at 19 net acres, however, the amount is not NOSCALE NOTE UL~TWS-WTE Zone 13 - Performance Standard Open Space EXHIBIT 37 44 Hofman Planning I~A s s o c i a t e s 119 3. bventorv of Future ODen %ace SUDD&: As shown on Exhibit 38 on page 121, no additional acres of future performance standard open space are identified within Zone 13 at this time. However, it is likely that additional performance standard open space will become available as future projects are identified. Not taking these future acres into consideration. the total open space supply is 119.03 acres at build out. The build out demand for open space is 79.70 acres. Therefore, the performance standard open space is projected to meet the demand at build out. B. PHASING Existing open space supply satisfies build out open space demand. Therefore, no phasing analysis is required. Any additional open space provided by future development will be above and beyond the adopted performance standard. C. ADEQUACY FINDINGS As of 1/1/95, Zone 13 has sufficient permanent performance standard open space to meet the adopted performance standard through build out. 111. MITIGATION Special Conditions .. No special conditions. IV. FINANCING Funding for performance standard open space will be provided by the property owners of Zone 13. Unconstrained open space that is not developed will not require maintenance. If unconstrained open space is developed, the funding will be provided by the developer of that open space. Zone 13 LFMP 120 October 1995 EXHIBIT 38 Zone 13 - LFMP Open Space Inventory - Constraints Analysis (as of 1 11 195) 79.70 General Plan Sub-Area 11 9.03 39.33 Existing os Total Existing Open Space+ Future Non-Residential Total Build Out Out Open’Space Project Performance Standard Project Open Space i Number Demand 31.55 31.55 48.1 5 Performance Standard Open Space SUPPlV 11 9.03 1 19.03 0.00 Adequacy1 (Inadequacy) Open Space demand = 15% of net developable General Plan Open Space areas OS-1 through OS-5. Open Space Supply = net acres in OS-1, OS-3 and OS-5 (does not include golf course areas OS-2 and OS-4. The golf course area in OS-1 is estimated at 19 net acres and IS not included in the performance standard Open Space supply. The 19 acre figure is an estimate and is subject to change.) Zone 13 LFMP 121 October 1995 SCHOOL FACILITIES I. PERFORMANCE STANDARD School capacity to meet projected enrollment within the zone as determined by the appropriate school district must be provided prior to projected occupancy. 11. FACILITY PLANNING AND ADEQUACY ANALYSIS Since Zone 13 will be entirely non-residential. the above performance standard does not apply. However, an analysis of School Facilities is provided to show its current status within the City. Management Zone 13 is located within the jurisdiction of the Carlsbad Unified School District (CUSD) as shown on Exhibit 39 on page 123. A. BUILD OUT ASSUMPTIONS The following analysis is based on the build out projections on Exhibit 10 on page 29. .. 1. xistiqg and Build Out POD-: Since there is no residential development in Zone 13. no future population is projected. B. INVENTORY 1. Enrollment: There is no existing enrollment within Zone 13. Student Population at Build Out: To project student enrollment at build out, the Carlsbad Unified School District uses a student generation rate of 0.5 per unit. To determine the build out population of elementary, junior high and high school students, the total number of projected units are multiplied by the district's student generation rate. Zone 13 LFMP 122 October 1995 Oceanside LEGEND rl. Carlsbad Unified School District I I Vista 2, Encinitas I 2 I San Marcos Unified School District 131 Encinitas Union ElementaryEan Dieguito High School Districts Hofman Planning Associates Zone I3 - School Districts EXHIBIT 39 The total projected students are proportionally assigned as elementary, junior high and high school students based on the number of grades per school (K-12). Elementary School Students: The Carlsbad Unified School District recently adopted a new school location plan that indicates future school locations within the district. The City of Carlsbad has incorporated these new locations into its recently adopted General Plan update. Junior High Students: Valley Junior High is the only Junior High facility in the CUSD. CUSD recently completed renovation of this school in 1992. The capacity at Valley Junior High is now 1,056. High School Students: CUSD recently completed renovating Carlsbad High School to provide a capacity of 2,500 students. C. ADEQUACY FINDINGS Under the Growth Management Program, a performance standard for non-residential uses is not identified. However, a school performance standard was adopted for the non- residential uses in Zone 5 which assumed that non-residential zones would be required to pay a school fee based on the square footage of development. The fee is based on legislation which determined that employees can educate their children in the same school district in which their place of employment is located. The fee is intended to offset the cost of the construction of school facilities required to accommodate children of parents working within the school district. Zone 13 is within the Carlsbad Unified School District. Applicable non-residential school fees will be paid to 'the Carlsbad Unified School District at the time of Building Permit issuance. 111. MITIGATION No special conditions. Zone 13 UMP 124 October I995 IV. FINANCING Because Zone 13 has no residential population, and the renovations mentioned above have been completed, the school financing matrix has been omitted from this analysis. In August of 1990 the Board of Trustees created an alternative to fee collection by adopting a "Facility Financing Plan". This Plan establishes a foundation for Mello-Roos bond financing to provide funding for necessary school facilities. If the Board elects to implement the plan, the current fee collection structure will be discontinued and replaced with an alternative financing system. Zone 13 LFMP 125 October 1995 Y I. 11. SEWER FACILITIES PERFORMANCE STANDARD Trunk-line capacity to meet demand as caterminec provided concurrent with development. ,,y the appropriate sewer district must be FACILITY PLANNING AND ADEQUACY ANALYSIS Sewer service in the City of Carlsbad is provided by three independent agencies: Carlsbad Municipal Water District, Leucadia County Water District (LCWD), and Vallecitos Water District. Zone 13 is located entirely within the Carlsbad Municipal Water District (CMWD) service area, as shown on Exhibit 40 on page 98. The information contained in this plan was obtained from the "City of Carlsbad Master Plan of Sewerage" prepared by Wilson Engineering, January, 1992, and updated by CMWD. A. INVENTORY 1. Zone 13 is located within two major sewer drainage basins. They are the South Agua Hedionda and the Buena/Vallecitos sewer drainage basins as shown in Exhibit 41 on page 128. Zone 13 is presently undeveloped farmland and contains no existing sewer collection system. Future development in Zone 13 will sewer through either the existing 10-inch collector sewer and its proposed extension in Cannon Road to the north or the existing BuenaNallecitos Interceptors to the south. a. Vallecitos Interceptor Sewer The Vallecitos Interceptor Sewer begins at the end of the Vallecitos siphon near the intersection of Camino Vida Roble and El Camino Real. It then flows westerly through an industrial park. The interceptor sewer then follows Palomar Airport Road westerly, adjacent to the Buena Interceptor Sewer. Exhibit 42 on page 129 provides a description of the reaches and the City of Carlsbad ownership in the Vallecitos Interceptor Sewer. 126 October 1995 Zone 13 LFMP Oceanside TI. Calavera Hills ReclamationlTreatment Facility Encina Water Pollution Control Facility 131 Meadowlark Reclamation Facility I 4 I Gafner Wastewater Reclamation Facility Hofman Planning Associates Zone 13 - Sewer Districts EXHIBIT40 LEGEND I & 1. Basin Boundary 171 Basin Designation . Palomar Airport Road 44 Hofman Planning A~A s s o c i a t e s Zone 13 - Sewer Basin Boundaries EXHIBIT41 128 Exhibit 42 Engineering Data for the Vallecitos Interceptor Sewer Full Pipe Reach Size Slope Length Capacity v3 30 0.67 3,260 21.7 v4 30 0.68 6,510 21.8 v5 30 0.68 1,670 21.8 V6 30 0.68 3,400 21.8 v7 39 0.16 2,130 21.3 V8 54 0.15 870 49.2 Engineering Data for the Vista-Carlsbad Interceptor (in.) (%) Ut.) (MGD) Full Pipe 1 Reach Size Slope Length Capacity (in.) (%I (ft:) (MGD) VC1 36 0.50 6690 30.0 VC2 42 0.28 2790 34.0 VC3 36 0.20 3170 19.5 VC5 27 0.36 2500 12.0 VC6 30 0.24 1180 13.0 VC7 27 1.64 760 25.0 VC8 36 0.10 720 13.8 VC9 36 0.10 1940 13.8 VC10 36 0.10 4330 13.8 VC11 42 0.10 1370 20.5 VC13 42 0.18 3520 20.5 VC14 42 0.10 5080 20.5 VC15 42 0.12 1760 22.8 VC16 54 0.28 310 67.2 City of Carlsbad Ownership Leased Full Pipe Full Pipe Capacity Capacity Available Capacity (1 ) (%) (MGD) (MGD) 23.0 5.0 5 .OO 22.9 5 .O 5.00 22.9 5.0 5.00 22.9 5.0 5.00 23.5 5.0 5.00 10.2 5.0 5.00 City of Carlsbad Ownership Full Pipe Full Pipe Ownership Capacity Available Capacity (1 1 (%I (MGD) (MGD) 0.0 0.0 0.0 15.5 5.3 4.7 15.5 3.0 1.4 27.3 2.6 0.6 27.3 3.3 1.3 27.3 6.8 4.0 27.3 3.8 0.7 37.3 5.1 1 .o 37.3 5.1 -0.1 37.3 7.6 0.0 51.7 10.6 , 3.0 51.7 10.6 2.1 51.7 11.8 3.2 45.24 30.4 20.8 Notes: (1 1 Available capacity as of January 1, 1991 Shaded Areas indicate those lines impacted by Zone 13. Zone I3 L FMP 129 October I995 b. South Agua Hedionda Drainage Basin The projected build out flow for Zone 13 can be adequately handled by the existing 10" VCP in Cannon Road. The Vista/Carlsbad Interceptor receives flows from this existing 10" VCP sewer at Cannon Road and 1-5. Construction of the future South Agua Hedionda Interceptor will not be required to serve Zone 13 south of Cannon Road. Provided that no sewer service is needed for those portions of Zone 13 north of and not fronting on Cannon Road, CMWD may install portions of the interceptor sewer in Cannon Road as part of the improvements to the area. Although not required for Zone 13, when constructed as necessary for future development to the east, SAH4 will intercept the 10" collector sewer and Zone 13 will then be serviced by the SAH4 interceptor. c. VistaKarlsbad Interceptor Sewer The Vista/Carlsbad Interceptor starts just west of College Boulevard along Highway 78 at the Vista Meter Station. This pipeline intercepts flow from the North Agua Hedionda Interceptor Sewer system and the 10" collector sewer in Cannon Road. This interceptor is jointly owned by the City of Vista and the City of Carlsbad. The City of Carlsbad ownership rights in the interceptor increase in the direction of flow reaching greater than 50 percent ownership in the most downstream reaches of the interceptor. Exhibit 42 on page 129 provides engineering data for the gravity portions of this interceptor. a. Sewer Basins The current Sewer Master Plan shows Zone 13 to sewer into two separate sewer basins. Basin A will feed to the 10-inch collector sewer in Cannon Road. Basin B feeds to the existing Vallecitos Interceptor Sewer. Exhibit 41 on page 128 shows the locations of the two sewer basins. Sewer Drainage Basin A Future development within Zone 13 is proposed to sewer into the existing 10" pipeline located in Cannon Road. Ultimately the proposed South Agua Hedionda Interceptor (SAHI) sewer system, to be constructed as development to the east of Zone 13 occurs, will intercept the existing 10- inch collector sewer. Zone I3 LFMP 130 October 1995 Vallecitos Interceptor Sewer Drainage (Basin B) Sewage flows tributary to Armada Crive will be intercepted by the existing 8-inch diameter sewer located at the intersection of the Price Club entrance and Palomar Airport Road. This existing sewer will convey the flow to the Vallecitos Interceptor Sewer. The Vallecitos Interceptor Sewer has already been constructed to its ultimate configuration. Exhibit 43 on page 132 shows the approximate alignment of these pipelines. The Sewer Master Plan for Carlsbad accounts for no development within sewer drainage Basin B in Zone 13. Therefore the proposed development within this sewer drainage basin will exceed the Plan's assumption by 859 EDU or a cumulative average flow of 0.19 MGD. VistaKarlsbad Interceptor Improvements will be required for the portions of the Vista/Carlsbad Interceptor which serve Zone 13. These improvements are to be funded by the City of Carlsbad and the City of Vista. The existing 42-inch trunk sewer (VC14) in the railroad right-of-way from Cannon Road to Palomar Airport Road will need to be upsized to a 54-inch trunk sewer by the year 1997. The 42-inch trunk sewer in the railroad right-of-way from Olive to Agua Hedionda Lagoon (VCll), from Agua Hedionda Lagoon to Cannon (VC13), and in Avenida Encinas from Palomar Airport Road to the EWPCF entrance will all need to be upsized to 54-inch trunk sewers by the year 2010. The Agua Hedionda Lift Station will ultimately be relocated by the year 2010. The following information summarizes the Vista/Carlsbad Interceptor improvements per the Master Plan of Sewerage: Reach Size cost Year Needed VC13 54" $1,461 .OOO 2010 VC 14 54 $ 2,108,000 I997 VC 15 54" $ 730,000 2010 Zone 13 LFMP 131 October I995 uenaNallecitos Encina Water LEGEND PI, Basin Boundary Fl Basin Designation VistalCarlsbad Interceptor Direction of Flow Proposed Facility Buena Interceptor Sewer Ill1711 NosCAE 171 Vallecitos Interceptor Sewer l/JI Existing Facility NOlE HLLOUllWSMPROFJ1UIE Zone 13 - Major Sewer Facilities EXHIBIT 43 44 Hofman Planning 11~ s s o c i a t e s i 132 The location and sizes of the major sewer lines were approximated only for the purpose of this Facilities Plan. The exact sizes and locations will be defined as the area develops and the sewer lines are designed per the City's current standards. 3. Build Out Assu- For purposes of estimating the ultimate sewage that will be generated from Zone 13 into each interceptor, the build out projections for each sewer drainage basin are estimated as follows: Land Use EDU Basin A Basin B Retail Commercial 194 190 EDU 4 EDU 464 299 EDU 165EDU HoteVRec. 1,148 458 EDU 690 EDU 4. a1 Assurnp~m Carlsbad's current sewer Master Plan establishes unit flow generation factors as a basis for projecting the average sewer flows. The average unit flow from the City of Carlsbad was projected using 220 gallons per day per equivalent dwelling unit (EDU). .. 5. XIS- Zone 13 is presently undeveloped farmland and contains no existing sewer collection system. There is no existing sewer demand in Zone 13.. 6. Projected Build Out Dew The projected build out sewer flows for each sewer basin in Zone 13 can be determined by multiplying the build out projections as established in this plan by the average unit flow factors obtained from Carlsbad's Sewer Master Plan. Projected Average Average Projected Build Out X Unit Flow = Build Out Sewer The projected build out average sewer flow for Zone 13 by sewer basin is as follows: 133 October 1995 Zone 13 LFMP BASIN A: Land Use Projected Build Out Average Unit Flow Build Out Sewer Flow Retail 190 EDU 220 GPD/EDU 4 1,800 GPD Commercial 299 EDU 220 GPD/EDU 65.780 GPD Hotel/Rec. 458 EDU 220 GPD/EDU 100.760 GPD TOTAL 208,340 GPD BASIN B: Land Use Projected Build Out Average Unit Flow Build Out Sewer Flow Retail 4 EDU 220 GPD/EDU 880 GPD Commercial 165 EDU 220 GPDIEDU 36.300 GPD Hotel/Rec. 690 EDU 220 GPDlEDU 151.800 GPD TOTAL 188,980 GPD For planning purposes, yearly sewer demand by year for each sewer basin in Zone 13 are projected in Exhibit 44 on page 135. Detailed demands at Buildout are shown by land use in Exhibit 45’5 on page 136 and graphically depicted in Exhibit 46 on page 138. *’ It should be noted that the acreage figures on Exhibit 45 are from the tentative map applications for the Specific Plan area. These numbers may vary from those shown on Exhibit 10. The acreage differences are due to differences in geographic areas and in constraints considered (e.g. Streets other than General Plan Circulation Element roadways are subtracted). Zone 13 LFMP 134 October I995 EXHIBIT 44 Zone 13 Yearly Sewer Demand BASIN A: BASIN B: Year Projected Yearly Cumulative Average Projected Yearly Cumulative Average Flow Number of EDU Flow (MGD) Number of EDU (MGD) 1996 96.1 0.021 1 16.5 0.0036 1997 11.4 0.0237 16.5 0.0073 1998 51.1 0.0349 40.5 0.0162 1999 352.4 0.1124 686.5 0.1672 2000 63.4 0.1265 16.5 0.1708 2001 108.3 0.1502 8.3 0.1727 2002 81.7 0.1682 8.3 0.1745 2003 5.7 0.1694 8.3 0.1763 2004 5.7 0.1707 8.3 0.1781 2005 5.7 0.1719 8.3 0.1800 2006 5.7 0.1732 8.2 0.1818 2007 5.7 0.1744 . 8.2 0.1836 2008 5.7 0.1757 8.2 0.1854 2009 5.7 0.1769 8.2 0.1872 2010 142.7 0.2083 8.2 0.1890 Build Out 947 0.2083 859 0.1890 October 1995 Zone 13 LFMP 135 Exhibit 45 Equivalent Dwelling Units for Zone13 - Basin A Specific Plan Area Parcel No. LFMP Land Use Land Use Acre?' EDU/Ac. EDU Subarea 1 Map 13078 O/PI- 1 GIA 7.76 6 47 Existing Lot 6 1 Map 13078 O/PI- 1 CIA 10.30 6 62 Existing Lot5 1 4 O/PI- 1 GIA/ALT 10.87 7 76 2 6 O/PI-2 R&D/Office 5.78 7 40 2 7 O/PI-2 R&D/Office 5.78 7 40 34 2 8 O/PI-2 R&D/Office 4.84 7 5 17 TR-2 Resort 52.80 5 264 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . - . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . ..... . . . . . 6 Map 13078 R Retail 10.70 7 75 Existing Lot 3 6 15 R Retail 15.95 7 112 8a 3 os-2 Golf 45.61 0. I 5 . . . . . . . . . , . . . . . . . . . . . . . . . . . . . , . , . . . . . . . . . - . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8b 5 os4 Golf 26.46 0.1 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 OS-5 Open Space 10.00 0 0 . .. . . . . . . . . . . . . . . . ... . . . . . , . , . . . . . . . . . . . . . . . . . .. . . . , . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. .. . . . . . . . . 9 . . . . . . . . . . . . . na na TR- 1 Resort 33.95 5 170 na na os- 1 Golf . 185.18 0.1 19 Basin A Total EDU's = 947 26 Net acres are from tentative maps for all areas except Subareas TR-1 and OS-1. These acreages are from the Exhibit 10. 136 October 1995 Zone 13 w;MP Exhibit 45 Equivalent Dwelling Units for Zone13 - Basin B Land Use Acres EDU/Ac. EDU Specific Plan Area Parcel No. LFMP Land Use Subarea 2 9 O/PI-2 R&D/Office 4.00 7 28 2 10 2 11 2 12 2 14 2 15 O/PI-2 R&D/Office 4.49 7 31 O/PI-2 R&D/Office 4.49 7 31 O/PI-2 R&D/Office 3.79 7 27 O/PI-2 R&D/Office 3.38 7 24 O/PI-2 R&D/Office 3.46 7 24 3 CT 92-7 TR/C HoteVRetail 10.48 5 52 Existing Lot 14 4 18 TR-3 LEG0 128.32 5 642 7 1 OS-3 Open Space 53.42 0 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . ... .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . , . , . . . , , , . . . . , . . . . . . . . . . . . . . . . . . .. . . Basin B Total EDU's = 859 Zone I3 LFMP 137 October 1995 Palomar Airport Road LEGEND I ’ 1. Parcel Number - Please refer to Exhibit 45 for Land Use and EDU associated with each parcel. 46 Hofman Planning 14~ s s o c i a t e s Zone 13 - EDU per Land Use EXHIBIT46 138 Poteal for R- Water .. 7. The City of Carlsbad has prepared a Reclamation Master Plan, which was adopted by the City Council in 1990. All future development will be required to conform to the .recommendations as outlined in the Reclamation Master Plan and by Ordinance No. 3 1. A more detailed description of reclaimed water is provided in the water section on page 143. B. PHASING The approach to phasing taken by this Local Facilities Management Plan is based on ensuring that needed facilities are in place prior to or commensurate with development. Basin boundaries are shown on Exhibit 41 on page 128 and correlate with the sewer basins within the zone. There are two separate basins, labeled Basins A and B, and thresholds for the major sewer facilities within each basin can be easily established, thereby determining the appropriate mitigation measures. The basin boundaries allow for independent review and development for the sewer facilities within each boundary. However, the City may require improvements outside of the basin boundaries if deemed necessary to serve development. C. ADEQUACY FINDINGS Zone 13 currently meets the adopted performance standard. Several improvements to the Vista/Carlsbad Interceptor will be needed within five years. Also, facilities will be needed to accommodate development. These improvements and other major sewer facilities wil f be constructed as development occurs in Zone 13 to assure that conformance with the adopted performance standard will be maintained through the build out of Zone 13. 111. MITIGATION .. cia1 Conditions; A. ALL WATERSHEDS All development within Zone 13 will be required to pay the appropriate sewer connection fee prior to issuance of any building permit. B. Basin A Basin A is located within the South Agua Hedionda sewer drainage basin. No improvements are required to this system for Zone 13, other than the extension of the 10" sewer main on Cannon Road. Zone 13 w;MP 139 October I995 C. Basin B Basin B is located within the Buena/Vallecitos Iiilerceptor sewer drainage basin. No improvements are required to this system for Zone 13. IV. FINANCING There is no financing required for this zone other than the extension of the 10" sewer main in Cannon Road. Zone 13 LFMP 140 October 1995 EXHIBIT 47 ' 'ILITY , .in A: ZONE 13 - SEWER FINANCING MATRIX AS OF 1 I1 195 ESTIMATED FUNDING OPTIONS AMOUNT COST TIMING FIRST I SECOND I THIRD NOTES 20% Engr. and Admin I 10 sewer line extension in Cannon Road 2,000 LF $1 70,000 Conc. wl dev. 15% Contingency 1 $25,500 I $39,100 I Total Sewer Costs 1 $234,600 I I Notes: (1 1 Developer(s1 within the respective Sewer Basin shall construct the necessary facilities concurrent with development. The City shall be guaranteed of this construction by imposing appropriate conditions on the pertinent tentative maps or site development plans, as the case may be. 1 Zone 13 LFMP 141 October 1995 This page intentionally Left Blank Zone 13 LFMP 142 October 1995 WATER FACILITIES I. PERFORMANCE STANDARD Line capacity to meet demand as determined by the appropriate water district must be provided concurrent with development. A minimum 10-day average storage capacity must be provided prior to any development. 11. FACILITY PLANNING AND ADEQUACY ANALYSIS Water service in the City of Carlsbad is provided by three independent agencies; Carlsbad Municipal Water District, Vallecitos Water District, and the Olivenhain Municipal Water District. Each of these agencies has separate service areas. Water service for Zone 13 is provided entirely by the Carlsbad Municipal Water District (CMWD) as shown on Exhibit 48 on page 144. The Carlsbad Municipal Water District has a Master Plan, entitled "Water Master Plan" CMWD Project 89-105, which was adopted January 29, 1991 by the Board of Directors. Its purpose is to evaluate the water system within the District and to formulate long-range plans that will provide for future improvements. CMWD is currently revising the above-described master plan, but has not issued an approved revision. The information contained in this Local Facilities Management Plan was obtained from the CMWD's "Water Master Plan", the "City of Carlsbad Water Reclamation Master Plan," dated January 1990 by Dudek and Associates, and through discussions with CMWD Engineering staff. A. INVENTORY 1. a. Potable System The Zone 13 Area will be served by two water pressure zones. With reference to Exhibit 49 on page 147, property lying within lower elevations will be provided water service from the lower 255 Pressure Zone. The remaining properties will be provided service from the higher 375 Pressure Zone. Zone 13 LFMP 143 October 1995 Oceanside I' I t LEGEND Encinitas Fl. Carlsbad Municipal Water District 121 Vallecitos Water District Olivenhain Municipal Water 0istri.d Hofman Plann Associat ing es Zone 13 -Water Districts EXHIBIT48 144 The existing water facilities for the 255 Pressure Zone include: No. Faciliry Description 1. A I .5 MG steel tank reservoir located adjacent to the east boundary of the Zone 13. 2. Two pressure reducing stations, one at the 1.5 MG steel tank, and the other at the intersection of Palomar Airport Road and proposed Armada Drive. A 16-inch and 12-inch pipeline from the 1.5 MG steel tank aligned southwesterly to Palomar Airport Road. (These two pipeline may need to be relocated depending on site grading and other constraints.) A IO-inch pipeline in Palomar Road from Armada Drive to Paseo Del None. A 12-inch pipeline in Paseo Del None and Car Country Drive. 3. 4. 5. The existing facilities for the 375 Pressure Zone include: 6. One 8.5 MG steel tank reservoir (now under construction to replace 1.25 MG.) A 16-inch pipeline in Palomar Airport Road. 7. b. Reclaimed System The Carlsbad Municipal Water District operates and maintains two reclaimed water pipelines in the Zone 13 Area. As shown on Exhibit 50, page 148, there is an existing 8-inch pipeline in Palomar Airport Road. Another 8-inch pipeline is in Hidden Valley Road extending from Palomar Airport Road north to the vicinity of an existing 1.5 MG steel tank. The water pressure in these pipelines is the same as the 375 Pressure Zone for domestic water. However, it is noted that the pipeline in Hidden Valley Road may need to be relocated based on proposed site grading plans. No. Facility Description 1. 2. An 8-inch pipeline in Palomar Airport Road. An 8-inch pipeline in Hidden Valley Road from Palomar Airport Road to the existing 1.5 million gallon tank. .. 2. x1st1- Zone 13 is comprised of 700.8927 gross acres and is used for agricultural and ancillary purposes. To determine existing demand, the following methodology was 27 From Exhibit 10. Zone 13 LFMP 145 October 1995 used. The acreage with slopes in excess of 25 percent was subtracted out to yield a net acreage of 635.80 acres (Powerline easements were not subtracted out because the land within the easement is used for agriculture)28. Due to seasonal crop rotations, an average of 70 percent of the net acreage is in use at any one time. With a consumption rate of 2500 GPD/acre for agricultural uses, the existing demand within the zone is, therefore, 1.11 MGD. 3. Build Out Assumptiom This section projects the ultimate build out for all of Zone 13, and is based on tentative maps, when available. The tentative maps provide a more accurate analysis than using general plan land uses. The tentative map acreages utilized in this chapter are also listed in detail in Exhibit 45 on page ? in the Sewer Chapter of this plan. It should be noted that, for the above reasons, the acreages shown in this chapter may vary from the constraints analysis acreage provided in Exhibit 10. The build out projections are listed below: Land Use Projections Commercial 26.65 Ac. Professional & Related 68.94 Ac. Hotels/Recreation 225.55 Ac. In the above table, land use subareas TR-1, TR-2, TR-3 and TR/C comprise the Hotels/Recreation category. 25% to 40% slopes are not considered a growth management constraint for non- residential development and therefore are not shown on Exhibit 10. 18 146 October 1995 Zone 13 LFMP - LEGEND PI. Service Area Boundary IT] Existing Facility *; . Existing Reservoir - . I A I ServiceArea I I Prop. Facility lwl Existing Lines I 4 I Existing P.R.. Station l:m*-*'l Prop. Lines I . . 1 Prop. P.R.. Station 4 Hofman Planning 34, s s o c i a t e s Zone 13 - Potable Water System EXHIBIT49 147 LEGEND IN 1. Service Area Boundary I @ I Existing Facility rl Service Area [TI Prop. Facility I/JI Existing Lines PI Prop. Lines 4 Hofrnan Planning SdA s s o c i a t e s Zone 13 -Reclaimed Water System EXHIBIT 50 148 4. a. Average Potable Water Unit Demand The Master Plan for CMWD established unit demand factors as a basis for determining the projected average water demands. The following are the average unit demand factors obtained from CMWD Master Plan: Land Use Unit Demand Commercial 1440 GPD/Ac. Professional & Related 1440 GPD/Ac. Hotels/Recreation 1440 GPD/Ac. Agriculture 2500 GPD/Ac. b. Fire Flow Demands The fire flow requirements in CMWD's Master Plan are as follows: Land Use Unit Demand (GPM) Commercial 6Ooo Professional & Related 3000-4000 HoteldRecreation 3000-4000 c. Reclaimed Water Average Unit Demand CMWD's Water Reclamation Master Plan establishes unit demand factors as a basis for determining the projected average water demands. The average unit demand factor obtained from the Water Reclamation Master Plan is 2.5 AF/AC/YR for irrigation usage for commercial/industrial land uses. The number of irrigated acres in a commercial/industrial area is estimated to be 15 % of the gross acreage. The average unit demand factor for golf courses is 3.2 AF/AC/YR. For purposes of this analysis, the number of irrigated acres in the golf course area was estimated to be 100% of the net developable acreage. Zone I3 LFMP 149 October 1995 The projected build out average potable water demands can be determined for Management Zone 13 by multiplying the build out projections as established in this plan to the average unit demand factors obtained from CMWD'S Master Plan. Projected Average Projected B/O Build Out (B/O) x Unit Demand = Average Water Demand The estimated build out average potable water demand in Management Zone 13 is as follows: Land Use Projected Build Out Average Unit Average Build Out Demand Water Demand Commercial 26.65 Ac. 1440 GPDIAc. 38,376 GPD Professional & Related 68.94 Ac. 1440 GPDIAc. 99,274 GPD HotelsIRec. 225.55 Ac. 1440 GPD/Ac. 324,792 GPD Total 462,442 GPD As stated previously, the above acreages are from tentative map level information and therefore may not necessarily coincide exactly with the figures shown in Exhibit 10. The estimated build out average reclaimed water demand in Management Zone 13 is as follows: Land Use Irrigated Acres Average Unit Average Build Out Demand Water Demand Commercial/ 51.9 Ac. 2.5 AFlAClYR 129.75 AFIYR Professional1 Hotel Agricultural 56.6 Ac. 2.8 AFIACIYR 158.48 AFIYR Golf Course 191.0 Ac. 3.2 AFIACIYR 61 1.20 AFIYR Total 899.43 AFIYR OR 0.803 MGD For planning purposes, yearly demand projections are shown on the following two pages for the potable system and the reclaimed system, respectively. Zone 13 LFMP 150 October 1995 YEARLY POTABLE WATER DEMANDSz9 Year Commercial Professional HoteURec. Agricultural Acres Cumulative Average Acres Acres Acres Demand (MGD) 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 0.0 9.2 0.0 9.2 0.0 0.0 8.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9.3 4.3 4.3 9.1 4.3 2.1 18.7 2. I 2.1 2.1 2.1 2.1 2.1 2.1 0.0 0.0 0.0 4.8 184.5 12.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 647.3 (647.3)M 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0' 0.0 1.13 0.03 0.03 0.06 0.34 0.36 0.38 0.4 1 0.41 0.41 0.4 1 0.42 0.42 0.42 0.43 29 Existing agricultural uses will be phased out as development occurs. 30 It is assumed that with the first development in the Agricultural Areas, reclaimed facilities will be provided to the entire Agricultural areas. Zone 13 LFMP 151 October 1995 YEARLY RECLAIMED WATER DEMANDS Year Commercial/Professional Golf Course Irrigated Agricultural Cumulative Irrigated Acres Acres Acres Irrigation Demand Acre- FeetlYR I r r igat ed” 1995 0.0 0.0 0.0 0.0 1996 4.0 0.0 472.43’ 1332.72 1997 0.3 0.0 (2.1) 1327.59 1998 1999 4.3 28.8 0.0 (26.4) 191 .O (326.2) 1264.42 1034.26 2000 2.2 0.0 (9.0) 1014.56 1009.7 I 2001 0.3 0.0 (2.0) 2002 2.3 0.0 (21.1) 956.38 2003 0.5 0.0 (2.7) 950.07 2004 0.5 0.0 0.0 951.32 2005 0.5 0.0 0.0 952.57 2006 0.5 0.0 0.0 953.82 2007 0.5 0.0 0.0 955.07 2008 0.5 0.0 0.0 956.32 2009 0.5 0.0 0.0 957.57 2010 6.2 0.0 (26.3) 899.43 B/O 51.9 191.0 56.6 899.4 AC- FrlYR 3 I Existing Agriculture uses will be phased out as development occurs. 32 It is assumed that once development occurs reclaimed facilities will be provided to the agriculture areas 152 October 1995 Zone 13 LFMP The CMWD Master Plan proposes the following major potable water facilities as shown on Exhibit 49 on page 147 for the ultimate build out of Zone 13: To provide adequate water service the following facilities are required in the 375 Pressure Zone only: No. Facilitv DescriDtion I. 16-inch pipeline in Hidden Valley Road extending from Camino De Las Ondas north to the vicinity of the existing 1.5 MG reservoir. This will enable the fire flow to be provided to the area from the 8.5 MG reservoir now under construction. A 12-inch pipeline extending in an easement across Parcel 11 from Hidden Valley Road to Cannon Road. 2. 3. 4. 5. 6. A 16-inch pipeline in Armada Drive from Palomar Airport Road to Cannon Road. A 10-inch pipeline in Leg0 Drive. A minimum 8-inch pipeline in "D" Street. A minimum 12-inch pipeline east of Car Country Drive to the easterly boundary of Zone 13 in Cannon Road. A pressure reducing station east of Car Country Drive. 7. The following facilities are required in the 255 Pressure Zone: 8. A 16-inch pipeline from the existing 1.5 million gallon reservoir to Palomar Airport Road. 9. Removal of the existing 12-inch and 16-inch transmission lines. The CMWD Reclaimed Water Master Plan proposes the following major reclaimed water facilities as shown on Exhibit 50 on page 148 for the ultimate build out of Zone 13: Zone 13 L.FMP 153 October 1995 No. Facility Description 1. 12-inch pipeline in Hidden Valley Road and easement from Palomar Airport Road to Cannon Road. (There is an existing temporary 8-inch water line in Hidden Valley Road from Palomar Airport Road to the Reservoir.) 20-inch pipeline in Cannon Road from Car Country Drive to proposed 12-inch water line easement per item 1. 8-inch pipeline in Armada Drive from Palomar Airport Road to Cannon Road. (Carlsbad Ranch Unit No. 1 has been designed and approved C.T. 92-7 on December 23,1993. 8-inch pipeline in Leg0 Drive. 8-inch pipeline in Paseo Del None from Palomar Airport Road to Car Country Drive. 2. 3. 4. 5. The location and sizes of the major water mains were approximated only for the purpose of this Facility Management Plan. The exact sizes and locations will be determined as the area develops and the water mains are designed according to District standards. Watez: .. 7. On March 21, 1989, the City of Carlsbad adopted an interim Reclaimed Water Use Policy for new land development. This policy specifies that all new development within the City of Carlsbad shall use reclaimed water if it can be reasonably determined by District and the District Engineer that reclaimed water is available to serve the project. The interim policy further indicates that installation of dual irrigation systems and connections to reclaimed water sources may be required subject to the terms and conditions of the Water Reclamation Master Plan. Additionally, the City adopted a mandatory use ordinance stating that if reclaimed water is available it will be used. The CMWD has prepared a Water Reclamation Master Plan which indicates availability of reclaimed water to new development within the District. Areas identified by this plan for reclaimed water use will be subject to the Interim Reclaimed Water Use Policy and consequent requirements from the District Engineer as specified above. The Water Reclamation Master Plan was approved by City Council March 3, 1992, Resolution Number 779. There are approximately 310.7 acres of general plan open space33 within Zone 13 that could potentially benefit from the future use of reclaimed water. 33 This acreage is taken from tentative map acreages as shown in Exhibit 45 on page 137 and includes those parcels whose land use is either agricultural or golf course. It does not include open space Parcel 16 as shown on Exhibit 46. Zone 13 LFMP 154 October 1995 B. PHASING The approach to phasing taken by this Local Facilities Management Plan is based on ensuring that needed facilities are in place prior to or commensurate with development. Service area boundaries are shown on Exhibit 49 on page 147 and correlate with logical boundaries of the proposed water facilities within the Zone. There are two separate service areas, labeled Service Areas A and B. and thresholds for the major water facilities within each service area may be determined as these areas are developed. The service area boundaries allow for independent review and development for the water facilities within each boundary. However, the Water District may require improvements outside the service area boundaries if deemed necessary to serve development. C. ADEQUACY FINDINGS Zone 13 currently conforms with the adopted performance standard. Since CMWD requires development to install domestic water and fire-flow needs as a condition to the approval of future development, conformance with the adopted standards will be maintained to ultimate build out of Zone 13. D. AVERAGE 10-DAY STORAGE CAPACITY Per the CMWD Water Master Plan the storage capacity within the system is currently 12.9 days. The projected storage capacity is 254.5 million gallons with average daily demand estimated to be 24.54 million gallons. This will provide for a projected storage of 10.4 days' capacity. Thus, the district's system design assures that a minimum of ten days' storage supply will be available. STORAGE CAPACITY Current - 1990 Ultimate Storage Capacity . Average Daily Demand Days of Storage 168.0 million gallons 13.1 million gallons 254.5 million gallons 24.54 million gallons 12.9 days 10.4 days 155 October 1995 Zone 13 L.FMP 111. MITIGATION .. SDecial Cond ltlQIlS A. All future development in Zone 13 shall pay a major facilities fee based on EDU's to the Carlsbad Municipal Water District and a capacity charge to the San Diego County Water Authority. In addition, all development in Zone 13 shall be required to provide any water reclamation facilities identified in the Water Reclamation Master Plan as determined by the District Engineer. Any water reclamation facilities necessary to accommodate future development must be guaranteed prior to the recordation of a final map, issuance of a grading permit or building permit, whichever occurs first. These guarantees shall be based upon the requirements for the service area within which the proposed development is located to the extent that the demand is created by future development. B. Service Area A Water facilities will be provided at the time of development within Service Area A, to the satisfaction of the Carlsbad Municipal Water District. 1. The proposed minimum 12-inch water main in future Cannon Road. 2. The proposed pressure regulating station in Cannon Road east of Car Country Drive. 3. The proposed 8-inch reclaimed water lines in future Armada Drive and future Leg0 Drive. 4. The proposed 16-inch water main in future Armada Drive. 5. The proposed 10-inch water main in future Leg0 Drive. 6. The proposed 12-inch water main extending from Hidden Valley Road to Cannon Road. 7. The proposed minimum 8-inch water main in future D Street. C. Service Area B The following water facilities will be required as a condition to the approval of future development within Service Area B to the satisfaction of CMWD. 1. The proposed relocation of the existing 16-inch water line from existing reservoir to the existing 16-inch water line in Palomar Airport Road. Zone 13 WMP 156 October 1995 2. The proposed 16-inch water line in future Armada Drive 3. The proposed 8 -inch reclaimed water lines in future Armada Drive, future Leg0 Drive and Paseo Del Norte. IV. FINANCING A. Service Area A The cost of the proposed pothole water facilities listed above is estimated to be $465,000. These facilities are to be financed by the development for which they are required. The cost of the proposed reclaimed water line listed above is $101,250. This facility is to be financed by the development for which it is required. a B. Service Area B The cost of the proposed potable water facilities listed above is estimated to be $325,000. These facilities are to be financed by the development for which they are required. The cost of the proposed reclaimed water lines listed above is $190,350. These facilities are to be financed by the development for which they are required. An itemized cost estimate of this facility is contained in Exhibit 51 on page 158. This estimate should only be used as a guide to approximate costs for preliminary planning purposes. Further cost analysis should be made as planning and design progress in Zone 13. Zone 13 LFMP 157 October 1995 EXHIBIT 51 ZONE 13 - WATER FINANCING MATRIX AS OF 1/1/95 FACILITY *ice Area A: o I 2" Water Main in future Cannon Rd. 2 Pressure Regulating Station - Cannon Rd. 3 8" Reclaimed Water Main - LegoIArmada Dr 4 16" Water Main . Armada Dr 5 10" Water Main - Leg0 Dr 6 12" Water Main - Hidden Valley to Cannon Rd 7 8" Water Main - D St Potable subtotal Reclaimed subtotal Service Area A Subtotal Service Area B: 1. 16" Water Main - Relocation 2. 16" Water Main - Armada Dr. 3. 8" Reclaimed Water Main - Armada, Lego, Paseo Del Norte Potable subtotal Reclaimed subtotal Service Area 6 Subtotal Total Water Costs Notes: AMOUNT 2.700 LF 1 EA 3,750 LF 2,250 LF 1,500 LF 2,100 LF 2,100 LF 3.600 LF 2,900 LF 7.050 LF ESTIMATED COST $97.200 $75.000. $101,250 $1 12;500 $4a,ooo $75,600 $56,700 $465.000 5101,250 $566,250 $1 ao.ooo $1 45.000 $1 90.350 $325.000 $1 90.350 $515,350 $1.081,6OQ TIMING Conc wldev Fl FIRST Developer IING OPTII SECOND 5 THIRD (1) Developerls) within the respective Water Service Areas shall construct the necessary facilities concurrent with development. the City shall be guaranteed of this construction by imposing appropriate conditions on the pertinent tentative maps or site development plans, as the case may be. Zone 13 LFMP 7 58 October f995 (This Page intentionally left blank) October 1995 Zone 13 WMP 159 FACILITY FINANCING This chapter details how the public facilities and improvements required of Zone 13 to maintain the adopted Growth Management performance standards will be financially guaranteed. This chapter addresses all applicable special conditions contained within this adopted Local Facilities Management Plan. FINANCING MECHA NISMS In preparing this financing plan, it became clear that no single financing mechanism could satisfy the complex infrastructure requirements of this zone. Therefore, several financing techniques are being used to address both the need for upgrading facilities, enabling them to conform with the adopted performance standards, and to ensure conformance of fhture facilities as development occurs. The following financing techniques will be used to guarantee the public facilities needed to serve future development within Zone 13: .. A. ies Diswt No. 1 Development in Zone 13 will contribute to a number of citywide and regional facilities including the construction of Cannon Road West through participation in the Community Facilities District No. 1. All parcels in Zone 13 are either currently within CFD No. 1 or will annex to CFD No. 1 concurrent with approval of the first discretionary permit. Asseswnt Dwict 95-1 .. B. Development within the Carlsbad Ranch Specific Plan area of Zone 13 may finance certain facilities through participation in proposed Assessment District 95-1. This district mav finance a number of facilities which benefit the Carlsbad Ranch area of the zone includim traffic signals, intersection improvements, wet and dry utilities, and street improvements at various locations. All parcels within Carlsbad Ranch will either be included in the Assessment District when it is formed or annex into it concurrent with approval of the first discretionary permit. Assessment District 95-1 may replace or offset the participation of Carlsbad Ranch properties in other financing mechanisms for certain major facilities by providing a financial guarantee for the Carlsbad Ranch property's share of those improvements. In the event that Assessment District 95-1 is not formed, alternative funding mechanisms (e.g . bonds, letters of credit, reimbursement agreements, development impact fees, improvement agreements, etc) may be used without amendment to this document, subject to the review and approval of the City Engineer, Financial Management Director and City Attorney. Zone 13 UMP 160 October 1995 C. DeveloDer F- Many of the drainage, sewer, water and circulation improvements will be directly funded and constructed by the developer(s). Facilities earmarked for developer funding are limited to those which normally would have been imposed as a condition of approval of a tentative map under the City's existing development review process. Without these essential facilities, the associated Planning Areas could not be developed. When appropriate, the City may enter into a reimbursement agreement with the developer for any facility which is included in a City impact fee program. The source of reimbursement shall be from the appropriate City impact fee. The schedule for reimbursement shall be based on the City's capital improvement program and the availability of unobligated impact fee revenue. E. F. eements Amnnp ProDea Owners Several facilities discussed in this plan are also required of other zones and property owners. Developers of Zone 13 may enter into private agreements with other property owners to address reimbursement for such facilities. Any such agreement must be recorded against the title of the participating properties and a copy of the recorded document must be provided to the City's Growth Management Division. - As a major link in the circulation network, Cannon Road from 1-5 to El Camino Real (Cannon Road West) will provide significant public benefit to the City as well as the region. Although there are several financing mechanisms which will contribute to the funding of Cannon Road West, the portion of the improvements which will benefit in common Zones 5, 8, 13 and 24 is anticipated to be financed through a fee program. FINANCING PLANS FOR OTHER ZONES Per the Growth Management Ordinance, future finance plans for other zones which impact facilities in common with Zone 13 shall be coordinated with this Finance Plan. Coordination, however, shall not require identical funding methods. ING AND AREAS OF DEVELOPMENT This plan is based on certain assumptions regarding the timing of development of Zone 13 in relation to other zones that share certain facilities with Zone 13. In the event that another zone develops earlier or later than anticipated, this plan may need to be amended. 161 October 1995 Zone 13 LFMP The areas of development, referred to as Finance Areas herein, are detailed in Exhibit 52, on page 164. These Financing Areas respect the following: 0) Property 0 wner bou&r i e$ - Finance Area 7 is owned by SDG&E, Finance Area 1 is owned by the Gemological Institute of America, a portion of Finance Area 2 is owned by the National Association of Music Merchants, and the remaining Finance Areas are currently owned by the Carlsbad Ranch Company and its affiliates. .. (ii) rinclples Because this Finance section is being processed concurrently with the Carlsbad Ranch Specific Plan SP 207(A) and the Zone 13 LFMP (87-13B), this section describes how the Finance Areas in this Finance Plan are designed to be consistent with and cross-referenced to the Specific Plan Areas in SP 207(A) and the General Plan Land Use Subareas from LFMP(87-13B). Specific Plan Area Consistency - The finance areas have been drawn and numbered, to the extent possible, to conform to the Planning Areas identified in the Carlsbad Ranch Specific Plan (Planning/Finance Areas 1 through 6). Planning Area/Finance Area 1 is owned by the Gemological Institute of America. Land uses and facility requirements vary with the geographic location between various parcels owned by the Carlsbad Ranch Company, hence Finance Areas 2 through 6 are called out separately. Since Zone 13 encompasses additional property north of Cannon Road which is not a part of the Specific Plan but which is required to participate in financing mechanisms, this property has been designated as Finance Area 7. Since Planning Area 8a of the Specific Plan and a portion of Planning Area 8b are a part of the golf course associated with the Resort, these areas are incorporated into Finance Area 5, rather than being numbered as stand alone Finance Areas. Planning Area 9 is not included in the financing areas because it will remain natural open space. Zone 13 LFMP Land Use Subarea Consistency - The Zone 13 LFMP divides the zone into General Plan Land Use Subareas based on land use and ownership. For properties within the Carlsbad Ranch Specific Plan SP 207(A), the General Plan Land Use Subareas are divided similarly to the Specific Plan Areas. For ease of reference, the following matrix identifies the Planning Areas from’ SP 207(A) and the General Plan Land Use Subarea from the Zone 13 LFMP which correlate to each of the Finance Area shown on Exhibit 52 on page 164. 162 October 1995 Zone 13 LFMP I Finance Area 4 4 TR-3 Planning Area General Plan [SP 207(A)] Land Use Subarea 5 5,8a, 8b TR-2 6 6 R 7 Not a part TR- 1 Zone 13's Finance Areas may, or may not, develop in numerical order and the finance plan does not require the sequential development of the zone. Each facility is linked to the related development area, regardless of timing. SUMMARY The appropriate financing mechanism for each special condition was determined based on the scale, scope and timing of the improvement. The following matrix (Exhibit 53, on page 165) summarizes the financing strategy for each public facility and also correlates the schedule of facility requirements to individual Finance Areas within Zone 13. A discussion of each facility follows, including a detailed description of the financial guarantee for each special condition. Zone 13 LFMP 163 October 1995 LEGEND I I ' Finance Area 1 Open Space Area, Not a Part ~ Hofman Planning ==A s s o c i a t e s Zone 13 - Finance Areas EXHIBIT52 164 Zone 13 LFMP ,' Ouober 1995 Parks Estimated Cost Financing Mechanism Guarantee Participating Finance Areas FinancinP Mechanism Recreational Facilities for employees within Zone 13 NIA Local Facilities Management Fee (LFM Fee) Payment of LFM Fee at building permit issuance Finance Areas 1, 2, 3, 4, 5, 6 and 7 A Zone 13 LFM Fee shall be established to fund recreational facilities to offset the demand created by employees within Zone 13. The amount of the fee shall be 40 cents per square foot of non-residential development within Zone 13. Guarantee Payment of LFM Fee at building permit issuance. Zone 13 WMP 166 October 1995 Drainage Condition C1 Estimated Cost Financing Mechanism Guarantee 51" - 60" Storm Drain Line BAA $873,439 Developer Funding Improvement Agreement prior to Final Map recordation Participating Finance Areas Reimbursement Finance Areas 1, 5, 6, and 7 Drainage Fees Financing Mechanism If at the time of development of Finance Areas 1, 5, 6 or 7, the City Engineer determines that this drainage facility is necessary to accommodate that Finance Area, the developer(s) of Finance Area 1, 5, 6 or 7, shall finance its construction. If needed, this facility would normally be imposed as a condition of approval on the tentative map@) for these Finance Areas. Guarantee If determined to be needed at the time of development, the City can ensure this improvement will be constructed with the development of Finance Area 1, 5, 6 or 7 by imposing Condition C 1 as a condition of approval on the appropriate tentative map(s). Condition C1 referenced above, if determined to be needed by the City Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map for Finance Area 1, 5, 6 or 7. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. Reimbursemea This 51"- 66" storm drain (BAA) is identified in the Master Drainage Plan and as such is included in the City's Drainage Fee program. The developer may receive reimbursement for costs directly related to the construction of this facility to the extent that funds are available from drainage fees as allowed under Section 20.09.090 of the Carlsbad Municipal Code. The schedule for reimbursement shall be 'based on the revised Master Drainage Plan, the City's capital improvement program and the availability of unobligated drainage funds. Zone 13 LFMP 167 October 1995 Drainage Condition D1 Estimated Cost Financing Mechanism Guarantee Participating Finance Areas Reimbursement Mechanism 42" - 48" Storm Drain Line CB $795,667 Developer Funding Improvement Agreement prior to Final Map recordation Finance Areas 2, 3, 4 and 5 Drainage Fees If at the time of development of Finance Areas 2, 3, 4 or 5, City Engineer determines that this drainage facility is necessary to accommodate that finance area, the developer of Finance Area 2, 3, 4 or 5 shall finance its construction. If needed, this facility would normally be imposed as a condition of approval on the tentative map(s) for these Finance Areas. Guarantee If determined to be needed at the time of development, the City can ensure this improvement will be constructed with the development of Finance Areas 2, 3. 4 or 5 by imposing Condition D1 as a condition of approval on the appropriate tentative map(s). Condition D1 referenced above if determined to be needed by the City Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map for Finance Area 2, 3, 4 or 5. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. Re im bursemea This 42"48" storm drain (CB) is identified in the Master Drainage Plan and as such is included in the City's Drainage Fee program. The developer may receive reimbursement for costs directly related to the construction of this facility to the extent that funds are available from drainage fees as allowed under Section 20.09.090 of the Carlsbad Municipal Code. The schedule for reimbursement shall be based on the revised Master Drainage Plan, the City's capital improvement program and the availability of unobligated drainage funds. Zone 13 LFMP 168 October 1995 Drainage Condition D2 Estimated Cost Financing Mechanism Guarantee Participating Finance Areas Reimbursement Mechanism 42" - 51" Storm Drain Line CC $855,945 Developer Funding Improvement Agreement prior to Final Map recordation Finance Areas 2, 3, 4 and 5 Drainage Fees If at the time of development of Finance Areas 2, 3, 4 or 5, the City Engineer determines that this drainage facility is necessary to accommodate that finance area, the developer of Finance Area 2, 3, 4 or 5 shall finance its construction. If needed, this facility would normally be imposed as a condition of approval on the tentative map(s) for these Finance Areas. Guarantee If determined to be needed at the time of development, the City can ensure this improvement will be constructed with the development of Finance Area 2, 3, 4 or 5 by imposing Condition D2 as a condition of approval on the appropriate tentative map(s). Condition D2 referenced above, if determined to be needed by the City Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map for Finance Area 2, 3, 4 or 5. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. bursemem This 42" - 5 1 " storm drain (CC) is identified in the Master Drainage Plan and as such is included in the City's Drainage Fee program. The developer may receive reimbursement for costs directly related to the construction of this facility to the extent that funds are available from drainage fees as allowed under Section 20.09.090 of the Carlsbad Municipal Code. The schedule for reimbursement shall be based on the revised Master Drainage Plan, the City's capital improvement program and the availability of unobligated drainage funds. October 1995 Zone 13 LFMP 169 Circulation Condition la Estimated Cost Financing Mechanism Guarantee Participating Finance Areas Reimbursement Facility also required by: Cannon Rd/I-5 NB ramps and Cannon RdlI-5 SB ramps - traffic signals, restriping and widen southbound ramp $232 ,OOO Public Facilities Fee (PFF), Traffic Impact Fee (TW Payment of PFF and TIF at building permit issuance or Improvement Agreement Finance Areas 1, 2, 5 and 7 City PFF and TIF Zones 3. 5. 8. 15 and 24 The above mentioned signal lights and intersection improvements including widening of the southbound ramps are included in the City's Capital Improvement Program. If at the time of development of Finance Areas 1, 2, 5 or 7, these improvements have not been installed and the City Engineer determines that these facilities are necessary to maintain the Growth Management Circulation Performance Standard, the developer of the applicable Finance Area shall front the construction of the needed signals and improvements. Guarantee Payment of PFF and TIF prior to issuance of building permit for any affected finance areas. In addition, if determined to be needed at time of development and if not already constructed, the City can ensure this improvement will be constructed with the development of Finance Area 1, 2. 5 or 7 by imposing Condition la as a condition of approval on the appropriate tentative map(s). Condition la referenced above, if determined to be needed by the City Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable.fina1 map. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. 170 October 1995 Zone 13 w;MP bursem If the developer(s) of Finance Areas 1, 2, 5 or 7 is required to install the improvements mentioned above, that developer(s) shall receive reimbursements for costs directly related to the installation of these improvements to the extent that funds are available from Public Facilities Fee and Traffic Impact Fee revenues. The schedule for reimbursement shall be based on the City's Capital Improvement Program (CIP) and the availability of unobligated PFF and TIF funds. Zone 13 w;MP 171 October 1995 11 Circulation Condition 2a Estimated Cost Financing Mechanism Guarantee Participating Finance Areas Reimbursement Facility also required by: Cannon Road from 1-5 to Car Country Drive - add lane in westbound direction $150,000 Traffic Impact Fee (TIF), Developer Funding Payment of TIF at building permit issuance or Improvement Agreement Finance Areas 1 , 2, 4, 5, and 7 City TIF Zones 3, 5, 8, 15 and 24 The portion of the above mentioned improvements from 1-5 to Paseo del Norte is included in the City's Capital Improvement Program as being funded through Traffic Impact Fees. However, only Finance Areas 1, 2, 4 and 5 are required to participate in this particular improvement. If at the time of development of Finance Areas 1, 2,4,5 or 7, these improvements have not been installed and the City Engineer determines that these facilities are necessary to maintain the Growth Management Circulation Performance Standard, the developer of the applicable Finance Area shall front the construction of the needed improvements. Guarantee Payment of TIF prior to issuance of a building permit. In addition, if determined to be needed and if not already constructed, the City can ensure these improvements will be constructed with the development of Finance Area 1, 2, 5, 6 or 7 by imposing Condition 2d as a condition of approval on the appropriate tentative map@). The condition referenced above, if determined to be needed by the City Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. Zone 13 LFMP 172 October 1995 If the developer(s) of Finance Area 1, 2, 4, 5 or 7, is required to construct the above improvements, they may be eligible for reimbursements pursuant to Section 20.16.041 of the Carlsbad Municipal Code. In addition, if the developer(s) of Finance Areas 1, 2, 4, 5 or 7 is required to install the improvements mentioned above, that developer(s) shall receive reimbursements for costs directly related to the installation of these improvements to the extent that funds are available from Traffic Impact Fee revenues. The schedule for reimbursement shall be based on the City's Capital Improvement Program (CIP) and the availability of unobligated TIF funds. Zone 13 LFMP 173 October 1995 Circulation Condition 2b Estimated Cost Financing Mechanism Guarantee Participating Finance Reimbursement Cannon Road from Car Country Drive to eastern zone boundary - two lanes each direct ion $8,467 ,OOO CFD No. 1, Assessment District 95-1, TransNet, Cannon Road West Fee Program Formation of and participation in Assessment District 95-1 or Frontage Improvement Agreement, Payment of Cannon Road West fee prior to Building Permit, Participation in CFD No. 1, TransNet Funds Finance Areas 1, 2, 4, 5, and 7 Cannon Road West Fee Program Zones 3. 5. 8. 15 and 24 The portion of the above improvements from Car Country Drive to the eastern boundary of the Carlsbad Ranch property are anticipated to be funded by proposed Assessment District 95- 1. The entire Carlsbad Ranch properties are anticipated to participate in Assessment District 95-1. However, only Finance Areas 1, 2, 4 and 5 of Carlsbad Ranch are required to participate in the funding of this particular improvement. Finance Area 7 is not within the Carlsbad Ranch Specific Plan area and therefore may not be included within Assessment District 95-1. If Finance Area 7 is not included in Assessment District 95-1, then an alternative mechanism will be required for Finance Area 7. In addition to Assessment District 95-1 funding, the inside lanes of Cannon Road and frontage improvements in General Plan Open Space are also included in the Cannon Road West Fee Program. As proposed, certain Zone 13 Finance Areas, are included in the proposed Cannon Road West Fee Program. These are Finance Areas 1, 2, 5, and 7. The portion of each Finance Area required to participate in the Cannon Road West Fee Program is specifically identified in the fee study dated November 4, 1994 as contained in Appendix A-5. For any Finance Area required to participate in both Assessment District 95-1 and the Cannon Road West Fee Program, to the extent that the improvements covered in each program are duplicated, participation in Assessment District 95-1 will be credited against the fees required per the Cannon Road West Fee Program. If Assessment District 95-1 is not formed (or if any of Finance Areas 1, 2, 4, 5 or 7 are not. included), then construction of the frontage improvements could be guaranteed through an Improvement Agreement or alternative mechanism as discussed below, with the inside lanes being guaranteed by the Cannon Road West Fee Program. In the event that Assessment District 95-1 is not formed and/or the Cannon Road West Fee Program is not adopted, alternative funding Zone 13 LFMP 174 October 1995 mechanisms (e.g. bonds, letters of credit, reimbursement agreements, development impact fees, improvement agreements, etc) may be used without amendment to this document, subject to the review and approval of the City Engineer, Financial Management Director and City Attorney. If at the time of development of Finance Areas 1, 2, 4, 5 or 7, these improvements have not been installed and the City Engineer determines that these facilities are necessary to maintain the Growth Management Circulation Performance Standard, the developer of the applicable Finance Area shall front the construction of the needed improvements. Guarantee Formation of Assessment District 95-1 prior to final map recordation. Adoption of Cannon Road West Fee Program prior to final map recordation. Payment of Cannon Road West Fee prior to building permit issuance. In addition, if determined to be needed at time of development and if not already constructed, the City can ensure this improvement will be constructed with the development of Finance Area 1, 2,4,5 or 7 by imposing Condition 2b as a condition of approval on the appropriate tentative map(s). In the event that either Assessment District 95-1 is not formed or the Cannon Road West Fee Program is not adopted (or neither event occurs) prior to recordation of a final map for affected Finance Areas, the property owner(s) may propose an alternative financial mechanism equivalent to the Assessment District tax or fee amount, subject to the approval of the City Engineer, Financial Management Director and City Attorney. If an Improvement Agreement is utilized as an alternative financing mechanism, then the improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. If the developer@) of Finance Areas 1, 2, 4, 5 or 7 are required to construct the above improvements, they may be eligible for reimbursements pursuant to Section 20.16.041 of the Carlsbad municipal Code. In addition, if the developer(s) of Finance Area 1, 2, 4, 5 or 7 are required to construct frontage improvements which would have been the responsibility of another developer, then the developer constructing the improvements may receive reimbursement from the responsible property owner. The City may require the reimbursement from the responsible developer as a condition of approval of that developer(s) tentative map. Zone 13 LFMP 175 October 1995 Circulation Condition 2c II Estimated Cost Financing Mechanism Guarantee Participating Finance Areas Reimbursement Facility also required by: Armada Drive/Lego Drive from Cannon Road to Palomar Airport Road $2,573,000 Assessment District 95- 1 Formation of Assessment District 95-1 or Improvement Agreement prior to Final Map Recordation Finance Areas 1, 2, 3, 4, 5 and 6 NIA none The above mentioned improvements are included in the proposed Assessment District 95-1. The entire Carlsbad Ranch properties are anticipated to participate in Assessment District 95-1. Finance Areas 1, 2, 3, 4, 5 and 6 are required to participate in the funding of this particular improvement. In the event that Assessment District 95-1 is not formed, alternative fbnding mechanisms (e.g. bonds, letters of credit, reimbursement agreements, development impact fees, etc.) may be used without amendment to this document, subject to the review and approval of the City Engineer, Financial Management Director and the City Attorney. If at the time of development of Finance Areas 1, 2, 3, 4, 5 or 6 these improvements have not been installed and the City Engineer determines that these facilities are necessary to maintain the Growth Management Circulation Performance Standard, the developer of the applicable Finance Area shall front the construction of the needed improvements. Guarantee Formation of Assessment District 95-1 prior to Final Map recordation. In addition, if determined to be needed at time of development and if not already constructed, the City can ensure this improvement will be constructed with the development of Finance Area 1, 2, 3, 4, 5 or 6 by imposing Condition 2c as a condition of approval on the appropriate tentative map(s). In the event that Assessment District 95-1 is not formed prior to recordation of a final map for the affected Finance Areas, the property owner(s) may propose an alternative financial mechanism equivalent to the Assessment District tax or fee amount, subject to the approval of the City Engineer, Financial Management Director and City Attorney. 176 October 1995 Zone 13 LFMP If an Improvement Agreement is utilized as an alternative financing mechanism, then the improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. October 1995 Zone 13 LFMP 177 Circulation Condition 2d Estimated Cost Financing Mechanism Guarantee Participating Finance Areas Reimbursement Facility also required by: Mecm Paseo del NortelCannon Road - traffic signal, restriping, and add a northbound exclusive right-turn lane, an eastbound left-turn lane and a westbound shared throughlright-turn $169,000 Public Facilities Fee (PFF), Developer Funding Payment of PFF at building permit issuance or Improvement agreement prior to Final Map recordation Finance Areas 1, 2, 5, 6 and 7 City PFF Zones 3. 5. 8. 15 and 24 The above mentioned signal is included in the City’s Capital Improvement Program. The intersection improvements are anticipated to be developer funded. If at the time of development of Finance Area 1, 2, 5, 6 or 7, these improvements have not been installed and the City Engineer determines that these improvements are necessary to maintain the Growth Management Circulation Performance Standard, the developer of the applicable Finance Area shall finance their construct ion. Guarantee Payment of PFF prior to issuance of a building permit. In addition, if determined to be needed and if not already constructed, the City can ensure these improvements will be constructed with the development of Finance Area 1, 2, 5, 6 or 7 by imposing Condition 2d as a condition of approval on the appropriate tentative map(s). Condition 2d referenced above, if determined to be needed by the City Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. Zone 13 UMP 178 October 1995 ursem If the developer(s) of Finance Areas 1, 2, 5, 6 or 7 are required to construct the above improvements, they may be eligible for reimbursements pursuant to Section 20.16.041 of the Carlsbad Municipal Code. In addition, if the developer(s) of Finance Area 1, 2, 5, 6 or 7 installs the signal light mentioned above, that developer(s) shall receive reimbursement for costs directly related to the installation of these signals to the extent that funds are available from Public Facility Fee revenues. The schedule for reimbursement shall be based on the City's Capital Improvement Program (CIP) and the availability of unobligated PFF funds. 179 October 1995 Zone 13 LZMP Circulation Condition 2e Estimated Cost Financing Mechanism Guarantee Participating Finance Areas Reimbursement Facility also Required by: Car Country Drive/Cannon Road - Traffic signal, restriping and add a northbound exclusive right-turn lane $1 10,000 Developer Funding Improvement Agreement prior to Final Map recordation Finance Areas 1, 2, 5, 6 and 7 Zones 3, 8. 15 and 24 Yes If at the time of development of Finance Area 1, 2, 5, 6 or 7, the Engineer determines that these improvements are necessary to maintain the Growth Circulation Management Performance standard, the developer of that Finance Area shall finance their construction. Guarantee If determined to be needed at time of development, the City can ensure these improvements will be constructed with the development of Finance Area 1, 2, 5, 6 or 7 by imposing Condition 2e as a condition of approval on the appropriate tentative map(s). Condition 2e referenced above, if determined to be needed by the City Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. Reimburse- If the developer(s) of Finance Areas 1, 2, 5, 6 or 7 are required to construct the above improvements, they may be eligible for reimbursements pursuant to Section 20.16.041 of the Carlsbad Municipal Code. 180 October 1995 Zone 13 LFMP Circulation Condition 2f Estimated Cost Financing Mechanism Guarantee Participating Finance Areas Reimbursement 11 Facilitv also reauired bv: Paseo del Norte/Palomar Airport Road - westbound exclusive rieht-turn lane $185,000 Assessment District 95- 1 Formation of Assessment District 95-1 or Improvement Agreement prior to Final Map Recordation Finance Areas 2, 3, 4 and 6 Yes Zones 3. 5. 8 and 24 P > I ~ Mechanism The above mentioned improvements are included in the proposed Assessment District 95-1. The entire Carlsbad Ranch properties are anticipated to participate in Assessment District 95-1. However, only Finance Areas 2, 3, 4 and 6 are required to participate in the funding of this particular improvement. In the event that Assessment District 95-1 is not formed, alternative funding mechanisms (e.g. bonds, letters of credit, reimbursement agreements, development impact fees, etc.) may be used without amendment to this document, subject to the review and approval of the City Engineer, Financial Management Director and the City Attorney. If at the time of development of Finance Areas 2, 3, 4 or 6, these improvements have not been installed and the City Engineer determines that these facilities are necessary to maintain the Growth Management Circulation Performance Standard, the developer of the applicable Finance Area shall front the construction of the needed improvements. Guarantee Formation of Assessment District 95-1 prior to Final Map recordation. In addition, if determined to be needed at time of development and if not already constructed, the City can ensure this improvement will be constructed with the development of Finance Area 2, 3, 4 or 6 by imposing Condition 2f as a condition of approval on the appropriate tentative map(s). In the event that Assessment District 95-1 is not formed prior to recordation of a final map for the affected Finance Areas, the property owner(s) may propose an alternative financial mechanism equivalent to the Assessment District tax or fee amount, subject to the approval of the City Engineer, Financial Management Director and City Attorney. Zone 13 LFMP 181 October 1995 If an improvement agreement is utilized as an alternative financing mechanism, then the improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. If the developer(s) of Finance Areas 2, 3, 4, or 6 are required to construct the above improvements, they may be eligible for reimbursements pursuant to Section 20.16.041 of the Catlsbad Municipal Code to the extent funds are included in Assessment District 95-1, subject to the review and approval of the City Engineer. Zone 13 LFMP 182 October 1995 Circulation Condition 2g II 1 Estimated Cost Financing Mechanism Guarantee Participating Finance Areas Reimbursement 11 Facility also reauired bv: Leg0 DriveKannon Road - traffic signal and construction of imDrovements $5,000 (signal included in Armadakg0 Drive cost) Assessment District 95- 1 Participation in Assessment District 95-1 or Improvement Agreement prior to Final Map Recordation Finance Areas 1, 2, 4, 5 and 7 Yes Zones 3. 5. 8. 15 and 24 I' I,, The above improvements are anticipated to be funded by proposed Assessment District 95-1. The entire Carlsbad Ranch properties are anticipated to participate in Assessment District 95-1. However, only Finance Areas 1, 2, 4 and 5 are required to participate in the funding of this particular improvement. Finance Area 7 is not within the Carlsbad Ranch Specific Plan area and therefore may not be included within Assessment District 95-1. If Finance Area 7 is not included in Assessment District 95-1, then an alternative mechanism will be required for Finance Are 7. If Assessment District 95-1 is not formed (or if any of Finance Areas 1, 2, 4, 5 or 7 are not included), then alternative funding mechanisms (e.g. bonds, letters of credit, reimbursement agreements, development impact fees, etc.) may be used without amendment to this document, subject to the review and approval of the City Engineer, Financial Management Director and the City Attorney. If at the time of development of Finance Areas 1, 2,4, 5 or 7, these improvements have not been installed and the City Engineer determines that these facilities are necessary to maintain the Growth Management Circulation Performance Standard, the developer of the applicable finance Area shall front the construction of the needed improvements. Guarantee Formation of Assessment District 95-1 prior to Final Map recordation. In addition, if determined to be needed at time of development and if not already constructed, the City can ensure this improvement will be constructed with the development of Finance Area 1, 2, 4, 5 or 7 by imposing Condition 2g as a condition of approval on the appropriate tentative map(s). In the event that Assessment District 95-1 is not formed prior to recordation of a final map for the affected Finance Areas, the property owner(s) may propose an alternative financial mechanism 183 October 1995 Zone I3 LFMP equivalent to the Assessment District tax or fee amount, subject to the approval of the City Engineer, Financial Management Director and City Attorney. If an improvement agreement is utilized as an alternative financing mechanism, then the improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. If the developer(s) of Finance Areas 1, 2, 4, 5 or 7 are required to construct the above improvements, they may be eligible for reimbursements pursuant to Section 20.16.041 of the Carlsbad Municipal Code to the extent funds are included in Assessment District 95-1, subject to the review and approval of the City Engineer. Zone 13 LFMP 184 October 1995 Armada DrivelPalomar Airport Road - traffic signal modification, restriping, add eastbound left-turn lane and westbound exclusive right- turn lane Circulation Condition 2h Estimated Cost Financing Mechanism Guarantee Participating Finance Areas Reimbursement Facility also required by: Zones 3, 5, 8 and 24 $205 ,OOO Assessment District 95-1 Participation in Assessment District 95-1 or Improvement Agreement prior to Final Map Recordation Finance Areas 2, 3, and 4 Yes The above improvements are anticipated to be funded by proposed Assessment District 95-1. The entire Carlsbad Ranch properties are anticipated to participate in Assessment District 95-1. However, only Finance Areas 2, 3 and 4 are required to participate in the funding of this particular improvement. If Assessment District 95-1 is not formed (or if any of Finance Areas 2, 3 or 4 are not included), then alternative funding mechanisms (e.g. bonds, letters of credit, reimbursement agreements, development impact fees, etc.) may be used without amendment to this document, subject to the review and approval of the City Engineer, Financial Management Director and the City Attorney. If at the time of development of Finance Areas 2, 3, or 4, these improvements have not been installed and the City Engineer determines that these facilities are necessary to maintain the Growth Management Circulation Performance Standard, the developer of the applicable Finance Area shall front the construction of the needed improvements. Guarantee Formation of Assessment District 95-1 prior to Final Map recordation. In addition, if determined to be needed at time of development and if not already constructed, the City can ensure this improvement will be constructed with the development of Finance Area 2, 3, or 4 by imposing Condition 2h as a condition of approval on the appropriate tentative map(s). In the event that Assessment District 95-1 is not formed prior to recordation of a final map forthe affected Finance Areas, the property owner@) may propose an alternative financial mechanism equivalent to the amount, subject to the approval of the City Engineer, Financial Management Director and City Attorney. 1s October 1995 Zone 13 LJ'MP If an improvement agreement is utilized as an alternative financing mechanism, then the improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. If the developer(s) of Finance Areas 2, 3, or 4 are required to construct the above improvements, they may be eligible for reimbursements pursuant to Section 20.16.041 of the Carlsbad Municipal Code to the extent funds are included in Assessment District 95-1, subject to the review and approval of the City Engineer. Zone 13 L.FMP 186 October 1 !395 Circulation Condition 2i Estimated Cost Hidden Valley Road/Palomar Airport Road - install traffic signal and construction of intersection $155,000 Financing Mechanism I Assessment District 95-1 Guarantee Participating Finance Areas Reimbursement Participation in Assessment District 95- 1 or Improvement Agreement prior to Final Map Recordation Finance Areas 2, 3, and 4 Yes Facilitv also reauired bv: I Zones 3. 5. 8 and 24 Mechanism The above improvements are anticipated to be hnded by proposed Assessment District 95-1. The entire Carlsbad Ranch properties are anticipated to participate in Assessment District 95-1. However, only Finance Areas 2, 3 and 4 are required to participate in the funding of this particular improvement. If Assessment District 95-1 is not formed (or if any of Finance Areas 2, 3 or 4 are not included), then alternative hnding mechanisms (e.g. bonds, letters of credit, reimbursement agreements, development impact fees, etc.) may be used without amendment to this document, subject to the review and approval of the City Engineer, Financial Management Director and the City Attorney. If at the time of development of Finance Areas 2, 3, or 4, these improvements have not been installed and the City Engineer determines that these facilities are necessary to maintain the Growth Management Circulation Performance Standard, the developer of the applicable Finance Area shall front the construction of the needed improvements. Guarantee Formation of Assessment District 95-1 prior to Final Map recordation. In addition, if determined to be needed at time of development and if not already constructed, the City can ensure this improvement will be constructed with the development of Finance Area 2, 3, or 4 by imposing Condition 2i as a condition of approval on the appropriate tentative map@). In the event that Assessment District 95-1 is not formed prior to recordation of a final map for the affected Finance Areas, the property owner(s) may propose an alternative financial mechanism equivalent to the amount, subject to the approval of the City Engineer, Financial Management Director and City Attorney. October 1995 Zone 13 LFMP 187 If an improvement agreement is utilized as an alternative financing mechanism, then the improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. ursemea If the developer(s) of Finance Areas 2, 3, or 4 are required to construct the above improvements, they may be eligible for reimbursements pursuant to Section 20.16.041 of the Carlsbad Municipal Code to the extent funds are included in Assessment District 95-1, subject to the review and approval of the City Engineer. Zone I3 LFMP 188 October 1995 Circulation Condition 2.j.i (Cannon Road not extended) Estimated Cost Financing Mechanism Guarantee Reimbursement Participating Finance Area Palomar Airport Road/I-S Northbound Ramps - restriping $1,725 Developer Funding Improvement Agreement prior to Final Map recordation Yes Finance Area 2, 3, 4 and 6 If at the time of development of Finance Area 2, 3, 4 or 6, the Engineer determines that these improvements are necessary to maintain the Growth Circulation Management Performance standard, the developer of that Finance Area shall finance their construction. ‘Guarantee If determined to be needed at time of development, the City can ensure these improvements will be constructed with the development of Finance Area 2, 3, 4 or 6 by imposing Condition 2.j.i (Cannon Road not extended) as a condition of approval on the appropriate tentative map(s). Condition 2.J.i. (Cannon Road not extended) referenced above, if determined to be needed by the City Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. Reimburse- If the developer(s) of Finance Areas 2, 3. 4 or 6 are required to construct the above improvements, they may be eligible for reimbursements pursuant to Section 20.16.041 of the Carlsbad Municipal Code. 189 October 1995 Zone 13 L.FMP Circulation Condition 2.j.ii (Cannon Road not Extended) Estimated Cost Financing Mechanism Guarantee Reimbursement Participating Finance Areas College Boulevard/Palomar Airport Road - restriping and improvements $1.150 Developer Funding Improvement Agreement prior to Final Map recordation Yes Finance Areas 1, 2. 3, 4, 5, 6 and 7 Financing Mechanism If at the time of development of Finance Area 1, 2. 3, 4, 5. 6 or 7, the City Engineer'determines that this improvement is necessary to maintain the Growth Management Circulation Performance, the developer of that Finance Area shall finance its construction. Guarantee If determined to be needed at the time of development, the City can ensure this improvement will be constructed with the development of Finance Area 1, 2, 3, 4, 5, 6, or 7 by imposing Condition 2.j.ii (Cannon Road not extended) as a condition of approval on the appropriate tentative map(s). Condition 2.j.ii (Cannon Road not extended) referenced above, if determined to be needed by the City Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of a final map for Finance Area 1, 2, 3, 4, 5, 6, or 7. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. Reimburse- If the developer(s) of Finance Areas 1.2, 3, 4, 5, 6 or 7 are required to construct the above improvements, they may be eligible for reimbursements pursuant to Section 20.16.041 of the Carlsbad Municipal Code. Zone 13 LFMP 190 October 1995 Circulation Condition 2.j.i (Cannon Road Extended) Estimated Cost Financing Mechanism Guarantee Reimbursement Participating Finance Areas Cannon Road/IJ Northbound Ramps - widening and restriping $1,150 TIF. Developer funding Improvement Agreement prior to Fina recordation TIF Finance Areas 1, 2, 5, 6, and 7 The above mentioned ramp widening is included in the City's Capital Improvement Program as being funded through TIF fees. The intersection improvements are anticipated to be developer funded. If at the time of development of Finance Area 1, 2, 5, 6 or 7, these improvements have not been installed and the City Engineer determines that these improvements are necessary to maintain the Growth Management Circulation Performance Standard. the developer of the applicable Finance Area shall finance their construction. Guarantee Payment of TIF fees prior to issuance of a building permit. In addition, if determined to be needed and if not already constructed, the City can ensure these improvements will be constructed with the development of Finance Area 1, 2, 5, 6 or 7 by imposing Condition 2.j.i. (Cannon Road extended) as a condition of approval on the appropriate tentative map(s). Condition 2.j.i (Cannon Road extended) referenced above, if determined to be needed by the City Engineer. shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. Reimburse- If the developer(s) of Finance Areas 1, 2, 5, 6 or 7 are required to construct the above improvements, they may be eligible for reimbursements pursuant to Section 20.16.041 of the Carlsbad Municipal Code. Zone 13 LFMP 191 October 1995 In addition, if the developer@) of Finance Area 1, 2, 5, 6 or 7 installs the signal light mentioned above, that developer(s) shall receive reimbursement for costs directly related to the installation of these signals to the extent that funds are available from Traffic Impact Fee revenues. The schedule for reimbursement shall be based on the City's Capital Improvement Program (CIP) and the availability of unobligated TIF funds. October 1995 Zone 13 L.FMP 192 Circulation Condition 2.j.ii (Cannon Road Extended) Estimated Cost Financing Mechanism Guarantee Participating Finance Areas Palomar Airport RoadlI-5 Northbound Ramps - restriping $1,725 Developer Funding Improvement Agreement prior to Final Map recordation Finance Areas 2, 3, 4 and 6 Financ in&kzhmm If at the time of development of Finance Area 2, 3, 4 or 6. the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, - the developer of that Finance Area shall finance its construction. Guarantee If determined to be needed at time of development, the City can ensure this improvement will be constructed with the development of Finance Area 2. 3, 4 or 6 by imposing Condition 2.j.ii (Cannon Road extended) as a condition of approval on the appropriate tentative map(s). Condition 2.j.ii. (Cannon Road extended) referenced above, if determined to be needed by the City Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of a final map for Finance Area 2, 3, 4 or 6. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. Zone 13 LFMP 193 October 1995 Circulation Condition 2 .j .iii (Cannon Road extended) Estimated Cost Financing Mechanism Guarantee College Boulevard/Palomar Airport Road - Restriping and improvements Participating Finance Areas Reimbursement Facility also required by: $1,150 Developer Funding Improvement Agreement prior to Final Map Recordation Finance Areas 2, 3, 4. and 6 Yes Zones 3. 5. 8 and 24 Financing Mechanism If at the time of development of Finance Area 2, 3. 4 or 6. the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that Finance Area shall finance its construction. Guarantee If determined to be needed at time of development, the City can ensure this improvement will be constructed with the development of Finance Area 2, 3. 4 or 6 by imposing Condition 2.j.iii. (Cannon Road extended) as a condition of approval on the appropriate tentative map(s). Condition 2.j.iii. (Cannon Road extended) referenced above, if determined to be needed by the City Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of a final map for Finance Area 2, 3.4 or 6. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. Reimbursemeu If the developer(s) of Finance Areas 2, 3. 4 or 6 are required to construct the above improvements, they may be eligible for reimbursements pursuant to Section 20.16.041 of the Carlsbad Municipal Code. 194 October 1995 Zone 13 LFMP Circulation Condition 2.j.iv (Cannon Road extended) Estimated Cost Financing Mechanism Guarantee Participating Finance Areas Reimbursement Facility also required by: Cannon Road from eastern Zone boundary to El Camino Real - two lanes in each direction $3,247,000 Cannon Road West Fee Program. CFD No. 1, TransNet Funds, Developer Funding Payment of Cannon Road West Fee prior to issuance of a Building Permit or Improvement Agreement prior to Final Map Recordation Finance Areas 1, 2, 4, 5, and 7 Yes Zones 3. 5. 8. 15 and 24 Financh Mechanism A portion of the inside lanes and certain frontage improvements for Cannon Road from the eastern Zone boundary to El Camino Real are anticipated to be funded by the proposed Cannon Road West Fee program. Other funding sources are Community Facilities District (CFD) No. 1 and TransNet Funds. Frontage improvements are anticipated to be funded by adjacent development. except within General Plan Open Space which is included in the fee program. The Zone 13 Finance Areas, and portions thereof, included in the proposed Cannon Road West Fee Program are Finance Areas 1, 2,4, 5 and 7. That portion of each area required to participate in the proposed fee program is identified in the fee study dated November 4, 1994 contained in Appendix A-5. Prior to issuance of a building permit for any project required to participate in the fee program, the applicant shall pay the fee as determined for that project in the Cannon road West Fee Program. In the event that the Fee Program is not adopted, alternative funding mechanisms (e.g. bonds. letters of credit, reimbursement agreements, development impact fees, etc.) may be used without amendment to this document, subject to the review and approval of the City Engineer, Financial Management Director and City Attorney. Guarantee Payment of Cannon Road West Fee prior to building permit issuance. In addition, if determined to be needed at time of development and if not already constructed, the City can ensure this improvement will be constructed with the development of Finance Area 1, 2, 4, 5 or 7 by imposing Condition 2.j.iv (Cannon Road extended) as a condition of approval on the appropriate tentative map(s). Zone 13 LFMP 195 October 1995 In the event that the Cannon Road West Fee Program is not adopted prior to issuance of a building permit for affected Finance .4reas. the propeny owner(s) may provide an alternative financial mechanism equivalent to the fee amount. subject to the approval of the City Engineer. Financial Management Director and City Attorney. Reimburseme nt If the developer(s) of Finance Area 1. 2. 4. 5 or 7 is required to construct the above improvements. they may be eligible for reimbursements pursuant to Section 20.16.031 of the Carlsbad Municipal Code. In addition, if the developer(si of Finance Areas 1. 2. 1. 5 or 7 is required to install the improvements mentioned above. that developer(s) shall receive reimbursements for costs directly reiated to the installation of these improvements to the estent that funds are available from the Cannon Road West Fee Program. subject to the review and approval of the City Engineer. Circulation Condition 2.j.v (Cannon Road extended) Estimated Cost Financing Mechanism Guarantee Participating Finance Areas Reimbursement Facility also required by: El Camino RealXannon Road - Traffic signal and improvements $340,000 TIF. PFF, Developer Funding Payment of TIF and PFF fee at issuance of building permit and/or Improvement Agreement prior to Final Map recordation Finance Areas 1, 2, 4, 5, and 7 Zones 3. 5. 8 and 24 Financing Mechanism A portion of the above improvements are included in the City's Capital Improvement Program as being funded by TIF and PFF fees. The remainder of the improvements is anticipated to be funded through developer funding. If at the time of development of Finance Areas 1, 2, 4, 5 or 7, these improvements have not been installed and the City Engineer determines that these facilities are necessary to maintain the Growth Management Circulation Performance Standard, the developer of the applicable Finance Area shall front the construction of the needed improvements. Guarantee If determined to be needed at time of development and if not already constructed, the City can ensure this improvement will be constructed with the development of Finance Area 1, 2, 4, 5 or 7 by imposing Condition 2.j.v (Cannon Road extended) as a'condition of approval on the appropriate tentative map(s). Condition 2.j.v (Cannon Road extended) referenced above, if determined to be needed by the City Engineer. shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. Zone 13 LFMP 197 October 1995 imbursemeu If the developer(s) of Finance Areas 1, 2, 4, 5 or 7 are required to construct the above improvements, they may be eligible for reimbursements pursuant to Section 20.16.041 of the Carlsbad Municipal Code. In addition, if the developer(s) of Finance Areas 1, 2, 4, 5 or 7 is required to install the improvements mentioned above, that developer(s) shall receive reimbursements for costs directly related to the installation of these improvements to the extent that funds are available from Traffic Impact Fee revenues. The schedule for reimbursement shall be based on the City's Capital Improvement Program (CIP) and the availability of unobligated TIF and PFF funds. Zone 13 LFMP 198 October 1995 Circulation Condition 3a Estimated Cost Financing Mechanisms Guarantee Reimbursement Participating Finance Areas Cannon Road/I-5 Northbound Ramps - restriping and add an eastbound leftlturn lane and northbound exclusive right-turn lane $4,600 TIF, Developer Funding Improvement Agreement prior to Final Map recordation TIF Finance Areas 1, 2, 5, 6, and 7 A portion of the above improvements are included in the City's Capital Improvement Program as being funded by TIF fees. The remainder of the improvements is anticipated to be funded through developer funding. If at the time of development of Finance Areas 1, 2, 5, 6 or 7, these improvements have not been installed and the City Engineer determines that these facilities are necessary to maintain the Growth Management Circulation Performance Standard, the developer of the applicable Finance Area shall front the construction of the needed improvements. Guarantee If determined to be needed at time of development and if not already constructed, the City can ensure this improvement will be constructed with the development of Finance Area 1, 2, 5, 6 or 7 by imposing Condition 3a (Cannon Road extended) as a condition of approval on the appropriate tentative map@). Condition 3a (Cannon Road extended) referenced above, if determined to be needed by the City Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map. The improvement agreement shall be in accordance with SectiQn 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. If the developer(s) of Finance Areas 1, 2, 5, 6 or 7 are required to construct the above improvements, they may be eligible for reimbursements pursuant to Section 20.16.041 of the Carlsbad Municipal Code. Zone 13 LFMP 199 October 1995 In addition, if the developer@) of Finance Areas 1, 2, 5, 6 or 7 is required to install the improvements mentioned above, that developer(s) shall receive reimbursements for costs directly related to the installation of these improvements to the extent that funds are available from Traffic Impact Fee revenues. The schedule for reimbursement shall be based on the City's Capital Improvement Program (CIP) and the availability of unobligated TIF funds. Zone 13 LFMP 200 October 1995 Circulation Condition 3b Estimated Cost Financing Mechanism Guarantee Participating Finance Areas Palomar Airport Road/I-5 Northbound Ramps - restriping $1,725 Developer Funding Improvement Agreement prior to Final Map recordation Finance Areas 2, 3, 4 and 6 If at the time of development of Finance Area 2. 3, 4 or 6. the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that Finance Area shall finance its construction. Guarantee If determined to be needed at time of development, the City can ensure this improvement will be constructed with the development of Finance Area 2, 3. 4 or 6 by imposing Condition 2.j.ii (Cannon Road extended) as a condition of approval on the appropriate tentative map(s). Condition 3.b. referenced above, if determined to be needed by the City Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of a final map for Finance Area 2, 3, 4 or 6. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 30.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds. cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. Zone 13 LFMP 201 October 1995 Circulation Condition 3c Estimated Cost Financing Mechanisms Guarantee Participating Finance Areas ~ Paseo del NorteKannon Road - add an eastbound left-turn and a westbound through lane $27,000 Developer Funding Improvement Agreement prior to Final Map recordation Finance Areas 1, 2, 5, 6, and 7 FinancinP Mechanism If at the time of development of Finance Area 1, 2, 5, 6, or 7, the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that Finance Area shall finance its construction. Guarantee If determined to be needed at time of development, the City can ensure this improvement will be constructed with the development of Finance Area 1, 2, 5, 6, or 7 by imposing Condition 3b as a condition of approval on the appropriate tentative map(s). Condition 3b referenced above, if determined to be needed by the City Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of a final map for Finance Area 1, 2, 5, 6, or 7. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. Reimbursemeu If the developer(s) of Finance Areas 1, 2, 5, 6 or 7 are required to construct the above improvements, they may be eligible for reimbursements pursuant to Section 20.16.041 of the Carlsbad Municipal Code. October 1995 Zone 13 LFMP 202 Circulation Condition 3d Estimated Cost Financing Mechanisms Guarantee Participating Finance Areas Paseo del Norte/Palomar Airport Road - restriping and add an eastbound exclusive right- turn lane $2,300 Developer Funding Improvement Agreement prior to Final Map recordation Finance Areas 2, 3, 4 and 6 Financ’ ing Mecm If at the time of development of Finance Area 2, 3, 4 or 6, the City Engineer deterniines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard. the developer of that Finance Area shall finance its construction. If determined to be needed at time of development, the City can ensure this improvement will be constructed with the development of Finance Area 2, 3, 4 or 6 by imposing Condition 3c as a condition of approval on the appropriate tentative map(s). Condition 3c referenced above, if determined to be needed by the City Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of a final map for Finance Area 2, 3, 4 or 6. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. Zone 13 LFMP 203 October 1995 Circulation Condition 3e Estimated Cost Financing Mechanisms Guarantee Participating Finance Areas El Camino RealKannon Road - restriping and add an eastbound exclusive right-turn lane $6,325 Developer Funding Improvement Agreement prior to Final Map recorda tion Finance Areas 1, 2, 5, 6, and 7 If at the time of development of Finance Area 1, 2, 5, 6 or 7, the City Engineer determines that this improvement is necessary to maintain the Growth Management Circulation Performance Standard, the developer of that Finance Area shall finance its construction. Guarantee If determined to, be needed at the time of development, the City can ensure this improvement will be constructed with the development of Finance Area 1, 2, 5, 6 or 7 by imposing Condition 3d as a condition of approval on the appropriate tentative map(s). Condition 3d referenced above, if determined to be needed by the City Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of a final map for Finance Area 1. 2, 5, 6 or 7. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds. cash, irrevocable instrument of credit or letter of credit, acceptable to the Financial Management Director and City Attorney. Zone 13 LFMP 204 October 1995 Circulation Condition 3f 1 Facility also required by: Estimated Cost Financing Mechanism Zones 3, 5, 8 and 24 Guarantee Participating Finance Areas Reimbursement Cannon Road from eastern Zone boundary to El Camino Real - two lanes in each direction $3,247,000 Cannon Road West Fee Program, CFD No. 1. TransNet Funds, Developer Funding Payment of Cannon Road West Fee prior to issuance of a Building Permit or Improvement Agreement prior to Final Map Recordation Finance Areas 1, 2, 5, and 7 A portion of the inside lanes and certain frontage improvements for Cannon Road from the eastern Zone boundary to El Camino Real are anticipated to be funded by the proposed Cannon Road West Fee program. Other funding sources are Community Facilities District (CFD) No. 1 and TransNet Funds. Frontage improvements are anticipated to be funded by adjacent development, except within General Plan Open Space which is included in the fee program. The Zone 13 Finance Areas, and portions thereof, included in the proposed Cannon Road West Fee Program are Finance Areas 1. 2, 5 and 7. That portion of each area required to participate in the proposed fee program is identified in the fee study dated November 4, 1994 contained in Appendix A-5. Prior to issuance of a building permit for any project required to participate in the fee program, the applicant shall pay the fee as determined for that project in the Cannon road West Fee Program. In the event that the Fee Program is not adopted, alternative funding mechanisms (e.g. bonds, letters of credit, reimbursement agreements, development impact fees, etc.) may be used without amendment to this document, subject to the review and approval of the City Engineer, Financial Management Director and City Attorney. Guarantee Payment of Cannon Road West Fee prior to building permit issuance. In addition, if determined to be needed at time of development and if not already constructed, the City can ensure this improvement will be constructed with the development of Finance Area 1, 2, 5 or 7 by imposing Condition 3e as a condition of approval on the appropriate tentative map(s). In the event that the Cannon Road West Fee Program is not adopted prior to issuance of a building permit for affected Finance Areas, the property owner(s) may provide an alternative financial Zone I3 WMP 205 October 1995 mechanism equivalent to the fee amount, subject to the approval of the City Engineer, Financial Management Director and City Attorney. If the developer(s) of Finance Area 1, 2. 5 or 7 is required to construct the above improvements. they may be eligible for reimbursements pursuant to Section 20.16.041 of the Carlsbad Municipal Code. In addition. if the developer(s) of Finance Areas 1, 2, 5 or 7 is required to install the improvements mentioned above. that developer(s) shall receive reimbursements for costs directly related to the installation of these improvements to the extent that funds are available from the Cannon Road West Fee Program, subject to the review and approval of the City Engineer. Ociober 1995 Zone I3 LFJIP 206 Sewer Condition B Estimated Cost Financing Mechanism Guarantee Participating Financing Areas Extension of 10" Sewer Main in Future Cannon Road $234,600 Developer Funding Improvement Agreement prior to Final Map recordation Financing Areas 1, 2. 5, and 7 Financirag Mecm If at the time of development of Financing Areas 1, 2, 5 or 7, the District Engineer determines that this improvement is necessary to accommodate that Finance Area, the developer of that Finance Area shall finance its construction. Guarantee If determined to be needed at the time of development, the City can ensure this improvement will be constructed with the development of Finance Areas 1, 2, 5 or 7 by imposing Co'ndition B as a condition of approval on the appropriate tentative map(s). Condition B referenced above, if determined to be needed by the District Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map for Finance Area 1, 2, 5 or 7. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured ith one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the General Manager and legal counsel to the Carlsbad Municipal Water District. 207 October 1995 Zone 13 LFMP /I Water Condition B1 Estimated Cost Financing Mechanism Guarantee Participating Financing Areas Minimum 12" Water Main in Future Cannon Road $97,200 Developer Funding Improvement Agreement prior to Final Map recordation Financing Areas 1, 2. 3. 4, 5, 6, and 7 Mechanism If at the time of development of Financing Areas 1, 2, 3, 4, 5. 6, or 7, the District Engineer determines that this improvement is necessary to accommodate that Finance Area, the developer of that Finance Area shall finance its construction. If determined to be needed at the time of development, the City can ensure this improvement will be constructed with the development of Finance Areas 1, 2. 3, 4, 5, 6, or 7 by imposing Condition B1 as a condition of approval on the appropriate tentative map(s). Condition B1 referenced above, if determined to be needed by the District Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map for Finance Area 1, 2, 3, 4, 5, 6, or 7. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the General Manager and legal counsel to the Carlsbad Municipal Water District. Zone 13 LFMP 208 October 1995 Water Conditions B2 Estimated Cost Financing Mechanism Guarantee I Pressure Regulating Station $75.000 Developer Funding Improvement Agreement prior to Final Map recordation Finance Areas Finance Areas 1, 2. 3, 4, 5, 6 and 7 Financin? Mecm If at the time of development of Finance Areas 1, 2, 3, 4, 5, 6 or 7 the District Engineer determines that these improvements are necessary to accommodate that Finance Area, the developer of that Finance Area shall finance their construction. Guarantee If determined to be needed at the time of development, the City can ensure this improvement will be constructed with the development of Finance Area 1, 2, 3,4, 5, 6 or 7 by imposing Conditions B2 as a condition of approval on the appropriate tentative map(s). Condition B2 referenced above, if determined to be needed by the District Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map for Finance Area 1, 2, 3, 4, 5, 6 or 7. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the General Manager and legal counsel to the Carlsbad Municipal Water District. Zone 13 LFMP 209 October 1995 Water Condition B3 Estimated Cost Financing Mechanism Guarantee Participating Finance Areas 8'' Reclaimed Water Line in LegolArmada Dr. $101,250 Developer Funding Improvement Agreement prior to Final Map recordation Finance Areas 1, 2, 3, 4, 5. 6 and 7 Financing Mechanism If at the time of development of Finance Areas 1, 2, 3, 4, 5, 6 or 7 the District Engineer determines that this improvement is necessary to accommodate that Finance Area, the developer of that Finance Area shall finance its construction. Guarantee If determined to be needed at the time of development, the City can ensure this improvement will be constructed with the development of Finance Area 1, 2, 3. 4, 5, 6 or 7 by imposing Condition B3 as a condition of approval on the appropriate tentative map(s). Condition B3 referenced above, if determined to be needed by the District Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map for Finance Area 1, 2, 3, 4, 5, 6 or 7. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the General Manager and legal counsel to the Carlsbad Municipal Water District. Zone 13 LFMP 210 October I995 Water Condition B4 Estimated Cost Financing Mechanism Guarantee Participating Financing Areas If at the time of development of Finance Area 1, 2, 3, 4, 5, 6 or 7 the District Engineer determines that this improvement is necessary to accommodate that Finance Area, the' developer of that Finance Area shall finance its construction. 16" Water Main in future Armada Drive $1 12,500 Developer Funding Improvement Agreement prior to Final Map recordation Finance Areas 1, 2, 3, 4, 5, 6 and 7 Guarantee If determined to be needed at the time of development, the City can ensure this improvement will be constructed with the development of Finance Area 1, 2, 3, 4, 5, 6 or 7 by imposing Condition B4 as a condition of approval on the appropriate tentative map(s). Condition B4 referenced above, if determined to be needed by the District Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map for Finance Area 1, 2, 3. 4. 5, 6 or 7. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the General Manager and legal counsel to the Carlsbad Municipal Water District. Zone 13 W;MP 21 1 October 1995 Water Condition B5 Estimated Cost Financing Mechanism Guarantee Participating Financing Areas 10" Water Main in future Leg0 Drive $48,000 Developer Funding Improvement Agreement prior to Final Map recorda tion Finance Area 4 Financing - Mechanism If at the time of development of Finance Area 4 the District Engineer determines that this improvement is necessary to accommodate that Finance Area, the developer of that Finance Area 4 shall finance its construction. Guarantee If determined to be needed at time of development, the City can ensure this improvement will be constructed with the development of Finance Area by imposing Condition B5 as a condition of approval on the appropriate tentative map(s). Condition B5 referenced above, if determined to be needed by the District Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map for Finance Area 4. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the General Manager and legal counsel to the Carlsbad Municipal Water District. Zone 13 LFMP 212 October 1995 /I Water Condition B6 Estimated Cost Financing Mechanism Guarantee Participating Financing Areas 12" Water Main extending from Hidden Valley Road to Cannon Road $75.600 Developer Funding Improvement Agreement prior to Final Map recordation Finance Areas 1, 2, 3, 4, 5. 6 and 7 Mechanism If at the time of development of Finance Area 1, 2, 3, 4, 5, 6 or 7 the District Engineer determines that this improvement is necessary to accommodate that Finance Area, the developer of that Finance Area 1, 2, 3, 4. 5. 6 or 7 shall finance its construction. Guarantee If determined to be needed at time of development, the City can ensure this improvement will be constructed with the development of Finance Area by imposing Condition B5 as a condition of approval on the appropriate tentative map(s). Condition B5 referenced above, if determined to be needed by the District Engineer. shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map for Finance Area 1, 2, 3, 4, 5. 6 or 7. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the General Manager and legal counsel to the Carlsbad Municipal Water District. Zone I3 LFMP 2 13 October 1995 Water Condition B7 Estimated Cost Financing Mechanism Guarantee Participating Financing Areas 8" Minimum water main in future D Street $56,700 Developer Funding Improvement Agreement prior to Final Map Finance Areas 2 , recordation Me- If at the time of development of Finance Area 2 the District Engineer determines that this improvement is necessary to accommodate that Finance Area, the developer of that Finance Area 2 shall finance its construction. Guarantee If determined to be needed at time of development, the City can ensure this improvement will be constructed with the development of Finance Area by imposing Condition B5 as a condition of approval on the appropriate tentative map(s). Condition B5 referenced above, if determined to be needed by the District Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map for Finance Area 2. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the General Manager and legal counsel to the Carlsbad Municipal Water District. Zone 13 LFMP 214 October 1995 Water Condition C 1 Estimated Cost Financing Mechanism Guarantee Participating Finance Areas Financing Mectunkm Relocation of the existing 16" Water Main from existing reservoir to 16" line in PAR $180,OOO Developer Funding Improvement Agreement prior to Final Map recordation Finance Areas 2, 3, 4, 5, and 6 If at the time of development of Finance Area 2, 3, 4, 5, or 6, the District Engineer determines that this improvement is necessary to accommodate that Finance Area, the developer of that Finance Area shall finance its construction. Guarantee If determined to be needed at time of development, the City can ensure this improvement will be constructed with the development of Finance Area 2, 3, 4, 5, or 6 by imposing Condition C1 as a condition of approval on the appropriate tentative map(s). Condition C1 referenced above, if determined to be needed by the District Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map for Finance Area 2, 3, 4, 5 or 6. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the General Manager and legal counsel to the Carlsbad Municipal Water District. 215 October 1995 Zone 13 LFMB Water Condition C2 Estimated Cost Financing Mechanism Guarantee Participating Finance Areas 16" Water Line in future Armada Drive $145,000 Developer Funding Improvement Agreement prior to Fina recordation Finance Areas 1, 2, 3, 4, 5, and 6 Financing Mechanism If at the time of development of Finance Areas 1, 2, 3, 4, 5, or 6, the District Engineer determines that this improvement is necessary to accommodate that Finance Area, the' developer of that Finance Area shall finance its construction. Guarantee If determined to be needed at time of development, the City can ensure this improvement will be constructed with the development of Finance Area 1, 2, 3. 4, 5, or 6 by imposing Condition C2 as a condition of approval on the appropriate tentative map(s). Condition C2 referenced above, if determined to be needed by the District Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map for Finance Area 1, 2, 3, 4, 5, or 6. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the General Manager and legal counsel to the Carlsbad Municipal Water District. 216 October 1995 Zone I3 w;MP Water Condition C3 Estimated Cost Financing Mechanism Guarantee Participating Finance Areas 8" Reclaimed Water Main in future Armada Drive, future Leg0 drive and Paseo del Norte $190,3 50 Developer Funding Improvement Agreement prior to Final Map recordation Finance Areas 1, 2, 3, 4, 5 and 6 Financb Mecm If at the time of development of Finance Areas 1, 2, 3, 4, 5, or 6, the District Engineer determines that these improvements are necessary to accommodate that Finance Area, the developer of that Finance Area shall finance their construction. Guarantee If determined to be needed at time if development, the City can ensure this improvement will be constructed with the development of Finance Area 1, 2, 3, 4, 5, or 6 by imposing Condition C3 as a condition of approval on the appropriate tentative map(s). Condition C3 referenced above, if determined to be needed by the District Engineer, shall be constructed or an improvement agreement shall have been provided by the developer prior to the recordation of the applicable final map for Finance Area 1, 2, 3, 4, 5, or 6. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the General Manager and legal counsel to the Carlsbad Municipal Water District. October 1995 Zone I3 WMP 217 I. REFERENCES "Capital Improvement Program," 1994-1995 to Build Out. "Citywide Facilities and Improvements Plan," City of Carlsbad, Revised September 29, 1986. "Master Drainage and Storm Water Quality Management Plan" The City of Carlsbad, California." Carlsbad Engineering Dept., Fraser Engineering, INC., Cooper Engineering Associates, March 1994 "Guidelines and Instructions for the Preparation of Local Facilities Management Plan Transportation Impact Studies, " Engineering and Planning Departments, City of Carlsbad. February 9, 1988. "Master Plan of Sewerage" City of Carlsbad, Wilson Engineering, January, 1992. "Water Master P1an"Project 89-105, CMWD, January, 1991 "Water Reclamation Master Plan, " Dudek & Associates, Draft Date January, 1990. Zone 13 LFMP 218 October 1995 APPENDICES A-1 Constraints Map A-2 LIBRARY "'- MTQ. mta7 DER. LIB J0 S.' ' OEPT. HD.' ftttE: LIBRARY SITE AND FUNDING RECOMJ6E3- DATION FOR A NEW LIBRARY IN SOUTH CARLSBAD 1. Approve the recoPlmended library site and direct the City Manager to negotiate a purchase agreement vieh che ovaer:. 2. Direct the City Manager to include funds in the CIP for land acquisition and coostructfon of a library. 3. Direct the City Manager to evaluate alternative methods of financing and constructing the library (developer build VI. City build). ITEH gCPUNATION: On January 27, 1987 tb City Council directed staff to negociate.the acqufsttic?. of a library rite and/or a developer ptoposal to build and lease back a library facility. report which listed five sites for consideration. All five sites met the selection criteria recommended in the Library Strategic Plan. Subsequent investigation and negotiations with Carlsbrd Retail Associates has resulted Fn the selection of a preferred site. selection codttee endorsed Site E as the besc site for a nev library. Ubrrry board also has endorsed the site. appears to be consistent vith ochrr property in the area. Council action vas based upon the library site selection cornmitcee At its meeting of April 16, 1987 the site rne The rsklng price for the property . Design funds of $650,000 are already budgeted in the CIP. vill occur upon purchase of the site. Design of the buildi.: Purchase is anticipated during 1988. The City ha8 several a€teraatives available for funding the acquirleion of a new Ubrrry. both existing and future, to this project. The ultimate decision on exactly how to financa the coartnrctioa vill determine che extent of pubLic facilitias fees committed to tho profrct in future years and the effect the Library wfll have on the timing of othrr improvements. tha folloving tabla: Descrfptioa ALl optionr depend on the City pladging public facflitics fee funds, The library project costs are ~unmarized in Piscar 4prOXht8 Year hunt Received - Land Acquisition 1988-89 $1 . 1 million Grading 88-89 0.9 millioa Design 88-89 Construction 89-90 to 90-91 Total Project Cost $11.0 million 0.6 dlion 8.4 million Operations 90-91 and thete8fter $0.5 to 0.9 million PUrCb. of the 1ibr.V site and funding grading costs prior to 1989-90 may require dedication of a11 8v8ilable public facilities fee revenues for 1987-88 and delay of certain existing PFF projects. includes Palomar Airport Road improvements, park Imptovements in the northeast and southwest quadrants, the Public Safety Center phase If and If1 and many smaller profec:s. The list of ptojects to be delayed This delay in funding other Fmprovernents is brought on by reduced PFF revenue due to the slowing of development activity. Existlng resources must be allocated to only top priority projects. Staff is recolmnending that Council reserve funds for the acqulsfcion of land and grading costs from 1987-88 revenue (assuming 87-88 revenues are sufficient to covet these and other committed costs). Actual purchase of the property would aot occur until 1988-89. The long term financing of the building construction costs could be done in one of three ways: 1. Building construction funded by sitr developer with lease back agreement = under this concept the City vould enter lnto a lease back agreement with the sitr developer to build the library to City specifications. The City would then enter into a long term lease back agreement with the developer pledging up to $1 million per year of public facilities fee revenue to lease payments The actual Lease payments vi11 depend 00 construction costs and interest rates during this 20 year period. By allowing the site developer to build the build- ing, the City may be able to lower total construction costs by taking advantage of certain economies of scale. over a 20 year period. 2. Certificates of Participation - The City may issue Certificates of Participation for the coustruction of the building. public facilities fee fund wuld be pledged, along with City genaral fund revenues, to the repayment of the debt, as in the above approach the library debt vould have first claim of PFF revenues. This alternative offers the City a lower interest rate due to our ab%lity to issue tax exempt debt. Repayment vould require up to $1 million per year for 20 years; however, due to lower interast rates, the actual cost to the City could be slightly less than alternative 01. The 3. Hello-Roos District Reimbureemcnt - Under this alternative the City must put together a series of financing steps. building could be constructad by the site developer or by the City through the use of Mello-Roos tax exempt debt. case the ultimate cost of the building -auld be supported by the could have the annual assestkent placed upon their district reduced by the amount of public facilities fees payed by that developer. The cost to the City is limited eo the amount of public facilities fees paid by developers within the district. Any shortfall could be assessed against property with the dir trlc t . First, the In either . MelZo-Roos district. The developers supporting the distric: Council is not required to select a funding alternative at this time. However, an understandlng of the alternatives is necessary before the City moves forward with the project. financing methods are I) Public facilities fees ar,e pledged co repay che Two important points found in all Page 3 AB NO. &,,7 -P/ cost of the building and, 2) The City will be delaying many public facilities fee projects to make way for library funding. The CfP which vi11 be presented to Council in the next few months will detail the fiscal impact of thii project. development of 400 to 600 dwelling units per year to fund the library cons truc t ion. The City will require The operating costs for the new library vi11 run from $500,000 to $900,000 per year depending on the level of operations. The City presently fs unable to support this additional cost. Preliminary projections of General Fund revenue show that an operating deficit of about $1.5 million will exist in 199041, the first year of operations for this facility. zone fees assessed against development to cover operating costs for the first year or two of operations. The Cfty must consider revenue enhancements or EXHIBITS : 1. Memo from Library Director to Site Selection Committee dated April 16, 1987. 2. Site plan. 3. Letter from Johnson Wax Development Corporation to Frank Hamen date Juna 26, 1987. 4. Site map. APRIL 16, 1987 TO: SITE SEtEC.TION COMMITTEE FROM: Library Of rector LI8RARY 5 ITE SELECTION PROGRESS REPORT Library and city staff have had six meetings with the developers who plan to build a shopping center on El Camino Real between Alga Road and Oove Lane. the development of a tentative sfte plan for a library building. The next step will be to develop a final site plan. The additfon of the new post office to this general site plan has caused some of the revisions we have developed. That has also required the developers to purchase an auditional seven acres of land to accommodate both the library and the post office. The developers are fn the process of purchasing the property at this time. financial data to purchase the sfte and the buildfng. The fol ow- fng optfons appear to be possible: The result of those meetfngs has been s We have also been working with some preliminary 1. Purchase the land from the developer and lease back the bu fng. 2. Lease back the rind and the building. 1 d- 3. Any one or a combination of these optfons may be feasible. work needs to be done on various financing alternatives. Purchase outrtght the land and the building from the developer after the bufldfng is built. . More Thfs proposed site appears to be the best possible site for the library fn the southern half of the city. The combination of a shopping center, post office and library will make for an ideal mix and should provide a convenient source of services to the publlc. The sfte satfsffes all the major criteria we have used to evaluate varfous potentf a1 1 i brary sites . b PA8 01 stri bu tf on : Geoff Amour John Cahfll Bebe Grosse Mi chae 1 Ho 1 zm i T 1 e r Ann Kulchin CITY OF CARLSBAD - AGENDA BILL AB#- MTQ. 4/10/9o OEM. APPROVAL 'OF ARCHITECT AGREEMENT FOR CARLSBAD LIBRARY PROJECT DEW. HD. LIBRARY DESIGN SERVICES AND APPROVAL OF INCREASED PROGRAM SPACE FOR THE ctn In the 1989-90 Capital Improvement Program budget, the City Council appropriated funds and directad staff to begin the preliminary work for the design of the Carlsbad Library Project including an analysis of the uristinq Cole Library facility. Attached is an agreement with the recammendad architectural firm of Cardwell/Thomas and Associates in cooperation with James McGraw and Associates for the design of the Carlsbad Library Project and the feasibility study and analysis of the Cole Library building. In 1986, tha City Council adopted me Stwc Pl- for Sbaca Nee- which identified a 58,000 square foot library facility to be located in the southern part of Carlrrbad. This report also identified tha eventual expansion of tha uristing Cole Library facility of an additional 20,000 to 25,000 square feet at buildout. The current work of the City's Consulting Librarian, Mr. David R. Smith, has concluded that a building program of 58,600 square feet for the proposed new library building is the established square footage to house all current and projected space requirements. Kr. Smith recommends a total program space of 64,000 square feet to more effectively and efficiently meet the Fncreasing library space needs of the new Carlsbad Library facility. Attached are several axhibits which addrasu these subjects in more datail. At this City Council meeting, City staff and the consultants will make a presentation regarding several issues facing the Proposed Carlsbad Library facility. FISCAL: The total valua of tha design sewices for the project is $928,255. The City Council ha8 previously appropriated a total of $3,806,000 for the prmliminary work including final dasign for the Carlsbad Library Project with funds appearing in Projact Account No. 320- 820-1810-3244. Staff recommonds the approval of the attached consulting agreement and commencement of the design of the project. Attached is a memorandum from the Fhanca Director dated April 5, 1990, outlining several: potential funding alternatives for the construction of the project estimated to range between $14.2 million to SlS.1 million. The Finance Director will be present at this Council meeting and assisting in the presentation regarding this subject. Page 2 of Agenda Bill No. /tTtC?78 . EXHIBITS: 1. 2. 3. 4. 5 .. 6. Location map. April 3, 1990 memo from the Municipal Projects Manager to the City Manager regarding the status of the proposed Carlsbad Library Project. Letter from David R. Smith, Library Building Consultant, dated February 10, 1990. April 2, 1990 memorandum from the Finance Director to the Municipal Pro] ects Manager regarding funding alternatives for the proposed Carlsbad Library Project. Resolutfon No . Tcm 3 approving an architectural consultant agreement with the firm of Cardwell/Thomas and Associates for library design services and authorizing the increase of program space for the Carlsbad Library Project. Consultant agreement. -. LOCATION MAP \ \ \ \ \ +ROJECT NAME PROJECT # SOUTH CARLS8AD LIBRARY 3244 ALGA EXHl8lT 1 z 0 LANE ROAD April 3, 1990 TO: CITY MANAGER FROM : Municipal Projects Manager STATU8 OF CARLSBAD LIBRARY PROJECT The following is a status report regarding the proposed Carlsbad Library Pro j ect . The following issues are addressed: Brief history of the project and work of the Library Building Review Committee . e Architect selection process, design agreement, and recommendation. e n for T,ibrarv SBac e Needs and Summary of 1986 Strateuic Pla City's Consulting Librarian, David R. Smith's 1990 Building Program . e Project cost estimates. e Finance Director's analysis of funding alternatives. RECENT PROJECT HIST ORY In the 1989-90 Capital Improvement Programbudget, the City Council appropriated funds and directed staff to begin the preliminary work for the design of the Carlsbad Library Project including an analysis of the existing Cole Library facility. On May 23, 1989, the City Council adopted Resolution No. 89-173 approving a purchase agreement for the acquisition of a six (6) acre site along the western extension of Dove Lane, west of El Camino Real. On July 18, 1989, the City Council adopted Resolution No. 89-254 approving a consultant agreement with Mr. David R. Smith, Consulting Librarian, to assemble a detailed City library building program and provide assistance and input into the selection of an architect for the project. The City Council approved Library Building Review Committee composed of two (2) City Council Members, one (I) member of the Planning Commission, representatives of the Library Board of Trustees, Friends of the Library, three (3) citizens at large, and City staff was assembled to act as an advisory group, provide input? and review of the building program, and make recommendations to the Library Board of Trustees and City Council regarding the selection of an architect team to design the Carlsbad Library Project and the feasibility study for the Cole Library facility. For the past several months, the Library Building Review Committee conducted an extensive selection process to identify an architectural consultant to provide design services for this project. April 3, 1990 Page 2 A--.CTI ON PROCESS. DES1 GN A GR-NT, AND COMMITTEE RECOMMENDAT1 ON On September 29, 1989, Request for Qualification packages were mailed to fifty-nine (59) architectural firms identified as potential candidates for the project. These firms consisted of architectural firms and individuals who had formally requested inclusion, had been recommended to the City by other governmental agencies, had specific design experience in public libraries, or had accomplished other City projects. Of this group, thirty-three (33) architectural firms submitted materials in response to the initial request. On November 9, 1989 following a review of the submitted materials, the Library Building Review Committlre identified and recommended seven (7) firms as finalists for the design of the project. The seven (7) final firms were requested to submit a detailed project proposal and prepare a formal design presentation at an interview session before the Library Building Review Committee. The seven (7) firms identified for the project were: Albert C. Martin and Associates Imine Cardwell/Thomas C Associates and Charles Walton & Associates Glendale IBI Group Newport Beach Ripley & Associates San Francisco Simon, Martin-Vegue, Winklestein, Moris San Francisco Wheeler, Wirner, Blackman San Diego On January 18 and 19, 1990, the Library Building Review Committee convened at the public Safety and Service Center to receive the formal design presentations and interview each of the seven (7) final firms. Particular emphasis was placed upon a demonstration of the firm's specific capabilities and experience in the design of public library projects. Following the completion of all seven (7) interviews and considerable discussion, the Committee requested that staff further research and provide additional background information on the proposed joint architectural team of Cardwell/Thomas and Associates and James McGraw and Associates. James McGraw & Associates Seattle/San Diego On February 13, 14, and 15, 1990, three (3) representatives of the Library Building Review Committee traveled to the offices of L. Cardwell/Thomas and Associates in Seattle, Washington and held extensive meetings with members of the firm to exchange ideas and discuss the project in more detail. The meetings included site visits to other completed library projects accomplished by this firm in the greater Seattle area. Additionally, the visit included interviews with several of the firm's subconsultants to further confirm the architect's qualifications and specific library design April 3, 1990 Page 3 . experience. A similar visit was made by Committee members to the offices of James McGraw and Associates in San Diego. During both of these visits, several other tours were conducted to review the firms' previously accomplished projects, including both public and academic libraries, and projects similar in detail and style desired for the Carlsbad Library Project. In addition to direct interaction with the proposed architectural team members, several references were contacted by City staff via telephone and questioned regarding their experience in working with these firms on other projects. On February 22, 1990, a report was presented to the Library Building Review Committee on the research and additional background information obtained on the proposed joint architectura1,team. The report summarized the office visits, meetings, tours, and reference checks. It was the conclusion of the Committee representatives that the additional background information revealed that the proposed architectural team possessed the necessary design capabilities, technical knowledge, building expertise, knowledge of current construction techniques, and axperience in public projects necessary to produce and manage complex pubLic library building projects. Additionally, the proposed architectural team has experience in design issues related to the remodeling and expansion of existing library facilities critical to the work associated with the Cole Library facility. Following the presentation of the report, the Library Building Review Committw unanimously selected Cardwell/Thomas and Associates and James McGraw and Associates as the firm to be recommended to the City Council for design of the new Carlsbad Library project. It is therefore the recommendation of the Library Building Review Committee and City staff that the firms of Cardwell/Thomas and Associates and James McGraw and Associates be authorized by the City Council to proceed with the design of the project. The lead firm for the project will be Cardwell/Thomas and Associates who will carry out all pharres of design and have prime responsibility and overview throughout the entire project. James McGraw and Associates will work under contract to Cardwell/Thomas and Associates to coordinate the production of the final project plans, specifications, and contract documents. This joint arrangement will provide the project with a team that includes a firm with specific design expertise and management experience of library . projects and a firm that has very detailed technical skills and is-* able to provide local representation. Staff feels this combination is advantageous to the administration of a successful project of this complexity. April 3, 1990 Page 4 The consultant agreement negotiated' between City staff and Cardwell/Thomas and Associates as the prime architectural consultant requires completion of approved final project plans, specifications, and contract documents in March of 1991. The agreement includes complete architectural services, interior design, and all other required building, engineering, lighting and acoustics, and landscaping disciplines. The architects are also tasked to immediately perform a full architectural and building safety assessment including an engineering analysis of the Cole Library building. Also to be accomplished are the exploration of alternatives and expansion options on the site as well as preparation of a written report to the City summarizing the findings . Library design is a complex and intricate process requiring a more intense effort and higher level of architectural organization and attention to technical detail than is customarily required for the design of other public facilities. The design process for the Carlsbad Library facility will be highly interactive and participatory. Upon the issuance of the Notice to Proceed, the architects will schedule and conduct the first in a series of workshops with staff, the Library Board, the Library Building Review Committee, and other interest groups to develop and examine various building layouts and design alternatives. This process will continue over a period of several weeks to reach consensus on a final schematic design which will undergo further refinement until a clearly defined library facility design emerges. During each design stage, the architects will also provide guidance in the process of selecting interior and exterior building finishes, interior furniture, fixtures, operating systems, and equipment. After completion of these phases, the construction plans, specifications and contract documents will be prepared and assembled and the project will be presented to the City Council for authorization to bid the construction of the project. The project will require a Conditional Use Permit to be issued by the Carlsbad Planning Commission. All other project permits and approvals have already been obtained. 0 ACE NEEDS AND CITY ' S SUMMARY OF 198 6 STRATEGIC PLAN F R WRRARY SP CONSULTIN G LIBMY. DA VID R. SMITH @S 1990 BUILDING PR OGW The primary guide to be used during design will be the Carlsbad Library Building Program as prepared over the past several months -* by the- City's Consulting Librarian, Mr. David- R. Smith. Now in final form, the Library Building Program contains information On current and future library needs and services essential to a successful public library design for the City of Carlsbad. The document includes information such as: April 3, 1990 Page 5 . Functional facility design criteria. An analysis and summary of all public and staffing space, shelving, and seating allowances. . An analysis and summary of each functional space including area requirements, aesthetics, general environmental and economic considerations, types and locations of collection materials, and specific descriptions of equipment, furnishings, and furniture to be installed in the building. acoustics, computer layout, technical/support service requirements, restrooms, maintenance space, and related issues . 0 General architectural requirements including lighting and In 1986, the City Council adopted the st rate^ SDace Needs . This report identif ied a prelimin-rogE space of 58,000 square feet for a library facility in the southern part of the city. This allocation of space was accomplished through a very preliminary analysis of existing. and proposed library functions, creation of shared spaces between functions and facilities, and significantly reduced unassigned building space. Further, the 1986 analysis did not take into consideration the location, functional size, and net-space requirements for other facilities within the library buildings such as larger auditoriums and meeting rooms, public service areas, introduction of public arts elements, expansion capabilities for new programs, etc. Minimal allowance of unassigned building space including space designated for interior walls, hallways, restrooms, maintenance areas and building equipment rooms was not definitively identified in the detail necessary to support a preliminary building program. Both the City's Library Building Consultant and City staff are concerned that a minimal allowance of unassigned building space commonly results in a utilitarian style building lacking in the open atmosphere, depth, receptivity, and ambiance that is critical to successful public library design, Both the consultants and staff feel strongly that the 58,000 square foot assigned space for the proposed library facility that was developed in the 1986 report, although functional, will not yield the quality library facility, over the long term, that is expected of the project. Further, a review of the 1986 Stratnuic P1a shows that the" conceptual library space of 58,000 square feet was based solely on an estimated library space per capita, as opposed to the current Library Building Program which is based on current information gathered from the primary users of the proposed Carlsbad Library. During the programming phase of this project, the lQhhlU established square footage for the new library building was 58,600 square feet. This included reductions in square footages in br April 3, 1990 Page 6 several areas otherwise requiring additional space and an allocation of only 222 unassigned space for the entire building. Attached for the City Council's information and review is a letter dated February 10, 1990, from the City's Consulting Librarian, Mr. David R. Smith, recommending an increase in the library program space for the new Carlsbad Library building of 5,400 square feet (a 6,000 square foot increase over the 1986 mteuic Plqn report) for a total program space of 64,000 squarm feet. The 5,400 square foot increase, representing a 9.21 increase in square footage, is proposed to be redistributed among those library functions rarliar reduced in the Building Program and would increase the unassigned building space to a more satisfactory derrign level for a facility of this size. The increase of program space for the new Carlsbad Library would also beneficially impact the proposed expansion of the Cole Library. The original concept of the 1986 mteuic Plq~l was to house certain library administrative functions, including administration and technical semrices, at the new Carlsbad Library facility until expansion of the existing Cole Ubrary facility. At that the, these administrative functions would then relocate back to the Cole Library. With an increase in program space at this time, these administrative functions will remain permanently at the new library facility making available additional public library space at the Cole Library. City staff considers thio to be a major organizational, functional, and economic advantage to relocating the administrative and technical operations of the library only one (1) time. The established library standards under the City's Growth Management Plan require the construction of an additional 20,000 to 25,000 square feet of library space at buildout. This expansion spaca is proposed to occur at the Cole Library building. Under the proposed approach to -and the new library building to 64,000 square feet, this increase would yield nearly equal public library spaces fn both the new building and the Cole Library building at buildout. Staff has investigated the effects an increased program space of 5,400 square feet would have on parking requirements for the new facility. while tha City has no adopted parking requirement standard for libraries, the parking currently designated for the project (3SO spaces) is adequate for a 64,000 square foot facility based on figures used satisfactorily on a number of other library buildings of this size. The City also has the option to design a . full or partial two-story facility that would create additional -. space for parking. This and other options will continue to be explored by the architect and the Library Building Review Committee as preliminary development of the building site evolves. The concept of increasing the program space to 64,000 square feet for the new Carlsbad Library was discussed and unanimously endorsed by the Library Building Review Committee at their meeting of February 22, 1990. In conclusion, staff recommends the City Council authorize the increase in program space for the new Carlsbad Library facility from 58,000 square feet to 64,000 square feet. April 3, 1990 Page 7 The following summarizes the estimated project budget for both a 58,600 square foot facility and a 64,000 square foot facility: Land purchase and site improvements Library Programming Services Architectural Design Services: - New Carlsbad Library Design - Cole Library Study - Reimbursable Expenses Construction at $135 per square foot Construction contingency (101) Furnishings, fixtures and equipment at $25 per square foot Collection development Construction management: - Architectural oversight - Resident inspection services - Special building inspection of structural steel, elevator, and related building issues Utility service fees and connections City project management Title, appraisal, and legal work . Miscellaneous including document reproduction, dedication plaques, dedication ceremonies, photographs and exhibits, etc. - Soiis and materials testing $ 2,300,000 45,000 795 I 750 50 I 000 82,505 7,911,000 791,100 1,465,000 200,000 150,000 100,000 2s, 000 25,000 75,000 65,000 10,000 35,000 $ 2,300,000 45,000 795,750 50,000 82,505 a, 640, ooo 864, ooo 1,600,000 200,000 150,000 100 I 000 25,000 2s, 000 75,005 65, OCG 10,000 TOTAL ESTIMATED PROJECT BUDGET $14,125,355 $15,062,255 Attached is a memo dated April 2, 1990 from the Finance Director discussing the potential funding alternatives for the library project taking into account increased square footage and updated budget estimates. Three (3) potential funding alternatives are identified in which the Council, during the upcoming CIP review, Will be asked to approve one (1) or a combination of the following: -, . . Increase tax rates under the proposed Mello-Roos District. 0 Delay and/or reprioritize projects in the Capital Improvement Program. . Contribute funds from the General Fund to the project. April 3, 1990 Page 8 With respect to the current status of the project and the design contract at hand, the total value of the design services for the project is $928,255. The City Council has previously appropriated a total of $3,806,000 for the preliminary work including final design and property acquisition for the Carlsbad Library Project with funds appearing in Project Account No. 320-820-1810-3244. Staff recommends the approval of the attached consultins aqreement -- and commencement of the design of the project. m Jomy WILL Muni pal Projects Manager JJC: jkb Enc 1 osure c: Assistant City Manager Finance Director Community Development Director Library Director City Engineer Ken Quon, Project Manager -. Fm: David R. Smith, Condthg Librarian CARLSBAD CITY LIBRARY 2/10/90 REVISED TO 64,000 Square Feet PUBLIC SERVICES AND RELATED AREAS 1.0 pUBrrC EM"CULOBSY/ntspLA~* 1.1 1.2 1.3 1.4 1.5 1.6 1.7 2.0 2.11 Am 2.12 Soppage (grand piano. paiium. AVl e) [+t,ooO] 2.550 200 220 [+l,OOo] 2,000 so 50 (+250] 2.250 150 (+2501 2,400 1 * 300 . -. 1,000 150 150 1. CARLSBAD CITY LIBRARY 3.1 CirruiatiOnDeskArca 3.11 Ckk-in(1) 3.12 Chechut(3) 3.13 R-Ibtbqui~~ - (2) 3.14 Matedab Shelving - Staff Atxm 3.15 secrpaYSystmJQucUingArur 3.2 Ckulatian Staff Wark Room 3.21 Reshdving Area- (2-3) 3.22 WdSt?rrinrU - (&a) 3.24 S~C - Suvpfies 3.23 ConecQilshChring 3.4 AAstant Cihuladal supcrwois omct 4.0 mm 4.1 4.2 4.3 4.4 4. s 4.6 Assigned bal!Lk uu 1,000 200 500 200 100 U&gIled 9 50 300 450 100 100 125 I25 [+ZOO] O.!OO [+3001 3,200 ('ZOO] 1.400 [+200] 300 100 ZOO 1.000 -. 300 5 50 150 Unassiwed 2. CARLSBAD CITY LIBRARY 5.1 Public CoiIeEtion Shelving - 4,000 itmu 5.2 UsSeating- 12 5.3 Young Aduit CaIleCtion 5.3 1 Public C~flcdon 2,500 itcmrtmagazines 5.32 Us~rscating-6 5.41 Boob, M~@IIc~, Sa- Aha 5.42 Friends Work Room 6.0 &.~&oVjgaalllpllogiqIl 6.1 Public conection Sheiving - 20,000 items 7.4 1 MsiP Termjm&(s) 10 of 30 7.42 adaryTcrnrinaL 10 of 30 7.5 7.6 Study Roolzu (4) - 48 Word- *crocomp~tcr/l)pmg Rm - 4 7.7 Machines - (#l , #2*' #3 copy macfrines of 4 total) 200 200 300 200 (+loo] 400 (+2OO] 600 500 [+300] 500 500 1.509 1,500 1.300 [+300] 1,050 (+300] 1,000 200 -, 200 150 3. CARLSBAD CITY LIBRARY 8.0 -- - Cum 9.2 Us~rktbg-40 9.3 Pubiic Am ratalag - PAC (4 Of 16) 9.5 RcfaarecDakAKa 9.51 RdaaracscrViaCh-(3) 9.52 T-Rdarna -(1) 9.53 Dat&meSea&ngSatial-(2)-2 9.54 laminnyb-(l) 9.6 1 srrdt W& Ar# (6) 9.62 M SbrkShehmg Aha 9.63 Stonage - Suppk 9.64 Referen- SCrviaJ supemism omoe (1) TOTAL PUBLIC SERVICES SPACE 750 50 150 (+300] 1,050 ooo 150 200 150 400 600 [+300] UOO 1,200 1 ,tDO 200 [+300] 2,000 700 .. 400 100 1 so a so -. [+2,8501 39,050 4. ADMINISTRATIVE AND SUPPORT STAFP/NON PUBLIC AREAS .. 10.0 -tl ‘VI? mice 10.1 RcceptioaAreri 11 10.11 v2titormg.2 10.12 Rmti~d~t-(I) 10.2 Adurh&mNesSemaryAha 11.4 Collection-Bo&T&andShebmg 11.5 StQsge - Suppiiu 11.6 Technical Hm Suprvlsor’~ - (1) , 11.7 conrputcrRoam-(1) 11.8 Conaionscomkamf 5 Arca - (2) law 1 so 50 1 00 406 150 250 250 450 200 150 200 U-Ui 3.200 500 600 600 100 200 300 300 12.11 work AlTa (2) 12.12 DcPkRm(1) 12.13 Rdg soOth(1) 12.14 Video ' CmtmiRoom(1) 12.2 Rograamand&hibits . 13.0 Staff Aiurp 13.1 SMbmma~ 13.3 SmW- lo0 13.4 Staffbmge/BreakRom 13.41 Vading Mad P e Area 13.42 KitchedFa &mim 13.44 Rmt Aidcat Room 13.43 * Aha-16 14.1 croaed Smk Aha - General COllmion compact Sheiving - 1 S,OOO itcrm 1.700 700 250 1 so 100 200 1.000 300 300 400 e9p Unassigned UXlEESigned 150 7 50 100 I so 430 50 - 700 sa 200 6. CARLSBAD CITY LIBRARY 15.0 m-1- 15.1 MerUCopyMa3rinJReccl 'ving Room - (3) 15.2 Defivcryhoecfing 15.21 Dodr 15.22 Refwe cOrrectionlstorage 1 5.3 Maintmazle staff work Are4s) 15.3 1 Gend Work - (2) 15.32 Supplies Stump 15.4 cloact(~) - 3 (DiSUlbUtsd L#.ations) (3) Pubk Area TUT'LL CiROSS BUILDING AREA 200 100 200 200 1.200 3 50 300 400 150 UIMSi@Cd 9,580 [ +2: 850 J 7%. c4a [+2,850] 58,550 [+2,550] 15.450 [+?,400] 64,000 -. 7. CARLSBAD CI"Y LIBRARY -OR SPACES - On the Library Si 16.0 16.1 plats 16.2 Pasengergnckql- 16.3 Aa#soobookhnan 16.4 he- 17.0 - 18.0 1.500. 1,000 500 306 50 L 18.1 Car 18.2 Motacydc 8 2 18.3 Bicyde - Racks at the enw ot stafkmy 15 10 18.4 Libraryvefiida-a- 2-3 -. 8. April 2, 1990 RECEIVED TO: MUN IC I PAL PROJECTS MANAGER FROM: Finance Director U N IClPA L PROJECTS DIVISION FUNDING FOR THE MAIN LIBRARY CONSTRUCTION The 1989-90 Capital Improvement Program includes a project which would construct a 58,000 square foot library in south Carlsbad. The funding of this project would be dependent upon the issuance of Certificates of Participation to be repaid from Public Facilities Fee (PFF) revenue over the next 20 - 25 years. The cost of this project was estimated to be approximately $12,000,000. According to the latest design plans, the library will now range in size frx 58,600 square feet to 64,000 square feet with costs ranging from 614.2 million to $15.1 million respectively. These new costs estimates result in an increase in $2 million to $3 million over the 1989-90 Capital Improvement Program estimates. - As the City Council determines the ultimate site and cost of the south Carlsbad Library, one of the keys points to consider is the funding for the ultimate - project. The City Council has several alternatives as described below for dealing with the fiscal impacts of this project. Fundi nq A1 ternat i vef 1. Citywide Me1 1 o-Roos District The City Council is currently considering the formation of a Citywide Mello- Roos District which would include undeveloped land throughout City of Carlsbad. The list of projects recommended for funding by the District includes the south Carlsbad Library. The estimated cost for the library construction included in the District is $10 mill ion. Current appropriations from PFF total $3.8 million for a total funds available of $13.8 million. 58,000 sq. ft. 64,000 sq. ft. . PFF Appropri at i on 6 3.80 million $ 3.80 million Mello-Roos District Funds 10.00 million 10.00 million Total Funds Avai 1 ab1 e $13.80 mill ion $13.80 mill ion . Project Cost Estimate 14.20 million 15.10 mill ion L i brarv Li brarv -. Current Funding Deficit (3 .40) million (J 1.30) million In order to fully fund the library project, the City Council would have to increase the cost estimates to the Mello-Roos District by 5400,000 to 61.3 million. An increase in project cost estimates results in an increase in total tax rates necessary to pay debt service related to these projects. Funding for Main Library Construction April 2, 1990 Page No. 2 2. 199 0-91 CaDital ImD rovement Proaram Even though the City is considering the inclusion of the Library project in the Mello-Roos Oistrict, there is no guarantee at this time that the District will approved by the landowners. Therefore, the City needs to consider alternate funding methods in the event that the Oistrict cannot be formed. The 1990-91 Capital Improvement Program is currently under consideration by staff. The Library cost included in the Capital Improvement Program is roughly equal to the cost to fund the 58,000 square foot Library project. In order to fund the 64,000 foot a1 ternative, the Capital Improvement Program would have to be increased by approximately 1900,000. The funding source for the Library would remain the PFF. The increase in funding for the Library project would reduce the amount of funds available for other PFF supported projects within the CIP. This may cause delays in other projects. A more detailed analysis of this alternative will be available following the assembly of the draft Capital Improvement Program in mid to late April. 3. Ge neral Cao i tal Construction Fund Particioation The City Council may consider the expenditure of up to $1 million of General Fund monies on the construction of the Library. Under Proposition H (Chapter 1.24 of the Carlsbad Municipal Code), the City Council may not spend more than $1 mill ion of General Fund monies on any project without previous voter approval. The City Council currently has an unobligated General Fund balance of approximately 35.5 mill ion. Although the City Council is not being asked at this time to take an action selecting a funding alternative, it is important for the Council to understand the importance of their decision to proceed with the design of the Library. If Council chooses to design and build the larger Library project, some change in future capital planning will be necessary. Council will be asked to increase tax rates under the Mello-Roos Oistrict, delay projects in the Capital Improvement Program or contribute funds from the General Fund to the project. The most appropriate time for making the decision related to the funding of additional costs' for the Library project is when the Council is considering the Capital Improvement Program. At that time, all projects competing for funds will be before the Council and each may be weighed in relation to the other for funding. -. JFE: tlg c: Ray Patchett Frank Mannen C1 iff Lange I I 4 1 I t r 4 t I IC 11 li 12 14 15 16 17 18 19 20 21 22 23 24 25 ?6 27 28 library RESOLUTION NO. 90-1Q2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING AN ARCHITE-L CONSULTANT AGREEMENT FOR BRARY DESIGN SERVICES. PROJECT NO, 3244 WHEREAS, the City of Carlsbad has solicited proposals for design services for the new Carlsbad Library and a feasibility study of the Cole Library: and WHEREAS, all prospective firms were required to submit qualifications statements and support information; and WHEREAS, the recommended firm possesses the necessary skills, background and expertise to accomplish the project; and WHEREAS, the City Council of the City of Carlsbad has previously appropriated funds for thm design of this project: NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That a consultant agreement with Cardwell/Thomas . and Associates is hereby approved and the Mayor and City Clerk are hereby authorized and directed to execute said agreement on behalf of the City of Carlsbad. 3. Following the Mayor's signature of the agreement, the City Clerk is further authorized and directed to forward copies af said agreement to Cardwell/Thomas and Associates, 1221 Seqond Avenue, Seattle, Washington, 98101, and the Municipal Projects Department for their files. I// I// I// -. 1 2 3 4 5 6 7 8 9 10 11 12 1s 14: ;I 4. That the City Council of the City of Carlsbad does ALETHA L. RAUTENKRANZ, City Clerk hereby authorize the increase of program space for said building to 64,000 square feet. PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council held on the day of , 1990, by the following vote, to wit: AYES : NOES -- : ABSENT: CLAUDE A. LEWIS, Mayor ATTEST: 22 23 I; I/ 24 11 !I I 25 8 26 " 27 j 28 -. AGREEMENT FOR ARCBITECTURAL CONSVtT3wT 8ERVICZ8 SOUTH CARLIBAD LIB-Y DtSIGH AND COLE LIBRARY FEASIBILITY STUDY THIS AGREEMENT, made and entered into as of the 3 day of &d , 1990, by and between the CITY OF CARLSBAD, a municipal corporation, hereinafter referred to as "City," and CARDWELL/THOMAS AND ASSOCIATES, hereinafter ref erred to as "Consultant . City requires the services of an architectural consultant to provide the necessary architectural design services for preparation of final plans and specifications for the South Carlsbad Library md the preparation of a feasibility study for the Cole Library: and Consultant possesses the necessary skills, experience, expertise, financial capabilities, and qualifications to provide the services required by the City; NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein, City and Consultant agree as follows: The Consultant shall provide architectural consultant serrices to the City for the South Carlsbad Library and the Cole Library ~ Feasibility Study. Saia services shall be performed diligently, in a professional. manner, and in accordance with the terms and -. conditions of this agreement under the direction of the City Manager or his authorized representative. 2 2- - The City shall pay the Consultant in accordance with Sections 4 and 5 of this agreement upon receipt of invoices submitted by the Consultant and approved by the City. 3. S AND COMpm The Consultant's work under this contract will begin immediately after receipt of notification to proceed by the City to be followed by completion and acceptance by City of all project working drawings, specifications, contract documents, reports, and all permits and agency approvals for all phases of the project no later than March 15, 1991. Extensions of time may be granted if requested by the Consultant and agreed to in writing by the City. In consideration of such requests, the City will give allowance for documented and substantiated unforeseeable and unavoidable delays not caused by a lack of foresight on the part of the Consultant, or delays caused by City inaction or other agencies' lack of timely action. The fees payable in accordance with Paragraph 5, lgPayment of Fees," shall be as described in attached Exhibit A which is attached hereto and incorporated by reference herein as follows: C SERV- . Investigation and Program Refinement $ 18,405 Schematic Design 145,890 Design Development 211,770 Contract Documents 410,890 As-built Drawings 8.795 Subtotal: Basic Services $795 , 750 OITIONAL SERVICPS Cole Library Study Subtotal: Additional Services s 50.000 $ 50,000 . -. 3 0 Reimbursable Expenses Subtotal: Reimbursable Expenses u $ 82,505 TOTAL PROJECT FEES $928,255 No other compensation for services will be allowed except those items covered by supplemental agreements per Paragraph 7, "Changes in Workon It is agreed to by the parties to this agreement that work to be performed by the Consultant and its subconsultants related to work required during the bidding and construction phases of the project shall be provided by a supplemental agreement. 5. - Payment of fees shall be made within thirty (30) days after receipt of monthly invoices submitted by Consultant and approved by City. Fees identified in Paragraph 4 above entitled ffBASfC SERVICES" and "ADDITIONAL SERVICES" are to be considered as the total and complete fees to be paid for these elements of the project by City to Consultant. Fees identified in Paragraph 4 above entitled "REIMBURSABLE EXPENSES" shall be paid by City to Consultant following receipt and approval of monthly invoices sufficiently detailed to include an itemized expenditure of actual costs incurred by Consultant in the administration of this project for- - the following expenses multiplied by fifteen percent (15%) * The total reimbursable expenses to be paid by City to Consultant shall not exceed $82,505. 4 . Travel $28, a25 . Printing, Reprographics, Reproduction 20,500 Fax, Long Distance, Express Mail, a, ooo Pro] ect Rendering 5,800 . Project Display Model 10,000 Preparation and Attendance at Public Meetings 9.380 . . TOTAL EXPENSES: Not to Exceed $82,505 It is understood between the parties to this agreement that if the project is resumed after being suspended for more than sixty (60) days, the Consultant's compensation shall be subject to renegotiation between the parties based upon adjustments to building rates that have occurred in the interim. 6. final Within fifteen (15) days of completion and approval of the design, the Consultant shall deliver to the City the following items: a. One (1) complete set of final approved project plans on mylar at scale. b. One (1) complete camera-ready set of the final approved project specifications. C. All final architectural and engineering certifications and documents. The plans shall be signed by a Licensed Architect, Registered Civil Engineer and/or Registered Landscape Architect, as appropriate. d. One (1) Statement of Probable Construction Cost. I. WGES IN WORK -. If, in the course of this contract and design, changes seem merited by the Consultant or the City, and informal consultations - with the other party indicate that a change in the conditions of . 5 the contract is warranted, the Consultant or the City may request a change in contract. Such changes shall be processed by &a city in the following manner: A letter ottlining the required changes shall be forwarded to the City by Consultant to inform them of the proposed changes along with a statement of estimated changes in charges or time schedule. After reaching mutual agreement on the proposal, a supplemental agreement shall be prepared by the City and approved by the City Council. Such supplemental agreement shall not render ineffective or invalidate unaffected portions of the agreement. Changes .requiring immediate action by the Consultant or City shall be ordered by the City Manager who will inform a principal of the Consultant's firm of the necessity of such action and follow up with a supplemental agreement covering such work. 8. - The Consultant shall prepare the plans and specifications in accordance with the design standards of the City of Carlsbad, State of California, and recognized current design practices. Applicable City of Carlsbad Standards and Regional Standards shall be used where appropriate. the City of Carlsbad. Copies of such standards shall be obtained from 9. COVENANTS AGAINST CONTINGENT FEU The Consultant warrants that their firm has not employed or retained any company or person, other than a bona fide employee4 working for the Consultant, to solicit or secure this agreement, and that Consultant has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage, brokerage fee; gift, or any other consideration 6 contingent upon, or resulting from, the award or making of this agreement. For breach or violation of this warranty, the City shall have the right to annul this agreement without liability, or, in its discretion, to deduct from the agreement price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. 10. NONDISCRIIIPATTON CLAUSE The Consultant shall Comply with the State and Federal Ordinances regarding nondiscrimination. 11. INATION OF CONTRAa In the event of the Consultant's failure to prosecute, deliver, or perform the work as provided for in this contract, the City may terminate this contract for nonperformance by notifying the Consultant by certified mail of the termination of the contract. The Consultant, thereupon, has five (5) working days to deliver said documents owned by the City and all work in progress to the City Manager or his designated representative. The City Manager shall make a determination of fact based upon the documents delivered to City of the percentage of work which the Consultant has performed which is consistent with the terms of this contract, usable, and of worth to the City in having the contract completed. Based upon that finding as reported to the City Council, the Council shall determine the final payment of the contract. -. 12. DISPUTES If a dispute should arise regarding the performance of work under this agreement, the following procedure shall be used to resolve any question of fact or interpretation not otherwise settled by agreement between parties. Such questions, if they 7 become identified as a part of a dispute among persons operating under the provisions of this-contract, shall be reduced to writing by the principal of the Consultant or the City Manager. A copy of such documented dispute shall be forwarded to both parties involved along with zecommended methods of resolution which would be of benefit to both parties. The City Manager or principal receiving the letter shall reply to the letter along with a recommended method of resolution within ten (10) days. If the resolution thus obtained is unsatisfactory to the aggrieved party, a letter outlining the dispute shall be forwarded to the City 'Council for their resolution through the Office of the City Manager. The City Council may then opt to consider the directed solution to the problem. In such cases, the action of the City Council shall be binding upon the parties involved, although nothing in this procedure shall prohibit the parties seeking remedies available to them at law. 13. ONSmTY OF THE CONSULTANT The Consultant is hired to render professional services of designing and preparation of drawings for the South Carlsbad Library Design and the Cole Library Feasibility Study. Any payments made to Consultant are compensation solely for such services. Consultant shall certify as to the correctness of all designs and sign all plans, specifications, and estimates furnished with Registered Architect's, Registered Civil Engineer's, Or 4 Landscape Architect's registration number where appropriate. 14 . SUSPENSION OR T-ATI ON OF SER VICES This agreement may be terminated by either party upon tendering thirty (30) days written notice to the other party. fn 8 the event of such suspension or termination, upon request of the city, the Consultant shall assemble the work product and put same in order for proper filing and closing and deliver said product to City. In the event of termination, the Consultant shall be paid for work performed to the termination date: however, the total shall not exceed the contract amount. The City shall make the final determination as to the portions of tasks completed and the compensation to be made. Compensation to be made in compliance with the Code of Federal Regulations. 1s. ATUS OF THE CONSUL- The Consultant shall perform the services provided for herein in Consultant's own way as an independent Contractor and in pursuit of Consultant's independent calling, and not as an employee of the City. Consultant shall be under control of the City only as to the result to be accomplished and the personnel assigned to the project, but shall consult with the City as provided for in the request for proposal. The Consultant is an independent contractor of.the City. The payment made to the Consultant pursuant to this contract shall be the full and complete compensation to which the Consultant is entitled. The City shall not make any Federal or State tax withholdings on behalf of the Consultant. The City shall not be required to pay any workers' compensation insurance on behalf of the Consultant. .The Consultant agrees to indemnify the City fog any tax, retirement contribution, social security, overtime payment, or workers' compensation payment which the City may be required to make on behalf of the Consultant or any employee of the Consultant for work done under this agreement. 9 The Consultant shall be aware of the requirements of the Immigration Reform and Control Act of 1986 and shall comply with those requirements, including, but not limited to, verifying the eligibility for employment of all agents, employees, subcontractors and consultants that are included in this agreement, 16 . CONFO-TY TO The Consultant shall cause all drawings and specifications to Federal, State and Consultant shall provide all necessary supporting documents conform to all applicable requirements of law: local. and Consultant shall file said supporting documents with any agencies whose approval is necessary. The City will provide copies of the approved plans to any other agencies. 17. OWNERSHIP OF DOCUMENTS All plans, studies, sketches, drawings, reports, and specifications as herein required are the property of the City, whether the work for which they are made to be executed or not. In the event this contract is terminated, all documents, plans, specifications, drawings, reports, and studies shall be delivered forthwith to the City. Consultant shall have the right to make one (1) copy of the plans for his/her records. The City acknowledges the Consultant's plans and specifications as instruments of professional service, Nevertheless, the plans and specifications prepared under: this agreement shall become the property of the City upon Completion Of the work. The City agrees to hold harmless and indemnify the tonsultant against all damages, claims, and losses, including # defense costs, arising out 'of any reuse of the plans and specifications without the written authorization of the Consultant. 18. HOLDHARMLESS AG- The City, its officers, and employees shall not be liable for any claims, liabilities, penalties, fines, or any damage to goods, properties, or effects of any parson whataver, nor for personal injuries or death caused by, or claimed to have been caused by, or resulting from, any intentional 01: negligent acts, errors or omission of Consultant or Consultant's agents, employees, or representatives. Consultant agrees to defend, indemnify, and save free and harmless the City and its officers and employees against any of the foregoing liabilities or claims of any kind and any cost and expense that is incurred by the City on account of any of the foregoing liabilities, including liabilities or claims by reason of alleged defects in any plans and specifications. 19. ASSIGNMENT OF CONTRACT The Consultant shall not assign this contract or any part thereof or any monies due thereunder without the prior written consent of the City. 20. SUBCONTRACTING If the Consultant shall subcontract any of the work to be performed under this contract by the Consultant, Consultant shall be fully responsible to the City for the acts and omissions of -. Consultant's subcontractor and of the persons either directly Or indirectly employed by the subcontractor, as Consultant is for the 11 acts and omissions of persons directly employed by Consultant. Nothing contained in this contract shall create any contractual relationship between any subcontractor of Consultant and the City. The Consultant shall bind every subcontractor and every subcontractor of a subcontractor by the terms of this contract applicable to Consultant's work unless specifically noted to the contrary in the subcontract in question approved in writing by the City. No official of the City who is authorized in such capacity on behalf of the City to negotiate, make, accept, or approve, or take part in negotiating, making, accepting, or approving of any architectural, engineering, inspection, construction or material supply contractor, or any subcontractor in connection with the construction of the project, shall become directly or indirectly interested personally in this contract or in any part thereof. No officer, employee, architect, attorney, engineer, or inspector of or for the City who is authorized in such capacity and on behalf of the City to exercise any executive, supervisory, or other similar functions in connection with the performance of this contract shall become directly or indirectly interested personally in this contract or any part thereof. T OR CONVERSATION 22. -. No verbal agreement or conversation with any officer, agent, or employee of the City, either before, during, or after the execution of this contract, shall affect or modify any of the terms 12 or obligations herein contained nor such verbal agreement or conversation entitles the Consultant to any additional payment whatsoever under the terms of this contract. 23. SUCCESSORS OR ASSIGM Subject to the provisions of Paragraph 18, "Hold Harmless Agreement," all terms, conditions, and provisions hereof shall insure to and shall bind each of the parties hereto, and each of their respective heirs, executors, administrators, successors, and assigns. 24. EFFECTIVE DATE This agreement shall be effective on and from the day and year first above written. 25. CONFWCT OF INTm The Consultant shall file a Conflict of Interest Statement with the City Clerk of the City of Carlsbad in accordance with the requirements of the City of Carlsbad Conflict of Interest Code. 26. UJSURANCE The Consultant shall obtain and maintain a policy of comprehensive general liability insurance from an insurance company authorized to be in business in the State of California, in an insurable amount of not less than one million dollars ($1,000,000) . This insurance shall be in force during the life of this agreement and shall not be cancelled without ten (10) days prior notice to -- . the City. 13 The City shall be named as an additionally insured on this policy. The Consultant shall furnish a certificate of said insurance to the City within ten (lo) calendar days of the execution of this agreement. IN WITNESS WHEREOF, we have hereunto set our hands and seals. CARDWELL/THOMAS AND ASSOCIATES : CITY OF CARISBAD: Mayor APPROVED AS TO FORM: Assistant City Attorney ATTESTED : City Clerk . -. FEE SCHEDULE SOUTH CARLSBAO LIBRARY DESIGN & COLE LIBRARY STUDY - $10.8 IO $52.340 s77.000 $85.aoO so .__-- I ~nci iiiw i unAL (CTA) 0 28.000 32.000 2o.ooo 0 I At ICHIl CCTUCUUFFE (CTA) AIlCHlJECTUF3Al (MA) INTElUO( I UESGN SJAUCTUnAL CIVIL MECt 4 ANICAL ELECl IUCAL LANDSCAPE LIGHTING KOUSTICAL COST ESrqAlING 2.485 0 890 1.050 1.130 2,040 0 0 0 0 19‘160 5.460 11.500 5,875 8.440 3.870 8.645 0 0 2.500 20.4 70 5,460 22,500 12,275 11.300 5.400 6,065 5.000 4,000 2.500 152,400 11,600 30,000 17.050 22.685 26.150 13.7m 7.025 6.750 8.500 2,200 0 2.500 1,000 1.250 1,300 545 0 0 0 1% I IMAl ED WIMOURSABLE WI’ENSES TOTAL FEES AND ESTIMATED EXPENSES SUBTOTAL 3ASC SEflVCEt $225,15(3 80,00(1 204.115 22,524 7s03@4 37.a 44,w 3&760 28.785 12,025 12,750 13.500 $795,750 =OLE LIBRA6 STUDY $15.ooo 0 7.500 0 12!000 3.000 6,500 6.000 0 0 0 0 S50.oOO TOTAL FEES $240,15( 80.00( 212.211 22.W 87.39 40.N 51.a 44,760 28.785 12,025 12.750 13.500 - $845,750 I $82.505 I I $928,255) .I. A-3 PARKS VI 11-1 8 Vlll-19 PAGE 2 Of 8 April 24, 1991 - I N VI 11-24 I PACE 5 Of 8 Aprct 24, 1001 Vlll-26 PACE 6 Of 8 April 24, lwl USES IN RCCREAIIOY AREAS MIRlN IOlAL yo(-CIIV QlyD 6 AC. VI 11-28 w 0 SRA SRA '( 10,561) (c) (WA) TOTAL SUA TOTAL 68,654 (c) (SUA) TOTAL SRA // 65.05 - 13.0 1 78.06 64.0 1 25.39 AQI a46 25.39 26.40 _128 31.68 26.12 54.78 65.73 52.77 171.63 34.31 205.91 168.30 A('H ES AC.X I is KI3OUIREl) EXIST 39.58 - 36.78 76.36 623.30 16.16 -a -- - 4.80 20.96 327.30 .O .o .O - / 559.30 40.34 1300 s3.34 75.30 96.08 - 54.58 150.64 1,585.20 .A +I< - > <25.47> + 23.77 < 1-70> + 559.29 <9.23> < .27> <!)SO> _I_ +301.91 < 26.40> < 5.28> <31.68> + 533.18 < 14.44> < ?2.39> + 24.16 < 75.55 > + 20.22 + 2.02 a 55.2n> + l,4 16.9) IM pol' I~SI. (37,979) (22,343) (3 1,775) (42,817) (134.914) A( 'It1 JS 1t14)I JIRlil) 94 '14 I 13.92 911.70 55.115 67.02 52.1 I 79.44 I5 89 95.33 79.44 107.04 - 21.41 128.45 107.04 337.27 67.45 404.72 3 37.2') _I IH on I_ 11.17 - A( 'I< I .s I* I J'I'I I I< I I 31) 20 11.73 4.3.93 .o 47.20 47.20 .o 91.25 b.(M 97.25 .o 7U.7H .(I - (J - - - 78.78 .0 247.43 I9 71 267.16 .(I (;I<ANI) 'I.( ) I'Al- b9 7H 120 2') 623.30 63.36 - 4.W) 611. e6 327.30 91.25 h (MI 97.25 5 50.30 11') I2 I3.W 132.12 75.30 343 51 74 31 4 I7.H2 - c_ I, 5~5.20 TOTAL +I<-> <25.16> + 31.35 t 6.37 + 524.60 + 7.51 <6.37> + 1-14 + 379.4 I + 11.81 < 9.89 > + 1.92 + 479.86 -0 12.w <A.4 I > + 3.67 (3 I .74) + 6.24 t 6.M t $3. IO t 1.4 I6.W 'POPULATION FIGURES PROVIDED BY GROWTH MANAGEMENT. INCI-LJDtS I>WLrl.l.lNci lfNl IJ 1'11~ I IIAVI' 111 Ill JWc I I'J HMI IS m Revised 4/22/91 cr AB#- DEPT. PER MTG. 11 /24/87 OF CARLSBAD - AGENr TlTtk ZONE 5 - PARK FEES BILL RECOMMENDED ACTION: Adopt Resolution No. 7307 , authorizing the collection of a local facilities management fee for park facilities in the area defined as local facility management zone 5. Direct staff to enter negotiations with the developers in Zone 5 for the up front construction of recreational facilities on City and/or County owned land. ITEM EXPLANATION: On August 4, 1987, the City Council adopted the Local Facilities Management Plan for Zone 5. In addition, Council directed staff to return the issue of a local facilities management fee fer recreation facilities to the Parks and Recreation Commission for further study. At the August Parks and Recreation Commission meeting a sub- committee, consisting of Barbara Donovan and James Popovich, was appointed to study the fee in depth. Mr. Mark Hughes was selected by the developers in zone 5 to represent their concerns. Exhibit 1 details the sub-cornmittee'.s findings and recommenda- tions on the following issues: Needs Assessment Zone vs. Citywide Application Facilities Fee Developers' Alternative Proposal On November 2, 1987, the Parks and Recreation Commission held a special meeting on this matter. After discussion and input from several members of the public, the Commission endorsed the sub- committee's report. The Parks and Recreation Commission voted (6-0) to advise the City Council as follows: authorize a park development fee of 40 cents per square foot on all development permits in Zone 5 pursuant to Section 21.90.050 of the Growth Management Program, and direct staff to negotiate with the developers in zone 5 to construct the recreational facilities up front. The final agreement to be brought back to the Parks and Recreation Commission for advisement to the City Council. \ It is the intent of the Parks and Recreation Commission that the developers' proposal to construct the facilities up front would Page 2 of Agenda Bill No. 9/21-*/ serve as an alternative to assessing a fee. Therefore, at the successful conclusion of the negotiations, collected fees would be refunded to the appropriate parties. However, if an agreement cannot be reached by the City and Zone 5 developers, these fees shall remain permanent. FISCAL IMPACT: The proposed fee would raise approximately $7,200,000 through buildout of zone 5. The fiscal impact of the developers' alternative proposal cannot be assessed at this time. EXHIBITS : .. 1. Parks and Recreation Sub-Committee Report on Zone 5 Park Fees, October 1987. 2. Resolution No. 9307 , authorizing the collection of a local facilities management fee for park facilities in the area defined as local facility management zone 5. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Resolution No. 9307 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, AUTHORIZING THE COLLECTION OF A LOCAL FACILITIES MANAGEMENT FEE FOR PARK FACILITIES IN THE AREA DEFINED AS LOCAL FACILITY MANAGEMENT ZONE 5. ~~ WHEREAS, Section 21.90.050 of the Carlsbad Municipal Code authorizes the establishment of a local facilities management fee to pay for improvements or facilities identified in a local facilities management plan which are related to new development in a zone and are not otherwise financed by any other fee, charge or tax on development, or are not installed by a developer as a condition of a building or development permit; and WHEREAS, the Local Facilities Management Plan for Zone 5 identified a need for park facilities which relate to new development in the zone and are not otherwise financed or being provided: and WHEREAS, the City Council on August 4,1987 adopted Resolution No. 9188 which approved the Local Facilities Management Plan for Zone 5 and directed staff to work with the Parks and Recreation Commission to specifically assess the need for park facilities and to determine how to best provide these facilities; and //// //// I 2 1 c 4 c Y 6 7 e 9 IC 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 WHEREAS, the Parks and Recreation Commission appointed a sub-committee charged to review the need for park facilities in Zone 5 with the assistance of input from the developers within Zone 5; and WHEREAS, the Parks and Recreation Commission sub- committee through the use of two independent surveys and input from the developers in Local Facility Management Zone 5 confirmed the demand and need for recreation facilities and, further determined that these facilities were not being provided; and WHEREAS, the Parks and Recreation Commission held a special meeting on November 2, 1987 to review and consider the sub-committees report and the Commission voted to recommend that the City Council adopt a Local Facilities Management Fee in the amount of 40 cents per square foot on all new development within the Local Facility Management Zone 5. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. Effective this date, a Local Facilities Management Fee shall be collected upon all new development within the Local Facility Management Zone 5 as shown on Exhibit “lgV which is made a part hereof. //// //// 1 2 3 4 5 6 7 a 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 20 3. The amount of the fee to be collected shall be based on a rate of 40 cents per square foot to be assessed on all development pennits issued in Local Facility Management Zone 5. 4. That all developers within the boundaries of the Local Facility Management Zone 5 who have been issued development pennits and have signed the AGREEMENT TO PAY FEES FOR FACILITIES AND IMPROVEMENTS AS REQUIRED BY THE GROWTH MANAGEMENT SYSTEM shall be required to pay this fee within thirty (30) days of receipt of the City's invoice in accordance with said agreement. 5. The Local Facilities Management Fee shall be collected as described in Section 21.90.050 (e) of the Carlsbad Municipal Code. 6. The Local Facilities Management Fee shall be reviewed annually and adjusted accordingly to ensure that sufficis: funds are being collected to provide for the recreational facilities in Zone 5. PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council held on the 24th day of November, 1987 by the following vote, to wit: AYES: Council Members Lewis, Kulchin, Pettine, Mamaux and Larson NOES: None ABSENT: None ATTEST: ALETHA L. CLAUDE A. LEWIS, Mayor EXHl BIT I' 1 I* ZONE 5 7=F - JANUARY 10 LOCAL FACILITIES MANAGEMENT PLAN -2- city of Carlsbad California PARKS AND RECREATION COMMISSION SUB-COMMITTEE REPORT ON LOCAL FACILITIES MANAGEMENT PLAN ZONE 5 - PARK FEES Sub-CommitWe Memberat Commissioner Donovan Commissioner Popovich a 6 DWWIO-' RepmtatW: .' Mr, Mark Hughes October 1987' TABLE OF CONTENTS IV. ZONE VERSUS CITYWIDE APPLICATION ......... 5 APPENDIX : A. Growth Management Zona Map with Zona 5 Highlighted ..................... A-1 C. Analyaia/Rasearch.Limftad Survay ......... A-4 0. Saction 21.90.050 of the Growth . Managmaant Ordinanca .......... ......... A-14 E. kttmr from David Bradstreat to tha Zono S Sub-Committea regarding tha davalopmant of a Golf Coursa ........... A-16 # The sub-committee (hereinafter referred to as 'lCommitteeii) has studied each of the four issues which the City Council directed staff to return to the Parks and Recreation Commission. The committeels conclusions and recommendations are as follows: NEEDS ASSESSMENT From current use information and the results of two, independent suweys, the Committee concluded that a recreational demand, which the City should address, does exist in Zone 5. ZONE VERSUS CITYWIDE APPLICATION Based on the concentration of employees in Zone 5 and the ability to locate facilities in close proximity to this concentration, the Committee recommends that the proposed fee be applied at the zone level. FACILITIES The Committea recommends that the following active recreational facilities ba devalopad: 7,500-10,000 square foot fitness center 1 swimming pool 3 ball Zields (lighted) 3 full-size basketball courts (lighted) 6 tennis courts (lighted) 4 outdoor racquetball/handball courts (lighted) These facilities could be placed on one site, or several sites throughout tha industrial corridor. It would require bethen 8 and If acres'to accommodate these facilities at a total cost of between $5.8 and 8.9 million. FEE Based on the above program the Commfttaa recommends that a fee of 40 cents per square foot ba assessed on all building pennits in Zone 5 pursuant to Section 21.90.050 of the Growth Management Ordinance. # ALTERNATrvG The Committea is aware of the drawbacks of assessing and collecting a developmant fee to pay- for the timely construction of recreational facilities. The developers have proposed an alternative whereby thay would design and build the Zacilfties up front on City (Macario Canyon) and/or County owned land. The Committea believaa that such an altarnativa has potential benefits, to both tha City and the developers, and recommends that the City explora this option. Gi2 Yb Zone 5 contains no residmtial davalopmant. The Growth xanaqement Performanca Standard for Parks, which only addresses residential demand, d0.s not apply in this zona. Howaver, staff felt a recreational demand was baing ganaratad by tha non- residential amployear in Zona 5 which was not baing satisffed by the employars and is impacting City park facilities dasignad to meat rasidantial damand. Currently thara ara 8,000 employees in Zona 5; at buildout thera will be a minimum of 40,000. Staff felt tha situation would gat proqrasmivaly vorm without City interrantion. Tharafora, in th. Local Facilitias Managament Plan for Zona 5, a davalopmant faa to pay for active racraational facilftias to meat non-rasidantial damand was introducad. At the Juna and July Parks and Racreation Commission maatings this faa was discussad. On August 4, 1987 a racommendation of 50 cantr par squara foot was prasantad to tha City Council. After considerabla public input and Council diS~~88iOn, Council supportad tha concapt of a park fa* but arkad that sevaral ismuas be raviawad by tha Parks and Racraation Coamission, namaly: Naada as8assmant Citywida versus zona application Facilitias to ba davalopad Amount Of fa8 to ba aS8aS8ad At tha August Parks and Racraation Cammiasion maating a sub- committee (harainaftat rafarrad to as Vomnittaaa) war formad to study * thasa issuam. CoPmrissionars Donovan and Popovich ware appointad to tha Committaa. Mr. Mark Hughra, Dfractor of Markrtfng for Centra Davalopmant wab invftad to raprarant the devaloperr of Zona S. David Bradstraat, Raith Bavatly, Michael Holtmillar, Philip Cartar and Graca Manuas providad staf if support . Tho followhq report datails tha conclusions of tha Committaa. To quantify thr currant, non-rasfdrntial, racraational damand in Zona 5, tha City askrd SANDAG to conduct a survey. Tha ifour- quartion postcard on paga 3 was draftad by City staff and rrvfrwrd by SANDAG. 2 1. 0- your employor currently 0n.r any on-dtm rnnrtlond f.ellllt.r/progrrmr? 1. Yes (sooc~ty) 2. No Carisbad park frellltloumrartlon progmma? 2. 1 to 4 4. 9 to 12 8. 17 or mor. 1. 6all FMdr J. Picnic Arras 9. otner (SPOCI~~) 2 On 0 monthly bartr. how many day* do you penonally utlllro city of 1. Nono 3. s to 8 5. 13tO 16 3. WRat r.croatfonal frcllltlor would you Illto derdopd to meet your nodo? 2. Fitnoso Contor 6. Running Trrcks 3. Golf Courw 7. SwimmingPool 10. None 4. Gymnarlum 8. tonnis Counr 1. Yor 2. No 4. AI. YOU clr(8b.d mldW(? Thana YOul SANDAG compo6ad a list of randomly salactad amployars in Zona 5. Keith Bevarly received parmission from aach of tha employars to distribute the su~ays to thair employea8. A total of 3,425 surrays warm hand dalivared by SANDAG. 73s survays warm returned for a responsa rata of 21.52. It is SANDAG's axparianca that a responsa rata of 17% provider a statistically significant sample. Therefor., staff feels the abova rarults accurataly raflect the recreational naad of tha amployea ba8a in Zona 5. Data from tha 1980 Census also affirm. tha reliability of the survey. Spaciffcally, tha 1980 Cen8us astimatad that 63% of the jobs In Carlsbad warm hald by non-residants which is similar to tha response of tha SANDAG Survay. Sima results from tha SANDAG survay: -0 501 of all rospondants use City park facilftiaa -- 629 of all rorpondants wera not raaldants of Carlsbad -0 638 rampondad that their employars do not provida on-sit. racraational Facilitias # Commissionar Donovan was concernad that tha wording of- the Introduction and rafaranca to the ttCltym of Carlsbad in the SANDAG Survay may haw biasad tha rasgonsa to quastion 3 regarding Facilftiea. Howwar, a. othar information (e.g.) the A/RL Survey, currant use statistics and an informal rurvay of her own) was availabla, sha felt comfortable supporting the recommendation of the Committaa. 3 *> 4 v- csing tha survay results, it is projected that at buildout a minimum of 2S,OOO .non-residents will be employed in Zona 3, of which half will US. City park facilities. In addition to the SANDAG sumey, the developcrrs commissioped a survey through Analysis/Research Limited (A/RL). (A copy or the survey is providad in the Appandix.) A total of 400 questionnaires were distributed, of which 204 wera returned for a responsa rate of 51%. Tha rasults of tha two surrays vere similar. A/RL reported similar parcantagar to tha residency question and the quastion raqarding amployar providad facilities. In both sumrayr, approximately ona-fourth responded they play golf. A/RL dotarminad that tl...moat paopla who work in Zone 3 participata in racraational activitiar in thair spare tima, and that most of those paopla prafar to angaqo in thair ricraatioRal activitfas naar thair homo." HOWaVOr, tha Exacutiva Summary goes on to concluda: "Facilitiar conduciva to amployaa bas. of Zona s might includa a jogging track and/or "par coursa" (I... jogging track with axarcisa/workout stations along tna path). Such a track should ba abla to ba langthanad or expandad as tha park area groor8. combination tannis/baskatball courts would accommodata a significant parcrntaga of tha Zona S amployear. Cycling paths through tha complax might also bo considorad, aa wall as outdoor wallad racquat courts (for tacquatball and handball). Study findings warrant considaration of an indoor exarcis. cantrt to ba usad by Zona S crmployaas during regular businmra hours and aftrr work. Such a facility might includa arras for axarcira machina., waight training, and aarobic danca or axarclsm.n In addition to th.8. swry8, an analysir of all adult sports teams which c0mpat.d in City laaquas during fiscal yaar 1986-87, indicat.4 that 16.7% warm sponsorad by Carlsbad industry. Of the total adult participation of 3,3SS, 693 warm not Carlsbad residanta and S60 participants worm from induatrfal lponsorad trams. Park Facility US. by industry, primarily for company picnics, from July 1, 1987 through Saptambar 13, 1987 nattad 1,466 participants and S6 hours of facility US.. Tha racant opening of Stagacoach Park gymnasium har also attractad industrial employees during tha noon houg for rrcraation play. An alavon-day survey period from Auguat 21 through Saptambar 4, 1987 (rxcludiw 4 weekends) netted 46 participants logging 276 hours of use. These statistics are evidence of the recreational demar,d generated by the influx of employees in zone 5. IV. ZOm mu3 CITYWIDE APPLICATION The need for recreational facilities in the industrial corridor is based on tha concentration of industrial land US. in this-one location. At buildout, it will generata a workday population of at least 40,000 employees. This situation daar not apply t:, commercial and office land uses which are dispersed in much smaller areas throughout the city. It would ba difficult to establish the ralationship requiring commercial and office uses, especially in the most northarly and southerly parts of the City, to fund a recreational park in tha industrial corridor which is located in tho centrr of the City. Also, when tha Parks and Recreation Elamant of tha General Plan was updated in 1982, it recognizad tha concantration of industrial land uso and tha resultant concantration of employmes. It contains policy statamants SpOCifiCally ancouraqing industrial devalopmantr to provida rrcraational facilitiaa for thair day usm population. Tho Elamant doa8 not Contain any similar policy statemants ralating to commarcial or offfca. Tha moat dafansibla justification for raquiring naw davalopmant Standard8 or exacting fees is whara it is supportad specifically by policy statements in tho Ganaral Plan. . As it is tha intent of this report to raflact tho opinions of all participants, it shoukl ba noted that the davalopars arm not in total agreemant with tha dacision of tho Committao. The developorr understand tha practical aspect of assassing the reo on a zona laval. Howavar, thay disagrao with the equity of such a fa.. Thay argua that amployaaa of commarcial development throughout tho City alro impact thm City racraational program, but simply bocaum theao amployaar aro not a8 concantratad, the davalopmant8 aro not boing assas~od. with regud to tho Ganaral Plan, thm dovalopars do not fed the word "ancouragam aquatas to asaassing a fa.. Tha Planning Director'# re8ponao war that the Canoral Plan consists bf broad assessing a fa., or by nagotiating with davalopars for the construction of racraational facilitiaa, tho City can ba assured that tha recreational naadr of tho amployaar in tha industrial corridor will bo mat. policy statemants rathor than spocific action plans. BY 1 V. FACILITIES Basad on tha rosults of tha SANDAC Suney, the A/RL Surrey ar,d current facility US. information, tho Committea recommends that the following activa recreational facilities bo devalopad: 7,500-10,000 squara foot fitnass cantor 1 swimming pool* 3 ball fields (lightad) 3 full-siza basketball courts (lighted) 6 tannis courts (lightad) 4 outdoor racquatball/handball courts (righted) Thesa facilities could ba placad on on0 lit., or savaral sites locatad throughout tha industrial corridor. Staff astimates that it will raquira batwamn 8 and 15 acras to accommodata thescc facilitia~. Mark Hughas suggastad an acquisition coat of $8 per spar. foot, or approximataly $350,000 par acra. Stalf astimatos tha cost of davaloping tha facilitias at $11S,ooO par acra, plus $2,000,000 for davalopmant of tha fitnam cantar and swimming pool. Thorafora, tha total cost of tha racommandad program would bo $5.8 - 8.9 million, dapanding on tha acraaga raquirad. Acquisition Devalopmant Fftnars Cantar C Pool $ 2.8 S 5.2 1.0 1.7 2.0 2.0 Total'in million8 -5.e $373 (Doas not include m8intanance and op8ration expansas.) In addition to t&a abova activa rrcraational facilitias, tha Committra racommands that davalopars continua to provida passiva recraational facilitima (a.q. picnic armam, par coutsaa, opan spaca) Such ar0.8 arm typicaily a condition- of approval. placing auch facilitiaa on-sit. thay will bast saw. employaaa. c Mark Hugh..' initial undarstanding war that thm swimming * would ba a 3-lanm lap pool adjacant to tha fitnasm cantat. subraquant maating, tha Commissionars indicatd that thair intent wa8 a swin complax with a 2S to 50 metar pool. Hark HUgh.8 faalr that such a complax is abova and bayond what is rmquirad to meat tha dimand ganaratad by tha amployaas in Zona S. - BY the pool ~t a 6 Staff estimates that the program datailed in Section V above, will cost batwean $5.8 and $8.9 million. The Local Facilities Management Plsr? for Zone 5 estimates that them is 18,000,ooo square feet remaining to ‘which this fee could be applied. Therefore, a tea of between 32 cants and 49 cents per spar. foot would be required. Mark Hughes estimated that the abova facilities could be placed on 10.25 acres and be developed at a cost of $2 million (which includes the cost of a lap pool and not a swim complex). His estimates yielded a fea of 30.9 cents per squara foot. To allow for inflation, ha suggastad that a fa0 of 35 cants par square foot be imposad. Tha Commissionarr consfdared all a8timat.S and compromised on a fea of 40 cants par squara foot. Tharafora, it is the recommandation of the Committaa that a faa of 40 cants par square foot bo assasrad on all building parmfts in Zona 5 pursuant to Section 21.90.0SO of the Growth Managamant Ordinanca. As an altarnatfva to assessing a fa., tha davalopars of Zona 5 have proposad the following: 1. 2. 3. 4. 5. Th8 Allow tha davolopmant community of Zona 5 to dasign and build tha do8ignat.d facilitias up front on City (Macarfo Canyon) and/or County omad land. If tha facilitias bra located in Macarfo Canyon, have tho davaloparr build tha axtansion of Faraday through to tha futura Cannon Road to accasa Macario Canyon with tha City antaring an agraamant to raimburrra tha cost of Faraday through daaignatad PPP funds. Devaloparr and City cooparata in astablirhing a Mallo- Roos Distrfct to front tho cost of dovaloping tha recraational facllitlar and Faraday in the immadiata f utura Include in tha Mollo-Roos District othar Zona 5 domignatad improvamant rmquiremantr (o.Q., circulation) to in8ura tha continued davalopmant of .tha com~rcial/indurtrial land in tha Zona. (Which is tha sourca of rapaymant of tha Hallo-Room.) City staff and davaloparr to cooparata in davaloping a comprahansiva plan and tima table for approval by tha city council. details of this altarnativa naad to ba negotiated. Commissioners Donovan and Popovich had many concorns and 7 1 questions, as did tha developers. One concam was tha expense of maintaining and operating these facilities. At this tiae, the city budgat has little room to operato additional tacFLities. There are basically three alternatives to fund the ongoing expensa of them facilities; (1) require the developers to pay for the MLO, (2) find tha money in tha City budget, or (3) include that expensa in tha MOllo-Roos District. Such financing issues nead to be rasolvad. In ordat to raach a final agraamant, both tha city and the devalopars of Zona J must banaflt. Tharafora, it is the racommandation of tho Committee that tha Parks and Racraation commission advisa tha City Council to direct staff to enter into negotiations with tho davaloperr on thair prop0s.d altarnativa. Tha final aqraamont will bo brought bafora tha Parks and Racraation Commission for reviow and subsequantly to tho city Council for approval. If tha city Council approva8 tha final agreemant than collactad fees will ba rafundad to tha appropriato partias. If an agraomant Is not raachad batwaan tha City and tha davalopmrs of zona 5 than tha faa shall ramaln parmanont. Tha Committeo recommands that tho fao bo raviawad on an annual basis to anaura that sufficlant funds arm baing collactad to pay for tha faCilftf.8 datailad in Saction V. It should ba notad that in tha coursa of thasa discusulons the issuo of having tho dovalopatr of Zona 5 conrtruct a golf coursa on tha County property naxt to thi Public Safaty Cantor has bean rafsad. A public, 18-holar championship golf course would ba a tremndous assat to Carlsbad. It would whanca tha City's overall recraational progras. It would satisfy a naad in tha colpmunlty. Through privltization, tha facility would pay for its saintrnanca and operation axponra and not be a drain on City ravanuos. For thosa rmaaons, the Commisaionars on tha Committaa consfdar the golf couxsa to ba M attractiva amonfty. Mark Huqhm ha. ropaatadly rtatad that tha davolopars of, Zona 5 arm not vlllirrq to construct a golf couraa. A golf courh would not satirfy tha racraatlonal damand. of tha amployaos in tha industrial corridor. Almo, they fael a golf course would provlda cityvida benefit and a8 such should ba fundod by a citpida fea. APPENDIX ZONE 5 - L ,CAL FACILITIES MANAGEMENT PLAN A- 1 -- SANDAG SURVEY -- The following surtey was conducted by SANDAG on behalf of the City of Carlsbad. A total of 3,425 surteys were distributed t3 randomly salected business in Zone 5. 735 surt9ys were reedrned for a response rate Of 21-50. It is SANDAC's experience that a response rata of 17t provides a statistically significant sample. Data from other sOUIC8s (Bog.# 1980 Census) also affirms the reliability of the survey. CITY OF -BAD PARK USE'SURWY The City of Carlsbad is conducting this sm.ay to determine and provido for the recreational needs of the industrial population in Carlsbad. Plmamr complete and return this po8tage-paid card by September 18, 1987. Q1: Q2: mea your amployor currently offar any on-rito recreational facilitios/programs? Number of porsonr responding (cases) - 721. Numbor of responses - 863, dum to multfpla answers. t of It of Responses Rerp Casm 62.6 No 451 52.3 Roc/ Fft/Weights 249 28.9 34.5 Aerobics 57 6.6 7.9 sports 90 10.4 12.5 16 1.9 2.2 Other 863 100 . 0 119.. 7 .. - On a monthly baaia, how many days do you puaonally utilize City of Carl8bad park facilitiea/racroation program? Casas Pmrcant 0 357 49.2 1 to 4 224 30.9 s to 8 82 11.3 13 to 16 17 2.2 17 or mora 16 2.2 9 to 12 29 4.0 - 725 - 100 . 0 A-2 43: What recreational facilities would you like developed to meet your needs? Number of persons responding (cases) - 714. Number of responses - 1631, due to multiple answers. % of % of Responses Resp Cases Ballfields Fitness Center Golf Course Picnic Area Track swimming Pool Tennis Other None Gymnasium 152 231 164 124 263 121 197 166 102 91 9.4 14.3 10.2 7.7 16.3 7.5 12.2 10.3 6.3 5.6 21.3 32.4 23.0 17.4 36.8 16.9 27.6 23.2 14.3 12.7 1,611 100.0 225.6 Q4: Are you a Carlsbad resident? Cases Percent Yes No 280 313.1 455 61.9 - 735 - 100.0 c f EACKGFtlUND AND PURWSE OF SFdX3Y he City of Carlsbad is propsim a fee tr, Zone 5 develocers for the purpose of providing recreational and park facilities for primarj use by employees in the area. The main plrpose of this study is to determine the recreational needs of Zone 5 employees. include : Specific objectives of this study 1. Tb profile Zone 5 employees resarding their recreational *behavior 2. ?b determine which near mrk activities are of mst interest to employees Tb determine the intprtance of and satisfaction with miscellaneous services and mities in the area 3. 4. 'Ib determine clarcnt levels of satisfaction mnnq Carlsbad resident emplm aoncerninu recreational facilities and proarams in Zone 5 5. Tb provide a demographic profile of Zone 5 enployees. A-5 9 The study reported herein was conducted durinq the week of sotember 7, 1987, wth Zone 5 gnployees in the City of Carlsbad. administered questionnaires *re distributed to emplops randmy drawn frcm various ccmnercial areas in Zone f. were returned, representing a response rate of 51 percent. and hardling of auestionnaires were cpnducttd by trained interriewers frm Analysis/Research Limited. mur bdrd =lf- A total of 204 mnpletd auestionnalras AU distrtbutron Prior to data collection, extensive discussions were bld with the client reqwdinq tk questionnaire 90 that all relevant topic areas and information nded WO~ bs fully mered in the SU~Y. maximize the efficiency of the survey ad validity of rtsrmses. A pretest was tkn mnducted to The margin of emr for the study is plus Or minus 6.5 percentacre vints at a confidence level of 95 pcrmt. A-6. b 3 Analysis/Research Limitd The Executive Findings am3 Reaxmendations will address the objectives of the study as previously mention&, i.e. the assessment of the needs of recreational facilities for people employed in the Zone 5 Area. Recreational activities mst mentioned as the activities.of cbice of the employees of Zone 5 were swimnirq (57%) It is perceived that these mreational activities tend to be activities that are most frequently performed (often ‘-doneroutside of any sinale recreat_io_nal - fscil ity. bikinq (47% 1 : W jogcritw/runnim ( 37%). While nearly half of the mplc surv~)nect did not know which recreational facilities and programs they wbold like to have near to their place of wrk,. 15% stated that they-wduld like swimnins facilities, 12% desired tennis murts, and 10% said they wuld like to have a physical fitness center.; It was determind thqh this study that kst people who mrk in the Zone 5 kea participate in recreational activitiea in thcir spare time, arid that most of these people prefer to -48 in air recreational activities near their twie. A total of 56.9a of th 204 respordentJ statcd that swimnim was a 1 recreational activit;y in which they participated. they preferred to sui18 near their place of work. they muld be very/muhat likely to swim near wrk if such SWimninCr facilities ere available, while 12.78 said that thty wuld swim often/mths near wtk A total of 12.7% said +it A total of 12.7% stated that if facilities were available for tbp to do 90. A- 7 Analvsis, ?search Linitd XA terns of jogging/runnhg: 36-89 Of the 204 respondents said that thv ~vn or jog; or ioq rns thcir place of wrk: 11 -3% explained tky would ke vr?ry/mt 1fidY to mn or iq near wrk if facilities were available; 9.8V stated or jog mar wrk ob/sanetinm if facilities were avaFlablc. 11.30 said tby preferred to Of tha 204 pop10 sxrveydt 32.48 stated that thy play tennis Mer, only-4.9% of thc 204 resporrdcnts stated tbat thy preferred to play tennis near- os- at their pl- af wrk. My 4.91 of thc 204 respondents explained that they would t9 very/mt likely to play tennis near thir place of wrk if facilities were available. often/sanetimes mar thhk placr of wrk if facaities were available. pnd, only 4.4a said that thy wwld play tennis VYlld bs dhly to use racreatfonal .- facilities located near their uock place. . A-b Analysis/Research Limit& It was also determined that an ovemkhinq prcentaae of the emloyees of zone 5 usually participate in their preferred recreational activities "after ._ - 9 4::On mkend~.~ Such a participation pattern wuld most likelv involve -. , . activities perfonned away fran a "near wrk" recreational facility; The survey reveal4 that onethird of the ccmpanies for which Zone 5 - employees work vide OrganiZd nxreational activities, of the Zone 5 employees WtDse cunpanies provide omanized recreational activities do rat participate in these orgadzed activities. sponsored recreational activity thy would like to participate, 439 of the met, half (49%) when asked in which ampany 5 errplopes said "me."* Facilities conducive to eha employee base of Zone 5 mkht include a iocrairw track &/or "par a~urses" (i.e., ths jcqgL# track with exercise/work oyt rtions along the path). SLrch a track sbuld be able to be lemthened or expndd as the park area qme. Canbination tennis/basketball courts wuld mate a significant prcentage of the Zone 5 employees. Cycling paths through the acmplcx miqht alse, be considered, as -11 as outdoor mlled racquet (bot raclauetball and handball). Studv findif98 urrrcnt mideration of an indoor exercise center to be' used by Zan~ 5 apbyeaa durirq rrgular business burs and after wrk. facility might include areas for exercise machines, uciuht traininq, and aerubic dance or exercise. - Such a .. A-9 1 e 7. 8. 9. 10. 11.- 12. 13. No ( PUASE CO TW 0.10 (IF YES) What are they? which mpany orqanized recreational activities do ypu particimte in? In which ccmpany sponsored recreational activities would you like to participate, if they were available? ~~ ~ ~ Did the company or area wbere you previously worked have any orqanized recreational activities? Yes No Ncvlcr Warked (IF m) What are ( ) KEASE (32"IMIE WITH Q.12 ( ) PLEASE cx) TO Q.14 ( ) PLFASE a 'TO Q.i4 they? which cunpany orqanized recreational activities did you participate in? A-1 1 14. If. 16. 17. bw adequate are the ament recreational facilities and proarms in the area around where 'flu rsrk? Very Mmate 1-1 Sanewhat Pcleaua te 1-2 Scrmewhat Inadeauate ( 1-3 Very Inademate ( 1-4 what additional recreational facilities and DLIwrms, if my, Lduld like to have near to where you wxk? HOW important ace the followinsr sewices to yw in your area? mY ml34WW NdvERy WI'ATALL mmwr m- RJfmRlwr ptpom Fast food restaurants ( 1-1 ( 1-2 ( 1-3 ( 1-4 Family type restaurants 1-1 1-2 ( 1-3 ( 1-40 Upscale adult type restaurants ( )-I ( )-2 ( 1-3 ( 14 Child care facilities ( 1-1 ( 1-2 ( 1-3 ( 1-4 Reliuious institutions ( 1-1 ( 1-2 ( 1-3 . ( 1-4 Autanotive service stat ions ( 1-1 ( 1-2 ( 1-3 ( 1-4 bw satisfid are yw with the followitw semima in vow area? VERY SCMEWAT NOPVERY WATU E13 SATISFIm SATISFIm SATISFIED SATISFIED c1pINICW Family type restaurants ( 1-1 ( 1-4 ( 1-5 Upscale adult typa Child care facilities ( 1-1 restaurants ( 1-1 ( 1-2 ( 1-3 ( 1-4 ( 1-5 ( 1-2 ( 1-3 ( )-4 ( )-5 ( 1-3 ( )-4 ( 1-5 -1iaious institutions ( 1-1 ( 1-2 Autanotive service stat ions ( )-4 (& J-3 - -.-. -- ~ -- And finally, we have a few questions for classsification pxpses. In what city or orrmunity do you live? How long have you live there? 18. 19. lass than 1 year ( )-1 1 - 4 years ( 1-2 5 - 9 years t 1-3 10 - 14 years ( 1-4 15 years or mre ( 1-5 20, 21. &lou are sane we cateqories. Please check th OM that includes What is the ZIP de where yw live? your age 18 - 25 ( 1-2 26 - 35 ( 1-3 36 - 45 ( 1-4 Over 65 ( 1-7 22. What is your occupation? 23. Are you employed full time or part time? 9908 7 'rl T!!XNCF: :m. The City CounciL of the City of Catlsbad, CaLiC~r-:~ does ordain as follows: I I SECTION 1: That Title 21 is amended by cP.e ac:',i:i=- :: Chapter 21.90 to read as foLlovs: "Chap tor 2 1 . 90 Gcouth flanaaerent Sect ions : I 21 . 90 . 0 10 Purnoso and intont . 21.90.020 Dot init ions . 21.90.030 Conoral prohibition, exceptions. 21.90.031 Tolling of tho Cor conridoration of applications submfttd bofore the ettect iv9 date of this chaptor. 21.90.032 Tollina of expiration of ureviousLy issued dovelop~ont p.rmits. 21.90.033 Extonsions of orior ap@rovals orohibitec!. 21.90.040 Como1ianc.o with this chaotet tscuitad. 21.90.aSO ~ Fqt-nf facueq ranacem*n& 21.90 . 060 21.90.070 21e90 080 21e90.090 2le9Oe1O0 21.90.310 21e90e120 21,90e 12s 21e90e130 21 . 90 . 140 21.90 . 110 21.90.160 21 . 90.170 21.90.180 21.90 . 190 far. Spocial provisions for buildtnu aemits iisuod during towpotary moratoriw. Finding of hoalth, safoty and uoltars nocossary for tho foos huosod by sections 21.90.0SO and 21.90.060. Porfomance standard. Cityvide facilitior and b~rovemonts ?La?. Local tacilitios managomont zonas. Contones of Local tacilfty mnaqement glans. Facilitfos management olan oreoattion. Facilitios manraemont plan orocesrinc tmplomontrtion ot Cacilitios and improvomontr roouiromonts . Obligation to pay foor or ingtall hprovomonts rooui,rod by any other law. Irnplomonting guido'linos . Exclusions Council actions foos not fC8 Exbiration of chaptor. Sovorabil i ty . I I I A-1 4 I - i (a) X local facilities managerent fee is here5:y established to Qdy for improvements or facilities *identrfitO in 4 Local facilities management plan which are related to new development within tho zone and are not otherwise financed by an*! other fee, charge Or tax on development, or are not installed by a developer as a condition of a building permit or development permit. .The fee may also b used to pay for that portion of t?.e €acilities or improvements identified in tho citywido facilities and improvements plan attributed to develooment within. the local zone which aro not financed by other mans. The facilfties management fee shall be paid before the issuanco of a building permit. The amount of the fee shall be determined based upon t3.e estimated cost of tho facility or improvement designated as necessary to accommodato additional development within the applicable local facilities managomont zone plus the estimated cost ot facilities and Fmprovoments identifiod in the citywide facilities and hprovoment plan attributablo to the local zone. The fee shall be fairly apportionod among the nev development. (b) The fro required by this section is in addition to any other means of financing facilities or Fmprovomonts identified by a local facilities management plan or any other tax, fee, charge or improvement reuuiroment which may be imposed on the doveloprnent of property under the provisions of state law this code or City Council policy. management tone shall bo sat by City Council resolution after a public hearing, published notice of which shall bo given according to Carlsbad Municipal Code Section 21.54.060(2) and Governmint Cod. Section S4992. permit applicatfon submitted aftrr the effectivo date of this chapter tho applicant shall agree to pay tho fee establishad by this section at tho timo a building pmit is issued. (c) Tho amount of the fee for a local facilities (4) ~3 a condition ot any building 01: dovolopm~nt (0) The fee established by this Section shall be hvieI at the tima OF iS8uanco of a building prmft. c A-1 5 I September 18, 1987 TO : ZONE 5 SUB COMMITTEE FROM: DAVID BRADSTREET, PARKS AND .FECREATION DIRECTOR ZONE 5 In an effort to provide the community with well balanced, comprehensive park facilities and recreation proqrms, staff has been involved in an extensive park and recreation development program. that there is a nted"to expand upon or create additional park and recreation facilities that are currently not provided for i.e., golf course complex. After review and analysis of the industrial population influx created primarily from Zone 5 (40,000-70,000 at buildout), it has been determined that this population will have an impact upon current and future planned recreation facilities. This impact may be absorbed in the Citys existing and planned facilities on1 program. In addition to PFF fees, staff is recommending the irnplementation of a separate fee to facilitate additional recreational development. Staff further recommends that the development fee be applied towards the construction of a golf course complex. not only provide a well balanced park and recreation program to the community, but would also eliminate rnaintenance/oparation and lease cost. By operating the complex under a privititation concept, user fees would offset maintenance cost by 1OOt and possibly provide additional ravenu. to further expand recreation facilities. suggested that resident and non-residant fees be established and that the industrial employaecs living outside the city be charged a resident fee. county to leas. 1SOs aczes in the industrial zone 5 area. preliminary evaluatLon of this property indicates suitability for the developrnmnt of a golf course complex. A recent feasibility study ha8 daterminad that a golf course complex could be developed within Macario Canyon should negotiations with the county fail. As part of this development program it has been established if industry participates in the City's over all recreation + acilities development A golf complex would It is Negotiations are currently undernay with the A The Golf Comglex Davalopment cost has been estimated at 58,000,000 in todays aconomy. With the remaining industrial development in Zone S through buildout, an assessed fea of .42C par square foot would facilitate construction, construction at a later date may substantially increase the develop- ment cost and thereby increase any assessed fee for facilities. An alternative to this inflationary factor is that tha industrial ' developers opt for up front construction of a golf complex built to City Standards. If the development cost should be less than the estimated $8,000,000 then the fees will be lowered accordingly. An inflationary factor for Zone 5 Sub Committee September 18, 1987 Page Two Should tho county lease or development of a golf complex on the Macarlo property fail to materialize, the following alternatives would be recommended. Alternative I - up front or incremental development of a centralized 15 acre recreation complex within Zone 5. Alternative If - up front or incremental development of three (3) five acre recreation .complexes statigically located throughout Zone 5. The cost to deve,lop either of the above alternatives is estimated between $7,822,500 and $8,000,000. The annual maintenance and operation cost associated with these alternatives is estimated at $g,OOO/Ac/Yt or $130,000 per year. All cost estimates are determined in 1987 dollars and have not determined inflationary cost should incremental development occur. Should either of these alternatives be instituted, staff recommends tho maintenance and operation costs be absorbed by the industrial developers. DB:pa c A-17 JULY 30, 1987 TO: RAY PATCHETT, ACTING CITY MANAGER FROM: PLANNING DIRECTOR ZONE 5 LOCAL FACILITIES MANAGEMENT PLAN (LFMP-5) The Planning Commission at their meeting of July 1, 1987, recommended. approval of the Local Facilities Mangement Plan for Zone 5. A number of the facilities analyzed had certain issues identified at the Commission meeting, and these issues are discussed below. Library The City's existing, adopted performance standard for Library does not apply in non-residential areas, however, the Plannlng Commission did recommend that this Zone Plan be submitted to the Library Board to see if they have comments or sugqestions on this section. The Library Board reviewed the matter at their Last meeting and agreed that the performance standard should not apply to Zone 5. However, they did wish to reserve the right in the future to consider a fee for non-residential use if library use by the non-residential zones increases. Parks Parks in Zone 5 would not be subject to an existing performance standard because the existing standard is based on residential development. However, the Planning Commission and staff are recommending that a local facility management fee for parks be considered for Zone 5 based on the square foot of non-residential building area. This fee would be specifically for the acquisition and improvement of park/recrea t ional facilities within Zone 5. Staff and Commission feel that thls proposed fee is justified for a number of reasons. The first is that there Is a policy statement in the Parks and Recreation Element (action plan 1.1:5) which indicates that industrial developments could provide recreational' facilities for their day use population. Other reasons identified for requiring this type of fee include a statewide survey which lists a number of cities that are already requiring park fees for industrial, office and commercial square footage. Those fees range in value from S.02 to $3.00 per square foot. This survey helps substantiate a current trend of providing recreational facilities within industrial areas. The trend is based on a number of positive factors involving the kinds of uses in industrial-commercial type areas. These include: Page 2 1) the fact that exercise tends to increase employee productivity ; 2) recreational facilities can also act as a selling point for developers of large Lndustrial lots/ buildings; 3) industrial areas are usually a good location for lighted ballfields as there are no homes which would be impacted; 4) recreational facilities can reduce the number of ' traffic trips at peak hours as many employees wlll remain later to utilize the facilities; 5) they would provide greater recreational safety than current activities, such as jogging or biking on industrial streets. In addition, park and athletic facilities are permitted uses in the City's PI General Plan designation and the P-M Zone which makes up much of Zone 5. Staff was recommending a fee of $.50 per square foot of building space in Zone 5. The fee was derived based upon the idea of developing a sports complex to serve the area. Specifically, a multi-use sports complex was considered which would meet the recreational needs of the industrial population. The following amenities and their estimated costs are listed below: Multi-Use Sports Complex Totals 1. Land - 15 ac at $350,00O/ac $5,225,000 2. Development - 15 ac at $115,00O/ac 1,725,000 3. Community Center - 15,000 sq ft at $10O/sq ft 1,500,000 500 000 4. TennislRacquetball Facility - 20 at $25,000 ea S8.9f5.000 Subtotal 5. Overhead Misc. .other 5% Total Rounded to $9,500,000 The proposed fee recommended in the Zone 5 Plan was based upon a projected development potential of approximately 19,000,000 square feet of industrial areas.' Therefore, a fee of 5.50 per square feet was proposed to cover the estimated $9,500,000 acquisition and development cost itemized above. The Local Facilities Management Plan for Zone 5 identlficd several alternatives for addressing the need for recreational facilities in this zone. In recommending the establishment of a fee the Planning Commission felt the matter, if approved by the City Council, should then be referred to the Parks and Recreation Commission to review the proposed fee. Rased upon a Page 3 more -detailed analysis of facility needs, the exact amount of the fee could then be established. The Zone 5 Plan would be amended accordingly once a final decision is made. Circulation Currently all intersections and road segments within Zone 5 or impacted by Zone 5 traffic meet the adopted performance standard. With existing plus committed traffic, however, seven intersections ‘and two road segments are projected to Pall below the adopted performance standard. At buildout, nine intersections are projected to fall below the standards unless mitigation beyond that required under the current Circulation Element is installed. The Planning Commission wants to. make sure circulation will be closely monitored by staff so if levels of service fall below the standard in the future, the City can act quickly to mitigate the problems or halt development. Zone 5 does not impact the adopted performance standard because . fire is based upon residential development. However, staff and the Planning Commission are recommending that the City Council approve a new non-residential performance standard for Flre facilities based on three thresholds: 1) a daily work force that exceeds 12,000 people in one area or zone; 2) an area that is beyond a five minute fire response time; and 3) that the Fire Department is unable to provide’one thousand gallons per minute of fire’flow in ten minutes or less. Zone 5 cannot currently comply wi’th the second and thlrd proposed thresholds. All three thresholds in this zone will be exceeded by early 1989. In accordance, the recommendation is that the schedule for Fire Station No. 5 be accelerated, with the constructlon to begln,in early 1988, with an opening date of early 1989. If the City Council concurs with the proposed new standard, the previously approved Council Resolution adoptlng the Growth Management Performance Standards will be amended to include the new fire standard. Sewer Collection System The Commission felt that the sewer facilities in Zone 5 meet the required performance standard. In approving sewer, they also verified the staff recommendation that the performance standard should be based on the sewer sub-basin rather than the entire zone. In other words, the failure of one sub-basin would not affect an adequate sub-basin in the same zone. The sub-basin meeting the performance standard could continue to develop. Some of the new recommendations conccrning parks and fire did not surface earlier because Zone 5 is really the first non- Page 4 residential zone plan staff has looked at In detail. The need for the new standards came about as d result of this close analysis. With the changes and comments mentioned above, the Planning Commission is recommending that the City Council approve the Local Facilities Managment Plana for Zone 5. / b13H: CG; din A-4 DRAINAGE APPENDIX A4 DRAINAGE COST ESTIMATES 5 ZONE 13 MAJOR DRAINAGE FACILITY - CB Headwai Is 1 EA $2,500 $2,500 CB Subtotal 15% Contingency subtotal 20% Engineering and administrative cost I $576,570 $86,486 $663,056 $132,611 I ~~ Storm Drain CB Total $795,667 APPENDIX A4 DRAINAGE COST ESTIMATES Item No. 1 2 3 4 5 ZONE 13 MAJOR DRAINAGE FACILITY - CC Item Estimated Unit Unit Price Total Cost Description Quantity 42" RCP 3,450 LF $1 18 $407,100 5 1 " RCP 700 LF $135 $94,500 Cleanouts 15 EA $3,050 $45,750 Catch Basin 10 EA $7,040 $70,400 Headwal Is 1 EA $2,500 $2,500 Service Area CC Subtotal cc $620,250 I 15~~ Contingency I $93,038 I I subtotal I $713,288 I I 20% Engineering and administrative cost I $142,658 I I ~ I I I Storm Drain CC Total I $855,945 I APPENDIX A4 DRAINAGE COST ESTIMATES Service Area BAA ZONE 13 MAJOR DRAINAGE FACILITY - BAA Item No. 1 2 3 4 5 6 7 8 9 15% Contingency subtotal 20Y0 Engineering and administrative cost Storm Drain BAA Total $94,939 $727,866 $1 45,573 $873,439 Unit Estimated 1,200 ~ LF $135 I $1 62,000 5 1 I' RCP LF $25 I $29,940 1,200 Repave 5 1 " 60" RCP LF $189 I $20,034 106 106 60" RCP Jack & Bore LF $240 I $2 5,440 $ $1 36,500 Channel Grading 14,000 CY $49,9 1 3 Erosion Control Riprap 8,250 SF 2 EA Cleanouts Reveg - planting Headwal Is 52,800 SF $1 98,000 EA A-5 CIRCULATION TRANSPORTATION ANALYSIS FOR THE CARLSBAD LOCAL FACILITIES MANAGEMENT PIAN - ZONE 13 Carlsbad, California August, 1994 Prepared for: CITY OF CARLSBAD Prepared by: KAKU ASSOCIATES, INC. 1453 Third Street, Suite 400 Santa Monica, California 90401 (31 0) 458-991 6 Ref: 762 TABLE OF CONTENTS 1 . INTRODUCTION ................................................ 1 PROJECT DESCRIPTION .................................... 1 STUDYSCOPE ............................................ 3 ORGANIZATION OF REPORT ................................. 6 II . EXISTING CONDITIONS ........................................... 7 STREETS AND HIGHWAYS .................................... 7 EXISTING TRAFFIC VOLUMES AND LEVEL OF SERVICE ............ 8 111 . FUTURE TRAFFIC PROJECTIONS ................................... 16 SANDAG MODEL TRAFFIC PROJECTIONS ....................... 16 BACKGROUND CUMULATIVE PROJECT fRAFFlC ................. 17 ZONE 13/CARLSBAD RANCH TRIP GENERATION ................. 17 ZONE 13 DISTRIBUTION PATTERNS ........................... 20 ZONE 13 TRAFFIC ASSIGNMENTS ............................. 22 ZONE 13/CARLSBAD RANCH TRIP GENERATION COMPARISON ...... 23 FUTURE TRAFFIC LEVELS ................................... 31 IV . TRAFFIC IMPACT ANALYSIS ..... : ................................. 35 FUTURESTREETNRWORK ................................. 35 LEVEL OF SERVICE STANDARDS ............................. 36 ROAD EXTENSION ..................................... 37 ROAD EXTENSION ..................................... 37 BUILDOUT TRAFFIC CONDITIONS ............................. 40 YEAR 2000 TRAFFIC CONDITIONS - WITH CANNON YEAR 2000 TRAFFIC CONDITIONS . WITHOUT CANNON V . MITIGATION MEASURES .......................................... 41 . DESCRIPTION OF MITIGATION MEASURES ...................... 41 EFFECT OF MITIGATION MEASURES ........................... 43 VI . ARMADNLEGO INTERSECTION ANALYSIS ............................ 46 TRADITIONAL INTERSECTION DESIGN ......................... 46 ROUNDABOUT ANALYSIS .................................... 48 SUMMARY ............................................... 50 TABLE OF CONTENTS (Continued) VI1 . KELLY PROJECT ANALYSIS ........................................ 52 TRIP GENERATION ......................................... 52 BUILDOUT TRAFFIC PROJECTIONS ........................... 52 BUILDOUT TRAFFIC CONDITIONS ............................. 55 MITIGATION MEASURES .................................... 55 THRESHOLD ANALYSIS ..................................... 58 VIII . SUMMARY AND CONCLUSIONS .................................... 60 APPENDIX A . INTERSECTION CONFIGURATIONS APPENDIX B . CARLSBAD LEG0 FAMILY PARK TRIP GENERATION r . LIST OF FIGURES - NO . 6 7 8 . 9 10 11 12 13 14 PROJECT STUDY AREA ........................................... LFMP-ZONE13 ................................................ EXISTING PEAK HOUR TRAFFIC VOLUMES ........................... YEAR 2000 LFMP ZONE 13 TRIP DISTRIBUTION ........................ YEAR 2000 WITHOUT CANNON ROAD EXTENSION LFMP ZONE 13 TRIP DISTRIBUTION BUILDOUT CONDITIONS LFMP ZONE 13 TRIP DISTRIBUTION ............. YEAR 2000 LFMP ZONE 13 ONLY PEAK HOUR TRAFFIC VOLUMES ......... YEAR 2000 WITHOUT CANNON ROAD EXTENSION LFMP ZONE 13 ONLY PEAK HOUR TRAFFIC VOLUMES ............ BUILDOUT CONDITIONS LFMP ZONE 13 ONLY PEAK HOUR TRAFFIC VOLUMES .............................. YEAR 2000 LFMP ZONE 13 WITH BACKGROUND PEAK HOUR TRAFFIC VOLUMES .............................. YEAR 2000 LFMP ZONE 13 WITH BACKGROUND WITHOUT CANNON ROAD EXTENSION PEAK HOUR TRAFFIC VOLUMES ....... BUILDOUT LFMP ZONE 13 WITH BACKGROUND CONDITIONS PEAK HOUR TRAFFIC VOLUMES .............................. ROUNDABOUT DESIGN ........................................... BUILDOUT CONDITIONS WITH KELLY C’OMMERCIAL PARCEL PEAK HOUR TRAFFIC VOLUMES .............................. ........................... 2 4 9 24 25 26 27 28 29 32 33 34 49 54 LIST OF TABLES 1 2 8 9 10 10 12 13 14 LEVEL OF SERVICE DEFINITIONS FOR SIGNALIZED INTERSECTIONS . . . . . . . LEVEL OF SERVICE DEFINITIONS FOR TWO-WAY STOP-CONTROLLED INTERSECTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . INTERSECTION LEVELS OF SERVICE ANALYSIS, EXISTING CONDITIONS . . . . STREET SEGMENT LEVELS OF SERVICE ANALYSIS, EXISTING CONDITIONS . LFMP - ZONE 13 TRIP GENERATION, YEAR 2000 . . . . . . . . I . . . . . . . . . . . . . . LFMP - ZONE 13 TRIP GENERATION, BUILDOUT . . . . . . . . . . . . . . . : . . . . . . . INTERSECTION LEVELS OF SERVICE ANALYSIS, YEAR 2000 AND BUILDOUT CONDITIONS WITHOUT MITIGATIONS . . . . STREET SEGMENT LEVELS OF SERVICE ANALYSIS, YEAR 2000 AND BUILDOUT CONDITIONS . . . . . . . . . . . . . . . . . . . . . . . INTERSECTION LEVELS OF SERVICE ANALYSIS, YEAR 2000 AND BUILDOUT CONDITIONS WITH MITIGATIONS . . . . . . . ARMADA DR./LEGO DR. INTERSECTION LEVEL OF SERVICE ANALYSIS, BUILDOUT CONDITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ROUNDABOUT LEVEL OF SERVICE ANALYSIS, BUILDOUT CONDITIONS . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . KELLY PROJECT TRIP GENERATION . . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . INTERSECTION LEVELS OF SERVICE ANALYSIS, BUILDOUT WITH KELLY PROJECT WITHOUT MITIGATIONS . . . . . . . . . . INTERSECTION LEVELS OF SERVICE ANALYSIS, BUILDOUT WITH KELLY COMMERCIAL PARCEL WITH MITIGATIONS . . I 11 12 13 15 21 22 38 39 44 47 51 53 56 59 Y 1. INTRODUCTION This report documents the findings of a traffic study conducted by Kaku Associates, Inc. to evaluate the potential traffic impacts of projects included within the City of Carlsbad Local Facilities Management (LF.M.) Zone 13. Zone 13 includes the land parcels of the Carlsbad Ranch plus some additional parcels not affiliated with the ranch. The intent of the traffic analyses was to identify the scope and timing of any transportation infrastructure improvements that would be required to accommodate the traffic generated by Zone 13 development. The traffic analyses were conducted for the Year 2000 and "Buildout" conditions. If intersections or street sections were projected to not meet City of Carlsbad performance standards in 2000 or Buildout conditions, interim year development levels were tested in order to identify the year and the amount of mitigation needed to bring the roadway or intersection up to City standards. This report represents an update of two previous reports. In June, 1991 the firm of Urban Systems Associates, INC. (USA) prepared a transportation analysis for Zone 1 3 that identified the needed transportation facilities for the Zone 13 land uses proposed at the time. Kaku Associates, Inc. (KA) prepared a transportation impact analysis that tested the effects of adding the LE57 Family Park (a family-oriented theme park) and other land uses proposed in the Carlsbad Rancn Specific Plan Amendment the land uses in Zone 13. This report was prepared in April, 1994. Background details on the history of development for Zone 13 and the traffic analysis for the LEG0 Family Park may be found in these reports. PROJECT DESCRlPTlON The Local Facilities Management Zone 13 is located just east of the Interstate 5 (1-5) freeway in the City of Carlsbad, California. The zone is situated on approximately 709 acres of land located generally between Palomar Airport Road and the Agua Hedionda Lagoon and east of the 1-5 freeway. Figure 1 illustrates the LF.M. Zone 13 in relation to the surrounding street system. 1 LfMP Zone 13 Zone 13 Boundoty Future Roodway KAKUASSOCIATES 2 flGURE 1 PROJECT STUDY FFrd me LF.M. Zone 13 would consist of a variety of land uses including Office, retail, research and development, hotel, institutional, resort and theme park (Le., LEGO Family Park) uses. Along with the Carlsbad LEGO Family Park, L.F.M. Zone 13 would consist of the following components: Pointe Resort - This would consist of a 700 room hotel, commercial uses, conference rooms, meeting/ballrooms, restaurants, and a golf course. Research and DeveloDment Office/Corporate Headauarters - This component would consist of approximately 500,000 square feet of research and development and approximately 300,000 square feet of corporate headquarters office uses. Communitv Hotel and Retail - The community hotel would consist of approximately 280 rooms and about 20,000 square feet of retail uses. Gemoloaical Institute of America (GIA) - The GIA component of the Carlsbad Ranch development would consist of approximately 550,000 square feet of educational, research, administrative and light assembly uses. SDecialtv Retail - This component of the project is projected to ultimately consist of approximately 325,000 square feet of regionally oriented specialty retail. SDG&E - This component would consist of approximately 463,600 square feet of travel services directed toward tourist/freeway activities. Figure 2 illustrates the location of the different components of the Zone 13. Although not shown on Figure 2, the SDG&E component is planned to be located in the northeast corner of the 1-5 and Cannon Road. STUDY SCOPE The scope of work for this study was developed in conjunction with the City of Carlsbad Engineering Department. The base assumptions, technical methodologies and geographic coverage of the study were all identified as part of the study approach. The study is directed at the analysis of potential traffic impacts along the existing and future street systems. As directed by the City of Carlsbad, the following traffic scenarios are analyzed in the study: 3 LEGEND: lffI Regional Retail Travel/Recreational Commercial/CommercfaI Open Space Area Io/p(J Offics/Plannrd Industrial Travei/Recreational Commercial Sourer: Hot mon Plonnlng hodalas \ KAKU AS SOCIATES - FIGURE 2 LFMP - ZONE 13 4 Existina Conditions -The existing conditions analysis includes an assessment of land use, streets and highways, traffic volumes, and operating conditions. Year 2000 Conditions with Zone 13 (Cannon Road extended to Pointe Resort Drive) - The objective of this phase of the analysis is to project future traffic conditions which could be expected to result from regional growth and traffic expected to be generated by the L.F.M. Zone 13 under Year 2000 conditions with Cannon Road only extending to Pointe Resort Drive. This was conducted for the typical commuter weekday peak hours and the weekend peak hour. Year 2000 Conditions with Zone 13 (Cannon Road extended to El Camino Reall - This analysis would be the same as the Year 2000 analysis described above with the exception that Cannon Road would be extended to El Camino Real. Buildout Conditions with Zone 13 -The objective of this phase of the analysis is to project future traffic conditions which could be expected to result from regional growth and traffic expected to be generated by the L.F.M. Zone 13 under buildout conditions. Under these conditions, Cannon Road would extend to the City of Oceanside. This was conducted for the typical weekday commuter peak hours and the weekend peak hour. The following locations, which are illustrated in Figure 1 , were identified for analysis in each of the scenarios identified above: Intersections 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 1 1. 12. 13. 14. 15. 16. Avenida Encinas & Cannon Road Avenida Encinas & Palomar Airport Road 1-5 Southbound Ramps & Cannon Road 1-5 Northbound Ramps & Cannon Road 1-5 Southbound Ramps & Palomar Airport Road 1-5 Northbound Ramps & Palomar Airport Road Paseo del Norte & Cannon Road Paseo del Norte & Palomar Airport Road Car Country Drive & Cannon Road Leg0 Drive & Cannon Road (future intersection) Armada Drive/Price Club Driveway & Palomar Airport Road Hidden Valley Road & Palomar Airport Road (future intersection) College Boulevard 8 Palomar Airport Road El Camino Real & Cannon Road (future intersection) Camino Vida Roble & Palomar Airport Road El Camino Real & Palomar Airport Road Street Seaments A. 8. C. 0. E. Cannon Road between 1-5 and Paseo del Norte Cannon Road between Paseo del Norte and Leg0 Drive (future location) Cannon Road west of El Camino Real (future location) Palomar Airport Road between 1-5 and Paseo del Norte Palomar Airport Road between Paseo del Norte and Armada Drive 5 F. G. Palomar Airport Road between College Boulevard and Camino Vida Roble Palomar Airport Road between Camino Vida Roble and El Camino Real ORGANIZATION OF REPORT This report is divided into eight chapters. Chapter II describes the existing circulation system, traffic volumes and traffic conditions within the study area. The methodologies used to forecast future traffic volumes and the Zone 13 project traffic volumes are described in Chapter 111. Chapter IV presents an assessment of potential traffic impacts for the Year 2OOO and Buildout scenarios. Chapter V discusses potential project traffic mitigation measures. Chapter VI discusses alternate treatments of the intersection of LEG0 Drive and Armada Drive. Chapter VI1 discusses the overall cumulative impact of changing the zoning on the Kelly Property (located on the south side of Palomar Airport Road across from the Zone 13 boundary) from industrial to commercial. Finally, a summary of the analysis along with conclusions are included in Chapter VII1. 6 II. EXISTING CONDITIONS A comprehensive data collection effort was undertaken to develop a detailed description of the existing conditions in and near Zone 13. The assessment of conditions relevant to this study includes an inventory of the streets and highways that serve the site, traffic volumes on these facilities, and the operating conditions on the key roadways and at key intersections. STREETS AND HIGHWAYS Primary regional access to the study area is provided by Interstate Highway 5 (1-5) which runs in a north-south direction, west of the LF.M. Zone 13. The main access to and from the zone would be via Cannon Road and Palomar Airport Road. The following provides brief descriptions of the principal streets serving the study area: Cannon Road - Within the study area, Cannon Road currently provides four travel lanes west of the 1-5 to its eastern terminus at Car Country Drive. For the Year 2000 scenarios, Cannon Road was assumed to be extended to Pointe Resort Drive in one scenario and to El Camino Real in the other. For the Buildout scenario, Cannon Road was assumed to be extended east of El Camino Real, providing access to the City of Oceanside. Palomar Airport Road - West of Avenida Encinas, Palomar Airport Road provides two travel lanes. East of Avenida Encinas to Yaro Drive, six travel lanes are provided along Palomar Airport Road. Within the study area, traffic signals are present at the Northbound and Southbound Ramps with the 1-5, Paseo del Norte, Armada Drive/Price Club Driveway, College Boulevard, and easterly at key intersections including the study intersections of Palomar Airport Road with Camino Vida Roble and with El Camino Real. Avenida Encinas - Avenida Encinas is a north-south street located west of 1-5 and the project site. Within the study area, Avenida Encinas provides four travel lanes from its northern terminus at Cannon Road to Palomar Airport Road. Paseo del Norte - Within the study area, Paseo del Norte is a north-south street which provides four travel lanes. Paseo del Norte provides access to Car Country south of Cannon Road and serves commercial uses and a residential neighborhood south of Palomat Airport Road. Within the study area, there is one signalized intersection along Paseo del Norte. This occurs at Palomar Airport Road. 7 Colleae Boulevard - Within the study area, College Boulevard provides four north-south travel lanes. The intersection with Palomar Airport Road is signalized. Diagrams of the existing lane configurations at the analyzed intersections are contained in Appendix A. EXISTING TRAFFIC VOLUMES AND LEVEL OF SERVICE The following sections present the existing peak hour traffic volumes at each intersection and roadway segment, a description of the methodology utilized to analyze the volume/capacity ratio or reserve capacity and the resulting level of service conditions at each of the locations for existing conditions. Existina Peak Hour Traffic Volumes Morning and afternoon peak hour traffic counts were obtained from the City at the 13 existing analyzed intersections and the analyzed roadway segments. It should be noted that the data supplied by the City was from the years 1992, 1993 and 1994. Per discussions with City staff, a growth in traffic of approximately 2 percent per year has been experienced. Therefore, traffic data used from 1992 was adjusted upwards by 4 percent and data from 1993 by 2 percent. The resulting volumes represent the year 1994 existing peak hour traffic volumes. The intersection peak hour traffic volumes are presented on Figure 3. Level of Service Methodolocay Level of service (LOS) is a qualitative measure used to describe the condition of traffic flow, ranging from excellent conditions at LO$ A to overloaded conditions at LOS F. LOS D is the typically recognized minimum acceptable level of service in urban areas. Under the Of Carlsbad's Growth Management Standards, the minimum acceptable level of service. during the peak hours is LOS D and for non-peak periods the minimum acceptable level of service is Los EXISTING PEAK HOUR TRbFFlC VOLUMES C. Level of service definitions are included in Tables 1 and 2 for signalized and two-way stop controlled locations, respectively. The Intersection Capacity Utilization (ICU) method of intersection capacity analysis was used to determine the intersection volume to capacity (V/C) ratio and corresponding level of service for the turning movements and intersection characteristics at the eight existing signalized intersections in the study area. Table 1 describes the ranges of V/C ratios and corresponding levels of service for signalized intersections. The "Two-way Stop Controlled" (Transportation Research Board, 1991) method was used to conduct intersection capacity analyses for the remaining four stopcontrolled intersections. This methodology calculates the amount of reserve capacrty available for each of the constrained movements allowed at an intersection, Le., those movements which are goJ free flow and must wait for the right-of-way before they can be completed. The methodology provides for the translation of this reserve capacity into a level of service for each movement. Reserve capacity represents the unused capacity of the lane in passenger cars per hour. Table 2 provides a description of the relationship between this reserve capacity and the projected level of service. The levels of service for the study roadway segments were determined based on a volume to capacity ratio (similar to the signalized intersections) using a per lane capacity of 1,800 vehicles per hour. The levels of service were determined using the same definitions as presented in Table 1. Existina Peak Hour Levels of Service Table 3 summarizes the existing weekday morning and evening peak hour V/C ratio, or available reserve capacity, and corresponding level of service at each of the existing analyzed intersections. As can be seen, under existing conditions, all of the eight signalized intersections are currently operating at acceptable levels of service (i.e., LOS D or better) during the morning and afternoon peak hours. Two of the four stop controlled intersections would operate at acceptable levels of service while the remaining two would have a constrained movement operating at LOS E during one or both peak hours. At the intersection of the 1-5 Southbound 10 TABLE 1 LEVEL OF SERVICE DEFlNlTlONS FOR SIGNALIZED INTERSECTIONS 1 Level of Sewice A B C D E F Volume/Capacity Ratio 0.00 - 0.60 0.61 - 0.70 0.81 - 0.90 0.91 - 1.00 .> 1 -00 Definition EXCELLENT. No vehicle waits longer than one red light and no approach phase is fully used. VERY GOOD. An occasional approach phase is fully utilized; many drivers begin to feel some- what restricted within groups of vehicle's. GOOD. Occasionally drivers may have to wait through more than one red light; backups may develo~ behind turning vehicles. FAIR. Delays may be substantial during portions of the rush hours, but enough lower volume peri- ods occur to permit clearing of developing lines, preventing excessive backups. POOR. Represents the most vehicles intersection approaches can accommodate; may be long lines of waiting vehicles through several signal cycles. FAILURE. Backups from nearby locations or on cross streets may restrict or prevent movement of vehicles out of the in?ersection approaches. Tremendous delays with continuously increasing Queue lenaths. Source: Transportation Research Board, Transportation Research Circular No. 212, Interim Materials on Highway Capacity, 1980. 11 TABLE 2 LEVEL OF SERVICE DEFlNmONS FOR TWO-WAY STOP-CONTROLLED INTERSECTIONS A 6 C D E F F > 400 300 - 399 200 - 299 100 - 199 0 - 99 Little or no delay Short traffic delays Average traffic delays Long traffic delays Very long traffic delays - co Failure - extreme congestion (Any value) Intersection blocked by external causes ~ Source: Transportation Research Board, Highway Capacify Manual, Special Report 209, 1985. 12 TABLE 3 INTERSECTION LEVELS OF SERVICE ANALYSIS EXISTING CONDITIONS SGNAUZED INTERSECTION 2. Avenida Encinas 8 Palomar Airport Rd. 5. 1-5 southbound ramps & Palomar Airport Rd. 6. 1-5 northbound ramps 8 Palomar Airport Rd. 8. Paseo del Norte 8 Palomar Airport Rd. 9. Car Country Dr. 8 Cannon Rd. 10. Leg0 Or. 8 Cannon Rd. 11. Armada Dr./Price Club Dnrvy. 8 Palomar Airport Rd. 12. Hidden Valley Rd. 8 Palomar Airport Rd. 13. College BI. 8 Palomar Airport Rd. 14. El Camino Real 8 Cannon Rd. 15. Camino Vida Roble 8 Palomar Airport Rd. 16. El Camino Real 8 Palomar Airport Rd. SToP-cOmoLLED MOVE- NB LT NB RT w8 LT SB LT SB RT WB LT NB LT NB RT EB LT NB LT NB RT WB LT 1. Avenida Encinas 8 Cannon Rd. 3. 1-5 southbound ramps &Cannon Rd. 4. 1-5 northbound ramps & Cannon Rd. 7. Paseo del None 8 Cannon Rd. AM PEAK HR VIC LOS 0.45 A 0.35 A 0.37 A 0.59 A NA [a] NA NA [b] NA 0.36 A NA [b] NA 0.37 A NA [b] NA 0.39 A 0.61 B AM PEAK HR RESERVE CAPAcrrY LOS +229 C +954 A +516 A +51 E 427 A +796 A +64 E +662 A +823 A +424 A +794 A 407 A Notes: [aJ Ninety degree two lagged intersection: LOS not applicable [b] Future intersection 13 PM PEAK HR VJC LOS 0.59 A 0.32 A 0.70 B 0.55 A NA [a] NA NA [b] NA 0.58 'A NA [b] NA 0.60 A NA [b] NA 0.62 B 0.72 C PM PEAK HR RESERVE CAPACrrY LOS +394 B + 766 A +904 A +187 D +916 A +717 A +69 E +889 A +348 B +134 0 +972 A +857 A TABLE 4 STREET SEGMENT LEVELS OF SERVICE ANALYSIS EXISTING CONDITIONS SEGMENT A. CannonRd. ' between 1-5 and Paseo del Norte B. CannonRd. between Paseo del Norte and Leg0 Dr. C. CannonRd. west of El Camino Real 4: Palomar Airport Rd. . between 1-5 and Paseo del Norte 5. Palomar Airport Rd. between Paseo del Norte and Price Club Drwy. F/ Palomar Airport Rd. between College 81. & Carnino Vida Roble G. Palomar Airport Rd. between Camino Vida Roble 8 El Camino Real DIRECTION w0 EB WB EB WB EB WB . E6 w0 EB WB EB WB E6 CAPACITY I ' J 3,600 3,600 3,600 3,600 3,600 3,600 5,400 5,400 5,400 5,400 5,400 5,400 3,600 3,600 AM PEAK HR VOL. VIC LOS 912 0.25 A 309 0.09 A NA NA NA NA NA NA NA NA NA NA NA NA 1,058 0.20 A 848 0.16 A 1,668 0.31 A 732 0.14 A 599 0.11 A 1,220 0.23 A 1,084 0.30 A 808 0.22 A PM PEAK HR VOL. v/c LOS 379 0.11 A 624 0.17 A NA NA NA NA NA NA NA NA NA NA NA NA 1,058 0.20 A 1,846 0.34 A 974 0.18 A 1,700 0.31 A 1,640 0.30 A 860 0.16 A 790 0.22 A 995 0.28 A - Note: ['I Capacity based on 1,800 vehicles per lane per hour. 111. FUTURE TRAFFIC PROJECTIONS In order to properly evaluate the needed transportation improvements to support the full buildout of Zone 13, it was necessary to develop estimates of future traffic conditions in the area with the proposed project traffic and future cumulative background traffic taken into account. Future traffic volumes (without Zone 13 development) were developed based on data from the San Diego Association of Governments' (SANDAG) traffic model for the City of Carlsbad. Next, it was necessary to develop trip generation estimates for the Zone 13 land use components. including Carlsbad LEGO Family Park. These project traffic estimates were then added to the SANDAG projections resulting in future traffic forecasts for conditions with the Zone 13 implemented. The methodologies and key assumptions used in this analysis are described below. SANDAG MODEL TRAFFIC PROJECTIONS The Year 2000 and Buildout traffic projections which were developed from the SANDAG traffic model for the City of Carlsbad included the development of the Carlsbad Ranch without the Carlsbad LEGO Family Park. The raw data which was obtained from the model was adjusted and refined utilizing existing count information. These traffic projections were used as a basis for developing the future traffic forecasts for the Zone 13 analyses. Included in the SANDAG model were roadway improvements which could be expected to occur for Year 2000 and Buildout conditions. These improvements include the extension of Cannon Road from Car County Drive to El Camino Real in the Year 2000 scenario (although this report also tests Year 2000 conditions without this extension). For the Buildout scenario, Cannon Road is expected to extend further east of El Camino Real, providing a link to the eastern portion of the City and to the adjoining communities to the east. The extension of Cannon Road was assumed in the future scenarios to represent a worst case scenario (Le., more through traffic would pass through the study area) and is not a responsibility of the development of the Carlsbad Ranch. 16 Trip Generation bv Land Use Component The weekday trip generation estimates for the land uses other than the LEGO Family Park which make up the remaining components of Zone 13 were based on the projected development scheme and information provided by the City of Carlsbad and SANDAG. The trip generation estimates for the retail, office, hotel, and resort land uses were based on a combination of sources including published SANDAG trip generation rates and the ITE Trip Generation Manual, 5th Edition. Trip rates for the specialized Gemological Institute of America were taken from the Carlsbad Ranch Specific Plan after review with city staff. Trip generation estimates for the LEGO Family Park were developed based on estimates of annual and daily attendance at the Park. As mentioned earlier, the trip generation estimates for the Carlsbad Ranch (without the Carlsbad LEGO Family Park) were included in the SANDAG model projections. Based on refined information (i.e., specific land use types, sizes of development, and increased trip generation rates) for the Ranch and the Zone as a whole, these trip generation estimates were actually increased for use in this: analysis. - Carlsbad LEGO Familv Park Trip Generation The development of traffic vqlumes for the proposed Carlsbad LEGO Family Park was based on a variety of sources. Information provided by LEGO along with data from other visitor attractions studies served as the basis for developing the proposed project trip generation. The methodology and assumptions which went into the development of the trip generation are described in detail in the April, 1994 Kaku Associates report Traffic Studv for the Carlsbad LEGO Familv Park. Trip Generation Methodology In order to develop trip generation estimates for the Carlsbad LEGO Family Park it was necessary to construct an analytical framework which utilized existing data from visitor attractions within Southern California. Published data from other Southern California theme parks and visitor 18 attractions include the Sari Diego Zoo, Disneyland, Knott's Berry Farm, the proposed Port Disney, Sea World, and Wild Animal Park. While none of these parks/attractions are exact duplicates of the proposed Carlsbad LEGO Family Park, they provide an indication of mode splits, vehicle occupancies, and hourly arrival and departure patterns at Southern California parks. Combining this data with the knowledge of the general operating characteristics of theme parks/visitor attractions and detailed information from LEGO on the Park itself (including attendance levels, number of employees, average length of stay, etc.), the Carlsbad LEGO Family Park trip generation estimates were determined to reflect Southern California conditions. The general approach to estimating vehicle trips involves a series of steps which convert "person" trips into vehicle trips. Carlsbad LEGO Familv Park Trim To be conservative, the trip generation estimates for the Carlsbad LEGO Family Park were developed for the busiest weekday (Friday) and weekend day (Sunday) during the busiest month of the year (August), thus representing a worst case scenario. It would be expected that for other days and months of the year, attendance levels would not be as high as those being modeled for this analysis, thus the proposed trip generation estimate would represent a conservative approach. For purposes of this study, the typical weekday morning and evening peak hours (8-9 AM and 5-6 PM) of street traffic were assessed. During the traffic analysis for the LEGO Family Park, a peak weekend analysis was conducted in addition to the summertime weekday AM and PM peak hour analysis. However, this weekend analysis showed that the most heavily impacted time period was indeed the weekday commuter peak periods of the day. Therefore the infrastructure requirements for Zone 13 will be determined by weekday peak hour conditions and not weekend conditions. The Carlsbad LEGO Family Park is expected to generate a total of approximately 6,630 daily trips (Le. 3,315 daily inbound and 3,315 outbound trips) for the Year 1999 for August Friday conditions. The Carlsbad LEGO Family Park peak morning hour would occur during the 11 AM to 12 Noon hour when a total of approximately 580 trips are expected (545 inbound and 35 outbound). The Park's evening peak hour would occur during the 5 PM to 6 PM hour, which 19 would coincide with the evening peak hour of street traffic, when a total of 710 trips are anticipated (1 20 inbound and 590 outbound). During the morning peak hour of street traffic (8-9 AM), the Park would be expected to generate a total of approximately 125 trips. The Carlsbad LEGO Family Park is expected to generate a total of approximately 8,180 daily trips (i.e., 4,090 inbound trips and 4,090 outbound trips) for Buildout conditions on an August Friday. The Carlsbad LEGO Family Park peak morning hour would occur during the 11 AM to 12 Noon hour when a total of approximately 71 5 trips are expected (675 inbound and 40 outbound). The park’s evening peak hour would occur during the 5 PM to 6 PM hour, which would coincide with the evening peak hour of street traffic, when a total of 875 trips are anticipated (1 50 inbound and 725 outbound). During the morning peak hour of street traffic (8-9 AM), the Park would be expected to generate a total of approximately 150 trips. Included in Appendix 6 are the trip generation estimates for the Carlsbad LEGO Family Park for the conditions described above. Future Zone 13 Total Trir, Generation Table 5 shows the estimated weekday trip generation for Zone 13 including the Carlsbad LEGO Family Park for the Year 2000. As can be seen, the development is expected to generate a total of approximately 41,980 daily trips, of which about 2,100 trips are expected during the morning peak hour and about 4,085 trips during the evening peak hour. Table 6 summarizes the weekday trip generation for Zone 13 for Buildout conditions, As shown on the table, Zone 13 (with LEGO) which includes the travel services commercial property owned by SDG&E would be expected to generate approximately 69,380 daily trips of which about 3,650 trips would be anticipated for the morning peak hour and about 6,900 during the evening peak hour. ZONE 13 DISTRIBUTION PATERNS The geographic distribution of traffic generated by the individual land use components of Zone 13 is dependent on factors such as: the geographic distribution of the population from which ABLE 6 BUILDOUT LFMP - ZUIJE 13 TRIP GENERATION DEVELOPMENT 3lA Speclalily Retail Mke 3&D iolel 3DG&E 'olnte Resort Lego Famlly Park Total LAND USE 550,000 SF Offlcel Campus 325,000 SF 3OO.OOO SF 500,OOO SF 280 Rooms 20.000 SFRelaIl 463.600 SF TNI Srvc I 1100 Rooms 6,OOO SF Commerclal12 &16,000 SF Commerclal(2 24,000 SF Meetlng (2) d6,OOO SF Restaurant , 6.000 SFClubhouse 1 Golt Course Incl. 131 GENERATION RATE 2 per staft plus sldnts 11 50 per 1000 SF 20 per lo00 SF B per 1000 SF 10 per room 40 per 1000 SF 40 per 1000 SF 3 per room 100 per lo00 SF 600 per course DAILY TRIPS 4,700 16,250 6,000 4,000 2,800 800 3,600 18.544. 5,600 1,900: - 600 8,100 8,182 69,376 ~~~ ~ AM PEAK HOUR IN OUT TOTAL 550 227 756 576 101 14 115 334 168 11 - 29 208 152 2,919 61 98 04 64 67 10 77 223 112 8 7 1 27 0 733 Notes: [I] Per 'Carlsbad Ranch Speclflc Plan' (Urban Systems Assoclales, Inc. June 1992) 12) Supportlng uses of hotel. [3) Trlp generatlon per .Traffk Study for the Carlsbad LEG0 Family Park' (Kaku Associates, Inc. April 1994). 61 1 325 840 640 168 24 192 556 280 19 36 335 152 - 3,651 PM PEAK HOUR OUT TOTAL IN 132 731 156 56 134 36 170 834 157 106 16 279 150 d 2,509 526 73 1 624 504 90 36 126 834 235 46 - 38 319 726 4,390 658 1,463 780 560 224 72 296 1,669 392 152 54 598 876 - 6,899 the potential visitors and employees are drawn, the location of the project site in relation to the surrounding street system, and physical characteristics of the street system. Based on these factors and information from other studies, three distribution patterns were developed for Zone 13 traffic. The trip distribution patterns for the Year 2000 with Cannon Road, Year 2000 without Cannon Road, and Buildout conditions are illustrated on Figures 4, 5, and 6, respectively. The major difference in the Year 2000 distribution patterns involves the heavier usage of Palomar Airport east of Armada Drive for the scenario in which Cannon Road is not extended to El Camino Real. Both Year 2000 distribution patterns show approximately two-thirds c?f project traffic using Interstate 5. Distribution patterns in the Buildout condition indicate a similar two-thirds usage of the freeway with a higher dependance on the Cannon Road corridor from the east. ZONE 13 TRAFFIC ASSlGNMENTS Utilizing the estimated trip generation, and the distribution patterns developed above, the traffic generated by the proposed Zone 13 land uses was assigned to the future street networks. Figures 7-9 show the Zone 13 generated peak hour traffic volumes at each of the analyzed intersections for both Year 2000 scenarios and for Buildout conditions. ZONE 1 WCARLSBAD RANCH TRIP GENERATION COMPARISON A comparison was conducted between the trip generation estimates summarized in Tables 5 and 6 with the trip estimates for Zone 13 included in the Transportation Analvsis for Carlsbad Facilities Manaqement Zone 13 (Urban Systems Associates, Inc., June 1991) and the Transportation Analvsis for Carlsbad Ranch SDecific Plan (Urban Systems Associates, InC., June 1 992). 23 N P YEAR 2000 LFMP ZONE 13 TRIP DISTRIBUTION YEAR 2000 WITHOUT CANNON ROAD fXTENSlON LFMP ZONE 13 TRIP OlSlRlBUTlON BUILDOUT CONUI i IONS LFMP ZONE 13 TRIP DISTRIBUTION YEAR 2000 LFMP ZONE 13 ONLY PEAK HOUR TRAFFIC VOLUMES YEAR 2000 WITHOUT CANNON ROAD ic ?J';ION LfMP ZONE 13 ONLY PEAK HOUR TPAfflC VOLUMES For the Year 2000, the Facilities Manaaement Zone (FMZI 13 report states that the expected trip generation for the zone (which is basically the Carlsbad Ranch site) is approximately 43,980 daily trips, 2,585 morning peak hour trips, and 4,535 evening peak hour trips. The trip generation estimates from the Carlsbad Ranch Specific Plan, for the Year 2000, are approximately 56,630 daily trips, 4,290 morning peak hour trips, and 6,165 evening peak hour trips. Comparing these estimates to those shown in Table 5, it can be seen that the daily estimates from this study are approximately five percent lower than those included in the FMZ 13 study and approximately 26 percent lower than the estimates in the Carlsbad Ranch Specific Plan. The morning and evening peak hour differences are somewhat higher. The proposed trip generation under Year 2000 conditions for all three studies are summarized below: Oailv Trips AM PK HR PM PK HR Zone 13 (1 994 Plan) (see Table 5) 41,980 2,100 4,085 Carlsbad Ranch Specific Plan 56,630 4,290 6,165 FMZ 13 (1991 Study) 43,980 2,585 4,535 For Buildout conditions, the Facilities Manaqement Zone (FMZ) 13 report states that the expected trip generation for the zone is approximately 69,750 daily trips, 5,690 morning peak hour trips, and 7,930 evening peak hour trips. The trip generation estimates from the Carlsbad Ranch Specific Plan for the Buildout conditions are approximately 70,000 daily trips, 6,075 morning peak hour trips, and 7,960 evening peak hour trips. Comparing these estimates to those shown in Table 6, the daily estimates from this study are within approximately one percent of those included in the FMZ 13 study and the Specific Plan. The peak hour trip generation differences are somewhat higher. The proposed trip generation under Buildout conditions for all three studies are summarized below: Oailv Trips AM PK HR PM PK HR Zone 13 (1 994 Plan) (see Table 6) 69,380 3,650 6,900 FMZ 13 Study (1 991 Study) 69,750 5,690 7,930 Carlsbad Ranch Specific Plan 70,000 6,075 7,960 The differences in volumes between those shown in Tables 5 and 6 and those included in the FMZ 13 study and Specific Plan (as outlined above) can be primarily attributed to a Slower development phasing schedule and to the refinement in the project description. The Year 2000 differences in trip generation estimates are related to the slower absorption schedule. Originally, 30 the Carlsbad Ranch consisted of approximately 1.5 million square feet of general commercial office development. Based on finer detailed information on the Ranch, the office uses have decreased in total square footage. This is the primary component which causes the differences in Buildout trip generation estimates. FUTURE TRAFFIC LEVELS Figures 10-1 2 show the total future peak hour traffic levels projected at the study intersections. These represent the combination of future background traffic plus the Zone 13 project traffic anticipated to occur in the Years 2000 and 201 0. Figures 10-1 2 show the traffic levels that will be used to measure the future intersection and street section levels of service. 31 YEAR 2000 LFMP ZONE 13 WITH 8ACKCROUND PEAK HOUR TRAfflC VOLUMES IV. TRAFFIC IMPACT ANALYSIS This chapter presents the results of the analysis of the impact of the Zone 13 project on the local street system. The analysis assesses the levels of service at each of the analyzed locations under both Year 2000 scenarios and Buildout (Year 201 0) conditions with the development of the proposed Zone 13 land uses. FUTURE STREET NElWORK As mentioned in the previous chapter, street network changes are expected in the future and were assumed in the model projections. In addition to these changes, localized intersection improvements were assumed to be in place for both the Year 2000 and Buildout conditions. It should be noted that these improvements which have been assumed to be in place are not all the responsibility of the LFM Zone 13. These improvements included traffic signals (at existing stopcontrolled locations) and additional turn lanes at various intersections. These improvements represent mitigation measures to existing conditions which are expected to be needed to maintain acceptable levels of service and are as follows: r. + Year 2000 Conditions Avenida Encinas & Cannon Road - Install a traffic signal. 1-5 Southbound Ramos & Cannon Road - Install a traffic signal. Also, add southbound left-turn lane and restripe westbound through lane for an additional left-turn lane. / - ' \P/ 1-5 Northbound RamDS & Cannon Road - Install a traffic signal. Paseo del Norte & Cannon Road - Install a traffic signal. Also, provide an excluske left- turn lane and a shared t~ugh/r~t-turn-~an~~~~e ~0~6ction. In the c/ northbound diremua a left-turn lane and restriEe the exdusive right-turn lane for a shared through/right-turn lane. Also, add an eastbound left-turn lane and westbound Paseo del Norte & Palomar AirDort Road - Provide a westbound exclusive right-turn lane. I, 1 ,I shared throughhight-turn lane. A 7 - -- - 35 9 2 Car Countw Drive & Cannon Road - Install a traffic signal. hovide an exclusive leftrturn , lane and two through lanes in the westbound direction. In the northbound direction, add an exclusive right-turn lane. f i Leao Drive & Cannon Road - Provide the following lane configuration at this intersection: _. - two left-turn lanes and an exclusive right-turn lane in the northbound direction; two e-' through lanes and an exclusive right-turn lane in the eastbound direction: and two left-turn lanes and two through lanes in the westbound direction. Armada Drive/Price Club Drivewav & Palomar Airport Road - Restripe the northbound approach for two left-turn lanes and a shared throughhight-turn lane. In the southbound direction provide two left-turn lanes, one shared throughhight-turn lane, and an exclusive 7 right-turn lane. Also, add a eastbound left-turn lane and a westbound exclusive right-turn lane. I' Colleae Boulevard & Palomar Airport Road - Provide two left-turn lanes, one through lane, and one shared throughhight-turn lane in the northbound direction. Restripe the southbound approach for a left-turn lane, one through lane, and a shared throughhight- turn lane. -. d\ . /- , Buildout Conditions (in addition to the above) .I: Avenida Encinas & Palomar Airport Road - Provide an additional eastbound and ' r. westbound through lane. -* ,PJ'$f 1-5 Northbound Ramps & Cannon Road - Add a northbound exclusive right-turn lane. P ' & LL,7 Paseo del Norte & Palomar Airport Road - Provide an eastbound exclusive right-turn lane. , The lane configurations which were assumed for both the Year 2000 and Buildout conditions are shown in Appendix A. LEVEL OF SERVICE STANDARDS Based on the City of Carlsbad's Growth Management Standards, a Level of Service D would be the minimum acceptable level of service during the weekday peak hours. Therefore, improvements would be necessary under either Year 2OOO scenario and Buildout conditions for locations operating at a LOS E or F during the weekday peak hours. An off-peak analysis was also conducted at selected locations and concluded that the City's off-peak operating standard (LOS C) would be satisfied. 36 YEAR 2000 TRAFFIC CONDITIONS - WITH CANNON ROAD EXTENSION This section presents an analysis of Year 2000 traffic conditions with the development of the Zone 13 land uses as shown on Table 5. The Year 2000 peak hour traffic volumes, illustrated on Figure 10 were analyzed to determine the V/C ratio and LOS for each of the analyzed locations. Table 7 summarizes these results for the analyzed intersections while Table 8 shows the projected volumes and level of service results for the seven analyzed street segments. As indicated in Table 7, two of the sixteen analyzed intersections are expected to exceed the Growth Management Standard under the Year 2000 - With Cannon Road Extension conditions (without mitigations). The intersections projected to operate at a LOS E or F during the one of the weekday peak hours are: 1-5 Northbound Ramps & Cannon Road (PM peak hour) 1-5 Northbound Ramps & Palomar Airport Road (PM peak hour) Table 8 shows that all of the analyzed street segments would operate at acceptable levels of service under Year 2000 conditions. YEAR 2000 TRAFFIC CONDITIONS - WITHOUT CANNON ROAD EXTENSION The second column of capacity calculation results shown in Table 7 summarizes the results for the analyzed intersections under the assumption that Cannon Road will not be extended to El Carnino Real by the Year 2000. As indicated in Table 7, two of the sixteen analyzed intersections are expected to exceed the Growth Management Standard under this scenario. The intersections projected to operate at a LOS E or F during the one of the weekday peak hours are: 1-5 Northbound Ramps & Palomar Airport Road (PM peak hour) College Boulevard & Palomar Airport Road (PM peak hour) Table 8 shows that all of the analyzed street segments would operate at acceptable levels of service under Year 2000 conditions even without the extension of Cannon Road. 37 TABLE 7 INTERSECTION LEVELS OF SERVICE ANALYSIS YEAR 2000 AND BUILDOUT CONDITIONS WITHOUT MlTlGATlONS I INTERS ECTlON A Avenida Encjnas & 1' ' Palomar Airport Rd. 3( 1-5 southbound ramps Cannon Rd. 1-5 northbound ramps & 'kannon Ad. 'x 1-5 southbound ramps & ,/ Palomar Airport Rd. 1-5 northbound ramps &3! ' Palomar Airport Rd. Paseo del None 8 A Cannon Rd. Paseo del Norte & Palomar Airport Rd. fi( Car Country Or. & J Cannon Rd. Cannon Rd. Avenida Encinas 8 j " - P \ x \ 3.0. Leg0 Or. & u' /'. Cannon Rd. y Armanda DrJPrice Club Driveway & Palomar Airport Rd. 1!. Hidden Valley Rd. & ' Palomar Airport Rd. d td. college 81. 8 Palomar Airport Rd. El Camino Real & 1 ' Cannon Rd. l/ Camino Vida Roble & d Palomar Airport Rd. El Camino Real & J 1 ' Palomar Airpon Rd. PEAK HOUR WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM YEAR 2000 WI :ANNON RD. EXT. VIC LOS 0.38 A 0.41 A. 0.75 C- 0.63 8.. 0.57 A 0.64 8 0.57 A 0.42 A. 0.38 A 0.49 A 0.59 0.73 0.74 0.83 0.30 0.52 0.27 0.62 0.45 0.67 0.58 0.69 0.45 0.83 0.50 0.58 0.54 0.71 0.86 -- 0.83 A C C D A A A' 8. A 8 A 8, A D A A A C 0. 0- YEAR2000WIO 1 CANNON RD. EXT. BUILDOUT VIC . LOS VIC LOS 0.38 A 0.61 8 ' 0.42 A 0.46 A ' 0.76 C 0.74 C 0.54 A 0.78 CJ 0.50 A 0.83 DI 0.55 A 0.75 G. , 0.86 0 0.42 A 0.56 A *J 0.39 A 0.52 A J' 0.52 A 0.65 E'.'' 0.52 A 0.73 C 0.79 c 0.84 0 0.17 A 0.38 A 0.27 A 0.38 A 0.51 A 0.75 C 0.69 B 0.75 C 0.76 C 0.60 A-", 0.68 8 0.69 B- 0.86 O 0.56 A:. 0.81 0 0.68 8 I 0.75 C . 0.76 C" fl ......_.......,._ - Unacceptable level of service. 38 680 0.19 A i 453 0.13 A 1 740 0.21 A 1,122 0.31 A i 1 NA NA NA NA STREET SEGMENT LEVELS OF SERVICE ANALYSIS YEAR 2000 AND BUILDOUT CONDITIONS I I YEAR 2O00 W/O PEAK HOUR WK AM WK AM WK PM WK PM WK AM WK AM WK PM WK PM WK AM WK AM WK PM WK PM BUILDOUT VOL. v/c LOS 1,169 0.32 A 2,367 0.66 B 2,662 0.74 C 2,100 0.58 A SEGMENT A. CannonRd. between 1-5 and Paseo del Norte DIRECTION WB €0 WB EB WB EB WB EB -- 3,600 3,600 1,663 0.46 A 1,518 0.42 A 1,683 0.47 A 816 0.23 A 3,600 3,600 3.600 3,600 663 0.18 A 574 0.16 A 1,121 0.31 A 1,293 0.36 A 219 0.06 A 496 0.14 A 1,017 0.28 A 429 0.12 A 1,068 0.30 A 1,587 0.44 A 1,809 0.50 A 1,640 0.46 A 8. CannonRd. between Paseo del Nom and Leg0 Dr. ~ 3,600 3,600 3.600 3,600 ~~~ ~ 2,286 0.64 B 1,712 0.48 A 1,378 0.38 A 936 0.26 A WB EB WB EB WB €6 WB EB WB €6 WB EB WB EB WB EB WB EB WB EB -- C. CannonRd. west of El Camlno Real 1,284 0.24 A 1,719 0.32 A 3,096 0.57 A 1,335 0.25 A 1,436 0.27 A 1,763 0.33 A 3,069 0.57 A 1,798 0.33 A 1,752 0.32 A 2,548 0.47 A 3,544 0.66 B 1,800 0.33 A WK AM WK AM WKPM WK PM WK AM WK AM WK PM WK PM 5,400 5,400 5,400 5,400 5,400 5,400 5,400 ' 5,400 D. Palomar Airport Rd. between 1-5 and Paseo del Nme ~~ 1,181 2,248 2,858 1.31 3 1,015 1,286 1.968 1,053 0.22 A 0.42 A 0.53 A 0.24 A ~ 1.587 2,377 3,071 1,854 1,053 1,313 1,965 1,236 A A B A A A A A - 1,611 0.30 3.173 0.59 3,309 0.61 1,800 0.33 1,201 0.22 1,961 0.36 2,036 0.30 1,336 0.25 0.29 A 0.44 A 0.57 A 0.34 A 0.20 A 0.24 A 0.36 A 0.23 A E. Palomar Alrport Rd. between Paseo del Norte and Armada Or. 5.400 5,400 5,400 5,400 0.19 A 0.24 A 0.36 A 0.20 A WK AM WK AM WK PM WK PM WK AM WK AM WK PM WK PM F. Palomar Alrporl Rd. between College 81. & Camlno VMa Roble 1,200 0.33 A 849 0.24 A 1,238 0.34 A 885 0.25 A 3,600/5.400 111 3,60015,400 1,435 0.27 A 1,097 0.20 A 1,385 0.26 A 1,337 0.25 A G. Palomar Alrport Rd. tetween Camlno Vlda Roble i% El Camlno Real 1,534 0.43 A 1.274 0.35 A 1,501 0.42 A 3'600/5'400 3,600/5,400 I 1,091 0.30 A ~ Notes: I 1 Capacity based on 1.800 vehlcles per lane per hour. 7 ill Under buildout conditlons Palomar Alrporl Road wlll be a six lane facility. BUILDOUT TRAFFIC CONDITIONS The Buildout (Year 2010) peak hour traffic volumes, illustrated on Figure 12 for weekday conditions were analyzed to determine the V/C ratio and LOS for each of the analyzed locations. The final column of Table 7 summarizes the capacity calculation results for the analyzed intersections while Table 8 shows the projected volumes and level of service results for the street segments. As indicated on Table 7, seven oPthe sixteen analyzed intersections are expected to be impacted under Buildout conditions without mitigations. The intersections projected to operate at unacceptable levels of service, unless mitigated, are: Avenida Encinas & Palomar Airport Road (AM & PM peak hours) . . 1-5 Northbound Ramps & Cannon Road (PM peak hour) 1-5 Northbound Ramps & Palomar Airport Road (PM peak hour) Paseo del Norte & Cannon Road (AM & PM peak hours) Paseo del Norte & Palomar Airport Road (AM & PM peak hours) El Camino Real & Cannon Road (AM peak hour) El Camino Real & Palomar Airport Road (AM & PM peak hours) Table 8 shows that all of the analyzed street segments would operate at acceptable levels of service under Buildout conditions. The following chapter of this report summarizes the mitigation measures necessary to address the deficient intersections identified above. 40 Year 2OOO Conditions 1-5 Northbound RamDs & Cannon Road - Restripe the westbound Cannon Road approach for the following: one through lane, one shared throughiright-turn lane, and one exclusive right-turn lane. With the implementation of this improvement, the intersection would operate at acceptable levels of service. Based on the development phasing of the zone, this improvement would be needed in 2000. 1-5 Northbound RamDs & Palomar Airport Road - Restripe the westbound Palomar Airport Road approach for the following: two through lanes, one shared throughhight-turn lane, and one exclusive right turn lane. With the implementation of this improvement, the intersection would operate at acceptable levels of service. Based on the development phasing of the zone, this improvement would be needed in 1997. Year 2000 Without Cannon Road Extension 1-5 Northbound Ramps & Palomar Airport Road - Restripe the westbound Palomar Airport Road approach for the following: two through lanes, one shared throughhight-turn lane, and one exclusive right turn lane. With the implementation of this improvement, the intersection would operate at acceptable levels of service. Based on the development phasing of the zone, this improvement would be needed in 1997. Colleae Boulevard & Palomar Airport Road - Restripe the southbound College Boulevard approach for the following: one left-turn lane, one shared throughhight-turn lane, and one exclusive right-turn lane. Under 2000 conditions, the northbound approach at this intersection is a driveway serving uses directly south of Palomar Airport Road therefore, provide one southbound throughhight-turn lane should be adequate. With the implementation of this improvement, the intersection would operate at acceptable levels of service. Based on the development phasing of the zone, this improvement would be needed in 1997. Buildout Conditions Avenida Encinas & Palomar AirDort Road - Restripe the northbound Avenida Encinas approach to provide the following configuration: one exclusive left-turn lane, one through lane, and one right-turn lane. With the implementation of this improvement, the intersection would operate at acceptable levels of service. Based on the development phasing of the zone, this improvement would be needed in 2007. 1-5 Northbound RamDs & Cannon Road - Restripe the westbound Cannon Road approach for the following: one through lane, one shared throughhight-turn lane, and one exclusive right-turn lane. In addition, provide an additional eastbound Cannon Road left-turn lane. The resulting lane configuration on the eastbound approach would be two exclusive left- turn lanes and two through lanes. With the implementation of these improvements, the intersection would operate at acceptable levels of service. Based on the development phasing of the zone, this improvement would be needed in 2008. 42 1-5 Northbound RamDs & Palomar AirPort Road -The improvement described for the Year 2000 would also mitigate this location under Buildout conditions. Based on the development phasing of the zone, this improvement would be needed in 1998. Paseo del Norte & Cannon Road - The southbound approach (SDG&E driveway) should be constructed and striped as follows: one exclusive left-turn lane, one shared throughhight-turn lane, and one exclusive right-turn lane. In addition, the eastbound Cannon Road approach would require an additional left-turn lane. The resulting lane configuration in the eastbound direction would be two exclusive left-turn lanes, one through lane, and one throughlright turn lane. Also, at a point east of the intersection, an additional westbound Cannon Road through lane would be required. At the intersection, this would result in the following lane configuration in the westbound direction: one exclusive left-turn lane, two through lanes, and a shared throughhight-turn lane. With the implementation of these improvements, the intersection would operate at acceptable levels of service. Based on the development phasing of the zone, this improvement would be needed at Buildout conditions. Paseo del Norte & Palomar Airport Road - Restripe the northbound and southbound Paseo del Norte approaches to provide the following: two exclusive left-turn lanes, one shared throughhight-turn lane, and one exclusive right-turn lane. With the implementation of this improvement, the intersection would operate at acceptable levels of service. Based on the development phasing of the zone, this improvement would be needed at Buildout conditions. , El Camino Real & Cannon Road - Restripe the southbound El Camino Real approach for the following: one left-turn lane, two through lanes, one shared throughlright-turn lane, and one exclusive right-turn lane. In addition, provide an exclusive right-turn lane on the eastbound Cannon Road approach. With the implementation of this improvement, the intersection would operate at acceptable levels of service. Based on the development phasing of the zone, this improvement would be needed in 2006. El Camino Real & Palomar Airport Road - Restripe the northbound El Camino Real approach for the following: one left-turn lane, two through lanes,. one shared throughhight-turn lane, and one exclusive right-turn lane. With the implementation of this improvement, the intersection would operate at acceptable levels of service. Based on the development phasing of the zone, this improvement would be needed in 2008. The improvements and the resulting lane configurations at the impacted locations are illustrated in Appendix A. EFFECT OF MmGATlON MEASURES With the implementation of the suggested improvements, the impacted locations would be mitigated to acceptable levels. Table 9 summarizes the effects of the proposed mitigation 43 TABLE 9 0.75 C 2. Avenlda Enclnas & Palomar Alrporl Ad. 4. 1-5 northbound ramps & Cannon Rd. 6. 1-5 northbound ramps b Palomar Alrporl Rd. 7. Paseo del Norte 6. Cennan Rd. 8. ease0 del Nwie a Fatomar Alrport Rd. 13. College 81. & Palomar AtrpMt Rd. 14. El Camlno flea1 b Cannon Rd. 16. El Camlno Real b Palomar AlrporI Rd. E- Unacceptable level of servlce. PEAK HOUR WK AM WK PM WK AM WK PM WK AM WK FM WK AM WK PM WU AM WK PM WU AM WK PM WK AM WK PM WK AM WK PM INTERSECTION LEVELS OF SERVICE ANALYSIS YEAR 2000 AND BUILDOUT CONDITIONS WITH MlTiGATlONS YEAR 2OOO WIO MITIGATIONS v/c 10s 0.75 C 0.63 B 0.57 A 0.49 A 069 A 0.73 C 0.74 C 0.83 D 0.45 A 0.83 D 0.50 A 0.58 A 0.86 D 0.83 D YUR2000wml VIC LOS 0.75 C 0.63 6 0.57 A 0.75 C MrnGAnws 0.49 A 0.73 C 0.59 A 0.73 C 0.74 C 0.83 D 0.45 A 0.83 D 0.50 A 0.58 A 0.86 0 0.83 0 YEAR 2OOO WIO CANNON flO. m. WIO MITIGATIONS vtc LOS 0.76 C 0;74 c 0.55 A 0.86 D 0.52 A 0.52 A 0.73 c 0.79 C 0.84 D 0.76 C NA NA NA NA 0.86 D 0.87 0 I BUlLoOuT WIO I BUILDOUT WITH YEAR 2OOO WK) CANNON flD. 0.76 C 0.74 C 0.55 A 0.86 D 0.52 A 0.80 C 0.52 A 0.73 C 0.79 C 0.84 0 0.60 A 0.90 D NA NA NA NA 0.86 0 0.87 o 0.76 C 0.86 0 0.86 D 0.86 D 0.89 D 0.68 B 0.87 D 0.63 B 0.87 D 0.85 0 0.88 D 0.81 D 9.89 D 0.76 C 0.86 0 0.88 D 0.78 C 0.83 D 0.81 D I (11 - Levels of servlce based on !talk volumes which Include cllywide and reglonal bulldoul conditions. measures. As shown on the table, the implementation of the mitigation measures proposed above would reduce the V/C ratios and resulting levels of service to levels within the City of Carlsbad's Growth Management Standards. It should be noted that all the levels of service analyses and mitigation measures were based on future conditions which include the clty-wide and region buildout and other background traffic. 45 VI. ARMADNLEGO INTERSECTION ANALYSIS When the Carlsbad LEG0 Family Park proposed its roadway system, it proposed to place a traffic circle/roundabout at the intersection of Armada Drive and Leg0 Drive. Because the City of Carlsbad was concerned with the operations and ultimate capacity of the roundabout, Kaku Associates was asked to review the design and potential performance of the roundabout under Buildout Conditions for Zone 13. In addition, three alternate configurations for a more traditional T-intersection were evaluated. The following paragraphs describe the results of the capacity calculations for the various Armada/Lego Drive configurations. TRADITIONAL INTERSECTION DESIGN Three different intersection configurations were investigated for the traditional approach of signalizing the intersection of Armada Drive/Lego Drive. The first alternate involved keeping Leg0 Drive as a continuous north-south street. Armada Drive would be rerouted to "T" into Leg0 Drive in an east-west direction (see sketch on Table 10, Alternate A). The heaviest movement in the morning peak hour involves southbound vehicles desiring to turn westbound into the employment area of Zone 13. In the morning peak hour, this movement must handle over 1,250 vehicles per hour. Because of this heavy turn movement, the intersection would perform at Level of Service 0 during the morning peak hours. All other hours of the day, including weekend conditions, would result in excellent operations at this signalized intersection. If Armada Drive and the north section of Leg0 Drive were kept continuous and the south section of Leg0 Drive became the third leg of the T-intersection (Alternate B on Table lo), the intersection would operate satisfactorily during the morning and afternoon peak hours. The level of Service 46 TABLE 10 ARMADA DR./LfCO DR. INTERSECTION LEVEL OF SERVICE ANALYSIS BUILDOUT CONDITIONS INTERSECTION DESCRIPTION Armada Or. (€6) T-ing into Leg0 Dr. PEAK BUILDOUT HOUR V/C LOS WK AM 0.81 D WK PM 0.55 A WKENO 0.56 A LEGO PK 0.60 A I I Leg0 inbound grade separated Leg0 Dr. (We) T-ing into Armada Dr. WK AM WK PM WKENO LEGO PK WK AM WK PM WKEND LEGO PK Lego inbound grade separated no left-turns. 0.45 A 0.80 C 0.87 D 0.65 e WK AM WK PM WKEND LEGO PK 0.81 D 0.45 A 0.56 A 0.39 A I I I 0.45 A 0.53 A 0.60 A 0.39 A B UI LDO UT VOLUMES Ln)md: XXX (XXX) AU(PU) Pwk Hour Traffic Volume8 AU Volumea Rmmdbd to the Moored - 5 Vrhicka would degrade on weekends and during the morning hours when inbound traffic to LEGO Family Park was at its peak. Even under these conditions, however, the intersection would still meet the City's Level of Service D criteria. Alternate C on Table 10 shows the effects of grade-separating the inbound traffic headed toward the LEGO Family Park. Under this scenario, southbound traffic destined for the LEGO Family Park would travel through an underpass under the southwest leg of Armada Drive. Under this configuration, excellent levels of service would be provided during the afternoon peak hours and during weekend and LEGO Park peak inbound operations. The morning peak hour for this configuration would still operate at Level of Service D because the southbound to westbound right-turn still requires a significant amount of the signal cycle. Level of Service 0 operations, however, would result. A fourth alternate (Alternate D on Table 10) would involve a variation of Alternate 6. If the westbound to southbound left-turn in this configuration were grade-separated (Le., the southbound traffic on tego Drive headed toward the EGO Family Park) and northbound left-turn was prohibited, the intersection would operate at Level of Service A during all time periods. ROUNDABOUT ANALYSIS The firm of Penfield & Smith, experts in the design and operation of roundabouts, were asked to review the proposed traffic volumes and develop a design for the roundabout which would result in satisfactory operations under Buildout Conditions. The resulting design is shown in Figure 13. In the proposed roundabout design, a roundabout with a 138-foot outside radius would satisfactorily accommodate future traffic levels through this intersection. The proposed roundabout design incorporates two "bypass" lanes. The first would allow northbound traffic leaving LEGO Family Park and headed for Cannon Road to stay in the right lane and completely bypass going through the roundabout itself. Similarly, a bypass lane has been provided so that the southbound to westbound heavy right turn headed to the Zone 13 employment areas could go directly through the intersection without passing through the roundabout. 48 FIGURE 13 ROUNDABOUT DESIGN 49 With the traffic volumes shown in Table 10 and the design shown in Figure 13, the roundabout itself is projected to operate at Level of Service A during both weekday and weekend peak hours. Table 11 shows the results of the roundabout capacity calculations using the RODEL computer software analysis program. SUMMARY There are a number of different configurations that would allow the intersection of Armada Drive and Leg0 Drive to operate within the City's level of service criteria - even under Buildout Conditions. The intersection could be configured as a signalized T-intersection, or a roundabout could be designed as shown in Figure 13. Since both an at-grade signalized T-intersection or an at-grade roundabout provide acceptable levels of service, grade-separating any movements at this location may be undesirable due to the associated costs. 50 TABLE 11 PEAK ROUNDABOUT LEVEL OF SERVICE ANALYSIS BUILDOUT CONDITIONS BUILDOUT DELAY INTERSECTION I HOUR (SEC.) LOS WK AM WK PM WEEKEND 0.19 A 4.88 A 3.12 A 51 VII. KELLY PROJECT ANALYSIS As mentioned in Chapter Ill, the parcel along the south side of Palomar Airport Road from Hidden Valley Road to College Boulevard (known as the Kelly Parcel) has applied for a zone change from industrial to commercial land use. The Kelly Parcel is not part of the LFM Zone 13 however the traffic associated with the parcel will affect the future conditions. The basic study included in this report assumed a continuation of the industrial classification for this parcel. This chapter discusses the impacts associated with the proposed land use changes and defines mitigation that might be necessitated by the change in land use. TRIP GENERATION In the background model projections, the trips associated with the Kelly project were based on approximately 33 acres of industrial. If the land use changed from industrial to commercial, the number of trips generated by the parcel would greatly increase. Using a proposed size of 356,756 square feet of commercial uses, the parcel would generate approximately 25,000 daily trips with approximately 750 trips occurring during the morning peak hour and 2,500 trips during the evening peak hour. Table 12 illustrates the difference in trips associated with the change in land use from industrial to commercial. As can be seen, an additional 22,OOO daily trips, 420 morning peak hour trips, and 2,145 evening peak hour trips would be expected from the parcel. BUILDOUT TRAFFIC PROJECTIONS The additional trips which would be generated by the change in land use were assigned to the future street system for Buildout conditions, The resulting peak hour traffic volumes for Buildout conditions with the Kelly parcel developed as commercial uses are illustrated on Figure 14. 52 TABLE 12 I SIZE 1 DAILY KELLY PROJECT TRIP GENERATION AM PEAK HOUR PM PEAK HOUR IN OUT TOTAL IN OUT TOTAL LAND USE INDUSTRIAL COMMERCIAL 33 AC 3.000 295 35330 70 285 355 356,756 SF 25,OOO 450 300 750 1,250 1,250 2,500 DIFFERENCE - Note: Trip generations based on rates included in 'San Diego Traffic Generators' ; San Diego Association of Government (October 1993).. 22,OOO 155 265 420 1,180 965 2,145 . 53 BUllOOUT CONDITIONS WITH KELLY COMMERCIAL PARCEL PEAK HOUR TIW' iilUMES BUILDOUT TRAFFIC CONDITIONS The Buildout peak hour traffic volumes including the Kelly parcel as a commercial development (Figure 14) for weekday conditions were analyzed to determine the V/C ratio and LOS for each of the analyzed locations. Table 13 summarizes the results. For purposes of comparison, the V/C ratios and levels of service are shown for Buildout conditions with the Kelly parcel as industrial uses. As shown, ten of the sixteen analyzed intersections are expected to operate at unacceptable levels of service with the commercial parcel. This is three more than conditions with the industrial parcel. The intersections projected to operate at a unacceptable levels of service are: 0 0 0 0 0 0 0 e e 0 Avenida Encinas & Palomar Airport Road (AM & PM peak hours) 1-5 Northbound Ramps 81 Cannon Road (PM peak hour) 1-5 Northbound Ramps 81 Palomar Airport Road (PM peak hour) Paseo del Norte & Cannon Road (AM & PM peak hours) Paseo del Norte & Palomar Airport Road (AM & PM peak hours) Hidden Valley Road & Palomar Airport Road (PM peak hour) College Boulevard & Palomar Airport Road (PM peak hour) Camino Vida Roble & Palomar Airport Road (PM peak hour) El Camino Real & Cannon Road (AM peak hour) El Camino Real & Palomar Airport Road (AM & PM peak hours) M IT1 GATl ON MEASURES Avenida Encinas & Palomar Airport Road - Restripe the northbound Avenida Encinas approach to provide the configuration: one exclusive left-turn lane, one through lane, and one right-turn lane. With the implementation of this improvement, the intersection would operate at acceptable levels of service. 1-5 Northbound Ramps & Cannon Road - Restripe the westbound Cannon Road approach for the following: one through lane, one shared througwright-turn lane, and one exclusive right-turn lane. In addition, provide an additional eastbound Cannon Road left-turn lane. The resulting lane configuration on the eastbound approach would be two exclusive left-turn lanes and two through lanes. With the implementation of these improvements, the intersection would operate at acceptable levels of service. 1-5 Northbound Ramps & Palomar Airport Road - Restripe the westbound Palomar Airport Road approach for the following: two through lanes, one shared throughhight-turn lane, and one exclusive right turn lane. After implementation of this improvement, additional physical improvements and/or reduction in land use density would need to be implemented in order to improve operating conditions to acceptable levels. 55 TABLE 13 PEAK HOUR INTERSECTION LEVELS OF SERVICE ANALYSIS BUILDOUT WITH KELLY PROJECT WITHOUT MITIGAllONS KELLY PARCEL KELLY PARCEL (IN WSIRIAL) (COMMERCIAL) CHANGE IN VIC LOS VJC LOS VJC INTERSECTION 1. Avenida Encinas & 2. Avenida Encinas 8 Cannon Rd. Palomar Airport Rd. 3. 1-5 southbound ramps & Cannon Rd. 4. 1-5 northbound ramps& Cannon Rd. 5. 1-5 southbound ramps & Palomar Airport Rd. 6. 1-5 northbound ramps 8 Palomar Airport Rd. 7. Paseo del Norte & Cannon Rd. 8. Paseo del None & Palomar Airport Rd. 9. Car Country Or. & Cannon Rd. Cannon Rd. 10. Leg0 Or. & WK AM WK PM 11. Armanda Dr./Price Club Di,veway 8 Palomar Airport Rd. 0.61 8 0.61 B 0.46 A 0.46 A 12. Hidden Valley Rd. 8 Palomar Airport Rd. WK AM WK PM WK AM 13. College El. & Palomar Airport Rd. 0.56 A 0.56 A 0.52 A 0.55 A 0.65 8 0.69 B 14. El Camino Real & Cannon Rd. 0.60 A 0.68 8 0.69 E 0.86 D 15. Camino Vida Roble & Palomar Airport Rd. 0.60 A 0.68 B 0.69 8 0.86 0 16. El Camino Real & Palomar Airport Rd. ~~~~ ~~ Note: ..::% ....., - Unacceptable level of service. m- WK AM WK PM WK AM WK PM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM W.K PM 0.67 B 0.90 D WK AM WK PM . 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.03 0.04- 0.07 0.00 0.00 0.01 0.03 0.00 0.00 0.00 0.00 0.05 0.04 0.04 0.1 8 0.03 0.20 0.00 0.01 0.03 0.07 0.01 56 Paseo del Norte & Cannon Road - The southbound approach (SDGE driveway) should be constructed and striped as follows: one exclusive left-turn lane, one shared throughhight-turn lane, and one exclusive right-turn lane. In addition, the eastbound Cannon Road approach would require an additional left-turn lane. The resulting lane configuration in the eastbound direction would be two exclusive left-turn lanes, one through lane, and one through/right turn lane. Also, at a point east of the intersection, an additional westbound Cannon Road through lane would be required. At the intersection, this would result in the following lane configuration in the westbound direction: one exclusive left-turn lane, two through lanes, and a shared throughhight-turn lane. With the implementation of these improvements, the intersection would operate at acceptable levels of service. Paseo del Norte 8t Palomar AirDort Road - Restripe the northbound and southbound Paseo del Norte approaches to provide the following: two exclusive left-turn lanes, one shared throughhight-turn lane, and one exclusive right-turn lane. After implementation of this improvement, additional physical improvements and/or reduction in land use density would need to be implemented in order to improve operating conditions to acceptable levels. Hidden Vallev Road & Palomar Airport Road - Restripe the southbound Hidden Valley Road approach for the following: one exclusive left-turn lane and one shared throughhight-turn lane. With the implementation of these improvements, the intersection would operate at acceptable levels of service. Colleae Boulevard & Palomar Airport Road - Provide an exclusive right-turn lane on the southbound College Boulevard approach. This would result in the following configuration: one exclusive left-turn lane, one through lane, one shared throughhight- turn lane, and one exclusive right-turn lane. In addition, provide an eastbound free-flow right-turn lane. With the implementation of these improvements, the intersection would operate at acceptable levels of service. El Camino Real & Cannon Road - Restripe the southbound El Camino Real approach for the following: one left-turn lane, two through lanes, one shared throughlright-turn lane, and one exclusive right-turn lane. In addition, provide an exclusive right-turn lane on the eastbound Cannon Road approach. With the implementation of this improvement, the intersection would operate at acceptable levels of service. Camino Vida Roble & Palomar Airport Road - Provide an additional northbound Camino Vida Roble left-turn lane. This would result in two left-turn lanes, one through lane, and one exclusive right-turn lane. With the implementation of this improvement, the intersection would operate at acceptable levels of service. El Camino Real & Palomar AirDort Road - Restripe the northbound El Camino Real approach for the following: one left-turn lane, two through lanes, one shared throughhight-turn lane, and one exclusive right-turn lane. With the implementation of this improvement, the intersection would operate at acceptable levels of service. As stated above, it is expected that two intersections (1-5 NB/Palomar Airport Road & Paseo del Norte/Palomar Airport Road) would not be mitigated to acceptable levels. Table 14 summarizes the effects of the mitigation measures at the impacted locations. THRESHOLD ANALYSIS From the analyses conducted for the Kelly commercial project, it was determined that operating conditions at two intersections could not be improved to acceptable levels. These results were based on the maximum amount of commercial development on the parcel. A threshold analysis was conducted to determine the amount of commercial development which could occur on the Kelly parcel without creating any unmitigatable impacts. It was determined that approximately 190,000 square feet of commercial uses could be developed on the parcel. With the development of 190,000 square feet of commercial uses all impacts could be mitigated to acceptable levels. 58 TABLE 14 PEAK HOUR . INTERSEwTION LEVELS OF SERVILE ANALYSIS BUILDOUT WITH KELLY COMMERCIAL PARCEL WlTH MITIGATIONS BUILDOUT WI MK. VIC LOS VIC LOS INTERSECTION 2. Avenida Encinas & Palomar Airport Rd. 4. 1-5 northbound ramps & Cannon Rd. 6. 1-5 northbound ramps & Palomar Airport Rd. 7. Paseo del Norte & Cannon Ad. 8. Paseo del Norte & Palomar Airport Rd. 12. Hidden Valley Rd. & Palomar Airport Rd. 13. College 81. 8 Palomar Airport Rd. 14. El Camino Real & Cannon Rd. 15. Camino Vida Roble & Palomar Airport Rd. 16. El Camino Real & Palomar Airport Rd. WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM WK AM WK PM 0.86 D 0.89 D 0.85 D 0.88 D 0.69 B 0.88 D 0.79 C 0.88. 0 0.88 0 0.88 D 0.64 B 0.80 c 0.84 D 0.84 D - Note: 111 Unacceptable levels of service remain after mitigation. 59 VIII. SUMMARY AND CONCLUSIONS This report documents the findings of a traffic study conducted by Kaku Associates, Inc. to determine the potential street system improvements necessitated by the development of the City of Carlsbad Local Facilities Management Zone 13. The analyses conclude that the recommended phased street improvements, based on ultimate buildout conditions, should be: 1997 2000 2007 2006 2008 2008 Buildout 1-5 Northbound Ramps & Palomar Airport Road - Restripe the westbound Palomar Airport Road approach for the following: two through lanes, one shared throughhight-turn lane, and one exclusive right turn lane. 1-5 Northbound Ramps & Cannon Road - Restripe the westbound Cannon Road approach for the following: one through lane, one shared throughhight-turn lane, and one exclusive right-turn lane. Avenida Encinas & Palomar Airport Road - Restripe the northbound Avenida Encinas approach to provide the configuration: one exclusive left-turn lane, one through lane, and one right-turn lane.. El Camino Real & Cannon Road - Restripe the southbound El Camino Real approach for the following: one left-turn lane, two through lanes, one shared throughhight-turn lane, and one exclusive right-turn lane. El Camino Real & Palomar Airport Road - Restripe the northbound El Camino Real approach for the following: one left-turn lane, two through lanes, one shared throughhight-turn lane, and one exclusive right-turn lane. 1-5 Northbound Ramps & Cannon Road - Restripe the westbound Cannon Road approach for the following: one through lane, one shared throughhight-turn lane, and one exclusive right-turn lane. In addition, provide an additional eastbound Cannon Road left-turn lane. The resulting lane configuration on the eastbound approach would be two exclusive left-turn lanes and two through lanes. Paseo del Norte & Cannon Road - The southbound approach (SDG&E driveway) should be constructed and striped as follows: one exclusive left-turn lane, one shared throughhight-turn lane, and one exclusive right-turn lane. In addition, the eastbound Cannon Road approach would require an additional left-turn lane. The resulting lane configuration in the eastbound direction would be two exclusive left- turn lanes, one through lane, and one throughhight turn lane. Also, at a point east of the intersection, an additional westbound Cannon Road through lane would be required. At the intersection, this would result in the following lane configuration in the westbound direction: one exclusive left-turn lane, two through lanes, and a shared throughhight-turn lane. Buildout Paseo del Norte & Palomar Airoort Road - Restripe the northbound and southbound Paseo del Norte approaches to provide the following: two exclusive left-turn lanes, one shared through/right-turn lane, and one exclusive right-turn lane. If Cannon Road is not extended to the east by the Year 2000 the following improvements would be necessary: 1997 1-5 Northbound Ramps & Palomar Airport Road - Restripe the westhound Palomar Airport Road approach for the following: two through lanes, one shared throughhight-turn lane, and one exclusive right turn lane. 1997 Colleae Boulevard & Palomar Aimort Road - Restripe the southbound College Boulevard approach for the following: one left-turn lane, one shared throughhight- turn lane, and one exclusive right-turn lane. All of the analyzed street segments are projected to operate at acceptable levels of service; therefore, the proposed street cross sections would be adequate to handle buildout traffic. 61 APPENDIX A INTERSECTION CONFIGURATIONS INTERSECTION CONFIGURATIONS YUR 2000 MAR 2000 WlTH YmCATlON 1. Avenida Encinas & Connon Rd. WE As NO MmwnoN MISTING REQUIRED NO MITKAKON SAME As NO UlTlCATlON REWIRED MlSllNC RE PURE D NO MITIi3lION NO YWKON REQUIRED REOUlRED 2. Avenida Encinas d! Pahar Airport Rd. WE As MlSnNC c 5* NO MlllGATDN SAME As NO MITIGATION REQUIRED YEAR 2000 RE aUm NO YrnmnoN REWIRED 3. 1-5 SB ramps dr Cannon Rd. Rd. 1-5 SB on mmp Id W MI ramp +-Me - 1-5 NB off mmp 4. 1-5 NE ramps & Cannon Rd. WE As msnwc NO YmCATYWJ WEAS NO MITIGATION REQUIRED OISTINC RE QUIRE D NO MITIG4llDN REQUIRED WE As MISTING 5. 1-5 SB ramps & Polomor Airport Rd. 1-5 NB on romp I: 6. 1-5 NB ramps Polomor Airport Rd. WE As EXISTING -I 1-5 NB btl romp 1-5 NB bff mmp \ KAKU ASSOCIATES - 7. Paseo Del Me L Cannon Rd. 8. Paseo Del Node & Palomar Airport Rd. 9. Cor Country Dr. 6 Cannon Rd. 10. Leg0 Dr. 6 Cannon Rd. 11. Armoda Rd. & Pakmor Urport Rd. 12. Hidden Valley Rd 6 Palomar Airport Rd. MlSlWG INTERSE CTlON CONFIGURATIONS YCAR 2000 Po3so lid Me DOES NOT am WES NOT am . Pobw hipoft Rd. Polmor Eiirport Rd YEAR 2000 WnH UIwm NO MIIIGAWN REQUIRLD NO urnam REWIRED No umw REOUlRfD No k4rnGATW)N REWIRED Yuff 2000 W/O CANNON RD. BUILDOW oc1. W/ MITlGATlON EUIw)UT WITH WTlCATloN KAKU ASSOCIATES -J NO MmGATK)N REQUYlED NO MmcATKxl REQUIRED No uITIG4nDN REWO SAME AS MAR 2000 NO MinanoN REWIRED SAME AS MAR 2000 No NlTlG4llON REWIRED NO WnCATlON RE(I(IIRED NO wTIcATw)E( REWIRED SANEAS MAR ZOO0 NO MrnanoN REWIRED \ INTERSE CTlON CONFIGURATIONS EAR 2000 YWI 2000 W/O WON fB. BUllDOuT WIW MIT#;P;TION M1. W/ UmCATlON BUIW)UT WITH MrnwnoN unwu EXISlUG *, I- YEAR 2000 *, t!, It 13. College BI. & Palomar Airport Rd. NO MIlCAlION WE As NO MITIGATION REOUlRE 0 REOWRED Aitpcd Rd. * Is 14. El Camino Real 6 Cannon Rd. 0 Comino Reo1 SANE. AS MISTING NO UITI(;ATIoN NO MlllCAllON REOUlAZO REOUREO NO MITIGATION REOUREO 15. Camino Vda Robk & Polomor Airport Rd. WE As EXLSlYJG WE As 'I& D(RnNG SAHE AS fXISIUJC NO YWlDN NO MlTlChllON REOUYIEO REOUREO 16. El Camino Real & Palomar Airport Rd. a comi Red L CCACtU ASSOCIATES - APPENOlX 8 CARLSBAD LEG0 FAMlLY PARK TRIP GENERATION LEGO FAMILY PARK - TRIP GENERATION YEAR 1999 - AUGUST FRIDAY VISITOR AlTENDANCE: ANNUAL = 1.80 MILLION DAILY = 9.520 EMPLOYEES = 818 SERVICE VEHICLES - 71 VISITORS LEGO TOTAL Am. PERSON TRIPS In. Out8 MODE Drive Alone C~pool Tour Bur Shunlo OthwlWnlk BU8 TOTAL ZUPANCY oriw AlocH Carpoor Tour Bu8 Shunle Bur OtherlWdk Tal Vehicle8 AVR PCE CU Tour Bur Shuttle Bur Senrice Vehicle DAILY PCE Regional 84% 1% om 2% ow 0% 100% 0% I .o 3.5 25.0 95.0 0.0 0.0 1 .o 2.0 1 .o 2.0 - 8.038 8.030 8.038 80 7.795 161 0 0 0 8.036 80 2,227 6 0 0 0 2.313 3.47 - 2.307 12 0 0 2.319 - - 11% 1% 25% 0% 41% 0% 100% 22% 1 .o 3.5 25.0 15.0 0.0 0.0 1 .o 2.0 1 .o 2.0 - 1.001 1 .m 1 ,om 10 252 0 413 0 333 1 .008 10 72 0 21 0 0 110 0.18 - 82 0 28 0 110 - - 5% 1% Q8% 0% 0% 0% 1% 100% - 1 .o 3.5 25.0 15.0 0.0 0.0 1 .o 2.0 1 .o 2.0 - 476 476 476 5 466 0 0 0 5 476 - 5 133 0 0 0 138 3.45 0 138 0 0 0 138 - - - TOW - 9.520 9.520 0.520 95 8.513 161 413 0 9.520 33p 85 2.432 6 28 0 0 2361 3.72 - 2,527 12 20 0 - - 2.m EMPLOYEES LEGO -P(w 55% 3346 04c 0% 1046 2% 100% - 1 .o 2.25 25.0 15.0 0.0 0.0 1 .o 2.0 1 .o 2.0 - 818 818 818 450 270 0 0 82 16 818 - 450 120 0 0 0 570 1 .u 9 CIo a a a - m s.wico Vehkkr Lnrica Vehkle ToW- 71 2.5 in LEGO TOTAL 10,338 10.338 Ws11 8.783 OMI 161 2% 413 4% 62 1% 10.338 100% 35425 648 2.w 8 28 0 0 3101 3.23 - 3.091 em 12 1% 21 146 0011 3.310 100% in w -- LEGO FAMILY PARK - TRIP GENERATION YEAR 1999 - AUGUST FRIDAY 0 .O% 0 0.0% 0 16.0% a1 23.0% 131 11.0% e3 16.0% 01 0.0% 0 17.0% 97 17.0% a7 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0 100.0% 570 I - 0.w - LEGO EMPLOYEES LEQO ARRIVALS - LEGO Vahlcloa TOTAL 6;7 AM 7-8 AM &oAM e10 AM 10-11 AM 11-12 AM 12-1 PM 2-3 PM 3-4PM 4-5 PM S-aPM 6-7 PM 7-9 PM WPM e10 PM 10-11 PM 11-12 PM 12-1 AM 1-2 AM TOTAL 1-2 PM~ 26 80 172 285 372 380 3n 3s3 2s5 187 0 0 0 I 2.567 JEPARTURES e-7 AM 7-8 AM 84 AM e10 AM 10-11 AM 11-12 AM 12-1 PM 1-2 PM 2-3 PM 3-4PM 4-5 PM HPM 6-7 PM 7-8 PM 8-0 PM 9-10 PM 10-11 PM 11-12 PM 12-1 AM 1-2 AM TOTAL 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.011 0 0.W 0 0.W 0 1 .016 1 3.1% 4 6.7% 9 11.1% 15 14.W 20 ' 14.8% 20 14.m 20 21 16 10 7.3% 0.011 0 0.W 0 1 ::E '0.Ow B /100.W 131 0.0% 0 0.0% 0 0.0% 0 10.0% 232 16.0% 371 17.5% 406 15.0% 34s 10.5% 243 . 10.5% 243 5.0% 116 8.0% 180 4.5% 104 3.0% 70 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0 100.0% 2.319 0.Ocn - I 0.0% 0 0.0% 0 10.0% 11 16.0% 18 17.5% 19 15.0% 17 10.646 12 10.5% 12 5.0% 6 8.0% 9 4.5% 5 3.0% 3 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0 100.0% 110 0.0%. 0 - 0.096 - 1 I 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 1.0% 23 3.1% 72 6.7% 155 11.1% 251 14.5% 334 14.8% 3u 14.7% 341 15.3% 3U6 11.5% 267 7.3% 160 0.W 0 0.W 0 0 100.0% 2.319 - 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 1 .ow 1 3.1% 3 6.7% 7 11.1% 12 14.W 16 14.8% 16 14.m 16 11.3% 17 1l.W 13 7.3% 8 0.0% 0 0.0% 0 100.0% 110 - 0.0% P lloul ~ I 0.0% 0 0.0% 0 0.0% 0 10.0% 14 16.0% 22 17.- 24 15.0% 21 1o.m 14 10.5% 14 5.0% 7 8.0% 11 4.5% 6 3.0% 4 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0 0.0% 100.0% 13a - - ~~ '0l.l 0 0 0 251 41 1 440 385 260 28 121 200 115 0 0 0 0 0 0 0 2.561 n - 0 :I 0.016 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 37.0% 23.0% 0.W 0.0% 24.0% 16.0% 0.0% 0.0% 100.0% 0 0 0 0 0 0 0 0 0 0 0 21 1 131 0 0 137 01 0 0 ma g 0.0% 0 18.8% 34 18.8% 34 18.8% 34 18.8% 34 3.0% 6 3.m 6 3.0% 6 3.6% 6 3.8% 6 3.4% 6 3.4% 6 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.w 0 0.0% 0 0.0% - 0 100.0% 178 - 0 34 125 421 547 547 392 372 372 136 212 121 TI 0 0 0 0 0 0 0 3.316 - 0.0% 0 0.0% 0 0.0% 0 18.8% 34 18.8% 34 18.8% 34 18.8% 34 ' 3.6% 6 3.646 8 3.m 6 3.0% 6 3.m 6 3.4% 6 3.4% 6 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.096 0 100.0% 178 - 0 0 0 34 34 34 34 31 86 178 291 580 517 393 393 432 270 0 0 0 3.31; I LEGO FAMILY PARK - TRIP GENERATION BUILDOUT - AUGUST FRIDAY VISITOR ATTENDANCE: ANNUAL - 2.20 MILLION DAILY = 11,625 EMPLOYEES = 1 .Ooo SERVICE VEHICLES - 87 VISITORS TOTAL AR. PERSON TRIPS In8 Out* MODE Drive Alone cupool Tour Bur Shuttle OtherMIdk BU8 TOTAL XCUPANCY D* AlocH Carpod Tour Bu8 Shutlle Bur OtherWdk Total Vehicle8 AVR FCE CU Tour Bur Shutu. Bur Service Vehiclo DAILY PCE 86% 1% 87% 2% 0% 0% 100% 0% 1 .o 3.5 25.0 15.0 0.0 0.0 1 .o 2.0 1 .o 2.0 10.030 10,030 10,030 100 8.735 201 0 0 0 10,036 - 100 2.781 8 0 0 0 2.869 3.47 - 2.881 10 0 0 2.887 - - LEGO Hotelr ILoul 0% 1% 25% OW 41 W 0% 33% 100% - 1 .o 3.6 25.0 15.0 0.0 0.0 1 .o 2.0 1 .o 2.0 - 1.008 I* 1,008 1.008 10 252 0 413 0 333 1.001 - 10 72 0 28 0 0 110 8.16 - 82 0 28 0 110 - - 1% 08% 0% ow 0% 1% looIc - 1 .o 3.5 25.0 15.0 0.0 0.0 1 .o 2.0 1 .o 2.0 - 581 581 581 0 wo 0 0 0 0 581 - 0 163 0 0 0 0 18 3.u - 18 0 0 0 18 - - ~~ - Tal 11.825 11,625 11,025 116 10.5Sd 201 413 0 339 11.e25 - 1 16 3.016 8 28 0 0 3,198 3.87 - 3.132 10 28 0 3,178 - - 7 EMPLOYEES LEGO mPm 55% 33% 0% 0% 10% 2% 100% - 1 .o 2.25 25.0 15.0 0.0 0.0 1 .o 2.0 1 .o 2.0 - 1 .OOo 1 .Ooo 1 .OOo 550 330 0 0 100 20 1 .OOo - 550 147 0 0 0 641 1 .a g ow 0 0 0 87 - - S.mic0 Vehicle8 sofvica Vehicl. Tow= 87 2.5 218 Note: - . PCE - Pawongar Cu Equivalent. A bum i8 oquivdent to 2.0 p.rmgr un and a andco Wick i8 oquinknt to 2.5 p.rmgr Un. LEGO TOTAL 12.62s 12.625 me596 10,See 86% 201 2% 413 3% 100 1% 359 3% 12.62s 100% -- 3.163 8 28 0 0 3.952 3.18 3.829 01% 16 096 28 1% 0 ow 218 5% 4.091 100% -- LEGO FAMILY PARK - TRIP GENERATION BUILDOUT - AUGUST FRIDAY ARRIVALS I VISITORS I I LEGO Ifbaiond I HotoIa 0 0 0 318 501 ssd 478 333 333 158 254 143 as 0 0 0 0 0 0 0 3,178 - 0.0% 0.0% 18.0% 23.0% 11 .O% 18.0% 0.0% 17.0% 17.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% - 6-7 AM 7-8 AM 8-8 AM e10 AM 10-11 AM 11-12AM 12-1 PM 1-2 PM 2-3 PM 3-4PM 4-5 PM SdPM b7 PM 7-8 PM 8-9 PM e10 PM 10-11 PM 11-12 PM 12-1 AM 1-2 AM TOTAL 0.0% 0.0% 0.0% 10.0% 18.0% 17.5% 15.0% 10.5% 10.5% 5.0% 8.046 4.5% 3.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% - 0 0 0 290 464 507 436 304 304 146 232 130 87 0 0 0 0 0 0 0 2.897 0.0% 0 0.0% 0 0.0% 0 10.0% 11 16.0% 18 17.5% 10 15.0% 17 10.5% 12 10.- 12 5.0% 8 8.0% 0 4.5% 5 3.0% 3 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.m 0 0.0% 0 0 100.0% 110 - 0.0% - JEPARTURES b7 AM 7-8 AM WAM e10 AM 10-11 AM 11-12 AM 12-9 PM 1-2 PM 2-3 PM 3-4PM 4-5 PM WPM 6-7 PM 7-8 PM 8-0 PM e10 PM 10-11 PM 11-12 PM 12-1 AM 1-2 AM TOTM 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1 .O% 3.1% 6.7% 11.1% 14.5% 14.8% 14.7% 15.3% 11.5% 7.3% 0.0% 0.0% 0.0% 100.0% - 0 0 0 0 0 0 0 29 00 194 322 420 429 420 443 333 21 1 0 0 0 2.607 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 1 .on 1 3.1% 3 0.m 7 11.1% 12 14.M 96 14.8% 10 14.m 16 1s.m 17 1l.M 13 7.3% 8 0.0% 0 0.0% 0 0 100.011 110 0.01( - ~~ 0.0% 0 0.0% 0 0.0% 0 10.0% 17 18.0% n 17.5% 30 15.0% 2s 10.5% 18 lo.% 18 5.0% 8 8.0% 14 4.5% 8 3.0% S 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0 100.0% 18 0.046 - 0.0% 0 0.0% 0 0.0% 0 0.0% '0 0.0% 0 0.0% 0 0.0% 0 1 .on 2 3.1% S 6.7% 11 11.1% 19 14.M 2s 14.8% 2s 14.7% 2s 15.3% 26 11.591 18 7.3% 12 0.091 0 0.0% 0 0 100.011 18 s.on - EMPLOYEES rpzi- 0 0 112 la 77 112 0 118 118 0 0 0 0 0 0 0 0 0 0 0 ea7 - 0 0 0 0 0 0 0 32 91 213. 353 461 470 467 486 as 232 0 0 3,176 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 37.0% 250 23.0% 100 0.0% 0 0.0% 0 24.0% 167 16.0% 112 0.0% 0 0.0% 0 0.0% 0 - 100.0% G s.Mo. Vohkkr 0.09) 0 18.8% 41 18.8% 41 18.8% 41 3.0% 8 3.0% 8 3.6% 8 3.6% 8 3.6% 8 3.4% 7 3.4% 7 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0% 0 100.0% 218 ia.845 41 0.0% 0 - 0.0% 0 0.0% 0 0.0% 0 18.8% 41 18.8% 41 18.8% 41 11.8% 41 3.6% 8 3.6% 8 3.6% 8 3.W 8 3.6% 8 3.4% 7 3.4% 7 0.011 0 0.0% 0 0.0% 0 0.011 0 0.0% 0 100.0% 218 0.0% 0 - LEGO TOTAL 0 41 152 518 e26 875 484 40 480 167 281 150 95 0 0 0 0 0 0 0 4.091 - 0 0 41 I 41 I 41 41 40 108 221 300 124 =: 474 1 4M 533 343 0 0 4,091 0 APPENDIX A-5 CIRCULATION COST ESTIMATES cost $960.00 $200.00 i $340.00 RESTRIPING - PALOMAR AIRPORT ROAD AT 1-5 NORTHBOUND RAMP 4 Item Description Quantity 1,600 Feet _______~ ~ Restriping Unit Price $O.6OiFoot Light Signal Traffic Control Revise Signage I 1 ~~ $200.00 Each I Total I $1,500.00 I 15% Contingency 1 $225.00 I I I TOTAL I$1,725.00 APPENDIX A-5 CIRCULATION COST ESTIMATES Description Restriping Light Signal Traffic Control Revise Signage RESTRIPING - COLLEGE BLVD. AT PALOMAR AIRPORT ROAD Quantity Unit Price cost 900 Feet $0.6O/Foot $540.00 1 $200.00 Each $200.00 $260.00 I I I I i Subtotal $1,000.00 15% Contingency TOTAL $150.00 $1,150.00 APPENDIX A-5 CIRCULATION COST ESTIMATES Quantity 420 Feet 420 Feet 2,520 Cubic Feet 5,040 Square Feet 5,040 Square Feet 1,680 Square Feet 1260 Feet LANE CONSTRUCTION - PASEO DEL NORTE AT CANNON ROAD Unit Price cost $4.OO/Foot $1,680.00 $ 1 0. OO/Foot $4,200.00 $1.1 5/Cubic Foot $2,898.00 $1.40/Square Foot $7,056.00 $0.2O/Square Foot $1,008.00 $3 .5O/Square Foot $5,880.00 $0.60/Foot $756.00 Description Subtotal 15% Contingency TOTAL Remove Curb and Gutter $23,478 $3,522 $27,000 New Curb and Gutter Base Material A. C. Paving Subgrade Preparation Revise Landscaping Striping APPENDIX A-5 CIRCULATION COST ESTIMATES ~~~ Restriping Light Signal Traffic Control RESTRIPING - PASEO DEL NORTE APPROACHES TO PALOMAR AIRPORT ROAD ~~ ~ 2,000 Feet $0.60/Foot $1,200.00 2 $200.00 Each $400.00 I Description I Quantity I Unit Price I cost I Revise Signage $400.00 15% Contingency TOTAL 1 Subtotal I $2,000.00 I $300.00 $2,300.00 APPENDIX A-5 CIRCULATION COST ESTIMATES RESTRTPING - EL CAMINO REAL / CANNON ROAD Description Quantity Unit Price cost Restnping 2,500 Feet $0.60/Foot $1,500.00 Replace A. C. Beam 500 Feet $S.OO/Foot $2,500.00 Light Signal Traffic 4 $200.00 Each $8 00.00 Control Revise Signage $700.00 Subtotal $5,500.00 15% Contingency $825 .OO I TOTAL I $6,325.00 APPENDIX A-5 CIRCULATION COST ESTIMATES Quantity 150 Feet 150 Feet 720 Square Feet ADD SIGNAL - CAR COUNTRY DRIVE / CANNON ROAD & PROVIDE 'RIGHT TURN ONLY ON CAR COUNTRY DRIVE AT CAIWON ROAD Unit Price cost $5.OO/Foot $750.00 $1 o.oo/Foot $1 , 500.00 $2.20/Square Foot $13 84.00 . Description Remove Curb and Gutter New Curb and Gutter ' 15% Contingency TOTAL Pavement (A. C. and Base) Striping Light Signal Traffic Control Signal Installation Design of Signal $14,349.00 $1 10,023.00 300 Feet 2 $0.60/Foot $200.00 Each Subtotal $180.00 $400.00 $90,000.00 $1,250.00 ~~~~ $95,664.00 - -- --_ . .. . ..: I .. December7, 1994 FOR THE INFORMATION Of r THECIMC(?UNCiL flu M. Mr. David Haufer 2075 b Palmas Drive Assistant CiEngYlctr Caritbd CA 92OO9-1576 Re: Propossd Cannon Road West Fee Prom Dear David: Wt are in rdpt of your letter dated Novemba 17,1994 kr which you inmducd tho Proposed Cannon Road West Fee Program We have serious concarnr with the equitable distribution of the assermmu necessary to pay fbr the extension of Cannon Road. Don Rose, Senior PIbnntr it SDG&E, has discussed our conceras with the City Eqheer. The Planning Dirraor told us that there was a coacvn on the City's put that !he pmpm description could be misconmued as not requiring bendthg pdtb to pay thdt fair shrve of tht costs. He said these pups are beg assessed, though their fen are being paid by particrs other than thenuelva We wish to rateratc our concern and request a m&g h which yau may nrpfrin the prow. Please contact me at 696-2483 of Don Rote at 696-2408 to meet that is comrurient fbr you. 8 the to Deccmba 13, 1994 CIU No. he. Ray Patckt City Manager City oiCdsbd Fax 720-9561 Re: Cyiobad City Council Agenda I39 #12,935, for 12/13/94 baring, rcguding tomwioa of a CFD fbr improvements within the CarSsbd RMch Spscific PJm Derr Mr. Patehstt: This letta rhd mumoriaiira SDG&E's concan over the tbdoa of a Mdo-Roor Communities Facilities District (CFD No. 3) to haace public improvements in conjunction with Cultas' Cdsbad Ran& Swc Plan. SDG&E proparty is shown as pair of the b&t area in the rgada biil h emr. Thii land is not a part of Cdt& Culhd Ranch SP&C Plan and SDGBtE'should d~ obligations of this type resulting fiom Caritas' Carisbad Ranch Spdc Plan Amctldment. We request clnrification of AB ti12.955, the exadom and qukneau phd hr En& East, particulariy in association with SDG&E's key role in providing Cannon Road right4-way u part of the Team Cllifomia ert, and in consideration of the recently proposed Cannon Road West Fee Program A copy of our letter to the &&ant City Engineer -rasing our concerns over the Feo Prom is attached. ENGINEERING REPORT FOR PROPOSED CANNON ROAD WEST FACILITY FEE PURPOSE The purpose of this report is to define the project, estimate the cost of improvement, determine a reasonable area of benefit, and establish a fair method of allocating cost for the construction 9f Cannon Road from Paseo del Norte to El Camino Real (referred to The report identifies the properties which have a responsibility as well as a general benefit from the construction of Cannon Road West and spreads the cost to improve this section of roadway to undeveloped properties within an established benefit area based upon average daily traffic projections. as Cannon Road West). The report includes a project description, cost estimation for Cannon Road West, an identification of existing funding sources, a description of the area of benefit, an estimate of traffic to be generated from future developments within the benefit area, a description of the fee calculation methodology and a recommended fee structure. The project consists of the completion of Cannon Road to major arterial standards from Paseo del None to El Camino Real, also known as Cannon Road West. The improvements proposed for inclusion in the fee program include all curbs, gutters, sidewalk, base and .pavement, median landscaping and irrigation, median hardscape, streetlights, street monumentation, grading and excavation, storm drainage facilities, guardrails and other incidentals necessary to complete a four-lane major arterial roadway. The project also includes two (2) 485-foot multi-span bridge structures across the saltwater wetlands at the north end of Macario Canyon and a 156-foot single-span bridge across the Agua Hedionda Creek at El Camino Real. In addition, the project includes the cost for full mitigation of the environmental impacts of the construction of the improvements noted above. The project does not include any utility, water, or sewer improvement costs. These costs are included within other fee programs or are assumed to be the responsibility of adjacent developing projects which require the need for the facility. Cost estimates were prepared for the project improvements using the latest plan revisions for Cannon Road West. The cost estimates prepared by Crosby, Mead, Benton and Associates as included within the Cannon Road Assessment District 1 1 1/4/94 Engineer's Report prepared by NBS/Loww in November of 1989, were used as a source for the bridge construction cost estimation. The items evaluated in the cost estimate were limited to the surface improvements which included grading, pavement, curb and gutter, sidewalk, median curbs, median landscaping, storm drains, street lights and erosion control. In order to evaluate the difference between shared center lane costs and those frontage improvements which would normally be required of the adjacent development projects, the cost estimates were further divided relative to inside and outside lane requirements. The "shared inside lanes" also called the "common improvements" consist of full road bed grading, two (2) 18-foot paved sections divided by a raised unimproved median. Only the drainage improvements necessary to serve the center lanes and to protect the roadway grading were included in the "common improvement" cost estimate (ie. drainage improvements serving the frontage go with the frontage improvements). For the purpose of project funding, the cost of the frontage improvements along properties which have a general plan designation of Open Space and which are environmentally constrained are included in the shared project costs and not listed as frontage obligation to the adjoining property owner. The cost estimate was divided into seven (7) segments or reaches for the purpose of allocating improvement costs. Table A summarizes the engineer's estimates for the "common", frontage and total combined improvement costs for the seven segments. Detailed cost estimates are included as Appendix A of this report. (Note: segments 1A thru 1F coorespond to the former Reach 1 of Cannon Road) The total estimated cost for Cannon Road West is $1 1,778,819. TABLE A Allow Totd Coat Common Front= ?A Paseo 0.I Nona to Cu County Oriw $05,250 80 $05,250 Staaon 7 + 38 to 18 + 77.98 Staaon 18+77.91 to 37+70 staaon 37+m to w+oo 3Mocr#)+00tos4+60 18 Cu Country Or to Annda Or 81,520,721 $1.060.31 2 8400.40S 1c Amd. Or to Cwhbd Rwk Boundwy $477,397 $24S,507 8 227,030 to crlrbd RmoA burdwy to M.cMo 8dg. $1,475,758 $1 .47S5,7U 80 84,602,200 84, 002.200 $0 1F M.cwr0 &id- to K.llv Ranah Bound~y 8384,088 8384,088 80 2 KW R.nch Boundwy to a cbna Rad 83,246.808 82.030.37 1 81 ,Zl OMS Station 09+38 to 72+81.30 $1 1,77831s 80,802,834 81,975.384 2 1 1/4/94 w CANNON ROAD WEST COST ALLOCATION There are presently two (2) funding sources identified in the City's Capital Improvement Program for the construction of Cannon Road West. The two sources are identified as follows: rn TransNet Highway Funds- Cannon Road West is designated on the Regional Transportation Improvement Program (RTIP) as a regional facility and was allocated $3,450,000 in Transnet funds. The Transnet funds are limited to funding one-half of the construction costs of a basic four lane facility excluding outside curb and gutter, sidewalks, streetlights, median landscape and median hardscape improvements. The detailed cost estimates presented in Appendix A include a column entitled "SANDAG Allowable" which summarizes the facility costs eligible for Transnet funding. Community Facilities District (CFD) R1 Funds- The list of improvements to be funded by CFD #1 includes provision for $3,950,000 to be applied towards the construction of Cannon Road West. rn The following table shows how the costs for Cannon Road West are allocated among the various funding sources: cost SANDAG Frontago Feo Estimate Transnot CFD I1 Obligations Program $1 1,778,819 $3,450,000 $3,950,000 $1,975,984 $2,402,835 4 1 1/4/94 The area of benefit for the proposed Cannon Road West Facility Fee is shown on Figure 2 bordered by a heavy solid line. The area includes portions of Local Facility Management Zones 5, 8, 13 and 24. With one.exception, each of the properties within the proposed benefit area is obligated by virtue of a condition of development approval or Local Facility Management Plan (LFMP) requirement to finance all or some portion of Cannon Road between Paseo Del None and El Camino Real. The relationship between developing properties within the area of benefit and the need to construct Cannon Road is discussed in more detail on a zone by zone basis in the following paragraphs. There are twenty parcels under two separate ownerships in LFMP Zone 5 that are included within the proposed area of benefit. The 18 parcels under the ownership of Upland Industries are fully developed parcels created with Phase V of the Carlsbad Research Center (CRC). These 18 parcels are subject to a tentative map condition of approval which requires construction of a secondary access prior to issuance of building permits on any of the parcels. Secondary access would occur with the extension of Faraday Avenue to Cannon Road and Cannon Road east to El Camino Real or west to the existing terminus of Cannon Road. Interim secondary access may be allowed by the City from Halley Way to Camino Hills Drive; however, City approval of the interim secondary access is conditioned upon the owner's participation in the financing of Cannon Road. The remaining two parcels under the ownership of the lvar Company are undeveloped and do not have any development approvals pending or otherwise. However, access to the lvar property must occur through Phase V of CRC and therefore, any development of the property would be subject to the same requirement for secondary access as was applied to the CRC properties. For this reason, the two lvar properties are included within the proposed area of benefit for the Cannon Road West Facility Fee. There are two parcels under two separate ownerships in LFMP Zone 8 that are included within the proposed area of benefit. All properties within LFMP Zone 8 are subject to a LFMP requirement to guarantee funding of Cannon Road from El Camino Real to Car Country Drive prior to development of the property. LFMP Zone 8 properties which have been excluded from the area of benefit include City owned property in Macario Canyon and privately owned property located along the north shore of the Agua Hedionda Lagoon. The property within Zone 8 located on the north shore of the Lagoon will access the freeway and other regional routes by way of Park Drive and Tamarack Avenue and thus were not included in the proposed facility fee program. There are twelve parcels under four separate ownerships in LFMP Zone 13 that 5 1 1 /4/94 are included in the proposed area of benefit. Each of these parcels is subject to a LFMP requirement to financially participate in the funding of all or some portion of Cannon Road West. Three parcels in LFMP Zone 13 located along Paseo Del Norte are not within the area of benefit and would not be subject to the Cannon Road West Facility Fee. The three excluded parcels are considered to have responsibility for Palomar Airport Road and are included in the existing Assessment District (AD) No. 86- 1 for the construction of Palomar Airport Road from Paseo Del Norte to Palomar Oaks Way. Three other parcels within LFMP Zone 13, identified as parcels 31, 32 and 34 on the Area of Benefit Map, are also included within the boundaries of AD No. 86-1 and thus, subject to the assessment for the construction of Palomar Airport Road. Recent mapping efforts revised and extended the boundary line of the original parcels to include property that was formerly north of the original assessment district boundary. It is proposed that an area equal to the original amount of area included within AD No. 86-1 be excluded from the proposed Cannon Road West Facility Fee program. This area of exclusion is identified by hatch marks on the Area of Benefit Map on Figure 2. . The value of the current PAR assessment for the excluded areas when compared on an ADT basis is approximately $100/ADT or twice what is proposed for the Cannon Road Facility Fee. The remainder of parcels 31, 32 and 34 lying north of the excluded area are included with the area of benefit and their potential traffic impact has been incorporated within the fee calculation for the Cannon Road West Facility Fee. It is anticipated that minor adjustment to the exclusion boundary will be necessary in the future to make the area of benefit coincide with future parcel boundaries. . There are fourteen parcels under seven separate ownerships in LFMP Zone 24 that are included in the proposed area of benefit. The existing mobile home park within Zone 24 is not included within the area of benefit. The approved Zone 24 LFMP requires that a financing plan guaranteeing the construction of Cannon Road from El Camino Real to Car Country Drive be approved by the City prior to any development occurring within the zone. This requirement was placed on development within Zone 24 because the traffic on Cannon Road West generated by the development of Zone 24 is projected to exceed the Growth Management threshold requiring implementation of a financing plan requiring construction of the facility. 6 1 1/4/94 AREA OF BENEFIT FOR PROPOSED CANNON ROAD WEST FAClLrPl FEE n The approved LFMP Zone plans, proposed and approved tentative maps and recorded final maps, were utilized to determine the projected land uses and development potential of each parcel included within the area of benefit. Projected Average Daily Traffic (ADT) totals were then estimated using traffic generation rates obtained from the October 1993 edition of the SANDAG Trip Generation Table (included in Appendix 8). The ADT projections for each parcel are listed within Table 6 of this report. The traffic projections listed on Table 6 are for future development only and do not include ADT figures for existing residences located on property within the proposed area of benefit. Existing residences are exempt from the proposed fee program; however, any additional development in excess of the existing units on such a property is subject to the Facility Fee. There are presently three existing units within the proposed area of benefit, two in LFMP Zone 24 and one in LFMP Zone 8. The Cannon Road West Facility Fee is calculated by dividing the total unfunded costs for Cannon Road West by the total number of average daily trips anticipated to be generated by the undeveloped propem within the established area of benefit. The unfunded costs were determined by totaling the Cannon Road West costs and subtracting out the SANDAG Transnet contribution, the Community Facilities District No. 1 contribution and the future frontage obligations of the adjoining property owners. As shown below, the total unfunded cost of Cannon Road West which is to be generated through the collection of benefit area fees is $2,402,835. Total Facility Cost SI 1,778,819 Less Frontage Obligations 1.975.984 Less SANDAG Transnet Funds 3,450,000 Less CFD #l Funds 3,950,000 Total Unfunded Cost $2,402,835 The total number of Average Daily Trips (ADT's) expected to be generated by the undeveloped property within the benefit area subtotaled by Local Facility Management (LFMP) zone is 48,642 trips. 5 4,718 0 7,788 13 33,051 24 3.008 Total 48,565 0 1 1/4/94 The Benefit Ares Fee calculated by dividing the unfunded costs by the total ADT is $ SO/ADT. Benefit Area Fee $2.402.835 = 45OtADT 48,565 ADT The actual fee for a developing property within the Benefit Area is calculated by multiplying the benefit area fee of SSO/ADT by the total ADT generated by the proposed development. Table B shows the development potential, general plan land use, estimated ADT, proposed benefit area fee, and frontage obligations for each of the parcels included within the established area of benefit. It should be noted that the fees listed in Table A are estimates based upon existing proposed land uses and growth management projections. The actual fee will be determined at time of development based upon the approved land use and the trip generation rates projected at the time building permits are issued. It is proposed that the fee charged per ADT will be adjusted annually based upon the incremental increase in the Engineering News Record, Los Angeles Construction Cost Index. 9 1 ll4t94 TABLE B ZoOe S 1 2 3 4 S 6 7 8 9 10 11 12 13 14 1s 16 17 18 19 20 ann8 21 22 Zoao 13 23 24 2s 26 27 28 29 30 31 32 33 34 zooau 3s 36 37 38 39 40 41 42 43 44 4s 44 47 48 Told 212- W- 17 212- W- 18 212-130-19 212-W-20 212-W-21 212- uo-22 212-uo-23 212- 130-24 212- 130-u 212- W-26 212- W-27 212- W-28 212- W-29 212-W-30 212- W-31 212- W-32 212- W-33 212-W-34 212-00-41 212 - WO- 43 subcoul m-aO-2a 212-010-03 SUblOUl 212-010-14 211 -010- 19 211-010-23 211-010-as 21 1-010-24 211-a-01 211 -a-03 211-a-01 211-m-06 211-m-as 211 -m-m 211-au-06 Subtoul 212-a- I3 212-00-38 212-80-3) 212-00-s 212-0-n 212-00-33 212-00-32 212-060-40 212-060-29 212-060-30 212-060-34 212-0-zz 212-mO-3S --a- 17 SUbU 253 21 1.92 13 130 13 1.79 13 293 fl 2.08 1.4 2.44 1.7 6.19 2.7 8.16 33 269 1.1 239 1.1 224 1.1 7.24 3.4 8.00 4.1 639 43 4.10 33 1.83 0.7 14.28 5.7 63.78 2.22 la 296 oa 333.93 146.0 21.90 110 3ss.83 S630 0.0 3.00 0.0 147.01 ao 1.40 ao 49.9s 0.0 47.18 10.9 10.06 10.1 27.9s 73 149.14 U.4 1200 lu) 71.96 66.7 7.10 7.7 sm 0 129 Ll L12 I3 120 l2 1.39 1.4 932 9.4 064 a7 14.42 13.7 %a 1w -01) 4837 01) 134 a0 1.09 od 242 24 16634 118963 PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI RM/III RL os as as os lll UA o/PI WPl OIPI** o/PIa* om UA RLM RIA RIA RIA RUI RUI RLM RUI RIM RUI RIA RIA RIA RM \ 270 1S7 12s 1S7 220 188 146 178 282 M 34s 11s 11s 11s 3ss 429 345 76 S% 410 f109n %a3 n641 $1097 s9.ro9 $7,318 S14.113 $1730 u.750 u.79.l U.7SO $17.72 $21.432 sz3322 11730 D&16 kL9.%S t7mi nm 14.m so so so so so so so so so so so so $0 so so so so so so fo 4718 S23S90) so 7678 Kelly S3639p $1316,493 110 Kir* urn so nsa S389AP S1316.49S 0 0 0 0 1u44 loo0 2#r) 1w13 784 4744 IUS Mu) $0 $0 $412370 so so s2333os so so so so so S1139U 33OS1 Slmw s7S9.48D IS7 3s 42 38 4s 301 10 2m 1- a a to 130 so $0 so so so so $0 so $0 $0 to $0 so so APPENDIX A 11/4/94 Caoroa Rod - Pueo Dei Nom to Car Couatry Drive Statio0 7+38.07 to 18+77.95 (Reach 1A) 41 Cmnoo Rod - Cu Country Dr to Armada Dr Statio. 18+77.9J to 37+70 (Rcoeh 16) 1 14 239300 14 2301 uoo 71012 0 0 3604 0 0 3 0 3 2M 0 0 0 360 8 rw 0 1 0 3 34 1040 [s CY Arrsr TOO TOa SF LF SF LF SF SF EA EA M LE EA u: IE LF W LF EA EA M M cy IE Ul000 lSOO.00 230 7% 28.00 930 0.12 9.00 Z00 6.00 2.80 zu) 3S0.00 2m.m lSa00 2700.00 1ZOO U 4a so 80 2700 ua, 3oMQ) ua, 6s 10 ais wooo $21000 $598uD SlOlOO $64.426 s23.7u) $8321 to sa $21424 sa to Sllw to WO w Y) Y) 317280 s400 Sa- to 52300 to $2210 SlW $0 nm 1 0 0 0 1J33 1664 47300 3484 0 toPo? s3m 0 1 5 7166 6 uloo 88 443 S76 197 '3 0 8 0 0 0 iwo 1JMNO 250 1SO 930 0.12 9.00 200 6.00 2.80 uo 3U)M) 2som 18O.00 2fMM ltD0 U 48 30 80 m 2sm Wr) 6s 10 imm am ais morn udm 521m uQdm $10300 f1073R $39358 $14.197 U3.1J6 so t2ld24 $0 $0 SlMO so $1.440 Sl.ll3 sa $0 urn t5113U t19300 t23960 SB.100 tzjoo swm f7300 52310 $10.00 A Cam808 Rod - Armada Dr to C.rlrbd Ranch Boumduy Statio. 37+70 to JO+OO (Reuk 1C) Cunon Rod - Cul8b.d Ruth B0und.q io Muurio Bridp Statio. JO+OO to 64+SO (Raub 1D) Qruocicy Unit UnitCac Amoum 1s okru OCY 0- 117s Too 127s Ta 362s SP 2900 w 14SW SP ow 190 SP Moos? 1m IE OEA SEA samw SEA 2OoOuI ow ow om om OEA om OCY ow loo00 1SW.W 230 7% 28.00 930 0.12 9.00 2.00 6.00 2.80 m 2S.W 3so.m 1- als m#m lur) 44 48 27w 2m 300400 2m 65 10 I- f1OM)I) Lo Lo to UL900 $12.113 w3m t36.100 S29bMo so u3340 S14M)O s37500 $900 so sm ti3m sz4m so so so so so so Lo so P Cumom Rod - Muurio Brid#e Statio. 64+SO to 69+3S (Resch 1E) Cannon Rod - Marario Bridge lo Kelly Ranch Boundaq Station 69+3S to 72+61.30 (Reach 1F) P Canon Rod - Kelly Ranch Boundary to El Camino Real Station 72+61.3 to 124+SO (Reach 2) 1 61310 6300 6833 184BaD 0 0 9978 0 0 9 0 0 8 ulo 0 0 740 5460 268 333 3 13 0 2 2 5 2 20 Ls CY T- Ton SF 1E SF u: SF SF EA Lp EA FA W EA Lp SP SF W W W Lp EA EA EA EA CY 4olm uo 28.00 93 0.12 9.00 200 6M) ZSO 2s 3mM) Urn mM) 180.00 0.1s m#oo 1200 US 75.00 44 48 6s 2100 U00 3oO0.00 twr) 6s m uom S176,raD $64914 $22,416 so so u9gss so so t3m so so $1.40 fbo 10 10 Slan uopm $11,792 SlS984 tlo3u w.40 um s1sm um stloo sis3m so 1 0 1J33 1664 13ooo 10178 So890 0 6Qzu 19320 0 4913 4 21 20000 21 8Ooo 1130 78m 110 0 775 110 4 0 4 4 40 S&XXl w 28.00 930 0.12 9.00 200 6.00 180 uo 350.00 Urn wxao lsa00 mrtoo l2.m 23s 75.00 44 48 6s 80 27W wx) 3Qoaoo 25m 65 ais APPENDIX B 1 1 /4/94 (NOT SO1 BRIEF GUIDE Of VEHICULAR TRAFFIC GENERATION RATE8 FOR THE SAN DIE430 REGION 10 8 12.8 7s it81 16. 16.61 3S 10S 48 48 n n n 78 IS 48 2.8 n 1t-u 8. 1 8.2 3.8 60/ 1 wo n h' ew/aoB' 28 38 -. . 48 lo. 11:61 11. 1l:SI n n as 4s n 1s 4s 78 28 n 108 128 208 14s 28s in 48 6. 5. 4s n ea 78 1- 11s 148 20. 168 n in 43 8.8 Y .o 48 S.0 3.4 1.7 3.4 n (481 lo. iL0 13s it81 n 1 68 8. J im mn 78 140 8.0 11 7 u*ouu ..- - --._.._________ .- [U:U: 1 tl - ......................... --...___ [60:30:41 Mol.( 1-t- - Mou n.- OW YLnMV ........ (0tl0ll omtl SI- CommucUrOma ........ -- .............................. (77.18:Y II.II~W ioo.000 w hi Lug.IHlgMiwlCMvnrcu~ ............................ (01.15.3) CorDa.l.Oma trngu lrnanll -1 Icm C.nlr) .......... -1- ......................... IWW. 101 cmuumu* Qur Cuywww im InuI* MI..- MI& Orom UM onw (mor. man 100.ooQ IC). h.. 8* II~IYI) -1 we. I-/- -a w O.OMmal1 o( Mom v.Ky Maa .......................................... [WQ:3&10I CUU .. ... [00:1~01 2. 8. S. 9. n 14. 1% 15% Bs 6% 8. I. 78 88 8. 4. n 4s 0s 3. 4. 5. 0.n n n n n n 3. 1. 4. n n n 14s 1 4. 11. (481 n n iW1 n 1731 ia 78 11 a I8 100 a0 a.4 54 0.3 a. i 78 47 lo. zo. 101 A-6 SEWER APPENDIX A-6 SEWER COST ESTIMATES Item No. 1 ZONE 13 MAJOR SEWER FACILITIES I tern Estimated Unit Unit Price Total Cost Description Quantity 10" PVC 2,000.00 LF $85.00 $1 70,000.00 SOUTH AGUA HEDIONDA BASIN' Subtotal $1 70,000.00 Contingencies at 15% Subtotal Engineering and Administration at 20% Total Construction Cost 'Source:"Master Plan of Sewerage" Dated January, 1992 $2 5,500.00 $1 95,500.00 $39,100.00 $234,600.00 A-7 WATER APPENDIX A-7 WATER COST ESTIMATES Item I Estimated I Unit I Unit Price Description Quantity ~ Service Item Area I No. Total Cost A I1 1 ZONE 13 MAJOR WATER FACILITIES EA 8" reclaimed main 16" main 12" main I 2,700 I LF I $36 I $97,200 I 3,750 LF $27 $101,250 2,250 LF $50 $1 12,500 Pressure reducing station 10" main 12" main 8" main 1,500 LF $32 $48,000 2,100 LF $36 $75,600 2,100 LF $27 $56,700 $75,000 B 1 16" main 3,600 LF $50 $1 80,000 2 16" main 2,900 LF $50 $1 45,000 8" main 7,050 LF $27 $1 90,350 B Subtotal $51 5,350 Total $1,08 1,600 __~ ~ A Subtotal I $566,250 I A-8 PROPERTY OWNERS Owner Winter, Ra R. 21 1-010-05 21 1-010-19 SDGE 21 1-010-23 10s-1 5.95 1.22 1 os-2 3.36 3.1 5 SDGE (1) 21 1-01 0-24 21 1-022-01 General Plan Gross Acreage os- 1 1.40 os-1 3.00 os- 1 147.04 Net Acreage 1.40 2.26 76.1 3 . -. . - TR- 1 I 44.00 I 33.95 I CRC CRC CRC CRC - - NAMM CRC OS-3 31.91 29.39 2 1 1-022-02 OS-3 3.55 3.13 21 1-022-03 R 10.70 10.70 21 1-022-07 O/PI-2 4.25 4.25 21 1-022-08 OIPI-2 4.85 4.85 21 1-022-09 O/PI-2 3.95 3.95 21 1-022-10 lO/PI-2 8.16 5.02 CRC CRC CRC 21 1-022-1 1 21 1-022-12 21 1-022-1 3 - TR-3 TR-3 TR/C I 12.20 I 10.15 TR-3 95.36 I 90.1 2 1.44 1.44 8.46 6.47 17.30 7.50 I 17m30 7.50 I OIPI-2 OS-4 TR-2 O/PI-1 9.12 9.1 2 10.91 10.91 CRC CRC 21 1-023-01 2 1 1 -023-02 os-2 R os-2 36.27 33.54 16.00 16.00 6.60 6.60 This information is a different level of detail than found on the constraints analysis or the tentative maps associated with SP 207 (A), therefore acreage totals will not match. GIA GIA CRC CRC SDGE = San Diego Gas and Electric CRC = Carlsbad Ranch Company GIA = Gemological Institute of America NAMM = National Association of Music Merchants 05-3 17.28 17.28 2 1 1-023-03 OIPI-1 10.06 10.06 2 1 1-023-04 O/PI-1 7.76 7.76 21 1-023-05 OS-4 5.72 5.72 O/PI-2 6.28 6.28 21 1-023-06 TR-3 5.53 5.53 TR-2 41.09 41.09 OS-4 15.28 15.28 (1) Because SDGE is not a part of SP 207 (A), this area's analysis was not revised at this time. This area will be subject to further analysis when SDGE submits improvement plans. SDGE Ecke, Paul Sr. TR Appendix AS OS-5 10.00 1.84 212-010-14 OS-1 56.50 23.27 212-041-05 TR-2 5.84 5.84 I TR-3 14.82 I 13.01 I