HomeMy WebLinkAboutSP 207H; Carlsbad Ranch Specific Plan; Specific Plan 207H; 2009-12-01 (2)
Carlsbad Ranch Specific Plan 176
IV. COMMUNITY FACILITIES
A. INTRODUCTION
The Carlsbad Ranch Specific Plan land area lies entirely within Local Facilities
Management Zone 13. The public facility requirements for this property are fully addressed
in the Zone 13 Local Facilities Management Plan (LFMP). The approved Zone 13 LFMP
was prepared pursuant to the City's Growth Management Program. The Zone 13 LFMP:
(1) provides a detailed description of how the zone will develop, (2) demonstrates how and
when each required facility and improvement will be constructed to accommodate phased
development within the zone, and (3) provides a complete description of how each facility
and improvement will be financed when mitigation is necessary.
The Carlsbad Ranch Specific Plan implements, but does not supersede the Zone 13
Local Facilities Management Plan. The specific plan has been designed to be consistent
with the purpose and intent of the Zone Plan. The following are the development policies
as they pertain to the community facilities identified in the Zone 13 Local Facilities
Management Plan. The following also identifies specific mitigation requirements of the
Zone 13 LFMP. Development within the Carlsbad Ranch Specific Plan shall be responsible
for providing its fair share of required facilities within Zone 13 as well as impacted facilities
outside of Zone 13.
B. CITY ADMINISTRATIVE FACILITIES
Zone 13, including the Carlsbad Ranch Specific Plan Area, will be developed with
entirely non-residential uses. Therefore, no impacts will be generated by development in
Zone 13 to the City's adopted performance standard, which requires that 1,500 square feet
of City Administrative Facilities per 1,000 population must be scheduled for construction
within a five-year period.
Although the specific plan's non-residential uses include a vocational campus and
associated dormitories, the City's Growth Management Ordinance does not count dormitory
rooms as dwelling units nor are they considered to be permanent residences. For this
reason, the vocational campus will not be subject to the City Administrative Facility
Performance Standard. The landowner is compensating for any impacts generated by the
dormitory uses through the payment of public facility fees and participation in the Citywide
Mello-Roos Community Facilities District, which contribute toward the construction of City
Administrative Facilities.
As concluded in the Zone 13 LFMP, no mitigation is required for Zone 13 to meet the
adopted performance standard.
Carlsbad Ranch Specific Plan 177
C. LIBRARY FACILITIES
Zone 13, including the Carlsbad Ranch Specific Plan Area, will be developed with
entirely non-residential uses. Therefore, no impacts will be generated by development in
Zone 13 to the City’s adopted performance standard, which requires that 800 square feet of
Library Facilities per 1,000 population must be scheduled for construction within a five-year
period.
As mentioned under the City Administrative Facilities section, the City’s Growth
Management Ordinance does not count dormitory rooms as dwelling units nor are they
considered to be permanent residences. For this reason the vocational campus will not be
subject to the Library Facility Performance Standard. The landowner is compensating for
any impacts generated by the dormitory uses through the payment of public facility fees
and participation in the Citywide Mello Roos Community Facilities District, which contribute
toward the construction of Library Facilities.
As concluded in the Zone 13 LFMP, no mitigation is required for Zone 13 to meet the
adopted performance standard.
D. PARK FACILITIES
Since the Carlsbad Ranch Specific Plan and the entire Zone 13 LFMP will be
developed for non-residential uses, the established performance standard of 3 acres of
Community Park or Special Use Area per 1,000 population within the Park District does not
apply to Zone 13 or the Carlsbad Ranch Specific Plan. However, the City has concluded
that non-residents who work in the City also have an impact on the City’s recreational
facilities.
This specific plan proposes the development of a golf course open to the public and
accessory uses as well as various trails and pedestrian walkways. These facilities will
contribute to the recreational needs of the employees working within the specific plan area.
Recreation facilities will be implemented by the specific plan. A brief description of
the recreation uses and facilities are as follows:
1. GOLF COURSE
A 9-hole golf course will be developed in Planning Area 8. Although privately
owned, this golf course will be open to the public.
Carlsbad Ranch Specific Plan 178
2. TRAIL SYSTEM/PEDESTRIAN WALKWAY
The proposed trail and pedestrian system have been incorporated into the
design of the Plan to encourage pedestrian movement within the specific plan.
These trails allow occupants to move freely within the Carlsbad Ranch and to
access both the open space and recreational amenities provided. They are also
designed to tie in to the future citywide trail system. Signage for the specific plan's
proposed trail system will be consistent and meet the signage requirements for the
Future Citywide Trail System. Figure 15 on page 47 identifies the location of trails,
which will be provided.
An extensive pedestrian walkway will be located along the developable
ridge's western wall. The pedestrian walkway will be separated from Armada Drive
by a planting area. The wall will serve a dual purpose by functioning as a barrier
between the agricultural and developed portion of the specific plan as well as
providing a walkway with scenic views of the flower fields and the ocean.
3. PARK MITIGATION RECOMMENDATIONS
The Zone 13 LFMP recommendation for park mitigation is to establish a park
fee of $0.40 per square foot on the zone's non-residential development. This fee
would be collected at the time of building permit issuance and would be used to
construct recreational facilities to offset the demand created by employees within
Zone 13.
E. OPEN SPACE
The Growth Management performance standard requires that 15% of the total land
area in the zone exclusive of environmentally constrained non-developable land be set
aside for permanent open space and must be available concurrent with development.
There are 531.33 net acres per the LFMP constraints analysis in Zone 13; therefore, at
build out, Zone 13 will require 79.70 acres of performance standard open space. This
demand is satisfied by the provision of 119.03 acres (Zone 13 LFMP: OS-1, OS-3 and OS-
5) of performance standard open space. The performance standard open space does not
include the areas to be utilized for the golf course (Zone 13 LFMP: OS-2 and OS-4). In
addition, approximately 19 acres of OS-1 are proposed as a part of the 9-hole golf course
at Point Resort and this acreage is not included in the performance standard open space
supply.
Carlsbad Ranch Specific Plan 180
F. FIRE
Within the Growth Management Program, a fire performance standard for non-
residential uses is not identified. However, a fire performance standard was adopted for
the non-residential uses in Zone 5. The Carlsbad Ranch Specific Plan does not exceed
any of the three thresholds applied to Zone 5 as discussed below:
1. Daily work force in excess of 12,000 people.
At build out, it is estimated that the daily work force in the Carlsbad Ranch
plus the SDG&E property will be much less than the threshold identified for
Zone 5.
2. Specific plan is beyond the five-minute response time for fire protection.
All of the Carlsbad Ranch Specific Plan falls within the five-minute response
time of Fire Station #4.
3. The Fire Department is unable to provide 1,000 gallon per minute of fire flow
in 10 minutes or less.
The Carlsbad Fire Department would need three engine companies on the
scene in less than ten minutes to provide 1,000 gallons per minute of fire
flow. Fire Stations 2, 3, 4 and 5 can currently reach the Carlsbad Ranch
Specific Plan within ten minutes; adequately addressing the third threshold.
Zone 13, and the Carlsbad Ranch currently and at build out, meet all three
non-residential fire-service thresholds. For this reason the specific plan and all
development in Zone 13 is not required to provide additional fire facilities. However,
the specific plan will be required to meet the landscaping restrictions identified in the
City of Carlsbad's Landscape Manual as well as provide required sprinkler systems
in all proposed development.
G. SCHOOLS
Under the Growth Management Program, a performance standard for non-
residential uses is not identified. However, a school performance standard was adopted for
the non-residential uses in Zone 5 which assumed that non-residential zones would be
required to pay a school fee based on the square footage of development. The fee is
based on legislation which determined that employees can educate their children in the
same school district in which their place of employment is located. The fee is intended to
offset the cost of the construction of school facilities required to accommodate children of
parents working within the school district.
Carlsbad Ranch Specific Plan 181
The Carlsbad Ranch Specific Plan is within the Carlsbad Unified School District.
Applicable non-residential school fees will be paid to the Carlsbad Unified School District at
the time of Building Permit issuance.
Carlsbad Ranch Specific Plan 182
V. UTILITIES AND INFRASTRUCTURE
A. INTRODUCTION
Of the utilities required to serve the project the most critical are water and storm
drainage. Facilities for reclaiming water are now being implemented along with the facilities
for transmission, distribution and storage. Storm drainage runoff must employ Best
Management Practices to control flooding, detention, desiltation and urban pollution
removal prior to being discharged into natural watersheds, wetlands and coastal lagoons.
Sewage from the project will be received by the Encina Water Pollution Control
Facility through existing sewer mains and trunk lines and the extension of an existing 10"
line in Cannon Road. San Diego Gas and Electric Company will provide both gas and
electric services to the site. Water service is provided by the Carlsbad Municipal Water
District. The project is within the service boundaries of Pacific Bell for telephone, and
Daniel's Cablevision for cable television services. Solid waste removal will be provided by
Coast Waste Management, a local private company.
B. DOMESTIC WATER
The City of Carlsbad is divided into three water districts: the Carlsbad Municipal
Water District, the Vallecitos Water District and the Olivenhain Municipal Water District.
The Carlsbad Ranch is entirely within the Carlsbad Municipal Water District.
As discussed in the Growth Management Ordinance, the Carlsbad Municipal Water
District has established two performance standards to ensure adequate water services.
The performance standards serve to: 1) ensure line capacity to meet demand and 2)
require that a minimum 10-day average storage capacity be provided. These performance
standards must be met prior to any development occurring within the zone. The line
capacity will be provided with development. Minimum average storage capacity shall be
determined by the local agencies; of these the requirement for fire flow is the most
demanding.
The project lies entirely within Local Facilities Management Zone 13. Currently, the
citywide storage capacity is 12.9 days. The projected storage capacity at build out is 254.5
million gallons with an average daily demand estimated to be 24.54 million gallons. This
will provide for a projected storage at build out of 10.4 days.
The specific plan area will be served by two water pressure zones. Parcels 1, 2 and
3 will be provided water service from the lower 255 Pressure Zone. The remaining Parcels
numbered 4 through 23 will be provided service from the higher 375 Pressure Zone.
The existing water facilities for the 255 Pressure Zone include:
Carlsbad Ranch Specific Plan 183
• A 1.5 MG steel tank reservoir located adjacent to the east boundary of the specific
plan.
• Two pressure reducing stations, one at the 1.5 MG steel tank, and the other at the
intersection of Palomar Airport Road and Armada Drive.
• A 16-inch and 12-inch pipeline from the 1.5 MG steel tank aligned southwesterly to
Palomar Airport Road.
• A 10-inch pipeline in Palomar Airport Road from Armada Drive to Paseo Del Norte.
• A 12-inch pipeline in Paseo Del Norte and Car Country Drive.
The existing water facilities for the 375 Pressure Zone include:
• One 8.5 MG steel tank reservoir (now under construction to replace 1.25 MG).
• A 16-inch pipeline in Palomar Airport Road.
• A 16-inch pipeline form the existing 1.5 MG reservoir to Palomar Airport Road.
• Removal of the existing 12-inch and 16-inch transmissions lines.
The existing water facilities are shown on Figure 57 on page 183.
To provide adequate water service, the following facilities are required in the 375
Pressure Zone only:
• A 16-inch pipeline in The Crossings Drive extending from Camino de Los Ondas
north to the vicinity of the existing 1.5 MG reservoir. This will enable the fire flow to
be provided to the area from the 8.5 MG reservoir now under construction.
• A 12-inch pipeline extending in on easement across Parcel 11 from The Crossings
Drive to Cannon Road.
• A 16-inch pipeline in Armada Drive from Palomar Airport Road to Cannon Road.
• A 10-inch pipeline in LEGO Drive.
• A minimum 8-inch pipeline in "D" Street.
Carlsbad Ranch Specific Plan 184
• A minimum 12-inch pipeline east of Car Country Drive to the easterly boundary of
Zone 13 in Cannon Road.
• A pressure reducing station east of Car Country Drive.
The location and sizes of the above facilities have been approximated. Figure 57 on
page 183 provides a conceptual recommendation of where these facilities shall be located.
The exact sizes and locations will be determined as areas within the specific plan develop.
The water distribution system interior to the project site will be designed at the time of the
development of final engineering plans.
This specific plan lies entirely within the boundaries of Zone 13 which currently
conforms with the adopted performance standards. Since the water district requires
development to install domestic water and fire flow needs as conditions of approval to
future development, conformance with the adopted standards will be maintained to ultimate
development of the project.
Carlsbad Ranch Specific Plan 187
C. RECLAIMED WATER
On March 21, 1989 the City of Carlsbad adopted an interim Reclaimed Water Use
Policy for new land development projects. The policy specified that all new development
shall use reclaimed water when reasonably available and that the installation of dual
irrigation systems may be required subject to the terms of the Water Reclamation Master
Plan.
The Carlsbad Municipal Water District operates and maintains two reclaimed water
pipelines in the specific plan area. There is an existing 8-inch pipeline in Palomar Airport
Road. Another 8-inch pipeline is in The Crossings Drive extending from Palomar Airport
Road north to the vicinity of an existing 1.5 MG steel tank. The water pressure in these
pipelines is the same as the 375 Pressure Zone for domestic water. However, it is noted
that the pipeline in The Crossings Drive may need to be relocated based on proposed site
grading plans.
To utilize the reclaimed water supply will require the following:
• A 12-inch pipeline in The Crossings Drive and an easement from Palomar Airport
Road to Cannon Road. (There is an existing temporary 8-inch water line in The
Crossings Drive from Palomar Airport Road to the reservoir.)
• A 20-inch pipeline in Cannon Road from Car Country Drive to the proposed 12-inch
pipeline described above.
• An 8-inch pipeline in Armada Drive from Palomar Airport Road to Cannon Road
(Carlsbad Ranch Unit No. 1 has been designed and approved as a part of CT 92-07
on December 23, 1993.)
• An 8-inch pipeline in LEGO Drive.
• An 8-inch pipeline in Paseo Del Norte from Palomar Airport Road to Car Country
Drive.
There also exists a 16" line located within and south of Palomar Airport Road
belonging to the Vallecitos Water District. The City of Carlsbad has the rights to use
reclaimed water from that line. That line has the capacity of two million gallons per day. As
long as there is a surplus of reclaimed water available, development within this project
could use this pipeline as a source of reclaimed water.
Carlsbad Ranch Specific Plan 188
The Encina Water Pollution Control Facility currently does not have the capability to
generate reclaimed water and no transmission or distribution lines have been constructed
from the facility. Studies are now being performed regarding the construction of such
facilities. The generating capacity requirements or the location of such a facility have not
yet been determined.
As mentioned earlier, new development must agree to use reclaimed water when
feasible and available. The existing pipeline in Palomar Airport Road makes access to
reclaimed water feasible and readily available as long as surplus reclaimed water capacity
exists. Although reclaimed water will be used in the landscape irrigation of the commercial
and office complexes, its greatest use will be for the proposed golf course and agricultural
fields. Therefore, a dual irrigation system shall be installed for this project.
D. STORM DRAINAGE
In the past, the major concern when designing storm drainage systems was flooding.
Today, with the growth of urban areas and concerns over the protection of wetlands and
habitat areas, the need for the removal of urban pollutants from urban drainage has
increased.
Storm drainage facilities required to prevent flooding will be constructed concurrent
with development. Currently, there are no major facilities within the project area. All major
facilities outside the project boundaries have been constructed except one which will be
constructed when development occurs in that area. This facility is a 51" storm drain and
the double 60" storm drain and channel grading collectively referred to as line BAA.
The primary components of the storm drainage system are the subsurface pipes,
overland drainage swales and detention basins. As for storm water management, the
basins serve three purposes: flood prevention, detention, and desiltation and removal of
urban pollutants. Detention requirements have been imposed to regulate the volumes of
water being discharged into the downstream wetland areas of the watershed.
The desiltation and removal of urban pollutants will also be factors of the storm
drainage systems. Water quality control guidelines have recently been adopted by the
State Water Quality Control Board and Environmental Protection Agency. These guidelines
will be implemented in the proposed system. The applicant shall comply with the
requirements of the National Pollutant Discharge Elimination System (NPDES) permit. The
applicant shall provide Best Management Practices to control discharges of pollutants to
the maximum extent practicable to waters of the United States. Plans for such
improvements shall be approved by the City Engineer prior to, or concurrent with, approval
of the final map, issuance of grading or building permit, whichever occurs first, in the
affected area.
Construction of the above facilities will occur concurrent with development.
Carlsbad Ranch Specific Plan 189
E. SEWER AND WASTEWATER FACILITIES
The site is divided into two sewer basins. The existing and proposed facilities are
illustrated on Figure 58 on page 187. To the north is a 10" sewer line within existing
Cannon Road. This line is adequate in size and remaining capacity to serve the northerly
sewer basin of the specific plan. This line travels westerly and is eventually intercepted by
the Vista-Carlsbad Interceptor which transports wastewater to the treatment plant. The line
in existing Cannon Road shall be extended easterly to Armada Drive within Cannon Road.
There are plans for the future development of the South Agua Hedionda Interceptor
which will serve development to the east. This line will replace the existing and proposed
sewer main in Cannon Road, however, it is not required for development within the specific
plan. The Carlsbad Municipal Water District is presently preparing a preliminary design on
the interceptor and may schedule construction within Cannon Road. In addition, the South
Agua Hedionda sewer force main is located across the SDG&E property and serves
development outside Zone 13.
The portion of the South Agua Hedionda sewer line adjacent to Zone 13 is known as
SAHI 3 and 4. These lines flow to the west into the Vista Carlsbad Interceptor sections VC
13, 14 and 15, beginning at Cannon Road and terminating at the Encina Water Pollution
Control Facility.
To the south, the Buena/Vallecitos Interceptor runs in a westerly direction on the
south side of Palomar Airport Road. This existing line is in use and is sufficient in size and
available capacity to serve the southerly and central development phases of the specific
plan. The project will be required to extend the 8" sewer from Armada Drive across
Palomar Airport Road to the existing sewer at Price Club. The Buena/Vallecitos line also
transports wastewater through to the treatment plant without being intersected by other
lines. The line has sufficient capacity to sewer the entire sewer basin at ultimate build out.
Therefore, no additional improvements are needed for this line.
No major facilities are required off-site within either sewer drainage basin for
development within this project.
An internal sewer system will be required to be designed consisting of 8" sewer
mains as shown on Figure 58 on page 187. These lines will connect to the existing sewer
main and interceptor located adjacent to the project boundaries. As a condition of approval
for future development the design of this system will be required to be in conformance with
the adopted standards and to be maintained through ultimate development of the project.
No lift stations are anticipated to be constructed to serve the Carlsbad Ranch's internal
sewer system. Wherever practical, the sewer system shall be constructed within the public
right-of-way.
Carlsbad Ranch Specific Plan 191
F. SOLID WASTE
Solid Waste collection and disposal services are provided by the City of Carlsbad.
The City contracts these services with Coast Waste Management, a private company.
G. ELECTRICITY
Electricity will be provided to the site by San Diego Gas and Electric Company.
There currently exist circuit points along Palomar Airport Road and Paseo del Norte which
are adequate to service the site.
H. NATURAL GAS
Natural gas will also be provided by San Diego Gas and Electric Company. There
exist 3" high-pressure gas lines within Palomar Airport Road, Cannon Road, Car Country
Road and Paseo del Norte. The line within Palomar Airport Road will need to be extended
easterly and then northerly into the site at the time of development. Also, the project lies
within the service area of an existing 20-inch high-pressure gas line.
I. TELEPHONE
Pacific Bell provides telephone service to this area. No service problems are
anticipated with the development of this service area.
The planning and design of "dry" utilities (electricity, natural gas and telephone) are
typically not started until the initial stages of the final design of the project site improvement
and grading plans. Utility lines will be located underground and construction will be
concurrent with development since these utilities are usually "joint trenched" within the
public right-of-way. The costs of providing these improvements are typically passed onto
the consumer via initial hookup fees and monthly charges.
J. CIRCULATION
The primary factors influencing and guiding development in the Carlsbad Ranch
Specific Plan are the project's circulation impacts. The proposed development for the
Carlsbad Ranch Specific Plan has been primarily constrained by a maximum generation of
69,376 Average Daily Trips (ADT's) for the Zone 13 area based on projected traffic intensity
in the circulation system affected by the Carlsbad Ranch Specific Plan. This figure
represents the maximum ADT's which can be accommodated by the build out design of the
surrounding circulation facilities in particular, the I-5 interchanges with current peak hour
assumptions related to the proposed land uses. The volume and distribution of traffic
generated from the Carlsbad Ranch has been carefully analyzed to maintain conformance
with the Zone 13 LFMP. Specific land uses, development locations and square footages
Carlsbad Ranch Specific Plan 192
for the specific plan were determined as a result of the site's traffic considerations. The
City of Carlsbad's Growth Management Program sets a Circulation Performance Standard
which prohibits any impacted road segment or intersection within or outside of the zone to
exceed Service Level C during off-peak hours or Service Level D during peak hours.
To maintain an acceptable Level of Service on all roadways impacted by the
Carlsbad Ranch Specific Plan, specific mitigation measures and circulation improvements
have been identified.
The circulation improvements identified are categorized into projected improvements
needed now, during development of Zone 13 and at build out. These time frames represent
milestones as opposed to actual completion dates. The milestones are based on assumed
traffic intensity from projected growth assumptions and therefore are intended to be used
for planning purposes only.
As a means of ensuring facility adequacy, the City of Carlsbad has established the
Growth Management Monitoring Program to monitor the City's growth and identify those
facilities, which fail to meet the City's Facility Performance Standards. If the City
determines that the timing of the necessary improvements needs to be accelerated, then
the required improvements must be adjusted to ensure conformance with the adopted
Performance standard. However, if the proposed project is delayed or other traffic
generating uses within the affected area are not developed, then the required construction
or financial guarantee required to meet the Performance Standard may be delayed as long
as the facilities are provided concurrent with need and a financing program guaranteeing
their construction is in place.
A traffic report has been prepared concurrent with this specific plan to identify
mitigation measures and circulation improvements needed as a result of development
within the Carlsbad Ranch Specific Plan. To ensure consistency between mitigation
measures in the specific plan and other concurrent applications, this report is also the basis
for the circulation improvements identified for the entire Zone 13 area in the Zone 13 Local
Facilities Management Plan Amendment. In addition, the report is also the basis for the
traffic section of the Carlsbad Ranch Specific Plan EIR.
Carlsbad Ranch Specific Plan 193
The construction of the following circulation improvements shall be financially
guaranteed, as set forth in the finance chapter of the Zone 13 LFMP:
1. IMPROVEMENTS NEEDED NOW
a. Cannon Road/I-5 Northbound and Southbound Ramps
Install traffic signals. Also, at the Southbound Ramps widen the ramp
and add a southbound left-turn lane. Restripe the westbound through
lane for an additional left-turn lane.
Estimated Cost - $232,000
Timing:
The I-5 Ramps at Cannon Road are not within the City of Carlsbad's
jurisdiction, however, Carlsbad's adopted Capital Improvement
Program has scheduled TIF and PFF funds for the City's share of the
improvements to the ramps. The timing for these improvements is
controlled by CalTrans, the responsible jurisdiction for completing the
work. This dedication of funds guaranteed the specific improvement
needed to bring this intersection into conformance with the City's
adopted performance standard. For these reasons, no further action
is required prior to development within Zone 13.
2. INTERIM YEAR IMPROVEMENTS
a. Cannon Road from I-5 to Car Country Drive - Add an additional
westbound through lane for a total of three westbound lanes.
Estimated Cost - $150,000
Timing:
Prior to recordation of a final map, issuance of a grading or building
permit, whichever occurs first for any project within subarea TR-1, TR-
2, TR-3, O/PI-1, O/PI-2 of Zone 13, if the City Engineer determines
that this improvement is necessary to maintain the Growth
Management Circulation Performance Standard, the developer of that
subarea shall financially guarantee its construction as set forth in the
Finance section of the Zone 13 LFMP.
Carlsbad Ranch Specific Plan 194
b. Cannon Road from Car Country Drive to the eastern Zone Boundary -
Construction of Cannon Road to full major arterial standards except
for the sidewalk on the north side adjacent to undeveloped areas.
Estimated Cost - $8,467,000
Timing:
Prior to recordation of a final map, issuance of a grading or building
permit, whichever occurs first for any project within subarea TR-1, TR-
2, TR-3, O/PI-1, or O/PI-2 of Zone 13, if the City Engineer determines
that this improvement is necessary to maintain the Growth
Management Circulation Performance Standard, the developer of that
subarea shall financially guarantee its construction as set forth in the
Finance section of the Zone 13 LFMP. Reimbursement from SDG&E
will be required for proportional share of improvements.
c. Armada Drive/Lego Drive from Cannon Road to Palomar Airport Road
- Construction of Armada Drive/Lego Drive to two lanes in each
direction.
Estimated Cost - $2,573,000
Timing:
Prior to recordation of a final map, issuance of a grading or building
permit, whichever occurs first for any project within subarea TR-2, TR-
3, O/PI-1, O/PI-2, TR/C or R of Zone 13, if the City Engineer
determines that this improvement is necessary to maintain the Growth
Management Circulation Performance Standard, the developer of that
subarea shall financially guarantee its construction as set forth in the
Finance section of the Zone 13 LFMP.
d. Paseo del Norte/Cannon Road - Install traffic signal. Also, provide an
exclusive left-turn lane and a shared through/right-turn lane in the
southbound direction. In the northbound direction, add a left-turn lane
and restripe the exclusive right-turn lane for a shared through/right-
turn lane. Also, add an eastbound left-turn lane and westbound
shared through/right-turn lane.
Estimated Cost - $169,000
Carlsbad Ranch Specific Plan 195
Timing:
Prior to recordation of a final map, issuance of a grading or building
permit, whichever occurs first for any project within subarea TR-1, TR-
2, O/PI-1, O/PI-2 or R of Zone 13, if the City Engineer determines that
this improvement is necessary to maintain the Growth Management
Circulation Performance Standard, the developer of that subarea shall
financially guarantee its construction as set forth in the Finance
section of the Zone 13 LFMP.
e. Car Country Drive/Cannon Road - Install traffic signal. Provide an
exclusive left-turn lane and two through lanes in the westbound
direction. In the northbound direction, add an exclusive right-turn
lane.
Estimated Cost - $110,000
Timing:
Prior to recordation of a final map, issuance of a grading or building
permit, whichever occurs first for any project within subarea TR-1, TR-
2, O/PI-1, O/PI-2 or R of Zone 13, if the City Engineer determines that
this improvement is necessary to maintain the Growth Management
Circulation Performance Standard, the developer of that subarea shall
financially guarantee its construction as set forth in the Finance
section of the Zone 13 LFMP.
f. Paseo del Norte/Palomar Airport Road - Provide a westbound
exclusive right-turn lane.
Estimated Cost - $185,000
Timing:
Prior to recordation of a final map, issuance of a grading or building
permit, whichever occurs first for any project within subarea TR-3,
O/PI-2, TR/C or R of Zone 13, if the City Engineer determines that this
improvement is necessary to maintain the Growth Management
Circulation performance Standard, the developer of that subarea shall
financially guarantee its construction as set forth in the Finance
section of the Zone 13 LFMP.
Carlsbad Ranch Specific Plan 196
g. Lego Drive/Cannon Road - Install traffic signal. Provide two left-turn
lanes and an exclusive right-turn lane in the northbound direction; two
through lanes and an exclusive right-turn lane in the eastbound
direction; and two left-turn lanes and two through lanes in the
westbound direction.
Estimated Cost - $5,000 (signal cost included in LEGO
Drive/Armada Drive cost estimate)
Timing:
Prior to recordation of a final map, issuance of a grading or building
permit, whichever occurs first for any project within subarea TR-1, TR-
2, TR-3, O/PI-1 or O/PI-2 of Zone 13, if the City Engineer determines
that this improvement is necessary to maintain the Growth
Management Circulation Performance Standard, the developer of that
subarea shall financially guarantee its construction as set forth in the
Finance section of the Zone 13 LFMP.
h. Armada Drive/Palomar Airport Road - Install traffic signal
modifications as necessary. Restripe the northbound approach for two
left-turn lanes and a shared through/right-turn lane. In the southbound
direction, provide two left-turn lanes, one shared through/right-turn
lane, and an exclusive right-turn lane. Also, add an eastbound left-
turn lane and a westbound exclusive right-turn lane.
Estimated Cost: $205,000
Timing:
Prior to recordation of a final map, issuance of a grading or building
permit, whichever occurs first for any project within subarea O/PI-2,
TR-3 or TR/C of Zone 13, if the City Engineer determines that this
improvement is necessary to maintain the Growth Management
Circulation Performance Standard, the developer of that subarea shall
financially guarantee its construction as set forth in the Finance
section of the Zone 13 LFMP.
i. The Crossings Drive/Palomar Airport Road - Construction of
intersection to include two through lanes, one shared right/through
lane and one left turn lane in the eastbound and westbound directions.
Provide one shared southbound left/right/through lane. Provide a
shared right-turn/through land and one left-turn lane in the northbound
direction.
Carlsbad Ranch Specific Plan 197
Estimated Cost - $155,000
Timing:
Prior to recordation of a final map, issuance of a grading or building
permit, whichever occurs first for any project within subarea O/PI-2,
TR-3 or TR/C of Zone 13, if the City Engineer determines that this
improvement is necessary to maintain the Growth Management
Circulation Performance Standard, the developer of that subarea shall
financially guarantee its construction as set forth in the Finance
section of the Zone 13 LFMP.
j. One of the following two groups of improvements dependent upon
whether Cannon Road is constructed between Zone 13 and El
Camino Real:
Conditions if Cannon Road is not Extended:
i. Palomar Airport Road/I-5 Northbound Ramps - Restripe the
westbound Palomar Airport Road approach for the following:
two through lanes, one shared through/right-turn lane, and one
exclusive right-turn lane.
Estimated Cost: $1,725
Timing:
Prior to recordation of a final map, issuance of a grading or
building permit, whichever occurs first for any project within
subarea O/PI-2, TR-3, TR/C or R of Zone 13, if the City
Engineer determines that this improvement is necessary to
maintain the Growth Management Circulation Performance
Standard, the developer of that subarea shall financially
guarantee its construction as set forth in the Finance section of
the Zone 13 LFMP.
ii. College Boulevard/Palomar Airport Road - Provide two left-turn
lanes, one through lane, and one shared through/right-turn
lane in the northbound direction. Restripe the southbound
College Boulevard approach for the following: one left-turn
lane, one shared through/right-turn lane, and one exclusive
right-turn lane.
Estimated Cost: $1,150
Carlsbad Ranch Specific Plan 198
Timing:
Prior to recordation of a final map, issuance of a grading or
building permit, whichever occurs first for any project within
subarea TR-1, TR-2, TR-3, O/PI-1, O/PI-2, TR/C or R of Zone
13, if the City Engineer determines that this improvement is
necessary to maintain the Growth Management Circulation
Performance Standard, the developer of that subarea shall
financially guarantee its construction as set forth in the Finance
section of the Zone 13 LFMP.
Conditions if Cannon Road is Extended:
i. Cannon Road/I-5 Northbound Ramps - Widen the northbound
on ramps and restripe the westbound Cannon Road approach
to provide one through lane, one shared through/right-turn
lane, and one exclusive right-turn lane.
Estimated Cost - $1,150
Timing:
Prior to recordation of a final map, issuance of a grading or
building permit, whichever occurs first for any project within
subarea TR-1, TR-2, O/PI-1, O/PI-2 or R of Zone 13, if the City
Engineer determines that this improvement is necessary to
maintain the Growth Management Circulation Performance
Standard, the developer of that subarea shall financially
guarantee its construction as set forth in the Finance section of
the Zone 13 LFMP.
ii. Palomar Airport Road/I-5 Northbound Ramps - Restripe the
westbound Palomar Airport Road approach to provide two
through lanes, one shared through/right-turn lane, and one
exclusive right turn lane.
Estimated Cost - $1,725
Timing:
Prior to recordation of a final map, issuance of a grading or
building permit, whichever occurs first for any project within
subarea TR-3, O/PI-2, TR/C or R of Zone 13, if the City
Engineer determines that this improvement is necessary to
Carlsbad Ranch Specific Plan 199
maintain the Growth Management Circulation Performance
Standard, the developer of that subarea shall financially
guarantee its construction as set forth in the Finance section of
the Zone 13 LFMP.
iii. College Boulevard/Palomar Airport Road - Provide two left-turn
lanes, one through lane, and one shared through/right lane in
the northbound direction. Restripe the southbound approach
for a left-turn lane, a through lane, and a shared through/right-
turn lane.
Estimated Cost - $1,150
Timing:
Prior to recordation of a final map, issuance of a grading or
building permit, whichever occurs first for any project within
subarea TR-3, O/PI-2, TR/C or R of Zone 13, if the City
Engineer determines that this improvement is necessary to
maintain the Growth Management Circulation Performance
Standard, the developer of that subarea shall financially
guarantee its construction as set forth in the Finance section of
the Zone 13 LFMP.
iv. Cannon Road from eastern Zone boundary to El Camino Real -
Construction of Cannon Road to two lanes in each direction.
Estimated Cost - $3,247,000
Timing:
Prior to recordation of a final map, issuance of a grading or
building permit, whichever occurs first for any project within
subarea TR-1, TR-2, TR-3, O/PI-1 or O/PI-2 of Zone 13, if the
City Engineer determines that this improvement is necessary to
maintain the Growth Management Circulation Performance
Standard, the developer of that subarea shall financially
guarantee its construction as set forth in the Finance section of
the Zone 13 LFMP.
v. El Camino Real/Cannon Road - Provide three through lanes,
one exclusive right-turn, and two exclusive left-turn lanes in the
southbound direction. Provide two through lanes, one shared
through/right-turn lane, and two exclusive left-turn lanes in the
Carlsbad Ranch Specific Plan 200
northbound direction. In the eastbound direction, provide one
through lane, one shared through/right-turn lane and two
exclusive left-turn lanes. In the westbound direction, provide
one through lane, one shared through/right-turn lane, and two
exclusive left-turn lanes. Install a traffic signal.
Estimated Cost - $340,000
Timing:
Prior to recordation of a final map, issuance of a grading or
building permit, whichever occurs first for any project within
subarea TR-1, TR-2, TR-3, O/PI-1 or O/PI-2 of Zone 13, if the
City Engineer determines that this improvement is necessary to
maintain the Growth Management Circulation Performance
Standard, the developer of that subarea shall financially
guarantee its construction as set forth in the Finance section of
the Zone 13 LFMP.
3. IMPROVEMENTS NEEDED BY BUILD OUT
a. Cannon Road/I-5 Northbound Ramps - Restripe the westbound
Cannon Road approach to provide one through lane, one shared
through/right-turn lane, and one exclusive right-turn lane. In addition,
widen the on ramp and provide an additional eastbound Cannon Road
left-turn lane. Also, widen the off ramp and add a northbound
exclusive right-turn lane.
Estimated Cost - $4,600
Timing:
Prior to recordation of a final map, issuance of a grading or building
permit, whichever occurs first for any project within subarea TR-1, TR-
2, O/PI-1, O/PI-2 or R of Zone 13, if the City Engineer determines that
this improvement is necessary to maintain the Growth Management
Circulation Performance Standard, the developer of that subarea shall
financially guarantee its construction as set forth in the Finance
section of the Zone 13 LFMP.
b. Paseo del Norte/Cannon Road - Construction of an additional
eastbound left-turn lane for a total of two exclusive left-turn lanes, one
through lane, and one through/right-turn lane. In addition, at a point
Carlsbad Ranch Specific Plan 201
east of the intersection, an additional westbound Cannon Road
through lane would be required. At the intersection, this would result
in the following lane configuration in the westbound direction: one
exclusive left-turn lane, two through lanes, and a shared through/right-
turn lane.
Estimated Cost - $27,000
Timing:
Prior to recordation of a final map, issuance of a grading or building
permit, whichever occurs first for any project within subarea TR-1, TR-
2, O/PI-1, O/PI-2 or R of Zone 13, if the City Engineer determines that
this improvement is necessary to maintain the Growth Management
Circulation Performance Standard, the developer of that subarea shall
financially guarantee its construction as set forth in the Finance
section of the Zone 13 LFMP.
c. Paseo del Norte/Palomar Airport Road - Restripe the northbound and
southbound Paseo del Norte approaches to provide two exclusive left-
turn lanes, one shared through/right-turn lane, and one exclusive
right-turn lane. Provide an eastbound exclusive right-turn lane.
Estimated Cost - $2,300
Timing:
Prior to recordation of a final map, issuance of a grading or building
permit, whichever occurs first for any project within subarea TR-3,
O/PI-2, TR/C or R of Zone 13, if the City Engineer determines that this
improvement is necessary to maintain the Growth Management
Circulation Performance Standard, the developer of that subarea shall
financially guarantee its construction as set forth in the Finance
section of the Zone 13 LFMP.
d. El Camino Real/Cannon Road - Restripe the southbound El Camino
Real approach to provide for two left-turn lanes, two through lanes,
one shared through/right turn lane, and one exclusive right-turn lane.
In addition, provide an exclusive right-turn lane on the eastbound
Cannon Road approach. [Note: Improvements listed in Condition
2.i.v. (Cannon Road extended) may be built prior to the above
improvements. If they are not built, then they must be constructed
with the above improvements.]
Carlsbad Ranch Specific Plan 202
Estimated Cost - $6,325
Timing:
Prior to recordation of a final map, issuance of a grading or building
permit, whichever occurs first for any project within subarea TR-1, TR-
2, O/PI-1, O/PI-2 or R of Zone 13, if the City Engineer determines that
this improvement is necessary to maintain the Growth Management
Circulation Performance Standard, the developer of that subarea shall
financially guarantee its construction as set forth in the Finance
section of the Zone 13 LFMP.
e. Cannon Road from eastern Zone boundary to El Camino Real -
Construction of Cannon Road to full major arterial standards from the
eastern Zone boundary to El Camino Real.
Estimated Cost - $3,247,000
Timing:
Prior to recordation of a final map, issuance of a grading or building
permit, whichever occurs first for any project within subarea TR-1, TR-
2, O/PI-1 or O/PI-2 of Zone 13, if the City Engineer determines that
this improvement is necessary to maintain the Growth Management
Circulation Performance Standard, the developer of that subarea shall
financially guarantee its construction as set forth in the Finance
section of the Zone 13 LFMP.
In addition to the facilities identified in the Zone 13 LFMP, the Carlsbad Ranch
Specific Plan, and the EIR, Figure 15 on page 47 illustrates the envisioned internal
Circulation Program of the Carlsbad Ranch property. Development of the identified
internal roadways will occur prior to or concurrent with the appropriate phase of
development they will serve.
Carlsbad Ranch Specific Plan 203
VI. SPECIFIC PLAN IMPLEMENTATION MEASURES
A. ORDINANCES TO BE ADOPTED
As this specific plan is both a policy and regulatory document, it is to be adopted by
ordinance to legally serve as the zoning for the Carlsbad Ranch. Unless otherwise stated
in the Carlsbad Ranch Specific Plan, the requirements of the underlying zone and the City
of Carlsbad's Municipal Code shall apply.
The Carlsbad Ranch Specific Plan is supplemental to the existing certified Mello II
Implementing Ordinances. Unless otherwise stated in the Carlsbad Ranch Specific Plan, all
of the municipal code provisions and implementing ordinances of the existing Mello II
Implementation Plan are applicable to the Carlsbad Ranch.
B. SUBSEQUENT APPROVALS NECESSARY TO IMPLEMENT THE SPECIFIC
PLAN
The Carlsbad Ranch Specific Plan is accompanied by a General Plan Amendment,
Local Coastal Program Amendment, Local Facilities Management Plan Amendment, Land
Conservation Contract Cancellation, Zone Change, Tentative Map, Non-Residential
Planned Unit Development, Hillside Development Permit and an Environmental Impact
Report. Prior to development of any property within the Carlsbad Ranch Specific Plan, a
Coastal Development Permit must be obtained. The Coastal Development Permit must be
provided to the City of Carlsbad prior to the issuance of a grading or building permit.
Subsequent permits and approvals shall be required prior to development within the
individual planning areas as follows:
1. Planning Area 1
Any development of the property shall be subject to the approval of a Site
Development Plan pursuant to Section 21.06 (Qualified Overlay Zone) of the
Carlsbad Municipal Code. Contained within the Carlsbad Ranch Specific Plan, the
Environmental Impact Report, Local Facilities Management Plan for Zone 13 and a
Site Development Plan application submitted to the City of Carlsbad Planning
Department is sufficient information to make the following findings with respect to a
vocational school for the Gemological Institute of America:
a. The requested use, a vocational school, is desirable for the
development within the City of Carlsbad and is essentially in harmony
with the elements and objectives of the General Plan. In addition, the
development of a vocational school is not detrimental to the health,
safety and welfare of the citizens and visitors of Carlsbad, to the
Carlsbad Ranch Specific Plan 204
existing uses within this portion of the City of Carlsbad or to uses
specifically permitted in the zone that the proposed use will be
located.
b. Planning Area 1 of the Carlsbad Ranch Specific Plan is of adequate
size and shape to accommodate the use of this site for a vocational
school.
c. All yards, setbacks, walls, fences, landscaping and any other features
necessary for the intended use of a portion of Planning Area 1 as a
vocational school will be provided and maintained in accordance with
the Carlsbad Ranch Specific Plan and the Municipal Code for the City
of Carlsbad.
d. The street system serving the site is adequate to handle all traffic
generated from this use.
These findings are supported by the facts, findings, conditions and mitigation
measures of this specific plan, the Environmental Impact Report (EIR 94-01), the
Local Facilities Management Plan for Zone 13 and an approved Site Development
Plan (SDP 94 -06). These documents are incorporated herein by reference.
Any other uses proposed for this site that are not specifically addressed
herein shall be subject to all applicable processing requirements of the underlying
zone and Title 21 (Zoning) of the Carlsbad Municipal Code.
2. Planning Area 2
Any development of the property shall be subject to the approval of a Site
Development Plan pursuant to Section 21.06 (Qualified Overlay Zone) of the
Carlsbad Municipal Code. A Site Development Plan application may be submitted
for the entire planning area, for any combination of contiguous lots or for any
individual lot as may be requested by the property owner or his authorized agent,
subject to the approval of the Planning Director.
Any other uses proposed for this site that is not specifically addressed herein
shall be subject to all applicable processing requirements of the underlying zone and
Title 21 (Zoning) of the Carlsbad Municipal Code.
Carlsbad Ranch Specific Plan 205
3. Planning Area 3
Any development of the property including hotels and/or commercial living
units (timeshares) shall be subject to the approval of a Site Development Plan
pursuant to Section 21.06 (Qualified Overlay Zone) of the Carlsbad Municipal Code.
In addition, a hotel or commercial living unit (timeshare) project shall be subject to
the requirements of Section 21.42.010(10) of the Carlsbad Municipal Code. In
addition to the above requirements, the City Council shall make the final decision to
approve or disapprove the Site Development Plan.
Any other uses proposed for this site that is not specifically addressed herein
shall be subject to all applicable processing requirements of the underlying zone and
Title 21 (Zoning) of the Carlsbad Municipal Code.
4. Planning Area 4 (LEGOLAND Carlsbad)
Planning Area 4 contains the entire LEGOLAND theme park. As shown on
Exhibit 35, the park is divided into the inner park and the outer park. The inner park
contains all of the existing attractions, food services and administrative services and
areas for future expansion. The outer park is the area reserved for LEGOLAND
theme park visitor parking, LEGOLAND hotel and hotel guest parking and a large
portion of the perimeter landscape buffer. This specific plan authorizes and
approves a LEGOLAND family park as a permitted use subject the approval of a
Site Development Plan. A Site Development Plan (SDP 96-14) and Coastal
Development Permit (CDP 96-16) were approved for the entire park by City Council
Resolution 97-670 on May 20,1997. This specific plan authorizes and approves a
LEGOLAND family park as a permitted use of the Planning Area for zoning
purposes and, therefore, a conditional use permit shall not be required pursuant to
Section 21.42.010(5)(F) of the Carlsbad Municipal Code. Any development of the
property shall be subject to the processes as described below.
Outer Park
Any development within the Outer Park shall be subject to the approval of a
Site Development Plan pursuant to Section 21.06 (Qualified Overlay Zone) of the
Carlsbad Municipal Code.
Inner Park
All future park projects within the Inner Park that comply with the
development standards and design guidelines set forth in this Specific Plan shall
be processed as a Minor Site Development Plan and Minor Coastal Development
Permit subject to Planning Director approval. The Planning Director shall
Carlsbad Ranch Specific Plan 206
ascertain all facts pertinent to the proposed development and shall approve,
conditionally approve, disapprove or give notice of referral to the Planning
Commission, together with the findings and reasons for such action. An
application for a Minor Site Development Plan/Minor Coastal Development
Permit shall be made in accordance with the procedures set forth below:
(1) An application for a Minor Site Development Plan/Minor Coastal
Development Permit may be made by the record owner or owners of the
property affected or the authorized agent of the owner or owners. The
application shall be filed with the Planning Director upon forms provided by
him. The application shall be accompanied by adequate plans which allow
for detailed review, a legal description of the property and all other
materials and information specified by the Planning Director.
(2) At the time of filing the application, the applicant shall pay a processing
fee in an amount specified by City Council resolution.
(3) If the applicant contemplates the construction of a LEGOLAND project
in phases, the application shall so state and shall include a proposed
phasing schedule.
(4) For minor coastal development permits, notwithstanding Section
21.201.080, all applications regardless of the cost of development shall be
approved or disapproved by the Planning Director.
Findings of the Planning Director.
In approving a Minor Site Development Plan/Minor Coastal Development Permit,
the Planning Director shall make the following findings:
(1) That the requested use is properly related to the site, surroundings and
environmental settings, is consistent with the various elements and
objectives of the general plan, will not be detrimental to existing uses or to
uses specifically permitted in the area in which the proposed use is to be
located, and will not adversely impact the site, surroundings or traffic
circulation;
(2) That the site for the intended use is adequate in size and shape to
accommodate the use;
(3) That all of the yards, setbacks, walls, fences, landscaping, and other
features necessary to adjust the requested use to existing or permitted
future uses in the neighborhood will be provided and maintained;
Carlsbad Ranch Specific Plan 207
(4) That the street system serving the proposed use is adequate to
properly handle all traffic generated by the proposed use
(5) The development has no adverse effect individually or cumulatively on
coastal resources or public access to the shoreline or along the coast.
Notification.
The planning director shall notify the applicant in writing of any decision made on
a Minor Site Development Plan/Minor Coastal Development Permit.
Effective Date of Order and Appeal of Planning Director Decision.
The effective date of the Planning Director’s decision and method for appeal of
such decision shall be governed by Section 21.54.140 of the municipal code.
Development Agreement
Additionally, a Development Agreement may be entered into between the City
of Carlsbad and LEGO. This Development Agreement shall not conflict with the
requirements of this specific plan.
Amendments to the Site Development Plan
The following types of minor amendments may be approved administratively
by the Planning Director:
a. Changes to the design and location of landscaping within the interior
of the park.
b. Revisions to the design and landscaping of the parking area that will
not substantially impact vehicular or pedestrian access.
c. The relocation of attractions within the interior of the park that will not
substantially alter the appearance of the park from any adjacent public
road.
d. Revisions to the architecture of buildings as long as the revisions are
in conformance with the Design Guidelines of Section IV.E.3 (
LEGOLAND Carlsbad Design Guidelines) of this specific plan.
e. Any other similar type of revisions determined to be minor in nature by
the Planning Director.
Carlsbad Ranch Specific Plan 208
5. Planning Area 5
Any development of the property including hotels and/or commercial living
units (timeshares) shall be subject to the approval of a Site Development Plan
pursuant to Section 21.06 (Qualified Overlay Zone) of the Carlsbad Municipal Code.
In addition, a hotel or commercial living unit (timeshare) shall be subject to the
requirements of Section 21.42.010(10) of the Carlsbad Municipal Code. In addition
to the above requirements, the City Council shall make the final decision to approve
or disapprove the Site Development Plan.
Any other uses proposed for this site that are not specifically addressed
herein shall be subject to all applicable processing requirements of the underlying
zone and Title 21 (Zoning) of the Carlsbad Municipal Code.
6. Planning Area 6
Any development of the property shall be subject to the approval of a Site
Development Plan pursuant to Section 21.06 (Qualified Overlay Zone) of the
Carlsbad Municipal Code. Any other uses proposed for this site that are not
specifically addressed herein shall be subject to all applicable processing
requirements of the underlying zone and Title 21 (Zoning) of the Carlsbad Municipal
Code.
In addition to the above requirements, the City Council shall make the final
decision to approve or disapprove the Site Development Plan for Planning Area 6.
7. Planning Area 8
A Site Development Plan in lieu of a Conditional Use Permit may be allowed
for the development of a golf course in this Planning Area.
C. CAPITAL IMPROVEMENT PROGRAM
The matrix presented in Figure 59 on page 205, identifies the estimated costs of the
public works projects contained as special conditions in the Zone 13 Local Facilities
Management Plan and described in the Public Facility and Infrastructure chapter of this
plan, the measures by which each public works project will be financed, and the persons or
agencies responsible for financing and carrying out each proposed improvement.
These improvements are categorized into projected improvements needed for
specific years. These years represent milestones as opposed to actual completion dates.
The milestones are based on projected growth assumptions and therefore are intended to
be used for planning purposes only.
D. PHASING PROGRAM
Carlsbad Ranch Specific Plan 209
Although this specific plan is regulatory in nature, it does not regulate the rate of
development within Carlsbad Ranch. Other than general market conditions and contractual
limitations set forth in the Land Conservation Contract, development within Carlsbad Ranch
will be controlled by the availability of adequate public facilities.
Figures 60, 61, 62 and 63 on pages 211 through 214 depict the potential sub-phases
of development on the Carlsbad Ranch that might occur if the property owners choose not
to grade the site and provide the infrastructure in a single phase. The phasing diagrams do
not suggest the sequence or suggested timing of new development, but rather identify the
grading and circulation improvements that would occur with the development of portions of
the project. See the text beginning on page 219 for a detailed description of the phasing of
grading and development.
A phasing program was developed for public facility planning purposes. The
phasing program, which is consistent with the Zone 13 LFMP analysis, is presented in
Figure 64 on page 215. Other than the scheduling of needed public facilities, the specific
plan is not influenced by this phasing program. Development within Carlsbad Ranch may
differ from the schedule presented in Figure 64 given the availability of adequate public
facilities and services.
~- -
PROJECT COST
-- ~p
TIMING FINANCING
ClRCULATlON FAClLlTlES (Phasing of Circulation Facilities has been updated pursuant to phasing
identified in the EIRI
IMPROVEMENTS NEEDED NOW:
Cannon Roadll-5 Northbound and Southbound $232,000 As Indicated City - PFFfrlF
Ram~s- Install traffic signals. At southbound
ramps, widen the ramps and add a
southbound left-turn lane. Restripe the
westbound through lane for an additional left-
turn lane.
INTERIM YEAR IMPROVEMENTS:
3-
Provide additional westbound lane
Cannon Road from Car Countrv Drive to
eastern zone boundarv - Construction of 2
lanes, each direction
Arrnada/Leao Drive from Cannon Road to
Palomar - Construction of 2
lanes, each direction
Paseo del NorteICannon Road - Install traffic
signal. Provide an exclusive left-turn land and
a shared through right-turn lane in the
southbound direction. In the northbound
direction, add a left-turn lane and restripe the
exclusive right-turn lane for a shared
throughlright-turn lane. Also, add an
eastbound left-turn lane and a westbound
shared throughlright turn lane.
Car Countrv Drivelcannon Road - Install
traffic signal. Provide an exclusive left-turn
lane and two through lanes in the westbound
direction. In the northbound direction, add an
exclusive right-turn lane.
Paseo Del NortelPalomar Air~ort Road -
Provide westbound exclusive right turn lane
$1 50,000 As lndicated TIFICFD No. 3
$8,467,000 I I CFD No. 11
Transnet 1
CFD No. 3 /
Fee Program
$2,573,000 I I CFD No. 3
$1 69,000 I I PFF /
Developer
Funding
$1 1 0,000 WI Developer
Funding
$1 85,000 I I CFD No. 3
PROJECT COST TIMING FINANCING
Leao Drivelcannon Road - Install traffic signal $5,000 I w CFD No. 3
and provide two left-turn lanes and an
exclusive right-turn lane in the northbound
direction; two through lanes and an exclusive
right-turn lane in the eastbound direction; and
two left-turn lanes and two through lanes in
the westbound direction. (Signal cost
included in LEGOlArmada Drive cost estimate)
1 - Install $205,000 w w CFD No. 3
traffic signal modifications as necessary.
Restripe the northbound approach for two
left-turn lanes and a shared throughlright-turn
lane. In the southbound direction, provide
two left-turn lanes, one shared throughlright-
turn lane, and an exclusive right-turn lane.
Also, add an eastbound left-turn lane and a
westbound exclusive right-turn lane.
Hidden Vallev RoadIPalomar Air~ort Road - $155,000 ww CFD NO. 3
Construction of intersection to include two
through lanes, one shared rightlthrough lane
and one left turn lane in the eastbound and
westbound directions. Provide one shared
southbound leftlrightlthrough lane. Provide a
shared right-turnlthrough land and one left-
turn lane in the northbound direction.
WIO Cannon Road Extension
Palomar air~ort Roadll-5 Northbound Ramos - $1,725 As Indicated Developer
Re-striping
Colleae Boulevard1 Palomar Air~ort Road - $1,150 I I I w
Re-striping and construct south leg.
With Cannon Road Extension
Cannon Roadfl-5 Northbound Ramps - Re- $1,150 As Indicated TIF I Developer
striping and widening of northbound on ramp.
Palomar Air~ort Roadll-5 Northbound Ram= - $1,725 w w Developer
Re-striping
Colleae Blvd/Palomar Air~ort Road - Restriping $1,150 I w Developer
PROJECT COST TIMING FINANCING
- - - - - - - -
With Cannon Road Extension
Cannon Road from eastern zone boundarv to $3,247,000 I w CFD NO. 1 /
El Camino Real - Two lanes, each direction Fee Program1
Transnet
El Camino Real/Cannon Road - Construct $340,000 As Indicated TIFIPFFI
intersection, signal installation Developer
- -- - - --
IMPROVEMENTS NEEDED AT BUILD OUT:
Cannon - Re- $4,600 As Indicated TIFIPFFI
striping and widening Developer
Paseo del NorteICannon Road - Lane
Construction, east and west
Paseo del NorteIPalomar Air~ort Road -
Re-striping
El Camino Real/Cannon Road -
Re-striping
$27,000 II I Developer
Cannon Road - Construction from eastern $3,247,000 I II CFD No. 1 /
zone boundary to El Camino Real Fee Program /
Developer
Total Circulation Costs without Cannon Road $1 5,540,500
Extended
Total Circulation Costs with Cannon Road $15,495,250
Extended
PROJECT COST TIMING
- -
FINANCING
WATER FACILITIES
Service Area A:
16" Water Main
12" Water Main
$1 1 2,500 Concurrent w/ Developer
Development
10" Water Main $48,000 I I I I
8" Water Main $56,700 " * " n
8" Reclaimed Water Main $1 01,250 " w I I
Pressure Regulating Station $75,000 11 I I I
Service Area B:
16" Water Main $325,000 Concurrent w/ Developer
Development
8" Reclaimed Water Main $1 90,350 " I I I
Total Water Cost $1,081,600
PROJECT COST TIMING FINANCING
SEWER FACILITIES
10" PVC $234,600 Concurrent w/ Developer
Development
Total Sewer Cost $234,600
Carlsbad Ranch Specific Plan 221
E. GRADING/EROSION CONTROL
1. INTRODUCTION
The purpose of this section is to establish appropriate guidelines for the
grading of the Carlsbad Ranch Specific Plan Area. Since the intent of the specific
plan process is to review the area in question in a comprehensive manner, this plan
proposes a comprehensive review of the grading for the entire specific plan area.
2. GUIDELINES
The following guidelines are hereby established to assure appropriate grading
designs for the Carlsbad Ranch Specific Plan Area. These guidelines incorporate
programs and policies from the Mello II segment of Carlsbad's Local Coastal
Program as well as City policies and programs dealing with grading and erosion
control.
a. Grading Plans shall conform to the requirements of Chapter 21.95
Hillside Development and Chapter 11.06 Excavation and Grading of
the Carlsbad Municipal Code. Preliminary and final grading plans will
be prepared in accordance with the Municipal Code for review by the
City Engineer.
b. Manufactured slopes shall be contoured to simulate natural terrain,
except where such contouring will conflict with the recommendations
of the soils engineer and be supported with the appropriate technical
data.
c. All grading and land alteration activities shall be subject to the
provisions of the Master Drainage Plan.
d. All permanent manufactured slopes, shall be constructed at a gradient
of 2 to 1 (horizontal to vertical) or less. Any exceptions to the gradient
must be approved by the City Engineer and Planning Director.
e. Grading within each planning area shall provide for the safety and
maintenance of other planning areas already developed or under
construction.
Carlsbad Ranch Specific Plan 222
f. All graded areas shall have erosion control measures installed within
30 days after rough grading is completed. If permanent vegetation
cannot be installed within the 30-day period, temporary erosion control
measures shall be installed, if required for maintenance of the public
health, safety and welfare. However, permanent planting is preferred.
g. All temporary slopes not scheduled for development within 60 days
shall be hydroseeded from April 16 through August 14 and juted from
August 15 through April 15. All graded pad areas not scheduled for
construction within 6 months must be hydroseeded. Ninety percent
(90%) germination within 30 days is required by means of rainfall or
with an irrigation system if rainfall is insufficient.
h. Grading shall be phased so that all onsite irrigation water and erosion
control basins are installed concurrent with or prior to any grading
activities.
i. Runoff and erosion shall be reduced by the construction of temporary
and/or permanent desiltation basins within each area of development.
Provision for maintenance and final removal of temporary desiltation
basins must be made prior to final map approval. The plans for these
basins must be approved by the City of Carlsbad Engineering
Department. Provisions for maintenance of permanent basins must
be made prior to final map approval.
j. The application for grading permits must provide assurance to the
Planning Director that manufactured slope banks will be properly
landscaped.
k. All slopes shall be planted per the requirements of Carlsbad's
Landscape Manual and Chapter 11.06 of the Carlsbad Municipal
Code. Drought tolerant xeriscape shall be used whenever possible to
reduce the need for irrigation.
l. Grading should direct runoff toward planned drainages and, if
possible, away from cut and fill areas.
m. Development should preserve, as feasible, natural drainage swales
and landforms.
n. Grading activity shall be prohibited during the rainy season: from October
1st to April 1st of each year, unless approved by the City of Carlsbad and
the Coastal Commission.
Carlsbad Ranch Specific Plan 223
o. All graded areas shall be landscaped prior to October 1st of each year
with either temporary or permanent landscaping materials, to reduce
erosion potential. Such landscaping shall be maintained and
replanted if not well established by December 1st following the initial
planting.
p. Slopes of 25% grade and over that possess endangered species
and/or Coastal sage scrub and Chaparral plant communities shall be
preserved in their natural state, unless the application of this policy
would preclude any reasonable use of the property.
q. Slopes and areas remaining undisturbed as a result of the hillside
review process, shall be placed in a permanent open space easement
as a condition of development approval.
r. Appropriate measures shall be taken on and/or offsite to prevent
siltation of lagoons and other environmentally sensitive areas.
s. Slope disturbance shall not result in substantial damage or alteration
to major wildlife habitat or native vegetation areas.
t. No development shall be permitted except pursuant to submittal of a
runoff control plan prepared by a licensed engineer qualified in
hydrology and hydraulics; such approved plans shall assure that there
would be no increase in peak runoff rate from the developed site over
the greatest discharge expected from the existing undeveloped site as
a result of a 10-year frequency storm. Runoff control shall be
accomplished by a variety of measures, including, but not limited to,
onsite catchment basins, detention basins, siltation traps, and energy
dissipators, and shall not be concentrated in one area.
u. When topography changes are required and natural vegetation is
removed, the area and duration of exposure shall be kept at a
minimum.
v. Soil erosion control practices shall be used against "onsite" soil
erosion. These include keeping soil covered with temporary or
permanent vegetation or with mulch materials, special grading
procedures, diversion structures to divert surface runoff from exposed
soils, and grade stabilization structures to control surface water.
w. The applicant may submit a revised Grading Plan for the inner and
outer park area of Lot 18. The revision is subject to approval of the
City Engineer and Planning Director under the guidelines of the
Substantial Conformance Policy.
Carlsbad Ranch Specific Plan 224
3. CONFORMANCE WITH CITY OF CARLSBAD ORDINANCES
All grading proposed by any grading design intended to implement this plan
shall also conform to the following City of Carlsbad ordinances, policies and/or
guidelines unless otherwise permitted within this specific plan:
a. Excavation and Grading Ordinance (Chapter 11.06 Carlsbad
Municipal Code)
b. Hillside Development Regulations (Chapter 21.95, Carlsbad Municipal
Code)
c. Zone 13 Local Facilities Management Plan
d. City of Carlsbad Landscape Manual
e. City of Carlsbad Master Drainage Plan
f. City of Carlsbad Planning Department Policies
g. City of Carlsbad Engineering Department Policies
h. Mello II segment of the Carlsbad Local Coastal Program.
4. PHASING OF GRADING
The comprehensive grading plan provides for an overall balanced grading
operation, as well as a balanced grading operation in each of the 4 phases that is in
compliance with the City of Carlsbad's Hillside Development Ordinance.
The phased grading concept was developed considering the following criteria:
• The grading shown on approved plans for the previous tentative map for
Carlsbad Ranch (CT 92-07), Units 1, 2 and 3) would be completed prior to
CT 94-09 grading.
• Each phase of the new tentative map must balance.
• Once LEGO Drive and Armada Drive are constructed, grading operations
would not cross the roadway.
Carlsbad Ranch Specific Plan 225
• Any rough grading material placed in agricultural areas must allow for
continued agricultural use until final grading operations begin. This requires
fill slopes no steeper than 6:1.
A total of 1,045,140 cubic yards will be moved during the CT 92-07 grading.
A total of 2,083,900 cubic yards of material will be moved during the CT 94-09 three
phases of grading.
Figure 60 shows the previous balanced grading for CT 92-07.
Figures 61, 62 and 63 show grading for Phases 1, 2 and 3 respectively for CT
94-09.
5. LANDSCAPE MITIGATION
All graded areas shall be landscaped per the requirements of the City of
Carlsbad's Landscape Manual, Chapter 11.06 of the Carlsbad Municipal Code and
the Final EIR for this specific plan.
When possible, slopes shall be planted with drought tolerant native species
using temporary irrigation systems. Once the vegetation has been established
these temporary irrigation systems shall be removed if above ground or abandoned
if buried.
Carlsbad Ranch Specific Plan 226
VII. SPECIFIC PLAN ENVIRONMENTAL REVIEW
A. ENVIRONMENTAL IMPACT REPORT (94-01)
As required by the California Environmental Quality Act, a Program Environmental
Impact Report (EIR) was prepared as a separate document concurrently with the Carlsbad
Ranch Specific Plan Amendment.
B. OPPORTUNITIES AND CONSTRAINTS
The Program Environmental Impact Report prepared by Cotton/Beland/Associates,
Inc. analyzed the Specific Plan Amendment in regard to impacts associated with
Agricultural Resources, Air Quality, Archeological and Paleontological Resources,
Biological Resources, Traffic/Circulation, Hazardous Waste/Pesticide Residue, Land Use
Compatibility, Noise, Public Services & Utilities, Solid Waste, Visual Aesthetics/Grading and
Water Quality. The EIR's mitigation measures for each of the above impacts are as
follows:
1. AGRICULTURAL RESOURCES
No mitigation measures are proposed, as impacts will be reduced to a level
less than significant through the payment of fees consistent with the coastal
program, the preservation of 53 acres on-site, and through implementation of
policies contained in the specific plan.
2. AIR QUALITY
Individual development projects within the specific plan area shall be required
to implement the following mitigation measures, as determined feasible on a project-
by-project basis by the City. These measures include:
• Provide preferential parking spaces for carpools and vanpools and provide
7'2" minimum vertical clearance in parking facilities for van access unless
surface parking is provided for vans.
• Implement on-site circulation plan in parking lots to reduce vehicle queuing
(stacking-up).
• Provide shade trees to reduce building heating/cooling needs.
• Use energy efficient and automated controls for air conditioning.
• Use energy-efficient low-sodium parking lot lights.
Carlsbad Ranch Specific Plan 227
• Provide adequate ventilation systems for enclosed parking facilities.
• Use light colored roof materials to reflect heat.
• Synchronize traffic lights on streets impacted by development.
• Schedule truck deliveries and pickups for off-peak hours.
• Require on-site truck loading zones.
• Require employers to provide commuter information areas.
• Implement compressed workweek schedules where weekly work hours are
compressed into fewer than five days:
- 9/80
- 4/40
- 3/36
• Develop a trip reduction plan to achieve 1.5 AVR for businesses with less
than 100 employees or multi-tenant worksites.
• Construct on-site or off-site bus turnouts, passenger benches, or shelters as
deemed necessary by the North County Transit District.
• Construct off-site pedestrian facility improvements such as overpasses and
wider sidewalks.
• Provide shuttles to major rail transit centers, multi-modal stations, and other local destinations for all uses within the specific plan.
• Contribute to regional transit systems (e.g., right-of-way, capital
improvements, etc.).
• Site Development Plan applications should contain the following:
- Bicycle parking facilities, such as bicycle lockers.
- Showers for bicycling employees' use.
Carlsbad Ranch Specific Plan 228
3. ARCHAEOLOGICAL AND PALEONTOLOGICAL RESOURCES
a. Prior to issuance of a grading permit for the area north of Cannon
Road, a data recovery program shall be completed for CA-SDI-6132
for the portion impacted north of Cannon Road. The data recovery program shall be completed in compliance with the City of Carlsbad's
"Cultural Resource Guidelines".
b. A portion of site CA-SDI-8797 within the Carlsbad Ranch was
identified as significant/important under City of Carlsbad and CEQA
criteria and was recommended to be mitigated of impacts through avoidance (Gallegos and Kyle 1992). This site shall be placed within
an open space easement and capped. Capping shall include
placement of 1-2" of sand followed by 12 to 24 inches of sterile fill soil.
Vegetation allowed within the fill soil should include grasses and other
shallow rooted plants that will not penetrate the underlying prehistoric site. This area could also be used for a parking area, upon
completion of capping. Placement of utility lines or other underground
lines shall be placed outside this sensitive area.
c. Mitigation of impacts for that portion of CA-SDI-8797 within the
additional survey area shall be achieved through avoidance or the completion of a City of Carlsbad approved data recovery program. If
a data recovery program is conducted for this site, the program shall
be completed in compliance with the City of Carlsbad's "Cultural
Resource Guidelines".
d. Prior to the issuance of a grading permit, the applicant shall provide written evidence that a certified archaeologist has been retained, shall
be present at the pregrading conference, shall establish procedures
for archaeological resource surveillance, and shall establish, in
cooperation with the project proponent, procedures for temporarily
halting or redirecting work to permit the sampling, identification, and evaluation of artifacts as appropriate. If additional or unexpected
archaeological features are discovered, the archaeologist shall report
such findings to the applicant and to the City. If the archaeological
resources are found to be significant, the archaeological observer
shall determine appropriate actions, in cooperation with the applicant for exploration and/or salvage. These actions, as well as final
mitigation and disposition of the resources, shall be subject to the
review of the City.
e. Prior to issuance of a mass-grading permit the developer shall present
a letter to the City of Carlsbad indicating that a qualified paleontologist has been retained to carry out an appropriate mitigation program. (A
qualified paleontologist is defined as an individual with a MS or Ph.D.
in paleontology or geology who is familiar with paleontological
procedures and techniques.)
Carlsbad Ranch Specific Plan 229
A qualified paleontologist shall be present at the pre-construction
meeting to consult with the grading and excavation contractors.
A paleontological monitor shall be on-site at all times during the
original cutting of previously undisturbed sediments of the Santiago Formation to inspect cuts for contained fossils. Periodic inspections of
cuts involving the Lindavista Formation is also recommended. In the
event that fossils are discovered in the Lindavista Formation it may be
necessary to increase the per/day in field monitoring time.
Conversely, if fossils are not being found then the monitoring should be reduced. (A paleontological monitor is defined as an individual
who has experience in the collection and salvage of fossil materials.
The paleontological monitor shall work under the direction of a
qualified paleontologist.)
When fossils are discovered, the paleontologist (or paleontological monitor) shall recover them. In most cases this fossil salvage can be
completed in a short period of time. However, some fossil specimens
(such as a complete large mammal skeleton) may require an
extended salvage period. In these instances the paleontologist (or
paleontological monitor) shall be allowed to temporarily direct, divert, or halt grading to allow recovery of fossil remains in a timely manner.
Because of the potential for the recovering of small fossil remains,
such as isolated mammal teeth, it may be necessary in certain
instances, to set up a screen-washing operation on the site.
Fossil remains collected during the monitoring and salvage portion of the mitigation program shall be cleaned, repaired, sorted, and
cataloged.
Prepared fossils, along with copies of all pertinent field notes, photos,
and maps, shall be deposited (as a donation) in a scientific institution
with permanent paleontological collections such as the San Diego Natural History Museum. Donation of the fossils shall be
accompanied by financial support for initial specimen storage.
A final summary report shall be completed that outlines the results of
the mitigation program. This report shall include discussions of the
methods used, stratigraphic sections(s) exposed, fossils collected, and significance of recovered fossils.
f. A certified paleontologist shall monitor all grading activity associated
with the improvements to the I-5/Cannon Road interchange. If buried
cultural materials are unearthed during construction, work shall be
halted in the vicinity of the find until a qualified paleontologist can assess its significance. If the testing demonstrates that a resource is
significant, then a data recovery program will be necessary.
Compliance with this measure shall be verified by Caltrans.
Carlsbad Ranch Specific Plan 230
4. BIOLOGICAL RESOURCES
a. Direct Impacts
• Diegan coastal sage scrub impacts should be mitigated by
creation or restoration at ratios of 2:1 and 1:1, respectively, and within Preserve Planning Area 3 or the purchase or
preservation at a 1:1 ratio within the HMP area of Carlsbad.
• To avoid direct impacts to the area proposed as natural open
space and to the proposed open space deed restriction, the
boundaries of these areas should be surveyed and fenced. The erection of fencing and its proper location should be
verified by a biologist or planning department representative.
After project completion, permanent fencing may need to be
established to prevent human intrusion into the areas.
b. Indirect Impacts
• It is anticipated that the gnatcatcher pair located immediately
off-site to the east of the project will be taken during
construction of the municipal golf course being proposed by the
City of Carlsbad. As a result, no mitigation for construction
noise impacts that may occur to this pair are proposed. If through final design of the City proposed golf course it is
determined that this gnatcatcher pair is not taken, the following
mitigation measure for noise impacts shall be implemented:
During the gnatcatcher breeding season (February 15
through August 15), noise levels during grading shall not exceed 65 decibels, averaged over a one-hour
period on an A-weighted decibel (dBA), measured at the
edge of Diegan coastal sage scrub habitat that is
occupied by the coastal California gnatcatcher. Grading
could be initiated in areas adjacent to occupied gnatcatcher habitat prior to August 15 if the pair has
successfully fledged young and the fledglings are at
least three weeks out of the nest. Grading will be
allowed adjacent to habitat occupied by unpaired
individual birds.
• Lighting should be selectively placed, shielded, and directed
away from the areas listed above, in particular to avoid
potential impacts to the coastal California gnatcatcher(s) east
of the future LEGOLAND Carlsbad and any that may occur in
the proposed open space.
Carlsbad Ranch Specific Plan 231
• During project construction and operation, measures should be
implemented to control erosion, sedimentation, and pollution
(fertilizers and pesticides from the proposed golf courses) that
could impact the proposed natural open space or that could impact Agua Hedionda Lagoon. These measures could
include berms, interceptor ditches, sandbags, filtered inlets,
debris basins, and silt traps.
• Landscaping adjacent to the open space shall include non-
invasive plant species.
5. TRAFFIC/CIRCULATION
a. The following mitigation measures shall be implemented by the
applicant to reduce significant impacts on two intersections under the
Year 2000 conditions and seven intersections under Buildout
conditions to a level of less than significant.
The required street improvements and their phasing, based on
ultimate buildout conditions, are as follows:
1997 I-5 Northbound Ramps & Palomar Airport Road
(CMP Location) - Restripe the westbound
Palomar Airport Road approach for the following: two through lanes, one shared through/right-turn
lane, and one exclusive right turn lane.
2000 I-5 Northbound Ramps & Cannon Road (CMP
Location) - Restripe the westbound Cannon
Road approach for the following: one through lane, one shared through/right-turn lane, and one
exclusive right-turn lane.
2006 El Camino Real & Cannon Road (CMP Location)
- Restripe the southbound El Camino Real
approach for the following: one left-turn lane, two through lanes, one shared through/right-turn
lane, and one exclusive right-turn lane.
2007 Avenida Encinas & Palomar Airport Road (CMP
Location) - Restripe the northbound Avenida
Encinas approach to provide the configuration: one exclusive left-turn lane, one through lane,
and one right-turn lane (already done).
Carlsbad Ranch Specific Plan 232
2008 El Camino Real & Palomar Airport Road (CMP
Location) - Restripe the northbound El Camino
Real approach for the following: one left-turn
lane, two through lanes, one shared through/right-turn lane, and one exclusive right-
turn lane.
2008 I-5 Northbound Ramps & Cannon Road (CMP
Location) - Restripe the westbound Cannon
Road approach for the following: one through lane, one shared through/right-turn lane, and one
exclusive right-turn lane. In addition, provide an
additional eastbound Cannon Road left-turn lane.
The resulting lane configuration on the
eastbound approach would be two exclusive left-turn lanes and two through lanes.
Buildout Paseo del Norte & Cannon Road (CMP Location)
- The southbound approach (SDG&E driveway)
should be constructed and striped as follows:
one exclusive left-turn lane, one shared through/right-turn lane, and one exclusive right-
turn lane. In addition, the eastbound Cannon
Road approach would require an additional left-
turn lane. The resulting lane configuration in the
eastbound direction would be two exclusive left-turn lanes, one through lane, and one
through/right turn lane. Also, at a point east of
the intersection, an additional westbound
Cannon Road through lane would be required.
At the intersection, this would result in the following lane configuration in the westbound
direction: one exclusive left-turn lane, two
through lanes, and a shared through/right-turn
lane.
Buildout Paseo del Norte & Palomar Airport Road - Restripe the northbound and southbound Paseo
del Norte approaches to provide the following:
two exclusive left-turn lanes, one shared
through/right-turn lane, and one exclusive right-
turn lane.
Carlsbad Ranch Specific Plan 233
If Cannon Road is not extended to El Camino Real by the Year 2000
the developer shall implement the following improvements:
1997 I-5 Northbound Ramps & Palomar Airport Road
(CMP Location) - Restripe the westbound Palomar Airport Road approach for the following:
two through lanes, one shared through/right-turn
lane, and one exclusive right turn lane.
1997 College Boulevard & Palomar Airport Road
(CMP Location) -Restripe the southbound College Boulevard approach for the following:
one left-turn lane, one shared through/right-turn
lane, and one exclusive right-turn lane.
b. In addition, the Congestion Management Plan (CMP) prepared for the
project requires the development and implementation of a deficiency plan for freeway segments. The deficiency plan shall include the
following:
Assist in Funding Other Improvements - This option would
involve providing funds which would be utilized in the
construction of other improvements. Several funding mechanisms already exist in the City of Carlsbad and are listed
in the Zone 13 Local Facilities Management Plan Finance Plan
for impacted facilities. These include:
- Traffic Impact Fees
- Transnet Funds - Public Facilities Fees
- Community Facility District Moneys
- Private Developer Construction
The Carlsbad Ranch development project is already conditioned on
financial participation in four of the above five funding mechanisms.
Implement Transportation Demand Management (TDM)
Measures -For applicable land uses within the development,
implementation of a TDM program would be a way of reducing
the peak hour trips and thus lessening the impacts on the
affected facilities. These TDM measures could include but are not limited to: incentives for employees to carpool/vanpool;
telecommuting and flextime; and providing a shuttle from the
commuter rail station at Poinsettia Lane.
Carlsbad Ranch Specific Plan 234
6. HAZARDOUS WASTE/PESTICIDE RESIDUE
a. During grading, observations shall be made by a qualified hazardous
materials specialist for areas of possible contamination such as the
presence of underground facilities, buried debris, stained soils, waste drums, and tanks or odorous soils. Should such materials be
encountered, further investigation and analysis shall be required to
identify the significance of the potentially contaminated area. Soil
remediation measures to address any potentially contaminated areas
shall be implemented based on the recommendations of the hazardous materials specialist.
b. Randomly selected surface samples shall be collected after each
phase of grading and chemically tested for pesticides to verify that
toxaphene and DDT plus its derivatives are below the established
TTLC and STLC action levels.
c. During site development, soils contaminated with petroleum
hydrocarbons shall be mitigated. Mitigation techniques shall include:
Place the affected soil beneath a proposed road/parking area
as a base material;
Recycle the affected soil; or
Bio remediate the affected soil on site.
d. The applicant shall prepare a report documenting results of any future
testing shall be prepared. This report shall indicate the measures
taken to mitigate contamination, as appropriate. The report shall be
submitted to the City of Carlsbad Engineering Department. All recommendations contained in the report shall be complied with by
the applicant.
Compliance with these measures shall be approved by the City of
Carlsbad in conjunction with the review and approval by the San
Diego County Department of Health Services and the Regional Water Quality Control Board as applicable.
7. LAND USE COMPATIBILITY
Any future site development permit associated with the specific plan or 21.16
acre SDG&E parcel (golf course) shall be reviewed for consistency with the specific
plan and related discretionary actions including the general plan and local coastal plan amendment, zone change, local facilities management plan amendment, and
hillside development permit. The Planning Department shall make a determination
that the site development plan is consistent with these plans, prior to approval of the
permit.
Carlsbad Ranch Specific Plan 235
8. NOISE
a. The interior noise level of the proposed community hotel building(s)
(planning area 3), and resort hotel buildings (planning area 5) shall not
exceed 45 dBA CNEL. As stated in the McClellan-Palomar Airport's Noise/Land Use Compatibility Implementation Directives, all transient
lodging buildings, within the airport's 60-70 CNEL contours must be
subjected to an acoustical study to determine that interior levels do
not exceed CNEL 45.
b. An avigation easement for noise shall be required to be recorded with the County Recorder as a condition of approval of the project. A copy
of the recorded easement is to be filed with the affected airport
operator. For all property transactions, appropriate legal notice shall
be given to all purchasers, lessees and renters of property in
"conditionally compatible" or "interior only, conditionally compatible" areas which clearly describes the potential for impacts from airplane
noise associated with airport operations. Notice also will be provided
as required on the state Real Estate Disclosure form.
9. PUBLIC SERVICES AND UTILITIES
a. Fire Protection Services
Existing City requirements will adequately reduce impacts. No
additional mitigation measures are necessary.
b. Police Protection Services
In addition to complying with the existing City requirements, individual
projects within the specific plan amendment area shall implement the following mitigation measure:
Prior to Site Development Plan approval, developers shall
submit security plans for review and approval by the Carlsbad
Police Department. The plans shall be submitted prior to Site
Development Plan approval, and shall include information about internal security programs, security systems and devices
and any other information required by the Police Department.
c. Sewer and Wastewater Treatment Facilities
Existing City requirements will adequately reduce impacts. No
additional mitigation measures are required.
d. Schools
No mitigation measures are proposed, as no significant impact has
been identified.
Carlsbad Ranch Specific Plan 236
e. Water Supply/Reclaimed Water
• Reclaimed water shall be utilized for all agriculture, golf course,
and landscaping on the project site to the extent feasible. The
reclaimed water facilities shall be installed in accordance with the conceptual reclaimed water facility plan as proposed in the
specific plan, and City of Carlsbad requirements.
• Dual plumbing shall be required for office, commercial, and
industrial uses, and the LEGOLAND Carlsbad project as
deemed feasible by the Carlsbad Municipal Water District.
10. SOLID WASTE
a. As a condition of any future site development plans for the project, the
applicant shall submit a solid waste management plan for review and
approval by the City of Carlsbad. This plan shall provide the following:
• The approximate location, type and number of containers to be used to collect refuse and recyclables.
• Refuse and recyclable collection methods to be used in each
planning area.
• A description and site plan for any planned on-site processing
facilities or equipment (balers, compactors).
• A description of the types of recycling services to be provided
and contractual relationships with vendors to provide these
services.
• The estimated quantity of waste generated and estimated
quantities of recyclable materials in each planning area.
This plan shall also evaluate the feasibility of the following diversion
programs/measures:
• Source separated green waste collection for specific plan
areas designated for agriculture, golf and developed areas with
substantial landscaping (in particular the LEGOLAND Carlsbad planning area).
• Cardboard recycling in office, retail, and warehousing areas.
• Office and retail programs which provide for the separation of
wet (disposable) and dry (recoverable) materials.
Carlsbad Ranch Specific Plan 237
• Where feasible, providing compactors for non-recyclables to
reduce the number of trips to disposal facilities.
• Glass recycling in restaurants.
• Providing on-site recycling containers accessible to the public to encourage the diversion of glass, and aluminum in
LEGOLAND Carlsbad.
• Where feasible, implement source reduction measures such as
reducing excess packaging, paper and polystyrene cups.
Carlsbad Ranch Specific Plan 238
11. VISUAL AESTHETICS/GRADING
No mitigation measure is proposed for the specific plan portion of the project
as no significant impact has been identified.
For the I-5/Cannon Road Interchange project area the following mitigation measures shall be followed:
a. Trees shall be replaced at a 5:1 ratio. These trees shall be planted at
Cannon Road and Palomar Airport Road, with supplemental water
systems. Shrubs shall be replaced at a 1:1 ratio at Cannon Road
only. Replacement trees shall be 15 gallon and replacement shrubs shall be 5 gallon. Species selection shall be determined by the
CalTrans project landscape architect.
b. I-5/Cannon Road landscaping shall be installed concurrently with the
interchange construction project in order to allow the planting to
become established in time for the opening of LEGOLAND Carlsbad in 1999.
c. A plantable wall system (e.g. crib wall) shall be utilized to reduce the
visibility and aid in graffiti deterrence of the proposed retaining walls.
If cast-in-place type walls are used, a form-liner texture (e.g. "ripped
rope") shall be incorporated into the design. Furthermore, the walls shall be aligned to allow the planting of vines and shrubs at the base
of the walls for graffiti deterrence and to help blend the walls into the
surrounding landscape. An agreement shall be reached with the
property owner immediately adjacent to this area to plant and maintain
on the owner's property.
12. WATER QUALITY
Erosion, sedimentation and urban runoff filtration systems proposed in the
specific plan are adequate to reduce potential water quality impacts. No additional
mitigation measures are required.
C. SUBSEQUENT ENVIRONMENTAL REVIEW
As detailed planning progresses, it is anticipated that Site Development Plans, Non-
Residential Planned Unit Developments and/or Tentative Maps will be submitted for City
review in accordance with the Specific Plan. A Program Environmental Impact Report was
required for the Carlsbad Ranch Specific Plan to determine and evaluate the project's
potential impacts. If subsequent activities are proposed outside of the scope of the Program Environmental Impact Report, then an Initial Study shall be used to determine
whether an additional California Environmental Quality Act (CEQA) document must be
prepared. Potential additional CEQA documents include Negative Declarations, Mitigated
Negative Declarations, Project, Supplemental and Subsequent EIR's. Subsequent CEQA
Carlsbad Ranch Specific Plan 239
documents may be tiered with the original EIR and may incorporate and reference aspects
and elements of the original EIR.
VIII. SPECIFIC PLAN ADMINISTRATION
A. INTRODUCTION
Approval of this Specific Plan signifies acceptance by the City of a general
framework as well as specific development standards for the build out of Carlsbad Ranch. It
is anticipated that certain amendments to the specific plan may be necessary during the
development of the area. Any amendments to the specific plan shall occur in accordance
with the Carlsbad General Plan and the amendment process described in this section.
Amendments may be initiated by the City Council or the property owner.
Amendments to the Carlsbad Ranch Specific Plan shall be subject to the review and
approval by the City Council provided public input has been solicited through public
hearings. The Planning Commission shall first hear and consider all applications for an
amendment to the specific plan. The Planning Commission shall prepare a
recommendation and findings on all applications for an amendment to the City Council. As
required by the Government Code and the California Environmental Quality Act, all
agencies significantly affected by the amendment to the plan shall also be notified of the
proposed action prior to approving the amendment of the specific plan.
Depending on the extent and impact of a proposed Specific Plan Amendment, a
subsequent Environmental Impact Report or mitigated negative declaration which focuses
on the new impacts may be warranted. Two categories of amendments to the Specific
Plan can be processed: Minor and Major Specific Plan Amendments. Minor Specific Plan
Amendments may be eligible for reduced processing fees. However, all other regulations
that apply to processing a Specific Plan amendment shall remain in place and will apply to
both Minor and Major Specific Plan Amendments.
All amendments shall be submitted to the California Coastal Commission for its
review and approval, prior to their enactment, in accordance with the Coastal Act of 1976
and the California Code of Regulations.
B. STATE REQUIREMENTS
As contained in Section 65450, et. seq. of the California Government Code, a
specific plan shall be prepared, adopted, and amended in the same manner as a general
plan, except that a specific plan may be adopted by resolution or by ordinance and may be
amended as often as deemed necessary by the legislative body. No specific plan may be
adopted or amended unless the proposed plan or amendment is consistent with the City's
General Plan.
Carlsbad Ranch Specific Plan 240
C. LOCAL REQUIREMENTS
1. MINOR SPECIFIC PLAN AMENDMENTS
Projects that meet the criteria noted below shall be processed as Minor
Specific Plan Amendments. The Planning Director shall make the determination
as to whether a project meets the following criteria:
a. Expansions or reductions of up to 10% in area,
b. Realignment or modification of internal streets serving the project,
lot lines, site access locations, easement locations and grading adjustments,
c. Minor modifications that do not change the densities or uses of the
subject property and,
d. Modification of design criteria such as minor architectural style or
detail changes, landscape treatments, fencing, lighting, etc., provided
the modifications are in substantial conformance with purpose and
intent of the design criteria in the Specific Plan; and with the baseline
approval of the subject project.
This Specific Plan was prepared pursuant to California Government Code
Section 65450, et. seq. and is partial implementation of the Mello II Segment of the
Local Coastal Program. All Minor Amendments to the Carlsbad Ranch Specific Plan
shall be submitted to the California Coastal Commission for its review and
certification of a corresponding Local Coastal Program Amendment, prior to their
enactment, in accordance with the Coastal Act of 1976 and the California Code of
Regulations (Title 14, Division 5.5; California Coastal Commission Administrative
Regulations).
Minor amendments to the Specific Plan shall be processed in accordance
with the applicable requirements of law, which include Section 65450, et. seq. of the
California Government Code, the California Coastal Act of 1976, and the California
Code of Regulations (Title 14, Division 5.5; California Coastal Commission
Administrative Regulations).
2. MAJOR SPECIFIC PLAN AMENDMENTS
All modifications to the Carlsbad Ranch Specific Plan that do not meet the
criteria of a Minor Amendment as determined by the Planning Director through the
Carlsbad Ranch Specific Plan 241
criteria listed above shall require a Major Specific Plan Amendment. Major
Amendments to the Carlsbad Ranch Specific Plan shall be reviewed and acted upon
by the City Council, after a recommendation of the Planning Commission.
This Specific Plan was prepared pursuant to California Government Code
Section 65450, et. seq. and is partial implementation of the Mello II Segment of the
Local Coastal Program. All Major Amendments to the Carlsbad Ranch Specific Plan
shall be submitted to the California Coastal Commission for their review and
approval of a corresponding Local Coastal Program Amendment, prior to their
enactment, in accordance with the Coastal Act of 1976 and the California Code of
Regulations(Title 14, Division 5.5; California Coastal Commission Administrative
Regulations).
Major Amendments to the Specific Plan shall be processed in accordance
with the applicable requirements of law, which include Section 65450, et. seq. of the
California Government Code, the California Coastal Act of 1976, and the California
Code of Regulations (Title 14, Division 5.5; California Coastal Commission
Administrative Regulations).
IX. SPECIFIC PLAN ENFORCEMENT
The Carlsbad Ranch Specific Plan shall constitute the orderly development and the
zoning for the property. Consistent with the City of Carlsbad Municipal Code, any violation
to the standards and regulations identified in the Carlsbad Ranch Specific Plan adopted by the City of Carlsbad's City Council shall be considered a violation to the Zoning Ordinance.
Where the specific plan is silent on an issue, the requirements of the Carlsbad Municipal
Code shall apply.
Carlsbad Ranch Specific Plan
APPENDIX A
CARLSBAD RANCH SPECIFIC PLAN
SUMMARY SHEET
Project Name: Carlsbad Ranch Specific Plan
Application Types: Specific Plan Amendment
General Plan Amendment
Local Coastal Plan Amendment
Zone Change
Local Facilities Management Plan Amendment Non-Residential Tentative Tract Map
Non-Residential Planned Unit Development
Hillside Development Permit
Environmental Impact Report
Cancellation of a portion of the Land Conservation Contract
Sewer District: Carlsbad Sewer Service District
Water district: Carlsbad Municipal Water District
School District: Carlsbad Unified School District
Street Address: Not Applicable
Assessor Parcel Numbers: 211-022-01, 02, 03, 04, 05, 06
211-023-01, 02, 03, 04, 05, 06
212-041-05
Site Acreage: 447.40
Existing General Plan: Community Commercial (C) Travel Recreation Commercial/Community Commercial (TR/C)
Unplanned Area (UA)
Open Space (OS)
Professional & Related Commercial/Planned Industrial (O/PI)
Community Commercial/Professional & Related Commercial/Planned Industrial (C/O/PI)
Travel Recreation Commercial (TR)
Proposed General Plan: Regional Retail (R)
Open Space (OS)
Office/Planned Industrial (O/PI) Tourist Recreational Commercial (TR)
Carlsbad Ranch Specific Plan
Existing Zoning: Open Space (O-S)
Office - Qualified Overlay / Planned Industrial - Qualified
Overlay (O-Q/PM-Q)
Commercial Tourist - Qualified Overlay / General Commercial - Qualified Overlay (C-T-Q/C-2-Q)
General Commercial - Qualified Overlay / Office - Qualified
Overlay / Planned Industrial - Qualified Overlay
(C-2-Q/O-Q/PM-Q)
Exclusive Agriculture (E-A)
Proposed Zoning: Open Space (O-S)
Office - Qualified Development Overlay/Planned Industrial
Qualified Development Overlay (O-Q/PM-Q)
Commercial Tourist - Qualified Development
Overlay/General Commercial - Qualified Overlay (C-T-Q/C-2-Q)
Commercial Tourist Qualified Development Overlay (C-T-Q)
General Commercial Qualified Development Overlay (C-2-Q)
Estimated ADT: G.I.A. 4,700 ADT
(At Build Out) Specialty Retail 15,000 ADT
(Source: KAKU, April 1994) Office 6,000 ADT
R & D 4,000 ADT
Hotel 3,600 ADT
Resort 8,100 ADT
LEGO 8,182 ADT TOTAL 48,582 ADT
Earthwork Quantities: Cut - 2,083,900 CY
Fill - 2,083,900 CY
---------------------
Import/Export Balanced Graded Area 340.6 Acres
Grading/Graded Area 6,118 CY / Acre
Constraints Information: All the constraints information can be found in Chapter II,
Section B, OVERVIEW OF PLANNING AREA OPPORTUNITIES AND CONSTRAINTS,
beginning on page 15 of the Carlsbad Ranch Specific Plan and on the Constraints Map that accompanies the Hillside Development Permit and the Local Facilities Management Plan
Amendment for Zone 13