Inspection Report
Date PlO. No. Weather Surveyors Name Pipe Segment Reference Section No.
61712017 E GARCIA 28
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
Jetting
5tree1123 HIBISCUS CR Use of Sewer Upstream MH 16C-48
City CARLSBAD Drainage Area Dowstream MH 16C-47
Loc. details Flow Control Dir. of Survey Upstream
Location Code Length surveyed 134.35 ft Section Length 134.35 ft
Purpose of Survey Pre-Acceptance Joint Length -
Year Laid Dia./Height 8 inch
Year Rehabilitated Material Vitrified Clay Pipe
lape/ Media No. Lining Method
Add. Information:
1:330 Position Observation
16C-47 0.00 Downstream Manhole, Survey Begins! PRE VIDEO
84.00 Tap Factory Made Active, at 10 o'clock,-, within 8 inches of joint: YES,
4"
55 Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES,
4,,
129.65 Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint:YES,
(1'46 '-48 134.35 Upstream Manhole, Survey Ends / PRE VIDEO
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 0 0 0 0 0
JOB# 873 CARLSBAD /1 Page: 1
(Pi OIAfl
Tek
E,I:
Inspection Report
Date PlO. No. Weather Surveyors Name Pipe Segment Reference Section No.
617/2017 EGARCIA 29
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
Jetting
Slreet123 HIBISCUS CR EASEMENT Use of Sewer Upstream MI-I 16C-47
City CARLSBAD Drainage Area Dowstream MH 16C-50
Loc. details Flow Control Dir. of Survey Downstream
Location Code Length surveyed 205.05 ft Section Length 205.05 ft
Purpose of Survey Pm-Acceptance Joint Length -
Year Laid DiaiHeight 8 inch
Year Rehabilitated Material Vitrified Clay Pipe
Tape / Media No. Lining Method
Add. Information
1:495 Position Observation .
('6 C 7 000 Upstream Manhole Survey Begins! PRE VIDEO
17175 FT
'7 69.10 Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"
Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"
171.75 Roots Ball Joint, at 02 o'clock, 55%, within 8 inches of joint: YES /
KNUCKLE ROOT
- 205.05 Downstream Manhole, Survey Ends /PRE VIDEO
OSR OMR 5PR MPR OPR SPRI MPRI OPRi
0000 4100 0 4 4 0 - 4 4
JJD O,3 .MrcLODMU ii rage: i
-
('.itv CARt SRAD
Tet
Inspection Report
Date P/O. No. Weather Surveyors Name Pipe Segment Reference Section No.
61612017 E GARCIA 21
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
1 Jetting -
Street123 BALDWIN AVE Use of Sewer UpstreamMH 16C-12
City CARLSBAD Drainage Area Dowstream MI-I 16C-11
Loc. details Flow Control Dir. of Survey Downstream
Location Code Length surveyed 293.05 ft Section Length 293.05 ft
Purpose of Survey Pre-Acceptance Joint Length
Year Laid DiaiHeight 8 inch
Year Rehabilitated Material Vitrified Clay Pipe
Tape / Media No. - Lining Method
Add. Information
1:705 Position Observation
,16C-12
0 00
Upstream Manhole, Survey Begins / PRE VIDEO
'7 30.60 Tap Factory Made Active, at 10 o'clock, -' within 8 inches of joint: YES,
Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES,
'7 97.70 Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES,
280 Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES,
7 162.50 Tap Break-In Active, at 10 o'clock, -' within 8 inches of joint: YES, 4"
a".
190.25 Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES,
7 232.80 Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES,
4"
293.05 Downstream Manhole, Survey Ends / PRE VIDEO
05R QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 0 0 0 ' 0 - 0
JUtW U73 (ARLSbAU II Page: 1
City CARLSBAD
Tet
Inspection Report
Date PlO. No. Weather Surveyors Name Pipe Segment Reference Section No.
61612017 E GARCtA 11
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
_________________________________________ Jetting
Street123 CARLSBAD BL Use of Sewer Upstream MH 150-1
City CARLSBAD Drainage Area Dowslream MH 15D-2
Loc. details Flow Control Dir. of Survey Upstream
Location Code Length surveyed 290.75 ft Section Length 290.75 ft
Purpose of Survey Pre-Acceptance Joint Length
Year Laid DiaiHeight 8 inch
Year Rehabilitated Material Vitrified Clay Pipe
Tape I Media No. Lining Method
Add. Information:
1:705 Position Observation
000 Downstream Manhole Survey Begins I PRE VIDEO
51.85 FT
5 1:85 Tap Break-In Intruding, at 02 o'clock, -, -, within 8 inches of joint: YES. z
167.10 Tap Break-In Active, at 02 o'clock, -within 8 inches of joint: YES, 4"
Tap Break-In Active, at 02 o'clock, -within 8 inches of joint: YES, 6"
232.95 Tap Break-In Active, at 02 o'clock, -' within 8 inches of joint: YES, 4"
290.75 Upstream Manhole, Survey Ends I PRE VIDEO
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 2100 0 2 2 0 2 2
JOB# 873 CARLSBAD II Page: 1
Upstream MH 15D-9
Dowstream MH 15D-7
Dir. of Survey Upstream
Section Length 307.05 ft
6 inch
Vitrified Clay Pipe
1:750 Position
City CARLSBAD
Tel
Inspection Report
Date P/C. No. Weather Surveyor's Name Pipe Segment Reference Section No.
616/2017 E GARCIA 12
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
1 Jetting
Street123 CHERRY AVE
City CARLSBAD
Loc. details
Location Code
Purpose of Survey Pre-Acceptance
Year Laid
Year Rehabilitated
Tape / Media No.
Add. Information
Use of Sewer
Drainage Area
Flow Control
Length surveyed 307.05 ft
Joint Length
Dia./Height
Material
Lining Method
Observation
Downstream Manhole, Survey Begins! PRE VIDEO
Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"
Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"
Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"
Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"
Tap Factory Made Defective, at 10 o'clock, -' within 8 inches of joint:
YES, 4,4"! ROOTS
Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
Tap. Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"
tClèanäutMainline, Survey Ends! PRE VIDEO
QSR OMR SPR MPR OPR 5PRl MPRt OPRI
0000 2100 0 2 2 0 2 2
JOB# 873 CARLSBAD II Page: 1
('Jtv C.ARI SRAr)
Tet
Ea'l
Inspection Report
Date PlO. No. Weather Surveyors Name Pipe Segment Reference Section No.
6/6/2017 E GARCIA 18
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
Jetting
Street123 CHINQUAPIN AVE Use of Sewer Upstream MN 16C-60
City CARLSBAD Drainage Area Dowstream MH 126C-58
Loc. details Flow Control Dir. of Survey Downstream
Location Code Length surveyed 197.85 ft Section Length 197.85 ft
Purpose of Survey Pre-Acceptance Joint Length
Year Laid Dia.lHeight 6 inch
Year Rehabilitated Material Vitrified Clay Pipe
Tape / Media No. Lining Method
Add. Information:
1:480 Position Observation
0.00 Upstream Manhole, Survey Begins I PRE VIDEO
15.20 Tap Factory Made Defective, at 10 o'clock, -' within 8 inches of joint:
YES; 4,4"I ROOTS
39.70 Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES,
17 93.75 Tap Break-In Active, at 10 o'clock, -,within 8 inches of joint: YES, 4"
116.90 Tap Factory Made Active, at 02 o'clock, -: within 8 inches of joint: YES,
'7 168.05 Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES,
70 Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES,
6C-5 11 97.85 Downstream Manhole, Survey Ends / PRE VIDEO
QSR QMR SPR MPR - OPR SPRI MPRI OPRI
0000 2100 0 2 2 0 2 2
JUbif 0(i (ANLSb1L) II 'age: 1
CARLSBAD
Tel.,
Inspection Report
Date PlO. No. Weather Surveyor's Name Pipe Segment Reference Section No.
6/7/2017 E GARCIA 26
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
I Jetting
Street123 CHINQUAPIN EASEMENT Use of Sewer Upstream MH 16C-17
City CARLSBAD Drainage Area Dowstream MH 16C-50
Loc. details Flow Control Dir. of Survey Downstream
Location Code Length surveyed 233.05 ft Section Length 233.05 ft
Purpose of Survey Pre-Acceptance Joint Length
Year Laid Dia./Height 10 inch
Year Rehabilitated Material Vitrified Clay Pipe
Tape/ Media No. Lining Method
Add. Information:
1:570 Position Observation =
Upstream Manhole, Survey Begins I PRE VIDEO
Tap Break-In Intruding, at 02 o'clock, -, -, within 8 inches of joint: YES,
Tap Break-In Active, at 10 o'clock, -,within 8 inches of joint: YES, 4"
Tap Break-In Active, at 10 o'clock, -within 8 inches of joint: YES, 4"
Tap Break-in Defective, at 10 o'clock,-, ,within 8 inches of joint: YES,
4', 4' I ROOTS
Tap Break-In Active, at 02 o'clock, -' within 8 inches of joint: YES, 4"
Tap Break-In Active, at 02 o'clock, -' within 8 inches of joint: YES, 4"
Downstream Manhole, Survey Ends I PRE VIDEO
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 3121 0 5 5 0 2.5 2.5
JOB# 873 CARLSBAD II Page: 1
(ih, . ('API SRAfl
Inspection Report
Date PlO. No. Weather Surveyois Name Pipe Segment Reference Section No.
61712017 E GARCIA 27
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
1 Jetting
Street123 CHINQUAPIN EASEMENT Use of Sewer Upstream MH 16C-50
City CARLSBAD Drainage Area Dowstream MI-I 16C-213
Loc. details Flow Control Dir. of Survey Downstream
Location Code Length surveyed 96.30 ft Section Length 96.30 ft
Purpose of Survey Pre-Acceptance Joint Length
Year Laid oiaiHeight 10 inch
Year Rehabilitated Material Vitrified Clay Pipe
Tape! Media No. Lining Method
Add. Information
1:240 Position Observation
T
0.00 Upstream Manhole, Survey Begins! PRE VIDEO
::102.0100 Tap Break-In Active, at 10 o'clock, -,within 8 inches of joint: YES, 4"
I
Downstream Manhole, Survey Ends! PRE VIDEO
OSR QMR 5PR MPR OPR SPRI MPRI OPRI
0006 0000 0 0 0 0 0 0
JOU# 573 UAKL5IJAU II Page: 1
(ih, CARl SRAD
Tet
Inspection Report
Date PlO. No. Weather Surveyor's Name Pipe Segment Reference Section No.
61612017 E GARCIA 23
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
Jetting
Street123 CHINQUAPIN EASEMENT Use of Sewer Upstream MH 16C-54
City CARLSBAD Drainage Area . DowstreamMH 16C-55
Loc. details Flow Control Dir. of Survey Upstream
Location Code Length surveyed 199.00 ft Section Length 199.00 It
Purpose of Survey Pm-Acceptance Joint Length
Year Laid DiaiHeight 10 inch
Year Rehabilitated Material Vitrified Clay Pipe
Tape / Media No. Lining Method
Add. Information:
1:480 , .• Position Observation
16C-55 0.00 Downstream Manhole Survey Begins! PRE VIDEO
81.6 FT
81.60 Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"!
ROOTS
100.50 Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 4"
199.00 Upstream Manhole, Survey Ends / PRE VIDEO
QSR QMR SPR MPR OPR 5PR1 MPRI OPRI
0000 0000 0 0 0 0 0 0
JUMP 01`4 (jlLWL) it rage: i
City: CARLSBAD
I7 Tell
Inspection Report -
Date PlO. No. Weather Surveyors Name Pipe Segment Reference Section No.
6/6/2017 E GARCIA 24
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
I Jetting
Street123 CHINUAPIN EASEMANT Use of Sewer Upstream MH 16C9
City CARLSBAD Drainage Area Dowstream Mt-I 16C-54
Loc. details Flow Control Dir. of Survey Upstream
Location Code Length surveyed 305.10 ft Section Length 305.10 ft
Purpose of Survey Pm-Acceptance Joint Length
Year Laid . oiaiHeight 10 inch
Year Rehabilitated Material Vitrified Clay Pipe
Tape/ Media No. Lining Method
Add. Information:
1:735 Position Observation
0.00 Downstream Manhole, Survey Begins CANNOT LOCATE MANHOLE / ,16C-54 PRE VIDEO 0 FT
Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
72.90 Tap Break-In Active, at 12 o'clock, -' within 8 inches of joint: YES, 4"
16C9 305.10 Upstream Manhole, Survey Ends! PRE VIDEO CANNOT LOCATE
MANHOLE
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 0 . 0 0 0 0
JOB# 873 CARLSBAD 11 Page: 1
i :o6pi ii nwa,Jw cio arr
0 z z 0 OO&Z 0000
IdO 18d IdS ddO 8dV4 Nds 8ND list)
]d33MS 3HI 01 3S010 AA SI 1V1V1 ISV1 3H1
ONY 0IVH SI ON38 OJOII\ Jdd I SPUR AeAJns aU!IUieAJ jnoueI3 sss
S2A :uioro S9q0U! 9 ULflM )pOp,O Zo Je 9A!l3V apeVq AjbjoeA de i 09
S2A :juioFo S3U! 9 U!Lfl!M 0op,o o e 9AIPV pe &JO0E del
CZ
S100 /..V 7
:u!0110 sal40u1 g uiqtM poo,o le eA!peoa opeVy /ioej del
S3A :juioFo SO0U! 9 U!Lfl!M pOp,O ZO le '!10V epej Aiope del os
S2A°.4U!OfjO S33U! 9 UIjIM pop,o Ot Je'9AII3V PP81N Aiooej de
SA uI0Fo Seqou! 8 U!q!M )jQOp,O Zo 18 9A!13V epeoj Ajoioej de i OL Ti— 7
SA WIOIJO Saq3U! 8 U!q!M 3013,0 0 je aA!43v ape ooe del 9996
SA :ui0r4o S33U! 9 uiqiM )0,0 Zo 18 OAI0V apej Ajope.j dej.
SBA :juioro S40U! 9 U!qj!M j3OI3,0 Zo le OAI43V epeN klojoed del oo
030IA 3Hd I 3dld H3NI 9 SI ai SU!6e9 IOA.Jfl9 ejoqueAJ Wea.qsuMoa 000
- uoI;eAJesq uo!;!sod ssc:i
uoqewJouI ppv
poqjej 6uufl '°N e!P0 / adei
odid Aelo pejLflI/ iepateN palepipeLlad Jea).
qoul 9 15!aHre!a P!81 jeeA
416u9 u!or o0ue2d933V-e.id AaMn9 jo asodind
j qq*qZZ q6ua- uoqoe peAesjns t4l6ual apoo UOfl0OO
weaisdfl AoAjn9 /0 J!0 IOJ1UO3 M0I sieep 001
-B6 HL/ WBOJISMOO eev 06eu1eia av9s1Ivo
-96 HI/ weaijsdfl J8M09 jo esfl aiv sinva M18ails
6uiuer
AJo6oe3 JOMOS 6u1u0013-oJd POUBOIO alea JOUMO WO1S/5 J0WO1SflO A05Jfl5 ON aieolj!1J83
6 VIOdV] LIO!9/9
ON UO!p05 aouejejaN juaw6aS ed!d OweN s.joAo,un5 JoqleoM ON Old eea
podaj uou;3edsul
Sl3
-
UVdS IdVJ
-:
Date P/O. No.
6/5/2017
Certificate No. Survey Customer
it
- . Tel:
- -. Fax.
E-mail:
Inspection Report
Weather Surveyor's Name Pipe Segment Reference Section No.
- EGARCIA .. . - 4
System Owner Date Cleaned . Pre-Cleaning Sewer Category
Jetting
Street123 EASEMENT N-O STATEST Use of Sewer - - , . 'Up stream MH 9B-81
City CARLSBAD Drainage Area Dowstream MH 9D-73
Loc. details Flow Control - Dir. of Survey Upstream
Location Code - Length surveyed 410.55 ft Section Length -410.55 ft
Purpose of Survey Pre-Acceptance Joint Length .
Year Laid Thia./Height -6 inch
Year Rehabilitated Material . Vitrified Clay Pipe
Tape / Media No. - . . . Lining Method -
Add. Information.
1:792 Position Observation
Downstream Manhole, Survey Begins 8 INCH STUB AT,THE MOUTH'
OF PIPE I PRE VIDEO
Tap Factory Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, -.
- . Broken; from 04 to 06 o'clock, within 8 inches of joint: YES, ift, ift •.
OFT
-Tap Break-In Intruding at 12 o'clock, -,-, within 8 inches of joint: YES,
Tap Factory Made Active, at 12 o'clock, -' within 8 inches of joint YES,
6" . . .
Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint YES,
6"
Tap Factory Made Active, at 12 o'clock, -' within 8 inches of joint: YES,
6"
. .
- - 'Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES,
-
Tap Factory Made Active, at 12 o'clock, -' within inches'of joint: YES,
6" . ., i'- -.
39.8 FT Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint:-YES, 4"t-
Mp
-
Tap Factory Made Active at 12 o'clock, within 8 inches of joint YES
Tap Factory Made Active, at 12 o'clock, -' within 8 inches of joint YES:
6'
-
.
,. .
- Tap lactory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES
4 . . -. - - .
314.9 FT
- Tap Break-In Intruding, at 12 o'clock, , -, within 8 inches of joint: YES, 1", I
Tap Break-In Intruding, at 12 o'clock,-, -' within 8 inches of joint: YES
3.
,
I I
, ,. -• 325.4 FT
JOB#873CARLSBAO I/Page:1 - :-"
n.
Inspection Report
Date: - Job number: Weather: Operator: Counter: Section name :
EGARCIA 4
Present: Vehicle: Camera: Preset: Cleaned: Rate:
Jetting
1:792 Position Observation .
354.45 Tap Factory Made Capped,-at 02 o'clock, -' within 8 inches of joint: YES,
380.70 Tap Break-In Active, at 12 o'clock, -,within 8 inches of joint: YES, 4'
401.95 Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4/ 't 9113-81 APARTMENTS -
404.75 Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES,
10.55 Upstream Manhole, Survey Ends / PRE VIDEO
QSR QMR SPR MPR OPR SPRI - MPRI OPRI
5100 2300 6 . 6 11 5 2 2.75
JOB# 873 CARLSBAD II Page: 2
s *ian Tet
Inspection Report
Date PlO. No. Weather Surveyofs Name Pipe Segment Reference Section No.
61612017 E GARCIA 16
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
1 Jetting
Street123 GARFIELD ST Use of Sewer UpstreamMH 1513-37
City CARLSBAD Drainage Area Dowstream MH 1513-38
Loc. details Flow Control Dir. of Survey Downstream
Location Code Length surveyed 354.00 ft Section Length 354.00 ft
Purpose of Survey Pm-Acceptance Joint Length
Year Laid Dia.lHeight 8 inch
Year Rehabilitated Material Vitrified Clay Pipe
Tape I Media No. Lining Method
Add. Information:
1:855 Position Observation
Upstream Manhole, Survey Begins I PRE VIDEO
Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
Tap Break-in Intruding, at 12 o'clock, -,-, within 8 inches of joint: YES,
Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"
Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 4"
Tap Break-In Intruding, at 10 o'clock, -, -' within 8 inches of joint: YES,
1" 1"
Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"
Material Change, Polyvinyl Chloride (PVC)
Downstream Manhole, Survey Ends! PRE VIDEO
OSR OMR SPR MPR OPR SPRI MPRI OPRI
0000 2200 0 4 4 0 2 . 2
JOB# 873 CARLSBAD II Page: 1
City: CARLSBAD
Inspection Report
Date PlO. No. Weather Surveyors Name Pipe Segment Reference Section No.
61612017 E GARCIA 17
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
Jetting
Street123 GARFIELD ST Use of Sewer Upstream MH 15B-39
City CARLSBAD Drainage Area Dowstream MH 15B-37
Loc. details Flow Control Dir. of Survey Upstream
Location Code Length surveyed 306.00 ft Section Length 306.00 ft
Purpose of Survey Pre-Acceptance Joint Length
Year Laid Dia.lHeight 6 inch
Year Rehabilitated Material Vitrified Clay Pipe
Tape / Media No. Lining Method
Add. Information
1:735 Position Observation
Downstream Manhole, Survey Begins! PRE VIDEO
Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
Tap Break-In Defective, at 10 o'clock,-, ,within 8 inches of joint: YES,
4",4" / ROOTS
Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
Hole, at 01 o'clock, within 8 inches of joint: YES, 41t, 4ft / CAPPED
Tap Break-In Active, at 02 o'clock, -within 8 inches of joint: YES, 4"
Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"
Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"
Cleanout Mainline, Survey Ends! PRE VIDEO
OSR OMR SPR MPR OPR SPRI MPRI OPRI
3100 3100 3 3 6 3 3 3
JOB# 873 CARLSBAD 11 Paae: I
('if,, ('API SRAl
Tet
Eas!
Inspection Report
Date P/O. No. Weather Surveyors Name Pipe Segment Reference Section No.
616/2017 1 E GARCIA 13
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
Jetting
Street123 GARFIELD ST Use of Sewer Upstream MH 16C-94
City CARLSBAD Drainage Area Dowstream MH 16C-95
Loc. details Flow Control Dir. of Survey Downstream
Location Code Length surveyed 347.25 ft Section Length 347.25 ft
Purpose of Survey Pre-Acceptance fJoint Length
Year Laid Dia./Heighl 8 inch
Year Rehabilitated Material Vitrified Clay Pipe
Tape / Media No. Lining Method
Add. Information
1:840 Position Observation
0 00
Upstream Manhole, Survey Begins! PRE VIDEO
18 3A 0 Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
20.55 Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
33.80 Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"
Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"
123.30 Tap Break-in Active, at
19 ::::::: ::: Tap Break-I n Active, at r:::: :::::::
129.45 Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"
240.15 Tap Break-In Active, at 02 o'clock, -,within 8 inches of joint: YES, 4"
271.15 Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"
311.30 Tap Break-In Active, at 10 o'clock, -' within 8 inches of joint: YES 4"
F322.45 Tap Break-In Active, at 02 o'clock, -' within 8 inches of joint: YES, 4"
116C-95 347.25 Downstream Manhole, Survey Ends/ PRE VIDEO
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 0 0 0 0 0
ue e,s (.RILAU I, I'age: 1
S - -
City CARLSBAD
E-mail'
Inspection Report
Date P/O. No. Weather Surveyors Name Pipe Segment Reference Section No.
6/6/2017 E GARCIA 14
Certificate No. Survey Customer System Owner Date Cleaned . Pie-Cleaning Sewer Category
Jetting
Street123 GARFIELD ST Use of Sewer Upstream MH 16C-95
City CARLSBAD Drainage Area DowstreamMl-1 16C-96
Loc. details Fldw Control Dir. of Survey Downstream
Location Code Length surveyed 349.00 ft Section Length 349.00 ft
Purpose of Survey Pre-Acceptance Joint Length
Year Laid - Dia./Height flinch
Year Rehabilitated Material Vitrified Clay Pipe
Tape / Media No. Lining Method
Add. Information
1:840 Position Observation
16C-95 0.00 Upstream Manhole, Survey Begins I PRE VIDEO
8.00 Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES,
9.70 Tap Break-In Active, at 10 o'clock,-, within 8 inches of joint: YES, 4"
26.20 Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"
64.60 Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"
81.75 Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
186.25 Tap Break-In Active, at 12 o'clock, -' within 8 inches of joint: YES, 4"
Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
25_7 80 Tap Break-In Active, at 02 o'clock, -' within 8 inches of joint: YES, 4"
-
66.05 Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
4--- _306.75 Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"
349.00 i6C-96 349.00 Downstream Manhole, Survey Ends I PRE VIDEO
QSR QMR - SPR MPR OPR . SPRI MPRI OPRI
0000 0000 0 0 0 . 0 10 0
Jub# d!$ (.JKLSAU 11 Page: 1 - -
(it, rAm SRAr
Tell
Inspection Report
Date P/O. No. Weather Surveyor's Name Pipe Segment Reference Section No.
616/2017 E GARCIA 15
Certificate No. Survey Customer SystemOwner Date Cleaned Pie-Cleaning Sewer Category
1 Jetting
51reet123 GARFIELD ST Use of Sewer Upstream MN 16C-96
City CARLSBAD Drainage Area DowstreamMH 15D-11
Loc. details Flow Control Dir. of Survey Downstream
Location Code Length surveyed 346.35 ft Section Length 346.35 ft
Purpose of Survey Pm-Acceptance Joint Length
Year Laid . . DiaiHeight 8 inch
Year Rehabilitated Material Vitrified Clay Pipe
Tape / Media No. Lining Method
Add. Information
1:702 Position Observation -
0.00 Upstream Manhole, Survey Begins / PRE VIDEO
6.05 Tap Break-In Intruding, at 12 o'clock, -; -. within 8 inches of joint: YES,
- 9.30 Tap Break-In Active, at 12 o'clock, -within 8 inches of joint: YES, 4 6.05 FT
25 Tap Break-In Intruding, at 12 o'clock, -, -, thin 8 inches of joint: YES,
24.60 Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4" \
35.40 Tap Break-In Active, at 02 o'clock, -' within 8 inches of joint: YES, 4"
148 FT
130.15 Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
el'-<13.00 Tap Break-In Intruding, at 12 o'clock, -, -' within 8 inches of joint: YES,
7 154.45 Tap Break-In Active, at 11 o'clock, -,within 8 inches of joint: YES, 4"
17_2 60 Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: YES, 4"
231.50 Tap Break-In Active, at 02 o'clock, -,within 8 inches of joint: YES, 4"
:2:32:70 Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
253.20 Tap Break-In Active, at 02 o'clock, -within 8 inches of joint: YES, 4"
287.10 Tap Break-In Active, at 10 o'clock, -within 8 inches of joint: YES, 4"
\ 988 85 Tap Break-In Active, at 02 o'clock, -,within 8 inches of joint: YES, 4"
JUMU/JUAKLbt5AU II Page: 1
('API SRAfl
Tet
Inspection Report
Date: Job number: Weather: Operator: Counter: Section name:
EGARCIA 15
Present: Vehicle: Camera: Preset: Cleaned: Rate:
Jetting
1:702 Position Observation
,7 293.25 Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"
300.45 Tap Break-In Active, at 02 o'clock, -,within 8 inches of joint: YES, 4"
315.75 Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"
346.35 Downstream Manhole, Survey Ends! PRE VIDEO •
te
QSR QMR SPR MPR OPR • SPRI MPRI OPRI
0000 2300 0 6 - 6 0 2 2
JOU# 573 CARLSUAO II Page: Z
City CARl SPAn A
17
. E-mail
Inspection Report'
Date PlO. No. Weather Surveyor's Name Pipe Segment Reference Section No.
6/5/2017 E GARCIA 2
Certificate No. Survey Customer System Owner Date Cleaned
L
Pre-Cleaning Sewer Category
Jetting
Street123 GRAND AVE Use of Sewer Upstream MH 9D-26
City CARLSBAD A Drainage Area Dowstream MH 90-72
Loc. details Flow Control . Dir. of Survey , Upstream
Location Code Length surveyed 189.60 ft Section Length 169.60 ft
Purpose of Survey Pre-Acceptance Joint Length
Year Laid Dia./Heighl 10 inch
Year Rehabilitated Material Vitrified Clay Pipe
Tape / Media No. Lining Method
Add. Information:
1:465 Position Observation
90-72 0.00 Downstream Manhole, Survey Begins 13 FOOT MANHLOE DEPTH I
PRE VIDEO IDON TAPE IS1O INCH NOT 8INCH
98.10 Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES,
6"
189.60 Upstream Manhole, Survey Ends / PRE VIDEO
QSR QMR SPR MPR OPR ' SPRI MPRI OPRI
0000 0000 0 0 0 0 ' 0 0
JOB# 873 CARLSBAD II Page: 1
('API RAfl
Tek
Inspection Report
Date P/O. No. Weather Surveyors Name Pipe Segment Reference Section No.
61512017 E GARCIA . 3
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
Jetting
Street123 GRAND AVE Use ofSewer lipstreamMH 90-72
City CARLSBAD Drainage Area . Dowstream MN 90-57 -
Loc. details Flow Control Dir. of Survey Downstream
Location Code Length surveyed 340.60 ft Section Length 340.60 ft
Purpose of Survey Pre-Acceptance Joint Length
Year Laid Dia./Heighl 10 inch
Year Rehabilitated Material Vitrified Clay Pipe
Tape / Media No. Lining Method
Add. Information:
1:825 Position Observation
9D-72 0.00 Upstream Manhole Survey Begins MH DEPTH 16 FEET! PRE VIDEO
I
332.2 FT
332.20 Shape or Size Change, -, 8", 8" INTERNAL REPAIR! INTERNAL
REPAIR PVC PIPE
'9D-57 340.60 Downstream Manhole, Survey Ends! PRE VIDEO -
OSR QMR SPR MPR OPR SPRI MPRi OPRI
e000 ease o e o a - a a
JOB# 873 CARLSBAD 11 Page: 1
City: CARLSBAD
E-mail.,
Tet
Inspection Report
Date PlO. No. Weather Surveyor's Name Pipe Segment Reference Section No.
61712017 EGARCIA 25
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
1 Jetting
5treet123 HARBOR DR Use of Sewer - Upstream MH I6C-15
City CARLSBAD Drainage Area Dowstream MI-f 16C-16
Loc. details Flow Control Dir. of Survey Upstream
Location Code Length surveyed 311.25 ft Section Length 311.25 ft
Purpose of Survey Pre-Acceptance Joint Length
Year Laid Dia.lHeight 6 inch
Year Rehabilitated . Material , Vitrified Clay Pipe
Tape / Media No. Lining Method
Add. Information
1:750 Position Observation
0.00 Downstream Manhole, Survey Begins I PRE VIDEO
16C-16
37.45 Tap Factory Made Active, at 09 o'clock, -' within 8 inches of joint: YES,
4,,
z Tap Factory Made Active, at 03 o'clock, -' within 8 inches of joint: YES,
93.40 Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES,
4,,
96.90 Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES,
4',
104.30 Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES,
4"
106.70 Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES,
4" .
163.80 Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES,
4"
167.45 Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES,
4,,
222.95 Tap Factory Made Active, at 02 o'clock, -' within 8 inches of joint: YES,
4
273.55 Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES
4.,
/' 286.70 Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, *
/ 4,,
302.30 Tap Factory Made Active, at 03 o'clock,-, within 8 inches of joint: YES,
311.25 Cleanout Mainline, Survey Ends / PRE VIDEO
QSR OMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 0 0 0 0 0
JUU# 0(3 CAKLSbAU II Page: 1
Cih, - (APl cin g7
Inspection _Report / Inspection I
Date
9/5/2017
P/O. No. Weather
Dry
Surveyor's Name
Victor
Pipe Segment Reference
. .
Section No.
26
Certificate No. . Survey Customer System Owner Date Cleaned
915/2017
Pie-Cleaning
No Pre-Cleaning
Sewer Category
Steet123 . BALDWIN N Use of Sewer Upstream MH 16C.12
City . CARLSBAD 873 Drainage Area Dowstream MH 16C-11
Loc. details SHEET 36 Flow Control Not Controlled Dir. of Survey Upstream
Location Code Length surveyed 294.10 ft Section Length 294.10 It
Purpose of Survey Post-Rehabilitation Survey
Year Laid 8inch EDiaHe
Year Iehabilitated. 2017 . CIPP
Tape / Media No. . DVD d Cured in Place
Add. Information:
1:735
I
Position Code Observation
0.00 AMH Downstream Manhole Survey Begins I POST VIDEO
60.50 TF Tap Factory Made at 02 o'clock, 4", within 8 inches of
joint YES
10390 TF . Tap Factory Made, at 10 o'clock, 4", within 8 inches of
joint: YES
.131.40 TB Tap Break-In, at 02 o'clock, 4", within 8 inches of joint: NO
181.90 TF Tap Factory Made, at 10 o'clock, 4", within 8 inches of
joint: YES .
' —_j9838Q TF Tap Factory Made at 02 o'clock, 4 within 8 inches of
joint: YES :
259.10 . TF Tap Factory Made, at 10 o'clock, 4", within .8 inches of . .......
joint YES
265.20 TF Tap Factory Made at 02 o'clock, 4", within 8 inches of
joint: YES
294.10 AMH Upstream Manhole Survey Ends I POST VIDEO
QSR QMR SPR I MPR OPR - SPRi MPRi I . OPRi - -
0000
-
0000 - 0 0 0 0 . 0
CARLSBAD 873
(it, ('API PAr R7
Inspection Report / Inspection: I
Date
9/14/2017
PlO. No. Weather
Dry
Surveyors Name
Victor
Pipe Segment Reference Section No.
27
Certificate No. Survey Customer System Owner Date Cleaned
9/14/2017
Pre-Cleaning
Jetting
Sewer Category
Street123 DAVIS AV Use of Sewer Upstream MH 913-1
City CARLSBAD 873 Drainage Area Dowstream MH 9B-2
Loc. details SHEET 5 . Flow Control Not Controlled Dir. of Survey Upstream
Location Code Length surveyed 231.10 ft Section Length 231.10 ft
Purpose of Survey Post-Rehabilitation Survey Joint Length
Year Laid Dia.lHeight 8 inch
Year Rehabilitated 2017 Material CIPP
Tape! Media No. DVD Lining Method Cured in Place
Add. Information:
1:585 Position Code Observation
10.00 AMH Downstream Manhole, Survey Begins / POST VIDEO
31.00 TFA Tap Factory Made Active, at 02 o'clock, 4", within 8 inches
of joint: NO
74.60 TFA Tap Factory Made Active, at 02 o'clock, 4", within 8 inches
of joint: YES
98.20 TFA Tap Factory Made Active, at 10 o'clock, 4", within 8 inches
of joint: YES
dZ4 —..108.0 TFA Tap Factory Made Active, at 02 o'clock, 4", within 8 inches
of joint: YES
119.50 TFA Tap Factory Made Active, at 10 o'clock, 4", within 8 inches
ofjoint: YES
180.10 TFA Tap Factory Made Active, at 02 o'clock, 4", within 8 inches
of joint: YES / ROOTS
191.00 TFA Tap Factory Made Active, at 10 o'clock, 4", within 8 inches
A of joint: YES I ROOTS
222.40 TFA Tap Factory Made Active, at 02 o'clock, 4", within 8 inches
of joint: YES
225.30 TFA Tap Factory Made Active, at 10 o'clock, 4", within 8 inches
/ of joint: YES / PVC OVER CUT
9 231.10 ACOM Cleanout Mainline, Survey Ends I POST VIDEO
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 0 0 0 0 0
ARLSUAD 373
('itv , ('.ARI SRAfl R7
H
Inspection Report / Inspection: I
Date
9/2112017
PlO. No. Weather
Dry
Surveyor's Name
Victor
Pipe Segment Reference Section No.
32
Certificate No. Survey Customer System Owner Date Cleaned
9/21/2017
Pre-Cleaning
Jetting
Sewer Category
Street123 CHINQUAPIN-EASEMENT Use of Sewer Upstream MH AH213
City CARLSBAD 873 Drainage Area Dowstream MR 16C-9
Loc. details SHEET? Flow Control Not Controlled Dir. of Survey Downstream
Location Code Length surveyed 9.90 ft Section Length 9.90 ft
Purpose of Survey Post-Rehabilitation Survey Joint Length
Year Laid Dia.lHeight 10 inch
Year Rehabilitated 2017 Material CIPP
Tape / Media No. DVD Lining Method Cured in Place
Add. Information:
1:50 Position Code Observation
AH213 0.00 AMH Upstream Manhole, Survey Begins! FINAL POST VIDEO
END SEAL AND TOP HATS
'16C-9 9.90 AMH Downstream Manhole, Survey Ends / FINAL POST VIDEO
WITH END SEAL
QSR QMR SPR ' MPR OPR SPRI MPRI OPRI
0000 0000 0 0 0 10 0 0
CARLSBAD 873
City CARl SRAfl R7
Waft
InspectionReport /,Inspection: I
Date
8/25/2017
PlO. No. Weather
Dry
Surveyor's Name
'Victor
Pipe Segment Reference
. .
Section No.
24
Certificate No. . Survey Customer System Owner Date Cleaned
8/25/2017
. Pre-Cleaning
Jetting '
Sewer Category
.Street123 -CHINQUAPIN/EASEMENT Use of Sewer Upstream MH 16C-50
City CARLSBAD 873 Drainage Area Dowstream MH 16C-17
Loc. details SHEET 46 ' Flow Control Not Controlled Dir. of Survey Downstream
Location Code Length surveyed 502.20 ft Section Length 502.20 ft
Purpose of Survey Post Rehabilitation Survey .
Year Laid 10 inch EDH
Year Rehabilitated 2017 CIPP :,. . .'
Jape/ Media No. DVD d Cured in Place
Add Information
1:1260
16C-50 0.00 ream , Survey Begins POSTVID
231.80 TBA Tap Break-In Active, at 12 o'clock, 4", within 8 inches of. . . '
.joint: NO I ....- ,. .., I 284.50 TBA - Tap Break-In Active, at 12 o'clock, 4", within 8 inches of; . ..
joint: NO
(1se 1Z QJQ AMH Manhole /
40340 TBA Tap Break In Active at 12 o'clock, 4 within 8 inches of
joint: NO
—_.2jJQ TBA Tap Break-in Active at 01 o'clock, 4", within 8 inches of
joint NO / ROOTS
50220 AMH Do Manhole, Ends / POST VIDEO
,
_Survey
fL-
QSR QMR . . MPR OPR iSPRI . MPRi OPRI
uuoo 0000 0 '0 0 0 . ; 0' - .0
- CARLSBAD 873
(it.,' ('ftPI qnan R7
Inspection Report / Inspection: I
Date
9/21/2017
P/O. No. Weather
Dry
Surveyors Name
Victor
Pipe Segment Reference Section No.
34
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning
Jetting
Sewer Category
Street123 CHINQUAPIN-EASEMENT Use of Sewer Upstream MH 16C-54
City CARLSBAD 873 Drainage Area Dowstream MH 16C-55
Loc. details SHEET 20 Flow Control Not Controlled Dir. of Survey Downstream
Location Code Length surveyed 198.60 ft Section Length 198.60 ft
Purpose of Survey Post-Rehabilitation Survey
Year Laid 10 inch EaHe
Year Rehabilitated 2017 CIPP
Tape / Media No. DVD Cured in Place
Add. Information:
1:510 Position Code Observation
I 6C-54 0.00 AMH Upstream Manhole, Survey Begins / FINAL POST VIDEO
END SEAL AND TOP HATS .
- I-
99.60 TB Tap Break-In, at 12 o'clock, 4", within 8 inches of joint: NO
117.80 TB Tap Break-In, at 01 o'clock, 4", within 8 inches of joint: NO
/TOP HAT
198.60 AMH Downstream Manhole, Survey Ends I FINAL POST VIDEO
END SEAL AND TOP HATS
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 .0 0 0 0 0
AKLSBAL) 373
(itv , CARI RAfl R7
f:1
Inspection Report / Inspection: I
Date
9/21/2017
PlO. No. Weather
Dry
Surveyor's Name
Victor
Pipe Segment Reference Section No.
33
Certificate No. Survey Customer System Owner Date Cleaned
9/21/2017
Pie-Cleaning
Jetting
Sewer Category
Street123 CHINQUAPIN-EASEMENT Use of Sewer Upstream MH 16C-9
City CARLSBAD 873 Drainage Area Dowstream MH 16C-54
Loc. details SHEET 30 Flow Control Not Controlled Dir. of Survey Downstream
Location Code Length surveyed 303.50 ft Section Length 303.50 ft
Purpose of Survey Post-Rehabilitation Survey
Year Laid 10 inch EaH
Year Rehabilitated 2017 CIPP
Tape I Media No. DVD Cured in Place
Add. Information:
1:765 Position Code Observation
0.00 AMH Upstream Manhole, Survey Begins / FINAL POST VIDEO
END SEAL AND TOP HATS
- 231.80 TB Tap Break-In, at 12 o'clock, 4, within 8 inches of joint: NO
- 284.30 TBA Tap Break-In Active, at 12 o'clock, 4", within 8 inches of -
joint: NO
16C-54 303.50 AMH Downstream Manhole, Survey Ends / FINAL POST VIDEO
WITH END SEAL
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 0 0 0 0 0
..MNLMU Oh
I
(tv' (.API SRAn R7
Inspection Report / Inspection: I
Date
9/21/2017
PlO. No. Weather
Dry
Surveyor's Name
Victor
Pipe Segment Reference Section No.
31
Certificate No. Survey Customer System Owner Date Cleaned
9/2112017
Pie-Cleaning
Jetting'
Sewer Category
Street123 CHINQUAPIN-EASEMENT Use of Sewer Upstream MH 16C-50
City . CARLSBAD 873 Drainage Area Dowstream MH AH213
Loc. details SHEET 32 Flow Control Not Controlled Dir. of Survey Downstream
Location Code Length surveyed 84.10 ft Section Length 84.10 ft
Purpose of Survey Post-Rehabilitation Survey
Year Laid 10 inch
Year Rehabilitated 2017
EaHe
CIPP
Tape! Media No. DVD Cured in Place
Add. Information:
1:225 Position Code Observation
16C50 0.00 ' AMH Upstream Manhole, Survey Begins / FINAL POST VIDEO
END SEAL AND TOP HATS
'7 970 TB Tap Break In at 10 o'clock, 4", within 8 inches of joint NO
1213 84.10 AMH Downstream Manhole, Survey Ends / FINAL POST VIDEO
END SEAL AND TOP HATS
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 0 0 0 0 0
AKLSBAO S7$
rits, ('API PAfl 571A
Inspection Report! Inspection: I
Date
8/17/2017
P/O. No. Weather
Dry
Surveyor's Name
Victor
Pipe Segment Reference Section No. 1 11
Certificate No. Survey Customer System Owner Date Cleaned
8/17/2017
Pre-Cleaning
Jetting
Sewer Category
Street123 CHERRY AV Use of Sewer Upstream MH 15D-9 C/O
City CARLSBAD 873 Drainage Area Dowstream MH 15D-7
Loc. details SHEET 26 Flow Control Not Controlled Dir. of Survey Upstream
Location Code Length surveyed 301.50 ft Section Length 301.50 ft
Purpose of Survey Post-Rehabilitation Survey
Year Laid 6 inch
Year Rehabilitated 2017
EaHe
ClPP
Tape I Media No. DVD Cured in Place
Add. Information:
1:765 Position Code Observation
1 ~=D-9 C'r _____~0.00 AMH Downstream Manhole, Survey Begins I POST VIDEO
105.20 TB Tap Break-In, at 03 o'clock, 4", within 8 inches of joint: NO
TB Tap Break-In, at 02 o'clock, 4", within 8 inches of joint: NO -
Z41,/ROOTS
19300 TB Tap Break-in, at 10 o'clock, 4", within 8 inches ofjoint NO
228.50 TB Tap Break-In, at 02 o'clock, 4", within 8 inches of joint: NO
243.40 TB Tap Break-In, at 10 o'clock, 4", within 8 inches of joint: NO
263.40 TB Tap Break-In, at 12 o'clock, 4", within 8 inches of joint: NO
279.50 TB Tap Break-In, at 12 o'clock, 4", within 8 inches of joint: NO
292.60 TB Tap Break-In, at 12 o'clock, 4", within 8 inches of joint: NO
ROOTS
298.20 TB Tap Break-In, at 10 o'clock, 4", within 8 inches of joint: NO
/ ROOTS
301.50 ACOM Cleanout Mainline, Survey Ends / POST VIDEO
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 . 0 1 0 0 0 0
UAKLAU ais
City CARLSRAD 873
Inspection Report / Inspection: I
Date
8/1612017
P/O. No. Weather
Dry
Surveyors Name
Victor
Pipe Segment Reference Section No.
8
Certificate No. Survey Customer System Owner Date Cleaned
8116/2017
Pre-Cleaning
Jetting
Sewer Category
5treet123 CARLSBAD AV Use of Sewer Upstream MH 15D-1
City CARLSBAD 873 Drainage Area Dowstream MH 15D-2
Loc. details SHEET 38 Flow Control Not Controlled Dir. of Survey Upstream
Location Code Length surveyed 290.50 ft Section Length 290.50 ft
Purpose of Survey Post-Rehabilitation Survey
Year Laid 8 inch EaHe
Year Rehabilitated 2017 CIPP
Tape / Media No. DVD . Cured in Place
Add. Information:
1:735 Position Code Observation
1 D-11 AMH Downstream Manhole, Survey Begins I POST VIDEO
- 50.10 TBA Tap Break-In Active, at 03 o'clock, 6", within 8 inches of
/
1
joint: NO
167.50 TBA Tap Break-In Active, at 02 o'clock, 4", within 8 inches of
joint: NO
, ------- l87.O TBA Tap Break-In Active, at 02 o'clock, 4", within 8 inches of
joint: NO
234.80 TBA Tap Break-In Active, at 02 o'clock, 4", within 8 inches of
joint: NO
D90O AMH Upstream Manhole, Survey Ends I POST VIDEO
QSR . QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 0 0 0 0 0
CARLUAD 873
(itv ('.ARI SRAfl R7
Inspection Report / Inspection: I
Date
8/21/2017
PlO. No. Weather
Dry
Surveyor's Name
Victor
Pipe Segment Reference Section No.
15
Certificate No. Survey Customer System Owner Date Cleaned
8/21/2017
Pre-Cleaning
Jetting
Sewer Category
Street123 HARBOR CT Use of Sewer Upstream MH 16C-15 C/O
City CARLSBAD 873 Drainage Area Dowstream MH 16C-16
Loc. details SHEET 24
.
Flow Control Not Controlled Dir. of Survey Upstream
Location Code Length surveyed 311.50 ft Section Length 311.50 ft
Purpose of Survey Post-Rehabilitation Survey Joint Length .. . . -
Year Laid Dia./Height 6 inch
Year Rehabilitated 2017 Material CIPP
Tape / Media No. DVD Lining Method Cured in Place
Add Information
1:780 Position Code Observation .
0.00 AMH Downstream Manhole, Survey Begins I POST VIDEO
.
I C15C • 0 36.30 TFA Tap Factory Made Active, at 09 o'clock, 4", within 8 inches
of joint: YES
37.80 TFA Tap Factory Made Active, at 03 o'clock, 4', within 8 inches
of joint YES
94.30 TFA Tap Factory Made Active, at 09 o'clock, 4", within 8 inches
of joint: YES .
96.00 TFA Tap Factory Made Active at 03 o'clock, 4 within 8 inches 7 of joint YES
/ 104.90 TFA Tap Factory Made Active at 09 o'clock, 4 within 8 in / of joint: YES .
106.20 TFA Tap Factory Made Active, at 03 o'clock, 4", within 8 inches
of joint: YES ,
165.30 TFA Tap Factory Made Active, at 03 o'clock, 4", within 8 inches *
- of joint: YES
167.60 TFA Tap Factory Made Active, at 09 o'clock, 4", within 8 inches
of joint: YES
226.20 TFA Tap Factory Made Active, at 03 o'clock, 4", within 8 inches
of joint: YES / ROOTS . •,
/ 277.80 TFA Tap Factory Made Active, at 09 o'clock, 4", within 8 inches .1 of joint: YES
• . / 291.00 TFA Tap Factory Made Active, at 09 o'clock, 4", within 8 inches :
/ 7,"-
of joint YES / ROOTS
306 80 TFA Tap Factory Made Active at 03 o clock 4 within 8 inches
of joint YES
(r16C 16 31150 ACOM Cleartout Mainline Survey Ends POST VIDEO
QSR QMR : SPR MPR OPR • SPRI • MPRi. OPRi
0000 0000 0 0 0 • 0 0 0
.RKLUPL) blj
(ih, CAPI Rfl R71
-Waft
Inspection Report / Inspection: I
Date
8/24/2017
PlO. No. Weather
Dry
Surveyors Name
Victor
Pipe Segment Reference Section No.
. 20
Certificate No. Survey Customer System Owner Date Cleaned
8/24/2017
Pre-Cleaning
Jetting
Sewer Category
5treet123 HIBISCUS DR/EASEMENT Use of Sewer Upstream MH 16C-47
City CARLSBAD 873 Drainage Area Dowstream MN 16C-50
Loc. details SHEET 54 Flow Control Not Controlled Dir. of Survey Downstream
Location Code Length surveyed 202.10 ft Section Length 202.10 ft
Purpose of Survey Post-Rehabilitation Survey Joint Length
Year Laid Dia./Height 8 inch
Year Rehabilitated 2017 Material CIPP
Tape / Media No. DVD Lining Method Cured in Place
Add. Information
1:510 Position Code Observation
16C 7 0.00 AMH Upstream Manhole, Survey Begins I POST VIDEO
j7 69.00 TBA Tap Break-In Active, at 10 o'clock, 4", within 8 inches of
joint: NO
TBA Tap Break-In Active, at 02 o'clock, 4", within 8 inches of
joint: NO
,11 6C-50 202.10 AMH Downstream Manhole, Survey Ends I POST VIDEO . .
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 0 0 0 0 0
CARLSBAD 373
C.ih, ('API czptan R7
Inspection Report / Inspection: I
Date
8/1512017
PlO. No. Weather
Dry
. Surveyors Name
Victor
Pipe Segment Reference Section No.
7
Certificate No. ,. Survey Customer System Owner Date Cleaned
8/15/2017
Pre-Cleaning
Jetting
Sewer Category
Street123 GARFIELD ST Use of Sewer Upstream MH 16C-96
City CARLSBAD 873 , Drainage Area Dowstream MH 15D-11
Loc. details SHEET 50 Flow Control Bypassed Dir. of Survey Downstream
Location Code . Length surveyed 355.10 ft Section Length 355.10 ft
Purpose of Survey Post-Rehabilitation Survey Joint Length
Year Laid Dia.lHeight 8 inch
Year Rehabilitated 2017 Material CIPP
Tape I Media No. DVD Lining Method Cured in Place
Add. Information
1:576 Position Code Observation
AMH Upstream Manhole, Survey Begins / POST VIDEO
TB Tap Break-In, at 12 o'clock, 4", within 8 inches of joint: NO
TB Tap Break-In, at 12 o'clock, 4", within 8 inches of joint: NO
TB Tap Break-In, at 12 o'clock, 4", within 8 inches of joint: NO
TB Tap Break-In, at 10 o'clock, 4", within 8 inches of joint: NO
TB Tap Break-In, at 02 o'clock, 4", within 8 inches of joint: NO
TB Tap Break-In, at 12 o'clock, 4", within 8 inches of joint: NO
TB Tap Break-In, at 12 o'clock, 4", within 8 inches of joint: NO.
TBA Tap Break-In Active, at l2 o'clock, 4", within 8 inches of
joint: NO
TB Tap Break-In, at 02 o'clock, 6", within 8 inches of joint: NO ,
I..MlLOPMUO(.
Inspection Report/Inspection':-.l .. .
Date: . ' Job number: ' Weather: Operator Counter: 'Section name
Dry Victor ' 7 . "
Present: " Vehicle: Camera: Preset: ' Cleaned: •' Rate:
Jetting .
"HI
1:576 Position Code Observation
.. • ' :'. '
'
'' S
-
- 238.00 ' • ' TB" - Tap Break-In, at 02 o'clock, 4, within 8 inchesof joint: NO S ' 'S ' S •,'
"N28.Q , TB Tap Break-In, at 12 o'clock, 4, within 8 inches of joint: NO
. . •. ' •,. . •,
1 . ~59 90 'TBA Tip Break-In Active, at 02 o'clock, 4", within 8 inches of •'
joint: NO
7 '29460 ' TB Tap Break-In, at 11 o'clock, 4'% within 8 inches of joint: NO
S S
96.20 ' , - TB Tap Break-In, at 02 o'clock, 4", within 8 inches of joint: NO.
-
''' S
\300 TB Tap Break In at 11 0
S
clock 4", within 8 inches of joint NO
0840 TB Tap Break In at 02 o'clock, 4 within 8 inches of joint NO
ED
24.10 .
' TB" . Tap Break-In, at 02 o'clock, 4", within 8 inches of joint: NO
55.10. AMH .' Downstream Manhole, Survey Ends I POST VIDEO
S • , 5 . S ,
S 5
5 S , S S S
- . 'S , , - S S . S . S , •'
Si S 5
S
' '•
S
'
•' -:
All S .
.5 5
'• S ''' ' S S
, ,, S
QSR QMR ' SPR . MPR OPR - SPRI . MPRI . OPRi
S flflflfl nnnn . I, . fl . 0 . ' 11 ' ' n . . n S S Si' - I I' ' S 'SI I- '-.''
-' '5
'•
5
5
• CARLSBAD 873
City' CARL SRAfl 873
Inspection Report / Inspection:' I
Date
8114/2017
PlO. No. Weather
Dry
Surveyor's Name
Victor
Pipe Segment Reference
.
Section No.
4
Certificate No. Survey Customer System Owner Date Cleaned
8/14/2017
Pre-Cleaning
Jetting
Sewer Category
5treet123 GARFIELD ST Use of Sewer Upstream MH 1513-37
City CARLSBAD 873 Drainage Area Dowstream MH 1513-38
Loc. details SHEET 28 Flow Control Not Controlled Dir. of Survey Downstream
Location Code Length surveyed 355.10 ft Section Length 355.10 ft
Purpose of Survey Post-Rehabilitation Survey Joint Length
Year Laid Dia./Height 8 inch
Year Rehabilitated 2017 Material CIPP
Tape / Media No. DVD Lining Method Cured in Place .
Add. Information,:
1:900 Position Code Observation
11513-37, 0.00 AMH Upstream Manhole, Survey Begins I POST VIDEO
81.50 TB Tap Break-In, at 12 o'clock, 4", within 8 inches of joint: NO
TBA Tap Break-In Active, at 12 o'clock, 4", within 8 inches of
joint: NO
13-550 TB Tap Break-In, at 12 o'clock, 4", within 8 inches of joint: NO
Z0 TBA Tap Break-In Active, at 12 o'clock, 4",'within 8 inches of
joint: NO
197.30 TBA Tap Break-In Active, at 10 o'clock, 4", within 8 inches of
joint: NO I ROOTS
TB Tap Break-In, at 12 o'clock, 4", within 8 inches of joint: NO
37.70 TB Tap Break-In, at 10 o'clock, 4", within 8 inches of joint: NO
325.60 TB Tap Break-In, at 02 o'clock, 4", within 8 inches of joint: NO
355.10 AMH . Downstream Manhole, Survey Ends/ POST VIDEO11513-38
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 0 0 0 0 0
AKLSbAU 573
City CARL SRAD 873
Inspection /Inspection: 1. _Report
Date
8/1512017
P/O. No. Weather
Dry
Surveyors Name
Victor
Pipe Segment Reference Section No.
6
Certificate No. Survey Customer System Owner Date Cleaned
8/1512017
Pre-Cleaning
Jetting
Sewer Category
Street123 GARFIELD ST Use of Sewer Upstream MH 16C-95
City CARLSBAD 873 Drainage Area Dowstream MH 16C-96
Loc. details SHEET 40 Flow Control Bypassed Dir. of Survey Downstream
Location Code Length surveyed 351.80 ft Section Length 351.80 ft
Purpose of Survey Post-Rehabilitation Survey Joint Length
Year Laid Dia./Height 8 inch
Year Rehabilitated 2017 Material CIPP
Tape / Media No. DVD Lining Method Cured in Place
Add. Information
1:885 Position Code Observation
AMH Upstream Manhole, Survey Begins / POST VIDEO
TB Tap Break-In, at 10 o'clock, 4", within 8 inches of joint: NO
TB Tap Break-In, at 10 o'clock, 4", within 8 inches of joint: NO
TB Tap Break-In, at 02 o'clock, 4", within 8 inches of joint: NO
TB Tap Break-In, at 12 o'clock, 4", within 8 inches of joint: NO
TBA Tap Break-In Active, at 12 o'clock, 4", within 8 inches of
joint: NO
TB Tap Break-In, at 12 o'clock, 4", within 8 inches of joint: NO
TB Tap Break-In, at 12 o'clock, 4", within 8 inches of joint:
YES/ROOTS
TBA Tap Break-In Active, at 12 o'clock, 4", within 8 inches of
joint: NO
TBA Tap Break-In Active, at 02 o'clock, 4", within 8 inches of
joint: NO I ROOTS
TBA Tap Break-In Active, at 12 o'clock, 4", within 8 inches of
joint: NO
TB Tap Break-In, at 12 o'clock, 4", within 8 inches of joint: NO
AMH Downstream Manhole, Survey Ends I POST VIDEO
NLWL) 151J
City: CARLSBAD 873
IL
jig
• Ihspeàtion Report / Inspection: f
Date: Job number: Weather: •.
Dry
Operator:
Victor
Counter..
6 • •
Section name:
•
Present:
•
Vehicle,:
. -
Camera:
- .
Preset: -
.
Cleaned :
Jetting -
Rate
NL.DMIJO1, • -
,.
I.MPcLobRUb(. • • - .• -
•.:
i:.
• Inspection Report I Inspection I •
Date: Job number: Weather:
Dry
Operator:
Victor
Counter:
6 •
Section name:
•
Present: Vehicle: Camera: Preset:, Cleaned: -.
Jetting -.
Rate:
:
City: CARLSBAD 873
Citv: CARLSBAD 873
r
Inspection Report I Inspection 1 4
Date P/C. No. Weather Surveyor's Name Pipe Segment Reference Section No.
8/1612017 Dry Victor 9
Certificate No. Survey Customer System Owner Date Cleaned . . Pre-Cleaning Sewer Category
- 8/16/2017 Jetting :
Street123 GARFIELD ST Use of Sewer Upstream MN 16C-94
City CARLSBAD 873 Drainage Area Dowstream MN 16C-95'
Loc. details SHEET 22 . Flow Control Bypassed Dir. of Survey . Upstream
Location Code - . Length surveyed 350.90 ft . - Section Length 350.90 ft - - -
Purpose of Survey Post-Rehabilitation Survey Joint Length
Year Laid - Dia./Height 8 inch
Year Rehabilitated 2017 Material . - CIPP
Tape I Media No. DVD Lining Method Cured in Place .- .
Add. Information: . ..
1:80 Position Code Observation
.,...
0.00 AMH Downstream Manhole Survey Begins / POST VIDEO
I.
16C;94 24.20 -TB Tap Break-In, at 10 o'clock, 4", within 8 inches of joint: NO \ r
-:--------------
37.50 TB Tap Break In at 02 o'clock, 4 within 8 inches of joint NO
/ ROOTS .
77.50 TB Tap Break-In, at 01 o'clock, 4", within 8 inches of joint: NO
10900 TB Tap Break-in, at 10 o'clock, 4", within 8 inches of joint NO
-
-
22-1.90 TB Tap Break-in, at 10 o'clock, 4', within 8 inches of joint NO :
22270 TB Tap Break In at 01 o'clock, 4 within 8 inches of joint NO T
227.90 TB Tap Break-in, at 02 o'clock, 4", within 8 inches of joint NO
80 TB Tap Break In at 10 o'clock, 4", within 8 inches of joint NO
277.30 TB Tap Break In at 01 o'clock, 4 within 8 inches of joint NO
>, 319.90 TB Tap Break-In, at 10 o'clock, 4", within 8 inches of joint: NO' .
...-
/ / / 33330 TB - Tap Break In at 12 o'clock, 4 within 8 inches of joint NO
/
335.20 TB Tap Break-In, at 12 o'clock, 4", within 8 inches of joint: NO
. . . .- -- .. . . -. 1' • 16C-95 350.90 - AMH ., Upstream Manhole, Survey Ends I POST VIDEO -
l•'•_. •
QSR . QMR SPR MPR - - OPR .. - SPRi MPRi. OPRi
0000 0000 . . 0 0 0 Q
(.AKL5AO81
r.itv (API SAfl R7
Inspection Report / Inspection: I
Date
8/14/2017
PlO. No. Weather
Dry
Surveyors Name
Victor
Pipe Segment Reference Section No.
5
Certificate No. Survey Customer System Owner Date Cleaned
8/14/2017
Pre-Cleaning
Jetting
Sewer Category
Street123 GARFIELD ST Use of Sewer Upstream M 1513-39 C/O
City CARLSBAD 873 Drainage Area Dowstream MH 15B-37
Loc. details SHEET 28 Flow Control Not Controlled Dir. of Survey Upstream
Location Code Length surveyed 300.20 ft Section Length 300.20 ft
Purpose of Survey Post-Rehabilitation Survey Joint Length
Year Laid Dia./Height 6 inch
Year Rehabilitated 2017 Material CIPP
Tape I Media No. DVD Lining Method Cured in Place
Add. Information:
1:765 Position Code Observation
AMH Downstream Manhole, Survey Begins / POST VIDEO
3.30
r(61.30
TB Tap Break-In, at 12 o'clock, 4", within 8 inches of joint: NO
TB Tap Break-In, at 12 o'clock, 4", within 8 inches of joint: NO
TB Tap Break-In, at 10 o'clock, 4", within 8 inches of joint: NO
/ROOTS
91.80 TB Tap Break-In, at 02 o'clock, 4", within 8 inches of joint: NO
IROOTS
156.80 TBA Tap Break-In Active, at 03 o'clock, 6", within 8 inches of
joint: NO
201.60 TB Tap Break-In, at 02 o'clock, 4", within 8 inches of joint: NO
/ROOTS .
210.20 TB Tap Break-In, at 10 o'clock, 4", within 8 inches of joint: NO
115 3-:37 300 2, 300.20 ACOM Cleanout Mainline, Survey Ends I POST VIDEO
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 0 0 0 0 0
tMNLRU 0(
City CARLSBAD 873
Inspection Report / Inspection: I
Date P/O. No. Weather Surveyors Name Pipe Segment Reference Section No.
8/2412017 Dry Victor 19
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
8/24/2017 Jetting
Street123 HIBISCUS DR Use of Sewer Upstream MH 16C-48
City CARLSBAD 873 Drainage Area Dowstream MH 16C-47
Loc. details SHEET 48 Flow Control Not Controlled Dir. of Survey Downstream
Location Code Length surveyed 134.20 ft Section Length 134.20 ft
Purpose of Survey Post-Rehabilitation Survey Joint Length
Year Laid Dia./Height 8 inch
Year Rehabilitated 2017 Material CIPP
Tape/ Media No. DVD Lining Method Cured in Place
Add., Information
1:345 Position Code Observation
0.00 AMH Upstream Manhole, Survey Begins / POST VIDEO
7 00 TFA Tap Factory Made Active, at 03 o'clock, 4", within 8 inches
of joint: YES
7 46.70 TEA Tap Factory Made Active, at 09 o'clock, 4", within 8 inches
of joint: YES / ROOTS
49.20 TEA Tap Factory Made Active, at 03 o'clock, 4", within 8 inches
of joint: YES / ROOTS
6C-4 134.20 AMH Downstream Manhole, Survey Ends / POST VIDEO
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 0 0 . 0 0 0
MKLRU öflj
(itv CARI 5RAr) R7 TIP,
Inspection Report / Inspection: I
Date
8/2212017
PlO. No. Weather
Dry
Surveyors Name
Victor
Pipe Segment Reference Section No.
17
Certificate No. Survey Customer System Owner Date Cleaned
8/2212017
Pre-Cleaning
Jetting
Sewer Category
Street123 HOME AVE Use of Sewer Upstream MH 9B-18
City CARLSBAD 873 Drainage Area Dowstream MH 913-17
Loc. details SHEET 7. Flow Control Not Controlled - Dir. of Survey Upstream
Location Code Length surveyed 286.80 ft Section Length 286.80 ft
Purpose of Survey Post-Rehabilitation Survey Joint Length
Year Laid - Dia./Height .6 inch
Year Rehabilitated 2017 Material CIPP
.Tape/ Media No. DVD Lining Method Cured in Place
Add. Information:
1:720 Position Code Observation
AMH Downstream Manhole, Survey Begins I POST VIDEO
4.50 TBA Tap Break-In Active, at 12 o'clock, 4", within 8 inches of
joint: NO
17.60 TBA Tap Break-In Active, at 12 o'clock, 4", within 8 inches of
\ \ joint: NO
\ \ \jç TB Tap Break-In, at 02 o'clock, 4", within 8 inches of joint: NO
/ROOTS
\28.70 TBA Tap Break-In Active, at 02 o'clock, 4", within 8 inches of
joint: NO I ROOTS
4 \66.20 TBA Tap Break-In Active, at 10 o'clock, 6", within 8 inches of
I joint: NO
I 105.70 TBA Tap Break-In Active, at 02 o'clock, 4", within 8 inches of
I. joint: NO
I TBA Tap Break-In Active, at 02 o'clock, 4", within 8 inches of
joint: NO
\ 164.10 TBA Tap Break-In Active, at 10 o'clock, 4", within 8 inches of
joint: NO .
179.40 TBA Tap Break-In Active, at 12 o'clock, 4", within 8 inches of
joint: NO
286.80 AMH Upstream Manhole, Survey Ends I POST VIDEO
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 0 0 0 0 0
CARLSBAD 873
City CARl sRAr) R7
fl
Inspection Report / Inspection: I
Date
811712017
P/O. No. Weather
Dry
Surveyor's Name
Victor
Pipe Segment Reference Section No.
12
Certificate No. Survey Customer System Owner Date Cleaned
8/17/2017
Pre-Cleaning
Jetting
Sewer Category
Street123 LINMAR LN Use of Sewer Upstream MH 16C-51
City CARLSBAD 873 Drainage Area Dowstream MH 16C-52
Loc. details SHEET 52 Flow Control Not Controlled Dir. of Survey Upstream
Location Code Length surveyed 333.50 ft Section Length 333.50 ft
Purpose of Survey Post-Rehabilitation Survey
Year Laid . 6 inch
Year Rehabilitated 2017
EaHe
CIPP
Tape I Media No. DVD Cured in Place
Add Information:
1:840 Position Code Observation
16C 51' 0.00 AMH Downstream Manhole, Survey Begins / POST VIDEO
65.50 TFA Tap Factory Made Active, at 09 o'clock, 4", within 8 inches
of joint: YES tc::IIII I 70.50 TFA Tap Factory Made Active, at 03 o'clock, 4", within 8 inches
of joint: YES
126.00 TFA Tap Factory Made Active, at 09 o'clock, 4", within 8 inches
of joint: YES
134.90 TFA Tap Factory Made Active, at 03 o'clock, 4", within 8 inches I of joint: YES
190.70 TFA Tap Factory Made Active, at 09 o'clock, 4, within 8 inches
of joint: YES
199.70 TEA Tap Factory Made Active, at 03 o'clock, 4", within 8 inches
of joint: YES
247.80 TEA Tap Factory Made Active, at 09 o'clock, 4', within 8 inches
of joint: YES
_._050 TFA Tap Factory Made Active, at 03 o'clock, 4, within 8 inches
, ofjoint: YES
305.80 TEA Tap Factory Made Active, at 09 o'clock, 4", within 8 inches
of joint: YES
314.80 TEA Tap Factory Made Active, at 03 o'clock, 4', within 8 inches
• ofjoint: YES L~333 50 MSA Survey Abandoned /POST VIDEO
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 0 0 0 . 0 0
(AKLSBAO 373
City CARl SRAD 873
.Waft
Inspection Report / Ins pectia
Date
8/22/2017
PlO. No. Weather
Dry
Surveyors Name
Victor
Certificate No. Survey Customer System Owner Date Cleaned
8/22/2017
Street123 TUTTLE ST Use of Sewer Upstream MH 40-9
City CARLSBAD 873 Drainage Area Dowstream MH 40-6
Loc. details SHEET 11 Flow Control Not Controlled Dir. of Survey Downstream
Location Code Length surveyed 376.00 ft Section Length 376.00 ft
Purpose of Survey Post-Rehabilitation Survey Joint Length
Year Laid . Dia./Height 6 inch
Year Rehabilitated 2017 Material ClPP
Tape I Media No. DVD Lining Method Cured in Place
Add. Information:
1:945 Position Code Observation
4D 9 0.00 AMH Upstream Manhole, Survey Begins / POST VIDEO
."7 57.00 TBA Tap Break-In Active, at 10 o'clock, 4", within 8 inches of
joint: NO
- 86.70 TBA Tap Break-In Active, at 02 o'clock, 4", within 8 inches of
joint: NO
-1_1 5 80 TBA Tap Break-In Active, at 10 o'clock, 4", within 8 inches of
joint: NO
7 167.70 TBA Tap Break-In Active, at 10 o'clock, 4", within 8 inches of
joint: NO
Z0 TBA Tap Break-In Active, at 02 o'clock, 4", within 8 inches of
joint: NO
7 239.90 TBA Tap Break-In Active, at 10 o'clock, 4", within 8 inches of
joint: NO
321.60 TBA Tap Break-In Active, at 12 o'clock, 4", within 8 inches of
. . joint: NO
((4 D-6 376.00 AMH Downstream Manhole, Survey Ends / POST VIDEO
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 0 0 0 0 0
CARLSBAD 873
City CA
.WE&
Inspection Rep
Date
8/23/2017
PlO. No. Weather
Dry
Certificate No. Survey Customer System Owner
Street123 PACIFIC ST Use of Sewer Upstream MH 9A-3
City CARLSBAD 873 Drainage Area Dowstream MH 9B-66
Loc. details SHEET I Flow Control Not Controlled Dir. of Survey Upstream
Location Code Length surveyed 250.00 ft Section Length 250.00 ft
Purpose of Survey Post-Rehabilitation Survey Joint Length
Year Laid Dia./Height 8 inch
Year Rehabilitated 2017 Material CIPP
Tape! Media No. DVD Lining Method Cured in Place
Add. Information:
1:630 Position Code Observation
913-66 0.00 AMH Upstream Manhole, Survey Begins / POST VIDEO
7.50 TEA Tap Factory Made Active, at 10 o'clock, 4", within 8 inches
of joint: YES
49.90 TBA Tap Break-In Active, at 10 o'clock, 4", within 8 inches of
joint: NO
80:10 TBA Tap Break-In Active, at 10 o'clock, 4", within 8 inches of
joint: NO
116.50 TBA Tap Break-In Active, at 10 o'clock, 4", within 8 inches of
joint: NO
247.70 AOC Drop Connection, Survey Ends I POST VIDEO
250.00 AMH Downstream Manhole, Survey Ends I POST VIDEO
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 0 0 0 0 0
AKLSBAO 373
City CARLSBAD
Tet
Eii.
Inspection Report
Date P/O. No. Weather Surveyors Name Pipe Segment Reference Section No.
6/6/2017 E GARCIA 22
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
I Jetting
Street123 YANG LAYANG'CR Use of Sewer tream MH 16C-21
City CARLSBAD Drainage Area wstream MH
TDir.
16C-22
Loc. details Flow Control of Survey Upstream
Location Code Length surveyed 40.35 ft tion Length 40.35 ft -
Purpose of Survey Pm-Acceptance Joint Length
Year Laid DiaiHeight 8 inch
Year Rehabilitated Material Vitrified Clay Pipe
Tape / Media No. Lining Method
Add. Information:
1:105 Position Observation
,16C-22 0.00 Downstream Manhole, Survey Begins / PRE VIDEO .
40.35 Upstream Manhole, Survey Ends I PRE VIDEO
QSR QMR SPR MPR OPR SPRI MPRI OPRI
0000 0000 0 0 0 0 0 0
JUtW51JUAKLbtJAU I, ,'age: 1
-
('.ARI r)sRAr
Tet
EiI
Inspection Report
Date P/O. No. Weather Surveyors Name Pipe Segment Reference Section No.
6/6/2017 E GARCIA 20
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
Jetting
Street123 LINMAR LN Use of Sewer Upstream MH 16C-51
City CARLOSBAD Drainage Area Dowstream MH 16C-52
Loc. details Flow Control Dir. of Survey Downstream
Location Code Length surveyed 349.45 ft Section Length 349.45 ft
Purpose of Survey Pre-Acceptance
Year Laid 6 inch =He
Year Rehabilitated Vitrified Clay Pipe
Tape / Media No.
Add. Information:
1:840 Position Observation
Ir307
Upstream Manhole, Survey Begins / PRE VIDEO
Tap Factory Made Active, at 10 o'clock, -' within 8 inches of joint: YES,
4,'
Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES,
'7 101.30 Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES,
Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES,
~150.40 Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES,
I Tap Factory Made Active, at 02 o'clock, -' within 8 inches of joint: YES, -
'7 212.90 Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES,
4,,
Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES,
'7 276.90 Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES,
85 Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES,
Downstream Manhole, Survey Ends / PRE VIDEO '
QSR QMR SPR MPR OPR 5PR1 MPRI OPRI
oeso 0000 0 0 0 0 0 • 0
JOB# 873 CARLSBAD 9 Page: 1 '
KAP
(itt, CARl SPAn
.: Tt
• E-mail.,
Inspection Report '• ' .
Date P/O. No. Weather Surveyor's Name Segment Reference - Section No.
61612017 E GARCIA
Tpe
••, 19
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
I Jetting
5treet123 MADISON ST Use of Sewer . ., Upstream MH 16A-27
City CARLSBAD , Drainage Area . Dowstream MH 16A-28
Loc. details . Flow Control Dir. of Survey. , Upstream
Location Code Length surveyed 233.20 ft . Section Length' 233.20 ft
Purpose of Survey Pre-Acceptance - —Font Joint Length ' . .
Year Laid 6 inch
Year Rehabilitated , Material . Vitrified Clay Pipe -
Tape / Media No. Lining Method
-Add.- Information:
1:570 Position Observation -
FFT
0.00 Downstream Manhole Survey Begins / PRE VIDEO
1100.45 FT
9.90 Tap Break-In Active, at 10 o'clock, -within 8 inches of joint: YES, 4
- ,, . . -.-. •- I. •"
44.90 Tap BreakIn Active, at 10 o'clock,-, within 8 inches of joint: YES, 4"
63.75 - Tap Break-In Active, at02 o'clock, -,within 8 inched of joint: YES, 4" z I .
Ci1Vtejt o
95.15 Tap Break-In Active, at 02 o'clock, -,within 8 inches of joint: YES, 4" , a
Tap Break In Intruding at 10 o'clock; within 8 inches of joint YES 64-6 1'5 4T(Ut
V.
- '
'' '
.',
' ' -•.:. e)
153.65 Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4" •-
-
176.50 'Tap Break-In Active, at 10 o'clock, -within 8 inches of joint: YES;4" • ' . '
231.00 Tap Break In Active at 10 o'clock, within 8 Inches of joint YES 4
4!:~233:2:0 Cleanout Mainline, Survey Ends! PRE VIDEO THE SWEEP IS VERY,
CLOSE TO THE LAST LATRAL
-, ..
- QSR QMR SPR MPR OPR . SPRI . '. ' MPRI -, OPRI
0000 2100 - 0 2 • 2 - 1 0 - -.- 2 • , 2
JOB 0S (.AKLbMU II I-'age:i • - - . - * - -
4 -
-
- • '
-
CCA t
City: CARLSBAD -
Tet
Ea ii
Inspection Report
Date P/O. No. Weather Surveyois Name Pipe Segment Reference Section No.
6/5/2017 E GARCIA 8
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
Jetting
Streel123 OCEAN ST Use of Sewer Upstream MN 9A-7
City CARLSBAD Drainage Area Dowstream MH 9A-6
Loc. details Flow Control Dir. of Survey Downstream
Location Code Length surveyed 102.05 ft Section Length 102.05 ft
Purpose of Survey Pre-Acceptance Joint Length
Year Laid oiaiHeight 8 inch
Year Rehabilitated Material Vitrified Clay Pipe
Tape / Media No. Lining Method
Add. Information
1:255 Position Observation
9A-7 0.00 Upstream Manhole, Survey Begins MH DEPTH 14 FEET I PRE VIDEO
31.80 Tap Factory Made dapped) at 02 o'clock, -, within 8 inches of joint: YES,
Tap Factory Made Ca ,at 10 o'clock,-, within 8 inches of joint: YES,
56.50 Tap Factory Made Ced, at 02 o'clock,-, within 8 inches of joint: YES,
57.35 Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES,4"
59.15 Tap Factory Made e?at 10 o'clock,-, within 8 inches of joint: YES,
4"
79.65 Tap Factory Made C'aplat 02 o'clock, -, within 8 inches of joint: YES,
82.25 Tap Factory Made eaped? at 10 o'clock, -, within 8 inches of joint: YES,
9_4 85 Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"
102.05 Downstream Manhole, Survey Ends I PRE VIDEO
QSR QMR 5PR MPR ' OPR 5PR1 MPRI - OPRI
0000 0000 0 0 • 0 0 0 0
JOB# 873 CARLSBAD II Page: 1
City CARLSBAD
Tet
Inspection Report
Date PlO. No. Weather Surveyors Name Pipe Segment Reference Section No.
61512017 1 E GARCIA 7
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
Jetting
Street123 OCEAN ST Use of Sewer Upstream MH 9A-8
City CARLSBAD Drainage Area Dowstream MI-I 9A-7
Loc. details Flow Control Dir. of Survey Downstream
Location Code Length surveyed 88.60 ft Section Length 88.60 ft
Purpose of Survey Pm-Acceptance Joint Length
Year Laid DiaiHeight 8 inch
Year Rehabilitated . Material Vitrified Clay Pipe
Tape / Media No. Lining Method
Add. Information
1:225 Position Observation
9A-48
0 00
Upstream Manhole, Survey Begins / PRE VIDEO
Tap Factory MadeActive, at 10 o'clock, -, within 8 inches of joint: YES,
4"
14.15 Tap Factory Made cd302 o'clock, -, within 8 inches of joint: YES,
Tap Factory 10 o'clock, -' within 8 inches of joint: YES,
36.35 Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
ZI Tap Factory Made cppe&, at 02 o'clock, -, within 8 inches of joint: YES,
39.70 Tap Factory Made qpped7at 10 o'clock, -, within 8 inches of joint: YES,
4
Tap Factory Made at 02 o'clock, -within 8 inches of joint: YES,
4,,
5665 Tap Factory Made 7d at 10 o'clock, , within 8 inches of joint: YES,
71.25 Tap Factory Made cappd at 02 o'clock, -, within 8 inches of joint: YES,
4,'
73.80 Tap Factory Made G'd,at 10 o'clock, -' within 8 inches of joint: YES,
8860 Downstream Manhole, Survey Ends! PRE VIDEO .
OSR QMR SPR MPR OPR SPRI MPRI OPRI
oeoo eoso 0 0 0 0 0 0
JOU# 573 CARLSBAD II Page: 1
(ih, . (API cRAr
E-mail.,
Tet
Inspection Report
Date PlO. No. Weather Surveyor's Name Pipe Segment Reference Section No.
61512017 E GARCIA 6
Certificate No. Survey Customer System Owner Date. Cleaned Pre-Cleaning Sewer Category
1 - Jetting
Street123 OCEAN ST Use of Sewer Upstream MN 9A-11
City CARLSBAD Drainage Area Dowstream MH 9A-10
Loc. details Flow Control Dir. of Survey Downstream
Location Code Length surveyed 152.6 ft - Section Length 152.65 ft
Purpose of Survey Pre-Acceptance Joint Length
Year Laid Dia.lHeighl 8 inch
Year Rehabilitated Material Vitrified Clay Pipe
Tape / Media No. Lining Method
Add. Information:
1:375 Position Observation
VIDEO
000
Upstream Manhole, Survey Begins 13 FT MANHOLE DEPTH / PRE
0T
—:6 26.85 85
a:::,:::,
within ::::: ::::
:: 28 70 Active, at 8 inches ofjoint: YES,
46.60 Tap Factory Made Cpp, at 02 o'clock, -, within 8 inches of joint: YES
6" ••'" . 147.4 FT
49.25 Tap Factory Made CEd, at 10 o'clock, -, within 8 inches of joint: YES,
6"
75.75 Tap Factory Made C at 02 o'clock, -' within 8 inches of joint: YES,
6"
Tap Factory Made C!ej at 10 o'clock, -within 8 inches of joint: YES,
Tap Bak-In Intruding, at 12 o'clock, -, -, within 8 inches of joint: YES,
9885 Tap Factory Made at 02 o'clock, -, within 8 inches of joint: YES,
101.40 Tap Factory Made at 10 o'clock, -, within 8 inches of joint: YES,
6"
Tap Factory Made p) at 10 o'clock, -, within 8 inches of joint: YES,
2",2" . . 147.40 Tap Break-In Intruding, at 10 o'clock, -, -' within 8 inches of joint: YES, -
/
Downstream Manhole, Survey Ends! PRE VIDEO -
QSR QMR SPR MPR - OPR SPRI MPRI OPRI
0000 2200 0 4 4 0 2 2
JUbif 0(3 AKLSWW II Page: 1 -'
City: CARLSBAD
maI!
Inspection Report
Date PlO. No. Weather Surveyors Name Pipe Segment Reference Section No.
6/5/2017 E GARCIA 5
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
Jetting
Street123 PACIFIC AVE Use of Sewer Upstream MN 9A-3
City CARLSBAD Drainage Area Dowstream MH 913-66
Loc. details Flow Control Dir. of Survey . Downstream
Location Code Length surveyed 250.00 ft Section Length 250.00 ft
Purpose of Survey Pm-Acceptance Joint Length
Year Laid DiaiHeight 8 inch
Year Rehabilitated Material Vitrified Clay Pipe
Tape / Media No. Lining Method
Add. Information
1:600 Position Observation
Upstream Manhole, Survey Begins / PRE VIDEO
Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES,
6"
Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 6
Tap Factory Made Cap'1at 10 o'clock, -, within 8 inches of joint:
6"
Repair Localized Liner, within 8 inches of joint: YES / PRE VIDEO
Tap Factory Made Active, at 10 o'clock, -' within 8 inches of joint: YES,
4"
Tap Factory Made ed at 10 o'clock, -, within 8 inches of joint: YES,
Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"
Tap Factory Made jpat 10 o'clock,-, within 8 inches of joint: YES,
4,,
Broken, from 05 to 07 o'clock, within 8 inches of joint: YES, ift, Ift
Drop Connection, Survey Ends! PRE VIDEO
QSR QMR SPR MPR OPR SPRI MPRI OPRI
5100 0000 5 0 5 5 0 5
JOB# 873 CARLSBAD I! Pace: 1
- •• __•1 - I -
City CARLBAD -. '.* i•
- ..
Inspection Report '•- '
Date PlO. No. Weather Surveyors Name, Pipe Segment Reference Section No.
61512017 .. . E GARCIA 10
Certificate No. Survey Customer System Owner , Date Cleaned . Pre-Cleaning Sewer Category
I - . Jetting .
StreetI23. TUTTLE ST Use of Sewer Upstream MH 4D-9 -
City CARLBAD. Drainage Area • Dowstream MH 4D-6
Loc. details . Flow Control Dir. of Survey Downstream
-Location Code . Length surveyed 375.80 ft Section Length • 375.80 ft -
Purpose of Survey Pre-Acceptance . Joint Length
Year Laid - - Dia./Height 6 inch ?
Year Rehabilitated • Material - Vitrified Clay Pipe•
Tape/ Media No. Lining Method ' - • *
Add. Information : . ,
•
1:915 .•
.
Position Observation
(44D 9~ 0.00 .Upstream Manhole, Survey Begins 6 INCH TRUE ID! PRE VIDEO
165 FT
- 55.25 Tap Break-In Active, at 10 o'clock, -' within 8 inches of joint: YES, 4"
85.95 Tap Break-in Active at 02 o'clock,., within 8 inches of joint YES 4
113.90 Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint YES, 4" 173.05 FT
'7 165.00 Tap Break-In Intruding, at 10 o'clock, -, -,thin 8 inches of joint: YES,
Tap Break-in Intruding, at 02 o'clock,-,-, thin 8 inches of joint YES
315.15 FT
"7 235.45 - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"' .
- • • '- : --
..i •
- • - ' -- t
-
- 315.15 ' Roots Ball Joint, at 12 o'clock, 60 %, within 8 inches of joint: YES! - ,',.
KNUCKLE ROOT
15.5 Tap Break-In Active, at 12 o'clock, -,within 8 inches of joint: YES, 4" - - • -- . . *
Downstream Manhole Survey Ends PRE VIDEO D~ 37_5 80
QSR QMR SPR MPR OPR • SPRi F' MPRi 7 OPRi
- 0000 '. . - 4122 . 0 8 -. 8 0 - 2.67 . 2.67
1.
JOB# 873 CARLSBAD II Page 1
F - •• l i. I- 4'
- * - .- J* , •.•- ,,-.F... -'- , , -. ',.4 - -. ' -
-4'- -• • ., - . -- ,-,.- • --I " . I ''I_ • — - - -•. .- --•- -- "- -- -'-r I- •
- * ,- - , .•-. • •- '-. -* .* •I
-. '' 1. •V
-• - . i•, I-..
- :
•- -(1' .7:
City CARLSBAD • .
MPR • OPR , SPRI , MPRI OPRI
12 . • 12 0 2.4 • 2.4
JOB# 873 CARLSBAD II Page: 1' • • • -
- - ,-• 14 - 4
, • .,. ,-• ' ' ,- •4 .•", '.
•t•• - -.7 .J. •
4 •1 .t ('4 ,
4-jr 4_•__ * '' t- - . .. * , • • ' -.' - - . •• (.' -
Tet
Inspection Report .
Date PlO. No. Weather Surveyors Name - Pipe Segment Reference Section No.
615/2017 E GARCIA -.
Certificate No. Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category
• . Jetting
Sireet123 HOME Use of Sewer . Upstream MH 9B-17 -
City CARLSBAD . Drainage Area , DowstreamMl-t 913-18 .
Loc. details Flow Control , Dir. of Survey Downstream .
Location Code Length surveyed 286.00 ft s Section Length 286.00 ft
Purpose of Survey - . Joint Length
Year Laid . . . DiaiHeight 8 inch . .
Year Rehabilitated Material Vitrified Clay Pipe
Tape / Media No. . . Lining Method . .
Add. Information
-.1:690 Position Observation ' ' • - -
.'' .7
*
- .
913-17 0.00' Upstream Manhole Survey Begins! PRE VIDEO
- , •• , . . - ,. .• 106.6 FT
10660 Tap Break In Intruding at 12 o'clock, within 8 inches of joint YES
• 122.65 Tap Break-In Active, at 02 o'clock, -within 8 inches of joint: YES, 6" .' - 262.6 FT
12740 Tap Break In Active at 10 o'clock, within 8 inches of joint YES 6
X.
179.25 .- Tap Break-In Active, at 10 o'clock, - within 8 inches of joint: YES, 6" :
204.45 Tap Break-In Capped, at 12 o'clock, -within 8 inches of joint: YES, 4'
- . ..
- 278.05 FT
217.15 Tap Break-In Active, at 02 o'clock, -within 8 inches of joint: YES, 6"!
•
,
APARTMENTS
253.55 Tap Break-In Defective, at 10 o'clock, -, , v'ithin 8 inches of joint: YES,'
• •. .
6", 6" / ROOTSIS
262.60 Tap Break-In Defective, at 10 o'clock, -, within 8 inches of joint: YES,
• . "'
.
264.45 • Tap Break-In Active, at 12 o'clock, -' within 8 inches of joint: YES, 6" eu rr
-. . 1.Q#4. 278.05 Tap Break-In Intruding, at 02 o'clock, -, -, within 8 inches of joint: YES,
1', 1" /APARTMENTS ,, .•. ..-•• -
.
13-18 286.00 Downstream Manhole, Survey Ends I PRE VIDEO ('ç
- .4
-
- . • . -' , -' .
QSR • QMR • SPR
0000 • ' 3223 0