HomeMy WebLinkAbout1 LEGOLAND DR; ; CB151340; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
07-10-2015 Commercial/Industrial Permit Permit No: CB151340
Building Inspection Request Line (760) 602-2725
Job Address:
1 LEGOLAND DR CBAD
Permit Type:
TI Sub Type: COMM
Status:
ISSUED
Parcel No:
2111000900 Lot #: 0
Applied:
05/04/2015
Valuation:
$17,961.00 Construction Type: 5B
Entered By:
RMA
Occupancy Group:
Reference #
Plan Approved:
07/10/2015
Issued:
07/10/2015
Inspect Area
Plan Check #:
Project Title: LEGOLAND-BIG SHOP- ADD 123 SF
COUNTER AREA EXPANSION, REMODEL 131 SF OF EXISTING DISPLAY
AREA, EXTEND EXISTING CANOPY TO COVER ADDITION
Applicant: Owner:
JOEY NUNEZ LEGOLAND CALIFORNIA L L C <LF> PLAY U S ACQUISI
STE B C/O PROPERTY TAX SERVICE CO
17848 SKY PARK CIRCLE P O BOX 543185
IRVINE CA 92614 DALLAS TX 75354
949 757-3240
Building Permit
$184.75
Meter Size
Add'I Building Permit Fee
$0.00
Add'I Red. Water Con. Fee
$0.00
Plan Check
$129.32
Meter Fee
$0.00
Add'I Building Permit Fee
$0.00
SDCWA Fee
$0.00
Plan Check Discount
$0.00
CFD Payoff Fee
$0.00
Strong Motion Fee
$5.03
PFF (3105540)
$0.00
Park Fee
$0.00
PFF (4305540)
$0.00
LFM Fee
$0.00
License Tax (3104193)
$0.00
Bridge Fee
$0.00
License Tax (4304193)
$0.00
BTD #2 Fee
$0.00
Traffic Impact Fee (3105541)
$0.00
BTD #3 Fee
$0.00
Traffic Impact Fee (4305541)
$0.00
Renewal Fee
$0.00
PLUMBING TOTAL
$0.00
Add'I Renewal Fee
$0.00
ELECTRICAL TOTAL
$45.00
Other Building Fee
$0.00
MECHANICAL TOTAL
$0.00
Pot. Water Con. Fee
$0.00
Master Drainage Fee
$0.00
Meter Size
Sewer Fee
$0.00
Add'I Pot. Water Con. Fee
$0.00
Redev Parking Fee
$0.00
Red. Water Con. Fee
$0.00
Additional Fees
$0.00
Green Bldg Stands (SB1473) Fee $1.00
HMP Fee
??
Fire Expedidted Plan Review
$0.00
Green Bldg Standards Plan Chk
??
TOTAL PERMIT FEES
$365.10
Total Fees: $365.10
Total Payments To Date:
$365.10 Balance Due:
$0.00
FINAL APPROVAL I
Inspector: Date: 4 '2-1-45' Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Storm Water Pollution Prevention Plan (SWPPP) Permit
07-10-2015 Permit No:SW 150191
Job Address: 1 LEGOLAND DR CBAD
Permit Type: SWPPP Status: ISSUED
Parcel No: 2111000900 Lot #: 0 Applied: 05/04/2015
Reference #: Entered By: RMA
CB#: CB 151340 Issued: 07/10/2015
Inspect Area:
Project Title: LEGOLAND-ADD 123 SF TO BIG Tier: 1
SHOP Priority: L
Applicant:
LEGOLAND CALIFORNIA L L C <LF> PLAY U S ACQUISI
C/O PROPERTY TAX SERVICE CO
P O BOX 543185
DALLAS TX 75354
Emergency Contact:
LINDSAY BURROUGHS
760 918-5412
Owner:
LEGOLAND CALIFORNIA L L C <LF> PLAY U S ACQUISI
C/O PROPERTY TAX SERVICE CO
P O BOX 543185
DALLAS TX 75354
SWPPP Plan Check $48.00
SWPPP Inspections $58.00
Additional Fees $0.00
TOTAL PERMIT FEES $106.00
Total Fees: $106.00 Total Payments To Date: $106.00 Balance Due: $0.00
IN
i '� Il�." 1 OMEM.
m4k�
THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: >PLANNING �tNGINEERING ><BUILDING ><FIRE HEALTH HAZMATIAPCD
Building Permit Application
Plan Check No.
Est. Value
City Of 1635 Faraday Ave., Carlsbad, CA 92008
760-602-2719 Fax:760-602-8558
Plan Ck. Deposit
Carlsbad email: building@carlsbadca.govPh:
ate�
SWPPP
www.carlsbadca.gov A
JOB ADDRESS
1 Le a Ur.
SUITE#/SPACE#/UNIT# APN
B+ Shot)ZI 1 - c��-
CT/PROJECT # LOT # PHASE # # OF UNITS # BEDROOMS
# BATH OMS T #ANT BUSINESS NAME CONSTR. TYPE OC'G GRROUP
a
DESCRIPTION OF WORK: Include Square Feet of Affected Area(s)cc \ (
�\`j410.y dYC� KK•� �4�r� 4'�' to`1 EfC � 23 S Gna+ti-1a✓
�e.vrnocl,Q.�,
O� e-(.1��\v1,y �31 $T. O�
Glt�o. e.`I• F-it IN-,10 V, kev�o� E��SK�j fgwdP� ce.le� thaw e.y p�\kSivh ,
EXISTING USE
�J _ �ql� M
, `
PROPOSED USE
1 �` 1 ► /\
GARAGE (SF)
PATIOS (SF)
DECKS (SF)
FIREPLACE
YES❑k NOM
AIR CONDITIONING
YES [:]NOM
FIRE SPRINKLERS
YES.M N0F]
APPLICANT NAME
^t`
PROPERTY OWNER NAME
�C
Primary Contact 02 , vU l
ADDRESS
ADDRESS
CITY STATE ZIP
CITY STATE ZIP
r �2ro1`i
PHONE
Hy�1• �5l• 2+-I.�
FAX
PHONE
FAX
EMAIL ov�1
c.
EMAIL
DESIGN PROFESSIONAL
CONTRACTOR BUS. NAME
ADDRESS ` � f�C �irG1 e ^
\l�J
►
ADDRESS
CI STATE ZIP
CITY STATE ZIP
i �\ws C-A
PHONE
FAX
PHONE
FAX
`441 LA
EMAIL
EMAIL
STATE LICn. #
Q`il t
STATE LIC.#
CLASS
CITY BUS. LIC.#
_
`
(Sec_ 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, Improve, oemousn or repair any scruciure, prior to i s issudnuu, duv IeuuUlu
applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commending with Section 7000 ycs of Division 3 of the
Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a
,M1 ., —it. of nr,t mn than fives hu rIrad dnllars 350011.
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations:
❑ I have and will maintain a certificate of consent to self -insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
❑ 1 have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy
number are: Insurance
Policy No.
Expiration Date
This section need not be completed if the permit is for one hundred dollars ($100) or less.
❑ Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of
California. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in
addition to the cost of compensation, damages as provided for in Section 3706 of the Labor code, interest and attorney's fees.
)K CONTRACTOR SIGNATURE
AGENT DATE
I hereby affirm that I am exempt from Contractor's License Law for the following reason:
❑ I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's
License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he did not build or improve for the purpose of sale).
® I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law).
I am exempt under Section Business and Professions Code for this reason:
1. 1 personally plan to provide the major labor and materials for construction of the proposed property improvement. Yes [—]No
2. 1 (have I have not) signed an application for a building permit for the proposed work.
3. 1 have contracted with the following person (firm) to provide the proposed construction (include name address I phone / contractors' license number):
4. 1 plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name I address I phone / contractors' license number):
5. 1 will provide some of the work, but I
the following persons to provide the work indicated (include name / address I phone I type of work):
)KPROPERTY OWNER SIGNATURE
AGENT DATE —I— 10--
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the
Presley -Tanner Hazardous Substance Account Act? Yes No
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? Yes No
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? Yes No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (1) Civil Code).
Lender's Name
Lender's Address
I certifythat I have read the application and state thatthe above information is conectand thatthe intormation on the plans is accurate. I agree to complywilh all City ordinances and State laws relating to building construction.
I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within
180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days (Section 106.4A Uniform Building Code).
AtSAPPLICANT'S SIGNATURE
DATE S / y / i 5
Irr
...4 STOP: THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE.
Complete the following ONLY if a Certificate of Occupancy will be requested at final inspection.
Fax (760) 602-8560, Email build ing(a Carlsbadca.gov or Mail the completed form to City of Carlsbad, Building Division 1635 Faraday Avenue, Carlsbad, California 92008.
CO#: (Office Use Only)
CONTACT NAME
OCCUPANT NAME
ADDRESS
BUILDING ADDRESS
CITY STATE ZIP
CITY STATE ZIP
Carlsbad CA
PHONE
FAX
EMAIL
OCCUPANT'S BUS. LIC. No.
DELIVERY OPTIONS
PICK UP: CONTACT (Listed above) OCCUPANT (Listed above)
CONTRACTOR (On Pg. 1)
ASSOCIATED CB#
MAIL TO: CONTACT (Listed above) OCCUPANT (Listed above)
CONTRACTOR (On Pg. 1)
NO CHANGE IN USE / NO CONSTRUCTION
MAIL / FAX TO OTHER:
CHANGE OF USE / NO CONSTRUCTION
)KAPPLICANT'S SIGNATURE
DATE
Inspection List
Permit#: CB151340 Type: TI COMM LEGOLAND-BIG SHOP- ADD 123 SF
COUNTER AREA EXPANSION, REMODEL
Date Inspection Item
12/16/2015 89
Final Combo
11/25/2015 17
Interior Lath/Drywall
11/24/2015 84
Rough Combo
11/23/201514
Frame/Steel/Bolting/Weldin
10/26/201511
Ftg/Foundation/Piers
Inspector Act Comments
PB
AP
PD
AP
PB
AP
PB
PA
PD
AP
Thursday, December 17, 2015 Page 1 of 1
HITE
HILL - INSPECTION
TESTING / ENGINEERING
Office (858) 220-1078
Fax (858) 220-7421
hill@h-ite.com
Special Inspection
Report
Project Address
Building Permit Number Jurisdiction / File Number
One Le oland Drive
CB151340 Carlsbad
Project Name
Big Sho -Q Bot Counter
Architect
SMS Architects
Construction Material Design Strength Source
Engineer
Grim and Chen
Structural Steel A36/A500
Description of Materials
General Contractor
Barnett Construction
ASTM A50OB-HSS
Filler Metal-E71T-8 (NR-232)
Sub Contractor
SD Steel Solutions
Welding Process-FCAW (Flux Core Arc Welding)
Other
Inspection Date/Start of Work/End of Work
22-Nov-15
Provided special inspection for the field welding of weldments and repairs for the Header and Canopy
Framing Along the exterior perimeter, per Plan on Sheet S2.2, Details 1 & 9 on Sheet S1.2, and RFI #5
provided by the Engineer of Record. Verified Welder qualifications, preparation of base metals, and
handling of filler materials. Welds visually inspected to verify that repairs meet quality requirements.
The welding processes and procedures are in substantial conformance with the construction drawings,
specifications, changes thereto, and meet the applicable quality requirements.
Welder: Toman G. Martinez, AWS D1.1, No: 4541 (08/07/13), Positions 1 G-4G
I HEREBY CERTIFY THAT I HAVE INSPECTED THE ABOVE REPORTED
WORK. UNLESS OTHERWISE NOTED, THE WORK INSPECTED IS TO /"'6��I�CCNo 1113681-MI
THE BEST OF MY KNOWLEDGE IN COMPLIANCE WITH THE APPROVED I PECTOR.S G ATURE REGISTRATION NUMBER
CONSTRUCTIOBN DOCUMENTS, AND APPLICABLE SECTIONS OF THE
GOVERNING BUILDING LAWS. November 22, 2015
Henry Barton Hill, PE 64822 DATE
San Diego • Orange • Imperial • Los Angeles - Riverside • San Bernardino
HITE
HILL - INSPECTION
TESTING f ENGINEERING
Office (858) 220-1078
Fax (858) 220-7421
hill@h-ite.com
Special Inspection
Report
Project Address
One Le oland Drive
Building Permit Number Jurisdiction / File Number
CB151340 Carlsbad
Project Name
Pig Sho -Q Bot Counter
Architect
SMS Architects
Construction Material Design Strength Source
Structural Steel A36/A500
Engineer
Grim and Chen
Description of Materials
ASTM A50OB-HSS
General Contractor
Barnett Construction
Filler Metal-[ 71T-8 (NR-232)
Sub Contractor
SD Steel Solutions
Welding Process-FCAW (Flux Core Arc Welding)
Other
Inspection Date /Starto! Work / End or Work
18-Nov-15
Provided special inspection for the field welding of repair weldments for the Header and Canopy Framing
Along the exterior perimeter, at new to existing conections Verified Welder qualifications, preparation of
base metals, and handling of filler materials. Work incomplete.
Welder: Toman G. Martinez, AWS D1.1, No: 4541 (08/07/13), Positions 1 G-4G
I HEREBY CERTIFY THAT I HAVE INSPECTED THE ABOVE REPORTED
WORK. UNLESS OTHERWISE NOTED, THE WORK INSPECTED IS TO ICC, No.: 1113681-MI
THE BEST OF MY KNOWLEDGE IN COMPLIANCE WITH THE APPROVED I PECTOR'S G TURE REGISTRATION NUMBER
CONSTRUCTIOBN DOCUMENTS, AND APPLICABLE SECTIONS OF THE
GOVERNING BUILDING LAWS. November 18, 2015
Henry Barton Hill, PE 64822 DATE
San Diego • Orange • Imperial • Los Angeles • Riverside • San Bernardino
HITE
HILL - INSPECTION
TESTING / ENGINEERING
Office (858) 220-1078
Fax (858) 220-7421
hill@h-ite.com
Special Inspection
Report
Project Address
One Le oland Drive
Building Permit Number Jurisdiction /File Number
CB151340 Carlsbad
Project Name
Big Sho -Q Bot Counter
Architect
SMS Architects
Construction Material Design Strength Source
Structural Steel A36/A500
Engineer
Grim and Chen
Description of Materials
ASTM A50OB-HSS
General Contractor
Barnett Construction
Filler Metal-E71T-8 (NR-232)
Sub Contractor
SD Steel Solutions
Welding Process-FCAW (Flux Core Arc Welding)
Other
Inspection Date / Stan of Work r End of Work
18-Nov-15
Provided special inspection for the fit -up and field welding of weldments for the Header and Canopy
Framing Along the exterior perimeter, per Plan on Sheet S2.2, and Details 1 & 9 on Sheet S1.2. Verified
Welder qualifications, preparation of base metals, and handling of filler materials. It should be noted, fit -up
to exsisting members is not flush. Repairs pending.
Welder: Hector Orozco, AWS D 1.1, Lab No: 14-048 (03/06/14), Positions 3G
I HEREBY CERTIFY THAT I HAVE INSPECTED THE ABOVE REPORTED A
W
WORK. UNLESS OTHERWISE NOTED, THE WORK INSPECTED IS TO 4ICC, No.: 1113681-MI
THE BEST OF MY KNOWLEDGE IN COMPLIANCE WITH THE APPROVED I PECTO IGNATURE REGISTRATION NUMBER
CONSTRUCTIOBN DOCUMENTS, AND APPLICABLE SECTIONS OF THE
GOVERNING BUILDING LAWS. November 18, 2015
Henry Barton Hill, PE 64822 DATE
San Diego - Orange • Imperial • Los Angeles • Riverside - San Bernardino
HITE
HILL - INSPECTION
TESTING / ENGINEERING
Office (858) 220-1078
Fax (858) 220-7421
hill@h-ite.com
Special Inspection
Report
Project Address
One Le oland Drive
Building Permit Number Jurisdiction /File Number
CB151340 Carlsbad
Project Name
-Big Sho -Q Bot Counter
Architect
SMS Architects
Construction Material Design Strength Source
Structural Steel A36/A500
Engineer
Grim and Chen
Description of Materials
ASTM A50OB-HSS
General Contractor
Barnett Construction
Sub Contractor
SD Steel Solutions
Other
Inspection Date / Start or Work /Eno of Work
17-Nov-15
Provided special inspection for the field welding of weldments for the Header and Canopy Framing Along
the exterior perimeter, per Plan on Sheet S2.2, and Details 1 & 9 on Sheet S1.2. Verified Welder
qualifications. It should be noted the Outrigger and Canopy Edge are not as specified on the approved
plans or shop drawings and sub -contractor failled to privide mill certifications for steel. Work stopped.
Welder: Hector Orozco, AWS D1.1, Lab No: 14-048 (03/06/14), Positions 3G
I HEREBY CERTIFY THAT I HAVE INSPECTED THE ABOVE REPORTED
WORK. UNLESS OTHERWISE NOTED, THE WORK INSPECTED IS TO
THE BEST OF MY KNOWLEDGE IN COMPLIANCE WITH THE APPROVED
CONSTRUCTIOBN DOCUMENTS, AND APPLICABLE SECTIONS OF THE
GOVERNING BUILDING LAWS.
Barton Hill, PE 64822
San Diego • Orange • Imperial • Los Angeles • Riverside - San Bernardino
r ICC, No.: 1113681-MI
REGISTRATION NUMBER
November 17, 2015
DATE
HITE
HILL - INSPECTION
TESTING J ENGINEERING
Office (858) 220-1078
Fax (858) 220-7421
hill@h-ite.com
Special Inspection
Report
Project Address
Building Permit Number Jurisdiction / File Number
One Le oland Drive
CB151340 Carlsbad
Project Name
Big Sho -Q Bot Counter
Architect
SMS Architects
Construction Material Design Strength Source
Reinforced Conc. fc=3000 psi Superior RMC
Engineer
Grim and Chen
Description of Materials
General Contractor
Barnett Construction
ASTM A615 Grade 60 Reinforcing
ASTM A307 Anchor Bolts
Sub Contractor
Superior RMC, Mix Design 868P, 4000 psi
Superior RMC, Mix Design 867P, 3000 psi
other
Inspectlon Date / Start of Work/End of Work
28-Oct-15
Provided Special Inspection for the placement of reinforcing steel in the New Slab -on -Grade (SoG)and
Continuous Footing, per Sheet S1.2, Details 1,2 & 3, at the referenced project. All steel sizes, laps and
clearances are in substantial conformance with the approved plans, specifications, and changes thereto.
In addition, observed the deposit of approximately 9 cubic yards (cyd) Superior RMC, Mix Design 867P,
3000 psi,and Mix Design 868P, 4000 psi into the footings and SoG referenced above. The concrete was
placed by trailer pump, and vibrated mechanically for consolidation. Fabricated one set of cylinders from
concrete for testing.
I HEREBY CERTIFY THAT I HAVE INSPECTED THE ABOVE REPORTED
WORK. UNLESS OTHERWISE NOTED, THE WORK INSPECTED IS TO ICC, No.: 1113681-MI
THE BEST OF MY KNOWLEDGE IN COMPLIANCE WITH THE APPROVED I SPECTOR' I ATURE REGISTRATION NUMBER
CONSTRUCTIOBN DOCUMENTS, AND APPLICABLE SECTIONS OF THE
GOVERNING BUILDING LAWS. October 28, 2015
Henry Barton Hill, PE 64822 DATE
San Diego • Orange - Imperial • Los Angeles • Riverside - San Bernardino
HITE
HILL - INSPECTION
TESTING f ENGINEERING
Office (858) 220-1078
Fax (858) 220-7421
hill@h-ite.com
Foundation Observation Report
Project Name
The Big Sho -Q Bot Counter
Date
I 24-Oct-2015
Project Location
One Le oland Drive, Carlsbad, California
Owner/Developer
Merlin Entertainment
Contractor
Barnett Construction
Project /Permit Number
CB151340
Lot(s) /Parcel
18 / 211-100-09
Soils Report Ref.
Soils Report
Foundation Type
Conventional
(Provided by Others)
Expansion Condition
High
Fill Geometry
Category 11
Foundation Depth
24 Inches min.
Found. Reinforcement
(6) #5 Bar Horizontal
#4 Ties 16"
Foundation Width
1.5 feet min.
Interior Reinforcement
#4 Bar @ 16" oc, ew
Slab bedding
Undisturbed Soil
Vapor Barrier
Installed
Observations:
Observed V-6" wide perimeter footing at a depth of 24". Verified soil conditions exposed are similar to
those anticipated. The observed foundation appears in substantial conformance.
Comments:
It is our understanding that all excavations will be cleaned of loose soil and debris prior to concrete
placement; and that the soil moisture content will be maintained.
The presence of our field representative is for the purpose of observing the
construction and reporting on its compliance with the approved plans and the
applicable building codes. Our work does not include the supervision or direction
of the contractor's work, his employees or agents. The contractor for this
project should be so advised. The contractor should all so be advised that ELD T CIAN /REPRESENT IVE SIGNATURE
neither the presence of our field personnel nor the observation and testing by
this firm shall excuse him in any way for defects in his work. It should further be
understood that we are not responsible for site safety.
San Diego - Orange - Los Angeles - Riverside - San Bernardino
RITE
HILL - INSPECTION
TESTING / ENGINEERING
Office (858) 220-1078
Fax (858) 220-7421
hill@h-ite.com
Special Inspection
Report
Project Address
One Le oland Drive
Building Permit Number Jurisdiction /File Number
CB151340 Carlsbad
Project Name
Big Sho -Q Bot Counter
Architect
SMS Architects
Construction Material Design Strength Source
Reinforced Conc. fc=3000 psi RMC
Engineer
Grim and Chen
Description of Materials
ASTM A615 Grade 60 Reinforcing
General Contractor
Barnett Construction
Simpson Stron -Tie®, SET-XP Epoxy, ICC ESR-2508
Sub Contractor
Other
Inspection Date / Stan of Work /End of Work
23-Oct-15
Provided special inspection for the epoxy installation of (26) #4 dowel anchors embedded a minimum of
4", into existing Slab -on -Grade, per Sheet S1.2, Details 1,2 & 3; and (12) #5 dowel anchors embedded a
minimum of 10", into existing footing, per Sheet S1.2, Detail 13. All holes were drilled using the correct
drill bit size, and properly brushed/cleaned. Installation of anchors is in compliance with ICC ESR-2508,
and manufactures specifications.
I HEREBY CERTIFY THAT I HAVE INSPECTED THE ABOVE REPORTED ACI No.: 0005533.
WORK. UNLESS OTHERWISE NOTED, THE WORK INSPECTED IS TO ICC, No.: 1113681-48
THE BEST OF MY KNOWLEDGE IN COMPLIANCE WITH THE APPROVED E o S SIGNATURE REGISTRATION NUMBER
CONSTRUCTIOBN DOCUMENTS, AND APPLICABLE SECTIONS OF THE
GOVERNING BUILDING LAWS. October 23, 2015
enry Ba ill, PE 64822 DATE
San Diego • Orange - Imperial • Los Angeles • Riverside - San Bernardino
To: Page 2 of 3 2015-10-24 22:53:09 (GMT) From: Henry Hill
HITE
HILL -INSPECTION
TESTING / ENGINEERING
City of Carlsbad
Building Department
1635 Faraday Avenue
Carlsbad, California 92008
Facsimile: (760) 602-8560
Reference: Permit Dumber CB 151340
October 24, 2015
Subject: ,Special Inspection Affidavit for LEGOLAND The Big Shop -Reserve and Ride
Ladies and Gentlemen:
This letter is to notify that; Special Inspections of Reinforced Concrete, Structural Steel Welding,
Epoxy Anchor Installation, Soil Observation and Materials Testing are to be performed at the
subject project by HiTE (Hilt-inspection/Testing,`Engineering). All work requiring special
inspection and/or materials sampling and testing for the structure(s) constructed under the
referenced permit are to be performed in accordance with the approved plans, specifications, and
changes thereto, and the California Building Code.
Respectfully submitted,
Ij iTE
.Z
Henry Barton Hill, Principal Engineer
M.S., P.E. 464822
Attachments:
Principal Certifications
PO Box 771, San Diego, CA 92038-0771
San Diego • Orange • Los Angeles • Riverside • Impedal • San Bernardino
www.h-ite.com 0 (858) 220-1078 Office • (858) 220-7421 Fax
EsGil Corporation
In Partnership with Government for BuiCrfing Safety
DATE: May 12, 2015
JURISDICTION: Carlsbad
PLAN CHECK NO.: 15-1340
PROJECT ADDRESS: 1 Legoland Dr.
PROJECT NAME: Legoland "The Big Shop"
❑ APPLICANT
❑ JURIS.
❑ PLAN REVIEWER
❑ FILE
SET: I
Addition/Remodel
❑ The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
❑ The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
❑ The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
❑ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
❑ The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
❑ The applicant's copy of the check list has been sent to:
❑ EsGil Corporation staff did not advise the applicant that the plan check has been completed.
❑ EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: ) Email:
Mail Telephone Fax In Person
❑ REMARKS:
By: Kurt Culver
EsGil Corporation
El GA ❑EJ ❑MB ❑PC
5/4/15
Enclosures:
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
Carlsbad 15-1340
May 12, 2015
ADO NOT PAY- THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: 15-1340
PREPARED BY: Kurt Culver
BUILDING ADDRESS: 1 Legoland Dr.
BUILDING OCCUPANCY:
DATE: May 12, 2015
BUILDING
PORTION
AREA
(Sq. Ft.)
Valuation
Multiplier
Reg.
Mod.
VALUE ($)
Add
17,961
Air Conditioning
Fire Sprinklers
TOTAL VALUE
17,961
Jurisdiction Code Icb By Ordinance
Bldg. Permit Fee by Ordinance
Plan Check Fee by Ordinance
Type of Review
❑ Repetitive Fee
Repeats
O Complete Review
❑ Other
❑ Hourly
EsGil Fee
❑ Structural Only
Hr. @*
$185.55
$120.61
$103.91
Comments:
Sheet 1 of 1
macvalue.doc +
C I T Y 0 F
�,ARLSBAD
PLAN CHECK
REVIEW
TRANSMITTAL
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
DATE:05-06-2015 PROJECT NAME: LEGOLAND COUNTER REMODEL/ EXPANSION PROJECT ID: CB15-1340
PLAN CHECK NO: I SET#: I ADDRESS: ONE LEGOLAND DR. APN: 211-100-09-00
VALUATION: $17,961
This plan check review is complete and has been APPROVED by the ENGINEERING
Division.
By: CG 5/6/15
A Final Inspection by the
Division is required Yes V No
This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to: JOEY@SMS-ARCH.COM
01,
,
-,, 1"; f:, - "
'0 �s �- j �
-- C D -)rov—
� f -
fi-, t b e! A
%, ,
, � z -� �
Q i i ce or
---�su,?
H
j ,
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING
760-602-4610
ENGINEERING
760-602-2750
FIRE PREVENTION
760-602-4665
Chris Sexton
760-602-4624
Chris.Sexton@carisbadca.gov
Chris Glassen
760-602-2784
Christoph(g.Glassen@
Greg Ryan
760-602-4663
Gregory.
Gina Ruiz
760-602-4675
Gina.Ruiz@carisbadca.gov
Linda Ontiveros
760-602-2773
Linda.Ontiveros@carisbadca.gov
Cindy Wong
760-602-4662
Cvnthia.Wong@carlsbadca.gov
Dominic Fieri
760-602-4664
Dom inic.Fieri@carlsbadca.gov
Remarks:
Development Services
BUILDING PLANCHECK Land Development Engineering
C. I T Y 0 F CHECKLIST 1635 Faraday Avenue
760-602-2750
QUICK-CHECK/APPROVAL
CARLSBAD www.carlsbadca.gov
ENGINEERING Plan Check for CB1 5-1340 Date:05-06-2015
Project Address: ONE LEGOLAND DR, APN: 211-100-09-00
Project Description: REMODEL 131 SQ. FT. OF EXISTING DISPLAY AREA. Valuation: $17,961
ADD 123 SQ. FT. OF COUNTER AREA, EXTEND
CANOPY.
ENGINEERING Contact: CHRIS GLASSEN
Phone: 760-602-2784
RESIDENTIAL INTERIOR
RESIDENTIAL ADDITION MINOR
(<$20,000.00)
CARLSBAD PREMIER OUTLETS
OTHER: GYM
Email: Christopher.Glassen@carlsbadca.gov
Fax: 760-602-1052
V TENANTIMPROVEMENT
PLAZA CAMINO REAL
COMPLETE OFFICE BUILDING
r - - -- - -- - - OFFICIAL USE ONLY
— -- ' " — — — — ' ' — - - — - - — - - — - - I
ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT
BY: CG 516/15 DATE:05-06-2015
REMARKS: NO ADDITIONAL ENGINEERING FEE
Notification of Engineering APPROVAL has been sent to JOEY@SMS-ARCH.COM
via EMAIL._.._.._.._.._.._.. . .. . .. . .. on 05-06-2015
. .. .. . ..
E-36 Page 1 of 1 REV 4/30/11
C I T Y O F
CARLSBAD
STORM WATER COMPLIANCE FORM
TIER 1 CONSTRUCTION SWPPP
E-29
STORM WATER COMPLIANCE CERTIFICATE
✓ My project is not in a category of permit types exempt from the Construction
SWPPP requirements
✓ My project is not located inside or within 200 feet of an environmentally
sensitive area with a significant potential for contributing pollutants to nearby
receiving waters by way of storm water runoff or non -storm water
discharge(s).
✓ My project does not require a grading plan pursuant to the Carlsbad
Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code)
✓ My project will not result in 2,500 square feet or more of soils disturbance
including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas that meets
one or more of the additional following criteria:
• located within 200 feet of an environmentally sensitive area or the
Pacific Ocean; and/or,
• disturbed area is located on a slope with a grade at or exceeding 5
horizontal to 1 vertical; and/or
• disturbed area is located along or within 30 feet of a storm drain inlet, an
open drainage channel or watercourse; and/or
• construction will be initiated during the rainy season or will extend into
the rainy season (Oct. 1 through April 30).
1 CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE
CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING
FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN
ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS.
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST
MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES
TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE
MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE
THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED
POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH
THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE
DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE
CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF
CARLSBAD.
1 l`- ✓�
OWNER(S)/ ER'S A NT NAME (PRINT)
OWNER(S)/O NER'S AGENT NAME (SIGNATURE) DATE
STORM WATER POLLUTION PREVENTION NOTES
1. ALL NECESSARY EQUIPMENT AND MATERIALS
SHALL BE AVAILABLE ON SITE TO FACILITATE
RAPID INSTALLATION OF EROSION AND
SEDIMENT CONTROL BMPS WHEN RAIN IS
EMINENT.
2. THE OWNER/CONTRACTOR SHALL RESTORE
ALL EROSION CONTROL DEVICES TO
WORKING ORDER TO THE SATISFACTION OF
THE CITY ENGINEER AFTER EACH RUN-OFF
PRODUCING RAINFALL.
3. THE OWNER/CONTRACTOR SHALL INSTALL
ADDITIONAL EROSION CONTROL MEASURES
AS MAY BE REQUIRED BY THE CITY
ENGINEERING OR BUILDING INSPECTOR DUE
TO UNCOMPLETED GRADING OPERATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY
ARISE.
4. ALL REMOVABLE PROTECTIVE DEVICES SHALL
BE IN PLACE AT THE END OF EACH WORKING
DAY WHEN THE FIVE (5) DAY RAIN
PROBABILITY FORECAST EXCEEDS FORTY
PERCENT (40%). SILT AND OTHER DEBRIS
SHALL BE REMOVED AFTER EACH RAINFALL.
5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE
WITH 3/4 INCH MINIMUM AGGREGATE.
6. ADEQUATE EROSION AND SEDIMENT
CONTROL AND PERIMETER PROTECTION BEST
MANAGEMENT PRACTICE MEASURES MUST BE
INSTALLED AND MAINTAINED.
SPECIAL NOTES
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
PROJECT INFORMATION p
Site Address: l L-dwL�+tiGt �tr•
Assessor's Parcel Number:.A I I' 1L cq
Project ID: � W / 1-21 yI
Construction Permit No.: —�12
Estimated Construction Start Date
Project Duration Months
Emergency Contact: (�
Name: L1 viols-y 19u�Yc3JC^17j
24 hour Phone: (pO ' �� - 5� ►2
Perceived Threat to Storm Water Quality
❑ Medium
r❑ Low
If medium box is checked, must attach a site plan
sheet showing proposed work area and location
of proposed structural BMPS
For City Use Only
CITY OF CARLSBAD
STANDARD TIER I SWPPP
Approved By: C r
Date: 5 - b ( 5
E_29 Page 1 of 3 REV 4/30/10
Erosion Control
Tracking
Non -Storm Water
Waste Management and Materials
BMPs
Sediment Control BMPs
Control
Management BMPs
Pollution Control BMPs
BMPs
o
C
O
o
—
c
d
a
c
m
2
2
C-O
a
a
aEicca>
f9
�
9
'D d
m f6
m
W
a
d
N
o y
y
o
l4
C
c�
\
2
7
w
�'
>
O
�
C
g
N
�
eU+
�
Best Management Practice
y
m
Co
v
V
aa)
f°
°'
�,
y
m
(BMP) Description
w
cn
m
F—
E
v,
rn
m
rn
mo
rn
aw
-ate,
c
o
c
H
m
g
yy
Q
0
m
3c
U% E
a,
N
Q'
N N
N co
oca
U
N
m
N C_
cC
t0i1
d
y
mm
o
X
(D
p 01
L C
d
C
N
U
j
N 7
'O
E d
Q
a
-
�'
C
W
U
«�
U
d
'O
f6
U
O
O
O
'-
0
O_
O
LL
=
'O
O
L
N
Q
N
U
O
C
O
O O
c0 p�
f0 O
.0+
N
>
>
O
N
A
.�0.
@
O
' a
O
N
N
C
O
y
c9
m
w Q
cn
rn
d
(n
U
i1
0
(n >
fn
Cn a`
in 5
in Q:
a
a
>
g
Cn
N
fn
2
U
CASQA Designation 4
r
co
-
�
r
I?v
w
w
L?
w
I?
r
w
cO
o
7
7
o!
c"
o'
7
cn
ch
en
n
(n
ao
rn
N
ch
v
Ln
2
T
�
U
w
6
w
U
w
w
w
cn
<n
cn
cn
w
cn
cn
w
rn
�
F
r
z
z
z
z
2
2
�
2
2
2
Construction Activity
Grading/Soil Disturbance
Trench in /Excavation
Stockpiling
Drilling/Boring
Concrete/Asphalt Saw
cutting
Vol
Concrete flatwork
Paving
Conduit/Pipe Installation
Stucco/Mortar Work
✓
Waste Disposal
Staging/Lay Down Area
Equipment Maintenance
and Fueling
Hazardous Substance
Use/Storage
Dewaterin
Site Access Across Dirt
Other (list):
Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the
blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best
management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was
checked off and for each of the selected BMPs selected from the list. For Example — If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review
the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction
Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on
the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with
Plastic" column.
To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice
measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project.
E-29 Page 2 of 3 REV 4/30/10
CITY OF
CARLSBAD
INSTRUCTIONS:
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
To address post -development pollutants that may be generated from development projects, the City requires that new development and
significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project
design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards
(Volume 4, Chapter 2) at www.carlsbadca.gov/standards.
Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision,
discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that
must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to
'Standard Stormwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many
aspects of project site design are dependent upon the storm water standards applied to a project.
Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has
responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire
was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return
of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City.
If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please
seek assistance from Land Development Engineering staff.
A separate completed and signed questionnaire must be submitted for each new development application submission. Only one
completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently.
In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits
for the project.
Please start by completing Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your
application to the city.
STEP 1
TO BE COMPLETED FOR ALL PROJECTS
To determine if your project is a priority development project, please answer the following questions:
YES NO
1. Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet
the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or
other non -erodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from
paved streets or roads; OR (3) designed and constructed with permeable pavements or surfaces in
accordance with USEPA Green Streetsguidance?
2. Is your project LIMITED TO retrofitting or redeveloping existing paved alleys, streets, or roads that are
designed and constructed in accordance with the USEPA Green Streets guidance?
If you answered "yes" to one or more of the above questions, then your project is NOT a priority development project and therefore is
NOT subject to the storm water criteria required for priority development projects. Go to step 4, mark the last box stating "my
project does not meet PDP requirements" and complete applicant information.
If you answered "no" to both questions, then go to Step 2.
E-34 Page 1 of 3 Effective 6/27/13
C I T Y O F
CARLSBAD
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
STEP 2
TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS
To determine if your project is a priority development project, please answer the following questions: YES NO
1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively
over the entire project site? This includes commercial, industrial, residential, mixed -use, and public
development projects on public or private land.
2. Is your project creating or replacing 5,000 square feet or more of impervious surface collectively over the entire
project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial,
industrial, residential, mixed -use, and public development projects on public or private land.
3. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared
foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared
foods and drinks for immediate consumption.
4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a hillside development project? A hillside development
project includes development on any natural slope that is twenty-five percent or greater.
5. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a parking lot. A parking lot is a land area or facility for the
temporary parking or storage of motor vehicles used personally for business or for commerce.
6. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a street, road, highway freeway or driveway? A street,
S(
road, highway, freeway or driveway is any paved impervious surface used for the transportation of
(�
automobiles, trucks, motorcycles, and other vehicles.
7. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of
impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive
Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less
from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the
project to the ESA i.e. not commingles with flows from adjacent lands).*
8. Is your project a new development that supports an automotive repair shop? An automotive repair shop is a
facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013,
5014, 5541, 7532-7534, or 7536-7539.
9. Is your project a new development that supports a retail gasoline outlet (RGO)? This category includes RGO's
that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of
100 or more vehicles per day.
10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and
are expected to generate pollutants post construction?
11. Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of
impervious surface or (2) increases impervious surface on the property by more than 10%?
If you answered "yes" to one or more of the above questions, you ARE a priority development project and are therefore subject to
implementing structural Best Management Practices (BMP's) in addition to implementing Standard Storm Water Requirements such
as source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your
application(s) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this
questionnaire, check the "my project meets PDP requirements" box and complete applicant information.
If you answered "no" to all of the above questions, you ARE NOT a priority development project and are therefore subject to
implementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for all
development projects. A Storm Water Management Plan (SWMP) is not required with your application(s) for development. Go to step
4 at the end of this questionnaire, check the "my project does not meet PDP requirements" box and complete applicant
information.
E-34 Page 2 of 3 Effective 6/27/13
"J
v CITY OF
CARLSBAD
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
STEP 3
TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPEMENT PROJECTS ONLY
Complete the questions below regarding our redevelopment project: YES NO
Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than
50% of the surface area of the previously existing development?
If you answered "yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement of
impervious surface and not the entire development. Go to step 4, check the "my project meets PDP requirements" box and
complete applicant information.
If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4,
check the "my project meets PDP requirements" box and complete applicant information.
THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMA
❑ My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater
criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application.
I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details.
fil My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per
the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project.
Applicant Information and Signature Box
Address: Cis YZoroB
Applicant Name:
Applicant Signature:
Accessor's Parcel Number(s):
211-lav —o
Applicant Title: _
Date:
This Box for City Use Only
City Concurrence: I YES
NO
By: G CT
Date: s -
Project ID: L r _ 13Lft
Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas
designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the
San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources
Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their
quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent
environmentally sensitive areas which have been identified by the Copermittees.
E-34 Page 3 of 3 Effective 6/27/13
� 4
C I T Y OF
CARLSBAD
STORM WATER
COMPLIANCE
ASSESSMENT
B-24
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.r;ov
am applying to the City of Carlsbad for the following type(s) of construction permit:
Building Permit ❑ Right -of -Way Permit
❑ My project is categorically EXEMPT from -p--- Electrical
the requirement to prepare a storm water Fire Additional
Fire Alarm
pollution prevention plan (SWPPP) because it
requires issuance of one or more of the Fixed Systems
only q Mechanical
following permit types: Mobile Home
Plumbing
Project Storm Water Threat Assessment Criteria*
No Threat Assessment Criteria
Patio/Deck
Photo Voltaic
Re -Roofing
Sign
Spa -Factory
Sprinkler
Water Discharge
❑ My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because
it meets the "no threat" assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier
Level. My project does not meet any of the High, Moderate or Low Threat criteria described below.
Tier 1 - Low Threat Assessment Criteria
My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type (See list above) and the project
meets one or more of the following criteria:
• Results in some soil disturbance; and/or
• Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling).
Tier 2 - Moderate Threat Assessment Criteria
❑ My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria:
• Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or,
• Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria:
• Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or
• Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or
• Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or
• Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30).
Tier 3 - Significant Threat Assessment Criteria
❑ My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or
❑ My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, refueling and maintenance areas: or,
❑ My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant
potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non -storm water discharge(s).
I certify to the best of my knowledge that the above
checked statements are true and correct,/ understand
and acknowledge that even though this project does
not require preparation of a construction SWPP, I must
still adhere to, and at all times during construction
activities for the permit type(s) check above comply
with the storm water best management practices
pursuant to Title 15 of the Carlsbad Municipal Code
and to Citv Standards.
*The City Engineer may authorize minor variances from the Storm
Water Threat Assessment Criteria in special circumstances where it
can be shown that a lesser or higher Construction SWPPP Tier Level is
warranted.
Project Address: Assessor Parcel No.
� L 1� 5� � Guilslba�, CA i tuo�, z I I.1 � • 09
Owner/Owner's Authorized Agent Name:
Title:
Jo ni�Jvu►-L
lob
Owner/Owner's Authorized Agent Signature:
�-
Date:
31 L4
City Concurrence:
IQ YES ❑NO
By:
C (3�
Date:
S ` G_
Project ID:
c & is — 13yt3
B-24 Page 1 of 1 Rev.03/09
PLANNING DIVISION QeVeIODment Services
BUILDING PLAN CHECK Planning Division
APPROVAL 1635 Faraday Avenue
(760) 602-4610
-29 P www.carlsbadca.eov
DATE: PROJECT NAME: PROJECT ID:
PLAN 0: ,-'3 15-1340 SET#: I ADDRESS: I Legoland Dr APN: 211-100-09
Thlan check review is complete and has been APPROVED by the Planning
D, )n.
By: I ri, '�xt,n
A i il . -1pc-tion by the Planning Division is required [:1 Yes E No
You niwl, -:vlr� Corrections from one or more of the divisions listed below. Approval
from th, n ,,ay be required prior to the issuance of a building permit.
Resu", gild include corrections from all divisions.
F-] T i,,
the
For quc,-,
7i
C!
Chris.`
Gina.['
Rct-,
-hc - k review is NOT COMPLETE. Items missing or incorrect are listed on
a ',,ed checklist. Please resubmit amended plans as required.
h -k l,.PPROVAL has been sent to: joey@sms-arch.com
crc' ';,-.,-ions on the attached checklist please contact the following reviewer as marked:
! r,
)2-
ENGINEERING
FIRE PREVENTION
-0
760-602-2750
760-602-4665
Chris, Gla,,
Gn:rg Ryan
J 160-602-2784
602-4663
Gregor, f,van6 carlsbadc
a I a y IN1 r "An. a
a V
-,y Won
imc, 9
7'Cl 602-4662
V: ov
_a_gov
Linua Ontivcr,,)s
Dorriinic Fied
L_J
760 602-2773
. ...... 76�) 02-4664
Lwda)WO,fe osC risix,•dca i2V
rr r 4, irO�,carlsbadcq,goy
47*1' \N,
CITY OF
CARLSD/-%D11
PLAN CHECK
REVIEW
TRANSMITTAL
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
DATE: 5/21/15 PROJECT NAME:big shop PROJECT ID:
PLAN CHECK NO: cb151340 SET#: I ADDRESS: 1 legoland APN:
® This plan check review is complete and has been APPROVED by the fire Division.
By: cwong
A Final Inspection by the Division is required ® Yes ❑ No
❑ This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING
76"02=4610
ENGINEERING
760-602-2750
FIRE PREVENTION
7604W-4665
❑
Chris Sexton
760-602-4624
Chris.Sexton@carisbadca.gov
❑ Kathleen Lawrence
760-602-2741
Kathleen.Lawrence@carlsbadca.gov
❑
Greg Ryan
760-602-4663
Gregory.Ryan@carisbadca.gov
❑
Gina Ruiz
760-602-4675
Gina.Ruiz@carisbadca.gov
❑
Linda Ontiveros
760-602-2773
Linda.Ontiveros@carisbadca.gov
® Cindy Wong
760-602-4662
Cynthia.Wong@carlsbadca.gov
❑
❑
❑
Dominic Fieri
760-602-4664
Dom inic.Fieri@carisbadca.gov
RemarKs:
5/21/15
"APPROVED:
Page 1 of 2
THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE
OF A BUILDING PERMIT.
THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE
DEPARTMENT NOTATIONS, CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH
ALL APPLICABLE CODES AND REGULATIONS.
THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE
LAW.
Page 2 of 2
Carlsbad Fire Department
Plan Review Requirements Category: TI , COMM
Date of Report: 05-21-2015 Reviewed by:
I
Name: JOEY NUNEZ ,
Address: STE B ;
17848 SKY PARK CIRCLE
IRVINE CA
92614
Peiinit 4: CB151340
Job Name: LEGOLAND-BIG SHOP- ADD 123 SF
Job Address: 1 LEGOLAND DR CBAD
INCOMPLETE The item you have submitted for review is incomplete. At this time, this office cannot
adequately conduct a review to detennine compliance with the applicable codes and/or standards. Please review
carefully all comments attached. Please resubmit the necessary plans and/or specifications, with changes "clouded",
to this office for review and approval.
Conditions:
Cond: CON0008301
[MET]
"APPROVED:
"PHIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A
BUILDING PERMIT.
THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT
NOTA"T'IONS,
CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND
REGtJLATIONS.
THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW.
Entry: 05/21/2015 By: ewong Action: AP
THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE
OF A BUILDING PERMIT.
THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE
DEPARTMENT NOTATIONS, CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH
ALL APPLICABLE CODES AND REGULATIONS.
THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE
LAW.
Page 2 of 2
JTRUQTURAL CALCULATION
G&C Job Number: 15-041
F R# EGH''
MAY 04 101`
TABLE OF CONTENTS
Load Criteria p. 1-2
New Addition Gravity Design p. 3-6
Canopy Framing Design p, 7-8
Seismic Check P. 9-10
Legolland - The Big Shop
Carlsbad, CA
Plan Check Submittal
April 27, 2015
PREPARED FOR-
SMS Architects
77500RC-dhill Ave.. Suite 240 wine Cahfol7va 0 92614 m Te/ 949,250.31150 - Fax 949.203 0450
Date: Job No.
w Engineer: Page Na: ' of
FAXf kwrnQI`-'Ll'
c.� t✓stah
s
f4f LL-2c7 { 9F
N'n-1
17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-0450 I www.gcstructural.com
Date: Job No.
L` 4 Engineer: Page No: �i of
.S►r�''..A7Mk L-
ul P (Dim 2oT =�+-2'
Phi MA (' 0 0 ; F) = V 114-
17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-0450 1 www.gcstructural.com
rAr
Daie: Job No.
l` Engineer: Page No: 3 of
f k1 4 TA -- O?- FW
s� ?L-f�
I •s�12-5"
o. o y
tUOc.
24�7 Fcv�f -:xvtW Gaw-w;::PnoO t-P" +t-to
Nt. r — fir, 1
==l--1 L-O �, t000-
L�'-v�k qpt� " - Vk'-
1,_m� 4^-VV'
- Of- lf►u`�
.5-;lr4PsoV4 OU - 1-0" - s-1
%4; "v 3 ST
4�Vp' V,-C/h;p- Wi
C�1 �4ww4 )
�► �,o-'Taq;
17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 9 l.com
Date: Job No.
OWL• . Engineer: Page No: of
kj �1- - \-Pn6A X;l
\TV
�- �j ao Ph.r
��-- �� ►sue �1���z� �- �� ��1����--�� �� �
Ate- s ��s �~��-1�►��`��t'i�y - o .� �L����
17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-0450 1 www.gcstructural.com
Date: Job No.
Engineer: Page No: of
e2, 41.01
cc- w
P,
Alm, r
Mom= �� � •- ��� �=-zssr=c��ti��� -��' ►�w��
�oauWri�
- P� - s� s'
17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949.250-3150 1 F 949-203-0450 1 www.gcstructural.com
Date: Job No.
\` Engineer: Page No: of
U� �w - = 1 -14-J " ��Aly-
OVA-
f oonah k &.,c townyj
pf'-Y - '2 e0-0 f -Ito - J�v -A
lvuu '�XqP
17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-0450 1 www.gcstructural.com
Date: Job No.
l` Engineer: Page No: of
�Fu OP o7
V-)d - (2S ���� w,n�`Z� �b Pub , - qO R
d 1 of Cyr to
L-�T'�hc'/`;>1kL"
Cyyu,�ll✓{
17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-0450 1 www.gcstructural.com
GRIMM & CHEN STROCTURAf zNGIINEEPiNG, INC. ,
U'V• �le,--
17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-0450 1 www.gcstructural.com
Date: Job No.
\` Engineer: Page No: of
k'14W O Aw LTOLA -
Vj fft- jjiL
V� ' --�fw G.u5• �nmt-t—A
Pam-
10�� 12--
17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-0450 1 www.gcstructural.com
Dale: Job No.
ILI
xt mommim"HM Engineer: Page No:) 0 of
eAA- (A--> 1
r�
F
�L�►a.i L" i ° � �
M � l S"V tf d7` G >L,
1� LL j J,
17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-0450 1 www.gcstructural.com
PROJECT:
Legoland - The Big Shop
1 Legoland Drive
Carlsbad, CA 92008
Project Designer:
SMS Architects
17848 Sky Park Circle, Suite B
Irvine, CA 92614
949.757.3240
Report Prepared by:
I BUILDING ENERGY ANALYSIS REPORT I
Q
�J
MAY04?.015
'`"-'s:�
Fernando A Rodriguez
IVIRC Engineering, Inc.
34300 Gateway Drive, Suite 120
Palm Desert, CA 92211
760.340.9005
Job Number:
15046.00
Date:
4/16/2015
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC — wvvw.energysoft.com.
6.4
L JC
J 15 1 3 Li r, I
I TABLE OF CONTENTS I
Cover Page
Table of Contents
Nonresidential Performance Title 24 Forms
Form ENV-MM Envelope Mandatory Measures
Form LTI-04-E Tailored Method
1
2
3
15
16
EnergyPro 6.4 by EnergySoft Job Number: ID: 15046.00 User Number: 5235 1
PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF-1 C
Project Name
Date
Legoland - The Big Shop
411612015
Project Address
Climate Zone
Total Cond. Floor Area
Addition Floor Area
1 Legoland Drive Carlsbad
CA Climate Zone 07
251
251
GENERAL INFORMATION
Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Relocatable - indicate ❑ specific climate zone ❑ all climates
Phase of Construction: ❑ New Construction ❑ Addition m Alteration
STATEMENT OF COMPLIANCE
This certificate of compliance lists the building features and specifications needed to
comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This
certificate applies only to a Building using the performance compliance approach.
The documentation author hereby certifies that the documentation is accurate and complete.
Documentation Author
Name Fernando A. Rodriguez
Signature
Company MRC Engineering, Inc.
Date 6/2015
Address 34300 Gateway Drive, Suite 120
Phone 760.340.9005
City/State/Zip Palm Desert, CA 92211
The Principal Designer hereby certifies that the proposed building design represented in this set of
construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with
any other calculations submitted with this permit application. The proposed building has been designed to meet the energy
efficiency requirements contained in sections 110.0, 116.0 through 118.0, and 140.0 through 149.0 of Title 24, Part 6.
Please check one:
ENV. LTG. MECH.
I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
❑ ❑ ❑ sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section
❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538 and 6737.1.
Principal Envelope Designer
Name
Signature
Company SMS Architects
Date
Address 17848 Sky Park Circle, Suite B
License #
City/State/Zip Irvine, CA 92614
Phone 949,757.3240
Principal Mechanical Designer
Name
Signature
Company Mechanical Compliance Not In the Scope Of This Submittal
Date
Address
License #
City/State/Zip
Phone
Principal Lighting Designer
Name Randall V Moss P.E.
Signature
9
Company MRC Engineering, Inc.
Date 04/23/2015
Address 72-880 Fred Waring Drive, Suite C-11
License # E.13453
City/State/Zip Palm Desert, CA 92260
Phone 760.340.9005
INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included)
[j] ENV-01 Certificate of Compliance. Required on plans. ❑ MCH-01 Certificate of Compliance. Required on plans.
LTI-01 Certificate of Compliance. Required on plans. ❑ MCH-02 HVAC Air/Water Side Requirements.
(� LTI-02 Lighting Controls Credit Worksheet. ❑ MCH-03 Mechanical Ventilation and Reheat.
❑ LTI-03 Indoor Lighting Power Allowance. ❑ MCH-08 Mechanical Equipment Details.
EnergyPro 6.4 by EnergySoft User Number: 5235 RunCode: 2015-04-16T15:37.39 ID: 15046.00 Page 3 of 16
PERFORMANCE CERTIFICATE OF COMPLIANCE
Le oland - The Big Shop
ANNUAL TDV ENERGY USE SUMMARY kBtu/sgft- r
Standard Proposed Compliance
Energy Component Design Design Margin
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps & Misc.
Domestic Hot Water
Lighting
Receptacle
Process
Process Lighting
TOTALS
1.71
0.87
0.84
196.12
199.35
-3.23
228.07
220.33
7.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
132.99
136.63
-3.64
93.44
93.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
652.33
650.621
1.72
Part 2of3
Heating
Cooling
Fans
Heat Rej
Pumps
DHW
Lighting
Receptacle
Process
Process Ltg
Percent better than Standard 1 0.3 0.3 % excluding process)
BUILDING COMPLIES
PERF-1 C
Date
411612015
GENERAL INFORMATION
Building Orientation (W 270 deg Conditioned Floor Area 251 sqft.
Number of Stories 1 Unconditioned Floor Area 0 sqft.
Number of Systems 1 Conditioned Footprint Area 0 sqft.
Number of Zones 1 Natural Gas Available On Site Yes
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Total
Roof
Orientation Gross Area
(M
386
(N)
0
(E)
0
(S)
0
386
195
sqft.
sqft.
sqft.
sqft.
sqft.
sqft.
k-11CIZ-111Y ruca
135
0
0
0
135
0
Standard Proposed
Prescriptive Lighting Power Density 1.500 W/sgft, 1.541 W/sgft
I Remarks:
sqft.
sqft.
sqft.
sqft.
sqft.
sqft.
Glazina Ratio
34.9
0.0
0.0 %
0.000
34.9
0.0
Prescriptive Values for
Comparison only. See
LTI-01 for allowed LPD.
I EnergyPro 6.4 by EnergySoft User Number: 5235 RunCode: 2015-04-16T15:37.39 ID: 15046.00 Page 4 of 16 1
PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF-1C
Project Name
Legoland - The Big Shop
Date
411612015
ZONE INFORMATION
System Name
Zone Name
Occupancy Type
Floor
Area
s ft.
Inst.
LPD
Wlsf'
Ctrl.
Credits
W/sf 2
Allowed LPD
Proc.
Loads
Wlsf
Area
W/sf 3
Tailored
W/sf 4
Undefined System
Legoland - The Big Shop
Retail Sales, Wholesale
251
1.927
0.385
Notes: 1. See LTI-01 2. See LTI-02 3. See LTI-03 4. See LTI-04
items marked with asterisk, see LTI-01 by others) (by others
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification to be used with the performance approach. The local enforcement agency
determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the
special justification and documentation submitted.
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized Signature or Stamp
EnergyPro 6.4 by EnergySoft User Number..- 5235 Run ode: 2015-04-16T15:37:39 ID: 15046.00 Page 5 of 16
STATE OF CALIFORNIA
ENVELOPE COMPONENT APPROACH
CEC-NRCC-ENV-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-ENV-01-E
Envelope Component Approach
(Page 1 of 4)
PYOfe" Name; Legoland - The Big Shop Date Prepared: 4/16/2015
A. GENERAL INFORMATION
1
Project Location:
1 Legoland Drive
6
Compliance Method:
m Component ❑ Unconditioned (file
Affidavit)
2
CA City and Zip Code:
Carlsbad, 92008
7
Building Front Orientation (deg or cardinal):
270 deg
3
Climate Zone:
7
8
Permitted Scope of Work ❑ New Construction ❑ Addition ❑ Alteration
4
Total Conditioned Floor
251
9
------
BuildingType(s)T
Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
Area:
5
❑ Schools (Public School) ❑ Relocatable Public School Bldg. ❑ Conditioned Spaces ❑ Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space > 5000 ftz (If checked include the NRCC-ENV-04-E with submittal)
B. ENVELOPE DETAILS — Framed
1
2
3
4
5
6
7
8
9
10
11
Tag/ID
Assembly Type
Frame
Material
Frame
Depth
Frame
Spacing
Appendix JA4
Reference
Cavity
R-value
Continuous
Insulation
R-value
Proposed
U-Factor
Required U-Factor From
Tables, B, C, D
Comments
1
Wall
Wood
2x6 @ 16
4.3.1-A6
21
0.0
0.069
R-21 Wall
2
Roof
Wood
2x4 @ 16
4.2.2-A6
19
0.0
0.062
R-30 Roof Attic
C. ENVELOPE DETAILS — Non -framed
1
2
3
4
5
6
7
8
9
10
Tag/ID
Assembly Type
Assembly Materials
Thickness
(inches)
Interior or
Core
Insulation
R-value
Continuous
Insulation
R-value
Appendix JA4
Reference
Proposed
U-Factor
Required U-Factor from
Tables, B, C, D
Comments
D. ENVELOPE DETAILS — Mass
1
2
3
4
5
6
7
8
9
10
11
Tag/ID
Mass
Type
Density
(lb/ft"
Mass
Thickness
(inches)
Furring Strip
Thickness
(inches)
Interior
Insulation
R-value
Exterior
Insulation
R-value
Appendix JA4
Reference
Proposed
Insulation
U-factor
Required U-Factor from
Tables, B, C, D
Comments
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
STATE OF CALIFORNIA
ENVELOPE COMPONENT APPROACH
GEC-Nf1CC-ENV-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-ENV-01-E
Envelope Component Approach (Page 2 of 4)
PYOie,t "aw Legoland - The Big Shop Date Prepared: 4/16/2015
E. ROOFING PRODUCTS (COOL ROOF)
1
2
3
4
5 6 7
8 9 10
11
Mass Roof
25 lb ft2
or greater
Roof Pitch
CRRC Product
ID Number
Product Type
Proposed
Minimum Required
Comments
Aged Solar
Reflectance
Thermal
Emittance
SRI'
(Optional)
Aged Solar
Reflectance
Thermal
Emittance
SRI
(optional)
❑
❑1
❑
❑1
❑
❑1
❑ An aged solar reflectance less than 0.63 is allowed provided the maximum roof / ceiling LI-factor in TABLE 140.3 is not exceeded
❑ High-rise residential buildings and Hotels and Motels with low -sloped roofs in Climate Zones 1 through 8, 12 and 16 are exempted from aged Solar
Reflectance and emittance requirements.
❑ High-rise residential buildings and Hotels and Motels with steep -sloped roofs in Climate Zones 1 and 16 are exempt from aged Solar Reflectance and
emittance requirements.
❑ The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempt from aged Solar Reflectance
and emittance requirements
To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended
by the coatings manufacturer and meet minimum performance requirements listed in §110.8(i)4. Select the applicable coating:
❑ Aluminum -Pigmented Asphalt Roof Coating
❑ Cement -Based Roof Coating
❑ Other
NOTES:
1. Check the box if the aged Solar reflectance was not available in the Cool Roof Rating Council's Rated Product Directory, Then use the equation in Section 110.8(i)2 where the Initial Reflectance
value from the some directory and use the equation (0.2+B(p;,,;t;of — 0.2) to obtain a calculated aged value. Where pis the Initial Solar Reflectance and 8 is either set to 0.65 for Field -Applied
Coatings or it is set to 0. 70for all other roofing products other than Field -Applied Coating.
2. Calculate the SRI Value by using the SRI- Worksheet at (TBD) and enter the resulting value in the SRI Column above and attach a copy for the SRI- Worksheet NRCC-ENV-03-E to the to this form.
F. Air Barrier
1
2
3
4
5
Tag/ID
Air Barrier
Material Type
Air Barrier
Assembly Type
Whole Building
Air Leakage Testing
Comments
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
STATE OF CALIFORNIA
ENVELOPE COMPONENT APPROACH
GEG-NRGG-ENV-01-E (Revised 06/14) _ CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-ENV-01-E
Envelope Component Approach (Page 3 of 4)
Pr°ie<tNa""Legoland - The Big Shop Date Prepared: 4/16/2015
G. FENESTRATION PROPOSED AREAS AND EFFICIENCIES
1
2
3
4
5
6
7
8
9
10
11
12
Tag/ID
Fenestration Type
Area
Orientation
N, S, W, E
or Roof
4 of
Panes
Max
U-Factor
Overhang
Max
(R)SHGC
Min
VT
Label
Conditions
Status
Comments
1
Window
72
W
1
0.36
No
0.25
0.50
New
2
Window
63
W
1
0.36
No
0.25
0.50
New
H. ENVELOPE MANDATORY MEASURES
Indicate location on building plans of Mandatory Envelope Measures Note Block: ENV-MM
INSTRUCTIONS TO APPLICANT ENVELOPE COMPLIANCE & WORKSHEETS (check box if worksheet are included)
For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the Nonresidential Compliance Manual.
IZI NRCC-ENV-01-E Certificate of Compliance. Required on plans for all submittals.
❑ NRCC-ENV-04-E Use when minimum skylight requirements for large enclosed spaces are required in climate zones 2 through 15. Optional on plans.
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
STATE OF CALIFORNIA
INDOOR LIGHTING
GEu-NRGU-L I I-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION ■t,
CERTIFICATE OF COMPLIANCE — USER INSTRUCTIONS NRCC-LTI-01-E
Indoor Lighting
(Page 1 of 5)
Project Name: Legoland - The Big Shop Date Prepared: 4/16/2015
Climate Zone:
7
Conditioned Floor Area : 251
Unconditioned Floor Area : 0
General Information
Building Type:
❑ Schools
❑ Nonresidential
❑ Relocatable Public Schools
❑
❑
High -Rise Residential
Conditioned Spaces
❑
❑
Hotel/Motel
Unconditioned Spaces
Phase of Construction:
❑ New Construction
❑
Addition
®
Alteration
Method of Compliance:
❑ Complete Building
❑
Area Category
❑
Tailored
[LIGHTING COMPLIANCE DOCUMENTS (select yes for each document included)
For detailed instructions on the use of this and all Energy Efficiency Standards compliance documents, refer to the Nonresidential Manual published by the California Energy Commission.
YES
NO
FORM
TITLE
YES
NRCC-LIT-01-E
Certificate of Compliance. All Pages required on plans for all submittals.
YES
NRCC-LIT-02-E
Lighting Controls, Certificate of Compliance, and PAF Calculation. All Pages required on plans for all submittals.
NO
NRCC-LIT-03-E
Indoor Lighting Power Allowance
YES
NRCC-LIT-04-E
Tailored Method Worksheets
NO
NRCC-LIT-05-E
Line Voltage Track Lighting Worksheets
Summary of Allowed Lighting Power
Conditioned and Unconditioned space Lighting must not be combined for compliance
Indoor Lighting Power for Conditioned Spaces
Indoor Lighting Power for Unconditioned Spaces
Watts
Watts
Installed Lighting
Installed Lighting
484
0
1.
NRCC-LTI-01-E, page 4
+
NRCC-LTI-01-E, page 4
+
2
PORTABLE ONLY FOR OFFICES
NRCC-LTI-01-E, page 3
+
3.
Minus Lighting Control Credits
97
_
Minus Lighting Control Credits
0
NRCC-LTI-02-E, page 2
NRCC-LTI-02-E, page 2
4
Adjusted Installed Lighting Power
387
Adjusted Installed Lighting Power
(row 1 plus row 2 minus row 3)
(row 1 minus row 3)
0
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
STATE OF CALIFORNIA
INDOOR LIGHTING
F1
GEC-NRCC-LTI-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION , W'!
CERTIFICATE OF COMPLIANCE — USER INSTRUCTIONS NRCC-LTI-01-E
Indoor Lighting (Page 2 of 5)
Project Name: Legoland - The Big Shop Date Prepared: 4/16/2015
S.
Complies ONLY if Installed !< Allowed
Complies ONLY if Installed <_ Allowed
6.
Allowed Lighting Power
Conditioned NRCC-LTI-03-E, page 1
387
Allowed Lighting Power
Unconditioned NRCC-LTI-03-E, page 1
0
Declaration of Required Installation Certificates — Declare by selecting yes for all Installation Certificates that will be submitted. (Retain copies and verify forms are
completed and signed.)
YES
NO
Form/Title
x
NRCI-LTI-01-E - Must be submitted for all buildings
❑ Field Inspector
NRCI-LTI-02-E - Must be submitted for a lighting control system, or for an Energy Management Control System (EMCS),
❑ Field Inspector
x
to be recognized for compliance.
NRCI-LTI-03-E - Must be submitted for a line -voltage track lighting integral current limiter, or for a supplementary
❑ Field Inspector
x
overcurrent protection panel used to energize only line -voltage track lighting, to be recognized for compliance.
x
NRCI-LTI-04-E - Must be submitted for two interlocked systems serving an auditorium, a convention center, a
❑ Field Inspector
conference room, a multipurpose room, or a theater to be recognized for compliance.
x
NRCI-LTI-05-E - Must be submitted for a Power Adjustment Factor (PAF) to be recognized for compliance.
❑ Field Inspector
NRCI-LTI-06-E - Must be submitted for additional wattage installed in a video conferencing studio to be recognized for
ElField Inspector
x
compliance.
Declaration of Required Certificates of Acceptance — Declare by checking all of the Certificates of Acceptance that will be submitted. (Retain copies and verify forms are
completed and signed.)
YES
NO
Form/Title
x
NRCA-LTI-02-A - Must be submitted for occupancy sensors and automatic time switch controls.
❑ Field Inspector
x
NRCA-LTI-03-A - Must be submitted for automatic daylight controls.
❑ Field Inspector
x
NRCA-LTI-04-A - Must be submitted for demand responsive lighting controls.
❑ Field Inspector
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
STATE OF CALIFORNIA
INDOOR LIGHTING
;Ec-NRCC-L I1-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION ape
CERTIFICATE OF COMPLIANCE — USER INSTRUCTIONS NRCC-LTI-01-E
Indoor Lighting (Page 3 of 5)
Project Name: Legoland - The Big Shop Date Prepared: 4/16/2015
A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for:
❑ CONDITIONED SPACE ❑ UNCONDITIONED SPACE
A. INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
❑ The actual indoor lighting power listed on this page and on the next page includes all installed permanent and planned portable lighting systems.
❑ When Complete Building Method is used for compliance, list each different type of luminaire on separate lines.
❑ When Area Category Method or Tailored Method is used for compliance, list each different type of luminaire by each different function area on separate lines
❑ Also include track lighting in schedule, and submit the track lighting compliance form (NRCC-LTI-05-E) when line -voltage track lighting is installed.
B. Installed Portable Luminaires in Offices — Exception to Section 140.6(a)
❑ This section shall be filled out ONLY for portable luminaires in offices (As defined in §100.1). All other planned portable luminaires shall be documented on next page of
this compliance form.
❑ This section is used to determine if greater than 0.3 watts of portable lighting is planned for any office
❑ Fill out a separate line for each different office. Small offices that are typical (having the same general and portable lighting) may be grouped together. This allowance
shall not be traded between offices having different lighting systems.
Office Portable Luminaire
Office Installed Portable Luminaire Watts Per Square
Office Location
Field
Schedule
Foot
Inspector
A
B
C
D
E
F
G
H
I
J
Installed
z
c
portable
o v
Watts
If F 5 0.3,
Identify Office area in which
. 3
luminaire
o
per
enter zero;
Complete Luminaire Description
v �
watts in this
o fD
square
E x G
these portable luminaires are
N
v
(i.e., LED, under cabinet, furniture mounted
Watts per
�° o
office
= fD
°
foot
if F > 0.3,
installed
direct/indirect)
Luminaire
(B x C)
(D / E)
(F-0.3)
❑
❑
❑
❑
❑
❑
❑
❑
Enter sum total of all pages into NRCC-
Total installed portable luminaire watts that are greater than 0.3 watts per square foot per office:
LTI-01-E; Page 1
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
STATE OF CALIFORNIA
INDOOR LIGHTING
AR
E-71
GEC-NRCC-L 11-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION W a
CERTIFICATE OF COMPLIANCE — USER INSTRUCTIONS NRCC-LTI-01-E
Indoor Lighting (Page 4 of 5)
Project Name: Legoland - The Big Shop Date Prepared: 4/16/2015
A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for:
ID CONDITIONED SPACE ❑ UNCONDITIONED SPACE
C. INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
Luminaire Schedule
Installed Watts
Location
Field Inspector 1
A
B
C
D
E
F
G
H
How wattage was
determined
o_
o'
Complete Luminaire Description
r C
3
n
>
a
(i.e, 3 lamp fluorescent troffer,
5, N
v
3
2 al,
o Q
W. 0-
r1
x v
Primary Function area in which
z
F32T8, one dimmable electronic ballastrD
� =
o
�
m fl
these luminaires are installed
Pass
Fail
A
20.9w LED
20.9
IZI
❑
4
84
Retail Sales, Wholesale
❑
❑
Ext. Trk.
Track Light (with 2 Amp Current Limiter)
200.0
m
❑
2
400
Retail Sales, Wholesale
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
El
0
INSTALLED WATTS PAGE TOTAL:
484
Enter sum total of all pages into
NRCC-LTI-01-E; Page 2
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
STATE OF CALIFORNIA
INDOOR LIGHTING — LIGHTING CONTROLS
GEC-NRGG-L I1-02-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION 11110
CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E
Indoor Lighting - Lighting Controls (Page 1 of 3)
"Na Legoland - The Big Shop °dYePfepdYed 4/16/2015
The NRCC-LTI-02-E shall be used to document all mandatory and prescriptive lighting controls that are aDDlicable to the nrniPrt
Mandatory Lighting Control Declaration Statements (Indicate if the measure applies by checking yes or no below.)
YES
NO
Control Requirements
Lighting shall be controlled by self-contained lighting control devices which are certified to the Energy Commission according to the Title 20 Appliance
x
Efficiency Regulations in accordance with Section 110.9.
Lighting shall be controlled by a lighting control a system or energy management control system in accordance with §110.9. An Installation Certificate
x
shall be submitted in accordance with Section 130.4(b).
x
One or more Track Lighting Integral Current Limiters shall be installed which have been certified to the Energy Commission in accordance with §110.9 and
§130.0. Additionally, an Installation Certificate shall be submitted in accordance with Section 130.4(b).
x
A Track Lighting Supplementary Overcurrent Protection Panel shall be installed in accordance with Section 110.9 and Section 130.0. Additionally, an
Installation Certificate shall be installed in accordance with Section 130.4(b).
All lighting controls and equipment shall comply with the applicable requirements in §110.9 and shall be installed in accordance with the manufacturer's
x
instructions in accordance with Section 130.1.
x
All luminaires shall be functionally controlled with manually switched ON and OFF lighting controls in accordance with Section 130.1(a).
General lighting shall be separately controlled from all other lighting systems in an area. Floor and wall display, window display, case display, ornamental,
x
and special effects lighting shall each be separately controlled on circuits that are 20 amps or less. When track lighting is used, general, display,
ornamental, and special effects lighting shall each be separately controlled; in accordance with Section 130.1(a)4.
The general lighting of any enclosed area 100 square feet or larger, with a connected lighting load that exceeds 0.5 watts per square foot shall meet the
x
multi -level lighting control requirements in accordance with Section 130.1(b).
x
All installed indoor lighting shall be equipped with controls that meet the applicable Shut -OFF control requirements in Section 130.1(c).
x
Lighting in all Daylit Zones shall be controlled in accordance with the requirements in Section 130.1(d) and daylit zones are shown on the plans.
Lighting power in buildings larger than 10,000 square feet shall be capable of being automatically reduced in response to a Demand Responsive Signal in
x
accordance with Section 130.1(e).
Before an occupancy permit is granted for a newly constructed building or area, or a new lighting system serving a building, area, or site is operated for
normal use, indoor lighting controls serving the building, area, or site shall be certified as meeting the Acceptance Requirements for Code Compliance in
x
accordance with Section 130.4.(a). The controls required to meet the Acceptance Requirements include automatic daylight controls, automatic shut -OFF
controls, and demand responsive controls.
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
STATE OF CALIFORNIA
INDOOR LIGHTING - LIGHTING CONTROLS
,EG-NRCC-L I1-02-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION , ®f9
CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E
Indoor Lighting - Lighting Controls (Page 2 of 3)
Na11e' Legoland - The Big Shop Date Prepared: 4/16/2015
A separate document must be filled out for Conditioned and Unconditioned Spaces. This page is used only for the following:
0 CONDITIONED SPACES ❑ UNCONDITIONED SPACES
MANDATORY AND PRESCRIPTIVE INDOOR LIGHTING CONTROL SCHEDULE, PAF CALCULATION, and FIELD INSPECTION CHECKLIST
PAF Credit Calculation Z
t
-n
C)
(D =
D
n
(D
s
Standards Complying With 1
O
r
o
—
n
n o
h
m
Lighting Control Schedule
(✓ all that apply, or enter 'E' if Exempted)
v
aq fl °
v
D
x rD
=
r
Q rD
o
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
Type/ Description of Lighting
Control (i.e.: occupancy sensor,
#
`al
`O'
t�
a
�
N
Location in Buildin-
automatic time switch,
of
o
0
0
0
0
0
v
v
dimmer, automatic daylight,
Units
v
s
V
Q
etc... )
Legoland - The Big Shop
Dimming - Multiscene
✓
400
0.20
80
✓
❑
❑
Legoland - The Big Shop
Dimming - Multiscene
✓
84
0.20
17
✓
❑
❑
Control Credit PAGE TOTAL (Sum of Column M):
97
IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column M):
97
Enter Control Credit total
into NRCC-LTI-01-E; Page
1.
1. §130.1(a) = Manual area controls; §130.0(b) = Multi Level; §130.1(c) = Auto Shut -Off- §130.1(d) = Mandatory Daylight; §130.1(e) = Demand Responsive; §140.6(d) _
Additional lighting controls installed to earn a PAF; §140.6(d) = Prescriptive Secondary Sidelit Daylight Controls.
2. Check Table 140.6-A for correct Factor. PAFs shall not be traded between conditioned and unconditioned spaces. As a condition to earn a PAF, an Installation Certificate is
also required to be filled out, signed, and submitted.
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV-MM
Project Name
Legoland - The Big Shop
Date
411612015
DESCRIPTION
-Building Envelope Measures:
§110.8(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality
Standards for insulating material, Title 20 Chapter 4, Article 3.
§110.8(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of
Sections 2602 and 707 of Title 24, Part 2.
§110.8(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R-value
of no less than R-13 between framing members.
§110.7(a): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed,
weatherstripped or otherwise sealed.
Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of
§110.6(a): window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors
(swinging and sliding), and 1.0 cfm/ft.2 for nonresidential double doors (swinging).
§110.6(a): Fenestration U-factor shall be rated in accordance with NFRC 100, or the applicable default U-factor.
§110.6(a) : Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the
applicable default SHGC.
§110.6(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be
weatherstripped (except for unframed glass doors and fire doors).
Ener yPro 6.4 by EnergySoft User Number: 5235 RunCode: 2015-04-16T15:37:39 ID: 15046.00 Pa e 15 of 16
CERTIFICATE OF COMPLIANCE — USER INSTRUCTIONS NRCC-LTI-04-E
Indoor Lighting —Tailored Method (Page 7 of 7)
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name: Fernando A. Rodriguez
Documentation Author Signature:
Company: MRC Engineering, Inc.
Signature Date: 4/16/2015
Address: 34300 Gateway Drive, Suite 120
CEA/ HERS Certification Identification (if applicable):
City/state/zip: Palm Desert, CA 92211
phone. 760.340.9005
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design
identified on this Certificate of Compliance (responsible designer).
3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system
design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of
Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information
provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement
agency for approval with this building permit application.
5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for
the building, and made available to the enforcement agency for all applicable inspections. I understa that a completed signed copy of
this Certificate of Compliance is required to be included with the documentation the builder pr o th buiidi o cy.
Responsible Designer Name: Randall V. Moss P.E.
Responsible Designer Signature: ^0~44W
Company:
MRC Engineering, Inc.
Date Signed:
04i23/2015
Address: 72-880 Fred Waring Drive, Suite C-11
License: E.13453
City/state/zip: Palm Desert, CA 92260
phone: 760.340.9005
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
PLUMBING, Development Services
I
ELECTRICAL, Building Division
719
CITY O F MECHANICAL 1635 Faraday Avenue
WORKSHEET 76lsbadc .gov
CARLSBAD www.carlsbadca.gov
B_18 Building@carlsbadca.gov
Project Address: I Levy �"'`� �r ca Permit No.:
Gar \s1��ai ,
Information provided below refers to worn being done on the above mentioned permit only.
This form must be completed and returned to the Building Division before the permit can be issued.
Building Dept. Fax: (760) 602-8558
Number of new or relocated fixtures, traps, or floor drains .......................................................
New building sewer line?......................................................................................... Yes
No X
Numberof new roof drains?...............................................................................................................
Install/alter water line?.........................................................................................................................
Number of new water heaters?.........................................................................................................
Number of new, relocated or replaced gas outlets?....................................................................
Numberof new hose bibs?..................................................................................................................
Residential Permits:
New/expanded service: Number of new amps: 5.6
Minor Remodel only, Yes-/ No
Commercial/Industrial:
Tenant Improvement: Number of existing amps involved in this project 718
Number of new amps involved in this 5.6
New Construction: Amps per Panel: 200
Single Phase
Number of new amperes
Three Phase................................................................. Number of new amperes 5.6
Three Phase 480........................................................ Number of new amperes
Number of new furnaces, A/C, or heat pumps?............................................................................
New or relocated duct workr?.......................................................................... Yes No _
Numberof new fireplaces?.................................................................................................................
Numberof new exhaust fans?............................................................................................................
Relocate/install vent?............................................................................................................................
Numberof new exhaust hoods?........................................................................................................
Number of new boilers or compressors? ........
..............................................
Number of HP
B-18 Page 1 of 1 Rev. 03/09
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
07-10-2015
Plan Check Revision Permit No:PCR15052
Building Inspection Request Line (760) 602-2725
Job Address:
1 LEGOLAND DR CBAD
Permit Type:
PCR Status:
ISSUED
Parcel No:
2111000900 Lot #: 0 Applied:
06/19/2015
Valuation:
$0.00 Construction Type: NEW Entered By:
RMA
Reference #:
Plan Approved:
07/10/2015
PC #:
CB151340 Issued:
07/10/2015
Project Title:
LEGO-BIG SHOP -REVISE ROOF PLAN Inspect Area:
& EXTEND CANOPY,
Applicant: Owner:
SMS ARCHITECTS LEGOLAND CALIFORNIA L L C <LF> PLAY U S ACQUISI
STE B C/O PROPERTY TAX SERVICE CO
17848 SKY PARK CIRCLE P O BOX 543185
IRVINE CA 92614 DALLAS TX 75354
949 757-3240
Plan Check Revision Fee $250.00
Fire Expedited Plan Review $0.00
Additional Fees $0.00
Total Fees: $250.00 Total Payments To Date: $250.00 Balance Due: $0.00
FINAL APPROVAL
Inspector: Date: Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this or as to which the statute of limitations has previously otherwise expired.
Clt Of PLAN CHECK REVISION Development Services
YBuilding Division
Carlsbad APPLICATION 1635 Faraday Avenue
6 - 15 760-602-2719
www.carlsbadca.gov
Plan Check Revision No. /S�j �s" '� Original Plan Check No. CIL 1
Project Address �e9c�a�Y Date i ti i S
Contact 30rty 01-Jvt.C-Z, Ph °�`�`i "i 5`1 3Z'� O Fax
Email J��'� SYh�� �re�. CS►n'1
Contact Address 1-1 C
city Iry iKe' Zip f Z io `q
General Scope of Work
Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person.
1 . Elements revised:
Plans X Calculations ❑ Soils ❑ Energy ❑ Other
2.
3.
4.
Describe revisions in detail
List page(s) where
List revised sheets
each revision is
that replace
shown
existing sheets
ttnj gZx-4e-ld 1ey"(N �t e4' C"V% ?'J
-De-L-TA' A
Se_L:tjo�,
kS. 2
P 3. -Z
p��ra a
S
S , Z.
S t. 2 ,
S2 2-
5. Does this revision, in anyway, alter the exterior of the project? �K Yes ❑ No
6. Does this revision add ANY new floor area(s)? ❑ Yes NoeY;�r
7. Does this revision affect any fire related issues? ❑ Yes NoQ~```��J
8. Is this a complete set? ❑ Yes
,KSignatu:e�nue,
1635 Faraday Carlsbad, CA 92008
Ph: 760-602- 2719 FFax: 760-602-8558 Email: building@carlsbadca.gov
www.carlsbadca.gov
EsGil Corporation
In Partnership with ('government for Buiffing Safety
DATE: June 25, 2015
JURISDICTION: Carlsbad
PLAN CHECK NO.: 15-1340 REV SET: I
PROJECT ADDRESS: 1 Legoland Dr.
❑ APPLICANT
❑ JURIS.
❑ PLAN REVIEWER
❑ FILE
PROJECT NAME: Legoland "The Big Shop" Addition/Remodel
® The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
❑ The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
❑ The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
❑ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
❑ The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
❑ The applicant's copy of the check list has been sent to:
❑ EsGil Corporation staff did not advise the applicant that the plan check has been completed.
❑ EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: ) Email:
Mail Telephone Fax In Person
❑ REMARKS: Revision
By: Kurt Culver
EsGil Corporation
❑GA ❑EJ ❑MB ❑PC
Enclosures: Previously -approved
plans
6/22/15
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
Carlsbad 15-1340 REV
June 25, 2015
ADO NOT PAY— THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: 15-1340 REV
PREPARED BY: Kurt Culver
BUILDING ADDRESS: 1 Legoland Dr.
BUILDING OCCUPANCY:
DATE: June 25, 2015
BUILDING
PORTION
AREA
(Sq. Ft.)
Valuation
Multiplier
Reg.
Mod.
VALUE ($)
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code Icb By Ordinance
Bldg. Permit Fee by Ordinance r�
Plan Check Fee by Ordinance
Type of Review: ❑ Complete Review
❑ Repetitive Fee
Repeats
* Based on hourly rate
❑ Structural Only
❑ Other
Hrly 2 Hrs. @
EsGi Fouee $100.00
$250.00
$200.00
Comments:
Sheet 1 of 1
macvalue.doc +
PLANNING DIVISION
Development Services
BUILDING PLAN CHECK Planning Division
C`: ! T Y 0 F APPROVAL 1635 Faraday Avenue
CARt A P_29 (760) 602 4610
L SBwww.carlsbadca.eov
DATE: 6-19-15 PROJECT NAME: PROJECT ID:
PLAN CHECK NO: PCR 15-52 SET#: 1 ADDRESS: 1 Legoland Dr APN:
❑ This plan check review is complete and has been APPROVED by the Planning
Division.
By: Chris Sexton
A Final Inspection by the Planning Division is required ❑ Yes ® No
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
E] This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check APPROVAL has been sent to:
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING
ENGINEERING
FIRE PREVENTION
760-602-4610
760-602-2750
760-602-4665
Chris Sexton
Chris Glassen
Greg Ryan
760-602-4624
760_ 62-2 784
760-662-4653
Chris.Sexton@carlsbadca.gov
r1sbad ca.gov
Gr rry,4 a ` c;.ad sb cic .gc�v
Gina Ruiz
VIP y Marshall
j Cindy Wong
760-602-4675
760-602-2741
760-602-4662
Gina.Ruiz@carlsbadca.gov
`faC_ v IVtY=rs} ll'°r;ai°03 t �cf�µr_ 5 v
Cyrntlj a,War,9(_ carlsbadca,91�y
Unda, Ontiveros
Dominic Fieri
t 60-602-2 7 7.3
7 60--602-4664
adc,a.ggy
Darninic_Fac s �` arlsbadca
Remarks:
CITY OF
CARLSDD13 A
PLAN CHECK
REVIEW
TRANSMITTAL
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
DATE: 07/9/15 PROJECT NAME:big shop PROJECT ID: 1A,
PLAN CHECK NO: per15052(cb151340) SET#: I ADDRESS: 1 legoland APtV:
® This plan check review is complete and has been APPROVED by the fire Division.
By: cwong
A Final Inspection by the Division is required ® Yes ❑ No
❑ This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to joeynsms-arch.com &LISPS
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING
760-602-4610
ENGINEERING
760-602-2750
FIRE PREVENTION
760-6OZ 4665
❑
Chris Sexton
760-602-4624
Chris.Sexton@carlsbadca.gov
❑ Kathleen Lawrence
760-602-2741
Kathleen.Lawrence@carisbadca.gov
❑
Greg Ryan
760-602-4663
Gregory.Ryan@carlsbadca.gov
❑
Gina Ruiz
760-602-4675
Gina.Ruiz@carlsbadca.gov
❑
Linda Ontiveros
760-602-2773
Linda.Ontiveros@carisbadca.gov
® Cindy Wong
760-602-4662
Cynthia.Wong@carisbadca.gov
❑
❑
❑
Dominic Fieri
760-602-4664
Dominic.Fieri@carisbadca.gov
Remarks:
7/9/15
"APPROVED:
Page 1 of 2
THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE
OF A BUILDING PERMIT.
THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE
DEPARTMENT NOTATIONS, CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH
ALL APPLICABLE CODES AND REGULATIONS.
THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE
LAW.
7/7/15
***Bubble All Changes***
1. Show that fire department access is not impeded by extension of canopy.
Page 2 of 2
Carlsbad
El bad Fire Department
Plan Review Requirements Category: PCR,
Date of Report: 07-09-2015
Name: SMS ARCHITECTS
Address: STE B
17848 SKY PARK CIRCLE
IRVINE CA
ATTN: JOEY NUNEZ 92614
Permit#: PCRI 5052
Job Name: LEGO-BIG SHOP -REVISE ROOF PLAN
Job Address: I LEGOLAND DR CBAD
Reviewed by:
INCOMPL ba, "4 ttedd for review is incomplete. At this time, this office cannot
c�
adequately conduct a review to determine i1i1b"�!1,jj,,/ tandards, Please review
4
r
s
carefully all comments attach �se resubmit necessary plans an c i fi c.'a t i 'on , wit
es "clouded",
to this office for rev' n approval.
Conditions:
Cond: CON00083013
[NOT mET]
**Bubble All Changes***
1, Show that fire department access is not impeded by extention of canopy.
Entry: 07/07/2015 By: ewong Action: CO
Cond: CON0008406
[MET]
XPI ROVRT)-
THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A
BUILDING PERMIT.
THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT
NOTATIONS,
CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND
REGULATIONS.
THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW.
Entrv: 07f",' 1f;9YT4Vi Mm Acdon: AP
CITY OF
CARLSBAD
PLAN CHECK
REVIEW
TRANSMITTAL 4fr.
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
_t
..n ,� www.carlsbadca.gov
09
DATE: 07/7/15 PROJECT NAME:big shop PROJECT ID: �' L`
PLAN CHECK NO: per15052(cb151340) SET#: I ADDRESS: 1 legoland APN:
❑ This plan check review is complete and has been APPROVED by the fire Division.
By: cwong
A Final Inspection by the Division is required ® Yes ❑ No
® This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to joeygsms-arch.com &LISPS
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
NING
760.602-46iO
ENGINEERING
760-602-2750
FIRE PREVENTION
760-602-4665
❑
Chris Sexton
760-602-4624
Chris.Sexton@carlsbadca.gov
❑ Kathleen Lawrence
760-602-2741
Kathleen.Lawrence@carlsbadca.gov
❑
Greg Ryan
760-602-4663
Gregory.Ryan@carlsbadca.gov
❑
Gina Ruiz
760-602-4675
Gina.Ruiz@carlsbadca.gov
❑
Linda Ontiveros
760-602-2773
Linda.Ontiveros@carlsbadca.gov
®
Cindy Wong
760-602-4662
Cynthia.Wong@carlsbadca.gov
❑
❑
❑
Dominic Fieri
760-602-4664
Dom inic.Fieri@carisbadca.gov
Remarks:
7/7/15
***Bubble All Changes***
1. Show that fire department access is not impeded by extension of canopy.
Page 1 of 1
Carlsbad Fire Department
Plan Review Requirements Category: PCR ,
Date of Report: 07-07-2015
Name: SMS ARCHITECTS
Address: STE B
17848 SKY PARK CIRCLE
IRVINE CA
ATTN: JOEY NUNEZ 92614
Reviewed by:
Permit #: PCR15052
Job Name: LEGO-BIG SHOP -REVISE ROOF PLAN
Job Address: 1 LEGOLAND DR CBAD
INCOMPLETE The item you have submitted for review is incomplete. At this time, this office cannot
adequately conduct a review to determine compliance with the applicable codes and/or standards. Please review
carefully all comments attached. Please resubmit the necessary plans and/or specifications, with changes "clouded",
to this office for review and approval.
Conditions:
Cond: CON0008393
[NOT MET]
"Bubble All Changes***
1. Show that fire department access is not impeded by extention of canopy.
Entry: 07/07/2015 By: cwong Action: CO
GRIMM & CHEN STRUCTURAL ENGINEERING, INC.
STRUCTURAL CALCULATIONS
G&C Job Number: 15-040
Summary of Changes:
The new wall and roof that were added
above the canopy have been removed
from the scope.
Legoland -
The Big Shop
Carlsbad, CA
Wall & Roof Revision \
June 16, 2015
PREPARED FOR:
SMS ARCHITECTS
17500 Redhill Ave., Suite 240 • Irvine • California • 92614 . Tel 949.250.3150 Fax 949.203.0450
Oate: Job No.
l` Engineer: Page No: of
Lug\Ji
AVc
cA01
L►A
116--, Vil "Lth C
eaMrM;D f vr� -1--*. e,
Al2 llzois
�IZ--i 17fl f s
('(►� (pis
tib t u r �h �i ,tea K/-V
w t. = 1 cw ft-F MIS.(,,
s-c'FLf (--m wr)
17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-C450 I www.gcstructural.com
Date: Job No.
l` Engineer: Page No: of
CkwWq l AO — ►COV), of
(11( 1'{t t -S off
1A*/ Tg tt,/,WgA4
1 pfl—
t.. �—
"I,. 1 to 0 0 �
CkJ+N
7 q�v, A
1
pot;,
.---------
te=1L,�
17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-0450 1 www.gcstructural.com
COMPANY PROJECT
WoodWorks"
�C)ILN.Ikt It)1t NC)(:f) I>F Jt:.4
June 18, 2015 16:04 Columnl
Design Check Calculation Sheet
WoodWorks Sizer 10.2
Loads:
Load Type Distribution Pat- Location `ft Magnitude Unit
tern
Start End
Start End
Loadl
Dead
Axial
(Ecc. = C.CC")
4280
lbs
Load2
Roof constr.
Axial
(Ecc. = O.CO")
26GC
lbs
Self -weight
Dead
Axial
72
lbs
Lateral Reactions (lbs):
10,
dy
o,
10,
Timber -soft, D.Fir-L, No.1, 6x6 (5-1/2"x5-1/2")
Support: Non -wood; Bearing length = column width
Total length: 10.0';
Pinned base; Load face = width(b); Ke x Lb: 1.0 x 10.0 = 10.0 [ft]; Ke x Ld: 1.0 x 10.0 = 10.0 [ft];
Analysis vs. Allowable Stress (psi) and Deflection (in) using NDS 2012:
Additional Data:
FACTORS: F/E(psi)CD CM Ct CL/CP CF Cfu Cr Cfrt Ci LC#
Fc' i000 1.25 1.00 1.00 0.610 1.000 - - 1.00 1.0C 2
Fc* 1000 1.25 !.CC 1.00 - 1.COC - - 1-CC 1.00 2
CRITICAL LOAD COMBINATIONS:
Axial : LC #2 = D+Lr, P = 7i52 lbs
D=dead L=live S=snow W=wind I=impact Lr=reof live Lc=concentrated E=earthquake
All LC's are listed in the Analysis output
Load combinations: ASCE 7-11-0 / IBC 2C12
Design Notes:
1. WoodWorks analysis and design are in accordance. with the ICC International Building Code (IBC 2012), the National Design Specification
(NDS 2012), and NDS Design Supplement.
2. Please verify that the default deflection limits are appropriate for your application.
CriterionAnal sis Value Desi n Value Arai sis/Design
Axial fc = 236 Fc' = 763 fc/Fc' _ 0.31
Axial Bearing fc = 236 Fc* = i250 fc/Fc* = .19
C
3-