Loading...
HomeMy WebLinkAbout1 LEGOLAND DR; ; CB151340; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 07-10-2015 Commercial/Industrial Permit Permit No: CB151340 Building Inspection Request Line (760) 602-2725 Job Address: 1 LEGOLAND DR CBAD Permit Type: TI Sub Type: COMM Status: ISSUED Parcel No: 2111000900 Lot #: 0 Applied: 05/04/2015 Valuation: $17,961.00 Construction Type: 5B Entered By: RMA Occupancy Group: Reference # Plan Approved: 07/10/2015 Issued: 07/10/2015 Inspect Area Plan Check #: Project Title: LEGOLAND-BIG SHOP- ADD 123 SF COUNTER AREA EXPANSION, REMODEL 131 SF OF EXISTING DISPLAY AREA, EXTEND EXISTING CANOPY TO COVER ADDITION Applicant: Owner: JOEY NUNEZ LEGOLAND CALIFORNIA L L C <LF> PLAY U S ACQUISI STE B C/O PROPERTY TAX SERVICE CO 17848 SKY PARK CIRCLE P O BOX 543185 IRVINE CA 92614 DALLAS TX 75354 949 757-3240 Building Permit $184.75 Meter Size Add'I Building Permit Fee $0.00 Add'I Red. Water Con. Fee $0.00 Plan Check $129.32 Meter Fee $0.00 Add'I Building Permit Fee $0.00 SDCWA Fee $0.00 Plan Check Discount $0.00 CFD Payoff Fee $0.00 Strong Motion Fee $5.03 PFF (3105540) $0.00 Park Fee $0.00 PFF (4305540) $0.00 LFM Fee $0.00 License Tax (3104193) $0.00 Bridge Fee $0.00 License Tax (4304193) $0.00 BTD #2 Fee $0.00 Traffic Impact Fee (3105541) $0.00 BTD #3 Fee $0.00 Traffic Impact Fee (4305541) $0.00 Renewal Fee $0.00 PLUMBING TOTAL $0.00 Add'I Renewal Fee $0.00 ELECTRICAL TOTAL $45.00 Other Building Fee $0.00 MECHANICAL TOTAL $0.00 Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00 Meter Size Sewer Fee $0.00 Add'I Pot. Water Con. Fee $0.00 Redev Parking Fee $0.00 Red. Water Con. Fee $0.00 Additional Fees $0.00 Green Bldg Stands (SB1473) Fee $1.00 HMP Fee ?? Fire Expedidted Plan Review $0.00 Green Bldg Standards Plan Chk ?? TOTAL PERMIT FEES $365.10 Total Fees: $365.10 Total Payments To Date: $365.10 Balance Due: $0.00 FINAL APPROVAL I Inspector: Date: 4 '2-1-45' Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Storm Water Pollution Prevention Plan (SWPPP) Permit 07-10-2015 Permit No:SW 150191 Job Address: 1 LEGOLAND DR CBAD Permit Type: SWPPP Status: ISSUED Parcel No: 2111000900 Lot #: 0 Applied: 05/04/2015 Reference #: Entered By: RMA CB#: CB 151340 Issued: 07/10/2015 Inspect Area: Project Title: LEGOLAND-ADD 123 SF TO BIG Tier: 1 SHOP Priority: L Applicant: LEGOLAND CALIFORNIA L L C <LF> PLAY U S ACQUISI C/O PROPERTY TAX SERVICE CO P O BOX 543185 DALLAS TX 75354 Emergency Contact: LINDSAY BURROUGHS 760 918-5412 Owner: LEGOLAND CALIFORNIA L L C <LF> PLAY U S ACQUISI C/O PROPERTY TAX SERVICE CO P O BOX 543185 DALLAS TX 75354 SWPPP Plan Check $48.00 SWPPP Inspections $58.00 Additional Fees $0.00 TOTAL PERMIT FEES $106.00 Total Fees: $106.00 Total Payments To Date: $106.00 Balance Due: $0.00 IN i '� Il�." 1 OMEM. m4k� THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: >PLANNING �tNGINEERING ><BUILDING ><FIRE HEALTH HAZMATIAPCD Building Permit Application Plan Check No. Est. Value City Of 1635 Faraday Ave., Carlsbad, CA 92008 760-602-2719 Fax:760-602-8558 Plan Ck. Deposit Carlsbad email: building@carlsbadca.govPh: ate� SWPPP www.carlsbadca.gov A JOB ADDRESS 1 Le a Ur. SUITE#/SPACE#/UNIT# APN B+ Shot)ZI 1 - c��- CT/PROJECT # LOT # PHASE # # OF UNITS # BEDROOMS # BATH OMS T #ANT BUSINESS NAME CONSTR. TYPE OC'G GRROUP a DESCRIPTION OF WORK: Include Square Feet of Affected Area(s)cc \ ( �\`j410.y dYC� KK•� �4�r� 4'�' to`1 EfC � 23 S Gna+ti-1a✓ �e.vrnocl,Q.�, O� e-(.1��\v1,y �31 $T. O� Glt�o. e.`I• F-it IN-,10 V, kev�o� E��SK�j fgwdP� ce.le� thaw e.y p�\kSivh , EXISTING USE �J _ �ql� M , ` PROPOSED USE 1 �` 1 ► /\ GARAGE (SF) PATIOS (SF) DECKS (SF) FIREPLACE YES❑k NOM AIR CONDITIONING YES [:]NOM FIRE SPRINKLERS YES.M N0F] APPLICANT NAME ^t` PROPERTY OWNER NAME �C Primary Contact 02 , vU l ADDRESS ADDRESS CITY STATE ZIP CITY STATE ZIP r �2ro1`i PHONE Hy�1• �5l• 2+-I.� FAX PHONE FAX EMAIL ov�1 c. EMAIL DESIGN PROFESSIONAL CONTRACTOR BUS. NAME ADDRESS ` � f�C �irG1 e ^ \l�J ► ADDRESS CI STATE ZIP CITY STATE ZIP i �\ws C-A PHONE FAX PHONE FAX `441 LA EMAIL EMAIL STATE LICn. # Q`il t STATE LIC.# CLASS CITY BUS. LIC.# _ ` (Sec_ 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, Improve, oemousn or repair any scruciure, prior to i s issudnuu, duv IeuuUlu applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commending with Section 7000 ycs of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a ,M1 ., —it. of nr,t mn than fives hu rIrad dnllars 350011. Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: ❑ I have and will maintain a certificate of consent to self -insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. ❑ 1 have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Insurance Policy No. Expiration Date This section need not be completed if the permit is for one hundred dollars ($100) or less. ❑ Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor code, interest and attorney's fees. )K CONTRACTOR SIGNATURE AGENT DATE I hereby affirm that I am exempt from Contractor's License Law for the following reason: ❑ I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he did not build or improve for the purpose of sale). ® I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). I am exempt under Section Business and Professions Code for this reason: 1. 1 personally plan to provide the major labor and materials for construction of the proposed property improvement. Yes [—]No 2. 1 (have I have not) signed an application for a building permit for the proposed work. 3. 1 have contracted with the following person (firm) to provide the proposed construction (include name address I phone / contractors' license number): 4. 1 plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name I address I phone / contractors' license number): 5. 1 will provide some of the work, but I the following persons to provide the work indicated (include name / address I phone I type of work): )KPROPERTY OWNER SIGNATURE AGENT DATE —I— 10-- Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley -Tanner Hazardous Substance Account Act? Yes No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? Yes No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? Yes No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (1) Civil Code). Lender's Name Lender's Address I certifythat I have read the application and state thatthe above information is conectand thatthe intormation on the plans is accurate. I agree to complywilh all City ordinances and State laws relating to building construction. I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories in height. EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days (Section 106.4A Uniform Building Code). AtSAPPLICANT'S SIGNATURE DATE S / y / i 5 Irr ...4 STOP: THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE. Complete the following ONLY if a Certificate of Occupancy will be requested at final inspection. Fax (760) 602-8560, Email build ing(a Carlsbadca.gov or Mail the completed form to City of Carlsbad, Building Division 1635 Faraday Avenue, Carlsbad, California 92008. CO#: (Office Use Only) CONTACT NAME OCCUPANT NAME ADDRESS BUILDING ADDRESS CITY STATE ZIP CITY STATE ZIP Carlsbad CA PHONE FAX EMAIL OCCUPANT'S BUS. LIC. No. DELIVERY OPTIONS PICK UP: CONTACT (Listed above) OCCUPANT (Listed above) CONTRACTOR (On Pg. 1) ASSOCIATED CB# MAIL TO: CONTACT (Listed above) OCCUPANT (Listed above) CONTRACTOR (On Pg. 1) NO CHANGE IN USE / NO CONSTRUCTION MAIL / FAX TO OTHER: CHANGE OF USE / NO CONSTRUCTION )KAPPLICANT'S SIGNATURE DATE Inspection List Permit#: CB151340 Type: TI COMM LEGOLAND-BIG SHOP- ADD 123 SF COUNTER AREA EXPANSION, REMODEL Date Inspection Item 12/16/2015 89 Final Combo 11/25/2015 17 Interior Lath/Drywall 11/24/2015 84 Rough Combo 11/23/201514 Frame/Steel/Bolting/Weldin 10/26/201511 Ftg/Foundation/Piers Inspector Act Comments PB AP PD AP PB AP PB PA PD AP Thursday, December 17, 2015 Page 1 of 1 HITE HILL - INSPECTION TESTING / ENGINEERING Office (858) 220-1078 Fax (858) 220-7421 hill@h-ite.com Special Inspection Report Project Address Building Permit Number Jurisdiction / File Number One Le oland Drive CB151340 Carlsbad Project Name Big Sho -Q Bot Counter Architect SMS Architects Construction Material Design Strength Source Engineer Grim and Chen Structural Steel A36/A500 Description of Materials General Contractor Barnett Construction ASTM A50OB-HSS Filler Metal-E71T-8 (NR-232) Sub Contractor SD Steel Solutions Welding Process-FCAW (Flux Core Arc Welding) Other Inspection Date/Start of Work/End of Work 22-Nov-15 Provided special inspection for the field welding of weldments and repairs for the Header and Canopy Framing Along the exterior perimeter, per Plan on Sheet S2.2, Details 1 & 9 on Sheet S1.2, and RFI #5 provided by the Engineer of Record. Verified Welder qualifications, preparation of base metals, and handling of filler materials. Welds visually inspected to verify that repairs meet quality requirements. The welding processes and procedures are in substantial conformance with the construction drawings, specifications, changes thereto, and meet the applicable quality requirements. Welder: Toman G. Martinez, AWS D1.1, No: 4541 (08/07/13), Positions 1 G-4G I HEREBY CERTIFY THAT I HAVE INSPECTED THE ABOVE REPORTED WORK. UNLESS OTHERWISE NOTED, THE WORK INSPECTED IS TO /"'6��I�CCNo 1113681-MI THE BEST OF MY KNOWLEDGE IN COMPLIANCE WITH THE APPROVED I PECTOR.S G ATURE REGISTRATION NUMBER CONSTRUCTIOBN DOCUMENTS, AND APPLICABLE SECTIONS OF THE GOVERNING BUILDING LAWS. November 22, 2015 Henry Barton Hill, PE 64822 DATE San Diego • Orange • Imperial • Los Angeles - Riverside • San Bernardino HITE HILL - INSPECTION TESTING f ENGINEERING Office (858) 220-1078 Fax (858) 220-7421 hill@h-ite.com Special Inspection Report Project Address One Le oland Drive Building Permit Number Jurisdiction / File Number CB151340 Carlsbad Project Name Pig Sho -Q Bot Counter Architect SMS Architects Construction Material Design Strength Source Structural Steel A36/A500 Engineer Grim and Chen Description of Materials ASTM A50OB-HSS General Contractor Barnett Construction Filler Metal-[ 71T-8 (NR-232) Sub Contractor SD Steel Solutions Welding Process-FCAW (Flux Core Arc Welding) Other Inspection Date /Starto! Work / End or Work 18-Nov-15 Provided special inspection for the field welding of repair weldments for the Header and Canopy Framing Along the exterior perimeter, at new to existing conections Verified Welder qualifications, preparation of base metals, and handling of filler materials. Work incomplete. Welder: Toman G. Martinez, AWS D1.1, No: 4541 (08/07/13), Positions 1 G-4G I HEREBY CERTIFY THAT I HAVE INSPECTED THE ABOVE REPORTED WORK. UNLESS OTHERWISE NOTED, THE WORK INSPECTED IS TO ICC, No.: 1113681-MI THE BEST OF MY KNOWLEDGE IN COMPLIANCE WITH THE APPROVED I PECTOR'S G TURE REGISTRATION NUMBER CONSTRUCTIOBN DOCUMENTS, AND APPLICABLE SECTIONS OF THE GOVERNING BUILDING LAWS. November 18, 2015 Henry Barton Hill, PE 64822 DATE San Diego • Orange • Imperial • Los Angeles • Riverside • San Bernardino HITE HILL - INSPECTION TESTING / ENGINEERING Office (858) 220-1078 Fax (858) 220-7421 hill@h-ite.com Special Inspection Report Project Address One Le oland Drive Building Permit Number Jurisdiction /File Number CB151340 Carlsbad Project Name Big Sho -Q Bot Counter Architect SMS Architects Construction Material Design Strength Source Structural Steel A36/A500 Engineer Grim and Chen Description of Materials ASTM A50OB-HSS General Contractor Barnett Construction Filler Metal-E71T-8 (NR-232) Sub Contractor SD Steel Solutions Welding Process-FCAW (Flux Core Arc Welding) Other Inspection Date / Stan of Work r End of Work 18-Nov-15 Provided special inspection for the fit -up and field welding of weldments for the Header and Canopy Framing Along the exterior perimeter, per Plan on Sheet S2.2, and Details 1 & 9 on Sheet S1.2. Verified Welder qualifications, preparation of base metals, and handling of filler materials. It should be noted, fit -up to exsisting members is not flush. Repairs pending. Welder: Hector Orozco, AWS D 1.1, Lab No: 14-048 (03/06/14), Positions 3G I HEREBY CERTIFY THAT I HAVE INSPECTED THE ABOVE REPORTED A W WORK. UNLESS OTHERWISE NOTED, THE WORK INSPECTED IS TO 4ICC, No.: 1113681-MI THE BEST OF MY KNOWLEDGE IN COMPLIANCE WITH THE APPROVED I PECTO IGNATURE REGISTRATION NUMBER CONSTRUCTIOBN DOCUMENTS, AND APPLICABLE SECTIONS OF THE GOVERNING BUILDING LAWS. November 18, 2015 Henry Barton Hill, PE 64822 DATE San Diego - Orange • Imperial • Los Angeles • Riverside - San Bernardino HITE HILL - INSPECTION TESTING / ENGINEERING Office (858) 220-1078 Fax (858) 220-7421 hill@h-ite.com Special Inspection Report Project Address One Le oland Drive Building Permit Number Jurisdiction /File Number CB151340 Carlsbad Project Name -Big Sho -Q Bot Counter Architect SMS Architects Construction Material Design Strength Source Structural Steel A36/A500 Engineer Grim and Chen Description of Materials ASTM A50OB-HSS General Contractor Barnett Construction Sub Contractor SD Steel Solutions Other Inspection Date / Start or Work /Eno of Work 17-Nov-15 Provided special inspection for the field welding of weldments for the Header and Canopy Framing Along the exterior perimeter, per Plan on Sheet S2.2, and Details 1 & 9 on Sheet S1.2. Verified Welder qualifications. It should be noted the Outrigger and Canopy Edge are not as specified on the approved plans or shop drawings and sub -contractor failled to privide mill certifications for steel. Work stopped. Welder: Hector Orozco, AWS D1.1, Lab No: 14-048 (03/06/14), Positions 3G I HEREBY CERTIFY THAT I HAVE INSPECTED THE ABOVE REPORTED WORK. UNLESS OTHERWISE NOTED, THE WORK INSPECTED IS TO THE BEST OF MY KNOWLEDGE IN COMPLIANCE WITH THE APPROVED CONSTRUCTIOBN DOCUMENTS, AND APPLICABLE SECTIONS OF THE GOVERNING BUILDING LAWS. Barton Hill, PE 64822 San Diego • Orange • Imperial • Los Angeles • Riverside - San Bernardino r ICC, No.: 1113681-MI REGISTRATION NUMBER November 17, 2015 DATE HITE HILL - INSPECTION TESTING J ENGINEERING Office (858) 220-1078 Fax (858) 220-7421 hill@h-ite.com Special Inspection Report Project Address Building Permit Number Jurisdiction / File Number One Le oland Drive CB151340 Carlsbad Project Name Big Sho -Q Bot Counter Architect SMS Architects Construction Material Design Strength Source Reinforced Conc. fc=3000 psi Superior RMC Engineer Grim and Chen Description of Materials General Contractor Barnett Construction ASTM A615 Grade 60 Reinforcing ASTM A307 Anchor Bolts Sub Contractor Superior RMC, Mix Design 868P, 4000 psi Superior RMC, Mix Design 867P, 3000 psi other Inspectlon Date / Start of Work/End of Work 28-Oct-15 Provided Special Inspection for the placement of reinforcing steel in the New Slab -on -Grade (SoG)and Continuous Footing, per Sheet S1.2, Details 1,2 & 3, at the referenced project. All steel sizes, laps and clearances are in substantial conformance with the approved plans, specifications, and changes thereto. In addition, observed the deposit of approximately 9 cubic yards (cyd) Superior RMC, Mix Design 867P, 3000 psi,and Mix Design 868P, 4000 psi into the footings and SoG referenced above. The concrete was placed by trailer pump, and vibrated mechanically for consolidation. Fabricated one set of cylinders from concrete for testing. I HEREBY CERTIFY THAT I HAVE INSPECTED THE ABOVE REPORTED WORK. UNLESS OTHERWISE NOTED, THE WORK INSPECTED IS TO ICC, No.: 1113681-MI THE BEST OF MY KNOWLEDGE IN COMPLIANCE WITH THE APPROVED I SPECTOR' I ATURE REGISTRATION NUMBER CONSTRUCTIOBN DOCUMENTS, AND APPLICABLE SECTIONS OF THE GOVERNING BUILDING LAWS. October 28, 2015 Henry Barton Hill, PE 64822 DATE San Diego • Orange - Imperial • Los Angeles • Riverside - San Bernardino HITE HILL - INSPECTION TESTING f ENGINEERING Office (858) 220-1078 Fax (858) 220-7421 hill@h-ite.com Foundation Observation Report Project Name The Big Sho -Q Bot Counter Date I 24-Oct-2015 Project Location One Le oland Drive, Carlsbad, California Owner/Developer Merlin Entertainment Contractor Barnett Construction Project /Permit Number CB151340 Lot(s) /Parcel 18 / 211-100-09 Soils Report Ref. Soils Report Foundation Type Conventional (Provided by Others) Expansion Condition High Fill Geometry Category 11 Foundation Depth 24 Inches min. Found. Reinforcement (6) #5 Bar Horizontal #4 Ties 16" Foundation Width 1.5 feet min. Interior Reinforcement #4 Bar @ 16" oc, ew Slab bedding Undisturbed Soil Vapor Barrier Installed Observations: Observed V-6" wide perimeter footing at a depth of 24". Verified soil conditions exposed are similar to those anticipated. The observed foundation appears in substantial conformance. Comments: It is our understanding that all excavations will be cleaned of loose soil and debris prior to concrete placement; and that the soil moisture content will be maintained. The presence of our field representative is for the purpose of observing the construction and reporting on its compliance with the approved plans and the applicable building codes. Our work does not include the supervision or direction of the contractor's work, his employees or agents. The contractor for this project should be so advised. The contractor should all so be advised that ELD T CIAN /REPRESENT IVE SIGNATURE neither the presence of our field personnel nor the observation and testing by this firm shall excuse him in any way for defects in his work. It should further be understood that we are not responsible for site safety. San Diego - Orange - Los Angeles - Riverside - San Bernardino RITE HILL - INSPECTION TESTING / ENGINEERING Office (858) 220-1078 Fax (858) 220-7421 hill@h-ite.com Special Inspection Report Project Address One Le oland Drive Building Permit Number Jurisdiction /File Number CB151340 Carlsbad Project Name Big Sho -Q Bot Counter Architect SMS Architects Construction Material Design Strength Source Reinforced Conc. fc=3000 psi RMC Engineer Grim and Chen Description of Materials ASTM A615 Grade 60 Reinforcing General Contractor Barnett Construction Simpson Stron -Tie®, SET-XP Epoxy, ICC ESR-2508 Sub Contractor Other Inspection Date / Stan of Work /End of Work 23-Oct-15 Provided special inspection for the epoxy installation of (26) #4 dowel anchors embedded a minimum of 4", into existing Slab -on -Grade, per Sheet S1.2, Details 1,2 & 3; and (12) #5 dowel anchors embedded a minimum of 10", into existing footing, per Sheet S1.2, Detail 13. All holes were drilled using the correct drill bit size, and properly brushed/cleaned. Installation of anchors is in compliance with ICC ESR-2508, and manufactures specifications. I HEREBY CERTIFY THAT I HAVE INSPECTED THE ABOVE REPORTED ACI No.: 0005533. WORK. UNLESS OTHERWISE NOTED, THE WORK INSPECTED IS TO ICC, No.: 1113681-48 THE BEST OF MY KNOWLEDGE IN COMPLIANCE WITH THE APPROVED E o S SIGNATURE REGISTRATION NUMBER CONSTRUCTIOBN DOCUMENTS, AND APPLICABLE SECTIONS OF THE GOVERNING BUILDING LAWS. October 23, 2015 enry Ba ill, PE 64822 DATE San Diego • Orange - Imperial • Los Angeles • Riverside - San Bernardino To: Page 2 of 3 2015-10-24 22:53:09 (GMT) From: Henry Hill HITE HILL -INSPECTION TESTING / ENGINEERING City of Carlsbad Building Department 1635 Faraday Avenue Carlsbad, California 92008 Facsimile: (760) 602-8560 Reference: Permit Dumber CB 151340 October 24, 2015 Subject: ,Special Inspection Affidavit for LEGOLAND The Big Shop -Reserve and Ride Ladies and Gentlemen: This letter is to notify that; Special Inspections of Reinforced Concrete, Structural Steel Welding, Epoxy Anchor Installation, Soil Observation and Materials Testing are to be performed at the subject project by HiTE (Hilt-inspection/Testing,`Engineering). All work requiring special inspection and/or materials sampling and testing for the structure(s) constructed under the referenced permit are to be performed in accordance with the approved plans, specifications, and changes thereto, and the California Building Code. Respectfully submitted, Ij iTE .Z Henry Barton Hill, Principal Engineer M.S., P.E. 464822 Attachments: Principal Certifications PO Box 771, San Diego, CA 92038-0771 San Diego • Orange • Los Angeles • Riverside • Impedal • San Bernardino www.h-ite.com 0 (858) 220-1078 Office • (858) 220-7421 Fax EsGil Corporation In Partnership with Government for BuiCrfing Safety DATE: May 12, 2015 JURISDICTION: Carlsbad PLAN CHECK NO.: 15-1340 PROJECT ADDRESS: 1 Legoland Dr. PROJECT NAME: Legoland "The Big Shop" ❑ APPLICANT ❑ JURIS. ❑ PLAN REVIEWER ❑ FILE SET: I Addition/Remodel ❑ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. ❑ The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. ❑ The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ❑ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. ❑ The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. ❑ The applicant's copy of the check list has been sent to: ❑ EsGil Corporation staff did not advise the applicant that the plan check has been completed. ❑ EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Email: Mail Telephone Fax In Person ❑ REMARKS: By: Kurt Culver EsGil Corporation El GA ❑EJ ❑MB ❑PC 5/4/15 Enclosures: 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 Carlsbad 15-1340 May 12, 2015 ADO NOT PAY- THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: 15-1340 PREPARED BY: Kurt Culver BUILDING ADDRESS: 1 Legoland Dr. BUILDING OCCUPANCY: DATE: May 12, 2015 BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) Add 17,961 Air Conditioning Fire Sprinklers TOTAL VALUE 17,961 Jurisdiction Code Icb By Ordinance Bldg. Permit Fee by Ordinance Plan Check Fee by Ordinance Type of Review ❑ Repetitive Fee Repeats O Complete Review ❑ Other ❑ Hourly EsGil Fee ❑ Structural Only Hr. @* $185.55 $120.61 $103.91 Comments: Sheet 1 of 1 macvalue.doc + C I T Y 0 F �,ARLSBAD PLAN CHECK REVIEW TRANSMITTAL Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov DATE:05-06-2015 PROJECT NAME: LEGOLAND COUNTER REMODEL/ EXPANSION PROJECT ID: CB15-1340 PLAN CHECK NO: I SET#: I ADDRESS: ONE LEGOLAND DR. APN: 211-100-09-00 VALUATION: $17,961 This plan check review is complete and has been APPROVED by the ENGINEERING Division. By: CG 5/6/15 A Final Inspection by the Division is required Yes V No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: JOEY@SMS-ARCH.COM 01, , -,, 1"; f:, - " '0 �s �- j � -- C D -)rov— � f - fi-, t b e! A %, , , � z -� � Q i i ce or ---�su,? H j , For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING 760-602-4610 ENGINEERING 760-602-2750 FIRE PREVENTION 760-602-4665 Chris Sexton 760-602-4624 Chris.Sexton@carisbadca.gov Chris Glassen 760-602-2784 Christoph(g.Glassen@ Greg Ryan 760-602-4663 Gregory. Gina Ruiz 760-602-4675 Gina.Ruiz@carisbadca.gov Linda Ontiveros 760-602-2773 Linda.Ontiveros@carisbadca.gov Cindy Wong 760-602-4662 Cvnthia.Wong@carlsbadca.gov Dominic Fieri 760-602-4664 Dom inic.Fieri@carlsbadca.gov Remarks: Development Services BUILDING PLANCHECK Land Development Engineering C. I T Y 0 F CHECKLIST 1635 Faraday Avenue 760-602-2750 QUICK-CHECK/APPROVAL CARLSBAD www.carlsbadca.gov ENGINEERING Plan Check for CB1 5-1340 Date:05-06-2015 Project Address: ONE LEGOLAND DR, APN: 211-100-09-00 Project Description: REMODEL 131 SQ. FT. OF EXISTING DISPLAY AREA. Valuation: $17,961 ADD 123 SQ. FT. OF COUNTER AREA, EXTEND CANOPY. ENGINEERING Contact: CHRIS GLASSEN Phone: 760-602-2784 RESIDENTIAL INTERIOR RESIDENTIAL ADDITION MINOR (<$20,000.00) CARLSBAD PREMIER OUTLETS OTHER: GYM Email: Christopher.Glassen@carlsbadca.gov Fax: 760-602-1052 V TENANTIMPROVEMENT PLAZA CAMINO REAL COMPLETE OFFICE BUILDING r - - -- - -- - - OFFICIAL USE ONLY — -- ' " — — — — ' ' — - - — - - — - - — - - I ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT BY: CG 516/15 DATE:05-06-2015 REMARKS: NO ADDITIONAL ENGINEERING FEE Notification of Engineering APPROVAL has been sent to JOEY@SMS-ARCH.COM via EMAIL._.._.._.._.._.._.. . .. . .. . .. on 05-06-2015 . .. .. . .. E-36 Page 1 of 1 REV 4/30/11 C I T Y O F CARLSBAD STORM WATER COMPLIANCE FORM TIER 1 CONSTRUCTION SWPPP E-29 STORM WATER COMPLIANCE CERTIFICATE ✓ My project is not in a category of permit types exempt from the Construction SWPPP requirements ✓ My project is not located inside or within 200 feet of an environmentally sensitive area with a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non -storm water discharge(s). ✓ My project does not require a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code) ✓ My project will not result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas that meets one or more of the additional following criteria: • located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or, • disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical; and/or • disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse; and/or • construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). 1 CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS. I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF CARLSBAD. 1 l`- ✓� OWNER(S)/ ER'S A NT NAME (PRINT) OWNER(S)/O NER'S AGENT NAME (SIGNATURE) DATE STORM WATER POLLUTION PREVENTION NOTES 1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN IS EMINENT. 2. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 3. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEERING OR BUILDING INSPECTOR DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 4. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGATE. 6. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND MAINTAINED. SPECIAL NOTES Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov PROJECT INFORMATION p Site Address: l L-dwL�+tiGt �tr• Assessor's Parcel Number:.A I I' 1L cq Project ID: � W / 1-21 yI Construction Permit No.: —�12 Estimated Construction Start Date Project Duration Months Emergency Contact: (� Name: L1 viols-y 19u�Yc3JC^17j 24 hour Phone: (pO ' �� - 5� ►2 Perceived Threat to Storm Water Quality ❑ Medium r❑ Low If medium box is checked, must attach a site plan sheet showing proposed work area and location of proposed structural BMPS For City Use Only CITY OF CARLSBAD STANDARD TIER I SWPPP Approved By: C r Date: 5 - b ( 5 E_29 Page 1 of 3 REV 4/30/10 Erosion Control Tracking Non -Storm Water Waste Management and Materials BMPs Sediment Control BMPs Control Management BMPs Pollution Control BMPs BMPs o C O o — c d a c m 2 2 C-O a a aEicca> f9 � 9 'D d m f6 m W a d N o y y o l4 C c� \ 2 7 w �' > O � C g N � eU+ � Best Management Practice y m Co v V aa) f° °' �, y m (BMP) Description w cn m F— E v, rn m rn mo rn aw -ate, c o c H m g yy Q 0 m 3c U% E a, N Q' N N N co oca U N m N C_ cC t0i1 d y mm o X (D p 01 L C d C N U j N 7 'O E d Q a - �' C W U «� U d 'O f6 U O O O '- 0 O_ O LL = 'O O L N Q N U O C O O O c0 p� f0 O .0+ N > > O N A .�0. @ O ' a O N N C O y c9 m w Q cn rn d (n U i1 0 (n > fn Cn a` in 5 in Q: a a > g Cn N fn 2 U CASQA Designation 4 r co - � r I?v w w L? w I? r w cO o 7 7 o! c" o' 7 cn ch en n (n ao rn N ch v Ln 2 T � U w 6 w U w w w cn <n cn cn w cn cn w rn � F r z z z z 2 2 � 2 2 2 Construction Activity Grading/Soil Disturbance Trench in /Excavation Stockpiling Drilling/Boring Concrete/Asphalt Saw cutting Vol Concrete flatwork Paving Conduit/Pipe Installation Stucco/Mortar Work ✓ Waste Disposal Staging/Lay Down Area Equipment Maintenance and Fueling Hazardous Substance Use/Storage Dewaterin Site Access Across Dirt Other (list): Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was checked off and for each of the selected BMPs selected from the list. For Example — If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with Plastic" column. To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project. E-29 Page 2 of 3 REV 4/30/10 CITY OF CARLSBAD INSTRUCTIONS: STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov To address post -development pollutants that may be generated from development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards (Volume 4, Chapter 2) at www.carlsbadca.gov/standards. Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'Standard Stormwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many aspects of project site design are dependent upon the storm water standards applied to a project. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A separate completed and signed questionnaire must be submitted for each new development application submission. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits for the project. Please start by completing Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. STEP 1 TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a priority development project, please answer the following questions: YES NO 1. Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non -erodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from paved streets or roads; OR (3) designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streetsguidance? 2. Is your project LIMITED TO retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? If you answered "yes" to one or more of the above questions, then your project is NOT a priority development project and therefore is NOT subject to the storm water criteria required for priority development projects. Go to step 4, mark the last box stating "my project does not meet PDP requirements" and complete applicant information. If you answered "no" to both questions, then go to Step 2. E-34 Page 1 of 3 Effective 6/27/13 C I T Y O F CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov STEP 2 TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS To determine if your project is a priority development project, please answer the following questions: YES NO 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed -use, and public development projects on public or private land. 2. Is your project creating or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, industrial, residential, mixed -use, and public development projects on public or private land. 3. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption. 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or greater. 5. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot. A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street, road, highway freeway or driveway? A street, S( road, highway, freeway or driveway is any paved impervious surface used for the transportation of (� automobiles, trucks, motorcycles, and other vehicles. 7. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA i.e. not commingles with flows from adjacent lands).* 8. Is your project a new development that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9. Is your project a new development that supports a retail gasoline outlet (RGO)? This category includes RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day. 10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? 11. Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? If you answered "yes" to one or more of the above questions, you ARE a priority development project and are therefore subject to implementing structural Best Management Practices (BMP's) in addition to implementing Standard Storm Water Requirements such as source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your application(s) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this questionnaire, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no" to all of the above questions, you ARE NOT a priority development project and are therefore subject to implementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for all development projects. A Storm Water Management Plan (SWMP) is not required with your application(s) for development. Go to step 4 at the end of this questionnaire, check the "my project does not meet PDP requirements" box and complete applicant information. E-34 Page 2 of 3 Effective 6/27/13 "J v CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov STEP 3 TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPEMENT PROJECTS ONLY Complete the questions below regarding our redevelopment project: YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? If you answered "yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement of impervious surface and not the entire development. Go to step 4, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4, check the "my project meets PDP requirements" box and complete applicant information. THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMA ❑ My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application. I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details. fil My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project. Applicant Information and Signature Box Address: Cis YZoroB Applicant Name: Applicant Signature: Accessor's Parcel Number(s): 211-lav —o Applicant Title: _ Date: This Box for City Use Only City Concurrence: I YES NO By: G CT Date: s - Project ID: L r _ 13Lft Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. E-34 Page 3 of 3 Effective 6/27/13 � 4 C I T Y OF CARLSBAD STORM WATER COMPLIANCE ASSESSMENT B-24 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.r;ov am applying to the City of Carlsbad for the following type(s) of construction permit: Building Permit ❑ Right -of -Way Permit ❑ My project is categorically EXEMPT from -p--- Electrical the requirement to prepare a storm water Fire Additional Fire Alarm pollution prevention plan (SWPPP) because it requires issuance of one or more of the Fixed Systems only q Mechanical following permit types: Mobile Home Plumbing Project Storm Water Threat Assessment Criteria* No Threat Assessment Criteria Patio/Deck Photo Voltaic Re -Roofing Sign Spa -Factory Sprinkler Water Discharge ❑ My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it meets the "no threat" assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier Level. My project does not meet any of the High, Moderate or Low Threat criteria described below. Tier 1 - Low Threat Assessment Criteria My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type (See list above) and the project meets one or more of the following criteria: • Results in some soil disturbance; and/or • Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling). Tier 2 - Moderate Threat Assessment Criteria ❑ My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria: • Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or, • Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria: • Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or • Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or • Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or • Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). Tier 3 - Significant Threat Assessment Criteria ❑ My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or ❑ My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, refueling and maintenance areas: or, ❑ My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non -storm water discharge(s). I certify to the best of my knowledge that the above checked statements are true and correct,/ understand and acknowledge that even though this project does not require preparation of a construction SWPP, I must still adhere to, and at all times during construction activities for the permit type(s) check above comply with the storm water best management practices pursuant to Title 15 of the Carlsbad Municipal Code and to Citv Standards. *The City Engineer may authorize minor variances from the Storm Water Threat Assessment Criteria in special circumstances where it can be shown that a lesser or higher Construction SWPPP Tier Level is warranted. Project Address: Assessor Parcel No. � L 1� 5� � Guilslba�, CA i tuo�, z I I.1 � • 09 Owner/Owner's Authorized Agent Name: Title: Jo ni�Jvu►-L lob Owner/Owner's Authorized Agent Signature: �- Date: 31 L4 City Concurrence: IQ YES ❑NO By: C (3� Date: S ` G_ Project ID: c & is — 13yt3 B-24 Page 1 of 1 Rev.03/09 PLANNING DIVISION QeVeIODment Services BUILDING PLAN CHECK Planning Division APPROVAL 1635 Faraday Avenue (760) 602-4610 -29 P www.carlsbadca.eov DATE: PROJECT NAME: PROJECT ID: PLAN 0: ,-'3 15-1340 SET#: I ADDRESS: I Legoland Dr APN: 211-100-09 Thlan check review is complete and has been APPROVED by the Planning D, )n. By: I ri, '�xt,n A i il . -1pc-tion by the Planning Division is required [:1 Yes E No You niwl, -:vlr� Corrections from one or more of the divisions listed below. Approval from th,­ n ,,ay be required prior to the issuance of a building permit. Resu", gild include corrections from all divisions. F-] T i,, the For quc,-, 7i C! Chris.` Gina.[' Rct-, -hc - k review is NOT COMPLETE. Items missing or incorrect are listed on a ',,ed checklist. Please resubmit amended plans as required. h -k l,.PPROVAL has been sent to: joey@sms-arch.com crc' ';,-.,-ions on the attached checklist please contact the following reviewer as marked: ! r, )2- ENGINEERING FIRE PREVENTION -0 760-602-2750 760-602-4665 Chris, Gla­,, Gn:rg Ryan J 160-602-2784 602-4663 Gregor, f,van6 carlsbadc a I a y IN1 r "An. a a V -,y Won imc, 9 7'Cl 602-4662 V: ov _a_gov Linua Ontivcr,,)s Dorriinic Fied L_J 760 602-2773 . ...... 76�) 02-4664 Lwda)WO,fe osC risix,•dca i2V rr r 4, irO�,carlsbadcq,goy 47*1' \N, CITY OF CARLSD/-%D11 PLAN CHECK REVIEW TRANSMITTAL Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov DATE: 5/21/15 PROJECT NAME:big shop PROJECT ID: PLAN CHECK NO: cb151340 SET#: I ADDRESS: 1 legoland APN: ® This plan check review is complete and has been APPROVED by the fire Division. By: cwong A Final Inspection by the Division is required ® Yes ❑ No ❑ This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING 76"02=4610 ENGINEERING 760-602-2750 FIRE PREVENTION 7604W-4665 ❑ Chris Sexton 760-602-4624 Chris.Sexton@carisbadca.gov ❑ Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carlsbadca.gov ❑ Greg Ryan 760-602-4663 Gregory.Ryan@carisbadca.gov ❑ Gina Ruiz 760-602-4675 Gina.Ruiz@carisbadca.gov ❑ Linda Ontiveros 760-602-2773 Linda.Ontiveros@carisbadca.gov ® Cindy Wong 760-602-4662 Cynthia.Wong@carlsbadca.gov ❑ ❑ ❑ Dominic Fieri 760-602-4664 Dom inic.Fieri@carisbadca.gov RemarKs: 5/21/15 "APPROVED: Page 1 of 2 THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT NOTATIONS, CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW. Page 2 of 2 Carlsbad Fire Department Plan Review Requirements Category: TI , COMM Date of Report: 05-21-2015 Reviewed by: I Name: JOEY NUNEZ , Address: STE B ; 17848 SKY PARK CIRCLE IRVINE CA 92614 Peiinit 4: CB151340 Job Name: LEGOLAND-BIG SHOP- ADD 123 SF Job Address: 1 LEGOLAND DR CBAD INCOMPLETE The item you have submitted for review is incomplete. At this time, this office cannot adequately conduct a review to detennine compliance with the applicable codes and/or standards. Please review carefully all comments attached. Please resubmit the necessary plans and/or specifications, with changes "clouded", to this office for review and approval. Conditions: Cond: CON0008301 [MET] "APPROVED: "PHIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT NOTA"T'IONS, CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND REGtJLATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW. Entry: 05/21/2015 By: ewong Action: AP THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT NOTATIONS, CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW. Page 2 of 2 JTRUQTURAL CALCULATION G&C Job Number: 15-041 F R# EGH'' MAY 04 101` TABLE OF CONTENTS Load Criteria p. 1-2 New Addition Gravity Design p. 3-6 Canopy Framing Design p, 7-8 Seismic Check P. 9-10 Legolland - The Big Shop Carlsbad, CA Plan Check Submittal April 27, 2015 PREPARED FOR- SMS Architects 77500RC-dhill Ave.. Suite 240 wine Cahfol7va 0 92614 m Te/ 949,250.31150 - Fax 949.203 0450 Date: Job No. w Engineer: Page Na: ' of FAXf kwrnQI`-'Ll' c.� t✓stah s f4f LL-2c7 { 9F N'n-1 17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-0450 I www.gcstructural.com Date: Job No. L` 4 Engineer: Page No: �i of .S►r�''..A7Mk L- ul P (Dim 2oT =�+-2' Phi MA (' 0 0 ; F) = V 114- 17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-0450 1 www.gcstructural.com rAr Daie: Job No. l` Engineer: Page No: 3 of f k1 4 TA -- O?- FW s� ?L-f� I •s�12-5" o. o y tUOc. 24�7 Fcv�f -:xvtW Gaw-w;::PnoO t-P" +t-to Nt. r — fir, 1 ==l--1 L-O �, t000- L�'-v�k qpt� " - Vk'- 1,_m� 4^-VV' - Of- lf►u`� .5-;lr4PsoV4 OU - 1-0" - s-1 %4; "v 3 ST 4�Vp' V,-C/h;p- Wi C�1 �4ww4 ) �► �,o-'Taq; 17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 9 l.com Date: Job No. OWL• . Engineer: Page No: of kj �1- - \-Pn6A X;l \TV �- �j ao Ph.r ��-- �� ►sue �1���z� �- �� ��1����--�� �� � Ate- s ��s �~��-1�►��`��t'i�y - o .� �L���� 17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-0450 1 www.gcstructural.com Date: Job No. Engineer: Page No: of e2, 41.01 cc- w P, Alm, r Mom= �� � •- ��� �=-zssr=c��ti��� -��' ►�w�� �oauWri� - P� - s� s' 17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949.250-3150 1 F 949-203-0450 1 www.gcstructural.com Date: Job No. \` Engineer: Page No: of U� �w - = 1 -14-J " ��Aly- OVA- f oonah k &.,c townyj pf'-Y - '2 e0-0 f -Ito - J�v -A lvuu '�XqP 17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-0450 1 www.gcstructural.com Date: Job No. l` Engineer: Page No: of �Fu OP o7 V-)d - (2S ���� w,n�`Z� �b Pub , - qO R d 1 of Cyr to L-�T'�hc'/`;>1kL" Cyyu,�ll✓{ 17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-0450 1 www.gcstructural.com GRIMM & CHEN STROCTURAf zNGIINEEPiNG, INC. , U'V• �le,-- 17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-0450 1 www.gcstructural.com Date: Job No. \` Engineer: Page No: of k'14W O Aw LTOLA - Vj fft- jjiL V� ' --�fw G.u5• �nmt-t—A Pam- 10�� 12-- 17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-0450 1 www.gcstructural.com Dale: Job No. ILI xt mommim"HM Engineer: Page No:) 0 of eAA- (A--> 1 r� F �L�►a.i L" i ° � � M � l S"V tf d7` G >L, 1� LL j J, 17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-0450 1 www.gcstructural.com PROJECT: Legoland - The Big Shop 1 Legoland Drive Carlsbad, CA 92008 Project Designer: SMS Architects 17848 Sky Park Circle, Suite B Irvine, CA 92614 949.757.3240 Report Prepared by: I BUILDING ENERGY ANALYSIS REPORT I Q �J MAY04?.015 '`"-'s:� Fernando A Rodriguez IVIRC Engineering, Inc. 34300 Gateway Drive, Suite 120 Palm Desert, CA 92211 760.340.9005 Job Number: 15046.00 Date: 4/16/2015 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC — wvvw.energysoft.com. 6.4 L JC J 15 1 3 Li r, I I TABLE OF CONTENTS I Cover Page Table of Contents Nonresidential Performance Title 24 Forms Form ENV-MM Envelope Mandatory Measures Form LTI-04-E Tailored Method 1 2 3 15 16 EnergyPro 6.4 by EnergySoft Job Number: ID: 15046.00 User Number: 5235 1 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF-1 C Project Name Date Legoland - The Big Shop 411612015 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 1 Legoland Drive Carlsbad CA Climate Zone 07 251 251 GENERAL INFORMATION Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Relocatable - indicate ❑ specific climate zone ❑ all climates Phase of Construction: ❑ New Construction ❑ Addition m Alteration STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation author hereby certifies that the documentation is accurate and complete. Documentation Author Name Fernando A. Rodriguez Signature Company MRC Engineering, Inc. Date 6/2015 Address 34300 Gateway Drive, Suite 120 Phone 760.340.9005 City/State/Zip Palm Desert, CA 92211 The Principal Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110.0, 116.0 through 118.0, and 140.0 through 149.0 of Title 24, Part 6. Please check one: ENV. LTG. MECH. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to ❑ ❑ ❑ sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section ❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document ❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Principal Envelope Designer Name Signature Company SMS Architects Date Address 17848 Sky Park Circle, Suite B License # City/State/Zip Irvine, CA 92614 Phone 949,757.3240 Principal Mechanical Designer Name Signature Company Mechanical Compliance Not In the Scope Of This Submittal Date Address License # City/State/Zip Phone Principal Lighting Designer Name Randall V Moss P.E. Signature 9 Company MRC Engineering, Inc. Date 04/23/2015 Address 72-880 Fred Waring Drive, Suite C-11 License # E.13453 City/State/Zip Palm Desert, CA 92260 Phone 760.340.9005 INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included) [j] ENV-01 Certificate of Compliance. Required on plans. ❑ MCH-01 Certificate of Compliance. Required on plans. LTI-01 Certificate of Compliance. Required on plans. ❑ MCH-02 HVAC Air/Water Side Requirements. (� LTI-02 Lighting Controls Credit Worksheet. ❑ MCH-03 Mechanical Ventilation and Reheat. ❑ LTI-03 Indoor Lighting Power Allowance. ❑ MCH-08 Mechanical Equipment Details. EnergyPro 6.4 by EnergySoft User Number: 5235 RunCode: 2015-04-16T15:37.39 ID: 15046.00 Page 3 of 16 PERFORMANCE CERTIFICATE OF COMPLIANCE Le oland - The Big Shop ANNUAL TDV ENERGY USE SUMMARY kBtu/sgft- r Standard Proposed Compliance Energy Component Design Design Margin Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process Process Lighting TOTALS 1.71 0.87 0.84 196.12 199.35 -3.23 228.07 220.33 7.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.99 136.63 -3.64 93.44 93.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 652.33 650.621 1.72 Part 2of3 Heating Cooling Fans Heat Rej Pumps DHW Lighting Receptacle Process Process Ltg Percent better than Standard 1 0.3 0.3 % excluding process) BUILDING COMPLIES PERF-1 C Date 411612015 GENERAL INFORMATION Building Orientation (W 270 deg Conditioned Floor Area 251 sqft. Number of Stories 1 Unconditioned Floor Area 0 sqft. Number of Systems 1 Conditioned Footprint Area 0 sqft. Number of Zones 1 Natural Gas Available On Site Yes Front Elevation Left Elevation Rear Elevation Right Elevation Total Roof Orientation Gross Area (M 386 (N) 0 (E) 0 (S) 0 386 195 sqft. sqft. sqft. sqft. sqft. sqft. k-11CIZ-111Y ruca 135 0 0 0 135 0 Standard Proposed Prescriptive Lighting Power Density 1.500 W/sgft, 1.541 W/sgft I Remarks: sqft. sqft. sqft. sqft. sqft. sqft. Glazina Ratio 34.9 0.0 0.0 % 0.000 34.9 0.0 Prescriptive Values for Comparison only. See LTI-01 for allowed LPD. I EnergyPro 6.4 by EnergySoft User Number: 5235 RunCode: 2015-04-16T15:37.39 ID: 15046.00 Page 4 of 16 1 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF-1C Project Name Legoland - The Big Shop Date 411612015 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area s ft. Inst. LPD Wlsf' Ctrl. Credits W/sf 2 Allowed LPD Proc. Loads Wlsf Area W/sf 3 Tailored W/sf 4 Undefined System Legoland - The Big Shop Retail Sales, Wholesale 251 1.927 0.385 Notes: 1. See LTI-01 2. See LTI-02 3. See LTI-03 4. See LTI-04 items marked with asterisk, see LTI-01 by others) (by others Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp EnergyPro 6.4 by EnergySoft User Number..- 5235 Run ode: 2015-04-16T15:37:39 ID: 15046.00 Page 5 of 16 STATE OF CALIFORNIA ENVELOPE COMPONENT APPROACH CEC-NRCC-ENV-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-ENV-01-E Envelope Component Approach (Page 1 of 4) PYOfe" Name; Legoland - The Big Shop Date Prepared: 4/16/2015 A. GENERAL INFORMATION 1 Project Location: 1 Legoland Drive 6 Compliance Method: m Component ❑ Unconditioned (file Affidavit) 2 CA City and Zip Code: Carlsbad, 92008 7 Building Front Orientation (deg or cardinal): 270 deg 3 Climate Zone: 7 8 Permitted Scope of Work ❑ New Construction ❑ Addition ❑ Alteration 4 Total Conditioned Floor 251 9 ------ BuildingType(s)T Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room Area: 5 ❑ Schools (Public School) ❑ Relocatable Public School Bldg. ❑ Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space > 5000 ftz (If checked include the NRCC-ENV-04-E with submittal) B. ENVELOPE DETAILS — Framed 1 2 3 4 5 6 7 8 9 10 11 Tag/ID Assembly Type Frame Material Frame Depth Frame Spacing Appendix JA4 Reference Cavity R-value Continuous Insulation R-value Proposed U-Factor Required U-Factor From Tables, B, C, D Comments 1 Wall Wood 2x6 @ 16 4.3.1-A6 21 0.0 0.069 R-21 Wall 2 Roof Wood 2x4 @ 16 4.2.2-A6 19 0.0 0.062 R-30 Roof Attic C. ENVELOPE DETAILS — Non -framed 1 2 3 4 5 6 7 8 9 10 Tag/ID Assembly Type Assembly Materials Thickness (inches) Interior or Core Insulation R-value Continuous Insulation R-value Appendix JA4 Reference Proposed U-Factor Required U-Factor from Tables, B, C, D Comments D. ENVELOPE DETAILS — Mass 1 2 3 4 5 6 7 8 9 10 11 Tag/ID Mass Type Density (lb/ft" Mass Thickness (inches) Furring Strip Thickness (inches) Interior Insulation R-value Exterior Insulation R-value Appendix JA4 Reference Proposed Insulation U-factor Required U-Factor from Tables, B, C, D Comments CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014 STATE OF CALIFORNIA ENVELOPE COMPONENT APPROACH GEC-Nf1CC-ENV-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-ENV-01-E Envelope Component Approach (Page 2 of 4) PYOie,t "aw Legoland - The Big Shop Date Prepared: 4/16/2015 E. ROOFING PRODUCTS (COOL ROOF) 1 2 3 4 5 6 7 8 9 10 11 Mass Roof 25 lb ft2 or greater Roof Pitch CRRC Product ID Number Product Type Proposed Minimum Required Comments Aged Solar Reflectance Thermal Emittance SRI' (Optional) Aged Solar Reflectance Thermal Emittance SRI (optional) ❑ ❑1 ❑ ❑1 ❑ ❑1 ❑ An aged solar reflectance less than 0.63 is allowed provided the maximum roof / ceiling LI-factor in TABLE 140.3 is not exceeded ❑ High-rise residential buildings and Hotels and Motels with low -sloped roofs in Climate Zones 1 through 8, 12 and 16 are exempted from aged Solar Reflectance and emittance requirements. ❑ High-rise residential buildings and Hotels and Motels with steep -sloped roofs in Climate Zones 1 and 16 are exempt from aged Solar Reflectance and emittance requirements. ❑ The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempt from aged Solar Reflectance and emittance requirements To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §110.8(i)4. Select the applicable coating: ❑ Aluminum -Pigmented Asphalt Roof Coating ❑ Cement -Based Roof Coating ❑ Other NOTES: 1. Check the box if the aged Solar reflectance was not available in the Cool Roof Rating Council's Rated Product Directory, Then use the equation in Section 110.8(i)2 where the Initial Reflectance value from the some directory and use the equation (0.2+B(p;,,;t;of — 0.2) to obtain a calculated aged value. Where pis the Initial Solar Reflectance and 8 is either set to 0.65 for Field -Applied Coatings or it is set to 0. 70for all other roofing products other than Field -Applied Coating. 2. Calculate the SRI Value by using the SRI- Worksheet at (TBD) and enter the resulting value in the SRI Column above and attach a copy for the SRI- Worksheet NRCC-ENV-03-E to the to this form. F. Air Barrier 1 2 3 4 5 Tag/ID Air Barrier Material Type Air Barrier Assembly Type Whole Building Air Leakage Testing Comments CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014 STATE OF CALIFORNIA ENVELOPE COMPONENT APPROACH GEG-NRGG-ENV-01-E (Revised 06/14) _ CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-ENV-01-E Envelope Component Approach (Page 3 of 4) Pr°ie<tNa""Legoland - The Big Shop Date Prepared: 4/16/2015 G. FENESTRATION PROPOSED AREAS AND EFFICIENCIES 1 2 3 4 5 6 7 8 9 10 11 12 Tag/ID Fenestration Type Area Orientation N, S, W, E or Roof 4 of Panes Max U-Factor Overhang Max (R)SHGC Min VT Label Conditions Status Comments 1 Window 72 W 1 0.36 No 0.25 0.50 New 2 Window 63 W 1 0.36 No 0.25 0.50 New H. ENVELOPE MANDATORY MEASURES Indicate location on building plans of Mandatory Envelope Measures Note Block: ENV-MM INSTRUCTIONS TO APPLICANT ENVELOPE COMPLIANCE & WORKSHEETS (check box if worksheet are included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the Nonresidential Compliance Manual. IZI NRCC-ENV-01-E Certificate of Compliance. Required on plans for all submittals. ❑ NRCC-ENV-04-E Use when minimum skylight requirements for large enclosed spaces are required in climate zones 2 through 15. Optional on plans. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014 STATE OF CALIFORNIA INDOOR LIGHTING GEu-NRGU-L I I-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION ■t, CERTIFICATE OF COMPLIANCE — USER INSTRUCTIONS NRCC-LTI-01-E Indoor Lighting (Page 1 of 5) Project Name: Legoland - The Big Shop Date Prepared: 4/16/2015 Climate Zone: 7 Conditioned Floor Area : 251 Unconditioned Floor Area : 0 General Information Building Type: ❑ Schools ❑ Nonresidential ❑ Relocatable Public Schools ❑ ❑ High -Rise Residential Conditioned Spaces ❑ ❑ Hotel/Motel Unconditioned Spaces Phase of Construction: ❑ New Construction ❑ Addition ® Alteration Method of Compliance: ❑ Complete Building ❑ Area Category ❑ Tailored [LIGHTING COMPLIANCE DOCUMENTS (select yes for each document included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance documents, refer to the Nonresidential Manual published by the California Energy Commission. YES NO FORM TITLE YES NRCC-LIT-01-E Certificate of Compliance. All Pages required on plans for all submittals. YES NRCC-LIT-02-E Lighting Controls, Certificate of Compliance, and PAF Calculation. All Pages required on plans for all submittals. NO NRCC-LIT-03-E Indoor Lighting Power Allowance YES NRCC-LIT-04-E Tailored Method Worksheets NO NRCC-LIT-05-E Line Voltage Track Lighting Worksheets Summary of Allowed Lighting Power Conditioned and Unconditioned space Lighting must not be combined for compliance Indoor Lighting Power for Conditioned Spaces Indoor Lighting Power for Unconditioned Spaces Watts Watts Installed Lighting Installed Lighting 484 0 1. NRCC-LTI-01-E, page 4 + NRCC-LTI-01-E, page 4 + 2 PORTABLE ONLY FOR OFFICES NRCC-LTI-01-E, page 3 + 3. Minus Lighting Control Credits 97 _ Minus Lighting Control Credits 0 NRCC-LTI-02-E, page 2 NRCC-LTI-02-E, page 2 4 Adjusted Installed Lighting Power 387 Adjusted Installed Lighting Power (row 1 plus row 2 minus row 3) (row 1 minus row 3) 0 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014 STATE OF CALIFORNIA INDOOR LIGHTING F1 GEC-NRCC-LTI-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION , W'! CERTIFICATE OF COMPLIANCE — USER INSTRUCTIONS NRCC-LTI-01-E Indoor Lighting (Page 2 of 5) Project Name: Legoland - The Big Shop Date Prepared: 4/16/2015 S. Complies ONLY if Installed !< Allowed Complies ONLY if Installed <_ Allowed 6. Allowed Lighting Power Conditioned NRCC-LTI-03-E, page 1 387 Allowed Lighting Power Unconditioned NRCC-LTI-03-E, page 1 0 Declaration of Required Installation Certificates — Declare by selecting yes for all Installation Certificates that will be submitted. (Retain copies and verify forms are completed and signed.) YES NO Form/Title x NRCI-LTI-01-E - Must be submitted for all buildings ❑ Field Inspector NRCI-LTI-02-E - Must be submitted for a lighting control system, or for an Energy Management Control System (EMCS), ❑ Field Inspector x to be recognized for compliance. NRCI-LTI-03-E - Must be submitted for a line -voltage track lighting integral current limiter, or for a supplementary ❑ Field Inspector x overcurrent protection panel used to energize only line -voltage track lighting, to be recognized for compliance. x NRCI-LTI-04-E - Must be submitted for two interlocked systems serving an auditorium, a convention center, a ❑ Field Inspector conference room, a multipurpose room, or a theater to be recognized for compliance. x NRCI-LTI-05-E - Must be submitted for a Power Adjustment Factor (PAF) to be recognized for compliance. ❑ Field Inspector NRCI-LTI-06-E - Must be submitted for additional wattage installed in a video conferencing studio to be recognized for ElField Inspector x compliance. Declaration of Required Certificates of Acceptance — Declare by checking all of the Certificates of Acceptance that will be submitted. (Retain copies and verify forms are completed and signed.) YES NO Form/Title x NRCA-LTI-02-A - Must be submitted for occupancy sensors and automatic time switch controls. ❑ Field Inspector x NRCA-LTI-03-A - Must be submitted for automatic daylight controls. ❑ Field Inspector x NRCA-LTI-04-A - Must be submitted for demand responsive lighting controls. ❑ Field Inspector CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014 STATE OF CALIFORNIA INDOOR LIGHTING ;Ec-NRCC-L I1-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION ape CERTIFICATE OF COMPLIANCE — USER INSTRUCTIONS NRCC-LTI-01-E Indoor Lighting (Page 3 of 5) Project Name: Legoland - The Big Shop Date Prepared: 4/16/2015 A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: ❑ CONDITIONED SPACE ❑ UNCONDITIONED SPACE A. INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST ❑ The actual indoor lighting power listed on this page and on the next page includes all installed permanent and planned portable lighting systems. ❑ When Complete Building Method is used for compliance, list each different type of luminaire on separate lines. ❑ When Area Category Method or Tailored Method is used for compliance, list each different type of luminaire by each different function area on separate lines ❑ Also include track lighting in schedule, and submit the track lighting compliance form (NRCC-LTI-05-E) when line -voltage track lighting is installed. B. Installed Portable Luminaires in Offices — Exception to Section 140.6(a) ❑ This section shall be filled out ONLY for portable luminaires in offices (As defined in §100.1). All other planned portable luminaires shall be documented on next page of this compliance form. ❑ This section is used to determine if greater than 0.3 watts of portable lighting is planned for any office ❑ Fill out a separate line for each different office. Small offices that are typical (having the same general and portable lighting) may be grouped together. This allowance shall not be traded between offices having different lighting systems. Office Portable Luminaire Office Installed Portable Luminaire Watts Per Square Office Location Field Schedule Foot Inspector A B C D E F G H I J Installed z c portable o v Watts If F 5 0.3, Identify Office area in which . 3 luminaire o per enter zero; Complete Luminaire Description v � watts in this o fD square E x G these portable luminaires are N v (i.e., LED, under cabinet, furniture mounted Watts per �° o office = fD ° foot if F > 0.3, installed direct/indirect) Luminaire (B x C) (D / E) (F-0.3) ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Enter sum total of all pages into NRCC- Total installed portable luminaire watts that are greater than 0.3 watts per square foot per office: LTI-01-E; Page 1 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014 STATE OF CALIFORNIA INDOOR LIGHTING AR E-71 GEC-NRCC-L 11-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION W a CERTIFICATE OF COMPLIANCE — USER INSTRUCTIONS NRCC-LTI-01-E Indoor Lighting (Page 4 of 5) Project Name: Legoland - The Big Shop Date Prepared: 4/16/2015 A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: ID CONDITIONED SPACE ❑ UNCONDITIONED SPACE C. INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Luminaire Schedule Installed Watts Location Field Inspector 1 A B C D E F G H How wattage was determined o_ o' Complete Luminaire Description r C 3 n > a (i.e, 3 lamp fluorescent troffer, 5, N v 3 2 al, o Q W. 0- r1 x v Primary Function area in which z F32T8, one dimmable electronic ballastrD � = o � m fl these luminaires are installed Pass Fail A 20.9w LED 20.9 IZI ❑ 4 84 Retail Sales, Wholesale ❑ ❑ Ext. Trk. Track Light (with 2 Amp Current Limiter) 200.0 m ❑ 2 400 Retail Sales, Wholesale ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ El 0 INSTALLED WATTS PAGE TOTAL: 484 Enter sum total of all pages into NRCC-LTI-01-E; Page 2 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014 STATE OF CALIFORNIA INDOOR LIGHTING — LIGHTING CONTROLS GEC-NRGG-L I1-02-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION 11110 CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 1 of 3) "Na Legoland - The Big Shop °dYePfepdYed 4/16/2015 The NRCC-LTI-02-E shall be used to document all mandatory and prescriptive lighting controls that are aDDlicable to the nrniPrt Mandatory Lighting Control Declaration Statements (Indicate if the measure applies by checking yes or no below.) YES NO Control Requirements Lighting shall be controlled by self-contained lighting control devices which are certified to the Energy Commission according to the Title 20 Appliance x Efficiency Regulations in accordance with Section 110.9. Lighting shall be controlled by a lighting control a system or energy management control system in accordance with §110.9. An Installation Certificate x shall be submitted in accordance with Section 130.4(b). x One or more Track Lighting Integral Current Limiters shall be installed which have been certified to the Energy Commission in accordance with §110.9 and §130.0. Additionally, an Installation Certificate shall be submitted in accordance with Section 130.4(b). x A Track Lighting Supplementary Overcurrent Protection Panel shall be installed in accordance with Section 110.9 and Section 130.0. Additionally, an Installation Certificate shall be installed in accordance with Section 130.4(b). All lighting controls and equipment shall comply with the applicable requirements in §110.9 and shall be installed in accordance with the manufacturer's x instructions in accordance with Section 130.1. x All luminaires shall be functionally controlled with manually switched ON and OFF lighting controls in accordance with Section 130.1(a). General lighting shall be separately controlled from all other lighting systems in an area. Floor and wall display, window display, case display, ornamental, x and special effects lighting shall each be separately controlled on circuits that are 20 amps or less. When track lighting is used, general, display, ornamental, and special effects lighting shall each be separately controlled; in accordance with Section 130.1(a)4. The general lighting of any enclosed area 100 square feet or larger, with a connected lighting load that exceeds 0.5 watts per square foot shall meet the x multi -level lighting control requirements in accordance with Section 130.1(b). x All installed indoor lighting shall be equipped with controls that meet the applicable Shut -OFF control requirements in Section 130.1(c). x Lighting in all Daylit Zones shall be controlled in accordance with the requirements in Section 130.1(d) and daylit zones are shown on the plans. Lighting power in buildings larger than 10,000 square feet shall be capable of being automatically reduced in response to a Demand Responsive Signal in x accordance with Section 130.1(e). Before an occupancy permit is granted for a newly constructed building or area, or a new lighting system serving a building, area, or site is operated for normal use, indoor lighting controls serving the building, area, or site shall be certified as meeting the Acceptance Requirements for Code Compliance in x accordance with Section 130.4.(a). The controls required to meet the Acceptance Requirements include automatic daylight controls, automatic shut -OFF controls, and demand responsive controls. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014 STATE OF CALIFORNIA INDOOR LIGHTING - LIGHTING CONTROLS ,EG-NRCC-L I1-02-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION , ®f9 CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 2 of 3) Na11e' Legoland - The Big Shop Date Prepared: 4/16/2015 A separate document must be filled out for Conditioned and Unconditioned Spaces. This page is used only for the following: 0 CONDITIONED SPACES ❑ UNCONDITIONED SPACES MANDATORY AND PRESCRIPTIVE INDOOR LIGHTING CONTROL SCHEDULE, PAF CALCULATION, and FIELD INSPECTION CHECKLIST PAF Credit Calculation Z t -n C) (D = D n (D s Standards Complying With 1 O r o — n n o h m Lighting Control Schedule (✓ all that apply, or enter 'E' if Exempted) v aq fl ° v D x rD = r Q rD o A B C D E F G H I J K L M N O Type/ Description of Lighting Control (i.e.: occupancy sensor, # `al `O' t� a � N Location in Buildin- automatic time switch, of o 0 0 0 0 0 v v dimmer, automatic daylight, Units v s V Q etc... ) Legoland - The Big Shop Dimming - Multiscene ✓ 400 0.20 80 ✓ ❑ ❑ Legoland - The Big Shop Dimming - Multiscene ✓ 84 0.20 17 ✓ ❑ ❑ Control Credit PAGE TOTAL (Sum of Column M): 97 IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column M): 97 Enter Control Credit total into NRCC-LTI-01-E; Page 1. 1. §130.1(a) = Manual area controls; §130.0(b) = Multi Level; §130.1(c) = Auto Shut -Off- §130.1(d) = Mandatory Daylight; §130.1(e) = Demand Responsive; §140.6(d) _ Additional lighting controls installed to earn a PAF; §140.6(d) = Prescriptive Secondary Sidelit Daylight Controls. 2. Check Table 140.6-A for correct Factor. PAFs shall not be traded between conditioned and unconditioned spaces. As a condition to earn a PAF, an Installation Certificate is also required to be filled out, signed, and submitted. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014 ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV-MM Project Name Legoland - The Big Shop Date 411612015 DESCRIPTION -Building Envelope Measures: §110.8(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter 4, Article 3. §110.8(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §110.8(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R-value of no less than R-13 between framing members. §110.7(a): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of §110.6(a): window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors (swinging and sliding), and 1.0 cfm/ft.2 for nonresidential double doors (swinging). §110.6(a): Fenestration U-factor shall be rated in accordance with NFRC 100, or the applicable default U-factor. §110.6(a) : Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the applicable default SHGC. §110.6(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). Ener yPro 6.4 by EnergySoft User Number: 5235 RunCode: 2015-04-16T15:37:39 ID: 15046.00 Pa e 15 of 16 CERTIFICATE OF COMPLIANCE — USER INSTRUCTIONS NRCC-LTI-04-E Indoor Lighting —Tailored Method (Page 7 of 7) DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Fernando A. Rodriguez Documentation Author Signature: Company: MRC Engineering, Inc. Signature Date: 4/16/2015 Address: 34300 Gateway Drive, Suite 120 CEA/ HERS Certification Identification (if applicable): City/state/zip: Palm Desert, CA 92211 phone. 760.340.9005 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understa that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder pr o th buiidi o cy. Responsible Designer Name: Randall V. Moss P.E. Responsible Designer Signature: ^0~44W Company: MRC Engineering, Inc. Date Signed: 04i23/2015 Address: 72-880 Fred Waring Drive, Suite C-11 License: E.13453 City/state/zip: Palm Desert, CA 92260 phone: 760.340.9005 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014 PLUMBING, Development Services I ELECTRICAL, Building Division 719 CITY O F MECHANICAL 1635 Faraday Avenue WORKSHEET 76lsbadc .gov CARLSBAD www.carlsbadca.gov B_18 Building@carlsbadca.gov Project Address: I Levy �"'`� �r ca Permit No.: Gar \s1��ai , Information provided below refers to worn being done on the above mentioned permit only. This form must be completed and returned to the Building Division before the permit can be issued. Building Dept. Fax: (760) 602-8558 Number of new or relocated fixtures, traps, or floor drains ....................................................... New building sewer line?......................................................................................... Yes No X Numberof new roof drains?............................................................................................................... Install/alter water line?......................................................................................................................... Number of new water heaters?......................................................................................................... Number of new, relocated or replaced gas outlets?.................................................................... Numberof new hose bibs?.................................................................................................................. Residential Permits: New/expanded service: Number of new amps: 5.6 Minor Remodel only, Yes-/ No Commercial/Industrial: Tenant Improvement: Number of existing amps involved in this project 718 Number of new amps involved in this 5.6 New Construction: Amps per Panel: 200 Single Phase Number of new amperes Three Phase................................................................. Number of new amperes 5.6 Three Phase 480........................................................ Number of new amperes Number of new furnaces, A/C, or heat pumps?............................................................................ New or relocated duct workr?.......................................................................... Yes No _ Numberof new fireplaces?................................................................................................................. Numberof new exhaust fans?............................................................................................................ Relocate/install vent?............................................................................................................................ Numberof new exhaust hoods?........................................................................................................ Number of new boilers or compressors? ........ .............................................. Number of HP B-18 Page 1 of 1 Rev. 03/09 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 07-10-2015 Plan Check Revision Permit No:PCR15052 Building Inspection Request Line (760) 602-2725 Job Address: 1 LEGOLAND DR CBAD Permit Type: PCR Status: ISSUED Parcel No: 2111000900 Lot #: 0 Applied: 06/19/2015 Valuation: $0.00 Construction Type: NEW Entered By: RMA Reference #: Plan Approved: 07/10/2015 PC #: CB151340 Issued: 07/10/2015 Project Title: LEGO-BIG SHOP -REVISE ROOF PLAN Inspect Area: & EXTEND CANOPY, Applicant: Owner: SMS ARCHITECTS LEGOLAND CALIFORNIA L L C <LF> PLAY U S ACQUISI STE B C/O PROPERTY TAX SERVICE CO 17848 SKY PARK CIRCLE P O BOX 543185 IRVINE CA 92614 DALLAS TX 75354 949 757-3240 Plan Check Revision Fee $250.00 Fire Expedited Plan Review $0.00 Additional Fees $0.00 Total Fees: $250.00 Total Payments To Date: $250.00 Balance Due: $0.00 FINAL APPROVAL Inspector: Date: Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this or as to which the statute of limitations has previously otherwise expired. Clt Of PLAN CHECK REVISION Development Services YBuilding Division Carlsbad APPLICATION 1635 Faraday Avenue 6 - 15 760-602-2719 www.carlsbadca.gov Plan Check Revision No. /S�j �s" '� Original Plan Check No. CIL 1 Project Address �e9c�a�Y Date i ti i S Contact 30rty 01-Jvt.C-Z, Ph °�`�`i "i 5`1 3Z'� O Fax Email J��'� SYh�� �re�. CS►n'1 Contact Address 1-1 C city Iry iKe' Zip f Z io `q General Scope of Work Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 . Elements revised: Plans X Calculations ❑ Soils ❑ Energy ❑ Other 2. 3. 4. Describe revisions in detail List page(s) where List revised sheets each revision is that replace shown existing sheets ttnj gZx-4e-ld 1ey"(N �t e4' C"V% ?'J -De-L-TA' A Se_L:tjo�, kS. 2 P 3. -Z p��ra a S S , Z. S t. 2 , S2 2- 5. Does this revision, in anyway, alter the exterior of the project? �K Yes ❑ No 6. Does this revision add ANY new floor area(s)? ❑ Yes NoeY;�r 7. Does this revision affect any fire related issues? ❑ Yes NoQ~```��J 8. Is this a complete set? ❑ Yes ,KSignatu:e�nue, 1635 Faraday Carlsbad, CA 92008 Ph: 760-602- 2719 FFax: 760-602-8558 Email: building@carlsbadca.gov www.carlsbadca.gov EsGil Corporation In Partnership with ('government for Buiffing Safety DATE: June 25, 2015 JURISDICTION: Carlsbad PLAN CHECK NO.: 15-1340 REV SET: I PROJECT ADDRESS: 1 Legoland Dr. ❑ APPLICANT ❑ JURIS. ❑ PLAN REVIEWER ❑ FILE PROJECT NAME: Legoland "The Big Shop" Addition/Remodel ® The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. ❑ The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. ❑ The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ❑ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. ❑ The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. ❑ The applicant's copy of the check list has been sent to: ❑ EsGil Corporation staff did not advise the applicant that the plan check has been completed. ❑ EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Email: Mail Telephone Fax In Person ❑ REMARKS: Revision By: Kurt Culver EsGil Corporation ❑GA ❑EJ ❑MB ❑PC Enclosures: Previously -approved plans 6/22/15 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 Carlsbad 15-1340 REV June 25, 2015 ADO NOT PAY— THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: 15-1340 REV PREPARED BY: Kurt Culver BUILDING ADDRESS: 1 Legoland Dr. BUILDING OCCUPANCY: DATE: June 25, 2015 BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code Icb By Ordinance Bldg. Permit Fee by Ordinance r� Plan Check Fee by Ordinance Type of Review: ❑ Complete Review ❑ Repetitive Fee Repeats * Based on hourly rate ❑ Structural Only ❑ Other Hrly 2 Hrs. @ EsGi Fouee $100.00 $250.00 $200.00 Comments: Sheet 1 of 1 macvalue.doc + PLANNING DIVISION Development Services BUILDING PLAN CHECK Planning Division C`: ! T Y 0 F APPROVAL 1635 Faraday Avenue CARt A P_29 (760) 602 4610 L SBwww.carlsbadca.eov DATE: 6-19-15 PROJECT NAME: PROJECT ID: PLAN CHECK NO: PCR 15-52 SET#: 1 ADDRESS: 1 Legoland Dr APN: ❑ This plan check review is complete and has been APPROVED by the Planning Division. By: Chris Sexton A Final Inspection by the Planning Division is required ❑ Yes ® No You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. E] This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check APPROVAL has been sent to: For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING ENGINEERING FIRE PREVENTION 760-602-4610 760-602-2750 760-602-4665 Chris Sexton Chris Glassen Greg Ryan 760-602-4624 760_ 62-2 784 760-662-4653 Chris.Sexton@carlsbadca.gov r1sbad ca.gov Gr rry,4 a ` c;.ad sb cic .gc�v Gina Ruiz VIP y Marshall j Cindy Wong 760-602-4675 760-602-2741 760-602-4662 Gina.Ruiz@carlsbadca.gov `faC_ v IVtY=rs} ll'°r;ai°03 t �cf�µr_ 5 v Cyrntlj a,War,9(_ carlsbadca,91�y Unda, Ontiveros Dominic Fieri t 60-602-2 7 7.3 7 60--602-4664 adc,a.ggy Darninic_Fac s �` arlsbadca Remarks: CITY OF CARLSDD13 A PLAN CHECK REVIEW TRANSMITTAL Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov DATE: 07/9/15 PROJECT NAME:big shop PROJECT ID: 1A, PLAN CHECK NO: per15052(cb151340) SET#: I ADDRESS: 1 legoland APtV: ® This plan check review is complete and has been APPROVED by the fire Division. By: cwong A Final Inspection by the Division is required ® Yes ❑ No ❑ This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to joeynsms-arch.com &LISPS You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING 760-602-4610 ENGINEERING 760-602-2750 FIRE PREVENTION 760-6OZ 4665 ❑ Chris Sexton 760-602-4624 Chris.Sexton@carlsbadca.gov ❑ Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carisbadca.gov ❑ Greg Ryan 760-602-4663 Gregory.Ryan@carlsbadca.gov ❑ Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.gov ❑ Linda Ontiveros 760-602-2773 Linda.Ontiveros@carisbadca.gov ® Cindy Wong 760-602-4662 Cynthia.Wong@carisbadca.gov ❑ ❑ ❑ Dominic Fieri 760-602-4664 Dominic.Fieri@carisbadca.gov Remarks: 7/9/15 "APPROVED: Page 1 of 2 THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT NOTATIONS, CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW. 7/7/15 ***Bubble All Changes*** 1. Show that fire department access is not impeded by extension of canopy. Page 2 of 2 Carlsbad El bad Fire Department Plan Review Requirements Category: PCR, Date of Report: 07-09-2015 Name: SMS ARCHITECTS Address: STE B 17848 SKY PARK CIRCLE IRVINE CA ATTN: JOEY NUNEZ 92614 Permit#: PCRI 5052 Job Name: LEGO-BIG SHOP -REVISE ROOF PLAN Job Address: I LEGOLAND DR CBAD Reviewed by: INCOMPL ba, "4 ttedd for review is incomplete. At this time, this office cannot c� adequately conduct a review to determine i1i1b"�!1,jj,,/ tandards, Please review 4 r s carefully all comments attach �se resubmit necessary plans an c i fi c.'a t i 'on , wit es "clouded", to this office for rev' n approval. Conditions: Cond: CON00083013 [NOT mET] **Bubble All Changes*** 1, Show that fire department access is not impeded by extention of canopy. Entry: 07/07/2015 By: ewong Action: CO Cond: CON0008406 [MET] XPI ROVRT)- THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT NOTATIONS, CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW. Entrv: 07f",' 1f;­9YT­4Vi Mm Acdon: AP CITY OF CARLSBAD PLAN CHECK REVIEW TRANSMITTAL 4fr. Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 _t ..n ,� www.carlsbadca.gov 09 DATE: 07/7/15 PROJECT NAME:big shop PROJECT ID: �' L` PLAN CHECK NO: per15052(cb151340) SET#: I ADDRESS: 1 legoland APN: ❑ This plan check review is complete and has been APPROVED by the fire Division. By: cwong A Final Inspection by the Division is required ® Yes ❑ No ® This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to joeygsms-arch.com &LISPS You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: NING 760.602-46iO ENGINEERING 760-602-2750 FIRE PREVENTION 760-602-4665 ❑ Chris Sexton 760-602-4624 Chris.Sexton@carlsbadca.gov ❑ Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carlsbadca.gov ❑ Greg Ryan 760-602-4663 Gregory.Ryan@carlsbadca.gov ❑ Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.gov ❑ Linda Ontiveros 760-602-2773 Linda.Ontiveros@carlsbadca.gov ® Cindy Wong 760-602-4662 Cynthia.Wong@carlsbadca.gov ❑ ❑ ❑ Dominic Fieri 760-602-4664 Dom inic.Fieri@carisbadca.gov Remarks: 7/7/15 ***Bubble All Changes*** 1. Show that fire department access is not impeded by extension of canopy. Page 1 of 1 Carlsbad Fire Department Plan Review Requirements Category: PCR , Date of Report: 07-07-2015 Name: SMS ARCHITECTS Address: STE B 17848 SKY PARK CIRCLE IRVINE CA ATTN: JOEY NUNEZ 92614 Reviewed by: Permit #: PCR15052 Job Name: LEGO-BIG SHOP -REVISE ROOF PLAN Job Address: 1 LEGOLAND DR CBAD INCOMPLETE The item you have submitted for review is incomplete. At this time, this office cannot adequately conduct a review to determine compliance with the applicable codes and/or standards. Please review carefully all comments attached. Please resubmit the necessary plans and/or specifications, with changes "clouded", to this office for review and approval. Conditions: Cond: CON0008393 [NOT MET] "Bubble All Changes*** 1. Show that fire department access is not impeded by extention of canopy. Entry: 07/07/2015 By: cwong Action: CO GRIMM & CHEN STRUCTURAL ENGINEERING, INC. STRUCTURAL CALCULATIONS G&C Job Number: 15-040 Summary of Changes: The new wall and roof that were added above the canopy have been removed from the scope. Legoland - The Big Shop Carlsbad, CA Wall & Roof Revision \ June 16, 2015 PREPARED FOR: SMS ARCHITECTS 17500 Redhill Ave., Suite 240 • Irvine • California • 92614 . Tel 949.250.3150 Fax 949.203.0450 Oate: Job No. l` Engineer: Page No: of Lug\Ji AVc cA01 L►A 116--, Vil "Lth C eaMrM;D f vr� -1--*. e, Al2 llzois �IZ--i 17fl f s ('(►� (pis tib t u r �h �i ,tea K/-V w t. = 1 cw ft-F MIS.(,, s-c'FLf (--m wr) 17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-C450 I www.gcstructural.com Date: Job No. l` Engineer: Page No: of CkwWq l AO — ►COV), of (11( 1'{t t -S off 1A*/ Tg tt,/,WgA4 1 pfl— t.. �— "I,. 1 to 0 0 � CkJ+N 7 q�v, A 1 pot;, .--------- te=1L,� 17500 Redhill Avenue, Suite 240, Irvine, CA 92614 1 P 949-250-3150 1 F 949-203-0450 1 www.gcstructural.com COMPANY PROJECT WoodWorks" �C)ILN.Ikt It)1t NC)(:f) I>F Jt:.4 June 18, 2015 16:04 Columnl Design Check Calculation Sheet WoodWorks Sizer 10.2 Loads: Load Type Distribution Pat- Location `ft Magnitude Unit tern Start End Start End Loadl Dead Axial (Ecc. = C.CC") 4280 lbs Load2 Roof constr. Axial (Ecc. = O.CO") 26GC lbs Self -weight Dead Axial 72 lbs Lateral Reactions (lbs): 10, dy o, 10, Timber -soft, D.Fir-L, No.1, 6x6 (5-1/2"x5-1/2") Support: Non -wood; Bearing length = column width Total length: 10.0'; Pinned base; Load face = width(b); Ke x Lb: 1.0 x 10.0 = 10.0 [ft]; Ke x Ld: 1.0 x 10.0 = 10.0 [ft]; Analysis vs. Allowable Stress (psi) and Deflection (in) using NDS 2012: Additional Data: FACTORS: F/E(psi)CD CM Ct CL/CP CF Cfu Cr Cfrt Ci LC# Fc' i000 1.25 1.00 1.00 0.610 1.000 - - 1.00 1.0C 2 Fc* 1000 1.25 !.CC 1.00 - 1.COC - - 1-CC 1.00 2 CRITICAL LOAD COMBINATIONS: Axial : LC #2 = D+Lr, P = 7i52 lbs D=dead L=live S=snow W=wind I=impact Lr=reof live Lc=concentrated E=earthquake All LC's are listed in the Analysis output Load combinations: ASCE 7-11-0 / IBC 2C12 Design Notes: 1. WoodWorks analysis and design are in accordance. with the ICC International Building Code (IBC 2012), the National Design Specification (NDS 2012), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. CriterionAnal sis Value Desi n Value Arai sis/Design Axial fc = 236 Fc' = 763 fc/Fc' _ 0.31 Axial Bearing fc = 236 Fc* = i250 fc/Fc* = .19 C 3-