HomeMy WebLinkAbout1 LEGOLAND DR; ; CB163081; Permit. City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
10-31-2016 Patio/Deck Permit Permit No: CB163081
Job Address:
Permit Type:
Parcel No:
Valuation:
Reference #:
Project Title:
Applicant:
Building-Inspection Request Line (760) 602-2725
1 LEGOLAND DR CBAD
PATIO
2111000900
$11,006.00
Lot#: 0
Construction Type: NEW
LEGOLAND: 726 SF METAL CANOPY
FOR EMPLOYEE USE
Owner:
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
Plan Check#:
ISSUED
08111/2016
SLE
10/31/2016
10/31/2016
PREGRESSIVE DESIGN PLAYGROUNDS LEGOLAND CALIFORNIA L L C <LF> PLAY US ACQUISI
C/0 PROPERTY TAX SERVICE CO
2458 SANTA FE AVENUE
VISTA CA 92084
760-597-5990
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Strong Motion Fee
Green Bldg Standards (SB1473) Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Additional Fees
TOTAL PERMIT FEES
P 0 BOX 543185
DALLAS TX 75354
$132.33
$0.00
$92.63
$0.00
$1.43
$1.00
$0.00
$0.00
$0.00
$0.00
$227.39
~
Total Fees: $227.39 Total Payments To Date: $227.39 Balance Due: $0.00
Inspector: ~IL Date: Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as 'fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: 0PLANNING 0ENGINEERING
Ccicyof
Carlsbad
JOB ADDRESS 1
CT/PROJECT II
u;.e...
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
Ph: 760-602-2719 Fax: 760-602-8558
email: building@carlsbadca.gov
www.carlsbadca.gov
SUITEII/SPACEII/UNir#
II BAni ROOMS
qr~c.,.
[!(BUILDING DFIRE
Plan Check No.
Est. Value
PlanCk. Deposit
Date 6-11-1(, SWPPP
OCC. GROUP
EXISTING USE GARAGE (SF) PATIOS (SF) AIR CONDITIONING
YES0No0
FIRE SPRINKLERS
YEsONoD
APPUCANT NAME
Prlmarv Contact
ADDRESS
CITY
PHONE
EMAIL
DESIGN PROFESSIONAL
ADDRESS
CITY
PHONE
EMAIL
-fe,
Cit ZIP qzoetr
-==t feD coll =1-s q4 '
.COM
STATE ZIP
FAX
STATE LIC.II
ADDRESS :1
CITY CJ\ ZIP
PHONE
EMAIL
CONTRACTOR BUS. NAME e
ADDRESS %a_
CITY
PHONE
EMAIL
~f
STATE LIC.#
liZ'/ I../ 1'13 I CITY BUS. LIC.II
I ZZ. 9 782..
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct. alter. improve, demolish or repair any structure. prior to its issuance. also requires the applicant for such permit to file a signed statement tt\at he is licensed pursuant to the provisions of the Contractor's Ucense Law {Chapter 9. commending with Section 7000 of Division 3 of the Business and Professions Code} or that he is exempt therefrom. and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars {$500}).
WORI<ERS' COMPENSATIO
Workers' Compensation Declaration I hereby affirm underpena«y ofpeljury one of the following declarations: 0 I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. ~ I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy
numberarelnsuranceCo. Oc::k ~lV#V"'" /laS-fA. PdicyNo. fR't../~707 9 3<-ExpirationDate 7-}-17
This section need not be completed if the permit is for one hundred dollars ($100} or less. 0 Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of
California. WARNING: Failure to secure w~rkers' com ansation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in
addition to the cost of compensation, damages a 'dad for in Section 3706 of the Labor coda, interest and attomey's fees.
,1$ CONTRACTOR SIGNATURE ~ 0AGENT DATE
OWNER-BUILDER DECLARATI
I hereby affirm that I am exempt from Contractor's Ucense Law for the following reason.
D
D
D
I, as owner of the property or my employees wth wages as their sole compensation, >Mil do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractors
License Law does not appy to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. If, however, the buildng or improvement is sold >Mthin one year of competion, the owner-builder >Mil have the burden of proving that he did not build or improve for the purpose of sale).
I, as owner of the property, am exdusivety contracting wth licensed contractors to construct the prciect (Sec. 7044, Business and Professions Code: The Contractor's License Law does not appy to an owner of
property who builds or improves thereon, and contracts for such projects wth contractor(s) licensed pursuant to the Contractor's License Law}.
I am exempt under Section -~~--Business and Professions Code for this reason:
1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. Oves 0No
2. I (have I have not) signed an app ication for a building permit for the proposed work.
3. I have contracted wth the followng person (firm) to provide the proposed construction (include name address I phone I contractors' license number):
4. I plan to provide portions of the work, but I have hi~ the following person to coordinate, supervise and provide the major work (include name I address I phone I contractors' license number}:
(hired) the foljsllljng person\ij!o provide the work indicated (indude name I ad<tess I phone I type of work):
.8$ PROPERTY OWNER SIGNATURE ENT DATE 8 -) /-/{,
--------·-·-------~·~-·-----------
I certify that I have read the application and state that the above infonnation is correct and that the infonnation on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction.
I hereby aulhorize representative of the Qty of Carlsbad to enter upon the above mentioned property fer inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHIC MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OFT HIS PERMIT
OSHA An OSHA permrt is required for excavations CNer 5'0' deep and ition cr construction of structures CNer 3 stories in height.
EXPIRATION: Every permit issued by the Building Official under the lsions .. of thJ~shall expire by limitation and become null and void if the builcing cr v.ak aulhorized by such permit is not corrrnenced wthin
180 days !rem the date of such permit cr if the building cr v.orK ed by such-~ is suspended cr albandoned at any time after the v.orK is ccrnmenced for a period of 180 days (Section 1 06.4. 4 Uniform Builcing Code).
N$ APPLICANT'S SIGNATURE DATE g-jl-''
• STOP: THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE.
Complete the following ONLY if a Certificate of Occupancy will be requested at final inspection.
Fax (760) 602-8560, Email building@carlsbadca.gov or Mail the completed form to City of Carlsbad, Building Division 1635 Faraday Avenue, Carlsbad, California 92008.
DELIVERY OPTIONS
PICK UP: CONTACT (Listed above)
CONTRACTOR (On Pg. 1)
MAIL TO: CONTACT (Listed above)
CONTRACTOR (On Pg. 1)
OCCUPANT (Listed above)
OCCUPANT (Listed above)
MAIL/ FAX TO OTHER:----------------
Ji5 APPLICANT'S SIGNATURE
(Office Use Only)
CA
ASSOCIATED CB#·------------
NO CHANGE IN USE/ NO CONSTRUCTION
CHANGE OF USE/ NO CONSTRUCTION
DATE
PERMIT INSPECTION HISTORY REPORT (CB163081)
BLDG-Commercial 08/11/2016Application Date:Permit Type:Owner:LEGOLAND CALIFORNIA, LLC
Subdivision:Patio 10/31/2016Work Class:Issue Date:
1 Legoland Dr
Carlsbad, CA
Address:05/01/2017Expiration Date:Status:
IVR Number: 716372
Closed - Finaled
Scheduled
Date Inspection Type Inspection No.Inspection Status Primary Inspector Reinspection CompleteActual
Start Date
11/10/2016 11/10/2016 BLDG-11
Foundation/Ftg/Pier
s (Rebar)
000585-2016 Failed Andy Krogh Reinspection Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Not ready No
11/15/2016 11/15/2016 BLDG-11
Foundation/Ftg/Pier
s (Rebar)
001217-2016 Passed Andy Krogh Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Not ready Yes
12/15/2016 12/15/2016 BLDG-11
Foundation/Ftg/Pier
s (Rebar)
005619-2016 Passed Andy Krogh Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Revised ftg layout Yes
12/30/2016 12/30/2016 BLDG-Final
Inspection
007738-2016 Passed Andy Krogh Complete
COMMENTS PassedChecklist Item
BLDG-Structural Final Yes
BLDG-Electrical Final Underground conduit run only for future, no
wiring done at this point in time
Yes
December 30, 2016 Page 1 of 1
HiTE
HILL -INSPECTION
TESTING I ENGINEERING
Office (858) 220-1078
Fax (858) 220-7421
hill@h-ite.com
Foundation Observation Report
Project Name Date
Metal Shelter 9-Nov-2016
Project Location
One Legoland Drive, Carlsbad, California
Owner I Developer Contractor
Merlin Entertainment Ultra Shelter
Project I Permit Number Lot(s) I Parcel
CB163081
Soils Report Ref. Soils Report Foundation Type Conventional
(Provided by Others)
Expansion Condition High Fill Geometry Category II
Foundation Depth 48 inches min. Found. Reinforcement (6) #6 Vert. w/ #4 ties @ 8"
Foundation Width 2 feet dia. min. Interior Reinforcement
Slab bedding Undisturbed Soil Vapor Barrier
ObseNations:
Observed (6) 24" diameter pier at a depth of 48", at Shelter. Verified soil conditions exposed are similar to
those anticipated.
Comments:
It is our understanding that all excavations will be cleaned of loose soil and debris prior to concrete
placement; and that the soil moisture content will be maintained.
The presence of our field representative is for the purpose of observing the
construction and reporting on its compliance with the approved plans and the
applicable building codes. Our work does not include the supervision or direction!
of the contractor's work, his employees or agents. The contractor for this
project should be so advised. The contractor should all so be advised that
neither the presence of our field personnel nor the observation and testing by
this firm shall excuse him in any way for defects in his work. It should further be
understood that we are not responsible for site safety.
San Diego • Orange • Los Angeles • Riverside • San Bernardino
HiTE
HILL -INSPECTION
TESTING I ENGINEERING
Office (858) 220-1 078
Fax (858) 220-7421
hill@h-ite.com
Special Inspection Report
Project Address Building Permit Number Jurisdiction I File Number
One Legoland Drive CB163081 Carlsbad
Project Name Architect Metal Shelter Pd Play
Construction Material Design Strength Source Engineer
Reinforced Cone. fc=3000 psi RMC Jason M Conn
Description of Materials General Contractor
ASTM A615 Grade 60 Reinforcing Ultra Shelter
3/4" ASTM F1554, GR 36 Anchor Bolts Sub Contractor
Community Playgrounds
Other
Inspection Date I Start of Work I End of Work I 11-Nov-16
Provided Special Inspection for the placement of reinforcing steel in the (6) Metal Shelter Foundations ,
per Pier Footing, Detail1 on Sheet 2.0, at the referenced project. All steel sizes, laps and clearances are
in substantial conformance with the approved plans, specifications, and changes thereto.
I HEREBY CERTIFY THAT I HAVE INSPECTED THE ABOVE REPORTED
WORK. UNLESS OTHERWISE NOTED, THE WORK INSPECTED IS TO
THE BEST OF MY KNOWLEDGE IN COMPLIANCE WITH THE APPROVED
CONSTRUCTIOBN DOCUMENTS, AND APPLICABLE SECTIONS OF THE
GOVERNING BUILDING LAWS.
Henry Barton Hill, PE 64822
San Diego • Orange • Imperial • Los Angeles • Riverside • San Bernardino
ICC, No.: 1113681-MI
REGISTRATION NUMBER
November 11, 2016
DATE
I
HiTE
HILL -INSPECTION
TESTING I ENGINEERING
Office (858) 220-1 078
Fax (858) 220-7421
hill@h-ite.com
Special Inspection Report
Project Address Building Permit Number Jurisdiction I File Number
One Legoland Drive CB163081 Carlsbad
Project Name Metal Shelter Architect Pd Play
Construction Material Design Strength Source Engineer
Structural Steel A992 Braun Straus Jason M Conn
Description of Materials General Contractor
ASTM C1107, Rapid Set Cement All, High Strength, Non-Ultra Shelter
Sub Contractor
Community Playgrounds
Other
Inspection Date I Start of Work I End of Work I 22-Dec-16
Provided special inspection for the High Strength Non-Shrink Grout at the Structural Steel (SS) columns
for the Metal Shelter. Rapid Set Cement All, High Strength, Non-Shrink Grout was used conforming to
ASTM C1107.
RECEIVED
' r "~ r,. JAN 0 5 2017 •'
CITY OF CARLSBAD
BUILDING DIVISION
I HEREBY CERTIFY THAT I HAVE INSPECTED THE ABOVE REPORTED ACI No.: 01347370
WORK. UNLESS OTHERWISE NOTED, THE WORK INSPECTED IS TO ICC, No.: 1113681-MI
THE BEST OF MY KNOWLEDGE IN COMPLIANCE WITH THE APPROVE REGISTRATION NUMBER .// CONSTRUCTIOBN DOCUMENTS, AND APPLICABLE SECTIONS OF THE
GOVERNING BUILDING LAWS. December 22, 2016
DATE
San Diego • Orange • Imperial • Los Angeles • Riverside • San Bernardino
-----------------------
HiTE
HILL -INSPECTION
TESTING I ENGINEERING
Office (858) 220-1 078
Fax (858) 220-7421
hill@h-ite.com
Special Inspection Report
Project Address Building Pennit Number Jurisdiction I File Number
One Legoland Drive CB163081 Carlsbad
Project Name Metal Shelter Architect Pd Play
Construction Material Design Strength Source Engineer Jason M Conn Structural Steel A992 Braun Straus
Description of Materials General Contractor Ultra Shelter ASTM A325, Dia 5/8-11x2" Type 1
ASTM A 194-2H, 5/8-11 Heavy Hex Nut Sub Contractor
ASTM F436, Flat Washer Community Playgrounds
Other
Inspection Date I Start of Worlf I End of Worlf I 22-Dec-16
Provided special inspection for the fit-up of bolted connections for Metal Shelter, per Plan and
Elevations. Verified, proper storage of fastener components, and that the faying surfaces adjacent to
the bolt head and nuts are free of dirt and foreign material. Observed turn of the nut tightening
procedures at all bolted connection.
... ' I
I HEREBY CERTIFY THAT I HAVE INSPECTED THE ABOVE REPORTED
WORK. UNLESS OTHERWISE NOTED, THE WORK INSPECTED IS TO
THE BEST OF MY KNOWLEDGE IN COMPLIANCE WITH THE APPROVE
CONSTRUCTIOBN DOCUMENTS, AND APPLICABLE SECTIONS OF THE
GOVERNING BUILDING LAWS.
RECEIVED
JAN 0 5 2017
CITY OF CARLSBAD
BUILDING DIVISION
ICC, No.: 1113681-MI
REGISTRATION NUMBER
December 22, 2016
DATE
San Diego • Orange • Imperial • Los Angeles • Riverside • San Bernardino
'
EsGil Corporation
In a'artnersliip witli government for (8ui(tfing Safety
DATE: OCT. 19,2016
JURISDICTION: CARLSBAD
PLAN CHECK NO.: 16-3081 SET: III
[J APPLICANT
D-d"t1f{ IS.
[J PLAN REVIEWER
[J FILE
PROJECT ADDRESS: 1 LEGOLAND DR.
PROJECT NAME: SHADE CANOPY FOR EMPLOYEE LUNCH AREA -LEGOLAND
L8J
D
D
D
D
D
L8J
D
D
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at EsGil
Corporation until corrected plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicant's copy of the check list has been sent to:
MARK AT PD PLAY
EsGil Corporation staff did not advise the applicant that the plan check has been completed.
EsGil Corporation staff did advise the applicant that the plan check has been completed .
., -Telephone #: 760-597-5990
REMARKS:
By: ALI SADRE, S.E. (FOR K.C.)
EsGil Corporation
D GA D EJ D MB D PC 1 0/13
Email: mark@PDPiay.com
Enclosures:
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
\
EsGil Corporation
In cpartnersliip witli qo'flernment for (}Jui{tfing Safety
DATE: SEPT. 16,2016
JURISDICTION: CARLSBAD
PLAN CHECK NO.: 16-3081 SET: II
1:1 J\PPLICANT
fi' JURIS.
1:1 PLAN REVIEWER
1:1 FILE
PROJECT ADDRESS: 1 LEGOLAND DR.
PROJECT NAME: SHADE CANOPY FOR EMPLOYEE LUNCH AREA -LEGOLAND
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
~ The check list transmitted herewith is for your information. The plans are being held at EsGil
Corporation until corrected plans are submitted for recheck. PLEASE SEE BELOW
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
~ The applicant's copy of the check list has been sent to:
MARK AT PO PLAY
D EsGil Corporation staff did not advise the applicant that the plan check has been completed.
~ EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: MARK Telephone#: 760-597-5990
/Date contacted: OJ /l bl! ~(by:~:fl<.) Email: mark@PDPiay.com
J(,Mail JrelephonevM Fax In Person
~ REMARKS: Supplemental plan check fees will be assessed for resubmitting the plans without
addressing all the corrections on the attached list at the next go around.
By: ALI SADRE, S.E. (FOR K.C.)
EsGil Corporation
D GA D EJ D MB D PC 9/13
Enclosures:
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
•
CARLSBAD 16-3081
SEPT. 16,2016
• GENERAL
• Please make all corrections, as requested in the correction list. Submit FOUR new complete sets
of plans for commercial/industrial projects (THREE sets of plans for residential projects). For
expeditious processing, corrected sets can be submitted in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad
Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will
route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire
Departments.
2. Bring jiW® corrected set of plans and calculations/reports to EsGil Corporation, 9320
Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets
of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to
their Planning, Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City
Planning, Engineering and Fire Departments until review by EsGil Corporation is complete.
• PLANS
1. Please include the following code information for the proposed shade structure
on the Title Sheet.:
• Occupancy Classification: New Addition = B (Assembly with less than 50 occupants);
Existing Building = I.e., B (Office); A3 (Assembly with OL ~50); A-2 (Restaurant); etc.
• Type of Construction: New= 11-B; Existing = ....
• Sprinklers: New= Yes or No; Existing= Yes or No
• Floor Areas: New= 600-s.f.; Existing = .....
+ Occupant Load: 600-s.f./15 (O.L. Factor)= 40-Occupant Load (OL); Existing= ...
2. Per city ordinance, it appears that a fire sprinkler system is needed?
3. Provide a statement on the Title Sheet of the plans, stating that this project shall
comply with the 2013 California Building Code, which adopts the 2012 IBC.
4. Show the distance between the proposed Shade Structure and the existing
building on the site plans. Section 1 07.2.
5. When two buildings are on the same property, the buildings shall have an
assumed property line between them for the purpose of determining the required
wall & opening protection & roof cover requirements, Sec. 705.3. An exception is
provided if the combined area of the existing building & shade structure is within
the limits specified in Chapter 5 for a single building. If this exception is used.
show how the building(s) will complv. This only works if both buildings have the
same type of Construction & they are both Sprinklered; otherwise, the existing
and new will have to be 20' apart. Section 503.1.2.
6. When a new building is to be erected on the same property as an existing
building, the location of the assumed property line with relation to the existing
building shall be such that the exterior wall and opening protection of the existing
building meets the criteria of Sections 705.5 and 705.8. Section 705.3.
CARLSBAD 16-3081
SEPT. 16,2016
7. Please specify the weld size and type between the steel columns & the base
plates.
8. The City Policy requires that their Special Inspection Agreement Form be
completed for the items listed on Sheet #5. This Form is available at the building
department.
• ADDITIONAL
9. PLEASE PROVIDE A RESPONSE LIST INDICATING WHERE EACH ITEM IS
ADDRESSED ON PLANS.
10. The jurisdiction has contracted with EsGil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact All SADRE, S.E.
(FOR K.C.) at EsGil Corporation. Thank you.
EsGil Corporation
In Partnersliip witli government for (]Jui{aino Safety
DATE: August22,2016
JURISDICTION: Carlsbad
PLAN CHECK NO.: 16-3081
PROJECT ADDRESS: 1 Legoland Dr.
SET: I
PROJECT NAME: Canopy for Employee Lunch Area
':J~PPLICANT
~JURIS.
. D PLAN REVIEWER
D FILE
Legoland
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
l8J The check list transmitted herewith is for your information. The plans are being held at EsGil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
l8J The applicant's copy of the check list has been sent to:
Mark at PD Play
D EsGil Corporation staff did not advise the applicant that the plan check has been completed.
l8J EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Mark Telephone#: 760-597-5990
pate ~o tacted:t5/L.D (by:~ Email: mark@PDPiay.com
/i:/Mail lephon~ Fax In Person
D REMA '&~.
By: Kurt Culver
EsGil Corporation
D GA D EJ D MB D PC
Enclosures:
8/15/16
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
Carlsbad 16-3081
August 22, 2016
PLAN REVIEW CORRECTION LIST
COMMERCIAL
PLAN CHECK NO.: 16-3081
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION:
DATE INITIAL PLAN REVIEW
COMPLETED: August 22, 2016
FOREWORD (PLEASE READ):
JURISDICTION: Carlsbad
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 8/15/16
PLAN REVIEWER: Kurt Culver
This plan review is limited to the technical requirements contained in the California version of
the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National
Electrical Code and state laws regulating energy conservation, noise attenuation and access for
the disabled. This plan review is based on regulations enforced by the Building Department.
You may have other corrections based on laws and ordinances enforced by the Planning
Department, Engineering Department, Fire Department or other departments. Clearance from
those departments may be required prior to the issuance of a building permit.
Code sections cited are based on the 2013 CBC, which adopts the 2012 IBC.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of
the 2012 International Building Code, the approval of the plans does not permit the violation of
any state, county or city law.
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet number, specification section. etc.
Be sure to enclose the marked up list when you submit the revised plans.
Carlsbad 16-3081
August 22, 2016
• GENERAL
• Please make all corrections, as requested in the correction list. Submit
FOUR new complete sets of plans for commercial/industrial projects (THREE sets of
plans for residential projects). For expeditious processing, corrected sets can be
submitted in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-
2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning,
Engineering and Fire Departments.
2. Bring TWO corrected set of plans and calculations/reports to EsGil Corporation,
9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver
all remaining sets of plans and calculations/reports directly to the City of Carlsbad
Building Department for routing to their Planning, Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed
by the City Planning, Engineering and Fire Departments until review by EsGil
Corporation is complete.
• PLANS
1. Provide a Building Code Data Legend on the Title Sheet. Include the following
code information for each building proposed:
+ Occupancy Classification(s)
+ Type of Construction
+ Sprinklers: Yes or No
+ Occupant Load
2. Per city ordinance, it appears that a fire sprinkler system is needed?
3. Provide a statement on the Title Sheet of the plans, stating that this project shall
comply with the 2013 California Building Code, which adopts the 2012 IBC.
4. Provide a fully dimensioned site plan drawn to scale. Sec. 107.2. Include the
following:
a) Clearly dimension building setbacks from property lines, street centerlines,
and from all adjacent buildings and structures on the site plan.
5. When two or more buildings are on the same property, the buildings shall have
an assumed property line between them for the purpose of determining the
required wall and opening protection and roof cover requirements, per Section
705.3. An exception is provided if the combined area of the buildings is within
the limits specified in Chapter 5 for a single building. If this exception is used,
show how the building(s) will comply. Section 503.1.2.
Carlsbad 16-3081
August 22, 2016
6. When a new building is to be erected on the same property as an existing
building, the location of the assumed property line with relation to the existing
building shall be such that the exterior wall and opening protection of the existing
building meets the criteria of Sections 705.5 and 705.8. Section 705.3.
7. Please show on the plans the weldment of the steel column to its base plate.
• ADDITIONAL
8. To speed up the review process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
9. Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction
list? Please indicate: D Yes D No
10. The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact Kurt Culver at
Esgil Corporation. Thank you.
Carlsbad 16-3081
August 22, 2016
[DO NOT PAY-THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad
PREPARED BY: Kurt Culver
BUILDING ADDRESS: 1 Legoland Dr.
BUILDING OCCUPANCY:
BUILDING AREA Valuation
PORTION ( Sq. Ft.) Multiplier
Canopy
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb By Ordinance
Bldg. Permit Fee by Ordinance ""' I
Plan Check Fee by Ordinance ~ I
Type of Review: 0 Complete Review
D Repetitive Fee •I Repeats
Comments:
D Other
D Hourly
EsGil Fee
PLAN CHECK NO.: 16-3081
DATE: August 22,2016
Reg. VALUE ($)
Mod.
11,006
11,006
c $132.331
I . -$ss.o11
D Structural Only
[--~Hr.@• c $74.101
Sheet 1 of 1
macvalue.doc +
~f~~ "'~}*. ~ CITY OF
CARLSBAD
PLANNING DIVISION
BUILDING PLAN CHECK
APPROVAL
P-29
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.f!.ov
DATE: 8-15-16 PROJECT NAME: metal canopy for employee lunch area PROJECT ID:
PLAN CHECK NO: CB 16-3081 SET#: 1 ADDRESS: 1 Legoland Dr APN:
[gl This plan check review is complete and has been APPROVED by the Planning
Division.
By: Chris Sexton/Teri Delcamp
A Final Inspection by the Planning Division is required DYes [gl No
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check APPROVAL has been sent to:
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING ENGINEERING FIRE PREVENTION
760:-602-4610 760-602-2750 760-602-4665
~ Chris Sexton D Chris Glassen D Greg Ryan
760-602-4624 760-602-2784 760-602-4663
Chris.Sexton@carlsbadca.gov Christogher.Giassen@carlsbadca.gov Grego[y.Ryan@carlsbadca.gov
D Gina Ruiz D VaiRay Marshall D Cindy Wong
760-602-4675 760-602-27 41 760-602-4662
Gina.Ruiz@carlsbadca.gov VaiRay.Marshall@carlsbadca.gov Cynthia.Wong@carlsbadca.gov
D Veronica Morones D Linda Ontiveros D Dominic Fieri
760-602-4619 760-602-2773 760-602-4664
Veronica.Morones@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Dominic.Fieri@carlsbadca.gov
Remarks:
~~~.~~·a\·~ "' ~· ~· ~···.CITY OF
CARLSBAD
PLAN CHECK
REVIEW
TRANSMITTAL
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
DATE: 08/23/20U1ROJECT NAME: Legoland Metal Shade Canopy PROJECT ID:
PLAN CHECK NO: CB163081 SET#:l ADDRESS: 1 Legoland Dr APN: 2111000900
VALUATION: $11,006 APPLICANT CONTACT: mark@pdplay.com
[XJ
D
Tlis plan check review transmittal is to notify you of clearance by:
LAND DEVELOPMENT ENGINEERING DIVISION
Final lll'>pe c tion by the Construction & Inspection Division is required: Yes No X
~ For status from a division not marked below, please call 760-602-2719
This plan check review is N<I'CO.MPLETE Items missing or incorrect are listed
on the attached checklist. Please resubmit arne nded plans as required.
Chris.Sexton@carlsbadca gov
760-602-27 41
Kathleen.Lawrence@carlsbadca.gov Gregory.Ryan@carlsbadca.gov
Gina Ruiz
760-602-4675
Gina.Ruiz@carlsbadca.gu,;
Linda Ontiveros D 760-602-2773
Unda.Ckltiveros@Carlsbadca.gov
:1.({] VALRAY MARSHALL
760-602-27 41
Cindy Wong
760-602-4662
Cynthia.Wong@carlsbadca.gov
Dominic Fieri
760-602-4664
Dominic.Fieri@carlsbadca.gov
Remarks: 726 sf shade structure does not affect any city owned easements. It is being built over
existing impervious area for employee lunch eating.
•
11"
0 0 [21 I 11"
0 0
r-A
/' .'::;: ~r
1111:\1 11(11; 1'1\1-l!l
______________________ e_,_,e_~_,,
SECTION B-B
SCALE 1 : 16
SECTION A-A
SCALE 1 : 16
' / \ / '" / \/
BACKER PLATES TO BE TACK
WELDED AS NECESSARY
109 1/8"
COLUMN TO BE
CENTERED ON
BASE PLATE
TYP 1/4"
Sam. 11 Sam. 21 Sam. 31 Sam. 41 Sam. 5
3
Column-Center #107747
C6l"~~''
• ~
BACKER PLATES TO BE TACK
WELDED AS NECESSARY---' SECTION A-A
SCALE1:16
' / \ / '' / \/
SECTION B-B
SCALE 1: 16
TYP
COLUMN TO BE
CENTERED ON
BASE PLATE
TYP
3/16lfG TYP
~ ~ ... ,,
ffi 3 ~g N ~ ~-~~~0 ~ ~r-.:::l<vt\1 § "05~Lh~~ > ~!=!.as!fJ !11~-~dH l;j ~.,-~., a: :.S ~£].2i ~ j-~~
§ ~
800.585.3131
WWW.PDPLAY.COM
N
W+E
s
RECEIVED
AUG 11 2016
CITY OF CARLSBAD
~ ~ ~ 0
0 :'
Perspective View
Site dimensions, ADA COMPLIANCE : REQUIRED ACTUAL size and
orientation, TOTAL ELEVATED COMPONENTS : existing utilities,
soil conditions, COMPONENTS ACCESSIBLE BY TRANSFER : drainage solutions,
and topography iA~CESSIBLE GROUND LEVEL COMPONENTS : should be
E:FEREi'h TYPE COMPONENTS : obtained,
evaluated, and
utilized prior to cJ'MPONENTS ACCESSIBLE BY RAMP : nl:arinft ftrlla.r
Employee
Lunch
Buildi
Offices
•••••• • • • • • •
•••• • • • •• •
•••• •
• I• •••'!·· . ; •• J. • •• l.· ~
•• • • • • •• •
•
• • • • • • • • Use the "Critical Fall Height" when choosing a resilient sur(irc."lftO•
(Refer to CPSC guidelines, section 10). • •••
Project Data • • • •• • LEGOLAND Picnic Area
Minimum Use Zone:
Model No:
lob No:
Fall Height :
Revision No: Age Group:
Date: 08/09/2016
Accepted By: C61L03 c:6l
)-
I~
'\ c
•••••• • • • •••
•••••• • • • • ••
• •••• • •••••
••••• • •• • ........
••
•••••• • • ••••
1
'.
•
ultra sheltel!
RECEIVED
AUG 11 2016
CITY OF CARLSBAD
BUILDING DIVISION
By ultra site
CALCULATIONS FOR:
UltraShelter #107747
HP2233S-ML
1 LEGOLAND DRIVE
CARLSBAD, CA 92008
2013 CALIFORNIA BUILDING CODE
August 1, 2016
•
PREPARED UNDER THE DIRECT CONTROL AND SUPERVISION OF:
• • • •• ••• • • • • • • • • ••• • • • • • • • •• • • • •• • • • • • ••
• ••• • • • • • •
• ••• • ••• ~Js:>EAt PERTJJlrv~oNi¥ TO THE MATERIALS SUPPLIED BY ULTRASHEL TER.
• • • • THI: ~E,L !Sok N@IeSERVE AS-OR REPRESENT-THE PROJECT •• • • • • • ENG,NEER OF. RECORD AND SHALL NOT BE CONSTRUED AS SUCH . ••
•• • • • • • • • • •• UltraShelter #1 077 4 7
•
• • • ••••• • • • • • • • • • • • • • • •• • • ••••••• • • • • • • • • • • • • • ••• • • Page 1 of 59 CJO \ LOEC ~obg \
)-r--c)
.,
• TABLE OF CONTENTS
1 DESIGN CRITERIA
2 BUILDING MATERIALS
3 SUPPORT REACTIONS
4 STRUCTURAL GEOMETRY AND COMPUTER MODEL
5 STRUCTURAL ANALYSIS AND DESIGN
6 CONNECTION DESIGN
7 FOOTING DESIGN
8 ROOF PANEL DATA
••• •• • • • • • • • • • • • ••• • • ••• • • • • • • • • • • ••• • • •
••• • ••• • • • • • ••• • • • • • • • • • • • • • • • • • • • • • • • • • •• • • •• • • • •• • • • • • • •
• • ••• • • • • • • • • • • • • • •• • • • • • • • • • • ••• • • • • • • • • • • • •• • • • • • • • • •• • • UltraShelter #1 07747 Page 2 of 59 • • • •• CEC #16-803
..
Risk Category:
Dead Loads, D:
Snow Loads,· S:
Live Loads, L r:
Wind Loads, W:
DESIGN CRITERIA
2013 CALIFORNIA BUILDING CODE
II
Weight of Roofing System =
Basic Ground Snow Load, P9 =
Importance Factor, 15 =
Slope Factor, Cs =
Thermal Factor, C1 =
Exposure Factor, c.=
Flat Roof Snow Load, P1 =
Sloped Roof Snow Load, P, =
Unbalanced Roof Snow Load, W<20 ft =
Roof Live Load, L, =
Ultimate Design Wind Speed = V u~ =
Nominal Design Wind Speed = V asd =
See Wind Analysis Sheets
2.00 psf + Structure Dead Weight
0.00 psf
1.00
1.00
1.20
1.00
0.00 psf
0.00 psf
0.00 psf
20.00 psf
110.00 mph
86.00 mph
Seismic Loads, E: Equivalent Lateral Force Procedure
Seismic Site Class = D
Seismic Force Resisting System =
Short Spectral Response Paramenter, Ss =
1-Sec Spectral Response Paramenter, S1 =
Seismic Design Category =
Steel Ordinary Cantilever Column System
1.127
Elevation:
Load Combinations:
Importance Factor, 1. =
Response Modification Coefficient, R =
Redundancy Factor, p =
Overstrength Factor, Oo =
Site Coefficient, Fa =
Site Coefficient, F v =
Adjusted Short Spectral Response Paramenter, SMs =
Adjusted 1-Sec Spectral Response Paramenter, SM1 =
Design Short Spectral Response Parameter, S05 =
Design 1-Sec Spectral Response Parameter, S01 =
Seismic Response Coefficient, C5 =
Effective Seismic Weight, W =
Seismic Base Shear, V =
Seismic Load, E =
Seimic Load with Overstrength Factor, Em =
154 Feet Above Sea Level
Basic Load Combinations Per Local Building Codes
• • • •••••
0.434
D
1.00
1.25
1.30
1.25
1.049
1.566
1.182
0.680
0.788
0.453
0.631
4508.75 lbs
2842.85 lbs
3695.70 lbs
3553.56 lbs
Strength Design Load Comt>irfttti&R( • • • • •••• Allowable Stress Design Load Combinations
1.40 : • • :
1.20 + 1.6(LrorS) + O.SW • • •
1.20 + 1.0W+ O.S(LrorS)
1.20 + 1.0E + 0.25 • ••• • • • 0.90 + 1.0W • •: • • • 0.90 + 1.0E •• • ••
•• • • • • • • • • • •• • UltraShelter #1 077 4 7
• • • • • • •
• • • • • • • • •
• •
•
• • • • •
• +fqu:~~n 16-1)
(Equation 16-3)
(Equation 16-4)
• o:'"quati~ 1.6-~): • Jt-• • • \equation '116-6)• •• • • • • (Equatiol1"16-7) •
• ••• • • • • • • • • • • • • • • ••• • • • • • • • • • ••• • •
1.00 (Equation 16-8)
1.00 + 1.0(LrorS) (Equation 16-10)
1.00 + (0.6Wor0.7E)
1.00 + 0.75(0.611\.1 + 0.75(LrorS)
1.00 + 0.75(0.7E) + 0.75(LrorS)
0.60 +0.6W
0.60 + 0.7E
Page 3 of 59
(Equation 16-12)
(Equation 16-13)
(Equation 16-14)
(Equation 16-15)
(Equation 16-16)
CEC #16-803
Project
Subject
Location
ON COVER
WIND ANALYSIS
ON COVER
Main Wind Force Resisting System
(Directional Procedure)
Velocity Pressure Calculations:
Rigid Structures
of all Heights
Free Pitched Roofs
File
Date
Eng
p
qh
G
Cn
Velocity pressure qh is calculated in accordance with section 27.3.2
qh =Velocity pressure @ height (h)
qh =Constant· Kh · Kzt · Kd · V 2
Where :Constant
Mean Sea Level
Air Density @MSL
Occupancy Category
Exposure Category
a
Zg
Basic Wind Speed
Structure Height
Width
Depth
Kh
Kzt
Topography
Kzt@ h
Kd
Numerical constant
Y, · [ (Air density lb/ cu ft) I ( 32.2 ft/s2 )]
[( mi/h )( 5280 ft/mi) · (1 hr/3600 s )] 2
0.00256
0.00 ft
0.0765 lb/cu ft
II
c
9.50
900.00 ft
110.00 mph
10.58 ft
22.00 ft
33.00 ft
Velocity pressure coefficient@ height h
2.01·( Z/Zg)" (2/a) for 15ft<= z <= Zg
2.01 · (15/Zg)" (2/a) for z <15ft
0.85
Topographic factor
(1 + K1 · K2 · K3) 2
None
1.00
Wind directionality factor
0.85
••• • • • • • • ••
•
••• •• • • . • ••• • • • • •••
••• • • • • • • •
= qh G Cn
ON COVER
8/1/2016
BMR
: velocity pressure at h
: Section 26.9.4
:Figure 27.4-5 & 27.4-7
• • • • • ••• • . • .. • • •
• • • . • • •
(Eq. 27.3-1)
(Section C27.3.2)
(Table C27.3-2)
(Table 1.5-1)
(Section 26.7.3)
(Table 26.9-1)
(Table 26.9-1)
(Figure 26.5-1 A-C)
(Table 27.3-1)
(Figure 26.8-1)
(Table 26.5-1)
• • • • . •
... . • . • . • • • •• • • . .
UltraShelter #1 077 4 7 Page 4 of 59
• • •
. . . . ... . . . . .
.. .. • • II! .... . . . . • •
. . . .
•
..
••
. •
••
CEC #16-803
..
Project
Subject
Location :
ON COVER
WIND ANALYSIS
ON COVER
File
Date
Eng
Gust Effect Factor. Gf. Obtained by Rational Analysis
The gust effect factor Gf obtained by rational analysis uses the dynamic properties of the system.
Values Obtained from Table 26.9-1
Zmin
E
e
c
Calculated Values
Analysis
z(")
lz
Lz
Q
gq
gv
Gust Factor ( G )
G
• • • •• • • • • • • • ••• • • • • • • • • •• • • •
• ••• • ••• • • • • • • • • • • • • •• • • • • • •• • • •• •• • • •
• • • •• • • • • • • • • • • • • • • • • • • • • • • .. • • • • • • • • • UltraShelter #1 onJ.l
••• • • • •• • • ••
• • • • • • •
••• • • ••• • •••
• • • •
• •
15ft
0.2
500ft
0.2
Category II : Rigid Structure-Complete Analysis
15ft
c · (33/z(")) A (1/6}
0.2280869
e · (z("}/33} "e
427.0566 ft
Sqr { 1/ ( 1+ 0.63 · {(b+h}/Lz}A0.63)]
0.943
3.4
3.4
0.925 · [(1 + 1. 7 · gq · lz · Q) I ( 1 + 1. 7 · gv · lz )]
0.895
• •• • • • • • •
• • • • • • • • • •
Page 5 of 59
(Eq. 26.9-7)
(Eq. 26.9-9)
(Eq. 26.9-8)
(Eq. 26.9-6)
ON COVER
8/1/2.016
BMR
CEC #16-803
Project
Subject
Location
ON COVER
WIND ANALYSIS
ON COVER
Design Wind Pressure, p. Equation 27.4-3
Figure 27.4-5 (Pitched Free Roofs)
Roof Height = 10.58 ft
Roof Angle = 18.47 deg.
h/L = 0.48
Clear Flow
UltraShelter #107747 Page 6 of 59
••• • • • •• •
• • • •
• • • • •• • • • • ••
File
Date
Eng
••• • • ••• • •••
•• • • • • •
• ••• • • • • • • • • •• • •
••• • • • • • • • ••• • • • • • • •• • •
• • • • • ••• • • • • • • •
• • • • • • • • • •
• • • • • • • • • • • • • •
• • • • • •
••• • • • • • • • • • • •• •
• •
•
•• • • • • • • . .. ••
••
ON COVER
8/1/2016
BMR
CEC #16-803
. '
..
Project
Subject
Location
ON COVER
WIND ANALYSIS
ON COVER
Design Wind Pressure. p, Equation 27.4-3
Figure 27.4-7 (Free Roofs -wind parallel to ridge)
Wind pressures are for gamma= 90 and 2 70 degrees.
Roof Height = 10.58 ft
Roof Angle
h/L
Clear Flow
• •
• . . • • . ...
• • •
• . • • • •
••• . . . .. •
•• . • . . . •
UltraShelter #1 077 ~f •
B
A
B
A
B
• . . •
•
..
• • • . •
18.47 deg.
0.48
1.00
1.00
1.00
1.00
1.00
• •• ••• . . • ... . • . .. • • •• . • • ••
. ... • • • . • . . • .
• • •• .
• • •
• • • ••• • • • • . . . . . . . . . .. . . . • • • •••
1.00
1.00
1.00
1.00
1.00
. ..
.
• • .
••
1.00
1.00
1.00
1.00
1.00
0.85
0.85
0.85
0.85
0.85
Page 7 of 59
22.35
22.35
22.35
22.35
22.35
File
Date
Eng
0.895
0.895
0.895
0.895
0.895
0.80
-0.60
0.50
-0.30
0.30
16.00
-12.00
10.00
-6.00
6.00
ON COVER
8/1/2016
BMR
CEC #16-803
Project
Subject
Location :
ON COVER
WIND ANALYSIS
ON COVER
Components and Cladding
File
Date :
Eng
p : qh G en
ON COVER
8/1/2016
BMR
Rigid Structures
Pitched Free Roofs
Open Buildings
qh : velocity pressure at h
G : Section 26.9.4
Cn : Figure 30.8-2
Velocity Pressure Calculations:
Velocity pressure is calculated in accordance with section 30.3.
qh =Velocity pressure@ mean roof height, h
qh =Constant· Kz· Kzt· Kd ·V2
UltraShelter #1 077 4 7
Where : Constant
Mean Sea Level
Air Density @MSL
Occupancy Category
Exposure Category
a
Zg
Basic Wind Speed
Structure Height
Width
Depth
Kh
Kzt
Topography
Kzt
Kd
Numerical constant
Y, · [ (Air density lb/ cu ft ) I ( 32.2 ftfsZ )] ·[(
mi/h )( S280 ft/mi) · (1 hr/3600 s)] z
0.00256
0.00 ft
0.0765 lb/cu ft
II
c
9.50
900.00 ft
110.00 mph
10.58 ft
22 ft
33.00 ft
Velocity pressure coefficient at height h
2.01·( Z/Zg) " (2/a) for 15ft<= Z <= Zg
2.01 · (15/Zg) " (2/a) for Z < 15 ft
0.85
Topographic factor
(1 + K1 · K2 · K3) z
None
1.00
Wind directionality factor
0.85
••• •• • • • • • • • ••• ••• • • • • • • • ••• •
••• • ••• • • • • .. • • • • • • • • • • • • • • •• • • •• • • • • • •
• • ••• • • • • • • • • • •• • • • • • • • • ••• • • • • • • •• • • • • •• • • • Page 8 of 59
• • • • •
•
• • • • •
(Section C27 .3.2)
(Table C27 .3-2)
(Table 1.5-1)
(Section 26.7.3)
(Table 26.9-1)
(Table 26.9-1)
(Figure 26.5-1 A-C)
(Table 30.3-1)
(Figure 26.8-1)
(Table 26.6-1)
• • • • • •
••• • • • • • • • • • • •• • • • •
• • • • • • • • • • • • •• CEC #16-803
..
Project
Subject
Location
ON COVER
WIND ANALYSIS
ON COVER
File
Date
Eng
Gust Effect Factor, Gf, Obtained by Rational Analysis
The gust effect factor Gf obtained by rational analysis uses the dynamic properties of the system.
Values Obtained from Table 26.9-1
Zmin
€
e
c
Calculated Values
Analysis
z()
lz
Lz
Q
gq
gv
Gust Factor ( G )
G
Design Wind Pressure, p, Equation 30.8-1.
Figure 30.8-2 {Pitched Free Roofs)
Roof Height = 10.58 ft
Roof Angle
Dimension, a
Zone 1 Area
Zone 2 Area
Zone 3 Area
Clear Flow
0.85
0.85
0.85
0.85
0.85
18.43 deg.
3ft.
0 Sq.ft.
164 Sq.ft.
562 Sq.ft.
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
• • • •• ••• • . . • . • • • ••• • • • • • • • •• • • • •• .
• • • • ••
••• • ••• • • • • . ~ • . • . . . • • • • • • . . • • • • . •• . • •• • •• • • • •
•• • • • ••• • . • . . . . . . . • .
• . . ' • . • • •
UltraShelter #1 077 4'1" • • • • . . ...
15ft
0.2
500ft
0.2
Category II :Rigid Structure-Complete Analysis
15ft
c · {33/zr!) A (1/6)
0.2280869
e · (zr!/33} AE
427.0566 ft
Sqr [ 1/ ( 1+ 0.63 · [(b+h}/Lz}A0.63 )}
0.943
3.4
3.4
0.925 · [(1 + 1.7 · gq · lz · Q) I ( 1 + 1.7 · gv · lz )}
0.895
• • • •
•
0.85
0.85
0.85
0.85
0.85
• •• • • • • • •
•
22.35
22.35
22.35
22.35
22.35
0.895
0.895
0.895
0.895
0.895
Page 9 of 59
-1.05
1.15
-1.05
1.15
-1.05
-21.09
22.92
-21.09
22.92
-21.09
(Eq. 26.9-7)
(Eq. 26.9-9)
(Eq. 26.9-8)
(Eq. 26.9-6)
ON COVER
8/1/2016
BMR
CEC #16-803
Member Description
Column
Hip Beam
Ridge Beam
Purlin A
Purlin B
Hip Beam Tail
STRUCTURAL STEEL
MEMBER TYPE
WSHAPES
RECTANGULAR HSS TUBES
SQUARE HSS TUBES
ROUND HSS TUBES
SCHEDULE PIPE
ROUND MECHANICAL TUBING
MISCELLANEOUS PLATES/SHAPES
CONNECTION BOLTS
HEADED ANCHOR BOLTS
UltraShelter #1 077 4 7
BUILDING MATERIALS
Member Size:
HSS6x6x3/16"
HSS6x6x3/16"
HSS6x6x3/16"
HSS6x4x1 /8"
HSS5x3x1 /8"
HSS2x6x1/8"
ASTM
A992
ASOO(GRADE B)
ASOO(GRADE B)
ASOO(GRADE B)
A53 (GRADE B)
A519
A36
A325
A1554
Page 10 of 59
Steel Fy (ksi)
••• •• • •• • • • • • • • • ••••• MIN. YD:!--c> Sl~t::N(}TH !
50 KSI••• • • •
46KSI
46KSI ·1~ ~~~. •
46
46
46
46
46
46
• !is ~s~ •
••• • • • • • • • •
• •• • • •
·~2 ~§It
36KSI
92KSI
•• • • • • • • • •• •
• • •fl •
l6 W:S1. • • • • • • • • • • • • • • • • •• • • • • • • • • • • ••• • • • • • & • • • • • • • • • • •• ••• • • • • •••
••
CEC #16-803
. '
tJ) z
0
1-0 <( w a:::
~
0 a. a.
::J
tJ)
•••••• • • • • • • • • • • • • •
•••• • • • •• • •••• • ••••••
• • •••••• • •••• • • ••••
• • • •••••• •
• •• • • • •••
•
• • •••••• • •••• • • • •• •
•••••• • • •• •• •••••• • • •
0> lO
0
(!)
Cl m o_
• • •
••••• • ••••• ••••• • • • • •••••
•• ···"'·· . .. ····~ t--o ;;
2 Ql .r: (/) ~ 5
Support Reactions
Units: Force Reactions Rx, Ry, Rz [lb]; Moment Reactions Rox, Roy, Roz [lb-ft]
Load Combination 64: ASCE7-l0 l.4D
Node Rx Ry Rz Rox Roy Roz
------------
l 55.114 1146.871 53.121 177.273 -4.790 -193.085
2 -0.000 862.379 139.263 516.037 0.000 0.000
3 -55.114 1146.871 53.121 177.273 4.790 193.085
4 -55.114 1146.871 -53.121 -177.273 -4.790 193.085
5 0.000 862.379 -139.263 -516.037 0.000 -0.000
6 55.114 1146.871 -53.121 -177.273 4.790 -193.085
Load Combination 65: ASCE7-10 1.2D+1.6LrorS+0.5WA-Z
Node Rx Ry Rz Rox Roy Roz
------------------------------------------------- ------------ ------------
1 261.380 5089.555 438.475 2070.915 -18.609 -923.048
2 0.000 4249.956 993.966 4197.315 0.000 -0.000
3 -261.380 5089.555 438.475 2070.915 18.609 923.048
4 -229.937 5560.996 -23.941 511.366 -27.282 824.930
5 0.000 5173.795 -508.867 -1350.530 0.000 -0.000
6 229.937 5560.996 -23.941 511.366 27.282 -824.930
Load Combination 66: ASCE7-10 1.2D+1.6LrorS+0.5WB-Z
Node Rx Ry Rz Rox Roy Roz
--------------------------------------------
1 266.071 5443.023 410.713 1836.257 -20.391 -931.831
2 -0.000 3396.110 840.359 3516.911 0.000 0.000
3 -266.071 5443.023 410.713 1836.257 20.391 931.831
4 -241.136 5802.234 -80.376 186.692 -27.557 854.122
5 -0.000 4099.083 -453.622 -1288.186 0.000 0.000
6 241.136 5802.234 -80.376 186.692 27.557 -854.122
Load Combination 67: ASCE7-10 1.2D+1.6LrorS+0.5WA-X
Node Rx Ry Rz Rox Roy Roz ------------------------------------------------
1 355.572 5008.446 212.271 718.849 -15.370 -1628.678
2 147.600 3499.612 609.016 2263.866 16.705 -879.857
3 -104.161 5604.121 231.257 776.456 29.098 -2.632
4 -104.161 5604.121 -231.257 -776.456 -29.098 -2.632
5 147.600 3499.612 -609.016 -2263.866 -16.705 -879.857
6 355.572 5008.446 -212.271 -718.849 15.370 -1628.678
Load Combination 68: ASCE7-10 1.2D+1.6LrorS+0.5WB-X
Node Rx Ry Rz Rox Roy Roz
------------------------------------
1 364.434 5266.845 229.635 780.282 -11.046 -1619.153
2 133.597 4918.150 783.266 2892.073 30.424 -782.798
3 -171.451 5950.701 276.385 921. 638 37.987 277.172
4 -171.451 5950.701 -276.385 -921. 638 -37.987 277.172
5 133.597 4918.150 -783.266 -2892.073 -30.424 -782.798
6 364.434 5266.845 -229.635 -780.282 11.046 -1619.153
Load Combination 69: ASCE7-10 1.2D+1.0WA-Z+0.5LrorS
Node Rx Ry Rz Rox Roy Roz
--------------------------------------------------------------------------------
1 133.673 1610.485 507.526 2869.352 -0.463 -467.361
2 0.000 1857.235 887.371 4295.644 0.000 -0.000
3 -133.673 1610.485 507.526 2869.352 0.463 467.361
4 -70.688 2554.298 324.042 2250.347 -17.731 270.851
5 0.000 3710.812 77.830 1341.562 • • •O .000 • • -~. 000
6 70.688 2554.298 324.042 2250.347 • -.fL• ·~ • 17. • ••• '!1.851 ••• • • ••
Load Combination 70: ASCE7-10 1.2D+1.0WB-Z+0.5LrorS • •• • • • ••• • •• Node Rx Ry Rz Rox Roy Roz
--------------------------------------------------------------------
1 142.987 2317.314 451.000 2402.gt~• • -3eii4 • -4~~ .. 453
2 -0.000 150.584 581.504 . . . ~ . . . 2945.4f)ti •• 0. oo.. ~.000.
3 -142. 987 2317.314 451.000 2402. '*~ : : • 3.-i64 • • 48:. 4~.
4 -93.049 3036.711 210.692 1605.6~4 · -:~:o~r·· 3~~:~~·· 5 -0.000 1560.684 189.935 1467.880
• • ••• • • • • • • • • • • • •• • • • • • • • • • • • • • • ••• • • • • • • • • • •• • • • • • • • ••• • • • • • UltraShelter #1 077 4 7 Page 12 of 59 •• CEC #16-803
6 93.049 3036.711 210.692 1605.694 18.278 -328.847
Load Combination 71: ASCE7-10_1.2D+1.0WA-X+0.5LrorS
Node Rx Ry Rz Rox Roy Roz
------------- ------------------------------------
1 322.982 1448.069 54.573 190.984 5.505 -1858.085
2 294.011 359.603 119.456 462.720 32.221 -1732.644
3 181.029 2640.639 90.484 299.338 20.828 -1361.625
4 181.029 2640.639 -90.484 -299.338 -20.828 -1361.625
5 294.011 359.603 -119.456 -462.720 -32.221 -1732.644
6 322.982 1448.069 -54.573 -190.984 -5.505 -1858.085
Load Combination 72: ASCE7-10 1.2D+1.0WB-X+0.5LrorS
Node Rx Ry Rz Rox Roy Roz
-------------------------------------------------
1 340.890 1965.224 89.179 312.890 14.158 -1844.474
2 265.369 3196.432 467.790 1711.819 59.592 -1544.130
3 46.901 3333.690 180.540 588.249 38.556 -810.263
4 46.901 3333.690 -180.540 -588.249 -38.556 -810.263
5 265.369 3196.432 -467.790 -1711.819 -59.592 -1544.130
6 340.890 1965.224 -89.179 -312.890 -14.158 -1844.474
Load Combination 73: ASCE7-10 1.2D+1.0E-Z+0.2LrorS
Node Rx Ry Rz Rox Roy Roz
---------------------------------------------
1 171.356 1681.308 563.784 3450.124 47.128 -552.554
2 0.000 1428.836 821.508 4324.542 -0.000 -0.000
3 -171.356 1681.308 563.784 3450.124 -47.128 552.554
4 26.286 1408.664 425.161 2985.100 -60.145 -42.653
5 -0.000 923.315 438. 60.2 2905.228 0.000 0.000
6 -26.286 1408.664 425.161 2985.100 60.145 42.653
Load Combination 74: ASCE7-10 1.2D+1.0E-X+0.2LrorS
Node Rx Ry Rz Rox Roy Roz
------------------------------------- ------------------------------------
1 633.751 1670.355 169.529 534.288 -59.085 -4039.435
2 495.959 1176.151 191.916 710.080 -100.399 -3586.639
3 489.290 1419.542 -30.351 -68.512 -46.049 -3530.359
4 489.290 1419.542 30.351 68.512 4 6. 04 9 -3530.359
5 495.959 1176.151 -191.916 -710.080 100.399 -3586.639
6 633.751 1670.355 -169.529 -534.288 59.085 -4039.435
Load Combination 75: ASCE7-10 0.9D+1.0WA-Z
Node Rx Ry Rz Rox Roy Roz
-------------------------------------------------------------------------
1 58.667 -40.264 436.497 2617.003 6.574 -202.383
2 0.000 578.417 675.138 3499.295 -0.000 -0.000
3 -58.667 -40.264 436.497 2617.003 -6.574 202.383
4 4.379 904.101 396.061 2478.722 -10.675 5.694
5 0.000 2434.899 288.082 2108. 674 -0.000 -0.000
6 -4.37 9 904.101 396.061 2478.722 10.675 -5.694
Load Combination 76: ASCE7-10 0.9D+1.0WB-Z
Node Rx Ry Rz Rox Roy Roz
-------------------------------------------------------------------------
1 67. 93 6 666.565 379.804 2152.893 3.089 -219.189
2 0.000 -1127.788 369.564 2154. 911 -0.000 -0.000
3 -67.936 666.565 379.804 2152.893 -3.089 219.189
4 -17.956 1386.390 282.668 1837.138 -11.206 63.470
5 -0.000 284.573 400.315 2235.745 -0.000 0.000
6 17. 95 6 1386.390 282. 668 1837.138 11.206 -63.470
Load Combination 77: ASCE7-10 0.9D+1.0WA-X
Node Rx Ry Rz Rox Roy Roz
--------
1 248.345 -202.740 -16.460 -47.645 12.296 -1583.655
2 293.244 -917.631 -91. 693 -315.791 31. 673 -1720.016
3 256.433 990.371 18.509 57.564 13.525 -1616.802
4 256.433 990.371 -18.509 -57.564 -13.525 -1616.802
5 293.244 -917.631 91. 693 315.791 -31.673 -1720.016
6 248.345 -202.740 16. 4 60 47.645 -12.296 -1583.655
Load Combination 78: ASCE7-10 0.9D+1.0WB-X
UltraShelter #1 077 4 7 Page 13 of 59 CEC #16-803
Node Rx Ry Rz Rox Roy Roz
------------------------------------------------
1 266.215 314.528 18.219 74.191 20.873 -1570.325
2 264.527 1919.063 256.551 929.499 58.854 -1531. 967
3 122.418 1683.443 108.317 345.239 31. 14 9 -1067.231
4 122.418 1683.443 -108.317 -345.239 -31.149 -1067.231
5 264.527 1919.063 -256.551 -929.499 -58.854 -1531.967
6 266.215 314.528 -18.219 -74.191 -20.873 -1570.325
Load Combination 79: ASCE7-10 0.9D+1.0E-Z
Node Rx Ry Rz Rox Roy Roz
--------------------------------------------------------
1 134.153 873.416 528.609 3323.952 50.479 -421.265
2 0.000 806.225 718.594 3937.330 -0.000 -0.000
3 -134.153 873.416 528.609 3323.952 -50.479 421.265
4 63.289 601.228 460.867 3096.811 -56.625 -173.035
5 0.000 302.358 540.453 3274.818 -0.000 -0.000
6 -63.289 601.228 460.867 3096.811 56.625 173.035
Load Combination 80: ASCE7-10 0.9D+1.0E-X
Node Rx Ry Rz Rox Roy Roz
------------
1 596.873 862.339 134.119 415.285 -55.651 -3898.169
2 495.512 554.366 89.532 331. 678 -100.416 -3575.053
3 526.615 612.230 -65.823 -187.395 -49.486 -3650.761
4 526.615 612.230 65.823 187.395 49.486 -3650.761
5 495.512 554.366 -89.532 -331.678 100.416 -3575.053
6 596.873 862.339 -134.119 -415.285 55.651 -3898.169
Load Combination 91: ASD ASCE7-10 1.0D --Node Rx Ry Rz Rox Roy Roz
------------------------------------------------------------
1 39.363 819.198 37.937 126.573 -3.420 -137.869
2 -0.000 615.976 99.473 368.518 0.000 0.000
3 -39.363 819.198 37.937 126.573 3.420 137.869
4 -39.363 819.198 -37.937 -126.573 -3.420 137.869
5 0.000 615.976 -99.473 -368.518 0.000 -0.000
6 39.363 819.198 -37.937 -126.573 3.420 -137.869
Load Combination 92: ASD ASCE7-10 1.0D+1.0LrorS --Node Rx Ry Rz Rox Roy Roz
------------
1 165.891 3628.640 158.338 532.217 -15.493 -586.014
2 -0.000 2801.092 462.177 1709.323 0.000 0.000
3 -165.891 3628.640 158.338 532.217 15.493 586.014
4 -165.891 3628.640 -158.338 -532.217 -15.493 586.014
5 0.000 2801.092 -462.177 -1709.323 0.000 -0.000
6 165.891 3628.640 -158.338 -532.217 15.493 -586.014
Load Combination 93: ASD ASCE7-10 1.0D+0.6WA-Z --Node Rx Ry Rz Rox Roy Roz
------------------------------------------------
1 53.318 352.661 279.022 1628.208 2.383 -184.893
2 -0.000 630.470 450.832 2269.156 -0.000 0.000
3 -53.318 352.661 279.022 1628.208 -2.383 184.893
4 -15.492 919.341 220.196 1429.183 -7.982 66.885
5 -0.000 1744.144 127.732 1096.394 -0.000 0.000
6 15.492 919.341 220.196 1429.183 7.982 -66.885
Load Combination 94: ASD ASCE7-10 1.0D+0.6WB-Z --Node Rx Ry Rz Rox Roy Roz
--------------------------------------------------------------------
1 58.874 776.812 245.335 1350.408 0. 276 -194.958
2 0.000 -393.357 267.105 1462.555 0.000 -0.000
3 -58.874 776.812 245.335 1350.408 -0.276 194.958
4 -28.890 1208.637 152.348 1044.718 -8.288 101.542
5 -0.000 454.098 194.425 1172.564 0.000 0.000
6 28.890 1208.637 152.348 1044.718 8.288 -101.542
Load Combination 95: ASD ASCE7-10 1.0D+0.6WA-X
Node Rx Ry Rz Rox Roy Roz
-------------------------------------------- ------------------------------------
1 167.016 255.219 7.506 29.396 5.840 -1014.893
UltraShelter #1 077 4 7 Page 14 of 59. CEC #16-803
2 175.836 -267.206 -9.2 63 -20.216 19.081 -1033.515
3 135.961 970.998 28.627 92.978 9.730 -908.387
4 135.961 970.998 -28.627 -92.978 -9.730 -908.387
5 175.836 -267.206 9. 263 20.216 -19.081 -1033.515
6 167.016 255.219 -7.506 -29.396 -5.840 -1014.893
Load Combination 96: ASD ASCE7-10 1.0D+0.6WB-X --Node Rx Ry Rz Rox Roy Roz
------------- -----------------------------------
1 177.619 565.511 28.430 102.880 10.922 -1004.664
2 158.844 1434.814 199.688 727.099 35.2 62 -918.551
3 55.433 1386.907 82.398 265.219 20.239 -576.389
4 55.433 1386.907 -82.398 -265.219 -20.239 -576.389
5 158.844 1434.814 -199.688 -727.099 -35.262 -918.551
6 177.619 565.511 -28.430 -102.880 -10.922 -1004.664
Load Combination 97: ASD ASCE7-10 1.0D+0.7E-Z
Node Rx Ry Rz Rox Roy Roz
-------------------------------------------------
1 108.476 914.499 384.102 2374.157 34.074 -345.923
2 0.000 792.343 539.955 2893.167 0.000 -0.000
3 -108.476 914.499 384.102 2374.157 -34.074 345.923
4 29.744 723.939 308.494 2121.338 -40.909 -70.142
5 0.000 439.525 341.454 2156.515 0.000 -0.000
6 -29.744 723.939 308.494 2121.338 40.909 70.142
Load Combination 98: ASD ASCE7-10 1.0D+0.7E-X --Node Rx Ry Rz Rox Roy Roz
------------- ------------------------------------
1 432.421 906.762 107.916 337.530 -40.219 -2780.506
2 346.893 615.971 99.476 368.533 -70.288 -2503.318
3 353.986 731.640 -32.036 -84.344 -33.375 -2505.128
4 353.986 731.640 32.036 84.344 33.375 -2505.128
5 346.893 615.971 -99.476 -368.533 70.288 -2503.318
6 432.421 906.762 -107.916 -337.530 40.219 -2780.506
Load Combination 99: ASD ASCE7-10 1.0D+0.45WA-Z+0.75LrorS --Node Rx Ry Rz Rox Roy Roz
------------- ------------------------------------
1 144.683 2576.546 308.625 1563.481 -8.099 -508.876
2 -0.000 2266.519 635.605 2808.206 0.000 0.000
3 -144.683 2576.546 308.625 1563.481 8.099 508.876
4 -116.341 3001.24 9 65.136 743.346 -15.892 420.446
5 -0.000 3100.042 -200.377 -267.030 0.000 0.000
6 116.341 3001.24 9 65.136 743.346 15.892 -420.446
Load Combination 100: ASD ASCE7-10 1.0D+0.45WB-Z+0.75LrorS --Node Rx Ry Rz Rox Roy Roz
------------
1 148.873 2894.672 283.549 1353.999 -9.693 -516.578
2 -0.000 1498.367 497.534 2199.960 0.000 0.000
3 -148.873 2894.672 283.549 1353.999 9.693 516.578
4 -126.403 3218.268 14.329 453.379 -16.127 446.563
5 -0.000 2132.670 -150.619 -210.361 0.000 0.000
6 126.403 3218.268 14.329 453.379 16.127 -446.563
Load Combination 101: ASD ASCE7-10 1.0D+0.45WA-X+0.75LrorS
Node Rx Ry Rz Rox Roy Roz
------------------------------------------------
1 229.713 2503.508 105.066 356.487 -5.361 -1137.185
2 132.277 1592.342 289.923 1080.848 14. 643 -782.836
3 -2.880 3040.001 121.480 406.084 17.351 -317.275
4 -2.880 3040.001 -121.480 -406.084 -17.351 -317.275
5 132.277 1592.342 -289.923 -1080.848 -14. 643 -782.836
6 229.713 2503.508 -105.066 -356.487 5.361 -1137.185
Load Combination 102: ASD ASCE7-10_1.0D+0.45WB-X+0.75LrorS
Node Rx Ry Rz Rox Roy Roz
----------------------------------------------------
1 237.653 2736.143 120.754 411.758 -1.527 -1128.664
2 119.643 2868.931 446.687 1643.555 2 6. 84 6 -695.678
3 -63.373 3351.943 161.913 535.851 25.272 -66.564
4 -63.373 3351.943 -161.913 -535.851 -25.272 -66.564
UltraShelter #107747 Page 15 of 59 CEC #16-803
5 119. 643 2868.931 -446.687 -1643.555 -26.846 -695.678
6 237.653 2736.143 -120.754 -411.758 1.527 -1128.664
Load Combination 103: ASD ASCE7-10 1.0D+0.525E-Z+0.75LrorS --Node Rx Ry Rz Rox Roy Roz ------------ ------------------------------------------------
1 186.221 2998.108 387.485 2126.473 15.776 -630.408
2 0.000 2388.210 702.634 3279.562 0.000 -0.000
3 -186.221 2998.108 387.485 2126.473 -15.776 630.408
4 -82.258 2854.529 131.231 1265.599 -40.705 317.036
5 0.000 2121.262 -40.116 532.567 0.000 -0.000
6 82.258 2854.529 131.231 1265.599 40.705 -317.036
Load Combination 104: ASD ASCE7-10 1.0D+0.525E-X+0.75LrorS
Node Rx Ry Rz Rox Roy Roz
-------------------------------- ------------ ------------------------
1 428.759 2992.481 180.655 588.866 -40.069 -2470.507
2 260.767 2254.757 371.503 1373.615 -52.705 -1893.817
3 160.449 2860.135 75.753 272.217 -15.134 -1523.293
4 160.449 2860.135 -75.753 -272.217 15.134 -1523.293
5 260.767 2254.757 -371.503 -1373.615 52.705 -1893.817
6 428.759 2992.481 -180.655 -588.866 40.069 -2470.507
Load Combination 105: ASD ASCE7-10 0.6D+0.6WA-Z
Node Rx Ry Rz Rox Roy Roz
------------------------------------------------------------------------
1 37.580 24.963 263.906 1576.261 3.752 -129.758
2 0.000 383.905 410.918 2119.941 -0.000 -0.000
3 -37.580 24.963 263.906 1576.261 -3.752 129.758
4 0.262 591.695 235.431 1478.508 -6.616 11. 698
5 0.000 1497.898 167.409 1242.374 0.000 -0.000
6 -0.262 591.695 235.431 1478.508 6.616 -11.698
Load Combination 106: ASD ASCE7-10 0.6D+0.6WB-Z --Node Rx Ry Rz Rox Roy Roz
-----~------------------
1 43.130 449.110 230.198 1298.706 1. 646 -139.785
2 0.000 -639.867 227.227 1313.988 -0.000 -0.000
3 -43.130 449.110 230.198 1298.706 -1. 64 6 139.785
4 -13.134 880.976 167.577 1094.382 -6. 920 46.331
5 -0.000 207.836' 234.116 1318.618 -0.000 0.000
6 13.134 880.976 167.577 1094.382 6.920 -46.331
Load Combination 107: ASD ASCE7-10 0.6D+0.6WA-X --Node Rx Ry Rz Rox Roy Roz
-------------------- ------------------------------------ ------------
1 151.320 -72.490 -7.608 -21.025 7.176 -958.709
2 175.741 -513.592 -49.046 -167.449 19.012 -1032.092
3 151.752 643.344 13.395 42.164 8.330 -962.462
4 151.752 643.344 -13.395 -42.164 -8.330 -962.462
5 175.741 -513.592 49.046 167.449 -19.012 -1032.092
6 151.320 -72.490 7.608 21.025 -7.176 -958.709
Load Combination 108: ASD ASCE7-10 0.6D+0.6WB-X
Node Rx Ry Rz Rox Roy Roz
------------
1 161.918 237.817 13.324 52.448 12.249 -948.510
2 158.740 1188.409 159.893 579.438 35.172 -917.184
3 71.238 1059.257 67.137 214.261 18.827 -630.673
4 71.238 1059.257 -67.137 -214.261 -18.827 -630.673
5 158.740 1188.409 -159.893 -579.438 -35.172 -917.184
6 161.918 237.817 -13.324 -52.448 -12.249 -948.510
Load Combination 109: ASD ASCE7-10 0.6D+0.7E-Z --Node Rx Ry Rz Rox Roy Roz
------------
1 92.706 586.765 368.999 2321.577 35.422 -290.636
2 -0.000 545.726 500.014 2743.358 -0.000 0.000
3 -92.706 586.765 368.999 2321.577 -35.422 290.636
4 45.469 396.320 323.748 2170.077 -39.519 -125.209
5 -0.000 193.351 381.092 2301.616 -0.000 0.000
6 -45.469 396.320 323.748 2170.077 39.519 125.209
UltraShelter #1 077 4 7 Page 16 of 59 CEC #16-803
Load Combination 110: ASD ASCE7-10 0.6D+0.7E-X --Node Rx Ry Rz Rox Roy Roz
------------- ------------ ------------ ------------------------------------
1 416.742 578.994 92.753 286.875 -38.854 -2722.566
2 346.757 369.575 59.687 221.078 -70.300 -2500.200
3 369.802 404.055 -47.231 -135.008 -34.747 -2557.541
4 369.802 404.055 47.231 135.008 34.747 -2557.541
5 346.757 369.575 -59.687 -221.078 70.300 -2500.200
6 416.742 578.994 -92.753 -286.875 38.854 -2722.566
UltraShelter #107747 Page 17 of 59 CEC #16-803
...J w c 0 ::E
0:: w 1-
::J D.. ::E 0 0 c z <(
~
tu
::E 0 w
.(!)
' .
Company/Project: CEC, INC. I ON COVER
Engineer:, BMR
~X z
Node Numbers
UltraShelter #1 077 47 Page 19 of 59
VersaFrame V6.02 (607.0)
(C) Digital Canal Corp.
Page 1
""i.l'Hj ·=....,.'""'-' 1 .. k, •N16
CEC #16-803
Company/Project: CEC, INC. I ON COVER
Engineer: BMR
.X
l
Member Numbers
U ltraShelter #1 077 4 7 Page 20 of 59
VersaFrame V6.02 (607.0)
(C) Digital Canal Corp.
CEC #16-803
Page 1
,.
Company/Project: CEC, INC. I ON COVER
Engineer~ BMR
~X
l
Member Lengths
UltraShelter #1 077 4 7 Page 21 of 59
VersaFrame V6.02 (607.0)
(C) Digital Canal Corp.
CEC #16-803
Page 1
z
(!) en w c c z <(
tn
~ <( z
<(
...J ~ ::> 1-0 ::> 0::
I-t/)
0> ll')
0
N N
(1)
Ol m 0...
00 . . . . 0 0
00 DD ~~ ~~ ~~ ~~ C~ 00 ::o ~7 M~ M~ ~~
. . ~ :': --'' ''
0 0
• • ~ ~ I. I. • • I. I. I. I.
. .
''
""~ :tlr-~g .. ~~
"'~ ~r-~~ ~~
0 ::0 :: D -0
• • -:_> D .; ?
c-.,. ;J',.,. :)J T
I• I• I• I• ~ ~ I I ~ ~
oo
c~ ~
]~
.. .; ~ . . . .
• 0
~ ~ . . ~ ~
"'r-"""" ~~ ~~ i~ ....
u~ "' U' '"'
--
0 ~~ ..
C') 0 CXl <D ,;;
u UJ u
0> 10
0
C')
Q)
Cl co [1_
c c gg . . . . . . . . 00 . . . . 00 ..
"""'· 0 0 ""..,. ""..,. a;"' 00 00 00
~~ 0~ 0~ ~:: ·~ ...... :: ............ ~~ ~0 .. 0~ 00 00 ~0 ~~
a:om t-t-~ ~ i i I. I.
~. 00 co 00 ~ ~ . . ~ ~ .. I. I. ~~ .... '' ''
,_c;, r-C'> ~~ ~~
.,...,. I I ''
~~ • • . . ~~ 00 oc 0~
o:;.., m,..,
~~ .. I.~ ~~ ~~
00 oc 00 00 m~
00 00 0~ 00 ~ ~ I. ,· I. I. ~ ~
--0 0 ..... .-~ ""' ~~ ~~ ~~ ~~ 1 I I' I' ~ ~ ~ ~ ~ i ~ ~ ~ ~ I I a:om <". N I I --'' ''
~. ~; ~ ~ ; ~ I' I• I I
"" N' 0 "<>' U' N N <'J <D v ...... -. ~~ ~s ~~ ~~ ~~ ~~
N~ <Dt-c, ~ rn o-
1• I. ; ~ I. I. I .• -I. I. ~ ~ ~ ~ ~ ~ ~ ~
.. ~~ .... 00 00 00 . . . . . . 0 0 0 0
t-0 u;,.., .... ~.·~.· ~ ~~
~. ~ ~ gg :: ~~ ~~ ~~ ;; .. ;I· ..... . 0 0 I. I. ? ~ ~ ~ I. I.
.,..,. .,..,. 0 0 ..... .-'" ..... ~~ ~~ ' ' 0 C ....; ....; I I
,_
"'"' '"'"' ~~ ~ I. I. ~ ~ ~ ~ ~ ~ ~ ~ I. I. ~ ~ I. I. I. I.
""'"" ""'"" ~~ ~~
00 cc
• . I.~ 0 0 I. I. . . 0~
0 "' ~N CO ~~ """" ..,...,. .,...,. gg DO 00
~~ ~~ I I ?~ ~~ ~~ ~~ ~g ~? ?? 00 :.· ..,...,.
0 0 c 0 .,. ...,. ~ ~ I. I. ? 9 . . I. I. I. I. ; ~ • • I. ,· • • ? ? ~ ~
~· ~~ ;~ ..
~~
<')
0 co cD ;;
0 UJ 0
0> LO -0
"<t
Q)
Cl "' c..
<..or-.,.c,
~~ ~~
cc cr,...,-"' .. ii
CJ-1 f~ ~~
"'"' 00 "'" "'"' 4 4 il . . ~ § ~ ~
Ul_fl Ul.t'l ""'"' "'<T "''"'
u> "' 0 0 0 ~ -~ ~; ~ ~ ,· ,· ,· .· ~ ~
"'"' .,..,. ~ ,·,~ ~~
co ~ ~ ~ .· .·
.:o "'"' ~~
C') 0 co cD ;
() w ()
0> I.C) ..... 0
I.C)
Q) Ol ttl (}_
00 .--<<') ........ . . 9·~ . . . . . . 0 9 0 0 . . . . . . . . . . 0 0 .. ~ ~ ~ ~
00 00 00 00 00 0~ 00 00 00 00 00 00 00 NOO .... ..., _,.,
00 9~ 00 00 ' • 09 90 09 • • co 00 00 09
99 ~ 0: ~ ~ c,'
............ .--.
,·,· .. (':~ .... g~ .·.· ~~ ~~ ~~ I . . .
00
c' 0 9 ~· ' ' ' ' ' ' ' ' ' ' ' ' ~ ~ ~@ ' ' ' · ' ' ' ' o o ~ ~ :
1
'
1
' ,· ~ ~ ~ ~ ,· ,·
.... .--< ~ .... "'·"' ~~ ~~ . . . . . . . .
"'"' co "'"' r-"'l ~~ ~~ ~~ ~~
Cf,..,. -<C') 00 ~~ ~~ .. ~~ ..... .
" ~~ ....... .
'' .. 'I I I
gg .--<.--< co
.--<.--< ~~ :.· 00 •·•· (':~ ~~ ........
00 mOO mm NN NN <"')<') 0 . . 99 ~~ gg ~~ ~~ --:: ~~ "'"' ...,...,. .... --'' ~~
~-;; ~~ ............. . ~~ "'"" """"' """""' "'"' ~~ ~~ ~~
r-:-.--<0 ..-<..-< GO
~~ ~~ ~~ ~; :: ~~ .· .· .· .· .· .· .· .· .· .· .· .· ~ ~ ' '
. .
N I '"1 I N I r' I ~ ~
00 00 "'·"'· 00 <. 09 ~~ 90 .. ~~ g~ ~~ ~~ .. .. ~ ~ .· .· . . : .· ~ ~ .· .· ~ ~
<')<"') "'"' 00 00 ~~ ~~ ~i 99 99 ~~ ~~ :: :.· I 00 __ • • • • •• • • • • • • • •••••••
::: ~ ~ g ~-' ~ I I ~ ~ I I (1) (1) I I 9 9 1 I '0" V 1 I W <r
00 <<
•••• ~~ •• 00 •• •• ~~ ~~ •. ~ ~ ~ ~ ~ ~ .· .· ~ ~ ~ ~ .· .· . . . . ,· : ,· ,· ..
-:>ow "'"'
.. ~~ ~~ !. ~ "'"> ' • • ' • • N -, ' ' ' • ' ' , , • • ~ ~ ~ I I I I I I I I I I "''""' -, <" ...-, "J ~(;:'
...,.., ,...,..,
~~ ~~ ~~
NO 0~ 0~ • • •. • • • • ~~ GO CO 00 00 00 00 ~ g~ ~~ ~~ ~~ ~~ ~~ ~~ 0
00 00 00 00 00 00 00 00 00 gg ~0 0
oocn """' ~r-aoco men ~"' "~ ~ ,-r "' ~ ~ g ~ ,· ,· ,· ,· .· .· 0 0 ,· ,· ,· ,· • • ,· ,· ' ' • • 0 0 •• ~~ ~~ ~~ .... ~~ ..
Cl'.-< "'"' "'"" "'"' ~~ ~~ ~~ ~~ ~i ~~ ~ • "1N ~. ~~ ~~ ~~ :: .·: ~~ ~~ ~~ • .. • • •
"' 0 00 cD ;
(.) w (.)
(1) "' 0
CD
~ .,-, ..,. .,.
~~ §~
"c ..
c
;; i3 ~~
rom """' ~~ i~
l
...,,., ,..,~
~~ ~~
"'"' --~~ ~~
r-<U' ..-, ••
~ ~ ~· ,· is ~ ~
8 <Xl <D ;
() w ()
(])
Cl ro Cl.
gg . . . . . . 00 : •·
...... ~~ ................ ....
C< N
"'"' "'"' ~§ s~ _,_ gs
~~ ..
~7 .... ,
m" ~~ ~~
"'CD 00 00 ..
'' ''
.. ~~ ........ 0000 ~i
'' '' '' ~~ ~~ ~~ ~~ ~~ •v ~~ ~.-~.: ~~ . . . . ~.-~.· .. ~~ ~~ I I I I ~~ I I I I
.--<['-""' ~~ ~~ . . . . g~ .. ~~
co ,--<0') .. c~
''
mo
. ~ ~ ~ . ~ g g . . ~ ~ 9?
~ ....
f. '' ''
~ ~ ~~ .·.· ,·,· ~~ ~~ 00 9? . . ,· ,· : .·
~ ~ . . ~. ~ . . . . ~ :S t ' ' ' ' ' ~c
c c c m ~~ -~ ~~ ~~ ~~ ~~~~~~.··1
00 00 00
c 0 0 0
~., a"' ..,...,. ~~ ~~
OJ> '' ~~ '• 0~ DO '• '' gg .... ?~ 00 0~ 0
, , , . , • , • , • , • , , , , tr>m a~ , . , , , , .... co ~~ , ,
"'1 _.--< ,...,... ~~ ~~ 11 Oc'
.... "'"' .... ~~ .. ~~ ........ :: .... :: ..... .
::;: ..,. ..,. ['-['-N C< M 0'" .t\ .t\ ~ ~ I I I I I I I I I I
~~ :: ..,...,. ~c: ?? ~~ '• ~~ ~ • ~~ '' .:~ '• '• '' •' . ' • • •' ~~ ~~
~ ';' ' ' ' '
gg
0~ co co .. co ...... 0~ .... 00 00 .. ~~ g~ .·.· .·.·
00 ?cf 0
00
•• I. ~ ~ 9 9 '' ""
....
"-'' '' '' ''
00 00 ['-['-t-t-
l•l• C<N 99 °0 '' ,·; ,, . ' . ' 9 9 s s
~,.., ~~ $ ~ .. .. .. " ~ ~ .. .. .. . ... ~ ~ .· .· .· .· " .· :
0000 CO DO ~ ~ I• I• I I I I
(') 0 "? c:o
~
0 UJ 0
Ol LO ..... 0
00
Q) C'l "' a_
c~ . . c: ~ ~
00 00 9° I I
~~ 00 00 • ' 9 ~ ; 0 I I
00 "..,. ~ ~ 00 ~~ ~~
~· .. .. {0 .. f ~ "~ ~ ,· ,·
C') 0 co cD ;;
(.) w (.)
en "' 0 en
~'"" ~'"" ~'"" "'"'"" .--<.<> ~~5~~s~ ...... 5~
00
c' 0 ' '
''
....
..... ~ ~~
"'"" "'"" "-JO'l
: •• : •• ~ ~ ~ ~ 11
" ~~ " "
, .. ~ .... ~~ .. ~~ ..
£
00 00
. . 0 0 ,· : 9 9 c 0 : •· ... : .~ ,: ~ •· •· : : ,· •· : •· . . •· •· ~ ~
.\ ~~ ~~ ;~ -.. ~~ ~~ :~ ~~
"m ~ ~ .·I.
r-<'> .... .--< . . ~ 9 ~ ~ ~ ~ . . I. : I. I. : I. • • • • • •
......
''
r-N .,. .... .,.,.... _,. .... .,.,.... 00'1 0~ •• ~~ •• 00 co .. §~ ~~ ~~ ~~ 00 . . . . . . ~ ~~ ~~ ~~ ~~ ~~ c~ o
0~ 09 09 OC -
oc c 9 . . . . . .
co cc oc 99
~'"" <.0'""
gg 00 co co co 00 00
C? 00 00 I I 00 co .. :: .. 90 99 00 00 co .. . . 90
gg gg gg .· .· . . c 0 9 4 0 0 --..
> > I I
00 08 08 co
:: ~~ .... 00 00 99 00
00 """" ,..."" 00 :1· .. ~~ tl '' ~~ 1.1 ..... ~·: .... ~~ ~~ .. ~~ ~~ ~~ ..
.--<0 .--<0 ;~ ~~ ~~ ~~ ~~ ~~ ...... ~~ .... ~~ ~~ .. ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~ ::
.--< ..... .--<.--< """" ,..,~ .,..,. .,..,. ~"" .,..,. ""'"" "'"' ~i ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~ ~ I. I. 11
"'"'" e-m "'"" ~~ ~~ ~~ .. :: ~~ :: ~~ §§ ........ ~~ .... §§ .. ~~ ~~
.. ~~ . . . . . . . . . . . . ~~ §§ .. 00 00 00 oc 00 00 00 00 00 09 09 ~~ 09 00 00 09 90 99 00 00 OC CO -, .... .....
00 co .,. .... .,..,. :: .... : .· ~~ ~~ .·: :: I.: .. 99 99 ~~ "'"' ,· .· ..
'""~ 00 ~g I> : ,· : I• ~~ .-.<.-< :: I•: '' : ,· :: • • '' , ' •, '• '• • • ·~ • • • •
~ "' O'l N ,....,.., ,..,~ _,.., ""~ ~"" ~"" "'"' "'"' 00 00 i~ ~ • O'lN ~~ ~~ ~~ ~~ ~~ ~~ . . ..
. . . . . . . . . . . . . .
U)u") Ul<.') ocro rom
' ' . ' '' I l l l
00 "" .. 00 § ~ g ,· :
00 00
c' 0 0 C · · 00 00 0 gg 00 00 00 00 00 co 00 co l . . . . . . "'.... . .
""·"' "'"' "'""' <'< <'J 0 0 <'J N N"' ~~ ~~ {{ :: ~~ ~~ ~~ 99 .. ~~ ~~ .·: ~~ 99 99 00 rom,·,·
m m . . . . . . . . ~cO
('J r-c 0 . . . . ~ ~ 9 9 ,· : I. : : I. ~ ~ "; ~ ~ :: C'C'J <,0.--< ~. ~~ ~~
,_
"" . . ~~ ....... . H ~. , , ~~ ~ ..
rotL rom <.~~ ~L~ ~~ ~~ C''~ ~C'' ;; .·: ,',' ~~ ~~ ~~ ~~ :I• ~~ .-.· ~~
C')
0 00 cD ;
() w ()
0> LO
0
0
(1) Cl m 11..
0 0 c-r-. . ~ ~: ~ ~
~ ~ ....
mo
• • ~ I. ~ :i
''
"""' .,..,. ..,..,. ~ ~ "'""' ~ ~
-c 00 ~~ ~~ ~~ 0 ~~
00 ~:i
--''
.. ~~
I I I I
--..
...-<...-< I I
C'? 0 co cD ;;
(.)
UJ (.)
Ol Ill -0
Q) Ol co a.
,.,.._ "',.._
~~ ~~ ..
•• ~~ •••• 00 ~~ ~~ ~~ cc
"><7> .;-o "'"' ~ ~ ~ ~ c, ~ •· •• • • •• •• ~ ~ •· •· ~ ~ • • ,· ,· ••
00 gg • • • • • • • • DC 00 ~~ 00
oc 0~ 0~
"'~ "'"' "'"' m<7> ma oo "'"' ~~ ~~ ~~ :: ~~ '' ~~ ~~ ~~ :I·
"""" .... oo oo rom ": ~ .· .. ~ ~ ~:: .· .· ,· ,· . . ,· : ,· ,· 0 0 ~ ~
"'r-< o.o~ .. 00 ~ ~ I I I' I' I' I' : I' I' I' ~ ~ ~~ ...... ~~ gg .·.· ,, ~ ~ .· .· "
;:;:;-g: ~~ "'"'' "<•;) §~ ~~ ~~ ~~ ..
00 00 co 00 00 oc 0 0 .. 0 0 0 0 0 0 0 0 • . • . • • 0 0 • ' c 0 ' . ,' ~ I
C•C 00 "'"' ..,._,. NN ~~ oc ~~ ~~ 0~
oo ,.._,.._ r-~ ,.._,.._ .................... 4~ ~~ ss ~.,.;
.. g~ . . ~~ . . . . . . ~~ ~~ .. 0~ . . . . . . . . ~~ . . . . . . . ...
7( .-<.-< I I It
ooro rom ~ "' ~ uO ~ ~ ~ ~ •• •• •• •• ~ ~ ~ ~ •· I. ~ ~ ,.._ ,.._ 'f i I I I I I I I t I t
g ..
'' ''
00 g~ .. co ~~ :: gg . . . . . . . . . . ~~ . . . . . . . . ' ' O'N ' ' ' ' ~~ ' ' ~~
: I. • • • • • • • • ~ ~ • • • • • • ~ ~
r-<r-< .-<r-< 00 ~~ :,· ~~ ~~ ~~ ~~ ,·,· ,·,· ~~ '' ~~ ,·,· •• §§ c~~ ~~ ,·,·
<()U', "'"" ,.-, ~ 0' cr---: ,· ,· ,· ...... ~~ ~~ .... ~~ ,·,· ,·,· ...;~ .·: ~~ ..
r--,.._,.._
'' '' .· .· ~ f ~~
~~ "'"' "'"' ..,...,. ..,...,. mm ~~ ~~ ~~ ~~ ~~ ~~ ....................
N ~< I I I I "J "'
00 eo ... C'"J CoN 00<7> . . . . . . 0 ~ ~ I. ~ ~ ~ 0 ~ ~ ~ •·
.... ~~ .. "'"' gg .... 00 00
It g~ ~~ I I ~C') ~~ ~~
--..
'' '' <<
"'"' """' ~~ ~~ ~~
''
"'N a. m "'"" "'"' r-oo "'"' ~~ ~~ .. ~~ ~~ t ~
l ......
~ . . ,· ,· ,· ,· ~~ ,· ,· . . ,· ,· . . . . . . . . . . . .
~ I I I I ,--, .-< 0oJ N j 1 1 I
~~ :: ~; ~. ~: ~~ ~2 ~~ .. ~~ ;~ .. ~~ ::
~~ m,-, oo •. :~ •• -m .. ~g ~~ OO "'N ~~ t t mro
~. ~·~ •• •• ~ ~ •• •• ~ ~ ~ ~ ~ ~ ~ ~ I. I. ~· ~ ~ ~ •• •·
~~ .-<
~: -]1
C')
0 CXl ch ;
C) w C)
Ql Cl ca (}_
.. ~~
~J ~J ~~ ~~
00 ~-g5
--
' ''
,· .. .~: ~: ~ ~ .--<-.--< ~
00 .. o;
00 GO
~~ 00
00 co
~4 00
(")
0 CXl cD
~
(.) UJ (.)
"' ll) -0
(")
Q) Ol til a..
•••••• I.~ •••••••••• :: •• ~~ •• ~~ •• ~~ ;~
'-
"""" "'"" ...-c-§~2~--~1
~o No .......... oc .... oo ~~ .. oo .. ~~ .. , ... """" ~~ oo ""c """" ~~II 00 d~ OO'j'O 0-i. ~o,...IN~
mm ~~ . , ...... co .... <-<-•••••••••• ~~ •••• ~~ ~~ •• oc ~~ .. ~~ ~~ I I I I I I I I I I ~~ I I I I <')"1 I I ....... I I I I "'"' ,..,_. ~~ ~~ .--<.--< NN
.-.~ "'"' ••••••.•.••. ~~ <-~
G •"I N ~, r-<,.. ~c~ ~~ ~~ ~~ f~ II 1•1• •• •• ~~ •• •• •• ~""
oo gg 00 . . 0 0 . . . . 0 0
•• ~I. ~~
N C'. "J "J 0 0 r-r-00
I. I. ~ ~ § ~ 4 # ~ ~ I. I. ~ ~ 0 0 I. I. ~ ~ ~ g
00 00 0 0 . . I. I. ~ ~ I. I. I. ,·
"" ~~~~~-~~
. .
I I I I
i~ ...
i ~ ...
jl:
gg oc 00 g;:: ..--~ ,_ ... .. 0~ .. 09 co co ~-~ 3 ~ ~ ~ ~ ~ ~ I. ~ I.
co oc gg c-co 00 . . . . . . 0 0 0 0 ~ I. ~ ~ I. I. ~ ~ • • ~ ~ · " 0 0 ~ c"
........ :: ~~ ...... ~~ §§
I I .--<~ I I ,....,_. ~~ ~~ 00 f ~ . . I. I.
...... "" .. ~~ .... ~~ '' :: ~~ '' ~~ '
~; N ~J ". ,_. .--< ~ r-o, • ... .;...; .; .. ..: ~~ I. I. ~~ -~~ ~~
"'"' """' ..,.,., ""'"' ~ ~ m c<1 ~ ~· ~ ,· .. 0: 0~ ..
cr.cr. mal ~~ ~~
N N . . ...; ; ..
oo ,., .. ~~ ~~ ~~ ~~ ~ ~ I. I •
I I I I
C') 0 CXl cD ;
()
UJ ()
Q)
Cl ro
Q_
gg 00
00 00
<>CC·
.· .· ~~
; c
"""' _...,~ --~~ Mr" ~~ 1•1• 1•1• ,·,•
..
..,..,. .,..,. . . ~ ~ s 2
0::) 00 00
9 ~ If
"" . . : ~ ,· ,·
"< ~ ~ .· .·
·-~ ~~
(;:
(") 0 co cD ;;
() w ()
0) 10
0
10
Q)
Cl ro Q_
'' .... ~~ go'~ ~~ ~~ .... ~~
0o o """' "'"'
I I I• I• ~~ ~~
00 00 00 00 00 00 00 co 00 co
• • • • ~~ ~~ ~~ 00 ~~ ci~ cici ~ci
""
,· I' ' • ~ ~ ,· ,· ~ ~ ,· ,· ~ ~ c) c) c) Q I I ' ' • • ~ ~ ~ ~
1
•
1
' ~ ~
1
•
1
' g g
.--< ~ C-J Cj G ~. ····~~~::i~9 --''
............
I I t I I I
r-r-.--<.--< g~ . .
I I I I ~~ 1° I• I I
~~~ . . . . . . . .
<(G': I I I I I I I I
tt-. . . . . . . . ~ ~ .· .· .· .· . . . . . ~ . ~ . . . .
o:;;, oo oo oo
·~ ...... ~; .. -~ 99 90 00
1.~~ ~: ~ :
'" -o ~ ~ .· .· . . ,· ,· .·.· ~~ ~~ .·.· :.· ~~ ss .·.· ~..: ,·,· .... :.·
,_ '''"" """" ~ ~ ~ 0 .· .· : .· N.--< ~~ ~; ~~ 0~ 0~ ''
0000 .--<.--< .--<.--< ~~ 5~ .--<.--<
""~ r-<1' "'"" ~~ ~ ... ~g ~~ ~g .. ~ ~ ~ ~ . . . . . .
"" <oo ..
I I I I
. . . . . . . . . . . . ~ ~ .· .· . . .· .· ~ ~ .· .· ~ ~ . . ,· ,· 9 0
MM "'"' 0000 <D<:r <:1000 00 ~ ~ ,· ,· . . ~ c: c: ~ .· .· ~ ~ ~ ~ ~ ~ ~ ~ ~ •· •· ~ ~ ~ ~ "'"' • • 0 0 •· •· ,., ,., ~ ~ a ~ .· .· .· .· : .·
"''' ~ ~ . . . . ,· ,· ,· ,· . . . . 9 9 0 0
~o ~. ~g .. ~~ ~~
,, 0 0 ...-."' "' ~
.· .· ... · ~~ .· .· .· .· . . ~ ~ ~ ~ ~ ~
0"' ON 0"< gg gg co gg 00 00 gg 00 gg 00 .. 0~ 00 .. 0~ 00 00 0~ .. 00
0 0 ~. "" o-00 00 00 00 oc co 00 00 00 00 gg
GO j'7 =~ .. ~~ ,· ,· ,· ,· ~0 .... 00 00 co .. ~0 ~0 00 co 00
co ,· ,· 0 0 ~.--< ""~ .--<.--< ~" ~~ "
~~ ~~ ~~ ~~ ~.--< .--<.--<
~~ ~~ 00 00 :: ~~ 1~ ~~
oc M~ ~0" GO 00 00 00 ('J0J .--< ~
~ ~ . . 0 0 •· •· ,· ,· ,· ,· ~~ ~~ ~~ 00 00 ....... . . . . . . . . . . . ~~
<")."') """" "'"" -~ 00 ~ ~ .· .· .· .· ~ ~ ~ ~ ...:o-1 •.•• .. ~ ~ ~ ~ .· .· .· .· ~ ; ~ ~ .· .· .· .· ~ 0
<"') 0 co ch ;
(.) w
(.)
0> 10
0 c:o
Q) Cl ctl [l_
0 0 ~ 0 0 0 0 0 0 ?
s ~ ~ -~ 0
~ " 0 0 0 0 ~ ' ' ~
' : : : :
0 -,_..,
0 ~ ; ; ~ : : ;
--· ~ " :-0 ., 2 ~ ~ ~ ., ~
0 0 0 6 0 0 ~ 0 0
.,
-
0
o, 0
--
0 0 0 ~ ., ., 0 0 ~
~
~ ~
-c
~ ~
c
; 0
,, 0 ., 0 ., ~
~
0 0
c c.
~
~ -
('") 0 co <D ;;
0 LlJ 0
Ol 14) .,_
0 .....
('")
Q)
Cl ro a..
..... ...,. ..... .....
0 ;;
~ .l!l Qj J:: (f)
jg
5
Steel Check Report
Project:: ON COVER
Description:
Software: Digital Canal VersaFrame
Code Check Results (LRFD 13)
CRITICAL STRESS SUMMARY
ID Section Name Status I Governing Criteria
SELECTED LOAD COMBINATIONS
UltraShelter #1 077 4 7 Page 38 of 59
Company:
User:
CEC,INC.
BMR
Load Combination
CEC #16-803
ASCB7~loO;..:Oc~l.Q.WB·X:
ASCE7-10 0.9D+I.OE-Z
M;oo'7ljjJi~t~~.s.x .. ·
ASD ASCE7-IO I.OD M;l) ASdtt~tft'.t:m»t~::C·······
ASD ASCE7-IO I.OD+0.6WA-Z
ASI:J·.~)tl ... tn_:;t~;~,,:
ASD ASCE7-10 I.OD+0.6WA-X
ASD l$Cm;;fi:f()OJ!)+0~1t:.r
ASD ASCE7-10 I.OD+0.7E-Z
ASD ASCE7-IO I.OD+0.45WA-Z+0.75LrorS I l x
'' ',)<>'' :,,',,, ~'' ,,, :,',' ' ,', ',,,, ':' ,, '))~>'i ,; \ ,, .' ': ,', '","'"li>'' ' :"-, ASD AS<ii't~l~Jcl·'l~llCUi'iiii~~.7~tiiiliS ......... , .. · .· . Ouf . ·~ r'• ... .
ASD ASCE7-IO I.OD+0.45WA-X+0.75LrorS
l·~t)JI~lf;it~~~~·'''i
ASD ASCE7-10 I.OD+0.525E-Z+0.75LrorS
ASD ASCE7-10 0.6D+0.6WA-Z ASD,ASOO!'OOi!O~~,.:·.: ,..,,..,.,
ASD ASCE7-IO 0.60+0.6WA-X ASD:AS~-:l~ojiM~~x::.·
ASD ASCE7-10 0.6D+0.7E-Z
AS0%A~f'~~;m;.X :
UltraShelter #1 077 4 7
X
X
1 .. ·.
Y''
X
X·:·
X r .·.·· .. x
Page 39 of 59
j... ··''·
. ,~f ' .. .:
.
I''C
CEC #16-803
z
(!)
en w c
z 0
1-0 w z z 0 0
8 co cD ;;
(.)
LU (.)
Ol I.C) .,_
0
0 v
C1l C'l ctl 0...
CONNECTION 51 -CENTER HIP BEAM TO CENTER COLUMN
Member End Results:
Fx (Axial) Fy (Major Shear)
!Combination 1: -14451bs. 14541bs.
!Combination 2: -1371 lbs. 1625 lbs.
~~{R ·-:·n /~
0 0 "
"' ; F " • / CJ t ••
0 0 ~"-'--"' ' ). ciw /
# of Bottom Bolts: 2 Bolts
#of Top Bolts: 2 Bolts
Min. Bolt Diameter: 0.34 in
Fy = 46000 psi
F y = 36000 psi
Member Pitch = 18.43 degrees
Member Size:
Dm = 6.000 in.
Wm = 6.000 in.
t = 0.188 in.
Bolt Size: 0.34 in.
Put= 8321 lbs
Put= 6121 lbs
Bolt Design:
combination 1:
combination 2:
UltraShelter #107747
combination 1·
combination 2:
db,reqd = \ I 2M11
n~Ftd1
db,reqd = 0.33
nm;n = RJ~rn
= 0.66 Bolts
db,reqd = \ I 2M11
1t~Ftd1
db,reqd = 0.28
nmin = RJ~rn
= 0.74 Bolts
Fz (Minor Shear) Mx (Torsion) My (Minor Moment)
Use: 0.75 in
beam
plate
<
<
<
<
0 lbs.
0 lbs.
0 lb-ft
0 lb-ft
dw = 6.000 in.
d = 6.324 in.
tp = 0.375 in.
Weld = 0.188 in.
E = 1.6 in.
D = 1.6 in.
g = 2.5 in.
d1 = 4.6 in.
Backer Plate = 0.250 in.
~m = 6124 lbs/Bolt (tension)
~m = 2195 lbs/Bolt (shear)
0 lb-ft
0 lb-ft
T b = 5719 lbs/Bolt (actual bolt tension)
T b = 4207 lbs/Bolt (actual bolt tension)
0.340 dia OK
2 Bolts OK
0.340 dia OK
2 Bolts OK
Mz (Major Moment)
47661b-ft
3587 lb-ft
plate width
plate depth
plate thickness
plate thickness
Page 41 of 59 CEC #16-803
End Plate Design:
Check End Plate Thickness
tp, reqd =
s = 1.94 in.
pf= 1.43 in.
Y = 29.18 in.
PI = 7tdb2Ftf4
= 8165 lbs
$Mnp = $[2Pt(Ldnl
= 56345 in-lb
~ / 1.11yr($Mnp) v $bFpyY
= 0.29 in
Check Shear yea/ding:
combination 1: $Rn = 2 X$(0.6FyA9)
874801bs
combination 2: $Rn = 2 X $(0.6FyA9)
combination 1:
combination 2:
= 874801bs
Check Fillet Welds:
(sidewall to end plate)
Dmin = 0.9Fytf(2 x 1.392L)
0.50 sixteenths
Dmin = RJ(2x1.392L)
= 0.09 sixteenths
(top and bottom wall to end plate)
Dmin = Purf(1.392L)
= 1.00 sixteenths
Dmin = RJ(2x1.392L)
= 0.10 sixteenths
(top and bottom wall to end plate)
Dmin = P urf(1.392L)
= 0.73 sixteenths
UltraShelter #1 077 4 7
. '
< 0.375 in OK
> 14541bs OK
> 16251bs OK
-> 1/16 inch weld OK
-> 1/16 inch weld OK
-> 1/16 inch weld OK
-> 1/16 inch weld OK
-> 1/16 inch weld OK
Page 42 of 59 CEC #16-803
CONNECTION 52 -CORNER HIP BEAM TO CORNER COLUMN
Member End Results:
Fx (Axial) Fy (Major Shear)
lcombination 1:
l.£ombination 2:
-80351bs. 6731bs.
~83981bs. 6531bs. ··---
"'.,.,.-ro'~·Y" / ~ 0 0 "
~ ~ F ' "' ~ () h -""' -· ' __ , ' )-/
# of Bottom Bolts: 2 Bolts
# ofTop Bolts: 2 Bolts
Min. Bolt Diameter: 0.14 in
F Y = 46000 psi
F y = 36000 psi
Member Pitch = 13.00 degrees
Member Size:
Dm = 6.000 in.
Wm = 6.000 in.
t = 0.188 in.
Bolt Size: 0.14 in.
Put= 10731bs
Put= 216 lbs
Bolt Design:
combination 1:
combination 2:
UltraShelter #1 077 4 7
combination 1:
combination 2:
d -;-· b,reqd -\ 2M,
n~Ftd1
db,reqd = 0.12
nm;n = Ruf~rn
= 1.81 Bolts
db,reqd = \ j 2M,
n~Ftd1
db,reqd = 0.05
nm;n = Ruf~rn
= 1.76 Bolts
Fz (Minor Shear) Mx (Torsion) My (Minor Moment)
---
Use: 0.75 in
beam
plate
<
<
<
<
321bs.
Bibs.
145 lb-ft
175 lb-ft
dw = 6.000 in.
d = 6.158 in.
tP = 0.375 in.
Weld = 0.188 in.
E = 1.5 in.
D = 1.5 in.
g = 2.5 in.
d1 = 4.6 in.
Backer Plate = 0.250 in.
15 lb-ft
53 lb-ft
~m = 1038 lbs/Bolt (tension)
~m = 372 lbs/Bolt (shear)
Tb =
Tb =
724 lbs/Bolt (actual bolt tension)
146 lbs/Bolt (actual bolt tension)
0.140 dia OK
2 Bolts OK
0.140dia OK
2 Bolts OK
Mz (Major Moment)
26121b-ft
22661b-ft
plate width
plate depth
plate thickness
plate thickness
Page 43 of 59 CEC #16-803
End Plate Design: ,
Check End Plate Thickness
tp, reqd =
s = 1.94 in.
pf = 1.31 in.
Y = 29.37 in.
Pt = ndb2Ftf4
= 13841bs
$Mnp = $[2Pt(Ldnl
= 09472 in-lb
~ j 1.11yr($Mnp) v $bFpyY
= 0.12 in
Check Shear yea/ding:
combination 1: $Rn = 2 X $(0.6F yA9)
= 874801bs
combination 2: $Rn = 2 X $(0.6F yA9)
combination 1:
combination 2:
= 874801bs
Check Fillet Welds:
(sidewall to end plate)
Dmin = 0.9FyU(2 X 1.392L)
0.50 sixteenths
Dmin = RJ(2x1.392L)
= 0.04 sixteenths
(top and bottom wall to end plate)
Dmin = Pur1(1.392L)
= 0.13 sixteenths
Dmin = RJ(2x1.392L)
= 0.04 sixteenths
(top and bottom wall to end plate)
Dmin = Purf(1.392L)
= 0.03 sixteenths
UltraShelter #1 077 4 7
< 0.375 in OK
> 6741bs OK
> 6531bs OK
-> 1/16 inch weld OK
-> 1/16 inch weld OK
-> 1/16 inch weld OK
-> 1/16 inch weld OK
-> 1/16 inch weld OK
Page 44 of 59 CEC #16-803
CONNECTION 53 -CENTER HIP BEAM TO RIDGE BEAM
Member End Results:
Fx (Axial) Fy (Major Shear) I Fz (Minor Shear) Mx (Torsion) I My (Minor Moment) I Mz (Major Moment)
Combination 1: -440 lbs. 111 lbs.l 0 lbs. 0 lb-ftl 0 lb-ftl 10711b-ft
Combination 2: 5931bs. 785 lbs.l 0 lbs. 0 lb-ftl 0 lb-ftl 96 lb-ft
# of Bottom Bolts: 2 Bolts
# ofTop Bolts: 2 Bolts
Min. Bolt Diameter: 0.16 in
F y = 46000 psi
F y = 36000 psi
Member Pitch = 18.43 degrees
Member Size:
Dm = 6.000 in.
Wm = 6.000 in.
t=o.188in.
Bolt Size: 0.16 in.
Pur= 18121bs
Puf = 478 lbs
Bolt Design:
combination 1:
combination 2:
UltraShelter #107747
combination 1:
combination 2:
d -r-... b,reqd -\ .... 2M,
, n$F1d1
db,reqd = 0.15
nmin = Rul$rn
= 0.23 Bolts
db,reqd = \ j 2M,
n$F1d1
db,reqd = 0.08
nm;n = Ruf$rn
= 1.61 Bolts
J,;~~~
, "'"'/C,, ... 11 , 0 0 l.,
~ c / q 1
'>.0 Oc'-' """' / dw }
Use: 0.75 in.
beam
plate
dw = 6.000 in.
d = 6.324 in.
tp = 0.375 in.
Weld = 0.188 in.
E = 1.6 in.
D = 1.6 in.
g = 2.5 in.
d1 = 4.6 in.
Backer Plate = 0.250 in.
$m = 1356 lbs/Bolt (tension)
$m = 486 lbs/Bolt (shear)
T b = 1245 lbs/Bolt (actual bolt tension)
T b = 329 lbs/Bolt (actual bolt tension)
< 0.160 dia OK
< 2 Bolts OK
< 0.160 dia OK
< 2 Bolts OK
Page 45 of 59
plate width
plate depth
plate thickness
plate thickness
CEC #16-803
End Plate Design:
Check End Plate Thickness
ip, reqd =
s = 1.94 in.
pf= 1.43in.
Y = 29.18 in.
P1 = rrdb 2Ftf4
= 18081bs
$Mnp = $[2Pt(:~::dnJ
= 12478 in-lb
1.11y,{$Mnp)
$bFpyY
= 0.13 in
Check Shear yea/ding:
combination 1: $Rn = 2 X $(0.6F yA9)
874801bs
combination 2: $Rn = 2 X $(0.6FyA9)
combination 1:
combination 2:
= 874801bs
Check Fillet Welds:
(sidewall to end plate)
Dmin = 0.9Fytf(2 X 1.392L)
0.50 sixteenths
Dmin = Ru/(2x1.392L)
= 0.01 sixteenths
(top and bottom wall to end plate)
Dmin = Purf{1.392L)
= 0.22 sixteenths
Dmin = RJ(2x1.392L)
= 0.05 sixteenths
(top and bottom wall to end plate)
Dmin = P urf(1.392L)
= 0.06 sixteenths
UltraShelter #107747
< 0.375 in OK
> 111 lbs OK
> 7851bs OK
-> 1/16 inch weld OK
-> 1/16 inch weld OK
-> 1/16 inch weld OK
-> 1/16 inch weld OK
-> 1/16 inch weld OK
Page 46 of 59 CEC #16-803
CONNECTION 54 -CORNER HIP BEAM TO RIDGE BEAM
Member End Results:
Fx (Axial) Fy (Major Shear)
Combination 1: -54681bs. 6881bs.
Combination 2: -5859 lbs. 5661bs.
# of Bottom Bolts: 2 Bolts
#of Top Bolts: 2 Bolts
Min. Bolt Diameter: 0.14 in
F Y = 46000 psi
F y = 36000 psi
Member Pitch= 13.00 degrees
Member Size:
Dm = 6.000 in.
Wm = 6.000 in.
t= 0.188in.
Bolt Size: 0.14 in.
Put= 2881bs
Put= 278 lbs
Bolt Design:
combination 1:
combination 2:
UltraShelter #107747
combination 1:
combination 2:
db,reqd = \ I 2M,
• n~F1d1
db,reqd = 0.06
nmin = Ruf~rn
= 1.85 Bolts
db,reqd = \ I 2M,
n~F1d1
db,reqd = 0.06
nm;n = Ru/~rn
= 1.52 Bolts
Fz (Minor Shear) Mx (Torsion) My (Minor Moment) I Mz (Major Moment)
51bs. 2941b-ft
281bs. 2241b-ft
,Af;.:·, q I :q ~ '''1Bcp.
~ J,;~ "-""/t]\\n, { '-
0 0 '
::; '"C q / 1
' "' 0 0 c.::::
/ dw J
Use: 0.75 in.
beam
plate
dw = 6.000 in.
d = 6.158 in.
tP = 0.375 in.
Weld = 0.188 in.
E = 1.5 in.
D = 1.5 in.
g = 2.5 in.
d1 = 4.6 in.
Compression Plate = 0.375 in.
~m = 1038 lbs/Bolt (tension)
372 lbs/Bolt (shear)
93 lb-ft I 1551 lb-ft
193 lb-ft 1646 lb-ft
plate width
plate depth
plate thickness
plate thickness
~m =
Tb =
Tb =
195 lbs/Bolt (actual bolt tension)
187 lbs/Bolt (actual bolt tension)
< 0.140 dia OK
< 2 Bolts OK
< 0.140 dia OK
< 2 Bolts OK
Page 47 of 59 CEC #16-803
End Plate Design:
Check End Plate Thickness
tp, reqd =
s = 1.94 in.
pf = 1.31 in.
Y = 29.37 in.
P1 = 1tdb 2F1/4
= 13841bs
$Mnp = $[2P,(Ldnl
= 09472 in-lb
1.11yr($Mnp)
$bFpyY
= 0.12 in
Check Shear yea/ding:
combination 1: $Rn = 2 X $(0.6F yA9)
874801bs
combination 2: $Rn = 2 X $(0.6FyA9)
combination 1:
combination 2:
= 874801bs
Check Fillet Welds:
(sidewall to end plate)
Dmin = 0.9Fytl(2 X 1.392L)
0.50 sixteenths
Dmin = RJ(2x1.392L)
= 0.04 sixteenths
(top and bottom wall to end plate)
Dmin = P urf(1.392L)
= 0.03 sixteenths
Dmin = RJ(2x1.392L)
= 0.04 sixteenths
(top and bottom wall to end plate)
Dmin = Purf(1.392L)
= 0. 03 sixteenths
UltraShelter #1 077 4 7
. '
< 0.375 in OK
> 6881bs OK
> 5671bs OK
-> 1/16 inch weld OK
-> 1/16 inch weld OK
-> 1/16 inch weld OK
-> 1/16 inch weld OK
-> 1/16 inch weld. OK
Page 48 of 59 CEC #16-803
,•
CONNECTION 55-PURLIN A TO COLUMN . '
Member End Results:
Fx (Axial) Fy (Major Shear)
!combination 1: 54741bs. 1290 lbs.
I combination 2: 48151bs. 1844 lbs.
,_____.,_ u·· --"'----'..;
0 "'
"() v 6
' 0 ci' ' """"' )( (]W }
# of Bottom Bolts: 1 Bolt
# ofTop Bolts: 1 Bolt
Min. Bolt Diameter: 0.32 in
F Y = 46000 psi
F Y = 36000 psi
Member Pitch = 0.00 degrees
Member Size:
Dm = 6.000 in.
Wm = 4.000 in.
t=o.125in.
Bolt Size: 0.32 in:
Put= 2737 lbs
Put= 2408 lbs
Bolt Design:
combination 1:
combination 2:
UltraShelter #1 077 47
combination 1:
combination 2:
db,reqd = \ j 4M
n~Ftd1
db,reqd = 0.27
nmin = Ruf~rn
= 0.69 Bolts
db,reqd = \ j 4M,
n~Ftd1
db,reqd = 0.25
nmin = Ruf~rn
= 0.98 Bolts
Fz (Minor Shear) Mx (Torsion) My (Minor Moment)
375 lbs. 57 lb-ft 0 lb-ft
466 lbs. 0 lb-ft 0 lb-ft
/.{;p
Use: 0.75 in.
dw = 4.000 in.
d = 6.000 in.
tp = 0.375 in.
beam
plate
<
<
<
<
Weld = 0.188 in.
E = 1.6 in.
D = 1.6 in.
d1 = 4.3 in.
Backer Plate = 0.250 in.
~m = 5424 lbs/Bolt (tension)
~m = 1945 lbs/Bolt (shear)
T b = 3808 lbs/Bolt (actual bolt tension)
T b = 3350 lbs/Bolt (actual bolt tension)
0.320 dia OK
· 1 Bolts OK
0.320 dia OK
1 Bolts OK
Mz (Major Moment)
plate width
plate depth
plate thickness
plate thickness
0 lb-ft
0 lb-ft
Page 49 of 59 CEC #16-803
End Plate Design:
Check End Plate Thickness
tp. reqd =
s = 2.00 in.
pf = 1.50 in.
Y= 17.61 in.
P1 = ndb2F1/4
= 72331bs
$Mnp = $[2Pt(:~::dnJ
= 46786 in-lb
1.11y,($Mnp)
$bFpyY
= 0.34 in
Check Shear yea/ding:
combination 1: $Rn = 2 X $(0.6FyA9)
583201bs
combination 2: $Rn = 2 X $(0.6F yAg)
combination 1:
combination 2:
= 58320 lbs
Check Fillet Welds:
(sidewall to end plate)
Dmin = 0.9Fytl(2 x 1.392L)
0.32 sixteenths
Dmin = RJ(2x1.392L)
= 0.08 sixteenths
(top and bottom wall to end plate)
Dmin = Pu1(1.392L)
= 0.49 sixteenths
Dmin = Ru/(2x1.392L)
= 0.12 sixteenths
(top and bottom wall to end plate)
' Dmin = Purf(1.392L)
= 0.43 sixteenths
UltraShelter #1 077 4 7
< 0.375 in OK
> 13431bs OK
> 19021bs OK
-> 1/16 inch weld OK
-> 1/16 inch weld OK
-> 1/16 inch weld OK
-> 1/16 inch w~ld {)K
-> 1/16 inch weld OK
Page 50 of 59 CEC #16-803
CONNECTION 56 -PURLIN B TO HIP BEAM
Member End Results:
Fx (Axial) Fy (Major Shear) Fz (Minor Shear) Mx (Torsion) My (Minor Moment) Mz (Major Moment)
!combination 1:
!Combination 2:
2941bs.
-13181bs.
Plate Thickness = 0.25 in.
Member Width = 3.00 in.
Member Depth= 5.00 in.
Bolt Diameter= 0.75 in.
#of Bolts= 2
Weld Size= 0.19 in.
15 lbs.
1081 lbs.
Worse Case Purlin Angle= 0.00 degrees
Check Bolt:
combination 1: Total Shear= 26.51bs.
Try: (2) 0.75 in. diameter bolts
221bs. 281b-ft
2721bs. 59 lb-ft
i'URL:N o:j
~ , I
"
Allowable V = 31792.51bs.
Limiting Tesion Stress
Combined Shear & Tension
combination 2: Total Shear= 1114.9 lbs.
Try: (2) 0.75 in. diameter bolts
fv =
ft =
$ft =
30 psi
332 psi
87716 psi
87716 psi
Allowable V = 31792.5 lbs.
Check Weld:
0.188 in. Fillet Weld
combination 1:
combination 2:
UltraShelter#1 077 47
Limiting Tesion Stress
Combined Shear & Tension
f = v
ft =
$ft =
Effective throat thickness =
Capacity of Weld =
Total Capacity=
Effective throat thickness =
Capacity of Weld =
Total Capacity=
Page 51 of 59
1262 psi
0 psi
86330 psi
86330 psi
0.13 in
4.18 klin
66.81 kips
66812 lbs.
0.13 in
4.18 klin
66.81 kips
66812 lbs.
1\ ~ iTI co l~ :?
UJ til ::J ,_
>
>
>
>
>
>
0 lb-ft 0 lb-ft
0 lb-ft 0 lb-ft
;O TUB[ l''l.,RLifS
26.51bs.
OK
332 psi
OK
1114.91bs.
OK
0 psi
OK
320 lbs.
OK
1115 lbs.
OK
CEC #16-803
Check Plate:
A9 = 1.25
Ae1 = 0.81
Ae2 = 0.38
combination 1:
combination 2:
UltraShelter #1 077 4 7
Pu = $tFyAg
= 40500.0 lbs.
Pu::: $tFuAe
= 30316.4 lbs.
14062.5 lbs.
Pu = $tFyAg
= 40500.0 lbs.
Pu::: $tFuAe
= 30316.4 lbs.
14062.5 lbs.
> 26.51bs. OK
> 26.51bs. OK
> 26.51bs. OK
> 1114.9 lbs. OK
> 1114.9 lbs. OK
> 1114.9 lbs. OK
Page 52 of 59 CEC #16-803
z
(!)
en w c 0> "' .... 0
(!) (")
"' z Ql
0>
1-0
ra 0..
0 u.
BASE PLATE DESIGN:
Column and Base Plate Perameters:
Column Width, D = 6.00 in.
Plate Length, L = 11.00 in.
Plate Thickness, t = 0. 75 in.
Applied Forces:
Max Axial, Pdn = 3.63 kips
Max Shear, V = 0.70 kips
Moment, M = 3.28 kip-ft
Uplift, Pup = 0.64 kips
Check Plate:
critical section = 2.65 in.
combination 1: Mp1 = 0.12 in.-kips/in
tp = 0.16 in.
combination 2:
combination 3:
Mp1 = 0.24 in.-kips/in
tp = 0.23 in.
Mp = 0.45 in.-kips/in
tp = 0.32 in.
Use: 11 in. x 11 in. x 0.75 in. thick baseplate
UltraShelter #1 077 4 7 Page 54 of 59
D ftf •
' ~n
/M'
-~·-· __ ...,.__
OK
OK
OK
CEC #16-803
www.hilti.us
Company:
Specifier:
Address:
Phone I Fax:
E-Mail:
Specifier's comments:
1 Input data
Anchor type and diameter:
Effective embedment depth:
Material:
Proof:
Stand-off installation:
Anchor plate:
Profile:
Base material:
Reinforcement:
Seismic loads (cat. C, D, E, or F)
Geometry [in.] & Loading (lb, ft.lb]
Hex Head ASTM F 1554 GR. 36 3/4
h.,= 12.000 in.
ASTM F 1554
Design method AC1318-11/ CIP
eb = 0.000 in. (no stand-off); t = 0. 750 in.
; E = 0 psi; fyk = 35998 psi; YMs = 1.1 00
Page:
Project:
Sub-Project I Pos. No.:
Date:
I
I; !!Sal
Profis Anchor 2.6.6
1
107747
8/1/2016
lx x ly x t = 11.000 in. x 11.000 in. x 0.750 in.; (Recommended plate thickness: calculated (0.039 in.))
Square HSS (AISC); (L x W x T) = 6.000 in. x 6.000 in. x 0.188 in.
cracked concrete, 3000, fc' = 3000 psi; h = 48.000 in.
tension: condition A, shear: condition A;
edge reinforcement: none or < No. 4 bar
Tension load: yes (D.3.3.4.3 (d))
Shear load: yes (0.3.3.5.3 (c))
z:
~~
9o
~v~y
',,X
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Anchor (c) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademar1< of Hilti AG, Schaan
UltraShelter #1 077 47 Page 55 of 59 CEC #16-803
www.hilti.us
Company: Page:
Specifier: Project:
I; rt-:. •. 1
Profis Anchor 2.6.6
2
107747
Address: Sub-Project I Pos. No.:
Phone I Fax:
E-Mail:
2 Proof I Utilization (Governing Cases)
Loading
Tension
Shear
Loading
Proof
Concrete Breakout Strength
Concrete edge failure in direction y+
fiN
Combined tension and shear loads 0.552
3 Warnings
• Please consider all details and hints/warnings given in the detailed report!
Recommended plate thickness: 0.039 in.
Date:
Design values [lb]
Load Capacity
5259 9519
822 5811
~ (,
0.141 5/3
Fastening meets the design criteria!
4 Remarks; Your Cooperation Duties
8/1/2016
Utilization
fiN'~ r1o1 Status
56/-OK
-/15 OK
Utilization f!N.v r1o1 Status
42 OK
• Any and all information and data contained in the Software concern solely the use of Hilti products and are based on the principles, formulas and
security regulations in accordance with Hilti's technical directions and operating, mounting and assembly instructions, etc., that must be strictly
complied with by the user. All figures contained therein are average figures, and therefore use-specific tests are to be conducted prior to using
the relevant Hilti product. The results of the calculations carried out by means of the Software are based essentially on the data you put in.
Therefore, you bear the sole responsibility for the absence of errors, the completeness and the relevance of the data to be put in by you.
Moreover, you bear sole responsibility for having the results of the calculation checked and cleared by an expert, particularly with regard to
compliance with applicable norms and permits, prior to using them for your specific facility. The Software serves only as an aid to interpret norms
and permits without any guarantee as to the absence of errors, the correctness and the relevance of the results or suitability for a specific
application.
• You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular, you must arrange for the
regular backup of programs and data and, if applicable, carry out the updates of the Software offered by Hilti on a regular basis. If you do not use
the Auto Update function of the Software, you must ensure that you are using the current and thus up-to-date version of the Software in each case
by carrying out manual updates via the Hilti Website. Hilti will not be liable for consequences, such as the recovery of lost or damaged data or
programs, arising from a culpable breach of duty by you.
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Anchor (c) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademar1< of Hilti AG, Schaan
UltraShelter #1 077 4 7 Page 56 of 59 CEC #16-803
DRILLED SHAFT FOUNDATION DESIGN WITHOUT GROUND SURFACE CONSTRAINT
• Rx[lb) Rv [lbl Rz [lbl Rox [lb-ftl Rovflb-ffi Roz[lb-ftl
Combination 1: 165.891 3628.64 158.338 532.217 -15.49< -586.014
Combination 2:
Combination 3:
Foundation Dimensions:
Diameter, W =
Depth, D =
Soil Conditions:
0
0
-639.867
2388.21
2.00 ft
4.00 ft
Allowable Soil Bearing Pressure, B1 =
Allowable Lateral Soil Bearing Pressure Lpa =
Foundation Properties:
fc =
Number of Vertical Reinforcement Bars =
Vertical Reinforcement Bar Size =
Horizontal Tie Size =
Horizontal Tie Spacing =
f = y
Ground Surface Constraint (O=No I 1 =Yes) =
Bearing Pressure Analysis:
Area of Footing, A;= nW/4 =
Actual Bearing Pressure, Bp = (P dn I A;)*1 000 =
227.227
702.634
1500.00 psf
100.00 psflf
3000 psi
(6)
#6
#4
8 in. o.c.
60000 psi
0
1313.988
3279.562
3.14 sq. ft.
1155.03 psf
Allowable Soil Bearing Pressure Exceeds Actual Soil Bearing Pressure -OK
Uplift Analysis:
Factored Wind Uplift Load = ((Pup *1.5)*1 000) =
Weight of Footing, W1 =
Weight of Footing Exceeds Factored Wind Uplift Load-OK
959.80 lbs.
1822.12 lbs.
Foundation Lateral/ Overturning Analysis (Nonconstrained):
Allowable Lateral Pressure, S1 = (Lpa*D*113) =
Equivalent Column Height, h = MN =
Nonconstrained Factor, A= (2.34V)I(S1*W) =
Embedment Depth, d = (A/2)(1 +(1 +(4.36h)IA)A112 =
Footing Depth Exceeds Embedment Depth -OK
Allowable Lateral Pressure, S1 = (Lpa*D*113) =
Equivalent Column Height, h = MN =
Nonconstrained Factor, A= (2.34V)I(S1 *W) =
. Embedment Depth, d = (A/2)(1 +(1 +(4.36h)IA)A112 =
Footing Depth Exceeds Embedment Depth -OK
Allowable Lateral Pressure, S1 = (Lpa*D*113) =
Equivalent Column Height, h = MN =
Nonconstrained Factor, A= (2.34V)I(S1 *W) =
Embedment Depth, d = (A/2)(1 +(1 +(4.36h)IA)A112 =
Footing Depth Exceeds Embedment Depth -OK
Steel Reinforcement Analysis:
Minimum Required Reinforcment, As-min =
266.67 pcf
0.00 ft
1.01 ft
1. 01 ft
266.67 pcf
0.58 ft
1.00 ft
1.44 ft
266.67 pcf
0.00 ft
3.08 ft
308ft
2.26 inA2
Actual Reinforcement, As-act = 2.65 inA2
Actual Reinforcement Exceeds Minimum Required Reinforcement-OK
0 0
0 0
VERTICAL BARS~ •.
HORIZONTAL TIES
Comb-1
Comb-2
Comb-3
max vertical
max uplift
max overturning
Use: 2 Ft. Diameter x 4 Ft. Deep Concrete Footing. w/ 6 No. 6 Bars Vertical and No. 4 Ties at 8 Inches O.C.
Notes:
f.>
·1. The foundation design is based on Table 1806.2 of the building code, Class 5 soil material. If different soil conditions are
encountered, it is recommended that a site specific geotechnical report is conducted to determine the load bearing values of the
soil.
0
2. If the footing depth does not meet local frost requirements, footings shall be re-designed under the direction of an engineer. It is
the contractor's responsibility to verify the local frost depth.
UltraShelter #1 077 4 7 Page 57 of 59 CEC #16-803
..
c(
1-c( c
...J w z
c(
Q.
u. 0 0 0::
8 00 cD ;
(.) w (.)
<» 10 -0
00 10
Q) Cl "' c..
, ..
McELROY METAL
CORPORATE OFFICE • P.O. BOX 1148 • SHREVEPORT, LA 71163·1148 • (318) 747·8000 • FAX (318) 747·8029
~r £ cl-t "' t c~\t au ttE~r t "'
Issue Date: June 1, 2006
Multi-Rib
--12''---i
L ~a· _________ _
f 36' COVERAGE-
1. Section properties are calculated in accordance with the 2001 AISI North 4. lx is for deflection determination.
American Specification for the Design of Cold-Formed Steel Structural Members. 5. Se is for bending.
2. Va is tne allaNable shear. 6. Ma is the allowable bending moment.
3. Pa is the allowable load for web crippling on end & interior supports. 7. All values are for one foot of panel width.
Allowable Uniform Loads (PSF)
Notes:
1. Allowable uniform loads are based upon equal span lengths.
2. Positive VVind is wind pres~ure and is NOT increased by 33 1/3 %.
3. Negative Wind is wind suction or uplift and is NOT increased by 33 1/3%.
4. Live is the allowable live or snow load.
5. Deflection (U180) is the allowable load that limits the panel's deflection to U180 while under positive or live load.
6. Deflection (U240) is the allowable load that limits the panel's deflection to U240 while under positive or live load.
7. The weight of the panel has NOT been deducted from the allowable loads.
B. Positive VVind, Negative Vv'ind, and Uve Load values are limited to combined shear & bending using Eq. C3.3.1-1 of the AISI Specification.
9. Positive Wind and Live Load values are limited by web crippling using a bearing length of 2".
10. Web crippling values are determined using a ratio of the uniform load actually supported by the top flanges of the section.
UltraShelter #107747 Page 59 of 59
No. 07-232-06
CEC #16-803
DESIGN CRITERIA
2013 CALIFORNIA BUILDING CODE
RISKC'\TEGORY: II
DEAD LOAD:
WEIGHT OF ROOFING SYSTEM = 2 PSF + STRUCTURE DEAD
WEIGHT
SNOW LOAD:
GROUND SNOW LOAD: 0 PSF
ROOF SNOW LOAD: 0 PSF
SNOW EXPOSURE FACTOR: 1.0
SNOW LOAD IMPORTANCE FACTOR: 1.0
THERMAL FACTOR: 1.2
LIVE LOAD:
ROOF LIVE LOAD: 20 PSF
WIND LOAD:
ULTIMATE DESIGN WIND SPEED: 110 MPH
NOMINAL DESIGN WIND SPEED: 86 MPH
WIND IMPORTANCE FACTOR: 1.0
WIND EXPOSURE CATEGORY: C
GUST EFFECT FACTOR: 0.895
INTERNAL PRESSURE COEFFICIENT (GCpi): 0
SEISMIC DESIGN:
SEISMIC IMPORTANCE FACTOR: 1.0
SEISMIC SITE CLASS: D
SEISMIC DESIGN CATEGORY: D
BASIC SEISMIC FORCE RESISTING SYSTEM: STEEL ORDINARY
CANTILEVER COLUMN SYSTEM
FOUNDATION DESIGN
CONCRETE COMPRESSIVE STRENGTH AFTER 28 DAYS: 3,000 PSI
STEEL REINFORCEMENT: ASTM-A615, GRADE 60
VERTICAL FOUNDATION PRESSURE: 1,500 PSF
LATERAL BEARING PRESSURE: 100 PSF/F
FOUNDATION NOTES:
1. THE FOUNDATION DESIGN IS BASED ON TABLE 1806.2 OF THE
BUILDING CODE, CLASS 5 SOIL MATERIAL. IF DIFFERENT SOIL
CONDITIONS ARE ENCOUNTERED, IT IS RECOMMENDED THAT A SITE
SPECIFIC GEOTECHNICAL REPORT IS CONDUCTED TO DETERMINE THE
LOAD BEARING VALUES OF THE SOIL.
2. IF THE FOOTING DEPTH DOES NOT MEET LOCAL FROST
REQUIREMENTS, FOOTINGS SHALL BE RE-DESIGNED UNDER THE
DIRECTION OF AN ENGINEER. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO VERIFY THE LOCAL FROST DEPTH.
STRUCTURAL STEEL
MEMBER TYPE
WSHAPES
RECTANGULAR HSS TUBES
SQUARE HSS TUBES
ROUND HSS TUBES
SCHEDULE PIPE
ROUND MECHANICAL TUBING
MISC. PLATES/SHAPES
CONNECTION SOL TS
HEADED ANCHOR BOLTS
ASTM
A992
A500 (GRADE B)
A500 (GRADE B)
A500 (GRADE B)
A53 (GRADE B)
A519
A36
A325
F1554
MIN.YIELD STRENGTH
50KSI
46KSI
46 KSI
42 KSI
35 KSI
42 KSI
36 KSI
92 KSI
36 KSI
[ 33'-0"]
396"
II--• ----[22'-0"] ------l•J 264" 1
PLAN VIEW
WELD: AWS STANDARD AND 70S-6 WIRE
1 ~·~
[ 11'-10 1/2"] T
142 1/2"
8/1/2016
[ 8'-0"]
96"
. "--t4,
GROUND LEVEL
FRONT VIEW
GROUND LEVEL
PROJECT
HIP RECT 22x33 SHELTER
24ga. MUL TIRIB ROOF
1 LEGOLAND DR
CARLSBAD, CA 92008
SIDE VIEW
City of Carlsbad
Building Division
ocT 31 zom
REVISIONS
APPROVED BY: _...!...-!~----r-~
w
ISSUED BY:·_ -.{-'::>.~~---r->
SHEET INDEX
....J ~ ::::>
1-u w I-
I u
0:: <(
BY
SHEET 1.0
3/4" X 16" F1554 GR. 36
HEADED ANCHOR BOLT
(4) PLCS EACH
CONNECTION
~¢24"
PIER FOOTING
8/1/2016
(1) 3/4" NUT
(2) 3/4" WASHER
(4) PLCS
(6) #6 VERTICAL
SCALE
N.T.S.
\
\
\
\
409518\
\
\
20' X 30' FOOTING LAYOUT
REVISIONS BY
29'-0"
SHEET 2.0
Page 2 of 9
ITEM NO. DESCRIPTION
1 Column #107747
2 Column-Center #107747
3 Hip Beam· Hip Rect. 22x33
4 Ridge Beam-hip rect. 22x33
5 Purlin·Hip Rect. 22' B
6 Purlin· Hip Rect. A 22'
7 3/4" Washer F436
8 3/4" x2" A325 Machine Bolt
9 3/4" x 1-1/2" Machine Bolt
10 Hip Beam • Hip Rect. 33' Side
11 Purlin·Hip Rect. 33' B LH
12 Purlin-Hip Rect. 33' B RH
13 Purlin· Hip Rect. 30' A RH/LH 6" x 4"
14 Roof Hat
15 Purlin Hat 4:12 • 10' Long
8/l /2016
QTY LENGTH
4 109"
2 109 1/8"
4 149 3/4"
1291/8"
2 107 1/4"
2 215 3/16"
96
72
24
2 109 3/8"
2 116 1/8"
2 116 1/8"
4 170 3/16"
2
6
MATERIAL
6x6x3/16" HSS
ASOO
6x6x3/16" HSS
ASOO
6x6x3/16" HSS
ASOO
6x6x3/16" HSS
A500
5x3x11ga HSS
A500
6x4x11ga HSS
A500
6x6x3/16" HSS
A500
5x3x11 ga HSS
A500
5x3x11ga HSS
A500
6x4x11ga HSS
A500
14ga HRPO
A36
16ga
Galvanized
REVISIONS BY
SHEET 3.0
Page 3 of 9
@3/8" PLATE
@ 1/4" PLATE
PURLIN A
6x4x11ga HSS
@3/8" PLATE
@ 1/4" PLATE
COLUMN
6x6x3/16" HSS
TYP
HIP BEAM TAIL
6x2x11ga HSS
COLUMN TO HIP BEAM, PURLIN
A & HIP BEAM TAIL
CONNECTION
PURLINA
6x4x11ga HSS
@3/8" PLATE
@ 1/4" PLATE
@1/4" PLATE
@3/8"PLATE
HIP BEAM
6x6x3/16" HSS
314" x 2" BOLT. WASHER, NUT
(2) PLCS EACH
CONNECTION
PURLIN A
6x4x11ga HSS
C 3/8" PLATE
SCALE
N.T.S.
3/8" PLATE
3/4" x 2" BOLT
WASHER. NUT
(21 PLCS EACH
CONNECTION
J 1/4" PLATE
PURLIN A
6x4x11 ga HSS
COLUMN TO HIP BEAM, PURLIN
A CONNECTION
COLUMN
6x6x3/16" HSS
COLUMN TO BASE PLATE
CONNECTION
8/1/2016
SCALE
N.T.S.
M 3/4" BASE PLATE
SCALE
N.T.S.
PURLIN B
5x3x11ga HSS
HIP BEAM
6x6x3/16" HSS
HIP BEAM TO PURLIN B
CONNECTION
PURLIN B
5x3x11ga HSS
@ 1/4" PLATE
PURLIN B
5x3x11ga HSS
HIP BEAM TO PURLIN B
CONNECTION
#12-24 X 7/8"
TEKSCREW
One every 12"
PURLIN A TO HAT
CONNECTION
@1/4" PLATE
3/4" x 1-112" BOLT.
WASHER. NUT (2) PLCS EACH
CONNECTION
SCALE
N.T.S.
HIP BEAM
6x6x3/16" HSS
@ 1/4" PLATE
3/4" x 1-112'' BOLT.
WASHER, NUT
(2) PLCS EACH
CONNECTION
SCALE
N.T.S.
#12-24 X 7/8"
TEKSCREW
One every 12"
PURLIN A
6x4x3/16" HSS
SCALE
N.T.S.
RIDGE BEAM
6x6x3/16" HSS
TYP ®318" PLATE
J.d.W--f,f.l.b>L---@ 3/8" PLATE
@3/8" PLATE
HIP BEAM TO RIDGE BEAM
CONNECTION
314" x 2-112" BOLT.
WASHER. NUT (4) PLCS EACH
CONNECTION
HIP BEAM
6x6x3/16" HSS
HIP BEAM TO RIDGE BEAM
CONNECTION
314" x 2" SOL T,
WASHER, NUT
(4) PLCS EACH
CONNECTION
HIP BEAM
6x6x3/16" HSS
SCALE
N.T.S.
RIDGE BEAM
6x6x3/16" HSS
HIP BEAM
6x6x3/16" HSS
SCALE
N.T.S.
REVISIONS BY
SHEET 4.0
Page 4 of 9
3/8" =i:::= ~/4"
¢13/16" \ f-2 1/2" 1 5/8" c;D 15/16" x4"""" r--2 1/2" 1 3/8" n t 1 1
4
12" n?±> 1 J/8" ~ t ~
J .. ' 515/16"
J .. 5 11/16"
0
-!
0
-~
~--5 3/4" ---i 1----5 1/4" ==!
PLATE A SCALE V "'-f-------1 A\ PLATEB SCALE / \
r-----1 B
N.T.S
II II I ~114"
\ ___\--1 5/8"
¢13/16" ~ \ \ 1 3/16"
4 L. \ '6 ' 2 112·
l_j .J,•
\--3 3/4" =--\
~/ N.T.S "'-/
3/8" ===~
1-51/16"-j
L...L.__ ____ __._. =t/8"
t------5 3/8" =l
PLATE C 1-s_c_A_L_E __ _,V C \ PLATE D
N.T.S 1"\.. /
J-----10 13/16"----j
3/8
goo
--4"-
1----+--2 3/16"
9 9
9 9
n (D (D ( ~ (l}----1Hfl---J
7" l1 7/16" 4 T6"
l <D<D Q)
'-------'--l.--
1-------+-1 5/8"
-31/4"-
SCALE
N.T.S
II
---+--1 7/8"
/ \ 0 ' /
REVISIONS BY
z ~
0 ~ I-_J LL co (.) wo 0 IQ o W (/)~ N z ~m z ~!:Qo<C ~----------.-----~~~-----------~-------~~4---------------------.---------.~~----------------------.---------,/~~o ~~o~
PLATE E f--s_c_AL_E ____ --t/ E\ PLATE F f--s_c_A_L_E ---IV F \ PLATE G t-s_c_A_LE ____ ---lv G' PLATE H scALE H\ 0 CfJ ~ ~ ~ ~
1\. / 1\. I W...Ju=>_J[]J t-------------------~N_.T_.S ______ ~,~~_/~--------------------LN_._T._S ______ Li~~~_/4-------------------L-N._T_.S _____ LI'~~----------------~N-.T-.S------~~~'-/~~~w~O(I) ~1--~m(!)_J
c;D 13/ 16" \ - 2 1 /2" --..!-----+-1 5/8" n ~ 19)16'
6 3116" " J
0 J
f----5 3/4" =l
PLATE I SCALE
N.T.S
8/1/2016
1/4" cc:::::======:o ~
¢15/16" x4 \
I-2 1 /2" -t-----11--1 3/8" nr-. -T~+---+--t---1---,1 • .---/'2"
(J ~J t
5 15/16"
3"
0 !
t----5 1/4" =!
/ \ PLATEJ SCALE / \
1------1 j I
\._ / N.T.S i"\._ /
PLATEK
=[1/4"
1 3/8" ¢13/16"~
• ~ 11/8"
I G-t---t----.-
4 3/4" 2 )/2" 1J 23/4" ~ j
SCALE
N.T.S
v \ K 1\.. /
0:: w 9:~~~ LL.OIN..-U
SHEET 4.1
Page 5 of 9
REVISIONS BY l_
=t/4" T1t4"
8" (/)718"
¢15/16" 16ga Galvanized n l 6</!2112" 11" 7/8"
5" goo _l 3" 8"
0 ·~ ~518"~ 0
5"~ 2 5/8"
11"
PLATE L SCALE BASE PLATE M SCALE HATN SCALE
N.T.S N.T.S N.T.S
SHEET 4.1
8/1/2016 Page 6 of 9
"'"' ·-·, ~UIRED VERIFICATION AND INSPECTION OF STEEL CONSTRUCTION OTHER THAN STRUCTURAL STEEL
!ABLE lZQ:!.Z.Z
V~RIFICATION ANQ IN:!P~CTION COI':!IIII\IUOUS P~RIODIC REFERENCED STANDARD
1. Material verification of cold-formed steel deck:
a.ldentification markings to conform to ASTM standards -X Applicable ASTM material
specified in the approved construction documents standards
b. Manufacturer's certified test reports -X
2.1nspection of welding:
a. Cold-formed steel deck:
1). Floor and roof deck welds. -AWS D1.3
b. Reinforcing steel: !
i
1) Verification of weldability of reinforcing steel other -X than ASTM A 706
2) Reinforcing steel resisting flexural and axial forces AWS 01.4 in intermediate and special moment frames and boundary ACI 318: X -elements of special structural walls of concrete and shear Section 3.5.2 reinforcement.
3) Shear reinforcement X -
4) Other reinforcing steel. -X
-----·· , ..... .......... .,
REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION
TABLE 170:!.3 ·
VERIElCATJO_N AND INSPECTION CONTINUO!.!S PERIQDIC BEEEBEtliC!;D STANDARQ IIBC REFERENCE
l.lnspection of reinforcing steel, including prestressing -X ACI 318: 3.5, 7.1-7.7 1910.4 tendons, and placement.
2. Inspection of reinforcing steel welding in accordance AWS D1.4 ---with Table 1705.2.2, Item 2b. ACI 318: 3.5.2
3.1nspection of anchors cast in concrete where allowable ACI 318: 1908.5, loads have been increased or where strength design is -X
used. 8.1., 21.2.8 1909.1
4.1nspection of anchors post-installed in hardened ACI 318:
concrete membersb. -X 1909.1 3.8.6, 8.1.3, 21.2.8
5. Verifying use of required design mix. X ACI 318: CH. 4, 5.2-5.4 1904.2, -1910.2, 1910.3
6. At the time fresh concrete is sampled to fabricate ASTM C172
specimens for strength test, perform slump and air content X -ASTM C31 1910.1
tests, and determine the temperature of the concrete. ACI 318: 5.6, 5.8
7. Inspection of concrete and shotcrete placement for X ACI 318: 5.9, 5.10 1910.6, 1910.7 -proper application techniques. 1910.8
8. Inspection for maintenance of specified curing -X ACI 318: 5.11-5.13 1910.9 temperature and techniques.
9. Inspection of prestressed concrete:
a. Application of prestressing forces. X ACI 318: 18.20 --
b. Grouting of bonded prestressing tendons in the seismic-X ACI 318: 18.18.4
force-resisting system.
10. Erection of precast concrete members. -X ACI 318: CH. 16 -
11. Verification of in-situ concrete strength, prior to
stressing of tendons in post-tenstioned concrete and prior -X ACI 318:6.2 -to rem ova I of shores and forms from beams and structura I
slabs.
12.lnspectformwork for shape, location and dimensions of -X ACI 318: 6.1.1 -the concrete member being formed.
8/l /2016
STATEMENT OF SPECIAL INSPECTIONS:
1. NOTICE TO THE APPLICANT/OWNER/OWNER'S AGENT/ARCHITECT OR ENGINEER OF
RECORD: BY USING THIS PERMITIED CONSTRUCTION DRAWINGS FOR
CONSTRUCTION/INSTALLATION OF THE WORK SPECIFIED HEREIN, YOU AGREE TO COMPLY
WITH THE REQUIREMENTS OF THE CITY FOR SPECIAL INSPECTIONS, STRUCTURAL
OBSERVATIONS, CONSTRUCTION MATERIAL TESTING AND OFF-SITE FABRICATION OF
BUILDING COMPONENTS, CONTAINED IN THE STATEMENT OF SPECIAL INSPECTIONS AND, AS
REQUIRED BY THE CALIFORNIA CONSTRUCTION CODES.
2. NOTICE TO THE CONTRACTOR/BUILDER/INSTALLER/SUB-CONTRACTOR/OWNER-BUILDER: BY
USING THIS PERMITIED CONSTRUCTION DRAWINGS FOR CONSTRUCTION/INSTALLATION OF
THE WORK SPECIFIED HEREIN, YOU ACKNOWLEDGE AND ARE AWARE OF THE REQUIREMENTS
CONTAINED IN THE STATEMENT OF SPECIAL INSPECTIONS. YOU AGREE TO COMPLY WITH THE
REQUIREMENTS OF THE CITY FOR SPECIAL INSPECTIONS, STRUCTURAL OBSERVATIONS,
CONSTRUCTION MATERIAL TESTING AND OFF-SITE FABRICATION OF BUILDING COMPONENTS,
CONTAINED IN THE STATEMENT OF SPECIAL INSPECTIONS AND AS REQUIRED BY THE
CALIFORNIA CONSTRUCTION CODES.
3. THE SPECIAL INSPECTOR MUST BE CERTIFIED BY THE CITY, DEVELOPMENT SERVICES, IN
THE CATEGORY OF WORK REQUIRED TO HAVE SPECIAL INSPECTION.
4. THE CONSTRUCTION MATERIALS TESTING LABORATORY MUST BE APPROVED BY THE CITY.
DEVELOPMENT SERVICES FOR TESTING OF MATERIALS SYSTEMS, COMPONENTS AND .
EQUIPMENTS.
5. FABRICATOR SHALL SUBMIT AN 'APPLICATION TO PERFORM OFF-SITE FABRCATION' TO THE
INSPECTION SERVICES DIVISION FOR APPROVAL PRIOR TO COMMENCEMENT OF
FABRICATION.
6. FABRICATOR SHALL SUBMIT A 'CERTIFICATE OF COMPLIANCE FOR OFF-SITE FABRICATION'
TO THE INSPECTION SERVICES DIVISION PRIOR TO ERECTION OF FABRICATED ITEMS AND
ASSEMBLIES.
7. THE SPECIAL INSPECTIONS IDENTIFIED ON PLANS ARE, IN ADDITION TO, AND NOT A
SUBSTITUTE FOR, THOSE INSPECITONS REQUIRED TO BE PERFORMED BY A CITY'S BUILDING
INSPECTOR.
8. SPECIAL INSPECTION FOR CONCRETE CONSTRUCTION.
----~~-~~-----. ·---· ---.-·-·~~-~---·-·---·-------~----~ .... ------·-
REQUIRED VERIFICATION AND INSPECTION OF SOILS i
IA!.!b~ lZO:Z.2
... __
VEBIFICATIQN ANQ INSf!;g:JON TASK CONTINUOUS DURIN~ TASK LISTED PERIODICALLY D!.!RIN~ TASK LISTED
1. Verify materials below shallow foundations are X adequate to achieve the design bearing capacity_ -
2. Verify excavations are extended to proper depth and --have reached proper material.
3. Perfom classification and testing of compacted fill X materials. -
4. Verify use of proper materials, densities and lift X thicknesses during placement and compacted fill. -
5. Prior to placement of compacted fill, observe subgrade X and verify that site has been prepared properly. -
·--·----~--~---· ·····--·· ··-------"-----·--·----·-·--·· i REQUIRED VERIFICATION AND IN_SJ>f.CTION OF CAST IN PLACE DEEP FOUNDATION ELEMENTS
IAim lZO:!.~
~~BIEI~l]OI':!I 81':!112 II':!ISf~OIQI':!I IASK !:;OI':!IIII':!IUOUS QUBII':!I~ IASK LIH~Q f~BIOQI~LI.l QUBII':!I~ IASK LISIEQ
1. Observe drilling operations and maintain complete and -accurate records for each element. X
2. Verify placement locations and pi umbness, confirm
element diametrs, bell diameters (if applicable), lengths,
embedment into bedrock (if applicable) and adequate end-X -
bearing strata capacity. Record concrete or grout volumes.
3. For concrete elements, perform additional inspections in --accordance with Section 1705.3
STATEMENT OF SPECIAL INSPECTIONS:
1. VERIFICATION AND INSPECTION OF CAST-IN-PLACE DEEP FOUNDATION ELEMENTS
REVISIONS BY
SHEET 5.0
Page 7 of 9
8!1 /2016
12 4~
~----38 1/4" Sheet Width ------t r--36" Coverage Width -------j
I f-12"Typ.--i I
6x4x11ga HSS
\ 0 0 /\_,____-,--
MUL TIRIB ROOF PANEL
24GA
ASTMA792
Fy=50 ksi
5x3x11ga HSS
24ga Multi Rib roof
METAL FASTENERS
CORRECT
Sealing material slightly
visible at edge of melal
washer. Assembly is
weathertight.
TOO LOOSE
Sealing material not
visible. Notenough
compression to seal
properly.
TOOnGHT
Sealing material extruded
beyond edge of washer.
#12-24 x 7/8" #1/4"-14 x 7/8" screw '4•------~,0~,--T-EK_4_s-cr~:~~------~,~ ,n~,------~,1\~,------~,~
FASTENER SCHEDULE
REVISIONS BY
SHEET 6.0
Page 8 of 9
24 ga. Multi Rib Roof Panel
#12-24 X 7/8"
TEK4 SCREW
Panel Cover w/ Drain Holes
SECTION@ EAVE
Hip Trim
#1/4-14 x 7/8" SCREW
SECTION @ HIP BEAM
8/1/2016
Purlin A
24 ga. Multi Rib Roof Panel
#12-24 X 7 /8"
TEK4 SCREW
Hip Beam
SECTION @ RIDGE
#1/4-14 x 7/8" SCREW
#12-24 X 7/8"
TEK4SCREW
24 ga. Multi Rib Roof Panel
#12-24 X 7/8"
TEK4 SCREW
Purlin
SECTION @ PURLIN
REVISIONS BY
Gable Hip Trim 4:12
Hip Rectangular Trim 4:12
SHEET 6.1
Page 9 of 9
I
I
:
' i
·j
l l I l l
J I
j
l j
l
't
I l '(
! !
! l j
J j
l
l J
I
. j
'I l l I
I I l j
j
I ' i I
l
I
I l
j
j
I
' J
I
1 I l
l I i
,, .
n
Q P.5 p
' I
. ' i'-0" 1' .. 6" ::10'-Q"
............... , ......... .,.· ....... t ......................... _"'~"'"""""'"'"'_l!l
1:1~~-
I .
-1-··----
'
• () ' ' h
I ' :1' I t-.
!%~~i~~ _·_.·.
I -.
I --r
' '
I .
l R.O.
I
I
I
I
I I
I
'
FLOOR 1 SCALE 1/8'•1'·0'
·. I . ____________ -__ --'-___ .. c _____ -------___ --_,_--'---
"
M L K.5
' I
I
I
I d~~t-ll--+·--H-·
I
, I
' '
. '
I BIRT~DAY . ~
TENTp
I
I
···'•······· ··-.. : ____ :...~~-~--~-..... ·-------····~-····--·--.. , .. '
J H G F
I
'
'
TERRACE
' 1 SEATING -t-~-
''
I
4i--.c.f-
' . '
I
I -
. ' '
A ..
1 .
' .
.. 3
' \.:_ __ -
8
-----10
r-· 11
--+--C:f-../
12
I I
13
I
' -r--14
+---HI+H-15
,,, . ' '•. ,"•" -'
I
·-. ' ··.· :· .. ..,~' "-." ' ' . ' ..... "•
LEGEND
I HR SEPARATION ~L.·
\\
\··_. ~ ·.
'GENERAL -··NOT:E:s:~ .... ~.~~
-. . . •·~ ..... ,."'·,...,, .... ,.,..,.,~,n ......
I, ALL DIMENSIONS ARE TO THE FACE OF FINISH OR <S>RID
LINE UNI.ESS NOTED OTHERI"'ISE
:2. FOR ALL ~LL. TYPES SEE D!;;TAIL. SHEETS P•SOI TO P·SO'l.
B. FOR BACKING PLATE DETAILS SEE P-965 AND P•504.
' . . ' -
4. INTERIOR PARTITIONS AT ReSTAURANTS, INCL. 6Ac;K OF H01!5E,
MUST SIT ON A 10" HI<!'>H CONCRETE CU~, I'IIDTH SAME AS STUO
S. INTERIOR PARTITIONS AT BATHROOMS, MUST SIT ON A 10" HIGH
CONCRETE CURB, I'IIDTH SAME AS STUD
6. FOR ALl.. DETAILS, PLEASE REFER TO PC:TAIL BOOK VOL.UMI:S I, t :2
7. FOR AL.L; INTERIOR COLOR 4 MATERIAL SPECIFICATIONS,
PLEASE RI::FER TO DETAIL BOOK Y~a:-
B. FOR KITC.HEN EQUIP. AND LOC.ATION5, ;<eFER,i.O.K!TCtiS'<:D.Y,!lcSi$.,.
FLOOR PLAN KEY NOTES
0 ~L.LS AT FREE:ZI;;I't AND COOLER (SHOI'IN HAT"HI;;D)
ARe ElY MANUFACTURE!'~.
@) R.EINFOR"ED CONCRETE FLOOR SLAB.
® LANDSCAPE FEATURE· $eE $HEET L419 AND L414
GJs" DEPFI.ESSED !>LAS SeE STRUCTURAL DI'IGS.
·. . -.. -~"·------~..:. -~-----~.~ .. --... :__ .. -----~----------·-----·-·-· ·-------~-----·'-·-·"·-.,.-_, ______ -----·-----------.-----·-·--------------------··-<••""'" ~--..... _, ________ ................. : .. :-____ ;;.__,~---"'" ----·--· --~-........... , .... __ ..... '·"'""""" ..... ....,-·--------~------~---"~"'""''"-·'"" ,, ---..................... ---.. .
' '
LEGO D
GARL.3BA:P
LEGOLAND Attraction Center, Billund
OK4190 Blllund
·• DENMARK
+457$33 II 83 Volco +-IS 75 35 39:18 I'm<
0
LEGOLAND Attraction Center, Windsor 0
I A.. Alma Rood. WindSor ·
Booi<sbl"" UK SLA JHU
+441753626400Vol<o +441753796667Fia•
... !louse Wyatt Associates
Attrattlon Design Consu-
. 1014 Vine Sm..t, Suite 1300, c:t..dnnad, OH 45201 ·
Sl3 381 0055 Voice 513 381l6911'olt
HOKStudioE
Architect of Reconi
1655 26tli Sto'<>ot. Suite 200, santa Monica, CA 90404 ·
310 453 0100 Vole<> 310 4532051i'a>< ·
Sasaki AssoCiates, Inc.
l.onds-Consullants .
703 Palo,... Al'l'Ort Road Ste. 1'10, Corlsbod, CA 92009
760 603 670$ Voice 760 603 6761 Fax·
Nolte and Associates, Inc.
Civil Engl.......mg
5469 Kearny Villa !load, Suite 30$, Son Dlegn, CA 921 U
619 2789392 Vol<:e 619 278 46211fox
0
0
D
McGraw/Bafdwin Architects ··· · · 0
Am>dotedArchlt ....
701 8 Street, SultelGO, San Diogo, CA 9liOI.SIQI
619:131 0751 Vol<» 619 231 43961'olt
Martin & Dunn, Inc.
Structural Engineering
7801 Mr..lon ConterCt,l/400 S.O.Diegn, CA 92108
6194972118Vol.., 61949704l91'm<
Rosenberg + Associates
Mechonl<:al. Plumbing, Fire P-on eoo .. ~tants
5933 W. Cent\11')' Blvd. #1050, Lao Angoleo, CA 901145
31 o 6-15 0 142 Voll!e ll o 645 1868 I'm< ·
Lucci & Associat"s' Inc. .
· Comult!n8 Elottrtcal !lngl"""rs
3251 CortcM~,#SI,Camarillo,CA_9301l-0094
0053896520 Vol<e 805 389 6519 Fax
Issue No.
~--------------·----·~·----~-------
-------------··--·--------------------
2 . & BUW!TIN 1132 12.03-97
. I IGMP#l FINALSI!T lo.IMT
.FUNTOWN
Marche Complex.
Floor PII;Ul
sCaie as shown HOK 96.0634.00
0
0
0
0
·.!'
~ ' . .
: ' ' !!
" "t
' ',
ft_
I '
" ' '