HomeMy WebLinkAbout1 LEGOLAND DR; ; CB972126; Permitl.
City of Carlsbad
05/19/1999 Building Permit Permit No:CB972126
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
Project Title:
Applicant:
ADACHI, KYOKO
Building Inspection Request Line (760) 438-3101
1 LEGO DR CBAD
COM Sub Type:
Lot#:
$7~,806.00 Construction Type: VN
Reference#: SDP96-14
3,072 SF GARDEN SHED
"LEGO" PLAN CHECK 97-1456
Owner:
Status.:
Applied:
Enterec;I By:
· Appr/lssued:
Inspect Area:
LEGQLAND CARLSBAD INC
1655 26TH STREET 90404
310 453-0100
ISSUED
07/31/1997
MOP
08/20/1997
PD
Total Fees: $3,966.00 total Payments To Date: $3,966.00 Balance Due: $0.00
Description
* ELECTRICAL TOTAL
* MEC:gANICAL TOTAL
* PLUMBING TOTAL
Building Permit
Enter Park Fee(Zone 5,13
Enter Traffic Impact Fee
Enter Y to Autocalc P.
Plan Check
Strong Motion Fee
lnspecto,;lf __ . ..,.... __
FINAL APPROVAL
Date: f.;tj. fo/ Clearance:
Fee
35.00
37.00
140.00.
518.00
1,229.00
330.00
1,325.00
337.00
15.00
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit.was issued,to protest imposition·of.these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Govern.men! Code Section 66020(a), and file the protest ~nd any other required information with the City Manager for
processing in accordance with Cal1sbad·Mu11icipal·Code Section 3.32.030. Failure to timely follow that procedure will bar.any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED tliat your right tci protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing.or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which vou have orevious1v·beeil oiven a NOTICE·similar to this or as to which the statute of limitations has oreviouslv otherwise·exoired.
I il/ZZ1
08/20/97 09: .09
~age 1 of -1
'BU IL D-1 NG 2 ER~ IT I>.ermit N_o; CB972126
Proj.ect ~o: A97Q2·672
Deveiopnieh~-No: ,F1305,00i
Job Address :. j_ LEGO DR suite:
Perm± t Type:. : COMMER(::IAL BU.ILDING
Parcel No: · ·
Val'uation: . 72,806
Lot#:-8267,08/20/97 0001 01 02
·constru.ction ·-lr-ffllif!f: VN· 3966~0b
SDP9.6-14. · . · Status:: ISS,UED -Occupahcy G·roup: Ref erenc:e-#:
Description: 3,072 SF GARDEN SHED
: ''LEG011 PLAN CHECK ·97-1456
·@plied: · 07 /31./9.7 ·
. Apr/Iss't.i.e =•· 08/2-0/91
-~nt~r$d .BY:,, -MD'P
Appl/Ownr: ADACHI, KYOKO
4655 26TH STREET
· $1.0 453..:.0,100-
SANTA MONICA, CA. 9·040_4-,______:__ --_--***' Fees Required *'** . ,...,,,,..--;;* -:Fee-f(_ Collected ~ Cred.'its, **'* ---------------, -----------// , ---/(",_ ·., ... , -",--~--. --------_-, _,., ---·:,, ': . ----,
F , 3 966/00 -<;> ' 1 "' !'-.. ~ , ees: , /·-,.--,',,_.., ,\_ __ 1 /W\/O),..., __ ~• ..
· ·Adjustments: _ .,,-• 0/~----'\"t\t \.:---~ID~'ti~1/t,<2r~dits =-·, • oo
· T9tal Fetas:· 3 :§66. CAp--,) · 'rota\l(E{ay1)f~pt's: _. . . · -:o.o 1/ (\ ,__ /'·;::,.... &a-la~~ue \ · · ·-. · 3, 9 6·6:-.,·o o
' -~ee description / ,A //' ,,::1171\,, "'('\~Unit\ \ 8~/U~i t E?{t ~<:!e . Da,:~-&-
---. --• -------•. -· 1 I ~ 7 ·--.----. · 7j " ------\ ·..::: __ .:._,,,_ -\ ------------------
Building Permit I J'·-._,,_¾_, I ~>'""' ~:::::>:;:_,....___.,~:;;,-,,,, _ \ '> v / '\ 518 .. 00
Plan Ch.eek / / ~---.,:,--__ ,,,,,.,'¥ \ V 337 :oo . ·
Strong -Motion Feel (? n / -. . j,.-"\.z,,,-· l!J\ f-.:;l 15. 00
Enter "Y" . to Au 1;:oFai,~:.:J>-', F.. F. ,efi i >_,~ --.1 ___,,,,.,,~/,: } 0 13 2 5. _0 0 Y
.Enter Traffic Imp~ct Fee\ ~--d{j / 1.-'~ 3o/0(,ttrqz:: 330~-00
Pa s·s-Thru f e,e,s , Y /llf ) or Wa1~::.v~d'(_,_W,J ? ~, j : t \ i <I}'~ I · Y
Enter Park Fee(Z-or~e 5,13,1/),, -~ ,§1 :-J~: / 1229.00 13 * BUILDING TOTAL \. \ ·;_/ __,.P-~1 / 3754. 00
Enter 11 Y 11 .for Plumbing l.$.,sJ.1e..,,Eee 1 ~ · · / .20. 00 Y
h I , b • p • \ /' /1-n ', ,, Nt;ORP08ATED , ("":-..._ I . _ -Eac P Ull.l :J.cn.g 1xtur~;v, .1.rap,,, J 1s52 -/ § ~ 71. 0·0 42.00.
Each Buildihg Sewer '\.)_/,;,/') "·,.,--.)___it-.,.--"' c-1~ ;s<·oo · ·15 .. o-o
' '-' ( I'~ \ \. \) , Each Ro?f Drain \ 1/ /1 ,.i. . (-;1\~5\ 7.00 35.00
Each Install/Repair Wate~J.ri.~ // f $ (r~:\t!--, \) 1 / 7. 00 . 7. 00
Ga,s Piping Sy·stem ·-. · U> \.."':-.:/ ,;-1/ 7. 00 7 .:oo
~ach Vacu·um Breaker -'-.._-2___ .. ~-·_...,,,,,,,..,-··~2 7'. 0 d · · ··14. 0 0
*· PLUMBING !OTAL 140. 00
E;n,ter 11 Y11• for El~ctric Issue Fee > 10. 00 .Y
S.ingle Ph,a.s,e Pe_:r: AMP. ___ ' > 100 . 2 5 , 2 5 .:0.Q
* EJ;,ECTRICAL TOTAL . . ·str:. 00
_Enter 'Y' ·for Mechanical Issue Fee> 15. ·oo Y
Install Furn/Ducts/Heat Pumps· > 1 9 •. oo 9.00
Each Exhaust Fan > 2 ·6. s·o 13. 00
* 'MECHANIC~J:. TOT,l\L 37. O 0
. CITY OF CARL~~AD _ .. • , .
2075 Las P;ilmas Dr:, Carlsbaq, CA 92009 '(619) 438-H61
' " ' . ' '.
Inspection List
Permit#: CB972126 Type: COM 3,072 SF GARDEN SHED
"LEGO'' PLAN CHECK 97~1456
Date Inspection Item Inspector Act Comments
2/1/99 19 Final Structural RI
2/1/99 29 Final Plumbing RI
2/1/99 39 Final Electrical RI
2/1/99 49 Final Mechanical RI
2/1/99 89 Final Combo PD PA
2/1/99 89 Final Combo Rf
1/29/99 19 Final Structural RI
1/29/99 29 Final Plumbing RI
1/29/99 39 Final Electrical RI
1/29/99 49 Final Mechanical RI
1/29/99 89 Final Combo PD NR
1/29/99 89 Final Combo RI-
6/5/98 89 Final Combo PD co
5/18/98 89 Final Combo PD co
3/12/98 84 Rough Combo PD AP
2/27/98 11 Ftg/Foundation/Piers PD AP SLAB
2/20/98 15 Roof/Reroof PD AP
2/11/98 14 Frame/Steel/Bolting/Weldin PD NR
1/21/98 63 Waifs PD AP
1/15/98 63 Walls PK PA 3RD LIFT
1/9/98 63 Waifs PD WO
1/9/98 66 Grout PD AP 2ND LIFT
10/21/97 11 Ftg/Foundation/Piers PK AP NEEDS UFER
9/15/97 21 Underground/Under Floor PK AP WASTE ONLY. & STORM DRAIN
Monday, May 17, 1999 Page 1 of 1
FINAL BUILDING INSPECTION
DEPT: BUILDING E~INEERING FIRE·. PI.ANN.ING CMWD ST LITE
PLAN CHECK#: CB97212·6
PERMIT#: CB972126
PROJECT NAME: 3, 072 .. SF G~DEN SHED
"LEGO" PLAN CHECK 97-1456
ADDRESS: 1 LEGO DR
CONTACT PERSON/PHONE#: J:l:M939-0099
SEWER DIST: CA WATER :OIST: CA
Lot#
DATE: 05/15/98
PERMIT TYPE: COM
MAY J 81998
INSPECTED
BY: ~~~~ECTED: s-).rhY APPROVED 7 D!SAPPRO,,:D _
INSPECTED
BY:
INSPECTED
BY:
COMMENTS:
DATE
INS.PEC'l?EP:
DATE
INSPECTED:
APPROVED DISAPPROVED -
. · APPROVED -............. ---DISAPPROVED
.... '
,,,
. PLANNING DEPARTMENT
FINAL INSPECTION
CHECKLIST
ROUTING
BLDG Y
M.HA:RDY '-r"'
PLANNE&/~ •
LBLACK_· __
MBLACK >4:'
M.HARDY_>P'. $
BLDG ___ _
Project Name:,,£.~ 'RJl.c.--f' .1t. ,, -A-
Address: I~~,,,. 10 -..
Plan Ch~ckNo. CB~7_ ,.;l./;),..-'
Project Number:
Project Planner: d J2Jt:frl ~ . Extension ~~,
Contact Person Phone No. I)rawingNo.
Inspections Fin_al Inspection Items
1st 2nd Approved All Items b~low Conform with Approved Site Plan .
1. Proj'ect Planner confirms conditions are met
2. Building elevations
..
3. Building materials·
4. Building colors
5. Ro.oftop equipment screens
6. Fence/wall height, location, and materials
7. Size, number and location of parking spaces
compact, regular, handicap .
8. Outdoor recreation facilities
9. Employee eating areas. . .
10. Trash enclosure and location
11. Pavement treatment
12. Street Addresses and mailboxes
13 . Landscaping installed (under separate contract)
. LIST BELOW ANY ADDITIONAL ITEMS REQUIRING
SPECIAL ATTENTION BY MJKE B_LACK:
wf7 14.~p i--ls-,,t-Ci.S --for -#r;,,. _,4. • .L ·' ..... ~--hi>! ./Jui/d/,.,,. .,, V 15. . . "
16.
17:
18 .
. .
Project complies witn all conditions, including above-listed items. Final inspection is complete.
J4J(Q ~ b· r o ·tib
Mike Black Date
(H:\ADMIN\COUNTER\Final Insp Check} 05/07/98
FINAL BUILDING INSPECTION
DEPT: BUILDING ENGINEERING FIRE PLANNING CMWD ST LITE
PLAN CHECK#: CB972126
PERMIT#: CB972126
PROJECT NAME: 3,072 SF GARDEN SHED
"LEGO" PLAN CHECK 97-1456
ADDRESS: 1 LEGO DR Lot#
.DATE: 05/15/98
PERMIT TYPE: COM
:{:1· --[ "?JS-;{-!i . \\.; :: .
t I fl :-® l!:: L, ___ :·' , ~; ,. i
1 \, I' i,
if r Ii MAV 5 , i /:. . f LU J •"at-11 f 1998 i L:J: ~ CONTACT PERSON/PHONE#: JIM9.39-0099 t J ·
SEWER DIST: CA WATER DIST: CA .. ;· ~-~-· ~ CARL~BAo· l ~==~=;i =======:========;:==== . i"I_IN!£1~LYifilEJ?filfilQ ___ .·
~~~I~~~ECTED: J~ APPRO~D ~ DISAPPROVED
INSPECTED DATE BY: _______________ INSPECTED:
INSPECTED
BY:
COMMENTS:
DATE··
INSPECTED:
.A~PRQVED DISAPPROVED
APPROVED -·-DISAPPROVED
== ........... =-----===
FINAL BUILDING INSPECT.ION
DEPT: BUILDING ENG,INEF;RING FIRE
PLAN CHECK#: CB97212:6
PERMIT#: CB972126
PLANNING
PROJECT NAME: 3,072 SF GARDEN SHED
"LEGO'i .PLAN CHECK 97-1456 .
ADDRESS: 1 LEGO DR
CONTACT PERSON/PHONE#: JIM939-0099
SEWER DIST: CA WATER DIST: CA
. Lot#
'DATE: 05/15/98
PERMIT TYPE: COM
INSPECTED 1
BY: JJb, e::: ;
DAT:li:
INSPECTED·: APPROVED ~ DISAPPROVE];)
INSPECTED
BY:
I~,PECTED
BY:
COMMENTS:
DATE
IMSPECTED:
DATE
INSPECTED:
APPROVED DISAPPROVED
APPROVED DISAPPROVED -·-
SEE
MULTIPLE
SPECIAL INSPECTIONS -
SCANNED
SEPA.RATELY
CB9720·27 IS THE . .
PLAN CHECK NUMBER FOR
MANY OTHER CB'S
ALSO SEE
'
CB971460(OUTER PARK)
CB971465(ADMIN BLDG)
REPORT OF MORTAR COMPRESSiON TEST
TESTED FOR: Legal.and Estates, Inc.
5600 Avenida Encinas, Suite 130
Carlsbad, CA 92008
Attn: David Cattle
PROJECT: Le_gol.and Theme Park
Carlsbad, California
DATE: 23-Oec-97 REPORT NO.: 059-70202-143
LOCATION OF POUR:
FIELD DATA
FIRST LIFT OF CMU WALLS @ 1.5-0 GAR.DENER'S SHED
DATE POURED:
TIME
SLUMP, IN.
AIR TEMPERATURE, F
CONCRETE TEMPERATURE, F
DATE RECEIVED IN LAB
FIELD DATA SUBMITTED BY
MIX DATA SUBMITTED BY
LAB CYLINDER
No. NO.:
16017 A
16017 B
16017 C
SPECIFICATIONS
REMARKS:
TEST
AGE
(DAYS)
7
28
28
28
15-Dec-97
1:30 PM
17-Dec-97
PSI/CARLOS HERNANDEZ
SUPPLIER
COMPRESSION TEST RESULTS
DATE OF TOTAL SAMPLE
TEST LOAD DIMENSION
(LBS) (IN.)
·22-.Dec-97 · · 6940 2X4
12-Jan-98 2X4
12...:Jan-98 2X4
...
cc: 1 -City of Carlsbad / Pat KeUey
1 -Bernards Brothers Construction 1 Alex Young
1 -H.O.K. / Chris Rooney
4 -Legoland
SAMPLE
AREA
(SQ.IN.)
. -3.:14
3 .. 14"
3,14 .
SUPPLIER JOB-SITE MIXED
DELIVERY TICKET NO.
MIX # & PROPORTIONS TYPE •s•
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
COMPRESSIVE
STRENGTH
(PSI)
2210
0
0
18.00
OBSERVATIONS [KJ Samples made by PSI representative
D Samples made by Others
[KJ Samples picked up by PSI Representative
D Samples delivered to PSI laboratory
D Test results comply with applicable
specifications. D Test results do not comply with applicable
specifications .
TYPE OF FRACTURE, IF OTHER
THAN CONICAL ____ _
Information To Build On
Professional Service Industries, Inc. • 6867 Nancy Ridge Drive, Suite E • San Diego, CA. 92121 • Phone 619/455-0544 • Fax 619/455-1170
Page_1_of~
INSPECTION REPORT
CLIENT _________ _
DATE __ O~(-_Z.=...,.....i-_1:;..;,.~,__ __
Architect._._t}o_{G_' _J_1U;...;;;_'O....;_J...;;;.O_t __ ----'-___ _
Engineer MN2-DN t/4 DUNAJ
Contractor. B~4./2.DJ f>l:-fJJ
INSPECTION MAT'L SAMPLING
_OSHPD /concrete Cylinders.
_OSA _Cement
_specialty _ Mortar Samples
_Mechanical _. Grout Samples
_ Electrical _ Masonry Prisms
_Roofing _ Masonry Block
Vconcrete _ Fireproofing
~Masonry _ Units (olock or brick)
_ Struct Steel _ Asphalt Concrete
_ Prestress Cone _Roofing
_ Pile Driving _ Reinf. Steel
_ Fireproofing _Steel
_Waterproofing _H.S.Bolts
_ Non-Destructive _. _Tendon (PT Strands)
_Soils Technician _._Other
_ Batch Plant _._. Other
_ Bolt Pull-Out . _Other
REMARKS \'f/£0fl£i0/r--/ 6/-ZJ-ff'
--Sfto<.UEJ? UP fo ~ MM 61-J /Vi
DH PllWJ. ffe,
QT.Y 3-
--
--
--
--
--
-·-
-·-.
--
--
--
--
PROJECT(Name),_._~ __ l/t1-W_· ~-----
_(Address)._l_~_.;;;__O_...;;;.J)...;..f!._. __ _
~B/tO CA-.
REPORT NO. OS?-70 2-0Z. ~/2-
Building Permit No . ..:.·-------------
Plan File No, ____________ --'--...;,._--'--
Govt. Contract No ...... ---'-------------
OSA or OSHPD #~·-------------
Other-'-·---.c.-----'------'-------
MATERIAL DESCRIPTION ~SPECTION CHECKLIST
.-Rinf.: Rebar Plan & Specs
_ Rinf.: W.W.F .. _. _ Clearances
_ Rinf.: Tendons ~ -.-Positions
L/"conc.: Mix #/psi i.Yf rj:(t)o _Sizes
_ Cone.: Mix #/psi . _Laps
_. _ Cone.: Mix #/psi _ Future Continuity #/psi
_ Grout: Mix #/psi ·-Consolidation
-. Mortar: Type/psi _ Mortar Batching
_ Units: Block _ Electrode Storage
-. _ Units: Brick _ Torque Applied .
_·_steel
_H.S.Bolts
_ Metal Decking
_ Electrodes .
-. Fireproofing
_Other _ Corrective action required __
_ Corrections completed
-SP£C,fA:c., /IJJP£UltJN ff!()t/fl)G£J OJ./ PcltW-1&7 0/Z etJNC/?6t7:! Mtx #13</
CERTIFICATION OF COMPLIANCE: To the best of our.knowledge, all.of the reported work, unless otherwise noted, substantially complies wkif:/)(;/!:}plans,
specifications and applicable sections of the building codes. This report cover's the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
CERT. NO. ~ /CUI;::' #2
DATE __ tJ_,1_~v-_._-_YJ> ________ ____,_.
l · •] Professional Service Industries, Inc. ~ • American Engineering Division .
INSPECTION REPORT
~ ;z_ Page_of_
,~ ~~~
Project Name (per plans) ____,~:::_O_l/tr-1--'-_fJ~·-----------'---------------------
Inspection
Date
WlPJ.163 Olrl OP "focfll Af6 J Po ,e. SI' A-c£ 1715£ FACt -,tr 'f<N71 t/J -,=o o 17A.I v tJ 11
D/,21---9t G UfJ /.S-70 .3 A-NtJ /!m;;/(/.f' J:()071d~. 6£.:rvJEb-l U#ei
CMT, /J z .. /C/71r(.; ;zi· C P. . · SU/'/1(.,iW . N£:40f-/
Inspector's Name~......,_,_-=-.:.,___;;__;_.....L..,;::;__~,<.=.,:==-~'--:._..;...--
PS1 B-900-171
:{:o.L ~h/-
Page_1_ of _i
INSPECTION REPORT
CLIENT _________ _
DATE __ O_\-~f'-"-l,'---_q.a..,,g __ _
Architect ·tb~ SN010 lz..
Engineer_M_lt(P---"--....,....;..-;(/_N_' '_____,f.---_D_r.._·JM_N'-. -----'----
Contractor._&_~_'-'-'-ilt-'-'-f-_0__;;,:;._f -~--~,{!,_' ~-}-1-/'--L_n_VIJ._ . .;._f _l-1_Mi_, ()l_f...;_· 'If-_,_·/
INSPECTION MAT'L SAMPLING QJY
_OSHPD _Concrete Cylinders ---
_OSA _Cement
_Specialty _ Mortar Samples --
_ Mechanical _Grout Samples --
_ Electrical _ Masonry Prisms --
_Roofing _. _ Masonry Block --
_Concrete _ Fireproofing --
//'Masonry _ Units (block or brick) --
_ Struct Steel _ Asphalt Concrete --
_ Prestress Cone _Roofing --
_ Pile Driving _ Reinf. Steel --·
_ Fireproofing _Steel --
_Waterproofing _H.S.Bolts --
_ Non-Destructive _Tendon (Pt Strands) --
_Soils Technician _Other --
_ Batch Plant _ Other -·-
_ Bolt Pull-Out _Other --
REMARKS rf!.10/rt 0/-/6 -f cf'
PROJECT (Name)_{_E-· ,,.._G_o_tA-t-l __ D ___ _
(Address)_)_~_· _O_f>_/-_:.._. __ _
CAF-,lJ $/fO ,I C:A-. ,,
REPORT NO.~-__ 0_-_f1_-~7_0_2_D_· l __ _
Building Permit No, _____________ _
Plan File NO.-,------,-------------
Govt. Contract No. ______________ _
OSAorOSHPD#-'-----'---------
Other_· ----'------'--------------
MATERIAL DESCRIPTION INSPECTION CHE:CKLIST
_ Rinf.: Rebqr .JL'Plan & Specs
_ Rinf.: W.W.F. _ Clearances
_ Rinf.: Tendons _.__ Positions
_ Cone.: Mix #/psi _Sizes
_. _ Cone.: Mix #/psi . _Laps
_. Cone.: Mix #/psi _ Future Continuity #/psi
_. Grout: Mix #/psi _ Consolidation
~ortar: Type/psi .S./;rf./JJ r11 _ Mortar Batching
_ Units: Block 7-_ Electrode Storage
_._ Units: Brick _ Torque Applied
_steel
_ H.S. Bolts .
_._ Metal Decking
___ Electrodes .
_ Fireproofing
__ Other _ Corrective action required __
__ Corrections completed
-JPeuAt i1d.JR3-{!flo1J /J,t!Oviai-/tJ 01-/ f'~tWr OP. {;tY,vJ.
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otheiWise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME ~j /', ;/~;+/,t/,£2
/J z,~ :;Jf--
1NsPECTORs1GNATURE ~$
PSl·B-900-170(2) .
DATE __ cJ._V.-_-/....::.t:,_~...:...-=-"<1----' _______ _
Page_i_o1_!:
INSPl:CTION REPORT
CLIENT ______ ~_,-
DATE_()_/_-_1_2_-_Cf_f--,-__
Architect . Ho(G. .. Yrt-P I 0
Engineer llf M>...:tr 1-/ /·· Ve.Jr-/ N
~-At?..M Dl!-BJ U;Jt.JS·'f1c. Ce) . Contractor . ' · · I
INSPECTION MAT'L SAMPLING QTY
_OSHPD _ Concrete Cylinders --
_OSA __ -_Cement --
_Specialty _ _Mortar Samples
_ Mechanical L Grout Samples . _...L'
_ Electrical _ Masonry Prisms
_Roofing _ Masonry Block
/"concrete _. Fireproofing --
VMasonry _ Units (block or brick) --
_ Struct Steel _ Asphalt Concrete --
_ Prestress Cone ___ Roofing --
_Pile Driving __ Reinf. Steel
_ Fireproofing _Steel --
_Waterproofing _._ H.S. Bolts --
_ Non-Destructive _Tendon (PT Strands) ---
_Soils Technician _Other --
_Batch Plant _Other --
_ Bolt Pull-Out _Other --
REMARKS 7l/z)/!.J.04Y 0/-22--'/J'
lE6oC..MD PROJECT(Name),~----------
(Address) J l.:G£;o DI!.·
l2Ml,.it34£'; C~. ·
R~PORT N0, __ 0_:5_:_9_-....:7---=0=-='2--=0~2=--_....;2,:..:.i~~?-
Building Permit No.-"-------,----------
Plan File No, _______________ _
Govt. Contract No. _____________ _
OSA or OSHPD #-------------
Other---~----'------------
MATERIAL DESCRIPTION INSPECTION CHECKLIST
_ Rinf.: Rebar _ Plan & Specs
__ Rinf.: W.W.F. _. _ Clearances
_ Rinf.: Tendons _ Positions
_ Cone.: Mix #/psi _. _ Sizes
_ Qonc.: Mix #/psi _Laps
_ Cone.: Mix #/psi - , ___ Future Continuity #/psi
v-'Grout: Mix #/psi3,B6Ec.V ~'-'' _ Consolidation
__ Mortar: Type/psi 7 -. Mortar Batching
_. Units: Block _ Electrode Storage
_ Units: Brick _ Torque Applied
_steel
_ H.S. Bolts
_. Metal Decking
_ Electrodes
_ Fireproofing
__ _ Other _ Corr~ctive action required __
_ Corrections completed
-Jt7t;CJA--l. j/vJ/Je:C!JlO~ /J/Zt)t/1.{f;L} Orf 6'/C{;)c//7/UC . 6~ C/4r l//=-'r Or Ob!CI
(,llAt,lJ~ A-r (jMJ:Jf!,....f-../B/41" St/&:) • o;: W-4-tcJ WAI ROr/E If?' {ZW"Jll,:
I ·rt:P-J P-tJ/c J)IV'Cc= P&!Pl~fG IT/;3r~J {:t)r/Fl!CT /:3-f:jU/££, ltritli,e Mtz..J· , "P 6t.-
LA-M DGA-t-1'/ /Jo CK-l::rf/ .A-rl'tJ # S 4 r la,t/£/Z -l!o t 1:f cJ t-/ NOR IJf <f JciciiJJ-ctl~tJ) ifrl-tlc
Nor .6£&1-J tlAR-i Ft-Gt? 6Y JTl§VL77./!2Al b-lf1~1Ec=,,e. {hte S6r o;::-3 6/!ovr
J~l't.£J MN}£ FcJ~. /:.tJ'-1/7/3£PJ/eJ;j 1EJJr. 6;~/f' II/I)( If 3rfGzo; ;lO:Jc) /'JI UJr,!~
4-r :2cf iJ!r/J /8B!Ju1~GP tll'/t..1£1} £Y. PNiJM,113 ~Ji r 1'41x·.
CERTIFICATION OF COMPLIANCE: to the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the IQcations of'the work inspected only and does not constitute engineering opin-
ion or project control.
/) .d:P'j_..
CERT. NO. v'l>f/1CZLlr= 7u '
INSPECTOR SIGNATURE__!:::'L!!i::.~Z!:_.,.()!,.~~e&-~~~~ DATE __ o~··_1-_zz_-....;..~-=~--------
PSI-B-900-170(2)
Ji •J Profes~ional Service Industries, Inc.
. • American Engineering Division '2--z_ Page_of_
INSPECTION. REPORT
U6o cb/O e;JI f-7 ozo z.. Project Name (per plans)----,----'-'-,----------------"-------~---
Inspection
Date
01 --z 2 -r ! CE,,tt;et-1r tJ H Ta:J r i 1 A r li 1-;E A 6e!ufu#· 1.1--MP ~ · ti/I£ -=
·Tlk.JRJ[}Ay' o81Z,/J~-1-A Mo D lr1ye.· 4 6iUt,t.~-A-/4-1£? C . JVl-tJtt/J t=a:JTJA,~
C!JN T.) if>V/7,l)~,..f C-J;> -3 --<-/ _ PA-CJ PCJ()J1A..JG / ,4r C-2 --2-. fi-/t];?I(/$
'D-F -2. 7-4-. ·t.,.t A-r .J7'ACL!. A-r11;
-------· --------------
Inspector's Name~~--'--=--<--~c....:._.:....:.....:.-~-----!...:--'------,---
PS1 B-900-171
------
·t ......... , Environme!fflll · .,..,,. Geotechn,c.al Page_1_6f...Z. •-"Construction Consulting • Engineering • Testing INSPECTION REPORT
CLIENT ________ _
DATE___,;O;a._J( ....... -_2-_0_-_9...;...~---
Architect_f!.o_~_-_, _J_ju._!]J_/_O _____ P.._,___· -~--'-----
Engineer_f_1,__M~q?--'--'--l{--1-f-.,·--'/J;:;...rJ._N,..;_' AJ....;__--,---,----
Contractor ~Nlrf'--!)J. 8,1!-0J f.-aAJ.J1.E, ClJ.
INSPECTION MAT'L SAMPLING QTY
_OSHPD _ Concrete Cylinders --
_OSA _Cement
_Specialty _ Mortar Samples
_Mechanical _ Grout Samples
_ Electrical __ . __ _Masonry Prisms --
_Roofing _ Masonry Block
_Concrete _ Fireproofing -·-
~asonry . _ Units (block or brick) --
_ Struct Steel _ Asphalt Concrete --
_ Prestress Cone _Roofing
_ Pile Driving _ Reinf. Steel --
_ Fireproofing _Steel
_Waterproofing _H.S.Bolts --
_ Non-Destructive _. Tendon (PT Strands) -----
_Soils Technician _.Other --
_Batch Plant _. Other --
_ Bolt Pull-Out _Other
REMARKS 7Vf,Jj)/('-/ eJ/--,)..D-'tcf
-JP£e,;A:l
PROJECT (Name)_{=f6=0_(h-./~...:;..0 ___ _
(Address)_/_(,/36.....:· :c..=...D;;;__...;;../)...;,_~-----
{jltf?(£bA-tJ i CA ·
REPORT NO. _ _,,0"'--'5;._Cf,__-__,7,-=0-=Z6-=
7
:...:Z=----'..:;;.c2._~'--V_
Building Permit No.--'--'--------------
Plan FileNo,-~--------------
Govt. Contract No. _____________ _
OSAorOSHPD#---------~---
Other _____ ...;..... ___________ _
MATERIAL DESCRIPTION INSPECTION CHECKLIST
_ Rinf.: Rebar _ Plan & Specs
__ _ Rinf.: W.W.F. __ Clearances
_ Rinf.: Tendons .. _ Positions
_ Cone.: Mix .#/psi _Sizes
_ Cone.: Mix #/psi _Laps
__ Cone.:. Mix #/psi . _ Future Continuity #/psi
_ Grqut: Mix #/psi . _ Consolidation
_ Mortar: type/psi __ Mortar Batching
_ Units: Block _ Electrode Storage
_ Units: Brick _ Torque Applied
___ steel
___ H.S. Bolts
_ Metal Decking
__ . __ Electrodes
_ Fireproofing
_ Other _ Corrective action required __
_ Corrections completed
wr uPr WAUJ_, 1/0T-b : ~ IJ
3 7 11, (j 1· ,..,..,.,, /3X fGN/) f C. I\/ I v {JJ A-r.,(,
PA-tJ£<. 8UWEE4 ~ Mo -of GN1 Nv J 5'o /4 oMd' uJU,e PtltCW Utl/JM 7lfti:, . . ( &iAff.)
CERTIFICATION OF COMPLIANCE: To the best of our knoVJledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME Gt@J f!_, ~/p-1.IJl;.,2,
INSPECTORSIGNATURF ~~ -
ps1-s-soo-110(2) ~
{!/>( ~Ct.I/ F .:ftz CERT. NO. ___________________ _
DATE_--.0_t-_;l_6-_fcJ> ________ _
l •J . Profe$sional Service Industries, Inc.
• American Engineering Division · Page-<-of£_
INSPECTION REPORT
1 ;~0 / A-,,;, OSCi-?Ozoz
Project Name (per plans) _C...t:-Q_,_1.JT_'"l",v __ -----=--,------------'~------------
Inspection
Date
Inspector's Name --'-""_;___:_-=----...!...-~::::.:....>o~----!,.;:C.J~:.___,..L--.;.-=-::... __
PSI B-900-171
Page_j_ofl
INSPECTION REPORT
CLIENT PROJECT (Name) leGaClb-lO
I
f) 1--0'1-'"f £ (Address) t.£60 Pl?..
DATE 8-~6,+o 6/4-
-&~ REPORT NO. os-r--7&2~L
Architect J-rup {<:) E:. Building Permit No.
f1M-17,.J i Plan File No.
Engineer OJA/1.J Govt. Contract No.
Contractor f>f-pr1t:g> J ~ Cot.1.r1l!-. Le;. OSA or OSHPD # _
Other
INSPECTION MAT'L SAMPLING QTY MATERIAL DE;SCRIPTION INSPECTION CHECKLIST
_QSHPD _ Concrete Cylinders --_ Rinf.: Rebar ~an&Specs
_QSA _Cement --_ Rinf.: W.W.F. _ Clearances
_Specialty _ Mortar Samples 3-__ __ Rinf.: Tendons _ Positions
_ Mechanical t~r<Jut Samples _ Cone.: Mix #/psi _Sizes
_ Electrical _ Masonry Prisms --__ Cone.: Mix #/psi -__ .Laps
_Roofing _ Masonry Block --~one.: Mix #/psi -/ ~ture Continuity #/psi
_Concrete ___ Fireproofing _ Grout: Mix #/psi JJJhZOJll.ei.-O _ Consolidation
~Masonry _ Units (block or brick) __ Mortar: Type/ps'i _ I _ Mortar Batching
_ Struct Steel _ Asphalt Concrete --___ Units: Block _-_ -Electrode Storage
_ Prestress Cone _Roofing --____ Units: Brick _ Torque Applied
_Pile Driving _ Reihf. Steel --_Steel
_Fireproofing _Steel --_H.S. Bolts
_Waterproofing _H.S.Bolts --__ Metal Decking
_ Non-Destructive __ Tendon (PT Strands) --___ Electrodes
_Soils Technician _Other _ Fireproofing _
_ Batch Plant _ Other --___ Other _ Corrective action required __
_ Bolt Pull-Out _Other --_ Corrections completed
REMARKS F/!!.ll}Ay <!JI----0 ?,-9 JJ /c£,foJe; 6(-!)9 . C/7-212-i .
-Jf EC!A-l I IJ.f f1 £etJ Ori /J~c//0~ (J.rf /JCA-ar,1 8,AIT -or ~u!r k
~US$£ ~U I c£) I t1 <; Of/ WE..-rr C,(/Af.<_ 1011-lAJ, -:rov.e C!)cJ,eSa:-_s (tv -°h)p OF W.+u),tlft~ S&e;notJ WM UJt-1f~ J Wr Of ~OH t(/,4-d
( -
£Af~O /Jc/ii.. 1V PA-, A.JI\ ro C 01Jr11JUE-(9 I'-( 0,--12 4tf.. ?5/' ~·z;~
--SP-ectk I
f lJ Sf £Crl <Jr-I /J /!.f)ft O-Gt) 01-f ~U17IJG OF -.5;c,OHO UH" or
(!j,{t) WAc,u' M G~.&N~ S/#bo o/l w21#1 -hf I'!<# ?<f blO/ ,:2.c)OO f-'JJ L. (lc}I; .. / ,
f' f!./2,.jJl()A.} £ fr{ ~ fJ/tYS f¾l4?o itf);) . ONG.. JE..:r OF 3 6?/!:odr .f_M;(f~ MA1J£, ·fJ.k~
7
~ f'WSS. ~M!WT : Gf(JU7/l.[G ·uJM ff:/!,FQ ,et-1/;P fJl{IJ# /:.,4-;AI, flc~~s _s;/1,;e:/£
-· -· " ro or.::r euu:
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME ~../ / /~,4..taz CERT. NO. M /'c«J r -{IL
&:?~ rf)/,,.oC/-ft:P INSPECTORSIGNATURE __ · ----~-_/. ~-DATE
PSl-8·900-170(2) / _ •
Page_1_of£
INSP.ECTION REPO.RT
CLIENT ________ _
DATE_---'-/Z_-_l....;.(c,_-_,q __ 7 __ _
Architect___,H:o_.___~ __ S_ru_, _D_J_o_E_ .. _____ ,,___
Engineer~M~Af!._e:rl_N_$~··~.O_u_N_tJ ___ "----
Contractor. b~A-P-.-DJ f>~S J"tJc..
INSPECTION MAT'L SAMPLING QTY
_OSHPD __ Concrete Cylinders --
_OSA _Cement --
_specialty VMortar Samples ..3
_Mechanical _. _ Grout Samples --
_Electrical _ Masonry-Prisms --
_Roofing _ Masonry Block
_concrete _ Fireproofing -·-
~asonry _ Units (block or brick) -·-
_ struct Steel _ Asphalt Concrete
_ Prestress Cone __ Roofing --
_ Pile Driving _ Re inf. $tee! --
_ Fireproofing · _Steel --
_Waterproofing _H.S.Bolts --
_ Non-Destructive -. Tendon (PT Strands) --
_Soils Technician _Other -·-·
_ Batch Plant _Other --·
_Bolt Pull-Out _Other --
PROJECT (Name)___._U _____ 6ocAH __ . ________ .O ___ _
(Address)_/ ___ -'-U6-=-o __ D_/!_. __ _
~6,4-0
,REPORT NO. . 05 9-702tJ2-/'3cJ
Building Permit No. ______ ___,c ______ _
Plan File No, _______________ _
Govt. Contract No. _____________ _
OSA or OSHPD #-------------
Other _________________ _
MATERIAL DESCRIPTION INSPECTION CHECKLIST
_ Rinf.: Rebar v"PJan & Specs
_ Rinf.: W.W.F. . _ Clearances
_ Rinf.: Tendons ·_ Positions
_ Cone.: Mix #/psi _Sizes
___ Cone.: Mbc #/psi _Laps.
_ Cone.: Mix #/psi _. _ Future Continuity #/psi
_ Grout: Mix #/p~[ _ Consolidation
__L""Mortar: Type/psi t [ilOOl'IL _ Mortar Batching 1 .
·_ Units: Block. _ Electrode Storage
_ Units: Brick _ Torque Applied
_. _Steel
_H.S.Bolts .
_ Metal Decking
_ Electrodes:
_ Fireproofing
_ Other _ Corrective action required __
_ Corrections completed
REMARKS tvGS Dir{ I i-1 c.o -~) (;Afl~E/!d Jf/U>: 17-212~ !6rr/fz l>ll'ti: .Cj 7 -.2 I 'Zf
-Seeci kk , b-JJPf.,c:Q o H t f!.e'JJ tDfAJ <ON . PLA C/bME.t-,./T o F CiJHC/2UE; . I-.( MOH I?-
U cl l tr (QH IZ;A:f, /h-l 0 WEJT s,oe.
LIPr, h-!D S"[lfeTM . WI [II
. /3{)/(,{)l,if(; -
-CoMMENt .• Tof' OF 'rOOT1Af4J'
IN lr/)D/1701-/ TO
PU fLMJs.
CERTIFICATION OF COMPLIANCE: To the be$! of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans
specifications and applicable sections of the building codes. This report covers the locations of-the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME f;reto1 R • ~11,-/~Z
INSPECTORSIGNATURF ~~~-..
PSI-B-900-170(2) ~
CERT. No.~CM::....:.!..!-~.:::.::..:...Y:: _ _.:1G_:_t_z ____ _
DATE--__:_/=-'l_-:..::/{t);_-_9:....,!7:,__ __ __,..._.__ __ _
!J •/ · Professional Service Industries, Inc. ~ _ • American Engineering Division · _ -· · · -Page 2ot Z
INSPECTI-ON REPORi
Project Name (per plans) _u.:::....;· ;:_6_0_l_M--'--'-D __ -'---_--'--~------------0_5_9_-_7_0--'Z=-0-'--'2..=--
Inspection
Date
Nf.
Inspector's Name__._..:..:.=..=-:..;:..~~...L.L.!:=::....:..:;;:~~~.::.__~~=---
Ps1 B-900-171
Page~of_f_
,INSPECTION REPORT (.£;6 ex.Ario.
CLIENT _______ _
DATE_..._./2'----------/_Z_--_9_7 __ _
Architect __ /lo_,::.._-_J;_7o._rp_r_o_£---'-, ~-'--------
Engineer __ Nf,_~=--' ---=-----N~/ _ _,_f?i_u_w,_N_· _· -----
Contractor~¥!) .D/Z.e}' /47(Ji(j MA:f{)/(,e,y.
I
INSPECTION -MAT'l S·AMPLING QTY
_OSHPD _Conc.rete Cylinders --
_OSA _Cement --
_Specialty _ Mortar Samples
_ Mechanical _· _ Grout Samples --
_ Electrical _ Masonry Prisms --
_Roofing _ Masonry Block --
_ Concrete ·-. _ Fireproofing --
~asonry _ Units (block or brick)
_ Struct Steel _ Asphalt Concrete ·--
_ Prestress Cone _Roofing --
_Pile Driving _._ Reinf. Steel --
_Fireproofing _Steel --
_Waterproofing __ _ H.S. Bolts --
_ Non-Destructive _.Tendon (PT Strands) --
_Soils Technician _Other --
_ Batch Plant _Other --
_Bolt Pull-Out _Other --
PROJECT (Name) 6~ J' I/EL) ~
(Address)__._/_~--'-::c..;::;..· -=-O__;s:Q;;....,.K---:... _
~JB"1o, DJ·.
REPORT NO. -----=...::(J;,._S'.....:.1_----L7...:;:.CJ-=~~2;,._-_
Building Permit No. ___ __._9__.7'---_;;..Z_/_2-0--=----
Plan Fi.le N6,-,-----------------
Govt. Contract No.-'-'-----------------
OSA or OSHPD #-------------
Other __ '------------------
MATERIAL DESCRIPT°ION INSPECTION CHECKLIST
-.. _ Rinf.: Rebar _L Plan & Specs
_ Rinf.: W.W.F. _ Clearances
_ Rinf.: Tendons _ Positions
-.-Cone.: Mix #/psi __ Sizes
__ Cone.: Mix #/psi _Laps
_ Cone.: Mix #/psi _ Future Continuity #/psi
_ Grout: Mix #/psi _ _ Consolidation
_ Mortar: Type/psi -. Mortar Batching
_ Units: Block _ Electrode Storage
_ Units: Brick _ Torque Applied
_Steel
_H.S. Bolts
_. Metal Decking
_. Electrodes
_ Fireproofing
_Other _ Corrective action required __ .
_ Corrections completed
REMARKS 'fJf/£JJtt tl-(2·-97 G:;AVJlN£itJ J~ : Cf7-;i._llk;
-Ji7evk /'/2.eJt.1~ &I. /JC1Jcb--1tp<-1T OP 60/f~ NM
I . .
A/6tfJ S Hw . 6//IU)/A/"6, Uloee /'{3,ri!-/'(1-NJ.
CERTIFICATION OF COMPLIANCE: To the· best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans
specifications and applicable sections of the building c;:odes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME {!,,f/!:,t,o.1. /!. ~ &(~c CERT. NO.~r!l,r;_a:_, -~_'t/r_17/_;_?c_2'--. -----
·~Prl~l::'1 /"" -· •• Afj/1 INSPECTOR SIGNATURE ~~~_.,M . . DATE_· ___ ..... -_/;__Z_-_/_Z_-9_.!,..? ____ -'---___ _
PSI-B-900-170(2) . _ --
~ ·1En~ I t::!t:u'::1i::' · Page__1_ of _f_
Consulting • Engineering • Testing INSPECTION REPORT 6~
PROJECT (Name) LE/4o<.kJl) ..
(Address) / (.,GG O 0/Z.
CLIENT _________ _
DATE __ lz_-_\_S_-_9~] __ _
CA12.LSMQ
t--\--o k
REPORT NO. 059-70 wz_ --1.:2£3
Architect Sill.D·LO E Building Permit No.
7
~ PvNt-J Plah File No.
Engineer MA.e:r7H Govt Contract No.
~ OSA or OSHPD #
Contractor. B~AAD.S .LJc.. Other
INSPECTION MAT'L SAMPLING QTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
_OSHPD _Concrete·Cylinders --_ Rinf.: Rebar Vp1an & Specs
_OSA _Cement --_ Rini.: W.W.F. _ Clearances
_Specialty ,_........ Mortar Samples -:.L _. Rinf.: Tendons _ Positions
_ Mechanical _ Grout Samples -. Cone.: Mi~ #/psi _Sizes
_Electrical _ Masonry Prisms --_ Cone.: Mix #/psi -. _ Laps
_Roofing _ Masonry Block ---. _ Cone.: Mix #/psi _ Future Continuity #/psi
_Concrete _ Fireproofing _. _ Grout: Mix #/psi _. _ Consolidation
.-&asonry _ Units (block or brick) --/' M<;>rtar: Type/psi S /J Jbo ['.J/ _ Mortar Batching
v"'struct Steel _ Asphalt Concrete --_ Units: Block _ Electrode Storage
_ Prestress Cone _Roofing --_ Units: .Brick _ Torque Applied
_ Pile Driving _ Reinf. Steel --_Ste~!
_ Fireproofing _Steel --_H.S.Bolts
_Waterproofing -. _ H.S. Bolts --· _ Metal Decking .
_ Non-Destructive _. Tendon (PT Strands) --_ Electrodes
_Soils Technician _Other --_. Firepro9fing .
_ Batch Plant _. Other --_Other . _ Corrective action required __
_ Bolt Pull-Out _Other _ Corrections completed
REMARKS MONDk-/ JZ-IS"-97 G; /rfJ.}lcfi U 1J 5/tf:,I? . .. 97--Ul~ M.,4-r,.; r. 97 -:.z._120
-SPE:CJAL l N-SP ~CJ] o J.../ P@U1Di?o OH P~·£N1 OF UY-I~ /'14
:SON (<.-'i U>--11-r.S DH fif-JT Ut=-r Ot-1 S'OurH kH.o. NOJZll/-S!tJe WA-U.<f
k1 t}~(hU . ~~ I {)N~ &U OP 3 M()K{l+,e. oA-M f'W N!A-l)G ,:0£
~Hl.P/!ESS"IOH n,Jr. Mo!U'M. IYl'E s_ J!(X) l'Jl /<[:-o)()( Jell) ( U}hf ,P' .e6.[J/d11) , (J.f £
tUotUc:-
I ,,
Pf,AZ. P(A-1.JS.
-0 6.JU-1/€,I{) ~OH <JF .J772UU/l);Z4(_ ~ Fol<. M £ ZV/,Jtl/6= AT /,f-frl Nll.
ALA:tJiF.,. bJL U)/,A.f 6, uJoeJc:.. IH . fJ!()Gf!Ed/ (N()1 WMl'L£n=1J) .,
I
CERTIFICATION OF COMPLIANCE: To the.best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report.covers the.loc.ations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME fA-fWJ t. !/4&-,,AH£>£Z CERT.NO. C/YI/IC!tl)r 1-tz
INSPECTOR SIGNATURE ~ DATE· /Z-IS-97
PSI-B-900·170(1)
REPORT OF CONCRETE COMPRESSION· TEST
TESTED FOR: MR. DAVID CATTLE
LEGOLAND ESTATES INC
5600 AVENIDA ENCINAS
SUITE 130
PROJECT: LEGOLAND THEME PARK
CARLSBAD, CALIFORNIA
CARLSBAD, CA ~2008
DATE: March 12, 1998
REVISION #1
OUR REPORT NO.: ·05·9-70202-356
FIELD DATA:
LOCATION OF PLACEMENT SLAB-ON-GRADE @ SOUTHWEST SIDE @ GARDENER'S SHED
PERMIT# 97-2126
DATE PLACED
TIME
SLUMP, IN.
AIR CONTENT, %
March 03, 1998
10:00 am
4 1/2
AIR TEMPERATURE, °F 60
CONCRETE TEMPERATURE, °F 67
DATE RECEIVED IN LAB March 04, 1998
FIELD DATA SUBMITTED BY PSI\CARLOS HERNANDEZ
MIX DATA SUBMITTED BY NELSON & SLOAN
SUPPLIER
DELIVERY TICKET NO./TRUGK NO.
MIX NUMBER A_ND PROPORTIONS
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
NOTE· APPLICABLE.Ali'.[lli;IANP.ABC!S UNLESS OTHEBWJSE INDICATED· SLUMP· C143-90a· AIR CONTENT' c2a1,91b· TEMPERATUBE· C1064-86193)· CAPPING:
COMPRESSION TEST RESULTS
ASTMC39-94
NELSON & SLOAN
681568
522
SPECIMEN TEST TOTAL CYLINDER CYLINDER COMPRESSIVE LABORATORY IDENTIFICATION AGE DATE OF LOAD DIAMETER AREA NUMBER OR SET NO. (DAYS) TEST (LBS:) (IN.) (SQ.IN:)
16474 A 7 03/1.0/98 60000 6.00 28.27
16474 B 28 03/3i/98 110000 6.00 28.27
16474 C 28 03/31/98 107000 6.00 28.27
16474 D
SPECIFICATIONS 28
REMARKS: ~ Cylinders made by PSI representative.
Cylinders picked up by PSI X represent~tive.
Cylinders made by Architect's or
Contracto~s representative. Cylinders delivered to PSI laboratory.
ALL CYLINDERS CAPPED IN ACCORDANCE WITH ASTM C617-94.
TECHNICIAN: CARLOS HERNANDEZ
cc: LEGOLAND (4), BERNARD BROTHERS, H.O.K., CITY OF CARLSBAD
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE·ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PE_RMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC.
PSI A-200·4 (4)F
STRENGTH
(PSI)
2120
3890
3780
3000
TYPE OF BREAK
Cone
Cone
Cone
Respectfully submitted,
5:::;_ervice Industries, Inc.
DAVID J.
1 !_-RT
DISTRICT~GER
Information To Build On
Professional Service Industries, Inc.• 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR: MR. DAVID CATTLE
LEGOLAND ESTATES INC
5600 AVENiDA ENCINAS
SUITE 130
.PROJECT: LEGOLAND THEME PARK
CARLSBAD, CALIFORNIA
CARLSBAD, CA 92008
DATE: March 12, . 1998
REVISION #1
OUR REPORT NO.: 059-70202-355
FIELD DATA:
LOCATION OF PLACEMENT SLAB-ON-GRADE @ EAST 'SIDE @ GARDENER I S SHED
PERMIT# 97-2126
DATE PLACED
TIME
SLUMP, IN.
AIR CONTENT, %
AIR TEMPERATURE, °F
CONCRETE TEMPERATURE, °F
March 03, 1998
09:05 am
3 1/'4
60
DATE RECEIVED IN LAB March 04, 1998
FIELD DATA SUBMITTED.BY PSI\CARLOS HERNANDEZ
MIX DATA SUBMITTED BY NELSON & SLOAN
SUPPLIER
DELIVERY TIQKET NO./TRUCK NO.
MIX.NUMBER AND PROPORTIONS
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
NQIE:..!,EJ:LICA6LE ASTM STAND.A8lls.\!Nl.ES.S..O.lliE™SEJNDJCAJE!): SLUMP· C143-9Da· AIR CONTENT· C23J-9W TEMPERATURE· C1064-86(93l;J;APPJN.G.:laz.llii.
COMPRESSION TEST RESULTS
ASTM C39·94
.NELSON & SLOAN
681515
522
SPECIMEN TEST TOTAL CYLINDER CYLINDER COMPRESSIVE LABORATORY IDENTIFICATION AGE DATE OF LOAD DIAMETER AREA· NUMBER OR SET NO. (DAYS) TEST (tBS.) (IN.) (SQ.IN.)
16473 A 7 03/10/98 57000 6.00 28.27
16473 B 28 03/;31/98 94000 6.00 ~8.27
16473 C 28 _03/31/98 93000 6.bo 28.27
16473 D
SPECIFICATIONS 28
REMARKS: X Cylinders made by PSI representative. Cylinders picked up by PSI X representative.
Cylinders made by Architect's or
Conlracto(s representative. Cylinders !Jelivered to PSI laboratory.
7-DAY BREAK BELOW 70% SPECIFICATION REQUIREMENT
CAP 280DAY BREAKS
TECHNICIAN: CARLOS HERNANDEZ
cc: LEGOLAND (4), BERNARD BROTHERS, H.O.K., CITY OF CARLSBAD
THESE TEST RES UL TS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT·BE INDICATIVE OF THE ENTIRE' CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC,
PSI A-200•4 (4)F
STRENGTH (PSI) TYPE OF BREAK
2020 Cone
3330 Cone
3290 Cone
3.000
Respectfully submitted,
~"ona/Se~ic~c.
DAVID J:. YAN, Ref
DIS TRI MANAGER
Information To Build On
Professional Service Industries, Inc.• 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR: MR. DAVID CATTLE
LEGOLAND ESTATES INC
5600 AVENIDA ENCINAS
SUITE 130
PROJECT: LEGOLAND THEME PARK
CARLSBAD, CALIFORNIA
CARLSBAD, CA ~2008
DATE: March 12, i998 OUR REPORT NO.: 059-70202-356
FIELD DATA:
LOCATION OF PLACEMENT SLAB-ON-GRADE @ SOUTHWEST SIDE @ GARDENER'S SHED
PERMIT # 97--2126
DATE PLACED
TIME
SLUMP, IN.
AIR CONTENT, %
AIR TEMPERATURE, °F
CONCRETE TEMPERATURE, °F
DATE RECEIVED IN LAB
FIELD DATA SUBMITTED BY
MIX DATA SUBMITTED BY
March 03, 1998
10:00 am
4 1/2
60
67
. March 04, :1:998
PSI\CARLOS HERNANDEi
NELSON & SLOAN
SUPPLIER
DELIVERY TICKE:T NO.rrRUCK NO.
MIX Nl.JMBE:R AND PROPORTIONS
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
-AOMD<TURE
NP.IE;.APJ'.LLCA61.E.MIMrnDAB.®.!JN!.E.S.ll..Qil!IIBl'VISE INPICATED~~&Qa:.AIB..CPNTENI· C231-91b-TEMPERATURE· C)064-86(93}· CAPPING· C1231-93
COMPRESSION TEST RESULTS
ASTM.C39-94
SPECIMEN TEST TOTAL CYLINDER CYLINDER COMPRESSIVE
LABORATORY IDENTIFICATION AGE DATE.OF LOAD-DIAMETER AREA STRENGTH NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (SO. IN,) (PSI)
16474 A 7 03/10/98 60000 6.00 28.27 2120
16474 B 28 03/31/98
16474 C 28 03/31/98
16474 D
SPECIFICATIONS
28 3000 ..
NELSON & SLOAN
681568
522
TYPE OF BREAK
Cone
REMARKS: X Cylinders made by PSI representative.
Cylinders picked up by PSI X represe_ntative:
test results-comply with applicable specifications.
Cylinders made by Architect's or
Contractors representative.
Test results do not comply with
Cylinders delivered to PSI laboratory. .applicable specifications. -
ALL CYLINDERS CAPPED IN ACCORDANCE WITH ASTM C617-94.
TECHNICIAN: CARLOS HERNANDEZ
cc: LEGOLAND (4), BERNARD BROTHERS, H.O·.K., CITY OF CARLSBAD
THESE TEST RES UL TS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE·INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROF-ESSIONAL SERVICE INDUSTRIES,.INC. -
PSI A-200-4 (4)F Information To Build On
Professional Service Industries, Inc. • 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
REPORT OF DAiLY BUILT-UP ROOFING INSPECTION
OWNER: Lego Land Estates, Inc.
GENERAL CONTRACTOR: Bernards Brothers Construction
SUPERINTENDENT'S NAME: Chuck.Schneider
ROOFING CONTRACTOR: Hayden Roofing Company
PROJECT: Lego Family Park USA
Cannon Road, Carlsbad, CA
DATE: February 28, 19?8, Saturday REPORT NO: 059-70202, 219-77044 (13)
~~
Areas worked: Gardener's Shed
--------------------,---,---.-----· % Roof Compieted:_-_--'-3 ..... 3=% ____ _
Weather: sunny and clear Temperature: 55 °P to 70 °P
Roofing foreman: Bill Sellon Crew Size: 5 Time Worked: · _ 6:30 AM to 1 :30 PM
Cant Size: 2" Type of Drain: Smith Cricket size/slope.: 1/2" per foot
Deck Type: plywood Clean: yes Dry: yes. .Slope: 1/4" per foot
Material Protection: On pallets? yes Covered? yes . Labeled? yes Dry? __ y'""e=s __ _
Base Ply: GS Glasbase Base Sheet, #25 Attachment: Senco Staples & tape or 1" sq. head nails
Spacing: 12" O.C. two rolls center of sheet 9-" O.C. on laps _ .
Roof Ply Type: Flintglas Type IV and GMS Roll Roofing Specification No: GMS~2-3-III Modified
Number of Piles: Three · Application Method:--=s=-o=lid=-=h=ot"-'m=· =oli=--p--'----'-----
Surfacing: Type: none today Etnbedment: __ _
Flashing Type: Flintlastic GMS/fl Modified Asphalt _ Spec.#. ==M=B=F=---------
Attachment Method: solid hot mop. . Fastener:_---'-~------Spacing: Bitumen:
Type: ill Bulk shipment or carton? carton _
(EVT °F) Kettle Temp: 9:30 a.m. _ 440 °F 11:30 p.m. 500 °F 1:00 p.m. 500 °F
Rooftop Temp.: ___ a.m. °F .p.m. ---'-----'-'--°F ___ p.m. __ °F
Edge Metal Type: -=n/=-=a-------'------'--------,-------,.-'---Gauge: ____ _
Counter Flashing: Type:~n/~a~~------~----,--~--Gauge: _____ _
Night Seal: ___,h=o=t-=a::,ispa=h=al=t-----'-~------------------,-'----------
Debris Removed: yes Penetrations Sealed:_y.,_e=s~ __ Test Cut: -=n=o ______ _
COMMENTS:
1. Installed 3" cant strip at base of wall fastened to plywood deck with #8 nails, 12" O.C
2. Covered metal seismic strap with one ply of modified. ·
3. Installed one ply of GS Glasbase 25# base sheet over plywood deck fastened with 1" square head nails. Two rolls 18" O.C. and 9"
O.C. on laps. Mastic at drains. ·
4. Solid hot mop one ply of Plintglas Type IV over attached base sheet with hand mops and felt machine.
5. Primed block wall, 4 lead pipe jacks and one vent.
6. Solid hot mop one ply of Poly base ~heet around pipes, drains, and vents.
7. Set four pipe jacks and one vent in mastic over poly base sheet.
PSI INSPECTOR: Bill Davis
Professional Service Industries, Inc., 350 S. Maple, Unit K, Corona, CA 91720, (909) 272-4230
.. ...... • r ...
~:;
/
_;:,.,o .... :--,' -· ·-.-;')."'..-
~ ~ ....(
t-)
i ~ 1 ~
I' ...
-'i •.
,-,~.:,•·
~
()--...
I ..._
\
fl)
-1.
-·t
. ,, . ~ .. -;._.--.
.•. ·1
:-t I 'r:· .. ·
:.· 2 -.:-~ .. :
--,;_7 ·I, ~-
•;. . ----.. -.. --~~~f\
\::;~;,;.;,;;~--;:-:-··· '~,: ,. ., . .: ~---:-.·
~--.J.
;_
r
.--H --·-_,,..:.'$
-~.~~'.'~:f"it~x~:·::.-,: -~: --J
:~;v. __
' .-.. .-1.t
--·~-.-
'j. \,
R~PORT OF GROUT -PRISM COMPRESSION TEST
TESTED FOR: Legoland Estates, Inc.
5600 Avenida Encinas, Suite 130
Carlsbad, CA 92008
Attn: David Cattle
PROJECT: Legoland Theme Park
Carlsbad,. California
Permit # 97-2126
DATE: 23-Feb-98 REPORT NO.: 059-70202-235
LOCATION OF POUR:
FIELD DATA
LAST LIFT OF CMU WALLS AT GARDENERS SHED
DATE POURED:
TIME
SLUMP, IN.
AIR TEMPERATURE, F
CONCRETE TEMPERATURE, F
DATE RECEIVED IN LAB
FIELD DATA SUBMITTED BY
MIX DATA SUBMITTED BY
LAB CYLINDER
No. NO.:
16269 A
16269 B
16269 C
SPECIFICATIONS
REMARKS:
TEST
AGE
(DAYS)
7
28
28
28
22-Jar\-98
12:25 PM
8"
68
?3-Jan-98'
PSI/CARLOS HERNANDEZ
SUPPLIER
COMPRESSION TEST RESULTS
(UBC STANDARD-21-18)
DATE OF TOTAL SAMPLE
TEST LOAD DIMENSiON
(L(?S) .. (IN.)
29-Jan-98 190Q0 3X3X6
19-Feb-98 30100 3X3X6
19-Feb-98. 28600 3X3X6
cc: 1 -City of Carlsbad / Pat Kelley
1 -Bernards Brothers Construction / Alex Young
1 -H.O.K. / Chris Rooney
4 -LegoLand
SAMPLE
AREA
(SQ.IN.)
9
SUPPLIER
DELIVERY TICKET NO.
MIX# & PROPORTIONS
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
COMPRESSIVE
STRENGTH
(PSI)
2110
PALOMAR TRANSIT MIX
799688/553
386201
OBSERVATIONS
Samples made by PSI representative
Samples made by Others
9. 3340,
[K]
D
~
D
~
D
Samples picked up by PSI Representative
9 3180
·2000
Samples delivered to PSI laboratory
Test results comp_ly with applicable
specifications.
Test results do not comply with applicable
specifications.
TYPE OF FRACTURE, IF OTHER
Respectfully submitted, ~=r1n~u'f-
Jnformation To Build On
Professional Service Industries, Inc. • 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
REPORT OF GROUT PRISM COMPRESSION TEST
TESTED FOR: Legoland Estates, Inc.
5600 Avenida Encinas, SL11te· 130
Carlsbad, CA 9200~
Attn: David Cattle
PROJECT: Legoland Theme-Park
Carlsbad, CaJifornia
Permit# 97-2126
DATE: 13-Feb-98 REPORT NO.: 059-70202_;_207
LOCATION OF POUR:
FIELD DATA
THIRD LIFT OF CMU WALL AT GARDENER'S SHED
DATE POURED:
TIME
SLUMP, IN.
AIR TEMPERATURE, F
CONCRETE TEMPERATURE, F
DATE RECEIVED IN LAB
FIELD DATA SUBMITTED BY
MIX DATA SUBMITTED BY
LAB CYLINDER
No. NO.:
16230 A
16230 B
16230 C
SPECIFICATIONS
REMARKS:
TEST
AGE
(DAYS)
7
28
28
28
15-,-Jan-98
12:05.PM
8"
· 19-Jan-98
PSI/CARLOS HERNANDEZ
SUPPLIER
COMPRESSION TEST RESULTS
{UBC STANDARD' 21-18)
DATE OF TOTAL SAMPLE
TEST LOAD DIMENS,1O1\
(LBS) (IN.)
22-Jan-98 24000 3X3X6
12-Feb-98 35500 3X3X6
12-Feb-98 32600 3X3X6
cc: 1 -City of Carlsbad / Pat Kelley
1 -Bernards Brothers Construction / Alex Young
1 -_H.O.K. / Chris Rooney·
4 -Legoland
SAMPLE
AREA
(SQ.IN.)
10.23
9.92
10.23
SUPPl,.IER
DELIVERY TICKET NO.
MIX# &.PROPORTIONS
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
COMPRESSIVE
STRENGTH
'{PSI)
2350
3580
3190
2000
00
D
~
D
[]]
D
PALOMAR TRANSIT MIX
798446/61
386201
OBSERVATIONS
Samples made by PSI representative
Samples made·by Others
Samples picked up by PSI Representative
Samples delivered to PSI laboratory
Test results comply with applicable
specifications.
Test results do not comply with applicable
specifications.
TYPE OF FRACTURE, IF OTHER
THAN CONICAL ____ _
CONF
Respectfully submitted,
Professional Service Industries, Inc. &~.y
Information To Build On
MS
Professional s·ervice Industries, Inc. • 6867 Nancy Ridge Drive, Suite· E • San Diego, CA 92121-• Phone 619/455-0544 • Fax 619/455-1170
REPORT OF MORTAR COMPRESSION TEST
TESTED FOR: Legoland Estates, Inc.
DATE:
5600 Avenida Encinas, Suite 130
Carlsbad, CA 92008
Attn: David Cattle
13-Feb-98
PROJECT, Legoland Theme Park
Carlsbad, California
Permit# 97-'-2126
REPORT NO.: 059-70202-206
FIELD DATA
LOCATION OF POUR: LAST LIFT OF CMU WALLS ON GARDENER'S SHED AT SOUTH SIDE
DATE POURED:
TIME
SLUMP, IN.
AIR TEMPERATURE, F
CONCRETE TEMPERATURE, F
DATE RECEIVED IN LAB
FIELD DATA SUBMITTED BY
MIX DATA SUBMITTED BY
LAB CYLINDER
No. NO.:
16228 A
16228 B
16228 C
SPECIFICATIONS
REMARKS:
TEST
AGE
(DAYS)
7
28
28
28
15-Jan-98
2:00PM
19-Jan-98
PSI/CARLOS HERNANDEZ
SUPPLIER
COMPRESSION TEST RESULT$
DATE OF TOTAL SAMPLE
TEST LOAD DIMENSION
(LBS) (I_N.)
22-Jan-98 7820 2X4
12-Fel;>-98 13200 2X4
12~Feb-98 13400 2X4
cc: 1-City of Carlsbad /-.Pat Kelley
1 -Bernards Brothers· Construction / Alex :Young
1 -H.O.K. / Chris Rooney
4 -Legoland
SAMPLE
AREA
(SO.IN.)
'3.14
3.14
3.14
. .
SUP.PLIER JOB-SITE MIXED
DELIVERY TICKET NO.
MIX# & PROPORTIONS TYPE •s•
CEMENT
WATER
FINE AGGREGATE
COARSE AG.GREGATE
ADMIXTURE
COMPRESSIVE
STRENGTH
(PSI)
2490
4200
4270
1800
CR]
D
[!]
D
~
D
OBSERVATIONS
Samples made by PSI representative
Samples made by Others
Samples picked up by PSI Representative
Samples delivered to PSI laboratory
Test results comply with applicable
specifications.
Test results do not comply with applicable
specifications .
TYPE OF FRACTURE, IF OTHER
THAN CONICAL ____ _
CO FO MS
Respectfully submitted, ll:::7j~us~
Information To Build On
Professional Service Industries, Inc. • 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
l -., Environme!1fal • Geotechn,cal
"Construction
Consulting • Engineering • Testing
REPORT OF MORTAR COMPRESSION TEST
TESTED FOR: Legoland Estates, Inc.
5600 Avenida Encinas, Suite 130
Carlsbad, CA 92008
Attn: David Cattle
PROJECT: Legoland Theme Park
Carlsbad, California
pERMIT # 97-2126
DATE: 15-Jan-98 REPORT NO.: 059-70202-143
LOCATION OF POUR:
Fll;LD DATA
FIRST LIFT OF CMU WALLS @ 1.5-D GARDENER'S SHED
DATE POURED:
TIME
SLUMP, IN.
AIR TEMPERATURE, F
CONCRETE TEMPERATURE, F
DATE RECEIVED IN LAB
FIELD DATA SUBMITTED BY
MIX DATA SUBMITTED BY
15-Dec-97
1:30 PM
17-Dec-97
PSI/CARLOS HERNANDEZ
SUPPLIER
COMPRESSION TEST RESUL T-S
LAB CYLINDER TEST DATE OF TOTAL SAMPLE
No. NO.: AG(= TEST LOAD DIMENSIO~
(DAYS). (LBS) (l('I.)
16017 A 7 22-Dec-97 6940 2X4
16017 B 28 1'2-'-Jan-98 11300 2X4
16017 C 28 12-"'-Jan-98 9800 2X4
SPECIFICATIONS 28
REMARKS:
cc: 1 -City of Carlsbad f Pat Kelley
1 -Bernards Brothers Con.str.uction / Alex Young
1 -H.O.K. / Chris Rooney
4 -Legoland
SAMPLE
AREA
(SQ.IN.)
3.14
3.14
3.14
SUPPLIER JOB-SITE MIXED
DELIVERY TICKET NO.
MIX# & PROPORTIONS TYPE •s•
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
C<;)MPRESSIVE
STRENGTH
(PS.I)
2210
3600
3120
1800
[Kl
D
CK]
D
~
D
OBSERVATIONS
Samples made by PSI representative
Samples made by Others
Samples picked up by PSI Representative
Samples delivered to PSI laboratory
Test results comply with applicable
specifications.
Test results do not comply with applicable
specifications.
TYPE OF FRACTURE, IF OTHER
THAN CONICAL ____ _
~ EQRMS
~::::;]~us~
_ . Inf ~ation r&uild On
Professional Service Industries, Inc. • 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
MAR 03 '98 10:53 FR PSI CORONA-CA 909 272 4271 TO SAN DIEGO P.02/02
REPORT OF DA.11..Y BUlLT-UP ROOFING INSPECTION
OWNER: Lego Land Estates, Inc. PROJECT: Lego Family Park USA
Cannon Road. Carlsbad, CA
GENERAL CONTRACTOR: Bernards .Brothers Construction
SUPERINTENDENT!S NAME: Chuck Schneid~
ROOFING CONTRACTOR: Hayden Roofing Comp_any
DATE: February 28, 1998, Sarurday REPORT NO: 059-70202-. 219-77044 (13) -3c0~
Areas worked: Gardener's Shed
___________________ ....,.. ....... ....,. ____ %.Project Completed:. _____ _
W cather: sunny and clear· ·· Temperature: $5 "F to 70 up
Roofing foreillilll: Bill Scllon Crew Size: 5 Time Worked: 6:30 AM. to 1:30 PM
Cant Size: 2" Type of Drain: Smith . Cricket size/slope: 1/2" per foot
Deck Type: plywood Clean: yes Dry: . yes Slope: 1/4" per foot
Material Protection: on·pallets?-yes . Covered?. yes · Labeled'? yes .Dry?_.y __ es __ _
Base Ply: GS Glasbase Base Sheet. #25 Attachment: Senco Stap1es & t.ape or 1" sq. head nails
Spacing: 12" O.C. two rolls center of sheet 9" O.C. on laps ·
Roof Ply Type: Flintglas Type IV and GMS Roll Roofin~ Specification No: GMS-2-3-ill Modified
Number of Piles: Three Application Method:_· -=s:.:o..,.li=-d.:.ahc,,.Ot"'-'m=ok!-p____,. ____ _
Surfacing: . Type:-=n=one=-t=oda=-'y __ . ________________ _::Embedment: __ _
Flashing Type:Flintlastic GMS/fl Modified Asphalt Spec.#.:MBF
Attachment Method: solid.hot mop. · Fastener: Spacing:-'----
Bitumen: Type: III · Bulk shipment or carton? ______ c ___ ar=-r ___ o=n ___ _
(EVT "F) Kettle Temp:. 9:30 a,m. 440 °F 11:30 p.m. 500 °F 1:00 p.m. 500 "F
Rooftop Temp.: ___ a.m. '~f p.m. _____ °F ___ p.m. __ 11F
Edge Metal Type: -=n/=-a-----------------Gauge: _____ _
Counter Flashing: Type:--a.::n/,..,a"--,-________________ Gauge: _____ _
Night Seal: hot asphalt ..
Debris Removed: yes Penetrations Sealed: _,._ye=s'---__ Test Cut: -=n .... o ____ . _____ _
COMMENTS:
1. Installed 3" cant strip at base of wall fastened to plywood deck·with #8 nails, 12" O.C.
2. Covered metal seismic strap with one ply of modified.
3. Installed one ply of GS Glasbase 25# base sheet over plywood deck fastened with I" square head nails. Two rolls 18" O.C. and 9"
O.C. on laps. Mastic at drains.
4. Solid hot mop one ply of Flintglas Type IV over attach~ base sheet with hand mops and felt machine.
5. Primed block wall, 4 pipe ledjacks and one vent.
PSI INSPECTOR: Bill Davis
Professional Service lnd1mries, Inc., 3SO S. Msplc, Uni! K, Curon:i, CA 91720, (909) 272-4230
** TOTAL PAGE.02 **
REPORT OF CONCR!=TE COMPRESSION TEST
TESTED FOR:
DATE:
FIELD DATA:
MR. DAVID CATTLE
LEGOLAND ESTATES INC
5600 AVENIDA ENCINAS
SUITE 130
CARLSBAD, CA 92008
November 03-, .1997
.PROJECT: LEGOLAND THEME PARK
CARLSBAD, CALIFORNIA
REVISION #1
OUR REPORT NO.: 059-70202-56
LOCATION OF PLACEMENT FOOTING @ NORTH WALL GARDNERS SHED
DATE PLACED
TIME
SLUMP, IN.
AIR CONTENT, %
AIR TEMPERATURE, °F
October 23, 1997
07:35 a,m
4
70
CONCRETE TEMPERATURE, °F 81
DATE RECEIVED IN LAB October 24, 1997 ·
FIELD DATA SUBMITTED BY PSI\DORRELL DUQUETTE
MIX DATA SUBMITTED BY SUPPLIER
SUPPLIER
DELIVE::RY TICKET NO./TRUCK NO.
MIX NUMBER AND PROPORTIONS
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
NELSON & SLOAN
606004
593/ 3000 psi
TYPE II
10 GAL
tlQIE:.AeeLICABLE ASTM STAtlPABPS UNLESS OTHERWISE INDICATED· sujMp· i;143:9oa· AIR COtlTENJ:• C231-111 b· TEMPERATURE· Cj064-B6(93)
LABORATORY NUMBER
15629
15629
15629
15629
SPECIFICATIONS
REMARKS:
COMPRESSION TEST RESULTS
ASTMC39-94
SPECIMEN TEST IDENTIFICATION AGE DATE OF OR SET NO. (DAYS) TEST
A 7 10/30/97
B 28 11/20/97
C 28 11/20/97
D
28
X Cylinders made by PSI representative.
Cylinders made by Architect's or· Con!rec!o(s representative.
TOTAL CYLINDER LOAD DIAMETER (LBS.) {IN.)
66000 6.00
100000 6.00
98000 6.00
. Cylinders picked up by PSI X represen\ative.
Cylinders delivered lo PSI laboratory.
TECHNICIAN: DORRELL DUQUETTE
CYLINDER COMPRESSIVE AREA STRENGTH (SQ.IN.) (PSI) TYPE OF BREAK
28.27 2330 Cone
48.27 3540 Cone
28.27 3470 Cone
3000
x Test results comply with applicable
specifications.
Tes! results do not comply with
applicatile specifications. s
coNfORM
Respectfully submitted,
cc: LEGOLAND (4), BERNARD BROTHERS, H.O.K., ·CITY OF CARLSBAD
~ro~essiQnal Service Industries, Inc.
J~(I-C,-
THESE TEST RESULTS APPLY ONLY TO·THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF -THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE RE~RODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERM)SSION BY PROFESSIONAL SERVICE IND.USTRIES, INC.
PSIA-200-4(4)F
DAVID J:. RYAN,
DIST T MANAG
Information To Build On
Professional Service Industries, Inc. • 6867 Nancy Ridge Drive, Suite E • San Diego, CA 9212:1 • Phone 619/455-0544 • Fax 619/455-1170
REPORT OF DAILY 1,lUILT-UP ROOFING INSPECTION
OWNER: Lego Land Estates, Inc. PROJECT: Lego Family Park USA
Cannon Road, Carlsbad, CA
GENERAL CONTRACTOR: Bernards Brothers Construction
SUPERINTENDENT'S NAME: Chuc;k Schrteidet
ROOFING CONTRACTOR: Hayden Roofing Company
DATE: March 4, 1998, Wednesday REPORT NO: 059-70202 , 219-77044 (15)
--1;3
Areas worked: Gardener's Shed. Maintenance building
-----------'--'-----------,----,----~----% 'Roof Completed:. ______ _
Weather: cloudy to partly sunny . Temperature: 50 °F to
Roofing foreman: Bill Sellon .Crew-Size: 5 . Time Worked': 6:30 AM to 5:00 PM
65 °F
Cant Size: 2" Type of Drain: Smith ·. Cricket size/slope: 1/2" per foot
Deck Type: plywood Clean: yes Dry: yes. Slope, 1/4!lper foot
Material Protection: On pallets? . yes Covered? yes Labeled? . yes Dry? -Y~e~s __ _
Base Ply: GS Glasbase Base Sheet. #25 . Attachment: l" sq. head nails -
Spacing: 18" O.C. two rolls center of sheet 911 O.C. on laps
Roof Ply Type: Flintglas Type IV and GMS Roll Roofing . Specification No: GMS-2-3-ill Modified
Number of Piles: Tpree Application Method:_s_o=lid=h=ot'e-'. m=op.....,_ _____ _
Surfacing: Type: Brubaker.;Mann (green) Embedment: solid ·hot
Flashing Type: . Flintlastic GMS/fl Modified Asphalt Spec.#.:=M=B ____ F __________ _
Attachment Method: solid hot mop ·. Fastener=--~--Spacing: · Bitumen:
Type: m Bulk shipment or carton? . . carton
(EVT °F) Kettle Temp: 8:00 a.m. 490 °F 10:00 p.m. 500 °P 1:00 p.m. 490 °P
R ft T op ____ op ---p.m. __ op oo op emp.: a.m. . . ____ p.m.
Edge Metal Type: -=·n/==a-------,----------,------------Gauge: ______ _
Counter Flashing: Type:--=n/:..:::a=---------------'-'-'--------'---Gauge: _____ _
Night Seal: hot asphalt ..
Debris Removed: yes Penetrations Sealed:_y..,...e-s ___ Test Cut: ~-~n_o-_____ _
COMMENTS:
1. Sealed all inside comers, pipe penetrations, and vent wiQi Henry 905 Flashmaster Modified Mastic.
2. Flood coat roof surface with hot asphalt using felt machine and .pouring cans artd embeded gravel into asphalt while it is still hot using
gravel spreader and shovels.
3. Gardener's Shed 100% covered with gravel, 30 squares complete.
Maintenance Building 60% covered with gravel, 100 squares complete.
No mastic work done on Maintenance Building.
PSI INSPECTOR: Bill Davis
Professional Service Industries, Inc., 350 S. Maple, Unit K, Corona, CA 91720, (909) 272-4230
REPORT OF DAILY BUILT-OP ROOFING INSPECTION
OWNER: Lego Land Estates, Inc.
GENERAL CONTRACTOR: Bernards Brothers Construction
SUPERINTENDENT'S NAME: Chuck Schneider
ROOFING CONTRACTOR: Hayden Roofing Company
DATE: March 3, 1998, Tuesday
Areas worked: Gardener's Shed
PROJECT:
REPORT NO:
Lego Family Park USA
Cannon Road, Carisbad, CA
059-70202. 219-77044 (14A)
-11211
--------------'-------------% Roof Completed:.,.-_____ _
Weather: cloudy Temperature: 55 °F to 70 °F
Roofing foreman: Bill s.ellon Crew Size: 5 Time Worked: 6:30 AM to 3:00 PM
Cant Size: 2" Type of Drain: Smith Cricket size/slope: 1/2" per foot
Deck Type: plywood Clean: yes Dry: yes Slope; .1/4" per foot
Material Protection: On pallets? yes Covered? yes Labeled? yes Pry? _y_e~s __ _
Base Ply: GS Glasbase Base Sheet. ·#25 Attachment: l" sq. head nails
Spacing: 18". O.C. two rolls center of sheet 911 O.C. on laps _
Roof Ply Type: Flintglas Type IV and GMS Roll Roofing Specification No: GMS-2-3-III Modified
Number of Piles: Three Application Method:--"s=o=lid=h=ot"'"'m=·=op ______ _
Surfacing: Type: none today Embecb.nent:_--
Flashing Type: Flintlastic GMS/fl Modified Asphalt Spec.#.==M=B=F=----------
Attachment Method: solid hot mop· . Fastener:. Spacing: Bitumen:
Type: III :Sulk Bhipment or carton? carton
(EVT °F) Kettle Temp: 9:00 a.m. 500 . °F 11:00 . p.m. 510. °F 1:00 p.m. 510 °F
RooftopTemp.:.. a.m. °F _.__ ___ p .. m. ____ °F ___ p.m. __ °F
Edge Metal Type: """'n/=-=a-----------+----'----------'--Gauge: _____ _
Counter Flashing: Type:-::n/::.::a:;__ __ ---'------~-------Gauge: _____ _
Night Seal: -----'h=o""""t"""'a=-sp.,__h=a=lt'-----'---,------'--'-----,---'--------~----------
Debris Removed: yes Penetrations Sealed: _y_._e~s~ __ Test·Cut: --=n=o---'------
COMMENTS:
1. Primed drain lead and 4 pipe lead ·and4 lead pipe fl11Shings ·with asphalt primer and set lead in a bed of mastic over poly base sheet.
2. Solid hot mop one ply of Flintlastic GMS modified over one ply of Flintglas Type IV with hand mop and Felft machine.
3. Solid hot mop one ply of Flintlastic G.M.S. Modified over primed block walls and wood nailer. Nailed top of wall with 1" square
head nails 8" on center.
4. Installed drain and overflow clamp rings, two each, tighten down with follr bolts each ring.
PSI INSPECTOR: Bill Davis
Professional Service Industries, Inc., 350. S. Maple, Unit K, Corona, CA .91720, (909) 272-4230
.(
-, . :i
' . -.() ----·----: I -~.::-.:--~ :0 .t ·
-·~
t
t
;•
-r ----·
·--~---
~----
.:.. ________ t •
. ' ~~ '?!-;·: ---r . -:: r
'. . :1 .. ., ----· --·· ',0 . l ----..
j~.~Vt?t~-~-+~i;i:i-::j;<:t·:! i"\ !-: .
V\ t