HomeMy WebLinkAbout1 LEGOLAND DR; CASTLE HILL; CB980241; Permitveie,a~o{p
l:Ji/29/98 09: 04. ·.
Page ·1 -of 1 .
B U ::t L D I N G P-ERMIT J?ermit No-: CB9B0241
Project. No: ,l:\98.00313
· Development No:
Job Address: 1·LEGO DR
l?ermit·Type: COMMER<::IAL BUILDING
Suite:
Parcel No: · Lot#:
Valuation-: · 674,717
Occ;upancy G;r:oup.:
pe.scription-: "CASTLE' ffILL"
: .. 5,092 SF PLAN
Reference#:
CASTLE INN .
CH.ECK C:,f,(!12» ~
Appl/Owp.r _: ADACHI, KYOKO
1655 26TH STREET #200
SANTA MONICA, CA,. 9-0404
31.0
Stafi~T:
Appl:ied:·
Apr /I s.s.u.e:
. Entered By:
453~0100 .
*·** Fe~s Retjuired *** *** Fees Collected & Credits
IS SlmB0. 36
01/28/98
01/29/98'.
MPP
***· ---------~ ---.--·--. ----------------------------------------------
I F1N~APPROVAL I
l:NSP.~-·---. DATE ~fi ·f:L.
CLEARA~~CE _ _.,.... ____ _
CITY OF CARLSBAD
. 2075 Las Pal.mas Dr., Carl~bad, CA 92009· (619) 438-1161 · . . -" . .
Inspection List
Permit#: CB980241 Type: COM CASTLE HILL CASTL,E INN
5,092 SF PLAN CHECK
Date Inspection Item Inspector ,Act. Comments
2/22/99 19 Final Structural RI
2/22/99 29 Final Plumbing RI
2/22/99 39 Final Electrical RI
2/22/99 49 Final Mechanical RI
2/22/99 89 Final Combo · PD co
2/22/99 89 Final Combo RI
2/16/99 19 Final Structural RI
2/16/99 29 Final Plumt;>ing RI
2/16/99 39 Final Electrical RJ
2/16/99 49 Final Mechanical RI.
2/16/99 89 Final Combo RI
2/16/99 89 Final Combo PD NR
1/29/99 19 Final Structural RI
1/29/99 29 Final Plumbing RI
1/29/99 39 Final Electrical RI
1/29/99 49 Final MeGhanicar RI
1/29/99 89 Final Combo PD PA
1/29/99 89 Final Combo RI
1/28/99 19 Final Structural RI
1/28/99 29 Final Plumbing· RI·.
1/28/99 39 Final El.ectric;:il RI.
1/28/99 49 Final Mechanical RI
1/28/99 89 Final Combo PD NR
1/28/99 89 Final Combo RI
1/15/99 19 Final Structural RI
1/15/99 29 Final Plumbing RI
1/15/99 39 Final Electrical RI
1/15/99 49 Final Mechanical RI
1/15/99 84 Rough Combo PD AP
1/15/99 89 Final Combo RI
1/15/99 89 Final Combo PD WC
1/14/99 84 Rough Combo PD co
1/13/99 14 Frame/Steel/Bolting/Weldin RI
1/13/99 24 Roughfropout RI
1/13/99 34 Rough Electric RI
1/13/99 44 Rough/Ducts/Dampers RI
1/13/99 84 Rough Combo RI
1/11/99 34 Rough Electric PD PA
1/11/99 34 Rough Electric RI
12/31/98 34 Rough Electric PD PA
10/26/98 17 Interior Lath/DryWall PD AP
10/21/98 17 Interior Lath/Drywall PD AP PUBLIC TOILETS
10/20/98 17 Interior Lath/Drywall PD NS
10/7/98 14 Frame/Steel/Bolting/Weldin PD AP WALLS
Monday, May 17, 1999 Page 1 of2
10/7/98 24 Roughffopout PD AP WALLS
10/7/98 34 Rough Electric PD AP WALLS
10/7/98 44 Rough/Ducts/Dampers PD NR
1017/98 84 Rough Combo PB NS
8/28/98 24 Roughffopout DH AP
8/28/98 34 Rough Electric DH WC
8/26/98 17 Interior Lath/Drywall DH AP EXCEPT ABOVE TRASH ENC
8/24/98 18 Exterior Lath/Drywall DH NR
8/18/98 17 Interior Lath/Drywall RP PA
8/14/98 15 Roof/Reroof PD PA
8/13/98 11 Ftg/Foundation/Piers PD WC
8/13/98 18 Exterior Lath/Drywall PD PA PARTIAL
8/11/98 14 Frame/Steel/Bolting/Weldin PD co
8/11/98 15 Roof/Reroof PD co
7/31/98 17 Interior Lath/Drywall PD PA EXT DRYWALL
7/28/98 14 Frame/Steel/Bolting/Weldin PO NR
7/23/98 13 Shear Panels/HD's OH AP
7/23/98 18 Exterior Lath/Drywall DH WC
7/21/98 15 Roof/Reroof pJj AP
7/9/98 15 Roof/Reroof PD PA
7/9/98 84 Rough Combo PD WC
6/25/98 63 Walls DH AP UP48"
5/28/98 34 ROl1gh Electric PD PA STEEL BONDING
5/27/98 23 Gasrr est/R~pairs PP AP
5/4/98 11 Ftg/Foundation/Piers PD AP SLAB
5/1/98 11 Ftg/Foundation/Piers PD PA
4/16/98 21 Underground/Under Floor PD AP
4/8/98 21 Underground/Under Floor pJj AP PUBL.IC TblLETS
3/26/98 34 Rough Electrrc PD PA UFER
3/25/98 11 Ftg/Foundation/Piers PD AP
Monday, May 17, 1999 Page 2 of2
• -*27:-c111 or Carlsbad ~ ·; Final Building Inspection
"~-"' .
RECEIVED
JAN I 81999
Dept: Building -E~et-~ P.lanning CMWD St Lite · Fire
CITY OF CARLSBAD
NGINEERING DEPARTMENT
Plan Check #:
Permit#:
Project Name:
Address:
GB980241
CASTLE HILL CASTLE INN
5,092 SF PLAN CHECK
1 LEGO DR
Date: 1/15/99
Permit Type: COM
~ub Type:
Lot:
Contact Person: JIM Phone: 6198432928
Sewer Dist: Water Dist:
•1111 II II II 1111 •••••••11II Ill llll 1••••••••• 1llll!liillllllllllllll 11111 •••••••••••••••••••·11••••••••••••••••••••••~1111 Ill 111111111111111111111111111111111
Inspected # Date ~ By: Inspected: f). -l -·'1' 1 Approved: Disapproved: ___
Inspected Date
By: Inspected: Approved: Disapproved: ___
Inspected Date
By: _ Inspected: Approved: Disapproved: ___
·····························••,!I••················-·-······························································•!••·················~·-···················
Comments: ----------------------------'-----'"----------
• ·if, .: : • CIIY-Of Carlsbad ~ ·; -Final Building Inspection
4 ~ .... ~
Dept: Building Engineering tJ[alfi,ing CMWD St Lite Fire
Plan Check#:
Permit#:
Project Name:
Address:
CB980241
CASTLE HILL CASTLE INN
5,092 SF PLAN CHECK
1 LEGO DR Lot:
Date: 1/15/99
Permit Type: COM
Sub Type:
Contact Person: JIM Phone: 6198432928
Sewer Dist: Water Dist: ...................................................................................................................... .-................................... .
Inspected Date f /"'2~?---q).pproved: / Disapproved: __ By: WI2 Inspected: _ --
Inspected Date
By: lnspe~ted: Approved: Disapproved: __
Inspected Date·
By: Inspected: Approved: . Disapproved: __
I I I I I I I I I 111111I11111111 I I I II I I I II 11111 II I I l 11111 I l"i I I I 11111 I I I I 111 I I I II I II Ill I II I I I II 11 ~I I Ill I I I II I I I 111 I I II I II I I I I I I 11 I I I I' I I II Ill I II II I 11 I I I I I I I I II II I I II
Comments:-----'------,-.,------'---------------'-----'-----'-..:.....-----'--------'---
Cltr or Carlsbad
_,.a·-· final Building Inspection:
Dept: Building l;ngineering Planning CMWD ... Fire
Plan Check#:
Permit#:
Project Name:
Address:
CB980241
CASTLE HILL CASTLE INN
5,092 SF PLAN CHECK
1 LEGO DR
Contact Person: JIM Phone: 6198432928
W?terDist: Sewer Dist:
Date: 1/15/99
Permit Type: COM
·. S!ib Type:
Lot:
I a I 111II111111 I 11 I II I I I I I I I I I II I 1111 I I II II I I II I ail I I II Ill II Ill i I I 111 ~II I Ill I I I I 11111 I I 111 II II Ill II 111-_I I I I I I I I ia I I II I Ill I I I I I I I I 111 I II I I I I I 11 I I I 11 I I I II I I II I
Inspected ~ Date / / { q fq1 Approved:· Voisapproved: __ By: Inspected:
Inspected Date
By: Inspected: Approved: Disapproved: __
Inspected Date
By: Inspected:. Approved: Disapproved:.--
I I 11111 I I I I I I I I I I II II 1111 I 11 I I I I II I I I Ill Ill I I I 11,1 I I II 1-1 I II II II I I ~I I I I I Ill II l•I I II I I 8 I I 111 II I I iii I II 111 I 11 I I I I I II I II I 11111 I I I II I I I I II I Ill I I I II I 11 I I I I 111 I II I II 111
Comments: ___ .....-_______________ -,--______ -'-_ ___..;......_ _____ .......,._
..
CIIY or cirlsbad
· Final Building 1nsnecuon
Dept: Building Engineering Planning CMWD St Lite ~
Plan Check#: Date: 1/15/99
Permit#: CB980241 Permit Type: COM -----CASTLE HILL CASTLE INN Sub Type: ::::\) f:= · ((;, I½ ~ \ 7 ;~~ 1:.\ /
5,092 SF PLAN CHECK i/ ..::= • '--=', \i:
Address: 1 LEGO DR Lot: llr1~ JAN 1 g 1999 : ' , :i,·
Contact Person: JIM Phone: 6198432928 · IL ~ c)
Sewer Dist: Water Dist:
1
By_______ I
Project Name:
·l·~:~:·~~~~ ... h·····~:······ .. ··· .... ············~:;:·····,·····.·;·:·;···· ........................... ., .. l .................................... --
By: ____ -:J'b _________ Inspected: ........,l'---G __ ---'--Approved: __ Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved:_._._
Inspected Date
By: Inspected: Approved: Disapproved: __
I I I II I 11 I I 11 I 1111 II I I I II I I I I I I I'! I Ill II I 1111 I I II I I I 1111 ••• 1111 I I 111III11)11111111 II II I I I 111111111 Ill I I I I I I II I 11111 I 11111 I I I I 111 I I I II I II Ill I I I I I I II I I II I I Ill 11
Comments:-------------------------------,----------------,-------
SEE
MULTIPLE
SPECIAL INSPECTIONS
SCANNED
SEPARATELY
CB972027 IS THE
. -
PLAN CHECK NUMBER' FOR
. .
MANY OTHER CB'S
ALSO SEE
(
CB971460(OUTER PARK)
CB971465(ADM1N BLDG)
Page_1_of _L
INSPECTION REPORT
CLIENT_...__lc~&d,._._.2) _____ _
DATE ___ {p.___z.a.....;~_7......,~,.__ __
Architect_---,;d!-------'t'J ........ -'L~---------
Engineer--..L.d~.JH!', ............ t.'-'-"-,d __ C/:__.~'-----L<'A-£ ....... ,,,_,_,_-d;"-7-D=--'----
Contractor. __ 3_._=-...,.6-=c....___,,_{2 _____ -___ _
INSPECTION MAT'L SAMPLING QTY
_QSHPD . __ Concrete Cylind~rs --
__ OSA __ Cement --
__ Specialty __ Mortar Samples --·-
__ Mechanical __ Grout Samples --
_ Electrical __ Masonry Prisms -·-·-
__ Roofing _. _ Masonry Block --
_concrete __ Fireproofing --
_Masonry __ Units (block or brick) --
~Struct Steel _· _ Asphalt Concrete --
__ Prestress Cone -.-Roofing --
__ Pile Driving __ Reinf. Steel -·-
__ Fireproofing _•_Steel --·
__ waterproofing · __ H.S. Bolts -·--
__ Non-Destructive -.-· Tendon (PT Strands) --
__ $oils Technician _._Other -·-
__ Batch Plant __ Other
__ Bolt Pull-Out __ . Other
REMARKS
· PROJECT (Name)_l_e,~7,....r .... > ...... , ...... &~.._d..._ __
(Address)......,,,.---.---------. c'9-Y fs'"Br3:7) ,·a·.
REPORT N0. _______ 7,__C~'Z._0_'"2..;,..___ __ _
Building Permit No. ___ ..... :f ..... 'B,..__-_.2"""Y:.......__('-___ _
Plan File No. _______________ _
Govt. Contract No. ______________ _
OSA or/?SHPP,# q :+:1
Other L~TI~ f · 1 'l /-(~iie In o.
MATERIAL DESCRIPTION ~SPECTION CHECKLIST
_ Rir\f.: Rebar _ Plan & Specs
-. Rinf.: W.W.F. _ Clearances
_ Rinf.: Tendons _ Positions
-. Cone::.: Mix #/psi _Sizes
_ Cone.: Mix #/psi _Laps
_. Cone.: Mix #/psi _ Future Continuity #/psi
_· Grout: Mix #/psi _ Consolidation
_ Mortar: Type/psi _ Mortar Batching
_ Units: Block _· Electrode Storage
_. _ Units: ·Brick
~Steel /fST~ Arna'B _ Torque Applied
_. H.S.Bolts
_ M!:!tal Decking
_. Electrodes
._ Firepro~ng
..L Other. __ .., ·,,. ~,, /!G,,./ k .,./ Corrective action required __ ~Tn, /1~-D if _ Corrections completed
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations.of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME D A::n ~ A-, 52
INSPECTOR SIGNATU~~Q.._~
PSl-8-900-170(2)
'lac,
CERT. NO. '1<2763 I
PATE---~~--2_--i<i._.'S?..__ _____ _
Page_1_ot_.L
INSPECTION REPORT
PROJECT (Name)-~ ......... _,_-_~......__-..... cl=----CLIENT_-"-j_--=C;....,'j~fJ-__ _
DATE __ t,_~~3_-_.'i~V __ _
Architect_~/_/_CJ_/C ____ -'------"--
(Address) _____________ __,, __
C~ad. z;.
REPORT NO. ______ Z'-'tJ~Z.~o.-2...__(""'"".-&~~-'{)_· _
Building Permit No. ____ ~'i-S ..... -_Z~¥......,_I ___ _
Engineer---=~__.__.'-"-~ ...... ~--=~"'--'----"y___..,a___.__...4:_g£=,...c.._. _j_. -~
Plan File No ..... -______________ _
Govt. Contract No.---,--------------'---
Contractor._3_...~ .... :1.: .... ~""'Jl{'-l-"-'meJ~--~.....,.::;..,P,/2.o_,..,.._$'..___ ___ _
OSA or OSHPJl/ -7/ ~ ;::/::7
Other CJt-S~ . MIii -Gtst/4::
INSPECTION MAT'L SAMPLING QTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
_OSHPD __ Concrete Cylinders --_ Rinf.: Rebar 0Jan&Specs
_OSA _-_Cement ___ Flint.: W.W.F. _ Clearances
__ Specialty __ . Mortar Samples --_ Rinf.: Tendons _ Positions
__ Mechanical __ Grout Samples _ Cone.: Mix #/psi /sizes
__ Electrical __ ·Masonry Prisms --_ Cone., Mix #/psi _Laps
_Roofing __ Masonry Block --__ Cone.: Mix #/psi , _ Future Continuity #/psi
_Concrete __ Fireproofing ___ Grout: Mix #/psi _ Consolidation
~asonry __ Units (block or brick) --__ Mortar: Type/psi _ Mortar Batching
__ Struct Steel _._ Asphalt Concrete --_ Units: Block · ..LElectrode Storage
__ Prestress Cone __ Roofing --_._. Units: Brick -_ Torque Applied
__ Pile Driving ___ Reinf. Steel ~teel 11:$,'[m JfS1JO B
__ Fireproofing __ Steel --_H.S.Bolts
__ Waterproofing _-_ H.S. Bolts _ M~tal Decking . i --L Electrodes /F71!J,}fr <.~,.. I< I __ Non-Destructive _-_Tendon (PT Strangs) J
__ Soils Technician __ Other __ Fireproofing . • , l ~ Other~Lff A J~ f __ Batch Plant __ Other _ Corrective action required __ !
__ Bolt Pull-Out · __ Ott1er _ Correctionscompleted I --!
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME b ~ J;:...,....,!:'52 ~~"l!a INSPECTOR SIGNATURF~ ·-Y
PSI-B-900-170(2) ( ' -
.xc%o· ' ,~ _Ji.
CERT. No.___._9-=8'_,_7..;:;...0_J..?_-____..$---.-UJ_f =---·'"*_'!'--S-;;._,I'---__ _
DATE-----'----'~;,__~..::c..3_,..._5o"....__ __ ___,. ___ _
Page_1_of_
INSPECTION REPORT
DATE b-12 --9 ':>
Architect_-=-¥0-------------'----'---
Engineer auta;o&
INSPECTION MAT'L SAMPLING QTY
_OSHPD __ Concrete Cylinders
__ OSA __ Cement --x-Specialty __ Mortar Samples---__ Mechanical __ Grout Samples --
__ Electrical __ Masonry Prisms --__ Roofing __ Masonry Block ---
":>c'Concrete __ Fireproofing --__ Masonry ___ Units (blo<?~ or.!?J.i<:;k). --__ Struct Steel __ Asphalt Concrete --
__ Prestress Cone __ Roofing --
__ Pile Driving __ Reinf. Steel --
__ Fireproofing __ -Steel --
__ Waterproofing __ H.S. Bolts --
__ Non-Destructive __ Tendon (PT Strands) --__ Soils Technician __ Ott)er --
__ Batch Plant __ Other ---
__ Bolt Pull-Out __ Other --
REMARKS
cn1K # 5Z-Z.. -3 o op ?s _,.
'Foo:nA,,J"'c.$ ,.
f>RQJECT (Name) L..qz..,p LAA-'0
(Address) C.,.,,-"$iW-4 M,
Rl:PORT NO. asq-702.-c:• z:
Buiiding Permit No .... 5' ..... B~_ ..,..~-=z ..... '(_,_/ _________ _
Plari File No·-------'-------------
Govt. Contract No.-'-----------------
OSA or OSHPD #-------------,-
MATERIAL DESCRIPTION INSPECTION CHECKLIST
_;i,.-Rinf.: Rebar A<.tS. -~&c i.-o ~ Plan & Specs
_ Rinf.: W.W.F. ~ Clearances
__ Rinf.: Tendons ~ Positions
~ Cone.: Mix #/psi ~Z.'Z.-'.I!> ooo _Sizes
___ Cone.: Mix #/psl _Laps_
___ Cone.: Mix #/psi _ Future Continuity #/psi
__ Grout: Mix #/psi _!:5:. Consolidation
__ Mortar: Type/psi _ Mortar Batching
__ Units: Block --: _ Electrode Storage
__ Units: Brick _ Torque Applied
__ Steel
___ H.S. Bolts
___ Metal Decking
__ Electrodes
__ Fireproofing
__ Other -__ Corrective action required __
_ Corrections completed
Fi:?OT21Vl-.S
>7 • .>
l.V J ,rl-
----------
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME _Y~~=--=:;;,~<-~_ -~X~-X---~-~<,-::O~·Y-
(Print Clearly) ~
INSPECTOR SIGNATURE-::Y--=-..... .::,.,c;z_A.,__, _?(?+---1?--=o;....~_..:;==-,,___....._
PSl·B-900-170(2)
Page_1_of -1.. ·
INSPECTION REPORT
CLIENT_,1-L ..... ~..:;..;k1rO...,.~----'--
DATE _ _.7.._. -~§~--1_K __ _
PROJECT (Name) L-e90~ .J
(Address) _________ _
&ds 6.1tD I . ~ •
REPORT NO. ______ ...,"7-=o"-"· 2--""""'O=-=--2,.,'---,,-..... &.,LC.· ~.....,c5=--
Architect ___ H_._Q,...__,.Y ___ ---~--Builging Permit No. ______ 9 ......... %-..... -_,Z..,,l/_,_____/ ______ _
Engineer_-l'-}11~t1:fl.---Z""""'.u'"""n _· _.;.,.,_..r..,.fd_·c.,.:.M..._,_,,· _-:£44,;j,,__ __
Plan File No,-------'----------'----
Govt. Contract No.--------------
0SA or CJAHPD_ 1 Jo ·
Contractor. ___ ]3~~B~_C,_~. --------'---"----Other, Vt:? 7/t!.-· ;;..; )( ,.. . Ctstl _-L-v0
INSPECTION
_OSHPD
_OSA
_ Specialty
_ Mechanical
_ Electrical
_Roofing
_ Concrete
_ Masonry
~truct Steel
_ Prestress Cone
_Pile Driving
_ Fireproofing
_Waterproofing
_ Non-Destructive
_Soils Technician
_ Batch Plant
_ Bolt Pull-Out
REMARKS
MAT'L SAMPLING
_ Concrete Cylinders
_Cement
_ Mortar.Samples
_ Grout Samples
__ Masonry Prisms
_ Masonry Block
_ ._ Fireproofing
___ Units (block .or brick)
_· __ Asphalt Concrete
_ Roofing
_ Reinf. Steel
__ · __ Steel
_H.S.Bolts
_. Tendon (PT Strands)
_Other
_Other ____ _
_ Other ____ ,...
QTY MATERIAL DESCRIPTION . INSPECTION CHECKLIST
____ Rinf.: Rebar ________ ~Plan & Specs.'--------
·-Rinf.: W.W.F. _ Clearances _____ _
_____ Rinf.: Tendons _ Positions ______ _
____ Conc.:Mix#/psi _Sizes _______ _
·_ Cone.: Mix #/psi . _ Laps. _______ _
__ ._ Cone.: Mix #/psi _ Future Continuity #/psi. __ _
_ Grout Mix #/psi __ _ Consolidation ____ __,.. _
_ Mortar: Type/psi. -.. Mortar Batching ____ _
___ _ Units: Block _ Electrode Storage ___ _
_ Units: Brick _ Torque Applied ____ _
--L Steel tf$Tm fJSZX> a
_. ___ H.$. Bolts"". _____ _
____ Metal Decking;:----'----::;;:::----.-
___ ..;,,,-Electrodes I= 7u .xx: C...,. ... r',,,:,
____ Fireproofing __ __,..-'----
-· __ Other _ Corrective action required __
--~----'-·-· _____ Corrections completed __ _
· . \It~;._,..() ~n-sfc¼cl;i ±l. ±iJ!d A-nd £/er,;-3EVGZ, yk"a-CrlG
/00 7,, e,~t.. . . . .
·cERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control. ·
CERT. N0._9L..l&'OL..7~D;;;;.......L3_· __ Stc.112).._#-__;·_.Y,c;_,.,o.5 ..... J ______ _
DATE __ ___,7,:__· --""'"'Z:,;....3o,:__-_'ry~. X..w-----,-----
',{ -'-,-.
Page_1_of _J_
INSPECTION AEPORT
PROJECT (Nam~), __ . .-L~e,:;,..,~oµl~~-L..!..j=---CLIENT __ ·L=/3 __ -_6""'-'t) ____ _
DATE_.J-7___.-2....__<g_-_:J:_'g....__ __
Architect __ ~;-/____,___CJ_ ..... /C _______ _
Engineer _ _,._//'11__,___._,,H.~,2_=-t.-'-"..u-.' __ _°r'..,____.rn---:.: -'ttf'--""-'-zt........ .;..::,0:;:...' __ _
Contractor ___ ~--;="--'-!5--==: _,.....;c_~------'-----'-----
INSPECTION MAT'LSAMPLING QTY
_QSHPD __ Concrete Cylinders ---__ OSA __ Cement ---
__ Specialty ___ Mortar Samples --__ Mechanical ____ Grout Samples --
__ Electrical __ Masonry-Prisms --
_Roofing __ Masonry Block ---
__ Concrete __ Fireproofing --
_Masonry __ Units (block or brick) --
~truct Steel __ Asphalt Concrete --
__ Prestress Cone __ Roofing --__ Pile Driving __ Reinf. Steel ----
__ Fireproofing __ Steel --
__ Waterproofing ___ H.S. Bolts --
_ Non-Destructive __ Tendon (PT Strands)
__ Soils Technician ___ Other --
__ Batch Plant __ Other
__ Bolt Pull-Out __ Other --
(Address) :7°' &,~,~,
REPORTNo. 7aZOZ-~LD A
Building Permit No. ~-21//
P-lan File No, _______________ _
Govt. Contract No.---,-,--------------
OSA or OS~D #-h' __
Other c~ {_ff,, -L ~ Iv
MATERIAL DESCRIPTION ~SPECTION CHECKLIST
__ _-Rinf.: Rebar _ Plan & Specs
__ Rinf.: W.W:F. _ Clearances
__ Rinf.: Tendons ' _ Positions '
_ Cone.: Mix #/psi ~Sizes
_ Cone.: Mix #/psi _Laps
_ Cone.: Mix #/psi _ Future Continuity #/psi
_ Grout: Mix #/psi _ Consolidation
____ Mortar: Type/psi · __ Mortar Batching i
_ Units: Block _ Electrode Storage I
_ Units: Brick _ Torque Applied I
./steel -d:5.'Zh:l ~ot:J 8-i _H.S.Bolts
_. _ Metal Deckinfl,.,, , I
...lL. Electrodes 6_ 206.X S~,lJ,, ·s I I
_ Fireproofing -!
.L, Other Jtsr;n t.fJ.le, _ Corrective action required __ '
_ Corrections completed !
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME VJ4:n ~*§-9
·~ INSPECTOR SIGNATURI'~~
PSl·B-900-170{2)
1~~ ~o._9.J-J&~7 Cv..--<-3--1,.._____..S,._..i)"---#-J__,,S=--+f---
DATE---,--,------=7:.,---!=2::...::'??=---7~R1....--___ _
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR: MR. DAVID CATTL.E
LEGOLAND ESTATES· INC
5600 AVENIDA ENCINAS
SUITE 130
PROJECT: LEGOLAND THEME PARK
CARLSBAD, CALIFORNIA
CARLSBAD, CA .9200.ff
D~!~: __________ M~:-_19 '. :..:?9_~::.:=:·:::= .. =--,:========O=U=R=R=E=PO::::;::::RT=N=0=.:=0=5=9=--=7=0=2=0=2=-=5=8=0=========-=
FIELD DATA:
LOCATION OF PLACEMENT CASTLE INN BUILDING SLAB·-ON-GRADE #A
PERMIT# 98-241
DATE PLACED
TIME
SLUMP, IN.
AIR CONTENT, %
AIR TEMPERATURE, °F
May 07, 1998
09: oo. am
4
57
CONCRETE TEMPERATURE, "F 7 0
DATE RECEIVED IN LAB
FIELD DATA SUBMITTED BY
MIX DATA SUBMITTED BY
May 08, 1998
PSI\DEREK PETERSON
NELSON & SLOAN
SUPPLIER
DELIVERY TICKET NO.fTRUCK NO.
MIX NUMBER AND PROPORTIONS
CEMENT
WATER
FINE AGGR~GATE
COARSE AGGREGATE
ADMIXTURE
NELSON & SLOAN
696232
1386
NQTE:.AP-1:LICAB~E.ASJ'.M..SIANDABDJ,.UJ'lLESS QjJ:lJIBWI.SEJtiDlCAIED.;J,UJ.Me;:cHHJla:.AIB.C.OfilENT.:..C.i.3.h~1.b.:..TEMEJ;8A.1:UBe:.CJ.ll.QB.e.(9_o];_C_Aeeu,IG:...C.1Z..1:.83
COMPRESSION TEST RES UL TS
ASTM C39-94
SPECIM LABORATORY IDENTIFIC
NUMBER OR SET
EN TEST I I TOTAL CYLINDER ATION AGE I 'DATE-OF LOAD DIAMETER NO. {DAYS)· TEST {LBS.) .{IN.)
i
16907 A 7 j 05./14/98 95000 6.00
16907 B
16907 C
28 i 06/04/98
28 06/04/98
16907 D ! I
' : i I '
' l ' i I ' ! i
SPECIFICATIONS
----· -1---···----i·----· -· --··· . -·.--L I I .
I 28 l I I
REMARKS: X Cylinders made by PS) representative.
Cylinders picked up by PSI
~-representative.
Cylinders made by Architect's or
Contractofs representative. Cylinders delivered to PSI laporatory.
CYLINDER COMPRESSIVE
AREA STRENGTH {SQ. IN.) {PSI) TYPE OF BREAK
28.27 3360 Cone
2500
Test results comply.with apphcable specifications.
Test results do not comply with applicable specifications.
ALL CYLINDERS CAPPED IN ACCORDANCE WirH ASTM C617~94.
TECHNICIAN: DEREK PETERSON
cc: LEGOLAND (4), BERNARD BROTH~RS, H.O.K., CITY OF CARLSBAD
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY-NOT.BE IN_DICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN.PERMISSION BY PRO_FESSIONAL SERVICE INDl,!STRIES, INC.
PSI A-200-4 (4)F
Respectfully submitted,
Profess,ional Service Industries, Inc.
~~~
DISTRIC~AGER
Information To Build On
Professional Service Industries, Inc. • 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
· l .-..~•J Irifo"!Wtion ~~• ®To Build On
Engineering • Consulting • Testing
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR: MR. DAVI.D CATTLE
LEGOLAND ESTATES INC
5600 AVENIDA ENCINAS
SUITE 130
PROJECT: LEGOLAND THEME PARK
CARLSBAD, CALIFORNIA
CARLSBAD, CA 92008
DATE: May 19, 1998
REVISION #1
OUR REPORT NO.: 059-70202-580
FIELD DATA:
LOCATION OF PLACEMENT CASTLE INN BUILDING SLAB-ON-GRADE #A
PERMIT# 98-241
DATE PLACED
TIME
SLUMP, IN.
AIR CONTENT, %
AIR TEMPERATURE, °F
CONCRETE TEMPERATURE, °F
DATE RECEIVED IN LAB
FIELD DATA SUBMITTED BY
MIX DATA SUBMITTED BY
May 07, 1998
09:00 am
4
57
70
May 08, 1998
PSI\DEREK PETERSON
NELSON & SLOAN
SUPPLIER
DELIVERY TICKET NO./TRUCK NO.
MIX NUMBER AND PROPORTIONS
CEMENT
WATER
FINE AGGREGATE
COARSE AGGR!=GATE
ADMIXTURE
COMPRESSION TEST RESULTS
ASTMC:39-94
NELSON & SLOAN
696232
1386
SPECIMEN TEST TOTAL CYLINDER CYLINDER COMPRESSIVE LABORATORY
NUMBER
16907
16907
16907
16907
SPECIFICATIONS
REMARKS:
IDENTIFICATION AGE DATE Of'
OR SET NO. (DAYS) TEST
A 7 05/14/98
B 28 06/04/98
C 28 06/04/98
D
28
X Cylinders made by PSI representative.
Cylinders made by Architect's or
Contracto(s representative.
LOAD DIAMETER (LBS.)
95000
110000
117000
Cylinders picked up by PSI X representative.
(IN.)·.
6.00
6,06
6.00
Cylinders delivered to PSI laboratory.
AREA STRENGTH
(S~.IN:) (PSI) TYPE OF BREAK
28.27 3360 Cone
· 28 .27 3890 Cone
28.27 4140 Cone
2500
X Test results comply with applicable
specifications.
Test results do not comply with
applicable specifications.
ALL CYLINDERS CAPPED_ IN ACCORDANCEcoN Fa·,
TECHNICIAN: DEREK PETERSON
MS
Respectfully submitted,
cc: LEGOLAND (4), BERNARD BROTHERS, H.O.K., CITY OF CARLSBAD §a~~ona/S~c-;z::c.
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF TH,E.ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC.
PSI A-200-<4 (4)F
DAVID J YAN, ~~cf
DISTRI MANAGER
Professional Service Industries, Inc. • 6867 Nancy Ridge Drive, Suite E • San Diego,-CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
· l•--~•1 Info~n ~.,,• .To Build On
Engineering • Consulting • Testing
REPORT Of· CONCRETE COMPRESSION. TEST
TESTED FOR:
DATE:
FIELD DATA:
MR. DAVID CATTLE
LEGOLAND ESTATES INC
5600 AVENIDA ENCINAS
SUITE 130
CARLSBAD, CA 92008
May 19, 1998
PROJECT: LEGOLAND THEME PARK
CAR~SBAD, CALIFORNIA
REVISION #1
OUR REPORT NO.: 059-70202-582
LOCATION OF PLACEMENT CASTLE INN BUILDING SLAB-ON-GRADE #B
PERMIT# 98-241
DATE PLACED
TIME
SLUMP, IN.
AIR CONTENT, %
AIR TEMPERATURE, °F
CONCRETE TEMPERATURE, °F
DATE RECEIVED IN LAB
FIELD DATA SUBMITTED BY
MIX DATA SUBMITTED BY
May 07, 1998
10:45 am
4 1/2
65
77
May 08, 19,98
PSI\DEREK PETERSON
NELSON & SLOAN
SLIPPLIER
DELIVERY TICKET NO.ffRUCK NO.
MIX.NUMBER AND PROPORTIONS
-CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
COMPRESSION. TEST RESULTS
ASTM.C39-94
NELSON & SLOAN
696287
1386
SPECIMEN TEST TOTAL CYLINDER CYLINDER COMPRESSIVE
LABORATORY IDENTIFICATION AGE DATE OF t:OAD DIAMETER AREA STRENGTH
NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (SQ.IN.) (PSI) TYPE OF BREAK
..
16908 A 7 05/14/9.8 90000 6,00 28.27 3180 Cone
16908 B 28 06/04/98 98000 6.00 28.27 3470 Cone
16908 C 28 06/04/98 93000 6.00 28.27 3290 Cone
16908 D
SPECIFICATIONS 28 2500
REMARKS: X Cylinders made by PSI representative.
Cylinders picked up by PSI X representative.
Test results comply with applicable X specifications.
Cylinders made by Architect's or Test results do not comply with
Contracto~s representative. Cylinders delivered to PSI laboratory. applicable specifications.
ALL. CYLINDERS CAPPED IN ACCORDANCECONfi-0 MS
TECHNICIAN: DEREK PETERSON
cc: LEGOLAND (4), BERNARD BROTHERS, H.O.K., CITY OF CARLSBAD
Respectfully submitted, :;:;:;::;.I Service Industries, Inc.
DAVID/~~,r
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC.
PSI A-200-1 (4)F
DISTRig0~AGER
Professional Service Industries, Inc. • 6867 Nancy Ridge Drive, Suite E • San Diego,_ 0A 92121 • Phone 619/455-0544 • Fax 619/455-1170
Page_1_of_l
INSPECTION REPORT
CLIENT le-z.?o LANt>
DATE--3~-~'2...=~....,_-~5~~"'-------
Architect __________________ _
Engineer M ,uz...n tJ . d b:d MN
Contractor. 1tf1l-,-vfl LC>._,
PROJECT (Name) Lb:-t;o L:d1>-<D-
(Address) U;&c s. ac1 2> 4#
REPORT NO. as9:::z 0£-c, z
Bullding Permit No. _.9 .... B.__---=Z-:;;,..1../ ........ / ----------
Plan Fi.le No,-'-------'------------
Govt. Contract No.--------------
OSA or OSHPD #-. ------"--------
Other (A,,;n,.('f" H IU,
---' -
INSPECTION MAT'L SAMPl,.ING QTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
_OSHPD __ Concrete Cylinders --...k Rinf.: Rebar ./Jt./5 -~~ ~o ~ Plan & Specs
_OSA __ ·Cement _ Rinf.: W.W.F. 2:5.,__ Clearances
..L..Specialty __ Mortar Samples --__ Rinf.: Tendons _k... Positions
__ Mechanical __ Grout Samples --_-_ Cone.: Mix #/psi ~Sizes
__ Electrical __ Masonry Prisms --__ Cone.: Mix #/psi ..2:5:.,.Laps
__ Roofing __ Masonry Block --___ Cone.: Mix #/psi __ Future Continuity #/psi
-2:'.-Concrete __ Fireproofing --__ Grout: Mix #/psi _ Consolidation
__ Masonry ___ 'Units (block or brick) --___ Mortar: Type/psi -. Mortar Batching
__ Struct Steel ___ Asphalt Concrete ----__ Units: Blo9k -_ Electrode Storage
__ Prestress Cone __ Roofing ---__ Units: Brick _ Torque Applied
__ Pile Driving ___ Reinf. Steel -----__ Steel
__ Fireproofing __ Steel --__ H.S. Bolts
__ Waterproofing __ H.S. Bolts --_. __ Metal-Decking -
__ Non-Destructive __ Tendon (PT Strands} --__ Electrocles
__ Soils Technician ___ Other · __ Fireproofing
__ Batch Plant ____ Other --__ .·Other _ Corrective action required __
__ Bolt Pull-Out __ Other --_ Corrections completed
REMARKS
pg..o PB""rL
c2Vtm--81ck
5#<aCTS-:5 '2-1 Q 7' s 6t o -z;,n--s -· 1 A , ta , 2. . 3, ¥ , -Z..I , 2..2.. , J'JNZ> SS'S;, -l:>rt..-lS ;r ;F >
# tt.201?K
3 ~o''
CERTIFICATION OF COMPLIANc·e: To the best of our knowledge, all of the repo_rted work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not.constitute engineering opin-
ion or project control.
INSPECTOR NAME-~"""""'~"""o::.iB'K..-.~-_p<--_.,_a_._m<-L.<.o/X:.....,,_Sv......:6,,)--'---sc1ear1y,_\~
INSPECTOR SIGNATUR1;_J2~Ll-__.-+f::----~-~-----~----
PSI-s-soo-110(2)
CERT. NO. e-f3BQ?t,I-S8
DATE-~--~-~~--~z..~~~--f~B=-------------
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR: MR. DAVID CATTLE
LEGOLAND ESTATES INC
5600 AVENIDA ENCINAS
SUITE l30
PROJECT: LEGOLAND THEME PARK
CARLSBAD, CALIFORNIA
CARLSBAD, CA 92008
DATE: April 09, 1998
REVISION #l
OUR REPORT NO.: 059-70202-471
FIELD DATA:
LOCATION OF PLACEMENT CASTLE INN FOOTJ;NGS LINE C-2
PERMIT# 9$-241
DATE PLACED Marc_h 31,. 199.8 SUPPLIER
TIME 05:00 pm DELIVERY TICKET NO.ffRUCK NO.
SLUMP, IN. 5 MIX NUMBER AND PROPORTIONS
AIR CONTENT, % CEMENT
AIR TEMPERATURE, °F 58 WATER
CONCRETE TEMPERATURE, °F 67 -FINE AGGREGATE
DATE RECEIVED IN LAB April 0l, l998 COARSE AGGREGATE
FIELD DATA SUBMITTED BY PSI\DEREK PETERSON ADMIXTURE;
MIX DATA SUBMITTED BY NELSON & SLOAN
N?~.AeeL.lCAlll.™.IbNDAf!D..sJ.J.Nl.f_~.ItfEB.WIUO.Jl;Ml:Q;__~.Mf:..C.14.3:ll.ll.a;,'\IBJ::9.filE~URl;:__C.JJWHll[il.3~G· C123J-93
-COMPRESSION TEST RES UL TS
ASTM C39-94
NELSON &
68753
l386
SLOAN
-------------------------------------------------··-----
SPECIMEN TEST LABORATORY IDENTIFICATION AGE DATE OF NUMBER OR SET NO. (DAYS) TEST
l6694 A 7 04/07/98
l6694 B 28 04/28/98
l6694 C 28 04/28/98
16694 D
--·· -------------------------
SPECIFICATIONS 28 ---. -------------· -------.. --
REMARKS: ~ Cylinders made by PSI representative.
Cylinders made by Architect's or
Contracto(s representative.
-
TOTAL CYLINDER-
LOAD DIAMETER (LBS.) '(IN.)
73·000 6.00
102000 6.00
105000 6.00
·-
Cylinders picked ~P by .PSI :l_C_ representative.
Cylinders delivered to PSI laboratory.
TECHNICIAN: DEREK P.ETERSON
CYLINDER COMPRESSIVE
AREA STRENGTH TYPE OF BREAK .. , (SQ. IN.) (PSI) -
28.27 2580 Cone
28.27 3610 Cone
28.27 3710 Cone
3000
X Test results comply with applicable
specifications.
Test results do·not corilply with
~:~~~~uKMS
Respectfully submitted,
Professional Service Industries, Inc.
cc: LEGOLAND (4), BERNARD BROTHERS, H.O.K., CITY OF CARLSBAD lf=/tl,~
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTJRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERViCE INDUSTRIES, INC.
PSI A-200-4 (4)F
DISTRIC~AGE~ct.7
Information To Build On
Professional Service Industries, Inc.• 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Pbone 619/455-0544 • Fax 619/455-1170
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR: MR. DAVID CATTLE
LEGOLAND ESTATES INC
5600 AVENIDA ENCINAS
SUITE l30
PROJECT: LEGOLAND THEME PARK
CARLSBAD, CALIFORNIA
DATE:
FIELD DATA:
CARLSBAD, CA 92008
April 09, 1998
REVISION #1
OUR REPORT NO.: 059-70202-473
LOCATION OF PLACEMENT CASTLE INN FOO+INGS LINE 'A--~. 5
:\?ERMIT # 98-241
-
DATE PLACED
TIME
March 31, 1998
11:00 am
SUPPLIER
DELIVERY TICKET NO.fTRUCK NO.
MIX NUMBER AND PROPORTIONS
NEL$ON & SLOAN
68745
SLUMP, IN. 5
AIR CONTENT, %
61
CEMENT
WATER
1386
AIR TEMPERATURE, °F
CONCRETE TEMPERATURE, °F
DATE RECEIVED IN LAB
FIELD DATA SUBMITTED BY
MIX DATA SUBMITTED BY
69
April 01., .1998
PSI\DEREK ~ETERSON
NELSON & SLOAN
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
-----
LABORATORY
NUMBER
16693
16693
16693
16693
SPECIFICATIONS
REMARKS:
COMPRESSION TEST RESULTS
ASTM C39-94
SPECIMEN TEST IDENTIFICATION AGE DATE OF
OR SET NO. (DAYS) TEST
A 7 04/07/98
B 28 04/28/98
C 28 04/28/98-
D
·-------------
28
.~ Cylinders made by PSI represenJative.
Cylinders made by Architect's or
Contractor's representative.
TOTAL CYLINDER
LOAD DIAMETER
(LBS.) (IN.)
73000 6. 0,0
99000 6.00
101000 6.on
Cylinders picked UJ) by PS I X representative. ·
Cyl_inders delivered to PSI laboratory.
CYLINDER COMPRESSIVE
AREA STRENGTH
(SQ. IN.) (PSI) TYPE OF BREAK
28.27 2580 Cone
28.27, ~500 Cone
2.8.27 3570 Cone
3000
X Test results comply with applicable specifications.
Test results do not comply with
applicable specifications.
,, ,.,
ALL CYLINDERS CAPPED IN ACCORDANCE
TECHNICIAN: DEREK PETERSON
WITH ASTM C61 7-94 , r u Ii. rJ\ s
VU I 'I Respectfully submitted,
cc: LEGOLAND (4), BERNARD BROTHERS, H.O.K., CITY OF CARLSBAD
THESE TEST RE SUL TS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT.BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SER\llCE INDUSTRIES. INC.
PSI A-200-4 (4)F
§f;;/r•R~
DISTRIC~GEicE(/
Information To Build On
Professional Service Industries, Inc.• 6867 Nancy Ridge Drive, Suite E • San Oiego, CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
~age __ 1_of_
INSPECTION REPORT
CLIENT ttJT,,,o I.A&(h
DATE a-1$1-98
Architect _ __._)./~O~~~----'-------------,'-----'--'
Contractor. la(f,')2...,UA#c i> s B#-0·7?f:l:hZ.-s
INSPECTION MAT'LSAMPLING QTY ~J ,. ~ Concrete Cylinders JL_ _OSHPD
_OSA __ Cement --
>c Specialty __ Mortar Samples --__ Mechanical __ Grout Samples --__ Electrical __ Masonry Prisms --__ Roofing __ Mas9nry Block --
~Concrete ___ Fireproofing
__ Masonry __ Units (block or brick) --__ Struct Steel __ Asphalt Concrete --__ Prestress Cone __ Roofing --__ Pile Driving __ Reinf. Steel --__ Fireproofing __ .Steel --
__ Waterproofing __ H.S .. Bolts --
__ Non-Destructive __ Tendon (PT Strands) --__ Soils Technician __ Other --__ Batch Plant __ Other -·-__ Bolt Pull-Out _._Other ---
REMARKS
I&-'$ )?q,::.z:rc,,v
ar2-, i> c..., 11..1 r-rs-A rZ? D
PROJECT (Name) IA&&? LdtY"t:>
(Address) 01.u. s fs4t) (Id,
REPORT NO. C2$"9-7QZ o:t,. -9'.<=2-
Buildi~g Permit No. -'41=·--'-2 .. s'--...,,Z.~Y....._l_---------'-----
Plan File No.-'-. __________________ _
Govt. Contract No.-...,......~---~--------
OSA or OSHPD #----------,--------
Other CktsrMr l,,...,N
.
MATERIAL DESCRIPTION INSPECTION CHECKLIST
-2C. Rinf.: Rebar d..lJS. -tbL C... o 'I<' Plan & Specs
__ Rinf.:W.W.F. ~ Clearances
__ Rinf.: Tendons --~ Positions
..:!s;:... Cone.: Mix #lpsi. / a':Bh-3g:,o ~ Sizes
__ Cone.: Mix #/psi ...:!:. laps
___ Cone.: Mix #/psi _ Future Continuity #/psi
__ :Grout: Mix #/psi ~-Consolidation
___ Mortar: Type/psi -. Mortar Batching
-___ Units: Block _ Electrode Storage
-·--Units: Brick . __ Torque Applied
__ Steel
___ -H.S. Bolts
_. _ 'Metal Decking
__ Electrodes
__ Ffreproofing .
_ ._Other _ Corrective action required __
Corrections completed
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and-does not constitute-engineering opin-
ion or project control. ·
INSPECTOR NAME J:::?.m._bf7< f> -_ P~sc-zy CERT. NO. ~~'30?$I-Bt$
-(Prl~tCleariy) ~
INSPECTORSIGNATURE 4/. Ai? ?.~
PSl-8-900-170(2)
0ATE_~3:C-~L3~'~~-~,_,,,e~.------------
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR:
DATE:
FIELD DATA:
MR. DAVID CATTLE
LEGOLAND ES,TATES INC
5600 AVENIDA ENCINAS
SUITE 130
CARLSBAD, CA 92008
April 09, 1998
LOCATION OF PLACEMENT CASTLE INN FOOTINGS LINE C-2
PERMIT# 98-241
PROJECT: LEGOLAND THEME PARK
CARLSBAD, CALIFORNIA
OUR REPORT NO.: 059-70202-471
DATE PLACED
TIME
March 31, 1998
05:00 pm
SUPPLIER
DELIVERY TICKET NO.ffRUCK NO.
MIX NUMBER AND PROPORTIONS
NELSON & SLOAN
68753
SLUMP, IN. 5
AIR CONTENT, %
AIR TEMPERATURE, °F 58
CONCRETE TEMPERATURE, °F 67
DATERECEIVEDINLAB April 01, 1998
FIELD"DATASUBMITTED BY PSI\DEREJ{ PETERSON
MIX DATA SUBMITTED BY NELSON & SLOAN
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
COMPRE~SiON TEST RES UL TS
ASTM·C39-94
SPECIMEN TEST TOTAL CYLINDER CYLINDER COMPRESSIVE
LABORATORY IDENTIFICATION AGE DATE OF LOAD DIAMETER AREA STRENGTH
1386
NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (SQ. IN.) (PSI) TYPE OF BREAK
16694 A 7 04/07/98
16694 B 28 04/28./98 ·
16694 C 28 04/28/98
16694 D
SPECIFICATIONS 28
REMARKS: X Cylinders made by PSI representative.-
Cylinders made by Architect's or
Contractor's representative.
73000
• Cylinders-picked up by PSI X representativi,.
6.00
Cylinders delivered to PS! labo~tory.
28.27 2580 Cone
3000
Test results·comply. with applicable
specifications.
Test results do not comply with applicable specifications.
·---I
TECHNICIAN: DEREK PETERSON Respectfully submitted,
cc: LEGOLAND (4), BERNARD BROTHERS, H.O.K., CITY OF CARLSBAD
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED. EXCEPT IN FULL. WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES • .INC.
PSI A-200-<I (4)F
Professional Service Industries, Inc.
~~:lf:::-
DISTRICT MANAGER
Information To Build On
Professional Service Industries, Inc. • 68_67 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
l ~~-, Envi,Qnmental . · ..,,g• .Geotechn{cal
:l!f~ "Construction
Consulting • Engineering • Testing·
Rl;PORT OF CONCRETE COMPRESSION TEST
TESTED FOR: MR. DAVID CAT.TLE .
LEGOLAND ESTATES J:.NC
5600 AVENIDA ENCIN*S.
.PROJECT: LEGOLAND THEME PARK
CARLSBAD, CALIFORNIA
SUITE 130
CARLSBAD, CA 92008 "· '"' ·,
DATE: April 09, 1998 OUR REPORT NO.: 059-702·02-473
FIELD DATA:
LOCATION OF PLACEMENT CASTLE INN FOOTINGS LINE A-2. 5
PERMIT # 98-241.
DATE PLACED March 31, 1998 SUPPLII;R
TIME 11:00 am DELIVERY TICKET NO.ffRUCK NO.
SLUMP, IN. 5 MIX NUMBER AND PROPORTIONS
AIR CONTENT, % CEMENT
AIR TEMPERATURE, °F 61 WATER
CONCRETE TEMPERATURE, °F 69 FINE AGGREGATE
DATE RECEIVED IN LAB April 01, 1998 COARSE AGGREGATE
FIELD· DATA SUBMITTED BY PSI\DEREK PETERSON ADMIXTURE
MIX DATA SUBMITTED BY NELSON & SLOAN
NO:a;· APPLICA~TANJMBD.s.l,J~LESS OTHERWISE IND(CA:U,D· SLUM_P· C143·9Qa· AIR CONTENT· C231-91b· :U,MPERATURE· C1064-86(93)· CAPPING· c1231.93
COMPRESSION TEST RESULTS
ASTM C39-94
.
SPECIMEN TEST TOTAL CYLINDER CYLINDER COMPRESSIVE LABORATORY IDENTIFICATION AGE DATE OF LOAD DIAMETER AREA STRENGTH
NELSON
68745
1386
& SLOAN
NUMBER OR SET NO. (DAYS) TEST (LBS.) (I_N.) (SQ. IN.) (PSI) TYPE OF BREAK
16693 A 7 04/07/98
16693 B 28 04/28/98
16693 C 28 04/28/98
16693 D
SPECIFICATIONS 28
REMARKS: X Cylinders made by PSI representative.
Cylinders made.by Architect's or
Contractor's representative.
73000
Cylinders picked up.by PSI
-~ representative.
6.00
Cylinders deliverect·to PSI laboratory.
28.27 2580 Cone
3000
Test results comply with applicable specifications. .
Test results do not comply with
applicable specifications.
ALL CYLINDERS CAPPED IN ACCORDANCE WITH ASTM C617-94.
TECHNICIAN: DEREK PETERSON
cc: LEGOLAND (4), BERNARD ~ROT~ERS, H.b.K., ~ITY OF CARLSBAD
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC.
PSI A-200-4 (4)F
Respectfully submitted,
Professional Service Industries, Inc.
~~1/f;;;-
DISTRICT MANAGER
Information To Build On
Professional Service Industries, Inc. • 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
t ., Environmental . -.,. • Geotechn~cal
•-. Construction Pijge_1_of .k -
Consulting • Engineering -• Testing INSPECTION REPORT
CLIENT Wil-:,Q L.AIUj)
DA TE "S -1-S g
Architect \4-o \<'..
INSPECTION MAT'L SAMPLING
__ QSHPD ...I!!... Concrete Cylinders
_QSA __ Cement
)... Specialty __ Mortar Samples
__ Mechanical ___ Grout-Samples
__ Electrical __ Masonry Prism..§
__ Roofing _._ Masonry Block
'>c"'Concrete -__ Fireproofing
__ Masonry __ Units (block or brick)
__ Struct Steel ___ Asphalt Concrete
__ Prestress Cone __ Roofing
__ Pile Driving __ Reinf. Steel
__ Fireproofing ___ Steel
__ Waterproofing __ H.S. Bolts
__ Non-Destructive _-_Tendon (PT Strands)
__ Soils Technician __ Other
__ Batch Plant __ Other
__ Bolt Pull-Out __ Other
REMARKS
$):Z-«~-;
dC-LQ f2 t> ff\ilo I!-?
QTY
--
----
--
--
------
--
--
---
--
--
--
--
--
PROJECT (Name) Ltn.::v L.e rur>
(Address) (!,,ga...<...5 MD 64 ,
-REPORT NO. 0~5--ro:::,,ett,. ..,,-53{5J:/:
. Building Permit No. _q--'-"'s~-·..,z;"-''i .... l~-----'------
. Plan File No. ___ .....,.. ___________ _
Govt. Contract No. _____________ _
OSAorOSHPD#~---------------
Other CA'2TW H \ '--~
-·-
MATERIAL DESCRIPTION INSPECTION CHECKLIST
>< Ribf.: Rebar t!:'.l'2\5-<bl.~,d !:It: ~ Plan & Specs
__ Rinf.: W.W.F. ~ Clearances
__ Rinf.: Tendons 2!c... Positions
___ Cone.: Mix #/psi _}c_Sizes
___ Cone.: Mix #/psi ...kLaps
__ Cone.: Mix #/psi _ Future Continuity #/psi
___ Grout: Mix #/psi _ Consolidation
___ Mortar: Type/psi _ Mortar Batching
___ Units: Block _ Electrode Storage
___ Units: Brick _ Torque Applied
__ Steel -
____ H.S: Bolts
___ Metal Decking -
___ Electrodes
__ Fireproofing
2s'-.. Other E,'Po)(Y H \~l:\ __ Corrective action required __
-!!~ ''?Q . __ Corrections completed
:n:Hf
ov~J::3-L.(....
THff ]>LA,yS
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report.covers the locations of tlie work inspected only and does not constitute engineering opin-
ion or project control. · ·
INSPECTOR NAME D<m.6\G: . ? Y~-,.,J
(Print Clearly) ~
INSPECTOR SIGNATUR~ 'f . :?~
PSl-8-900-170(2)
-DATE ~-~--')~
I -
Page_1_of_
INSPECTION REPORT
CLIENT l.GJ.2c LA,..,.,!}
DATE ~-?-c; 9,
Architect H:o '4:
Engineer M tt a...n JY
Contractor S>li=-"")'WV r'\ tkJ:> c;
INSPECTION MAT'LSAMPLING
_OSHPD _2!::_ Concrete Cylinders-
_OSA ___ Cement
..:,c..Specialty ___ Mortar Samples
__ Mechanical __ Grout Samples
__ Electrical _____ Masonry Prisms _
__ Roofing __ Masonry Block
1 Concrete __ Fireproofing
__ Masonry __ Units (block or brick)
__ Struct Steel __ Asphalt Concrete
__ Prestress Cone __ Roofing.
__ Pile Driving ___ Reinf. $tee!
__ Fireproofing -__ Steel
__ Waterproofing ___ H.S. Bolts
__ Non-Destructive _____ Tendon (PT Strands)
__ Soils Technician _-_Other
__ Batch Plant ___ Other
__ Bolt Pull-Out __ Other
REMARKS
7 r'.b9 ,, , t:::, c:d':>
w t1-:LLS C
1? , Ac trr)1. tn:V:t
CH-
QTY
_Ji_
--
--
--
--
--
-----
----
----
--
--
------
--
--
PROJECT (Name) L-s:zec L/41'-'S'>
(Address) -&-a.-t& ?>/4-J> CA,
---~! J Rl;:PORT NO, O'.$(i ·) Ol q 1--._,., ~ ~
Building Permit No. __.9 .... ~.__~·.c..z.._~ .... ,..__ _______ _
Plan File No.--------------------
Govt. Contract No.--------------
OSA or OSHPD #-------------'----
Other M"? TI-er 1 (\J 1\J
MATERIAL DESCRIPTION INSPECTION CHECKLIST
.2£_ Rinf.: Rebar A-t..1:S a:.!b ~o ~ Plan & Specs
___ Rink W.W.F. ~ Clearances
___ Rinf.: Tendons ~ Positions
.x--Cone.: Mix#/psi\~51,-;--3000 ~Sizes
-----Cone;: Mix #/psi _>--Laps
__ Cone.: Mix #/psi _ Future Continuity #/psi
___ Gro[Jt: Mix #/psi ~ Consolidation
__ Mqrtar: Type/psi _ Mortar Batching
___ Units: Block _ Electrode Storage
__ Units: Brick _ Toi'que,Applied
__ Steel
__ _ H.S. Bolts
__ Meta:! Decking
____ Electrodes
---Fireproofing
_-_Other _ Corrective action required __
_ Corrections completed
H \LL,_ tt,.JT-.) ~\llL°t>INl,-,
.,:-w-o
""
·.~
$ ?<:=n >-C:..1 C...t:9 TTQN«> _ o
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the-reported work, unless otherwise noted, substantially complies with approved plans.
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control. ·
INSPECTOR NAMEYlM-C:DL 1' 'Yt:f'tl:,I'):\ $e")t,J ,-~
INSPECTOR SIGNATURE =:?....J.. :P ~
PSl-8-900-170(2) _
CERT. NO. oW oei e \ '-s 8,
DATE :5-7-'1'3
DBI Geotechn~cal ~ -, Environmental
•-~ Construction Page_1_. of 1-
Consulting • Engineering • Testing INSPECTION REPORT
CLIENT _ _,/4=--t::.--./'-'~"-----
DATE __ ,Z_-__ l/~------n _____ _
PROJECT(Narne) t~761~d.
(Address) 7"'
{);z.lsi?&o ., l-14 . %,.,,......,
REPORT No. _ _____,Z~o~ZA::;;..;;.;.. .... z.-.....---,,:...z=;:;-/7+-'/_
Building Permit No. ____ q=---~=---2._'-/-'-'-/ ____ · __ Architect _____ t/ ..... _.__J,,()..__..,..? ___ ----"--------'---
Engineer_....,.~/l/,,..L-J.=A-.al2_,,~-<-<.::,(__,/=,-...;.4-~£c....c..,i--.Ar.~........,tc..,/_.,,.L1..,0'----
Contractor. __ ~3-~.l-'B"""'--c-"""~------------'--
Plan File-No. _________________ _
Govt. Contract No.~--'-----------------
~~:ror?:!/t #/.h}/ ~ {;;7f ~
INSPECTION MAT'LSAMPLING QTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
_OSHPD __ Concrete Cylinders --~ Rinf.: Rebar /l'&iTm.. A k I':> ./ Plan & Specs
_OSA __ Cement --_ Rinf:: W.W.F. ~ Clearances .
__ Specialty __ Mortar Samples --_ Ririt: Tendons ,,,,.. Positions
__ Mechanical __ Grout Sarnples _ Cone.: Mix #/psi .. V Sizes
__ Electrical __ Masonry Pri$ms --_. _ Cone.: Mix #/psi _!::_Laps
__ Roofing __ Masonry Block --_ Cone.: Mix #/psi _ Future Continuity #/psi
__ Concrete __ Fireproofing _ Grout: Mix #/psi _ Consolidation --
VMasonry __ Units (block or brick) --JL Mortar: Type/psi S /;'700 v Mortar Batching . I
__ Struct Steel __ Asphalt Concrete ..JL Units: Block 11::Slm Cc:Jo N·( _ Electrode Storage
__ Prestress Cone _._Roofing --_ Units: Brick _ Torque Applied
__ Pile Driving __ . Reinf. Steel --_Steel
__ Fireproofing __ St~el _H.S. Bolts
__ Waterproofing __ H.S. Bolts --_ M~tal Decking
__ Non-Destructive __ Tendon (PT Strands) --_ Electrodes
__ Soils Technician __ Other _ Fireproofing
' ' __ Batch Plant __ Other --_Other _ Corrective action requited __
__ Bolt Pull-Out . _._Other --_ Corrections completed
REMARKS
T11.-.,fg cte.J ±l('._ _ f 'Ao'."'S dt ~ 1t fl->Trvt C· ':[o
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers tlie locations of the work inspected only and does not constitute engineering opin-.
ion or project control.
~c..i?'c
CERT. NO. 5'. '8 J O 5
DATE_---'-7_.-B...,.__-1..L.8E::,1,--------
I I
l
)
I I
I I
I
t
' i
' i
;
Page_1_of_l ·
INSPECTION REPORT
CLIENT kC-/0
DATE 7--10 -1<1
PROJECT (Name) h<pl!Jtt\ d
(Address) . =
{L?/2-aJt i)/ Lit:_.
Architect ti a 1c_
REPORT NO. __ ,J.7_,,0~Z'"""'Oe...,2,-=::;..._ ___ _
Building Permit No. ___ _.9 ..... -a'.(,l._--=z:....'-l.,__._I _____ _
Engineer olzi~ Cf lttr2t~ Plan File No, _______________ _
Govt. Contract No. _____________ _
Contractor. ?:BC CSA or ~HP"fk ./1// {kflc Other~ I_ ~ Ii,;AJ
INSPECTION MAT'LSAMPLING QTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
_OSHPD __ Concrete Cylinders ~ Rinf.: Rebar -IK7M ll.!J. I<" ,o ~Plan & Specs
__ OSA ___ Cement _ Rinf.: W,W.F. L Clearances
__ specialty __ Mortar Samples -·--_ Rinf.: Tendons -JL°Positions I
__ Mechanical __ Grout Samples --_ Cone.: Mix#/psi ,/ Sizes
_ Electrical _._ Masonry Prisms --·.--_ Cone.: Mix #/psi ~ Laps
__ Roofing __ ·Masonry Block ---_ Cone.: Mix #/psi. _ Future Continuity #/psi
_Concrete -.-Fireproofing --L Grout: Mix #lps/ z~ L ConsoJidation
/Masonry .--Units (block or brick) ---3L Mortar: Type/psi $ (!Bt:50 _ Mortar Batqhing
__ struct Steel __ Asphalt Concrete --./ Units: Block 1/5.:r,,,,? C. ':f..O /1.(,f _ Electrode Storage
__ Prestress Cone __ Roofing .. _ Units: Brick _ Torque Applied
__ Pile Driving __ Reinf. Steel --_Steel
__ Fireproofing ___ Steel --_H.S.Bolts
__ Waterproofing ___ H.S. Bolts _ Metal Decking
__ Non-Destructive ____ Tendon (PT Str~nds) _ Electrodes . .
__ Soils Technician -· __ Other --_ Fireproofing
__ Batch Plant __ Other _Other _ Corrective action required __ !
__ Bolt Pull-Out __ Other -··--_ Corrections completed i
REMARKS
Ins~e-T<d ±1(:· o )Ms:,~f . ~J C~soJ,;J.?3--+~ o-f z Cu:i31~ 7~...d
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report-covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME J)#9::')"\=2~A:-<. ~
(Print Clearty) ;J
INSPECTOR SIGNATUR~J;!,Q.,.. ~
PSl·B-900-170(2) ·
xc~o
CERT. NO. <q~:]03
DATE ___ 7.,__-..LJ-=O~--:i....f._l,.;){l._ _____ _
Page_1_of _J_
INSPECTION REPORT
PROJECT (Name)_k""'-'-=9,._..t;_. /4..._)9-r? ............. _..c/ ___ · __
CLIENT Le70
DATE 7-J 5 -'7<;'
Architect_~16_/__,_0,c.__,_J:-=--------
Engineer __ //4'----'-._._~ ....... '-"'""-'-'t..........,_J--,-,_+ ............ f1i_,_· ............ !1-e..--'-"-=-,_,_t,.:,,.U-..· __
Contractor. ___ ]3....,,__ .... 3_· ""'-_,{!.__ __ '---------
INSPECTION MAT'L SAMPLING QTY
_QSHPD __ Concrete Cylinders --
_QSA __ Cement ---
_Specialty __ Mortar Samples --
__ Mechanical __ Grout Samples --
__ Electrical __ Masonry Prisms --
_Roofing __ Masonry Block
_Concrete __ Fireproofing --
_Masonry __ Units (block or brick) --
,..,,, Struct Steel __ Asphalt Concrete
__ Prestress Cone __ Roofing --
_ Pile Driving ___ Reinf. Steel ---
_ Fireproofing _._Steel ---
_Waterproofing __ H.S. Bolts --
_ Non-Destructive __ Tendon (PT Strands) --
_Soils Technician __ Other --
__ Batch Plant __ Other --
__ Bolt Pull-Out __ Other ---
(Addi'ess) __ ---=-------4+--
Crtcls &r-1-1), 01-, I
REPORT NQ. __ -l-7'--"ooG...lio:2:...:0o:::....::Z=----
Building Permit No. ____ __,_9_,.7'-· ~-=2-_'f,,...._J ___ _
PlanFileNo.'"'"-_______________ _
Govt. Contract No. _____________ _
OSA or ~HP~ · r-;=d '--:"SI
Other Chue fl)/1-~-·L.-5t
-
MATERIAL DESCRIPTION INSPECTION CHECKLIST
_ Rinf.: Rebar .LP1an & Specs
_ Rinf.: W.W.F. _ Clearances
_Rinf.: tendons _ Positions
_ Cone.: Mix #/psi-· :/sizes
_ Cone.: Mix #/psi _Laps
_ Cone.: Mix #/psi _ Future Continuity #/psi
._ Grout: Mix #/psi _ Consolidation
__ _ Mortar: Type/psi _ Mortar Batching
_ Units: Block _ Electrode Storage
_ Units: Brick -_ Torque Applied
v Steel &i-'.w1 II-S7)6 ft -~ .
·_HS.Bolts
--Metal Decking
~ Electrodes £7¢?19: ~~IZ,i.e:)
_ Fireproofing
_ Other _ Corrective action required __
_ Corrections completed
CERTIFICATION OF COMPLIANCE: To the best of-our knowledge, all of the reported work, unless otheiwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR SIGNATURE~-,,c........=...--11:--i.=:y~~-:;i~-
Ps1-s-9oo-110(2>
cfR~~Ni._q-f..-5,L<; 1....J,.;~~3--S-:,l-7)-t!,,L-=1=-3::;_~...c..,_/ __ _
DATE_--,-_7.,_~.J-J_3_-_,,_.,S?....__ ____ _
l ·1 Environmental ., I Geotechn{cal
•-a Construction Page_1_of ...L
Consulting • Engineering • Testfng INSPECTION REPORT
cuENT ___ L,_,_e~7-r---O ___ _
DATE __ 'J_-~/_1/_-_<z._<;'--__
PROJECT (_Name)_...,.L ___ · ~----'j"'""'o.._h....,.1t ..... ""-....ad=-· __ _
(Address>--------~-~ (c; B A-b . {;,
Architect_-----'h_-/_O-----'-C ________ -'"-
REPORT NQ. ___ 7'---0"--'Z""'-=-O_:Z,.,c:..-_;.-.2_~-~~
Building PermitNo. ________ 9.L.-->,a7.___-.... Z""-Y_,__._{ ____ _
Engineer_......e.../Yl--'-'~c.i..=""'-'-'-/J..)=·--_-t_· __._/J1~ ..... ~--..s.:..u:;:,,"'. ----
Plan File No·-----------------
. Govt. Contract No. _______________ _
Contractor: ____ r'"7=i3'---'73=--C-=----------. OSA or OSHPD # :tJ 1
Other G1tl~ 1-l'I/-G~u~Z~ 73kl,
INSPECTION MAT'L SAMPLING QTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
__ OSHPD ___ Concrete Cylinders _ Rinf.: Rebar ,,/ Plan & Specs
_OSA __ Cement --_.Rinf.: W.W.F. _ Clearances
__ Specialty __ Mortar Samples --_ Rinf.: Tendons _ Positions
__ Mechanical __ Grout Samples --_ Cone.: Mix #/psi . ~ Sizes
__ Electrical __ Masonry Prisms --_· Cone.: Mix#/psi _Laps
_Roofing __ Masonry Block --__ _ Cone.: Mix #/psi __ Future Continuity #/psi
_Concrete __ Fireproofing --___ Grout: Mix #/psi _ Consolidation
__ Masonry __ Units (block or brick) _ Mortar: Type/psi _ Mortar Batching .
~ Struct Steel __ Asphalt Concrete --__ Units: Block L Electrode Storage
__ Prestress Cone __ Roofing --_ Units: Brick _ Torque Applied
__ Pile Driving ___ Reinf. Steel --~ Steel d-$1w) bo.-73..
__ Fireproofing __ Steel --_H.S.Bolts
__ Waterproofing __ H.S. Bolts --_-_ Metal Decking
__ Non-Destructive __ Tendon (PT Strands) · v Electrodes ~-'7o>GX. <=-.-.,.,~
__ Soils Technician __ Other _:fireproofing
__ Batch Plant __ Other --,/" Other Mn., /1-S--.,]--5 _ Corrective action required ____
__ Bolt Pull-Out __ Other .. _ Corrections completed
REMARKS
J, s:._.,.. \ t6 , ~5r=w:> ±1 c £//e...f ';="> d +'/...., 12 b ~ vd 7= ve
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all qf the reported work, unless.otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME'):)!'tn "2-"'4f (Print Clearty)
~,~P,~.~~~>R SIGNATUR~O..,?YL&/
.XCc3o
CERT. NO. 9~7D°)
DATE ___ J1--_._t4_,__-_.j'._,,.~ _______ _
!
., as: Geotechn~cal L -, Environmental
•-s Construction Page_1_of _L
Consulting • Engineering • Testing INSPECTION REPORT
cuENr_____.L~c ...... Gz ______ o ___ ___
DATE __ J_-_../_(e'---7_,8'..____
Architect ___ /_j ___ Oowa....-....... /< ___________ .,---
Engineer __ _._yY}--'-'rl::-l-.1i~~..,__--'-T__._d)-'--4-=,4-=g...,_fi_,_/.,_;v,__,_ __
Contractor. ____ ,./ ..... 5~B~""""L_".____ _______ _
INSPECTION MAT'L SAMPLING QTY
_OSHPD _Concrete Cylinders --
_OSA _Cement -.-
_Specialty _ Mortar Samples --
_ Mechanical _ Grout Samples -·-
_ Electrical _Masonry Prisms --
_Roofing _ Masonry Block --
_Concrete _·Fireproofing
~asonry _ Units (bloqk or brick) --
_ Struct Steel _Asphalt Concrete --
_ Prestress Cone _._Roofing -.-
_ Pile Driving _ Reinf. Steel
_ Fireproofing _Steel --
_Waterproofing _H.S.Bolts
_ Non-Destructive · _Tendon (PT Strands) --
_Soils Technician _Other --
_ Batch Plant __ Other
_ Bolt Pull-Out _Other --.
REMARKS
PROJECT(Name) UJ Oland.
(Address}----.-----,.---. CJ1£& Bltl.'\. CA I
REPORT NO. __ . ---+-7_,,0 ..... 2"""0-.-h:c----
Building Permit No. ___ ___.2 ...... 'l:"----Z._'-/-'/ _____ _
Plan File No,-----------,---------
Govt. Contract No.--------------
OSA or OSHPD_l ~
Other cA'~lfc:. /£/( -Utif/4 ·_L-;._; 5A,·
MATERIAL DESCRIPTION INSPECTION CHECKLIST
_ Rinf,: Rebar / Plan & Specs
_ Rinf.: W.W.F. _ Clearances
_ Rinf.: Tendons _ Positions
_. Cone.: Mix #/psi /sizes
_ Cone.: Mix #/psi _Laps
_ Cone.: Mix #/psi_ _ Future Continuity #/psi
_ Grout: Mix #/psi _ Consolidation
_. Mortar: Type/psi _ Mortar Batching
_ Units: Block _ Electrode Storage
7 units: ~-. . .
_. _ Steel. l IY1 1/_s:b.b, E
_ Torque Applied
_ H.S. 13olts .
_. Metal Decking .
v Electrodes £',z.o;a S:-zl~S
_ Fireproofing ..
~ Other /fs(f"I 11-t:.~ _ Corrective action required __
_._ Corrections completed
l(d'.Jy /H~clti~ ~f \ -fYk f ,t,,, J //4.':u;-i3FY€L. ,<;goo V€
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME 'p. ~ ~ ~ g_
(Print Clearty) y
INSPECTOR SIGNATUREP¥ ~_.R
PSl·B-900·170(2)
f(A6 c.
CERT. NO. ff 7 ~ .J
J
DATE __ ~z_---"--'/(,..,o..__-...... ,?._.._ _______ _
Page_1_ofL
INSPECTION REPORT
PROJECT (Name) __ k,;.._;;,_/~-~CJ.-/4..:....'4--t-__ --=J"--_
CLIENT_£-=-&__,/_(J....._ __ _
DATE _ _,7_--=-Z_._J_-__,_7 ........ <:f_---'----"-(Address) /4,
~7?~/), G:. ~ '
Architect ___ ..... M___.__tJ___.~.----------=------'-
Engineer __ d/4_!f£_ ___ ~l-"'='--=-/--~------........ -c.....,..:,i2c,-~~t. __ • _
REPORT NO. __ 'Z ...... 6...,.__2,~tJ--Z..""--___ _
Building Permit No. ___ j' .... ?_-_2..._o/ ...... l ______ _
Plan File No, ________________ _
Govt. Contract No. ______________ _
Contractor._~l3 ___ ]_3_ ----'{!~------,----
INSPECTION MAT'LSAMPLING QTY MATERIAL DESCRIPTION ~PECTION CHECKLIST l
__ OSHPD __ Concrete Cylinders ---____ Rint: Rebar _ Plan & Specs !
_OSA __ Cement --__ -Rinf.: W.W.F. _ Clearances I
_Specialty __ Mortar Samples _.Rinf.:·Tendons _ Positions ! --
_ Mechanical __ Grout Samples --_ Cone.: Mix #/psi ·7sizes i
__ Electrical __ Masonry Prisms __ _ Cone.: Mix #/psi _Laps l . . I _Roofing __ Masonry Block --_. Cone.: Mix #/psi . _ Future Continuity #/psi
_Concrete __ Fireproofing _ Grout: Mix #/psi _ Consolidation i -·--I
' _Masonry __ Units (block or brick) --_ Mortar: Type/psi _ Mortar Batching
L Struct Steel __ Asphalt Concrete __ Units: Block ..IL Electrode Storage I _ Prestress Cone __ Roofing --_ Units: Brick _ Torque Applied
__ Pile Driving __ Reinf. Steel .-·--L Steel ,Jf$1"""1 /1--rtrt; 73_
_ Fireproofing __ Steel -· HS.Bolts
__ Waterproofing __ H.S. Bolts --_ Metal Decking •
_ Non-Destructive __ Tendon (PT Strands) ,.....Le1ectrodesk20X)(' S -c:.E,1e. S
_Soils Technician __ Other / Fireproofh1~ J4 -.
__ Batch Plant __ Other --_ dtherlf( Z-t-t I'2 _ Corrective action required __
__ Bolt Pull-Out __ Other --._ Corrections completed ..
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported Work, unless otherwise rioted, substantially complies with approved plans,
specifications and applicable sections of the-building codes. This report covers the loCl:ltions of the work inspected only and does not constitute engineering opin-
ion or project control.
CERT. N0.--1..'1.r.J.K....!..li..:::::6_::..J __ S':...l!:P::......4'___:,::......),!;._/-/ __ _
INSPECTOR SIGNATUR<' ~
PSl-8-900-170(2)
DATE __ _,7e......--=2=..:/,__-....r../'-=;/~-------
. .
l ·1 Environmental K 1. 8::!r:U'J:1~::' Page_1_. of _L
Consulting • Engineering • Testing INSPECTION REPORT
cuENr __ L=---e:...,;;7r-o ____ _
DATE _ __,7,_-.... 26...._-....... '2-~---
Architect __ __,__/i-+---!O=--.... c __________ _
Engineer _ _,.{d'---..,.A-~...,2"'""1;'""", µ_._c/:~ .... t?Z---',-f. · .... A-. .... 72-=i"-'-c--'1..,.;""". ----,,-'-,----
Contractor. ___ /3=-_7i.___--=C.ac....-____ --,--.. __ -,--
INSPECTION MAT'L SAMPLING OTY
__ QSHPD __ Concrete Cylinders -·-
_QSA __ Cement --__ Specialty __ Mortar Samples --
__ Mechanical __ Grout:Samples --__ Electrical __ Masonry Prisms --__ Roofing __ Masonry Block --__ Concrete __ Fireproofing -·-__ Masonry __ Units (block or brick) ----L Struct Steel ___ Asphalt Concrete
__ Prestress Cone __ Roofing --
__ Pile Driving __ Reinf. Steel -·-
__ Fireproofing __ Steel --__ Waterproofing __ H.S. Bolts --__ Non-Destructive __ Tendon (PT Strands)
__ Soils Technician _. _Other
__ Batch Plant __ Other --·
__ Bolt Pull-Out . __ Other --
PROJECT (Name>-k~~~;=o=/4.=...:Pr-"Y'-:.....:.-..!O:J"--_· --
(Address)_--,.,...--,-------,,,..---
Gds81cc, , {l ,
REPORT N0 .. __ -#-7__..o'-A,2 ..... 0.._.2.--=---__._7..___7_,_·1/ __
Building Permit No . ..;..· ___ 7' .... ;z._-_Z~-/'--'-{ _____ _
Plan File No,---~-------------
Govt. Contract No. ______________ _
OSA or OSHPD # i../
Other · CMT &-IA->~
MATERIAL DESCRIPTION INSPECTION CHECKLIST
_ Rinf.: F\ebar v"' Plan & Specs
_ Rinf.: W.W.F. ·-Clearances
___ . _Rinf.: Tendons _ Positions
_ Cone.: Mix #/psi Lsizes
._ Cone.: Mix #/psi _Laps
_ Cone.: Mix #/psi. _ Future Continuity #/psi
_ Grout: Mix #/psi _ Consolidatio
-. Mortar: Type/psi _ Mortar Batching
_ Units: Block .,rElectrode Storage
_. _. Units: Brick
13.
_ Torque Applied
v' Steel l!J:irm HS-::Q.Q
_H.S.Bolts
_. Metal Decking. ;
./ Electrodes l:.701~ AA
___ Fireproofing . 7J
_ Corrective action required __ . / Other lf<Tm . lie
_ Corrections completed
REMARKS
1/4:r ~ 11-~ ~ ,., s'pb-c..TISD -tf...+ . fl( I.e..-/ ,-,. d .f'/.,,,2," ~.we ~ zoo I"~
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of toe work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAM•~
(P~
:~,~t;;;~RSIGNATUR~
· '1810 3 5''D -H-3c; / CERT.NO, _ _,_ ____ _,_ __ =--'-.._ ______ _
DATE ___ 7..__-_z_o_.-__._65' __ ? ______ _
Page_1_of_ ·
INSPECTION REPORT
CLIENT ~ Ldc-£D
DATE G-lf-'98
PROJl::CT (Name) '=<i"k<2 <4""'?>
(Address) (!,,u-<-~B."1-e 61,
Architect__.M~o~~----------'--------
REPORT NO. <?:i -Z· 7es;,;-.,;.. -~ 28
Building Permit No. ___..,f.s .... -'---_.2:::...'-fwl'-----------
Engineer m,1~w,.;
INSPECTION MA T'L SAMPLING
_OSHPD ___ Conc:rete Cylinders
_OSA __ Cement
_2£..Specialty _._ Mortar Samples
__ Mechanical ___ Grout Samples .
__ Electrical __ Masonry Prisms
__ Roofing __ Masonry Block
..x_Concrete __ Fireproofing
__ Masonry . __ Units (block or brick)
__ Struct Steel __ Asphalt-Concrete
__ Prestress Cone __ Roofing
__ Pile Driving -.-Reinf, Steel
__ Fireproofing __ Steel
__ Waterproofing __ H.S. Bolts
__ Non-Destructive __ Tendon (PT Strands)
__ Soils Technician __ Other
__ Batch Plant __ Other
__ Bolt Pull-Out __ Other
REMARKS
tf:T
,
D.s,,.
0 VC:'22-d ,_,
QTY
--
--
--
--
--
--
--
--
--
--
--
-·-
--
Plan File No, _________________ _
Govt. Contract No.-'-------------------
OSA or OSHPD #~-------------
Other Mll4" tl4-mtC tNAJ 04--12
MATERIAL DESCRIPTION INSPECTION CHECKLIST
_a_ Rinf.: Rebar A{;,r:f. -~.e.~,, ~ Plan & Specs
__ Rinf.:W.W:F. ~ Clearances
__ Rinf.: Tendons 2::L Positions
___ Cone.: Mix #/psi ..!:!i:....Sizes
__ Cone.: Mix #/psi ....-:..Laps
__ Cone.: Mix #/psi _ Future Continuity #/psi
__ Grout: Mix #/psi _ Consolidation
__ Mortar: Type/psi -. Mortar Batching
__ Units: Block _ Electrode Storage
__ Units: Brick Torque Applied
__ Steel
__ H.S. Bolts
___ Metal Decking
___ Electrodes
__ Fireproofing
__ Other __ Corrective action required __
_ Corrections completed
...
4a<M~tY 1>r9;;, Eoqn..-v¢,c; AZ: t,.4Y6'S·· 6,'5-41'$TV
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME J)tDW'JL.. :? Ye:rt-:'.1L":>Ot,.)
''""'"""' ~
INSPECTOR SIGNATURE~ J :r 2.
PSl·B-900-170(2)
CERT. NO. tisacx,e,1-ss
DATE_-=l.~-=-i...f~l-:__,'~~"----,--------------
·· i a~--, 16¥"dffrtation
·c" M-.,• .toBuita:oii ·
-. : ~· "
· Page_1_of ~ ·
Engineering • Consulting • Testing INSPECTION REPORT
CLIENT_l_e_,_o ___ _
DATE_--.ez?_-J __ f_-_,<j._..~--·--
Architect __ _._H--'--....;Q~-'~=-------'--"--,---
Engineer_fVl_.....)4::j._.,i2.=-h~~'-----t'---'-'-n?---+.-.:..:th!.....,__._t..L.:;c~-=·--'----
Contractor. __ 'i) ______ l3-=-_c_"""'·~---....,...--'-----
INSPECTION MAT'LSAMPLING QTY
__ OSHPD L Concrete Cylinders -!t-
_OSA __ . Cement
__ Specialty ___ Mortar Samples --
__ Mechanical __ Grout Samples --
__ Electrical ___ Masonry Prisms
__ Roofing ___ Masonry Block
.......--Concrete __ Fireproofing --__ Masonry __ Units (block or brick)
__ Struct Steel __ . A_sphalt Concrete --
__ Prestress Cone __ Roofing
__ Pile Driving __ Reinf. Steel --
__ Fireproofing __ Steel --·
__ Waterproofing _._ H.S. Bolts --
__ Non-Destructive __ Tendon (PT Strands)
__ Soils Technician __ Other --
__ Batch Plant __ Other
__ Bolt Pull-Out __ bther. --
REMARKS
PROJECT (Na~e) ·Le7cl*nd
(Address)___, ______ ___,~-
{J;~/'5 B&u . (; ·
REPORT NO. __ 7._,0--=Z-=O-"'Z-'---_f?_._L/.._7-'-ff_.__
Buil~ing Permit No. ____ 9_~g: __ -~Z.~1/~l ____ _
Plan File No,-------'-----------
Govt. Contract No.__,----~--------
OSA ·or~~-7# C)-7,f
Other CdJ:s_& fi"ij,_[k;,J:~
MATERIAL DESCRIP~ INSPECTION CHECKLIST
/Rinf.: Rebar ~'t"m •_;£ /p1an & Specs
_ Rinf.: W.W.F. . . . . --'clearances ·.
_ Rinf.: Tendons 0ositions
. .,/' Cone.: Mix #/psi-~ZZ.. / ::r 00 r: Lsizes . ,
_...--Caps _ Cone.: Mix #/psi
_ Cone.: Mix #7psi . _ Future Continuity #/psi
_ Grout: Mix #/psi L Consolidation·
._. Mortar: Type/psi . _ Mortar Batching
_. _ Units: Block _ Electrode Storage
_ Units: Brick _ Torque Applied
_Steel
_H.S.Bolts
_. Metal Decking
_ Electrodes
_ Fireproofing
_ .. _Other _ Corrective.action required __
_ Corrections completed
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTORNAME ~ ~fl-:; 9 ~7:-~~y
INSPECTORSIGNATURl'~·~Q .,
PSI-B-900-170(2) • ,
~~l~o._.,..3~S:~.3.L.,S-1-1Z..z_.__S))~F#-=J~S:_,_/ __ _
DATE _ ____,,<g-=---f...L..)_--.Cf'8~------
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR: MR. DAVID CATTLE
LEGOLAND ESTATES INC
5600 AVENIDA ENCINAS
SUITE 130
PROJECT: LEGOLAND THEME PARK
CARLSBAD, CALIFORNIA
CARLSBAD, CA 92008
DATE: May 19, 1998. Ol)RREPORT NO.: 059-70202'-582
FIELD DATA:
LOCATION OF PLACEMENT CASTLE INN. BUILDING SLAB-ON..,.GRADE #B
PERMIT# 98-241
DATE PLACED
TIME
May 07, 1998.
10:45 am
SUPPLIER
DELIVERY TICKETNO.ffRUCK NO.
MIX.NUMBERANDPROPORTIONS
NELSON & SLOAN
696287
SLUMP, IN. 4 l/2
AIR CONTENT, %
65 AIR TEMPERATURE, °F
CONCRETETEMPERATURE, °F 77
DATE RECEIVED IN LAB May 08, 199$
FIELD DATA SUBMITTED BY PSI\DEREK PETERSON
MIX DATA SUBMITTED BY NELSON & SLOAN
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
N_OIE:.Ae.e.LlCA8l.E.hSIM.SIANRABP.S,U.NLE_SS_Oil:!l;BWI.S.ia.Jl'!D)CAJEQ;.SL)Jf,le:...c_t§;l-~A:.818,CQtiTI:l,lI:.Q2;1J·9.1ll:...1EMe.eBAIUBE~.e.4.:S§(l1.3):...Cl.leetN,G;_C12.lli~.3
COMPRESSION TEST RES UL TS .
ASTMC39·94
EN I TEST
r-
SPECIM l LABORATORY IDENTIFIC ATIONI AGE l DATE OF
1386
NUMBER OR SET NO. ! (DAYS) I TEST
TOTAL LOAD (LBS.)
CYLINDER DIAMETER (IN.)
CYLINDER
AREA
(SQ. IN.)
COMPRESSIVE STRENGTH (PSI) TYPE OF BREAK
---l ' I 16908 A I 7 05/14/98
16908 B I 28 06/04/98
16908 C I 28 06/04./98
16908 D I I
90000 6.00 28.27 3180 Cone
I i I ! I ; i l I
-~--t-------:------------------' ···------· --'-----·---·-------+----------·-------·-· -···----·-
SPECIFICATIONS I 1
i 28 __ ,_! __ 2500 --------------------~----~-------~
REMARKS: X Cylinders made by PSI representative. Cylinders picke'd up by PSI X representative. Test results comply with applicable specifications.
Cylinders made by Architect's or
Contracto~s representative. Cylinders delivered to PSI laboratory.
Test results do not comply with
applicable specifications.
ALL CYLINDERS CAPPED IN ACCORDANCE.WITH ASTM C6l7-94.
TECHNICIAN: DEREK PETERSON Respectfully submitted,
cc: LEGOLAND (4), BERNARD BROTHERS, H.O.K., CITY OF CARLSBAD cz5::;rvic91dus01es, Inc
DAVID J. R;/.""'f-THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED ANO MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED. EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC,
PSI A·200-4 (4)F
DISTRICT MANAGER
Information To Build On
Professional Service Industries, Inc. • 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
REPORT OF DA.U. Y BUIL T-1.JP ROOFING INSPECTION
OWNER: Lego Land Estat~, Inc.
GENERAL CONTRACTO.R: Bernards Brothers Construction
SUPERINTENDENT'S NAME: Chuck Schneid~r
ROOFING CONTRACTOR: Hayden Roofing Company
DATE: August l, 1998, Saturday
PROJECT: Lego Family Park USA
Cannon Road, Carlsbad, CA
REPORT NO: 059-70202, 219-77044 (44)-853>
· Areas worked:_..::::C.::::as.,_,tl,._e_..lnn=--------:..----------------------------------,-,...,.---'----------% Project Co~pleted: 90
Weather: overcast . Temperature: 60 "F to 80 °F
Roofing foreman: Bill Sellnn C,ew Size: 5 Time Worked: 7:00 a.m. to --=3=:00=-i:P=·m=:,...___,_ ___ _
Cant Size: 3" Type of Drain: Smith. cast iron Cricket size/slope: 1/2" per foot Deck
Type: plywood Clean, yes . Dcy: yes Slope:· 1/4" per foot
Material Protection: On pallets? yes Covered:? yes Labeled? yes Dry'?_,y:..:=e:.:e..s __ _
Base Ply: GS Glasbase Base Sheet #25 Attachment: Senco Staples & tape or 1" sq. head nails
Spacing: 18" O.C. two rolls center of sheet 9" O.C. on laps
Roof Ply Type: Flintglas Type IV and GMS.Roll Roofing Specification No: GMS.:.2-3-I.II Modified
Number of Piles: Three Application Method:.---=-s:.;:;:o.:..:1i=d..:.:h=ot"-'m=opi:;..._ _______ _
Surfacing: Type: rock _ Embedrnent:---:.h.:.::o:.:a.t-=a~fill~h=a::.:lt _______ ---,-
Flashing Type: Flintlastic GMS/fl Modified. Asphalt Spec.#. ~=M~B::::F:...· ______ _
Attachment Method: solid hot mop· -· Fastener: 1" round nails Spacing: _....:;9;,..." _____ _
Bitumen: Type: ill Bulk shipment or carton? . carton
(EVT "F) Kettle Temp: 8:30 a.m .. 500°F 11:00 a.m. '500°F_p.in. _. _· _°F
Rooftop Temp.: 8:30 a.m. 470°F 11:00 a.m. 470°P . p.m. ___ °F
Edge Metal Type: n/a Gauge: ____ _
Counter Flashing: Type: galvanized Gauge:-=2=6 ___ _
Night Seal: __,h=o=t-=ae,:,isp;,:,::h=a=lt ...... ____ -___ ..,... ______________ __,... _____ _
Debris Removed: yes · Penetrations Sealed: yes Test Cut: _,!.!Cno::<__ _____ _
COMMENTS:
I. Install 1-1 /2" perlite insulation on side walls of air conditioning platforms. Set in mastic and fastened with No. 6 nails.
2. Install one ply of GS Glasbase 25 lb. base sheet on walls and air conditioning platform. Solid hot mop on insulation and fastened on
plywood walls with l" round head nails. . .
3. Solid hot mop one ply of GS Flintlastic GMS modified cap sheet over completed one ply of Flintglas Type IV fells using felt machine and
hand mops.
4. Solid hot mop one ply of GS Flintlastic GMS modified' cap sheet on wall, box:es, and air conditioning platform. Fastened at top of sheet
with 1" round nails 9" O.C.
5. [nstall drain and overflow clamping rings. tighten with 4 bolts.
PSI INSPECTOR: Bill Davis
Pi·oressional Sc::rvicc'lmlustric.~, Inc., 3!i0 S. Maple, Unit K, Corona. CA 91720. (909) 272-4230
l0/Z0"d 083!0 N~S 01 tlZv ZlZ 606
I
I
. ·~ ' .
KEY.Vlff VI<" UAJJ., l' tsUi.LT-UY .KUU.tlNli .lMSP.t:Cl'lUN
OWNER: Lego Land £'states, Inc.
GENERAL CONTRACTOR: Bernards Brothers Construction
SUPERINTENDENT'S NAMS~ ¢huck Schneider
ROOFING CONTRACTOR: Hayden Roofing Company
DA TE: July 31, 1998, Friday
PROJECT: Lego Family P~k USA
Cannon Road, Carlsbad. CA
REPORT NO: 059-70202, 219-77044 (43) ~BScQ.
Areas worked: Castle Inn -==-==----------------------,---,,---"-------------------'------------,-------~---· % Project Completed: ____ ....__
Weather: overcast, surtny after 10:00 a.in. Temperature: 60 ~F to 75 uF
Roofing foreman: Bill Sellen Crew Size: . S · Ti.me Worked: 6:30 a.m. · to ___,6=:0=0..cP=·m=·=--·------
Cant Size: 3'' Type of Drain: Smith, cast iron Cricket size/slope: 1/2" per foot Deck
Type: .]l~wood Clean: yes Dry: yes Slope: 1/4" per foot
Material Protection: On ·pallets? . yes Covered? yes Labeled'? yes Dry? _,y~e .... s __ _
Base Ply: GS Glasbase Base Sheet. #25 Attachment: Senco Staples & tape or l 11 sg. head nails
Spacing: 18" O.C. two rolls center of sheet 9" O.C. on laps -·
Roof Ply Type: Flintglas I~pe IV and GMS Roll Roofing Specification No: GMS-2-3-ID Modified
Number of Piles: · Three Application Method:..,.._ -=s=ol=id:;...;h=o=t~m=o=p___,,. __ -'--____ _
Surfacing: Type: rock Embedmertt:---=.h.:;;o=t-=a::a:.ispi;;.::ha=lc=-· ___________ _
Flashing Type: Flintlastic GMS/fl Modified Asphalt Spec.# .... :M=B=F _________ _
Attachment Method: solid hot mop Fastener: l" round nails Spacing: _..,:::9_" _____ _
Bitumen: Type: · ID Bulk shipment or carton? carton
(EVT 0F) Kettle Temp: 11:00 a.m .. 500°F i::00 p.m. 500°F 3:06 p.m. 490 °F
Rooftop Temp.: 11:00 a.m. -470'°F 1:00.p.m. 470°P .]_;_QQp.m. 460 "F
Edge Metal Type: n/a · Gauge: ____ _
Counter Flashing: Type: galvanized . Gauge:=2.;:;..6 ____ ---,-
Night Seal: __,h=o=t-=a:::.iSPi:..:h=al=t:......,... ___ ~------.---------,.--,----------------
Debris Removed: yes · Penetrations Sealed·: yes Test Cut: -=no=·------
COM1\.1ENTS:
I . Clear plywood deck with power blower.
2. Covered metal straps ?lld plywood edge of cricket wil:h one ply of invl!rtcd cap sheet.
3. Install 3" cant strip at base of wall and boxes. Fastened with No. 6 nails to plywood deck. .
4. Install one ply of GS Glasbase 25 lb. base s!).eet-over plywood deck. Fastened with 1" round heaq nails. Set in mastic at drains.
S. Solid hot mop one ply of GS Flintglas Type IV felts over completed: 25 lb. base sheet using felt machine and Jland mops:
6. Solid hot mop one ply of Poly SMS base sheet 1n drain area, around all pipe penetrations, and metal vents.
7. Prime all drain lead, lead pipe flashings and metal vents with asphalt primer. All set in bed of mastic over Poly SMS base sheet.
PSI INSPECTOR: Bill' Davis
Professional Service Industries, ln~ .• 350 S. Maple, Unit K. Corona, CA 91720, {909) 272-4230
l0/170"d
SEP 17 '98 13:51 FR PSI CORONA CA 909 272 4~71 TO SAN DIEGO P.02/09
REPO~T OF DAil,Y BUILT-UP ROOFING. INSPECTION
OWNER: Lego Land Estates, Inc. PROJECT: Lego Family Park USA
Cannon Road, Carlsbad, CA
GENERAL CONTRACTOR: Bernards Brothers Construction
SUPERINTENDENT'S NAME: Chuck Schneider
ROOFING CONTRACTOR: Hayden Roofing Company
DATE: Sept. 9, 1998., REPORT NO: 059-70202, 219-77044 (50) -9 t;;i_
Areas worked: Castle Hill Roller Coaster -main building and north wing
------------.-----------~-% Project Completed: 90%.
Weather: cloudy morning, sunny afternoon Temperature: 65 °F to 85 °F
Roofing foreman: Bill Sellon Crew Size: 5 . Time Worked: 8:bo· a.m. to --=5=:3=0..,p=.m=''-------
Cant Size: 3" Type of Drain: Smith~ cast iron Cricket size/slope: 1/2" per foot
Deck Type: plywood Clean: · yes Dry: yes Slope: 1/4" per foot
Material Protection: On pallets? yes Covered? yes Labeled? yes Dry? _.y"""e""'"s __ _
Base Ply: GS Glasbase Base Sheet. #25 Attachment: 1" round head nails
Spacing: 18" 0.C. two rolls center of sheet 9" O.C. on laps
Roof Ply Type: Flintglas Type IV and GMS Roll Roofing Specification No: GMS .. 2-3-ID Modified
Number of Piles: Three Application Method:---'s-o=li=d~h-o~t .... m=o_o ______ _
Surfacing: Type: rock .Embedment:--=h=o=t""'a..,.sp""'h=al=t _________ _
Flashing Type: Flintlastic GMS/fl Modified Asphalt Spec.#. :=MB=F~------
Attachment Method: solid hot mop Fastener: I" round nails Spacing: -~9_" ___ _
Bitumen: Type: Ill Bulk shipment or carton? carton
(EVT 0P) Kettle Temp: 9:00 a.m. 475°F 11:00a.m. 500 °F 1:00 p.m. 500 °F
Rooftop Temp.: __ a.m.-"-°F ---12.m. °F __p.m. _11F
Edge Metal Type: n/a Gauge: ____ _
Counter Flashing: Type: n/a Gauge: _____ _
Night Seal: __,h=o=t-=as1p=h=al:.:;..t _-_____________________ _
Debris Removed: yes Penetrations Sealed: needs mastic Test Cut: -~n=o _____ _
COMMENTS:
1. Laid out cant strip and nailed with No. 8 nails, 12" O.C.
2. Rolled out base, let relax, nailed with 1" round head nails, mastic at drains.
3. Solid mopped one ply of Type IV Flintglas.
4. Solid mopped one ply poly base around pipes and drains.
5. Mastic drain leads in place and lead jacks, primer on top.
6. Nail Glasbase to walls with round head nails.
7. Solid mop Modified cap sheet to roof.
8. Solid mop Modified cap to wall flashing and nail top 9: O.C.
9. Drain rings screwed down.
Note: Loose base flashing laps need.mastic.-To be done with other mastic work when roof is to be rocked in.
PSI INSPECTOR: Bert Mantik
Professional Service Industries, Inc., 350 S. Maple, Unit K, Corona, CA 91720, (909) 272-4230
Page_1_of __l_
INSPECTION REPORT
CLIENT 1~1 t)
DATE t,--2,5,.. <r<E
Architect __ +f-/__...___Q ____ ~-------'-----"----------'---,-------
Engineer____,,n'"--'-"_l'h2-~~--J.J-~·~9_· ~/2t .......... ~_: __ -.,__./ .,J-=---· --
Contractor. ___ "'-=/3=-.... £3=---'~=----,------.,..--------
INSPECTION MAT'LSAMPLING QTY
_OSHPD __ Concrete Cylinders ---
_OSA , __ Cement. --
_Specialty _. _ Mortar Samples --
_Mechanical ___ Grout Samples --
_ Electrical _ Masonry Prisms --
_Roofing _ Masonry Block --
_Concrete _.Fireproofing --
~Masonry _ Units (block or brick}
_ Struct Steel __ Asphalt Concrete ---
_ Prestress Cone _Roofini;;r --
_Pile Driving __ Reinf. Steel --
-. _Fireproofing _Steel
_Waterproofing __ H.S. Bolts --
_ Non-Destructive _Tendon (PT Strands)
__ Soils Technician _Other --
_ Batch Plant _-_Other --
_ Bolt Pull-Out __ Other ---
REMARKS
PROJECT (Name)-~:;..;;·;;...,~-=-t)~~-----.;:;.;_d=-----· __
(Ac:ldres$) ______________ _
arLfsB6-D -(1. ..
REPORT NO. __ '1-=a_"Z. ___ 6....,..2=-,-__ . 7_µ_1/-,--_
Building Permit No. ___ ....,9t..J'8 .... ·_-~2 .... ,4_. -_,_/ _____ ---'--
Plan File NO,---------~------
Govt. Contract No.-----------------
OSA or Of~:: jf~, r-Other Cb-Lt~, tt1. _
MATERIAL DESCRIPTION .J;SPECTION CHECKLIST
.J!... Rinf.: Rebar Jtk'P't. J!k,1_r Plan & Specs
_ Rinf.: W.W.F. -z Clearances -
_ Rinf;: Tendons /positions - _ ·
_ Cone.: Mix #/psi ./ Sizes
_._ Cone.: Mix #/psi ~Laps _
__ Cone.: Mix #/psi __ Future Continuity #/psi
__ _ Grout: Mix #/psi _ . -_ Consolidation.
~ Mortar: Type/ps~ ~~ _ Mortar Batching
~Units: Block /!t, ~ °"10 · ~ Electrode Storag~
__ Units: Brick __ Torque Applied
_Steel --
_H.S.Bolts
_ Metal Decking
_ Electrodes -
__ Fireproofing
_ Other _ Corrective action required __
_ Corrections completed
. 'Lnb2-<'TJ_ ±le. J"'711'\7 e-.f 'l .... $1}'.Y\ C-<;c /\}-[ mcd1~,-..._,
l ST L1.er.
!«~ .· ·.
CERTIFICATION OF COMPLIANCE: To the best ofour knowledge, all of the,reported·work, unless otherwise noted, substantially·complies with approved,plans,_
specifications and applicable sections ofthe building codes. This report covers the locations of the work inspected only and does not c.onstitute engineering opin•
ion or project control.
INSPECTOR NAME~ K~ ~ 9. -
(Print CleaM)/
INSPECTOR SIGNATURE~ ]CG<--$--;. 0
PSl-8-900-170(2) f
~~l~o:*.:3:i201 , SD ~::ss1
DATE l_a ... 2.'3 --5:2
~ · 7 Environmentcd I Geotechn!cal Page_1_of J_ ~ Construction
Consulting • Engineering • Testing INSPECTION REPORT
cueNr_-=L=C!:.-.......,7_......o _______ --
oArE ___ G_-__ 1 ..... r_-c:nf ............ __ _
Architect __ ;-/---'-_0..,..-""""/c---'t:_"-----'--~----,'-----
Engineer__._ril,....;._r;...=M.. ........ Z .......... 2----E.'7:___._~__.-~=~"'-'-"'.0"'-·_~---
Contractor. ___ J3.._____,6=-...,C-""'".-----------'---
INSPECTION MAT'L SAMPLING QTY
_OSHPD __ Concrete Cylinders --
_OSA ___ Cement --
__ Specialty ___ Mortar Samples ----
__ Mechanical ___ Grout Samples --__ Electrical __ Masonry Prisms --__ Roofing __ . Masonry Block --
__ Concrete ___ Fireproofing --__ Masonry __ . _Units (block or brick) --
/ Struct Steel __ Asphalt Concrete --
__ Prestress Cone .. __ Roofing --__ Pile Driving __ Reinf. Steel --
__ Fireproofing ___ Steel --
__ Waterproofing __ H.S. Bolts --·-
__ Non-Destructive __ Tendon (PT Strands)
__ Soils Technician __ . Other ·--
__ Batch Plant ___ Other
__ Bolt Pull-Out __ Other
PROJECT (Name) kqolft13 d .
(Address) 7 _ . _ Z11-,!s<-{) . U ..
' . 1 J09 REPORT NO. --,--~-Z'--'a~2 ...... al,,,,L-;Z_......-~ .... .___+, _
Building Permit No. --------0
.... 1--='f----------------~
Plan File NO,--------------~--~
Govt. Contract No.---'------------------~
OSAor~o,
Other (As.1 f-G
MATERIAL DESCRIPTION
_ Rinf.: Rebar
___ Rinf.: W.W.F.
_ Rinf.: Tendons
_ Coric.: Mix #/psi
_ Cone.: Mix #/psi
_ Cone.: Mix #/psi
_ Grout: Mix #/psi -
._ Mortar: Type/psi
_ Units: Block
_ l./nits: Brick
~Steel As[~ ti,~ ~ .. 6
_ H.S. Bolts -
iNSPECTION CHECKLIST
./ Plan & ·sp:Scs
_ Clearances
__ Positions
·7sizes --
-_Laps
. -_ Future Continuity #/psi
·-· Consolidation
-. Mortar Batching
_ Electrode Storage
__ _ Torque Applied
~ Metal DeckinQ_; ... ,
~Electrodes -h "7-:Jt ~Pl(!.<;
_ Fireproofing
Y"0ther~l.11!:l if_~&" _ Corrective action required_-_
. _ Corrections completed
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications.and applicable sections of the building-codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTORNAMF~~4-5{--· . J;;{X/~M INSPECTORSIGNATUR•~ ~
PSI-B-900-170(2)
tflr~No ... qvo-r . 52,# :s~; _ I
DATE----"'-~--___,.;..../"'---f---'-1'(_;__ _____ _