HomeMy WebLinkAbout1 LEGOLAND DR; ; CB980626; PermitI V2of5'f>
I I.
I/· 02/27~98 13:25
~-Page 1 of 1
BUILDJ,'.NG P E 'RM I T Permit' No: CB980-62($
Project·, No:· A9,800799
_Development. No:
Job Address: 1 LEGO DR
Permit. Type: GOMME~CIAL . BU:CLDING
Parcel No: 211-100--09-00
Valuation: 311,507
Suite:
Lot#:
Occupancy Group: Referen~e#:
De·scrip't;.iori: 1,646 SF BUILDING" IMAGINATION
~ PUBLIC TOILETS" PLAN CHECK 98-25
Appl/Ow~r: ADACH1, KYOKO 310
1655 26TH STREET #200
Constrµ¢tion Type: VN'
· Statµ~: ISSUED
Applied: -02/26/9·8
Apriissue: · 02/27/98
. Entered By;. MD:P 453-·oi'oo· ··
I Fl~I,£ APPROVAL
INSP.W;t: · DATE 3'. S·f L I CLEARANCE . . ' -~
CITY ,OF CARLSBAD
. 2075·:tas Palmas Dr., Carlsbad, CA 92009 (619) -438-1161
City of Carlsbad ·inspection -Request
For: 3/2/99
Permit# CB980626
Title: 1,646 SF BUILDINGIMAGINATION
Description: PUBLiC TOILl;TS" PLAN CHECK 98-25
Type: COM Sub Type:
Job Address: 1 LEGO DR
Suite: Lot
Location:
~PPLICANT : ADACHI, KYOKO
Owner: LEGOLAND CARLSBAD INC <LF> LEGO
Remarks:
Total Time:
CD Description Comments
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
----
--
----
Inspection History
Date Description Act .lnsp Comments
1/21/99 89 Final Combo co PD
1/19/99 89 Final Combo co PD
1/4/99 89 Final Combo co PD
9/11/98 17 Interior Lath/Drywall AP DH
9/9/98 16 Insulation AP PD
9/8/98 16 Insulation AP PD
8/20/98 17 Interior Lath/Drywall WC PD·
8/20/98 18 Exterior Lath/Drywall AP PD
8/19/98 18 Exterior Lath/Drywall NR PD
8/18/98 18 Exterior Lath/Drywall NR PD
8/14/98 84 Rough Combo AP PD
6/3/98 14 Frame/Steel/Bolting/Welding WC PD
6/3/98 18 Exterior Lath/Drywall PA PD
5/19/98 14 Frame/Steel/Bolting/Welding NR PD
5/19/98 15 Roof/Reroof AP PD
5/19/98 83 Roof Sheath[ng/Ext Shear AP PD
4/13/S8 12 Steel/Bond Beam AP PD SLAB
4/10/98 -12 Steel/Bond Beam CA PD SET FOR4713
Inspector Assignment: PD ---
Phone:
ln~peclDdL
Requested By: JIM SKATES
Entered .By: ROBIN
JUN 01 '98 11:01 FR PSI CORONA CA 909 272 4271 TO SAN DIEGO P.03/03 . . .,
REPORT ()F DAILY ~UILT-UP ROOFING INSPECTION
OWNER: 1...cgo Land Estates, Inc. PROJECT: Lego Family Park USA
Cannon Road, Carlsbad, CA
GENERAL CONTRACTOR: Bernards .Brothers Construciion
SUPERINTENDENT'S NAME: Chuck Schneider
ROOFING CONTRACTOR: Hayden Roofing Comp¥iy
DATE: May 28. 1998 · REPORT NO: 059-70202, 219-77044 (33).
-Le35
Areas worketl: ___ _.I.:.:am=ag=:ina=ti,.,,,on=R""es,.,,tr.,.o""oms.,.,,,_ __________ .,,..... _____ ___,,---------------------------------------------% Roof Completed: · 80% Weather: partly sunny Temperarure: 55 np to._lQ_aF
Roofing foreman: Fidencio Crew Size: 4 Time Worked: 6:00 to i:00
Cant Size: ___ 3_" __ Type of Drain: Smith . Cricket size/slope: 1/2" per foot
Deck Type: plywood_ Clean: _ yes Dry: yes -Slope: 1/4" per foot
Material Protection: Op pallets? yes Covered'? yes L~beled? yes Dry? .... Y...ae=s __ _
Base Ply: GS Glas base Base Sheet, #25 Attachment,_: _____,m=e=c=h=aru=· c=a=-1 _____ _
Spacing: two rows centr of sheet 18" on center and 9" on center at laps
Roof Ply Type: Flintglas Type IV and. GMS Roll Roofing Specification No: GMS-2-3-ill Modified
Number of Piles: · Three Application Method: nails and solid hot asphalt
~urfacing: Type: gravel Embedment:_.s=o=li=d-=h=o.::..t ----------'----
Flashing Type: Flintlasric GMS/fl Modified Asphalt Spec.#.=:M=B=F"-----------
Attachment Method: solid hot mop __ Fa.stener: 1" square head nails Spacing: 6"0.C.
Bitumen:
(EVT "F)
Type·: III Bulk shipment or carton? carton
Kettle Temp: 8:30. a.m .. 50CfF 11:00 a.m. 500 °f 1:00 p.m. 510 op
Rooftop Temp.: 8:40 a.m. 475°:F 11:10 a.m. 475 °F 1:10 p.m. _4=9-=-0 __ ''F
Edge Metal Type: n/a Gauge: ____ _
Counter Flashing: Type: n/a Gauge: ______ _
Night Seal:
Debris Removed: _y'-"e=-s ____ Penetrations Sealed:_.,_ye=s _______ Test Cut: ----=n=-o ______ _
COMMENTS:
1. Installed 3" cant strip at base of walls and around boxes. Attached to plywood-deck with No. 6 nails.
2. Installed tapered insulation on top side of air conditioning platform and two ins-ide comer at drains.
3. Installed over plywood deck one ply of GS Glasbase 2~ lb. base sheet. Fastened to deck with I" square head nails. Set in mastic al drains.
4. Solid hot mop one ply of GS Flintglas Type IV. over base meet.
5. Primed 2 lead drain, 7 lead pipe flashings and one metal flashing with asphalt primer.
6. Solid hot mop one ply of GS Poly SMS base sheet in drain .area and axound pipe penetrations. Set all lead for drain and pipes and one
metal flashing in bed of mastic on Poly SMS base sbeet. ·
7. Solid hot mop one ply of GS Flintlastic GMS Modified over completed Type IV ply 'and Poly SMS base sheet.
S, Solid hot mop one ply of GS Flintla.stic GMS Modified on walls, air conditioning platfonn and air conditioning curb over nailed 25 lb. bas
sheet. Fastened at top with l' square head nails, 6" on center. ·
9. Installed drain and-overflow clamp rings. Tighten with four bolts.
PSI INSPECTOR: ~B=il-=-1 =D=av...;is=------
** TOTAL PAGE.03 **
JUN 01 '98 11:01 FR PSI CORONA CA 909 272 4271 TO SAN DIEGO P.02/03
REPORT OF DAILY BUILT-UP ROOFING INSPECTION
OWNER: Lego Land E~tates, Inc .. ·PROJECT: Lego Family P3rk USA
Cannon Road, Carlsbad, CA
GENERAL CONTRACTOR: Bernards Brorhers Construction
SUPERINTENDENT'S NAME: Chuck Schneider
ROOFING CONTRACTOR: Hayden Roofmg Company
DATE: May 27, 1998 REPORT NO: 059-70202 , 219-77044 (32)
-1931
Areas workcd: ___ ... Im=ag=ina=cio=n ..... R=e=st:;,-'ro=o=ms~Cn=o=t r=e=ad::.,.y...,)._B=r="ic=k...,,B=ro=th=e=rs,,__ ________________ _ _____________________ .__ ___________ % Roof Completed: __________ _
Weather: ____ p.a::art_l..._y =sunn=y...__ ______________________ T,ernperature: 65 °F to _]L°F
Roofing foreman: .Bill Sellon Crew Size:-'s ______ time Worked: 6:30 to 3:30
Cant Size:~3_" __ Type of Drain: __ S:;::.::_· rru=·th,.._ __ . ______ Cricket size/slope: 1/2 11 per foot
Deck Type: plywood Clean: yes Dry:. yes. Slope: 1/4". per foot
Material Protection: On pall~ts? yes . Covered?_ye __ s ___ Labeled? . yes Dry?_.y~e .... s __ _
Base Ply: GS Glasbase Base Sheet #25. Attachrnent: mechanical
Spacing: two rows centr of sheet 18" on center and 9" on center at laps
Roof Ply Type: Flintglas Type IV andGMS RollRoofmg Specification No: GMS-2-3--ID Modified
Number of Piles: . Three. Applica~ion Method: · nails and solid hot asphalt
~urfacing: Type: _gravel . Embedment: ... s .... o...,.li=d-h=o~t --------------
, FlintlasticGMS/flModified Asphalt. Spec,#.=:M=B=F,_· _____ _
solid hot mop . Fastener:. No. 8 nail Spacing: 12"0.C.
Flashing Type:
Attachment Method:
Type: III Bulk shipment or carton? carton Bitumen:
(EVT °F) Kettle Temp: __ a.m. 0f ......:...... a.m. "F ___ ---tp.m. ____ °F
Rooftop Temp.: ___ a.m. "F a.m. _____ °F ____ p.rn. tip ----Edge Metal Type: 'n/a Gauge: ____ _
Counter Flashing: Type: n/a Gauge: _____ _
Night Seal:
Debris Removed: ..... Y~e=s ____ Penetrations Sealed:. yes .. . Test Cut: -~n~o. __________ _
COMMENTS:
1. Set up kettle and equipment on restrooms in Imagination-not ready .for Roofing (7:00 a.m.)
2. Nailed 40 lb. all weather base sheet on sloped plywood. Decks underlayment for shingles. On Brick Brothers and Fun Town all except 2
areas in front on Fun Town. ·
PSI INSPECTOR.: -=B=il=...:l D=a=-v=is _____ _
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR: MR. DAVID CATTLE
LEGOLAND ESTATES INC
5600 AVENIDA ENC+NAS
SUITE 130
PROJECT: LEGOLAND THEME PARK
CARLSBAD, CALIFORNIA
CARLSBAD, CA 92008
DATE: April 21, 1998 OUR REPORT NO.: 059-70202-482
FIELD DATA:
LOCATION OF PLACEMENT IMAGINA1ION. PBBLIC TOILETS FOOTNGS
PERMIT# 98-626
DATE PLACED
TIME
April 10, 19~8
08:00 am
SUPPLIER NELSON & SLOAN
SLUMP, IN. 4
AIR CONTENT, %
AIR TEMPERATURE, °F 56
CONCRETE TEMPERATURE, °F 70
DATE RECEIVED IN LAB April 13, 199!;3
FIELD DATA SUBMITTED BY PSI\I)EREK PETERSON
MIX DATA SUBMITTED BY NEL$0N & SLOAN
DELIVERY TICKET NO./TRUCK NO.
MIX NUMBER AND PROPORTIONS 1386
CEMENT
WATER
FINE AGGR.EGATE
COARSE AGGREGATE
ADMIXTURE
N.OJ.E;.hEELJCA6l.J:ASIM.l>IA!iOABllS.J./MJ.i;J,S OTHEBWISE INP!.CAWD·SLUMe;...~IB CONTENT· <;231-91b· TEMPE\lA[UBE· C10~4-86f93l· CAPPING· C1231-~3
SPECIMEN TEST LABORATORY IDENTIFICATION AGE DATE.OF
COMPRESSION· iEST RESULTS
ASTMC39-94
TOTAL CYLINDER
LOAD DIAMETER
CYLINDER COMPRESSIVE .AREA STRENGTH ' .•Y NUMBER OR SET NO. (DAYS) TEST (LBS.) (IN.) (SO.IN.) (PSI) TYPE OF BREAK
16757 A 7 04/17/98
16757 B 28 05/08/98
16757 C 28 05/08/98
16757 D
SPECIFICATIONS
28
REMARKS: X Cylinders made by PSI representative.
Cylinders made by Architect's or
Contractors representative.
74000
Cylinders picked up by PSI
-~ representative.
6.00
..
Cylinders delivered lb PSI laboratory.
2.S.27 2620 Cone
3000
Test results comply with applicable
specifications.
Test results do not comply wilh
applicable specifications.
ALL CYLINDERS CAPPED J;N .ACCORDANCE·WITH ASTM C617-94.
TECHNICIAN: DEREK PETERSO~
cc: LEGOLAND (4), BERNARD BROTHERS, H.O.K., CITY OF CARLSBAD
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES,TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE·PLACEMENT.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC.
PSI A-200-4 (4)F
Respectfully submitted,
Professional Service Ind stries, Inc. R::~t.
DISTRICT
Information To Build On
Professional Service Industries, Inc. • 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
'-. _ ~ _ CIIY of Carlsbad
$ ·; Final Building Inspection ..... ,,.... .. .
RECEIV~o-j
JAN I 81999
CITY OF CARLSBAD
_ENGINEERING DEPARTMENT
Dept: Building Efflffl"e_eJ:ing Pl~nning CMWD St Lite Fire
Plan Check #:
Permit#:
Project Name:
C898062(;l
1,646 SF BUILDINGIMAGINATION
PUBLIC TOl~ETS" PLAN CHECK 98-25
Address: 1 LE(.30 DR
Contact Person: JERRY Phone: 7609300099
Sewer Dist: CA Water-Dist CA
Date: 1/18/99
Permit Type: COM
Sub Type:
Lot:
.............................................. ~ ............................... , .............................................................................. .
}
Inspected ~ Date
By: lnsp~cted: :2.-J ~ '7 ? Approved: _..Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __
I I I 1111111111 I I I 11 I I I I 111 I 11 I I I I I 11 I a 111!1 I~ I I I I I a I 1111 I 11 Ill 1a"1I11118 I 11 I I I II 1111 a'a a I I I I II I 11 I I I 11IIIII11111111 I I II I I I I I I I 11 I 1111 I Ill I I 111 I I I 11III111111111
Comments: _____________________________ -------'--------------
Cltr of Carlsbad
~ ·; Final Building Inspection -"\.,, .. ~-...
Dept: Building Engineering Planning CMWD
Plan Check #:
Permit#:
Project Name:
Address:
CB980626
1,646 SF BUILDINGIMAGINATION:
PUBLIC TOILET$" PLAN CHECK 98-25
1 LEGO DR
Contact Person: JERRY Phone: 7609300099
Sewer Dist: CA Water Dist: · CA
Inspected Date
~-IP Fire
Date: 1/18/99
Permit Type: COM
Sub Type:
l:.ot:
By:---------------lqspected; -----·Approved: __ Disapproved: __
Inspected Date
By: Inspected:'""". ·_· ----------~-Approved: ___ Disapproved:--._ ............................................................................... , .......................................................................... ,
Comments:--------------------------,---,-----,------------
CilY of-Carlsbad
· Final Building Inspection
Dept:. Building Engineering Planning CMWD St Lite Rtt)
Plan Check#: Date: 1/18/99
CB980626 · Permit Type: COMi------------,
1,646 SF BUILDINGIMAGINATION Sub Type: /fr\ ~ Tr; F =: ~ \\. :'! :·, ·= C:;
PUBLIC TOILETS" PLAN CHECK 98-25 I · 1/
1
. :;
;111 Ji\ i\l 1 n 1999 'j 1 LEGO DR Lot: !i 11 14 '' .:1 . i/,
IL L L)!
Contact Person: JERRY Phone: 7609300099 _______ / ·:::::~ ......... :~ ........................ ~:~~: .... ~ ........................................ i .......... :? .................. ..
By: ("1vk, Inspected: . ~ r::;,,--Approved: ___ Disapproved: __
Permit#:
Project Name:
Address:
Inspected Date
By: Inspected: . Approved:. Disapproved: __
Inspected Date
By: Inspected: .. Approved: . bisapproved: ____
••••••11111111••••••••••1 llllllllllllllllllllal ••••••••••••••••••••••.!1••••••••••••111 II ••••••••••••···~1191l111allllll I Ill I Ill •••••••1111111111 •••••••••••I
Comments:---------'----'-"-------------'----------------
PLANNING DEPARTMENT
FINAL INSPECTION
CHECKLIST
Project Name: J. l cft. Sr &/JJ( IM /9:G1NfiT11NPlan Check No. CB '1 cY uroz..'
Ad~ess: { ~~·~di k\b . Project Number:
PrOJ ect Planner: . . . · Extension
Conta,ct Person Phone No. Drawing No.
Inspections Final Inspection Items
1st 2nd Approved All Items below Conform with Approved Site Plan
1. Project Planner confirms conditions are met
2. Building elevations
3. Building materials
4. Building colors . .
5. Rooftop equipment screens
6. Fence/wall height, location, and materials
7. Size, number and location of parking spaces
compact, regular, handicap
8. Outdoor recreation facilities
9 .. Employee eating areas
. .
10. Trash enclosure and location
11. Pavement treatment
12. Landscaping installed (under separate contract)
LIST BELOW ANY ADDITIONAL ITEMS REQUIRING
SPECIAL ATTENTION BY MIKE BLACK:
13.
14.
15.
16.
17.
Project complies with all conditions, including abov~;listed items. Final inspection is complete.
'
~ I _122.qq
<
Mike Black Date
(H:\ADMIN\COUNTER\Final Insp Check) 12/17/98
Cltr of Carlsbad
· -Final Building Inspection
Dept: Building Engineering Biliifiib"§l CMWD St Lite Fire
Plan Check#: Date: 1/1"8/99
Permit#: CB980626 Permit Type: COM
Project Name:
Address:
1,646 SF BUILDINGIMAGINATION
PUBLIC TOILETS" PLAN CHECK 98-25
1 LEGO DR
Contact Person: .JERRY Phone: 7609300099
Sewer Dist: CA Water Dist CA
Sub Type:
l:.ot:
• I 11 I 1111111 I I I 11 I 11IIIII111111 ~ I 11 I 111 I I 11 I I I I I I I I I 111a1 ii I 11 I I I I I I I I I I 1111111111 I I I I I 11 I I I I Ill I I 11111 i ~.-.I II I I II I I I I I I I I I I I I I I I I I I II I II I I I I I 11 I I I I I I I I 111
Inspected ~ Date l /').-1-.capproved: v;isapproved: __ By: Inspected:
Inspected Date
By: Inspected: Approved: Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __
••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• 11!-.
Comments: _______ ~-----------------------,------.--------