HomeMy WebLinkAbout1 LEGOLAND DR; ; CB982289; Permitv ((])34-03 .
BU IL.DING P E R M I T ·Pe:i;-mi t No: CB982i289
· Pr'oJect No: A98,03043
Development N·o:
09/18/98 15:01
,Page. 1 of 1
:'Job Addre;:;s: 1 LEGO DR Suite:.
Permit Type: COMMERCIAL. TEN~NT
Parcel No_: 211-100·-09-0·0
Valuation.: . 27,916
IMPROVEMENT
Lot#:
Occupancy Group::$ Refe:r,en:ce#:
Description: MAINTENANCE BUILDING TI
Appl/Ownr : ROLLINS DAWN 760
.5342 .ARMADA DRIVE
. ~i' :. CARLSBAD CA 92.008
..
t
Construction Type: VN
Stat:us: ISSUED.
Applied: 07/17/98 · . :. 121ihMw~~&o1 ~118f $B . .
8·04~$355 . ~-fJRM'.r' · 501•00 ..
\! ' . • T ~_...--,,.c..,...~-....-......__ *~* Fee·s Required *** /*1[* Fees C'"G.llected & 9redi:ts--. *** ---. -----, ----.. -----------'/,:::. _____ ,:<:::::>,l_{~"r'----~, --------·-.---· '------
Fees: 501. oo/ ~2') ( C 6 ~ /2"\ '" ·
Adjustments: .,,00 r7c· \~\S ~, 6ea:1'"1qtj@i ts: . . . 00 ..
T.otal Pees:-501/. 00 ~-:;;1 . . Total -~at._1ert~: . 00
___ Fee~desc,iption ___ LA.Pftt\~~n~~~t-t -~~~~~~;0_~:~:
Building Permit / {~/ -. ,-::;:-~~~ \ ~i:7) ,· 264.00
Plan Cheqk . i ~ · .. ~,,,._, \ (/_ 172_.00 .
Strong Motion Fee f. n. 5). f .. '··,. __ .. ,.,.,. JD\ t;::=.;l_ ' 6. 00
. Enter "Y" _f_or Plumbi*g~sUEy Fee~4 lc1/{_ . \~ . · N
Enter "¥" tor El.ectrtc Issu~ ~~ J'L f~~ .. · ·, 10,0Q Y
R,emodel/Alte-r Per AM~\ .... : . \~_ fl[_~ 1 f, ~ 25 , : 2~. 00.
Enter 'Y' for Mechan1yal Issu,e ~ee~· . , 1S.. 00 Y ,
Install Fu~~/Ducts/He~-p~~Ps\" ?J ,.cO.:e~RA';;f ~~~ 00/ · ·9 .-00 r
· t{ ~)~ 1952 / <:'\ i's:>r . cf [/2 , ........ .__J;J~ _ _, (.\\::, ) //
. ·\.J){}.@~~./
~
jt'
DATE r/t ~-9 '7 .. , V"=-----. -4--., •• ™
i GLt;~RANCE _~-~---==----J '
CITY OF CAR~SBAD
2075 Las PalJQas,Dr., Carlsbad, CA 92009 (619) 438-1161
l
·I
I I
..,, I ' ·" PERMIT APPLICATION
FOR OFFICE us_E ONL y w
PLAN CHECK NO. :{75?~
CITY OF CARLSBAD BUILDING DEPARTMENT
2075 Las Palmas Dr., Carlsbad CA 92009
(760) 438-1161
E$T. VAL_....., _ _._ _____ _
Address (include Bldg/Suite #) · · · · · · Business Nami (at this address)
Legal Description lot No. · . Subdivision Name/Number · Unit-No. Phase No • T 9tal II, of units
Existing Use Proposed Use
:c
SQ. FT. #of ·stories # of Bedrooms I of Bathrooms
804 ·'"'-" Name Address City State/Zip Telephone If ·Fax If =~~6=tt=i~~rqta=r:t~gem~M5<-2(~91.~·-':.:·;:eo+~ e?6S-' ~ l5'=1-
Name Address · City · ·State/Zip Telephorie # · ·
Name Address City State/Zip Telephone If
:s;:::t~CONTRACTOR'~iCOMP:ANY.-£NA.Mm.-:~~~~cy-Jrt~~~~ft·-i.:t.~t;:?t:~tt· ·;-z::1:· ?:,~.~\.1:r[;'.::(. trk:· ·fltt'i_:;~:.~.:::=-:.t :':-.: . · · .~ · '.=· ...
(Sec. 7031.6 Business and Professions Code: Any City or County which requires a permit to co111truct, alter,. improve, de.molish·or repair any structure, prior to-its
issuance, also requires the applicant for such permit to file a signed state.ment th!lt he is licensed pursuant to the provisions of the Contractor's License Law
(Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for-the alleged
exemption. Any violation of Section 7031,6 by any applicant for a permit subjects the applicant to a civil.penalty of not more thlin five hundred· dollars {$600)).
Name Address· City State/Zip · Telephone#
State License# ___________ _ License Class __________ _ City Business license ,. ________ _
Designer Name Address City State/Zip · Telephone
State License # ----------'-
!6, _ ,,· ,WORKER$'.;COMPENSATION.:D:t<.f.:.::r.:~~:S.::.I:'.'.:2!:'/,i/.IJ~·::: .• : ..::::.::::;:.: ·" .:a:.::,.'.:, __ ;·i t~:,::~·~\·'.~·/,i./:. ·: ::.:.:,'.·:,:-.:·'.!:\:,, ,7,:f:'.'.'i::.::. t-.,.=··~t./-i:. : . · .. ; ·.
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following.declarations:
O I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance
of the work for which this permit is ilisued. ·
O I have and will maintain workers' compensation, as required by Section 3700 of the Labor Gode, for the performince of the work for which this permit is
issued. My worker's compensation insurance carrier and policy number are:
Insurance Company . . Policy No. __________ ..,...___ Expiration Date ______ _
(THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOL~RS {$1001 OR LESS)
O CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued, I shall -not employ ariv person in any manner so as
to become subject to the Workers' Compensation Laws of California.
WARNING: Failure to aecure worken' compenaet~ coverage Is unlawful, and shall a~ject an employer_ to criminal penalties ilnd clvll fln11 up to one hundred
thousand dollars ($100,000), In addition to the coat of companaatlon, clamegaa as provided for In Section 3706 of the Labor code, lritereat-end·attomey's fHs.
SIGNATURE _______________________________ """"."" __ DATE ________ _
01: · _.·,'oWNER.:BUltDERfDECL:ARATION''r,t:i·~ +J.::f'~~)::it.:-i.::8·-i"":".:· .. :, .,\•it··/··:.\·}'.'.':':',''!\'·':·,:;:·.,,-:: .. ; .. :.;,·, . ·: ; ·'<
I hereby affirm that I am exempt from the Contractor's License Law for the following reason:
O 1, as owner of the property or my employees with wages as their soli compensation, will do the work aild the structure is not intended or offered for sale
(Sac, 7044, Business and Profaaalons Code: The Contractor's License L•w does not apply to an owner of property. wh'o builds or improves thereon, and who does··
such work himself or through his own employees, provided that.such improvements are not intended or offered·for sal•· If, however, the building or-Improvement is
sold within one year of completion, the owner-builder will·havi the.burden of-proving that he did not bui14 or improve for the purpose-of sale).
lil, I, as owner of the property, am excluaively contractirig with llcen11d contractors to co111truct the project (Sec, 7044, Busin111 and Professions Code: The
Contractor's License Law does ·not apply to an owner of property who builds or improves thereon,. and contracts for s1,1ch projects with co_ntractor(s) licensed
pursuant to the Contractor's-1:icen,a Law).
O I am exempt under Section ______ Business and Professions Cod11 for this-reason:·
I personally plan to provide the major labor and materiala for construction of the proposed property improvement. 0 YES ONO
~ have not) signed an application for a building·permit for the proposed work.
,:
2.
3. ~contracted with the followin parson (firm) to provide the proposed construction. !include name / liddress / phone number / contractors license number):
4. I plan to provide portions.of the work, but I have hired the following person to coordiriate, supervise an4 provide the major work (includa·name /address/ phone number/ contractors license number):. ___________ ...,. __ ...,. ____________________________________ _
6. I will provide some of the work, but I have contracted (hired) the following persons to provide the work.indicated (include name/ address/ phone number /'type
of work):. ________ ....,_'f"-~---'---'7'9-i---:::-:----'-.._.-t----fl--------------+r-rl-~---'---..,.,.-,.-------
DATE ----'"+-'.__+-CV-----'S ____ -,.,-_
·. · Jiu1tn1NG,PJ:RM1JJ'.0Ntr~-~"\);:::1r:t:t~:i::/:·1, ·: :-:::.,.::Jiit:=::::u:E,:;/':.];f,;·.,; flr~:k::·.-,;:\·r:t.'"-C:: :; :_.· ·> · · <: '.'. :·.-·.: ·· -:.,:y:: "·: :. ·
Is the applicant or future building occupant -required to submit a business plan, acutely hazardous materh1ls registration forin or risk management and prevention
program under Sections 26505, 26633 or 265.34 pf the Presley-Tanner Hazardous Substance Account Act? D YES O NO ·
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? O YES O NO
Is the facility to be constructed within 1,000 feet of the outer boundary of !I school site? 0 YES O NO
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE-APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY·SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
!8,1,:t{;_~O.N.~TRU9.TIONi~1;>iN~IA~~,~~.'r~fi1l;1;![li!!-!~;~~J\r:~/lrt~t?}\'i::~,it:'Jf.Jt::it»!:~t::,ur;::,,;:::\ 1'.i)l(~IM\,. /:'.;::\,,\,;{~·, /;.:::-:;::):_\ r ·:' '.;:i.<:·-.;: -. . ' ; ·'"" ·.::-
I hereby affirm that there is.a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097(i)·Civil Code).
LENDER'S NAME ____________ _ LENDER'S ADDRESS ________________ ...,.. ____ ---'----
•. : " .~ )
I certify that I have reed the appllcatlon·and· state that the above information l1 correct and that·the Information on the plans 11 accurate. I agree·.to comply with all
City ordinances and State laws relating to building construction. I hereby authorize repre11ntativas of the Cltt of C1rl1!)ad to enter upon the above mentioned
property for Inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES,
JUDGMENTS, COSTS AND EXPENSES WHICH MAY' IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS. Pf:RMIT. ·
OSHA: An OSHA permit is required for excavations,over s•o• deep end demolition or construction of lltructures over 3 stories in height.
EXPIRATION: Every permit issued by the Building Official under th,e provisions of this Code 1h1II expire by !Imitation and become null and void if the building or
work authorized by such permit is not commenced within 366 days from the date of such permit or if the buildiog or work authorized by such permit is suspended
or abandoned at any time a a a work is com n d for a period of 1 O days (Section 106,4.4 Unfform Building Code). I l · ·
APPLICANT'S SIGNATURE . DATE 1 _ 1 lp _ 9 j>
PINK: Finance 1 p -• ~
~,
Inspection List
Permit#: CB982289 Type: CTI MAINTENANCE BUILDING Tl
Date Inspection Item Inspector Act Comments
10/30/98 19 Final Structural PD co
10/30/98 29 Final Plumbing PD co
10/30/98 39 Final Electrical PD co
10/30/98 49 Final Mechanical PD co
10/21/98 84 Rough Combo PD AP
10/16/98 17 Interior Lath/Drywall PD AP
10/14/98 17 lhterJor Lath/DryWall PD CA
10/8/98 84 Rough Combo PD AP ON 10-7-98
10/7/98 14 Frame/Steel/Bolting/Weldin PD AP WALLS
10/7/98 34 Rough Electric PD AP WALLS
10/6/98 84 Rough Combo PD co
Monday, May 17, 1999 . Page 1 of 1
SEE
MULTIPLE
SPECIAL INSPECTIONS
SCANNED·
SEPARATELY
CB-972027 IS THE
PLAN CHECK -NUMBER FOR .
MANY OTHER CBjS
ALSO SEE
CB971460(OUTER PARK)
CB971465{ADMIN BLDG)
""· .
07 October 1998
City of Carlsbad
To Whom It May Concern:
. . Ill .
·LEGO.LAN:D
E: .5 T-A T E -5
25 gauge in lieu 20 gauge metal studs for the non-bearing partitions at the Administrative
Maintenance Building #205 is hereby·approved.
John P. Peruzzi
Architect
LEGOLAND ESTATES
02184-8
LEGOLAND California Inc.
1 LEGO Drive
Carlsbad, CA 92008 USA
Tel: (760) 804-8355, Fax: .(760) 804-7959
FINAL BUILDJNG INSPECTION
I
DEPT: BUILDING ENGINEERING ~~~ PLANNING CMWD ST LITE
PLAN CHECK#: CB982289
PERMIT#: CB982289
PROJECT NAME: MAINTENANCE BUILDING TI
ADDRESS: 1 LEGO DR
CONTACT PERSON/PHONE#: C/471-9388
SEWER DIST: CA WATER DIST: CA
DATE: 10/30/98
PERMIT TYPE: CTI
~
~t;!f~~ n~:f:::~·~1j
I ;
t 1;:·J -2 1998 JI
INSPECTEDM
BY: I\~
DATE
· INSPECTED:
, By ;;;;;::-_:k ==========================·=·==· ·7-=~---------·----·-·--·
APPROVED DISAPPROVED
INSPECTED
BY:
INSPECTED
BY:
COMMENTS:
DATE ·
INSPECTED:
DATE
INSPECTED:
APPROVED DISAPPROVED
APPROVED DISAPPROVED
1
EsG_il Corporation
-'1.n Pq,rtrtersliip,witli{Jov~tnment for'lJ.uifafng SaRt:y-·.;
DATE: September 10, 1998.
JURISDICTION: Carlsbad ·
PLAN CHECK NO.: 98-2289
PROJECT ADDRESS: 1 J.,ego Dr.
PROJECT NAME: . Maintenance Buildlng
SET:.i:I
l'I
~T
· · -~ PLAN REVIEWER
Cl FII-E
. I
D The plans _transmitted herewith '.have been corrected where necessary anct substantially-comply
with the jurisdiction's building, code$. . · ·
~ The plans transmitted herewith will substantially comply with the Jurisdiction's building codes
when minor deficiencies identified below ate resolved and-checked by bui!c;ling department staff.
D The plans transmitted herewith have significant deficiencies identified on_the enclosed check list
and should be corrected and resubmitted tor a complete recheck.
D The check list transmiftecl .herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans arersubmjtted for recheck.
D The applicant's copy of_the check l_istis enclosed for the·jurisdiction to forwardto the applicant
contact person. · .. ·
D The applicant's:copy of the check,list has been sent to:
~ Esgil Corporation staff did-not advise t~e applica_nt that the plan check f.las been completed.
D . . .
Esgil Corporation staff did. advise -the ·applicant that the plan check has been c0mpleted.
Person contacted: : · Tel~phone #: -: · ·
Mail · Telephone Fax ln-Per$on -. -. ·
Date contacted: .lby: . ) . : --_ · _ _ _ Fax t}: -~-. _
~ 'REMARKS: The upper level requires. two exits. As shown, bot~ of tho e xit~ pass t~r~ugh . <
Room 115 on sheet A207L. Per UBC Sec. 10Q3.5, _only one exit may o -hrough an intervening
room. The building official should determine Wheth~r the proximity of the stairs_ to the exterior
qooJs is such that the intent of Sec. 1003;·t,.7Lsatis~i7d. /41 Ice--fti4!V?.. otlk. ~
{)e/ IN e ~ ~ , ko12-j?~ ,v<Pf!Jf. . cJ; _ fl?A/2,,R' /A.A f' /'1 tr ;-"""r
By: Kurt Culv~r @ 2 ,,;/ /I Enalosur : _v-. i62-.Alo ~~
Es'gil Corporation /4-c:,G( rf.(?J. /.w:J ..,. . . · · 0 -
D GA D CM . D EJ D PC 9/3/98~ -trns.mtl.dot . . •,' ' '~ '
'-. -' ~
9320 Chesapeake Drive, Suite 208 ·+ San Diego, California 92123 + (619) 5.60-1468 + Fax ((>19)~560-1576
...
DATE: July 30~ 1998
JURISDICTION: Carlsbad
PLAN CHECK NO.: 98-2289
EsGil Corporation
'l.n Partnersliip witli {jovemment for '.Buifaing Safetg
Sl::T: I
PROJECT ADDRESS: 1 Lego Dr.
PROJECT NAME: Maintenance Building TI
D APPLICANT
Ir;( JURIS;:=:,
D PLAN REVIEWER
D FILE
D The plans transmitted h_erewith have been corrected where necess~ry and substantially comply
with the jurisdiction's building codes. -
D The plans transmitted herewith will substantially comply with the jurisdictioh's·building codes _
when minor ·deficiencies identified below are resolved arid checked by building department
~~ . .
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
~ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check lisf is enclosed for the jurisdiction to forward to the applicant
contact person.
rg) The applicant's copy of the check list has been sent to'.
Dawn Landon
5342 Armada Dr. Carlsbad 92009
D Esgil Corporation staff did not advise the applicant that the plan check has been completed.
[gj Esgil Corporation staff did advise the applicant that the plan check has been completed.·
Person contacted: Dawn Landon Telephone#: (760) 804-8355 x 157
Date contacted: 7/31/98 (by: kc)
Mail ../'Telephone V Faxv---In Person
[2J REMARKS: See 97-145_6 for shell building.
By: Kurt Culver
Esgil Corporation
D GA D CM D EJ D PC 7/21/98
Fax#: -7960
Enclosures:
trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California. 92123 + (619) 560-1468 + Fax (619) 560-1576
Carlsbad 98-2289
July 30, 19~8
PLAN REVIEW CORRECTION LIST
TENANT IMPROVEMENTS
PLAN CHECK NO.: 98-2289
OCCUPANC~ B/Fl/S1
TYPE OF CONSTRUCTION: V-N
ALLOWABLE FLOORAREA: OK
SPRINKLERS?: Yes
REMARKS:
DATE PLANS RECl;IVED BY
JURISDICTION: 7/17/98
DATE INITIAL PLAN REViEW
COMPLEiED: July 30, 19~8
FOREWORD (PLEASE RE:AD):
JURISDICTION·: Carlsbad
USE: Office/Maint.
ACTUALAREA: -1300
STORIES: 2
HEIGHT: n/ c ·
OCCUPANT LOAD: -60
DAiE PLANS RECEIVED BY
ESGIL CORPORATION: 7/21/98
PLAN REVIEWER: Kurt Culver
This plan review is Umited to the technical requirements contained in the Uniform Building
Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state
laws regulating energy conservation, noise attenuation and access for the disabled. This plan.
review is based on regulations enforced by the Building Department. You may have other
corrections based on laws and ordinances enforced by the Planning Department, Engineering
Department, Fire Department or other departments. Clearance from those departments may be
required prior to the issuance of a building permit. ·
Code sections cited are based on the 1994 UBC.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited~codes and regulations. Per Sec. 106.4.3,
1994 Uniform Building. Code, the approval of the plans does not permit the violation of any
state, county or city law.
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet number. specification section, etc.
Be sure to enclose the marked up list when you submit the revised plans.
LIST NO. 40, TENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1994UBC) tiforw.dot
Carlsbad 98-2289
July 30, 1998
Please make all .corrections ·on the original tracings, .as requested in the
correction list.
Submit three sets of plans for commercial/industrial projects (two sets of plans
for residential projects). For expeditious processing, corrected sets can be
submitted in one of two ways: · ·
1. Deliver all corrected sets of plans and calculations/reports directly to
the City of Carlsbad Building Department, 2075 Las Palmas Drive, Carlsbad, CA
92009, (760) 438-1161. The City will route the plans to EsGil Corporation ar,1d
the Carlsbad Planning, Engineering and Fire Departments.
2. Bring one corrected set of plans and calcul'ations/reports to EsGil
Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (619)
560-1468. Deliver all remaining sets of plans and calculations/reports directly to
the City of Carlsbad Building Department for rbuting to their Planning,
Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not
be reviewed by the City Planning, Engineering and Fire Departments until review
by EsGil Corporation is complete.
1. Indicate on the Title Sheet of the plans, the name of the per~on responsible for
the preparation of the plans. Section 106 .. 3.3.
2. Each sheet of the plans must be signed by the person responsible for their
preparation, even though there are no structural changes. Business and
Professions Code. ·
3. Provide a statement on the Title Sheet of the plans that this project shall comply
with Title 24 and 1994 UBC, UMC and UPC and 1993 NEG.
4. UBC Section 1'07.2 requires the Building Official to determine the total value of
all construction work proposed under this permit. The value shall include all
finish work, painting, roofing, electrical, plumbing, heating, air conditioning,
elevator, fire extinguishing systems and any other permanent equipment. Please
provide a signed copy of the designer's or cdntractor's construction cost
estimate of all work proposed.
5. On the first sheet of the plans indicate:
• The floor area Qf the remodeled area,·
• The occupant load of the remodel area(s).
• Type of construction of the existing building,
• Present and proposed occupancy classifications of the remodel area,
Carlsbad 98-2289
July 30, 1998
6. A complete description of the activities and processes that will occur in this ,
tenant space should be provided. A listing of all hazardous materials should be
included. The materials listing should be stated in a form that would make
classification in Tables 3-D and 3-E possible. The building official may require a
technical report to identify and develop methods of protection from hazardous
materials. Section 307.1.6.
7. Provide a note on the plans indi'cating if any hazardous materials will be stored
and/or used within the buildingwhich exceed the quantities listed in UBC Tables
3-0 and 3-E.
8. The tenant space and new and/or existing facilities serving the remodeled area
must be accessible to and functional fOr the physically disabled. Title 24; Part 2.
a) Specify lever-type hardware fOr the doors.
9. In Groups B, F, H, Mand S Occupanciesi if the number of employees exceeds
four, provide separate toilet facilities for men and women .. Section 2902.3.
Show Title 24 signage for each separate-sex restroom.
1 O. Based on floor area, the upper level occupant load is at least ten, so two
complying exits are required:
a) Per Section 1005.1, the office corridor· cannot be discontinuous through
Rootn 201. .
b) Per Section 1003.s,· exiting through the storage area·to access the
second stair is prohibited.
11. Rooms with more than 10 occupants may have one exit through one adjoining
room. Revise ~xits to comply. Section 1003.5.
12. Exit signs are required whenever two exits are required. Show all required exit
sign locations. Secfioff 1013.1.
13. Note on the plans: 11AII exits are to be openable from inside without the use of a
key or special knowledge.11 In lieu of the above, in a Group B, F, M or S
. occupancies, you may note ''Provide a sign· on or near the exit door, reading
THIS DOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS." This
signage is only allowed at the main exit.· Section 1004.3.
14. Provide complete electrical and mechanical plans.
15. Submit Title 24 energy calculations and forms ..
16. Indicate signage on the plans per .use ~ec. 1604.5. ·
17. Provide uplift struts at the suspended ceiling detail on sheet A501L
Carlsbad ·98-2289
July 30, 1998
18. To speed up the review process1 note on this list (or a copy) where each
correction item has been addressed1 i.e.1 plan sheet, note or detail number,
calculation page1 etc.
19. Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes! please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction
list? Please indicate:
Yes a No CJ
' The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive1 Suite 2081 San Diegel California 92123; telephone number
of 619/560-14681 to perform the plan review for your project. If you have any
questions regarding these plan review items1 please contact Kurt Culver at
Esgil Corporation. Thank you.
Carlsbad 98-2289
July 30, 1998
JURISDICTION: Cadsbad
VALUATION AND PLAN CHECK FEE
PLAN-CHECK NO.: 98-2289
DATE: J.uly 30, 1998 PREPARED BY: Kurt Culver
BUILDING ADDRESS: 1 Lego Dr.
BUILDING OCCUPANCY: 13/Fl/Sl TYPE OF CONSTRUCTION: V-N
SUILDING PORTION BUILDING AREA VALUATION VALUE
(ft. 2) MULTIPLIER ($) ...
Tl 2500 28 70,000
..
.
Air Conditionino , .
Fire Sprinklers ..
TOTAL VALUE 70,000
D 199 UBC Building Permit Fee ~ Bldg. Permit Fee by ordinance: $ 489.83
D 199 UBC Plan Check Fee ~ Plan Check Fee by ordinance: $ 318.39
Type of Review: ~ Complete Review D Structural Only D Hourly
D Repetitive Fee Applicable D Other:
Esgil Plan Review Fee: $ 254.71
Comments:
Sheet 1 of 1
macvatue.doc 5196
. . ~ City of Carlsbad . · .. ·.··
. Fire Department
97156-F
• Bureau of Prevention
Plan Review: · Requirements Category: Building; Plan Check
Date of Report: Friday, August 14, 1998 Reviewed by: ~ ./
Contact Name Dawn ijollins ..
Address 5342 Armada Dr ----------,-,--'--'-'--,"----'-'----'--'---~--
City, State Carlsbad CA 9200~
Bldg. Dept. No. CB982289. Planning No.
Job Name Lego Admin 'rl
Job Address 1 Lego Ste. or Bldg. No. -~-..,---
D Approved. -The item you have submitted for review has been approved. The approval is
based on plans; information and/or specifications provioed in your submittal;
therefore any changes to th~se items after this date, including field modific_a-
tidns, must be reviewed by this office to insure continued conformance with
applicable ·codes. Please review carefully all comments attached, as failure
to comply with instructions iA this report can result in suspension of permit to
construct or install improvements. ·
~ Disapproved -Please $ee the attached report of deficiencies .. Please make corrections to
plans or specifications necessary to indicate compliance with applicable
codes and standards. Submit corrected plans and/or specifications to this
office for review.
For Fire Department Use Qn/y
Review 1st,___ __ 2nd. __ _ 3rd_'--_
Other Agency ID
CFD Job# __ 97_1_5_6-_F_ File#_~--
2560 Orion Way • Carls·bad, California 9200'8 •· (619) 931-2121
IIH·
LEGOLAN·D
Memo/Report
t::..5TATE..5
To
Building Department
City of Carlsbad
Mike Peterson
From
Dawn Rollins Landon, P.E.
Copy to A205 ecc JP, RL, M~, JF, RA .
Re·: , Submittal of Plan Check Corrections for CB 98-2289
Administration-. Maintenance Bldg. Tl
Dear Mike:
Date
9/2/98
Page 1 I
Extension llni~R·L 1-57
Attached are ·items required to satisfy the deficiencies identified by EsGil for the referenced plan
check. The drawings that we previously submitted should be. discarded and replaced by this set
of drawings in its entirety. These items included with this package are: ·
• EsGil Ph:m Review Correction List
• LEGOLAND Legal Description
• Title 24 Report
• Fire Dept Bldg Plan Check comments
Sheet No.
• A205-00-A 103L
• A205-00-A207L
• A205-00-A208L
• A205-00~A501
• A205-00-E207L
• A205-00-E208L
• A205-00-M208L ·
Description / Comments
Administration & Service Area Maintenance Bldg Tl:
Title Sheet
First Floor Plan
Second Floor Plan
Detail Sheet
First Floor Electrical Plan
Second Floor Electrical Plan
Second Floor Mechanical Pl~n
'
The information contained herein should complete the plan check review. Please let me know if
you have any questions.
Best Regards,
13133-8
LEGO~AND Cafifornia Inc.
1 LEGODrive
Carlsbad, CA 92008 USA
Tel: (760) 804-8:355; Fox: (760) 804-7959
LEGOLANJ> CaUfornia
Address:
1 LEGO Drive .
Carlsbad, CA 92008
Legal Description:
Lots 18 and 19 of City of Carlsbad Tract No. 94-09, Carlsbad Ranch-Units 2 and 3, in the City
of Carlsbad, County of San Diego, State of California, according to Map No. 13408 filed in the
Office of the ·county Recorder of San Diego County April 1, 1997.
Assessor's Parcel No.:
Lot 18 (LEGOLAND): 211-100-09
Lot 19 (LEGO Drive): 211 .. 100-11
26June98
LLEAG
•. 1-
EsGil Corpo,rati,on
in !Part,ursliip fllitli (]01/~rruru.nt for 1Juilifi1tJJ Sa.f~tJJ.
DATE: July 30, 1998
JURISDICTION: Carlsbad
PLAN CHECK NO.: 98-2289
PROJECT ADDRESS: 1 :Lego Dr.
SET:I
PROJECT NAME: Malntenance Building TI
~
D PLAN REVIEWER
0 FILE
D The pla'ns transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes. '
D The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved_ and checked by building department
.staff.
D The plans transmitted herewith have significanf deficiencies identified on the enclosed check list
and should be :corrected and resubmitted for a. complete recheck.
~ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected ,plans are submitted for recheck.
D The applicant's copy of the .check list is enclosed for the jurisdiction to forward to the applicant
contact person.
[81 The applicant's copy of the check list has been sent to:
Dawn Landon
5342 Armada Dr. Carlsbad 92009
'D Esgil Corporation staff did not advise the applicant that the plan check has bee~ completed.
~ Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Dawn Landon Telephone,#: (760) 804-8355 x 157
Date contacted: 7/31/98 (by: kc)
Mail .../Telephone v Fax'-""'.' In Person
~ REMARKS: See .97 -1456 for shell building,.
By: Kurt Culver
Esgil Corporation
0 GA O CM O EJ '0 PC 7/21/98 ,
Fax #: -7968 ,c, S9
Enclosures:
tmsmtl.dot
9320 Chesapeake Drive, Suit~ 208 + San Diego, California 92123 + (6i9) S60-1468 + Fax (6l9) 560-1576 . .
, I
I •
Carlsbad 98-2289
July 30, 1998
PLAN REVIEW CORRECTION LIST
TENANT IMPROVEMENTS
PLAN CHECK NO.: 98-2289
OCCUPANCY: B/Fl/S1
TYPE OF CONSTRUCTION: v.,.N
ALLOWABLE FLOOR AREA: OK
SPRINKLERS?: Yes
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION: 7/17/98
DATE INITIAL PLAN REVIEW .
COMPLETED: July 30, 1998
FOREWORD (PLEASE READ).:
JURISDICTION:. Carlsbad
USE: Office/Maint.
ACTUALAREA: -1300
STORIES: 2
HEIGHt: n/c
OCCUPANTLOAD: -60
DATE PLANS RECEIVED BY
· ESGIL CORPORATION: 7/21/98
PLAN REVIEWER: Kurt Culver
This plan review is limited to-the technical requirements contained in the Uniform Building
Code, Uniform Plumbing·code, Uniform Mechanical Code, National Electrical Code and state
laws regulating energy conservation, noise attenuation and access for the disabled.· This plan
review is based on regulations enforced by the Building Department. You· may have other
corrections based on laws and ordinances enforced by the Planning Department, Engineering
Department, Fire· Department or·other departments·. Clearance from those departments may be
required prior to the issuance of a building permit.
Code sections cited are based on .the 1994 UBC.
The following items listed need clarification, modifi~tion or change. All items must be satisfied
before the pl~ns will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1994 Uniform Building Code1 the approval of the plans does not permit the violation of any
state, county or city law.
To spe.ed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet numb.er, specification section. etc.
Be sure to enclose the marked up list when_you submit the· revised p_lans.
LIST NO. 40, TENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY PATA OR POLICY SUPPLEMENTS (1994UBC) tiforw.dot
' ' '
Cm;-lsbad 98 .. 2289
July 30, 1998
1.
2.
3.
4.
5.
Please make all corrections on the original tracings, as reqLJested in the
correction list.
Submit three sets of plans for commercial/industrial projects (two sets of plans
for residential projects). For expeditious processing, corre·cted sets can be
submitted in one of two ways: ·
1. Deliver all corrected sets of plans and calculations/reports dir~ctly to
the City of Carlsbad Building Departm~nt, 2075 Las Palmas Drive, Carlsbad, CA
92009,. (760) 438-1161. The-City will route the plans to EsGil Corporation and
the Carlsbad-Planning, Engineering. and Fire Departments.
2. Bring one corrected set of plans. and calculations/reports to EsGil
Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 921:23, (619}
560-1468. Deliver all remaining sets of plans and calculations/reports directly to
the City of Carlsbad Building Department for routing to their Planning,
Engineering and Fire Departments,
NO.TE: Plans that are submitted oirectly to EsGil Corporation only will not
be reviewed by the City Planning, Engineering ·and Fite Departments until review
by EsGil Corporation is complete.
Indicate en the Title Sheet of the plans, the name of the person responsible for
,the preparation,ofthe plans. Section 106.3.3. ~ ~~ ~
. ~ A.2U5/oo-AJ~l Each: sheet of the plans must be signed by the person responsible for their •
preparation, even though there are· no structural changes. Business and
Pr0fessions Code. ~ A1;?Q-\tt~::r~ ~'P; ~ ~
Provide a. statement on the Title Sheet of the plans that this project shall comply
with Title 24 and 1994 UBC; UMC and UPC and 1993 NEC. ~ ~ AZO~/ro-AlD?L--,N~-1.
UBC Section 107.2 requires the Building Official to determine the total value of
all construction work proposed under this permit. The value shall include all
finish work, painting, roofing, electrical, ,plumbing, heating, air conditioning,
elevator, fire extinguishing systems and any other permanent equipment. Please
provide a sighed copy of the designer's or contractor's construction cost
estimate.of all work proposed. ·
~o h ~fi · h -~f h Vi,ro.Ald·.@L; C/ii-C . .Z.. n t e irst s eet o t e p ans in Icate:
?~ ~ "-?frJO(J A:to3L:
• The floor .area of lherembdeled area, CALC. /.
• The occupant load of the remodel .area(s). C/xl..C, .. J.
• Type of construction. of the existing. building, · 17MA :?-A-
• Present and proposed occupancy classifications .of the remodel ~rea, . V~?-e?
J ' ..
Carlsbad 98-2289
July 30, 1998
6. A complete description of the activities and processes that will ·occur in this ·
tenant space should be provided. A listing of all hazardous materials should be
included. The materials· listing should be stated in a form that would make
classification in Tables 3-D and 3:E possible. The building official may require a
technical report to identify and develop methods of protection from hazardous
materials. Section 307.1.6. ~ ~--r .A2{Jt5/oo-P...l03L-1 N ~ 2.. ,At,-./o 4·
7. isrovide a note oh the plans indicating if any hazardous materials will be stored
and/or used within the building which exceed the quantities listed in UBC Tables
3-D and 3-E. . .
L,p_,,e:. ~ A2-rJr=./ (){>-_A.\D3-N011:;:::Z.~
a. the tenant space and new and/or existing faciliti.~s serving the remodel·ed area
must be accessible to and func:tional for the physically disabled. Title 24, Part 2. .
a) ~pecify lever-type hardware for the doors.~ .POOR~~
. . ~~ A.~/to--A:zoe>t..:-9. In Groups 8, F, H, M and S Occupancies, if the number 6f employees exceeds
.four, provide separate toilet facilities for men and women. Section 2902.3.
Show Title 24 signage for e~ch s~parate-sex restroom.t v~ ~
~2-0'5/ro-,A.2.b?L1 7J01NMt::::. ~~ ~ t'oDM~ lb~ ~ I Jz...
10. Based on floor area, tl'le upper level occupant load is at least ten, so two
complying exits are required:
a) Per Section 1005.1, the office corridor cannot be discontinuous through
Room 201 ..
b) Per Section. 1,003.5, exiting through the storage area·to access the
second stair is prohibited. itf~ A2£5/oo-A2.0?JL-1 C-ORfZl170R ~
11. Rooms with more than 10 occupants may have ~ exit through ~ adjoining
room. Revise exits to comply. Section 1.003.5. ~ ~ A~/ro-A2o5L,
CORKIYVR ~ ~ :2-vi .. ·
12. Exit signs are required whenever two ~xits are required. Show all requireq ~xit ·
sign locations. Section 1 0t3.1. ~ 7~ ,fia.fJt:.J ov-~1 :fLa>fZ
'f\--At,t ,.¼"it7 ~tf'~ ~ 1
13. Note on the plans: "All exits are to be openable from inside without the use of a
key orspecialknowledge.11 In lieu of-the above, in a_ Group B, F, M or.S
occupancies, you may note "Provide a sign on or near the exit door, reading
THIS DOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS." This
signage· is only allowed at the main exit. Section 1004.3.~ ~
Kl-D5"\.C>D-,IMD?t--1 Norg,"?, ~tl:i~~~
14. Provide complete electrical and mechanical plans.
~~~ A.2-IY5/~f3;-Z07'L1 AZOS/a)e-,~L; f\Zcr5/cc-M2o
15. Submit Title 24 energy calculations and fofms. 1 . ~k-~~ B~XI \ ~ 24--OklC~-
16. Indicate signage on_the plans per l)BC Sec. 1604.5.~ ~~
', A:2.D"5/0D-A'ZD7L b--2D5L-1 ~ ~~ ~ ~\tJ,N~~'P.'.
17. Provide uplift struts at the suspended ceiling detail on sheet A501 L.
~ ~ A~o5/oo-A1X>\ /~~ ..2.
''", I . ,: .. . '
I • I
Carlsbad 98-2289 ·
July 30, 1998
18. To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet; note or detail number,
calculation page, etc.
19. Please indicate here if any changes have been· made to the pla·ns that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and Where they are located in the plans. ·
Have changes ·been made to the plans not resulting from this correction
list? Please indicate:
Yes -Cl · No I(
The jurisdiction has contracted with Esgil Corporatic,n·.1ocated at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number
of 619/560-1468, to perform the plan review for your project. If you have any
. questions regarding these plan review items, please contact Kurt Culver at
~sgil Corporation~ Thank you. .
> CUy of Carlsbad '1%~-19 s11 s6-F
· Fire Departmeht • Bureau of Prevention
Plan Review: Requirements CategQry: Building Plan Check ~ ~
Date of Report: Friday, A~gust 14, 1998 Reviewed by: '&r-~
Contact Name Dawn Rollins ----------------------------
Address 5~42 Armada Qr -------------------------------------
City, State Carlsb~d CA 92008
Bldg. Dept. No. CB982289 Planning No.
Job Name Lego Admin Tl ..
Job Address 1 Lego Ste. or Bldg. No. ----------"----
D Approved -The item you have submitted for review has been approved. The approval is
based on plans; information and/or specification$_provided in your submittal;
therefore any changes to these .items ~fter this date, including field modifica-
tions, must be reviewed·by this office to insure continued conformance with
applicable codes. Please review carefully all comments attached, as failure
to comply with'instructions in this report can result in suspension of permit to
construct or install improvements.
~ Disapproved -Please see the attached report of deficiencies. Please. make corrections to
plans or specifications necessary to indicate compliance with applicable
codes and standards. Submit corrected .plans and/or specifications to this
office for review.
'
For Fire Department Use Only
Review 1st ·---2nd_. __ 3rd--'--~-
Other.Agency ID
CFO Job# 97156-F -----File# -~--
2560 Orion Wa.y • Carlsbad, California 92008 • (619) 931-2121 *
~ ,i . , . · . Requirements Category: . .. Building Plan Check 97156-F ..
Def,ciency Item: .pend I n·g 14 Provide Technical Report
To determine the acceptability of technologies, processes, products, facilities, materials and uses
attending the design; operation or use of a building or premises subject to the inspection of the
department,· the chief is authorized to require the owner or the person in possession or control of
the building or premises to provide, withQu~ charge. to the jurisdiction, a technical opinion and report.
The opinion and report shall be prepared by a qualified engineer, specialist, laborat_ory or fire-safety
specialty organization acceptable to the chief and the owner and shall analyze ·the fire-safefy
properties of the design, operation or use of the building or premises and the.facilities and
appurtances situated thereon, to recommend necessary changes.
Deficiency Item: _Pen d.l n g 29 High Piled Combustible Storage
Page2
I .,
Storage in closely packed piles shall not exceed 15 feet In height, 12 feet on pallets or in
rac!<s and 6 feet for ttres, plastics and some flammable liquids. If high piled stock piling
is to be done, submit a complete storage plan and description of the commodities to be
stored. Show compliance with Article 81 of the Uniform Fire Code.
;
08/14198
TI.TLE .24 REPORT FOR:
Legoland _
Ac!min & Srvc Area -Mairttainance Bldg
Carlsbad, CA
PROJECT DESIGNER:
REPORT PREPARED BY:
Steve Balderrama, CEPE
STU·EVEN )!:NGINEERING CONSUI,;TANTS
425 W.. FI'FT~ AVE~, #103
ESCONDIDO, CA 92023
(760) '135-8577
,Job Number: T98106_
Date: 8/27/1998
The COMPLY 24 computer p.:i;:ograni has been used to perfo,rm the ~al.ctilatiohs
summarized in this compliance report. This program has approval and is·
authorized by the California Energy Commission fo-r use with both the
Residential and Nonresidential;. Buildi'ng Energy .Efficien.cy Standards.
Th~s program developed by Gabel Dodd/EnergySoft, llc (415) 883-5900.
!
Table Of Contents for Title 24 Report. --------------------------------. -
Cover Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Table of Contents ............................ "· ! • • • • • • • • • • • • • • • • • • • • • • • 2
Nonresidential Performance Title _24 Fo-rms • • . . . • . • • • . • • . • . . . . . . . . . . . . 3
Form ENV-3 Construction Assemblies •....•......... , .•..•.•...•......• 17
\
PERFORMANCE CERTIFICATE OF COMPLIANCE (part 1 of 3)
Run Initiation Time: 11:53:50
PERF-1 page 3 of 19
Runcode: 3429~622550720
-----------------------------------------------_ ---------------------------
Project Name: Legoland' IDate: 8/27/1998
Address: Admin & Srvc A_rea -Maintainance Bldg
Carlsbatj., CA
1 _________ _
!Building Permit No
Designer:
I ______ -__ _
I Checked by/ Date
I
Documentation: STUEVEN ·ENGINEERING CONSULTAN'J,'S ICOMPLY 24 User 3429
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the Bu.j.lding features and performance
specifications needed to comply with Title 24, Parts 1 and 6, of the State
Building Code. This certificate appli~s only to a Building using the
performance compliance approach.
The Principal Designers hereby certify that the proposed building design
represented in the construction documents and modelled for tl;lis permit
application are consistent with all othe.i; forms and worksheets, specifi..;.
cations, and other calculations submitted with this permit application.
The proposed building as designed· meets the em.ergy e,fficiency requirements
of the State Building Code1 title 24, Part 6, Chapter 1. ·
1. I hereby affirm that I am eligible under the provisions of Division 3 of
the Business and Professions Code to sign this document as the person
responsible for its preparation; and that I am licensed as a civil
engineer.( mechanical engineer,.· e;I:ectrical engineer or architect.
2. I affirm that I am eligible under the exemption to Divis·ion 3 of the
Business anc:i Professions Gode by Section 5537.2 of the Business and
Professions Code t9 sign this doct,imep.t as the person responsible for its
preparation; and that I am a licensed contractor .preparing documents for
work that :t have contracted to perform.
3. I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section--'------of the
Code to sign this document as the person responsible for its
pr~pa~ati6n; and for the following reason: ,------,'-'------------
SCOPE OF COMPLIANCE (Designers should circle applicable paragraph numbers)
ENVELOPE -
Principal Designer
~F~
1)/AV'f ~ "~~~ ~~, u,,. .q,z~ LIGHTING:-
t...lC.-:1:f 7Z.~c./-1q
Principal Designer
e'AV1,,,; S,1,..~e--rp.1a.:.·
Required
Location
Required
Location
Forms: ENV-' ENV-2
of Mandator on Plans
u) 2 3
e) (Circle)
Forms: LTG-1; LTG-2
of Mandatory Measures on Plans M?--
~,;7 1-f.o~~NA-1?L.11'D,1 .s'T"f, }"/'01
~"'1-t 1?~111 CA "f-,..117
~ f ~. 1$-')K-lj'(!' 1 lZ) 3
(Sighature) · (Date) (Circle)
MECHANICAL -
L,..1?• 79C.8b°I
Principal Designer
.J ,,;.. P'i"~G'-'S .~. 9.-' Ac;,.
1$~ 7 >.lMJO.SO"' wk(, 5~· H
e-st.oNo too, t:-/'t ct .,_ 0" ,-
Required Fo:rrms: MECH-1, MECH-2, MEGH-3, MEGff-4
Location of Mandatory Measures on Plans M "'2--
l ti) 3
(Circle.)
PERFORMANCE CERTIFICATE OF COMPLIANCE {part 2 of$) PERF-1 page 4 of 19
Run Initiation Time: 11:53:50 Runcode: 3429-622550720 -------------------------------------------------------------------------,·-
Project Name: Legoland I Date: 8/27/1998
I
Documentation: 'STUEVEN ENGINEERING CONSULTANTS I COMPLY 24 User .3429 --------------------:-------------------------------------------------------
ANNUAL SOURCE ENERGY USE SUMMARY (KB~u/sqft-yr)
Energy Component ------------------------
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps
Domestic Hot Water
Lighting
Receptacle
Process
TOTALS
GENERAL INFORMATION
Conditioned Floor Area:
Average Ceiling Height:
Glass Area/ Wall Area:
Average Glazing U-Value:
Front Orientation:
Number of Stories:
Number of Zones:
Number of Occupancies:
·1172
10.0
.0.02
1.19
0 deg (N)
2
2
1
Standard Proposed Complianc'7
Design Design Margin --------------------------
8.96 7.42 1.54
27.90 27.39 0.51
24.32 23.29 1.02 o·. oo 0.00 0.00
0.00 0.00 0.00 o.oo 0.00 0.00
47.10 46.08 1..02
25.34 25.34 0.00
0.00 0.00 0.00 --------------------------
133. 62 129.52 4.10
Compliance Methoq.: COMPLY 24 v5.10
Location: Carlsbad
Climate Zone: 7
ZONE INFORMATION Floor Display Inst Tailored Process Tailored
A,rea Pe.d,m. LPD Lighting Loads Vent.
Zone Name (sqft) (f1") (w/sf.) ~watts) (w/sf) (y/n)
-----------------------------------------------------------------
Offices 1172 0 1.57 0 0 N
Unconditioned Areas 1000· (j 0.00 0 0 N
PERFORMANCE CERTI'FICATE OF COMPLIANCE {part 3 of 3)
Run Initiation Time: 1:1:53:50
PERF-1 page 5 of 19
Runcode: 342.9-622550720 ------------·-.· ----------·-----.---.--------·---.------------------------
Project Name: tegoland !Date: 8/27/1998
J
Documentation: STUEVEN ENGINEERING CONSULTANTS !COMPLY 24 User 3429
. . . .
The documentation preparer hereby certifies that the documentation 'is
accurate and complete,
DOCUMENTATION AUTHOR
Stev:e Balderrama, CEPE
(760) 735-8577
~-,Rt+ii'ze.,. .. :-..'5}-3"'""".:."""","t.--.at.u/£-t/46
(Signature) (Date)
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency shoul~ pay special attention to the items
specified in this checklist. These items require special written
justification and documenta.tion, and special verification to be used with
the per,forman,c;e. approach. The local enforcement ag.ency determines the
adequacy of the just;i.fication, and may reject a building or design that
otherwise complies based on tl:).e adequacy of the special justification and
documentation submitted.
BUILDING DEPARTMENT APPROVAL OF EXCEPTIONAL FEATURES ·JUSTIFICATION:
The exceptional feat:ures listed in this performance approach application
have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
authorized signature .or stamp
CERTIFICATE OF COMPLIANCE -~nvelope
Run Initiation Time·: 11:53:50
ENV-1 page 6 of 19
Runcode: 3429-622550720 ----------------------------------------------------------.. ----------------
Project Name: Leg·o1a_pd
Documentation: STUEVEN ENGlN~ERING CONSULTANTS
I Date: 8/27/1998
I
!COMPLY 24 User 3429 ---------------------------------------------· -----------------------------
OPAQUE SURFACES
Assembly Name
Ccmst
Type Locati.on/C:omments
Note to
Field
-----------------------------
R-11 Demi~ing Wall(Mtl) Metal
R-19 on As;:oustical Tile Woc;,d
7" Concrete Wall None
FENESTRATION Frame
Orient Panes Type Exterior Shade --------_____ , _______________ .
,, '
Back (S) 1 Metal None
OH Glazing Type
N Single Clear Default(N)
CERTIFICATE OF COMPLIANCE -Lighting
Run Initiation TiI!\e: 11:53:59
LTG-1 page 7 of 19
Runcode: 3429-622550720 ------------------------------------------~----------------------------
Project Name: Legqland
Documentation: STUEVEN ENGINEERING CONSVLTAN!S
IDate: 8/27/1998
r
I.COMPLY 24 User 3429
------------------------------.--------------> ____________________________ _
INSTALLED LI.GHTING SCHEDULE
No of
Name Lamp Type Lamps
-----·------------
Fluor~s.cent 3
MANDATORY AUTOMATIC CONTROLS
Control
Watts/ Ballast Ballasts/
Lamp Type L~naire -------------. -----------
34 $tandard 1.5
Control Location ID Control Type Zone controlled
CONTROLS FOR CREDIT
Control·
Control Location ID Control Type Zone Cont-rolled
No of
Fixt.
17
---------------· --------· ---------------.----~ -----------------
Note to
Field
-------
Note to
Field
I
I
I
I
I
Note to
Field
CERTIFICATE OF COMPI,IANCE -Mechanical (part 1 of 2) MECH-1 page 8 of 19
Run Initiation Time: 11:53:50 Runcode: 3429-6225507-20 --------------------------.--------. -------,-------------------------------
Project Name: tegoland
Documentation: STUEVEN ·ENGINEERING CONSULT.ANTS
!Date: 8/27/1998
I
I COMPLY 24 User 3429 ---------------_____ . ------------------------~ ----------------------
SYSTEM FEATtJRES
Zone Name HP-1
Time Control S ----Setback Con-trol Setback
#of Isolation Zones n/a
HP Thermostat Yes
Electric Heat 0.0 KW
Fan Control Constant Volume
VAV Min Position n/a
Simul. Heat/Cool n/a
Heat Supply Reset Constant Temp
Cool Supply Reset Constant Temp
Ventilation B
0A Damper Control
Economizer Type
Outdoor Air CFM
Heat Equip Type
Make & Model No.
Cool Equip Type
Make and Model
Code Tables
A
N·o Ecqnomizer
176
Heat Pump
RHE_EM RPKA-042JA
DX
---------------------------------------------.--
Time Control
S:Prog Switch
O:Occ Sensor
M:Man Timer
Venti.iation
B:Air Balanc;:e
C:OA Cert.
M:OA Measure
D:Demand Cont
N:N:atural
OA Damper ,
A:A,uto
G:Gravity
Note to
Field
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.,. _J.
/
CERTIFICATE ·OF COMPLIANCE -Mechanical (part 2 of 2) MECH-1 page 9 of 19
Run Initiation Time: 11:53:50 Runcode: 3429-622550720 · ----------·--·--'----------~---------·--------------------------------------
Proj~ct Name: Legol~nd
Documentation: STUEVEN ENGINEERING CONSULTANTS
!Date: 8/27/1998
I
!COMPLY 24 User 3429 ----------------------·---------------------------------------------------
DUCT INSULATION
System Name
RHEEM RPKA-042JA
Type ----~--
~eating
Cooling
Duct Location
-------------------
Dµcts in l',.ttic
Ducts in Attic
PIPE INSULA'-';'ION Insul
System Name Pipe Type Required ----------------.-------------------------
Domestic .Hot Water
RHEEM RPKA-042JA
y / N
y / N
NOTES TO FIELD -For Bui1ding Department Use Only
Duct Tape
Allowe-c::l. ~------
y I N
y I N
Insul
R-Val
4 .. 2
4.2
Note to
Field -------
Note to
Field.
------------------------------~--------------------------------------------
ENVELOPE COMPLIANCE.SUMMARY -Performance (part 1 of 3)ENV-2 page 10' of 19
Run Initiation Time: 11:53:50 Runcode: 3429-622550720
. . .
Project Name: Legoland
Documentation: ·STUEVEN ENGINEERING CONSULTANTS
!Date: 8/27/1998
I
!COMPLY 24 User 3429 -------------------------------------:---.----------------------------------
GENERAL INFORMATION BY ZONE
Flr Floor Display
Zone Name Occupancy No Area Volume Perim. -------------------------------------------------------------
Offices Office 2 1172 11720 0
Unconditioned Areas Unconditioned i 1000 9000 0
-----
Total 2172
ENVELOPE COMPLI,ANCE SUMMARY ,.... Pe~formance (,part 2 of 3) J;:NV-2 page 11 of. 19
Run Initiation T;i.me: 11:'53.:·50 Runcode: 3429-622550720
--------. ----.--·--".-. -·-..J-- . --. '. ------.-----. -------, .. ---. -------. ---. -------
Project Name: Legoland
Documentation: STUEVEN ENGINEERING CONSULTANTS
!Date: 8i27/1998
I I COMPLY 24 User 342·9 -------------~-----.----------------------~-----------------------
OPAQUE SURFACES Act Solar
Type Are·a V-:-Val Azm Tilt Gains Form 3 Reference Locati.on/Comments
. -----------------------------------------
Wall 190 0.709 0 90 Yes 7" Concrete Wall Offices
Wall 730 0,709 -90 90 Yes 7'' C:::onc:rete Wall Offices
Wall 158 0.709 180 90 Yes .7" Concre·te Wall Offices
Wall 730 0.192 Int 90 No R..., J..l Dei:nisi:i-ig Wall.(Mtl) Offices
Roof 1172 0.043 0 22 Yes R...,i9 on Acous·ti cal Tile Offices
'.
ENVELOPE COMPLIANCE SU1-1MA,RY -Pe.dormance (part 3 -of 3) ENV:-2 page 12 of ·:j.9 ·
Run Initiation. Time: 11:53-:50 · Runcode: 3429-622550'Z2Q ---------. --------------------~----------.----------------~---------
Project Name: Legoland !Date: 8/27/1998
" Documentat;i.on: STUEVEN ENGINEERING CONSULTANTS. I COMPLY 24 Us-~r. 3429
--------------------.---,. -----------------------.-------------------------
FENESTRATION SURFACES SC
Act Glass.
# Type Area. Frame Div U-Val Azm ·Tilt Only Loc.ation/Comments __ ;,,___ ---
1 Wdw Back (S) 32. 0 Me,tal No 1.19 180 90 0.94 Offices
OVERHANGS/SIDE FINS . ' .
--W.tndow-"""
# Type Ht Wd
-----overhang--_----
Len Ht LExt RExt
-..,.-Left Fin-......
Dist L~n Ht
---Right Fin--
. Dist Len Ht
------------------------------~----- ----
LIGHTING COMPLIANC~ SlJI1MARY -Performance
Run Initiation Time: 11:53:'50
LTG-2' page 13 of _19
Runcode: 3429-6225507.20 ------------------------' --. ----------_-----------------. -------------------
Project Name: Legoland
Documentation: STUEVEN ENGINEERING CONSULTANTS
JDate: 8/27/1998
I
!COMPLY 24 User 3429
--------------, ---------------, ------------------.----------------------
ACTUAL LIGHTING POWER
No of Watts Total
Name Description Lumin per Default Watts ---------------------·----------------,_--
48" T-12 Low·w~tt /3 Lamp (Tandem) 17 108,0 Y, 1836
1836
0
StibTotal
Less Control Credits {LTG~3)
Total Propos~d--watts 1836
* If not CEC Default value, please p-rovide supportipg documentation.
MODELLED LIGHTING POWER BY Z'ONE
Zone Name Occupancy ------------------------. -----------------, __
Offices Office
TOTALS
Modelled
Floor LPD
Area (w/sf)
'11otal Tailored
(·watts) (watts) _ .:.,. ____ __ ..,.;;. ____ ~-------
1172 1.567 1836 0 ----~ -------------____ ...;_~_
1172 1.567 1836 0
* Note: Tailored Allotment .requires supporting documentation on form LTG-4.
I• t
MECHANICAL EQUIPMENT zoNiNG SUMMARY -P~rfor~ance.
Run Initiation Time: .11:53:50
MECH-~ page 14 of 19
Runcode: 3429-622550720 --------·-----, --------· ____ . ___ ' -----.--------· ______ . --------------------
Project Name: Legoland·
Documentatio_n: STUEVEN ENG;l:NEERING CONSULTANTS
JDate~ 8/27/1998
I
!COMPLY 24User 3429 ---------·-------------·-------.-.---. ---·---------------·-----------------
SYSTEM/ZONING SUMMARY
System/Zones, Served ------------------·------
HP-1
Offices
Unconditioned Area&
Centra+/Zonal Syst~m ---. ,_ ---------------
RHEEM RPKA-042JA
S-yst.em Type
----------------
Splj_t Heat Pump
No
Sys
.1
MECHANICAL EQUIPMENT·. SUMMARY -Perj;o·rmarice
Run Init.:j.ation Time:.11::5~:50
ME.CH-3 page 15 of. 19
Runcode: 3429-622550720 ---------------------------------------·----------------·------·
Project Name·: Legoland
Documentation: STUEVEN J;:NGINEERING CONSUI.;TANTS
I Date: 8/27/1998
1·
I.COMPLY 24 User 3429 ---------, ______ c---------~ --, -"----·. -----,. ______ • ____ ,_ ·-·,. • ---. ------------t
CENTRAL SYSTEM SUMMARY
Sys
No System Nam~
. . .
System Type
No
Sys Econoxrlizer Type
. . . ----------. -----------------
1 RHEEM-RPKA-042JA Spiit Heat Pump 1 N0 Economizer·
CENTRAL SYSTEM RATINGS
Sys-------H~ating ~-----------------~----------~~----Cooling -----------
No Type Output A~x KW EfF Type Qµtput Sensible· EER SEER
- -,7 .
1 Heat Pump· 42000 0.0 1.50 DX 42000 4 7 3 0 0 .. 9 .4'0 10 . 0 0
CENTRAL FAN SlJ.MMARY ___ _: _________ Supply Fan . .. -~-~-Return Fan
sys Mtr Orv
No Fan Type Motor Location BHP
. -----------------------
1 Constant Volume Draw-Through 1400
ZONAL FAN SUMMARY
Zone Name
None
---------Zon~l Fan
Mtr
No CFM BHP· Eff
0.50
brv
Ef.f
Eff Eff
70 roo
;...------~
No CFM
Mtr Orv
CFM BHP Eff Eff
.None
Exhaust ]fan
Mtr DFV
BHP :Eff Eff
----------
1.. ( ) ,l
MECHANICAL VENTILATION -Performance
Run Initiation. Time: 11:53:56
MECH-4 page I6·of 19
Runcode.: 3429-622550720 -------------------,--------------------.----------,--------' --------------
Project Name: L~goland
Documentation: STUEYEN ~NGINEERING CONSULTANTS
I Date: 8/27/1998
I
fC:OMPi,Y 24 User 3429
-------,--------·-----------------------------------------------------------
VENTILATION SUMMARY BY ZONE
Floor
Zone Name T Occupancy' Area, -----------------------..,. ----------' --··, ..
Offices Office i.172
sq:f:t CFM
/'Occ /Oc,c
100 15.0
TOTALS
Dsg
Cn1
176
176
Tran
Min sfer
CFM CFM
176 0
176
Tailored OA (T=*) requi+es supporting documentation on ME.CH-5, Tailored
Ventilation ·anq P+oces$ L'oads Worksheet
l. J I .-,
PROPOSED CONSTRUCTION ASSEMBLY .:e;NV-3 pc:tge 17 of 19
---. --.-------------·------------------------------------------------
Project Name: tegoJ,c:tnd I Date: 8/27/1998 _
I
Documentation: STUEVEN ENGIN~I;::RING CONSULTANTS I COMPJ.,Y 2-4 User 34-29 ------· ------------------.--.--· -----------------------------0-------------
COMPONENT DESCRIPTIOI>f ----------------. -. ---------. -
I
I
I
I
I
I
I
I
I
I
I ----------------~ -------
Sketch of Const~~ction Assembly
ASSEMBLY U-VALUE
Construction Components
A,ssembly Name:: &~11 Demis·ing Wa,11 (Mtl)
Assembly TyPe.:· Wa11
Assembly Tilt: ·go deg (Vertical)
Framing Ma-terial :· Metal
Framing S_pacing: . II o.c ..
-Framing Pe-rcent: 15. 0 %
A.bsq,rptivity: 0.7.0
Roughness: Smooth :Plaste,r, Metal
-Th
Fr {in.)
R-Value
Cavity Frame --------------------·-----------:-. -------------.. ----------- -----
Outside Air Film -
1. Gypsum o,r Plaster Board
2. Insulation, Mineral_ Fiper,
3. Gypsum or Plaster Boal:'d
4.
5.
6.
7.
8.
9.
Inside Air Film. . . .
R-11 *
0.17 0.17
o .•. 500 0.45 0 .. 45
3,500 11.00 11. 00
0.500 ·0. 45, 0.45
0.68 0.68 --------·--------------------------.---------------'.. -------·_ ---------
Weight:
Heat Capacity:
Unadjust~d R-Values
4 .. 3 lb/ sqft
Lll
· TOTAL
·TOTAL
12. 7!;i 0.00
U-VALUE = 0.19,2
-----
R-VA.:LUE = 5.20
PROPOSED· CONSTRUCTION ASSE;MBLY ENV~3 page 18 of 19
-' \ -. . ' . ' -------
Project Name: Legoland !Date: 8/27h998
I
Documentation: STUEVEN ENGINEERING CONSULTANTS !COMPLY 24 User 3429
---------.----------- ------. --------.--------·------------------
COMPONENT DESCRIPTION -------------------------------
----------------------. ----
Sketch of Construction Assembly
ASSEMBLY u~vALUE
Construction Components-
Assembly Name: R-19 on Acoustical Tile
As-sembly Type: Roo-f
Assembly Tilt: 2~ deg (Tilted Up·)
Framing Material: W6od
Framing Spacing: " o.c.
Framing Percent: 10.0 %
Absorptivity: O, 70
Roughness·: Concrete, Asph. Shingles
Th
Fr (in}
R-Value
Cavity Frame ------------------- ---------------------~ -------------... -----------
Outside Ai.t F.:i.lm 0.17 0.17
1. Roofing, Built-Up 0.375 0.33 0.33
2. Membrane, Vapor-Permeable Felt 0.010 0.06 0.06
3. Plywood 0.500 0-. 62 0.62
4. Air Space 12. 0.00 Q.80 o. 8.0
5. Insulation, M,ineral Fiber., R~l9 6.000 19·. 00 19.00
6. Aco"(Jstical Tile, Interior Finish 0.500 1.43 1.43
7.
8.
9.
Inside Air. Film 0 .. 61 . 0. 61
----------. ------------------------------· -------------------------
Unadjusted R-Values 23.02
ADJUSTMENT FOR FRAMING
(1 /23.02} X (0.90} + (1 /23.0~} X (0.1Q1
Weight:
Heat Capacit,:{:
4.-6 lb/sqft
1.45
0.043
TOTAL lJ'-VALUE;.
TOT.AL R""VALUE =
23.02
0.043
23.02
ll, • f i
PROPOSED CONSTRUCTION ASSEMBLY ENV-3 page 19 of 19 ------------_____________ , __________ , ___________ ·--------------------------
Project Name: Legoland_ !Date: 8/27/1998
I
Documentation: STUEVEN ENGINEERING CONSULTNJ-TS !COMPLY 24 User 3429
. ·-_-. .
COMPONENT DESCRIPTION
--. ' , . ,
I
I
I·
I
I
I
I
I
I .,
I -----------------.-------------
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Assembly Name: 7" Concrete Wall
Assembly Type: Wall
f,.ssembly '.I'ilt: 61 deg (Tilted Up)
Framing Mat;erial: None
Framing Spacing: -"O.C.
framing Percent: a.a%
Absorptivity:_ O·. 70
Roughness: Concrete, Asph. Shingles
Th R-Value
Fr (in) Cavity 'Frame ---------------------------------------------~--:---------------------
Outside Air Film
1. Concrete, 140 lb, Not D~i~d
2.
3.
4.
5.
6.
7.
8.
9.
Inside Air Fi-lm'
7.000
0.17
0.56
0.68
0.17
0.56
0.68
----------.-·-----------------------------·. -----· -------,. ----------------
Unadjusted R-Values 1.41
ADJUSTMENT FOR FAAMING
( 1 / 1. 41) x ( L 0 0) + ( 1 /. 1.A 1) X ( 0 • Q 0)
Weight:
Heat Capacity:
81,7 lb/sqft
lp.33
= o_. 709
TOTAL U-VALUE =
TOTAL R-VALUE
1.41
0.709
1.41
-4 ,l_ • "'-
MANDATORY REOU.IREMENTS
ENVELOPE REQUIREMENTS
A DOORS. WINDOWS AND SKYLIGHTS:
MANUFACTURED FENESTRATION PRODUCTS MUST BE LABELED AND THE
MANUFACTURER OR INDEPENDENT CERTIFYING ORGANizATION MUST .
CERTIFY THAT THE PRODUCT MEETS IBE AIR INFILTRATION AND U-V ALUE
REQUIREMENTS OF SECTION _116(a). IF SITE BUILT, THE STANDARDS REQUiRE
THAT THE l.JNIT BE CAULKED, GASKETED, WEATHER,S1'RIPPING00R OTHER-
WISE SEALED PER SECTION 116(1>). .
B. JOINTS AND OPENINGS:
ALL JOINTS AND OTHER OPENINGS IN THE BUILDING ENVELOPE THAT ARE
POTENTIAL SOURCES OF AIR LEAKAGE BE CAULKED, GASKETED: WEATH~
ER-STRIPPED, OR OTHERWISE SEALED TO LIMIT AIR LEAKAGE INTO OR OUT
OF THE BUILDING-PER SEeTION ll 7(a). . .
C. INSULATION MATERIALS: .
MANUF ACTIJR.ERS MUST CERTIFY ,INSULATIN!} MATERIALS TO COMPLY ·
WITH CALIFORNIA QUALITY STANDARDSFOR INSULATING MAXERIALS PER
SECTION 118(a). UREA FORMALDEHYDE FOAM INSutATION MAY BE INST-
ALLED PER SECTION 1 \8(1?) 1 & 2. ALL INSULATINGMATE:RIAL SHALL BE
INSTALLED IN COMPLIANCE WITRSECrION 118(c):. INSULAT):ON IN$TALLED
IN AN EXISTING BUILDING SHALL COMPLY WITil:SECTION 118(d) 1,1.& 3.
DEMISING WALLS IN NONRESIDENTIALBUILDINGS·SHALL HA VE INSUL-
ATION WITH AN R-V ALUE OF NO LESS THAN R-11 PER SECTION U8(e).
MECHANICAL REQUIREMENTS
A EQUIPMENT CERTIFICATION:
ANY APPLIANCE FOR WHICH THERE IS A CALIFORNIA STANDARD EST ABL,
!SHED IN THE APPLIANCE EFFICIENCY REGULATIONS MAY BE INSTALLED
ONLY IF THE MANUF A,CTURER HAS CERT:IFIED TQ THE COMMISION, AS
SPECIFIED IN THOSE REGULATIONS, THAT THE APPLIANCE COMPLIES WITH
THE APPLICABLE STANDARD FOR THAT APPLIANCE-SECTION 111). ANY
SPACE EQUIPMENT LISTED IN THIS SECTION MAY BE INSTALLED ONLY IF
THE MANUFACTURER HAS CERTIFIED THAT THE EQUIPMENT COMPLIES
WITH ALL THE APPLICABLE REQUIREMENTS OF ~ECTION 112(a) 1,2,3 & 4.
HEAT PUMPS WITH SUPPLEMENT ARY ELECTRIC RESISTANCE HEATERS
SHALL HA VE CONTROLS THAT COMPLY WITH $ECTION U2(b) 1 & 2.
B. PILOT LIGHTS:
PILOT LIGHTS ARE PROHIBITED IN (a) FAN TYPE CENTRAL FURNACES,.(b)
HOUSEHOLD COOKINQAPPLIANCES(EXCEPTION·-HOl:JSEHOLD•COOKING
APPLIANCES WITHOUT AN ELECTRICAL SUPPLY VOLTAGE CONNECTION
AND IN WHICH EACH PILOT CONSUMES.LESS THAN 150 Btwbr), (~) POOL
HEATERS AND (d) SPA,HEATERS.
C. OUTDOOR VENTILATION GENERAL REQUIREMENTS:
ALL ENLCLOSED SPACES IN A Bl:JILDINQ THAT ARE NORMALLY USED BY
HUMANS MUST BE CONTINUOUSLY VENTILATED WITH OlJfDOOR: AIR
USING EITHER NATURAL OR MECHANICAL VENTILATION_;_ PER SECTION
121(a), (b), (c), (d), (e) & (f).
D. REQUIRED CONTROL FOR SPACE CONDITIONING.SYSTEMS:
A THERMOSTAT MUST BE PROVIDED FOR EACH SPACE CONDITIONiNG
ZONE OR DWELLING UNIT TO CONTROL THE SUPPLY OF HEATING AND
COOLING ENERGY WITHIN,THAT ZONE-_ PER SECTION 122{a), (o)& (c).
E. SHUT-OFF AND TEMPERATURE SETUP/SETBACK:
FOR SPECIFIC OCCUPANCIES AND CONDITIONS, EACH SPACE CONDITIONING
SYSTEM MUST BE PROVIDED WITH CONTROLSTHATCAN AUTOMATICALLY.
SHUT OFF THE EQUIPMENT DURING UNOCCUPIED HOURS -PER SECTION .
122(e). · ·
F. DAMPERS FOR AIR SUPPLY AND EXHAUST EQUIPMENT:
OUTDOOR AIR SUPPLY AND EXHAUST EQUIPMENT SHALL ~E INSTALLED
WITH DAMPERS THAT AUTOMATICALLY CLOSE DURING PERIODS OF NON-
USE OF THE AREAS SERVED BY THE EQUIPMENT -PER SECTIQN 122(f). .
G. ISOLATION AREA DEVICES:
EACH SPACE CONDITIONING SYSTEM SER.YING MULTIPLE ZONES WITH.A
COMBINED CONDITIONED FLOOR AREA MORE THAN 25,000 SQUARE FEET
SHALL BE DESIGNED, INSTALLED AND CONTROLLED TO SER:VE ISOLATION
AREAS -PER SECTION 122(g). . . . . .
H. REQUIREMENTS FOR PIPE INSULATION:
THE PIPING FOR Ai.,L.SPACE CONDITIONING AND SERVICE WATER
HEATING SYS'.I'EMS WITH FLUID TEMPERATURES LISTED IN TABLE NO.
1-G SHALL HA VE THE AMOUNT OF INSULATION SPECIFIED IN SUB-
. SECJ'ION (a) OR SUBSECTION (b)-SECTION 123(a) AND (b).
. .I. REQUIREMENTS FOR DUCTS AND PLENUMS:
ALL DUCTlf SHAI:.L BE INST AI.,LED AND INSULATED IN COMPLIANCE
WITH:SECTIONS 601, 603 AND 604 OF THE UMC-PER SECTION 124(a).
SERVICE WATE~ SYSTEM REQUIREMENTS
A CERTIFICATION BY MANUFACTURERS:
ANY.SERVICE WATER HEATING SYSTEM OR EQUIPMENT MAY BE
INSTALLED ONLY IF THE MANUFACTURER HAS CERTIFIED THAT
THE·SYSTEM,OR EQUIPMENT COMPLIES WITH ALL PF THE REQUIR-
EMENTS OF THIS SUBSECTION FOR THAT SYSTEM OR EQUIPMENT -
SECTIQN ll3(a)& (b).
B .. POOL AND SPA HEATING SYSTEMS· AND EQUIPMENT:
ANY ,POOLQR.SPA HEATING SYSTEM OR EQUIPMENT MAY BE IN-
STAI,LED ONLY IF THE MANUFACTURER HAs CERTIFIED THAT THE
SY.~TEM OR EQUIPMENT COMPLIES WITH SECTION 114(a) & (b).
LIGHTING ,REQUIREMENTS
A CONTROL REQUIREMENTS:
AN¥ Atn:oMATIC TIME SWITCH CONT,ROL DEVICE, OCCUPANT-
SENSING DEVICE, AUTOMATIC DAYLIGHTING CONTROL DEVICE,
LUMJ~N MAINTENANCE CONTROL DE VIC$, OR INTERIOR PHOTOCELL
SENSOR DEVICE MAY BE INSTALLED ONLY IFTHE MANUFACTURER
HAS CERTIFIED TO THE COMMISIQN, THAT THE DEVICE COMPLIES
WITH ALL OF THE AP.PLICABLE REQUIREMENTS OF SECTION 119
(a)-(g), AND IF THE DEVICE IS INSTALLED IN COMPLIANCE WITH
SUBSi;:CTION (h).
B; LIGHTING CONTROLS:
EACH.AREA ENCLOSED BY CEILING-HEIGHT PARTITIONS SHALL HAVE
AN INDEPENDENT SWITCHIN<:iOR CONTROi:, DEVICE. THIS SWITCHING
OR CONTROL DEVICE:SHA+L COMPLY WITH SECTION 13 i(a)-(f).
C. REQUIREMENTS FOR LIGHTING CIRCUITING;.
PAIRS OF ONE-LAMP OR THREE-LAMP RECESSED FLUORESCENT
LUMINAIRES THAT ARE 1) ON THE SAME SWITCH CONTROL, 2)
IN THE SAM.I;: ENCLOSED AREA AND 3) WITHIN 10 FEET OF EACH
OTfIER IN AN, ACCESSiBLE,CEILING SP AQE, MUST BET ANDEM WIRED.
SINGLE LAMP.BALLASTS SHOULD NOT BE USED. SURFACE·OR
PENDANT MOUNTED FIXTURES THAT ARE CONTiNuous WITH EACH
OTHER MUST ALSO BE TANDEM. TANDEM WIRING REFERS TO THE
ARRANGEMENT WHERE A BALLAST OPERATES A LAMP IN ONE
LUMINAIREAND.ALJ\MPIN AN ADJAOENTLUMINAIRE. LUMINAIRES
THAT ARE EXEMPT FROM THIS REQUIREMENT ARE: 1) SURFACE
OR PENJ;>ANT MOUNTED LUMINAIRES THAT ARE NOT CONTINUOUS,
2) Ll/MINAIRES THAT USE ELECTRONIC HIGH FREQUENCY BALLASTS.
SINGLE LAMP BALLA$TS MAY BE USED WHEN THERE ARE AN ODD
NUMBER OF LAMPS OR WHERE THERE ARE MULTIPLE GROUPS OF BI-
LEVEL SWITCHING AND THE CONTROL:SCHEME PRODUCES TWO
ONE-LAMP BALLASTS ADJACENT TO EACH.OTHER, BUT CONTROLLED
BY DIFFERENT SWITCHES -PER SECTION 132(a) & (b).
C. HIGH RISE RESIDENTIAL LIVING QUARTERS AND HOTELJMOTEL
GUEST ROOMS, .
THE LIGHTING IN HIGH-RISE RESIDENTIALL/WG QUARTERS AND IN
HOTEL/MOTEL GUEST ]J.OOMS COMPLY WITH LIGI{TING REQUIREMENTS
THAT ARE. ESSENTIALLY IDENTICAL TO tHE LIGHTING REQUIREMENTS
OF THE RESIDENTIAL STANDARDS.. THE DESIGNER HAS THE OPTION TO
EXEMPT AS MANY AS 10%·0F TfIE GUEST ROOMS IN A HOTEUMOTEL
FROM THIS R,EQUIREMENT-PER SECTION 130(a) & (b). ..
.. ' .. t~' .. i . •
•
•
•
TITLE 24 REPORT FOR:
Legoland
Admin & Srvc Area -Maintainartce Bldg
Carlsbad, CA
PROJECT DESIGNER:
-..jP-1-\-fl f'ffa-z..\
\...-~&OvArJO ~ S~
ef-11! t..-~t.o ¢:iP..Lve-
b~SfA:O, c-A ~"l6Cl1J
REPORT PREPARED BY:
Steve Balderrama, CEPE
STUEVEN ENGINEERING CONSULTANTS
425 W. FIF'.j.'H AVE., #103
ESCONDIDO, CA 92023
(760) 735-8577
Job Number: ·t981:06
Date: 8/27/1998
The COMPLY 24 comput;er progra,:in has been µsed t;o perform the calculations
summarized in this compliance report. This prog~am has approval and is
authorized by the California Energy Commission for use with both the
Residential and Nonresidential Building Energy Efficiency Standards .
Th.i,s program developed by Gabel Dodd/Energ,ySoft, lie (4;1.5) 883-5900.
I
l
•
•
•
Table Of Contents fo·r Title 2.4 Report --------------------·----· ·--------
Cover Page ........................................ ~ . . . . . . . . . . . . . . . . . 1
Table of content$ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . 2
Nonresidential Performance Title 24 Forms ....•........... ,, . . . . . . . . . . 3
Form ENV-3 Construction Assemblies .......•.......................... 17
\
t '
•
•
•
PERFORMANCE CERTIFICATE OF COMPLIANCE (part 1 of 3) PERF-1 page 3 of 19
Run Initiation Time: 11:53:50 Runcode: 3429-622550720
---------------------------------------------. -----------------------------
Project Name: Le_goland !Date: 8/27/1998
Address: Admin & Srvc Area -Maintainance Bldg
c·arlsbad, CA '----,---'-------IBuiJdipg Permit No
Designer:
I ______ -,--__ _
I Checked by/ Date
I
Documentation: STUEVEN ENGINEER:tNG CONSULTANTS !COMPLY 24 User 3429 ----------------:-----------------------------------------------------------
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists th_e Building features and performance
specifications heeded to c0mp:Ly with Title 24, :Parts 1 and 6, of the State
Building Code. 'This certifi~·ate applies qnly to a Building using the
performance compliance approach.
The Principal Designers hereby certify that the p1;oposed building design
represented in the constructiqn documents and modelied for this permit
application are consistent with all other forms and worksheets, specifi-
cations, and ot;her calculations submitted with this permit application.
The proposed building as designed meets the energy efficiency requirements
of the State Building Cod~, Title 24, Part 61 Cha~ter 1.
1. I hereby aff'irm that I am eligible under the provisions of Division 3 of
the Business and Profession~ Code to sign this document as the person
responsibl.e for its prepa;ration; and that I am licensed as a civil
engineer, mechanical engineer, electrical engineer or architect .
2. I affirm that I am eligipl.e unde:i;-the exemption to Division 3 of the
Business and Prdfessions Cdde by Section 5537.2 of the Business and
Professions Code to sign this document as the person 1;:esponsihle for its
preparation; and that I am~ licensed contractor ~reparing documents for
work that I have contracted to perform.
3. I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section--,-----of the
Code to sign this document as the pei=son responsible for its
preparation; and for the follow;i.ng reason: -----,--------------"---------
SCOPE OF COMPLIANCE (Designers should circle applicable paragraph numbers)
ENVELOPE -Reqµired Forms: ENV~, ENV-2
Principal Designer
6/11. v'-" r s-1. s--c..112-1 c..
Location of Mandator Meas·ures· on Plahs
Required Forms: LTG--,i, LTG-2
Location of Mandato-ry Measures on P:Lans -k-~ ?-
i;qo; ,_.,o~E-NA-1?L.~O.,~. J"fO]
-~ l?~o1 t:..A -,~117
MECHANICAL -
~ f~ ~-;-)g-f'c:r 1 ~ 3
(Signature) ~Date) (Circle)
~,c..• 79f..8b"f
Principal Designer
.J • ,:. • ~<av S f/"n;,. ~ Ac.-
I$~ 7 S" l MfOJ()'" t.lk/ 1 5 Tl<, H
e-sc.oNoto", t;,o, CJ"2-d'~,-
Required Forms: MECH,..1, MECH-2; MEC}i-3, MECH-4
Location of Mandatory Measu-res on PJ,ans .M "'2....
_ (Date)
1 ti) 3
(Circle)
,·
••
•
•
PERFO~CE CERTIFICATE OF GOMPLIANCE (-part 2 of 3)
Run Initiation Time: 11:5·3:50
PERF-1 page 4 of 19
Ruhcode: 3429-622550720
---------------------; ---------------------------------~---.-----------
Project Name: Legoland
Documentation: STUEVEN ENGINEERING CONSULTANTS
!Date: 8/27/1998
I
!COMPLY 24 User 3429
----------------------~-------------. ----------------------·-------
ANNUAL· SOURCE ENERGY USE SUMMARY (KBtu/sqft-yr)
Energy Component -----------------------~
Space Heating
Space Coolin·g
Indoor Fans
Heat Rejection
Pumps
Domest-ic Hot Water
Lighting
Receptacle
Process
TOTALS
GENERAL INFORMATION
Conditioned Floor Area:.
Average Ceiling Height.:
Glass Area / Wall Area.:
Average Glazing U-Value:
Front Orientation:
Number of Stories:
Number of Zones:
Number of Occupanci~s:
O deg
1172
10.0
o .. 02
1.19
(N)
2
2
1
s.tanctard Proposed Compl.i;.ance
Design Design Margin
_;;... _______ ------------------
?.96 7. 4'2 1. 54
27.90 27.39 0.51
24.32 23.29 1.02
0,0'0 o.oo 0.00
Q.00 b.Od o.oo o.oo Q.QQ 0.00
47.iO 46 .·08 1.02
25.34 25~34 0.00
0.00 0.00 0.00 -------------·-~-----------
133,62 129.52 4.10
Compliance Method: COMPLY 24 vS.10
Location: Carlsbad
-ci.i:inate Zone: 7
ZONE INFORMATION Fl.oor .Displat Inst Tailor.ed Process Tailored
}\rea Perim. L.PD Lighting. Loads Vent.
Zone Name (sqft) (ft) ·(w/sf) ·(watts) (w/sf)' (y/n)
----------------------------------------------------------------
Offices 1172 0 1.57 0 0 N
Unconditioned Areas 1000 0 o. oo· 0 0 N
•
PERFORMANCE CERT:IFICATE OF COMPLIANCE (part 3 of 3)
Run Initiation T.ime: 11:53:50
PERF-1 page 5 of 19
Runcode: 3429-622550720 ----------------------,------------------------------------------------.---
Project Name: l;,ego],and
Documentation: STUEVEN ENGINEERING CONSULTANTS
!Date: 8/27/1998
I
!COMPLY 24 User 3429 -------------.---·-,--_----------------------------------·------------------
The documenta~ion preparer hereby certifies that the documentation is
accurate and complete.
DOCUMENTATION AUTHOR
Steve Balde.r:rama., CEPE
(760) 735-8577 ~ R'R:'!lt-<"'<• (Signature)
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
. ,e/4,.-?/4t,
· (Date)
The local enforcement agency shouid pay special attention to the items
specified in this checklist. These items require special written
justification and documentation, and special verification to be used with
the performance approach. The local enforcement agency determines the
adequacy of the justification, and may reject a building or design that
otherwise complies based on the adequacy of th~ special justification and
documentation submitted.
BUILDING DEPARTMENT APPROVAL OF EXCEPTIONAL FEATURES JUSTIFICATION:
The exceptional feature,s listed in this performance appro.ach application
have specifically been reviewed. Adequate written justification and
documentation fo_r: their use have been provided by the applicant.
• authorized signature or stamp
•
~' 1 -\
•
•
•
CERT+FICATE OF ~OMPLIANCE -Envelope
Run Initiation Time: 11:53:50
ENV-1 page 6 of 19
Runcode: 3429~622550720
----------------------------------·-----------------------------
Project Name: :Legoland
Documentation: STUEVEN ENGINEERING <;:ONSUt.TANTS
I Date: _8/27 /1998
I
-I COMPLY 24 User 3429 ----------------------------------.---------------------------------------.
Const OPAQUE SURFACES
Assembly Name Type Location/Comments
R-11 Demising Wall(Mtl) Metal
R-19 on Acoustical Tile Wood
7" Concrete Wall None
FENESTRATION Frame
--. ~ -
Orient ];anes Typ.e Exterior Shac:ie OH Glazing_ Type
Note to
Field
--------------------------~----------------------
Back (S) l· Metal None N Single Clear Qefault(N)
•
•
•
CERTIFICATE OF.COMPLIANCE -Lighting
Run Initiation Time: 11:53:50 ·
LTG-1 page 7 of 19
Runcode: 3429-622550720 ________________ , -----"-·--"-------------------·---------------------------
Project Name: Legoland
Documentation: STUEVEN ENGINEERING CONSULTANTS
ro~te: 8/27/1998
I
ICOMPl;,Y 24 User 3429 ------------------------------------------------------------------------.
INSTALLED LIGHTING SCHEDUi,E
No of Watts/ Ballast Ballasts/ No of N<:>te to
Name Lamp Type Lamps Lamp TY)?e Lumirraire Fixt. Field ------------------...,;;.....;; _____ --------------------------
Fluorescent 3 34 Standard LS 17
MANDATORY AUTOMATIC CONTROLS
Control Note to
Control Location tD Cont~ol Type Zone Controlled Field
CONTROLS FOR CREDIT
·control
Control Location ID Control Type Zone Controlled
Note to
Field
-----------------~----~ -----------------------------~----------
·,
•
•
•
CERTIFICATE OF COMPLIANCE -Mechanical (part 1 of 2) MECH-1 page 8 of 19
Run Initiation Time: 11:53:50 Runcode: 3429-622550720 --------~------------------------"------"--------------, ---------~---------
Project Name: Legoland
Documentation: ST.UEVEN ENGINEERING CONSULTANTS
!Date: 8/27/1998
I
!COMPLY 24 User 3429 --------------------------------------------------------------:--"---------
SYSTEM FEATURES
Zone Name
Time Control
H?-1
s
Setback Control Setback
#of Isolation Zones n/a
HP Thermostat
Electric Heat
Fan Control
VAV Min Position
Simul. Heat/Cool
Heat Supply Reset
Cool Supply Reset
Ventilation
OA Damper Control
Economizer Type
Outdoor Air CFM
Heat Equ4,p Type
Make & Model No.
Cool Equip Type
Make and Mopel
Code Tables
Yes
0.0 KW
Constant Volume
n/a
n/a
Constant Temp
Constant Temp
B
A
No E<;;onontizer
176
Heat Pump
RHEEM RPKA'-042JA ·
DX
-------------------------· ---~---------------
Time G::ontrol
S:Prog Switch
O:Occ Sensor
M:Man Timer
Ventilatic;m
B:Air Balance
C:OA Cert.
M:OA Measure
D:Demand Cont
N·:Natural
OA Damper.
A:Auto
G:Gravity
Note to
Field
I
I
I
I
I
I
I
" I
,·,
•
•
•
CERTIFICATE OF COMPLIANCE -Mechanical (-part· 2 of 2) MECH-1 page 9 of 19
Run Initiation Time: 11:53:50 Run9ode: 3429-622550720 -----------------------------------------~-----------------------------------
Project Name: Legoiand
Documentation: STUEVEN ENGINEERING CONSULTANTS
!Date: 8/27/1998
I
!COMPLY 24 User 3429 ---------------------.-------------------------·----------, ----------------
DUCT INSULA'l'ION
System Name Type buct Loca~ion ---------------------------------------------
RHEEM RPKA-042JA Heating Ducts in Attic
Cooling Ducts in Attic
PIPE INSULA.'I"ION In,sul
System Name Pipe Type Requi~ed -----------------------___ , --------~---~-~
Domestic Hot Water
RHEEM RPKA-042JA
Y I N
Y I N
NOTES TO FIELD -For Building Department Use Only
Duct Tape
Allowed -------
y I N
y I N
:):nsul
R-Val
4.2
4.2
Note to
Field -------
Note to
Field
--------------------·---------------------------------------------·--------
' .
•
•
•
ENVELOPE COMPLIANCE SUMMA.RY -Performance {part 1 9f 3)ENV-2 page 10 of 19
Run Initiation Time: 11:53:50 Runcode: 3429-622550720 -----------· -------------------------.------.---------J --------------------· -
Project Name: Legoland
Documentation: STUEVEN ENGINEERING CONSULTANTS
!Date: 8/27/1998
I
!COMPLY 24 User 3429 -------------------------------------------------------------~ ----
GENERAL INFORMATION BY ZONE· ·
Flr Floor Display
Zone Name. Occupancy No Area Volume Perim. ---------------------------------------------------------------.::----
Offices Qffice 2 1172 11720 0
Unconqit;i.oned Areas Unconditioned 1 1000 9000 0
Total 2172
,.,
•
•
•
ENVELOPE· COMPLIANCE SUMMARY -Performance (part 2 o.f 3)ENV-2 page 11 of 19
Run Initiation Time: 1.1:53;.50 Runcode: 3429-622550720
---------------.----~-----------------------.----------------------
Project Name: L~goland
Documentation: STVEVEN ENGINtERING CONSULTANTS
!Date: 8/27/1998
:)
I .COMPLY 24 User 3429 --------------------------------------------- -------------------
OPAQUE SURFACES Act Solax
Type Area U-Val Azm Tilt Gains Form 3 Refe-rence Location/Commemts ----:------------~w--·, -----------------
Wall 190 0.709 0 90 Yes 7'" Conc;:rete Wall . Offices·
Wall '.730 0.709 90 90 Yes 7" ·Concret~ Wall Offices.
Wall 158 0.709 180 90 Yes 7" Concrette Wall Offices
Wall 730 0.192 Int 90 No R-11 Demising Wall(Mtl) Offices
Roof 1172 0.043 0 22 Y'es R-19 on Acoustical Ti-le Office·s
..
•
•
•
ENVELOPE COMPLIANCE SW1MARY --Pe·.tforinance (part 3 -of 3) ENV-2 pa.ge· 12 of 19
Run Initiation Time: 11: 53: 50 Runc:0de: 34,?-9-6225507'20 ___________ ,, ---------' -------,,-'----.. --------------. --. '------·-.-------. ---
Project Name: Legoland IDat~l 8/17/19S~
r
Documentation: -STUEVEI-l ENGI.NEERING CONSULTJ\NTS I.COMFLY 24 User 3429
-----------------------------. -------------'.--. ---------------------
FENESTRATION SURFACES
# Type A.tea Frame Div U-Va+ ------------------· . .
1 Wdw 13ack (S) 32,0 Metal No 1.19
OVERHANGS/SIDE FINS
'.'""-Window--
# Type Ht Wd
-----Overhang----~-
Len Ht LExt RExt
Act
SC
~lass
Azm ·T:i,.lt Only Location/Comments ----
180 90 0. 94 Of.fices
-,---Left Fin---,
Dist Len Ht
_:_._..,:.. ~---
-,.--Right Fin--'-
Dist Leh Ht
l-, ..
•
•
•
LIGHTING COMPLIANCE SUMMARY -Performance
Run Initiation Ti~e: 11:53:50
LTG-2 page 13 pf 1.9 _
-Runcode; __ 3429-622550720 ------------------------------------------------.-:---~ ----------------
Project Name: Legoland _
Document~tion: STUEVEN ENGINEERING°CONSULTANTS
!Date: 8/27/1998
I
!COMPLY 24 User 3429
---------------------------------------·------------------------.--
ACTUAL LIGHTING POWER
Name Description
No of Watts
L1,Uriin per beta.ult
Total
Watts -------·------------------------------· --~----
48" T,..12 Low Watt /3 Lamp (Tandem) 17 1.08. 0 Y 1836
Su):,Totcl,l 1836
Les:; ·Control Credits (LTG-3.) 0
Total.· Proposed Watts 1836
* If not tEC Default value, please provide supportingdocumentation.
MODELLED.LIGHTING POWER BY ZONE
Zone Name
Offices
· Occupancy
Office
TOTALS
Modelled
Floor LPB· Total Tailored.
Area (w/sf.) (watts) (watts) __ .,..;. ___ ---------------'
1172 i. 567 ·183·6 b -~------------------______ :;.....
1172 1.567 1836 0
* Note: Taildred Allotment requires supporting. documentation on .form LTG-4 .
•
•
•
MECHANICAL·EQUIPMENT ZONING SUMMARY'-Performance
Run Initiation Time: 11:53:50
MECH-2 page 14 of 19
Runcode-: 34·29-62-2550720 ------------------· --------·. ---·------------··---·------·-------
Project Name: tegoland
Documentation: STUEVEN ENGINEERING CONSULTANTS
I Date:. 8/27 /19.98
I
l'(:'.:OMPLY 24 User 3429 --------------------------------·-------------.. --··-------------
SYSTEM/ZONING S~Y
System/Zones Served -----------------~----
HP-1
Offices
Uncondition~d Areas
Central/Zonai sys·tem \ , ----------_·---, '::----· -----
RHEE!1 RPKA-042J"A
System Type -----~ -------
Split Heat Pump
No
Sys
1
'l ' "
•
•
•
MECHANICAL EQUIPMENT SUMMARY -Performance
Run Initiation Time: 11:.53:50
MECH-3· .pa(J't;-15 of 19
. Runcode: ·3429·-622550720
-----------·--------------------- -----------------------------------
Project Name: Legolap.tj. !Date: 8/27/1998
I
Documentation: S.TUEVEN ENGINEERING· ·coNSULTANTS ICOMPL):" 24 User 3429
--_' -. --
CENTRA;L SYSTEM SUMMARY
Sys N9
No System Name. System Type S.ys ~c::Qhomizer TyP,e.
---------------, -'' -, ---' ---------------.·~ ---------·-----------
1 RHEEM RPKA.~042JA S:plit Heat Pump 1 No Economizer
CENTRAL SYSTEM RATING$
Sys------~ Heating-~--------------------------------Cooli:p-g ---------·-
No Type Output Atf~ KW :!;:FF Type Output Sensible EER SEER ---~--~ ---------~--~,; ... : --------, __ ..;. __
. '
1 Heat Pump 42.000 0. 0 7. 5.0 DX 42000 273bci 9.40 10.0b
CENTRAL FJI.N SUMMARY ------------Supply Fan -----------Return Fan
Sys Mtr Dr"\( Mtr Drv
No Fan Type Mc:>t;,o;i; Location CFM B}-IP ·gff Eff CFM BHP Ef°f Eff
. . ' -----------------------------------------. -~ -
1 Constant Volume Draw-T.hrough 1400 0.50 70 10·0 None
ZONAL FAN SUMMARY ---------Zonal Fan -------Exhaust Fan
Mtr Drv Mtr Drv
Zone ·Name Eff Eff No CFM BHP Eff Eff
--------------: .------·----------~~--..:,. __ ;...._ ------
None
•
~ I.
•
•
•
MECHANICAL VEN.TILATION -Performance
Run Init·iation Time: 11:53:50
MECH-4 page 16 of 19
Runcode: 3429-622550720 ---------------------.. ---------------.-·--------------------------------.-
Project Name: Legoland IDat;e: 8/27/1998
I
Documentation: STUEVEN-ENGiNEERING CONSULT.AN~$ I COMPLY 2-4 User 3429 -----------------------. -------·---------------------------~----------
VENTILATION SUMMARY BY ZONE
Floor sqft CFM Dsg Min
Zone Name T Occupancy Area /Occ /Occ CFM CFM ----------. --'-··-·------· -----------------. ---~ ------
Offices O-ffice 1172 1·00 1:S.O 176 176
TOT.A.LS 176 17'6
Tailored QA (T=*) requires supporting documentation on MECH-5, Tailored
Ventilation and Process Loads Worksheet
Tran
sfer
CFM
0
-'' )... .. ( l •
•
•
•
PROPOSED CONSTRUCTION ASSEMBLY ENV-3 page 17 of 19 ---------------------. -------· ------.----------------------------------------
Project Name: L1;go·1anci !Date: 8/27/1998
I
Documentat_ion: STUEVEN ENGINEERING CONSULTANTS !COMPLY 24 User 3429 ------·----.-----------------------·------:---------------· --------------·-:
COMPONENT DESCRIPT~ON
I
1.
I
I
I
I.
I
·I
I
I
I
Assemb],y Name: R-11 -Demising Wall(Mtl)
Assembly Type.: Wall
.Assembly Tilt: 90 deg (Vertical)
Framing Material: Metal
Framing Spacing: " o.c.
Framing Percent: i5.0 %
)\bsorptivity: 0. 70 ·
Sketch of Construction Assembly· Roughness: Smooth Plaster, Metal
ASSEMBLY U-VALUE
Th R-Va-lue
Construction Co~ponents Fr (in) Cavity Frame --------------------'-~------------------------~------.------------
Outside Air F;i.lm 0.17 0.17
1. Gypsum or Plaster Board 0.500 0.45 0.45
2. Insulation, ,Miperal Fiber, R-J;l * 3.500 11. 00 11. 00
3. Gypsum or Pl~~ter Board o .• 500 0.4.5 0.45
4.
5.
6.
7.
8.
9.
Inside Air Film 0.68 0.68
---------------------------------,-------------·----------------------------
Weight:
Heat Capacity:
'u:nadjust;ed R--Values · 12.75 O·. 00
TOT~ U-'-VALUE = 0.192
+OTAL R-VALUE 5.20
4.3 lb/sqft
1 . .11
•
•
•
PROPOSED CONSTRUCTION ASSEMBLY ENV-3 page 18 of 19, ·
----~ ---~ ------------------. -----------. -------·. -~ --------------
Project Name: Legoland !Date: 8/27/1998
I
Documentation: S.TUEVEN ENGINE~RING CONSULTANTS I <;:OMPLY 24 Use.r. ~4;29 ---------~----- --.------------·--------.---------------. ------~ ~-
COMPONENT DESCRIPTION ----------------------~--:----
I
I
I
I
I
I
I
I
I-
I
I
-I.
I
I
I
I
I
I
I
I
I
I -------------------------------
Sketch of Construt::tioh Assembly
ASSEMBLY U-VALUE
Construction Co~ponents
Assern};,ly Name: R-19 on Acoust.:j.ca-1 Tile
As~embly Type: Roof
Ass~mbly Tilt:. 22 d~g (Tilted Up)
Franµ.ng Material: Wood
Framing Spacipg: II o.c.
Framing P~.i::cent: 10·. 0 %
Ab~orptivity: 0-. 70
Rough11ess: Conc;rete, Asph. Shingles
Th R-Value
F~ (in) Cavity Frame --------------· --. --------· ----------------· ---------. ----------------
Outside Air Film 0.17 0.17
1. Roofing, Bu.:j.lt:-Up 0.375 0.33 0.33
2. Membrane, ·vapor-Permeable Fel.t 0 •. 610 0.06 O.Q6
3. Plywood Q.500 0.62 0.62
4. Air $pace 12.000 0.80 0.80
5. Insulatton,, Mj,:neral Fiber, R-19 6:000 19.00 19.00
6. Acoustical Til.e, Interior Finish 0.500 1.43 1.43
7.
8.
9.
Inside Air Film 0.61 0.61 -------------------------------------:---------------.---------. ------
Unadjusted R-Values· 23.02-23.02
ADJUSTMENT FOR FRAMING
(1 /23.02) ~ (0.901 + (i /23,02) g (0.10)
Weight:
Heat Capacity:
4'.6ib/sqft
1. 4-5
·= 0.043
TOTAL U-VALUE -0.043
TOTAL R-VALUE -23,02
~. -' f • '-(, • ~-
•
•
•
PROPOSED.CONSTRUCTION ASSEMBLY · ENV-3 page. 19 o:f; 19 -----------------·-----------~-··-----------~ ---·--.. ------------.
Project Name: Legolarid !Date: 8/27/1998
I
Documentation: STUEVEN ENGINEERING CONSUDTANTS !COMPLY 24 User ~429 ---------------,------' -------.---·----------·------' _______ , ______________ _
COMPONENT DESCRIPTION
---~ ----------.. -------------
I
I
I
I
I
I
I
I
I
I
I ---------~----------------.
Sketch of Construction Assembly
ASSEMBLY U-V:ALUE
Constructi·on ·components
Assembly Name: 'J" Concrete Wall
Assembly Type: Wali
Assembly Tilt: 61 deg (Tilt~d Vp)
Framing Mater;i.al: None
Framing Spacing: "o.C.
Framing Percent: 0.0 %
Absorptivity: 0.70
Roughness:. Concrete, Asph. Shingles
Th Fl-Value
F.r · (i:n) Cavi.ty Frame -------------------------------------------------.-------------------
Outside Air Film
1. Concrete, 140 lb, Not Dr.i.ed
2.
3.
4.
5.
6.
7.
8.
9.
Inside Air Film
7.000
0.17
0.56
o. 68
0.17
0.56
0.68
--------------------------. --------·-----------.--------------.. ---
Unadjust:ed R'.c..Va,lu~s 1.41 1.41
ADJUSTMENT FOR FRAMING
(1 / 1.41) X (1.00) + (1 / 1.41) X t0.00)
Weight:
Heat Capacity:
8.1. 7 J.b/ sqft
16.33
= 0. 709
TOTAL U-V.ALUE = 0.709
TOTAL R-VALUE = 1.4J.
....
MANDATORY RE9UlREMENTS
ENVELOPE REQU~MENTS
DOORS WINDOWS AND SKYLIGHTS:
UF ACTIJRED FENESTRATION PRODUCTS MUST BE LABELED AND THE·
MANUF ACTIJRER OR INDEPENDENT CERTIFYING ORGANIZATION-MUST
CERTIFY THAT THE PRODUCT MEETS THE AIR.INFILTRATION AND U-V ALUE
REQUIREMENTS OF SECTION 116(a). IF SITE BUILT, THESTANPARDSREQUIRE
THAT THE UNIT BE CAULKED, GASKETED, WEATHER-STRIPPING-OR OTHER-
WISE SEALED PER SECTION H6(bj. . .
B. JOINTS AND OPENINGS:
ALL JOINTS AND OTHER OPENINGS IN THE BUILDING-ENVELOPE-THAT ARE
POTENTIAL SOURCES OF AIR: LEAKAGE BE-CAULKED; GASKETED, WEATH-
ER-STRIPPED; OR OTHERWISE SEALED TO-LIMIT AIR LEAKAGE INTO OR OUT
OF THE BUILDING-PER SECTION ll 7(a): · · . · · ·· . ·
C. INSULATION MATERIALS:
MANUFACTIJRERS MUST CERTIFY INSULATING MATERIALS TO COMPLY
WITH CALIFORNIA QUALITY-STANDARDS FOR INSULATING MATERIALS PER
SECTION 118(a). UREA FORMALDEHYDE FOAM INSULATION MAY BE INST-
ALLED PER SECTION l 18(b) 1 & 2. ALL INSULATING MATERIAL SHALL BE
INSTALLED IN COMPLIANCE WITTI SECTION 118(c). INSULATION INSTALLER
IN AN EXISTING BUILDING SHALL COMPLY WITH SECTION 118(d) 1,2 & 3.
DEMISING WALLS IN NONRESIDENTIAL BUILDINGS SHALL HA VE INSUL-
ATION WITH AN R-VALUE OFNO LESS THAN R-11 PER.SECTION 118(e).
MECHANICAL REQUIREMENTS
A EQUIPMENT CERTIFICATION:
ANY APPLIANCE FOR WHICH THERE IS A CALIFORNIA STANDARD EST ABL,
ISHED IN THE APPLIANCE EFFICIENCY REGULATIONS MAY.BE INSTALLED
ONLY IF THE MANUFACTURER HAS CERTIFIED. TO THE.C0MMISI0N, AS
SPECIFIED IN THOSE REGULATIONS, THAT THE APPLIANCE COMPLIES WITH
THE APPLICABLE ST AND:ARD FOR TlfAT APFLIANCE -$ECTION 1).f). ANf
•
CE EQUIPMENT LISTED'IN THIS SECTION.MAY BE INSTALLED ONLY IF
MANUF ACTIJRER HAS CERTIFIED THAT TH.E EQUIPMENT COMPLIES
TH ALL THE APPLICABLE REQUIREMENTS OF SECTION 112(a) 1,2,3 &4.
HEAT PUMPS WITH SUPPLEMENTARY ELECTRIC RESISTANCE HEATERS
SHALL HA VE CONTROLS THAT C0MPLY WITH SECTI0:1)1 i 12(b) 1.& 2.
B. PILOT LIGHTS:
PILOT LIGHTS ARE PROHIBITED IN (a) FAN TYPE CENTRAL FURNACES, (b)
HOUSEHOLD COOKING APPLIANCES(EXCEPTION -HOUSEJIOLD COOKING
APPLIANCES WITHOUT AN ELECTRICAL SUPPLY VOLTAGECONNECTION
AND IN WHICH EACH PILOT CONSUMES LESS THAN 150:°Btuifu.), ( c) POOL
HEATERS AND (d) SPA HEATERS.
H. REQUIREMENTS FOR PIPE INSULATION:
THE PIPING FOR ALL SPACE G0NDITIONING AND SERVICE WATER
HEATING SYSTEMS, WITI-1 FLl)Ib TEMPERATURES LISTED IN TABLE NO.
1-G SHALL HA VE THE AMOUNT,OF INSULATION SPECIFIED IN SUB-
SECTION (a) OR SUBSECTION.,(b):..:. SECTION 123(a) AND (b).
I. REQUIREMENTS FOR DUCTS AND PLENUMS:
ALL DUCTS SHALL BE INST ALLED:AND INSULATED IN COMPLIANCE
WITlfSECUONS 601,603 A,ND 604 OF THE UMC-PER SECTION 124(a).
SERVICE WATERSYSTEM;lIBQUIREMENTS
A. -CERTIFICATION BY MANUFACTURERS:
ANY SER v_ICE WATER HEATING SYSTEM OR EQUIPMENT MAY BE
INSTALLED ONLY IF THE MANUFACTURER HAS·CERTIFIED'THAT
THE SYSTEM_QR EQUIPMENT COMPLIES WITH.ALL OF THE REQUIR-
EMENTS OF THIS SUBSJ):CTION FQR THAT SYSTEM OR EQUIPMENT-
SECTION 113(a) & (b).
B. POOL AND SPA HEATiNG SYSTEMS AND EQUIPMENT,
ANY POOL OR SPA HEATING SYSTEM QR.EQUIPMENT MAY BE IN-
STALLED ONLY IF THE MANUFACTURER. HAS CERTIFIED THAT THE
SYSTEM OR EQUIPMENT COMPLIES WITH SECTION 114{a) & (b).
LIGHTING REQUIREMENTS
.A. CONTROL REQUIREMENTS:·
ANY AUTOMATIC TIME SWIT-Cij CONTROL DEVICE, OCCUPANT-
SENSING DEVICE, AUTOMATIC.DAYLIGHTING CONTROL DEVICE
. LUMEN MAINTENANCE CONTROL DEVICE, OR INTERIOR PHOTOCELL
SENSOR DEVICE MAY BE INSTALLED ONLY IF THE MANUFACTURER
HAS CERTIFIED TO THE CO_NfMISION, THAT THE DEVICE.COMPLIES
WITH ALL OF THE APPLICABLKREQUIREMENTS OF SECTION 119
(a)-(g), AND IF THE DEVICE IS INSTALLED IN COMPLIANCE WITH
SUBSECTION-(IJ.).
B. LIGHTING CONTROLS:
EACH AREA ENCLOSED BY CEILING-HEIGHT P ARTITIONSSHALL HAVE
AN INDEPENDENT SWITCHING QR CONTROL DEVICE. THIS SWITCHING
OR CONTROJ;., DEVICE SHALL COMPLY WITH SECTION i31(a)-(f).
C. REQUIREMENTSFORLIGHTING.CIRCUITING: ·
PAIRS-OF ONE-LAMP.OR THREE-LAMP RECE"SSED FLUORESCENT
C. OUT-DOOR VENTILATION -GENERAL REQUIREMENTS: · LUMINAIRES THAT ARE 1) ON THE"SAME SWITCH CONTROL, 2)
ALL ENLCLOSED SPACES IN ABUILDING THAT ARE NORMALLY USED BY
HUMANS fyfUST BE CONTINUOUSLY VENTILATED WITH OUTDOOR AIR
USING EITHER NATURAL OR MECHANICAL VENTILATION -PER SECTION
12l(a), (b), (c), (d), (e) & (f). ·· ·
D. REQUIRED CONTROL FGR: SPACE CONDITIONING S:YSTEMS:
A THERMOSTAT MUST BE PROVIDED FOR EACH SPACE CONDITIONING
ZONE OR DWELLING UNIT TO CONTROL THE SUPPLY. OF HEATING. AND
COOLING ENERGY WITHIN THAT ZONE-PER SE.CTION 122(~),. (b),&·(c).
E. SHUT--OFF AND TEMPERATURE SETUP/SETBACK:
FOR SPECIFIC OCCUP ANCIES'AND CONDITIONS, EACH SPACE.CONDITIONING
SYSTEM MUST BE PROVIDED WITH CONTROLS THAT CAN AUTOMATICALLY
SHUT OFF THE EQUIPMENT DURING UNOCCUPIED HOURS -PER SECTION 122(e). · · .
F. DAMPERS FOR AIR SUPPLY AND EXHAUST EQUIPMENT:
OUTDOOR AIR SUPPLY AND EXHAUST EQUIPMENT SHALL B;E INSTALLED
WITH DAMPERS THAT AUTOMATICALLY CLOSE DURING PERIODS OF NON-
• OF THE AREAS SERVED BY THE EQUIPMENT -PER SECTION122(f): .
G. ISOLATION AREA DEVICES: . ·
EACH SPACE CONDITIONING SYSTEM SERVING MULTIPI:,EZO:NES WITH A
COMBINED CONDITIONED FLOOR AR.EA MORE THAN 25,000 SQUARJ;: FEET
SHALL BE DESIGNED, INSTALLED AND CONTROLLED TO SERVE ISOLATION
AREAS -PER SECTION 122(g). . .
IN THE SAME ENCLOSED AREA AND 3) WITHIN 10 FEET OF EACH
OTHER IN AN ACCESSIBLE CEILING SPACE, MUST BE TANDEM WIRED.
SINGLE LAMP BALLASTS.SHOULD:NOT BE USED. SURFACE OR
PENDANT MOUNTED FIXTUR.EfTi-iAT ARE CONTINUOUS WITH EACH
OTHER MUST ALSO BET AND EM. TANDEM WIRING REFERS TO THE
ARRANGEMENT WHERE A BALLAST GPERATES A LAMP IN ONE .
U:JMINAIRE AND A LAMP m· ~ ADJACENT LUMINAIRE. LUMINAIRES
"l'HAT ARE ·E?ffiMfr FROM THIS REQUIREMENT ARE: 1) SURF ACE
0R PEND)\NT MOUNTED LUMINAIRES THAT ARE NOT CONTINUOUS,
2) LUMINAIRES THAT USE ELECTRONIC HIGH FREQUENCY BALLASTS.
SINGLE LAMP BALLASTS MAY BE USED WHEN THERE ARE AN ODD
NUMBER OF LAMPS OR WHERE.THERE ARE MULTIPLE GROUPS OF BI-
1;,EVEL SWITCJIING· AND THE CONTROL SCHEME,l'RODl:ICES TWO
ONE-LAMP BALLASTS ADJACENT TO EACH OTHER, BUT CONTROLLED
BY DIFFERENT SWITCHES -P.E;R SECTION 132(a) & (b).
:C. HIGH RISE RESIDENTIAL LIVING-QUARTERS AND HOTEUMOTEL
GUEST ROOMS: . . .
THELIGHTING IN HIGH-RISERESIDENTIAtiJWG QUARTERS AND IN
1-IOTEUMOTEL GU.~ST ROOMS COMPLY WITH.LIGHTING REQUIREMENTS
THAT ARE ESSENTIALLY IDENTICAL ro THE LIG~TING REQUIREM)):NTS
OF THERESI[)ENTIAL STANDARDS. THE DESIGNER HAS THE OPTION TO
EXEMPT AS MANY AS 10% OF THE GUEST°ROOMS IN A HOTEUMOTEL
FROM THIS REQUIREMENT"" PER SECTION 130(a) &(b). .