Loading...
HomeMy WebLinkAbout1 PONTO RD; PCRS; VARIOUS; Permit07-17-2013 City of Carlsbad 1635 Faraday Av Carlsbad.CA 92008 Plan Check Revision Permit No:FOR11046 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No; Valuation: Reference #: PC #: Project Title: Applicant: SCOTT MCMANUS 1372 STONERIDGE CR 92029 925 914-9376 1 PONTO RD CBAD PCR 2141601900 $0.00 CB101660 HILTON RESORT- HOLD DOWN SUBSTITUTION Lot#; Construction Type: Status 0 Applied NEW Entered By Plan Approved Issued Inspect Area Owner: WAVE CREST OCEANFRONT LLC C/O WILLIAM SHANNAHAN 1200 PROSPECT ST #425 LA JOLLA CA 92037 ISSUED 04/25/2011 RMA 05/09/2011 05/09/2011 Plan Check Revision Fee Fire Expedited Plan Review Additional Fees $435.00 $0.00 $0.00 Total Fees: $435.00 Total Payments To Date: $435.00 Balance Due: $0.00 Inspector: FINAL APPROVAL Date: Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition' of fees, dedications, reservations, or other exactions hereafter collectively refen'ed to as "fees/exactions." You have 90 days from the date this pemtiit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have previously been given a NOTICE similar to this, or as to which the statute of limitations has oreviouslv othenwise expired. ^ CITY OF CARLSBAD PLAN CHECK REVISION APPLICATION B-15 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Plan Check Revisio{;^No, Project Add Contact _Origjnal Plan Check No. Contact Address /57^ ST/r?miP^ t^J/^t^ City &^^s^^d) Zip "^^^f General Scope of Work_ Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 Elements revised: jp Calculations • Soils • Energy • Other Plans 2 Describe revisions in detail 3 List page|s) where eacti revision is shown 4 List revised sheets that replace existing sheets 5 Does this revision, in any way, alter the exterior of the project? • Yes 6 Does this revision add ANY new floor area(s)? Q Yes |^ No 7 Does this revision affect any fire related Issues? • Yes ^ No 8 Is this a complete/^t? Yes • No No ^sS'Signaturc 1635 Faraday A^fenue, Carlsbad, CA 92008 Phone; 760-602-2717 / 2718 / 2719 www.carlsi3adca.gov Fax: 760-602-8558 EsGll Corporation In (PartnersHip tvitti government for (BuMing Safety DATE: MAY 2, 2011 •APPLICANT JURISDICTION: CARLSBAD • PLANREVIEWER • FILE PLAN CHECK NO.: 10-1660 (REV. # 1) - PCR 11-046 SET: I PROJECTADDRESS: Intersection of Carlsbad Blvd. & Ponto Drive PROJECT NAME: HILTON CARLSBAD OCEANFRONT RESORT/SPA & Parking Garage The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. Tlie plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. I I The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. I I The applicant's copy of the check list has been sent to: IXl Esgil Corporation staff did not advise the applicant that the plan check has been completed. I I Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Fax #: Mail Telephone Fax In Person XI REMARKS: Revisions to the Hold Down package is under this plan revision. By: ALI SADRE Enclosures: EsGil Corporation • GA • EJ • PC 4/28 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576 CARLSBAD 10-1660 (REV. # 1) - PCR 11-046 MAY 2, 2011 [DO NOT PAY- THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: CARLSBAD PLANCHECKNO.: 10-1660 (REV. # 1) -PCR 11-046 PREPARED BY: ALI SADRE DATE: MAY 2, 2011 BUILDING ADDRESS: Intersection of Carlsbad Blvd. & Ponto Drive BUILDING OCCUPANCY: R1/S2 TYPE OF CONSTRUCTION: V-A/II-B BUILDING PORTION AREA ( Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) REVISIONS Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code CB By Ordinance Bldg. Permit Fee by Ordinance Plan Check Fee by Ordinance Type of Review: I I Repetitive Fee Repeats • Complete Review • Other [3 Hourly EsGil Fee $435.00 • Structural Only $116.00 Hrs. @ $348.00 Based on tiourly rate Comments: Sheet 1 of 1 macvalue.doc + "^GsNEERS REVIEW DCA ENGINEERS No Exceptions Taken Note Markings Revise j^B^bmit Ey B::^— Date. E;JG!NEER'S REVIEW FOR GENERAL CCfJFORMANCE TO THE DESIGN COW EPT AND CCiflKACT DOCUME>^T.S, REVIEW OF THE SPECIALTY STRUCTURAL E'lGi'iEERS (SSE) DESIGN IS EOR CUNfO.RMAICE TO DESIGN CRITERIA AND C)t.TWIBIL!TY WITEi THE UES16N OF THE BUILDING AND DOES NOT RELIEVE THE SSE OF RES^ONSIiJiLITY FOR THAI DESiGN. MARKINGS OR COMMENTS SHALL NOT il CONSTRUED AS RELIEViNG THE CONTRACTOR FROM COMPLIANCE WITH THE PROJECT PLANS ANO SPECIFICATIONS, NCfl DEPARTURES THEREffiflM. T:FE CONTRACTOR REMAINS RESP0NS:3LE FOR DETAILS ANO ACCURACY; FOR CONFIRMING AND CORRELATING ALL QUANTITIES ANO DIMENSIONS; FOR SELECTING FABRICATION PROCESSES; FOR TECHNIQUES OF ASSEMBLV; AtlDflW PERFORMING WORK IN A SAFE MANNER, A Hardy Fram^ Product Quick Connect Submittal Package To: Charlie S & H Construction 470 Corporate Drive Escondido, CA 92029 Mobile; Phone: (760) 489-5647 Fax: Email: Date: Subject: Deliverables: From: Steven Helton Zone Four 31945 Corydon Road Lake Elsinore, CA 92530 Mobile: (951)442-0401 Phone: (951)245-5140 Fax: (951)245-9653 Email: shelton@mii.com April 8, 2011 Jurisdiction: Hilton Carlsbad Oceanfront Resort & Spa (3) Sets of stamped calculations showing the design of the QC system that meets or exceeds project demand. Z4 Run sheets showing the quantity and project demand of runs with the corresponding QC Run names. (6) Sets of stamped elevations & details showing parts and installation configurations. (6) Sets of placement plans showing the locations of the QC runs where different from those originally specified on the plans. If the QC run names are identical to the run names specified on the plans a placement plan is not required. City of Carlsbad Framer: General Contractor: RECEIVED APR 1 .9 2011 Damato Conversano, Inc San Diego, CA S & H Construction (760) 489-5647 Please review submittal package as part of your coordination with the construction documents and comment as necessary. Inform General Contractor of your receipt of the documents and forward to them for their use & approval. Prior to Zone Four submitting to the city we will need a copy of the front page and the structural sheets of the permitted set of construction documents along with the infonnation required to pull permit on behalf of the Owner or Contractor (see below). Please review submittal package as part of your coordination with the construction documents and comment as necessary. Inform Engineer of Record of your receipt of the documents and forward to them for their use & approval. Prior to Zone Four submitting to the city we will need a copy of the front page and the structural sheets of the permitted set of construction documents along with the information required to pull permit on behalf of the Owner or Contractor (see below). Please provide plan checkers name, phone number, and plan check number. A Hardy Fram^ Product Engineer of Record: Architect: DCI Engineers (619) 234-0501 Please review submittal package as part of your coordination with the construction documents and comment as necessary. During your review if you should have any questions please call Steven Helton (951) 245- 5140. Please provide your shop drawing stamp on all of the sheets provided, including the calculation package. Keep a copy for your records. Inform Architect of your receipt of the documents and forward to them for their use & approval. If the Architect doesn't require review please call Zone Four and we will pick up and process through the local jurisdiction. Joseph Wong Design (619) 233-6777 Please review submittal package as part of your coordination with the construction documents and comment as necessary. Once your review is complete please call Zone Four and we will pick up and process through the local jurisdiction. Owner/Contractor Permit Information: When required by a local jurisdiction the permit process requires a notarized authorization letter from either the owner or registered contractor authorizing Zone Four to pull a permit for the project along with a copy of the owner or contractor's City Business Tax License, a copy of owner or contractor's valid contractor's license, and copy owners or contractor's Worker's Compensation Certificate addressed to the State of CA Contractor's Board. Thank you for using Zone Four and please let us know if we can facilitate this process further. Sincerely, Steven Helton. NO EXCEPTIONS TAKEN flK^ REVISE RESUBMIT • MAKE CORRECTIONS NOTED 0 SUBMIT SPECIFIED ITEM • DO NOT RESUBMIT 0 REJECTED 0 REVIEWED SUBJECT TO ENGINEER S COMMENTS REVIEWED ONLY FOR GENERAU CONFORMANCE TO PROJECTS DESIGN CONCEPT AND GENERAL COMPLIANCE WITH CONTRACT DOCUMENTS CONTRACTOR IS RESPONSIBLE FOR DIMENSIONS, QUANTITY, CON- STRUCTION METHODS AND INSTALLATION. DATE_^l2liL .BY. «.7K^A JWDA 2359 FOURTH AVE. SAN DIEGO, CA 92101 (619) 233-6777 A Hardy Fram^ Product Quick Connect Calculations Substitution of Continuous Rod System Date: Project Name: Project Address: April 8,2011 Hilton Carlsbad Oceanfront Resort & Spa Carlsbad Blvd. & Ponto Dr. Carlsbad, CA Submittal Package: The following Quick Connect Calculations are provided along with the detail and elevation sheets as a substitution of the specified tie-down system in the construction documents. These documents have been submitted to the Engineer of Record and bear their shop drawing stamp as an accepted substitution. For evaluation reports please refer to ICC ESR No. 2190 and/or Los Angeles RR No. 25623. As Specified: Continuous Rod System (ATS): • Overturning forces are transferred from the structural sheathing to the wood posts. • Shearwall overturning forces generate tension and compression loads at opposite ends of the shearwall. • Compression loads accumulate in the wood posts from the top to the bottom level. • Uplift (tension loads): wood posts push up and are resisted by the bearing plates above. • Take up device and nut transfer load from the bearing plate to the continuous rod. • Tension loads are accumulated in the rod. Substitution: Continuous Rod System (Zone Four Quick Connect (QC)): Overturning forces are transferred from the structural sheathing to the wood posts. Shearwall overturning forces generate tension and compression loads at opposite ends of the sheaoA/all. Compression loads accumulate in the wood posts from the top to the bottom level. Uplift (tension loads): wood posts push up and are resisted by bearing plates above (at selected levels). Cinch Nuts (CN) transfer load from the bearing plate to continuous rod per level. Tension loads are accumulated in the rod CN provided perpetual shrinkage compensation. Substitution Design Intent: Substituting the specified continuous rod system with the Quick Connect continuous rod system is a direct replacement. The design loads have been taken directly from the construction documents, comparing them to the loads listed in our calculations and elevations it shows that we meet and/or exceed the values of the originally specified design. ZONE FOUR 789 S, Victoria Ave, Ste 200, VIntura, CA 93003 Phone (800)432-4444 Z4 Quick Connect "TIe/Hold-down" System forthe 2006 IBC (DF-L) Project Name : Acldress: Hliton Oceanfront Resort Carlsbad, CA T/C Upint Loads Accumulated Hold-down, ATR & CN Page Rev Date 1 4.*20t' Proj# Designer 1.00 3a 39 a 1 a. ° 8 (In) (In) (In) (lbs) (Ibs) (lbs) (Ibs) I (lbs) ATR ASTM Spec (Ibs) (In) ®f « to (In) (In) - I 1 £ in 3 O « (In) (Grades selected on appendices stieet 1A) (lbs) e & is it (lbs) ts I I « u I XS 1 Cap (lbs) (lbs) (lbs) (lbs) SPcii Cap (lbs) IMucH AtR to HB ATH wl HS wduclng couplar pilorto gnd l.wl framing, imtill 61i>-^ for Irt l.vel shrlntogT Run Naine Quantity Notes : •rig' "4" 102 12 A3« 700 Iir 12,500 AM 1S0 25,200 14.500 2tW aWl 29.219 Sir ————— Run Name : Quantity Notes: • 5,000 5,000 5.000 JUS 900 Fl 117 Wm^ 6,000 ISO 'tai" "I * "I? 6,000 A3S I 0 111.0001 Pwll A3» 6.554 Run Name Quantity 3: Notes: 6,673 AW 60 13,575 117 6,600 AM 13,575 lm ISO 133.5 8,900 5,000 13,079 32,670 92BS 7,851 Capacities versus demands are considered okay if within 3% and elongations versus limits are considered oltay if wittiin 5%, ZONE FOUR 789 S, Victofia Ave, Ste 200, Ventura, CA 93003 Phone (800)432.4444 Z4 Quick Connect "TIe/Hold-down" System for the 2006 IBC (DF-L) Rev Date l.t!2ll(t Pro|« Designer Project Name : Address: Hilton Oceanfront Resoit Cansbad, CA Non-Fire Treated Lumber ASD Allowable Stress Increase > 31 32 I 1.00 Level „ (Floor) FF FD Post 1, T/C Uplift Loads Hold-dovm, ATR&CN Wood Posts Level „ (Floor) FF FD Post 1, Accumulated Per Level Hold-dovm, ATR&CN Wood Posts Level „ (Floor) FF FD o ^L Ik u. Max demand (irKiudes carry over from IMIOVH) Minimum Capacity System T/C Capacity Check LD MLC Quick Connect Plate Washer (Table 2) ¥ ! 15 < Piate Washer Capacity (Tabla 2) ATR Capacity (Table 3A) ATR ASTM Spec Cormectton to Connection (L) PW above @ Siii or Top Plate = 0 or Bridge - FF/2 min J S B li a Compare A« to Umit as Shown Betow CN for 5, 6, 7, 8, 9 & 10 Rod orNutfor4&>11 Rod Cinch Nut Cap (Table 3A) or Nutfor4,&>11 Rod (Grades selected on appendices sheet 1 A) Level „ (Floor) Floor to Floor or Top Plate @ Roof Floor Depth (or pHs > 4.5") o ^L Ik u. Max demand (irKiudes carry over from IMIOVH) Minimum Capacity System T/C Capacity Check s o £• 1 Minimum Level Capacity Quick Connect Plate Washer (Table 2) ¥ ! 15 < Piate Washer Capacity (Tabla 2) ATR Capacity (Table 3A) ATR ASTM Spec Cormectton to Connection (L) PW above @ Siii or Top Plate = 0 or Bridge - FF/2 min J S B li a Compare A« to Umit as Shown Betow CN for 5, 6, 7, 8, 9 & 10 Rod orNutfor4&>11 Rod Cinch Nut Cap (Table 3A) or Nutfor4,&>11 Rod d- Wall Thickness Wood Grade (Tablel) Accum Comp Demand Post Capacity Check Added Level Comp Demand (from EOR) Compression Posts Left Side Compression Posts Right Side Adcfftional Compression Posts SPci Cap Pen Cap Left Side Posts te IS £ a I » U CL 1 < » £ SPcii Cap Level „ (Floor) (in) (In) (In) (lbs) (lbs) System T/C Capacity Check (lbs) (Ibs) Quick Connect Plate Washer (Table 2) ¥ ! 15 < (lbs) (lbs) ATR ASTM Spec (In) (In) (In) CN for 5, 6, 7, 8, 9 & 10 Rod orNutfor4&>11 Rod Cinch Nut Cap (Table 3A) or Nutfor4,&>11 Rod (in) DF-L (lbs) Post Capacity Check (lbs) Compression Posts Left Side Compression Posts Right Side Adcfftional Compression Posts (Ibs) (lbs) (Ibs) (lbs) (Ibs) Run Name : Quantity : Notes: 5 0 0 0 0 0 3.5 0 0 5 0 0 0 0 0 0 5.5/7.5 0 0 4 0 0 0 0 0 3.5 0 0 4 0 0 0 0 0 0 5.5/7.5 0 0 3 102 97.5 0 0 0 0 0 3.5 0 0 3 102 tz 97.5 0 0 0 0 0 0 5.5/7.5 0 0 2 117 tz 100.5 0 0 0 0 0 3.5 0 0 2 117 it 100.5 0 0 0 0 0 0 5.5/7.5 0 0 1 19« it 133.5 8,300 9000 9,000 • PWO 9,000 9,609 80 « 0.068 OK 3/4 23,420 3.5 No.2 9,400 ' 1 4W 22,969 7,851 3,925 11776 1 19« 133.5 8,300 9000 0 9,000 ,„fm„„ 9,000 9,609 80 « 0.068 OK 3/4 23,420 5.5/7.5 No.2 9,400 1 2X0 10,313 10,251 10,251 20502 Run Name : Quantity : n Notes: 5 0 0 0 0 0 3.5 0 0 5 0 0 0 0 0 0 5.5/7.5 0 0 4 0 0 0 0 0 3.5 0 0 4 0 0 0 0 0 0 5.5/7.5 0 fr 1 'i' 0 3 0 0 0 0 0 3.5 0 0 3 0 0 0 0 0 0 5.5/7.5 0 0 2 •5. 0 0 0 0 0 3.5 0 0 2 •5. tf 0 0 0 0 0 0 5.5/7.5 0 0 1 2M tf 283.5 13,300 #N/A #N/A MiSflO #N/A PWIS' • 14,500 21,620 A36 144 0.086 OK 1 1/8 44,508 3.5 #N/A 13,300 #N/A 0 .1 N/A #N/A #N/A #N/A #N/A 1 2M 283.5 13,300 14500 0 14,500 • 14,500 21,620 A36 144 0.086 OK 1 1/8 44,508 5.5/7.5 No.2 13,300 0 2 2li« '€ 3 28,125 7,326 7,326 14652 Run Name : IC Quantity : 18 Notes: 5 0 0 0 0 0 3.5 0 0 5 0 0 0 0 0 0 5.5/7.5 0 0 4 0 0 0 0 0 3.5 0 0 4 0 0 0 0 0 0 5.5/7.5 0 0 3 D 0 0 0 0 3.5 0 0 3 D 0 0 0 ,- .,. 0 0 5.5/7.5 0 llit^M 1,111 0 2 0 0 0 0 0 3.5 0 0 2 0 0 0 0 0 0 0 5.5/7.5 0 0 1 too 0 175.5 8,500 «N/A #N/A #N/A PWO B 9,000 9,609 MO 90 0.078 OK 3M 23,420 3.5 #N/A 12,300 «N/A 3800 1 m «N/A IKN/A #N/A #N/A 1 too 175.5 8,500 9000 0 9,000 B 9,000 9,609 MO 90 0.078 OK 3M 23,420 5.5/7.5 No.2 12,300 3800 2 2X. 15,469 13,139 6,570 19709 Capacities versus demands are considered okay if within 3% and elongations versus limits are considered okay if within 5%. ZONE FOUR 789 S. Victoria Ave, Sl* 200, Ventura, CA 93003 Phone (600)432-4444 ZA Quick Connect "TIe/Hold-down" System forthe 2006 IBC (DF-L) Page Rev Date ProJ# Designer Project Name : Address: Hilton Oceanfront Resort Carlsbad.CA Non-Fire Treated Lumber ASD Allowable Stress Increase • 1.00 Level „ (Floor) FF FD Post 1. T/C Uplift Loads Hold-down, ATR & CN Wood Posts Level „ (Floor) FF FD Post 1. Accumulated Per Level Hold-down, ATR & CN Wood Posts Level „ (Floor) FF FD I a u. u. u. Max demand (includes carry over trom below) Minimum Capacity System T/C Capacity Check LD MLC <Mck Connect Plete Washer (Table 2) I i t s < nate Washer Capactty (Table 2) ATR Capacity (Table 3A) ATR ASTM Spec Connection to Connection (L) PW above e Siii or Top Ptate = 0 or Bridge = FF/2 min 1' a Compare &^ to Limit as Shown Below CNforS, 6, 7, 8, 9&10Rod orNutfor4&>11 Rod Cinch Nut Cap (Table 3A) or Nutfor4, &>11 Rod (Grades selected on appendices sheet IA) Level „ (Floor) Floor to Floor or Top Plate @ Roof ROOT Depth (or pKs> 4.5") I a u. u. u. Max demand (includes carry over trom below) Minimum Capacity System T/C Capacity Check 1 o t is 1 Minimum Level Capacity <Mck Connect Plete Washer (Table 2) I i t s < nate Washer Capactty (Table 2) ATR Capacity (Table 3A) ATR ASTM Spec Connection to Connection (L) PW above e Siii or Top Ptate = 0 or Bridge = FF/2 min 1' a Compare &^ to Limit as Shown Below CNforS, 6, 7, 8, 9&10Rod orNutfor4&>11 Rod Cinch Nut Cap (Table 3A) or Nutfor4, &>11 Rod d- Wall Thickness Wood Grade (Tablel) Accum Comp Demand Post Capacity Check Added Level Comp Demand (ft^om EOR) Compression Posts Left Side Compression Posts Rigtit Side Additionai Compression Posts SPci Cap Pee Cap Left Side Posts 1 Q. i ts I tfl 1 a. 1 < LPcii Cap Level „ (Floor) (In) (In) lln) (lbs) (lbs) System T/C Capacity Check (Ibs) (Ibs) <Mck Connect Plete Washer (Table 2) I i t s < (lbs) (lbs) ATR ASTM Spec (In) (in) (In) CNforS, 6, 7, 8, 9&10Rod orNutfor4&>11 Rod Cinch Nut Cap (Table 3A) or Nutfor4, &>11 Rod (In) DF-L (lbs) Post Capacity Check (Ibs) Compression Posts Left Side Compression Posts Rigtit Side Additionai Compression Posts (lbs) (Ibs) (Ibs) (lbs) (lbs) Run Name : Quantity : n Notes : PT SLAB BT* AT.QUAD-BOHLY. 5 0 0 0 0 0 3.5 0 0 5 0 0 0 0 0 0 5.5/7.5 0 0 4 0 0 0 0 0 3.5^ 0 0 4 0 0 0 0 0 0 5.5/7.5 0 0 3 102 97.5 3,000 5000 5,000 5,000 6,673 AM 60 » 0.027 OK 5/8 13,575 3.5 No.2 3,200 200 6,583 3,060 3,060 6119 3 102 12 97.5 3,000 5000 0 6,673 AM 60 » 0.027 OK 5/8 13,575 5.5/7.5 No.2 3,200 200 10,313 14,679 14,679 29358 2 IIT s 100.5 8,500 8675 9609 0 8,000 8,000 * 6,000 8,000 9,609 A36 117 0 0.102 OK 3/4 23,420 3.5 5.5/7.5 No. 2 No.2 8.700 0 1 1 9,844 10,313 5,783 14,311 2,892 14,311 8675 28623 1 s 0 0 0 0 0 0 3.6 0 0 1 0 0 0 0 0 0 0 5.5/7.5 0 0 Run Name : 2C Quantity : 9 Notes: 5 0 0 0 0 0 3.5 0 0 5 0 0 0 0 0 0 5.5/7.5 0 0 4 0 0 0 11 1 0 0 ^ ..-3.5 0 0 4 0 0 0 0 0 0 ^ ..-5.5/7.5 0 0 3 101 97.5 0 0 0 0 0 3.5 0 0 3 101 12 97.5 0 0 0 0 '. ', >\' 0 0 5.5/7.5 0 0 2 117 12 100.5 400 5000 5,000 S 5,000 6,673 ASS 60 10 0.003 OK 5/S 13,575 3.5 No.2 2,000 1000 1. nt^ 6,583 2,892 2,692 2 117 100.5 400 5000 0 5.000 S 5.000 6,673 ASS 60 10 0.003 OK 5/S 13,575 5.5/7.5 No. 2 2,000 1000 m 10.313 14,311 14,311 28623 1 1» 133.5 3,500 6673 • xm. 5,000 •S-5,000 6,673 A36 150 s 0.080 OK 5/8 13,575 3.5 No. 2 7,200 2100 f, M 2 2X4 16,406 5,047 3,365 8411 1 1» 133.5 3,500 6673 0 5,000 ' M... •S-5,000 6,673 A36 150 s 0.080 OK 5/8 13,575 5.5/7.5 No. 2 7,200 2100 •I" HI ff... .wfc 10,313 10,251 10,251 20502 Run Name : Quantity : Notes: 5 0 0 0 0 0 3.5 0 0 5 0 0 0 0 0 0 5.5/7.5 0 0 4 0 0 0 0 0 3.5 0 0 4 0 0 0 0 0 0 5.5/7.5 0 0 3 0 0 0 0 0 3.5 0 0 3 0 0 0 0 0 0 5.5/7.5 0 0 2 0 0 0 0 0 3.5 0 0 2 0 0 0 0 0 0 5.5/7.5 0 0 1 0 0 0 0 0 0 3.5 0 0 1 0 0 0 0 0 0 0 5.5/7.5 0 0 Capacities versus demands are considered okay if wittiin 3% and elongations versus limits are considered okay if within 5%. ZONE FOUR 789 S Vicloria Ave, Sie 2O0, Ventura, CA 93003 Phone (600)432-4444 Date Engr 6/9/2010 RFN lAof3 ZA Quick Connect 'TIe/Hold-down' System for the 2006 IBC TABLE 1 - Compression Design Capacities (Ibs) for Wood Studs or Posts max I, / b < 50 I DF-L t (Inches), length of bolt in wood member' 7,656 No y : 1*0.1 m i Visually Graded Dimension Lumber (used flat wise at TP & CP posts) ' P,i max may be multiplied by 0^ for bearings not nearer than 3" to the end of a member b • width (depth) of wood stud or post, unbraced dimension. CD >= load duration factor t • thickness (breadth) of stud or post, braced dimension For 81:1 Inch • 25.4 mm, 1 pound = 4.45 N Flre-Retardant-Treiaed Lumber Strength Oeefgn Factor* (Douglas Fir} Comp Parallel, Comp Perp, f^i Tension Parallel, F, Bending: Modulus of Elasticity, E Fasteners / Connectors IOD too Capacity, Compressive Stress Parallel to Grain Pc^ax(lbs) = C,F,*Ag Ag(in^) = bt Cp = {[1 + (FcE / Fe*J] / 2 c} - {[(1 + (F,E / F,*)) /2cr- [(F^E / F,*) / c]}"^ FcE^KcEE'/O./d)-^ I. U.M; C = 0.8 le = K.I Ke=1.00 le/d<50 d = b (member braced continuously on t axis, NDS, Appendix A.11.3) Posts 2x6 3x8 4x6 8x6 8x6 10x6 12x6 Posts 2x8 3x8 4x8 6x9 8x8 10x8 12x8 Grade No 2 HI. 2 Ne. 2 '^ Mi, hc ' Sa • \c • Grade Ne 2 No 2 ' fill ' No 1 m.)' t (1 post) 1.50 2,50 3.50 5.50 7.50 9.50 11.50 t (1 post) 1.50 2.50 3.50 5.50 7.60 9.50 11.50 A,/2 (In') 8,25 13.75 19.25 30.25 41.25 52.25 63.25 ^/2(in') 11.25 18.75 26.25 41.25 56.25 71.25 86.25 5,156 8,594 12,031 18,906 25,781 32,656 39,531 Fci (psI) 1 post Pel mm ' 7,031 11,719 16,406 26,781 35,156 44,531 53,906 (2 posts) N/A N/A N/A N/A N/A N/A N/A 625 N/A (2 posts) N/A N/A N/A N/A N/A N/A N/A 1,4B6 1,485 1,418 1,000 1,000 1,000 1,000 375 F*c 1,00 1,485 1,485 1,418 1,000 1,000 1.000 1,000 2,376 2,376 2,268 1,600 1,600 1,600 1,600 375 F*c Co-1.60 2,376 2,376 2,268 1,600 1,600 1,600 1,600 E (psi) • 1.60E+06 1.60E+06 1,60E+06 1.60E+0S 1,60E+06 1,60E+06 1.60E1-06 E (psi) = 1.60E.tOe 1.60E+06 1.60E+06 1,60E+06 1.eOE+06 1.60E+06 1.60Et0e 5 6 7 8 9 10 11 12 13 M 15 16 17 18 19 20 21 22 23 2d TABLE ^^ - 2008 NDS DF-L Capacities ZONE FOUR 789 S. Victoria Ave, Ste 200, Ventura, CA 93003 Ptione (800)432-4444 Date 6/9/2010 Engr RFN Page 2A of 3 Z4 Quick Connect "Tie/Hold-down" System for the 2006 IBC TABLE 2 - Quick Connect Plate Washer ASD Capacities ^'^'^ DF-L No 2 min visually graded dimension lumber used for compression posts (see sht IA) plate washer designation b min. width (depth) req'd plate washer width plate washer length hole on plate washer for rod •4-* *- ffl TO Jt. o Q. CO < <t «> design capacity (Anet*625) Use Capacities « ta o '^i TO TO 8 plate thickness plate washer designation b min. width (depth) req'd plate washer width plate washer length hole on plate washer for rod •4-* *- ffl TO Jt. o Q. CO < <t «> design capacity (Anet*625) Use Capacities « ta o '^i TO TO 8 M per inch of plate width @ hole ASD stress increase washer plate thickness used plate washer designation b min. width (depth) req'd plate washer width plate washer length hole on plate washer for rod •4-* *- ffl TO Jt. o Q. CO < <t «> design capacity (Anet*625) Use Capacities « ta o '^i TO TO 8 M per inch of plate width @ hole 1.00 washer plate thickness used plate washer designation b min. width (depth) req'd plate washer width plate washer length hole on plate washer for rod •4-* *- ffl TO Jt. o Q. CO < <t «> design capacity (Anet*625) P « ta o '^i TO TO 8 M per inch of plate width @ hole mintjqd washer plate thickness used plate washer designation (in) (in) (in) (in) (in') (Ibs) (Ibs) (in) (in-lbs) (in) (in) PWS 3.5 3 3 1 1/16 8.11 5071 5000 0.998 307 0.261 1/4 PW6 3.5 31/4 3 3/8 1 5/16 9.62 6010 6000 1.185 438 0.312 3/8 PW7 3.5 31/4 3 7/8 1 5/16 11.24 7025 7000 1.435 641 0.377 1/2 PW9 3.5 31/4 5 1 5/16 14.90 9311 9000 1.998 1205 0.518 5/8 PW11 3.5 31/4 5 7/8 1 5/16 17.74 11088 11000 2.435 1838 0.639 3/4 PWI 5 3.5 31/4 7 3/4 1 5/16 23.83 14897 14500 3.373 3460 0.877 7/8 PW20 3.5 31/4 10 1/4 1 5/16 31.96 19975 20000 4.623 6686 1.219 1 1/4 PW25 3.5 31/2 11 3/4 1 5/16 39.77 24858 25000 5.334 8942 1.410 1 1/2 PW30 3.5 31/2 14 1 5/16 47.65 29779 30000 6.459 13134 1.708 1 3/4 PW6-36 5.5 5 11 3/4 1 5/16 57.40 35873 36000 5.334 8923 1.408 1 1/2 PW6^3 5.5 5 14 1 5/16 68.65 42904 43000 6.419 12904 1.693 1 3/4 b = plate width a (In) = (plate length / 2) - (1/4 CN diam) q (psi) = P^se' <.625 M,otai = qa'/2 M/S<Fb S = t^/6 t„i„ (in) = (6*M,^*b/Fb V Fy (ksi) = 36.00 Ft (ksi) = 0.75 Fy = 27.00 Ct (bearing area factor) = 1.00 ' Design capacities have a load stress increase factor as shown . " The design engineer shall select an AII-thread/Anchor rod with a design capacity > the design force. ' The capacity of the concrete anchor must be equal to or greater than the design capacity of the connector being specified. Cinch Nut Housing Diameters ON hs'g diam ATR diam capacity 5 1.861 5/8 13,575 6 2.010 3/4 23,420 7 2.164 7/8 32,640 8 2.325 1 42,130 9 2.498 1 1/8 44,508 10 2.687 1 1/4 60,000 ZONE FOUR 789 S. Victoria Ave, Ste 200, Ventura, CA 93003 Phone (800)432-4444 Date 6/9/2010 Engr RFN Page 3A of 3 ZA Quick Connect "Tie/Hold-down" System for the 2006 IBC 1 2 TABLE 3A 3 4 5 6 7 ATR All Thread Anchor Rod & Cinch Nut Capacities 10 11 12 13 14 15 ATR Allthread Anchor Rod ASD Capacity (Ibs) w/ Allowable Stress Increase = 1.00 AISC / ASD Part 5, Rod Tensile Capacity = (0.75/2) * F^, * An E = ffffffffffffff ASTM Rod Spec. Anchor Rod Diameter (in) Fu(psi) ASTM Rod Spec. 4 5 6 7 8 9 10 11 12 14 16 Fu(psi) ASTM Rod Spec. 1/2 5/8 3/4 7/8 1 1 1/8 1 1/4 1 3/8 1 1/2 1 3/4 2 Fu(psi) Nominal Area An 0.20 0.31 0.44 0.60 0.79 0.99 1.23 1.48 1.77 2.41 3.14 Fu(psi) A36 4,271 6,673 9,609 13,079 17,082 21,620 26,691 32,296 38,435 52,315 68,330 58,000 A193-B7 9,204 14,381 20,709 28,187 36,816 46,595 57,524 69,604 82,835 112,748 147,262 125,000 A3^1045 8,468 13,231 19,052 25,932 33,870 42,867 52,922 64,036 76,208 103,728 135,481 115,000 small 120,000 psi large 105,000 psi 120,000 A449 8,836 13,806 19,880 27,059 35,343 39,140 48,320 58,468 69,581 94,708 123,700 105,000 A354-BD 11,045 17,257 24,850 33,824 44,179 55,914 69,029 83,525 99,402 135,297 176,715 150,000 Net Area Ag 0.142 0.226 0.334 0.462 0.606 0.763 0.969 1.160 1.410 1.900 2.500 CODE ICC ESR 2190 Cine 1 Nut Capac ties (includes stress increase notec above) IBC 13,575 23,420 32,670 42,130 44,508 60,000 AC316 Tested CN Looseness 0.092 0.110 0.091 0.081 0.047 0.061 Hilton Oceanfront Resort 4/8/2011 Run List Building Type APTS. Number of Levels 1 Spec'd For Generic ATS Building Quantity 1 QUAD A Holdown Device Post Size ATR Grade (HS Only) Comments FT = Fire treated Run Ref. Term. Level WB SB Total Qty Run Name Comments FT = Fire treated Run Ref. Term. 1 2 3 4 5 WB SB Total Qty Run Name 2X8 BALLOON WALLS 37 CF T C 13 12.3 2 IB 2X8 BALLOON WALLS 38 CF T C 11.3 12.3 2 IB 2X8 BALLOON WALLS 35 CF T C 10.7 12.3 2 IB 2X8 BALLOON WALLS 36 CF T C 10.5 12.3 2 IB 51 CF T C 8.5 12.3 2 IC 2X8 BALLOON WALLS 1 CF T C 8.4 9.5 6 IB 2X8 BALLOON WALLS 3 CF T C 7.5 9.5 2 IB 2X8 BALLOON WALLS 2 CF T C 6.7 9.5 4 IB 2X8 BALLOON WALLS 31 CF T C 6.1 7.2 2 IB 2X8 BALLOON WALLS 34 CF T C 6.1 7.2 2 IB 2X8 BALLOON WALLS 32 CF T C 4.2 7.2 2 IB 2X8 BALLOON WALLS 33 CF T C 4.2 7.2 2 IB 50 CF T C 2.5 8.3 2 IC 4 CF T C 1.5 2.1 2 IC 6 CF T C 1.5 2.1 2 IC 8 CF T C 1.5 2.1 2 IC 39 CF T C 1.3 2.4 2 IC 40 CF T C 1.3 2.4 2 IC 5 CF T C 0.8 2.1 2 IC 7 CF T C 0.7 2.1 2 IC T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Tenn. Key FP Foundation Possible TOTAL: Runs per Bldg - 46 Runs all Bldgs - 46 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Tenn. Key CF Continue rod to foundation TOTAL: Runs per Bldg - 46 Runs all Bldgs - 46 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Tenn. Key WB Rod ties to Wood beam TOTAL: Runs per Bldg - 46 Runs all Bldgs - 46 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Tenn. Key SB Rod ties to Steel beam TOTAL: Runs per Bldg - 46 Runs all Bldgs - 46 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Tenn. Key TS Rod ties to tube steel beam TOTAL: Runs per Bldg - 46 Runs all Bldgs - 46 Variations - 0 Zone Four 23447 Cajaico Road, Perris, CA 92570 Phone: (510) 351-4370 Fax: (510) 567 -1677 Hilton Oceanfront Resort 4/8/2011 Run List Building Type APTS. Number of Levels 2 Spec'd For Generic ATS Building Quantity 1 QUAD B Holdown Device Post Size ATR Grade (HS Only) Comments FT = Fire treated Run Ref. Term. @ Level WB SB Total Qty Run Name Comments FT = Fire treated Run Ref. Term. @ 1 2 3 4 5 WB SB Total Qty Run Name 77 CF T C PTSLAB 8.5 8.7 3 3.2 2 2A 78 CF T C PTSLAB 8.5 8.7 3 3.2 2 2A 75 CF T C PTSLAB 7.4 8.7 2.4 3.2 2 2A 76 CF T C PTSLAB 7.4 8.7 2.4 3.2 2 2A 82 CF T C PTSLAB 5.9 6.1 2.2 2.2 3 2A 84 CF T C PTSLAB 5.6 6.5 2.1 2.4 2 2A 60 CF T C PTSLAB 5.5 7.6 1.4 2.8 2 2A 61 CF T C PTSLAB 5.5 7.6 1.4 2.8 2 2A 62 CF T C PTSLAB 5.5 7.6 1.4 2.8 2 2A 63 CF T C PTSLAB 5.5 7.6 1.4 2.8 2 2A 64 CF T C PTSLAB 5.5 7.6 1.4 2.8 2 2A 65 CF T C PTSLAB 5.5 7.6 1.4 2.8 2 2A 85 CF T C PTSLAB 4.7 6.5 1.8 2.4 2 2A 67 CF T C PTSLAB 4 6.1 0.8 2.2 2 2A 68 CF T C PTSLAB 4 6.1 0.8 2.2 2 2A 69 CF T C PTSLAB 4 6.1 0.8 2.2 2 2A 70 CF T C PTSLAB 4 6.1 0.8 2.2 2 2A 71 CF T C PT SLAB 4 6.1 0.8 2.2 2 2A 72 CF T C PT SLAB 4 6.1 0.8 2.2 2 2A 86 CF T C PTSLAB 3.5 6 1.2 2.2 2 2A 87 CF T C PTSLAB 3.5 6 1.2 2.2 2 2A 66 CF T C PTSLAB 3.1 6.1 0.3 2.2 2 2A 83 CF T C PTSLAB 3 6.1 1.3 2.2 2 2A 88 CF T C PTSLAB 2.9 6.2 1.3 2.3 2 2A 73 CF T C PTSLAB 2.7 4.3 1 1.6 2 2A T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Term. Key FP Foundation Possible TOTAL: Runs per Bldg - 51 Runs all Bldgs - 51 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Term. Key CF Continue rod to foundation TOTAL: Runs per Bldg - 51 Runs all Bldgs - 51 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Term. Key WB Rod ties to Wood beam TOTAL: Runs per Bldg - 51 Runs all Bldgs - 51 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Term. Key SB Rod ties to Steel beam TOTAL: Runs per Bldg - 51 Runs all Bldgs - 51 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Term. Key TS Rod ties to tube steel beair\ TOTAL: Runs per Bldg - 51 Runs all Bldgs - 51 Variations - 0 Zone Four 23447 Cajaico Road, Perris, CA 92570 Phone: (510) 351-4370 Fax: (510) 567-1677 Hilton Oceanfront Resort 4/8/2011 Run List Building Type APTS. Number of Levels 2 Spec'd For Generic ATS Building Quantity 1 QUAD B Cont. Holdown Device Post Size ATR Grade (HS Only) Comments FT = Fire treated Run Ref. Term. @ Level WB SB Total Qty Run Name Comments FT = Fire treated Run Ref. Term. @ 1 2 3 4 5 WB SB Total Qty Run Name 80 CF T C PTSLAB 1.7 5 0.9 1.8 10 2A 81 CF T C PTSLAB 1.7 5 0.9 1.8 9 2A 74 CF T C PTSLAB 1.4 4.3 0.5 1.6 2 2A 41 CF T C PTSLAB 13.1 9.9 0 NIC 42 CF T C PTSLAB 13.1 9.9 0 NIC 43 CF T C PTSLAB 3.6 3.7 0 NIC 44 CF T C PTSLAB 3.6 3.7 0 NIC 10 CF T C PTSLAB 3 4.4 0 NIC T=Tension Run FP Foundation Possible TOTAL: Runs per Bldg - 21 Runs all Bldgs - 21 Variations - 0 P=Plate Washer W=Wood spec'd C=Compression H=Holdown Term. Key CF Continue rod to foundation TOTAL: Runs per Bldg - 21 Runs all Bldgs - 21 Variations - 0 P=Plate Washer W=Wood spec'd C=Compression H=Holdown Term. Key WB Rod ties to Wood beam TOTAL: Runs per Bldg - 21 Runs all Bldgs - 21 Variations - 0 P=Plate Washer W=Wood spec'd C=Compression H=Holdown Term. Key SB Rod ties to Steel beam TOTAL: Runs per Bldg - 21 Runs all Bldgs - 21 Variations - 0 P=Plate Washer W=Wood spec'd C=Compression H=Holdown Term. Key TS Rod ties to tube steel beam TOTAL: Runs per Bldg - 21 Runs all Bldgs - 21 Variations - 0 Zone Four 23447 Cajaico Road, Perris, CA 92570 Phone: (510) 351-4370 Fax: (510) 567-1677 Hilton Oceanfront Resort 4/8/2011 Run List Building Type APTS. Number of Levels 3 Spec'd For Generic ATS Building Quantity 1 QUAD C Holdown Device Post Size ATR Grade (HS Only) Comments FT = Fire treated Run Ref. Term. @ Level WB SB Total Qty Run Name Comments FT = Fire treated Run Ref. Term. @ 1 2 3 4 5 WB SB Total Qty Run Name 121 CF T C 25.2 28.8 12.5 14 4.2 4.9 2 3A 103 CF T C 15.5 17.5 7.1 8.6 1.8 2.8 2 3B 107 CF T C 14.8 17.5 6.6 8.6 1.5 2.8 2 3B 108 CF T C 14.8 17.5 6.6 8.6 1.5 2.8 2 3B 109 CF T C 14.8 17.5 6.6 8.6 1.5 2.8 2 3B 110 CF T C 14.8 17.5 6.6 8.6 1.5 2.8 2 3B 111 CF T C 14.8 17.5 6.6 8.6 1.5 2.8 2 3B 113 CF T C 14.1 17.5 6.2 8.6 1.3 2.8 4 3A 120 CF T C 13.6 18 7.5 9.3 2.7 3.6 10 3B 106 CF T C 13.5 17.5 5.7 8.6 1 2.8 2 3B 105 CF T C 13.3 16 6.6 8.6 1.5 2.8 3 3B 124 CF T C 9.2 12.7 4.6 6 1.2 2 2 3B 123 CF T C 8.7 12.7 4.3 6 1.1 2 2 3C 100 CF T C 6.6 16 6.6 8.6 1.5 2.8 2 3C 101 CF T C 6.6 16 6.6 8.6 1.5 2.8 2 3C 102 CF T C 6.6 16 6.6 8.6 1.5 2.8 2 3C 104 CF T C 6.6 16 6.6 8.6 1.5 2.8 2 3C 122 CF T C 3.5 7.2 0.4 2 9 2C 116 CF T C 8.3 9.4 0 NIC 114 CF T C 7.3 9.4 3 lA 115 CF T C 4.2 8.9 2 lA 117 CF T C 3.4 8.9 2 lA T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Term. Key FP Foundation Possible TOTAL: Runs per Bldg - 61 Runs all Bldgs - 61 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Term. Key CF Continue rod to foundation TOTAL: Runs per Bldg - 61 Runs all Bldgs - 61 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Term. Key WB Rod ties to Wocxl t>eam TOTAL: Runs per Bldg - 61 Runs all Bldgs - 61 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Term. Key SB Rod ties to Steel beam TOTAL: Runs per Bldg - 61 Runs all Bldgs - 61 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Term. Key TS Rod ties to tube steel beam TOTAL: Runs per Bldg - 61 Runs all Bldgs - 61 Variations - 0 Zone Four 23447 Cajaico Road, Perris, CA 92570 Phone: (510) 351-4370 Fax: (510) 567-1677 Hilton Oceanfront Resort 4/8/2011 Run List Building Type APTS. Number of Levels 3 Spec'd For Generic ATS Building Quantity 1 QUAD D Holdown Device Post Size ATR Grade (HS Only) Comments FT = Fire treated Run Ref. Terni. @ Level WB SB Total Qty Run Name Comments FT = Fire treated Run Ref. Terni. @ 1 2 3 4 5 WB SB Total Qty Run Name 160 CF T C 17.6 17.4 8.2 8.2 2.6 2.7 2 3B 159 CF T C 17.3 17.4 8 8.2 2.5 2.7 2 3B 144 CF T C 17.1 16.7 7.9 7.8 2.4 2.6 4 3B 143 CF T C 16.3 16.7 7.4 7.9 2.2 2.6 4 3B 151 CF T C 16 16 8.5 8.6 2.7 2.8 2 3B 152 CF T C 15.8 16 8.4 8.6 2.7 2.8 2 3B 153 CF T C 15.5 17.4 7 8.2 2.1 2.7 2 3B 154 CF T C 15.5 17.4 7 8.2 2.1 2.7 2 3B 155 CF T C 15.5 17.4 7 8.2 2.1 2.7 2 3B 156 CF T C 15.5 17.4 7 8.2 2.1 2.7 2 3B 157 CF T C 15.5 17.4 7 8.2 2.1 2.7 2 3B 158 CF T C 15.5 17.4 7 8.2 2.1 2.7 2 3B 140 CF T C 14.3 16.7 6.2 7.9 1.6 2.6 4 3B 141 CF T C 14.3 16.7 6.2 7.9 1.6 2.6 4 3B 142 CF T C 14.3 16.7 6.2 7.9 1.6 2.6 4 3B 174 CF T C 14 17.9 6.8 8.5 2 2.8 2 3B 148 CF T C 13.2 15.1 5.9 7.1 1.8 2.4 2 3B 149 CF T C 13.2 15.1 5.9 7.1 1.8 2.4 2 SB 150 CF T C 13.2 15.1 5.9 7.1 1.8 2.4 2 3B 147 CF T C 12.5 15.1 5.5 7.1 1.6 2.4 2 3B 145 CF T C 11.8 16.1 4.9 7.6 1.7 2.5 2 3B 177 CF T C 8.9 10.7 4 5.1 1.4 1.7 2 3C 170 CF T C 8.6 12.6 4.3 6 1.1 2 8 3C 171 CF T C 8.6 12.6 4.3 6 1.1 2 14 3C 176 CF T C 8.6 10.6 3.8 5 1.3 1.6 2 3C T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Term. Key FP Foundation Possible TOTAL: Runs per Bldg - 78 Runs all Bldgs - 78 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Term. Key CF Continue rod to foundation TOTAL: Runs per Bldg - 78 Runs all Bldgs - 78 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Term. Key WB Rod ties to Wood beam TOTAL: Runs per Bldg - 78 Runs all Bldgs - 78 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Term. Key SB Rod ties to Steel beam TOTAL: Runs per Bldg - 78 Runs all Bldgs - 78 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Term. Key TS Rod ties to tube steel beam TOTAL: Runs per Bldg - 78 Runs all Bldgs - 78 Variations - 0 Zone Four 23447 Cajaico Road, Perris, CA 92570 Phone: (510) 351-4370 Fax: (510) 567-1677 Hilton Oceanfront Resort 4/8/2011 Run List Building Type APTS. Number of Levels 3 Spec'd For Generic ATS Building Quantity 1 QUAD D Cont. Holdown Device Post Size ATR Grade (HS Only) Comments FT = Fire treated Run Ref. Term. @ Level WB SB Total Qty Run Name Comments FT = Fire treated Run Ref. Term. @ 1 2 3 4 5 WB SB Total Qty Run Name 146 CF T C 7.8 16.1 2.5 7.6 0.9 2.5 2 3C 178 CF T C 7.7 10.7 3.3 5.1 1.2 1.7 2 3C 175 CF T C 6.7 10.6 2.8 5 1 1.6 2 3C 172 CF T C 6.3 10.6 3.2 5 0.8 1.6 4 3C 173 CF T C 6.3 10.6 3.2 5 0.8 1.6 4 3C T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Tenn. Key FP Foundation Possible TOTAL: Runs per Bldg - 14 Runs all Bldgs - 14 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Tenn. Key CF Continue rod to foundation TOTAL: Runs per Bldg - 14 Runs all Bldgs - 14 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Tenn. Key WB Rod ties to Wood beam TOTAL: Runs per Bldg - 14 Runs all Bldgs - 14 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Tenn. Key SB Rod ties to Steel beam TOTAL: Runs per Bldg - 14 Runs all Bldgs - 14 Variations - 0 T=Tension P=Plate Washer W=Wood spec'd C=Compression H=Holdown Run Tenn. Key TS Rod ties to tube steel kteam TOTAL: Runs per Bldg - 14 Runs all Bldgs - 14 Variations - 0 Zone Four 23447 Cajaico Road, Perris, CA 92570 Phone: (510) 351-4370 Fax: (510) 567-1677 HARDY FRAME 31946 Corydon Road, Lake EUnore, OA 92S30 tel: (877) 432-4444 fax: (961) 24&«663 LOAD CHARTS ACCUMUUTIVE LOAD DEMAND CAPACITY LOAD PER LEVEL DEMAND CAPACITY ACCUMUUTIVE LOAD DEMAND CAPACITY LOAD PER LEVEL DEMAND CAPACITY 2700 5000 2700 5000 1500 5000 1500 5000 8200 9609 5500 6000 6600 6673 5100 5000 17600 19662 9400 11000 8900 2300 5000 6X4 OR 6X6 TOTAL 4" WOOD EACH SIDE EITHER SIDE 2X - TOTAL 6" WOOD EACH SIDE EITHER SIDE 2X - 3/4"-5/8"— ROD COUPLER TOTAL 4" WOOD EACH SIDE EITHER SIDE (2)2X - TOTAL 6" WOOO EACH SIDE EITHER SIDE 2X - 1 1/8--3/4" ROD COUPLER TOTAL 4" WOOD EACH SIDE EITHER SIDE 6X 6X TOTAL 6" WOOO EACH SIDE EITHER SIDE (2)2X - 1 1/8" ROD COUPLER FOUNDATION ANCHOR QC 3B 6X4 OR 6X6- TOTAL 4" WOOD EACH SIDE EtlHERSIDE 2X - TOTAL 6" WOOD EACH SIDE EITHER SIDE 2X - 5/8" ROD • COUPLER TOTAL 4' WOOD EACH SIDE EITHER SIDE 2X 2X TOTAL 6" WOOD EACH SIDE EITHER SIDE 2X - TOTAL 4" WOOD EACH SIDE EITHER SIDE (2)4X - TOTAL 6" WOOD EACH SIDE EITHER SIDE (2)2X - A36 5/8" ATR -PW-5 -FOUNDATION ANCHOR QC 3C FIGURE 1 QUICK CONNECT ELEVATIONS HILTON OCEANFRONT RESORT DATE: 4/8/11 REV. _ HARDY FRAME 31946 Coiydon Road, Lake Elsinore, CA 92530 tel: (877) 4324444 fax: (961) 24&e663 LOAD CHARTS ACCUMULATIVE LOAD DEMAND CAPACITY LOAD PER LEVEL DEMAND CAPACITY -I ACCUMULATIVE LOAD •' DEMAND I CAPACITY LOAD PER LEVEL DEMAND CAPACITY ACCUMUUTIVE LOAD DEMAND CAPACITY LOAD PER LEVEL DEMAND CAPACITY 8300 9000 8300 9000 13300 14500 13300 14500 8500 9000 8500 9000 QC IA ] / 6X4 OR 6X6 TOTAL 8" WOOO EACH SDE ETTHERSIDE (2)2X8 - 1 1/8" ROD COUPLER 1 1/8" ROD COUPLER 6X4 OR 6X6- TOTAL 4' WOOD EACH SIDE ETTHERSIDE TOTAL 6* WOOD EACH SIDE 2X EITHER SIDE 2X 3/4" ROD- COUPLER _i 1 -A36 3/4" ATR -FOUNDATION ANCHOR QC IB QC IC FIGURE 2 QUICK CONNECT ELEVATIONS HILTON OCEANFRONT RESORT DATE: 4/8/11 REV. _ HARDY FRAME 31946 Coydon Road, Lake Elsinore, CA 92S30 tel: (877) 4324444 fax: (961) 24&9663 DATE: 4/8/11 REV. _ PCR11046 1 PONTO RD HILTON RESORT- HOLD DOWN SUBSTITUTION • cv ^proved Da^e By luiLOING PLANNING / ENGINEERING / / FIRE Expedite? Y N / / J HazMat APCD Health Forms/Fees Sent Rec'd Due? By Encina V N Fire Y N HazHealthAPCD Y N PE&M Y N School Y N Sewer Y N Stormwater Y N Special Inspection Y N CFD: Y N LandUse: PFF: Density: ImpArea: FY: Comments Building Planning Engineering Fire Need? Date Date Annex: Oate Factor- Date SW a Done a Done a Done • Done a Done • Issued 07-17-2013 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Plan Check Revision Permit No:PCR11072 Building Inspection Request Line (760) 602-2725 Job Address: 1 PONTO RD CBAD Permit Type: PCR Parcel No: 2141601900 Valuation: $0.00 Reference #: 0^ IO»i*<#0 PC#: PC11-05 Project Title: HILTON: PLUMBING & MECHAN Lot#: Construction Type: REV 0 NEW Status: ISSUED Applied: 06/06/2011 Entered By: JMA Plan Approved: 06/17/2011 Issued: 06/17/2011 Inspect Area: Applicant: MICHAEL TRIA 2359 4TH AVE STE. 300 SAN DIEGO 92101 619-233-6777 Owner: WAVE CREST OCEANFRONT LLC C/O WILLIAM SHANNAHAN 1200 PROSPECT ST #425 LA JOLLA CA 92037 Plan Check Revision Fee Fire Expedited Plan Review Additional Fees $435.00 $0.00 $0.00 Total Fees: $435.00 Total Payments To Date: $435.00 Balance Due: $0.00 Inspector: FINAL APPROVAL Date: Clearance: NOTICE: Please take NOTICE that approval of your project Includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively refen'ed to as "fees/exactions." You have 90 days from the date this permit was Issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth In Government Code Section 66020(a). and file the protest and any other required Information with the City Manager for processing In accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees In connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have previously been given a NOTICE similar to this, or as to which the statute of limitations has previousiv othenvise expired. CITY OF CARLSBAD PLAN CHECK REVISION APPLICATION B-15 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Plan Check Revision No ^C^CI ( ^Original Plan Check No \O'\yy0 Project Address IT^'S ^^^^ I^/^^. rvte(.^3AP, d ^2<? II Date ^f^/^> Contact l^\c^m. T^A ?hik^)j^^:^221_ F^y Email m+no/f ju,'dk t/)^.^g^ Contact Address g^S-'l 4fM A^g., SUa^ ZOO city ^ fm?o Zip °'^''^) General Scope of Work Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 Elements revised: 0 Plans (3 Calculations • Soils • Energy • Other 2 Describe revisions in detail 3 List page(s) where each revision is shown 4 List revised sheets that replace existing sheets AtrA<^*r&:> 4Af2i3M\ie i^^jQpticKi ^ -^ISBD 5 Does this revision, in any way, alter the exterior of the project? • Yes 6 Does this revision add ANY new floor area(s)? • Yes |3 No T Does this revision affect any fire related issues? Q Yes No 8 Is this a complete set? • Yes ^ No S No JS^ Signature-^..^ 1635 Faraday Avenue, Carlsbad, CA 92008 Phone: 760-602-2717 / 2718 / 2719 www.cartsbadca.gov Fax: 760-602-8558 EsGil Corporation In (Partnersfiip with Qovemment for (BuiCding Safety DATE: JUNE 14, 2011 • APPLICANT JURISDICTION: CARLSBAD • PLANREVIEWER • FILE PLAN CHECK NO.: 10-1660 (REV. # 2) - PCR 11-072 SET: I PROJECTADDRESS: Intersection of Carlsbad Blvd. & Ponto Drive PROJECT NAME: HILTON CARLSBAD OCEANFRONT RESORT/SPA fic Parking Garage XI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified beiow are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. I I The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. I I The applicant's copy of the check list has been sent to: Esgil Corporation staff did not advise the applicant that the plan check has been completed. I I Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Fax #: Mail Telephone Fax In Person ^ REMARKS: Revisions to selected Mechanical & Plumbing Sheets changing two floor drains in the nail salon to floor sinks. "M" sheets containing revised energy Title 24 plans have been included with this revised submittal however this energy edition (5/23) is not for the energy design compliance building permit and has not been reviewed. By: ALI SADRE Enclosures: EsGil Corporation • GA • EJ • PC 6/09 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858)560-1468 • Fax (858) 560-1576 CARLSBAD 10-1660 (REV. # 2) - PCR 11-072 JUNE 14, 2011 [DO NOT PAY- THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: CARLSBAD 2) - PCR 11-072 PLAN CHECK NO.: 10-1660 (REV. # PREPARED BY: ALI SADRE DATE: JUNE 14, 2011 BUILDING ADDRESS: Intersection of Carlsbad Blvd. & Ponto Drive BUILDING OCCUPANCY: R1/S2 TYPE OF CONSTRUCTION: V-A/II-B BUILDING PORTION AREA ( Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) REVISIONS Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code CB By Ordinance Bldg. Permit Fee by Ordinance Plan Check Fee by Ordinance Type of Review: • Complete Review $435.00 • structural Only I I Repetitive Fee Repeats Based on hourly rate • Other • Hourly EsGil Fee $116.00 Hrs. @ $348.00 Connments: Sheet 1 of 1 macvalue.doc + PERFORMANCE CERTIFICATE OF COMPLIANCE (Parti of3) PERF-1 C Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cartsbad Climate Zone CA Climate Zone 07 Total Cond. Floor Area 166,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • • Relocatable - indicate • High-Rise Residential B specific climate zone • Hotel/Motel Guest Room all climates Phase of Construction: B New Construction • Addition • Alteration STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation author hereby certifies that the documentation is accurate and complfJe Documentation Author Name jg^g„ Signature Company Ronson Engineering 5/23/2011 Address 20300 19th Avenue NE 206-364-3343 CIty/Slate/Zip shoreline. WA 98155 The Principal Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please check one: ENV. LTG. MECH. • I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. -3 Principal Envelope Designer Name John D. Toman, P.E. Signature Company Rob/son Engineering, Inc. yt License#/]f ^^5j> Address 20300 19th Ave NE City/State/Zip shoreline. WA 98155 Principal Mechanical Designer Name John D, Toman, P.E. Signature Company Robison Engineering, Inc, Address 20300 19th Ave NE License#^ ^ . ?,5g55 City/State/Zip shoreline, WA 98155 Phone C206; 364-3343 Principal Lighting Designer Name Signature Company Lighting Compliance Not In The Scope Of This Submittal Date Address License # City/State/Zip Phone INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included) 0 ENV-IC Certificate of Compliance. Required on plans. 0 MECH-IC Certificate of Compliance. Required on plans. • LTG-1 C Certificate of Compliance. Required on plans. 0 MECH-2C Air/Water Side/Sen/ice Hot Water & Pool Requirements, • LTG-2C Lighting Controls Credit Worksheet. 0 MECH-3C IMechanical Veni • LTG-3C Indoor Lighting Power Allowance. 0 MECH-5C Mechanical Equi| EnergyPro 5.1 by EnergySoft User Number: 6394 RunCode: 2011-05-23T11.05:22 ID: 1 JzrrsE M CB>tOiM PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 2 Of 3) PERF-1 C Project Name Date Hilton Carlsbad Oceanfront Resort and Spa 5/23/2011 ANNUAL TDV ENERGY USE SUMMARY (kBtu/sqft-yr) Energy Component Standard Design Proposed Design Compliance Margin Heating Space Heating 4.62 5.61 -0.99 Heating Space Cooling 49.30 62.83 -73.53 Cooling Indoor Fans 43.46 24.82 18.64 Fans Heat Rejection 11.78 0.00 11.78 Heat Rej Pumps & Misc. 1.43 3.46 -2.03 Pumps Domestic Hot Water 6.71 6.24 0.47 DHW Lighting 37.69 37.69 0.00 Lighting Receptacle 26.73 26.73 0.00 Receptacle Process 8.86 8.86 0.00 Process Process Lighting 0.00 0,00 0.00 Process Ltg TOTALS 190.59 176.25 14.34 Percent better than Standard 7.5% { 7.9 % excluding process) NOT FOR PERMIT USE - SEE PART 3 GENERAL INFORMATION Building Orientation Number of Stories Number of Systems Number of Zones ^N; 0 deg 260 51 Conditioned Floor Area Unconditioned Floor Area Conditioned Footprint Area Natural Gas Available On Site J 66,436 58,78? Yes sqft. sqft. sqft. Orientation Gross Area Glazing Area Glazing Ratio Front Elevation (N) 73,963 sqft. 2,796 sqft. 75.7% Left Elevation (E) 76,575 sqft. 2,597 sqft. 75.6% Rear Elevation (S) 73,630 sqft. 2,737 sqft. 75.7% Right Elevation (W) 78,326 sqft. 5,039 sqft. 275% Total 62,494 sqft. 77,963 sqft. 79.7 % Roof 68,569 sqft. 0 sqft. 0.0% Standard Prescriptive Lighting Power Density Prescriptive Envelope TDV Energy 0.896 2,356,074 W/sqft. Proposed 0.896 2,548,131 Prescriptive Values for W/sqft. Comparison only. See LTG-1 C for allowed LPD. Remarks: EnergyPro 5,1 bv EneravSoft User Number: 6394 RunCode: 2011.05-23711:05:22 ID: 379-007 Paae2 of 81 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF-1 C Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2011 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area (sqft.) Inst. LPD (W/sf)' Ctrl. Credits (W/sf)^ Allowed LPD Proc. Loads (W/sf) System Name Zone Name Occupancy Type Floor Area (sqft.) Inst. LPD (W/sf)' Ctrl. Credits (W/sf)^ Area (W/sf)' Tailored (W/sf)" Proc. Loads (W/sf) Rrt;-7 Ballroom SE Section Convention/Conference/Mee 7,740 •7.400 RTU-2 Ballroom NE Section Convention/Conference/Mee 967 *7.400 RTU-3 Ballroom Center Section Convention/Conference/Mee 2,700 "1,400 RTU-4 Ballroom NW Section Convention/Conference/Met 967 '1.400 RTU-5 Ballroom SW Section Convention/Conference/Met 1,080 '1.400 RTU-6 East Pre-Function Lobby, Hotel 2,640 '1.100 RTU-7 Service Corridor/Restroomsi Corridor/Restroom/Support 2,000 '0.600 RTU-8 Service Corridor/Restroomsi Corridor/Restroom/Support 2,970 '0.600 RTU-9 West Pre-Function Lobby, Hotel 3,770 '1.100 RTU-10 Meeting Room Conveniion/Conference/Met 7,023 '1,400 RTU-11 Kitchen Kitchen, Food Preparation 2,370 '1,600 RTU-12 Boardroom Convention/Conference/Met 877 '1,400 HP-1 Guestrooms 1st Floor Hotel/Motel Guest Room 77,838 '0.500 Guestrooms 2nd Floor Hotel/Motel Guest Room 38,505 '0.500 Guestrooms 3rd Floor Hotel/Motel Guest Room 38,078 '0.500 HP-3 Com'dor/Storage/Shop Corridor/Restroom/Support 3,640 '0.600 HP-4 Electrical Panel Electrical, Mechanical Room 558 '0.700 75.000 HP-5 MPOE Electrical, Mechanical Room 462 '0.700 10.000 HP-6 Staff Lounge Corridor/Restroom/Support 793 '0.600 HP-7 Corridor/Storage/HR Offices Corridor/Restroom/Support 2,450 '0.600 Notes: 1. See LTG-1 C (items marked with asterisk, see LTG-1-C by olhers) 2. See LTG-2C 3. See LTG-3C (by others) 4. See LTG-4C Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay speciai attention to the items specified In this checkiist. These items require speciai written lustification and documentation, and speciai verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a buiiding or design that otherwise complies based on the adequacy of the special lustification and documentation submitted. 7?ie Cooling Tower BAC FXV-644 includes a Variable Speed Drive on the fan motor. The DHW System Lochinvar Corp. CFN1441 isa non-NAECA large storage gas water heater. Verify DHW details. The HVAC System RTU-3 Includes Demand Control Ventilation per Standards Section 121. The HVAC System RTU-10 includes Demand Control Ventilation per Standards Section 121. The Room Wine Room has a Heating Indoor Design Temperature of 55 degrees F. The Room Wine Room has a Cooling Indoor Design Temperature of 55 degrees F. The HVAC System Carrier 48TCA007 includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500. The HVAC System AHU-2 Reznor RDCB has the Supply Fan Motor mounted extemally, outside the Conditioned Air Stream. The HVAC System AHU-3 Reznor RDCB has the Supply Fan Motor mounted extemally, outside the Conditioned Air Stream. The HVAC System AHU-4 Reznor RDCB has the Supply Fan Motor mounted extemally, outside the Conditioned Air Stream. 'Denotes an OSHPD Healthcare (I Occupancy) In the list of spaces above. This report may NOT be used for Title 24 pennit purposes. The exceptional features listed in this performance approach appiication have specificaiiy been reviewed. Adequate written justification and documentation for their use have been provided by the appiicant. Authorized Signature or Stamp EnergyPro 5.1 by EnergySoft User Number: 6394 RunCode: 2011.0S-23T11:05:22 ID: 379-007 Page 3 of 81 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF-1 C Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2011 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area (sqft.) Inst. LPD (W/sf)' Ctrl. Credits {\N/stf Allowed LPD Proc. Loads (W/sf) System Name Zone Name Occupancy Type Floor Area (sqft.) Inst. LPD (W/sf)' Ctrl. Credits {\N/stf Area (W/sf)' Tailored (W/sf)" Proc. Loads (W/sf) HP-8, 9, 70 Restaurant Dining 4,925 '1.100 HP-77, 72, 73 Lobby/Gift Shop Lobby, Hotel 5,740 '1.100 HP-74, 75 Back Offices Office > 250 sqft 2,383 '0.900 HP-16 pex Room Electrical, Mechanical Room 374 '0.700 70.000 HP-77 Laundry/Storage Laundry 2,780 '0.900 1.000 HP-18 Elevator Lobby Lobby, Hotel 7,590 '1.100 HP-19 Fitness Center Exercise, Gymnasium 1,420 '1.000 HP-20 Wine Room All Others 705 '0.600 5.000 HP-SI Reception/Office "Lobby 496 '0.800 HP-S2 Nail Salon Beauty Salon 294 '1.700 HP-S3 Locker Rooms Locker/Dressing Room 7,700 '0.800 HP-S4 Relaxation Lounge Lobby, Hotel 576 '1.100 HP-S5 Treatment Rooms "Physical Therapy/Hydrothi 567 '0.900 Corridor Corridor/Restroom/Support 275 '0.600 HP-S6 East Treatment Rooms "Physical Therapy/Hydrothi 328 '0.900 HP-S7 Couple's Treatment Room "Physical Therapy/Hydrotht 260 '0.900 HP-S8 Staff/Linen Corridor/Restroom/Support 256 '0.600 IAC-1/0AC-1 Elevator Equipment room Electrical, Mechanical Room 773 '0.700 30.000 IAC-2/0AC-2 Elevator Equipment room Electrical, Mechanical Room 788 '0.700 20.000 IAC-3/0AC-3 Elevator Equipment room Electrical, Mechanical Room 59 '0.700 50.000 Notes: 1. See LTG-1 C (items marked with asterisk, see LTG-1-C by others) 2. See LTG-2C 3. See LTG-3C (by others) 4. See LTG-4C Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency shouid pay speciai attention to the items specified in this checldist. These items require speciai written justification and documentation, and speciai verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a buiiding or design that otherwise complies based on the adequacy of the speciai justification and documentation submitted. The exceptional features listed in this performance approach appiication have specificaiiy been reviewed. Adequate written justification and documentation for their use have been provided by the appiicant. Authorized Signature or Stamp EnergyPro 5.1 by EnergySofI User Number: 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 4 of 81 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF-1 C Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2011 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area (sqft.) Inst. LPD (W/sf)' Ctrl. Credits (W/sf)^ Allowed LPD Proc. Loads (W/sf) System Name Zone Name Occupancy Type Floor Area (sqft.) Inst. LPD (W/sf)' Ctrl. Credits (W/sf)^ Area (W/sf)' Tailored (W/sf)" Proc. Loads (W/sf) AHU-1 7sf Floor Corridor Corridor/Restmom/Support 2,870 •0600 2nd Floor Conidor Conidor/Restroom/Support 2,070 *0.600 3rd Floor Corridor Corridor/Restroom/Support 2,290 '0.600 AHU-2 1st Floor Conidor Corridor/Restroom/Support 597 '0.600 2nd Floor Corridor Conidor/Restroom/Support 597 '0.600 3rd Floor Conidor Corridor/Restroom/Support 597 '0.600 AHU-3 1st Floor Corridor Corridor/Restroom/Support 7,760 '0.600 2nd Floor Conrldor Corridor/Restroom/Support 7,490 '0.600 3rd Floor Corndor Conidor/Restroom/Support 1,490 '0.600 AHU-4 2nd Floor Corridor Corridor/Restroom/Support 3,047 '0.600 3rd Floor Conidor Conidor/Restroom/Support 3,047 '0.600 Notes: 1. See LTG-1 C (items marked with asterisk, see LTG-1-C by others) 2. See LTG-2C 3. See LTG-3C (by others) 4. See LTG-4C Items above require special documentation EXCEPTIONAL CONDiTIONS COMPLIANCE CHECKLIST The iocai enforcement agency shouid pay speciai attention to the items specified in this checkiist. These items require speciai written lustification and documentation, and speciai verification to be used with the performance approach. The iocai enforcement agency determines the adequacy of the justifications, and may reject a buiiding or design that otherwise compiles based on the adequacy of the speciai justification and documentation submitted. The exceptional features listed in this performance approach appiication have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp EnergyPro 5,1 by EnergySoft User Number: 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 5 of 81 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Parti of3) ENV-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) Relocatable Public School El Conditioned Spaces • Unconditioned Spaces • Skylight Area for Large Enclosed Space > 8000 ft^ (If checked include the ENV-4C with submittal) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component B Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Tag/iD Assembly Type S < Orientation N, E, S,W U-Factor Cavity R-Value Exterior R-Value Exterior Furring' interior R-Vaiue interior Furring' Joint Appendix 4 Condition Status Pass Fail' 7 Slab 1,140 (N) 0.730 None 4,4,7-A1 New • • 2 Roof 7,740 (N) 0.037 R-30 4.21-A20 New • • 3 Slab 967 (N) 0730 None 4.4,7-A1 New • • 4 Roof 967 (N) 0.037 R-30 4.2.1-A20 New • • 5 Slab 2,700 (N) 0,730 None 4.4.7-A1 New • • 6 Roof 2,700 (N) 0.031 R-30 4.2.1-A20 New • • 7 Slab 967 (N) 0.730 None 4.4.7-A1 New • • 8 Roof 967 (N) 0.031 R-30 4.2.1-A20 New • • • • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type Atea (ft') Orientation N, E, S, W Max U-Factor U-Factor Source Max {R)SHGC SHGC Source Overhang Conditions Status Pass Fall' 7 Window 7,972 (N) 0.700 NFRC 0.450 NFRC • New • • 2 Window 2,597 (E) 0700 NFRC 0.450 NFRC • New • • 3 Window 5,039 (W) 0.700 NFRC 0.450 NFRC • New • • 4 Window 2,737 (S) 0.700 NFRC 0.450 NFRC • New • • 5 Window 224 (NE) 0.700 NFRC 0.450 NFRC • New • • • • • • • • • • • • • • • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify buiiding plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 6 of 81 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 3) ENV-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. • Conditioned Spaces • Unconditioned Spaces • Skylight Area for Large Enclosed Space s 8000 ft (If checked include the ENV-4C with submittal) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component B Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly Type c 0> UJ 4) IS •• O K OC o ~ « >< a UJ > o o> « 3 CE S — 15 .2? i;E £ u. v X •a c « 4) £ a. o 3--> < o S O OT n IS o. 9 70 Slab 1,080 (N) 0.730 None 4,4,7-A1 New Roof 1,080 (N) 0.031 R-30 4.2.1-A20 New 11 12 13 14 15 16 Wall 644 (N) 0.069 R-21 4.3.1-A6 New • Wall 1,327 (E) 0.069 R-21 4.3.1-A6 New Roof 2,640 (N) 0.031 R-30 4.2.1-A20 New Slab 2,640 (N) 0.730 None 4.4.7-A1 New Slab 2,000 (N) 0.730 None 4.4.7-A1 New Roof 1,703 (N) 0.031 R-30 4.2.1-A20 New 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fall, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fall does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type Area {if) Orientation N, E, S, W Max U-Factor U-Factor Source Max (R)SHGC SHGC Source Overhang Conditions Status Pass Fail' • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to con-ect. Verify building plans If necessary. EnergyPm 5.1 by EnergySoft User Number: 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 7 of 81 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Parti of3) ENV-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Carlsbad Climate Zone Total Cond. Floor Area 166,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) Relocatable Public School Bldg. B Conditioned Spaces • Unconditioned Spaces • Skylight Area for Large Enclosed Space > 8000 ft (If checked include the ENV-4C with submittal) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component El Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Tag/iD Assembly Type IS 2^ •a . I OT S UJ n • u cc EC k_ o 4) ^2 H IS UJ > o o> ^ .E 0) ~ « 3 EC O ii o) St E u. X c « 4) .E o- -» < c o jS II) ^ 3 C e o 3 O OT « (0 IS CL a u. 77 78 Roo^ 2,970 (N) 0.031 R-30 4.2.1-A20 New Slab 2,910 (N) 0.730 None 4.4.7-A1 New 19 20 21 22 23 24 Wall 906 (N) 0.069 R-21 4.3.1-A6 New Wall 1,300 (W) 0.069 R-27 4.3.1-A6 New Wall 263 (S) 0.069 R-21 4.3.1-A6 New Roof 3,110 (N) 0.031 R-30 4.2.1-A20 New Slab 3,110 (N) 0.730 None 4.4.7-A1 New Wall 62 (N) 0.069 R-21 4.3.1-A6 New 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type Area (ft') Orientation N, E, S,W Max U-Factor U-Factor Source Max (R)SHGC SHGC Source Overhang Conditions Status Pass Fail' • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1. See Instructions In the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySofI User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 8 of 81 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Parti of3) ENV-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) Relocatable Public School Bldg. B Conditioned Spaces • Unconditioned Spaces • Skylight Area for Large Enclosed Space i 8000 ft (If checked include the ENV-4C with submittal) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component B Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or In Degrees: Odeg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly Type c I OT" 4> Uj" o z' 4> IS "T O EC o ~ 4) ^2 i< IS UJ > O Ol •= .E 0) ~ UJ u. EC I u SE E u. •o c « 4> .E o- -i < c o is U OT 10 10 IB 0. 25 Wall 338 (W) 0.069 R-21 4.3.1-A6 New 26 Roof 7,023 0.031 R-30 4.2.1-A20 New 27 Slab 1,023 (N) 0.730 None 4.4.7-A1 New 28 Wall 128 (W) 0.069 R-21 4.3.1-A6 New 29 Roof 2,012 (N) 0.031 R-30 4.2.1-A20 New • 30 Slab 2,370 (N) 0.730 None 4.4.7-A1 New 37 Wall 254 (W) 0.069 R-21 4,3,1-A6 New 32 Wall 72 (S) 0.069 R-21 4.3.1-A6 New 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checkiist Fonn and take appropriate action to con'ect. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type Area {if) Orientation N, E, S, W Max U-Factor U-Factor Source Max (R)SHGC SHGC Source Overhang Conditions Status Pass Fall' • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 9 of 81 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Parti of3) ENV-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: El Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) Relocatable Public School Bldg. • Conditioned Spaces • Unconditioned Spaces • Skylight Area for Large Enclosed Space s 8000 ft^ (If checked include the ENV-4C with submittal) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component B Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Tag/iD Assembly Type c 2^ 3 m" o z u 4> > > 8i X O K CO UJ > o ot 111 u. £ > 2 ? X xi c « 4) .E a-o S--> < c o S <» V 3 o is O OT (0 10 IS CL 33 34 Slab 811 (N) 0.730 None 4.4.7-A1 New Roof 811 (N) 0.031 R-30 4.2.1-A20 New 35 36 37 38 39 40 Wall 1,724 (N) 0.069 R-21 4.3.1-A6 New Wall 3,125 (W) 0.069 R-21 4.3.1-A6 New Wall 2,197 (S) 0.069 R-21 4.3.1-A6 New Wall 1,786 (E) 0.069 R-21 4.3.1-A6 New Floor 17,838 (N) 0.269 None 4.4.6-A1 New Wall 2,935 (N) 0.069 R-21 4.3.1-A6 New 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type Area (ft') Orientation N, E, S, W Max U-Factor U-Factor Source Max (R)SHGC SHGC Source Overhang Conditions Status Pass Fail' • • • • • • • • • • • • • • • • • • • • • • • • • • O • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySofI User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 10 of 81 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Parti of3) ENV-1 C Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 166,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: El Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) Relocatable Public School Bldg. B Conditioned Spaces • Unconditioned Spaces • Skylight Area for Large Enclosed Space > 8000 ft (If checked include the ENV-4C with submittal) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component B Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly Type c 2^ SOT" 4> Uj" o z 4> O X K o X a 111 > O D> " .E 4) ^ « ^ IU 11, EC 4) .= 15 .2 c 0) c B u. >« T3 C •B 4» .E o. -> < c o .« « •O 3 o Is O OT 10 « (S Q. 47 Wall 3,140 (W) 0.069 R-21 4.3.1-A6 New 42 Wall 3,057 (S) 0.069 R-21 4.3.1-A6 New 43 Wall 3,411 (E) 0.069 R-21 4.3.1-A6 New 44 Floor 763 (N) 0.048 R-19 4.4.2-A4 New 45 Wall 2,398 (N) 0.069 R-21 4.3.1-A6 New 46 Wall 2,558 (W) 0.069 R-21 4.3.1-A6 New 47 Wall 2,611 (S) 0.069 R-21 4.3.1-A6 New 48 Wall 2,890 (E) 0.069 R-21 4.3.1-A6 New 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type Area (ft') Orientation N, E,S,W Max U-Factor U-Factor Source Max (R)SHGC SHGC Source Overhang Conditions Status Pass Fall' • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5-1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 11 of 81 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Parti of3) ENV-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 166,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) Relocatable Public School Bldg. Conditioned Spaces • Unconditioned Spaces • Skylight Area for Large Enclosed Space s 8000 ft^ (If checked include the ENV-4C with submittal) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component B Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly Type •a . Sm 4) IU U a u. 4) 8± lm O ~ 4> £3 K a UI > o a> 'EI .E § -K 3 IU u. X Is 4> B 15 S c is _>< •o C « 4> £ o. -> <. c o £ <» TJ 3 c IS o 3 o « tn a IB a 49 50 Roof 38,078 (N) 0,031 R-30 4.2.7-/120 New F/oorBG 3,640 (N) 0.730 None 4.4.7-A7 New 57 52 53 54 55 56 WallBG 1,256 (N) 0.820 None 4.3.6-D5 New WallBG 726 (N) 0.820 None 4.3.6-D5 New WallBG 614 (N) 0.820 None 4.3.6-D5 New WallBG 237 (N) 0.820 None 4.3.6-D5 New F/oorBG 558 (N) 0,730 None 4.4.7-A7 New WallBG 189 (N) 0,820 None 4.3.6-D5 New 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS 1? Max (R)SHGC 10 c Tag/ID Fenestration Type € a o> < Orlentat N. E, S, Max U-Factoi U-Factoi Source Max (R)SHGC SHGC Source Overhar Conditic Status Pass Fail' • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Fomn and take appropriate action to conect. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 12 of 81 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Parti of3) ENV-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) Relocatable Public School Bldg. • Conditioned Spaces • Unconditioned Spaces • Skylight Area for Large Enclosed Space > 8000 ft (If checked include the ENV-4C with submittal) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component B Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg FIELD INSPECTION ENERGY CHECKUST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly Type 3 OT" 0) IU o 4) > 5 a "7 O K X o ~ 4) ^2 H IS UJ > O Ol *- .E S) c IU U. K o 1:2 .2 c x> c « 4) .E o. o 9--> < c o is o in 10 10 a 0. 57 58 F/oorBG 462 (N) 0.730 None 4.4.7-A1 New WallBG 216 (N) 0.820 None 4.3.6-D5 New 59 60 67 62 63 64 FloorBG 793 (N) 0.730 None 4.4.7-A1 New FloorBG 2,450 (N) 0.730 None 4.4.7-A1 New WallBG 312 (N) 0.820 None 4.3.6-D5 New Wall 63 (E) 0.820 None 4.3.6-D5 New Door 21 (E) 0.500 Insul 4.5.1-A3 New Wall 790 (W) 0.069 R-27 4.3.7->i\6 New 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type Area (ft') Orientation N, E, S, W Max U-Factor U-Factor Source Max (R)SHGC SHGC Source Overhang Conditions Status Pass Fall' • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1. See instructions In the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 13 of 81 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Parti of3) ENV-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) Relocatable Public School Bldg. • Conditioned Spaces • Unconditioned Spaces • Skylight Area for Large Enclosed Space s 8000 ft^ (If checked include the ENV-4C with submittal) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component B Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg FIELD INSPECTION ENERGY CHECKUST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly Type 2^ 3 OT" 4) IU U IS u. 4) n I U E X o 'v: 4) 32 X IS UJ > O Ol 4> « 3 UJ u. •is 4) 3 1^ •a c e 4) .E o. -> < c o jg 10 Tl 3 o 3 O OT IS a. 65 66 Wall 773 (S) 0.069 R-21 4.3.1-A6 New Wall 103 (E) 0.069 R-21 4.3.1-A6 New 67 68 69 70 77 72 Slab 4,500 (N) 0.730 None 4.4.7-A1 New Roof 428 (N) 0.031 R-30 4.2.1-A20 New Wall 296 (NE) 0.069 R-21 4.3.1-A6 New Wall 192 (N) 0.069 R-21 4.3.1-A6 New Wall 154 (N) 0.069 R-21 4.3.1-A6 New Door 24 (N) 0.500 Insul 4.5.1-A3 New 1. See Instructions in the Nonresidential CompiiEince Manual, page 3-96. 2. If Fall, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/iD Fenestration Type s lm < Orientation N, E,S,W Max U-Factor U-Factor Source Max (R)SHGC SHGC Source Overhang Conditions Status Pass Fail' • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fall then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 14 of 81 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Parti of3) ENV-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Dale 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) Relocatable Public School Bldg. 13 Conditioned Spaces • Unconditioned Spaces • Skylight Area for Large Enclosed Space s 8000 ft^ (If checked include the ENV-4C with submittal) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component B Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg FIELD INSPECTION ENERGY CHECKUST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly Type c 2$ fOT 4> lU" o tl i2 4> IS "7 O X X I— o •C 4> £ 2 X IS UJ > O Ol " 2 4> " IU u. o i > ^ Ol 2 c X •a c •e 4> .E o. -3 < C O 1 s U OT a Q. 73 74 Wall 467 (S) 0.069 R-21 4.3.1-A6 New Roof 2,042 (N) 0.031 R-30 4.2.1-A20 New 75 76 77 78 79 80 Slab 3,286 (N) 0.730 None 4.4.7-A1 New Wall 44 (N) 0.069 R-21 4.3.1-A6 New Wall 337 (N) 0.069 R-21 4.3.1-A6 New Door 48 (N) 0.500 Insul 4.5.1-A3 New Wall 725 (E) 0,069 R-21 4.3,1-A6 New Wall 290 (S) 0.069 R-21 4.3.1-A6 New • 1. See Instmctions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type Area (ft') Orientation N, E, S, W Max U-Factor U-Factor Source Max (R)SHGC SHGC Source Overhang Conditions Status Pass Fail' • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1. See Instructions In the Nonresidential Compliance Manual, page 3-96. 2. if Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 15 of 81 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Parti of3) ENV-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2077 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) Relocatable Public School Bldg. B Conditioned Spaces • Unconditioned Spaces • Skylight Area for Large Enclosed Space s 8000 ft^ (If checked include the ENV-4C with submittal) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component B Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg FIELD INSPECTION ENERGY CHECKUST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly Type Area {ff) Orientation N, E,S,W U-Factor Cavity R-Value Exterior R-Value Exterior Furring' Interior R-Value Interior Furring' Joint Appendix 4 Condition Status Pass Fall' 87 Floor 440 (N) 0.269 None 4,4,6-A1 New • • 82 Wall 78 (W) 0.069 R-21 4,3,1-A6 New • • 83 Wall 66 (W) 0.069 R-21 4.3,1-A6 New • • 84 Wall 417 (S) 0.069 R-21 4.3.1-A6 New • • 85 Roof 152 (N) 0.037 R-30 4.2.1-A20 New • • 86 Floor 140 (N) 0269 None 4.4.6-A1 New • • 87 Wall 514 (W) 0.069 R-21 4.3.1-A6 New • • 88 Door 21 (W) 0.500 Insul 4.5.1-A3 New • • • • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS .15 Ol n c Tag/ID Fenestration Type Area (ft' Orlentat N, E,S, Max U-Factoi U-Factoi Source Max (R)SHG( SHGC Source Overhar Conditic Status Pass Fall' • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1. See Instructions In the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to con-ect. Verify building plans if necessary. EnergyPro 5.1 by EnergySofI User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 16 of 81 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 3) ENV-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 166,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: El Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) Relocatable Public School Bldg. Ea Conditioned Spaces • Unconditioned Spaces • Skylight Area for Large Enclosed Space s 8000 ft^ (If checked include the ENV-4C with submittal) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component B Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg FIELD INSPECTION ENERGY CHECKUST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly Type 2$ •a . |OT 4) IU o z 4) n • U K X O II UJ > O Ol »i « 3 UJ u. K O ii Ol 2 c X -o I i -> < c o i <" "O 3 o 3 o m 89 90 Wall 120 (N) 0.069 R-21 4.3.1-A6 New Door 21 (N) 0.500 Insul 4.5.1-A3 New 91 92 93 94 95 96 Wall 72 (S) 0.069 R-21 4.3.1-A6 New Floor 1,323 (N) 0.269 None 4.4.6-A 7 New Slab 12 (N) 0.730 None 4.4.7-A1 New Demising 420 (N) 0.356 None 4.3.1-A1 New Wall 90 (N) 0.069 R-21 4.3.1-A6 New Floor 496 (N) 0.269 None 4.4.6-A1 New 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fall, then describe on Page 2 of the Inspection Checklist Form and tcike appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type Area (ft') Orientation N, E,S,W Max U-Factor U-Factor Source Max (R)SHGC SHGC Source Overhang Conditions Status Pass Fall' • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 17 of 81 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Parti of3) ENV-1 C Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) Relocatable Public School Bldg. B Conditioned Spaces • Unconditioned Spaces • Skylight Area for Large Enclosed Space s 8000 ft^ (If checked include the ENV-4C with submittal) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component B Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly Type a £ c 2$ Sm O IU o z 4) fi O X c o ~ 41 X IS UJ > O Dl " 2 IU u. €s 15! X c « 41 £ o. o S- c o S IA •O 3 o is U OT 10 n IS a. 97 98 Wall 154 (N) 0,069 R-21 4,3,1-A6 New Wall 312 (E) 0.069 R-21 4.3.1-AO New 99 Floor 294 (N) 0.269 None 4.4.6-A1 New 100 Wall 758 (E) 0.069 R-21 4.3.1-A6 New 101 Wall 14 (N) 0.069 R-21 4.3.1-A6 New 102 Wall 14 (S) 0.069 R-21 4.3.1-A6 New 103 Floor 1,700 (N) 0.269 None 4.4.6-A1 New 104 Wall 97 (E) 0.069 R-21 4.3.1-A6 New 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type Area (ft') Orientation N, E, S, W Max U-Factor U-Factor Source Max (R)SHGC SHGC Source Overhang Conditions Status Pass Fall' • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fall then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 18 of 81 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Parti of3) ENV-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) Relocatable Public School Bldg. B Conditioned Spaces • Unconditioned Spaces • Skylight Area for Large Enclosed Space ^ 8000 ft^ (If checked include the ENV-4C with submittal) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component B Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg FIELD INSPECTION ENERGY CHECKUST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly Type .25 IS -|OT 4> uT oz IS 3 4) l> o — 4> ^2 X a UJ > O O) 'c .E 4> t H 3 IU u. O £ > ii Ol .2 c X •o c S 4) £ o. -> < c o S <" ^ 3 o is O OT 705 Floor 576 (N) 0,269 None 4.4,6-A1 New 106 Floor 567 (N) 0,269 None 4.4.6-A1 New 107 Floor 275 (N) 0.269 None 4.4.6-A1 New 108 Wall 330 (E) 0.069 R-21 4.3.1-A6 New 109 Wall 37 (N) 0.069 R-21 4.3.1-A6 New 110 Floor 328 (N) 0.269 None 4.4.6-A1 New 111 Wall 187 (E) 0.069 R-21 4.3.7-A6 New 772 Floor 260 (N) 0.269 None 4.4.6-A1 New 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to con-ect. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type Area {if) Orientation N, E, S, W Max U-Factor U-Factor Source Max (R)SHGC SHGC Source Overhang Conditions Status Pass Fail' • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPm 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 19 of 81 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 3) ENV-IC Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) Relocatable Public School Bldg. B Conditioned Spaces • Unconditioned Spaces • Skylight Area for Large Enclosed Space s 8000 ft (If checked include the ENV-4C with submittal) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component B Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg FIELD INSPECTION ENERGY CHECKUST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly Type |OT" 0> IU O Z u a u. 4) Ste X o ~ 4) £2 X IS UJ > O Ol X 3 IU u. .2 c 1 X •o c « 41 £ CL o 5- c o i « ^ 3 o 3 O OT 10 IS Q. 773 Wall 112 (E) 0,069 R-21 4,3,1-A6 New 114 Floor 256 (N) 0.269 None 4.4.6-A1 New 115 FloorBG 113 (N) 0.730 None 4.4.7-A1 New • • 776 FloorBG 188 (N) 0.730 None 4.4.7-A1 New 117 Wall 72 (E) 0.102 R-13 4.3.1-A3 New 118 Wall 72 (W) 0.102 R-13 4.3.1-A3 New 119 Wall 110 (N) 0.102 R-13 4.3.1-A3 New 120 FloorBG 59 (N) 0.730 None 4.4.7-A1 New 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type Area {if) Orientation N, E, S, W Max U-Factor U-Factor Source Max (R)SHGC SHGC Source Overhang Conditions Status Pass Fall' • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify buiiding plans if necessary. EnergyPro 5.1 by EnergySofI User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 20 of 81 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 3) ENV-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential El Hotel/Motel Guest Room • Schools (Public School) Relocatable Public School Bldg. B Conditioned Spaces • Unconditioned Spaces • Skylight Area for Large Enclosed Space s 8000 ft (If checked include the ENV-4C with submittal) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component B Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg FIELD INSPECTION ENERGY CHECKUST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly Type .25 |OT~ 4> IU o z u a u. 4> IS "T U X X o X IS UI > O Ol k. £ 4> ^ ^ 3 IU u. c o n Ol 2 C X •o c 4> £ o. -5 < c o jE « V 3 c ti o 3 O OT IS OL 727 Wall 51 (N) 0.069 R-21 4.3.1-A6 New 122 Wall 451 (E) 0.069 R-21 4.3.1-A6 New 123 Wall 418 (S) 0.069 R-21 4.3.1-A6 New 124 Door 63 (S) 0.500 Insul 4.5.1-A3 New 125 Floor 2,870 (N) 0.269 None 4.4.6-A1 New • 726 Wall 448 (E) 0.069 R-21 4.3.1-A6 New 127 Wall 234 (S) 0.069 R-27 4.3.7-A6 New 728 Wall 330 (E) 0.069 R-21 4.3.1-A6 New 1. See Instmctions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Forni and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS |5 Max (R)SHGC Ul 10 c Tag/iD Fenestration Type Area (ft' Orlentat N,E,S, Max U-Factoi U-Factoi Source Max (R)SHGC SHGC Source Overhar Conditic Status Pass Fail' • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1. See instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPm 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 21 of 81 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Parti of3) ENV-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 166,436 Addition Fioor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential Hotel/Motel Guest Room • Schools (Public School) Relocatable Public School Bldg. B Conditioned Spaces • Unconditioned Spaces • Skylight Area for Large Enclosed Space ^ 8000 ft^ (If checked include the ENV-4C with submittal) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component B Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg FIELD INSPECTION ENERGY CHECKUST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly Type c .2^ S OT 4> IU o z" o a u. 4> n • O X c o ™ 0) ^2 X a UJ > O Dl r .E 4> ? H 3 IU u. K o £ > ii Ol .2 c X •a c « 4> £ Q. o 2- c o is U OT « 10 729 Wall 204 (S) 0,069 R-21 4.3.7-A6 New 730 Roo^ 2,290 (N) 0.031 R-30 4.2.1-A20 New 131 Wall 179 (N) 0.069 R-21 4.3.1-A6 New 132 Door 21 (N) 0.500 Insul 4.5.1-A3 New 133 134 Floor 591 (N) 0.269 None 4.4.6-A 7 New Wall 174 (N) 0.069 R-21 4.3.1-A6 New 135 Wall 152 (N) 0.069 R-21 4.3.1-A6 New 136 Roof 591 (N) 0.031 R-30 4.2.1-A20 New 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. if Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/iD Fenestration Type Area (ft') Orientation N, E,S,W Max U-Factor U-Factor Source Max (R)SHGC SHGC Source Overhang Conditions Status Pass Fail' • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fall then describe on Page 2 of the Inspection Checklist Fomn and take appropriate action to correct. Verify building plans if necessary. EnergyPm 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 22 of 81 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Parti Of3) ENV-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 166,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. • Conditioned Spaces • Unconditioned Spaces • Skylight Area for Large Enclosed Space ^ 8000 ft (If checked include the ENV-4C with submittal) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component B Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg FIELD INSPECTION ENERGY CHECKUST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly Type £ < Orientation N, E, S, W U-Factor Cavity R-Value Exterior R-Value Exterior Furring' Interior R-Vaiue Interior Furring' Joint Appendix 4 Condition Status Pass "is u. 737 Floor 7,760 (N) 0.269 None 4.4.6-A7 New • • 738 Wall 304 (W) 0.069 R-21 4.3.7-A6 New • • 739 Wall 228 (W) 0069 R-21 4.3.7-A6 New • • 740 Wall 799 (W) 0.069 R-21 4.3.7-A6 New • • 747 Roof 7,490 (N) 0.037 R-30 4.2.7-A20 New • • 742 Wall 388 (N) 0069 R-21 4.3.7-A6 New • • 743 Door 27 (N) 0.500 Insul 4.5.7-A3 New • • 744 Wall 300 (E) 0.069 R-21 4.3.7-A6 New • • • • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type Atea {ff) Orientation N, E,S,W Max U-Factor U-Factor Source Max (R)SHGC SHGC Source Overhang Conditions Status Pass CM £ • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fall then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnemyPro 5.7 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page23ofei CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 3) ENV-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cartsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) Relocatable Public School _B!d£L B Conditioned Spaces • Unconditioned Spaces • Skylight Area for Large Enclosed Space s 8000 ft^ (If checked include the ENV-4C with submittal) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component B Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg FIELD INSPECTION ENERGY CHECKUST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly Type < c 55 I OT" 4) IU o z U X c o X IS UJ > O 81 4> UJ u. K •is ti Ol .2 c C IJ X •a c •S 4) £ o-OS- c o is U OT 10 IS a. 145 Wall 92 (W) 0.069 R-21 4.3.1-A6 New 146 Wall 182 (S) 0.069 R-21 4.3.1-A6 New 147 Wall 472 (N) 0.069 R-21 4.3.1-A6 New 148 Wall 261 (E) 0.069 R-21 4.3.1-A6 New 149 Wall 80 (W) 0.069 R-21 4.3.1-A6 New 150 Wall 159 (S) 0.069 R-21 4.3.1-A6 New 151 Roof 3,047 (N) 0.031 R-30 4.2.7-A20 New 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fall, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/iD Fenestration Type % IS 4) < Orientation N, E, S, W Max U-Factor U-Factor Source Max (R)SHGC SHGC Source Overhang Conditions Status Pass Fail' • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPm 5,1 by EnergySofI User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 24 of 81 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Part 2 of 3) ENV-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 ROOFING PRODUCT (COOL ROOFS) (Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or Performance Approach. CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS: Pass Fail^ N/A • Roofing compliance not required in Climate Zones 1 and16 with a Low-Sloped. 2:12 pitch or less. • • • • Roofing compliance not required in Climate Zone 1 with a Steep-Sloped with less than 5 Ib/ft'. Greater than 2:12 pitch. • • • p. Low-sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or SRI that have a U-factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV-2C. • • • PI Low-sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and themial emittance or SRI that have a U-factor of 0.048 or lower. See Opaque Surface Details roof assembly below, Column H of ENV-2C. • • • PI The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempted. Solar reflectance and thermal emittance or SRI, see spreadsheet calculator at www.enerav.ca.aov/tHI^^4/ • • • PI Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft' are exempt from the Cool Roof criteria below. • • • |-| High-rise residential buildings and hotels and motels with low-sloped roofs in Climate Zones 1 through 9,12 and 16 are exempted from the low-sloped roofing criteria. • • • 1. If Fall then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans If necessary. CRRC Product ID Number' Roof Slope s 2:12 >2:12 Product Weight < 5lt>/ft' i Stoltf Product Type' Aged Solar Reflectance' Thermal Emmitance SRI' Pass Fail* • • • • • • • • • • U* • • • • • • u* • • • • • • u* • • • • • • u* • • • • • • u* • • 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at www.coolroofs.ora/products/search.php 2. Indicate the type of product is being used for the roof top, i.e. single-ply roof, asphalt roof, metal roof, etc. 3. If the Aged Reflectance is not available in the Cooi Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the same directory and use the equation (0.2+0.7(piniM - 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool Roof Rating Council's Rated Product Directory. 4. Check box if the Aged Reflectance is a calculated vaiue using the equation above. 5. The SRI vaiue needs to be calculated from a spreadsheet calculator at http7/www.enerqv.ca.aov/title24/ 6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans If necessary. To apply Liquid Fleld Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(1)4. Select the applicable coating: • Aluminum-Pigmented Asphalt Roof Coating • Cement-Based Roof Coating • Other Discrepancies: EnergyPm 5.1 by EnemySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 25 of 81 CERTIFICATE OF COMPLIANCE (Part 3 of 3) AND FIELD INSPECTION ENERGY CHECKLIST ENV-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Required Acceptance Tests Designer: This form is to be used by tfie designer and attaclied to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the site-built fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies pians, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV-2A for each different fenestration product line musl be provided to the owner of the building for their records. Test Description ENV-2A Test Performed By: Fenestration Products Name or ID Requiring Testing or Verification Area of like Products Building Envelope Acceptance Test r24 Code Minimum (Carisbad) 77,963 e • • • • • • • • • • • • • • • • • • • • • • • • • EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 26 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti of4) MECH-IC Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2077 Project Address Cadsbad Climate Zone Total Cond. Floor Area 166,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. El Conditioned Spaces P, Unconditioned Spaces *-* (affidavit) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component Q Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or In Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Meets Criteria or Requirements Equipment^ Inspection Criteria Pass Fall - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) BAC FXV-644 • • Equipment Type^: n/a Cooling Tower • • Number of Systems 2 • • Max Allowed Heating Capacity^ n/a • • Minimum Heating Efficiency' n/a • • Max Allowed Cooling Capacity' 215 tons • • Cooling Efficiency' 10 °F Approach • • Duct Location/ R-Value n/a • • When duct testing is required, submit MECH-4A & MECH-4-HERS n/a • • Economizer n/a • • Thermostat n/a • • Fan Control n/a • • Equipment^ Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) Lochinvar Corp. CHN0991 • • Equipment Type^: Gas Fired HW Boiler • • Number of Systems 2 • • Max Allowed Heating Capacity' 990,000 Btu/hr • • Minimum Heating Efficiency' 85% • • Max Allowed Cooling Capacity' n/a • • Cooling Efficiency' n/a • • Duct Location/ R-Value n/a • • When duct testing is required, submit MECH-4A & MECH-4-HERS n/a • • Economizer n/a • • Thermostat n/a • • Fan Control n/a • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails If a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 27 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 4) MECH-IC Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. B Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope TDV Energy • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Meets Criteria or Requirements Equipment^ Inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) DHW Heater • • Equipment Type^: Gas Fired DHW Boiler • • Number of Systems 2 • • Max Allowed Heating Capacity' 1,440,000 Btu/hr • • Minimum Heating Efficiency' 85% • • Max Allowed Cooling Capacity' n/a • • Cooling Efficiency' n/a • • Duct Location/ R-Value n/a • • When duct testing is required, submit MECH-4A & MECH-4-HERS n/a • • Economizer n/a • • Thermostat n/a • • Fan Control n/a • • Equipment^ inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment^ inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) RTU-1 • • Equipment Type^: Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 101,000 Btu/hr • • Minimum Heating Efficiency' 80% AFUE • • Max Allowed Cooling Capacity' 49,800 Btu/hr • • Cooiing Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity Is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails If a Fall box is checked. 3. Indteate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPm 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 28 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti Of4) MECH-IC Project Name Hilton Cartsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. B Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: El New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope TDV Energy • Unconditioned (file affidavit) Front Orientation: N, E, S, W or In Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Meets Criteria or Requirements Equipment^ Inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) RTU-2 • • Equipment Type^: Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 101,000 Btu/hr • • Minimum Heating Efficiency' 80% AFUE • • Max Allowed Cooling Capacity' 49,800 Btu/hr • • Cooling Efficiency^ 13.0 SEER/11.0 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) RTU-S • • Equipment Type^: Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 148,000 Btu/hr • • Minimum Heating Efficiency' 82% AFUE • • Max Allowed Cooling Capacity' 91,800 Btu/hr • • Cooling Efficiency' 11.0 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer Fixed Temp (Integrated) • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity Is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fall box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 29 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti of4) MECH-IC Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. B Conditioned Spaces P, Unconditioned Spaces *-* (affidavit) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component • Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Meets Criteria or Requirements Equipment^ inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) RTU-4 • • Equipment Type^: Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 101,000 Btu/hr • • Minimum Heating Efficiency' 80% AFUE • • Max Allowed Cooling Capacity' 49,800 Btu/hr • • Cooling Efficiency' 13,0 SEER/11.0 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • FIELD INSPECTION ENERGY CHECKLIST Equipment^ inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) RTU-5 • • Equipment Type^: Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 101,000 Btu/hr • • Minimum Heating Efficiency' 80% AFUE • • Max Allowed Cooling Capacity' 49,800 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.7 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 30 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti of4) MECH-IC Project Name Hilton Cartsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. B Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope TDV Energy • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Equipment^ inspection Criteria Meets Criteria or Requirements Equipment^ inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) RTU-6 • • Equipment Type^: Packaged DX • • Number of Svstems 1 • • Max Allowed Heatino Capacity' 148,000 Btu/hr • • Minimum Heating Efficiency' 82% AFUE • • Max Allowed Cooling Capacity' 91,800 Btu/hr • • Cooling Efficiency' 11.0 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer Fixed Temp (Integrated) • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment^ inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment^ inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) RTU-7 • • Equipment Type^: Packaged DX • • Number of Svstems 1 • • Max Allowed Heating Capacity' 101,000 Btu/hr • • Minimum Heating Efficiency' 80% AFUE • • Max Allowed Cooling Capacity' 49,800 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or olher. EnergyPro 5,1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 31 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 4) MECH-IC Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. B Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance: • Component PJ Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Meets Criteria or Requirements Equipment^ inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) RTU-8 • • Equipment Type^: Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 101,000 Btu/hr • • Minimum Heating Efficiency' 80% AFUE • • Max Allowed Cooling Capacity' 49,800 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • FIELD INSPECTION ENERGY CHECKLIST Equipment^ inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) RTU-9 • • Equipment Type^: Packaged DX • • Number of Svstems 1 • • Max Allowed Heating Capacity' 205,000 Btu/hr • • Minimum Heating Efficiency' 80% AFUE • • Max Allowed Cooling Capacity' 152,100 Btu/hr • • Cooiing Efficiency' 11.0 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer Fixed Temp (Integrated) • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual Installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5,1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 32 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 Of 4) MECH-IC Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cartsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. B Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment" inspection Criteria Meets Criteria or Requirements Equipment" inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) RTU-10 • • Equipment Type': Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 120,000 Btu/hr • • Minimum Heating Efficiency' 80% AFUE • • Max Allowed Cooling Capacity' 79,400 Btu/hr • • Cooling Efficiency' 11.0 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer Fixed Temp (Integrated) • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment" inspection Criteria FIELD INSPECTION ENERGY CHECKUST Equipment" inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) RTU-11 • • Equipment Type': Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 101,000 Btu/hr • • Minimum Heating Efficiency' 80% AFUE • • Max Allowed Cooling Capacity' 65,700 Btu/hr • • Cooling Efficiency' 10.8 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to inciude the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode; 2011-05-23711:05:22 ID: 379-007 Page 33 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 4) MECH-IC Project Name Hilton Cartsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. • Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component PJ Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment" inspection Criteria Meets Criteria or Requirements Equipment" inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) RTU-12 • • Equipment Type': Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 101,000 Btu/hr • • Minimum Heating Efficiency' 80% AFUE • • Max Allowed Cooling Capacity' 49,800 Btu/hr • • Cooling Efficiency' 13,0 SEER/11.0 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4.HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment" Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment" Inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-1 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 215 • • Max Allowed Heating Capacity' 11,600 Btu/hr • • Minimum Heating Efficiency' 4.20 COP • • Max Allowed Cooling Capacity' 8,600 Btu/hr • • Cooling Efficiency' 13.4 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4.HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or spilt), Hydronic, PTAC, or other. EnergyPm 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 34 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 4) MECH-IC Project Name Hilton Cadsbad Oceanfront Resort and Spa Dale 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. B Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: EI New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLiST Equipment" inspection Criteria Meets Criteria or Requirements Equipment" inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-3 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 45,200 Btu/hr • • Minimum Heating Efficiency' 4.40 COP • • Max Allowed Cooling Capacity' 35,300 Btu/hr • • Cooling Efficiency' 13.5 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment" inspection Criteria FIELD INSPECTION ENERGY CHECKUST Equipment" inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-4 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 55,900 Btu/hr • • Minimum Heating Efficiency' 4.70 COP • • Max Allowed Cooling Capacity' 49,500 Btu/hr • • Cooling Efficiency' 13.3 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shail resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPm 5.7 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 35 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti of4) MECH-IC Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2077 Project Address Cartsbad Climate Zone Total Cond. Fioor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. B Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Meets Criteria or Requirements Equipment" Inspection Criteria Pass Fall - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-5 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 28,500 Btu/hr • • Minimum Heating Efficiency' 4.70 COP • • Max Allowed Cooling Capacity' 24,400 Btu/hr • • Cooling Efficiency' 13.5 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • FIELD INSPECTION ENERGY CHECKUST Equipment" inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-6 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 21,500 Btu/hr • • Minimum Heating Efficiency' 5.00 COP • • Max Allowed Cooling Capacity' 18,300 Btu/hr • • Cooling Efficiency' 14.3 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 36 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti Of4) MECH-IC Project Name Hilton Cartsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. • Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component PI Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Equipment" inspection Criteria Meets Criteria or Requirements Equipment" inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-7 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 55,900 Btu/hr • • Minimum Heating Efficiency' 4.70 COP • • Max Allowed Cooling Capacity' 49,500 Btu/hr • • Cooling Efficiency' 13.3 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment" inspection Criteria FIELD INSPECTION ENERGY CHECKUST Equipment" inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-8, 9, 10 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 3 • • Max Allowed Heating Capacity' 77,000 Btu/hr • • Minimum Heating Efficiency' 4.30 COP • • Max Allowed Cooling Capacity' 60,400 Btu/hr • • Cooling Efficiency' 13.4 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. if the Actual Installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fall box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5,1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 37 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 4) MECH-1 C Project Name Hilton Cartsbad Oceanfront Resort and Spa Date 5/23/2077 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. B Conditioned Spaces _, Unconditioned Spaces *-* (affidavit) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component Pl Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Equipment" Inspection Criteria Meets Criteria or Requirements Equipment" Inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-77, 72, 73 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 3 • • Max Allowed Heating Capacity' 77,000 Btu/hr • • Minimum Heating Efficiency' 4.30 COP • • Max Allowed Cooling Capacity' 60,400 Btu/hr • • Cooling Efficiency' 13.4 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment" inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment" inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-74, 15 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 2 • • Max Allowed Heating Capacity' 45,200 Btu/hr • • Minimum Heating Efficiency' 4.40 COP • • Max Allowed Cooling Capacity' 35,300 Btu/hr • • Cooling Efficiency' 13.5 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. if the Actual Installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 38 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 4) MECH-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. B Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component PI Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment" inspection Criteria Meets Criteria or Requirements Equipment" inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-16 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 21,500 Btu/hr • • Minimum Heating Efficiency' 5.00 COP • • Max Allowed Cooling Capacity' 18,300 Btu/hr • • Cooling Efficiency' 14.3 EER • • Duct Location/ R-Value Conditioned / 8.0 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment" inspection Criteria FIELD INSPECTION ENERGY CHECKUST Equipment" inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-77 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 55,900 Btu/hr • • Minimum Heating Efficiency' 4.70 COP • • Max Allowed Cooling Capacity' 49,500 Btu/hr • • Cooling Efficiency' 13.3 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Fomi. Compliance fails if a Fall box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.7 bv EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 39 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 4) MECH-IC Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. B Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component PI Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or In Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Meets Criteria or Requirements Equipment" Inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-18 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 55,900 Btu/hr • • Minimum Heating Efficiency' 4.70 COP • • Max Allowed Coolinq Capacity' 49,500 Btu/hr • • Cooling Efficiency' 13,3 EER • • Duct Location/ R-Value Conditioned / 4,2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • FIELD INSPECTION ENERGY CHECKUST Equipment" inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-19 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 55,900 Btu/hr • • Minimum Heating Efficiency' 4.70 COP • • Max Allowed Cooling Capacity' 49,500 Btu/hr • • Cooling Efficiency' 13.3 EER • • Duct Location/ R-Value Conditioned / 8.0 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. if the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPm 5,1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 40 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 4) MECH-IC Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2077 Project Address Cadsbad Climate Zone Total Cond. Fioor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. B Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope TDV Energy • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Equipment" Inspection Criteria Meets Criteria or Requirements Equipment" Inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-20 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 11,600 Btu/hr • • Minimum Heating Efficiency' 4.20 COP • • Max Allowed Cooling Capacity' 8,600 Btu/hr • • Cooling Efficiency' 13.4 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment" Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment" Inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-S7 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 15,200 Btu/hr • • Minimum Heating Efficiency' 4.30 COP • • Max Allowed Cooling Capacity' 12,300 Btu/hr • • Cooling Efficiency' 13.5 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. if the Actual installed equipment performance efficiency and capacity Is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Fomn. Compliance fails if a Fall box is checked. 3. indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 41 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti of4) MECH-IC Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. B Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope TDV Energy • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Equipment" inspection Criteria Meets Criteria or Requirements Equipment" inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-S2 • • Equipment Type': Hydronic Heat Pump • • Number of Svstems 1 • • Max Allowed Heating Capacity' 15,200 Btu/hr • • Minimum Heating Efficiency' 4.30 COP • • Max Allowed Cooling Capacity' 12,300 Btu/hr • • Cooling Efficiency' 13.5 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment" inspection Criteria FIELD INSPECTION ENERGY CHECKUST Equipment" inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-S3 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 55,900 Btu/hr • • Minimum Heating Efficiency' 4.70 COP • • Max Allowed Cooling Capacity' 49,500 Btu/hr • • Cooling Efficiency' 13.3 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the buikiing plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fall box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPm 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 42 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti Of4) MECH-IC Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. B Conditioned Spaces PI Unconditioned Spaces *-* (affidavit) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component PJ Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment" inspection Criteria Meets Criteria or Requirements Equipment" inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-S4 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 21,500 Btu/hr • • Minimum Heating Efficiency' 5.00 COP • • Max Allowed Cooling Capacity' 18,300 Btu/hr • • Cooling Efficiency' 14.3 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment" inspection Criteria FIELD INSPECTION ENERGY CHECKUST Equipment" inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-S5 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 28,500 Btu/hr • • Minimum Heating Efficiency' 4.70 COP • • Max Allowed Cooling Capacity' 24,400 Btu/hr • • Cooling Efficiency' 13.5 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 43 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti Of4) MECH-IC Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2077 Project Address Cadsbad Climate Zone Total Cond. Fioor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. B Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope TDV Energy • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Equipment" inspection Criteria Meets Criteria or Requirements Equipment" inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-S6 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 15,200 Btu/hr • • Minimum Heating Efficiency' 4.30 COP • • Max Allowed Cooling Capacity' 12,300 Btu/hr • • Cooling Efficiency' 13.5 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment" Inspection Criteria FIELD INSPECTION ENERGY CHECKUST Equipment" Inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-S7 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 11,600 Btu/hr • • Minimum Heating Efficiency' 4.20 COP • • Max Allowed Cooling Capacity' 8,600 Btu/hr • • Cooiing Effteiency' 13.4 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 44 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 4) MECH-IC Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cartsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. B Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component PI Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or In Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Equipment" Inspection Criteria Meets Criteria or Requirements Equipment" Inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-S8 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 11,600 Btu/hr • • Minimum Heating Efficiency' 4.20 COP • • Max Allowed Cooling Capacity' 8,600 Btu/hr • • Cooling Efficiency' 13.4 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment" Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment" Inspection Criteria Pass Fail - Descritte Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) /AC-7/OAC-7 • • Equipment Type': Sp//f DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 0 Btu/hr • • Minimum Heating Efficiency' n/a • • Max Allowed Cooling Capacity' 17.000 Btu/hr • • Cooling Efficiency' 13.0 SEER/10.0 EER • • Duct Location/ R-Value n/a • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fall box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 45 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 Of 4) MECH-IC Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2011 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: Ci New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope TDV Energy • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Equipment" inspection Criteria Meets Criteria or Requirements Equipment" inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) IAC-2/OAC-2 • • Equipment Type': Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 0 Btu/hr • • Minimum Heating Efficiency' n/a • • Max Allowed Cooling Capacity' 17,000 Btu/hr • • Cooling Efficiency' 13.0 SEER/10.0 EER • • Duct Location/ R-Value n/a • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment" Inspection Criteria FIELD INSPECTION ENERGY CHECKUST Equipment" Inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) /AC-3/OAC-3 • • Equipment Type': Sp//f DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 0 Btu/hr • • Minimum Heating Efficiency' n/a • • Max Allowed Cooling Capacity' 17.000 Btu/hr • • Cooling Efficiency' 13.0 SEER/10.0 EER • • Duct Location/ R-Value n/a • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 46 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti Of4) MECH-IC Project Name Hilton Cartsbad Oceanfront Resort and Spa Date 5/23/2077 Project Address Cartsbad Climate Zone Total Cond. Floor Area 166,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential B Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. B Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: El New Construction • Addition • Alteration Approach of Compliance: • Component PI Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLiST Equipment" inspection Criteria Meets Criteria or Requirements Equipment" inspection Criteria Pass Fail - Descril>e Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) AHU-1 • • Equipment Type': Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 123.000 Btu/hr • • Minimum Heating Efficiency' 80% AFUE • • Max Allowed Cooling Capacity' 84,000 Btu/hr • • Cooling Efficiency' 10.0 EER • • Duct Location/ R-Value Outdoors/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer 100% Outside Air • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment" inspection Criteria FIELD INSPECTION ENERGY CHECKUST Equipment" inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) AHU-2 • • Equipment Type': Packaged DX • • Number of Systems 1 • • Max Allowed Heatinq Capacity' 164,000 Btu/hr • • Minimum Heating Efficiency' 80% AFUE • • Max Allowed Cooling Capacity' 96,000 Btu/hr • • Cooling Efficiency' 10.0 EER • • Duct Location/ R-Value Outdoors/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer 100% Outside Air • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fall box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 47 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti Of4) MECH-IC Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2077 Project Address Cadsbad Climate Zone Total Cond. Floor Area 766,436 Addition Floor Area n/a GENERAL INFORMATION Building Type: EI Nonresidential • High-Rise Residential El Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. B Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: B New Construction • Addition • Alteration Approach of Compliance: • Component PI Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment" Inspection Criteria Meets Criteria or Requirements Equipment" Inspection Criteria Pass Fail - Describe Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) AHU-3 • • Equipment Type': Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 164.000 Btu/hr • • Minimum Heating Efficiency' 80% AFUE • • Max Allowed Cooling Capacity' 96.000 Btu/hr • • Cooling Efficiency' 10.0 EER • • Duct Location/ R-Value Outdoors/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer 100% Outside Air • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment" inspection Criteria FIELD INSPECTION ENERGY CHECKUST Equipment" inspection Criteria Pass Fail - Descrit>e Reason" Item or System Tags (i.e. AC-1, RTU-1, HP-1) AHU-4 • • Equipment Type': Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 164.000 Btu/hr • • Minimum Heating Efficiency' 80% AFUE • • Max Allowed Cooling Capacity' 120.000 Btu/hr • • Cooling Efficiency' 10.0 EER • • Duct Location/ R-Value Outdoors/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer 100% Outside Air • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 48 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 2 Of 4) MECH-IC Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2011 Discrepancies: EnergyPm 5.1 bv EnemvSofi User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Paae 49 of 81 CERTIFICATE OF COMPUANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 4) MECH-1 C Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2011 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space-conditioning system serving a building or space is operated for normal use, ali control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. The MECH-1 C torm is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked-off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans, specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title-24 Part 6. The building inspector must receive the properly filled out and signed forms before the building can receive final occupancy. TEST DESCRIPTION MECH-2A MECH-3A MECH-4A MECH-5A MECH-6A MECH-7A MECH-8A MECH-9A MECH-1 OA MECH-11A Equipment Requiring Testing or Verification Qty. Outdoor Ventilation For VAV & CAV Constant Volume & Single-Zone Unitary Air Distribution Ducts Economizer Controls Demand Control Ventilation DCV Supply Fan VAV Valve Leakage Test Supply Water Temp. Reset Hydronic System Variable Flow Control Automatic Demand Shed Control BAC FXV-644 2 • • • • • • El • • • Lochinvar Corp. CHN0991 2 • • • • • • B B • • Canier 48TCA005 7 El El • • • • • • • • Carrier 48TCA008 7 El • B • • • • • Carrier 48TCA008 7 • Q • • • • • • Carrier 48TCA014 7 Ei • B • • • • • • Canier 48TCA007 7 Ei • B B • • • • • Canier 48TCA006 7 El • • • • • • • • Climatemaster TCV/TCH009 278 El El • • • • • • • • Climatemaster TCV/TCH036 3 Ei Ei • • • • • • • • Climatemaster TCV/TCH048 6 El El • • • • • • • • Climatemaster TCV/TCH024 2 El El • • • • • • • • Climatemaster TCV/TCH018 3 El El • • • • • • • • Climatemaster TCV/TCH060 6 El El • • • • • • • • Enemy Pro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Paqe 50 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 4) MECH-1 C Project Name Hilton Cadsbad Oceanfront Resort and Spa Date 5/23/2011 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space-conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked-off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans, specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title-24 Part 6. The building inspector must receive the properly filled out and signed forms before the building can receive final occupancy. TEST DESCRIPTION MECH-2A MECH-3A MECH-4A MECH-5A MECH-6A MECH-7A MECH-8A MECH-9A MECH-1 OA MECH-11A Equipment Requiring Testing or Verification Qty. Outdoor Ventilation For VAV & CAV Constant Volume & Single-Zone Unitary Air Distribution Ducts Economizer Controls Demand Control Ventilation DCV Supply Fan VAV Valve Leakage Test Supply Water Temp. Reset Hydronic System Variable Flow Control Automatic Demand Shed Control Climatemaster TCV/TCH012 3 E El • • • • • • • • Canier 38HDF018 3 B El • • • • • • • • AHU-1 Reznor RDCB 7 B El • • • • • • • • AHU-2 Reznor RDCB 7 B El • • • • • • • • AHU-3 Reznor RDCB 7 B B • • • • • • • • AHU-4 Reznor RDCB 7 B B • • • • • • • • • • • • • • • • • • • • n • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • EnemvPm 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Paae 51 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 4) MECH-1 C Project Name Date Hilton Carlsbad Oceanfront Resort and Spa 5/23/2011 TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-15A Equipment Requiring Testing Qty. Fault Detection & Diagnostics for DX Units Automatic Fault Detection & Diagnostics for Air & Zone Distributed Energy Storage DX AC Systems Thermal Energy Storage (TES) Systems Test Perfonned By: BAC FXV-644 2 • • • • Lochinvar Corp. CHN0991 2 • • • • Can-ier 48TCA005 7 • • • • Carrier 48TCA008 7 • • • • Carrier 48TCA008 7 • • • • Carrier 48TCA014 7 • • • • Can-ier 48TCA007 7 • • • • Can-ier 48TCA006 7 • • • • Climatemaster TCV/TCH009 278 • • • • Climatemaster TCV/TCH036 3 • • • • Climatemaster TCV/TCH048 6 • • • • Climatemaster TCV/TCH024 2 • • • • Climatemaster TCV/TCH018 3 • • • • Climatemaster TCV/TCH060 6 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • EnergyPro 5,1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 52 of 81 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 4) MECH-1 C Project Name Date Hilton Carlsbad Oceanfront Resort and Spa 5/23/2011 TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-15A Equipment Requiring Testing Qty. Fault Detection & Diagnostics for DX Units Automatic Fault Detection & Diagnostics for Air & Zone Distributed Energy Storage DX AC Systems Thermal Energy Storage (TES) Systems Test Performed By: Climatemaster TCV/TCH012 3 • • • • Carrier 38HDF018 3 • • • • AHU-1 Reznor RDCB 7 • • • • AHU-2 Reznor RDCB 7 • • • • AHU-3 Reznor RDCB 7 • • • • AHU-4 Reznor RDCB 7 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • EnergyPro 5,1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page53of81 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Hilton Carlsbad Oceanfront Resort and Spa 5/23/2011 item or System Tags (i.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) item or System Tags (i.e. AC-1, RTU-1, HP-1) RTU-1 RTU-2 R7U-3 Number of Systems 1 1 7 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 80% AFUE 80% AFUE 82% AFUE MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13.0 SEER/11.0 EER 13.0 SEER/11.0 EER 11.0 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 600 cfm 500 cfm 1,050 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Gravity Gravity Gravity MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Conditioned / 4.2 Conditioned / 4.2 Conditioned / 4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 101,000 mu/hr 101,000 Btu/hr 148,000 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 33,965 Btu/hr 33,777 Btu/hr 86.922 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer Fixed Temp (Integrated) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this projecf exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exceptlon(s) to §144(g) apply. EnergyPm 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 54 of 87 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Hilton Cadsbad Oceanfront Resort and Spa 5/23/2011 item or System Tags (i.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) item or System Tags (i.e. AC-1, RTU-1, HP-1) RTU-4 RTU-5 RTU-6 Number of Systems 1 1 7 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value indicate Page Reference on Pians or Scheduie and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 80% AFUE 80% AFUE 82% AFUE MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13.0 SEER/11.0 EER 13.0 SEER/11.0 EER 11.0 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 500 cfm 600 cfm 700 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Gravity Gravity Gravity MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Conditioned / 4.2 Conditioned / 4.2 Conditioned / 4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 101,000 Btu/hr 101.000 Btu/hr 148,000 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 33,777 Btu/hr 34,102 Btu/hr 91,177 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) No No Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer Fixed Temp (Integrated) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(i) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144ik) No No No 1. Total installed capacity (MBtu/hr) of ali electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exceptlon(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 10:379-007 Page55of81 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Hilton Carlsbad Oceanfront Resort and Spa 5/23/2011 item or System Tags (i.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) item or System Tags (i.e. AC-1, RTU-1, HP-1) RTU-7 RTU-8 RTU-9 Number of Systems 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value indicate Pai je Reference on Pians or Scheduie and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 80% AFUE 80% AFUE 80% AFUE MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13.0 SEER/11.0 EER 13.0 SEER/11.0 EER 11.0 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 800 cfm 700 dm 700 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122ie) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required Setback Requimd MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Gravity Gravity Gravity MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Conditioned / 4.2 Conditioned / 4.2 Conditioned / 4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Cetpaclty Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Cetpaclty Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 101,000 Btu/hr 101,000 Btu/hr 205,000 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Cetpaclty Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Cetpaclty Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 36,821 Btu/hr 35,917 Btu/hr 102,134 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Cetpaclty Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Cetpaclty Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Cetpaclty Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Cetpaclty Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Cetpaclty Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer Fixed Temp (Integrated) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Cetpaclty Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Cetpaclty Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Cetpaclty Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Cetpaclty Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Cetpaclty Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exceptlon(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 10:379-007 Page 56 of 81 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Hilton Cadsbad Oceanfront Resort and Spa 5/23/2011 item or System Tags (i.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) item or System Tags (i.e. AC-1, RTU-1, HP-1) RTU-10 RTU-11 RTU-12 Number of Systems 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value indicate Page Reference on Pians or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 80% AFUE 80% AFUE 80% AFUE MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 11.0 EER 10.8 EER 13.0 SEER/11.0 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 600 cfm 600 cfm 425 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) Yes No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Requimd Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Gravity Gravity Gravity MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Conditioned / 4.2 Conditioned / 4.2 Conditioned / 4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 120,000 Btu/hr 101,000 Btu/hr 101.000 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 59,831 Btu/hr 57,340 Btu/hr 33,935 Btu/hr . Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) Fixed Temp (Integrated) No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps, if electric heat Is used explain which exception{s) to §144(g) apply. EnergyPm 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 57 of 81 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Hilton Cadsbad Oceanfront Resort and Spa 5/23/2011 item or System Tags (i.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-1 HP-3 HP-4 Number of Systems 215 1 7 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value indicate Pai 36 Reference on Plans or Scheduie and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 4.20 COP 4.40 COP 4.70 COP MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 73.4 EER 13.5 EER 13.3 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) Ocfm 550 cfm Ocfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Pmgrammable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Reguimd Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Gravity Gravity Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Conditioned / 4.2 Conditioned / 4.2 Conditioned / 4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heaf Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heaf Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 2,150,314 Btu/hr 43.431 Btu/hr 48,116 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heaf Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heaf Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 1,629,988 Btu/hr 28,100 Btu/hr 43,178 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heaf Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heaf Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heaf Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heaf Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heaf Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heaf Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heaf Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heaf Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heaf Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heaf Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. £ne;gyPro5.7 byEnerjjySofif User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page58of81 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Hilton Cadsbad Oceanfront Resort and Spa 5/23/2011 item or System Tags (i.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-5 HP-6 HP-7 Number of Systems 7 1 7 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value indicate Paj 36 Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 4.70 COP 5.00 COP 4.70 COP MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 73.5 EER 14.3 EER 73.3 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) Ocfm 150 cfm 400 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Pmgrammable Svritch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required Setback Requimd MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Auto Gravity Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Conditioned / 4.2 Conditioned / 4.2 Conditioned / 4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sonsor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sonsor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 24,560 Btu/hr 19,870 Btu/hr 51,691 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sonsor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sonsor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 21,887 Btu/hr 15,195 Btu/hr 28,032 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sonsor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sonsor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sonsor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sonsor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sonsor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sonsor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sonsor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sonsor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sonsor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(i) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sonsor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacrty (MBtu/hr) of all electric heat on this projecl exclusive of electric auxiliary heaf for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 59 of 81 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Hilton Carlsbad Oceanfront Resort and Spa 5/23/2011 item or System Tags (i.e. AC-1, RTU-1, HP-1) indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-8, 9, 70 HP-77, 72, 73 HP-74, 75 Number of Systems 3 3 2 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value Indicate Pa( je Reference on Plans or Scheduie and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 4.30 COP 4.30 COP 4.40 COP MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 73.4 EER 73.4 EER 73.5 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 2,497 cfm 900 cfm 400 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Pmgrammable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Gravity Gravity Gravity MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Naturai Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Conditioned / 4.2 Conditioned / 4.2 Conditioned / 4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 222,723 Btu/hr 207,459 Btu/hr 81,388 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 133,548 Btu/hr 143,360 Btu/hr 56,481 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total Installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 10:379-007 Page60of81 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Hilton Cadsbad Oceanfront Resort and Spa 5/23/2011 Item or System Tags (i.e. AC-1, RTU-1, HP-1) indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-16 HP-17 HP-18 Number of Systems 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value Indicate Page Reference on Pians or Scheduie and indicate the applicabie exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 5.00 COP 4.70 COP 4.70 COP MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 14.3 EER 13.3 EER 13.3 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) Ocfm 350 cfm 250 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Programmable Switch Pmgrammable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required Setback Requimd MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Gravity Gravity Gravity MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Conditioned / 8.0 Conditioned / 4.2 Conditioned / 4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 18,478 Btu/hr 51,127 Btu/hr 50,280 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 16,358 Btu/hr 39,874 Btu/hr 40,810 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(0) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exceptlon(s) to §144(g) appiy. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 10:379-007 Page61of81 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Hilton Carlsbad Oceanfront Resort and Spa 5/23/2011 item or System Tags (i.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-19 HP-20 HP-S7 Number of Systems 1 1 7 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value indicate Pai 3e Reference on Pians or Scheduie and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 4.70 COP 4.20 COP 4.30 COP MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 73.3 EER 13.4 EER 73.5 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 250 cfm Ocfm 100 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Pmgrammable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Requimd Setback Required Setback Requimd MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Gravity Gravity Gravity MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Conditioned / 8.0 Conditioned / 4.2 Conditioned / 4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 50,369 Btu/hr 11,146 Btu/hr 14,035 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 39,078 Btu/hr 6,363 Btu/hr 8,946 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 10:379-007 Page62of81 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Dafe Hilton Cadsbad Oceanfront Resort and Spa 5/23/2011 Item or System Tags (i.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-S2 HP-S3 HP-S4 Number of Systems 7 1 7 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Confrol Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value indicate Pa; ]e Reference on Plans or Scheduie and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Confrol Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Confrol Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 4.30 COP 4.70 COP 5.00 COP MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Confrol Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 73.5 EER 13.3 EER 74.3 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Confrol Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Confrol Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Confrol Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Confrol Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 150 cfm 800 cfm 200 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Confrol Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Confrol Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Confrol Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Confrol Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required Setback Requimd MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Confrol Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Gravity Gravity Gravity MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Confrol Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Confrol Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Confrol Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Conditioned / 4.2 Conditioned / 4.2 Conditioned / 4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 14,499 Btu/hr 54,979 Btu/hr 20,287 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 8,939 Btu/hr 37,678 Btu/hr 15,400 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of ali electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnemyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 10:379-007 Page63of81 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Hilton Cadsbad Oceanfront Resort and Spa 5/23/2011 Item or System Tags (i.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-S5 HP-S6 HP-S7 Number of Systems 1 1 7 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value indicate Page Reference on Plans or Scheduie and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 4.70 COP 4.30 COP 4.20 COP MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13.5 EER 13.5 EER 73.4 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 250 cfm 100 cfm 100 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Requimd Setback Required Setback Requimd MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Gravity Gravity Gravity MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Conditioned / 4.2 Conditioned / 4.2 Conditioned / 4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 26,734 Btu/hr 14.038 Btu/hr 10,957 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 19,814 Btu/hr 8,991 Btu/hr 7,237 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(i) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnerqyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 64 of 81 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Hilton Cadsbad Oceanfront Resort and Spa 5/23/2011 item or System Tags (i.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) item or System Tags (i.e. AC-1, RTU-1, HP-1) HP-S8 IAC-1/OAC-1 IAC-2/0AC-2 Number of Systems 7 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value Indicate Pa< 30 Reference on Plans or Scheduie and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 4.20 COP n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 73.4 EER 13.0 SEER/10.0 EER 13.0 SEER/10.0 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 100 cfm Ocfm Ocfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Requimd Setback Reguired MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Gravity Gravity Gravity MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Conditioned / 4.2 n/a n/a PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 10,939 Btu/hr 0 Btu/hr 0 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 7,161 Btu/hr 14,612 Btu/hr 14,652 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 10:379-007 Page65of81 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Hilton Cadsbad Oceanfront Resort and Spa 5/23/2011 item or System Tags (Le. AC-1, RTU-1, HP-1) indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) item or System Tags (Le. AC-1, RTU-1, HP-1) IAC-3/0AC-3 AHU-1 AHU-2 Number of Systems 1 1 7 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value Indicate Pas e Reference on Pians or Scheduie and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) n/a 80% AFUE 80% AFUE MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13.0 SEER/10.0 EER 10.0 EER 10.0 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) Ocfm 2,730 cfm 3,035 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Pmgrammable Switch Pmgrammable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Reguimd Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Gravity Auto Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Themnostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 n/a Outdoors/4.2 Outdoors/4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 0 Btu/hr 123,000 Btu/hr 164,000 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 12,889 Btu/hr 68,482 Btu/hr 81,931 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer 100% Outside Air 100% Outside Air Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 66 of 81 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Hilton Cadsbad Oceanfront Resort and Spa 5/23/2011 item or System Tags (i.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) item or System Tags (i.e. AC-1, RTU-1, HP-1) AHU-3 AHU-4 Number of Systems 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value Indicate Pa ge Reference on Pians or Scheduie and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 80% AFUE 80% AFUE MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 10.0 EER 10.0 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 3,165 cfm 3,425 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Auto Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Outdoors/4.2 Outdoors/4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 164,000 Btu/hr 164,000 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 82,309 Btu/hr 101,340 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) 100% Outside Air 100% Outside Air Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(i) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 67 of 81 WATER SIDE SYSTEM REQUIREMENTS (Part 2 Of 2) MECH-2C project Name Date Hilton Cadsbad Oceanfront Resort and Spa 5/23/2077 WATER" SIDE SYSTEMS: Chillers, Towers, Boilers, Hydronic Loops Item or System Tags (I.e. AC-1, RTU-1, HP-1)' BAC FXV-644 Lochinvar Corp. CHN0991 Number of Systems 2 2 Number of Systems indicate Page Reference on Pians or Specification 2 MANDATORY MEASURES T-24 Sections Equipment Efficiency 112(a) 10'F Approach 85% Pipe Insulation 123 n/a HW Piping PRESCRIPTIVE MEASURES Cooling Tower Fan Controls 144(a&b) Variable-Speed-Fan n/a Cooling Tower Flow Controls 144(h) Fixed Temp n/a Variable Flow System Design 144(h) n/a n/a Chiller and Boiler Isolation 1440) n/a Required CHW and HHW Reset Controls 144(1) n/a Required WLHP Isolation Valves 144(1) Requimd n/a VSD on CHW, CW & WLHP Pumps>5HP 144(1) n/a n/a DP Sensor Location 144(i) n/a n/a 1. The proposed equipment need to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column next to applicable section. 2. For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicabie, put "N/A" in the column next to applicable section. Service Hot Water, Pool Heating Item or System Tags (i.e. WH-1, WHP, DHW, etc...)' DHW Heater Number of Systems 2 indicate Page Reference on Pians or Scheduie" MANDATORY MEASURES T-24 Sections SERVICE HOT WATER Certified Water Heater 111,113(a) Lochinvar Corp. CFN1441 Water Heater Efficiency 113(b) 85% Service Water Heating Installation 113(c) Contmis Req. Pipe Insulation 123 n/a POOL AND SPA Pool and Spa Efficiency and Control 114(a) n/a Pool and Spa Installation 114(b) n/a Pool Heater - No Pilot Light 115(c) n/a Spa Heater - No Pilot Light 115(d) n/a Pipe Insulation 123 Required 1. The Proposed equipment needs to match the building plans schedule or specifications. If a requirement Is not applicable, put "N/A" in the column next to applicable section. 2. For each water heater, pool heater and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. EnergyPm 5.1 by EnergySoft User Numben 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Pase 68 of 81 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2077 MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H 1 J K L M N Zone/System Condition Area (ft') CFM per ft' Min CFM By Area BXC Number Of People CFM per Person Min CFM by Occupant EXF REQ'D V.A. Max of D or G Design Ventilation Air CFM 50% of Design Zone Supply CFM BX0.4 CFM / ft' Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air Ballroom SE Settion 7,740 0.50 570 600 600 RTU-1 Total 600 600 Ballroom NE Secthn 967 0.50 487 500 500 RTU-2 Total 500 500 Ballroom Center Section 2,700 0.50 7,050 7,050 7,050 RTU-3 Total 7,050 1,050 Ballroom NW Section 967 0.50 487 500 500 RTU-4 Total 500 500 Ballroom SW Section 7,080 0.50 540 600 600 RTU-5 Total 600 600 East Pm-Function 2,640 0.75 396 700 700 RTU-6 Total 700 700 Service Corridor/Restmoms/Storag 2,000 0.75 300 800 800 RTU-7 Total 800 800 Service Corridor/Restmoms/Storag 2,970 0.75 437 698 700 Totals Column 1 Total Design Ventilation Air C Minimum ventilation rate per Section §121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating. H Required Ventilation Air (REQ'D V.A.) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or G). 1 Must be greater than or equal to H, or use Transfer Air (column N) to make up the difference. J Design fan supply CFM (Fan CFM) x 50%; or the desiqn zone outdoor airflow rate per §121. K Condition area (ft^) x 0.4 CFM / ft^; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than or equal to Column L and greater than or equal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (Column H) and the Design Minimum Air (Column M), Column H minus M. EnergyPm 5.1 by EnergySofI User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 69 of 81 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2077 MECHANICAL VENTILATION (§121 (b)2) REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H 1 J K L M N Zone/System Condition Area (ft') CFM per ft' Min CFM By Area BXC Numijer Of People CFM per Person Min CFM by Occupant EXF REQ'D V.A. Max of DorG Design Ventilation Air CFM 50% of Design Zone Supply CFM BX0.4 CFM/ft' Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air RTU-S Total 698 700 IVesf Pm-Function 3,770 0.75 467 700 700 RTU-9 Total 700 700 Meeting Room 7,023 0.50 572 600 600 RTU-10 Total 600 600 Kitchen 2,370 0.75 356 600 600 RTU-11 Total 600 600 Boardroom 877 0.50 406 425 425 RTU-12 Total 425 425 Guestrooms 1st Floor 17,838 0.75 2,676 2,676 0 2,676 Guestmoms 2nd Floor 38,505 0.75 5,776 5,776 0 5,776 Guestmoms 3rd Floor 38,078 0.75 5,712 5,712 0 5,712 HP-1 Total 14,163 0 Corridor/Storage/Shop 3,640 0.75 546 550 550 HP-3 Total 550 550 Totals Column 1 Total Design Ventilation Air C Minimum ventilation rate per Section §121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating. H Required Ventilation Air (REQ'D V.A.) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or G). 1 Must be greater than or equal to H, or use Transfer Air (column N) to make up the difference. J Design fan supply CFM (Fan CFM) x 50%; or the desiqn zone outdoor airflow rate per §121. K Condition area (ft') x 0.4 CFM / ft'; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than or equal to Column L and greater than or equal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (Column H) and the Design Minimum Air (Column M), Column H minus M. EnergyPm 5.7 by EnergySofI User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Pasre 70 of 87 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2077 MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H 1 J K L M N Zone/System Condition Area (ft') CFM per ft' Min CFM By Area BXC Number Of People CFM per Person Min CFM by Occupant EXF REQ'D V.A. Max of DorG Design Ventilation Air CFM 50% of Design Zone Supply CFM BX0.4 CFM/ft' Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air Electrical Panel 558 0.75 84 84 0 84 HP-4 Total 84 0 MPOE 462 0.15 69 69 0 69 HP-5 Total 69 0 Staff Lounge 793 0.15 779 779 750 HP-6 Total 119 750 Corridor/Storage/HR Offices 2,450 0.15 368 400 400 HP-7 Total 400 400 Restaurant 4,925 0.50 2,463 2,497 2,497 HP-8. 9, 10 Total 2,497 2,497 Lobby/Gift Shop 5,740 0.15 867 900 900 HP-77, 72, 73 Total 900 900 eacit Offices 2,383 0.15 357 400 400 HP-74, 75 Total 400 400 pex Room 374 0.15 47 47 0 47 Totals Column 1 Total Design Ventilation Air Minimum ventilation rate per Section §121, Table 121-A. Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating. Required Ventilation Air (REQ'D V.A.) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or G) Must be greater than or equal to H, or use Transfer Air (column N) to make up the difference. Design fan supply CFM (Fan CFM) x 50%; or the design zone outdoor airflow rate per §121. Condition area (ft') x 0.4 CFM / ft'; or Maximum of Columns H, J, K, or 300 CFM M This must be less than or equal to Column L and greater than or equal to the sum of Columns H plus N. 'Xroncfar Ait* rviiift Ka nra\/i^a/4 tarhara Df\miirf>^ \/AnfiinfIAH AIV /O^liiw... I_J\ *U»I>. «UO n.>»:o>>. I Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (Column H) and the Design Minimum Air (Column M), Column H minus M. EnergyPm 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 71 of 81 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2077 MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H 1 J K L M N Zone/System Condition Area (ft') CFM per ft' Min CFM By Area BXC Number Of People CFM per Person Min CFM by Occupemt EXF REQ'D V.A. Max of DorG Design Ventilation Air CFM 50% of Design Zone Supply CFM BX0.4 CFM/ft' Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air HP-7 6 Totar 47 0 Laundry/Storage 2,780 0.75 327 350 350 HP-17 Total 350 350 Elevator Lobby 7,590 0.75 239 250 250 HP-18 Total 250 250 Fitness Center 7,420 0.75 273 250 250 HP-19 Total 250 250 Wine Room 705 0.75 76 76 0 76 HP-20 Total 76 0 Reception/Office 496 0.75 74 700 100 HP-S1 Total 100 100 Nail Salon 294 0.40 778 150 150 HP-S2 Total 150 750 Locker Rooms 7,700 0.75 255 800 800 HP-S3 Total 800 800 Totals Column 1 Total Design Ventilation Air C Minimum ventilation rate per Section §121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating. H Required Ventilation Air (REQ'D V.A.) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or G). 1 Must be greater than or equal to H, or use Transfer Air (column N) to meike up the difference. J Design fan supply CFM (Fan CFM) x 50%; or the design zone outdoor airflow rate per §121. K Condition area (ft') x 0.4 CFM / ft'; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than or equal to Column L and greater than or equal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) Is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (Column H) and the Design Minimum Air (Column M), Column H minus M. EnergyPro 5.7 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 72 of 87 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H 1 J K L M N Zone/System Condition Area (ft') CFM per ft' Min CFM By Area BXC Number Of People CFM per Person Min CFM by Occupant EXF REQ'D V.A. Max of DorG Design Ventilation Air CFM 50% of Design Zone Supply CFM BX0.4 CFM/ft' Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air Relaxation Lounge 576 0.75 86 200 200 HP-S4 Total 200 200 Treatment Rooms 567 0.30 770 209 209 Corridor 275 0.75 47 47 47 HP-S5 Total 250 250 East Tmatment Rooms 328 0.30 98 700 700 HP-S6 Total 700 700 Couple's Tmatment Room 260 0.30 78 78 100 HP-S7 Total 78 100 Staff/Linen 256 0.75 38 38 100 HP-S8 Total 38 100 Elevator Equipment mom 773 0.75 77 77 0 77 IAC-1/0AC-1 Total 77 0 Elevator Equipment mom 788 0.75 28 28 0 28 IAC-2/OAC-2 Total 28 0 Totals Column 1 Total Design Ventilation Air C Minimum ventilation rate per Section §121, Table 121 -A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces wnthout fixed seating. H Required Ventilation Air (REQ'D V.A.) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or G). 1 Must be greater than or equal to H, or use Transfer Air (column N) to make up the difference. J Design fan supply CFM (Fan CFM) x 50%; or the desiqn zone outdoor airflow rate per §121. K Condition area (ft') x 0.4 CFM / ft' or L Maximum of Columns H, J, K, or 300 CFM M This must be less than or equal to Column L and greater than or equal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (Column H) and the Design Minimum Air (Column M), Column H minus M. EnergyPm 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 73 of 81 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Hilton Cartsbad Oceanfront Resort and Spa Date 5/23/2077 MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MiNlMUM A B C D E F G H 1 J K L M N Zone/System Condition Area (ft') CFM per ft' Min CFM By Area BXC Number Of People CFM per Person Min CFM by Occupant EXF REQ'D V.A. Max of D orG Design Ventilation Air CFM 50% of Design Zone Supply CFM BX0.4 CFM/ft' Max, of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air Elevator Equipment mom 59 0.75 9 9 0 9 IAC-3/OAC-3 Total 9 0 1st Floor Corridor 2,870 0.75 437 437 2nd Floor Corridor 2,070 0.75 377 377 3rd Floor Conidor 2,290 0.75 344 344 AHU-1 Total 7,085 2,730 700% OA 1st Floor Conidor 597 0.75 89 89 2nd Floor Corridor 597 0.15 89 89 3rd Floor Conidor 597 0,15 89 89 AHU-2 Total 266 3,035 100% OA 1st Floor Corridor 7,760 0,15 774 774 2nd Floor Corridor 7,490 0,15 224 224 3rd Floor Conidor 7,490 0.15 224 224 AHU-3 Total 627 3,765 100% OA 2nd Floor Corridor 3,047 0,15 457 457 Totals Column 1 Total Design Ventilation Air C Minimum ventilation rate per Section §121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating H Required Ventilation Air (REQ'D V.A.) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or G) 1 Must be greater than or equal to H, or use Transfer Air (column N) to make up the difference. J Design fan supply CFM (Fan CFM) x 50%; or the desiqn zone outdoor airflow rate per §121. K Condition area (ft') x 0.4 CFM / ft' or L Maximum of Columns H, J, K, or 300 CFM M This must be less than or equal to Column L and greater than or equal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (Column H) and the Design Minimum Air (Column M), Column H minus M. EnergyPm 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23^7:05:22 ID: 379-007 Paqe 74 of 81 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2077 MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H 1 J K L M N Zone/System Condition Area (ft') CFM per ft' Min CFM By Area BXC Number Of People CFM per Person Min CFM by Occupant EXF REQ'D V.A. Max of D orG Design Ventilation Air CFM 50% of Design Zone Supply CFM BX0.4 CFM / ft' Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air 3rd Floor Corridor 3,047 0.75 457 457 AHU-4 Total 974 3,425 700% OA Totals Column 1 Total Design Ventilation Air C Minimum ventilation rate per Section §121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant ioad for egress purposes for spaces without fixed seating. H Required Ventilation Air (REQ'D V.A.) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or G). 1 Must be greater than or equal to H, or use Transfer Air (column N) to make up the difference. J Design fan supply CFM (Fan CFM) x 50%; or the design zone outdoor airflow rate per §121. K Condition area (ft') x 0.4 CFM / ft'; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than or equal to Column L and greater than or equal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (Column H) and the Desiqn Minimum Air (Column M), Column H minus M. EnergyPm 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Paqe 75 of 81 MECHANICAL EQUIPMENT DETAILS (Part 1 of 2) MECH-5C Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2077 CHILLER AND TOWER SUMMARY PUMPS Equipment Name Type Qty. Efficiency Tons Qty. GPM BHP Pump Control BAC FXV-644 Tower w/30.000 bhp fan 10 F Appmach 215 300 7.50 One-Speed/3 Way Valves Building Loop Pumps 285 14.00 Variable-Speed Hot Water Pumps 90 1.05 One-Speed/3 Way Valves DHW / BOILER SUMMARY System Name Type Distribution Qty. Rated Input Vol. (Gals). Energy Factor or RE Standby Loss or Pilot Tank Ext. R-Value Status Lochinvar Corp, CHN0991 Large Gas Hydmnic Heating 990,000 0,85 0,00% 0.0 New Lochinvar Corp. CFN1441 Large Gas Kitchen Pipe Ins 1.440,000 0,85 0,00% 0.0 New MULTI-FAMILY CENTRAL WATER HEATING DETAILS Hot Water Pump Hot Water Piping Length (ft) Control _Qtt. HP Type In Plenum Outside Buried Add W Insulation • CENTRAL SYSTEM RATINGS HEATING COOLING System Name Type Qty. Output Aux. kW Efficiency Output Efficiency Status Can-ier 48TCA005 Packaged DX 7 707,000 0.0 80% AFUE 49,800 13.0 SEER/11.0 EER New Carrier 48TCA008 Packaged DX 2 748,000 0.0 82% AFUE 97,800 11.0 EER New Canier 48TCA014 Packaged DX 7 205,000 0.0 80% AFUE 752,700 11.0 EER New Can-ier 48TCA007 Packaged DX 7 720,000 0.0 80% AFUE 79,400 11.0 EER New Canier 48TCA006 Packaged DX 7 707,000 0.0 80% AFUE 65,700 10.8 EER New Climatemaster TCV/TCH009 Hydmnic Heat Pump 278 77,600 0.0 4.20 COP 8,600 13.4 EER New Climatemaster TCV/TCH036 Hydmnic Heat Pump 3 45,200 0.0 4.40 COP 35,300 73.5 EER New CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN System Name Fan Type Economizer Type CFM BHP CFM BHP Carrier 48TCA0Q5 Constant Volume No Economizer 1,600 1.00 Can-ier 48TCA00B Constant Volume Fixed Temp (Integrated) 3,000 1,70 Can-ier 48TCA014 Constant Volume Fixed Temp (Integrated) 5,000 2,90 Carrier 48TCA007 Constant Volume Fixed Temp (Integrated) 2,400 1.75 Can-ier 48TCA006 Constant Volume No Economizer 1,950 1.20 Climatemaster TCV/TCH009 Constant Volume No Economizer 300 0.10 none Climatemaster TCV/TCH036 Constant Volume No Economizer 1,200 0.50 none EnergyPm 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 76 of 81 MECHANICAL EQUIPMENT DETAILS (Parti of 2) MECH-5C 1. Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 CHILLER AND TOWER SUMMARY PUMPS Equipment Name Type Qty. Efficiency Tons Qty. GPM BHP Pump Control DHW / BOILER SUMMARY System Name Type Distribution Qty. Rated Input Vol. (Gals). Energy Factor or RE Standby Loss or Pilot Tank Ext. R-Vaiue Status MULTI-FAMILY CENTRAL WATER HEATING DETAILS Hot Vifater Pump Hot Water Piping Length (ft) Control HP Type In Plenum Outside Buried Add W Insulation • • CENTRAL SYSTEM RATINGS HEATING COOLING System Name Type Qty. Output Aux. kW Efficiency Output Efficiency Status Climatemaster TCV/TCH048 Hydmnic Heat Pump 6 55,900 0.0 4.70 COP 49,500 73.3 EER New Climatemaster TCV/TCH024 Hydmnic Heat Pump 2 28,500 0.0 4.70 COP 24,400 73.5 EER New Climatemaster TCV/TCH018 Hydmnic Heat Pump O 27,500 0.0 5.00 COP 78,300 74.3 EER New Climatemaster TCV/TCH060 Hydmnic Heat Pump 6 77,000 0.0 4.30 COP 60,400 73.4 EER New Climatemaster TCV/TCH012 Hydmnic Heat Pump 3 15,200 0.0 4.30 COP 72,300 73.5 EER New Canier 38HDF018 Split DX 3 0.0 n/a 77,000 13.0 SEER/10.0 EER New AHU-1 Reznor RDCB Packaged DX 7 123,000 0.0 80% AFUE 84,000 10.0 EER New CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN System Name Fan Type Economizer Type CFM BHP CFM BHP Climatemaster TCV/TCH048 Constant Volume No Economizer 7,600 0.75 none Climatemaster TCV/rCH024 Constant Volume No Economizer 800 0.50 none Climatemaster TCV/TCH018 Constant Volume No Economizer 600 0.70 none Climatemaster TCV/TCH060 Constant Volume No Economizer 7,950 7.00 none Climatemaster TCV/TCH012 Constant Volume No Economizer 400 0.70 none Carrier 38HDF018 Constant Volume No Economizer 600 0.06 none AHU-1 Reznor RDCB Constant Volume 100% Outside Air 2,730 2.00 none EnergyPro 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 77 of 81 MECHANICAL EQUIPMENT DETAILS (Part 1 of 2) MECH-5C Project Name Date Hilton Cartsbad Oceanfront Resort and Spa 5/23/2011 CHILLER AND TOWER SUMMARY PUMPS Equipment Name Type Qty. Efficiency Tons Qty. GPM BHP Pump Control DHW / BOILER SUMMARY System Name Type Distribution Qty. Rated Input Vol. (Gals). Energy Factor or RE Standby Loss or Pilot Tank Ext. R-Value Status MULTI-FAMILY CENTRAL WATER HEATING DETAILS Hot Water Pump Hot Water Piping Length (ft) Control Qty. HP Type In Plenum Outside Buried Add Vi" insulation • • • CENTRAL SYSTEM RATINGS HEATING COOLING System Name Type Qty. Output Aux. kW Efficiency Output Efficiency Status AHU-2 Reznor RDCB Packaged DX 7 764,000 2.7 80% AFUE 96,000 70.0 EER New AHU-3 Reznor RDCB Packaged DX 7 764,000 2.7 80% AFUE 96,000 70.0 EER New AHU-4 Reznor RDCB Packaged DX 7 764,000 2.7 80% AFUE 720,000 10.0 EER New CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN System Name Fan Type Economizer Type CFM BHP CFM BHP AHU-2 Reznor RDCB Constant Volume 700% Outside Air 3,035 2.50 none AHU-3 Reznor RDCB Constant Volume 100% Outside Air 3,765 2.50 none AHU-4 Reznor RDCB Constant Volume 100% Outside Air 3,425 3.00 none EnergyPm 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 10:379-007 Page78of81 MECHANICAL EQUIPMENT DETAILS (Part 2 of 2) MECH-5C Project Name 1 Date Hilton Carlsbad Oceanfront Resort and Spa 1 5/23/2011 ZONE SYSTEM SUMMARY t SYSTEM VAV Fan Fan Cycles ECM Motor Zone Name System Name Type Qty. Heating Cooling Min CFM Ratio Reheat Coil CFM BHP Fan Cycles ECM Motor Outside Air • • • • • • • n • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • EXHAUST FAN SUMMARY EXHAUST FAN EXHAUST FAN EXHAUST FAN Room Name Qty. CFM BHP Room Name Qty. CFM BHP Room Name Qty. CFM BHP Service Corridor/Restrooms/Storage 1.0 700 0.17 Corridor/Storage/HR Offices 7.0 100 0.70 Kitchen 1.0 600 0.25 Restaurant 7.0 900 0.25 Corridor/Storage/Shop 1.0 750 0.10 Staff Lounge 2.0 75 0.10 EnergyPm 5.1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 79 of 81 ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV-MM Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2077 DESCRIPTION Building Envelope Measures: S11 stay Installed insulating material shall have been certified by the manufacturer to comply with the California Quality ^ ^ '• Standards for insulating material, Title 20 Chapter 4, Article 3. f.... o, ,. All Insulating Materials shall be installed In compliance with the flame spread rating and smoke density requirements of SI 10(C). Sections 2602 and 707 of Title 24, Part 2. §118(f): The opaque portions of framed demising walls in nonresidential buildings shall have Insulation with an installed R-value of no less than R-13 between framing members. S117(a)- ^" 'Joi'^te snd openings in the building that are obsen/able sources of air leakage shall be caulked, gasketed, s ^ weatherstripped or othenwise sealed. Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.^ of §116(a) 1: window area, 0.3 cfm/ft.^ of door area for residential doors, 0.3 cfm/ft.^ of door area for nonresidential single doors (swinging and sliding), and 1.0 cfm/ft.^ for nonresidential double doors (swinging). §116(a) 2: Fenestration U-factor shall be rated in accordance with NFRC 100, or the applicable default U-factor. Rl 1 «rai r>. Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site-built fenestration, or the Sl 1 bia) -5• applicable default SHGC. 6116(b)- ^'^^ Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be ^ ^ weatherstripped (except for unframed glass doors and flre doors). EnergyPro 5.1 by EnemvSoft User Number 6394 RunCode: 2011-05-23711:05:22 ID: 379-007 Page 80 of 81 MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name Hilton Carlsbad Oceanfront Resort and Spa Date 5/23/2011 Equipment and System Efficiencies §111: Any appliance for which there is a California standard established In the Appliance Efficiency Regulations will comply with the applicable standard. §115(a): Fan type central furnaces shall not have a pilot light. §123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be Insulated In accordance with Standards Section 123. §124: Air handling duct systems shall be installed and Insulated In compliance with Sections 601, 602, 603, 604, and 605 of the CMC Standards. Controls §122(e): Each space conditioning system shall be installed with one of the following: 1A. Each space conditioning system sen/ing building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off-hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or IB. An occupancy sensor to control the operating period of the system; or 1C. A 4-hour timer that can be manually operated to control the operating period of the system. 2. Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. §122(g): Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shali be provided with isolation devices, such as valves or dampers that ailow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. §122(c): Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §122(b): Heat pumps shall be installed with controis to prevent electric resistance supplementary heater operation when the heating ioad can be met by the heat pump alone §122(a&b): Each space conditioning system shail be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shali be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e): Controis shali be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these pians. §122(f): Aii gravity ventilating systems shali be provided with automatic or readily accessible manually operated dampers in aii openings to the outside, except for combustion air openings. §121(f): Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed buiiding or space, or a new ventilating system serving a buiiding or space is operated for normal use, aii ventilation systems serving the buiiding or space shali be certified as meeting the Acceptance Requirements for Code Compliance Service Water Heating Systems §113(c) Installation 3. Temperature controls for public lavatories. The controls shail limit the outlet Temperature to 110° F. 2. Circulating sen/ice water-heating systems shail have a control capable of automatically turning off the circulating pump when hot water is not required. EnergyPm 5,1 by EnergySoft User Number 6394 RunCode: 2011-05-23711:05:22 10:379-007 Page 81 of 81 iiHiirtlRii r PCR11072 HILTON: PLUM^G & MECMAN. ? 07-17-2013 City of Carlsbad 1635 Faraday Av Carlsbad.CA 92008 Plan Check Revision Permit No:PCR11093 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Reference #: PC #: I' OOO Project Title: 1 PONTO RD CBAD PCR 2141601900 $0.00 Lot#: 0 Construction Type: NEW HILTON: ADDTITION OF COOLING TOWER Status: Applied: Entered By: Pian Approved: Issued: inspect Area: ISSUED 07/18/2011 JMA 08/04/2011 08/04/2011 Applicant: MICHAEL TRIA 2359 4TH AVE. STE.300 SAN DIEGO 92101 619-233-6777 Owner: WAVE CREST OCEANFRONT LLC C/O WILLIAM SHANNAHAN 1200 PROSPECT ST #425 LAJOLLACA 92037 Pian Check Revision Fee Fire Expedited Plan Review Additionai Fees $218.00 $0.00 $0.00 Total Fees: $218.00 Total Payments To Date: $218.00 Balance Due: $0.00 Inspector: FINAL APPROVAL Date: Clearance: NOTICE: Please take NOTICE that approval of your project Includes ttie "Imposition" of fees, dedications, resen/ations, or other exactions hereafter collectively refen-ed to as "fees/exactions." You have 90 days from the date this permit was Issued to protest Imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required Information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely fallow that procedure will bar any subsequent legal action to a(tacl<, review, set aside, void, or annul their Imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or serelce fees In connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have previousiv been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. PLAN CHECK REVISION Development Services Building Division 1635 Faraday Avenue NJ^ CITY OF CARLSBAD APPLICATION Development Services Building Division 1635 Faraday Avenue NJ^ CITY OF CARLSBAD B-15 760-602-2719 ww/w.carlsbadca.gov Plan Check Revision No. / Original Plan Check No.__J^zl^^ 7> li-. II Project Address ^?^t^fc)>^tD Q?. CA^L^BAO, CA • H20i} Q^^Q Contact M(Ci^^ (Cl<^) ~^777 Fax.(Sj^iJ_ilZl^Email fin-f'i^tkejl/jck\{ii>c. CQyH Contact Address ^gAJ^g ^ €01^300 city Pi^C^ Zip General Scope of Work ^' cvvisy^cr A fYgAa^ s^mJP frPiz <ssout.i<^ iGulBiR. (P gxrM . Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 Elements revised: • Plans • Calculations • Soils • Energy Q Ofher A/- ^ • 2 Describe revisions in detail 3 List page(s) wfiere eacfi revision is sfiown 4 List revised sfieets that replace existing sheets 4 C6oUfj<i^ -fmj^K H^TM^ 'smxio /s>c^BeAi WIBP TO ^&TJI^ -Ml^ A&fJB THi^ G!vUf4G iTMje^ /14 HcC^ 12C0 , 5 Does this revision, in any way, alter the exterior of the project? O Yes 6 Does this revision add ANY new floor areafs)? • Yes 0 No T Does this revision affect any fire related issues? 8 Is this a complete set? • Yes 13 No m No • Yes 3 No ^Slgnature. 1635 Faraday Avenue, Carisbad, CA 92008 Phone: 760-602-2717/2718/2719 vvwvt^.carlsbadca.gov Fax; 760-602-8558 ' EsGil Corporation In (Partnersfiip -witH government for (Buifding Safety DATE: JULY 20, 2011 • APPLICANT • JURIS. JURISDICTION: CARLSBAD • PLAN REVIEWER • FILE PLAN CHECK NO.: 10-1660 (REV. # 3) - PCR 11-093 SET: I PROJECTADDRESS: Intersection of Carlsbad Blvd. & Ponto Drive PROJECT NAME: HILTON CARLSBAD OCEANFRONT RESORT/SPA & Parking Garage ^ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. I I The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. I I The applicant's copy of the check list has been sent to: [Xj Esgil Corporation staff did not advise the applicant that the plan check has been completed. I I Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Fax #: Mail Telephone Fax In Person XI REMARKS: Revisions to add metal shroud/ screen for the cooling tower to serve as a shaft to prevent mixing ofthe supply & return air above the cooling tower in room 1260. Only S-Yz'x 11" revised pages were submitted. By: ALI SADRE Enclosures: EsGil Corporation • GA • EJ • PC 7/19 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576 I CARLSBAD 10-1660 (REV. # 3) - PCR 11-09(3 JULY 20, 2011 [DO NOT PAY- THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE PLAN CHECK NO.: 10-1660 (REV. # JURISDICTION: CARLSBAD 3) - PCR 11-093 PREPARED BY: ALI SADRE DATE: JULY 20, 2011 BUILDING ADDRESS: Intersection of Carlsbad Blvd. 85 Ponto Drive BUILDING OCCUPANCY: R1/S2 TYPE OF CONSTRUCTION: V-A/II-B BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) REVISIONS Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code CB By Ordinance Bldg. Permit Fee by Ordinance Plan Check Fee by Ordinance Type of Review: I 1 Repetitive Fee Repeats • Complete Review • Other [3 Hourly EsGil Fee $217.50 • Structural Only 1.5 $116.00 Hrs. @ $174.00 * Based on hourly rate Comments: Sheet 1 of 1 macvalue.doc + DCI encineeRs E I Seattle q I Everett ^ I Spokane 8 Portland p SanDiego I COOLING TOWER SHROUD •o AT THE HILTON CARLSBAD PREPARED FOR JWDA DESIGN IS BASED ON THE 2007 CALIFORNIA BUILDING CODE STRUCTURAL CALCULATIONS ^ 1. \ ^ 00 '-^^it Off cP^^ APPROVED JULY 2011 DC! Job# 09051 -0018 AUG 0 4 2011 City of CARLSBAD BUILDING DEPT 525 B street, Suite 750 San Diego, California 92101 Service Inno Hilton PROJECT mu HILTON CARLSBAD OCEANFRONT RESORT & SPA DAAVMNGlrOE ftoAiL i^yoixr DATE SOLTEK PACIFIC CONSTRUCTION JWDA *«eM I TCeTUR C/riANNI••/ IHTtRltfR BCIIBM ntojEcrwiiniii}: SUSMnALHO. SKETCH NO. REFERENCE: f 42.1P =DCI encBineGRS Project No. Sheet No. / Project l-fC- — SjoKZyuc^ Date , 7/|3//, Subject By. Cf^- 2.5" O. 11 W/ J- 3 2_/>5-f • . (iZ,3^^\>c1-''^x4^*'^^^ V 12.5 i i eriGineeRS Project No. Sheet No. Project Date , ~7/iy/u Subject By hA^TC- 5feeiO - l/^ ^5r-fh. JP-- '/5,^^>f fo'S--o-'s^ =DCI encineeBs Project No. Sheet No. ? Project Date , V/i/ll Subject By 75^ /Lj 23 CesVO/A/i/ A^jgVT Pe*<^tAA/0 Al&\f jtJ/^Ace:.- enGineeRS Project No. Sheet No. Project Date Subject By 2 / Fx 5x^/3 7 1^ P. 0 ^ .Jt- " S3.-=1 /' .6 7 'S'5 ? Si^ J:\Temp Folders\Blake\Spreadsheets\Steel\[Steel HSS,xls]Shroud Column I^^S Li*^ ^^HH 1 Project No. Sheet No. - n (3 . n - E R E 09051-0018 Projecf Date HC - Cooling Tower Shroud 7/14/11 Subject By Shroud Column BCS HSS8X8X3/8 Required Strengths H = 8.00 in Mn<= 21.9 k-ft Pr = 8 k L = 0 ft. B = 8.00 in Mry = 0.0 k-ft Vr= 3 k Lbx= 10 ft. A = 10.4 in^ Tr = 0.0 k-ft Fy= 46.0 ksi Lby= 10 ft. 0.35 in b/t = 19.9 Compact Criteria Axial Capacity h/t = 19.9 h/t= 19.9 K = 1.0 lx = 100 in^ Ao= 60.8 KL/r = 39 ly = 100 in^ K= 143 Fe= 191.0 ksi Sx = 24.9 in^ Compact Web Fer= 41.6 ksi Sy = 24.9 in^ l'x = 3.10 in b/t= 19.9 P, = 432.5 k ^y = 3.10 in A,= 28.1 Zx = 29.4 in^ K= 35.2 29.4 in^ Compact Flange J = 160 in^ C = 40.7 in^ Major Axis Capacity 1. M„= 113 k-ft 2. Mn = NA k-ft 3. Mn = NA k-ft Mnx = 113 k-ft /V\^/JL'' 67.1 Shear Capacity b(iii): Aw ~ Cv- CPv = CPvVn = 5 61.8 76.9 4.12 1 0.9 102 k Minor Axis Capacity 1. Mo= 113 k-ft 2. Mn = NA k-ft 3. Mn = NA k-ft Mnv= 113 k-ft _9Miv^ -lerR^ Ciornbined Forces Mjcp,Mnx= 0.22'' v,/cpy^= \03 As V 0.23X 1.0 OK Torsion Capacity F„,„= 27.6 ksi Fcriiii = 85.3 ksi Fcriiiii = 331 ksi Fcr = 27.6 ksi Tn = 93.6 k-ft ._.^-n-'--8^3-lc=ft-" b^flection Strong axis bending DL= AD = 5*(D)*L7(38^= AL = 5*(LL)*LX^4*Elt-^.. AT = AD+AL = Span/A^ = Spon/AT = •-•iso plf 1200 plf 0.00 in. 0.00 in. •O.00 in. N/A OK N/A OK Use HSS8X8X3/8 for Shroud Column J:\Temp Folder5\Blake\Spreadsheets\Steel\[Steel Angles In Bendlng.xIsJSteel Angle In Bending JJJUJJ fc^^ 1 Project No. Stieet No. EE' f"* C3 ' n G E R S 09051-0018 Project Dafe HC - Cooling Tower Shroud 7/14/11 Subject By Steel Angle in Bending BCS Steel Angle in Bending - Reference AISC 13th, 16.1-57 Design Moment, My = Angle to Consider Length, L = Toe Length, b = Other Leg, b2 = Thickness, t = Section MocJ, S = Cb = Yielding 900 Ib-ft 93 in 5 in 5 in 0.38 in 2.41 1 0 in^ 0 in 0 in Fy = E = 36,000 psi 29,000 ksi Lat-Tors restraint provicjed nowhere Max. Tens. at the toe. Bending about major axis 4^ Compact Criteria Ap= 15.3 K= 25.8 b/t= 13.3 Section is compact Lateral-lorsional Buckling Use 5"x5"x0.375" for shroud horizontal. My = FyS = 7.23 k-ft (i): Me = 112 k-ft (F10-4a,b) Mn = 1 .5My = 10.8 k-ft My = 0.8FyS -5.8 k-ft (ii): Me = 140 k-ft Leg Local Buckling M = F S = y ' y"" 7.2 k-ft b = 5 in (iii): Me = 42.0 k-ft (F10-5) Fcr = 116 ksi (FlO-9) (iv): Me-NA k-ft (F10-6) Sc = 1.93 Values Used: Mn = -k-ft (F 10-7,8) Me-42.0 k-ft My = 5.8 k-ft Governing Nominal Moment Mn = 8.59 k-ft (Fl 0-2,3) Mn = 8,595 Ib-ft , 7,7a5-^-ft-or" /A^yji. EnGinEERS Project No. Sheet No. 7 Project ;/ Date Subject /^T' By Z77^ 0^ I 't •A 5^^ It/vi, 7, ki! = bJ-^- f^isc FZ-1) tv > —O \/ v/ •ii UJ /i-i Jo ^ I, (6 'w^ £ v/ U.S6 l"" TH^Lct encineeRs Project No. Sheet No. Project Date Subject Q,T - 5Wo). By ) ~ -) •< /'6 SOOO p. OB-2) I . fo A/oTs: )- /9(^ -2- rm^^ fell, - \^io/'~\ Sc^ L I a coot iis/tt ^^'^^A: 5"ttl.W^Pl-AA/ ©Copyriglil 07/2011 D'AmolD Conversono Inc. All Rights Reserved This document, ond ths ktias and dMigne rr«y not b« wiMd. DCI n G I WEBSITE: www.dci.engineers.com CIVIL / STFRUCTURAL PROJECT NAME: HILTON CARLSBAD PROJECT NO: SKETCH NO: 0951-0018.00 SSK6/20/11-1 DATE: CONSTRUCTION HELD SKETCH: 07/13/11 STRUCTURAL 07/13/11 C00UNC3 TOWER BT: C00UNC3 TOWER NAA METAL SHROUD NAA DETAIL "T op r,K>^ T o .-I 1^ 54> Ji ,y _—^ st t '5 ^ . Ct7oi\fvti -p^tA- © Copyrighl 07/2011 D'^ato Conversono Inc. All Rights Reserved ^m document, ond the ideas and dwlgw rrxiy not reueedl In i/tKi^ pr la jgrt^wlthoul iffttliB pennfceton from l/Afnelo ConnefeoBp toe D'Amolo CoiiveriQno Inc. dliclokns nny reepOKMHy tor He uneiihortztd use. DCI n o I n E ^ R S(s WEBSITE: www.dci-engineers.com CIVIL / STRUCTUFIAL PROJECT NAME: HILTON CARLSBAD PROJECT NO: SKETCH NO: 0951-0018.00 SSK/4/8/11-2 DATE: CONSTRUCTION FIELD SKETCH: 07/13/11 STRUCTURAL 07/13/11 COOUNG TOWER BY: COOUNG TOWER NAA METAL SHROUD NAA DETAIL .4 V 11 1 1 1 1! , L 1 1 1! 1 07/2011 D'Amato Conversono Inc. All Rights Reserved Thii document. ond the ideos ml dnigna moy not tw reused, SDCI WEBSITE: www.dd-engireers.com CIVIL / S r I J C ~ T LJ F=i/X L PROJECT NAME: HILTON CARLSBAD SDCI WEBSITE: www.dd-engireers.com CIVIL / S r I J C ~ T LJ F=i/X L PROJECT NO: 0951-0018.00 SKETCH NO: SSK6/20/11-3 SDCI WEBSITE: www.dd-engireers.com CIVIL / S r I J C ~ T LJ F=i/X L DATE: 07/13/11 CONSTRUCTION HELD SKETCH: STRUCTURAL COOUNG TOWER METAL SHROUD DETAIL SDCI WEBSITE: www.dd-engireers.com CIVIL / S r I J C ~ T LJ F=i/X L BY: NAA CONSTRUCTION HELD SKETCH: STRUCTURAL COOUNG TOWER METAL SHROUD DETAIL 090018 SSK3-11-6-20.dwg 13-Jul-11 2:04 PW notkins {'^ JCHS ^9 5 Copyright 07/2011 D'Amoto Conversono Inc, All Rights Reserved THS docufflertt and tht ideos and detignt may not ba reuMd, 090018 SSK4-11-4-8.dwg 13-Jul-11 2:08 PM natl< *i whole Of n part, mthpul written peRMseion from OAmeto Conwersono k»e. O^imato C i^MI I onvefMne Inc. dischim any reioaneibil'tty fer its PROJECT NAME: uneuthorizett use- ——Ilf 1 HILTON CARLSBAD 1 y V 1 PROJECT NO: SKETCH NO: 0951-0018.00 SSK4/8/11-4 DATE: CONSTRUCTION mJH SKETCH: 07/13/11 STRUCTURAL COOLING TOWER BY: STRUCTURAL COOLING TOWER WEBSITE: www.dd-engineers.com CIVIL / STRUCTURAL NAA METAL SHROUD DETAIL ©Copyrighl 07/2011 D'Amoto Conversono Inc. All Rights Reserved Thie docunmt, ml th« 'dus and tM'gns ir«y tui bt r«MM, y for HI wnuthorlzrt uw. E n G I n ^ s R WEBSITE: www.doi-engineers.com CIVIL / STRUCTURAL PROJEa NAME: HILTON CARLSBAD PROJECT NO: SKETCH NO: 0951-0018.00 SSK6/20/11-5 DATE: CONSTRUCTION FIELD SKETCH: 07/13/11 STRUCTURAL 07/13/11 COOUNG TOWER BY: COOUNG TOWER NAA METAL SHROUD NAA DETAIL ©Copyrighl 07/2011 D'Amoto Conversono Inc. All Rights Reserved TNS decimnt, ond the UNS and dntgns mcy not be raueed. In Htwie ar In port, titthoul written i^j[mio^ermgw^rom^D|«n«^on»er^^ DCI e n G I n e R S(s WEBSITE: www.dci-engineers.com CIVIL / STRUCTURAL PROJECT NAME: HILTON CARLSBAD PROJECT NO: SKETCH NO: 0951-0018.00 SSK/4/8/11-6 DATE: CONSTRUCTION RELD SKETCH: 07/13/11 STRUCTURAL 07/13/11 COOUNGTOWER BY: COOUNGTOWER NAA METAL SHROUD NAA DETAIL PCR11093 1 PONTO RD HILTON: ADDTITION OF COOLING 7'/.%.'? I (I auiA'JA. j 'Hit!- IT-SSUFO ifAJ^ /OA 09-06-2011 City of Carlsbad 1635 Faraday Av Carlsbad.CA 92008 Plan Check Revision Permit No:PCR11107 Building Inspection Request Line (760) 602-2725 Job Address: 7205 PONTO DR CBAD Permit Type: PCR Status: ISSUED Parcel No: 2141601900 Lot#: 0 Applied: 08/18/2011 Valuation: $0.00 Construction Type: NEW Entered By: RMA Reference #: CB101660 Plan Approved: 09/06/2011 PC#: PC110005 Issued: 09/06/2011 Project Title: HILTON-DEFERRED SUBMITTAL Inspect Area: BARRIER CABLES & METAL SDTAIRS @ PARKING Applicant: JOHNO ORTEGA 2424 CONGRESS ST SAN DIEGO CA 92139 619 666-8327 Owner: WAVE CREST OCEANFRONT LLC C/O WILLIAM SHANNAHAN 1200 PROSPECT ST #425 LA JOLLA CA 92037 Plan Check Revision Fee Fire Expedited Plan Review Additional Fees $580.00 $0.00 $0.00 Total Fees: $580.00 Total Payments To Date: $580.00 Balance Due: $0.00 Inspector: FINAL APPROVAL Date: Clearance: NOTICE: Please take NOTICE that approval of your project Includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was Issued to protest Imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth In Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Catlsoad Ivlunlclpal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or sen/ice fees In connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have previousiv been oiven a NOTICE similar to this, or as to which the statute ot limitations has previousiv otherwise exoired. ^ CITY OF CARLSBAD PLAN CHECK REVISION APPLICATION B-15 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov 3.i _Original Plan Check No. for^-to t>ir. f^^rL^h^M. Project Address Contact jo^^" Or^t^^ Ph^ {hi<)Ui-ti7.i pax. Contact Address ^><M ^oi^y^^s. Email jorH^<^£^'i-^l^f^^<^ • ^"'^ City ^^»^ t>.e^o Zip ^^'^t General Scope of Work K. /-f-o/^ ^^ri$h^A. ^^for-t Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 Elements revised: Plans • Calculations • Soils • Energy • Other , . 2 ' ^^^"^ Describe revisions in detail 3 List page(s) where each revision is shown 4 List revised sheets that replace existing sheets ) J { \ ' ) . .'I J ( , V ^ J \ I ' J y 5 Does this revision, in any way, alter the exterior of the project? • Yes 6 Does this revision add ANY new floor area(s)? QYes ^ No T Does this revision affect any fire related issues? • Yes ^ No 8 Is this a complete s^? ^^^^ Z^*^® '^0 X. O ^No ^Signature. 1635 Faraday Avenue, Carlsbad, CA 9200 Phone: 760-602-2717/2718/2719 www.carlsbadca.gov Fax: 760-602-8558 EsGil Corporation In Partnerstiip with government for (BuiCding Safety DATE: AUG. 31, 2011 • APPLICANT • JURIS. JURISDICTION: CARLSBAD • PLANREVIEWER • FILE PLAN CHECK NO.: 10-1660 (REV. # 5) - PCR 11-107 SET: II PROJECTADDRESS: Intersection of Carlsbad Blvd. & Ponto Drive PROJECT NAME: HILTON CARLSBAD OCEANFRONT RESORT/SPA & Parking Garage 3 The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and shouid be corrected and resubmitted for a complete recheck. I I The check list transmitted herewith is for your information . The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to fonward to the applicant contact person. I I The applicant's copy of the check list has been sent to: John Ortega 2424 Congress St., S.D., CA 92139 IXI Esgil Corporation staff did not advise the applicant that the plan check has been completed. I I Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: John Telephone #: 619-666-8327 Date contacted: (by: ) Fax #: 760-438-0065 Mali Telephone Fax In Person ^ REMARKS: Parking structure barrier cables, meta! stairs & hotel metal stairs are under this submittal (deferred packages). By: ALI SADRE Enclosures: EsGil Corporation • GA • EJ • PC 8/30 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576 EsGil Corporation In (PartnersHip -witH government for (BuiCding Safety DATE: AUG. 24, 2011 • AEELIQANT JURISDICTION: CARLSBAD • PLANREVIEWER • FILE PLAN CHECK NO.: 10-1660 (REV. # 5) - PCR 11-107 SET: I PROJECTADDRESS: Intersection of Carlsbad Blvd. & Ponto Drive PROJECT NAME: HILTON CARLSBAD OCEANFRONT RESORT/SPA fic Parking Garage I I The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. [ I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. XI The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. PLEASE SEE BELOW I I The applicant's copy of the check list is enclosed for the jurisdiction to fonward to the applicant contact person. 3 The applicant's copy of the check list has been sent to: John Ortega 2424 Congress St., S.D., CA 92139 I I Esgil Corporation staff did not advise the applicant that the plan check has been completed. Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: John (v-M\ Telephone #: 619-666-8327 Date contacted: ^UH'»< (by:!-^ ) Fax #: Mail -.^n'elephone Fax In Person ^ REMARKS: Submit (2) sets of stamped & signed calc's. to EsGil for the proposed deferred items on plans. *Parking structure barrier cables, metal stairs & hotel metal stairs are under this submittal (deferred packages). By: ALI SADRE Enclosures: EsGil Corporation • GA • EJ • PC 8/22 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576 CARLSBAD 10-1660 (REV. # 5) - PCR 11-107 AUG. 24, 2011 [DO NOT PAY- THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: CARLSBAD PLANCHECKNO.: 10-1660 (REV. # 5) - PCR 11-107 PREPARED BY: ALI SADRE DATE: AUG. 24, 2011 BUILDING ADDRESS: Intersection of Carlsbad Blvd. & Ponto Drive BUILDING OCCUPANCY: R1/S2 TYPE OF CONSTRUCTION: V-A/II-B BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) REVISIONS Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code CB By Ordinance Bldg. Permit Fee by Ordinance Plan Check Fee by Ordinance Type of Review/: I I Repetitive Fee Repeats • Complete Review • Other • Hourly EsGil Fee $580.00 • Structural Only $116.00 Hrs. @ $464.00 Based on hourly rate Comments; Sheet 1 of 1 macvalue.doc + ORION STRUCTURAL ENGINEERING, INC 12257 OLD POMERADO ROAD SUITE A POWAY, CA 92064 STRUCTURAL CALCULATIONS FOR BUILDING STAIR # 1, AND 2 AND GARAGE STAIRS #8 AND 9 FOR THE HILTON RESORT AND SPA CARLSBAD, CA CLIENT: MINSHEW BROTHERS STEEL CONSTRUCTION INC. 12578\TGILANTERD. LAKESIDE, CA 92040 Introductioii Stair Framing Analysis Anchorage Analysis Tread Analysis Handrail Analysis . Table of Contents: PREPARED BY RYAN J. OMER Mav 9.2011 Sheet 1 Sheet 2 Sheets 3-4 Sheets Sheet 6 Pt«^ I I'iOl INTRODUCTION: THE FOLLOWING CALCULATIONS ADDRESS STAIRWAY BEING CONSIDERED USING THE FOLLOWING ASSUMPTIONS: 1) THE STRUCTURE HAS BEEN DESIGNED (BY OTHERS) TO RESIST ALL LOADS INDUCED BY THE STAIRS. 2) ALL STEEL MATERIALS TO BE GRADE 36 OR BETTER (A-36, A-500 ORA992). 3) EDGE DISTANCE OF ALL ANCHORS INTO EXISATING CMU OR CONCRETE MATERL\LS IS GREATER THAN 8 INCHES. LOADS 12 GAGE PAN/TREADS (W/ 2" L.W. CONCRETE) 30 psf LANDING (W/2" LW CONCRETE) 40 psf UNIFORM LIVE LOAD 100 psf POINT LR^ LOAD 300 lb RAIL LINEAR LOAD 50 plf RAIL POINT LOAD 200 lb May 9, 2011 OmON SmUJCTUMAL ENGIMEElM^s IIHC PAGE NO. PROJECT- J. .H f / ^^r-Pf^'-^ ^1. f&.,.,„ .,4;^. , PROJECTL f'^**^^^^!^^?^?^ ^'mr^/F'l ' f (-!-5^4)- 1/ / 1^. V> :\ OMON smucTumAL ENGIIMEIMNGJ mc PAGE NO t y *- PROJECT- ...IU«. i3m€.i.j"3/^ /i^£iTr'^A My.. 4 B. tMf.^ : ^; " OmONSmreiTOALIENGIIMEEMNGjMC PAGENO. is* PROJECT. il 5 5 <:.;, OmON SmUJCTTOAL ENGIMEEMMGs MC PAGE NO. , ^ PROJECT tf4f4 Mrv / .-•^^j:^ M/- .#C p.'^^i^Mi ,^ « 5^ ORION STRUCTURAL ENGINEERING, INC. 12257 OLD POMERADO ROAD SUITE A POWAY, CA 92064 STRUCTURAL CALCULATIONS FOR CABLE RAILING FOR HILTON CARLSBAD OCEANFRONT RESORT AND SPA PARKING STRUCTURE CLIENT: MINSHEW BROTHERS STEEL CONSTRUCTION INC. 12578VIGILANTE RD. LAKESIDE, CA 92040 Table of Contents: Loads /Assumptions Cable and Anchorage Analysis Sheet 1 Sheets 2-9 PREPARED BY RYAN J. OMER ASSUMPTIONS: 1) THE STRUCTURE HAS BEEN DESIGNED (BY OTHERS) TO RESIST ALL LOADS INDUCED BY THE BARRIER. 2) ALL ROLLED STEEL MATERIALS TO BE GRADE 36 OR BETTER (A- 36, A-500 OR A992). ALL TUBE MATERIALS TO BE GRADE 46 OR BETTER 3) CABLES TO BE ^4" DIAMETER X 150 ksi 4) ALL CONCRETE RECEIVING ANCHORS IS AT LEAST 4000 psi 5) EDGE DISTANCE OF ALL ANCHORS AT LEAST EQUAL TO DEPTH OF EMBEDMENT LOADS POINT LOAD @ 18" ABOVE DRIVING SURFACE 6000 lb APPLIED OVER A 1 FOOT SQUARE AREA PROJECT. JOBNO. / -r 4 4» .4., ..m...^ • 7 ^ 0^0 i'>-^o OMON SmUCTHJMAlL ENGIMEIEMIING, MC PAGE NO PROJECT. JOBNO., 1^ •7^ '/'/D^,: ti^i.tj, lit' ; / P J ' - /'// —-'"JT' q. JOBNO PROJECT. •7^ 4r^:.^<h...'k. ^^^^ PROJECIL JOBNO PROJECT JOBNO.__ J /-IL /bKi;* 2 . .^}f^elfM--.-l^.y--'^--sli0^........ - t^Z^T. ,:,him£,ji'.: 1^ OMON§TlILJCr]ITOM.EPJ^^ Z. PROJECT-JOB NO.. (P> 6.£-^j \ p \ ;:^^..JL/L2.U1... PROJECT JCB NO. Lo^ic^js^^^^. „ - $.;?i>^c ^uUcM^ jy^^-^ /iy -'dJ^c ^"^t-ty ..^ ^ .i/ij* 4^'/,-^ - - J^.m~'. ii ^ ^,^4^ ±.Lkli^.^il&t^- f^J..lM.J^../z<^ OMON SmUCTILJMAL ENGM1EMM(S, MC PAGE NO. PROJECT. JOBNO. n 0 o 0 0 1 • 1 0 t f 1 PCR11107 1 PONTO RD HILTON-DEFERRED SUBMITTAL • cv Approved BUILDING PLANNING ENGINEERING FIRE Expedite? Y N AFS Checked by: HazMat APCD Health By Forms/Fees Sent Rec'd Due? By Encina Fire HazHeaimAPCD PE5.M School Sewer Stormwater Special Inspection CFD: Y LandUse: V N Y N Y N Y N Y N Y M Density ImpArea; FY: Annex: Factor: PFF: Y N Comments Building Planning Engineering Fire Need? Date / Date Date Date SW • Done • Done • Done • Done • Done • Issued 07-17-2013 City of Carlsbad 1635 Faraday Av Carlsbad.CA 92008 Plan Check Revision Permit No:PCRl 1114 Building Inspection Request Line (760) 602-2725 Job Address: 1 PONTO RD CBAD Permit Type: PCR Parcel No: 2141601900 Valuation: $0.00 Reference*: CB+MfiGO' PC#: PC11-005 Project Titie: HILTON CARLSBAD OCEANFRONT ARCHITECTURAL, ELECTRICAL.IVIECHINICAL AND Lot#: Construction Type: 5A Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: ISSUED 09/13/2011 MDP 10/11/2011 10/11/2011 Applicant: MICHAEL TRIA 619 233-6777 Owner: WAVE CREST OCEANFRONT LLC C/o WILLIAM SHANNAHAN 1200 PROSPECT ST #425 LAJOLLACA 92037 Plan Check Revision Fee Fire Expedited Pian Review Additional Fees $725.00 $0.00 $0.00 Total Fees: $725.00 Total Payments To Date: $725.00 Balance Due: $0.00 Inspector: FINAL APPROVAL Date: Clearance: NOTICE: Please take NOTICE that approval of your project Includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this pemiit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth In Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their Imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have oreviouslv been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. CITY OF CARLSBAD PLAN CHECK REVISION APPLICATION B-15 Development Services Building Division 1635 Faraday Avenue 760-602-2719 wv/w.ca risbadca.gov Plan Check Revision No. Original Pfan Check No. Project Address 7^g?5' ^oi^ t^R. cAfg^eAP. ck. ^zoll Date—-JliJ^iil Contact l^iCliA^n^lA Ph 2-»3-<;777 Fax.^^kf^X^27:^£^Email ^ ^i''^ &^ojdcti^o. oo^ Contact Address -z-g-S^ 'T^f^ /^l/gAtag-, 5<Uffg -^OO city -a^ ^/g6^0 Zip General Scope of Work (nt^lo/Z iZcaH^A^OJ^ fet--/?g^^6^gp go^gme^^-4 Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 Elements revised: 2 Describe revisions in detail 3 List page(s) where each revision is shown 4 List revised sheets that replace existing sheets &ideiUB^l^O fOR. lZ0jise^ AfZoHT^cruieAc-f HPB 5 Does this revision, in any way, alter the e;<terior of the project? O Yes 6 Does this revision add ANY new floor area(s)? • Yes S No T Does this revision affect any fire related issues? D Yes 0 No 8 Is this a complete set? • Yes E No E No .eS^Signature. 1635 Faraday Avenue, Carlsbad, CA 92008 Phone: 760-602-2717/2718 /27 !9 wvvw.cai1sbadca.gov Fax: 760-602-8558 EsGil Corporation In (PartnersHip witH government for (BuiCding Safety DATE: SEPT. 20, 2011 • APPLICANT • (^uRis:\ JURISDICTION: CARLSBAD •PLANREVIEWER • FILE PLAN CHECK NO.: 10-1660 (REV. # 6) - PCR 11-114 SET: I PROJECTADDRESS: Intersection of Carlsbad Blvd. & Ponto Drive PROJECT NAME: HILTON CARLSBAD OCEANFRONT RESORT/SPA & Parking Garage xl The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. I I The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. I I The applicant's copy of the check list has been sent to: IXI Esgil Corporation staff did not advise the applicant that the plan check has been completed. I I Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Fax #: Mail Telephone Fax In Person 3 REMARKS: Owner's miscellaneous revisions to the commercial portion of the project are under this plan change. All disciplines are being impacted, Partial Sets are submitted. By: Ali Sadre Enclosures: EsGil Corporation • GA • EJ • PC 9/13 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576 CARLSBAD 10-1660 (REV. # 6) - PCR 11-114 SEPT. 20, 2011 [DO NOT PAY- THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE PLAN CHECK NO.: 10-1660 (REV. # JURISDICTION: CARLSBAD 6) - PCR 11-114 PREPARED BY: Ali Sadre DATE: SEPT. 20, 2011 BUILDING ADDRESS: Intersection of Carlsbad Blvd. & Ponto Drive BUILDING OCCUPANCY: R1/S2 TYPE OF CONSTRUCTION: V-A/II-B BUILDING PORTION AREA ( Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) REVISIONS Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code CB By Ordinance Bldg. Permit Fee by Ordinance Plan Check Fee by Ordinance Type of Review: D Repetitive Fee Repeats • Complete Review • Other EsGil Fee $725.00 • Structural Only $116.00 Hrs. @ $580.00 Based on tiourly rate Comments: Sheet 1 of 1 macvalue.doc + CITY OF CARLSBAD BUILDING PLANCHECK CHECKLIST QUICK-CHECK/APPROVAL Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov ENGINEERING Plan Check for PCR 11-114 (CB 10-1660) Date: September 29,2011 Project Address: 7205 Ponto Drive APN: Project Description: Architectural, MPE revisions Valuation: ENGINEERING Contact: Linda OntiverOS Phone: 760-602-2773 Email: linda.ontiveros@carlsbadca.gov Fax: 760-602-1052 RESIDENTIAL Z TENANTIMPROVEMENT RESIDENTIAL ADDITION MINOR (<$20,000.00) PLAZA CAMINO REAL ] CARLSBAD COMPANY STORES COMPLETE OFFICE BUILDING IOTHER: OFFICIAL USE ONLY ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT BY REMARKS DATE: September 29,2011 Notification of Engineering APPROVAL has been sent to via on Page 1 of 1 E-36 REV 4/30/11 JWDA Joseph Wong Design Associates 2359 Fourth Avenue, Suite 300 San Diego, CA 92101 ARCHITECTURE / PLANNING / INTERIOR DESIGN Phone:(619)233-6777 Fax: (619) 237-0541 www.jwdainc.com September 12, 2011 Plan Check Revisions The following is a list ofthe changes Delta-12 to the approved Architectural, Mechanical, Plumbing and Electrical Building Plans Permit No. CB101660. General Notes 1. Basement: a. Change Storage Room B126 to Office. 2. Level-1 Floor Plan: a. Convert a portion of Storage Room 1211 (1148 sf) to Meeting Room (620 sf). b. Remove interior walls in Boardroom 1207 increasing square footage from 741 sf to 808 sf. c. Convert a portion of Storage Room 1216 (436 sf) to Office (169 sf). d. Re-configure Offices and Administration Area. e. Remove Gift Shop Door. f. Add Door to Conference Room 1242.5. g. Install louvered roof system over outdoor dining patio. 3. Exterior Elevation: a. Raise outdoor patio glass screen from 4'-6" to 6'-0". Arcliitectural CS Project Summary - Parking Calculation. A0.40 Revise means of egress for new Office. A0.41 Revise means of egress to new Meeting Room, Office and Conference Room. A2.0 Revise Storage Room to Office. A2.0B Revise partial Storage Room B126 to Office. A2.0C Revise Storage Room B126 to Office. A2.1 Convert a portion of Storage Room 1211 to Meeting Room. Remove interior walls in Boardroom 1207. Convert a portion of Storage Room 1216 to Office. Re-configure Office and Administration Area. Remove Gift Shop Door. Add door to Conference Room 1242.5. A2.1 A Convert a portion of Storage Room 1211 to Meeting Room. A2.1B Remove interior walls in Boardroom 1207. Convert a portion of Storage Room 1216 to Office. Re-configure Office and Administration Area. Remove Gift Shop Door. A2.1C Re- configure Office and Administration Area. Add door to Conference Room 1242.5. A3.0 Revise ceiling plan to new Offices. A3.0B Revise partial ceiling plan to new Offices. A3.0C Revise ceiling plan to new Offices. A3.1 Revise ceiling plan to new Offices, Boardroom, Conference Room and Outdoor Dining Patio. A3.1 A Revise ceiling plan to new Office. A3.1B Revise ceiling plan to new Offices, Boardroom, partial Administration Area and Outdoor Dining Patio. A3.1C Revise ceiling plan to Offices, Administration Area and Conference Room. A4.10 Revise Elevation B (West) & C (South) - Outdoor Dining Patio glass screen height. A4.22 Revise Elevation B (West) - Outdoor Dining Patio glass screen height A4.23 Revise Elevation C (South) & Elevation C.l (East) - Outdoor Dining Patio glass screen height. A5.10 Revise Section 1 - Outdoor Dining Patio. A5.11 Revise Section 2 - Outdoor Dining Patio. A9.30 Revise Door Schedule B134 and B134.1. Door #1217 - Not used. A9.31 Revise Door Schedule 1240, 1240.1, 1243.1 and 1266. A9.61 Revise Trellis Plan at Outdoor Dining patio. A9.62 Revise Trellis Elevations IA, IB and IC at Outdoor Dining Patio. A9.63 Details 5 & 8 - Louvered roof system at Outdoor Dining Patio. A9.64 Detail 5 - Glass Rail at Outdoor Dining Patio. Mechanical See attached Narrative from Robison Engineering. Plumbing See attached Narrative from Robison Engineering. Electrical See attached Narrative from Robison Engineering. PCR11114 1 PONTO RD HII TON CARLSBAD OCEANFRONT 1^11 l i (STuW 10-12-2012 City of Carlsbad 1635 Faraday Av Carlsbaci, CA 92008 Plan Check Revision Permit No:PCR12049 Building Inspection Request Line (760) 602-2725 Job Address: 1 PONTO RD CBAD Permit Type: PCR Parcel No: 0000000000 Valuation: $0.00 Reference*: |0l(*(^0 PC #: 11 OOO-S Project Title: CARLSBAD HILTON: DEFERRED SUBMITTAL: GAS LINES TO 2 FIREPITS/ SOME CIVIL & Lot #: 0 Construction Type: NEW Applicant: MICHAEL TRIA 2359 4TH AV SAN DEIGO CA 92101 619-233-6777 Status Applied Entered By Plan Approved Issued Inspect Area ISSUED 05/16/2012 JMA 10/10/2012 10/10/2012 Owner: Plan Check Revision Fee Fire Expedited Plan Review Additional Fees $500.00 $0.00 $0.00 Total Fees: $500.00 Total Payments To Date: $500.00 Balance Due: $0.00 Inspector: FINAL APPROVAL Date: Clearance: NOTICE: Please take NOTICE tliat approval of your project Includes ttie 'Imposition" of fees, dedications, reservations, or other exactions hereafter collectively refen'ed to as lees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously othenwise expired. ^ CITY OF CARLSBAD PLAN CHECK REVISION APPLICATION B-15 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Plan Check RevlslonJMo. T^^l^" Origin;^! Plan Checl< No. /O'l(*(*0 Project Address of^S&AC>, ci,. <K2ai\ n?t^ g-/o/2 Contact Htcm^U yzifij ph ^t'?-g??-(^777 Fax.^/llZlZlf^Email '»'fria€'^(/jd,cKma. con^ Contact Address ^» ^ A</g.,S^^^ City ^ Zip ^^^^^ General Scope of Work "^rpagfi -Rge^ f*ffS Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 Elements revised: 12 Plans • Calculations • Soils • Energy • Other 2 Describe revisions in detail 3 List page(s) where each revision is shown 4 List revised sheets that replace existing sheets miP^-tS' Atl^tteD '^App^B A\^t>A- ^ 5 Does this revision, in any way, alter the exterior of the project? • Yes 6 Does this revision add ANY new floor area(s)? • Yes ^ No / Does this revision affect any fire related issues? Efves • No 8 Is this a complete set? • Yes 0 No je^S'ignature. 0 No 1635 Faraday Avenue, Carlsbad, CA 92008 Phone: 760-602-2717 / 2718 / 2719 www.carisbadca.gov Fax: 760-602-8558 EsGil Corporation In Partnersfiip witH government for (BuiCding Safety DATE: Sept. 21, 2012 • APPLICANT • JURIS. JURISDICTION: Carlsbad • PLANREVIEWER • FILE PLANCHECKNO.: 101660 Rev7 (PCR12-49) SET: IV PROJECT ADDRESS: 1 Ponto Dr. PROJECT NAME: Hilton Carlsbad Beach Resort revised outdoor dining & courtyard and Fire Pits. XI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. Building Official to check for Fire Department Approval. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. XI The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. I I The applicant's copy of the check list has been sent to: Michael Tria, 2359 '1^ Ave, Suite 300, San Diego, CA, 92101 [XI EsGil Corporation staff did not advise the applicant that the plan check has been completed. I I EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Michael Tria Telephone #: (619)233 6777 Date contacted: (by: ) Email: mtria@iwdainc.com Fax #: (619)237-0541 Mail Telephone Fax In Person n REMARKS: By: Glen Adamek Enclosures: EsGil Corporation GA • EJ • PC 9/13/2012 9320 Cliesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576 EsGil Corporation In PartnersHip witH government for (BuiCding Safety DATE: JULY 25, 2012 • APELlfiANT •CJURIS^ JURISDICTION: Carlsbad • PLANREVIEWER • FILE PLANCHECKNO.: 101660 Rev7 (PCR12-49) SET: III PROJECTADDRESS: 1 Ponto Dr. PROJECT NAME: Hilton Carlsbad Beach Resort revised outdoor dining & courtyard and Fire Pits. I I The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. [ I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. X The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. X The applicant's copy of the check list has been sent to: Michael Tria, 2359 4*^ Ave, Suite 300, San Diego, CA, 92101 I I EsGil Corporation staff did not advise the applicant that the plan check has been completed. IXI EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Michael Tria Telephone #: (619)233-6777 Date contacted: '^\tui:'^ (by: i-^) Email: mtria(S).iwdainc.com Fax #: (619)237-0541 t Mail -^Telephone Fax^' In Person • REMARKS: By: Glen Adamek Enclosures: EsGil Corporation • GA • EJ • PC 7/18/2012 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576 Carlsbad 101660 Rev7 (PCR12-49) JULY 25, 2012 NOTE: The items listed below are from the previous correction list. These remaining items have not been adequately addressed. The numbers of the items are from the previous check list and may not necessarily be in sequence. The notes in bold underlined font are current. 1. Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602- 2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 2. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes, before the permits are issued. Business and Professions Code. The final set of corrected drawings to be reviewed for signing and sealing just before the permits are to be issued. 5. Building Department to check for Carlsbad Fire Department approval of the proposed Fire Pit drawings. The Carlsbad Fire Department must review the proposed plans for the Fire Pits. 6. Please provide listing data and installation instructions to install three Grand Effects Fire Pit/Fire Pit Inserts Model 100-A units in a single fire pit with a single "Grand Effects' Safetv Pipe Train". Please show the on the plans the manufacture's name, and model numbers for each ofthe proposed outdoor gas fired fire pits. 7. The installation instructions and the data on the plans do not seem to agree: Please provide cut-sheets, listing data, and installation instructions for each ofthe proposed outdoor gas fired fire pits. B) Please provide listing data and installation instructions to install three Grand Effects Fire Pit/Fire Pit Inserts Model 100-A units in a single fire pit with a single "Grand Effects' Safetv Pipe Train". The Grand Effects Fire Pit/Fire Pit Inserts Model 100-A owner's manual show the gas demand is only 120,000 Btu, not the 240 MBH on the gas riser drawing on sheet P4.3. Please correct. C) See items # 8 and 9 below. The Grand Effect Model 100-A is not a fireplace insert. It is a Fire Pit insert and may not be used in a fireplace. Please correct. Carlsbad 101660 Rev? (PCR12-49) JULY 25, 2012 8. A complete review ofthe "Patio Gazebo Firepit" will be done when plans and calculations are provided. The details #14 & 16 on revised sheet ID-5.1 states: "Decorative hood and chiminev bv FEC." Please provide complete construction drawing for the proposed "Patio Gazebo Fireplace". Please provide construction detail ofthe proposed hood over the proposed Grand Effects model 100-A is a Fire Pit/Fire Pit Insert, including support svstem (have engineer review gazebo framing design), clearances to combustible materials, and heat transfer from hood through metal supports to wood framing. The details # 13,14, & 16 on sheet ID-5.1 have notes stating the Architectural Drawings will provide separate drawing and details for the construction of the gas fired fireplace. But no Architectural Drawings provided in this plan package. The details # 13,14,16, & 18 on sheet ID-5.1 have not been corrected and still shows gas fired fire pit to be installed under a patio roof system and calls it a "Patio Gazebo Fireplace". This is not an approved fireplace. Please correct. Outdoor gas fired fire pits may not be installed under any roof system. Please correct the details # 13,14,16, & 18 on sheet [D-5.1. 9. The revised detail #14 on sheet ID-5.1 is for a "Patio Gazebo Firepit". Note: Fire Pits are not allowed within a gazebo as per the installation instruction. Please provide design data for the infield constructed metal patio fireplace, for Building Official's review. The proposed Grand Effects model 100-A is a Fire Pit/Fire Pit Insert. Not an approved listed Fireplace. Please correct the "Patio Gazebo Fireplace". Please provide cut-sheets, listing data, and installation instructions for the proposed Patio Fireplace. 10. The revised sheets show three Grand Effects Fire Pit/Fire Pit Inserts Model 100-A units in a single fire pit with a single "Grand Effects' Safetv Pipe Train" and a single gas line. Please correct to show separate gas lines and gas shut-off valves for each ofthe separate listed gas burners. And provide cut-sheets, listing data, details and installation instructions for the proposed "Grand Effects' Safetv Pipe Train" and control panels to operate the three separate listed gas burners (Grand Effects Fire Pit/Fire Pit Inserts Model 100-A units). Please provide complete revised gas line plans and sizing calculations (corrected sheet P4.3, Gas Riser Diagram) showing gas demands that match the data from the gas fire pit manufactures data (and fireplace manufactures data) for the gas demands. Note the sheet ID-5.1 shows change in the patio fireplace not shown on the gas line plans. The y4 inch gas line to the Linear Fire Pit with a gas demand of 155 MBH and developed gas pipe length of 50 feet (shown on the gas riser drawing on sheet P4.3) is undersized as per CPC, Table 12-8. Also, correct the gas demand for the proposed Grand Effects model 100-A is a Fire Pit/Fire Pit Insert on the gas riser drawing on sheet P4.3. And provide approved designs and show the gas demands for the "Patio Gazebo Fireplace". 11. A complete review of the gas lines, fire pits and fireplace will be done when the corrected and completed drawing; and the listing data, cut-sheets and installation instructions for the fire pits and fireplace: a copy of the Building Department Approved Plan Package are provided. Carlsbad 101660 Rev7 (PCR12-49) JULY 25, 2012 12. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon which each correction on this sheet has been made and return this sheet with the revised plans. 13. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located on the plans. Have changes been made not resulting from this list? • Yes • No The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Glen Adamek at Esgil Corporation. Thank you. EsGil Corporation In PartnersHip witH government for (BuiCding Safety DATE: JULY 25, 2012 • APPLICANT • JURIS. JURISDICTION: Carlsbad • PLANREVIEWER • FILE PLANCHECKNO.: 101660 Rev7 (PCRl 2-49) SET: III PROJECT ADDRESS: 1 Ponto Dr. PROJECT NAME: Hilton Carlsbad Beach Resort revised outdoor dining & courtyard and Fire Pits. I I The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. X The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to fonward to the applicant contact person. XI The applicant's copy of the check list has been sent to: Michael Tria, 2359 4*'' Ave, Suite 300, San Diego, CA, 92101 I I EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Michael Tria Telephone #: (619)233-6777 Date contacted: (by: ) Email: mtria(a)iwdainc.com Fax #: (619)237-0541 Mall Telephone Fax In Person • REMARKS: By: Glen Adamek Enclosures: EsGil Corporation • GA • EJ • PC 7/18/2012 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576 Carlsbad 101660 Rev? (PCR12-49) JULY 25, 2012 NOTE: The items listed below are from the previous correction list. These remaining items have not been adequately addressed. The numbers ofthe items are from the previous check list and may not necessarily be in sequence. The notes in bold underlined font are current. 1. Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602- 2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 2. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes, before the permits are issued. Business and Professions Code. The final set of corrected drawings to be reviewed for signing and sealing lust before the permits are to be issued. 5. Building Department to check for Carlsbad Fire Department approval ofthe proposed Fire Pit drawings. The Carlsbad Fire Department must review the proposed plans for the Fire Pits. 6. Please provide listing data and installation instructions to install three Grand Effects Fire Pit/Fire Pit Inserts Model 100-A units in a single fire pit with a single "Grand Effects' Safetv Pipe Train". Please show the on the plans the manufacture's name, and model numbers for each of the proposed outdoor gas fired fire pits. 7. The installation instructions and the data on the plans do not seem to agree: Please provide cut-sheets, listing data, and installation instructions foreach ofthe proposed outdoor gas fired fire pits. B) Please provide listing data and installation instructions to install three Grand Effects Fire Pit/Fire Pit Inserts Model 100-A units in a single fire pit with a single "Grand Effects' Safetv Pipe Train". The Grand Effects Fire Pit/Fire Pit Inserts Model 100-A owner's manual show the gas demand is only 120,000 Btu, not the 240 MBH on the gas riser drawing on sheet P4.3. Please correct. C) See items # 8 and 9 below. The Grand Effect Model 100-A is not a fireplace insert. It is a Fire Pit insert and may not be used in a fireplace. Please correct. Carlsbad 101660 Rev7 (PCR12-49) JULY 25, 2012 8. A complete review ofthe "Patio Gazebo Firepit" will be done when plans and calculations are provided. The details #14 & 16 on revised sheet ID-5.1 states: "Decorative hood and chiminev bv FEC." Please provide complete construction drawing for the proposed "Patio Gazebo Fireplace". Please provide construction detail of the proposed hood over the proposed Grand Effects model 100-A is a Fire Pit/Fire Pit Insert, including support svstem (have engineer review gazebo framing design), clearances to combustible materials, and heat transfer from hood through metal supports to wood framing. The details # 13,14, & 16 on sheet ID-5.1 have notes stating the Architectural Drawings will provide separate drawing and details for the construction of the gas fired fireplace. But no Architectural Drawings provided in this plan package. The details # 13,14,16, & 18 on sheet ID-5.1 have not been corrected and still shows gas fired fire pit to be installed under a patio roof system and calls it a "Patio Gazebo Fireplace". This is not an approved fireplace. Please correct. Outdoor gas fired fire pits may not be installed under any roof system. Please correct the details # 13,14,16, & 18 on sheet ID-5.1. 9. The revised detail #14 on sheet ID-5.1 is for a "Patio Gazebo Firepit". Note: Fire Pits are not allowed within a gazebo as per the installation instruction. Piease provide design data for the infield constructed metal patio fireplace, for Building Official's review. The proposed Grand Effects model 100-A is a Fire Pit/Fire Pit Insert. Not an approved listed Fireplace. Please correct the "Patio Gazebo Fireplace". Please provide cut-sheets, listing data, and installation instructions for the proposed Patio Fireplace. 10. The revised sheets show three Grand Effects Fire Pit/Fire Pit Inserts Model 100-A units in a single fire pit with a single "Grand Effects' Safetv Pipe Train" and a single gas line. Please correct to show separate gas lines and gas shut-off valves for each ofthe separate listed gas burners. And provide cut-sheets, listing data, details and installation instructions for the proposed "Grand Effects' Safetv Pipe Train" and control panels to operate the three separate listed gas burners (Grand Effects Fire Pit/Fire Pit Inserts Model 100-A units). Please provide complete revised gas line plans and sizing calculations (corrected sheet P4.3, Gas Riser Diagram) showing gas demands that match the data from the gas fire pit manufactures data (and fireplace manufactures data) for the gas demands. Note the sheet ID-5.1 shows change in the patio fireplace not shown on the gas line plans. The Vt, inch gas line to the Linear Fire Pit with a gas demand of 155 MBH and developed gas pipe length of 50 feet (shown on the gas riser drawing on sheet P4.3) is undersized as per CPC, Table 12-8. Also, correct the gas demand for the proposed Grand Effects model 100-A is a Fire Pit/Fire Pit Insert on the gas riser drawing on sheet P4.3. And provide approved designs and show the gas demands for the "Patio Gazebo Fireplace". 11. A complete review of the gas lines, fire pits and fireplace will be done when the corrected and completed drawing: and the listing data, cut-sheets and installation instructions for the fire pits and fireplace: a copy of the Building Department Approved Plan Package are provided. Carlsbad 101660 Rev7 (PCR12-49) JULY 25, 2012 12. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon which each correction on this sheet has been made and return this sheet with the revised plans. 13. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located on the plans. Have changes been made not resulting from this list? • Yes • No The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Glen Adamek at Esgil Corporation. Thank you. EsGil Corporation In PartnersHip witH government for (BuiCding Safety DATE: JUNE 7, 2012 •APPLICANT CCTJURIST^ JURISDICTION: Carlsbad • PLAN REVIEWER • FILE PLANCHECKNO.: 101660 Rev7 (PCR 12-49) SET: II PROJECTADDRESS: 1 Ponto Dr. PROJECT NAME: Hilton Carlsbad Beach Resort revised outdoor dining & courtyard and Fire Pits. I I The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ^ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to fonward to the applicant contact person. X The applicant's copy of the check list has been sent to: Michael Tria, 2359 4*^ Ave, Suite 300, San Diego, CA, 92101 I I EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Michael Tria Telephone #: (619)233-6777 Date contacted: <^Ig))e- (by:Dl^) Email: mtria(5)iwdainc.com Fax #: (619)237-0541 ^ Maih-^Telephone ^ Fax In Person • REMARKS: By: Glen Adamek Enclosures: EsGil Corporation • GA • EJ • PC 6/5/2012 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576 ' Carlsbad 101660 Rev7 (PCR12-49) JUNE 7, 2012 NOTE: The items listed below are from the previous correction list. These remaining items have not been adequately addressed. The numbers of the items are from the previous check list and may not necessarily be in sequence. The notes in bold font are current. 1. Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 2. Jeffrey Hatch is not a State Licensed Designer and can not sign the construction drawing for this project. The sheets ID-5.1 and I D-5.3 are not signed and sealed. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes, before the permits are issued. Business and Professions Code. The final set of corrected drawings to be reviewed for signing and sealing just before the permits are to be issued. 5. Building Department to check for Carlsbad Fire Department approval of the proposed Fire Pit drawings. The Carlsbad Fire Department must review the proposed plans for the Fire Pits. 6. Please correct the following for the two exterior Fire Pits: Please show the on the plans the manufacture's name, and model numbers foreach ofthe proposed outdoor gas fired fire pits. A) Please provide the installation instruction and listing data for each of the two exterior Fire Pits. Only the Owner's Manual / Operating and Maintenance Instructions were provided in the plan packages. B) Clearly show the proposed length of the linear gas fire pit. (48" maximum as per the gas demand used on the gas riser drawing on sheet P4.3.) C) The Grand Effect Model 100-A is not a fireplace insert. It is a Fire Pit insert and may not be used in a fireplace. Please correct. Carlsbad 101660 Rev7 (PCR12-49) JUNE 7, 2012 7. The installation instructions and the data on the plans do not seem to agree: Please provide cut-sheets, listing data, and installation instructions for each of the proposed outdoor gas fired fire pits. A) For the proposed Linear Flre Pit the plans and the manufactures data provided do not clearly show the proposed length ofthe linear gas fire pit. Please correct. (48" maximum as per the gas demand used on the gas riser drawing on sheet P4.3.) B) The Grand Effects Fire Pit/Fire Pit Inserts Model 100-A owner's manual show the gas demand is only 120,000 Btu, not the 240 MBH on the gas riser drawing on sheet P4.3. Please correct. C) The Grand Effect Model 100-A is not a fireplace insert. It is a Fire Pit insert and may not be used in a fireplace. Please correct. 8. The details # 13,14, & 16 on sheet ID-5.1 have notes stating the Architectural Drawings will provide separate drawing and details for the construction ofthe gas fired fireplace. But no Architectural Drawings provided in this plan package. The details # 13,14,16, & 18 on sheet ID-5.1 have not been corrected and still shows gas fired fire pit to be installed under a patio roof system and calls it a "Patio Gazebo Fireplace". This is not an approved fireplace. Please correct. Outdoor gas fired fire pits may not be installed under any roof system. Please correct the details # 13,14,16, & 18 on sheet ID-5.1. 9. The proposed Grand Effects model 100-A is a Fire Pit/Fire Pit Insert. Not an approved listed Fireplace. Please correct the "Patio Gazebo Fireplace". Please provide cut-sheets, listing data, and installation instructions for the proposed Patio Fireplace. 10. Please provide complete revised gas line plans and sizing calculations (corrected sheet P4.3, Gas Riser Diagram) showing gas demands that match the data from the gas fire pit manufactures data (and fireplace manufactures data) for the gas demands. Note the sheet ID-5.1 shows change in the patio fireplace not shown on the gas line plans. The inch gas line to the Linear Fire Pit with a gas demand of 155 MBH and developed gas pipe length of 50 feet (shown on the gas riser drawing on sheet P4.3) is undersized as per CPC, Table 12-8. Also, correct the gas demand for the proposed Grand Effects model 100-A is a Fire Pit/Fire Pit Insert on the the gas riser drawing on sheet P4.3. And provide approved designs and show the gas demands for the "Patio Gazebo Fireplace". 11. A complete review of the gas lines, fire pits and fireplace will be done when the corrected and completed drawing; and the listing data, cut-sheets and installation instructions for the fire pits and fireplace: a copy of the Building Department Approved Plan Package are provided. 12. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon which each correction on this sheet has been made and return this sheet with the revised plans. Carlsbad 101660 Rev7 (PCR12-49) JUNE 7, 2012 13. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located on the plans. Have changes been made not resulting from this list? • Yes • No The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Glen Adamek at Esgil Corporation. Thank you. EsGil Corporation In PartnersHip witH government for (BuiCding Safety DATE: May 24, 2012 •,A^2pyqANT JURISDICTION: Carlsbad • PLANREVIEWER • FILE PLANCHECKNO.: 101660 Rev7 (PCR12-49) SET: I PROJECT ADDRESS: 1 Ponto Dr. PROJECT NAME: Hilton Carlsbad Beach Resort revised outdoor dining & courtyard and Fire Pits. I I The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ^ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to fonward to the applicant contact person. X The applicant's copy of the check list has been sent to: Michael Tria, 2359 4"" Ave, Suite 300, San Diego, CA, 92101 I I EsGil Corporation staff did not advise the applicant that the plan check has been completed. IX EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Michael Tria C^i'^?) Telephone #: (619)233-6777"^ Date contacted: ^/zt^li2. (by: wz^ ) Email: mtria(%iwdainc.com. ^ Fax #: (619)237-0541 t Mail ^Telephone ^ Fax^ In Person • REMARKS: By: Glen Adamek Enclosures: EsGil Corporation • GA • EJ • PC 5/21/2012 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858)560-1468 • Fax (858) 560-1576 Carlsbad 101660 Rev7 (PCR12-49) May 24, 2012 GENERAL PLAN CORRECTION LIST JURISDICTION: Carlsbad PLAN CHECK NO.: 101660 Rev7 (PCR12-49) PROJECT ADDRESS: 1 Ponto Dr. DATE PLAN RECEIVED BY DATE REVIEW COMPLETED: ESGIL CORPORATION: 5/21/2012 May 24, 2012 REVIEWED BY: Glen Adamek FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and disabled access. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. The approval of the plans does not permit the violation of any state, county or city law. • Please make all corrections and submit two new complete sets of prints to: ESGIL CORPORATION. • To facilitate rechecking, please identify, next to each item, the sheet of the plans upon which each correction on this sheet has been made and return this sheet with the revised plans. • Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located on the plans. Have changes been made not resulting from this list? • Yes • No Carlsbad 101660 Rev7 (PCR12-49) May 24, 2012 1. Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, conected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 2. The sheets lD-5.1 and lD-5.3 are not signed and sealed. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes, before the permits are issued. Business and Professions Code. The final set of corrected drawings to be reviewed for signing and sealing just before the permits are to be issued. 3. Please provide a copy of the complete City approved building plan packages. 4. Please provide full size revised plan sheets. El.O, P1.0, P2.1B, P2.1C, P3.2, P4.3, L1-3, lD-5.1, and lD-5.3. 5. The Carlsbad Fire Department must review the proposed plans for the Fire Pits. 6. Please show the on the plans the manufacture's name, and model numbers for each of the proposed outdoor gas fired fire pits. 7. Please provide cut-sheets, listing data, and installation instructions for each ofthe proposed outdoor gas fired fire pits. 8. Outdoor gas fired fire pits may not be installed under any roof system. Please correct the details #13, 14, 16, & 18 on sheet ID-5.1. 9. Please provide cut-sheets, listing data, and installation instructions for the proposed Patio Fireplace. 10. Please provide complete revised gas line plans and sizing calculations (corrected sheet P4.3, Gas Riser Diagram) showing gas demands that match the data from the gas fire pit manufactures data (and fireplace manufactures data) for the gas demands. Note the sheet ID-5.1 shows change in the patio fireplace not shown on the gas line plans. Carlsbad 101660 Rev7 (PCR12-49) May 24, 2012 11. A complete review of the gas lines, fire pits and fireplace will be done when the corrected and completed drawing; and the listing data, cut-sheets and installation instructions for the fire pits and fireplace: a copy of the Building Department Approved Plan Package are provided. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Glen Adamek at Esgil Corporation. Thank you. Carlsbad 101660 Rev7 (PCR12-49) May 24, 2012 [DO NOT PAY- THIS IS NOT AN INVOICE] JURISDICTION: Carlsbad (PCR12-49) VALUATION AND PLAN CHECK FEE PLAN CHECK NO.: 101660 Rev7 PREPARED BY: Glen Adamek BUILDING ADDRESS: 1 Ponto Dr. BUILDING OCCUPANCY: DATE: May 24, 2012 TYPE OF CONSTRUCTION: BUILDING PORTION AREA (Sq.Ft.) Valuation Multiplier Reg. Mod. VALUE ($) Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code cb By Ordinance Bldg. Permit Fee by Ordinance Plan Clieck Fee by Ordinance Type of Review: • Repetitive Fee Repeats • Complete Review • Other 0 Hourly EsGil Fee $500.00 • structural Only $100.00 Mrs. @ $400.00 Based on liourly rate Comments: Sheet 1 of 1 macvalue.doc + BUILDING PLANCHECK Development Services Land Development Engineering CITY OF CHECKLIST 1635 Faraday Avenue CARLSBAD QUICK-CHECK/APPROVAL 760-602-2750 ww/w.carlsbadca.gov ENGINEERING Plan Check for 12.-4^ (l\3iO-iUo^ Date: ^| ^// Project Address: H I (9 J^j^ | V ^ APN Project Description: f-f I LT<^N j^OTE: L/ $ (^-^ M E Valuation: TOK ft(^& P^Tt ENGINEERING Contact: Linda Ontiveros Phone: 760-602-2773 Email: llnda.ontlveros@carlsbadca,gov Fax: 760-602-1052 RESIDENTIAL RESIDENTIAL ADDITION MINOR (<$20,000.00) J CARLSBAD COMPANY STORES OTHER: TENANT IMPROVEMENT I PLAZA CAMINO REAL I COMPLETE OFFICE BUILDING OFFICIAL USE ONLY ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT DATE. •5/z'Z/l2^^ Notification of Engineering APPROVAL has been sent to via on Page 1 of 1 E-36 REV 4/30/11 CITY OF CARLSBAD PLANNING DIVISION BUILDING PLAN CHECK APPROVAL P-29 Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.gov PERMIT NUMBER PCR 12-49 DATE 5/17/12 ADDRESS 1 PONTO DR RESIDENTIAL ADDITION- MINOR (<17,000.00) RETAINING WALL POOL/SPA TENANT IMPROVEMENT COMPLETE OFFICE BUILDING VILLAGE FAIRE SOLAR PANELS OTHER FIRE PITS PLANNER CW/GR DATE 5/17/12 p-29 Page 1 of 1 07/11 \8 ^ M<9Cgi- 1<»-A 1 -—i 1. 1 ^ • *- 1 1 / \ 1 1 / \ 1 ',/ \l \\ 11 /! / 1 1 •.| :— ^ 1 1 I 4-2" 7*^ 00 PIT Pee. srciouR*- o Hilton HKUEnnu HILTON CARLSBAD OCEANFRONT RESORT & SPA SMMMHU SOLTEK PACIFIC CONSTRUCTION SMMMHU JWDA (p-10. JWDA (p-10. BaMnN.in:. tag, ts; >P-g.^ S^et-FVtffB-., ftrvjAU* PER yTDknj^ a a^oc. I- 1^ 3 ^1 >tear «Bue Hilton muEcinu HILTON CARLSBAD OCEANFRONT RESORT a SPA BME SOLTEK PACIFIC CONSTRUCTION JWDA tgmss. srcUs/caiO- WAlU CAP Kt»R. AiX Hook -4 Hilton noscifniE HILTON CARLSBAD OCEANFRONT RESORT & SPA 6. -S^-1*3. SOLTEK PACIFIC CONSTRUCTION JWDA nMmiNa.- nensiiB: \ id =DCI Project No. Sheet No. Project Date Subject By &6S /•f^P- 9lr(^/^ -2. =DCI Project ~ ' Project No. Sheet No. Date, '. 5//7//'Z- subject —— ^' OO^ r •••• ty-,-. - • • . - . r ^ By •1 3^ • ^ ^ i,- v%s* /.v.r*'' Af =DCI enr;inf=f=R=? Project No. Sheet No. Project , Date. Subject By, 3St 3 5S^ oi ROOF EXHAUST FAN. INSTAU. PER MFR'S RECOMMENDATIONS •set/' -^Af/^Ji/Cr COMPOSmON SHNGLES ROOFING - INSTAa PER MANUFACTURER'S RECOMMENMTK)NS UNDERIAYMENT MEMBRANE S-Xa' EXPOSED HIP TRUSS - PAINTED 04"XI/4' HSS SQUARE ROOF COUAR WITH IX wm COVERING - PTD. 5/8" DIA. LAG BOLT W/ 1/8* THK. NYLON BUSHING OR SUEVE / WASHER AT EACH HP " TRUSS WITH 4' MM. EMBED INTO ROOF TRUSS 2'X4" CONT. 16 GA. STAINLESS STEEL FORMED METAL SHEET ie GA. STAiNlESS STEa OCCORATIve CHMNET STACK 3/B' DIA. STAINLESS STEa DECOWnvE RODS SCREWED TO THE TDP AND BOTTOM 14 GA. STAINLESS STEa DECORATIVE HOOD 6'-8* CLEAR TO 6"X6- WOOD POST-I— BY APPROVED OCT 10 2012 City of CARLSBAD BUILDING DEPT GRAND EFFECTS Fire Pit Inserts (Automated) Model 100A INSTALLATION GUIDE OPERATING AND MAINTENANCE INSTRUCTIONS For vour safetv: If you smell gas: 1. Shut off gas to the appliance 2. Extinguish any open flame near unit. 3. If odor continues, immediately call your gas supplier For vour safetv: Do not store or use any gasoline or other flammable vapors and / or liquids in the vicinity of this or any other appliance. NO EXCEPTIONS TAKEN X REVISE RESUBMfr 0 MAKE CORRECTIONS NOTED'D SUBMIT SPECIFIED ITEM 0 00 NOT RESUBMIT 0 REJECTED • REVIEWED SUBJECT TO ENGINEER'S COMMENTS 0 REVIEWED ONLY FOR GENERAL CONFORMANCE TO PROJECT'S DESIGN CONCEPT AND GENERAL COMPLIANCE WITH CONTRACT DOCUMENTS CONTRACTOR IS RESPONSIBLE FOR DIMENSIONS, QUANTITY. CON- STRUCTION METHODS AND INSTALUTION. OATE, _BY. 0 • >?• IZ. JWOA 2359 FOURTH AVE. SAN DiEGO, CA 92101 (619) 233-6777 This manual should remain with the homeowner or parties responsible for operation. (RevH) Cf^(o|(^C^O Table of Contents Gas and Electrical Requirements Page 3 Installation of Fire Pit Insert ^ Page 6 Burner Setup and Adjustment Page 8 Maintenance Page 9 Operation Page 9 Spare Parts Page 10 Troubleshooting Guide Page 11 Control Panel Wiring Diagram Page 12 Burner Assembly Wiring Diagram Page 13 1.0 Gas and Electrical requirements: 1.1 Input Voltage: 120 Vac / 60 Hz to Grand Effects Control Panel 1.2 Gas type: Natural Gas Propane 1.3 Gas Pressure: Nominal: 7"wc 11 "wc 1.4 Gas flow: 1 Burner System: 80,000 Btu/hr Note: Check with your gas supplier to verify gas flows and pressures available at the location of your installation. In many cases utility companies will install larger meters at no charge to accommodate larger flows. 2.0 Installation for Fire Pit Insert Warning: This unit is for outdoor use only Recommended CSAI AGA Clearances: Sides 4 ft/Top 6ft unit is for outdoor use only 2.1 Do not install near any combustibles such as wood structures, fuels, clothing, fabrics or dry vegetation. 2.2 Install Burner Assy well out of the way of pedestrian traffic. 2.4 Installation shall be performed by a licensed contractor. All aspects of installation must conform to local or National codes, or in the absence of codes, with National Fuel Gas Code ANZI Z223.1. 2.5 The Control Panel and approved manual gas valve shall be located where they can be easily accessible so that the gas can be shut off quickly in case of an emergency. 2.6 Install the Control Panel and gas piping as shown in Fig. 1 (Natural Gas) or Fig. 2 (Propane Gas) or Fig. 3 (Commercial Installation). Gas lines must be clean and free from any dirt, debris or contamination 2.1 A gas pipe elbow must be installed on gas line for proper installation of gas hose. (See Fig. 4) Do not kink or make tight radius bend on gas hose. 2.65 Note that piping is different for propane than natural gas as shown in Fig. 1 and Fig. 2 2.7 Low voltage 14 or 16ga wiring (24Vac) shall be installed underground between the Control Panel and the Burner Assembly. Wire per Grand Effects Wiring Diagram. 120v source into Control Panel can come from any 120v source, including pool controller or home system. Typically, the pool controller is the device that turns the unit on/off. If a pool controller is not available. Grand Effects can provide a hand held remote system or an electrician can wire a decorative switch for on/off control upstream of the Grand Effects Control Panel. 2.8 Providing good drainage is critical as shown in Fig. 4 2.9 Venting (air gap at bottom of fire pit walls) is required as shown in Fig. 4 and Fig. 5. 2.8 Maintain good piping practice by keeping pipe length and elbows to a minimum to eliminate unnecessary pressure drops. (Do not use any corrugated flexible gas line). 2.9 Adjust the height of the Support Plate as shown in Fig. 3 & 4. Cut off excessive length of bolts. 2.95 On commercial installations, it is recommended to install a keyed switch and kill switch located in close proximity and in visible sight of feature or features. The keyed and kill switches are supplied by others. 2.96 Using fire brick to line the inside of the fire pit is not recommended. Fire brick will retain heat and may result in over heating of the electronics. IMPORTANT!! Note: 18" Minimum Depth Requirement of Fire Pit (as shown in Fig. 4 and Fig. 5) Venting is required for cooling Burner Assembly (as shown in Fig. 4 and Fig. 5) 120VAC 60HZ INPUT- TO CONTROL PANEL O -CONTROL PANEL (MOUNTED TYPICALLY WITH POOL EQUIPMENT) 24VAC OUTPUT & CONDUIT (UNDERGROUND) 3/4" - 1" NPT GAS PIPING (UNDERGROUND) Set up for Natural Gas Fig.1 120VAC 60HZ INPUT TO CONTROL PANEL GAS INLET (PROPANE) SUPPLIED BY GRAND EFFECTS INSTALLED AS CLOSE AS POSSIBLE TO FIRE PIT- -CONTROL PANEL (MOUNTED TYPICALLY WITH POOL EQUIPMENT) 24VAC OUTPUT 4 CONDUIT (UNDERGROUND) 3/4" - r NPT GAS PIPING (UNDERGROUND) Set UP for Propane Gas Fig. 2 120VAC 60HZ INPUT TO CONTROL PANEL GRAND EFFECTS' SAFETY PIPE TRAIN -KILL SWITCH (SUPPLIED BY OTHERS) -KEYED SWITCH (SUPPLIED BY OTHERS) CONTROL PANEL 24VAC OUTPUT & CONDUIT (UNDERGROUND) 3/4" - r NPT GAS PIPING (UNDERGROUND) Fig. 3 (Commercial Installation) Important: Do not kink or make sharp radius on metal gas hose. Do not come straight up with gas hose. As shown below, a 90 gas pipe elbow must be installed on gas line for proper installation of gas hose. If not installed with elbow as shown below, product warranty will be void. -THREADED ROD 3/4" BALL VALVE OR KEYED VALVE 3/4" - 1" NPT GAS PIPING (4) 2.5" DIA. MULTIPLE VENTS REQUIRED - -REDUCE TO 1/2" Fig. 4 (Natural Gas- Residential Installation) 3.0 Installation of Fire Pit Insert 3.0 Install Burner Assembly as shown in Figure 6. The Burner Assembly shall be centered and supported by the "SUPPORT Plate". 3.1 Connect Gas Hose to Burner Assembly as shown in Figure 6. 3.2 Install wire nuts on wires from Control Panel and Burner Assembly. Be careful to hook up the "positive" to the red wire and the "negative" to the white wire. Wrap wire nuts with electrical tape or some means to prevent moisture from getting in. Make sure wire nuts are positioned at bottom of fire pit, away from bottom of Burner Assembly. 3.3 With all gas connections tight, position Burner Assembly so that it sits level on the "SUPPORT Plate". REMOVE EXCESS AFTER INSTALLING NUT THREADED ROD J/4" BALL VALVE OR KEYED VALVE 3/4" - 1" NPT GAS PIPING Fig. 5 (Propane-Residential Installation) REMOVE EXCESS AFTER INSTALLING NUT 3/4" BALL VALVE OR KEYED VALVE 3/4" - r NPT GAS PIPING REDUCE TO 1/2" Fig. 6 (Natural Gas-Commercial Installation) REDUCE TO 1/2" Fig. 7 (Propane-Commercial) BURNER ASSEMBLY Fig. 8 (Natural Gas) GAS INLET PILOT SOLENOID MAIN SOLENOID IGNITOR ENCLOSURE WiTH HONEYWELL FLjAME SAEETY Fig. 9 (View is from bottom side of Burner Assembly) 4.0 Burner Setup and Adjustment 4.1 4.2 4.3 4.4 After the "Burner Assembly" has been lit, it can now be adjusted for flame size. The height of the flame can be adjusted by opening or closing the customer ball valve as shown in Fig. 1 and Fig. 2. On propane installation you can adjust valve provided with propane adder. Flame height should be adjusted to 10"-12". More flame height can result in overheating of the burner. Install decorative rock or glass on top of "Burner Support" and "Burner Assembly". Larger lava rock is recommended (2"-4" in size). It will work better than smaller rock. Make sure that all rock is clear of the pilot area and hood area. Pilot Hood area needs to remain clear of rock for proper operation. Note: Do not use glass with propane installations. (If you use glass with natural gas, you will need to lay down stainless mesh screen to prevent the glass from falling through. Do not cover Burner Assembly with thick layer of glass, glass thickness should be just enough to cover Burner Assembly and Support Plate. Fire Glass requires a Glass Pilot Hood, which is different than standard Pilot Hood used with lava rock. Please consult Grand Effects Glass Install Manual. If you use %" pieces of lava it should be treated as a glass installation. IMPORTANT: Do not use flre glass with propane installations!! CAUTION!! Use only approved decorative media to cover Burner Assembly. Lava and Tumbled Lava/Ceramic Stone and Flre Glass are all accepted media. However, use caution when in immediate area, pieces may pop or explode when exposed to heat or when wet and exposed to heat. 5.0 Maintenance 5.1 Periodically clean the Burner Assembly with a wet cloth or cleaning solution to remove carbon build-up. 5.2 Frequency of the cleaning will depend on usage. 5.3 Periodically inspect the underside of the Burner Assembly for any signs of excessive temperatures. 5.4 Check that all gas connections are tight 5.5 The units should be cycled frequently (especially after a rain). The Burner Assemblies will not work in snow and ice conditions. They should be covered or removed for storage in snow and ice conditions. The Units should not be operated in high wind conditions. High winds can limit the cooling air required for cooling of the Burner Assembly. 5.6 Gas should be securely shut-off during non use. Note: If any problems are present, consult a licensed heating specialist or call Grand Effects. 6.0 Operation Warning: This unit is for outdoor use only For your safety: 1. If you smell gas, shut off Gas Valve immediately. 2. Extinguish any open flame. 3. If odor continues, immediately call your gas supplier. 4. Do not store or use gasoline or other flammable vapors and / or liquids in the vicinity of this appliance. 5. Do not leave flame on while unsupervised. 6. Do not operate in windy or rainy conditions. If this is done, unit will cycle on and off automatically. 7. Unit should be operated only by a responsible adult 8. When in use, an open flame is present, therefore, use with extreme care and at your own risk. 9. Before any inspection of the unit, always turn off power and gas supply at the Control Panel. 10. If you experience problems with this unit, call Grand Effects or a licensed heating professional. All work on this unit shall be perfonned by a licensed heating professional. Caution! Before you turn on the Grand Effects System, make sure that it is clear or people, animals or any objects that are combustible. Operating Instructions: To turn unit "On": 1. Turn Burner Power "On" To turn unit "Off": 1. Turn Burner Power "Off". Note: If Burner fails to light, turn corresponding Burner Switch in the Control Panel to the "Off" position then to the "On" position. This will initiate a new trial for ignition. 7.0 Spare Parts 1/4" Pilot Solenoid 3/8" Main Solenoid Ignition Module 10 Main Burner Does Not Light (No Spark) Model 100/1 OOA Burner Assv. 1) Remove rock/glass away from pilot area 2) Remove Pilot Hood (Look for small pieces obstructing pilot) 3) If still no spark, confirm that you have 24vac out of Panel and at Burner (measure voltage on terminals L, N) 4) If you have voltage going out to Burner, but no spark -Replace Control Module (Look fbr excess heat on module) 5) If you have no voltage out of Panel, Reset fuse button on transformer and breaker switch, Confirm 110v going into panel on terminals L, N 5) If you have 110 V on L, N and Fuses check OK, but still no 24 v output on X1,X2, replace transfomer Spark (But No Pilot) Burner Goes ON/OFF 1) Remove rock/glass away from pilot area 2) Remove Pilot Hood (Look for small pieces obstructing pilot) 2) Confirm if gas is coming out of pilot, you can hear it (use BBQ Lighter to determine if gas is coming out of pilot) 3) If no pilot gas, check that gas is turned on. 4) Pilot orifice may be plugged. Replace orifice or complete pilot assembly 5) If still no gas, pilot valve may not be opening. Turn gas off and confirm if Pilot Solenoid is energizing 6) If not energizing-replace Control Module, if it is energizing-clean out Pilot Solenoid 1) Is it going off because of wind? If so, how windy-slight breeze-gusty?? (If wind, rotate Burner Assy in bowl, or add 3.5" X 17" Wind Band) 2) Remove rock/glass away from pilot area (Does it get better?) How much glass? Thin down glass on burner assy 3) Remove all Rock/Glass from Burner Assy. (Does Problem go away?) 5) Is main flame adjusted to low? (If Burner is adjusted to low, pilot will be to small and unstable) 6) If burner shuts off after a 30-4min period and then goes off and does not come back on (Replace Control Module) Pilot comes on but no main burner 1) On Model! 00 Burner Assy, confirm that red handled batt valve underneath burner is open 2) If possible confirm that main gas solenoid is energizing, if not replace Control Module 3) Main Burner Solenoid may have to be replaced if buzzing Main Burner or Pilot does not shutoff 1) Remove Solenoid Coil and clean inside of solenoid (looking for contaminants) CPWD-1 LEGEND L = 120 VAC LINE N = 120 VAC NEUTRAL GND = EARTH GROUND XI = 24 VAC HOT X2 = 24 VAC COMMON A ELECTRICAL SERVICE 120 VAC SINGLE PHASE i WITH EARTH GROUND NOTES: A /k\ FEEDER CIRCUIT PROTECTION PROVIDED BY OTHERS A TORQUE TERMINAL BLOCKS T012.0-13 LB4N. ^ USE STRANDED COPPER CONDUCTORS ONLY RATED @60°C MIN A TORQUE GROUND TERMINALS TO 20 LWN. FIELD WIRE BY OTHERS 0 0 0 0 0 0 L N GND X1 X2 GND 9 9 9 9 9 9 I L_ L I "I "I J J RED BURNER THIS PANEL ENCLOSURE IS RATED NEMA 3R. TO PRESERVE RATING USE NEMA 3R CONDUIT ENTRY HUBS A TERMINAL STRIP IN GRAND EFFECTS CONTROL PANEL WHTi , 1°"°"°- BAED-1 iSI",^ O SPARK SENSE °o 24V to 24V (GRP) in GRD (BURNER)-i- PV MV/PV fM MV REVISION HISTORY DATE APPROVED IGNITER ( + ) EROM CONTROL PANEL (-) EROM CONTROL PANEL GROUND + ) PILOT SOLENOID -) PILOT SOLENOID / MAIN SOLENOID + ) MAIN SOLENOID JRAWING PRODUCED ON AUTOCAD 2000 AU. DIMENSIONS IN INCHES Unten .p«HM tMronca. 0 OECIUHLS ANGl£ E RMS or b.lt.r APPROVALS DATE DRAWNBY 05-FEB-07 REQUESTOR MANUFACTURING ENGINEERING GRAND EFFECTS MISSION VIEJO.CA BURNER ASSEMBLY ELECTRICAL DRAWING SCALE SHEET DWG NO. N/A 1 OF 1 BAED- ©COPYRIGHT GRAND EFFECTS 13 Grand Effects Limited Warranty 1 Year Residential 16 IVIonth Commercial Grand Effects will replace, at its expense, any unit, which in normal use, has proven to be defective in workmanship or material, provided that the customer returns the product prepaid to Grand Effects with proof of product within one year and provides Grand Effects with reasonable opportunity to verify the alleged defect by inspection. Grand Effects will not be responsible for any asserted defect, which has resulted from misuse, abuse, repair or alteration. Under no circumstances will Grand Effects be liable for incidental or consequential damage resulting from defective products. This warranty is Grand Effects' sole warranty and sets forth the customer's exclusive remedy, with respect to defective products, all other warranties, expressed or implied, whether of merchantability, fitness for purpose or otherwise, are expressly disclaimed by Grand Effects. Grand Effects is not responsible for any injury or mishap related to misuse, abuse or lack of judgment choosing fire display locations. Contact us at: GRAND EFFECTS 18 Technology Dr. #122 Irvine, CA 92618 Office (949) 697-5270 Fax (949) 625-8027 e-mail: info@grandeffectsinc.com 14 CSA INTERNATIONAL Certificate of Compliance Certificate: 1355624 Project: 1781223 Issued to: Grand Effects 10 Argento Drive Mission Viejo, CA 92692 USA Attention: Kevin Doud Master Contract: 217348 Date Issued: 2006/11/08 The products listed below are eligible to bear the CSA Mark shown with adjacent indicator *US* Issued by: Eiigio Trinidad Authorized by: Bret Ekstrand, Project Engineer FROPUCTS CLASS 2731 82 - LIGHTING (GAS) - Outdoor Decorative Type-Certified to U.S. Standards Model Number For Use With Natural Gas Illuminating Appliance for Outdoor Installation Maximum Minimum Input Rating Input Rating Trade name: GRAND EFFECTS The US' indicator adjacent to tbe CSA Maik signifies ttiat the product has been evaluated to the applicable ANSIAJL Standaids, ror use in die U.S.. This US' indicator includes products ehgible to bear the "NRTL' indicator. NRTL, i.e. National Recognized Testing Laboratory, is a designation granted by the U.S. Occupational Safety and Heahfa Administration (OSHA) to laborat<nies which have been recognized to perfonn certific^ion to U.S. Standards. DQD 507 Rtv. 2004-06-30 CSA INTERNATIONAL Certificate: 1355624 Master Contract: 217348 Project: 1781223 Date Issued: 2006/11/08 100, 100-A 80,000 60,000 100-M 80,000 For Use With Propane Gas Illuminating Appliance for Outdoor Installation Trade name: GRAND EFFECTS 100, 100-A 80,000 60,000 100-M 80,000 For details related to rating, size, configuration, etc. reference should be made to the CSA Certification Record or the descriptive report. APPUCABLE REOUIREMENTS I.A.S. Requirement 8-96 Gas-Fired Decorative Illuminating Appliances For Outdoor Installation MARKINGS All markings and printed instructions are in compliance with the above-mentioned requirements. Samples are contained in the main certification report POP 507 Rev. 2004-06-30 BY APPR 1^ OCT 10 2012 City of CARLSBAD BUILDING DEPT GRAND EFFECTS Linear Fire Bar Inserts (Automated Operation) OWNER'S MANUAL / OPERATING AND MAINTENANCE INSTRUCTIONS For vour safetv: For vour safetv: If you smell gas: Do not store or use any gasoline or 1. Shut off gas to the appliance other flammable vapors and / or 2. Extinguish any open flame liquids in the vicinity of this or any near unit. other appliance. 3. If odor continues, immediately call your gas supplier NO EXCEPTIONS TAKEN -« REVISE RESUBMrT D MAKE CORRECTIONS NOTED tl SUBMIT SPECIFIED ITEM 0 DO NOT RESUBMIT D REJECTED • REVIEWED SUBJECT TO ENGINEER'S COMMENTS 0 REVIEWED ONLY FOR GENERAL CONFORMANCE TO PROJECTS DESIGN CONCEPT ANO GENERAL COMPLIANCE WITH CONTRACT DOCUMENTS CONTRACTOR IS RESPONSIBLE FOR DIMENSIONS. QUANTrfV, CON- STRUCTION METHODS AND INSTAUATION. DATE. .BY. T- 14- 12. JWDA 2359 FOURTH AVE. SAN DIEGO, CA aZIOl (618) 233^777 This manual should remain with the homeowner or parties responsible for operation. (Rev B) POL I Zoc/^ Table of Contents Gas and Electrical Requirements Page 3 Installation of Linear Fire Bar Insert ^ Page 3 Burner Setup and Adjustment Page 10 Maintenance Page 11 Operation (Automation) Page 11 Operation (IVlanual) Page 13 Spare Parts Page 13 Troubleshooting Guide Page 15 Control Panel Wiring Diagram Page 16 Burner Assembly Wiring Diagram Page 17 1.0 Gas and Electrical requirements: 1.1 Input Voltage: 120 Vac / 60 Hz to Grand Effects Control Panel 1.2 Gas type: Natural Gas Propane 1.3 Gas Pressure: Nominal: 7"wc 11 "wc 1.4 Gas Requirements: Length 36" 48" 60" 72" 84" 96" 108" 120" (Btu/Hr) 120,000 155,000 190,000 225,000 260,000 295,000 330,000 365,000 Note: Check with your gas supplier to verify gas flows and pressures available at the location of your installation. In many cases utility companies will install larger meters at no charge to accommodate larger flows. 2.0 Installation for Linear Flre Pit Insert Warning: This unit is for outdoor use only Recommended CSA/AGA Clearances: Sides 4 ft unit is for outdoor use only 2.10 Do not install near any combustibles such as wood structures, fuels, clothing, fabrics or dry vegetation. 2.15 Install Fire Feature well out of the way of pedestrian traffic. 2.20 Installation shall be performed by a licensed contractor. All aspects of installation must conform to local or National codes, or in the absence of codes, with National Fuel Gas Code ANZIZ223.1. 2.25 The Control Panel and approved manual gas valve shall be located where they can be easily accessible so that the gas can be shut off quickly in case of an emergency. 2.30 Install the Control Panel and gas piping as shown in Fig. 1 (Natural Gas) or Fig. 2 (Propane Gas) or Fig. 3 (Commercial Installation). Gas lines must be clean and free from any dirt, debris or contamination 2.35 Note that piping is different for propane than natural gas as shown in Fig. 1 and Fig. 2 A Propane Adder Valve is required with propane. It is installed upstream of the Line Burner and serves as a redundant safety valve located upstream in the propane line. 2.40 Low voltage 14 or 16ga wiring (24Vac) shall be installed underground between the Control Panel and SubPanel. Wire per Grand Effects Wiring Diagram. 120v source into Control Panel can come from any 120v source, including pool controller or home system. Typically, the pool controller is the device that turns the unit on/off. If a pool controller is not available, Grand Effects can provide a hand held remote system or an electrician can wire a decorative switch for on/off control upstream of the Grand Effects Control Panel. 2.45 Build structure so that inside dimensions meet requirements shown in Fig. 5 2.50 2.55 2.60 2.65 2.67 2.70 2.75 2.77 Do not use fire brick to line the inside ofthe Linear Fire Pit. Fire brick will retain heat and may result in over heating of the electronics. Providing good drainage is critical as shown in Fig. 6 Venting (air gap at bottom of Linear Fire Pit side and end walls) is required as shown in Fig. 6 to keep wiring and electrical components from overheating. Maintain good piping practice by keeping pipe length and elbows to a minimum to eliminate unnecessary pressure drops(Do not use any corrugated flexible gas line). SubPanel can be mounted OUTSIDE of trough (Outside Mount-Fig.7) or INSIDE of trough (Inside Mount-Fig.8). Outside Mount requires the gas and electrical to be located outside and at end of trough. Inside Mount requires gas and electrical to be located inside and at end of trough. Mount the Support Plate using the L Brackets provided. The Support Plate should be mounted so that top of Burner is 1/2"-1" below top of wall or cap. (shown in Fig. 6) The Support Plate should rest on top of the L Brackets. If the inside trough dimensions (width x length) are larger than suggested dimensions in Fig. 5, then builder will need to support Burner Assembly with cross member supports. The extra gap around burners will need to be filled in with metal plate so that decorative media does not fall through. On commercial installations, it is recommended to install a keyed switch and kill switch located in close proximity and in visible sight of feature or features. The keyed and kill switches are supplied by others. IMPORTANT!! Note: 20" Minimum Depth Requirement (SubPanel Inner Mount-shown in Fig. 6) 12" Minimum Depth Requirement (SubPanel Outer Mount-shown in Fig. 6) Venting Is required for cooling Burner Assembly (as shown in Fig. 6) 120VAC 60HZ INPUT TO CONTROL PANEL CONTROL PANEL (MOUNTED TYPICALLY WITH POOL EQUIPMENT) 24VAC OUTPUT & CONDUIT (UNDERGROUND) 3/4" - 1" NPT GAS PIPING (UNDERGROUND) Set up for Natural Gas Fig.1 120VAC 60HZ INPUT TO CONTROL PANEL GAS INLET - (PROPANE) CONTROL PANEL (MOUNTED TYPICALLY WITH POOL EQUIPMENT) SUPPLIED BY GRAND EFFECTS INSTALLED AS CLOSE AS POSSIBLE TO FIRE PIT 24VAC OUTPUT St CONDUIT (UNDERGROUND) 3/4" - 1" NPT GAS PIPING (UNDERGROUND) Set up for Propane Gas Fig. 2 120VAC 60HZ INPUT - TO CONTROL PANEL -KILL SWITCH (SUPPLIED BY OTHERS) -KEYED SWITCH (SUPPLIED BY OTHERS) GRAND EFFECTS' SAFETY PIPE TRAIN CONTROL PANEL 24VAC OUTPUT & CONDUIT (UNDERGROUND) 3/4" - 1" NPT GAS PIPING (UNDERGROUND) (Commercial Installation) Fig. 3 NOTE: Inside Mount requires SubPanel to be mounted inside and at end of trough. Outside Mount requires SubPanel to be mounted on outside wall trough. IMPORTANT! Sub Panel must be Installed within 4 ft of Pilot Assembly located at end of Burner Assembly. Grand Effects pilot gas hose and electrical wires to pilot is 4ft maximum. GRAND EFFECTS SUB-PANEL -2WAC FROM CONTROL PANEL BYPASS VALVE SHOULD BE CLOSED AS SHOWN (MANUAL OPERATION) GAS VALVE TO ADJUST BURNER HEIGHT ELECTRICAL TO PILOT GAS OUTLET TO LINE BURNER (Sub-Panel) Fig. 4 SUPPORT PLATE DIMENSIONS (L x W) Burner Length Outer Mount Inner Mount 3ft 44"x 10" 60"x 13" 4ft 56"x 10" 72"x 13" 5ft 68"x 10" 84"x 13" 6ft 80"x 10" 96"x13" 7ft 92"x10" 108" xl3" 8ft 104"x10" 120" X 13" 9ft 116" x 10" 132" X 13" 10ft 128" x 10" 144"x 13" Burner Assembly PILOT MOUNT PLATE PILOT COVER UPPORT PLATE LINE BURNER —DEFLECTOR Z-CUP \MT+) T/4-20 BOU 1/4- TO 1/2" WIDER THAN SUPPORT PLATE -1/4" to 1/2" LONGER THAN SUPPORT PLATE- -PILOT ASSEMBLY -SUPPORT PLATE 13" (INSIDE MOUNT) 10" (OUTSIDE MOUNT) Top View of Trough and Burner Assembly Fig. 5 MULTIPLE 3' VENTS REQUIRED (ENDS AND SIDES) - UNE BURNER SUPPORT PLATE O 12" MIN (OUTER WOUNT) 20' MIN (INNER MOUNT) Cut Awav of Trough Section Fig. 6 Note: Gas and Electrical should be located INSIDE of trough for INSIDE MOUNT and OUTSIDE of trough for OUTSIDE MOUNT IMPORTANT! Sub Panel must be Installed within 4 ft of Pilot Assembly located at end of Burner Assembly. Grand Effects pilot gas hose and electrical wires to pilot is 4ft maximum. Note: Gas and Electrical should be located outside of trough at one end. (OUTER MOUNT) SUBPANEL (OUTSIDE MOUNT) Fig. 7 8 MULTIPLE 3" VENTS REQUIRED (ENDS AND SIDE) ACCESS PLATE (ACCESS TO CONTROL PANEL) GRAND EFFECTS SUB-PANEL o ELECTRICAL FROM • GRAND EFFECTS CONTROL PANEL - SUPPORT PLATE Note: Gas and Electrical should be located inside of trough at one end. Do not mount SubPanel on floor or side walls. SubPanel must be mounted vertical on end wall closest to Pilot Assembly on Burner. SUBPANEL (INSIDE MOUNT) Fig. 8 rLINE BURNER PILOT ASSEMBLY BURNER GAS HOSE (GRAND EFFECTS) INSTALL 9Cr ELBOWS PILOT GROUND PILOT SPARK PIPING CONFIGURATION Fig. 9 9 2.80 Mount SubPanel (inside mount should be mounted vertically at end of wall) This will allow access for service. 2.85 Connect inlet and outlet gas hoses supplied by Grand Effects, making sure all connections are tight. Keep hoses away from underside of Support Plate, (away from heat) 2.90 Connect ignitor and ground wires at pilot to SubPanel. Important: Do not kink or make sharp radius on gas hose. Make sure gas hoses are not touching underside of Support Plate. 3.0 Burner Setup and Adjustment 3.10 With the upstream gas valve in the "closed" position and 1 lOVac coming into the Control Panel, turn the switch located in the panel to the "OFF" position. 3.20 At the Burner Assembly, check that the spark electrode is arcing across the gap. You should be able to hear and see the electrode spark. If there is no spark, check that the SubPanel is receiving 24vac from the Control Panel. 3.30 Open the upstream gas valve. 3.40 In the Control Panel, turn the switch to the "On" position. Note: At this time the Burner Assembly should ignite. If it does not light, it may be a result of air in the gas line. Purging the air from the gas line will be required. Open up Manual Bypass valve on the Subpanel. This will purge air from gas line. Close Manual Bypass valve when attempting to light. After purging is complete, make sure area is vented and free from built up gas. Caution: When purging air from a propane system, disconnect wires going to Burner Assembly (terminals X1/X2) located in Grand Effects Control. There should be no power at Burner Assemblies when purging Propane. Propane Adder valve should remain wired and energized when Purging. Open up Manual Bypass valve on the Subpanel. This will purge air from gas line. Reinstall wires at X1/X2 terminals, thus providing to power to Burner Assembly. After purging is complete, make sure area Is vented and free from built up gas. 10 3.50 After the "Burner Assembly" has been lit, it can now be adjusted for flame size. 3.60 The height ofthe flame can be adjusted by opening or closing the red handled ball located on the SubPanel. On propane installation you can adjust red handled valve on SubPanel or gas valve provided with propane adder. Flame height should be adjusted to 6"-10". Excessive flame height can result in overheating of the burner. 3.70 Install decorative rock or glass on top of "Burner Support Plate" and "Burner". Larger lava rock is recommended (2"-4" in size). It will work better than smaller rock. Make sure that all rock is clear of the pilot area and hood area. Pilot Hood area needs to remain clear of rock for proper operation. 3.80 Note: Do not use glass with propane installations. (If you use glass with natural gas, and you have more than a %" gap between inside wall and Support Plate, you will need to lay down stainless mesh screen to prevent glass from falling through) If you use %" pieces of lava it should be treated as a glass installation). CAUTION!! Use only accepted media such as:(Lava/Glass/Stone) However, use caution, accepted media may still may pop or explode when exposed to heat or when wet and exposed to heat. Use caution when in immediate area. IMPORTANT: Do not use fire glass with propane installations!! 4.0 Maintenance 4.10 Periodically clean the Burner Assembly with a wet cloth or cleaning solution to remove carbon build-up. 4.20 Frequency of the cleaning will depend on usage. 4.30 Periodically inspect the underside of the Burner Assembly for any signs of excessive temperatures. 4.40 Check that all gas connections are tight. 4.50 The units should be cycled frequently (especially after a rain). The Burner Assemblies will not work in snow and ice conditions. They should be covered or removed for storage in snow and ice conditions. The Units should not be operated in high wind conditions. High winds can limit the cooling air required for cooling of the Burner Assembly. 4.60 Gas should be securely shut-off during non use. 11 IMPORTANT: The System should be cycled ON/OFF after a rain to remove any water in the pilot area. Note: If any problems are present, consult a licensed heating specialist or call Grand Effects. 5.0 Operation (Automated) Warning: This unit is for outdoor use only For your safety: 1. If you smell gas, shut off Gas Valve immediately. 2. Extinguish any open flame. 3. If odor continues, immediately call your gas supplier. 4. Do not store or use gasoline or other flammable vapors and / or liquids in the vicinity of this appliance. 5. Do not leave flame on while unsupervised. 6. Do not operate in windy or rainy conditions. If this is done, unit will cycle on and off automatically. 7. Unit should be operated only by a responsible adult. 8. When in use, an open flame is present, therefore, use with extreme care and at your own risk. 9. Before any inspection of the unit, always turn off power and gas supply at the Control Panel. 10. If you experience problems with this unit, call Grand Effects or a licensed heating professional. All work on this unit shall be performed by a licensed heating professional. Caution! Before you turn on the Grand Effects System, make sure that it is clear or people, animals or any objects that are combustible, Operating Instructions: To turn unit "On": 1. Turn Burner Power "On". To turn unit "Off": 1. Turn Burner Power "Off'. Note: If Burner falls to light, turn corresponding Burner Switch in the Control Panel to the "OfT' position then to the "On" position. This will initiate a new trial for Ignition. 12 GRAND EFFECTS SUB-PANEL 24VAC FROM CONTROL PANEL BYPASS VALVE (MANUAL OPERATION) GAS INLET ELECTRICAL ' TO PILOT GAS OUTLET TO LINE BURNER Fig. 9 6.0 Operation (MANUAL OPERATION) In the event that the automation is not working, the burner can operate in a Manual mode of operation. For your safety: 1 If you smell gas, shut off Gas Valve immediately. 2 Extinguish any open flame. 3 If odor continues, immediately call your gas supplier. 4 Do not store or use gasoline or other flammable vapors and / or liquids in the vicinity of this appliance. 5 Do not leave flame on while unsupervised. 6 Do not operate in windy or rainy conditions. If this is done, unit will cycle on and off automatically. 7 Unit should be operated only by a responsible adult. 8 When in use, an open flame is present, therefore, use with extreme care and at your own risk. 9 Before any inspection of the unit, always turn off power and gas supply at the Control Panel. 10 If you experience problems with this unit, call Grand Effects or a licensed heating professional. All work on this unit shall be perfonned by a licensed heating professional. 13 Caution! Before you turn on the Grand Effects System, make sure that it is clear or people, animals or any objects that are combustible. Operating Instructions: To turn unit "On": 1 Open Manual Bypass Valve on SubPanel to the "On" position. 2 In safe manner, light burner with approved lighting device. To turn unit "Off': 2. Close Manual Bypass Valve on SubPanel to the "Off' position. 7.0 Spare Parts Pilot Assembly SubPanel Ignition Module 14 Main Burner Does Not Light (No Spark) Spark (No Pilot) Burner Goes ON/OFF Pilot comes on but no main burner Linear Insert Burner Assv. 1) Remove rock/glass away from plk>t area (Look for small pieces obstructing pilot) 2) If still no spark, confimn that you have 24vx out of Panel and at Burner (measure voltage on terminals XI ,X2) 3) If you have voltage going out to Burner, but no spark -Replace Control Module (Look for excess heat on module) 4) If you have no voltage out of Panel, reset GFI Circuit Breaker and reset button on transformer, confinn 11 Ov going into panel on terminals L, N 5) If you have 110 V on L, N, but still no 24v output repteu^ transformer 1) Remove rock/glass away from pik>t area (Look for small pieces obstnjcting pikit) 2) Confirm if gas is coming out of pitot, you can hear it (use BBQ Lighter to detennine if gas is coming out of pibt) 3) If no pikA gas, check that gas is tumed on. 4) Pik^ orifk:e may be plugged. Retrace pik>t assembly. 5) If still no gas, pilot valve may not be opening. Tum gas o^f and confirm if PM. SolenokJ is energizing 6) If not energizing-replace nrKxJule (if tt is energizing pik>t valve may have contaminatkMi lodged in it) 1) Is it going off because of wind? If so, how windy-slight breeze-gusty? 2) Remove rock/glass aNnay from pik^ area (Does tt get better?) 3) Remove all Rock/Glass from Burner Assy. (Does Problem go away?) 5) Is main fiame adjusted to k>w? (If Burner is adjusted to k>w. pik}t will be to smaU and unstat^) 6) If burner shuts off after a SCMmin perkxl and ttien goes off and does not come back on (Replace Control Module) 1) Confirm that gas valve on SubPanel (red handled ball valve) is open 2) If possible confirm that main gas solenoki is energizing, if tV3t energizing replace Control Module) 3) Main Bumer SolenoM may have ta be replaced if buzzing Main Bumer or Pikjt does not shutoff 1) Remove Solenoki Coil and clean inside of solenoki (kx>king for contaminants) LEGEND L = 120 VAC LINE N = 120 VAC NEUTRAL GND = EARTH GROUND XI = 24 VAC HOT X2 = 24 VAC COMMON A ELECTRICAL SERVICE 120 VAC SINGLE PHASE < WITH EARTH GROUND NOTES: A FEEMR CIRCUIT PROTECTION PROVIDED BY OTHERS A A TORQUE TERIylNAL BLOCKS T012.0-13 LWN. ^ USE STRANDED COPPER CONDUCTORS ONLY RATED QeOXWN /C\ TORQUE GROUND TERMINALS TO 20 LWN. FED WRE BY OTHERS THIS PANEL ENCLOSURE IS RATED NEMA 3R. TO PRESERVE RATING USE NEMA 3R CONDUIT ENTRY HUBS LB-1 0 0 0 0 0 0 L N GND X1 X2 GND 9 9 9 9 9 9 A TERMINAL STRIP IN GRAND EFFECTS CONTROL PANEL J L_ RED SUB-PANEL 1 PILOT ASSY WHT ^ SPARK GROUND (PILOT) GRN J2 i 2a " s OS 1 1 i i IB-I «» 10ft |DWNo. BAED-1 \\ REVISION HISTORr OESCRIPTION T DATE J APPROVEO IGNITER ( + ) FROM CONTROL PANEL (-) FROM CONTROL PANEL GROUND { + ) PILOT SOLENOID (-) PILOT SOLENOID / MAIN SOLENOID ( + ) MAIN SOLENOID 3RAWING PRODUCED ON AUTOCAD 2000 AIL DWENSKMS IN MCHES OECMAIS WGLZS " N/A APPROVALS DRR MANUFACTURING ENGINEERING DATE 05-FEB-07 TITLE GRAND EFFECTS MISSION VIEJO.CA BURNER ASSEMBLY ELECTRICAL DRAWING SCA1£ N/A SHEET DWG NO. I OF 1 BAED-1 eSSMiSHt 6RAN6 EFFECTS MOi 17 Grand Effects 1 year Limited Residential Warranty/6mo Commercial Grand Effects will replace, at its expense, any unit, which in normal use, has proven to be defective in workmanship or material, provided that the customer returns the product prepaid to Grand Effects with proof of product within one year and provides Grand Effects with reasonable opportunity to verify the alleged defect by inspection. Grand Effects will not be responsible for any asserted defect, which has resulted from misuse, abuse, repair or alteration. Under no circumstances will Grand Effects be liable for incidental or consequential damage resulting from defective products. This warranty is Grand Effects' sole warranty and sets forth the customer's exclusive remedy, with respect to defective products, all other warranties, expressed or implied, whether of merchantability, fitness for purpose or otherwise, are expressly disclaimed by Grand Effects. Grand Effects is not responsible for any injury or mishap related to misuse, abuse or lack of judgment choosing fire display locations. Contact us at: GRAND EFFECTS 18 Technology Dr. #122 Irvine, CA 92618 Office (949) 697-5270 Fax (949) 625-8027 e-mail:info@grandeffectsinc.com 18 CSA INTERNATIONAL Certificate: 2325190 Project: 2325190 Issued to: Grand Effects 18 Technology Drive #122 Irvine, CA 92618 USA Attention: Kevin Doud Master Contract: 217348 Date Issued: October 12,2010 The products listed below are eligible to bear the CSA Mark shown with adjacent indicators 'C and 'US* for Canada and US or with adjacent indicator 'US'for US only or without either indicator for Canada only. Issued by: Felix German PRODUCTS CLASS 2701 03 - DECORATIVE GAS APPLIANCES - Outdoor Fireplaces CLASS 2701 83 - DECORATIVE GAS APPLL^NCES - Outdoor Fireplaces-Certified to U.S. Standards Model Number For Use With Natural & Propane Gas Outdoor Gas Fireplaces Automatic Control System Maxiinum Minimum Input Rating Input Rating Trade Name: GRAND EFFECTS LB3A 125,000 DQD 507 Rev. 2009-OSM)1 CSA INTERNATIONAL Certificate: 2325190 Project: 2325190 Master Contract: 217348 Date Issued: October 12,2010 LB4A LB5A LB6A LB7A LB8A LB9A LBIOA 157,000 189,000 221,000 253,000 286,000 318,000 350,000 For Use With Natural & Propane Gas Outdoor Gas Fireplaces Manual Control System LB3M Trade Name: GRAND EFFECTS 60,000 APPLICABLE REQUIREMENTS ANSI Z21.97-2010 Outdoor Decorative Gas Appliances CGA Certificate Requirement CR97-003 Outdoor Gas Fireplaces DQD 507 Rev 200^09-01 Pane 2 <a> o 1 t 1 inn e tSf ® ® i o * 10.00 -PILOT MOUNT PLATE PARTNO. 11026 -MOUNT PLATE PART NO. 11230 -DEFLECTOR PART NO. 14000 ^—BURNER C'^^") PARTNO. 11016-2 SPACER PARTNO. 12030 4 PLACES- NO EXCEPTIONS TAKEN H" REVISE RESUBMfr D MAKE CORRECTIONS NOTED 0 SUBMIT SPECIFIED ITEM • DO NOT RESUBMIT D REJECTED D REVIEWED SUBJECT TO ENGINEER S COMMENTS • REVIEWED ONLY FOR GENERAL CONFORMANCE TO PROJECTS DESIGN CONCEPT AND GENERAL COMPLIANCE WITH CONTRACT DOCUMENTS CONTRACTOR IS RESPONSIBLE FOR DIMENSIONS. QUANTITY. CON- STRUCTION METHODS AND INSTALUTION. DATE. -BY. JWDA 2359 FOURTH AVE. SAN DIEGO, CA 92101 (619) 233-6777 ntornnAiY AND coNnoEKTiAi THE INFORMATION CONTAINED IN THE DRAWING IS THE SOLE PROPERTY OF GRAND EFFECTS, INC.. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF GRAND EFFECTS. INC, E PROHIBITED, APPLICATION UNLES.S OTHERWISE SPECIFIED; DIMENSIONS ARE IN INCHES TOIERANCB: FRACTIONAL ±1/32 ANGULAR: MACHil- BEND TWO PLACE DECIMAL i-03 THREE PLACE DECIMAL .010 OO NOT SCALE DRAWING GRAND EFFECTS, INC. MISSION VIEJO. CA UNE BURNER ASSEMBLY 4 FT X 10" OUTER MOUNT SIZE B DWG. NO. 410 REV SCALE: 1:6 WEIGHT: SHEET 1 OF I 2.58 PILOT COVER 016.00 BURNER RING 18" OD NO EXCEPTIONS TAKEN BT REVISE RESUBMrT D MAKE CORRECTIONS NOTED 13 SUBMIT SPECIFIED fTEM O DO NOT RESUBMIT 0 REJECTED Q REVIEWED SUBJECT TO ENGINEER'S COMMENTS D REVIEWED ONLY FOR GENERAL CONFORMANCE TO PROJECTS DESIGN CONCEPT AND fiFNFRA|, COMPLIANCE WITH CON|TRACT DOCUMENTS PIOrtlETARY AND CONFtDEHTIAl THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF GTiAVTO tTTtCl^. INC.. Wf REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRFTEN PERMISSION OF GRAND EFFECTS, INC. K PROHIBITED. SOLENOID 2 PLACES SWIVEL TEE FITTING APPLICATION UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN INCHES TOLERANCES: FRACTIONAL ±1/32 ANGULAR: MACHtl" BEND • TWO PLACE DECIMAL *.03 THREE PLACE DECIMAL ±.010 DO NOT SCALE DRAWING GRAND EFFECTS, INC. MISSION VIEJO. CA BURNER ASSEMBLY SIZE DWG. NO. B Assem2 SCALE: 1:8 WEIGHT: SHEET 1 OF I CONTRACTOR IS RESPONSIBLE FOR^DIMENSIONS. QUANTITY. tON- STRUCTION METHODS AND INSTALUTION. DATE. -BY. JWOA 2359 FOURTH AVE. SAN DIEGO. CA 92101 (619) 233-6777 l^e^o^Oid Uj^ir^ 1 12 GA, CARBON STE£L SHEET / / / / KioM loo A •J30 -CEfilERLINE FOR "12^ CUTOUTS GRAND EFFECTS INC. / / / A , 18 Technology Dr. #122 0^/^(f //^ 'fvine. CA 92618 ' ' 92618 NO EXCEPTIONS TAKEN % MAKE CORRECTIONS NOTED 0 DO NOT RESUBMIT 0 REVISE RESUBMIT • SUBMIT SPECIFIED ITEM 0 REJECTED • REVIEWED SUBJECT TO ENGINEER'S COMMENTS 0 REVIEWED ONLY'FOR GENERAL CONFORMANCE TO PROJECTS DESIGN CONCEPT AND GENERAL COMPLIANCE WITH CONTRACT DOCUMENTS CONTRACTOR (S RESPONSIBLE FOR OIMENSIONS, QUANTITY. CON- STRUCTION METHODS AND INSTALLATION. JWOA 2359 FOURTH AVE. SAN OiEGO, CA S2101 2334777 3932001 05.12 Product Information Chimney Fan RS 009-016 Use The RS Chimney Fan is an exhaust fan used to maintain proper draft in a chimney or stack system. Typical uses include venting of fireplaces, BBQ's, pizza ovens and stoves. Description The RS Fan should be installed at the termination point of the chimney or stack section. It is typically mounted in the vertical position but may be side-wall vented as well. The fan assures a negative pressure is maintained in the entire chimney or stack system. The fan discharges horizontally (vertically, if side-wall vented) at a high velocity. The fan housing is hinged and the top can be opened for easy service and access to stack. Material Housing is 3/16" thick cast aluminum. Finished with one coat of grey hammerpaint for added corrosion resistance. Axial vanes are stainless steel, dynamically and statically balanced to assure low noise level and vibration-free operation. Motor Split capacitor, totally enclosed. Class H insulated, IP54 Protection Class. Sealed ball bearings. Variable Speed. Thermal overload protection. Standard Equipment 2"x4" or 4"x4" Junction Box with Cover and Conduit Fiber Mat and Mounting Brackets Bird Screen 5 Amp Fan Speed Control BY OCI 1) 201? Optional Equipment ADC 100 Fan Control EFC 211 Fan Control EW 40 Wireless Control Proven Draft Switch Listings ETL Listed to: UL378, Standard for Draft Equipment (for gas installations only) CSA-CAN3-B255-M81, Standard for Mechanical Flue Gas Exhausters (for gas installations only) Approvals CE Compliant The Commonwealth of Massachusetts City of Los Angeles, CA (RR 8474) Warranty 2-year factory warranty on entire fan. 10-year warranty against corrosion perforation. Manufactur(5d at ISO9001 certified plant. Citv ot CARLSE3AL. Specifications a^e stjljjpcp]^ j;h^^nge|U|ijtK|Uj.<^tice. VENTING DESIGN SOLUTIONS 5932007 05.72 Product Information Specifications Model Rsoog RS012 RS014 RS01B Discharge Horizontal Fan Type Axial Vane Motor Type Totally enclosed, Variable speed. Class H Voltage VAC 1x120 RPM 1600 CFM 0.0 Ps 450 950 1400 1950 Amperage Amps 0.5 1.2 1.4 3.9 Motor Output HP 1/30 1/10 1/7 1/3 kW 0.025 0.08 0.1 0.25 Weight Ibs 29 37 47 61 kg 13 17 21 28 Dimensions A in 10.2 11.5 13.1 16.0 mm 259 292 334 407 Bx B in 11.7 14.3 16.6 18.8 mm 296 364 422 478 C in 10.8 13.5 15.5 17.4 mm 275 344 395 441 D in 3.0 3.3 3.9 3.9 mm 75 85 100 100 E in 9.4 11.6 13.5 15.4 mm 238 294 342 397 Temperature Interm. 575°F/300°C Rating Cont. 482°F/250°C Capacity Ps (inW.C 1.0 Sound Data 1 Junction Box 2 Conduit/cord 3 Motor 4 Motor Housing 5 Cooling Plates 6 Bird Screen 7 Base Plate 8 Locking Nut 9 Inlet 10 Axial Vane 11 Hinges 12 Capacitor (inside junction box) Model Lw dB (measured in accordance with ISO 3744) Lp dB(A) Model 125Hz 250Hz 500 Hz 1000Hz 2000Hz 4000Hz 8000Hz Lp dB(A) RS 009 54 50 47 43 38 31 25 21 RS012 64 60 55 52 48 42 34 30 RS014 75 69 65 62 57 51 44 41 RS 016 81 76 72 69 64 58 52 47 250 500 750 1000 1250 1500 1750 2000 Volume (cfm) ENERVEX Inc. 1685 Bluegrass Lakes Pkwy. Aipharetta, GA 30004 P: 770.587.3238 F: 770.587.4731 T 800.255.2923 lnfo@enervex.com www.chimneyfans.com VENTING DESICN SOLUTIONS V MOTOR J ADC100 AC M FAN our 24M)C Ll N POWER SUPPLY 1 X 120 VAC lnhMt Be D«<fic<it«d MK 2 M HK 1 M 24 25 9 0 9 10 rot M OAMPOI vn) RELAY! CTRL L !_J 11 12 13 14 15 16 17 IB 1» 20 21 Al» ( 2 OUT 29 30 P AUX 1 our WMl swrf&H OR RECEIVER I I I I 22 23 NOINC PDS-1 FIREPLACE GAS VALVE GENERATOR HOT COM TH TR <^TH TR~^ GAS VALVE OR IGNmON Refer to page 1 for details on parts, wires and power supply. O Wire Nui Foctory Wired Held WlrlB9 —1— Not Connected ^ Connected OONRDENHAL ^^^^^^^^ 1 II iiaBiii 1 ll Ml fa AwKiInf li tftv lolt pfopwty of DMMJSTO, Inc. Any nprwIucHon in pHt er at • virholt wRh out the expftii Mfllllen ranttnt of BOMUSTO, Inc. b piaNMM. BXHAUSTO VENTING DCSIGN SOLUTIONS imtmmmtmmmi MB 110 {mmi-tm Refer to page 1 for details on parts, wires and power supply. O Wire Nui Foctory Wired Held WlrlB9 —1— Not Connected ^ Connected OONRDENHAL ^^^^^^^^ 1 II iiaBiii 1 ll Ml fa AwKiInf li tftv lolt pfopwty of DMMJSTO, Inc. Any nprwIucHon in pHt er at • virholt wRh out the expftii Mfllllen ranttnt of BOMUSTO, Inc. b piaNMM. THLE WIRING DIAGRAM DATt 06012012 Refer to page 1 for details on parts, wires and power supply. O Wire Nui Foctory Wired Held WlrlB9 —1— Not Connected ^ Connected OONRDENHAL ^^^^^^^^ 1 II iiaBiii 1 ll Ml fa AwKiInf li tftv lolt pfopwty of DMMJSTO, Inc. Any nprwIucHon in pHt er at • virholt wRh out the expftii Mfllllen ranttnt of BOMUSTO, Inc. b piaNMM. NAME AtXlOO Sample JOB # F-XXXXX_WD Refer to page 1 for details on parts, wires and power supply. O Wire Nui Foctory Wired Held WlrlB9 —1— Not Connected ^ Connected NOTTOSCALE DWG BY 2 Of 2 #0 Specifications UL 103 HT and ULC S604 System Applications 5"-8" DuraTech is a double-wall, all-fuel chimney system for use with wood stoves, fireplaces, furnaces, boilers, ranges, water heaters, or other appliances fueled by wood, oil, coal, or gas, and zero-clearance fireplaces that are factory-built. Materials and Construction 5"-8" diameter pipe features inner wall of .020" 430 stainless steel. Outer wall options of .016" 430 stainless steel or .021" galvalume steel. A Thermal Tech (ceramic refractory) blanket insulation is encased between walls. Stainless steel end rings seal the pipe. Dura Tech features light weight insulation, twist-lock fittings, support boxes with factory installed starter sections, elbows with 360° swivel base, select black finish pipe lengths, and five foot length pipe sections. DuraTech 5"-8" With ,1 I hf>iiiiol Ice h bldi'iket Insulation PIifa.sed betweei> diifil walls DVSI.IIMI) offers the optinuini in safety anci f)eifoi inani e. It keet!' th> cuter vv.ill of ' In i. hinun-y cool, while eiiMiiinc] huiii fine o,-"-, t('ni|)('i ,it III es for o|)tinii im cfr<ift iiei fCiiMianc e 1 he innei wall is /" "i. thic kei than (ompetitive ciiimneys for an extra maiyin of safety. No loc kincj bands or tnecfiaiiiral fasteners tetiiiiied. Dnralerh's sleek 1" wall desicjn piovides foi easy installations tliiocigh 16" on-renlei fiaiiiincj. Lor tight installations, a Reduced Clearance Sqnare Ceilincj Scjpporl Box is available (6" dianteter Oiitalech only). f)esicjned for normal, continuous operation at 1000" F ffuc cjas temperatures, DuraTech is subjected to rigorous and stringent HT reciuiremenis ol tlie Ul standard, including one liour at I'lOO' I-, plus three ten minute chimney fire tests at ?100' f". Clearances 2" clearance to combustibles. Shrouds UL Listed with DuraVent shroud specifications. Information available online at www.duravent.com or call and request L157. Diameters 5"-8" Listings c-UL-us Listed to UL 103 HT and ULC S604 (MH7399) (Stainless steel outer wall required for installation In Canada). 21 DuraVent | www.duravent.com DuraTech | All-Fuel Chimney Typical Installations For 5"- 24" DuraTech DVLorDuraBlack Ceiling Support Wall Thimble Chimney Pipe Attic Insulation Shield Hashing Storm Collar Chimney Cap Elbow Bbow Strap TeeiwthTeeCap Tee Support Chase Top Flashing Base Tee/DouWe Tee Anchor Plate or Anchor Plate with Damper RoofSupport Finishing Collar DVL Adapter, DuraBlack Slip Connector, or Snap-Lock Adapter Stove Adapter Cattiedral Ceiling Oil Furnace Refer to our Typical Installation drawings to select the appropriate component parts for your instaliation. • DVL/DuraBlack Chimney Adapter must be used when connecting DVL pipe to a Ceiling Support Box or Finishing Collar. When connecting DuraBlack pipe, a DVL/DuraBlack Chimney Adapter, DuraBlack Slip Connector, or Snap-Lock Adapter must be used. • Wall Thimble must be installed with an appropriate length of chimney pipe for all horizontal through-the-wall installations. To accommodate thicker walls, the telescoping pieces of the Wall Thimble can be separated, and a field-fabricated extension may be installed. • Attic Insulation Shield must be used in all installations that pass through an attic, regardless of whether the attic is insulated or not. • Firestop Radiation Shield must be used when a chimney passes through a floor or ceiling without a support box. Chimney Cap Storm Collar Flashing Attic Insulation Shield Firestop Radiation Shield Adjustable Wall Strap Chimney Pipe Ceiling Support Box DVl/DuraBlack Chimney Adapter DVt or DuraBlack Pipe Appliance adapter Rrcphce (Neworretroflt) Cattwdral Ceiling w/Support BoK 23 DuraVent | www.duraventcom All-Fuel Chimney | DuraTech Planning Your Installation f 3 FT. NfllN. ABOVE ROOF PENETRATION 2n.N4IN.ABOVE .JHIGHEST POINT OF THE BUILDING WITHIN ion. lO- MINIMUM CHIMNEY HEIGHT REQUIREMENT Figure 1 > The following recommendations are general guideline to assist in the layout and selection ofthe chimney components needed for your installation. Always follow DuraVent Installation instructions before installing your chimney system, found with the cap or support box. Installation instructions can be viewed online at www.duravent.com, under catalogs and instructions. • The diameter ofthe chimney should match the outlet size ofthe appliance. An improperly sized chimney results in poor draft and excessive creosote formation. • Measure the diameter ofthe appliance flue outlet. Select the chimney and either DVL or DuraBlack connector stovepipe with the same size diameter as the appliance flue outlet. For fireplace installations, refer to the sizing chart in the back ofthis catalog. • Determine if the installation is a through-the-roof installation or a through-the-wall Installation. A through-the-wall installation will require additional components (Wall Thimble, Tee/ Cap, Tee Support, and Wall Straps). • Install the chimney in the interior of the structure whenever possible. A cold exterior chimney will produce tess draft and will generate n>ore creosote. • If possible avoid offsets that serve to restrict the natural draft. A straight vertical installation is more efficient and less likely to develop creosote. If an offset is required to avoid rafters or other obstructions, measure the horizontal distance required and the vertical height available. Both 15° and 30° elbows are available. Elbows have a 360° swivel base to allow orientation of elbow direction only. Elbows are fixed at 15° or 30°. Elbows greater than 30* are not allowed in the United States. A maximum of two offsets in a single irutallatlon are permitted. Refer to the offset table in the back section ofthis catalog. At least one Elbow Strap is required for each offset. EHsow Straps ensure adequate support. • Determine the minimum chimney height above the roof line. Building codes require a minimum of 3' above the roof penetration and at least 2* higher than any portion of a building within 10*. See figure 1. The termination cap is installed above that point. If chimney extends 5' or more above the roof penetration an extended roof bracket is required. An additional roof bracket is needed every 5'. • Measure the roof pitch. For example a 6/12 pitch has a vertical rise of 6' over a horizontai distance of 12*. Select the appropriate flashing. • Determine the total length of chimney and stovepipe required for the installation. To calculate the instaHed per length of 5'-8' DuraTech pipe, subtract 1 V»' per Joint. For 10'-24* diameter, subtract %* per joint of pipe. Subtract 1 Vt' per joint of DuraBlack stovepipe. Subtract 1 Vl' per joint of DVL stovepipe. Minimum chimney height, at sea level, of straight vertical chimney is 10' to 15" aisove the appliance outlet. Higher elevations, or the use (rf elbows or a tee, wiH require approximately 30% to 60% more height to provide for an adequate draft. • For a UL approved shroud, see the DuraTech Shrouds Installation Instructions (L157). View online at www.duravent.com, under catalogs and instructions. • Be fire safe. Maintain at least 2' clearance to combustibles. Follow local building codes and have your chimney inspected by a certified professional. 800435^429 I DuraVent 24 EFFECTS Automated Fire Features www.grarKleffectsinc.comi 8-3-2012 Dear Michael Grand Effects Safety Pipe Trains are not required for each burner. It is an additional Safety Equipment that Grand Effects incorporates into their systems. It is not a requirement from U.L. or CSA, but a Grand Effects requirement. One Safey Pipe Train per feature is required. The purpose ofthe Safety Pipe Train is to provide dual redundancy in gas shut off. When the system is off, the gas valves making up the Safety Pipe Train are de-energized and in the Off position, not allowing any gas flow to feature. The Fire Pit with the three burners requires one Safety Pipe Train. The one Safety Pipe Train is providing dual redundancy for all three burners. i Ail Grand Effects Burners have been^aproved and tested to meet national ANSI standards. They can be installed in either a built on site strurtcle or a decorative feature provided by Grand Effects. As a manufacturer, CSA gives us the ability to incorporate a burner or multiple burners irito a built on site structure or decorative piece supplied by Grand Effects. As a manufacturer it is up to us to provide the correct number of burners, the proper support assembly, proper venting with the installations. Best Regards Kevin Doud Director of Engineering PCR12049 1 pbrrftw CARLSBAD HILTON: DEFERREB. SUBMITTAL: GAS LINES TO 2 RR- 'nS ^ Cs.<^^c ujj^Ca ics (z) Approved • cv BUILDING PLANNING ENGINEERING HRE Expedite? Y N AFS Checked by: Date Haziviat APCD Health Forms/Fees ^/C 'gvV^ . , , -^i n I 111. o/^Mh^^'h^ Encina HazHealthAPCD SchCMDl Stormwater Special Inspection CFD: Y N LandUse: Due? Density: ImpArea: FY: Annex: By PFF: Y N Comments Date Building Planning Engineering Fire Need? Oate Date 3S • Done • Done • Done • Done • Done SW • Issued t a.*5. City of Carlsbad 1635 Faraday Av Carlsbad.CA 92008 06-06-2012 Plan Check Revision Permit No:PCRl 2055 Building Inspection Request Line (760) 602-2725 Job Address: 1 PONTO RD CBAD Permit Type: PCR Status: ISSUED Parcel No: 0000000000 Lot#: 0 Applied: 05/31/2012 Valuation: $0.00 Construction Type: NEW Entered By: LSM Reference #: lO^W»(ot) Plan Approved: 06/06/2012 PC#: \\000< Issued: 06/06/2012 Project Title: HILTON- REVISED DETAIL FOR Inspect Area: POOL ENCLOSURE (SURROUND) Applicant: Owner: JOHNO ORTEGA 2424 CONGRESS ST SAN DIEGO CA 92110 619-666-8327 Plan Check Revision Fee $145.00 Fire Expedited Plan Review $0.00 Additional Fees $0.00 Total Fees: $145,00 Total Payments To Date: - $145.00 Balance Due: $0.00 FINAL APPROVAL Inspector: Date: Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, resen/ations, or other exactions hereafter cotlectively referred to as "fees/exactions." You have 90 days from the date this pertnit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attacl<, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any tees/exactions of which vou have previousiv been given a NOTICE similar to this, or as to which the statute of limitations has previousiv othenwise expired. ^ CITYOF CARLSBAD PLAN CHECK REVISION APPLICATION B-15 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Plan Check Revision No. PG^ IP.PS^ Original pi,an Check No. IQ ICaCpXD ^^^-^^^^^^br^ Project Address f f^A-fc 1^^. Contact ytA/vo Or-te^^ .Email jtrfe^^^5r»tfgk^4^./.-^ 9^ . , J r-^ • Contact Address ^'^^V ^^•-y^^ir $4-- City P'^^g//^ Zip General Scope of Work AM-I E^<:^o$ure ({^l^^^^^ Original plans preparecJ by an architect or engineer, revisions must be signecJ & stamped by that person. 1 Elements revised: CICIIIC/115 ICVIiCU. ^ Plans • Calculations • Soils • Energy • Other. 2 Describe revisions in detail 3 List page(s) where each revision is shown 4 List revised sheets that replace existing sheets C9.r A^Z — \>iW>\ 2- /^Aeef or.. /I" X f?" ^^ee-f- 5 Does this revision, in any way, alter the exterior of the project? Q Yes 6 Does this revision add ANY new floor area(s)? • Yes H No T Does this revision affect any fire related issues? Q Yes S No 8 Is this a complete set? |S Yes • No S No ^Signature 1635 Faraday Avenue, Carlsbad, CA 92008 Phone: 760-602-2717 / 2718 / 2719 www.carlsbadca.gov Fax: 760-602-8558 EsGil Corporation In PartnersHip witH government for (BuiCding Safety DATE: June 4, 2012 O^EeUfiANT JURIS. JURISDICTION: Carlsbad "O-^^tAN-R^VIEWER • FILE PLAN CHECK NO.: 101660 (Rev. #8) - PCR12-55 SET: I PROJECT ADDRESS: 1 Ponto Dr. PROJECT NAME: Hilton Carlsbad Beach Resort (Revised Pool Enclosure Details) XI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. I I The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to fonward to the applicant contact person. I I The applicant's copy of the check list has been sent to: Michael Tria, 2359 4"" Ave, Suite 300, San Diego, CA, 92101 EsGil Corporation staff did not advise the applicant that the plan check has been completed. I I EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Michael Tria Telephone #: (619)233-6777 Date contacted: (by: ) Email: mtriaOjiwdainc.com Fax #: (619)237-0541 Mall Telephone Fax In Person • REMARKS: By: ALI SADRE Enclosures: EsGil Corporation • GA • EJ • PC 6/01/2012 9320 Chesapeake Drive, Suite 208 • SanDiego, Califomia92123 • (858) 560-1468 • Fax(858) 560-1576 Carlsbad 101660 (Rev. #8) - PCR12-55 June 4, 2012 [DO NOT PAY- THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad - PCR12-55 PLAN CHECK NO.: 10166O (Rev. #8) PREPARED BY: ALI SADRE DATE: June 4, 2012 BUILDING ADDRESS: 1 Ponto Dr. BUILDING OCCUPANCY: U TYPE OF CONSTRUCTION: V-B BUILDING PORTION AREA ( Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) REVISIONS Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code Cb Bldg. Permit Fee by Ordinance Plan Check Fee by Ordinance By Ordinance $145.00 Type of Review: • Complete Review • structural Only D Repetitive Fee Repeats Based on hourly rate • Other [7] Hourly EsGil Fee 1 $116.00 Hr.@ $116.00 Comments: Sheet 1 of 1 macvalue.doc + PCR12055 1 POmO RD HILTON- REVISED DETAIL FOR s///s~ TO esc^jL LD^lo /(^o^D ^Hlzh-fS 1/^5,'oe. UOL.S c& 10/CO a