Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1000 AVIARA PY; 100; CB061935; Permit
07-19-2007 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No: CB061935 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: 1000 AVIARA PY CBAD St: 100 Tl Sub Type: 2120407000 Lot#: $4,620.00 Construction Type: Reference #: COMERICA: 132 SF PRE-FAB VAULT COMM 0 NEW Applicant: INTERIOR ARCHITECTS, INC 550 SO. HOPE ST. LOS ANGELES, CA 90071 Status: EXPIRED Applied: 07/07/2006 Entered By: JMA Plan Approved: Issued: Inspect Area: Plan Check*: Owner: KELLY CORPORATE CENTER II C L L C C/0 THE ALLEN GROUP 5330 CARROLL CANYON RD #200 SAN DIEGO CA 92121 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee $61.19 Meter Size $0.00 Add'l Reel. Water Con. Fee $39.77 Meter Fee $0.00 SDCWA Fee $0.00 CFD Payoff Fee $1.00 PFF (3105540) $0.00 PFF (4305540) $0.00 License Tax (3104193) $0.00 License Tax (4304193) $0.00 Traffic Impact Fee (3105541) $0.00 Traffic Impact Fee (4305541) $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Master Drainage Fee Sewer Fee $0.00 Redev Parking Fee $0.00 Additional Fees HMP Fee TOTAL PERMIT FEES $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00?? $101.96 Total Fees:$101.96 Total Payments To Date:$99.83 Balance Due:$2.13 Inspector: FINAL APPROVAL Date:Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition' of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. 0618801-2 0028 07/07/2006 001 PERMIT APPLICATION CITY OF CARLSBAD BUILDING DEPARTMENT 1635 Faraday Ave., Carlsbad CA 92008 1. PROJECT INFORMATION PLAN CHECK NO. EST. VAL. Plan Ck. Deposit Validated Date By ,_VEV\ •7/SP-/D6 Legal DescrirJlii Total # of units Assessor's Parcel #Existing Use Proposed Use 2. CONTACT PERSON (If Name 3. Address D Agent for Contractor Name 4. Address City State/Zip Telephone # Name " " Addrels * / City Stat^Zip ' / Telephone* ' 5. CONTRACTOR-COMPANY NAME (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law [Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code] or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars [$500]). Narrfe State License # Designer Name State License 8 Address License Class Address City City State/Zip City Business License # State/Zip Telephone # Telephone # 6. WORKER'S COMPENSATION ] , * ' , • Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: D I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. D I have and will maintain worker's compensation, as required by Section 3700 of the labor Code, for the performance of the work for which this permit is issued. My worker's compensation insurance carrier and policy number are: Insurance Company Policy No. Expiration Date (THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS [$100] OR LESS) D CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars($100,000), in addition to the cost of compensation, damages are provided for in Section 3706 of the Labor Code, interest and attorney's fees. SIGNATURE DATE 7, OWNER-BUitDERDECLARATION i .. I hereby affirm that I am exempt from the Contractor's License Law for the following reason: D I, as owner of the property or my employees with wages as their sole compensation, will d the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). D I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractors) licensed pursuant to the Contractor's License Law). D I am exempt under Section Business and Professions Code for this reason: 1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. DYES D NO 2. I (have/have not) signed an application for a building permit for the proposed work. 3. 4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone number / /ontractors license number): 5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone number / type of work): PROPERTY OWNER SIGNATURE DATE WHITE: File YELLOW: Applicant PINK: Finance PERMIT APPLICATION CITY OF CARLSBAD BUILDING DEPARTMENT 1635 FaradayAve., Carlsbad CA 92008 Page 2 of 2 COMPETE TMS SECTION FOR NOAWES/DBmAt BUILDING PERMITS ONLY Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration for or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? DYES D NO Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? D YES D NO Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? D YES D NO IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. 8. CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097(1) Civil Code). LENDER'S NAME LENDER'S ADDRESS 9. APPUCANTCERTIFtCATION I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGEMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations of 5'0" deep and demolition or construction of structures over 3 stories in height. by such permit is not commenced within 180days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180>4aysjsection 106.4.4 Uniform Building Code). APPLICANTS SIGNATURE Wr///(M^/Mf/////W///l DATE WHITE: File YELLOW: Applicant PINK: Finance City of Carlsbad Building Department MAY 2, 2007 INTERIOR ARCHITECTS, INC 550 S HOPE ST LOS ANGELES CA 90071 RE: APPLICATION DATE: 07/07/2006 PLAN CHECK #: CB061935 ADDRESS: 1000 AVIARA PKWY EXPIRATION DATE: 07/07/2007 PERMIT TYPE: TI DESCRIPTION: COMERICA BANK-132 SF PRE FAB VAULT INSTALATION You applied to have your plans checked on the date noted above. To date, the related building permit has not been obtained. The original plan review application will expire as no building permit has been issued. Plans submitted and not retrieved from the building department prior to the plan check expiration date noted above will be destroyed. The provisions of sections 304 (d) of the Uniform Building Code state: "Section 304 9d) Expiration of Plan Review Applications for which no permit is issued within one year following the date of application shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant-or destroyed by the Building Official. In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee." In order to provide better service, please indicate your handling choice for the plans originally submitted and return this letter to the Building Department. Project Abandoned -1 will pick up the plans within 10 days Project Abandoned - Plans may be destroyed If you have any questions, please contact the Building Department at (760) 602-2719. Building Department 1635 Faraday Avenue • Carlsbad, CA 92008 • (760) 602-4660 • FAX (760) 602-8561 May 3, 2007 City of Carlsbad Building Department 1635 Faraday Avenue Carlsbad, CA 92008 Regarding: Expiration of Plan Check # CB061935 BOSTON COSTA MESA DALLAS DENVER LONDON LOS ANGELES NEW YORK SAN FRANCISCO SEATTLE SHANGHAI SILICON VALLEY WASHINGTON, DC 550 HOPE STREET SUITE 1700 LOS ANGELES, CA 90071 213.623.2164 213.623.2139 FAX www.interiorarchitects.com Dear Sir, I am concerned that I have received this notice in regards to the expiration of this plan check application #CB061935. As a design firm we normally do not receive a hard copy of the Permit when our Plan Check has been approved. In all cases we usually get a phone call or a postcard indicating that our project has been approved for construction. On this project, we had three stages of notification that our project had cleared Plan Check. On 8/1/06 we called Esgil Corporation, Bryan Zuppinger, and he indicated that our plans have been approved. On 8/3/06 we called The City of Carlsbad Building Department and were informed that our project cleared plan check. On 8/10/06 Red Hawk Corporation called and told us that Esgil had approved our plans. And, I believe a few days later, the Contractor, Reno Contracting, picked up the permit to build. I would like to have you recheck your records and confirm that this application is expiring. Upon conclusion of your review, can you let me know as soon as possible your findings? Thank you for your help, Edward Yamada, Cc: Harold Kallaway, Principal EsGil Corporation In <PartnersHip •with government for Quitting Safety DATE: August 4, 2006 a AEeLJCANT JURIS^ JURISDICTION: Carlsbad a FILE PLAN CHECK NO.: 06-1935 SET: II PROJECT ADDRESS: 1000 Aviara Parkway Suite 100 PROJECT NAME: Comerica - TI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. 2S| The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. AJ The applicant's copy of the check list has been sent to: Interior Architects / Edward Yamada 550 S. Hope Street Suite 1700, Los Angeles, CA 90071 Esgil Corporation staff did not advise the applicant that the plan check has been completed. XI Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Edward Yamada Telephone #: 213-623-2164 Date contacted: Sh/ok' (by:rA*) Fax #: 213-623-2139 Mail ^/Telephone Fax^ In Person REMARKS: By: Bryan Zuppiger Enclosures: Esgil Corporation D GA D MB D EJ D PC 07/28/06 trnsmtl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858)560-1468 * Fax (858) 560-1576 Carlsbad O6-1935 August 4, 2006 RECHECK PLAN CORRECTION LIST JURISDICTION: Carlsbad PLAN CHECK NO.: 06-1935 PROJECT ADDRESS: 1000 Aviara Parkway Suite 100 SET: II DATE PLAN RECEIVED BY DATE RECHECK COMPLETED: ESGIL CORPORATION: 07/28/06 August 4, 2006 REVIEWED BY: Bryan Zuppiger FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and disabled access. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,1997 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. A. Please make all corrections on the original tracings and submit two new sets of prints to: See item#1 next sheet. B. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon which each correction on this sheet has been made and return this sheet with the revised plans. C. The following items have not been resolved from the previous plan reviews. The original correction number has been given for your reference. In case you did not keep a copy of the prior correction list, we have enclosed those pages containing the outstanding corrections. Please contact me if you have any questions regarding these items. D. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located on the plans. Have changes been made not resulting from this list? a Yes a No Carlsbad O6-1935 August 4, 2OO6 • PLANS NOTE: The items listed below refer to the item numbers from previous list. These remaining items have not been adequately addressed. The notes in bold at the end of or contained within each item are to emphasize the remaining problem. 1. Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: a) Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, and (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. b) Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, and (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 2. Please show the vault square footage at a conspicuous location on the plans. 3. On the cover sheet of the plans, specify any items requiring special inspection, in a format similar to that shown below. UBC Section 106.3.2. • REQUIRED SPECIAL INSPECTIONS In addition to the regular inspections, the following checked items will also require Special Inspection in accordance with UBC Sec. 1701 of the Uniform Building Code. ITEM REQUIRED? REMARKS • FIELD WELDING YES 5. Designer to check the slab for supporting door jamb, 5 kips. 6. Please incorporate structural design in the plans. Carlsbad O6-1935 August 4, 2006 The person responsible for their preparation must sign all final sheets of plans. (California Business and Professions Code). Final structural plans, specifications and calculations must be signed and sealed by the engineer or architect licensed by the State of California who is responsible for their preparation. Please specify the expiration date of license. (California Business and Professions Code). To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Bryan Zuppiger at Esgil Corporation. Thank you. EsGil Corporation In (Partners/Up with, (government for 'Zuitd.ing Safety Date: Time Sent: To: FAX TRANSMITTAL *7 7-/0 0*Number of Pages Being Transmitted: (Including Fax Transmittal) /Cr YAH From: Phone #: Fax#: Hard Copy Mailed? YES NO Remarks: 9320 Chesapeake Drive, Suite 208 4 San Diego, California 92123 4 (858)560-1468 4 Fax (858) 560-1576 EsGil Corporation In Partnership with government for Quitting Safety t DATE: July 19, 20O6 a APPLICANT JURISDICTION: Carlsbad a PLAN REVIEWER a FILE PLAN CHECK NO.: O6-1935 SET: I PROJECT ADDRESS: 1000 Aviara Parkway Suite 100 PROJECT NAME: Comerica - TI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. XI The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. [X] The applicant's copy of the check list has been sent to: Interior Architects / Edward Yamada 550 S. Hope Street Suite 1700, Los Angeles, CA 90071 I I Esgil Corporation staff did not advise the applicant that the plan check has been completed. X] Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Edward Yamada Telephone #: 213-623-2164 Date contactedH/Zo/Ob (by^a^ Fax #: 213-623-2139 Mail Telephone v Fax v/ln Person REMARKS: By: Bryan Zuppiger Enclosures: Esgil Corporation D GA D MB D EJ D PC 07/11/06 trnsmtl.dot 9320 Chesapeake Drive, Suite 208 4 San Diego, California 92123 + (858)560-1468 * Fax (858) 560-1576 Carlsbad 06-1935 July 19, 2006 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: 06-1935 DATE PLANS RECEIVED BY JURISDICTION: DATE INITIAL PLAN REVIEW COMPLETED: July 19, 2006 JURISDICTION: Carlsbad DATE PLANS RECEIVED BY ESGIL CORPORATION: 07/11/06 PLAN REVIEWER: Bryan Zuppiger FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 1997 UBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,1997 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. TENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1997UBC)tiforw.dot Carlsbad O6-1935 July 19, 2006 • PLANS t 1. Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: a) Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, and (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. b) Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, and (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 2. Please show the vault square footage at a conspicuous location on the plans. 3. On the cover sheet of the plans, specify any items requiring special inspection, in a format similar to that shown below. UBC Section 106.3.2. • REQUIRED SPECIAL INSPECTIONS In addition to the regular inspections, the following checked items will also require Special Inspection in accordance with UBC Sec. 1701 of the Uniform Building Code. ITEM REQUIRED? REMARKS • FIELD WELDING YES 4. When special inspection is required, the architect or engineer of record shall prepare an inspection program which shall be submitted to the building official for approval prior to issuance of the building permit. Please review UBC Section 106.3.5. Please complete parts 1, 2 & 3 of the attached form and resubmit. 5. Designer to check the slab for supporting door jamb, 5 kips. 6. Please incorporate structural design in the plans. Carlsbad 06-1935 July 19, 2OO6 The person responsible for their preparation must sign all final sheets of plans. (California Business and Professions Code). Final structural plans, specifications and calculations must be signed and sealed by the engineer or architect licensed by the State of California who is responsible for their preparation. Please specify the expiration date of license. (California Business and Professions Code). To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Bryan Zuppiger at Esgil Corporation. Thank you. Carlsbad O6-1935 July 19, 2OO6 City of Carlsbad Building Department BUILDING DEPARTMENT NOTICE OF REQUIREMENT FOR SPECIAL INSPECTION Do Not Remove From Plans Plan Check No. 06-1935 Job Address or Legal Description 1000 Aviara Parkway Suite 100 Owner Address You are hereby notified that in addition to the inspection of construction provided by the Building Department, an approved Registered Special Inspector is required to provide continuous inspection during the performance of the phases of construction indicated on the reverse side of this sheet. The Registered Special Inspector shall be approved by the City of Carlsbad Building Department prior to the issuance of the building permit. Special Inspectors having a current certification from the City of San Diego, Los Angeles, or ICBO are approved as Special Inspectors for the type of construction for which they are certified. The inspections by a Special Inspector do not change the requirements for inspections by personnel of the City of Carlsbad building department. The inspections by a Special Inspector are in addition to the inspections normally required by the County Building Code. The Special Inspector is "not authorized to inspect and approve any work other than that for which he/she is specifically assigned to inspect. The Special Inspector is not authorized to accept alternate materials, structural changes, or any requests for plan changes. The Special Inspector is required to submit written reports to the City of Carlsbad building department of all work that he/she inspected and approved. The final inspection approval will not be given until all Special Inspection reports have been received and approved by the City of Carlsbad building department. Please submit the names of the inspectors who will perform the special inspections on each of the items indicated on the reverse side of this sheet. (over) Carlsbad 06-1935 July 19, 2006 SPECIAL INSPECTION PROGRAM F ADDRESS OR LEGAL DESCRIPTION: 1000 Aviara Parkway Suite 100 PLAN CHECK NUMBER: 06-1935 OWNER'S NAME: I, as the owner, or agent of the owner (contractors may not employ the special inspector), certify that I, or the architect/engineer of record, will be responsible for employing the special inspector(s) as required by Uniform Building Code (UBC) Section 1701.1 for the construction project located at the site listed above. UBC Section 106.3.5. Signed I, as the engineer/architect of record, certify that I have prepared the following special inspection program as required by UBC Section 106.3.5 for the construction project located at the site listed above. Englneer-l/Architect's Seal & Signature Hera Signed 1. List of work requiring special inspection: D Field Welding 2. Name(s) of individual(s) or firm(s) responsible for the special inspections listed above: A. B. C. 3. Duties of the special inspectors for the work listed above: A. B. C. Special inspectors shall check in with the City and present their credentials for approval prior to beginning work on the job site. Carlsbad O6-1935 July 19, 2006 f JURISDICTION: Carlsbad VALUATION AND PLAN CHECK FEE PLAN CHECK NO.: 06-1935 PREPARED BY: Bryan Zuppiger DATE: July 19, 2006 BUILDING ADDRESS: 1000 Aviara Parkway Suite 100 BUILDING OCCUPANCY: B TYPE OF CONSTRUCTION: VN BUILDING PORTION vault Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code AREA (Sq.Ft.) 132 cb RIHn Permit Poo hw fVriinanro W Valuation Multiplier 34.37 By Ordinance Reg. Mod. VALUE ($) 4,537 4,537 $61.19 Plan Check Fee by Ordinance Type of Review: [U Repetitive Fee Repeats Complete Review D Other •—I Hourly Structural Only Hour* $39.77 Esgil Plan Review Fee $34.27 Comments: macvalue.doc EsGil Corporation Q APPLICANT a JURIS. Q PUN REVIEWER a FILE In fittntnfiip wilA (j'ffvemmenlfor QSitittfing Safety DATE July 19, 2006 JURISDICTION: Carlsbad PLAN CHECK NO.: O6-1935 SET: I PROJECT ADDRESS: 1OOO Aviara Parkway Suite 1OO PROJECT NAME: Comerica - TI « [""] The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. j_j The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. [""] The plans transmitted herewith have significant deficiencies identified on the enclosed check iist and should be corrected and resubmrtted for a complete recheck. [X] The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Interior Architects / Edward Yamada 550 S. Hope Street Suite 1700, Los Angeles, CA 90071 , |~~j Esgil Corporation staff did not advise the applicant that the plan check has been completed. [X] Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Edward Yamada Telephone #: 213-623-2164 Date contacted:7/2o/C6 (by^C6) Fax #: 213-623-2139 Mail Telephone v Fax v^ln Person REMARKS: Enclosures: 07/11/06 trrisfnu.dot By Bryan Zuppiger Esgil Corporation D GA Q MB Q EJ Q PC 9320 Chesapeake Drive. Suite 208 * San Diego, California 92123 * {855)560-1468 + Fa* (SS8) 560-1576 Carlsbad O6-1935 July 19, 2OO6 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO,: 06-1935 DATE PLANS RECEIVED BY JURISDICTION; DATE INITIAL PLAN REVIEW COMPLETED: July 19, 20O6 JURISDICTION: Carlsbad DATE PLANS RECEIVED BY ESG!L CORPORATION: 07/11/06 PLAN REVIEWER: Bryan Zuppiger FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department, You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department. Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 1997 UBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in confomnance with the cited codes and regulations. Per Sec. 106.4.3,1997 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. r~ TENANT IMPROVEMENTS WITHOUT SPECiFSC ENERGY DATA OR POLICY SUPPLEMENTS (1997U8C) Carlsbad O6 1935 July 19, 2OO6 * PLANS 1. Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: a) Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, and (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. b) Bring one corrected set of plans and calculations/reports to EsGii Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, and (858) 560-1468. Deliver all » remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 2. Please show the vault square footage at a conspicuous location on the plans. \ 3, On the cover sheet of the plans, specify any items requiring special inspection, in a format similar to that shown below. UBC Section 106.3.2. • REQUIRED SPECIAL INSPECTIONS In addition to the regular inspections, the following checked items will also require Special Inspection in accordance with UBC Sec. 1701 of the Uniform Building Code. ITEM REQUIRED? REMARKS • FIELD WELDING YES , 4. When special inspection is required, the architect or engineer of record shall prepare an inspection program which shall be submitted to the building official for approval prior to issuance of the building permit. Please review UBC Section 106.3.5 Please complete parts 1, 2 & 3 of the attached form and resubmit. 5. Designer to check the slab for supporting door jamb, ft kips. 6. Please incorporate structural design in ihe plans. Carlsbad O6-1935 July 19, 20O6 The person responsible for their preparation must srgn ail final sheets of plans. (California Business and Professions Code). Final structural plans, specifications and calculations must be signed and sealed by the engineer or architect licensed by the State of California who is responsible for their preparation. Please specify the expiration date of license. (California Business and Professions Code). To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, » Suite 208, San Diego, California 92123, telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Bryan Zuppiger at Esgil Corporation. Thank you. Carlsbad O6 1935 July 19, 2OO6 City of Carlsbad Building Department BUILDING DEPARTMENT NOTICE OF REQUIREMENT FOR SPECIAL riV Do Not Remove From Plans Plan Check No. 06-1935 Job Address or Legal Description 100O Aviara Parkway Suite 100 Owner Address, ______ You are hereby notified that in addition to the inspection of construction provided by the Building Department, an approved Registered Special Inspector is required to provide continuous inspection during the performance of the phases of construction indicated on the reverse side of this sheet. The Registered Special Inspector shall be approved by the City of Carlsbad Building Department prior to the issuance of the building permit. Special Inspectors having a current certification from the City of San Diego, Los Angeles, or ICBO are approved as Special Inspectors for the type of construction for which they are certified. The inspections by a Special Inspector do not change the requirements for inspections by personnel of the City of Carlsbad building department. The inspections by a Special In; rector are in addition to the inspections normally required by the County Building Code. * The Special Inspector is not authorized to inspect and approve any work other than that for which he/she is specifically assigned to inspect. The Special .Inspector is not aulho'ized to accept alternate materials, structural changes, or any requests for plan changes. The Special Inspector is required to submit written reports to the City of Carlsbad building department of all work that he/she inspected aid approved. The final inspection approval will not be given until all Special Inspection reports have been reccn ed and approved by the City of Carlsbad building department. Please submit the names of the inspectors who will perform the special inspections on each of the items indicated on the reverse side of this sheet. (over) Carlsbad O6-1935 July 19, 20O6 SPECIAL INSPECTION PROGRAM ADDRESS OR LEGAL DESCRIPTION: 1000 Aviara Parkway Suite 100 PLAN CHECK NUMBER: 06-1935 OWNER'S NAME: I, as the owner, or agent of the owner (contractors may ngj employ the special inspector), certify that i( or the architect/engineer of record, will be responsible for employing the special inspector(s) as required by Uniform Building Code (UBC) Section 1701.1 for the construction project located at the site listed above, UBC Section 106.3.5. Signed I, as the engineer/architect of record, certify that I have prepared the following special inspection program as required by UBC Section 106.3.5 for the construction project located at the site listed above. Signed 1. List of work requiring special inspection: D Field Welding 2. Name(s) of individual(s) or firm(s) responsible for the special inspections listed above: A. _ _ C. 3. Duties of the special inspectors for the work listed above: A. B. C. Special inspectors shall check in wit! the City and presenf their credentials for approval eoaJs beginning work on the jots site Q SOD/ SOO'i J5?£* PLANNING/ENGINEERING APPROVALS PERMIT NUMBER CB ADDRESS 0&DATE /oc RESIDENTIAL RESIDENTIAL ADDITION MINOR «$10,000.00) IMPROVEMENT PLAZA CAMINO REAL CARLSBAD COMPANY STORES VILLAGE FAIRE COMPLETE OFFICE BUILDING OTHER PLANNER ENGINEER DATE DATE STRUCTURAL TECHNOLOGY CONSULTANTS INCORPORATED Response to Plan Check Comments for COMERICA BANK 1000 Aviara Blvd. Carlsbad, CA (V006-251.2) JliL 2 7 7827 Convoy Court, Suite 406 • San Diego, California 92111 (858)278-2400 • (800)681-8106 • FAX (858) 278-2424 • www.stcsd. STRUCTURAL TECHNOLOGY CONSULTANTS INC. 7827 Convoy Court, Suite 406 San Diego, California 92111 Project: Comerica Bank 1000 Aviara Blvd., Carlsbad, CA Project No.: V006-251.2 Date: 07-26-06 Plan Check No.: 06-1935 RESPONSES TO PLAN CHECK COMMENTS: Item No. Descriptions 2 See DWG No.1 for vault dimensions. 3 See DWG No.1 for additional note for 'Special Inspection Summary' 4 See attached 'Special Inspection Program1 of the City of Carlsbad. 5 See additional calculations for 'Existing concrete slab at door' Carlsbad O6-1935 July 19, 2006 City of Carlsbad Building Department BUILDING DEPARTMENT NOTICE OF REQUIREMENT FOR SPECIAL rNSPECTlON Do Not Remove From Flans Plan Check N7o. 06-1935 Job Address or Legal Description 1OOO Aviara Parkway Suite 100 Owner &PME£ICA Efr&MlO Address You are hereby notified that in addition to the inspection of construction provided by the Building Department, an approved Registered Special Inspector is required to provide cc ntinuous inspection during the performance: of the phases of construction indicated on the reverse side of this sheet. The Registered Special Inspector shall be approved by the City of Carlsbad Building Department prior to the issuance of the building permit. Special Inspectors having a current certification from the City of San Diego, Los Angeles, or ICBO are approved as Special Inspectors for the t/pe of construction for which they are certified. The inspections by a Special Inspector do not change the requirements for inspections by personnel of the Ciiy of Carlsbad building department. The inspections by a Special Inspector are in addition to the inspections normally required by the County Building Code. » The Special Inspector is not authorized to inspect and approve any work other than that for which he/she is specifically assigned to inspect. The Special Inspector is not auihcnzed to accept alternate materials, structural changes, or any requests for plan changes. The Special Inspector is icquired to submit written reports to the City of Carlsbad building department of all work that he/she inspected and approved. The final inspection approval will not be given until all Special Inspection reports have been reccn ed and approved by the City of Carlsbad building department. Please submit the names of the inspectors who will perform the special inspections on each of the items indicated on the reverse side of this sheet. (over) 90 o Carlsbad O6-1935 July 19, 2OO6 SPECIAL INSPECTION PROGRAM ADDRESS OR LEGAL DESCRIPTION: 1000 Aviara Parkway Suite 100 PLAN CHECK NUMBER: 06-1935 OWNER'S NAME: CoHERlCA I, as the owner, or agent of the owner (contractors may not employ the special inspector), certify that I, or the architect/engineer of record, will be responsible for employing the special inspector(s) as required by Uniform Building Code (UBC) Section 1701.1 for the construction project located at the site listed above. UBC Section 106.3.5. Signed I, as the engineer/architect of record, certify that t have prepared the following special inspection program as required by UBC Section 106.3.5 for the construction project located at the site listed above. Signed 1. List of work requiring special inspection: C3. Field Welding 2. Name(s) of individual(s) or firm(s) responsible for the special inspections listed above: A. C. 3, Duties of the special inspectors for the work listed above: A. Flfcl'D Kl£kPIK<3 MAY B. C. Special inspectors shall check in with the City and present then credentials (or approval prior to beginning work on the job site 900,' 933-c ZSZE* ino>««rcsj •fe INO S I . 1, ilJ r 01 01UJ «ns x A •> «4-1C M -rl CUto O CO -rt (U014-1CO v ui<—U4 CO •H O M CO•P U CO T3 O <COO X O 733 CO 10 D3 COr- H73 <7* Mtu cn IB 05 rH U § wMO•j oU O • oo • 01;o c i o orH II ,J >» \ X >H4-> 4-1 tO rH m m o D>c <uoNfO dP H) O, <0cou 4-1 TT rH IH rH CU CU 0) CO C ' O O O O <T\m o i II =* II II 4->i-(l4TJ Oi IB•H S111I C•H O OT3 M >J TJ(J 1)too o*J & J3J3OOc C•H-H -H-Hto <o -MOiCl.'tH O O O O 00o m o o o• • o o •in fo o o o rH IO rH O rH * -V. IOOOO <£>O OO •O OID 00 CM< H3S II 4-1<H 3 I tN TrH inOCM O tB fto 3 !•a-Eto O«T O rH O rH OO rH O * CN CNO\ O i-Hin o oo • CN O rH *\ CNCN O\< in •orao •otutoot CDa CO O cu 00 00 CM T) tN IB 4-1 O Oat)a, tu3 toto Oci-IB -HU MII <U 3 3 C 3HH <w IH to toto CO to rHa a Q.CU cOi rH O P- -rl m •» 41Q Oin oo a tN o o o m *tN 00 IO CN«> 00 • tN O o to00CN I rH ~~O o n <<cc-H-rl •H J3 CO rHa iO 4->O >H Oo in OH Ito in o ift • 'O < H- rH II "fi CO II CV CN 00~ -r < O O-H -rl 4-1 Q E-" EH -J IBS *2 H& <0o CDtn i-(o fi 4J4-1 J3 4-1•O t> to PH - .O O CW -H 4J U IB EH JC - >i ft B CD D -rl 2Cfi S CO OO (!) Z Q O U 3fcri H m tu* *tN 3 II II fc 3 S3S — rH 2+ ~~m t- II a < -v — 0)Q M CO O.O —^— (P <o VJ /"\" ^^ vj— it% •• Ml«o !y § (M T? *° M ^** cC «J\"y ^w CO "a^— ir^ .|v. W ^— ix Xt ^? ^^ Steg^ •?i \ ^3 1— v RJ i fv Xr— J Q ^ jt Z JO F § CM ^J ^"^ *™\ pis<D T— v. 1ifk CM Q fll f W1— O QL—1 Of.Ill s ^nV^ <D1UQ O* ^NK\VK /O o _V~LJ^J 10<D QL ^lo S?oi<|y^j I— k^ «OK\ || | 5 1 «rf | 1 •0 o{ - ^l - Jfc.O ift "\ m \B -1 £ § Qr\ ^A in O > E t3 iIB! ECrf CM< *03 •O H 73 * O *OS 03 II WO •o i R r-lO •o ^X >H *(K X•*03 ^Cd ^HX E-1» MQ XrH W &00 ISro M* OSO II & "V^ *TJo+ro in roo voto >• ro cot/3 ro rH < + rO rH2 XIrH CTl rH 1 rH p- 4J CO X P- T MH CO rH¥?J * roo 2O rHin o • CM*r vo ^ m in4J CM CM — — in m w oKto ^>ro ^ o rH U • 4-1 0 CMSCM X MHio — in o03 0 X! rO rH Q ^ota rH mHH cnGu O CM TOM 03 P* -^ T VDiJ n w io ro CM PH II tO XI U> CM I-H U S 2 —CO Cu— — OS P- ro rtw m o zH • + Oc/3 o ro H>• EH^ H II H< QS! ro > Qa u «; rH.a * EHS rt EH O S OSO rtl OOS O rH rH 00 CMin in rH p- r- o o O O rH rH O O CM CM rH rH 9 T O O in in ro v£>ID en 00 O CM U3i> in• > 0 0CM in CMo in O rHCM O O O O CM CM T O CM CM O CM in M> *r *rro CM in in in *T rH rH ^D T T CM rH rH en en CM enro ro ID enCD oo m roCM CM VOrH rH CM rH en in inCM CM CM CM o o in in rH o o rH eno o CM r~ in in o en OO CO VD VD in in M) us CM CM CM CM ^2r£o)•IE O t*^3 ^* ( rH CM 00 -0« H? »-5 tJ (-^W ^q ^ j t-^ issss CMCM 1-1 pMH ro\ rH > 00 Of ^ [^ H T p- MH T3 -aen rH tt> at II ft <D 14 O « -rl CM D1CM <U 3C ro u D* -rl *O 4-1 0)u « nr~ co ro >sx pin (U ft TO 4-1 MH•O m c -a o \ rH O -H rH C W CM T3 W TJ 11 X)rH P 0) O 3 CO rHP4J tJ10>^^ U4JO-H MHMHWC3U OO 0) 10 • - CO en TinCrHOsoisB.. <i)3 CO coen 03 CM M ID to o ooooco U+-H-H co rH • • O S & • - !ZS Zv . XrHCO4-l X!ro oomo toiu^' \\ xro-nrou rHo u ft ojU OOinO P- rHTOftCMr^T w^r^coin p 4JIH~ COO lOOXCrH MH 0)O* CMCM «lTjP->B-HCn -V•=r II II IS — rH-g IOMH T EH tJ>H)OT3 XlrH HH d)3*OrH rHft CMOO rHVO'^OJII X>^ ^^kD^DODO =iHO-rl IOOM> XM *rOrOlOP- S O -^ MH XI rH <0roaiMlinincMen vo.r04-i « H in aa S-HE-rHrHrOT XrHkO+MHtO XI 1 rH CMGu—^trro >^,-H3rHpro 01 m o O MHC ftin 3 oR uomoo e-ri -C o oX1MH4-1~CMCMOO OgOOO-rH O ID II•HOT3-..." 3O p T rHMO-H' — 'inincMCM "Oro^rojc oo coIHJH3 OJTO^riOO* Xt CO «C rH 3 O rHro enCD M^ — ^vDvoencM XI CM CMro 4J ro ~ en ch en ro • roT •H0)>vrororo^ T3 CM CMF^o C J5 * rH ^- ino a to — <u II « rH S XI4J P ft rHMHMH OOrHrH g II IIH^ooenen ft CMooroin p*p-p-ooro TOIOTOM -^inCMI-CM 2x!irorooii> XIXIXI ro VDrHoo«. EH*-rororHin rHrHrno "^cnTTin OU*— itiT c\j CO 4-1 4J P < +MH MH MH 4J ^~C 4-1 PinmrH^T OOP-[^ a) MH MHlOlDOOrO CO rHrHO) >II II l|H-M^enencM«3 oo rHrHg 01 rHiirHo*rororH^D rocMCMroEg CM>4-»^^ roroMtjt^ — ^p~ X >< g 4J MH 0) M (0 MH rH XIO -H rH oi — . m in in n u n u Q « o 4-1Ug>! — lOlClO H-4JMHMO — *CMCM q c c X t! ro P-MHu onp— -Hooroc P— o IuMH2 E-H-rlgro DlMH— «>•U P P C 0 0 MH W<l)a)WrHM^.P-rH 01^^ 4->-H-H4-iro.T3OXlrncooen Ogx— 2TJT32>rH -rH-^llroocM no— * — — CTIrH-HT OMP— XX eilOlPBPcnpm buMH2 P PO>ft«MHX)rHrnro C 4-) 4J C 01 ft O H3u <uee<u3i-<noroo p go><ugp«xivcoi> 1-5 D 2 P-P-W>^D OgEOOl -HrHrHin CO Og-~ rHrHUJlO 2OO203 COrHMHro MO'*roro 22 Mocno2 OlHC — rH rHIOOOII tuMH-rf ttJrHrHrodlOOIIftrH E Sro«Ot3BTJ'r«Oro occo»2<o<opp ^^oooor^ao -rHOO-Haip-a) aiw O II > OS— ^TCMID OJ-H-HlOMlOX! HOJ4JEH * — 3felDt£p-m MIOIOMP-P 4-llnro>oS E — roro VD OI-I>HOCOO «4JCuB EHOOEHtnmc TO EH EH O C Dl OrH CM rO TT -H II -H C P -H g g -H O 4-1•j^^hH 8 a 9 TJ o> oJ ^ J j -HUnCMror4^f4ji4|rt{ (UTO(l)*iHO>^^S^ COi<03QOS STRUCTURAL TECHNOLOGY CONSULTANTS, INC 1821 CONVOY COURT, SUITE 40fc, SAN DIEGO, CA 92111 (8&8>) 218-2400 FAX C858; 218-2424 PROJECT: COMERICA BANK, 1000 AVlARA BLVD., CARLSBAD, CA 92009 SHEET: 3 OF 4 PROJ. NO.: V006-251.2 DESIGNER: LR DATE: 05-2&-0fc CLIENT: RED HAWK INDUSTRIES Vault: L 10.00 ft D 10.50 ft WallWT: wall! 2568 Ibs wall 2 2568 \bs wall 3 2696 Ibs wall 4 2696 Ibs Total wall WT. 10528 Ibs Total Mass 19131 Ibs DL mass -wall wt/2 = 13867 Ibs Seismic Load: F= 0.381 * DL = 5283 Ibs Moment F*D/8= 6934 Ibs-ft Chord Force moment/L= 693 Ibs Weld Capacity = 14400 psi x 0.1875" x 0.7071 x 6" x 1.33 15235 Ibs /weld 5" Concrete Stab: Assume allowable soil bearing pressure = 1000 psf P = (150 pcf * 5/12 * 10.5 ft / 2) + (150 pcf * 5/12 * 8.5 ft) = 328 + 531 = 859 Ibs -} — l^- - 1 4- / \ | •» | q =859 Ibs / 1 .25 = 687 psf < 1 000 psf ok ^t = 5" d = 5" BASE ANCHORAGE: b=15" Use 3/8" dia. Threaded Rod with Him 'HY-150' eooxv anch< ICBO#5193 Embedment = 31/2" min. fc' = 2500 psi min. concrete Allowable T=1970#x 1.33 = 2620 # > Allowable V = 1090 # x 1 .33 = 1450 # Structural Technology Consultants Inc. 7827 Convoy Court, Suite 406, San Diego, CA 92111 (858) 278-2400 (800) 681-8106 FAX (858) 278-2424 PROJECT:&AA4K,-SHEET OF PROJ. NO.DESIGNER:DATE: 7-16-00 * ui* i.o x s.e?' LOAD PT * e PT M le>o.3 t 507.4 *•**•' I P t STRUCTURAL TECHNOLOGY CONSULTANTS INCORPORATED Response to Plan Check Comments for COMERICA BANK 1000 Aviara Blvd. Carlsbad, CA (V006-251.1) JUN 1 6 2006 7827 Convoy Court, Suite 406 • San Diego, California 92111 (858)278-2400 • (800)681-8106 • FAX (858) 278-2424 • www.stcsd.com • email: strtech@stcsd.com STRUCTURAL TECHNOLOGY CONSULTANTS INC. 7827 Convoy Court, Suite 406 San Diego, California 92111 Project: Comerica Bank 1000 Aviara Blvd., Carlsbad, CA Project No.: V006-251.1 Date: 06-14-06 Plan Check No.: 06-1199 RESPONSES TO PLAN CHECK COMMENTS: Item No. Descriptions 6 'Hamilton Safe' manufacturer modular vault: UL68L5 Class 1, City of Los Angeles Fabricators License No. 1699. 7 See attached 'Certificate of Reapproval' City of Los Angeles 8 See DWG No.1 for additional note for 'Special Inspection Summary' 9 See attached 'Special Inspection Program' inino>««reg SPECIAL INSPECTION PROGRAM ADDRESS OR LEGAL DESCRIPTION: I OOP A/lAR PLAN CHECK NUMBER: 0^> " I < ^ * OWNER'S NAME: -^ CARU>g>AD ; I, as the owner, or agent of the owner (contractors may rjoj employ the special inspector), certify that I, or the architect/engineer of record, will be responsible for employing the special inspector(s) as required by Uniform Building Code (UBC) Section 1701.1 for the construction project located at the site listed above. UBC Section 106.3,5. Signed I, as the engineer/architect of record, certify that I have prepared the following special inspection program as required by UBC Section 106.3.5 for the construction project located at the site listed above. Signed 1. List of work requiring special inspection: Q Soils Compliance Prior to Foundation Inspection Q Structural Concrete Over 2500 PSI O Prestressed Concrete Q Structural Masonry D Designer Specified Field Welding High Strength Bolting Expansion/Epoxy Anchors Sprayed-On Fireprooflng Oth«r _^_____ 2. Name(s) of Pndividual(s) or flrm(s) responsible for the special Inspections listed above: A. B. C. 3. Duties of the special inspectors for the work listed above: A. fiEMP K161PIM6 rlAY £?& i^5p6C[6P E>Ae?l£> _ B. C. ' Special Inspectors starif chec* In with tt>e City and pr«s«nl their oreoerttiate tor approval prior jo beginning work on VM Job *te. t* ^" Q - TJttjO TJ CDtoo &•rl M CD &to o >H 00 0) CM TJCM IB4J O H rH OftTJft CD3 toto O c£IB -rl U M II DII -* ft3 3 C 3m MH m IB to to to to rHft ft ft d) C O I<£> ( 3rHSTJ •rtto CDQ C -rl Oin COi VD CM' 00 • <N O • + O IO COtN "HOIQ Oo * 00 —Co o •HIN o in rH rH * — — II •» ~ 01 •H XI fttO rH Oft I O O 4J rH II C <*> O >M ft\O II O- CM COo m *-- + < rH CM IB IB CM U3— rH g 2 < 00 ft o [- in I • • (Nm o in rH• in< + S3 om -H • eu 0Q £ nc-UQ.OE ~ — ' _ CM ^^_o O rx1 ^~ /H - Ml(O ^^ z Q<r _r x* H- ^ CM =j> <° CM z $<& O "X V— |T^ /5? • 1% ~^ 5?v « T? J?O 35 ^ 4^. Urn || 1 \ ^J 1— v S| II? \J ^* *""\jrf 1™"* cO pjSlS * $59if»CM S\ ^^ til lii S o /w\f I OLUl "^rwvy (D1UQ <yic\S* CM ff' ^^O (l s (t ^T *-^ /"\ _i(Q < < > ^L_^Q (D§ lili {* jf, -i* 3* li [Q 2 E J 1 r*V C\ ||| l\ Xl IV n t< ' III CN 73 *05 SHT?* o * 05 05 II IHO>i X73 1 II MO 73 1X ^1 *05 X•* (S 0? Xx f-1 » tHQ X rH M 05 00 Oon tn o II 05 mo•noo in ooo co co * oo S «j * 00 rH CO rH CTl rH 1 rH r~4-1 co x r~ TI*H CO rH O rHin o • CM•>T vo —. m in 4-1 CM CMII II X MH o7 05 2 S O XCO ~ W • 4-1 O CN CO CM X <Mrtl * co ~~ in oCQ O XtOO rHQ CDW rH inM cy> PM O CSI T OM CQ r* -^ ^r ^>^ rj CO CO OO CN CU II CO XI ^> CMS 05 BC rHrr rl "* •?rH w !S jt, ^-* CO CU ~ ~ * J 1r~ as ftco in o atH • * O CO O 00 H 3 Qa ni > Ort u < rH r3 * EH EH O K O tjft. O ft O ft 3 05 Q S rH rH 00 O4in in rH r~ r~ o o O O rH rH O O CM CM rH rH T T O O. . in in 00 ID CD CTl. 00 O CM ID^i if) . 0 0 CM in CM O rH CM O Oo o •T O CM CM O CM in ID ^ Too CM in m in *T rH rH CM rH rH Ol O~l CM <T1 00 00 >D <T>oo oo m oo CM CM VD rH tH CM rH CT» in in CM CM CM CM.... rH o o CM r- in in o <r» OO CO CD CD in in VD VD CM CM CM CM t9Z<So| rHCN^T | "^ ,1 ,~[ ^ 1 S S S S CM CM rH f. <T> O CM r- rH CM 73,-H1 t [ > fji (y IH "w M c S (Ti OO CM rt OJ (0 O• • O S O, • CJ 4J M T ii ii a T EH X X 1C U M S -H S £> MH 4J•H O -O OO M00 4-> (Tj 0 'c AO D CO 4-1 4-1MH MH IIoo oo in 4-*CM T CM S J3 00 • . EH * 00 II II II + U S € t< t> -4-J X X D ~ '• M 0 — U O M 4-1. [u IH Eo q_l 'N. Q rH C 00 01 U B ^< OO O CM HO—'rH -iH T O H 4J O1 4-1 lO b MH E rH (0 UO 4J E oneto MH -rj H B10 O II J> 05 EH * — £ ** 3 CQ , — , U O 0 O O co co ~*!s\\ 0 O LO Or^ *3* *-- fO O * CM CM — VO >i> 00 Osft; oo ro ^ r^t m m CM cri ^, ^ 5 ^ m 10 m o o^^ CM CM O O— . . . . — ' ID if) CM CM ^^- U3 kD CTi CM - CTv (T. <Ti CO =» O O r-l rH— O O CT\ O^* r* r- GO ooI co ro o ^- ro m t-i in 10 in r- 1 ^r V£> U3 00 CO -— ' ^ CT\ TT OlO LO LT) s*= CM CM O O O O ~ •— * rHrHSS — >~* ^J1 "sj* CM ^D-H- ^p ^o pN. Lf) — 00 00 VO rH CM 00 <T «£ ie^ «4^ <CS S SE S 4-1<H oo\ rH > 00 0*> rH r-II T MH 73 73rH 0) D II Q. « H CO -H D>OM (U 3 C 00 H Cf •rl CD 4-1 (U U CO HCO 10 >x 4-1 73 CO C 73 O \O -rt rH C CO H 73 (!) XI4-1 (U O 3 CO rH U 4-> 0 -H 01 «J • -. 00 0> 3 C O 00O * -H -H CO rH O U O. 01C~ rH 10 Q, CMW ^ r^ co m 4-i CO 0 X C rH "H rH • B CO MH Ol 01 O 73 ft rH01 3 * O rH rH CX = rH O -H CO O VD 5 O ""^ m Xt rH ID CD • 00 4J CO rH in OD ' \ -H 3 rH 4-> 00 Ol CO O O MHC CX in 3 oC -H • C O OO E O OO -rl O ID II 3 0 4J ^T rH CO ft rH 3 O rHra cn XI CM CM0073 CM CM r-H \ in d) II (0S XI Q. rHS II II 0. CMco co co M ^ in Xt XI Xl <C ID rHrH rH rH tj ^~ O-l 1 1 1 T CM 4J 4J 4-1 < +MH MH MH 4-J C 4-> 4Jo o r~ r~ o> MH MH 00 rH rH (1) > CD rHrHE Ol rHIIrHOO CM CM ffjoo oo H U 1 "~- r— B 4-1 MH CO H CO MH rH XI O -H rHa01 CD 1 101 0 4J •Hooroe 4->— o B *H *rl B ^1 DI MH "~* CD * 4-14-1 C O O ^~OU~4J -HCM-^ -CDH Q) Q) (H rH H *V r~- rH OHMO3O300CO— 00 4-1 -H -rl 4-1 Ifl • 73 O XI S7373S>rH -rH^II XX C II OJ 4-IC04-1 C 4-1 4-1 C <1) d, O r-13oicccuSM mo rag 0) 0) g 4-1 COX1«>CM> OBBOO) -iHrHrHin E O O E CQ CO rH *HE S H o 01 orH rH 01 O O II Ctonjeco 73TCO o OCCOCO ECOC04J M 'rt 'rl (A H in A H CD 4-1uncoH-p -4-1 4-1 n roOHHOCOO «4-J EH O O EH C31 CO CEH EH 0 C tJl 0 •H II -rt C 4J -H E E -H O 4->map 73 01 u CO < CQ Q 04 STRUCTURAL TECHNOLOGY CONSULTANTS, INC 1821 CONVOY COURT, SUITE 40fe, SAN DIEGO, CA 92111 (8&&) 218-2400 FAX (S5&) 218-2424 PROJECT: COMERICA BANK, 1000 AVIARA BLVD., CARLSBAD, CA 92009 PROJ. NO.: V006-25! DESIGNER: LR CLIENT: RED HAWK INDUSTRIES SHEET: 3 OF 3 DATE: 05-25-06 Vault:L D 10.00 10.50 ft ft Wall WT: wall 1 wall 2 waits wall 4 Total wall WT. Total Mass 2568 2568 2696 2696 10528 19131 Ibs Ibs Ibs Ibs Ibs Ibs DL mass-wall wt/2 = 13867 Ibs Seismic Load: F= 0.381 * DL = 5283 Ibs Moment F*D/8= 6934 Ibs-ft Chord Force moment/L= 693 Ibs Weld Capacity = 14400 psi x 0.1875" x 0.7071 x 6" x 1.33 15235 Ibs/weld 5" Concrete Slab: Assume allowable soil bearing pressure = 1000 psf P = (150 pcf * 5/12 * 10.5 ft / 2) + (150 pcf * 5/12 * 8.5 ft) = 328 + 531 = 859 Ibs q =859 Ibs /1.25 = 687 psf < 1000 psf ok BASE ANCHORAGE: Use 3/8" dia. Threaded Rod with Hilti 'HY-150' eooxv anch< ICBO#5193 Embedment = 3 1/2" min. fc1 = 2500 psi min. concrete Allowable T=1970#x 1.33 = 2620* > Allowable V = 1090 # x 1.33 = 1450 # 5" = 5" =15" »» Q I* s| £»Is.. I 3 \i i<;i,Mi! .!*• ISftIKSffi^i 61. ;*5 ru ii!5 Si I! 8 111 ri <«>•»« {; Ini§ i^iii iiii ;;'m u uj <o =!Q- 2 «D 3 Q 11J Q UJ ^ © 'Niw '.5(6 Q39W3 UJ CO Carlsbad Fire Department Plan Review Requirements Category: TI, COMM Date of Report: 07-11-2006 Name: INTERIOR ARCHITECTS, INC Address:550 SO. HOPE ST. LOS ANGELES, CA Reviewed by: 90071 Permit #: CB061935 Job Name: COMERIC A: 1 00 SF PRE-FAB VAULT Job Address: 1 000 AVI ARA P Y CBAD adequately conduct a review to carefully all cnmme Conditions; Cond:CON0001512 [MET] No Comments Entry: 07/11/2006 By: MS Action: AP S^BTffffi^^ esubrnit the necessary plans and/or revew l (J CO o; cco li ii 8 V V)<n ^ 4i O CL 4 ? *I- (0s « •5f r c ° I -COs o en tUJ 5o:<onOa: Oo 83 J00 I- 4?6 O\-sC £ *> «\ Vtf</)Ui) t-a 5 ?a.H ^ o Cu r ro o T V