Loading...
HomeMy WebLinkAbout1001 CANVASBACK CT; ; CB150763; Permit03-31-2015 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Pool Permit Permit No: CBI50763 Building Inspection Request Line (760) 602-2725 Job Address: Pernnit Type: Parcel No: Valuation: Reference #: PC #: Project Title: 1001 CANVASBACK CT CBAD POOL 2146433900 Lot #: 0 $20,020.00 Construction Type: NEW KHARRAZIAN RES-320 SF POOL/SPA 140 SF DECK (® BACK-, REPLACE COVERED ENTRY W/ 96 status: Applied: Entered By: Plan Approved: Issued: Inspect Area: ISSUED 03/12/2015 RMA 03/31/2015 03/31/2015 Applicant: FINAL CONSTRUCTION Ow/ner: KHARRAZIAN DATIS 3070 RACETRACK VIEW DR DEL MAR CA 92014 858 356-5049 1001 CANVASBACK CT CARLSBADCA 92011 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Electrical Fee Plumbing Fee Strong Motion Fee Green Bldg Standards (SB1473) Fee Renewal Fee Add'l Renewal Fee Other Building Fee Additional Fees $211.21 $0.00 $147.85 $0.00 $33.00 $33.00 $2.60 $1.00 $0.00 $0.00 $130.00 $0.00 TOTAL PERMIT FEES $558.66 Total Fees: $558.66 Total Payments To Date: $558.66 Balance Due: $0.00 Inspector: FINAL>^P5JR0Vy Date: Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit vnas issued to protest imposition of these tees/exactions. Ifyou protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required informaiion with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exaclions of which vou have nreviouslv been given a NOTICE similar lo this, or as to which the statute of limitations has nreviouslv othenA/ise expired. 03-31-2015 City of Carlsbad 1635 Faraday Av Cartsbad.CA 92008 Storm Water Pollution Prevention Plan (SWPPP) Permit Permit No:SW150114 Job Address: Permit Type: Parcel No: Reference #: CB#: Project Title: 1001 CANVASBACK CT CBAD SWPPP 2146433900 CBI50763 KHARRAZIAN POOL/SPA Lot#: Applicant: FINAL CONSTRUCTION 3070 RACETRACK VIEW DR DEL MAR CA 92014 858 356-5049 Emergency Contact: ANDREW FINE Status: Applied: Entered By: Issued: Inspect Area: Tier: Priority: Owner: KHARRAZIAN DATIS 1001 CANVASBACK CT CARLSBAD CA 92011 ISSUED 03/12/2015 RMA 03/31/2015 1 M 858 356-5049 SWPPP Plan Check SWPPP Inspections Additional Fees $53.00 $224.00 $0.00 TOTAL PERMIT FEES $277.00 Total Fees: $277.00 Total Payments To Date: $277.00 Balance Due: $0.00 FINAL APPKOVAL DATE f • ^/J S'GNAT!.IPE THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: nPLANNING •ENGINEERING •BUILDING •FIRE • HEALTH •HAZMAT/APCD PlanCheckNo. CS/SOYf^ Ccityof Carlsbad Building Permit Appiication 1635 Faraday Ave., Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 email: building@carlsbadca.gov www.carlsbadca.gov Est. Value Plan Ck. Deposit SWPPP JOB ADDRESS SUITE#/SPACE#/UNIT# CT/PROJECT # PHASE # # OF UNITS # BEDROOMS # BATHROOMS TENANT BUSINESS NAME DESCRIPTION OF WORK: Inc/utfe Square Feet of Affected Areafs; J/, f iMoi ^^^i^ ^^^^ GARAGE (SF) PATIOS (SF) I DECKS (SF) FIREPLACE YES[~|* NOj I AIR CONDITIONING YES I INO I I FIRESPRINKLERS YES I |NO| I APPLICANT NAME A ^ Primary Contact /jUPaPUj / /A/Sr PROPERTYOWNER ADDRESS 3070 /^/tti^r^Aci^ >^^^^ ADDRESS / STATE CA PHONE ZIP FAX " ' cm Sh PHON ZIP EMAIL EMAIL DESIGN PROFESSIONAL CONTRACTOR BUS. NAME ADDRESS ADDRESS CITY STATE CITY PHONE FAX PHON ZIP EMAIL riuiAii Z, ^ ~ r STATE LIC.# fCLA^ | CITY BUS. LIC;# >.^LMOO I T OUO. LIU.ff ^jCS3 I /T? ,f ^ "ture, — -•— (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, iniprove, demolish or repair any structure, prior to its issuance, also requires the applicantfor such permitto file a signed statement that he is licensed pursuantto the provisions ofthe Contractor's License Law (Chapter 9, commendingwith Section 7000 of Division 3 ofthe Business and Professions Code) or that he is exempt therefrom, and the basis forthe alleged exemption. Any violation of SecUon 7031.5 by any applicantfor a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)). WORKERS' COMPENSATION Workers' Compensation Declaration: / /lensby affimi uncier pena/fy of perjury one of the following declarations: Bl have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the perfonnance of the work for which this pemilt is issued. I have and will maintain workers' compensation, as required bv Section 3700 of the Labor Code, for the performance of the work for which this pennit is issued. My wori<ers' compensation insurance canier and policy ' nujuter are: Insurance Co. Policy No. Expiration Date TgjjMction need not be completed if the permit is for one hundred dollars ($100) or less. rl Certificate of Exemption: I certify that in the performance of the wori< for which this pemiit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of Califomia. WARNING: Failure to secure workers' compensation coverage Is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,00j)|i In addition to the cost of compensation,jtanl^es as prjivided for Iny^ction V^jMIStfabor code. Interest and attomey's fees. JS$ CONTRACTOR SIGNATUR& • AGENT DATE OWNBR-BUILOER DECLARATION / hereby affinn that I am exempt from Contractor's License Law for the following reason: I, as owner of the praperty or my employees with wages as their sole compensation, will do the work and the stnicture is not intended or offered for sale (Sec. 7044, Business and Professions C^ode: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the bunien of praving that he did not build or imprave for the purpose of sale). I, as owner of the property, am exclusively contrxting with licensed contractors to constmct the project (Sec. 7044, Business and Professions Code: The Contraclor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). I [ I am exempt under Section Business and Prafessions Code for this reason: • • 1.1 personally plan to provide the major labor and materials for constmction of the proposed property improvemenl QYes I iNo 2.1 (have / have not) signed an application for a building permit for the proposed worit. 3.1 have contracted with the following person (fimi) to provide the proposed construction (include name address / phone / contractors' license number): 4.1 plan to provide portions of the work, but I have hired the following person to coordinate, supervise and pravide the major worii (include name / address / phone / contractors' license number): 5.1 will provide some of the wori(, but I have contracted (hired) the following persons to provide the worii indicated (include name / address / phone / type of work): ^eS'pROPERTY OWNER SIGNATURE QAGENT DATE COMPLETE THIS SECTION FOR N O N - R E S I D E N T I A L BUILDINC PERMITS ONLY Is the applicant or future building occupant required to submit a business plan, acutely hazanlous materials registration form or risk management and prevention program under Sections 25505,25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? Yes No Is the applicant or future building occupant required to obtain a pennit from the air pollution conlrol district or air quality management district? Yes No Is the facility to be constnicted within 1,000 feet of the outer boundary of a school site? Yes No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. ^C O NSTRUCTION LENOING AGENCY I hereby affirm that there is a construction lending agency for the perfomiance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name Lender's Address APPLICANT CERTiFICATION I certily that 1 have read the application and state thatthe above infbimation is conect and that the infonnation on the plans is accuiate. I agiee to comply with all Ci^ ordinances and State laws lelating to building consbtiction. I heneby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspectkin purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABIUTIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA pemiit is required for excavations over 5'0' deep and demolition or constmction of structures over 3 stories in height. EXPIFiATION: Every pennit issued by the Buikling OfScial under the provisfons of this Code shall expire by limitatfon and become null and void if the building or viorii authorized by such pemiit is not commenced within 180 days tam the date of such pemiit or if Ihe buikjing or v«iri< authorized by SUCK'aennitissyspe^led or abandoned at any time after the work is commenced for a period of 180 days (Sectfon )06.4.4 Unifomn BuikJing Code). ^eTAPPLICANT'S SIGNATURE DATE STOP: THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE. Complete the following ONLY if a Certificate of Occupancy will be requested at final inspection. Fax (760) 602-8580, Email buildinq(3)carlsbadca.aov or Mail the completed form to City of Carlsbad, Building Division 1635 Faraday Avenue, Carlsbad, Califomia 92008. C0#: (Office Use Only) CONTACT NAME OCCUPANT NAME ADDRESS BUILDING ADDRESS CITY STATE ZIP CITY STATE ZIP Carlsbad OA PHONE FAX EMAIL OCCUPANT'S BUS. LIC. No. DELIVERY OPTIONS PICK UP: CONTACT (Listed above) OCCUPANT (Listed above) CONTRACTOR (On Pg. 1) MAILTO: CONTACTT(Listed above) OCCUPANT (Listed above) CONTRACTOR (On Pg. 1) MAIL/FAX TO OTHER: ASSOCIATED CB# NO CHANGE IN USE / NO CONSTRUCTION CHANGE OF USE / NO CONSTRUCTION ASSOCIATED CB# NO CHANGE IN USE / NO CONSTRUCTION CHANGE OF USE / NO CONSTRUCTION >ef APPLICANT'S SIGNATURE DATE Inspection List Permit*: CB150763 Type: POOL Date Inspection Item Inspector Act 09/03/2015 59 Final Pool - Rl 09/03/2015 89 Final Combo PD AP 08/07/2015 19 Final Structural MC PA 08/07/2015 29 Final Plumbing MC PA 08/07/2015 39 Final Electrical MC PA 08/07/2015 59 Final Pool MC PA 07/23/2015 55 Fence/Pre-Plaster PD AP 06/30/2015 14 Frame/Steel/BoltingA/Veldin PD AP 06/30/2015 34 Rough Electric PD AP 06/30/2015 51 Excav/Steel/Bonding/Fence PD AP 06/24/2015 14 Frame/Steel/Bolting/Weldin PD PA 06/23/2015 14 Frame/Steel/Bolting/Weldin PB NR 06/22/2015 84 Rough Combo PD CA 04/22/2015 23 Gasn"est/Repairs PD AP 04/22/2015 31 Underground/Conduit-Wirin PD AP 04/22/2015 51 Excav/Steel/Bonding/Fence PD AP KHARRAZIAN RES-320 SF POOUSPA 140 SF DECK @ BACK-, REPLACE COVE Comments MINOR PICK-UP SEE CARD Thursday, September 03, 2015 Page 1 of 1 PLAN CHECK Community & Economic ^ CITY OF REVIEW Development Department 1635 Faraday Avenue CARLSBAD TRANSMITTAL Carlsbad CA 92008 www.carlsbadca.gov DATE: 03-31-2015 PROJECT NAIVIE: KHARRAZIAN RESIDENCE POOL & YARD IMPROV. PROJECT ID: CB15-0763 PLANCHECKNO: 1 SET#: ADDRESS: 1001 CANVASBACK CT. APN: 214-643-39-00 VALUATION/SCOPE OF WORK: $20,020 ^ This plan check review is complete and has been APPROVED by the ENGINEERING Division. By: CG 3/31/15 A Final Inspection by the Division is required Yes / No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. NOTE: ONLY ITEMS THAT NEED CORRECTION/CLARIFICATION ARE MARKED X. Plan Check Comments have been sent to: ANDREW_FINE2003@YAHOO.COM You may also have corrections from one or more ofthe divisions listed below. Approval from these divisions may be required prior to the issuance ofa building permit. Resubmitted plans should Include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING 760-602-461(3 ENGINEERING 760-602-2750 FIREPREViNTION 760-6024665 Chris.Sexton@carlsbadca.gov / Chris Glassen ^ 760-602-2784 ChristoDher.Glassen@carlsbadca.gov Gregorv.Rvan@carlsbadca.gov Gina.Rui2@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cvnthia.Wong@carlsbadca.gov DoiTiirrc t'leri Dominic.Fieri@carlsbadca.gov Remarks: Any outattinding issues ivill he murketi Ti'ith an I X I .Make the necessuty corrections for compliance ivith applicable codes and standards. Submit corrected pUms and/or specifications lo the Building division for re-sidmiittal to the I.ngineering dii'isions. Iteins lhat confonn to j'ennit requirements are marked with [ y [ 1. SITE PLAN Provide a fully dimensioned site plan drawn to scale. Show; / North arrow / Existing & proposed structures / Property line dimensions Easements Show on site plan: / Drainage patterns Existing & proposed slopes Existing topography / Retaining Walls (location and height) / Indicate what will happen with soil excavated from pool area. Include on title sheet: / Site address / Assessor's parcel number / Legal description/lot number Grading: Quantities of Cut Fill Import Export Project does not comply with the following engineering conditions of approval for project no: Conditions were complies with by: Date: LOT NO, #207 MAP NO, #14841 REF, NO, CT 98-14 E-37 Page 2 of 4 REV 6/2012 2. GRADING PERMIT REQUIREMENTS The conditions that require a grading permit are found in Section 11.06.030 of the Municipal Code. Inadequate information available on site plan to make a determination on grading requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and remedial). This information must be included on the plans. If no grading is proposed write: "NO GRADING" Grading Permit required. NOTE: The grading permit must be issued and rough grading approval obtained priorto issuance ofa building permit. A separate grading plan prepared a registered civil engineer must be submitted together with the completed application form attached. / No grading permit required. MISCELLANEOUS PERMITS APPLICANT TO SUBMIT SEPERATELY / RIGHT-OF-WAY PERIVIIT is required to do worl< in city right-of-way and/or private worl< adjacent to the public right-of-way. A separate right-of-way issued by the engineering division is required for the following: Please complete attached right-of-way application form and return to the engineering department together with the requirements on the attached right-of-way checklist, at the time of resubmittal. Right-of-way permit and pool permit will be issued simultaneously. E-37 Page 3 of 4 REV 6/2012 4. STORMWATER Construction Compliance / Project Threat Assessment Form complete / incomplete / Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form and return (SW is-iw ) Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2 SWPPP, payment of processing fee and review by city. Post-Development (SUSMP) Compliance >^ storm Water Standards Questionnaire complete / incomplete Project is subject to Standard Storm Water Requirements. See city Standard Urban Storm Water Management Plan (SUSMP) for reference. http://www.carlsbadca,qov/business/buildinq/Documents/EngStandsw-stds-vol4-ch2,pdf Project needs to incorporate low impact development strategies throughout in one or more of the following ways: Rainwater harvesting (rain barrels or cistern) Vegetated Roof Bio-retentions cell/rain garden Pervious pavement/pavers Flow-through planter/vegetated or rock drip line Vegetated swales or rock infiltration swales Downspouts disconnect and discharge over landscape Other: 5, ADDITIONAL COMMENTS E-37 Page 4 of 4 REV 6/2012 A. ^ CITY OF CARLSBAD STORM WATER COMPLIANCE ASSESSMENT B-24 Development Services Building Division 1635 FaradayAvenue 760-602-2719 www.carlsbadca.gov am applying to the City of Carlsbad for tlie following type(s) of construction permit: Building Permit • Right-of-Way Permit • My project is categorically EXEMPT from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it only requires issuance of one or more of the following permit types: Electrical Fire Additional Fire Alarm Fixed Systems Mechanical Mobile Home Plumbing Patio/Deck Photo Voltaic Re-Roofing Sign Spa-Factory Sprinkler Water Discharge Project Storm Water Threat Assessment Criteria* Wo Threat Assessment Criteria • My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it meets the "no threaf assessment criteria on the City's Project Threat /Assessment Worksheet for Determination of Construction SWPPP Tier Level. My project does not meet any of the High, Moderate or Low Threat criteria described below. Tier 1 •^ovi Threat Assessment Criteria or My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt pemnit type (See list above) and the project meets one or more of the following criteria: • Results in some soil disturbance; and/or • Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling). Tier 2 - Moderate Threat Assessment Criteria • My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria: • Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carisbad Municipal Code); or, • Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria: • Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or • Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or • Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or • Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). Tiers - Signif icant Threat Assessment Criteria • My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or • My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, refueling and maintenance areas: or, • My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-stonn water discharge(s). / certify to the best of my knowledge that the above checked statements are true and correct I understand and acknowledge that even though this project does not require preparation ofa construction SWPP, I must still adhere to, and at all times during construction activities for the permit type(s) check above comply with the storm water best management practices pursuant to Title 15 of the Carlsbad Municipal Code and to City Standards, 'The City Engineer rray authorize minor variances frorr the Storrr Water Threat Assessment Criteria in special circumstances where it can be shown that a lesser or higher Constmction SWPPP Tier Level is wananted. B-24 Page 1 of 1 Rev.03/09 CITY OF CARLSBAD CONSTRUCTION THREAT ASSESSMENT WORKSHEET FOR DETERMINATION OF PROJECT'S PERCEIVED THREAT TO STORM WATER QUALITY E-33 Development Services Land Development Engineering 1635 FaradayAvenue 760-602-2750 www.carlsbadca.gov Construction SWPPP Tier Level Construction Threat Assessment Criteria* Perceived Threat to Storm Water Quality Tier 3 Tier 3 - Hioh Construction Threat Assessment Criteria High Tier 3 • Project site is 50 acres or more and grading will occur dunng the rainy season • Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA • Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors kf greater than or equal to 0.4) • Site slope is 5 to 1 or steeper • Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). • Owner/contractor received a Storm Water Notice of Violation within past two years High Tier 3 Tier 3 - Medium Construction Threat Assessment Criteria Medium Tier 3 • All projects not meeting Tier 3 High Construction Threat Assessment Criteria Medium Tier 2 Tier 2 Hiah Construction Threat Assessment Criteria • Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA • Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors kf greater than or equal to 0.4) • Site slope is 5 to 1 or steeper • Construction is initiated during the rainy season or will extend into the rainy season (Oct 1 through April 30). • Owner/contractor received a Storm Water Notice of Violation within past two years • Site results in one half acre or more of soil disturbance High Tier 2 Tier 2 - Medium Constaiction Threat Assessment Criteria Medium Tier 2 • All projects not meeting Tier 2 High Construction Threat Assessment Criteria Medium Tierl Tier 1 - Medium insoection Threat Assessment Criteria Medium Tierl • Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA • Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors kf greater than or equal to 0.4) • ^^ite slope is 5 to 1 or steeper •r Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). • Owner/contractor received a Storm Water Notice of Violation within past two years • Site results in one half acre or more of soil disturbance Medium Tierl Tier 1 - Low Inspection Threat Assessment Criteria • All projects not meeting Tier 1 Medium Construction Threat Assessment Criteria Low Exempt - Not Applicable -Exempt "The city engineer may authorize minor variances from the construction threat assessment criteria in special circumstances where it can be shown that a lesser or higher amount of storm water compliance inspection is warranted in the opinion of the city engineer E-33 Page 1 of 1 REV 4/30/10 STORM WATER Development Services Land Development Engineering STANDARDS Development Services Land Development Engineering ^ CITY OF QUESTIONNAIRE E-34 1635 Faraday Avenue 760-602-2750 CARLSBAD QUESTIONNAIRE E-34 www.carlsbadca.gov INSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards (Volume 4, Chapter 2) at www.carlsbadca.qov/standards. Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'Standard Stormwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many aspects of project site design are dependent upon the storm water standards applied to a project. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff detennines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A separate completed and signed questionnaire must be submitted for each new development application submission. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits for the project. Please start by completing Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. STEPI TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a priority development project, please answer the following questions: YES NO 1. Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non-erodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from paved streets or roads; OR (3) designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? / 2. Is your project LIMITED TO retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? If you answered "yes" to one or more of the above questions, then your project is NOT a priority development project and therefore is NOT subject to the storm water criteria required for priority development projects. Go to step 4, marl< the last box stating "my project does not meet PDP requirements" and complete applicant information. If you answered "no" to both questions, then go to Step 2. E-34 Page 1 of 3 Effective 6/27/13 CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 FaradayAvenue 760-602-2750 www.carlsbadca.gov STEP 2 TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS To determine if your project is a priority development project, please answer the following questions: YES NO 1. is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, and pubiic development projects on pubiic or private land. 2. Is your project creating or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? This includes commerciai, industrial, residentiai, mixed-use, and pubiic development projects on pubiic or private land. 3. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a faciiity that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption. y 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or greater 5. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot. A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. y 6. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street, road, highway freeway or driveway? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. y 7. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directiy to" includes flow that is conveyed overtand a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingles with fiows from adjacent lands).* y 8. Is your project a new development that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in any one of the following Standard Industriai Classification (SiC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. y 9. Is your project a new development that supports a retail gasoline outlet (RGO)? This category includes RGO's that meet the foiiowing criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day. / 10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? y 11.1s your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? If you answered "yes" to one or more of the above questions, you ARE a priority development project and are therefore subject to implementing structural Best Management Practices (BMP's) in addition to implementing Standard Storm Water Requirements such as source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your application(s) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this questionnaire, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no" to all of the above questions, you ARE NOT a priority development project and are therefore subject to implementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for all development projects. A Storm Water Management Plan (SWMP) is not required with your application(s) for development. Go to step 4 at the end of this questionnaire, check the "my project does not meet PDP requirements" box and complete applicant information. E-34 Page 2 of 3 Effective 6/27/13 STORM WATER Development Services Land Development Engineering STANDARDS Development Services Land Development Engineering CITY OF QUESTIONNAIRE E-34 1635 FaradayAvenue 760-602-2750 CARLSBAD QUESTIONNAIRE E-34 www.carlsbadca.gov TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPEMENT PROJECTS ONLY Complete the questions below regarding your redevelopment project: YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% ofthe surface area ofthe previously existing development? Ifyou answered "yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement of impervious surface and not the entire development. Go to step 4, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4, check the "my project meets PDP requirements" box and complete applicant information. STEP 4 CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION • y My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater criteriajjer the SUSMP and I understand I must prepare a_Storm Water Management Plan for submittal at time of application. 1 urideretandilowxontrol (hydromodification) requirements may apply to my project Referto SUSMP for details. My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the SUSMP. As part ofthese requirements, 1 will incorporate low impact development strategies throughout my project. Applicant Information and Signature Box Address: /Dp/ /V^//^^x<ggLifer Cr-. Appljoant Name: Accessor's Parce) Niiniber(s)~/.n Date: This Box for City Use Only City Concurrence: YES NO City Concurrence: K By: C 6- Date: ^.^/WS Project ID: Q^f^ | ^ _ C>7 * Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the F?ARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as presen/es or their quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. E-34 Page 3 of 3 Effective 6/27/13 CITY OF CARLSBAD STORM WATER COMPLIANCE FORM TIER 1 CONSTRUCTION SWPPP E-29 Development Services Land Development Engineering 1635 FaradayAvenue 760-602-2750 www.carlsbadca.gov STORM WATER COMPLIANCE CERTIFICATE My project is not in a category of permit types exennpt from the Construction SWPPP requirements My project is not located inside or within 200 feet of an environmentally sensitive area v/ith a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s). <^ My project does not require a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 ofthe Carlsbad Municipal Code) ^ My project will not result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas that meets one or more of the additional follovdng criteria: • located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or, • disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical; and/or • disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse; and/or • construction will be Initiated during the rainy season or will extend Into the rainy season (Oct. 1 through April 30). 1 CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS. 1 UNDERSTAND AND ACKNOWLEDGE THAT 1 MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PF?ACT1CABLE TO MINIMIZE THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF CARLSBAD. GBNTJfAME (PRIt STORM WATER POLLUTION PREVENTION NOTES 1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN IS EMINENT. 2. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 3. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEERING OR BUILDING INSPECTOR DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 4. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGATE. 6. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND MAINTAINED. SPECIAL NOTES PROJECT INFORMATION Site Address: /dC/ C/I 1 ^"T Assessor's Parcel Number: JZ/^ ~ ^ V.^ ' Project ID: Construction Permit No.: f ^^ Estimated Construction Start Date ^/ ^ 12£>L Project Duration ^ /Months Emergency Contact: Name: 24 hour Phone: Perceived Threat to Storm Water Quality Ltr Mediym [jLow If medium box Is checked, must attach a site plan sheet showing proposed vw)ri< area and location of proposed structural BMPs For City Use Only CITY OF CARLSBAD STANDARD TIER 1 SWPPP Approved By: Date: "IILLHS E-29 Page 1 of 3 REV 4/30/10 Erosion Control BMPs Sediment Controt BMPs Traclcing Control BMPs Non-Storm Water Management BMPs Waste Management and Materials Pollution Control BMPs Best Management Practice (BMP) Description -> Geotextiles & Mats Wood Mulching Earth Dikes and Drainage Swales Slope Drains Silt Fence Sediment Trap Check Dam Fiber Rolls Gravel Bag Berm street Sweeping and Vacuuming Sandbag Barrier Storm Drain Inlet Protection Stabilized Construction Ingress/Egress Stabilized Construction Roadway Water Consen/ation Practices Paving and Grinding Ooerations Potable Water/Irrigation Vehicle and Equipment Cleanina Material Delivery and .Stnrane Material Use Stockpile Management Spill Prevention and Contml Solid Waste Mananemsnt Hazardous Waste Mananfimfint Concrete Waste Uanaofiment CASQA Designation Construction Activity EC-7 EC-8 EC-9 EC-11 SE-1 SE-3 SE-4 ^ SE-5 SE-6 \ SE-7 SE-8 SE-10 TR-1 TR-2 NS-1 NS-3 NS-7 NS-8 WM-1 WM-2 WM-3 WM-4 WM-5 WM-6 WM-8 ^Grading/Soil Disturbance 7 Trenching/Excavation / y Stockpiling Drilling/Boring Concrete/Asphalt Saw ^Euttinq •/ / / ' Concrete flatwork / / / / / /Paving / / )Donduit/Pipe Installation y y / V ''Stucco/Mortar Work • y y Waste Disposal Staging/Lay Down Area Equipment Maintenance and Fueling Hazardous Substance Use/Storage ,<Dewatering / • Site Access Across Dirt / »/ Other (list): Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the blank activity description boxes provided for that purpose and place a check in the box immediately to the left ofthe added activity description. For each activity descrribed, pick one or more best management practices (BMPs) from the list located along the top of the fom. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was checked off and for each of the selected BMPs selected from the list. For Example - If the project includes site access across dirt, then check fhe box to the left of "Site Access Across Dirt". Then review the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with Plastic" column. To learn more about wrtiat each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice measures. The reference also explains the Califomia Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project. E-29 Page 2 of 3 REV 4/30/10 CITY OF CARLSBAD PLANNING DIVISION BUILDING PLAN CHECK REVIEW CHECKLIST P-28 Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.eov DATE: 3-16-15 PROJECTNAME: PROJECTID: PLAN CHECK NO: CB 15-0763 SET#: 1 ADDRESS: 1001 Canvasback Ct APN: 214-643-39-00 ^ This plan check review is complete and has been APPROVED by the Planning Division. By: Chris Sexton A Final Inspection by the Planning Division is required • ves ^ No You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the Issuance ofa bulldlng permit. Resubmitted plans should Include corrections from all divisions. Q This plan check review is NOT COIVIPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: andrew_fine2003@yahoo.com For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING 760-602-4610 ENGINEERING 760-602-2750 FIRE PREVENTION 760-602-4665 X Chris Sexton 760-602-4624 Chris.Sexton@carlsbadca.fiov 1 ] Chris Glassen 760-602-2784 Chri.stoi)her.6lassen@carlsbadca^ov Greg Ryan 760-502-4663 Gregory.Ryatvacarlsbadca.gov 1 1 Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.fiov [y ValRay Marshall 760-602-2741 ValRay.Marshall@carlsbadca.gov Cindy Wong 760-602-4662 Cynthia.Wong@carlsbadca.gov • Linda Ontiveros 760-602-2773 Linda.Ontiveros@carlsbadca.gov [ ] Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: REVIEW #: Plan Check No. CB 14-0763 Address 1001 Canvasback Ct Date 3-16-15 Review # 1 Planner Chris Sexton Phone (760) 602-4624 APN: 214-643-39-00 Type of Project & Use: pool, spa, covered entrv. new balcony, Net Project Density: 1.32. DU/AC Zoning: RD-M-Q General Plan; RjVl Facilities Management Zone: 20 CFD (in/out) #_Date of participation: Remaining net dev acres;_ (For non-residential development: Type of land use created by this permit: ) 2 3 Legend: |E1 Item Complete • Item Incomplete - Needs your action • • Environmental Review Required: YES • NO • TYPE DATE OF COMPLETION: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval: • • Discretionary Action Required: YES • NO • TYPE APPROVAL/RESO. NO. DATE PROJECT NO. OTHER RELATED CASES: Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval: • • Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES Q NO • CA Coastal Commission Authority? YES • NO O If California Coastal Commission Authority: Contact them at - 7575 Metropolitan Drive, Suite 103, San Diego, CA 92108-4402; (619) 767-2370 Determine status (Coastal Permit Required or Exempt): • • Habitat Management Plan Data Entry Completed? YES • NO • If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application and assess fees in Permits Plus (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, HMP Fees, Enter Acres of Habitat Type impacted/taken, UPDATE!) • • Inclusionary Housing Fee required: YES • NO Q (Effective date of Inclusionary Housing Ordinance - May 21, 1993.) Data Entry Completed? YES • NO • (A/P/Ds, Activity Maintenance, enter CB#, toolbar. Screens, Housing Fees, Construct Housing Y/N, Enter Fee, UPDATE!) • • Housing Tracking Form (form P-20) completed: YES • NO • N/A • p-28 Page 2 of 3 07/11 Site Plan: IEI • • Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of- way width, dimensional setbacks and existing topographical lines (including all side and rear yard slopes). Provide legal description of property and assessor's parcel number. City Council Policy 44 - Neighborhood Architectural Design Guidelines K • • 1. Applicability: YES • NO • 13 • • 2. Project complies: YES • NOQ Zoning: IEI • • 1 • Setbacks: balcony in front yard setback- PUD 98-05 Front: Required 10^ Shown 15; Interior Side: Required Shown Street Side: Required 10^ Shown 10' Rear: Required Shown Top of slope: Required Shown IEI • • 2. Accessory structure setbacks: fireplace, rear balcony (patio cover) Front: Required 20: Shown 20; Interior Side: Required 5^ Shown more than 5' Street Side: Required Shown Rear: Required 5^ Shown lO^ Structure separation: Required Shown IEI • • 3. Lot Coverage: Required 50% of the net pad area Shown <50 El • • 4. Height: Reauired <30' with min. 3:12 roof pitch Shown <30' Fireplace: 8 feet max ok El • • 5. Parking: Spaces Required 2 Shown 2 (breakdown by uses for commercial and industrial projects required) Residential Guest Spaces Required Shown Additional Comments OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER Chris Sexton DATE 3-16-15 p-28 Page 3 of 3 07/11 ^TBACKS FOR R-1 PARCB-S FRONT VARD - XT from front property irw NTERJOR SVE VARO -10% of lot wicth upto a maximuni of Iff STTOET see YARD - 10- REAR YAra) - 20% of kt wkm upto maximum of 20 feet MAX LOT COVERAGE - 40% Contact ttie Planning Oepertment for Intonnation on comer lots or lots wth unusual conf iguralions anci for information on Ptatwed Communties, accessory tteigfils. The tetephone number for ttie 602-4610. 10%, 1 20% of LOT REAR YARD VWCTH TO A MAX.Of 2ff I . ADOCnON . • -eXlSTNO RESCeNCE kDRAMAG6 2%lti»l. 20- -4- ^ 10%0f LOTV^«)TH UPTOA MAX OF 10' LOT VVB5TH MEASURED 20 "FROM BACK OF FROf<rr PfWDPERTY Lt^JE PROPERTY Llf« STIEET Minimum Square Footing (inches)^'2 Post Spacing Joist Span (in feet) Post Spacing 6 10 12 14 16 18 4 i4 ' i? '16 ' '18 20 ' 20 22 24 (S) 14 16 20 22 24 24 28 30 8 16 20 ^j,;22: ^, 24 26 28 30 32 10 18 22 24 28 30 32 34 36 12 ^ ••:*24 28 32 32 36 36 38 1. Assumes 1,000 psf soil bearing capacity 2. The minimum depth for all footings is 12 inches into natural grade B-4 Page 2 of 6 Rev. 03/09 Allowable Joist Sizes Joist Span Douglas Fir Joist Span Redwood Joist Spacing Size of Joist 6'3" 5'6" -is'o" -© 9'9" 8'9" 7'9" 9'9" 8'9" 7'9 12" 16" 24" 2x6 .12'9" . i1-'9" 10'2' 12'9". 11'9" . tO'2" , > 12" . ' 16" ; "24".^ ;, 16'5" 15'0" 13'0" 16'5" 15'0" 13'0" 12" 16" 24" 2x10 -,20'0" • t'v^8'0" ' '15'10' ^eo'O" . ' -18*0" .-: ' ;12"-,-- , 24"-"> V* '•^i AX ' 22'9" 19'9"- 16'0" 22"6" 21'0" 17'0" 12" 16" 24" 2 x14 1. Assumes a live load of 40 psf and a dead load of 8 psf. 2. If joists are within 18° of grade, use pressure treated Douglas Fir-Larch or Foundation Grade Redw/ood 3. Assume F(b)=825 psi, F9v)=90 psi, and E=1,200,000 psi for D.F. #2 4. Assume F(b)=925 psi, F9v)=80 psi, and E=1,200,000 psi for Redwood Allowable Beam Sizes Post Spacing Joist Span (in feet) Post Spacing t 6 8 10 12 14 16 4 4x4 4x6^, .4x10 - lu 4x14 4x8 4x8 4x 10 6x8 4x 10 6x8 4x 14 6x10 4x 14 6X12 4X10 6xB 4|43^10 ' f^X6 ^•4x12-' 6x10 Jj^ X14 V. 6x10 «4*,144 6X10 ; '^«^Xv14 6 X12 '4x16 6x12 10 4x 10 6x 10 4x14 6x12 4x14 6x12 4x16 6x14 4x 16 6x 14 4x 18 6x14 6x16 12 4x10 6x10 4x14 6x12 4x14 6x12 4x16 6x14 4x16 6x14 4x18 6x14 6x16 B-4 Page 3 of 6 Rev. 03/09 SETBACKS FOR R-1 PARCELS FROMT YARD - 2ff from front property Ine NTERiOR see YARD -10% ot lot widtti up to a maxirnuni of Iff STRKT soe YARD - Iff REAR YARD - 20% of lot wfclth upto maximum of 20 feet MAX. LOT OOVERACSE - 40% Contact Itie Planning Department for infonnation on comer iols or lots wth unusual configuraliorts and for Informaiion on Ptomed Cotnmunlles, accessory stnjctures, and txjidng hetgMs. Tlw telephone numtier forthe Ptermirwi rkMrwirlment IS 602-4610. 10%, 20% of LOT REAR YARD VW5TH TO A N. MAX.OF2ff \ I EXISTNO RESCeNCE >.DRA»lAG€2%Mri. 20- STREET 10%OF LOTVyOTH UPTOA MAX. Of 10' LOT W4DTH MEASURED 2ff 'FROM 20'BACK OF FRONT PftOPERTY LNE PROPERTY LNE Minimum Square Footing Sizes (inches)^'^ Post Spacing Joist Span (in feet) 4 6 10 12 14 16 18 4 12 •"14 ;• '16 18 • 20 "20 22 24 6 14 16 20 22 24 24 28 30 16 20 ' y';M2-M ::;o|4' :26 28 30 32 10 18 22 24 28 30 32 34 36 ••,,ai^Oi#^:;;-•;,::tm --y 32 36 36 38 1. Assumes 1,000 psf soil bearing capacity 2. The minimum depth for all footings is 12 inches into natural grade B-4 Page 2 of 6 Rev. 03/09 / / / Allowable Joist Sizes Joist Span Douglas Fir Joist Span Redwood Joist Spacing Size of Joist " . 6'3" • J5'6' •S'O" 6'3" , 6'6" 12" 16" . ...24" 2x4 . 9'9" 7'9" 9'9" 8'9" 7'9 12" 24" Qxe) 12'9" /11*9" ... Sj0*2' . • . .irr i02" . ,12" '*b'?^2i^« '•*• ,,.,2x8 16'5" 15'0" 13'0" 16'5" ^ 15'0" 13'b" 12" 16" 24" 2x10 ,20'0" ' ^JIB'O' •?15'10" - /ib'O"! . • .i8'o" ;«!.isi24",- 22'9" 19'9" 16'0" 22'6" 21'0" 17'0" 12" 16" 24" 2 x14 1. Assumes a live load of 40 psf and a dead load of 8 psf. 2. If joists are within 18" of grade, use pressure treated Douglas Fir-Larch or Foundation Grade Redwood 3. Assume F(b)=825 psi, F9v)=90 psi, and E=1,200,000 psi for D.F. #2 4. Assume F(b)=925 psi, F9v)=80 psi, and E=1,200,000 psi for Redwood Allowable Beam Sizes Post Spacing Joist Span (in feet) Post Spacing 4 6 10 12 14 16 4 4X4 4X6 ^4X6 ' • .' " ^ 4x8 . •4x10 J - • •x, • 4x14 6 4x6 4x8 4x8 4x 10 6x8 4x10 6x8 4x 14 6x10 4x 14 6x 12 jjftXiO 'Bx8 ,,4xib 4x12 '6 x1b.;. '4 x 14 - ' 6^-10''^ *--4xl6 %X12 10 4x10 6x 10 4x14 6x 12 4x 14 6x12 4x16 6x14 4x16 6x 14 4x 18 6x 14 6x 16 4x10 6x10 4x14 6x 12 6x12/ 4x16 6 Xl4 .^:.,::4X"'16^: 6x14 4x18 6x14 6x16 B-4 Page 3 of 6 Rev. 03/09