HomeMy WebLinkAbout1019 SAGEBRUSH RD; ; CBR2020-0812; PermitPrint Date: 06/09/2020 Permit No: CBR2020-0812
Residential Permit
Building Permit Finaled
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
1019 Sagebrush Rd
BLDG-Residential
2146441100
$0.00
Work Class:
Lot #:
Reference #:
Cogen Status:
Applied:
Issued:
04/16/2020
04/16/2020Construction Type:PermitFinal
Close Out:
Closed - Finaled
MColl
Plan Check #:Project Title:
Inspector:
Orig. Plan Check #:
Bathrooms:
Bedrooms:
# Dwelling Units:
Description:ADD ENERGY STORAGE SYSTEM TO EXISTING PV ARRAY (E-REVIEW)
Final
Inspection:06/09/2020
Contractor:
TESLA ENERGY OPERATIONS, INC
3055 Clearview Way
San Mateo, CA 94402-3709
650-963-5100
Owner:
TRUST FRANCISCO LIVING SURVIVORS TRUST
1019 Sagebrush RdCARLSBAD, CA 92011
AMOUNTFEE
PLUMBING, ELECTRICAL, AND MECHANICAL PERMIT $175.00 SB1473 GREEN BUILDING STATE STANDARDS FEE $1.00
Total Fees:$176.00 Total Payments To Date:$176.00 Balance Due:$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
1635 Faraday Avenue, Carlsbad CA 92008-7314 ï 760-602-2700 ï 760-602-8560 f ï www.carlsbadca.gov
Building Division
Page 1 of 1
Russ Clapton8225 Mercury CtSan Diego CA92111619-538-6485rclapton@tesla.comTesla Energy Operations 8225 Mercury Ct San Diego CA 92111 619-538-6485rclapton@tesla.com888104BLOS 12278031019 Sagebrush RdCA92011Joe Francisco1019 Sagebrush Rd Carlsbad925-785-1933joef@franciscoandassociates.comAdding 27kWh Energy Storage (2-ACPW2) to (E)10.725KW PV ArrayXAdding 27kWh Energy Storage (2-ACPW2) to (E)10.725KW PV ArrayCBR2020-08124/16/20
XZurich AmericanXWC-1074583-0210-31-204-16-204-16-20
Building Permit Inspection History Finaled
PERMIT INSPECTION HISTORY for (CBR2020-0812)
BLDG-Residential 04/16/2020Application Date:Permit Type:Owner:TRUST FRANCISCO LIVING
SURVIVORS TRUST
Cogen 04/16/2020Work Class:Issue Date:Subdivision:CARLSBAD TCT#98-14-03
THOMPSON/TABATA
12/07/2020Expiration Date:Status:
IVR Number: 25927
Closed - Finaled 1019 SAGEBRUSH RD
CARLSBAD, CA 92011-3974
Address:
Scheduled
Date
Inspection Type Inspection No.Inspection
Status
Primary Inspector Reinspection InspectionActual
Start Date
05/28/2020 05/28/2020 BLDG-34 Rough
Electrical
128663-2020 Failed Michael Collins Reinspection Incomplete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency No contractor or plans on site No
BLDG-Final Inspection 128664-2020 Failed Michael Collins Reinspection Incomplete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency No
BLDG-Electrical Final No contractor or plans on site No
06/09/2020 06/09/2020 BLDG-34 Rough
Electrical
129624-2020 Passed Michael Collins Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency 2 - BBU's only Yes
BLDG-Building Deficiency No contractor or plans on site No
BLDG-Final Inspection 129623-2020 Passed Michael Collins Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
BLDG-Building Deficiency No
BLDG-Electrical Final No contractor or plans on site No
BLDG-Electrical Final 2 - BBU's only, release emailed to SDGE Yes
Tuesday, June 9, 2020 Page 1 of 1