Loading...
HomeMy WebLinkAbout1022 PINE AVE; ; CB930995; PermitBUILDING PERMIT Permit No: CB930995 Project No: A9301403 Development N: 10/22/93 11:04 Page 1 of 1 Job Address: 1.022 PINE AV Permit Type: RESIDENTAL ADD/ALT Pcircel No: 204-111-18-00 Valuation: 73,29q Constr uction Type: VN Occupancy Group: R3/MI Description: 660 SF ADD OVER 660 + DECK/STAIRS Appl/Ownr : DOKKEN, GORDON 1022 PINE AVENUE CARLSBAD, CA 92008 Reference4t: 4404 .10 002 SF GARAGE App °''iotb Apr/Issue: 10/2i../93 Entered By: DC 619 729-6214 Suite: Lot#: AA Fees Required A/ - '( 1\ Lç.ected & Credits ----------------------- \_ _L_L.L_L.. Fees: 1 Adjustments: / . . .00 Total Fees: 307.00 S - I' -'. Ba aoc Fu'r: 707.00 Fee descriDtion Units C~ t- Extf ee Building Permit •, r 52.00 Plan Cieck . / 340.00 Strong Motion Fee \.. f) < \.. 7.00 A BUiLDING TOTAL " '1/ 4 ! I ' 870.00 Enter "Y for PlumL.. 20. (10 Y Each Plumbing Fixtthe': T 'ap 35.00 Each Building Sewer S \ / . > . r , 15.00 Each Install/Repair -i,jrj 'PR.flD ' nO 7.01) Each Water Heater andYor:rt > C0 7.() Gas Piping System J/ .: (10 7.()o * PLUMBiNG TOTAL . ( .' / 9.0c Enter "1" for Electric \Isstt': Fc. i' - .' 10.00 Y Enter "Y" for Remodel 10.00 Y ELECTRICAL TOTAL --- 20,00 Enter Y' for Mechanical Issue Fee> 15.00 Y Install Furn/Ducts/Heat Pumps > 1 9.00 9.00 Each. Instali/Reloc Vent > 2 4.50 9.00 A MECHANICAL TOTAL 33.00 INAPPROV. 1NSP(,L DATE CLEARANCE CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 PUA IlcL1 7 • City of Carlsbad Building Department 2075 Las Patinas Dr., Carlsbad, CA 92009 (619) 438-1161 1. PER?i1T TYPE A - Li Commercial Li New Building Li Tenant Improvement B - 0 Industrial 0 New Building 0 Tenant Improvement C -' Residential 0 Apartment 0 Condo 0 Single Family Dwelling 'Addition/Alteration Duplex 0 Demolition 0 Relocation 0 Mobile Home 0 Electrical 0 Plumbing Mechanical 0 Pool 0 Spa 0 Retaining Wall 0 Solar 0 Other__________ PLAN CHECK NO. 95 ESE VAL 7O' PLAN CK DEPOSIT p !V,&1JJ) BY hC 3919 09/15/93 0001 01 02 C-PRMI 30700 2. PROJECT INFORMATION FOR OFFICE USE ONLY Address IOZZ PlmiE AVE Building or Suite No. Nearest Cross Street vpiwe LEGAL DESCRIPTION Lot No. subdivision Name/Number Unit No. Phase No. 2e4- o4c - CHECK BELOW IF SUBMrITED: 2 Energy Calcs 02 Structural Calcs 02 Soils Report 0 1 Addressed Envelope ASSESSOR'S PARCEL FXST1NG 11SF. pnnpnccn irce DESCRIPTION OF WORK VU. 2 P # OF STORIES NAME e-c OAFT11461 AN)%4P. ADDRESS CITY STATE ZIP CODE DAY TELEPHONE APPLICANT Li CONTHAUUOR U AGENT FOR CONTRACUI{ LI OWNER GENT FOR OWNER NAME T' PEA FTING ADDRESS tz4ç cXC'Ee ozve CITY VIA STATE .A ZIP CODE Zo 84 DAY TELEPHONE O) 72-4-74, PROPERTY OWNER NAME CioeN ADDRESS 107-2.. ?N€ A'JE CITY C L , STATE A ZIP CODE 2.bo8 DAY TELEPHONE i, 77-CZ4 TRACI1M B-7= NAME ADDRESS CITY STATE ZIP CODE DAY TELEPHONE STATE DC. # LICENSE CLASS CITY BUSINESS DC. # DESIGNER NAME ADDRESS CITY STATE ZIP CODE DAY TELEPHONE STATE DC. # WORKERS' WMPENSA HON Workers' Compensation Declaration: I hereby affirm that I have a certificate 01 consent to sell-insure issued by the Director of Industrial Relations, or a certificate of Workers' Compensation Insurance by an admitted insurer, or an exact copy or duplicate thereof certified by the Director of the insurer thereof filed with the Building Inspection Department (Section 3800, Lab. Q. INSURANCE COMPANY POLICY NO. EXPIRATION DATE Certificate 01 Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. SIGNATURE DATE OWNER-BUILDER DECIARA11ON Owner-Builder Declaration: I hereby affirm that I am exempt from the Contractor's License Law for the following reason: bil I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale.). 0 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). 0 I am exempt under Section Business and Professions Code for this reason: (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commencing with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars [$500]). SIGNA11JRE)ik J (p AN DATE COMPLETE THIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY: Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? DYES 0 N Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? DYES ONO Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? DYES 0 N IF ANY OF THE ANSWERS ARE YES A FINAL CERTIFICATE OF OCCUPANCY MAY NCYF BE ISSUED AFTER JULY 1, 1989 UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF 11W OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT'. WNSTRLJCI1ON LENDING AGENCY I hereby affirm that there is a construction lending agency for the perlormance 01 the work for which this permit is issued (Sec 3097(1) Civil Code). LENDER'S NAME LENDER'S ADDRESS I certify that I have read the application and state that the above information is correct. 1 agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE 10 SAVE INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL UABIIIFIES, JUDGMENTS, (X)STS AND EXPENSES WHICH MAY IN ANY WAY A(XIRIJE AGAINST SAID C1Y IN CONSEQUENCE OF 111E GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over 5,0" deep and demolition or construction of structures over 3 stories in height. Expiration. Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 365 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days (Section 303(d) Uniform Building Code). APPLICANTS SIGNATURE JJ DATE: WI-IITE: File YELLOW: Applicant PINK: Finance 06/09/95 INSPECTION HISTORY LISTING FOR PERMIT# CB930995 DATE INSPECTION TYPE INSP ACT COMMENTS 03/14/95 Final Combo RI RI 03/14/95 Final Combo PY CO 02/28/95 Frame/Steel/Bolting/Wel RI RI 02/28/95 Frame/Steel/Bolting/Wel P1 CO 02/28/95 Frame/Steel/Bolting/Wel PY NR 12/06/94 Shear Panels/HD's RI RI 12/06/94 Shear Panels/HD's P1 WC 12/06/94 Interior Lath/Drywall PY AP 12/06/94 Rough Electric RI RI 12/06/94 Rough Electric P1 AP 10/25/94 Rough Electric P1 AP 10/25/94 Final Combo RI RI 04/26/94 Roof/Reroof P1 AP 04/26/94 Rough Combo PY AP 04/25/94 Frame/Steel/Bolting/Wel RI RI 04/25/94 Frame/Steel/Bolting/Wel P1 CO 04/14/94 Gas/Test/Repairs PY CO 04/13/94 Shear Panels/HD's RI RI 04/13/94 Shear Panels/HD's P1 AP 04/13/94 Gas/Test/Repairs RI RI 04/13/94 Gas/Test/Repairs P1 CO 03/29/94 Ftg/Foundation/Piers P1 AP 03/29/94 Steel/Bond Beam RI RI 03/29/94 Steel/Bond Beam P1 WC 03/24/94 Ftg/Foundation/Piers RI RI 03/24/94 Ftg/Foundation/Piers P1 WC 03/24/94 Underground/Under Floor P1 AP 03/22/94 Underground/Under Floor RI RI 03/22/94 Underground/Under Floor P1 CO 03/21/94 Rough/Topout RI RI 03/21/94 Rough/Topout PK CO MW ND DRYWALL TAPED NW/729-6214 NOT HOME NO ONE THERE MW/GORDON/729-6214 MW/GORDON/729-6214 MW/GORDON BJN/DON/94 0-42 57 SEE NOTES ND PRESSURE TEST MH/DON/94 0-42 57 OK TO WRAP LOWER LEVEL NH/ DON/ 940-4257 ND METAL ON HORIZONTAL MH/GRODON/729-6614 MH/GORDON/729-6214 BJN/GORDON/ SEE CORR 3/21 PER PAT BJN/GORDON/729-62 14 SEE NOTICE HIT <RETURN> TO CONTINUE... CITY OF CARLSBAD INSPECTION REQUEST PERMIT# CB930995 FOR 03/14/95 INSPECTOR AREA PY DESCRIPTION: 660 SF ADD OVER 660 SF GARAGE PLANCK# CB930995 + DECK/STAIRS 0CC GRP R3/Ml TYPE: RAD CONSTR. TYPE VN JOB ADDRESS: 1022 PINE AV STE: LOT: APPLICANT: DOK KEN, GORDON PHONE: 619 729-6214 CONTRACTOR: PHONE: OWNER: PHONE: REMARKS: MW INSPECTOR SPECIAL INSTRUCT: TOTAL TIME: CD LVL DESCRIPTION ACT COMMENTS 19 ST Final Structural ,t4J 29 PL Final Plumbing 39 EL Final Electrical 49 ME Final Mechanical ***** INSPECTION HISTORY ***** DATE DESCRIPTION ACT INSP COMMENTS 022895 Frame/Steel/Bolting/Welding CO PY NOT HOME 022895 Frame/Steel/Bolting/Welding NR PY NO ONE THERE 120694 Rough Electric AP PY 120694 Interior Lath/Drywall AP PY 102594 Rough Electric AP PY 042694 Rough Combo AP PY 042694 Roof/Reroof AP PY 042594 Frame/Steel/Bolting/Welding CO PY SEE NOTES 041494 Gas/Test/Repairs CO PY ND PRESSURE TEST 041394 Shear Panels/HD's AP PY OK TO WRAP LOWER LEVEL 041394 Gas/Test/Repairs CO PY ND METAL ON HORIZONTAL 032994 Ftg/Foundation/Piers AP PY 032494 Underground/Under Floor AP PY 032294 Underground/Under Floor CO PY SEE CORR 3/21 PER PAT 032194 Rough/Topout CO PK SEE NOTICE ESGIL CORPORATION 9320 CH.SAPEAKE DR., SUITE 203 SAN DIEGO, CA 92123 (619)560-146.3 - ,-URSDiCTiO) SD.ICTIO: _Ct5 o'- COZY O: (—, c23q4kSET: c V) DSIG ??OCT SS: fT) Ct4 '! ST.ttaQ aVC an cc::actad 'a:a U necessary and suszant.ailv CC?lV tI t:- .rscct.on's building codas. ?lanS tr a. stt .5C1tn •.•fl s stantially CCply 'ith tna 5rsd.c:pn t s c: codas en .no: CZ1C:an- CS cc:d by biilding department staff. transmitted herewith 'n a ve significant deficiencies U identified on the enclosed check list and should be corrected and resubmitted for a Complete recheck. The check list transmitted. herewith is for your information. LJ The plans are being held at Esgil Corp. until corrected clans are submitted for recheck. D T1 a?plcant t s coy of the check list is enclosed for the rjsccton to return to t ap?lcant contact person. The applicant's coy of the check list been sent to: !sil staff did not advise the a?licant contact parson that plan check has bean completed. D Es.gil staff did advise ??c that the plan check has been com1eted. Person contacted: Date contacted: Telephone . s. viZ ri' '•L &.QJij iu , 'E~IC6V'A4 C_ LiArP 4AT) _V jvv 4(t v bo't re, 'f . 2ks 1_ 3y: a\ 'C>aA re Encl osures ESGIL COR?O;TIO OGA Dc t Date L Jurisdiction_______________ Prepared by: (3 Bldg. Dept. VALUATION AND PLAN CHECK FEE 'Esgi1 PLAN CHECK NO,( 3— ir_c BUILDING ADDRESS - i 'P APPLICANT/CONTACT 1— PHONE NO. - BUILDING OCCUPANCY DESIGNER PHONE___________ TYPE OF CONSTRUCTION -+J CONTRACTOR PHONE - BUILDING PORTION BUILDING ARk VALUATION MULTIPLIER VALUE -. 7( Air Conditioninz Commercial - Residential Res. or Comm. Fire _Sprinklers Total Value Buildin Permit Fee $_ S Plan Check Fee S $ 33 COMMENTS: SHEET Ct) OF 6) 12/87 By:_ Date:_________ A06k _ C i t of Carlsbad BUILDING PLANCHECK CHECKLIST DATE: PLANCHECK NO. I , BUILDING ADDRESS:. PROJECT DESCRIPTION: ASSESSOR's PARCEL NUMBER: VALUE2, 7v ENGINEERING DEPARTMENT APPROVAL The item you have submitted for review has been approved. The approval is based on plans, information and/or specifications provided in your submittal; therefore any changes to these items after this date, including field modifications, must be reviewed by this office to insure continued conformance with applicable codes. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to build. DENIAL Please see the attached report of deficiencies marked with 0. Make necessary corrections to plans or specifications for compliance with applicable codes and standards. Submit corrected plans and/or specifications to this office for review. By:__ Date:_________ By:__ Date:_________ ATTACHMENTS fE ,1JtT17 CONTACT PERSON O Dedication Application O Dedication Checklist ~xx~vv 'i / O Improvement Application O Improvement Checklist NAME:_____________________________________ O Future Improvement Agreement ADDRESS: PHONE: P:\docs\chklst\bp0001.frm REV 6/5/92 2075 Las Palmas Dr. • Carlsbad, CA 92009-1576 • (619) 438-1161. FAX (619) 438-0894 BUILDING PLANCHECK CHECKLIST SITE PLAN A;/2nd%/ 3rd%/ El U 1. Provide a fully dimensioned site plan drawn to scale. Show: North Arrow D. Property Lines Easements Existing & Proposed Structures E. Easements Existing Street Improvements F. Right-of-Way Width & Adjacent Streets zrlo El 2. Show on site plan: / A. Drainage Patterns C. Existing Topography / B. Existing & Proposed Slopes 0 0 3. Show on a section drawing or include a note stating that there is a minimum of 6" difference between the finished floor and the finished grade elevation adjacent to the structure. El" El 0 4. Include note: "Surface water to be directed away from the building foundation at a 2% gradient for no less than 5' or 2/3 the distance to the property line (whichever is less)." On graded sites, the top of any exterior foundation shall extend above the elevation / of the street gutter at point of discharge or the inlet of an approved drainage device / a minimum of 12 inches plus two percent" (per 1990 UBC 2907(d)5.). El El 5. Include on title sheet Site address Assessor's Parcel Number Legal Description For commercial/industrial buildings and tenant improvement projects, include: Total building square footage with the square footage for each different use, existing sewer permits showing square footage of different uses (manufacturing, warehouse, office, etc.) previously approved. EXISTING PERMIT NUMBER DESCRIPTION P:\docs\chk1st\bp0001.frm Page 1 of 4 REV 6/5/92 BUILDING PLANCHECK CHECKLIST DISCRETIONARY APPROVAL COMPLIANCE 1 sW 2ndv 3rd/ El El 6. Project does not comply with the following Engineering Conditions of approval for i'1. Project No. Conditions were complied with by: Date:__________________ DEDICATION REQUIREMENTS D 0 7. Dedication for all Street Rights-of-Way adjacent to the building site and any storm drain or utility easements on the building site is required for all new buildings and for remodels with a value at or exceeding $_a ea -pursuant to Code Section 18.40.030. Dedication required as follows: Attached please find an application form and submittal checklist for the dedication process. Provide the completed application form and the requirements on the checklist at the time of resubmittal. Dedication completed by Date:___________ IMPROVEMENT REQUIREMENTS O 0 0 8a. All needed public improvements upon and adjacent to the building site must be constructed at time of building construction whenever the value of the construction exceeds $ -pursuant to Code Section 18.40.040. Public improvements required as follows: Please have a registered Civil Engineer prepare appropriate improvement plans and submit them together with the requirements on the attached checklist for a separate plancheck process through the Engineering Department. Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of permit. Attached please find an application form and submittal checklist for the public improvements requirements. Provide the completed application form and the requirements on the checklist at the time of resubmittal. Improvement Plans signed by: Date: P:\docs\chkl.t\bp0001.frm Page 2 of 4 REV 6/5/92 14 BUILDING PLANCHECK CHECKLIST 1 sW 2nd' 3rdf 0 0 0 8b. Construction of the public improvements may be deferred pursuant to code Section 18.40. Please submit a recent property title report or current grant deed on the property and processing fee of $ so we may prepare the necessary Future Improvement Agreement. This agreement must be signed, notarized and approved by the City prior to issuance of a Building Permit. Future public improvements required as follows: 0 0 0 8c. Enclosed please find your Future Improvement Agreement. Please return signed and notarized Agreement to the Engineering Department. Future Improvement Agreement completed by: Date: O 8d. No Public Improvements required. SPECIAL NOTE: Damaged or defective improvements found adiacent to building site must be repaired to the satisfaction of the City Inspector prior to occupancy. GRADING PERMIT REQUIREMENTS The conditions that invoke the need for a grading permit are found in Section 11 .06.030 of the Municipal Code. O 0 0 9a. Inadequate information available on Site Plan to make a determination on grading requirements. Include accurate grading quantities (cut, fill import, export). O 0 0 9b. Grading Permit required. A separate grading plan prepared by a registered Civil Engineer must be Submitted together with the completed application form attached. NOTE: The Grading Permit must be issued and rough grading approval obtained prior to issuance of a Building Permit. Grading Inspector sign off by: Date: E( 0 0 9c. No Grading Permit required. BUILDING PLANCHECK CHECKLIST P:\doc9\chk19t\bp0001.lrm Page 3 of 4 REV 6/5/92 MISCELLANEOUS PERMITS 1 sW 2nd,./ 3rd-v/ IV 0 0 10. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or private work adjacent to the public Right-of-Way. Types of work include, but are not limited to: Street improvements, trees, driveways. A separate Right-of-Way permit issued by the Engineering Department is required for the following: Please complete attached Right-of-Way application form and return to the Engineering Department together with the requirements on the attached Right-of-Way checklist, at the time of resubmittal. 0 11. A SEWER PERMIT is required concurrent with the building permit issuance. The fee f/f is noted in the fees section on the following page. 0 D 12. INDUSTRIAL WASTE PERMIT is required. Applicant must complete Industrial III Waste Permit Application Form and submit for City approval prior to issuance of a Permit. Industrial waste permit accepted by: Date: P:\docs\chklst\bp0001.frm Page 4 of 4 REV 6/5/92 CALCULATIONS WORKSHEET N EDU CALCULATIONS: EDU's: ADT CALCULATIONS: ADT's: FEES REQUIRED: -WITHIN CFD: U YES (NO BRIDGE & THOROUGHFARE FEE, REDUCED TRAFFIC IMPACT FEE) 0 N 0 1. PARK-IN-LIEU FEE PARK AREA: FEE/UNIT:_________ O 27RAFFIC IMPACT FEE ADT's: FEE/ADT: 0 3. BRIDGE AND THOROUGHFARE FEE ADT's: FEE/ADT:____________ El 4. FACILITIES MANAGEMENT FEE ZONE: FEE/EDU:_________ PUBLIC FACILITIES FEE SEWER FEES PERMIT No. EDU's: FEE/EDU: $__________ BENEFIT AREA: FEE: $_________ 0 7. SEWER LATERAL REQUIRED (2,500 DEPOSIT) REMARKS: P:\docs\chklst\bp000l.frm REV 6/5/92 PLANNING CHECKLIST Plan Check No. 93- Address /0 Planner VAN LYNCH Phone 438-1161 ext. 4325 (Name) APN: 2ô /— /O Type of Project and Use I2-6S i t)7 1/L C4'6 4 Zone /2-3 Facilities Management Zone I Item Complete () Item Incomplete - Needs your action 1, 2, 3 Number in circle indicates plancheck number where deficiency was identified 0 Environmental Review Required: YES — NO TYPE DATE OF COMPLETION: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval 0 Discretionary Action Required: YES — NO TYPE APPROVALJRESO. NO. DATE: PROJECT NO. OTHER RELATED CASES: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval California Coastal Commission Permit Required: YES NO&. DATE OF APPROVAL: San Diego Coast District, 3111 Camino Del Rio North, Suite 200, San Diego, CA. 92108-1725 (619) 521-8036 Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval Landscape Plan Required: YES ___ NO X See attached submittal requirements for landscape plans Site Plan: Provide a fully dimensioned site plan drawn to scale. Show: North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of-way width and dimensioned setbacks. Show on Site Plan: Finish floor elevations, elevations of finish grade adjacent to building, existing topographical lines, existing and proposed slopes and driveway. Zoning: 1. Setbacks: Front: Int. Side: Street Side: Rear: Lot coverage: Height: Parking: A 69-co Al Required 26 Shown 72 -5 '- Required ' Shown S Required - Shown - Required /0 / Shown /C'/.' Required Shown Required 4k" Shown 22o" Spaces Required 2— Shown Guest Spaces Required Shown Provide legal description of property. Provide assessor's parcel number. 7 13 E Additional Comments 163 I OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER_1/ 6%'IL DATE 9'-2Q9 PLNCK. FRM CERTIFICATION OF COMPLIANCE CITY OF CARLSBAD Plan Check No. 7995 DEVELOPMENT PROCESSING SERVICES DIVISION 2075 LAS PALMAS DR., CARLSBAD, CA 92009 (619) 438-1161 This form shall be used to determine the amount of school fees for a project and to verify that the project applicant has complied with the school fee requirements. No building permits for the projects shall be issued until the certification is signed by the appropriate school district and returned to the City of Carlsbad Building Department. SCHOOL DISTRICT: VCarlsbad Unified San Marcos Unified 801 Pine Avenue 1290 West San Marcos Blvd. Carlsbad, CA 92009 (434-0610) San Marcos, CA 92024 (744-4776) Encinitas Union San Dieguito Union High School 101 South Rancho Santa Fe Rd. 710 Encinitas Boulevard Encinitas, CA. 920214 (619) 944-4300, Encinitas, CA 92024 (753-6491) Project Applicant: T1c k"r A) APN: Project Address: /Z2 RESIDENTIAL: SQ. FT. of living area number of dwelling units___________ SQ. FT. of covered area SQ. FT. of garage area COMMERCIAL/ INDUSTRIAL: SQ. FT. AREA______ Prepared by /-&,7 (4___ Date FEE CERTIFICATION (To be completed by the School District) ______Applicant has complied with fee requirement under Government Code 53080 Project is subject to an existing fee agreement Project is exempt from Government Code 53080 Final Map approval and construction started before September 1, (other school fees paid) - Other Residential Fee Levied: $ _based on _____ sq. ft. t______________ / du.st Fee Levied:$____ based on sq. ft. @_______ istrict Official AB 2926 and SB 201 fees are capped at $.2..65per square foot for residential. AB 2926 is capped at .-27 per square foot for commercial /industrial. 1986. Cit of Carlsbad SCHOOL FEES Please fill out the form on the reverse side of this page and take it to the appropriate school district. Once you have paid the school fee, a school. official has signed the school fee form, and all other plan check requirements have been met, a building permit can be issued. The City of Carlsbad will not issue any building permit without a completed school fee form. BUILDING DEPARTMENT dc enc. 2075 Las Palmas Drive.Carlsbad, California 92009-4859•(619) 438-1161