HomeMy WebLinkAbout1024 BEWICKS CT; ; CB971448; PermitBUILDING PERMIT Permit No: (33971448
I 06/16/97 15:35 Project No: A9700678
I Page 1 of 1 Development No: DEV89028
1 Permit Type: RETAINING WALL
Job Address: 1024 BEWICKS CT Suite:
Parcel No: 215-800-07-00 Lot#: 40
Valuation: 4,455 con55WMAiMR VNE
Description: 330 SF RETAIN WALL-W/SPECS Applied: 05/03/97
: ISLA MAR-RICHMOND AMERICAN Apr/Issue: 06/16/97
Occupancy Group: R3 Reference#: CT90-30 StPrnT Issum.#
i
Entered By: RMA
Appl/Ownr : RICHMOND AMERICAN HOMES 71 4-756-7 37 3
17310 REDHILL AV, STE 320
\
Adjus Tota
Fee
Build
Plan
Stron
X BUS
------
IR
Plan Ch
Fees Req
---I - - - - -.
Fees :
tments:
.1 Fees:
descript ---------
ling Permi
Check'
.g Motion
LDING TOT
Credits ***
.oo
47.00
73.00
Ext fee Data -_--------------
72.00
47.00
1.00
120.00
,
moFCARLsBA0
2075 Lap Palmas Dr., catlsbad, CA 92009 (619) 438-1161
'ERMIT APPLICATION
I FOR OFFICE USE ONLY
CITY OF CARLSBAD BUILDING DEPARTMENT
2075 Las Palmas Dr., Carlsbad CA 92009
(760) 438-1 161
Pian Ck. Deposit
. . , :* :. G," q*"-* r-7 . I 1. PROJECT INFORMATION +.+: ,..r-i I. fo2-4 (F(4 /c1v fif hrqml Busitwss Nama (at this addrassl
Unit No. e No. Totel X of units
cr+vdc30 Address (inhde BldglSuita I1
Legal Dercri tion
Assessor's Rarcal X
zd f&+C.r wL.27 *posed Use
- sou-07
3 34 Description of @ark SO. FT. #of stories X of Badrooms X of Bathrooms
issuance, also requires the applicant for such permit to file a aigned statemant that ha is licensed pursuant to the provisions of the Contractor's License Law
[Chaptar 9, commanding with Section 7000 of Division 3 of the Business and Professions Code1 or that he is exempt therefrom, and the basis for the alleged
exemption. Any violation of Section 7031.5 by eny applicant for a permit subjacta the applicant to I civil penalty of not more than five hundred dollera [$6001).
Name ' Address City StateRip Telaphone X
State License I License Class City Business Ucanse X
Designer Name Address city StateEip Telephone
State Licensa t
6. WORKERS' COMPENSATION Workers' Compensation Declaretion: I hereby affirm under penalty of perjury ona of the following decler
0 of t
issued, My worker's com ensation i rurance arrier and pdicy numbar are:
insurence Company
0
.".
I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code. for the performance
I have and will maintain workers' compensation, as required by Section 3700 of tho Labor Coda, for tho performance of the work for which this permit is
work for which this permit is lssuad.
O.?$ &ub<l Pdicy~o. klrt * !q!4 q/q f%Exptra ton Data 7- I 97
d" L I 6~ 6
ITHIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS woo1 OR uis)
CERTIFICATE OF EXEMPTION: I certify that in the performance of tho work for which this permit is issued, I than not amploy any person in any manner ao as
aws of California.
0 1, as owner of the property or my employees with wages as their sola compansation, will do tho work and the structure is not intended or offered for sale (Ssc. 7044. Business and Professions Coda: The Contractor's Ucense Law does not apply to an owner of property who builds or improves thoon, 8nd who doer
such work himself or through his own employees, provided that such improvements are not intended or offered for soia. If, howavar, the building or improvement is
so d within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of aalel.
I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sac. 7044. BuahMIs and Professions Code: The
actor's Licensa Law does not apply to an owner of property who builds or improvas tharwn, and contracts for ouch projects with contractorb) licensed
I am exampt under Section
I personally plan to proviL the major labor and materkls for conatmction of the propoaad properly improvemom. 0 YES ON0
I (have I have not) signed an application for a building permit lor the propos8d work.
I have contracted with tho following pomn (firm1 to provide the propoiad conrtruction tinduda Mme I &.u / phoIw number I COntrecton Imsa nmbarl:
pursuant to the Contractor's License Lawl.
0
1.
2.
3.
Business and Professions Coda for this reason:
k
~
4.
number I contractora license numberi:
5.
I plan to provide portions of the work, but I have hired tha following person to coordinata, supervise and provide the major work linchh name / addrass / phon0
I will provida some of tho wo
Is the applicant or future building occupant required to aubmit a business plan, acutely hazardous matorimla registration form or riak nunagenmnt and prevention
program under Sections 25605, 25533 or 26634 of the haslay-Tannar Hazardous Substance Account Act?
Is the epplicant or futuro bcllding occupant mqdred to obtain a permit from the air pdlution control district or air quality management distrlct? 0 NO
Is tho facility to bo conatrwted within 1,000 feat of tho outer boundary of a schod alto?
0 YES 0 YO
0 YES
0 YES 0 NO
IF ANY OF THE ANSWERS ARE YES. A flNAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
LENDERS NAME ENDEA'S ADDRES
19. APPUCANT
I certify that I hava read th application and state that tho above Infamtlon is cwoct and that tho information on tho plana Is accwata. I agraa to comply with ail
City ordinances and Stata laws rdating to building conmuCtion. I koby wthom. fuprmmtatives of th. CW of CU(ab8d to enter upon the above mentioned
property for inspectlon purposes. I ALSO AGREE TO SAM, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABIuT1ES. JUDGMENTS. COSTS AND EXENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEOUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA permit is required for excavations over 5'0' dwp and domdition or co~rruction of structures over 3 atodes In heiiht.
become null and void if the building or
authorized by such permit is suspended
APPLICANT'S SIGNATURE DATE 6/2/97
I I
EsGil Corporation
DATE: June9, 1997
JURISDICTION: Carlsbad
PLAN CHECK NO.: 97-1448 SET: I
gE?$9NT
0 PLAN REVIEWER
0 FILE
PROJECT ADDRESS: 1024 Bewicks Ct.
PROJECT NAME: Retaining Wall
0 The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department
staff.
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
0 The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
c] The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
c] The applicant's copy of the check list has been sent to:
(x1 Esgil Corporation staff did not advise the applicant that the plan check has been completed.
0 Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: 1 Fax #:
Mail Telephone Fax In Person
REMARKS: Page 16 of the package
must be signedkealed by the
retaining wall: 1. That sheet
that special inspection is
required for the 3000 psi concrete stem of the wall.
is on the wrong face of the key. It should be moved to the opposite face.
3. The rebar in the 2'4" key of the footing
By: KurtCulver Enclosures:
Esgil Corporation
GA CM 0 EJ c] PC 6/5/97 tmsrntl.dot
9320 Chesapeake Drive, Suite 208 San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576
Carlsbad 97- 1448
June9, 1997
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: 97-1448
PREPARED BY: Kurt Culver DATE: June 9, 1997
BUILDING ADDRESS: 1024 Bewicks Ct.
BUILDING OCCUPANCY: U-1 TYPE OF CONSTRUCTION: Mas.
BUILDING AREA 11 VALUATI 0 N
I Ret. Wall I330 I I4455 I
Air Conditioning
Fire Sprinklers
I 1 TOTALVALUE 14,455
199
0 199
Type of Review: 0 Complete Review 0 Structural Only 0 Hourly
0 Repetitive Fee Applicable
UBC Building Permit Fee
UBC Plan Check Fee
0 Bldg. Permit Fee by ordinance: $ 72.00
0 Plan Check Fee by ordinance: $ 46.80
0 Other:
Esgil Plan Review Fee: $ 37.44
Comments:
Sheet1 of 1
macvalue.doc 51 96
BUILDING PLANCHECK CHECKLIST
RETAINING WALL
BUILDING PLANCHECK NUMBER: CB 97 /4# 8
BUILDING ADDRESS: c'7-90 P e rnQr
PROJECT DESCRIPTION: Retainina Wall
ASSESSOR'S PARCEL NUMBER:
ENGINEERING DEPARTMENT
APPROVAL
The item you have submitted for review has been
approved. The approval is based on plans,
information and/or specifications provided in your
submittal; therefore any changes to these items
after this date, including field modifications, must
be reviewed by this office to insure continued
conformance with applicable codes. Please review
carefully all comments attached, as failure to
comply with instructions in this report can result
in suspension of permit to build. , .._
ATTACHMENTS
Right of Way Permit Application
DENIAL
Please see the attached report of deficiencies
marked with 0. Make necessary corrections to
plans or specifications for compliance with
applicable codes and standards. Submit corrected
plans and/or specifications to this office for
review.
By : Date:
By: Date:
' By: Date:
ENGINEERING DEPT. CONTACT PERSON
NAME: MICHELE MASTERSON
City of Carlsbad
ADDRESS: 2075 Las Palmas Drive
PHONE: 16191 438-1161, Ext. 4315
P:\DOCS\CHKLST\WALL REV 04/18/96
2075 Las Palmas Dr. - Carlsbad, CA 92009-1576 (619) 438-1161 - FAX (619) 438-0894 @
- _- ~
BUILDING PLANCHECK CHECKLIST - RETAINING WALLS
SITE PLAN
2nd 3rd
1. Provide a fully dimensioned site plan drawn to scale. Show:
A. North Arrow C. Property Lines
B. Existing & Proposed Structures D. Easements
(dimensioned from street) E. Retaining wall (location and height)
0 2. Show on site plan:
A. Drainage Patterns
B. Existing & Proposed Slopes
C, Existing Topography
3. Include on title sheet
A. Site address
B. Assessor's Parcel Number
C. Legal Description
D. Grading Quantities Cut Fill Import/Export
(Grading Permit and Haul Route Permit may be required)
0 4. Project does not comply with the following Engineering Conditions of approval for
Project No.
Conditions were complied with by: Date:
MISCELLANEOUS PERMITS
0 5. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-way and/or
private work adjacent to the public Right-of-way.
A separate Right-of-way permit issued by the Engineering Department is required
for the following:
Please complete attached Right-of-way application form and return to the
Engineering Department together with the requirements on the attached Right-of-
Way checklist, at the time of resubmittal.
P\DOCS\CHKLSnWAU Page 1 REV 04/18/96
m - d
a..
N 0
a
e f 6 h
0
do
do
PLANNING DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLIST
Plan Check No. CB
Planner 6W J< ~3 jCN1 Phone (61 9) 438-1 161 , extension 4 ?! 9 3 - /44 . g Address a, &I!' &I< 5 OTC
APN: 215- %Bo - 0 7
CFD fin/out) # n I&
Circle One (if propartc/in, complete SPECIAL TAX CALCULATION WORKSHEET provided by Bullding .
Department.)
Leaend
Item complete
Item Incomplete - Needs your action
Environmental Review Required:
DATE OF COMPLETION:
YES - NO - /TYPE
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval
NO TYPE - Discretionary Action Required: YES
APPROVAL/RESO. NO. DATE
PROJECT NO.
OTHER RELATED CASES:
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval
Coastal Zone Assessment/Compliance
I NO YES - - Project site located in Coastal Zone?
If NO, proceed with checklist; if YES, proceed below.
Determine status (Exempt or Coastal Permit Required):
If Exempt, proceed with checklist; if Coastal Permit required, hold building permit until Coastal
Permit issued.
Coastal Permit Determination Form already completed?
If NO, complete Coastal Permit Determination Form now.
Coastal Permit Determination Log #:
YES - NO-
Follow-Up Actions:
1) Stamp Building Plans as "Exempt" or "Coastal Permit Required" (at minimum
Floor Plans).
2) Complete Coastal Permit Determination Log as needed.
do 0
dOO
dUO
-dD
NO lnclusionary Housing Fee required: YES - - (Effective date of lnclusionary Housing Ordinance - May 21, 1993.)
Site Plan:
1. Provide a fully dimensional site plan drawn to scale. Show: North arrow,
property lines, easements, existing and proposed structures, streets, existing
street improvements, right-of-way width, dimensional setbacks and existing
topographical lines.
2. Provide legal description of property and assessor's parcel number.
Zoning:
1. Setbacks:
Front:
Int. Side:
Street Side:
Rear:
Required Shown
Required Shown
Required Shown
Required Shown
2. Lot Coverage: Required Shown
3. Height: Required Shown
4. Parking: Spaces Required Shown
Guest Spaces Required Shown
Additional Comments
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER TE b-//-4?
TO: C 3 1s hK,d ................... .7.. ............................................
...... 207.5 ........ .L.G. f ..... 13,.l,P..Z. ............
...... ~.4".!$..b46(... ...... f ......... G.4 ..................
.............................................................................................
ATTENTION: .... ?hec\.f..fl.~. .... fi .......
TRANSMITTAL:
VIA: OVERNIGHT 0
LETTER OF TRANSMITTAL
DATE: . 6-2-97 .................................................
PER YOUR REQUEST 0 FOR YOUR INFORMATION 0
MAIL 0 COURIE+
PLEASE REPL~
OTHER 0
COMMENTS:
.......... ............................. ..............................................................................................................................................
... ........ ... ...
..... ........
........ ..... ....
....... ........ .. ....... ........ ..... ......................................................................................
..................... ... .......... ...... ..... .... ..... .... .........
....................... 6% f ........ ..... ..... ........ 4.. COhCW ..., .......................... Ph Yo-,".. .................................................... k& *
pr e Few;/$. fim~s f-
d ypriib W, phw ch4 e. BY: .............. .... .....................
cc:
17310 REDHILL AVENUE SUITE 320 IRVINE CALIFORNIA 92614 714/756-7373 Fax 714/757-4333
(WHITE - Recipient YELLOW - File Copy)
..
APPLICANT:
RICHMOND AMERICAN
HOMES OF CALIFORNIA. INC.
LOT 40 OF CITY OF CARLSBAD TRACT NO.
90-30, AVIARA PLANNING AREA 30 UNIT 2. IN THE CITY OF
CARLSBAD COUNTY OF SAN DIEGO, STATE OF CALIFORNIA,
ACCORDING TO MAP THEREOF NO, 13370. RECORDED NOVEMBER
COUNTY RECORDER OF SAN DIEGO COUNTY. 08, 1996 AS FILE NO. 1996-566545 IN THE OFFICE OF THE
CURRENT ADDRESSES:
LOT 40 - 1024 BEWICKS COURT
PREPARED B Y:
SOUTHWEST CIVIL
ENGINEERING
SHEET 1 OF 2 RCE 54277 - EXP 12/31/99
CURRENT ASSESSOR’S
PARCEL NUMBERS:
LOT 40 : 215-800-07
OCEANSIK WSTA
WCINITY MAP
LEGEND:
RETAINING WALL
PREPARED B
..
h e 3
2 z :
z1
B
C
TRACT NO. 90-30 i UNIT 2 c ? LOT 40 <
SHEET 2 OF 2 C 3
..
Principals:
Anthony F. Belfast Michael P. Imbriglio W. Lee Vanderhurst May 9,1997
Richmond American Home
17310 Red Hill Avenue, Suite 320
Irvine, California 92714
Project No. 0282-002-01
Document No. 7-0285
Attention: Mr. Me1 Mercado
SUBJECT: RETAINING WALL RECOMMENDATIONS
Islamar Lot 40
Aviara PA 30
Carlsbad, California
REFERENCES: Geotechnics Incorporated, August 6, 7996, As-Graded Geotechnical
Report, Aviara Planning Area 30, Carlsbad, California, Project No. 0073-
006-00, DOC. #6-0496
Dear Mr. Mercado:
In response to your request, we have prepared this letter of recommendations for design and
construction of a retaining wall in Lot 40 of Islamar. The retaining wall is proposed for the rear or
easterly portion of the lot. The wall will be located just below the existing top of slope. Based on
a review of the referenced report, the wall will be underlain by compacted fill. The maximum
height of the walls will be 5 feet.
Recommendations
The following recommendations assume that the wall will be founded in compacted fill. A
representative of Geotechnics Incorporated should review the foundation excavations to see that
the soil conditions are as anticipated.
Earth-Retainina Structures
For cantilever retaining walls, where the backfill is level or nearly level, an active earth
pressure approximated by an equivalent fluid pressure of 35 lbs/ft3 may be used. The
active pressure should be used for walls free to yield at the top at least 0.2 percent of the
wall height. For walls restrained so that such movement is not permitted, an equivalent
fluid pressure of 55 Ibs/W should be used, based on at-rest soil conditions with level
backfill. The above pressures do not consider any surcharge loads or hydrostatic
pressures. If these are applicable, they will increase the lateral pressures on the wall and
we should be, contacted for additional recommendations. Walls should contain an
adequate subdrain to reduce hydrostatic forces. Typical wall drain detains are given in the
Retaining Wall Drain Detail, Figure 1.
9951 Business Park Ave., Ste. B San Diego California 92131
Phone (619) 536-1000 Fax (619) 536-8311
.-
Richmond American
Mav 9. 1997
Project No. 0283-002-01
Document No. 7-0285
Backfilling retaining walls with expansive soils can increase lateral pressures well beyond
normal active or at-rest pressures. We recommend that retaining walls be backfilled with
soil having an Expansive Index of 20 or less. The backfill area should include the zone
defined by a 1:l sloping plane, back from the base of the wall. Retaining wall backfill
should be compacted to at least 90% relative compaction, based on ASTM 01557-91.
Backfill should not be placed until walls have achieved adequate structural strength.
Heavy compaction equipment which could cause distress to walls should not be used.
Slope Setback
The foundations for the proposed structures should be setback from the slope a minimum
horizontal distance of 8 feet. The setback should be measured horizontally from the
outside bottom edge of the footing to the slope face. The horizontal setback can be
reduced by deepening the foundation in order to achieve the required setback distance
projected from the footing bottom to the face of the slope.
We trust the information provided in this letter meets your current needs. If you have any
questions please call.
Very truly yours,
GEOTECHNICS INCORPORATED
Thomas B. Canady, P.E. 50057
Senior Engineer
TBC/46
Distribution: (2) Addressee
Attachment: Figure 1, Retaining Wall Drain Details
Geotechnics Incorporated
DAMP-PROOFING OR WATER-PROOFING
AS REQUIRED
12 INCHES OF
SOIL COVER
..... CONSTRUCTION SLOPE
MINUS 314-INCH CRUSHED ROCK
ENVELOPED IN FILTER FABRIC
(MIFAFI 140NL, SUPAC 4NP, OR
APPROVED SIMILAR)
&INCH DIAM. ABS OR PVC
PERFORATED PIPE
TO AVOID UNDERMINING FOOTING,
DRAIN EXCAVATION SHOULD NOT
EXTEND BELOW THIS PLANE
NOTES
1)
2)
3)
Subdrain perforated pipe should have a fall of at least 1.5%. Perforated pipe should outlet to a
solid pipe carrying the drainage to a free gravity outfall. Slope of outlet pipe should be at least 1 %.
Filter fabric should be overlapped at least 6-inches.
Drain installation should be observed by the geotechnical consultant prior to backfilling.
RETAINING WALL DRAIN DETAIL
Lot 40 of lslamar
Aviara PA 30
Geotechnics -1 n c o rp or at e d - Project No . 0282-002-01
Document No. 7-0285
FIGURE 1
May 19, 1997
Richmond-American Homes
17310 Red Hill Avenue, Suite 320
Irvine, California 92714
Principals:
Anthony F. Belfast Michael P. Imbriglio W. Lee Vanderhurst
Project No. 0282-002-01
DOC. #7-0304
Attention: Mr. Me1 Mercado
SUBJECT:
Reference:
Gentlemen:
RETAINING WALL FOUNDATION PIAN REVIEW
Aviara PA 30, lslamar Lot 40
Carlsbad, California
Geotechnics Incorporated, May 9, 1997, Retaining Wall Recommendations,
lslamar Lot 40, Aviara PA 30, Carisbad, California, Project No. 0282-002-01, Doc.
#7-0285.
Geotechnics Incorporated, August 6, 1996, As-Graded Geotechnical Reporf, A viara
Planning Area 30, Carisbad, California, Project No. 0073-006-00, Doc. #6-0496
€SI FME Inc. May 19, 1997, Foundation Details, Retaining Wall, Isla Mar Lot 40,
J:\FILES\7400\7400DFX
This letter confirms that we have reviewed the geotechnical aspects of the drawings for the
retaining walls referenced above. The retaining wall drawings reviewed consisted of pages 16
and 19 of the ESVFME structural details which were transmitted to us by facsimile. It is our
opinion that these foundation plans adequately incorporate the recommendations provided in the
referenced geotechnical reports. We appreciate this opportunity to be of continued service.
Please feel free to contact the office with any questions or comments.
GEOTECHNICS INCORPORATED
79-D- c-Y
Thomas B. Canady, P.E. 50057
Senior Engineer
WLV/TBC/wlv
Distribution: (4) Addressee
9951 Business Park Ave., Ste. B San Diego California 92131
Phone (619) 536-1000 Fax (619) 536-8311
ESI/FME
MAY I 9 1997 Shipped : .
I N C.
STRUCTURAL ENGINEERS
I PROJECT :
Structural calculations on " ISLA MAR " site retaining walls to
be built in Carlsbad, California for RICHMOND AMERICAN
Site Retaining Walls
1994 Uniform Building Code
Date : April 23 , 1997
Revisions :
Client : R1 CH M ON D
AMERICAN
Client Job No.
Job No. 7400-1 8
1921 EAST CARNEGE AVENE, ST. 3J, SANTA ANA, CALIFORNIA 92705-0055 Ph: (714) 261-1811 F~x (714) 261-8506
.- ..
ESI/FME, Inc.
STRUCTURAL ENGINEERS
SINCE 1974
04/23/97
7400-1 8
ROOF : Wd.Shake Rock Tile FLOOR :
Slope 1432 4 3:12 2 4:12 141151 w/o Conc. w/ Conc. Elmm
Live Load
Roof'g Mt'l Built - Up
Sheathin# Roof Ra ers Ceilin Joist Orywt!I Miscellaneous Total 0.L
Total LOAD
16.0 psf 20.0 psf -- 4.0 6.0 1.5 1.5 1.5 1.5 1.5 1.5 2.5 2.5 1 .o 1 .o
--
- 12.0 psf 14.0 psf
28.0 psf 34.0 psf
16.0 psf
10.0
1.5 1.5 1.5 2.5 1 .o
--
18.0 psf
34.0 psf
Live Load 40.0 psf 40.0 psf
D.L. of F.F. 5.0 15.0 Sheath in9 1.5 1.5 Floor Joists 3.0 3.0 Drywall 2.5 2.5 Total D.L. 12.0 psf 22.0 psf
Total Load 52.0 psf 62.0 psf LOAD CONDITIONS :
Elnil
STANDARD SPECIFICATIONS FOR STRUCTURAL CALCU IATIONS
1. Sketches of details in calculations are not to scale and may not represent true conditions on plans. Architect or designer is responsible for drawing details in plans which represent true framing conditions and scale. Enclosed details are intended to complement standard construction practice to be used by experienced and qualified
contractors.
c
2. The structural calculations included here are for the analysis and design of primary structural system. The attachment of non- structural elements is the responsibility of the architect or designer, unless specifically shown otherwise.
3. The drawings, calculations, specifications and reproductions are instruments of service to be used only for the specific project covered by agreement and cover sheet. Any other use is solely prohibited.
4. All changes made to the subject project shall be submitted to ESI/FME, Inc. in writing for their review and comment.
These calculations are meant to be used by a design professional, omissions are intended .
-. 5. Copyright 0 - 1994 by E S I / F M E, Inc. Structural Engineers. All rights reserved.
This material may not be reproduced in whole or part without written permission of E S I / F M E, Inc.
PROJECT DESCRIPTION:
I' ISLA MAR " Site Retaining Walls
Carlsbad, California for RICHMOND AMERICAN
PROJECT ENGINEER: F.M.
CALCS By: D.A. DATE: 04/23/9/
ASSOC. CHECK: DATE: BACK CHECK: DATE: ROOF TRUSS Rev.: DATE: FLR. TRUSS Rev.: DATE: P/l FOUND. Rev.: DATE:
PIAN CHECK: DATE:
REVISIONS:
@ SHTS: \j tt 3 8 DATE: 4-a3-?7
Init.: @.A @ SHTS: \, 1, \ - %\ DATE: 5-r% 9-
Init.: ~3 A . @ SHTS: DATE: Init.: DATE: Init.:
DATE: @ SHTS: Init.:
DATE:
Init.: DATE: 0 SHTS: Init.:
E S I / F M E, Inc - Sfmcfurd Engim
(This signature is to be a wet signature, not a copy.) APPROVED BY:
@ SHTS:
6 SHTS:
DATE:
..
I
SEE SOIL REPORT FOR
BACKFILL MATER1 AL.
\
'I
c
ESIEME mc.
STRUCTURAL ENGINEERS & CONSULTANTS
1921 E. CARNEGIE AVE. # 3K
SANTA ANA, CA 92705
PH: (714)261-1811 FAX: (714)261-8506
(7
Title : AVAIRA
Description.. . .
Job# : 7400 Dsgnr: DA Date: APR 11.1997
10'4" REATIN WALL T/U
CANTILEVERED RETAINING WALL DESIGN Page 1 of2 - GENERAL I SOILDATA P I I Retained Height - i0.50 n Allow Soil Bearing - - 2.500.0pSf
Height of Soil over Toe 6.00 in Active Soil Pressure - Toe Side - - 35.0pcf
200.0pcf
Soil Density = 110.00pcf Water table height over heel -
Toe Width - - 1.ooft Friction Factor @ Footing C Soil 0.300
Total Footing Width -
-
Wall height above retained soil
Slope Behind Wall 0.00 : 1 Active Soil Pressure - Heel Side - - 35.0psf
0.00 tt Equivalent Fluid Pressure Method
- - Passive Pressure
0.OA -
FOOTING DATA I SLIDINGDATA
Heel Width - - 4.50 ... neglect ht. for passive O.00in
Footing Thickness
1
5.50
12.00 in
-
Lateral Sliding Force = 2.275 .O Ibs
less Passive Pressure Force - -- 1.600.01bs - -- 1.981.11bs less Friction Force
0.Olbs
- -
1 i KEY DATA - 4.50 ft Added Restraint Force Required - - Distance from Toe -
Width -
Depth -
I FOOTING DESIGN RESULTS I
12.00 in
30.00 in
- -
f'c
Minimum As %
Rebar Cover @ Top
Rebar Cover Bottom
FY
= 2.500 psi = 60,OOOp~i = 0.0018
3.00 in
3.00 in
- - - -
Upward Soil Pr&ure Under Heel Omitted
ACI Factored Soil Pressure - - 3,181 88 psf
Mu' : From Downward Loads - - 144 11,190 ft4
TOe Heel
Mu' : From Upward Loads - - 1,497 4,559 ft#
Mu: Used For Design
Actual One-way Shear
Minimum Footiug Rebar Options......
Heel Side.. ..
# 4 @ 13.25 in
# 5 @ 20.50 in
# 6 @ 29.00 in
# 7 @ 39.25 in
# 8 @ 48.25 in
#9@48.25in
# 10 6 18.25 in
Toe Side.. ....
Not req'd
Mu < S*Fr
6'632 *-# Key Reinforcement: - - 1,353
8.04 25.90 psi - -
-
Not Req'd = Mu<S*Fr
Ailowable One-way Shear - - 85.00 85.00 &i
DESIGN SUMMARY
Total Bearing Load - 6,605 Ibs Summary of Stem Section Designs.. . .
si] Pressure Toe = 2,337 = 2,500 psf 2nd: 12 in Mas, #6@ 8.00 in@Edge, From 5.5 ft to 2.0 ft
Soil Pressure (3 Heel = 65 = 2.500 Pf 3rd: 12 in Conc. #6@ 8.00 in@Edge, From 2.0 ft to 0.0 ft
ACI Factored Press Toe - 3,181 psf
Footing Shear @ Toe - - 8.0 e= 85.0 psi
Footing Shear @I Heel = 25.9 < = 85.0 psi
WALL STABILITY RATIOS
I
10.41 in Top: 8 in Mas. #5@16.00 in@Edge, From 10.5 ft to 5.5 ft - ... resultant ecc.
88 psf - - ACI Factored Press (r? Heel
2.40
1.57
- Overturning Stability Ratio -
Sliding Ratio Ratio - -
RetainPro V4.Oa (c) 1989-Y6 ENERCALC
c
.ESI/FME ,INC.
STRUCTURAL ENGINEERS & CONSULTANTS
1921 E. CARNEGIE AVE. # 3K
SANTA ANA , CA 92705
PH: (714)261-1811 FAX: (714)261-8506
t0
Title : AVAIRA
Description.. . .
Job# : 7400 Dsgnr: DA Date: AF'R 11,1997
10'-6" REATIN WALL TN
+---
CANTILEVERED RETAINING WALL DESIGN Page 2 of 2
SUMMARY OF OVERTURNING & RESISTING FORCES & MOMENTS 1 ..... OVERTURNING.. . . . . . . . .RESISTING.. . . .
Item
Heel Active Pressure
Soil Over Heel
Sloped Soil Over Heel
Surcharge Over Heel
Adjacent Footing Load
Axial Dead Load on Stem
Toe Active Pressure
Soil Over Toe
Surcharge Over Toe
Stem Weight(s)
Earth @ Stem Transitions
Footing Weight
Key Weight
Vert. Component Ad&d Lateral Load
Load @ Stem Above Soil
TOTALS
Force Distance Moment Ibs ft ft#
2.314.4 3.83 8.871.8 - -
Vertical component of active pressure used for soil pressure
Toe Surcharge Not Used To Resist Overturning
Heel Surcharge Used To Resist Overturning
0.T.M = 8,852.1
Force Distance Moment Ibs ft A#
4.042.5 3.75 15.159.4
0.00
55.0 0.50 27.5
1,621.0
183.3 1.83 336.1
825 .O 2.75 2.268.7
375.0 5.00 1,875.0
1,124.0 1 :44
6.604.8 R.M. = 21,287.7
Resisting/Overturning Ratio 2.40
STEM CONSTRUCTION & DESIGN I Top Stem 2nd Stem 3rd Stem
Stem OK Stem OK Stem OK
Wall Material Above "Ht" Masonry Masonry Concrete
Thickness 8.00in 12.00 in 12.00 in
Rebar Size #5 #6 #6
Rebar Spacing 16.00in 8.00 in 8.00 in
Rebar Placed at Edge Edge Edge
Design Data
tbfFB + fa/Fa 0.689 0.979 0.431
Total Force @ Section 437.5 Ibs 1,264.4 Ibs 3,272.5 Ibs
Moment.. . .Actual 729.2 ft4 3,582.4 A# 11.478.5 e-#
Moment.. . . .Allowable 1.058.0ft-# 3,659.9 ft# 26.658.7 ft-#
Shear.. . . .Actual 7.81 Ibs 13.57 psi 28.33 psi
Shear ..... Allowable 19.36psi 19.36 psi 93.11 psi
Bar Embed ABOVE Ht. 30.00in 23.62 in 12.00 in
Bar Embed BELOW Ht. 30.00in 12.00 in 6.00 in
Wall Weight 78.0psf 124.0 psf 150.0 psf
Rebar Depth 'd' 5.25 in 9.00 in 9.63 in
f'm 1.500psi 1.500 psi
Fs - - 24,OOOpsi 24.000 psi
Solid Grouting Yes Yes
Modular Ratio 'n' 25.78 25.78
Equiv. Solid Thick. 7.60in 11.60 in
f'C 3,000 psi FY 60,OOO psi
Design at this height above ftg 5 SO ft 2.00 ft 0.00 ft
Masonry Data
-. Special Inspection - No No
Short Term Factor 1.OOO 1 .Ooo
-
Concrete Data
RetainPro Vl.Oa (c) 1989-96 ENERCAL('
.-
,/-
5iEE 50IL REPORT FOR
BACKFILL MATERIAL.
' .ESIFME .MC.
STRUCTURAL ENGINEERS & CONSULTANTS
1921 E. CARNEGIE AVE. # 3K
SANTA ANA , CA 92705
,-
rc-- PH: (714)261- 181 1 FAX: (714)261-8506
&7
Title : AV[ARA
Description.. . .
Job# :7400 Dsgnr: DA Date: APR 22.1997
8'-6" RETAINING WALL T/U
CANTILEVERED RETAINING WALL DESIGN Page I of 2
GENERAL SOIL DATA
Retained Height - 8.50 ft Allow Soil Bearing - - 2.500.0psf
Wall height above retained soil
I I -
0.00 f? Equivalent Fluid Pressure Method
Slope Behind Wall 0.00: 1 Active Soil Pressure - Heel Side - - 35.0psf
Height of Soil over Toe 6.00 in Active Soil Pressure - Toe Side - - - 200.0pcf
Soil Density = 110.00pcf Water table height over heel =
Toe Width - - 1.00 ft Friction Factor @ Footing & Soil 0.300
Total Footing Width -
35.0pcf
0.on
-
Passive Pressure
~ FOOTING DATA SLIDING DATA I 17 1
Heel Width - - 3.00 ... neglect ht. for passive O.OOin
Footing Thickness - 1 540.0 Ibs
1 KEY DATA less Friction Force - -- 1.149.7 Ibs
0.Olbs
4.00
12.00 in
-
Lateral Sliding Force - - -
less Passive Pressure Force = - 1,225.01bs I b - 3.00 A Added Restraint Force Required - - Distance from Toe -
Width - 12.00 in
24.00 in
- - Depth -
[ FOOTING DESIGN RESULTS I
f'C
FY Minimum As %,
Rebar Cover @ Top
Rebar Cover @ Bottom
ACI Factored Soil Pressure
Mu' : From Upward Loads
Mu' : From Downward Loads
Mu: Used For Design
Actual One-way Shear
2,500 psi
60,OOO psi
0.0018
3.00 in
3.00 in
TO49
2.958
2,032
224
1,808
21.99
~
Minimum Footing Rebar Options ......
Heel Side. ...
# 4 @ 13.25 in
# 5 @ 20.50 in
# 6 @ 29.00 in
# 7 @ 39.25 in
0 psf #8@48.25in
# 9 @ 48.25 in 0 A4
3,845 ft# # 10 @ 48.25 in
31845 ft-# Key Reinforcement: Not Req'd = Mu<S*Fr 29.78 psi
Toe Side.. ....
Not req'd
Mu < S*Fr
Heel
Allowable One-way Shear - - 85.00 85.00 pSi
1DESIGN SUMMARY
Total Bearing Load - 1 3,832 Ibs Summary of Stem Section Designs.. . . -
... resultant ecc. - 10.18 in Top: 8 in Mas, #5@16.00 in@Edge. From 8.5 fl to 3.5 t't
Soil pressure ($ Toe = 2,219 < = 2,500 psf 2nd: 12 in Mas. #6@ 8.00 in@Edge. From 3.5 ft to 0.0 ft
Soil Pressure @ Heel = 0 <= 2.500psf
ACI Factored Press (ij Toe - - 2,958 psf
Footing Shear @ Toe = 22.0 < = 85.0 psi
Footing Shear @ Heel = 29.8 < = 85.0 psi
WALL STABILI?"Y RATIOS
-
0 Pf - - ACI Factored Press (ii) Heel
1.89
1.54
- Overturning Stability Ratio -
Sliding Ratio Ratio - -
Retainpro V4.h (c) 1989-96 ENERCALL'
21
Title : AVLQRA
Description.. . . Job# : 7400 Dsgnr: DA Date: APR 32.1997
8'4" RETAINING WALL T/W
'J , -ESI/FME JNC.
STRUCTURAL ENGINEERS I& CONSULTANTS
1921 E. CARNEGIE AVE. # 3K
SANTA ANA, CA 92705
-
,- PH: (714)261-1811 FAX: (714)261-8506
CANTILEVERED RE3M"G WALL DESIGN Pug.? 2 of 2
SUMMARY OF OVERTURNING & RESISTING FORCES & MOMENTS
Force Distance Moment Force Distance Moment Item Ibs fi A# Ibs A ft#
Heel Active Pressure - - 1,579.4 3.17 5,001.4
Soil Over Heel 1.870.0 3.00 5,610.0
Sloped Soil Over Heel a
Surcharge Over Heel -
Adjacent Footing Load - - -
0.00 - - Axial Dead Load on Stem Toe Active Pressure - - -39.4 0.50 -19.7
Soil Over Toe 55.0 0.50 27.5
Surcharge Over Toe -
1.171.0 Stem Weight@) - - 824.0 1.42
Earth @ Stem Transitions - 183.3 1.83 336.1
Footing Weight - - 600.0 2.00 1,200.0
Key Weight - - 300.0 3 SO 1.050.0
Vert. Component -
Added Lateral Load -
Load @ Stem Above Soil
-
- - - -
TOTALS = 1,540.0 0.T.M = 4,981.7 3,832.3 R.M. = 9.394.6
Vertical component of active pressure used for soil pressure Toe Surcharge Not Used To Resist Overturning Reskting/OvertUrning Ratio 1.89
Heel Surcharge Not Used To Resist Overturning
I STEM CONSTRUCITON & DESIGN 1 I Top Stem 2nd Stem
Stem OK Stem OK
Design at this height above ftg 3.50ft 0.00 A
Wall Material Above "Ht" Masonry Masonry
Thickness 8.00in 12.00 in
Rebar Size #5 #6
Rebar Spacing 16.00in 8.00 in
Rebar Placed at Edge Edge
Design Data
tb/FB + fa/Fa 0.689 0.979
Moment.. . .Actual 729.2ft4 3,581.7 ft-#
Moment.. . ..Allowable 1.058.0ft4 3,659.9 ft#
Shear ..... Actual 7.81 Ibs 13.53 psi
Shear.. . . .Allowable 19.36psi 19.36 psi
Bar Embed ABOVE Ht. 30.00in 23.62 in
Bar Embed BELOW Ht. 30.00in 6.00 in
Wall Weight 78 .O psf 124.0 psf
Rebar Depth 'd' 5.25 in 9.00 in
f ' m 1,500psi 1,500 psi
Fs - - 21.000 psi 24,000 psi
Solid Grouting Yes Yes
Modular Ratio 'n' 25.78 25.78
Equiv. Solid Thick. 7.60in 11.60 in
f'C
Total Force @ Section 437.5 Ibs 1.260.0 Ibs
Masonry Data - Special Inspection - No NO
Short Term Factor 1.OOO 1 .Oo
-
Concrete Data
FY
(c) 1989-96 ENERCALC Retainpro V4.oa
ESI/FME
I N C.
STRUCTURAL ENGINEERS
I PROJECT :
Structural calculations on 'I ISLA MAR " site retaining walls to
be built in Carlsbad, California for RICHMOND AMERICAN
Site Retaining Walls
1994 Uniform Building Code
Date : April 23 , 1997
Revisions :
I Shipped :
Client : RICHMOND
AMERl CAN
Client Job No.
Job No. 7400-1 8
1921 EAST CARNEGE AVENE, ST. N, SANTA AM, CAUFORNIA 92705-0055 Ph: (714) 261-1811 Fa (714) 261-8506
t-
ESI/FME, Inc.
STRUCTURAL ENGINEERS
SINCE 1974
LOAD CONDITIONS :
ROOF : Wd.Shake Rock Tile FLOOR :
Slope L 4:12 5 312 L 4:12 14j w/o Conc. (lim131
Live Load 16.0 psf 20.0 psf 16.0 psf Live Load 40.0 psf
Roof'g Mt'I 4.0 -- 10.0 D.L of F.F. 5.0 Built- Up -- 6.0 -- Sheathing 1.5 1.5 1.5 1.5 Floor Joists 3.0 2.5 - Roof Ra ers 1.5 1.5 1.5 Drywall Ceilin Joist
Miscellaneous 1 .O TotaJ D.L 12.0 psf 14.0 psf 18.0 psf LOAD CONDITIONS :
1.5 1.5 1.5 Total D.L 12.0 psf Sheathink!
Dryw 3 1 2.5 2.5 2.5 1 .o 1 .o Total Load 52.0 psf
sheet 2
D& 04/23/97
7400-18 I JN.
El w/ Conc.
40.0 psf
15.0
1.5 3.0 2.5 22.0 psf
62.0 psf
Total LOAD 28.0psf 34.Opsf 34.Opsf [-I 1-1 [I
STANDARD SPECIFICATIONS FOR STRUCTURAL CALCULATIONS
1. Sketches of details in calculations are not to scale and may not represent true conditions on plans. Architect or designer is responsible for drawing details in plans which represent true framing conditions and scale. Enclosed details are intended to complement standard construction practice to be used by experienced and qualified contractors.
rc-
2. The structural calculations included here are for the analysis and design of primary structural system. The attachment of non - structural elements is the responsibility of the architect or designer, unless specifically shown otherwise.
3. The drawings, calculations, specifications and reproductions are instruments of service to be used only for the specific project covered by agreement and cover sheet. Any other use is solely prohibited.
4. All changes made to the subject project shall be submitted to ESI/FME, Inc. in writing for their review and comment. These calculations are meant to be used by a design professional, omissions are intended.
_- 5. Copyright 0 - 1994 by E S I / F M E, Inc. Structural Engineers. Ail rights reserved. This material may not be reproduced in whole or part without written permission
of E S I / F M E, Inc.
PROJECT DESCRIPTION:
'' lSlA MAR " Site Retaining Walls
Carlsbad, California for RICHMOND AMERICAN
REVISIONS:
SHTS: \> ti 48 DATE: 4-23-97
Init.: @.A
Init.: o A
Init.:
Init.:
Init.:
SHTS: \I 2, \ - 'L\ DATE: 5-m-q 1
SHTS: DATE:
SHTS: DATE:
SHTS: DATE:
SHTS: DATE:
Init.:
Init.: @ SHTS: DATE:
E S I 1 F M E, Inc - Structural Engineem
(This signature is to be a wet signaturn, not a copy.) APPROVED BY:
DATE:
5EE SOIL REfORT FOR B ACKF I LL MATER1 A1 -
L66F 2E :9S :PF 6F AeW UOW jXOOOPL\OOPL\S3lIJ\ :f'
. ~ES~IFME ,wc.
STRUCTURAL ENGINEERS & CONSULTANTS
1921 E. CARNEGIE AVE. # 3K
SANTA ANA . CA 92705
I PH: (714)261-1811 FAX: (714)261-8506
(7
Title : AVAIRA Job # : 7400.. Dsgnr: DA Date: APR 31.1997
Description.. . .
10'4" REATIN WALL T/U
/-
CANTILEVERED RETAINING WALL DESIGN Page I of 2
i GENERAL SOIL DATA 1 l Retained Height - - 10.50 t't Allow Soil Bearing - - 2.500.0psf
Wall height above retained soil
Slope Behind Wall 0.00 : 1 Active Soil Pressure - Heel Side - - 35.0psf
35.0pcf
0.Oft
0.00 ff Equivalent Fluid Pressure Method
- Height of Soil over Toe 6.00 in Active Soil Pressure - Toe Side -
Soil Density = 110.00pcf Water table height over heel -
Toe Width - - 1.00 ft Friction Factor @ Footing & Soil 0.300
Total Footing Width -
200.0pcf - Passive Pressure - -
~ FOOTING DATA I 1 SLIDINGDATA 1 I
Heel Width - - 4.50 ... neglect ht. for passive O.00in
- 2.275 .O Ibs = 12.00 in Lateral Sliding Force - -- 1.600.01bs Footing Thickness
[KEY DATA less Friction Force =- 1,981.41bs
O.Olbs
5.50 -
less Passive Pressure Force I - 4.50 ft Added Restraint Force Required - - Distance from Toe -
12.00 in Width -
Depth = 30.00 in
-
1 FOOTING DESIGN RESULTS I
rC
FY Minimum As ?&
Rebar Cover @I Top
Rebar Cover 6) Bottom
= 2,500 psi = 60,OOOpsi = 0.0018 = 3.00 in = 3.00 in Upward Soil Pr&ure Under Heel Omitted
ACI Factored Soil Pressure - 3,181 88 psf
Mu' : From Downward Loads - - 144 11,190 ft-#
TOe Heel
Mu' : From Upward Loads - - 1,497 4.559 ff-#
Mu: Used For Design
Actual One-way Shear
Minimum Footing Rebar Options......
Tae Side...... Heel Side....
Not req'd
Mu < S*Fr
# 4 @ 13.25 in
# 5 @ 20.50 in
# 6 @ 29.00 in
# 7 @ 39.25 in
# 8 @ 48.25 in
# 9 @ 48.25 in
# 10 @ 48.25 in
67632 *-# Key Reinfowemeat: 1,353 - -
8.04 25.90 psi - -
-
Not Req'd = Mu<S*Fr
Allowable One-way Shear = 85.00 85.00 &
4DESIGN SUMMARY I 6.605 Ibs Summary of Stem Section Designs.. . . - Total Bearing Load -
... resultant ecc. - 10.41 in Top: 8 in Mas. #5@16.00 in@Edge, From 10.5 ff to 5.5 ft
soil Pressure Q Toe = 2,337 = 2,500 psf 2nd: 12 in Mas. #6@ 8.00 in@Edge. From 5.5 ft to 2.0 ft
Soil Pressure @ Heel = 65 < = 2,500 Pf 3rd: 12 in Conc, #6@ 8.00 in@Edge, From 2.0 ft to 0.0 ft
ACI Factored Press @ Toe - 3,181 psf
88 psf ACI Factored Press @ Heel
Footing Shear @ Toe - - 8.0 < = 85.0 psi
Footing Shear @I Heel = 25.9 < = 85.0 psi
WALL STABILITY RATIOS
-
- -
2.40
1.57
- Overturning Stability Ratio -
Sliding Ratio Ratio - -
-- RetainPro V4.h (c) 1989-96 ENERCALC
' 'ESIFME ,INC.
STRUCTURAL ENGINEERS & CONSULTANTS
1921 E. CARNEGiE AVE. # 3K
SANTA ANA , CA 92705
PH: (714)261-1811 FAX: (714)261-8506
F
\0 Title :AV-
Job# : 7400. Dsgnr: DA Date: APR 11.1997
Dexnption.. . .
10'-6" REA" WALL T/U
CANTILEVERED RETAIMNG WALL DESIGN Page 2 o/ 2
SUMMARY OF OVERTURNING & RESISTING FORCES & MOMENTS
c
. . . . .OVERTURNING.. . . .
Item Ibs ft ft-# Ibs ft ft -#
Heel Active Pressure = 2,314.4 3.83 8.871.8
Soil Over Heel 4.042.5 3.75 15,159.4
. . . . .RESISTING.. . . . Force Distance Moment Force Distance Moment
- Sloped Soil Over Heel -
Surcharge Over Heel -
Adjacent Footing Load -
Axial Dead Load on Stem Toe Active Pressure - - -39.4 0.50 -19.7
Soil Over Toe 55.0 0.50 27.5
Stem Weight(s) - - 1,124.0 1.44 1.621.0
Earth @ Stem Transitions - 183.3 1.83 336.1
Footing Weight - - 825.0 2.75 2.28.7
Key Weight - - 375.0 5.00 1.875.0 Vert. Component -
Added Lateral Load =
Load @ Stem Above Soil
- -
0.00 - -
Surcharge Over Toe =
- -
TOTALS = 2.275.0 0.T.M = 8,852.1 6,604.8 R.M. = 21.287.7
Vertical component of active pressure used for soil pressure
Heel Surcharge Used To Resist Overturning
Toe Surcharge Not Used To Resist Overturning Resisting/Overturning Ratio 2.40
1 SlXM CONSTRUCI'ION & DESIGN I I Top Stem 2nd Stem 3rd Stem
Stem OK Stem OK Stem OK
Wall Material Above "Ht" Masonry Masonry Concrete
Thickness 8.00in 12.00 in 12.00 in
Rebar Size #5 #6 #6
Rebar Spacing 16.00in 8.00 in 8.00 in
Design at this height above ftg 5.50ft 2.00 fi 0.00 fi
Rebar Placed at Edge Edge Edse
Design Data
tbFB + fa/Fa 0.689 0.979 0.431
Total Force @ Section 437.5Ibs 1.264.4 Ibs 3,272.5 lbs
Moment.. ..Actual 729.2fi4 3,582.4 ft-# 11.478.5 ft-#
Moment.. ... Allowable 1,058.0fi4 3,659.9 ft-# 26.658.7 ft-#
28.33 psi Shear ..... Actual 7.81 Ibs 13.57 psi
Shear ..... Allowable 19.36psi 19.36 psi 93.11 psi
Bar Embed ABOVE Ht. 30.00in 23.62 in 12.00 in
Bar Embed BELOW HI. 30.00in 12.00 in 6.00 in
Rebar Depth 'd' 5.25in 9.00 in 9.63 in
f'm 1.500psi 1.500 psi
24,000psi 24,000 psi Fs -
Solid Grouting Yes Yes
Special Inspection =: No No - Modular Ratio 'n' 25.78 25.78
Wall Weight 78.0psf 124.0 psf 150.0 psf
Masonry Data
-
Short Term Factor 1.0o0 1.OOO
Equiv. Solid Thick. 7.60in 11.60 in
f'C 3,000 psi
FY 60,OOO psi
Concrete Data
RetainPro Vl.Oa (c) 1989-96 ENERCALC'
I4
5EE SOIL REPORT FOR
BACKFILL MATERIAL.
24
Title : AVIARA Job# : 7400.. Dsgnr: DA Date: APR 22.1997
Description.. . .
8'4" RETAINING WALL T/U
-. *ESI/FME .MC.
STRUCTURAL ENGINEERS & CONSULTANTS
1921 E. CARNEGIE AVE. # 3K
SANTA ANA, CA 92705
PH: (714)261-1811 FAX: (714)261-8506 rc.
CANTILEVERED RETAINING WALL DESXGN Page I of 2
GENERAL SOIL DATA
Retamed Height - 8.50 ft Allow Soil Beanng - - 2.500.0psf I J -
Wall height above retained soil
Slope Behind Wall 0.00 : 1 Active Soil Pressure - Heel Si& - - 35.0psf
Height of Soil over Toe 6.00 in Active Soil Pressure - Toe Side 3 35.0pcf
0.00 ft Equivalent Fluid Pressure Method
- - 200.0pcf Passive Pressure
0.OA - Soil Density = 110.00pcf Water table height over heel -
~ FOOTING DATA 1 I SLIDING DATA - 1
Toe Width - - 1.00 R Friction Factor @ Footing & Soil 0.300
Heel Width - - 3.00 ... neglect ht. for passive O.00in
Total Foolinn Width =! 4.00 --
Footing Thickness 12.00 in - - Lateral Sliding Force
less Passive Pressure Force
1,540.0 Ibs
=- 1.225.01bs
- -
.~ ..
1 KEY DATA less Friction Force -- - 1.149.7 Ibs
0.0 Ibs - Distance from Toe - 3.00 ft Added Restraint Force Required - -
12.00 in - Width -
Depth = 24.00 in
I FOOTlNG DESIGN RESULTS I
f'c
Minimum As ?&I
Rebar Cover @ Top
Rebar Cover 0 Bottom
FY
2,500 psi = 60,OOOpsi = 0.0018
3.00 in
3.00 in
- -
- - - -
Minimum Footing Rebar Options......
Heel Side.... Toe Side......
Not req'd #4@ 13.3 in
Mu c S*Fr # 5 @ 20.50 in - # 6 @ 29.00 in
# 7 @ 39.25 in
# 8 @ 48.25 in
#9 @ 48.25 in
TOe Heel
0 psf 2.958 - ACI Factored Soil Pressure -
Mu' : From Upward Loads - - 2.032 0 A4
Mu' : From Downward Loads - 224 3,845 A4 # lO@48.25 in
Mu: Used For Design -
Actual One-way Shear = 21.99 29.78 psi
Allowable One-way Shear - 85.00 85.00 psi
37845 ft4 Key Reinforcement Not Req'd = Mu<S*Fr 1,808 -
-
IDESIGN SUMMARY I 3,832 Ibs Summary of Stem Section Designs.. . . - Total Bearing Load -
... resultant ecc. - 10.18 in Top: 8 in Mas, #5@16.00 in@Edge. From 8.5 A to 3.5 ft
Soil Pressure @ Toe = 2,219 c = 2,500 psf 2nd: 12 in Mas. #6@ 8.00 in@Edge, From 3.5 ft to 0.0 ft
Soil Pressure @ Heel = 0 <= 2,500psf
ACI Factored Press @ Toe - - 2.958 psf
Footing Shear @ Toe = 22.0 c = 85.0 psi
Footing Shear @ Heel = 29.8 c = 85.0 psi
WALL STABILITY RATIOS
0 psf - - ACI Factored Press (@ Heel
1.89
1.54
- Overturning Stability Ratio -
Sliding Ratio Ratio - -
- RetainPro V4.Oa (c) 1989-96 ENERCALC'
r- .. ESIEME JNC.
STRUCTURAL ENGiNEERS & CONSULTANTS
1921 E. CARNEGIE AVE. # 3K
SANTA ANA , CA 92705
PH: (714)261-1811 FAX: (714)261-8506
2(
Title : AVIARA Job# : 7400' Dsgnr: DA Date: APR 11.1997
Description ....
8'4" RETAINING WALL T/U
CANTILEVERED RETAINING WALL DESIGN Page 2 of 2
SUMMARY OF OVERTURNING dk RESISTING FORCES Uz MOMENTS I ..... OVERTURNING ..... .... RESISTING.. . . .
c
item
Heel Active Pressure
Soil Over Heel
Sloped Soil Over Heel
Surcharge Over Heel
Adjacent Footing Load
Axial Dead Load on Stem
Toe Active Pressure
Soil Over Toe
Surcharge Over Toe
Stem Weight(s)
Earth @ Stem Transitions
Footing Weight
Key Weight
Vert. Component
Added Lateral Load
Load @ Stem Above Soil
TOTALS
Force Distance Moment Force Distance Moment Ibs A 84 Ib6 ft ft4
1.579.4 3.17 5,001.4
1,870.0 3.00 5,610.0
0.00
-39.4 0.50 -19.7
55.0 0.50 27.5
824.0 1.42 1.171.0
183.3 1.83 336.1
600.0 2.00 1.200.0
1.050.0 300.0 3.50
1,540.0 0.T.M = 4,981.7 3,832.3
Vertical component of active pressure used for soil pressure
Toe Surcharge Not Used To Resist Overturning
Heel Surcharge Not Used To Resist Overturning
Resbtias/overturning Ratio
R.M. = 9.394.6
1 .89
~ .STEM CONSTRUCTION & DESIGN 1 Top Stem 2nd Stem
Stem OK Stem OK
Design at this height above fig 3 .SO ft 0.00 ft
Wall Material Above "Ht" Masonry Masonry
Thickness 8.00in 12.00 in
Rebar Size #5 #6 Rebat Spacing 16.00in 8.00 in
Rebar Piaced at Edge Edge
Design Data
tbfFB + fa/Fa 0.689 0.979
Moment.. . .Actual 729.2ft4 3,581.7 A4
Moment.. . . .Allowable 1.058.0ft4 3,659.9 ft4
Shear ..... Actual 7.811bs 13.53 psi
Shear.. . . .Allowable 19.36psi 19.36 psi
Bar Embed ABOVE HI. 30.00in 23.62 in
Bar Embed BELOW Ht. 30.00in 6.00 in
Wall Weight 78.0psf 124.0 psf
Rebar Depth 'd' 5.25in 9.00 in
f ' m 1,500psi 1,500 psi
Fs - - 24,OOOpsi 24,000 psi
Solid Grouting Yes Yes
Modular Ratio 'n' 25.78 25.78
Equiv. Solid Thick. 7.60in 11.60 in
f'c
Total Force @ !Section 437.5 Ibs 1.260.0 Ibs
Masonry Data
Special Inspection - No NO
Short Term Factor 1.ooO 1.ooO
-
Concrete Data
FY
(c) 1989-96 ENERCALC RetainPro Vl.0a