Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1089 CARLSBAD VILLAGE DR; ; CB090431; Permit
04-03-2009 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No Building Inspection Request Line (760) 602-2725 CB090431 Job Address Permit Type Parcel No Valuation Occupancy Group Project Title 1089 CARLSBAD VILLAGE DR CBAD Tl Sub Type COMM 2033203100 Lot# 0 $40,000 00 Construction Type NEW i Reference # CBAD GAS & PROPANE-INSTALL PHASE 2 EVR SYSTEM-VAPOR POLISHER Applicant VERDUGO TESTING COMPANY 862 STARBOARD ST CHULA VISTA, CA 91914 619-691-0600 Status Applied Entered By Plan Approved Issued Inspect Area Plan Check# ISSUED 03/17/2009 RMA 04/03/2009 04/03/2009 Owner ALLAHYARI FAMILY TRUST 07-17-02 19TIERRAVISTA LACUNA HILLS CA 92653 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot Water Con Fee Meter Size Add'l Pot Water Con Fee Reel Water Con Fee Green Bldg Stands (SB1473) Fee $352 86 Meter Size $0 00 Add'l Reel Water Con Fee $229 36 Meter Fee $0 00 SDCWA Fee $0 00 CFD Payoff Fee $840 PFF (3105540) $0 00 PFF (4305540) $000 License Tax (3104193) $0 00 License Tax (4304193) $0 00 Traffic I mpact Fee (3105541) $000 Traffic Impact Fee (4305541) $0 00 PLUMBING TOTAL $0 00 ELECTRICAL TOTAL $0 00 MECHANICAL TOTAL $0 00 Master Drainage Fee Sewer Fee $0 00 Redev Parking Fee $0 00 Additional Fees $1 00 HMP Fee TOTAL PERMIT FEES I $000 $000 $000 $000 $000 $000 $000 $000 $000 $000 $000 $2000 $000 $000 $000 $000 $000 77 $611 62 Total Fees $611 62 Total Payments To Date $61162 Balance Due.$000 BUILDING PLANS STORAGE ATTACHED Inspector FINAL APPROVAL Date Clearance NOTICE Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack, rpview, set aside, void, or annul their imposition You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired City of Carlsbad 1635 Faraday Ave, Carlsbad, CA 92008 « ' 760-602-2717 / 2718 / 2719 Fax 760-602-8558 Building Permit Application Plan Check No Est. Value Plan Ck. Deposit JOB ADDRESS CarlsbaJ V,/la$< Dr SUITE#/SPACE#/UNrr# # BATHROOMS TENANT BUSINESS NAMECflfCT/PROJECT #PHASES tt OF UNITS I # BEDROOMS CONSTR TYPE OCC GROUP DESCRIPTION OF WORK. Include Square Feet of Affected Areafs; vsr Specifically EXISTING USE PROPOSED USE GARAGE (SF)PATIOS (SF)DECKS (SF)FIREPLACE YES|~|# AIR CONDITIONING FIRE SPRINKLERS CONTACT NAME (If Different Foot Applicant)AI APPLICANT NAME ADDRESS /Of 9 Corlsbod Vtllagt 2>r.ADDRESS CITY Car/sba STATE ZIP CITY STATE ZIP -3\ 0 - &312.FAX OtaQ) PHONE FAX EMAIL EMAIL PROPERTY OWNER NAME CONTRACTOR BUS NAME ADDRESS ADDRESS CITY STATE ZIP CITY STATE ZIP C.A PHONE FAX PHONE EMAIL FAX EMAIL ARCH/DESIGNER NAME & ADDRESS STATE LIC #STATE LIC tt CLASS CITY BUS LIC# (Sec 70315 Business and Professions Code Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law [Chapter a commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom and the basis for the alleged exemption Any violation of Section 70315 by any applicant for a permit subjects the applicant to acivil penalty of not more than five hundred dollars ($500)) Workers' Compensation Declaration / hereby affirm under penalty of penury one of me following declarations _>nave and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued U/l I have and will maintain workers' compensation as required by Section 3700 of the Labor Code for the performance of the work for which this permit is issued My workers' compensation insurance earner and policy number are Insurance Co S-t-q-Ve p<_)ir>tjl Policy No I ^£>(p~l~l Expiration Date ""1~ (~Q^ Th]S section need not be completed if the permit is for one hundred dollars ($100) or less '' I I Certificate of Exemption I certify that in the performance of the work for which this permit is issued I shall not employ any person in any manner so as tobecome subject to the Workers Compensation Laws of California WARNING Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in addition to the cost of compensation, damages as provided for in Section 3706 of the Lab^ JS$ CONTRACTOR SIGNATURE "\__T DATE 3 ' , V- fbpde, interest and attorney's fees / hereby affirm that I am exempt from Contractor's License Law for the foltowmg reason | I as owner of the property or my employees with wages as their sole compensation will do the work and the structure is not intended or offered for sale (Sec 7044, Business and Professions Code The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for ^ sale If however the building or improvement is sold within one year of completion the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale) /y as owner of the property am exclusively contracting with licensed contractors to construct the project (Sec 7044 Business and Professions Code The Contractor's License Law does not apply to an owner of / property who builds or improves thereon and contracts for such projects with contractors) licensed pursuant to the Contractor's License Law) | [ I am exempt under Section Business and Professions Code for this reason 1 I personally plan to provide the major labor and materials for construction of the proposed property improvement I |Yes I [NO 2 I (have / have not) signed an application for a building permit for the proposed work 3 I have contracted with the following person (firm) to provide the proposed construction (include name address / phone / contractors' license number) 4 I plan to provide portions of the work, but I have hired the following person to coordinate supervise and provide the mapr work (include name / address / phone / contractors license number) 5 I wll provide some of the work but I have^pntpfcteql (hired) the following persons/) provide (he work indicated (include name / address / phone / type of work) ® g3P US? BIPODS 8B(ggQ®CO g®03 DOOOklDDKKg (PBECSOTr'S ®C3(W Is the applicant or fu'ure building occupant required to submit a business plan, acutely hazardous matenals registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? | [Yes EXlNo ^ Is the applicant or future building occupant required to obtain a permit from the air pollution control district or airauality management district7 JAttes I I No Is the facility to be constructed within 1 000 feet of the outer boundary of a school site? CU Yes JXlNo IP ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT s ® cassis oo e go ®G3 ancaBDia® ^®Bcae\y _ I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec 3097 (i) Civil Code) Lender's Name Lender's Address A [P IP Q, Dig A tag e@EB'u'D[?0@£>'0'D®Ca _ I certify that I have read the application and state that the above information is correct and that ttie informaton on the rjlans is accurate. I agree to comply vvlth all Crty ordinances and State laws relatngto I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY ll> OSHA. An OSHA permit is required for excavations over 5'ff deep and demolition or construction of structures over 3 stones in height EXPIRATION I ^APPLICANT'S SIGNATURE DATE City of Carlsbad Bldg Inspection Request For 05/07/2009 Permit* CB090431 Title CBAD GAS & PROPANE-INSTALL Description PHASE 2 EVR SYSTEM-VAPOR POLISHER Inspector Assignment RB 1089 CARLSBAD VILLAGE DR Lot 0 Type Tl Sub Type COMM Job Address Suite Location APPLICANT VERDUGO TESTING COMPANY Owner ALLAHYARI FAMILY TRUST 07-17-02 Remarks PLEASE INSPECT 1PM OR SO Phone 6197784445 Inspector Total Time CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Act Comments Requested By NA Entered By CHRISTINE / "£ Comments/Notices/Holds Associated PCRs/CVs Original PC# Inspection History Date Description Act Insp Comments 05/05/2009 31 Underground/Conduit-Wiring AP RB 04/21/2009 11 Ftg/Foundation/Piers AP RB 04/15/2009 11 Ftg/Foundation/Piers NR RB NO PLANS, PERMIT OR WORK BEING DONE ON SITE EsGil Corporation In <Partnerskip with (government for (RinCcfing Safety DATE March 24, 2009 JURISDICTION Carlsbad cTPDftTREVIEWER a FILE PLAN CHECK NO 09-0431 SET I PROJECT ADDRESS 1089 Carlsbad Village Drive PROJECT NAME Veeder Root System The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes XI The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck The check list transmitted herewith is for your information The plans are being held at Esgil Corporation until corrected plans are submitted for recheck The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person The applicant's copy of the check list has been sent to XI Esgil Corporation staff did not advise the applicant that the plan check has been completed Esgil Corporation staff did advise the applicant that the plan check has been completed Person contacted Telephone # Date contacted (by ) Fax # Mail Telephone Fax In Person X] REMARKS OK to issue with Fire Department Approval and the applicant adding "Carlsbad Village Drive" to the Street name on the Site Plan By Bryan Zuppiger Enclosures Esgil Corporation D GA D MB D EJ D PC 03/19/2009 trnsmtl dot 9320 Chesapeake Drive Suite 208 * San Diego, California 02123 ^ (858)560-1468 * Fax (858) 560-1576 PLANNING/ENGINEERING APPROVALS PERMIT NUMBER CB DATE ADDRESS RESIDENTIAL TENANT IMPROVEMENT RESIDENTIAL ADDITION MINOR « $17,000.00) PLAZA CAMINO REAL CARLSBAD COMPANY STORES VILLAGE FAIRE COMPLETE OFFICE BUILDING OTHER PLANNER ENGINEER DATE DATE OocsMisforms/Pianning Engineering Approvals March 20, 2009 TO BUILDING DEPARTMENT FROM Assistant Planner, Redevelopment Department CB090431 I have reviewed the plans for the above referenced project The Housing and Redevelopment Department supports the installation of the phase II EVR system This information has been entered into Permits Plus If you have any questions, please contact me at x2813 AUSTIN SILVA £ & £(Q (Q COQ Q Q 556c c c_oj _cg _rg O. Q. Q. 53 n n D D n REDEVEL OPMENT DEPARTMENT BUILDING PLAN CHECK REVIEW CHECKLIST Plan Check No CB Planner l/\nvtit-j APN 2a^ Address Dr. Phone (760) -%Q& Type of Project & Use Zoning v^- General Plan CFD (in/out) #_Date of participation Circle One v Net Project Density DU/AC Facilities Management Zone Remaining net dev acres 1 (For non-residential development Type of land used created by this permit ) Legend Item Complete Environmental Review Required DATE OF COMPLETION Item Incomplete - Needs your action YES NO N* TYPE Compliance with conditions of approval7 If not, state conditions which require action Conditions of Approval Discretionary Action Required APPROVAL/RESO NO PROJECT NO YES TYPE DATE OTHER RELATED CASES Compliance with conditions or approval7 If not, state conditions which require action Conditions of Approval Coastal Zone Assessment/Compliance Project site located in Coastal Zone7YES CA Coastal Commission Authority7 YES NO NO If California Coastal Commission Authority Contact them at - 7575 Metropolitan Drive, Suite 103, San Diego CA 92108-4402, (619) 767-2370 Determine status (Coastal Permit Required or Exempt) _ Habitat Management Plan Data Entry Completed7 YES NO If property has Habitat Type identified in Table 1 1 of HMP, complete HMP Permit application and assess fees in Permits Plus (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, HMP Fees, Enter Acres of Habitat Type impacted/taken, UPDATE') Inclusionary Housing Fee required YES (Effective date of Inclusionary Housing Ordinance - May 21, 1993 ) Data Entry Completed7 YES NO (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y/N, Enter Fee, UPDATE') H \ADMIN\COUNTER\BldgPlnchkRevChklst Rev 3/06 Site Plan -M I I I I Provide a fully dimensional site plan drawn to scale Show North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of- way width, dimensional setbacks and existing topographical lines (including all side and rear yard slopes) Provide legal description of property and assessor's parcel number Policy 44- - Neighborhood Architectural Design Guidelines -0 D D 1 Applicability YES NO Q CH d 2 Project complies YES NO Zoning HI EH 1 Setbacks 1 Front Required Shown Interior Side Required Shown Street Side Required Shown Rear Required Shown Top of slope Required Shown _ HU O O 2 Accessory structure setbacks ^ /"" Front Required Shown Interior Side Required Shown Street Side Required Shown Rear Required Shown Structure separation Required Shown D D D 3 Lot Coverage N/A Required Shown D D D 4 Height ^ I^ Required Shown O Q O 5 Parking Spaces Required Shown (breakdown by uses for commercial and industrial projects required) Residential Guest Spaces Required _ Shown _ D D D Additional Comments _ £te farto To 8»/t/l/A>6 D<t)r€D _ 3/2*9/0? OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER /&*£>*&<* DATE H \ADMIN\COUNTER\BldgPlnchkRevChklst Rev 3/06 Carlsbad Fire Department ^ Plan Review Requirements Category TI, COMM Date of Report 04-02-2009 Name Address Reviewed by Permit # CB090431 Job Name CBAD GAS & PROPANE-INSTALL Job Address 1089 CARLSBAD VILLAGE DR CBAD INCOMPLETE The item you have submitted for review is incomplete At this time, this office cannot to this office for review and approval Conditions: Con THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF BUILDING PERMIT THIS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON, CONDITIONS IN CORRESPONDENCE AND CONFORMANCE WITH ALL APPLICABLE REGULATIONS THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW Ent: Carlsbad Fire Department Plan Review Requirements Category TI, COMM Date of Report 03-25-2009 Reviewed by Name Address VERDUGO TESTING COMPANY 862 STARBOARD ST CHULA VISTA, CA 91914 Permit # CB090431 Job Name CBAD GAS & PROPANE-INSTALL Job Address 1089 CARLSBAD VILLAGE DR CBAD INCOMPLETE The item you have submitted for review is incomplete At this time, this office cannot adequately conduct a review to determine compliance with the applicable codes and/or standards Please review carefully all comments attached Please resubmit the necessary plans and/or specifications, with changes "clouded", to this office for review and approval Conditions; Cond CON0003358 [NOT MET] 1 Plans shall bear a Registered Engineers stamp with License number, certify that the design meets all Local, County and State codes and regulations 2 A Reg PE shall certify the design of the support post for the EVRII Carbon Canmster 3 Provide documentation on the length of the cross-over pipe between the tank vent risers and the EVR II C Canister, and whether or not a flexible hose is required 4 Do all three tanks vent through one riser cap or are there two Entry 03/25/2009 By GR Action CO Carlsbad Fire Department Plan Review Requirements Category TI, COMM Date of Report 03-25-2009 Reviewed by Name Address VERDUGO TESTING COMPANY 862 STARBOARD ST CHULA VISTA, CA 91914 Permit # CB090431 Job Name CBAD GAS & PROPANE-INSTALL Job Address 1089 CARLSBAD VILLAGE DR CBAD INCOMPLETE The item you have submitted for review is incomplete At this time, this office cannot adequately conduct a review to determine compliance with the applicable codes and/or standards Please review carefully all comments attached Please resubmit the necessary plans and/or specifications, with changes "clouded", to this office for review and approval Conditions: Cond CON0003358 [NOT MET] 1 Plans shall bear a Registered Engineers stamp with License number, certify that the design meets all Local, County and State codes and regulations 2 A Reg PE shall certify the design of the support post for the EVRII Carbon Canmster 3 Provide documentation on the length of the cross-over pipe between the tank vent risers and the EVR II C Canister, and whether or not a flexible hose is required 4 Do all three tanks vent through one riser cap or are there two Entry 03/25/2009 By GR Action CO Air Pollution Control Board flIR POLLUTION CONTM DISTRICT COUNTY OF SAN DIEGO Greg Cox Dianne Jacob Pam Slater-Price Ron Roberts Bill Horn District 1 District 2 District 3 District 4 District 5 DATE March 10.2009 FACILITY NAME CARLSBAD GAS & PROPANE MAILING ADDRESS 1089 Carlsbad Village Dr CITY Carlsbad STATE CA ZIP 92008 GDF LOCATION _ CITY Carlsbad 1089 Carlsbad Village Dr STATE CA ZIP 92008 APPLICATION No 987827 SECTOR 15 ID No 4607A Authority to Construct is granted only to install a new Phase II Enhanced Vapor Recovery (EVR) system at an existing gasoline dispensing facility in conformance with California Air Resources Board (ARB) requirements and the attached conditions at the above location The new Phase II EVR system shall consist of a new Vapor Systems Technologies, Inc (VST) Balance Phase II EVR system, equipped with a Veeder-Root In-Station Diagnostics (ISD) System, in accordance with ARB Executive Order (E O ) VR-204-E, the underground piping shall consist of existing vapor recovery\and vent lines. a Carbon Polisher manufactured by Veeder-Root, model 332761-002, in accordance with Figure 2B-3, Exhibit 2 of ARB EO VR-204-E, 8 VST Model VST-EVR-NB nozzles, with _ 1 grade(s) per nozzle in (No of nozzles) (No of grades/nozzle) accordance with Figure 2B-1 Exhibit 2 of ARB E O VR-204-E, The existing Phase I EVR system and underground storage tanks shall not deviate from the equipment description on Permit No 940136/987241 _ This Authority to Construct may not be transferable and will expire one (1) year from the date it is issued, unless an extension is requested and granted in writing prior to expiration Air Pollution Control District I hereby certify that all of the information on this page and provided on the application form is true and correct and agree to comply with all of the enclosed conditions Signature Print Name Enclosures ,.) , 7J7^ r J' 10124 Old Grove Road , San Diego, California 92131-1649 • (858) 586-2600 FAX (858) 586-2601 • Smoking Vehicle Hotline 1-800-28-SMOKE • www.sdapcd o Air Pollution Control Board , mfwmmmmm COIKIV OF SA« DIECO Greg Cox Dianne Jacob Pam Slater-Price Ron Roberts Bill Horn District ! District 2 District 3 District 4 District 5 Authority to Construct, Application No 987827 is subject to the following conditions GENERAL 1 All equipment associated with the vapor recovery system or that affects the vapor recovery system shall be certified and approved by the ARE for this vapor recovery system 2 This Authority to Construct shall be posted within 25 feet of the above described equipment or maintained readily available at all times on the operating premises 3 The temporary authorization to operate that is incorporated into this Authority to Construct letter will commence only upon receipt by the District of notice of completion Operation without authorization is a violation of District Rule 10(b) and can result in civil and criminal penalties 4 Prior to any deviation of the information submitted on the application forms for this Authority to Construct, the applicant shall submit the proposed changes in writing and request and wait for a written approval from the District 5 Any person conducting any test required by this Authority to Construct shall have completed the South Coast Air Quality Management District's orientation class for testing, the manufacturer's training program applicable to the Phase I and Phase II equipment authorized herein, and any subsequently required refresher classes Proof of certification shall be made available to the District upon request 6 Any person installing, modifying, or repairing any Phase I or Phase II vapor recovery system or component, including removal and installation of such components in the course of any required performance test, shall have successfully completed the manufacturer's training program applicable to the Phase I and Phase II equipment authorized herein The technicians shall have a proof of certification during the start up and pre-backfill inspections 7 Any person installing, repairing, or testing any vapor recovery system or component shall have successfully completed the International Code Council's (ICC) certification program for Vapor Recovery System Installation and Repair (VI) The technicians shall have proof of certification during the startup inspection 10124 Old Grove Rd -San Diego - California 92131 -(858)586-2600 FAX (858) 586-2601- Smoking Vehicle Hotline - 1-800-28-SMOKE ww\\ sdapcd org Application No 987827 -2- 8 The permittee shall record the combined volume of all gasoline grades dispensed at this facility Attachment C, "Monthly Gasoline Throughput", or an equivalent form, approved by the District, shall be used for this purpose Monthly gasoline throughput records shall be maintained on site for at least three (3) years and made available to the district upon request 9 The dispensing rate of every grade point shall be maintained at all times between six (6 0) and ten (10 0) gallons per minute (gpm) The permittee shall verify the maximum handheld dispensing flow rate of every grade point on a monthly basis Attachment E, "Dispensing Flow Rate," or an equivalent form, approved by the District, shall be used for this purpose Dispensing flow rates records shall be maintained onsite for at least three (3) years and made available to the District upon request The fueling point shall be removed from service when the dispensing rate is greater than ten (10) gpm or less than five (5) gpm as determined by Section 7 of Exhibit 5 of VR-203-E or VR-204-E or by direct observation for 30 seconds minimum at the maximum handheld position 10 The permittee shall drain all vapor recovery coaxial hoses on a weekly basis and record the volume of gasoline accumulated in each hose Attachment F, "Volume Accumulated in the Hoses", or an equivalent form, shall be used for this purpose These records shall be maintained onsite for at least three (3) years and made available to the District upon request The fueling point shall be removed from service when a hose is found to have greater than 175 mL of gasoline in the vapor side as determined by sections 6 1 to 6 5 of Exhibit 5 of ARE EO VR-203-E or VR-204-E Note Prior to draining gasoline from the vapor side of the VST hose, use VST tool P/N VST-STP-100 and plug the fuel spout Do not activate the dispenser when draining gasoline from the vapor side of the VST hose 11 The onsite vapor control system shall be maintained in good working conditions and shall be operated at all times when volatile organic fuels (i e gasoline) are transferred or stored 12 There shall be no fugitive liquid leaks associated with the transfer of volatile organic fuels Fugitive liquid leak means any visible liquid leak at a rate in excess of three (3) drops per minute other than spillage or losses, which occur upon disconnecting transfer lines 13 Access, facilities, utilities and any necessary safety equipment for source testing and inspection shall be provided upon request of the District 14 The permittee shall, upon determination of applicability and written notification by the District, comply with all applicable requirements of the Air Toxic "Hot Spots" Information and Assessment Act (California Health and Safety Code Section 44300 Et Seq ) 15 All Phase-11 fuel dispensing nozzles shall be electrically connected to an earth ground Clearly marked and easily accessible electrical clamp attachment points, which are electrically connected to a verified earth ground (<lohm resistance), shall be installed at each Phase II fueling point 16 The Phase I and Phase II vapor recovery systems including all associated underground plumbing, shall be installed, operated, and maintained in accordance with the requirements Application No 987827 -3- specified in the appropriate ARE E O s and Installation, Operational and Maintenance Manual, if applicable, and District Rules and Regulations 17 The Phase I and Phase II vapor recovery equipment and associated components, except for components with an allowable leak rate as specified by the most recent applicable ARB Executive Order and Certification Procedure, shall be maintained free of liquid leaks and shall be vapor tight Components with an allowable leak rate shall operate within such rate 18 The permittee shall perform a visual weekly inspection of all Phase I vapor recovery components The components to be inspected for damage, loose connections, or leaks are the vapor and product dust caps and gaskets, poppeted dry breaks, vapor and product fill adaptors, spill boxes, including the drain valves In addition, the permittee shall verify that there is no standing gasoline or debris in the spill boxes and that the drain valves are seating properly 19 The permittee shall perform a visual daily inspection of all Phase II components at retail gasoline dispensing facilities The components to be inspected for damage, loose connections or leaks are nozzles, including hold-open latches, hoses, swivels, and breakaways In addition, each nozzle shall be inspected for damaged faceplates, vapor boot guards, spouts and each hose shall be inspected for wear, severe kinks, cracks, and splitting If the combined volume of all gasoline grades dispensed at this facility is less than 750,000 gallons in any consecutive twelve (12) month period, holidays and weekends are excluded from the daily inspection requirements 20 The permittee shall perform a visual daily inspection, excluding weekends and holidays, of all Phase II components at non-retail gasoline dispensing facilities The components to be inspected for damage, loose connections, or leaks are nozzles, including hold-open latches, hoses, swivels, and breakaways In addition, each nozzle shall be inspected for damaged faceplates, vapor boot guards spouts, and each hose shall be inspected for wear, severe kmks, cracks, and splitting If the combined volume of all gasoline grades dispensed at this facility is less than 1,000,000 gallons in any consecutive twelve (12) month period, the inspection shall be performed weekly 21 An inspection, maintenance and repair log shall be kept onsite for at least three (3) years and made available to the District upon request Attachment I, "Inspection, Maintenance and Repair Log," is attached as an example and can be used for this purpose The inspection, maintenance and repair log shall record the daily and weekly inspections and itemize at a minimum the date the defect was found or the date the component was identified as not being in good condition, the date the component was removed from service, the date of call for service, the date of repair/replacement, the affiliation and name of the person performing the repair/replacement, the certified technician identification number from the applicable manufacturer, the make and model number of the component, and whether the component was maintained, replaced, or repaired 22 Any Phase I and/or Phase II component, device or system identified and recorded by the permittee as not being in good condition, based on testing and/or visual inspections or not operating properly shall be repaired, replaced, or adjusted within seven (7) calendar days of Application No 987827 -4- detection in a manner that will bring the facility into compliance with the applicable District Rules and Regulations and the most recent applicable CARB Executive Orders Any Phase I and/or Phase II component or system that is determined to have a defect as set forth in the California Code of Regulations, Title 17, Section 94006, shall not be operated and shall be removed from service immediately The defective component or system shall not be operated until the defect has been repaired or the defective component replaced such that the defect no longer exists 23 The permittee and/or designated agent shall perform an annual inspection to ensure compliance with all applicable District Rules and Regulations, and all permit conditions , An inspection checklist shall be kept onsite for at least three (3) years and made available to the District upon request Attachment J "Annual Inspection and Maintenance Checklist" is attached as an example and can be used for this purpose The inspection shall verify that a The District permit and the required signs are current and posted These signs include operating instructions for the gasoline nozzles, a toll-free phone number specified by the air pollution control officer for the public to call to report problems with a nozzle or a vapor recovery system (applicable to retail facilities only), and a warning sign stating that topping off is prohibited and may result in spillage of gasoline b The facility complies with all permit conditions c The Phase I and Phase II vapor recovery systems are properly installed and comply with the most recent applicable CARB certification procedures and CARB Executive Orders d Each gasoline underground storage tank or compartment has a gasoline submerged drop tube with a discharge opening entirely submerged when the liquid level is six (6 0) inches above the bottom of the tank or compartment e The vent pipes are equipped with the required pressure/vacuum valves and each such valve is properly installed f All connections and fittings inside the dispenser are free of liquid leaks g The lengths and installation arrangements of all dispenser hoses are in compliance with the most recent applicable CARB Executive Orders PHASE II EQUIPMENT 24 The VST Balance Phase II EVR System, including Veeder-Root ISO System, shall be installed, operated, and maintained in accordance with the ARB E O VR-204-E, the ARB approved Installation, Operation, and Maintenance (IOM) Manual for VR-204-E, and District Rules and Regulations A copy of this E O , including the IOM manual, shall be maintained at the facility at all times and be available for review by the District upon request Application No 987827 -5- 25 Only components specified in the ARB E O VR-204-E, Exhibit 1, shall be installed at this facility These components shall be clearly identified by a permanent identification, showing the manufacturer's name and model number, unless specifically exempt from this requirement 26 If installed, optional components for the vapor recovery system, in accordance with ARB EO VR-204-E, Exhibit 1, shall be ARB certified and shall be installed, operated and maintained in accordance with the ARB approved Installation, Operation, and Maintenance Manual for VR-204-E 27 The Phase II system authorized herein shall be equipped with the latest version of the ARB certified Veeder-Root ISD software and shall be setup for use with a Balance System and a V-R Vapor Polisher 28 The TLS Console shall be installed in a location that allows the RS232 port to be easily accessible for use at any time No obstructions shall be placed within a radius of one foot (1') from the TLS Console A vacant RS232 port shall always be available and be able to electronically download complete and accurate reports The TLS Console shall also be equipped with an operational printer (including an adequate supply of paper and toner) 29 The TLS Console shall automatically prohibit the dispensing of fuel through shutdown of all the gasoline turbine pumps upon a failure alarm or TLS Console ISD system power loss 30 The facility attendant shall notify (e g , direct contact, voice mail, e-mail, fax) the responsible company official or their designee within two (2) hours of detecting any ISD warning alarm and shall request service as soon as is reasonably possible to correct the problem Only technicians certified by the manufacturer shall be allowed to make vapor recovery or ISD system repairs 31 The permittee and/or designated service technician shall promptly record all information relating to the alarm event, reporting, and associated repairs on Attachment I, "Inspection, Maintenance and Repair Log," or an equivalent form The inspection, maintenance, and repair log shall be kept onsite for at least three (3) years and made available to the District upon request 32 When an ISD alarm occurs and gasoline dispensing is terminated, the permittee shall reset the ISD system to allow vehicle fueling to resume only if a All required repairs have been made and all information associated with the repairs is recorded in Attachment I, the maintenance and repair log, or b The dispenser(s) associated with the problem that triggered the alarm is isolated and not operated until the required repairs are completed, and all information associated with the repairs is recorded The time the components are isolated shall be logged immediately Application No 987827 -6- 33 The ISD audible alarms shall be installed at a location that is most likely to be heard by the station attendant during normal station operation (e g at the cash register) 34 The permittee and/or designated contractor shall not perform a "Clear Test After Repair" (i e clear alarm conditions) upon any alarm unless all repairs necessary to correct the alarm condition have been successfully performed per Attachment L and recorded in the maintenance log Only a manufacturer certified technician shall perform a "Clear Test After Repair" 35 The vapor recovery ISD system shall be operational for a minimum of ninety-five percent (95%) of the time, based on an annual basis or prorated thereof The operational percentage time shall be verified through the daily reports 36 Each dispenser shall have a certified vapor flow meter as shown in Figures 2B-6, 2B-10 and 2B-11 of Exhibit 2, ARE EO VR-204-E 37 Each gasoline dispensing facility shall have a certified vapor pressure sensor installed into one of the dispensers located closest to the tanks, as shown in Figures 2B-7, 2B-10 and 2B- 11 of Exhibit 2, ARB EO VR-204-E In the event that a row of dispensers are equal distance from the tank pad and within 10 feet of each other, the vapor pressure sensor can be installed into any of the dispensers 38 The ISD system shall maintain a complete electronic archive of monthly reports for a period of 12 consecutive months and an archive of daily reports for the last 365 consecutive days 39 Scheduled maintenance, which includes daily and annual inspections and/or tests, shall be performed in accordance with the ARB approved Installation, Operation, and Maintenance Manual for VR-204-E Annual inspections and testing shall be performed by a technician certified by the manufacturer Only technicians certified by the manufacturer can service any problems discovered while conducting the daily or annual inspections and/or testing 40 A maintenance log for the daily and annual scheduled maintenance, including any repairs performed and drive offs, shall be kept onsite for at least three (3) years and made available to the District upon request The maintenance log shall itemize at a minimum the date of each inspection and test, any defect, damage, loose connections, or leaks found during the inspections or tests, any test failure, the make and model number of any component that is replaced, maintained or repaired as a result of these inspections or tests, the date of repair/replacement, and the affiliation and name of the person performing the inspections, tests, and repair/replacement 41 In accordance with the application submitted, the underground vapor recovery and vent lines shall only be replaced within the tank, vent and dispenser sumps 42 All vapor return lines shall have a minimum slope of 1/8 inch per foot from the dispenser riser to the riser of the UST All vent lines shall be sloped a minimum of 1/8 inch per foot from the vent risers to the storage tanks Application No 987827 -7- 43 The dispenser vapor piping of all new dispensers shall have a minimum nominal internal diameter of one inch (1" I D ) 44 Liquid condensate traps are not allowed at this facility 45 Product shall not be dispensed from any fueling point at this facility if a vapor line is disconnected and open to the atmosphere 46 A Vapor Polisher, manufactured by Veeder-Root, model 332761-002, shall be installed at this gasoline dispensing facility 47 Security seal tags shall be installed on the Vapor Polisher The permittee shall inspect the Vapor Polisher for damage or missing security tags on a monthly basis and document the inspection in the maintenance log Exhibits 11 and 12 of ARB E O VR-204-E shall be successfully conducted and new security seal tags shall be installed within thirty (30) days of finding missing or damaged security tags 48 The carbon type in the Vapor Polisher shall be BAX Gl 500, manufactured by MeadWestvaco 49 Unless maintenance or testing is being performed on the Vapor Polisher, the ball valve located at the inlet of the Vapor Polisher shall be locked in the open position as shown in Figure 2B-3, Exhibit 2 of ARB EO VR-204-E The handle of the ball valve shall not be removed 50 Unless maintenance or testing is being performed on the processor, the Carbon Polisher shall be on and in the automatic vapor processor mode at all times, even when the facility is closed for business 51 The Vapor Polisher Pressure Regulated Valve shall operate (i e open or close) in accordance with the percent load and pressure settings located in Table 6 of Section 16 of the ARB approved Installation, Operation, and Maintenance Manual for VR-204-E 52 Only VST, Model VST-EVR-NB or Model VST-EVR-NB-R, nozzles as shown in Figure 2B-1, Exhibit 2 of ARB EO VR-204-E, shall be installed at this facility 53 The maximum length of the curb hose, breakaway, and whip hose combined shall not exceed fifteen feet (15') as measured from the base of the nozzle to the end of the dispenser adapter or dispenser 54 Flow limiters are not allowed to be installed at this facility CONSTRUCTION COMPLETION NOTICE Application No 987827 -8- '55 Upon completion of construction in accordance with this Authority to Construct and prior to commencing operation, the applicant must complete and mail, deliver personally or via facsimile the enclosed Construction Completion Notice to the District 56 The enclosed construction completion notice shall report the name and Manufacturer Certification Number of the contractor who installed the Phase II EVR system Alternatively, a copy of the Manufacturer Certification Card of the contractor who installed the Phase II EVR system shall be attached to the Construction Completion Notice 57 After submitting the Construction Completion Notice, the applicant may commence operation of the equipment Operation must be in compliance with all of the conditions of this Authority to Construct and applicable District Rules and Regulations CONFIRMATION OF TEST DATE ' 58 Within 30 days of completion of construction and at least fifteen (15) calendar days prior to the proposed test date, the applicant shall contact Suha Haddad at (858) 586-2716 to schedule a test date PERFORMANCE TESTING 59 The following performance tests shall be successfully conducted within 60 days after startup of the equipment authorized herein For the purpose of compliance with this condition, all tests shall be conducted after backfilling, paving and installation of all required Phase II components Within 15 calendar days of completion of the following tests, the applicant/testing company shall submit copies of all test data and results to the District's Vapor Recovery Section of the Engineering Division All test results shall be maintained onsite for three (3) years from test date a The integrity of the vapor valve shall be tested to assure that there are no leaks in the nozzle's vapor valve, in accordance with Exhibit 10 of ARE E O VR-203-E or VR- 204-E or ARE Test Procedure TP-201 2B b A pressure decay leak test of the entire vapor control system, including nozzle/check valve and the underground tanks, shall be performed in accordance with the ARB's Test Procedure TP-201 3 and Exhibit 4 of ARE E O VR-203-E or VR-204-E Under no circumstances shall gasoline be poured into spill containers to check for leaks All liquid in the spill containers and sumps shall be removed prior to conducting this test ARB's Test Procedure TP-201 3 shall be conducted and completed between sundown and a half hour after sunrise to minimize interface from solar effects and barometric pressure changes No fuel shall be introduced into the underground tank(s) for at least three (3) hours preceding this test procedure In lieu of TP-201 3 and Exhibit 4 of ARE E O VR-203-E or VR-204-E, the operator/owner may choose to conduct and submit the results of District leak test method TP-96-1 and Exhibit 4 of ARE E O VR- 203-E or VR-204-E This test can be conducted at any time during the day, except when ambient temperatures exceed 100 degrees Fahrenheit, and there is direct sunlight on exposed metal vent pipe(s) and metal manhole cover(s) that are in contact with Application No 987827 -9- * vapor space of the storage tank(s) No fuel shall be introduced into the underground tank(s) for at least eight (8) hours preceding this test procedure Ensure all P/V valves have been removed and vent risers capped prior to conducting the test and re-mstall the valves after this test has been completed If this facility is identified as a BACT site by the permit to operate, a pressure decay leak test must be successfully conducted per District Test Procedure TP-96-1 and Exhibit 4 of ARB E O VR-203-E or VR-204-E and performance of the ARE test procedure TP-2Q1 3 and Exhibit 4 of ARB E O VR- 203-E or VR-2Q4-E is not an acceptable alternative c A tank vapor manifold tie test, to verify the existence of an underground tank interconnect vapor pipe, shall be performed in accordance with ARB's Test Procedure TP-201 3C Note this test shall be performed after the aboveground vent manifold (if installed) is removed and the vent risers capped off d A Veeder-Root Vapor Polisher Operabihty Test shall be performed in accordance with Exhibit 11 of ARB EO VR-203-E and VR-204-E e A Hydrocarbon Emissions Verification Test shall be conducted in accordance with Exhibit 12 of ARB EO VR-203-E and VR-204-E f A dynamic pressure performance test shall be conducted in accordance with ARB's Test Procedure TP-201 4 (Methodology 1) and Exhibit 14 of ARB EO VR-204-E The pressure drop shall be measured from the nozzle to its associated underground storage tank with pressure/vacuum vent valves installed and with the poppeted Phase I vapor connection open This test shall be performed after liquid is introduced down each dispenser riser into the Phase II system The maximum pressure drop shall not exceed 035 inches WC at 60 standard cubic feet per hour and 0 62 inches WC at 80 standard cubic feet per hour g A liquid removal test shall be conducted in accordance with Option 2 of Exhibit 5 of ARB EO VR-203-E or VR-204-E on each hose installed at this facility If umhose dispensers are installed at this facility, then the liquid removal test shall be performed on the grade with the lowest flow rate The minimum liquid removal rate shall be 5 0 milhliters (ml) per gallon dispensed when tested with a gasoline flow rate between six (6 0) and ten (100) gallons per minute h A Vapor Pressure Sensor Verification Test shall be conducted in accordance with Exhibit 8 of ARB EO VR-203-E and VR-204-E i An ISD Flow Meter Operabihty Test shall be performed in accordance with Exhibit 13 of ARB EO VR-204-E j A Veeder-Root Vapor Polisher Valve Position Operabihty Verification shall be conducted in accordance with Attachment M 60 The performance sequence of all the above tests shall be determined by the District prior to the start of testing at this site and shall be strictly followed by the testing company Application No 987827 -10- Performance of these tests simultaneously, proceeding with other tests after failure of a previous test or re-testing at this site shall only occur upon District approval If the tests listed above reveal system problems or inadequacies, corrective repairs shall be made Pre- testing of the vapor recovery system is an option for the applicant This is done to identify and correct problems before the District witnesses official testing Pre-testing can eliminate the time and expense of having to perform a second test and pursue a variance until a second test has taken place. The District recommends, but does not require, pre-testing ANNUAL TESTING 61 The tests referenced in Attachment L, shall be conducted and passed at least once every calendar year within forty- five (45) calendar days prior to the permit expiration date All results shall be reported completely and accurately and submitted to the District Compliance Division within fifteen (15) calendar days of conducting these annual tests in a format approved by the District Compliance Division The permittee shall notify the District Compliance Division, in writing, fifteen (15) calendar days prior to conducting the required annual tests and shall include the date and the time in a format approved by the District Compliance Division This Authority to Construct does not relieve the holder from obtaining permits or authorizations, which may be required by other governmental agencies Contact the appropriate building inspection department (city or county) and fire district prior to installation or modification of the vapor control equipment for permit and/or inspection requirements If underground tanks or vapor or liquid lines are to be installed or replaced, contact the County Health Department at (619)338-2222 Within 30 days after receipt of this Authority to Construct, the applicant may petition the Hearing Board, in accordance with Rule 25, for a hearing on any conditions imposed herein This Authority to Construct authorizes temporary operation of the above specified equipment This temporary Permit to Operate shall take effect upon written notification to the District that construction has been completed in accordance with this Authority to Construct This temporary Permit to Operate will remain in effect, unless withdrawn or modified by the District, until the equipment is inspected by the District and a revised temporary permit (Startup Authorization) is issued or a Permit to Operate is granted or denied cc Compliance Bldg Dept Fire District Env Health Svcs CONSTRUCTION COMPLETION NOTICE San Diego County Air Pollution Control District 10124 Old Grove Road San Diego, CA 92131 (858)586-2600 FAX (858)586-2601 Please complete the "APPLICANT USE ONLY" portion of this notice and fax or mail it to the APCD The following information has been included based on your application information Please note any corrections to this information COMPANY NAME (DBA) APPLICATION # EQUIPMENT ADDRESS » * TYPE OF EQUIPMENT GASOLINE DISPENSING FACILITY APCD PROJECT ENGINEER DIANA M WILLIAMS TELEPHONE (858) 586-2730 APPLICANT USE ONLY DATE CONSTRUCTION WAS COMPLETED CONTRACTOR WHO INSTALLED THE HEALY PHASE II EVR EQUIPMENT (Please Print). NAME CERTIFICATION NO • PERSON PROVIDING NOTIFICATION (Please Print) SIGNATURE DATE OF NOTIFICATION- TELEPHONE APCD USE ID# VAX ENTRY DATE DATE RECEIVED Check a License or Home Improvement Salesperson (HIS) Registration - Contractors Stat Page 1 of 1 Department of Consumer Affairs feOV Contractors State License^Board Contractor's License Detail - License # 866381 i'\ DISCLAIMER A license status check provides information taken from the CSLB license database Before relying on this information, you should be aware of the following limitations * CSLB complaint disclosure is restricted by law (B&P Z124_6) If this entity is subject to public complaint disclosure, a link for complaint disclosure will appear below Click on the link or button to obtain complaint and/or legal action information > Per B&P 70.7.1 1.7, only construction related civil judgments reported to the CSLB are disclosed "* Arbitrations are not listed unless the contractor fails to comply with the terms of the arbitration •- Due to workload, there may be relevant information that has not yet been entered onto the Board's license database License Number 866381 Extract Date 04/03/2009 Business Information Entity Issue Date Expire Date License Status VERDUGO TESTING CO INC PO BOX 211958 CHULA VISTA, CA 91921 Business Phone Number (619) 691-0600 Corporation _ 10/24/2005 _ _ _ 10/31/2009 This license is current and active All information below should be reviewed Classifications CLASS DESCRIPTION D40 Certifications CERT I DESCRIPTION HAZ HAZARDOUS SUBSTANCES REMOVAL CONTRACTOR'S BOND Bonding This license filed Contractor's Bond number 548885C in the amount of $12,500 with the bonding company DE.yELO..PERS_SU..REIY_ANDlNpEMNIJY.. COMPANY Effective Date 01/01/2007 Contractor s. Bon.ding.JHjsto.ry BOND OF QUALIFYING INDIVIDUAL 1 The Responsible Managing Officer (RMO) ANTONIO FERNANDO VERDUGO certified that he/she owns 10 percent or more of the voting stock/equity of the corporation A bond of qualifying individual is not required Effective Date 10/24/2005 Workers' Compensation This license has workers compensation insurance with the STATE COMPENSATION INSURANCE FUND Policy Number 1350677 Effective Date 07/01/2005 Expire Date 07/01/2009 Personnel listed on this license (current or disassociated) are listed on other licenses Personnel List I Other Licenses Conditions. ofJJse | Privacy_PpJicy Copyright"© 2009 State of California https //www2 cslb ca gov/OnhneServices/CheckLicense/LicenseDetail asp 04/03/2009 U a ^ VI "*• «•Approve, ^ Cl •^ 01 m X <:•% ^4 * \ ^^J fr f>VHC >-^Jl^*"en 01 c TO Q. I L• ^ t ^ . j V.5 ^ 01 EngmeenrS ^Ql c1 J cr ^— -. *^ >x LL h ^~ O LL s, • S HazMati ^^-"^ cT ^C (^ ^^\ c- x < A ^QUD. i k r 4-t a; ^ 01 3 p £ OJv\ I Forms/Fiz ^ QLLU Z •1 ••^ / ^«^>"^^ >, «^-^ ^V, LL Z •^ ooLL Z £ "TOQJ 1N TO z 4-J TO I Z § Z LLLLQ_ Z LU D. Z ~5o u00 Z 1(Don Z k.Stormwatez z i 01 Q reQ 01 ^Q M*»Commen01 2 CO 01 c TO O- m EngineenniLL Need?(LICOQa (LICOQa (LiCOQa (LICODa (LI a (LI OQn ^ ^ -z- -z. ^ Si £a E i*.•? !*• O QJ e 25 o_"•2 p*• E(C O£ U i *< u. s ^ »I o <y t/ N J -J ^^-/- ^ ^ ^ ^f ' \s > -CK^ V^YAl QJ-t> y — ' *) O •s, 0- n -4- i (/) ?<i>—i ^ CW J^ (X t 14. * 4s•>**ci*- c^, ^& <£ ^o ^c/J 4- ^d