Loading...
HomeMy WebLinkAbout1097 BUENA VISTA WAY | 1099 BUENA VISTA WAY; ; PC110008; Permit10-03-2012 City of Carlsbad 1635 Faraday Av Carisbad, CA 92008 Plan Check Permit No: PC 110008 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Reference #: Project Title: 1099 BUENA VISTA WY CBAD PLANCK 1552510200 Lot#: $0.00 Construction Type: SMERUD RES- BUILD NEW 3,125 SF SFD W/789 SF GARAGE, 138 SF PORCH & 640 SF 2ND DU Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: Applicant: MARTIN VOLK 2835 PROGRESS PL ESCONDIDO CA 92029 858 997 5866 Owner: SMERUD FAMILY TRUST 03-27-97 3667 CAMINO MARGLESA ESCONDIDO CA 92025 ISSUED 02/23/2011 LSM 11/03/2011 11/03/2011 Plan Check Fee $0.00 Additional Fees $0.00 Total Fees: $0.00 Total Payments To Date: $0.00 Balance Due: $0.00 Inspector: FINAL APPROVAL Date: Clearance: NOTICE: Please take NOTICE that approval of your project indudes the 'Imposition" of fees, dedications, reservations, or other exactions hereafter (X)llectively referred to as 'fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exat^lons. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have previouslv been given a NOTICE similar to this, or as to which the statute of limitations has previously othenvise expired. A ^ CITY CARLSBAD Building Permit Application O F 1635 Faraday Ave., Carlsbad, CA 92008 760-602-2717/2718/2719 Fax 760-602-8558 www.carlsbadca.gov Plan Check No. P(L j t 0O0% Est. Value / ins-. 73 Plan Ck. Deposit -f-l I'D . Pate ^|^Jl\ lauyflOO"?^ JOB ADDRESS . , lo-H^ ButUA Vl<.tA \ A/AY SUITE#/SPACE#/UNrr# APN -01. - CT/PROJECT # LOT# PHASE# # OF UNITS 2 # BEDROOMS # BATHROOMS TENANT BUSINESS NAME CONSTR. TYPE V OCC. GliOUP DESCRIPTION OF WORK: /nc/ude SQuara Fmt ofAAtsctsd Aiea(s) ftHiTioo (orr EXISTING USE VACAKAT UM17 PROPOSED USE GARAGE (SF) DECKS (SF) FIREPLACE YESg|# ^ N0| I AIR CONDITIONING YESgjNOQ FIRE SPRINKLERS YES^NOl ] CONTACT NAME (It Dlfttnnt Fom Applicant) APPLICANT NAME ADDRESS ADDRESS STATE ZIP _ CITY STATE CITY _C::A. PHCNE FAX PHONE FAX EMAIL PROPERTY OWNER NAME ADDRESS CONTRACTOR BUS. NAME ADDRESS I CITY STATE ZIP CITY STATE ZIP PHONE FAX PHONE FAX EMAIL EMAIL ARCH/DESIGNER NAME & ADDRESS CITY BUS. UC.# (Sec. 7031.5 Business and Professions Code: Any City or Counly wiiloh requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)). Wt> RKERS' COMPENSATION mom' B; Workers' Compensation Declaration: / /leretiy affirm under penalty of perjury one the foiiowing deciarations: 11 have and will maintain a ceitlflcate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the worl< for which this permit is Issued. I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Insurance Co Policy No. Expiratton Date lection need not be completed if the permit is for one hundred dollars ($100) or less. :ertificate of Exemption: I certify that in the perfomiance of the vrork for which this pemiit is issued, I shall not ernploy any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation coverage Is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in addition to the cost of compensation, damag^^4|tevM^to^lrvSectlon 3706 of the Labor code, interest and attorney's fees. ^eS" CONTRACTOR SIGNATURE ^// //^^^^^^ ^IVGENT DATE 2/ : io W NER-BUILDER DECLARATION I hereby affirm that i am exempt from Contractor's License Law for the foltowing reason: [ I I, as owner of the property or my emptoyees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professtons Code: The Contractor's — License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the bunlen of proving that he did not build or improve for the purpose of sale). I I I, as owner of the property, am exclusively contracting with Itoensed contractors to constmct the project (Sec. 7044, Business and Professtons Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) Itoensed pursuant to the Contractor's License Law). • I am exempt under Section _ .Business and Professions Code for this reason: 1.1 personally plan to provide the major labor and materials for constructton of the proposed property improvement. •Yes I INO 2.1 (have / have not) signed an applicatton for a building pemiit for the proposed vrork. 3.1 have contracted with the following person (fimi) to provide the proposed construction (include name address / phone / contractors' license number): 4.1 plan to provide portions of the work, but I have hired the following person.to coordinate, supewise and provide the major work (include name / address / phone / contractors' Itoense number): 6,1 will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of work): >€S'PR0FERTY OWNER SIGNATURE QAGENT DATE COMPLETE THIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY Is the applicant or future building occupant required to submit a business olari. acutely hazardous materials registration fomi or hsk management and preventton program under Secttons 25505,25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? I I Yes I iNo Is the appltoant or future buikling occupant required to obtain a pennit from the air pollutton control district or air aualitv management district? I lYes I j No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? C^Yes [_]NO IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. sC ONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the perfonnance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name Lender's Address APPLICANT CERTIFICATION I cedily that I have read ttie application and state that the above infbmiadon Is correct and thatthe Inform I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property Ibr inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HAFiMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT, OSHA: An OSHA pemnit is required Ibr excavations over S'C deep and demolitton or constaidion of stmctures over 3 stories in height. EXPIRATION: Every permit issued by the Buikling Official under the provisions of this Code shall expire by limitation and become null and void if the building or wDrt< authorized by such pemiit is not commenced within 180 days torn Ihe date of such peimit or if the building or wori< authorized by such pemiit is suspended or abandoned at any time after the wori( is commenced Ibr a period of 180 days (Section 106.4.4 Unifbnn Building Code). > APPLICANT'S SIGNATURE DATE 2, EsGil Corporation In (Partnership with government for (Building Safety DATE: APRIL 28, 2011 • APPLICANT JURISDICTION: CARLSBAD • PCAfTREVIEWER • FILE PLAN CHECK NO.: PCI 1-0008 SET: III PROJECT ADDRESS: 1099 BUENA VISTA WAY PROJECT NAME: SFR WITH AN ACCESSORY UNIT FOR STRONG SIDE BUILDERS I I The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. 3 The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. r~1 The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. I I The applicant's copy of the check list has been sent to: Esgil Corporation staff did not advise the applicant that the plan check has been completed. I I Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Email: Fax #: Mail Telephone Fax In Person (TN 3 REMARKS: Plans need to be signed by the project drafter as well. ' A J QjJ._^— By: Ali Sadre Enclosures: EsGil Corporation • GA • EJ • PC log in/ out 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576 EsGil Corporation In Partnership with government for (Building Safety DATE: APRIL 25, 2011 • APEUO^NT • cjuRisT^ JURISDICTION: CARLSBAD • PLAN REVIEWER • FILE PLAN CHECK NO.: PCll-0008 SET: II PROJECT ADDRESS: 1099 BUENA VISTA WAY PROJECT NAME: SFR WITH AN ACCESSORY UNIT FOR STRONG SIDE BUILDERS I I The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ^ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. PLEASE SEE BELOW I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. XI The applicant's copy of the check list has been sent to: MARTIN VOLK 2835 PROGRESS PLACE, ESCONDIDO, CA 92029 I I Esgil Corporation staff did not advise the applicant that the plan check has been completed. Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: MARTIN Telephone #: 858-997-5866 Date contacted: (by: (^) Email: martyvolk@gmail.com Fax #: 6 Mail-' Telephone-^ Fax In Person AI REMARKS: Please see attached for remaining items from previous list. By: Ali Sadre Enclosures: EsGil Corporation • GA • EJ • PC 2/25 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576 CARLSBAD PCll-0008 APRIL 25, 2011 PLANS 1. The following note should be given with each correction list: Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two'ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 2. Plans deviating from conventional wood frame construction shall have the structural portions signed and sealed by the California state licensed engineer or architect responsible for their preparation, along with structural calculations. (California Business and Professions Code). • CITY POLICY ITEIVIS 3. For R-3's, fire sprinkler plans must be included with the original plan submittal. The sprinkler plans must be reviewed/ approved by EsGil staff before a permit can be issued. This Item can not be deferred as per response. 4. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. 5. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Ali Sadre at Esgil Corporation. Thank you. EsGil Corporation In (Partnership with government for (Building Safety DATE: MAY 2, 2011 a-APPH^NT <q JURis3 JURISDICTION: CARLSBAD • PLAN REVIEWER • FILE PLAN CHECK NO.: PCll-0008 (REV. # 1) SET: I PROJECT ADDRESS: 1099 BUENA VISTA WAY PROJECT NAME: SFR WITH AN ACCESSORY UNIT FOR STRONG SIDE BUILDERS ^ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. I I The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. I I The applicant's copy of the check list has been sent to: Esgil Corporation staff did not advise the applicant that the plan check has been completed. I I Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Email: martyvolk(ggmail.com Fax #: Mail Telephone Fax In Person El REMARKS: ROOF TRUSS CALCS. & PLANS ARE UNDER THIS PERMIT (DEFERRED PACKAGE). By: Ali Sadre Enclosures: EsGil Corporation • GA • EJ • PC 4/28 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858)560-1468 • Fax (858) 560-1576 CARLSBAD PCll-0008 (REV. # 1) MAY 2, 2011 [DO NOT PAY- THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURJSDICTION: CARLSBAD # 1) PLAN CHECK NO.: PCll-0008 (REV. DATE: MAY 2, 2011 PREPARED BY: Ali Sadre BUILDING ADDRESS: 1099 BUENA VISTA WAY BUILDING OCCUPANCY; R3/U TYPE OF CONSTRUCTION: V-B/SPR BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) TRUSS PLANS & CALCS. TOTAL VALUE Jurisdiction Code CB By Ordinance BIdg. Permit Fee by Ordinance Plan Checic Fee by Ordinance Type of Review: I I Repetitive Fee Repeats • Complete Review • Other [7] Hourly EsGil F«e $290.00 • Structural Only Hrs. @ * $116.00 $232.00 Based on hourly rate Comments: Sheet 1 of 1 macvalue.doc + EsGil Corporation In (Partnership with government for (Building Safety DATE: MARCH 03, 2011 • APPLICANT JURIJ JURISDICTION: CARLSBAD ^a-pCAN REVIEWER • FILE PLAN CHECK NO.: PCll-0008 SET: I PROJECT ADDRESS: 1099 BUENA VISTA WAY PROJECT NAME: SFR WITH AN ACCESSORY UNIT FOR STRONG SIDE BUILDERS r~1 The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ^ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to fonward to the applicant contact person. The applicant's copy of the check list has been sent to: MARTIN VOLK 2835 PROGRESS PLACE, ESCONDIDO, CA 92029 I I Esgil Corporation staff did not advise the applicant that the plan check has been completed. Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: MARTIN Telephone #: 858-997-5866 Date contacted: Email: martyvolk(ggmail.com Fax #: ^^ail \/le\ephor)&y^ Fax In Person • REMARKS: By: Ali Sadre Enclosures: EsGil Corporation • GA • EJ • PC 2/25 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858)560-1468 • Fax (858) 560-1576 CARLSBAD PCll-0008 MARCH 03, 2011 PLAN REVIEW CORRECTION LIST SINGLE FAMILY DWELLINGS AND DUPLEXES PLAN CHECK NO.: PCll-0008 JURISDICTION: CARLSBAD PROJECT ADDRESS: 1099 BUENA VISTA WAY FLOOR AREA: UNIT A: LIVING = 3125; GARAGE 789; PATIO = 138; UNIT B: LIVING = 640; GARAGE = = 290; PATIO = 200; STORIES: TWO HEIGHT: 25' REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 2/23 DATE PLANS RECEIVED BY ESGIL CORPORATION: 2/25 DATE INITIAL PLAN REVIEW PLAN REVIEWER: Ali Sadre COMPLETED: MARCH 03, 2011 FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the International Residential Code, International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinance by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Present California law mandates that construction comply with the 2010 edition ofthe California Code of Regulations (Title 24), which adopts the following model codes: 2009 IRC, 2009 IBC, 2009 UPC, 2009 UMC and 2008 NEC. The above regulations apply, regardless of the code editions adopted by ordinance. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2009 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list for a copy) where each correction item has been addressed, i.e.. plan sheet number, specification section, etc. Be sure to enclose the marked UP list when vou submit the revised plans. CARLSBAD PCll-0008 MARCH 03, 2011 • PLANS 1. The following note should be given with each correction list: Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver ail corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 2. Plans deviating from conventional wood frame construction shall have the structural portions signed and sealed by the California state licensed engineer or architect responsible for their preparation, along with structural calculations. (California Business and Professions Code). 3. Provide a statement on the Title Sheet of the plans stating that this project shall comply with the 2010 California Residential Code, which adopts the 2009 IRC, 2009 UMC, 2009 UPC and the 2008 NEC. Section R106.2. Revise General Note # 1 on the cover sheet of plans accordingly. 4. Please revise the section numbers and notes on the plans to match the 2009 International Residential Code (IRC), as adopted in the 2010 California Residential Code. . FIRE PROTECTION 5. Please dimension the eave projections on plans. 6. In dwelling units within which fuel-burning appliances are installed (and in dwelling units having attached garages), show the locations of permanently wired carbon monoxide alarms with battery backup, per Section R315: a) Outside each separate sleeping area in the immediate vicinity of the bedrooms. b) On each story. • NOTE: When more than one carbon monoxide alarm is required to be installed, the alarm devices shall be interconnected in such a manner that the actuation of one alarm will activate all of the alarms in the unit. CARLSBAD PCll-0008 MARCH 03, 2011 • GENERAL RESIDENTIAL REQUIREMENTS 7. Bathrooms (defined as having a shower or tub), shall be provided with mechanical ventilation (an openable window is not allowed). CalGreen 4.506.1. See master bathroom. 8. If fans are installed in bathrooms (having a shower or tub), they shall be Energy Star rated, vented to the outside and shall be controlled by a humidistat. CalGreen 4.506.1. 9. Glazing in the following locations should be shown on the plans as safety glazing material in accordance with Sec. R308.4 (see exceptions): See bath # 2 on A1.2: a) Glazing adjacent to a door where the nearest exposed edge of the glazing is within a 24-inch arc of either vertical edge of the door in a closed position and where the bottom exposed edge of the glazing is less than 60 inches above the walking surface. Exceptions: i) Glazing in walls on the latch side of and perpendicular to the plane of the door in a closed position. ii) Glazing that is adjacent to the fixed panel of patio doors. 10. Wall assemblies separating units in a duplex shall be of one-hour fire resistive construction. Provide details of assemblies. Sec. R302.3. Such wall assemblies shall extend to the underside of roof sheathing, where applicable. Exceptions: a) A fire-resistance rating of Vi-hour shall be permitted in buildings equipped throughout with an automatic sprinkler system installed in accordance with NFPA 13. b) Wall assemblies need not extend through attic spaces when the ceiling is protected by not less than -inch Type X gypsum board and an attic draft stop constructed as specified in Section R302.12.1 is provided above and along the wall assembly separating the dwellings. The structural framing supporting the ceiling shall also be protected by not less than >i -inch gypsum board or equivalent. 11. Provide a note on the plans stating: "Penetrations of fire-resistive walls, floor- ceilings and roof-ceilings shall be protected as required in CRC Section R302.4." 12. Walls separating units in a duplex shall have a sound transmission class (STC) of not less than 50. CBC Section 1207.6. Show the location of and provide details of the listed wall assemblies, and indicate listing agency and listing # for tested ratings. STRUCTURAL 13. Please specify the soils report information on Sheet SP1. Include the soils classifications, bearing values and expansion index, as per the report, on plans. 14. Note on the foundation plan that "Prior to the contractor requesting a Building Department foundation inspection, the soils engineer shall advise the building official in writing that: a) The building pad was prepared in accordance with the soils report, b) The utility trenches have been properly backfilled and compacted, and c) The foundation excavations, the soils expansive characteristics and bearing capacity conform to the soils report." CARLSBAD PCll-0008 MARCH 03, 2011 15. Provide a letter from the soils engineer confirming that the foundation plan, grading plan and specifications have been reviewed and that it has been determined that the recommendations in the soils report are properly incorporated into the construction documents. 16. Note on plans that surface water will drain away from building and show drainage pattern. The grade shall fall a minimum of 6" within the first 10 feet. Section R401.3. 17. Please note where details 2, 3, 4, 5 & 10/RD2 are cross referenced on plans. 18. Please indicate where details 9, 14 and 15/RD1 are cross referenced on plans. 19. Please specify where details 2, 4, 9, 12, 13 & 15/FD1 are cross referenced on plans. 20. Please delete all the details not relevant to this project on plans. 21. Please note where details 4, 8, 9, 11 & 12/F1 are cross referenced on plans. 22. Please indicate the size and reinforcement of the exterior pad footings on Sheet S4. This is not noted on detail 10/F1. 23. Provide the following note on the plans: "The contractor responsible for the construction of the seismic-force-resisting system shall submit a written Statement of Responsibility to the building official prior to the commencement of work on the system." CBC Section 1709. • MECHANICAL 24. Show the minimum 30" deep unobstructed working space in front of the attic installed furnace. Section CMC Section 904.11.4. 25. Note that passageway to the mechanical equipment in the attic shall be unobstructed, have continuous solid flooring not less than 24 inches wide, and be not more than 20 feet in length from the access opening to the appliance. CMC Section 904.11. • ELECTRICAL 26. Note on plans that receptacle outlet locations will comply with CEC Art. 210.52(A). 27. Include, on the plans the following specifications for electrical devices installed in dwellings: CEC Article 210 & 406: a) Tamper resistant receptacles for all locations described in 210.52 (i.e., all receptacles in a dwelling). b) Weather resistant type for receptacles installed in damp or wet locations (outside). Note this on Sheet Al.7. c) Arc-fault protection for all outlets (not just receptacles) located in rooms described in NEC 210.12(B): Family, living, bedrooms, dining, halls, etc. CARLSBAD PCll-0008 MARCH 03, 2011 28. Include a receptacle outlet in any hallways within of 3' of door opening on Al .8, by door from bedroom # 4. CEC Article 210.52(H). • PLUMBING 29. Provide a note on the plans: The control valves in bathtubs, whirlpool bathtubs, showers and tub-shower combinations must be pressure balanced or thermostatic mixing valves. CPC Section 414.5 and 418.0. 30. Specify on the plans: Water conserving fixtures: New water closets shall use no more than 1.6 gallons of water per flush, lavatories and kitchen faucets may not exceed 2.2 GPM, and showers may not exceed 2.5 GPM of flow. CPC Section 402.0. • GREEN BUILDING STANDARDS The California Building Standards Commission (BSC) has adopted the Green Building Standards Code which became effective January 1, 2011 and must be enforced by the local building official. The following mandatory requirements for residential construction must be included on your plans. CGC 101.3 31. Note on the site plan that the site shall be planned and developed to keep surface water away from buildings. Plans shall be provided and approved by the City Engineer that show site grading and provide for storm water retention and drainage during construction. BMP's that are currently enforced by the city engineer must be implemented prior to initial inspection by the building department. CGC 4.106.3. 32. Note on the plans that a minimum of 50% of construction waste is to be recycled. CGC 4.408.1. 33. Note on the plans that the builder is to provide an operation manual (containing information for maintaining appliances, etc.) for the owner at the time of final inspection. CGC 4.410.1. 34. Note on the plans that during construction, ends of duct openings are to be sealed, and mechanical equipment is to be covered. CGC 4.504.1. 35. Note on the plans that interior moisture control at slab on grade floors shall be provided by the soil engineer responsible for the project soil report per CGC Section 5.505.2.1, item 3. If a soil engineer has not prepared a soil report for this project, the following is required: A 4" thick base of Vz" or larger clean aggregate shall be provided with a vapor barrier in direct contact with concrete, with a concrete mix design which will address bleeding, shrinkage and curling shall be used. 36. Note on the plans that bathroom fans shall be Energy Star rated, vented directly to the outside and controlled by a humidistat. CGC 4.506.1. CARLSBAD PCll-0008 MARCH 03, 2011 37. Note on the plans that if provided, whole house exhaust fans shall have insulated covers or louvers which close when the fan is off. The covers or louvers shall have minimum R4.2 insulation. CGC 5.507.1. 38. Note on the plans that heating and AC shall be sized and selected by ACCA Manual J or ASHRAE handbook or equivalent. The duct sizing shall be sized in accordance with one of the ACCA methods listed in CGC Section 4.507.2. 39. Note on the plans that prior to final approval of the building the licensed contractor, architect or engineer in responsible charge of the overall construction must complete and sign the Green Building Standards Certification form and given to the building department official to be filed with the approved plans. . ENERGY CONSERVATION 40. Show on the plans compliance with the residential energy lighting requirements (Mandatory requirement): a) In bathrooms, garages, laundry rooms, and utility rooms all fixtures must be high efficacy style or be controlled by a vacancy sensor. b) All other rooms require any installed fixtures to be high efficacy or be controlled by a vacancy sensor or dimmer. (Closets under 70 square feet are exempt). c) Outdoor lighting fixtures that are attached to a building are required to be high efficacy or controlled by a combination photo-control/motion sensor. Note: Generally a high efficacy style of fixture is fluorescent, complete with electronic ballasts. Regular incandescent, quartz halogen and halogen MR lamps do not comply. 41. All hot water piping from the heating source to the kitchen fixtures must be insulated (2" or less pipe size = 1" thick insulation; greater than 2" pipe size = 1 Yi" insulation). 42. Residential ventilation requirements: • Kitchens require exhaust fans (either intermittent/100 cfm or continuous/5 air changes/hour), ducted to the exterior. Detail compliance by including a complying exhaust fan or a ducted range hood to the exterior. Note: CFM and noise rating ("Sone") must be specified on the plans. • Bathrooms require exhaust fans (minimum 50 cfm) to be ducted to the exterior. Note: CFM and noise rating ("Sone") must be specified on the plans. A bathroom is defined "as a room with a bathtub, shower, or spa or some similar source of moisture". • Residential bathroom exhaust fans shall be energy star rated and shall be control by a humidistat capable of an adjustment between 50 and 80% humidity. CalGreen 4.506.1. Exception: Control by a humidistat is not required if the bathroom exhaust fan is also the dwelling whole house ventilation. • Mechanical whole house ventilation must be provided. Include the following information: Fan sizing (cfm), "Sone" specification, and the duct sizing and length. Note: The information must match or exceed the design found on CF-6R-MECH energy forms. CARLSBAD PCll-0008 MARCH 03, 2011 • All fans installed to meet the preceding requirements must be specified at a noise rating of a maximum 1 "Sone" (for the continuous use calculation) or 3 "Sone" (for the intermittent use calculation). • CITY POLICY ITEMS 43. Nails for shear transfer connection (using A35's, etc.) may not be driven parallel to the flanges of TJI's (i.e., along the sides), per city policy, unless specific written approval from Trus-Joist Macmillan is first obtained. Details or notes on the plans should make this clear. Nails may be driven perpendicular to TJI flanges. 44. All new buildings that will use recycled water for irrigation require the following note on the plan check list: "The City of Carlsbad requires the installation of a "bypass tee and associated ball valves'- be installed above grade on the main water supply line before it enters the building. Please include the location and specifications for this fitting on the plumbing plans. (The City Engineer has a detail available. Standard drawing W35)." 45. The use of an automatic or self regenerating water softener unit is limited by the City plumbing adoptive ordinance. Please review this ordinance and revise the water softener design, if required. 46. The use of flexible metal conduit as a grounding means must comply with City Policy 84-36. 47. No wiring is permitted on the roof of a building and wiring on the exterior of a building requires approval by the Building Official. (City Policy). 48. For R-3's, fire sprinkler plans must be included with the original plan submittal. The sprinkler plans rinust be reviewed/ approved by EsGil staff before a permit can be issued. 49. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. 50. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes • No • 51. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Ali Sadre at Esgil Corporation. Thank you. CARLSBAD PCll-0008 MARCH 03, 2011 [DO NOT PAY- THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: CARLSBAD PLAN CHECK NO.: PCll-0008 PREPARED BY: Ali Sadre DATE: MARCH 03, 2011 BUILDING ADDRESS: 1099 BUENA VISTA WAY BUILDING OCCUPANCY: R3/U TYPE OF CONSTRUCTION: V-B/SPR. BUILDING PORTION AREA ( Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) LIVING 3125 110.17 344,281 GARAGE 789 28.74 22,676 PATIO 138 9.59 1,323 UNITS LIVING 640 110.17 70,509 GARAGE 290 28.74 8,335 PATIO 200 9.59 1,918 Air Conditioning 3765 4.19 15,775 Fire Sprinklers TOTAL VALUE 464,817 Jurisdiction Code CB By Ordinance BIdg. Permit Fee by Ordinance Plan Check Fee by Ordinance Type of Review: I I Repetitive Fee ^ Repeats [Zl Complete Review • Other j—j Hourly EsGil Fee • Structural Only Hr. @ $1,974.53 $1,283.44 $1,105.74 Comments: Sheet 1 of 1 macvalue.doc + CITY OF CARLSBAD BUILDING PLANCHECK CHECKLIST E-36 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov DATE: BUILDING «u.ufr^coo. 1'^^ 'V yycjiyx yy | x,^ -v PROJECT DESCRiPTi0N~5ro CJ>gM.£> {0^0 5f 5fD / fzUXlA^ ^my/^^U. ) ASSESSOR'S PARCEL NUMBER: EST. VALUE: ^f^ t52J^.,00 3 ADDf?ESS: PLANCHECK NO.: CB/PC), ( 1 -0^ sw ENGINEERING DEPARTMENT APPROVAL The item you have submitted for review has been approved. The approval is based on plans, information and/or specifications provided in your submittal; therefore any changes to these items after this date, including field modifications, must be reviewed by this office to ensure continued confonnance with applicable codes. Please review carefully all comments attadned, as ^ilure to comply with instructions in this report can result in suspension of permit to build. • A Right-of-Way permit is required prior to construction of the following imprpvements: DENIAL Please see the attached list of outstanding issues marked with following: terns may require clarification/con'ection Once necessary confections to plans or specifications for compliance with applicable codes and standards is made, submit corrected plans and/or specifications to the Building Department for resubmittal to the Engineering Department. Onlv the applicable sheets have been sent. By By " >OR OFFICIAL USE ONLY N6INEERING AUTHORIZATION TO ISSUE BUILDIN ^yj/Vt^^^ Date Date: Date: Date: ATTACHMENTS • Dedication Checklist • Grading Submittal Checklist • Neighborhood Improvement Agreement • Reference Documents • Right-of-Way Permit Application and Info Sheet • Storm Water Fomi(s): • Other: Name: email: Phone: ENGINEERING DEPT. CONTACT PERSON Linda Ontiveros City of Carlsbad linda.ontiveros@carlsbadca.gov 760-602-2773 Fax: 760-602-1052 NOTE: If there are retaining walls associated with your project, please check with the building department if these walls need to be pulled by separate RETAINING WALL PERMIT. E-36 Page 1 of 7 REV 6/30/10 SITE PLAN Provide a fully dimensioned site plan drawn to scale. Show: North anrow Existing & proposed structures Existing street improvements Property lines (show all dimensions) Easements Right-of-way width & adjacent streets Show on site plan: Driveway widths ixisting or proposed sewer lateral isting or proposed water service Existing or proposed inigation service Submit on signed /approved plans: DWG No. U^yO- ^Js. /UjDrainage patterns . Building pad sur^ce drainage must maintain a minimum slope of one percent towards rLi* AJN^ 1/* r> A 1/^ ^ adjoining street or an approved drainage course. GfCADi ^s)6' ptAMb) 2. ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive drainage of 2% to swale 5' away from building*. n~Existing & proposed slopes and topography D~1Size, type, location, alignment of existing or proposed sewer and water sen/ice(s) that serves the project. Each unit requires a separate service; however, second dwelling units and apartment complexes are an exception. 5-8ewer and water laterals should not be located within proposed driveways, per standards. • • 3. Include on title sheet: CZ^ite address Q^^sessor's parcel number 0Legal description/lot number For commercial/industrial buildings and tenant improvement projects, include: total building square footage with the square footage for each different use, existing sewer permits showing square footage of different uses (manufacturing, warehouse, office, etc.) previously approved. Show all existing use of SF and new proposed use of SF. Example: Tenant improvement for 3500 SF of warehouse to 3500 SF of office. EXISTING PERMIT NUMBER DESCRIPTION Lot/Map No. Subdivision/Tract: Reference no(s): E-36 Page 2 of 7 REV 6/30/10 .jST 2"^° 3"'' DISCRETIONARY APPROVAL COMPLIANCE f • )( • j llj 0/ Project does not comely with the following engineering conditions of approval for project no. • All conditions are in compliance. Date: DEDICATION REQUIREMENTS .^ST 3^° • • l^^edication for all street rights-of-way adjacent to the building site and any storm drain or utility easements on the building site is required for all new buildings and for remodels with a value at or exceeding $ 17.000.00 . pursuant to Carlsbad Municipal Code Section 18.40.030. For single family residence, easement dedication will be completed by the City of Carlsbad, cost $60500. Dedication required as follows Dedication required. Please have a registered civil engineer or land sun/eyor prepare the appropriate legal description together with an 8 x 11" plat map and submit with a title report. All easement documents must be approved and signed by owner(s) prior to issuance of building permit. Attached please find an application fomn and submittal checklist for the dedication process. Submit the completed application form with the required checklist items and fees to the engineering department in person. Applications will not be accepted by mail or fax. Dedication completed by: Date: IMPROVEMENT REQUIREMENTS .|Oi 2"" n Q All needed public improvements upon and adjacent to the building site must be constructed at time of building construction whenever the value of the construction exceeds $ 82.000.00. pursuant to Carisbad Municipal Code Section 18.40.040. Public improvements required as follows: Construction of the public improvements may be deferred pursuant to Carlsbad Municipal Code Section 18.40. Please submit a recent property title report or current grant deed on the property and processing fee of $ 441.00 so we may prepare the necessary Neighborhood Improvement Agreement. This agreement must be signed, notarized and approved by the city prior to issuance of a building permit. ^ E-36 Page 3 of 7 REVSOO/IQ Future public improvements required as follows: • Enclosed please find your Neighborhood Improvement Agreement. Please return agreement signed and notarized to the engineering department. Neighborhood Improvement Agreement completed by: Date: -O-No public improvements required. SPECIAL NOTE: Damaged or defective improvements found adjacent to building site must be repaired to the satisfaction of the citv inspector prior to occupancy. GRADING PERMIT REQUIREMENTS The conditions that invoke the need for a grading pemiit are found in Section 15.16 of the Municipal Code. 5^ Inadequate infonnation available on site plan to make a determination on grading requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and remedial). This information must be included on the plans. Srading Permit required. NOTE: The grading permit must be issued and rough grading arpval obtained prior to issuance of a building permit. fed Pad Certification required. (Note: Pad certification may be required even if a grading 5ennit is not required.) All required documentation must be provided to your Engineering Construction Inspector. The inspector will then provide the engineering counter with a ^^leapfo^r^l^dir^g^^^^ ^/// I H-No grading permit/^uired. ^ST 2^0 ^^2)^° 3 0 • tfA), • • MISCELLANEOUS PERMITS _ RIGHT-OF-WAY PERMIT is required to do wori< in city right-of-way and/or private wori< \^^6]acent to the public right-of-way. Types of wori< include, but are not limited to: street improvements, tree trimming, driveway construction, tying into public storm drain, sewer and water utilities. Right-of-way permit required for: " *~ ' ' — • [cntA fifCtjyririB-C • AND Arfsiv/ l^L^ri^ (B^ INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carisbad sewer sen/ice area, you must complete the attached Industrial Wastewater Discharge Permit Screening Survey. Fax or mail to Encina Wastewater Authority, 6200 Avenida Encinas, Carisbad, CA 92011, (760) 438-3941, Fax (760) 476-9852. E-36 Page 4 of 7 REV 6/30/10 ^ST ^0 jRD m • STORM WATER - Construction Compliance ^ ST -^^^ ^3"° ••^ • • \^ Project Threat Assessment Fomi complete. •"Project Threat Assessment Form incon'ectly completed. H-Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form and return (SW ) B— Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2 SWPPP, payment of processing fee and review by city. Post-Development (SUSMP) Compliance 53'''^Stomi Water Standards Questionnaire complete. H Storm Water Standards Questionnaire incorrectly completed. Please make the corrections, re-sign the questionnaire and resubmit with next submittal. S^:^ Project is subject to Standard Storm Water Requirements. See city Standard Urtsan Storm Water Management Plan (SUSMP) for reference. Disconnect discharges per SUSMP. Do not connect runoff from impen/ious surfaces to stonn drains without first discharging water over landscape areas. See SUSMP. Minimize use of impervious surfaces per SUSMP. Redesign to reduce the excessive use of impervious area (pavement) on project. Use a balanced design of pervious surfaces (landscape area, planters, etc.) and impen/ious surfaces. See SUSMP. Project needs to incorporate low impact development strategies throughout the project in one or more of the following ways: • Rainwater han/esting (rain barrels or cisterns) • Vegetated Roof 0^io-retention cell/rain garden • Pen/ious pavement/pavers • Flow-through planter/vegetated or rock drip line • Vegetated swales or rock infiltration swales • Downspouts disconnect and discharge over landscape FEES • Other: • • Q Required fees have been entered in building pemiit B— Drainage fee applicable Added square feet Added square footage in last two years? yes no Pemiit No. Pennit No. Project built after 1980 yes no Impervious surface > 50% yes no Impact unconstructed facility yes no • Fire sprinklers required yes no (is addition over 150' from center line) Water Meter Upgrade yes no "B^ No fees required E-36 Page 5 of 7 REV 4/30/10 WATER METER REVIEW .jST 2^0 3RD • • Q^omestic (potable) Use Ensure that the meter proposed by the owner/developer is not oversized. Oversized meters are inaccurate during low-flow conditions. If it is oversized, for the life of the meter, the city will not accurately bill the owner for the water used. t^ \^Tir[P * ^^i*^ ^ residential unit is required to have an automatic fire \X^\\^ extinguishing system, the minimum meter size shall be a Tmeter. NOTE: rr"! ^ /^r-»v-» n connection fee, SDCWA system capacity charge and the water J \rv_^^ oPl^^lhslK-'LHl c ^i^^^*"^®"* capacity charge will be based on the size of the meter ^ necessary to meet the water use requirements. WCSLA/C' I^A PDOl^ residential units the minimum size meter shall be 5/8°, except where ^ I the residential unit is larger than 3,500 square feet or on a lot larger than N 0T\ CjP quarter (1/4) acre where the meter size shall be %: w * I • If owner/developer proposes a size other than the "standard", then '^^^^^^^ 3 /1 L)- / 1 \ owner/developer must provide potable water demand calculations, which / I ' ) fixture counts and maximum water demand in gallons per ' ' J minute (gpm). A typical fixture count and water demand wori^sheet is ~^ ' • «• attached. Once the gpm is provided, check against the "meter sizing »-;^y^ pr 1^ y\ A A ijrTCV) schedule' to verify the anticipated meter size for the unit. •^-^ ' Io / v v'D\ fc/c*^ Maximum service and meter size is a 2" service with a 2" meter. TKOplE^ ^^Jlirigation Use (where recycled water is not available) / All Irrigation meters must be sized by the landscape architect based on the ' flow demand in gallons per minute (gpm) for the area to be irrigated. The minimum size meter(s) shall be capable of supplying the peak irrigation water demand determined. • If the project is a newer development (newer than 1998), check the recent improvement plans and observe if the new irrigation service is reflected on the improvement sheets. If so, at the water meter station, the demand in gpm may be listed there. Irrigation services are listed with a circled "1", and potable water is typically a circled "W. • If the improvement plans do not list the irrigation meter and the service/meter will be installed via another instrument such as the building plans or grading plans (w/ a right of way permit of course), then the applicant must provide irrigation calculations for estimated worst-case irrigation demand (largest zone with the farthest reach). Typically the planning department landscape consultant has already reviewed this if landscape plans have been prepared, but the applicant must provide the calculations to you for your use. Once you have received a good example of irrigation calculations, keep a set for your reference. In general the calculations will include: • Hydraulic grade line • Elevation at point of connection (POC) • Pressure at POC in pounds per square inch (PSI) • Worse case zone (largest, farthest away from valve) • Total sprinkler heads listed (with gpm use per head) • Include a 10% residual pressure at point of connection E-36 Page 6 of 7 REV60O/IO Q—trrigation Use (where recycled water is available) 1. Recycled water meters are sized the same as the irrigation meter above. 2. If a project fronts a street with recycled water, then they should be connecting to this line to irrigate slopes within the development. For subdivisions, this should have been identified and implemented on the improvement plans. Installing recycled water meters is a benefit for the applicant since they are exempt from paying the San Diego County Water Capacity fees. However, if they front a street on which the recycled water is there, but is not live (they are charged with potable water until recycled water is available), then the applicant must pay the San Diego Water Capacity Charge. If recycled water is eventually supplied to the service connection and meter within one year of the original application for Water meter Pennit, the customer must prepare and submit the San Diego County Water Authority's "Capacity Charge Refund Requesf fomri to CMWD for verification to request the connection fee refund. .^ST 2^0 3RD • • • • Additional Comments: E-36 Page 7 of 7 REVBOO/IO PROJECT INSPECTOR:.. PROJECT ID Stf\e.Cok CITY OF CARLSBAD GRADING INSPECTION CHECKLIST FOR PARTIAL SUE RELEASE DATE:_ lti^\}it/\e^ GRADING PERMIT NO. II 0"7 LOTS REQUESTED FOR RELEASE: N/A = NOT APPLICABLE V = COMPLETE 1st 2nd. . A/A 1. Site access to requested lots adequate and logically grouped 2. Site erosion control measures adequate. 3. Overall site adequate for health, safety and welfare of public. 4. Letter from Owner/Dev. requesting partial release of spedfic lots, pads or bidg. 5. 814" X11" site plan (attachment) showing requested lots submitted. 6. Compaction report fi'om soils engineer submitted. (If soils report has been submitted with a previous partial release, a letter from soils engineer referencing the soils report and identifying specific lots for release shall accompany subsequent partial releases). 7. EOW certification of work done with finish pad elevations of spedfic lots to be released. Letter must state lot (s) is graded to within a tenth (.1) of the approved grading plan. 8. Geologic engineer's letter if unusual geologic or subsurface conditions exist 9. Fully functional fire hydrants within 500 feet of building combustibles and an all weather roads access to site is required. 10. Letter from EOW that TCBMP's are installed. rW Partial release of grading for the above stated lots is approved for the purpose of building pennit issuance. Issuance of building pennits is still subject to ail nonnal City requirements required pursuant to the building permit process. I I Partial release of the site is denied for the foiiowing reasons: f-3o-l\ Date Manager Date ^ KVIU MASTEXVPtniKlPAKnm.nM <K Linda Ontiveros From: Sherri Ferguson Sent: Tuesday, March 08, 2011 7:48 AM To: Linda Ontiveros Subject: RE: 1099 Buena Vista Wy I'm so sorry but I was out yesterday. The meter is 5/8". Thanks, Sherri ^ CtTir Of cmmm finance Department Sherri L. Ferguson City of Carlsbad Finance Department www.carlsbadca.gov P: (760) 602-2412 F: (760) 602-8553 Sherri.Ferguson^carlsbadca.gov Please consider the environment before printing this e-mail From: Linda Ontiveros Sent: Monday, March 07, 2011 11:11 AM To: Sherri Ferguson Subject: 1099 Buena Vista Wy Good morning Sherri - When you get a moment, would you mind looking up 1099 Buena Vista Wy to see what size meter they show on their utility bill? Thanks! CiTTf Of Development Services Linda Ontiveros Engineering Technician Land Development Engineering www.carlsbadca.gov ENGINEERINQ DEPARTMENT FEE CALCULATION WORKSHEET ' inmate based on unconfirmed information from applicant. Calculation based on building plancheck plan submittal. ^ w Address: 10^^^ (f^W WSfAr WN/BIdg. Permit f^o.____Z_ Prepared by; Date: '-^"7^(1 Checked by: Date: EDU CALCULATIONS: List types and square footaget for all uses. Types of Use^f^O Sq. Ft./Units; ' EDU's: ~' Types of UseRDVI Sq. Ft./Units: EDU's: ( Types of Use: Sq. Ft./Unltf: EDU's: Types of Use: Sq. Ft./Units: EDU's: ADT CALCULATIONS: List types and square footages for ali uses. Types of Use: _ Sq. Ft/Units: ' ADT's: . Tvpes of U8e.<SJ^lX Sq. Ft./Unlts: , ADT's:. Types of Use: Sq. Ft./Units: ADT's: ' Types of Use: Sq. Ft./Unlts: ADT's: FEES REQUIRED: WITHIN CFO: • YES (no bridge & thoroughfare fee in District #1, reduced Traffic impact Fee) PARK IN-LIEU FEE: NW QUADRANT NE QUADRANT SE QUADRANT FEE/UNIT! / . X \ NO. UNITS: - 2. TRAFFIC IMPACT FEE^xZWl ^ J ADT's/UNITS: X FEE/ADT:ifeM^ \ ^ 6^ 6D |J^)^RIDGE AND THOROUGHFARE FEE (DIST. #1 DiST. #2 ADT's/UNITS: X FEE/ADT: FACILITIES MANAGEMENT FEE ZONE:_j____ UNIT/SQ.FT.:_j X . FEEySQ.FT./UNIT^ 2^ = S SEWER FEE ^^b(MliAtL EDU's; _( X FEE/EDU! //^^.' »» ( / ^9^. aeHEFrr AREA: ' EDU's; X FEE/EDU; ~ 6. DRAINAGE FEES PLDA A HIGH /LOW <^ ACRES: X FEE/AC; 6) ,< ^ -^V 7. POTABLE WATER FEES ^ UNITS CODE CONNECTION FEE . METER FEE SDCWA FEE IRRIGATION fo^ DA-n5} ^/lLp/)T y CITY OF CARLSBAD STORM WATER COMPLIANCE ASSESSMENT B-24 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov I am applying to the City of Carlsbad for the following type(s) of construction permit: • Building Permit • Right-of-Way Pennit • My project is categorically EXEMPT from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it only requires issuance of one or more of the following permit types: Electrical Fire Additional Fire Alami Fixed Systems Mechanical Mobile Home Plumbing Patio/Deck Re-Roofing Sign Spa-Factory Sprinkler Water Discharge Project Storm Water Threat Assessment Criteria* No Threat Assessment Criteria • My project qualifies as NO THREAT and is exempt from tfie requirement to prepare a storm water pollution prevention plan (SWPPP) because it meets the 'no threaf assessment criteria on ttie City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier Level. My project does not meet any of the High, Moderate or Low Threat criteria described below. Tler1 - Low Threat Assessment Criteria • My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type (See list above) and the project meets one or more of the following criteria: • Results in some soil disturbance; and/or • Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling). T/er2 - Moderate Ttireat Assessment Criteria ^ My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria: • Project requires a grading plan pursuant to the Carisbad Grading Ordinance (Chapter 15.16 of the Carisbad Municipal Code); or, • Project will result in 2,500 square feet or more of soils disturbance including any assxiated construction staging, stockpiling, pavement ^CJ^^LJN I kj/^^^— removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria: ^^^i-^i——, , Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or • Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or • Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or • Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). 5W T/er3 - Significant Tlireat Assessment Criteria • My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres Including any associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or • My project is part of a phased development plan that will cumulatively result in soil disturi}ance totaling one or more acres including any associated construction staging, equipment storage, refueling and maintenance areas: or, • My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-stomn water discharge(s). I certify to tfie best of my knowledge that the above checked statements are true and conect I understand and acknowledge tfiat even though this project does not require preparation of a construction SWPP, I must still adhere to, and at all times during construction activities for the pemtit t/pe(s) check above comply virith die storm water best management practices pursuant to Title 15 ofthe Carlsbad Municipal Code and to Citv Standards. *The City Engineer may authorize minor variances from the Stomn Water Threat Assessment Criteria ir: special circumstances where it can be shown that a lesser or higher Constmction SWPPP Tier Level is wan'anted. B-24 Project Address: Assessor Parcel No. Owner/Owner's AuthorizeiAgent Name: Title: _ . , .. Date: Project ID: . Page 1 of 1 Rev.03/09 ^ STORMWATER „ . ^ . QTAMHARnc; Development Services O I AM^L/MIXL^O Engineering Department 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov ^ CITV OF QUESTIONNAIRE CARLSBAD E-34 INSTRUCTIONS: To address post-developnnent pollutants that may be generated fronn developnnent projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project design per the City's Standard Urban Stormwater Management Plan (SUSMP). Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of stomn water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'Standard Stormwater Requirements' or be subject additional criteria called 'Priority Development Project Requirements'. Many aspects of project site design are dependent upon the storm water standards applied to a project. Applicant responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent stomn water standards than initially assessed by the applicant, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City. If applicants are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, they are advised to seek assistance from Land Development Engineering staff. A separate completed and signed questionnaire must be submitted for each new development application submission. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. In addition to this questionnaire, applicants for construction pennits must also complete, sign and submit a Project Threat Assessment Form to address construction aspects of the project. Please answer the questions below, follow the instructions and sign the form at the end. 1. Is your pmject a significant redevelopment? DEFINITION: Significant redevelopment is defined as the creation, addition or replacement of at least 5,000 square feet of impervious surface on an already existing developed site. Significant redevelopment includes, but is not limited to: the expansion of a building footprint; addition to or replacement of a stmcture; structural development including an increase in gross floor area and/or exterior construction remodeling; replacement of an impervious surface that is not part of a routine maintenance activity; and land disturbing activities related with structural or impervious surfaces. Replacement of impervious surfaces includes any activity that is not part of a routine maintenance activity where impervious material(s) are removed, exposing underiying soil during construction. If your project IS considered significant redevelopment, then please s/c/p Section 1 and proceed with Section 2. If your project IS NOT considered significant redevelopment, then please proceed to Section 1. E-34 Page 1 of 3 REV 3/23/10 CITY CARLSBAD O F STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Engineering Department 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov SECTION 1 NEW DEVELOPMENT PRIORITY PROJECT TYPE Does you project meet one or more of the following criteria: YES NO 1. Housina sutKlivisions of 10 or more dwelling units. Examoles: sinqle familv tiomes, multi-familv fiomes, condominium and apartments X 2. Commercial - areater than 1-acre. Am develooment other than heaw industry or residential. Examoles: hosoitals: laboratories and other medical facilities; educational institutions; recreational facilities; municipal facilities; commercial nurseries; multi-apartment buildings; car wash facilities; mini-malls and other business complexes; shopping malls; hotels; office buildings; public warehouses; automotive dealerships; airfields; and other light industrial facilities. X 3. Heavi^ Industrial / Industry- areater than 1 acre. Examples: manufacturina plants, food processina plants, metal working facilities, printing plants, and fleet storage areas (bus, truck, etc.). X 4. Automotive repair shoo. A facilitv cateaorized in anv one of Standard Industrial Classification (SIC) codes 5013. 5014, 5541, 7532-7534, and 7536-7539 X 5. Restaurants. Anv facilitv that sells oreoared foods and drinks for consumotlon. includina stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (SIC code 5812), where the land area for development is greater than 5,000 square feet. Restaurants where land development is less than 5,000 square feet shall meet all SUSMP requirements except for structural treatment BMP and numeric sizing criteria requirements and hydromodification requirements. X 6. Hillside develooment Anv develooment that creates 5.000 sauare feet of impervious surface and is located in an area with known erosive soil conditions, where the development will grade on any natural slope that is twenty-five percent (25%) or greater. X 7. Environmentallv Sensitive Area (ESA)\ All development located within or directly adjacent^ to or discharaina directly^ to an ESA (where discharges from the development or redevelopment will enter receiving waters within the ESA), which either creates 2,500 square feet of impervious surface on a proposed project site or increases the area of imperviousness of a proposed project site to 10% or more of its naturally occurring condition. X 8. Parifina lot Area of 5.000 sauare feet or more, or with 15 or more oarkino soaces. and potentially exposed to urban runoff X 9. Streets, roads, hiahwavs. and freewavs. Any paved surface that is 5.000 sauare feet or greater used for the transportation of automobiles, trucks, motorcycles, and other vehicles K 10. Retail Gasoline Outlets. Servina more than 100 vehicles oer day and areater than 5,000 square feet X 11. Coastal Develooment Zone. Anv oroiect located within 200 feet of the Pacific Ocean and (1) creates more than 2500 square feet of impenneable surface or (2) increases impermeable surface on property by more than 10%. >\ 12. More than 1-acre of disturttance. Proiect results in the disturbance of more than 1-acre or more of land and is considered a Pollutant-generating Development Project*. K 1 Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) Impaired 'Mater bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent environmentally sensitive areas which have been identified by the Copermlttees. 2 "Directly adjacent" means situated within 200 feet ofthe Environmentally Sensitive Area. 3 "Discharging directly to" means outflow from a drainage conveyance system that is composed entirely of flows from the subject development or redevelopment site, and not commingled with flow from adjacent lands. 4 Pollutant-generating Development PnDjects are those projects that generate pollutants at levels greater than background levels. In general, these include all projects that contribute to an exceedance to an impaired water body or which create new impervious surfaces greater than 5000 square feet and/or introduce new landscaping areas that require routine use of fertilizers and pesticides. In most cases linear pathway pnsjects that are for Infrequent vehicle use, such as emergency or maintenance access, or for pedestrian or bicycle use, are not considered Pollutant-generating Development Projects if they are built with pervious surfaces or If they sheet flow to surrounding pervious surfaces. Section 1 Results: .If you answered YES to ANY of the questions above your project is subject to Priority Development Project requirements. Please check the "meets PRIORITY DEVELOPMENT PROJECT requirements" box in Section 3. A Storm Water Management Plan, prepared in accordance with City Stonn Water Standards, must be submitted at time of application. If you answered NO to ALL of the questions above, then your project is subject to Standard Stormwater Requirements. Please check the "does not meet PDP requirements" box In Section 3. E-34 Page 2 of 3 REV 3/23/10 CARLSBAD CITY OF STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Engineering Department 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov SECTION 2 SIGNIFICANT REDEVELOPMENT Complete the questions t>elow regarding your redevelopment project: YES NO 1. Project results in the disturbance of more than 1 -acre or more of land and is considered a Pollutant-generating Development Project (see definition in Section 1). X If you answered NO, please proceed to question 2. If you answered YES, then you ARE a significant redevelopment and you ARE subject to PRIORITY DEVELOPMENT PROJECT requirements. Please check the "meets PRIORITY DEVELOPMENT PROJECT requirements" box in Section 3 below. 2. Is the project redeveloping an existing priority project type? (Priority projects are defined in Section 1) If you answered YES, please proceed to question 3. If you answered NO, then you ARE NOT a significant redevelopment and your project is subject to STANDARD STORMWATER REQUIREMENTS. Please check the "does not meet PDP requirements" box in Section 3 below. 3. Is the project solely limited to just one of the following: a. Trenching and resurfacing associated with utility work? b. Resurfacing and reconfiguring existing surface parking lots? c. New sidewalk construction, pedestrian ramps, or bike lane on public and/or private existing roads? d. Replacement of existing damaged pavement? If you answered NO to ALL of the questions, then proceed to question 4. If you answered YES to ANY of the questions then you ARE NOT a significant redevelopment and your project is subject to Standard Stormwater Requirements. Please check the "does not meet PDP requirements" box in Section 3 below. 4. Will your redevelopment project create, replace, or add at least 5,000 square feet of impervious surfaces on an existing development or, be located within 200 feet of the Pacific Ocean and (l)create more than 2500 square feet of impermeable surface or (2) increases impermeable surface on the property by more than 10%? If you answered YES, you ARE a significant redevelopment, and you ARE subject to PRIORITY DEVELOPMENT PROJECT requirements. Please check the "meets PRIORITY DEVELOPMENT PROJECT requirements" box in Section 3 below. If you answered NO, then you ARE NOT a significant redevelopment and your project Is subject to STANDARD STORMWATER REQUIREMENTS. Please check the "does not meet PDP requirements" box in Section 3 below. SECTION 3 Questionnaire Results: • My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater criteria per the SUSMP and must prepare a Storm Water Management Plan for submittal at time of application. My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the SUSMP. Applicant Information and Signature Box This Box for City Use On/y Address: Assessor's Parcel Number(s): iSG. 2^1-02. Applicant Name: Applicant Title: Applicant Signature: Date: • E-34 Page 3 of 3 REV 3/23/10 <^C^ CITY OF , ^ CARLSBAD Community & Economic Development www.carisbadca.gov September 20, 2010 Mr. Bob Sukup The Sea Bright Company 4322 Sea Bright Place Carlsbad, CA 92008 RE: CDP 10-12: 1099 Buena Vista Residence Dear Mr. Sukup: Thank you for your letter dated September 15, 2010 requesting that the city reconsider their requirement that the property owner ofthe above property dedicate 5 feet of their frontage for right-of-way purposes. After reviewing the Buena Vista Way improvements plans (DWG 161-7), we concluded that these plans established the ultimate street right-of-way width at 55 feet since the street centerline is offset to establish an equally wide parkway of 7.5 feet on both sides ofthe street. Therefore, no further dedication is necessary for the above property. If you have any questions or wish to contact me, you may either call me at (760) 602-2781 or e- mail me at david.rick@carlsbadca.gov. Sincerely, David Rick Associate Engineer cc: Glen Van Peski, Senior Civil Engineer Clyde Wickham, Associate Engineer Land Development Engineering 1635 Faraday Ave. I Carlsbad, CA 92008 I 760-602-2740 I 760-602-1052 fax ^ B B (0 (0 (0 O Q O « $ S » 1^ ^ J: .c £ O O O • • • PLANNING DEPARTIVIENT BUILDING PLAN CHECK REVIEW CHECKLIST Plan Check No. CB11-0403 Address 1099 Buena Vista Way Planner Chris Garcia Phone (760^ 602- 4622 APN: 155-251-02-00 Type of Project & Use: Single Familv Home and SDU Net Project Densitv:4.34 DU/AC Zoning: Ril General Plan: RLM Facilities Management Zone: 1 CFD (in/out) #_Date of participation: Remaining net dev acres: Circle One (For non-residential development: Type of land used created by this permit: ) Legend: ^ Item Complete • Item Incomplete - Needs your action Environmental Review Required: YES • NO lEI TYPE DATE OF COMPLETION: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval Discretionary Action Required: YES |EI NO • TYPE CDP APPROVAL/RESO. NO. 6732 DATE 12/1/2010 PROJECT NO. CDP 10-12 OTHER RELATED CASES: CDP 10-29 Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval: Condition 6: Provide a mvlar COPY of the site plan. Condition 14: Provide completed Notice of Restriction mailed January 26. 2011. Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES M NO • CA Coastal Commission Authority? YES O NO ^ If California Coastal Commission Authority: Contact them at - 7575 Metropolitan Drive, Suite 103, San Diego, CA 92108-4402; (619) 767-2370 Determine status (Coastal Permit Required or Exempt): Habitat IVIanagement Plan Data Entry Completed? YES • NO • If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application and assess fees in Permits Plus (A/P/Ds, Activity Maintenance, enter CB#, toolbar. Screens, HMP Fees, Enter Acres of Habitat Type impacted/taken, UPDATE!) inclusionary Housing Fee required: YES • NO |^ (Effective date of Inclusionary Housing Ordinance - May 21,1993.) Data Entry Completed? YES • NO • (A/P/Ds, Activity Maintenance, enter CB#, toolbar. Screens, Housing Fees, Construct Housing Y/N, Enter Fee, UPDATE!) H:\ADMIN\Template\Building Plancheck Review Checklist.doc Rev 4/08 Site Plan: lEl ^ • Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of-way width, dimensional setbacks and existing topographical lines (including all side and rear yard slopes). Provide legal description of property and assessor's parcel number. Policy 44 - Neighborhood Architectural Design Guidelines 1. Applicability: YES • NO IEI 2. Project complies: YES • NOQ Zoning: 1. Setbacks: Front: Interior Side: Street Side: Rear: Top of slope: Reouired 20' Shown 20: Required 6'9" Shown 6'9" Required 6'9" Shown 6'9'' Required _13N61 Shown 20' Required N/A Shown N/A 2. Accessory structure setbacks: Front: Interior Side: Street Side: Rear: Structure separation: 3. Lot Coverage: Required. Required. Required. Required. Required. Shown. Shown. Shown. Shown. Shown Required 40% Shown 33.4% • 4. Height: 5. Parking: Required 30: Shown 27'6" Spaces Required 3 Shown 4 (breakdown by uses for commercial and industrial projects required) Residential Guest Spaces Required 0 Shown 2 Additional Comments Make corrections to the Title sheet as follows. Zoning is R-1 (not R-3). Allowable height is 30' (not 35'). Reouired parking is 2 covered for the SFD and 1 covered or uncovered for the SDU. Please also see above and submit a mylar site plan and completed Notice of Restriction per conditions 6 and 14 of Resolution 6732. OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER DATE H:\ADMIN\Template\Building Plancheck Review Checklist.doc Rev 4/08 Carlsbad Fire Department l>mem<;^r COPY Plan Review Requirements Category: PLANCK , Date of Report: 03-14-2011 Name: Address: Reviewed by: Permit #: PCI 10008 Job Name: SMERUD RES- BUILD NEW 3,125 SF Job Address: 1099 BUENA VISTA WY CB AD Conditions: Cond: CON0004469 [MET] * CITY OF CARLSBAD FIRE DEPARTMENT Subject to field inspection and required tests, notations hereon, conditions in correspondence and conformance with applicable regulations. The stamping of these plans shall not be held to permit or approve the violation of any law. Entry: 03/14/2011 By: GR ^Kction: AP FIRE SPRINKLERS are required - Defence Submittal per CBD BD. gr CHRISTIAN WHEELER. ENGINEERING March 16,2010 Richard Smerud c/o Martin Volk 568 Compass Road Oceanside, Califomia 92054 CWE 2100122.03 SUBJECT: FOUNDATION FLAN REVIEW, FROFOSED BUENA VISTA WAY RESIDENCE, 1099 BUENA VISTA WAY, CARLSBAD, CALIFORNIA References: 1) Foundation Plans for Buena Vista; Sheets SPl, S4, and Fl; HTK Stmctural Engineers; Febmary 23, 2011. 2) "Report of Preliminary Geotechnical Investigation, Proposed Buena Vista Way Residence", Christian Wheeler Engineering; May 18, 2010 (CWE 2100122.01). Dear Mr. Volk: In accordance with your request, we have reviewed the referenced foundation plans for the subject project in order to ascertain that the recommendations presented in die referenced geotechnical report have been implemented, and that no additional recommendations are needed due to changes in the proposed constmction. Based on this review, it is our opinion that in general, the plans reflect the recommendations contained in the referenced report. If you have any questions after reviewing this report, please do not hesitate to contact our office. This opportunity to be of professional service is sincerely appreciated. I Respectfully submitted, CHRISTIAN WHEELER ENGINEERING Daniel cc: (2) Submitted (1) m3rtyYolk@,gmail.com (1) dfn@htkse.com 3980 Home Avenue • San Diego, CA 92105 • 619-550-1700 • FAX 619-550-1701 l>o>^bue troA^-L^ 6^sr6i^ AJOt^ iASe£^ 5erK>fe*vj Structural Plan Check Responses PROJECT: Buena Vista PLANCHECK*: PCll-0008 HTK PROJECT*: 10-320 DATE: March 9,2011 HTK HOROWITZ TAYLOR KUSHKAKI STRUCTURAL ENGINEERS 13. Soils infonnation added to SPl per the report. 14. Note added to sheet S4. 15. See letter from soils engineer. 16. Note added to sheet S4. See architectural for drainage pattern 17. -21. All details not needed have been omitted from the plans. 22. Size and reinforcing called out on sheet S4. 23. Note added to sheet SPi. 14288 Danielson St. • Suite #200 • Poway, CA 92064 • (858)679-8989 2350 8. Jones • Suite #101 • Las Vegas, NV 89146 • (702)505-8225 STRUCTURAL CALCULATIONS PROJECT: 5^^€-'OA 1/^ 5 I A STRUCTURAL ENGINEERS DESIGN ASSUMPTIONS: CONCRETE STRENGTH AT TWENTY EIGHT DAYS: MASONRY: GRADE "N" CONCRETE BLOCK F ' M ^ MORTAR: TYPES 1,800 PSI GROUT: 2000 PSI REINFORCING STEEL: A-615 STRUCTURAL STEEL: A-36 TIMBER: DOUGLAS FIR-LARCH JOISTS BEAMS AND POSTS STUDS SEISMIC CATEGORY: GRADE 40: GRADE 60: PSI PSI #4 AND LESS (U.O.N.) #5 AND LARGER #2 #2 STUD OR BETTER REPORT BY: WIND FORCE: <? DESIGN LOADS: ROOF DEAD LOAD SLOPED ROOFING PLYWOOD JOISTS INSUL. & CLG. MISC. TOTAL = ROOF LIVE LOAD 20 PSF FLAT REPORT NO.: SOIL PRESSURE: FLOOR DEAD LOAD FLOORING PLYWOOD JOISTS INSUL. & CLG. MISC. TOTAL = 1-4 £5F- FLOOR LIVE LOAD INTERIOR BALCONY WALKWAY WALL DEAD LOAD INTERIOR EXTERIOR 10 PSF 16 PSF 40 PSF 60 PSF (U.O.N.) 100 PSF These calculations are limited only to the items included herein, selected by the client and do not imply approval of any other portion of the structure by this office. These calculations are not valid if altered in any way, or not accompanied by a wet stamp and signature of the Engineer of Record. Job No. Designed By Date 14288 Danielson St. • Suite 200 • Poway, CA 92064 • (858) 679-8989 • Fax (858) 679-8959 I^IAG/^A X/XSrA - H^SG^'^"^ iAS£ I'V TTX 3iSQg t<^Vc. ^s^iFT {Ad- WCo'lJ^ 5iA€AiA \/xsrA- Z^^Q-^' FT x^'l^ WHUrr,"^ A5e ^V:^x 16. ASL. ^ ^ - ST A VXSTA" IS' tAS£ 3V2^ X )t| LSL 5 £X5 y^r c v'- Cs L £? A s : ^ A Tea Y C:^ X - I. o \/ 'Y. 3.S- PSF 1 o 3. 03> PS F CO — /oo 7 ^S. PSF S (S- r s ' 1/ £ 1 S F r r-/0 £ F r l4 or 12.7 1^-FT (?) ^K.^S^0lVs7) =^ ^7LS*//6' - 17 1^/ 5) HTK HOROWITZ TAYLOR KUSHKAKI PROJECT CLIENT JOB NO. Buena Vista DATE: 01/27/11 WIND DESIGN ASCE 7-05 IBC 2006 INPUT DATA Exposure category (B, c or D) B Importance factor, pg 77, (0.87, 1.0 or 1.15) 1 = 1.00 Basic wind speed (IBC Tab 1609.3.1 Vjs) V = 85 mph Topographic factor (Sec.6.5.7.2, pg 26 & 45) = 1 Building height to eave he = 19 ft Building height to ridge hr = 10.5 ft Roof Pitch (3-12) 3.5 /12 Least Horizontal Dimension B= 27 ft Alternate Basic Load Factor 1 ANALYSIS Velocitv pressure qh = 0.00256 KhKrfKdV^ = 11.01 psf where; Qh = velocity pressure at mean roof height, h. (Eq. 6-15, page 27) Kh = velocity pressure exposure coefficient evaluated at height, h, (Tab. 6-3, Case 1,pg 79) = w/ind directionality factor. (Tab. 6-4, for building, page 80) h = mean roof height Design pressures for MWFRS P = qh[(G Cp,)-(G Cpi)] 0.70 0.85 14.75 OK ft where: Note p = pressure in appropriate zone. (Eq. 6-18, page 28). G Cp f = product of gust effect factor and external pressure coefficient, see table below. (Fig. 6-10, page 53 & 54) G Cpi = product of gust effect factor and intemal pressure coefficient.(Fig. 6-5, Enclosed Building, page 47) = 0.18 or -0.18 a = width of edge strips. Fig 6-10, note 9, page 54, = 3.00 ft negative pressures are away from surface face Pressures (psf), Basic Load Cases Roof angle 9 = 16.26 Surface G Cpf Net Pressure with (+GCpO (-GCpi) Max Design 1 0..56 4.18 8.14 8.14 8.14 2 0.21 0.33 4.29 4.29 1.20 3 -0.43 -6.71 -2.75 -6.71 -1.88 4 -0.37 -6.05 -2.09 -6.05 -6.05 IE 0.69 5.61 9.57 9.57 9.57 2E 0.27 0.99 4.95 4.95 1.39 3E -0,53 -7.81 -3.85 -7.81 -2.19 4E -0.48 -7.26 -3.30 -7.26 -7.26 5 -0.45 -6.93 -2.97 -6.93 -6.93 6 -0.45 -6.93 -2.97 -6.93 -6.93 Design=Horiz. Component LONGITUDINAL ot-i^*^ 7' 1 Fr HA ^' Fr r- 3^0"^ j?o ^)0 i^Fux FT lie-FT C?,>A;Q ^PLXFT ^•-6" OT^ - IS". XI^^'Fr ^ 375^/^6«^8 C?Tr^- / jt: T 6' - or*-^^ "2.'^. I k- -Fr $~<2,7' U)AtC • g,iA.&/OA yxsrA- ^ c?r^ - /L IM 'Fr JIFS = 3.1 K - FT T^ I-^U^^ HC^IA-U a^e% - K'Fr r- -Lib ^±!^i2Jlit^tr i^S = )l:>,Oj6-Fr r-t^6 ^^g/OQ ^<^LXFT •f^lA^£^^ A V XStA - O - ' FT Qy^-' XO. ^ k -FT i^feS- !S"^^FY- T- HSO*" ji»/0(9 IAPLX. FT ]CircK€/o: C3-<LO^ C7V^S^ ^ XGO^A/' ^ ) ^/O*/ [H ;^es = lA 1^ -Fr T-7^1* H C)IAX (s) ixxq^/^' ^ ^^os PROJECT: STRUCTURAL CALCULATIONS 51^6-/0 A i/X5>r"A STRUCTURAL ENGINEER i3 DESIGN ASSUMPTIONS: CONCRETE STRENGTH AT TWENTY EIGHT DAYS: MASONRY: GRADE "N" CONCRETE BLOCK F ' MORTAR: TYPES 1,800 PSI GROUT: 2000 PSI REINFORCING STEEL: A-615 PS\ PSI STRUCTURAL STEEL: A-36 TIMBER: DOUGLAS FIR-LARCH JOISTS BEAMS AND POSTS STUDS SEISMIC CATEGORY: GRADE 40: GRADE 60: #4 AND LESS (U.O.N.) #5 AND LARGER #2 #2 STUD OR BETTER REPORT BY: WIND FORCE: DESIGN LOADS: ROOF DEAD LOAD SLOPED ROOFING PLYWOOD JOISTS INSUL. & CLG. MISC. REPORT NO.: TOTAL /=>SF ROOF LIVE LOAD 20 PSF FLAT FLOOR DEAD LOAD FLOORING PLYWOOD JOISTS INSUL. & CLG. MISC. TOTAL SOIL PRESSURE: FLOOR LIVE LOAD INTERIOR BALCONY WALKWAY WALL DEAD LOAD INTERIOR EXTERIOR 10 PSF 16 PSF 40 PSF 60 PSF (U.O.N.) 100 PSF These calculations are limited only to tfie items included herein, selected by the client and do not imply approval of any other portion of the structure by this office. These calculations are not valid if altered in any way, or not accompanied by a wet stamp and signature of the Engineer of Record. Job No. Designed By Date 14288 Danielson St. • Suite 200 • Poway, CA 92064 • (858) 679-89 989 • Fax (858) 679-8959 i 6- fSF - ^36yi^^^ ^5x*v^ (^l/v€^a(F vxSTA - Li_ - Ho f^SF /Hx 3a%^'FT KS£ H"T3XXIOC^I^ZO.C. 7^X* ^- FT i^-- xq^l^ iA^^- Ho 16.*-FT jC- X3^0^ S^ea- 7<^^ CA S Hx(o M - / O 7 ^ - F T 6M,£/0A x/xsrA- X^€?^ IIW^TA'^ "SV^.^ 16. /^Si^ 6>/Ae/OA VXSTA- IX' •^^ IS' K}^ ^S'M\(.7.SV WOT*/ is AJTot^^t Fox LOA Dxsr^re>t^rxoAj: VO^- 16? +XiX= X6> PSF IfJp ^ H f/O f P^F ^OO F n L o s^ ^/ 3. 03> /^SF 6C? — 8sW /oo 7. PSF ^ou; /Loo F : 3>-Xo PSF (S o V/ eii->^ G c M £ etc.: /*L.F 6K£AJA ^XS ' ^'^ D-f^" l7.X|c-^FT R-es- X''fF-i=^r HTK HOROWITZ TAYLOR KUSHKAKI PROJECT CLIENT JOB NO. Buena Vista DATE: 01/27/11 s T ? u C N = £ ,? S WIND DESIGN ASCE 7-05 IBC 2006 INPUT DATA Exposure category (B, C or D) Importance factor, pg 77, (0.87, 1.0 or 1.15) Basic wind speed (IBC Tab 1609.3.1 Vjs) Topographic factor (Sec.6.5.7.2, pg 26 & 45) Building height to eave Building height to ridge Roof Pitch (3-12) Least Horizontal Dimension Alternate Basic Load Factor ANALYSIS Velocitv pressure B= u = B 1.00 85 1 19 10.5 3.5 27 1 mph ft ft /12 ft qh = 0.00256 Kh K^K^V^ where: 11.01 psf qh = velocity pressure at mean roof height, h. (Eq. 6-15, page 27) Kh = velocity pressure exposure coefficient evaluated at height, h, (Tab. 6-3, Case 1 ,pg 79) = wind directionality factor. (Tab. 6-4, for building, page 80) h = mean roof height Design pressures for MWFRS P = qh[{G Cp,)-(G Cpi)] 0.70 0.85 14.75 OK where: Note p = pressure in appropriate zone. (Eq. 6-18, page 28). G Cpf = product of gust effect factor and external pressure coefficient, see table below. (Fig. 6-10, page 53 & 54) G Cpi = product of gust effect factor and internal pressure coefficient.(Fig. 6-5, Enclosed Building, page 47) = 0.18 or -0.18 a = width of edge strips, Fig 6-10, note 9, page 54, = 3.00 ft negative pressures are away from surface face Pressures (psf), Basic Load Cases Roof angle 9 = 16.26 Surface G Cpf Net Pressure with (+GCpi) (-GCpi) Max Design 1 0.56 4.18 8.14 8.14 8.14 2 0.21 0.33 4.29 4.29 1.20 3 -0.43 -6.71 -2.75 -6.71 -1.88 4 -0.37 -6.05 -2.09 -6.05 -6.05 IE 0.69 5.61 9.57 9.57 9.57 2E 0.27 0.99 4.95 4.95 1.39 3E -0.53 -7,81 -3.85 -7.81 -2.19 4E -0.48 -7.26 -3.30 -7.26 -7.26 5 -0.45 -6.93 -2.97 -6.93 -6.93 6 -0.45 -6.93 -2.97 -6.93 -6.93 Design=Horiz. Component TRANSVERSE LONGITUDINAL (p' - c?T/^ - 6 X F ' F r ^ I */, [9] oT/n- 1^-FT /^^S- 7.7/^'/=r T- t^zxo^ /HST<X $X^^) (3) ^HXSVKP.S)^^^^ - 1^7^^//-^'- ^es^ HA ' Fr X= 3XO* ^0 AJO i/^ur FT P coo/x r (7) ^^.^oVsyNl 5Xd^ OT^ ^ F -Fr *eL6S-- X, It-Fr <?^/0Q ^AL^X FT (2) ^^x£j* F6^.O^\(I)(^H'I^ ^ (^.zoVayiH^- Hzs^Vnx^' CPT*^- / ^ -FT =^ XSax^//V-' M16=^/' 13 6' - or«-L- Z"^. I 1^ -pr g>^^^A KXsrA- - iXl S'^/fo' ~ 1-^x^A fTj Or^^ \0, ^ /c- -F T (0 ^bXoVs:sU^a\ +C-5XoU^)^^3) - n Sx^/xs':. ^id^/' )3 (pr*^ s jo. ^F X^r , ,,,, ., ^r*^ - i6',6 k-- Fr A>(A,eT->A VXSTA- 7 SST IM o r*^ ' Off AT ^ CHF.ISTIAN WHEELER ENGINEEFIING REPORT OF PRELIMINARY GEOTECHNICAL INVESTIGATION PROPOSED BUENA VISTA WAY RESIDENCE 1099 BUENA VISTA WAY CARLSBAD, CALIFORNIA SUBMITTED TO RICHARD SMENUD C/O MARTIN VOLK 568 COMPASS ROAD OCEANSIDE, CALIFORNIA 92054 I SUBMITTED BY CHRISTIAN WHEELER ENGINEERING 3980 HOME AVENUE SAN DIEGO, CALIFORNIA 92105 3980 Home Avenue -f San Diego, CA 92105 619-550-1700 May 28, 2010 W CHRISTIAN WHEELER ENGINEERING Richard Smenud c/o Martin Volk 568 Compass Road Oceanside, Califomia 92054 CWE 2100122.01 SUBJECT: REPORT OF GEOTECHNICAL INVESTIGATION, PROPOSED BUENA VISTA WAY RESIDENCE, 1099 BUENA VISTA WAY, CARLSBAD, CALIFORNIA Dear Mr. Smenud: In accordance with your request, and ovir proposal and agreement dated February 15, 2010, we have completed a geotechnical investigation for the subject project. We are presenting herewith a report of our findings and recommendations. As encountered in our investigation, the site is underlain by potentially compressible fill/topsoil deposits extending to a maximum depth of about V/i feet. In order to mitigate this condition, it is recommended that the compressible materials be removed and replaced as compacted fill. If you have questions after reviewing this report, please do not hesitate to contact our office. This opportunity to be of professional service is sincerely appreciated. Respectfully submitted, CHRISTIAM WHEELER ENGINEERING Charles H. Christian, RGE #00215 CHC:CRB:DBA Distflbution: (6) Submitted 3980 Home Avenue -f San Di Curtis R. Burdett, CEG #1090 •f 619-550-1700 4- FAX 619-55 TABLE OF CONTENTS PAGE Introduction and Project Description 1 Project Scope 2 Findings 3 Site Description 3 General Geology and Subsurface Conditions 3 Geologic Setting and Soil Description 3 Artificial FiU/Topsoil 3 Old Paralic Deposits 3 Groundwater 3 Tectonic Setting 4 Geologic Hazards 4 Seismic Design Factors 4 Landslide Potential and Slope Stability 5 liquefaction 5 Flooding 5 Tsxanamis 5 Seiches 5 Conclusions 6 Recommendations 6 Grading and Earthwork 6 General 6 Pregrade Meeting 6 Observation of Grading 6 Site Preparation 7 Removal Limits 7 Imported Fill 7 Excavation Characteristics 7 Processing of Fill 7\reas 7 Compaction and Method of Filling 7 Surface Drainage 8 Foundations 8 General 8 Dimensions 8 Bearing Capacity 8 Foundation Reinforcement 8 Lateral Load Resistance 9 Expansive Characteristics 9 Settlement Characteristics 9 Foundation Plan Review 9 Foundation Excavation Observation 9 Soluble Sulfates 9 On-Grade Slabs 10 Interior Floor Slabs 10 Under-Slab Vapor Retarders 10 Exterior Concrete Flatwork. 11 Earth Retaining Structures 12 CWE 2100122.01 Proposed Buena Vista Way Residence 1099 Buena Vista Way, Carlsbad, Califomia TABLE OF CONTENTS (Continued) PAGE Foundations 12 Passive Pressure 12 Active Pressure 12 Waterproofing and Subdrain 12 Backfill 12 Limitations 12 Review, Observation and Testing 12 Uniformity of Conditions 13 Change in Scope 13 Time Limitations 13 Professional Standard 14 Client's Responsibility 14 Field Explorations 14 Laboratory Testing 15 ATTACHMENTS FIGURES Figure 1 Site Vicinity Map, Follows Page 1 PLATES Plates 1 Site Plan & Geologic Map Plates 2-5 Test Pit Logs Plate 6 Laboratory Test Results Plate 7 Subdrain Detail APPENDICES Appendix A References Appendix B Recommended Grading Specifications-General Provisions CWE 2100122.01 Proposed Buena Vista Way Residence 1099 Buena Vista Way, Carlsbad, Califomia REPORT OF GEOTECHNICAL INVESTIGATION PROPOSED BUENA VISTA WAY RESIDENCE 1099 BUENA VISTA WAY CARLSBAD. CALIFORNIA INTRODUCTION AND PROJECT DESCRIPTION This report presents the results of a geotechnical investigation performed for a proposed single- family residence to be located at 1099 Buena Vista Way, in the city of Carlsbad, Califomia. The following Figure Number 1 presents a site vicinity map showing the location of the property. We understand that the proposed project will consist of the constmction of a single-family residential stmcture, and an attached accessory dwelling unit. The residence will be a two-story, wood-fi:ame stmcture with an on-grade concrete floor slab; the accessory building will be a single-story stmcture with an on-grade concrete floor slab. We expect that both stmctures will be supported by conventional shallow foundations. A retaining wall, less than four feet in height, is proposed along the eastem property line. Grading is expected to consist of cuts and fills of less than about three to five feet from existing grades. To assist in the preparation of this report, we were provided with a civil design plan of unknown origin, dated April 27, 2010. A copy of said plan was used as the base for our Site Plan and Geotechnical Map, which is included herewith as Plate Number 1. This report has been prepared for the exclusive use of Richard Smenud and his design consultants for specific application to the project described herein. Should the project be changed in any way, the modified plans should be submitted to Christian Wheeler Engineering for review to determine their conformance with our recommendations and to determine whether any additional subsurface investigation, laboratory testing and/or recommendations are warranted. Our professional services have been performed, our findings obtained, and our recommendations prepared in accordance with generally accepted engineering principles and practices. This warranty is in lieu of all other warranties, express or implied. SITE VICINITY MAP (Adapted from Thomas Brothers Maps) PROPOSED BUENA VISTA WAY RHSinHNCH 1099 BUENA VTSTA WAY CARLSBAD. CALIFORNIA i North SITE CWE 2100122.01 CWE 2100122.01 May 28, 2010 Page No. 2 PROJECT SCOPE The scope of our preliminary investigation included: surface reconnaissance, subsurface exploration, obtaining representative soil samples, laboratory testing, analysis of the field and laboratory data and review of relevant geologic literature. Our scope of service did not include assessment of hazardous substance contamination, recommendations to prevent floor slab moisture intmsion or the formation of mold within the stmcture, evaluation or design of storm water infiltration facilities, or any other services not specifically described in the scope of services presented below. More specifically, the intent of this investigation was to: a) Explore the near-surface soil conditions of the site; b) Evaluate, by laboratory tests and our past experience with similar soil types, the engineering properties of the various strata that may influence the proposed constmction, including bearing capacities, expansive characteristics and settiement potential; c) Describe the general geology at the site including possible geologic hazards that could have an effect on the proposed constmction, and provide seismic design parameters as required by the 2007 edition of the Califomia Building Code; d) Address potential constmction difficulties that may be encountered due to soil conditions, groundwater or geologic hazards, and provide recommendations concerning these problems; e) Develop soil engineering criteria for site preparation and grading; £) Recommend an appropriate foundation system for the type of constmction anticipated and develop soil engineering design criteria for the recommended foundation design; g) Present our professional opinions in this written report, which includes, in addition to our conclusions and recommendations, a plot plan, exploration logs and a summary of the laboratory test results. CWE 2100122.01 May 28, 2010 Page No. 3 FINDINGS SITE DESCRIPTION The subject site is a nearly rectangular shaped parcel of land located at 1099 Buena Vista Way, in the city of Carlsbad. The site is bounded on the south by Buena Vista Way, and is otherwise surrounded by single family residential properties. The property is vacant at this time, but appears to once have supported a single- family home and associated improvements. The relatively flat lot is about 67 feet wide and 150 feet deep. Topographically, the site slopes gentiy to the northeast, with elevations ranging from about 74*72 feet mean sea level (MSL) at the southwestern comer to elevation 70 feet MSL at the northeastern comer. GENERAL GEOLOGY AND SUBSURFACE CONDITIONS GEOLOGIC SETTING AND SOIL DESCRIPTION: The subject site is located witiiin die Coastal Plains Phjrsiographic Province of San Diego County. Based on our subsurface explorations, and analjrsis of readily available pertinent geologic literature, the area of the site investigated was found to be underlain by undifferentiated artificial fill and topsoil, and old paralic deposits. Each of these units is discussed below in order of increasing age. ARTIFICIAL FILL/TOPSOIL: The site is underlain by a diin layer of undifferentiated fill/topsoil extending, where exposed, to a maximum depth of about 1 Va feet below existing grade. The fill is the result of recent grading associated with the demolition of the residential stmcture and associated improvements that previously occupied the property. These materials consist of grayish-brown, dry to damp, loose, silty sand (SM). The fill/topsoil materials were judged to possess a very low expansion index (EK20). OLD PARALIC DEPOSITS (Qop): Old paralic deposits, locally referred as terrace deposits, underlie the surficial soils. These deposits consist of orangish-brown, moist, medium dense to dense, silty sands (SM). The formational soils were judged to possess a very low expansion index (EK20). GROUNDWATER: No groundwater was encountered in our subsurface explorations. However, it should be recognized that minor groundwater seepage problems might occur after constmction and landscaping at a site even where none were present before constmction. These are usually minor phenomena and are often the result of an alteration in drainage patterns and/or an increase in irrigation water. Based on the anticipated constmction and landscaping, it is our opinion that any seepage problems that may occur will be minor in CWE 2100122.01 May 28, 2010 Page No. 4 extent. It is fiirther our opinion that these problems can be most effectively corrected on an individual basis if and when they occur. TECTONIC SETTING: No active or potentially active faults are known to traverse the subject site. However, it should be noted that much of Southern Califomia, including the San Diego County area, is characterized by a series of Quatemary-age fault zones that consist of several individual, en echelon faults that generally strike in a northerly to northwesterly direction. Some of these fault zones (and the individual faults within the zone) are classified as "active" according to the criteria of the Califomia Division of Mines and Geology. Active fault zones are those that have shown conclusive evidence of faulting during the Holocene Epoch (the most recent 11,000 years). The Division of Mines and Geology used the term "potentially active" on Earthquake Fault Zone maps until 1988 to refer to all Quatemary-age (last 1.6 million years) faults for the purpose of evaluation for possible zonation in accordance with the Alquist-Priolo Earthquake Fault Zoning Act and identified all Quatemary-age faults as "potentially active" except for certain faults that were presumed to be inactive based on direct geologic evidence of inactivity during all of Holocene time or longer. Some faults considered to be "potentially active" would be considered to be "active" but lack specific criteria used by the State Geologist, such as sufficiently active and mil-defined. Faults older than Quatemary-age are not specifically defined in Special Publication 42, Fault Rupture Hazard Zones in Califomia, published by the CaUfomia Division of Mines and Geology. However, it is generally accepted that faults showing no movement during the Quaternary period may be considered to be "inactive". The nearest active fault zone is the Newport-Inglewood Fault Zone located approximately IV2 kilometers to the west of the site. Other active fault zones in the region that could possibly affect the site include the Rose Canyon Fault Zone to the southwest, the Palos Verde and Coronado Bank Fault Zones to the northwest; the Elsinore, San Jacinto, and San Andreas Fault Zones to the northeast; and the Earthquake Valley Fault to the east. GEOLOGIC HAZARDS SEISMIC DESIGN FACTORS: A likely geologic hazard to affect the site is ground shaking as a result of movement along one of the major active fault zones mentioned above. The fault most likely to have a significant effect on the site is the Newport-Inglewood Fault, located about IV2 kilometers to the west of the site. The seismic design factors applicable to the subject site are provided below. The seismic design factors were determined in accordance with the 2007 Califomia Building Code. The site coefficients and adjusted maximum considered earthquake spectral response acceleration parameters are presented herein: CWE 2100122.01 May 28, 2010 Page No. 5 Site Coordinates: Latitude Longitude 33.169° -117.347° Site Class D Site Coefficient Fa 1.0 Site Coefficient Fv 1.513 Spectral Response Acceleration at Short Periods Ss 1.293 g Spectral Response Acceleration at 1 Second Period Si 0.487 g SMS=FaSs 1.293 g SMI=FVSI 0.737 g SDS=2/3*SMS 0.862 g SDI=2/3*SMI 0.491 g Probable ground shaking levels at the site could range from slight to moderate, depending on such factors as the magnitude of the seismic event and the distance to the epicenter. It is likely that the site wiQ experience the effects of at least one moderate to large earthquake during the life of the proposed improvements. LANDSLIDE POTENTIAL AND SLOPE STABILITY: As part of diis investigation we reviewed the publication, "Landslide Hazards in the Northern Part of the San Diego Metropolitan Area" by Tan, 1995. This reference is a comprehensive study that classifies San Diego County into areas of relative landslide susceptibility. According to this publication, the majority of the site is located in Relative Landslide Susceptibility vVrea 3-1, which is classified as "generally susceptible" to landsliding. Based on the lack of significant slopes within the site vicinity, it is our opinion that the site potential for landsliding is negligible. LIQUEFACTION: The near-surface soils encountered at the site possess a low risk potential for liquefaction due to such factors as soil density, grain-size distribution and the absence of a regional shallow groundwater condition. FLOODING: The site is located outside of the boundaries of both the 100-year and 500-year flood zones. TSUNAMIS: Tsunamis are great sea waves produced by submarine earthquakes or volcanic emptions. The site is not subject to risk firom tsunamis. SEICHES: Seiches are periodic oscillations in large bodies of water such as lakes, harbors, bays or reservoirs. The site will not be affected by seiches. CWE 2100122.01 May 28, 2010 Page No. 6 CONCLUSIONS It is our professional opinion and judgment that no geotechnical conditions exist on or in the general vicinity of the subject property that would preclude the constmction of the proposed residential project, provided the recommendations presented herein are followed. The main geotechnical condition affecting the subject project is the presence of a relatively thin layer of potentially compressible fill and topsoil. Where encountered, these materials were nbted to extend to a maximum depth of about IV2 feet below existing grade. These deposits are considered unsuitable, in their present condition, for the support of settiement-sensitive improvements. In order to mitigate this condition, it is recommended that these materials be removed and replaced as compacted fill. The site is located in an area that is relatively free of geologic hazards that wiU have a significant effect on the proposed constmction. The most likely geologic hazard that could affect the site is ground shaking due to seismic activity along one of the regional active faults. However, constmction in accordance with the requirements of the most recent edition of the Califomia Building Code and the local governmental agencies should provide a level of life-safety suitable for the type of development proposed. RECOMMENDATIONS GRADING AND EARTHWORK GENERAL: All grading should conform to the guidelines presented in Appendix} of the Califomia Building Code, the minimum requirements of the City of Carlsbad, and the Recommended Grading Specifications and Special Provisions attached hereto as Appendix B, except where specificaEy superseded in the text of this report. PREGRADE MEETING: It is recommended that a pre-grade meeting, including the grading contractor and a representative from Christian Wheeler Engineering be held, to discuss the recommendations of this report and address any issues that may affect grading operations. OBSERVATION OF GRADING: Continuous observation by the Geotechnical Consultant is essential during the grading operation to confirm conditions anticipated by our investigation, to allow adjustments in design criteria to reflect actual field conditions exposed, and to determine that the grading proceeds in general accordance with the recommendations contained herein. CWE 2100122.01 May 28, 2010 Page No. 7 SITE PREPARATION: Site preparation should begin with the removal of any vegetation and deleterious matter. Existing fill and topsoil materials underlying all areas to receive settiement-sensitive improvements (including exterior flatwork) should be removed to expose competent formational deposits. Based on our findings, the maximum estimated removal depth is about IV2 feet below existing grade. However, deeper removals may be necessary in areas of the site not investigated. Actual removal depths will be determined by our project geologist, engineer or technician supervisor during site preparation. The bottoms of all excavations should be approved by our representative prior to placing fills or constmcting improvements, and all areas to receive fill should be processed as described below in the "Processing of Fill Material" section of this report. REMOVAL LIMITS: Removal of unsuitable soils should extend at least five feet beyond the perimeter of the proposed settiement-sensitive improvements, including exterior flatwork, or property lines, whichever is less. IMPORTED FILL: Imported fill may be necessary for the subject project. Imported fill should consist of nondetrimentally expansive (Expansion Index less than 50) sands, silty sands and silty sands with clay. Imported soils should be approved by this office prior to delivery to the site. A minimum 72-hour advance notice is required to allow for laboratory testing required for proper evaluation. EXCAVATION CHARACTERISTICS: It is anticipated that proposed excavations will be achieved utilizing conventional grading equipment in good working order. PROCESSING OF FILL AREAS: Prior to placing any new fill soils or constmcting any new improvements in areas that have been cleaned out and approved to receive fill, the exposed soils should be scarified to a depth of 12 inches, moisture-conditioned, and compacted to at least 90 percent relative compaction. COMPACTION AND METHOD OF FILLING: All fill soils placed at die site should be compacted to a relative compaction of at least 90 percent of maximum dry density as determined by ASTM Laboratory Test D1557. Fills should be placed at or slightiy above optimum moisture content, in lifts six to eight inches thick, with each lift compacted by mechanical means. Fills should consist of approved earth material, free of trash or debris, roots, vegetation, or other materials determined to be unsuitable by our soil technicians or project geologist. Fill material should be free of rocks or lumps of soil in excess of six inches in maximum dimension. However, in the upper two feet of pad grade, no rocks or lumps of soil in excess of three inches should be allowed. CWE 2100122.01 May 28, 2010 Page No. 8 SURFACE DRAINAGE: The drainage around the proposed improvements should be designed to collect and direct siarface water away from proposed improvements toward appropriate drainage facilities. Rain gutters with downspouts that discharge mnoff away from the stmcture and the top of slopes into controlled drainage devices are recommended. The ground around the proposed improvements should be graded so that surface water flows rapidly away from the improvements without ponding. In general, we recommend that the ground adjacent to stmctures be sloped away at a minimum gradient of two percent. Densely vegetated areas where runoff can be impaired should have a minimum gradient of five percent for the first five feet from the stmcture. FOUNDATIONS GENERAL: Based on our findings, it is our opinion that the proposed improvements may be supported on conventional shallow footings. The following recommendations are considered the minimum based on soil conditions and are not intended to be lieu of stmctural considerations. All foundations should be designed by a qualified stmctural engineer. DIMENSIONS: Conventional footings supporting the main stmcture should have a minimum embedment depth of 18 inches below lowest adjacent finish grade. Continuous and isolated footings should have a minimum width of 15 inches and 24 inches, respectively. Footings to support the proposed accessory building, and miscellaneous exterior improvements may be 12 inches deep and 12 inches wide. However, footings for retaining walls should have a minimum depth and width of 18 inches and 24 inches, respectively. BEARING CAPACITY: Continuous footings with minimum dimensions equal to 12 inches in depth and width may be designed for an allowable soil bearing pressure of 2,000 pounds per square foot. This value may be increased by 600 pounds per square foot for each additional foot of embedment and 400 pounds per square foot for each additional foot of width up to a maximum of 4,000 pounds per square foot. The bearing value may also be increased by one-third for combinations of temporary loads such as those due to wind or seistnic loads. FOUNDATION REINFORCEMENT: The project stmctural engineer should provide foundation reinforcement recommendations. However, based on the anticipated soil conditions, we recommend that the minimum reinforcing for continuous footings should consist of at least one No. 5 bars positioned near the bottom of the footing and one No. 5 bars positioned near the top of the footing. CWE 2100122.01 May 28, 2010 Page No. 9 LATERAL LOAD RESISTANCE: Lateral loads against foundations may be resisted by friction between the bottom of the footing and the supporting soil, and by the passive pressure against the footing. The coefficient of friction between concrete and soil may be considered to be 0.35. The passive resistance may be considered to be equal to an equivalent fluid weight of 350 pounds per cubic foot. This pressure may be increased one- third for seismic loading. This assumes the footings are poured tight against undisturbed soil. If a combination of the passive pressure and friction is used, the friction value shoxild be reduced by one-third. EXPANSIVE CHARACTERISTICS: The foundation soils were found to have a low expansive potential (EI < 50). The foundation recommendations presented in this report reflect this condition. SETTLEMENT CHARACTERISTICS: The anticipated total and differential foundation settiement is expected to be less than about 1 inch and 1 inch over 40 feet respectively, provided the recommendations presented in this report are followed. It should be recognized that minor cracks normally occur in concrete slabs and foundations due to shrinkage during curing or redistribution of stresses, therefore some cracks should be anticipated. Such cracks are not necessarily an indication of excessive vertical movements. FOUNDATION PLAN REVIEW: The foundation plans should be submitted to tiiis office for review in order to ascertain that the recommendations of this report have been implemented, and that no additional recommendations are needed due to changes in the anticipated constmction. FOUNDATION EXCAVATION OBSERVATION: All footing excavations should be observed by Christian Wheeler Engineering prior to placing reinforcing steel to determine if the foundation recommendations presented herein are followed and that the foundation soils are as anticipated in the preparation of this report. All footing excavations should be excavated neat, level, and square. All loose or unsuitable material should be removed prior to the placement of concrete. SOLUBLE SULFATES The water soluble sulfate content of a randomly selected soil sample from the site was determined in accordance with Califomia Test Method 417. The results of this test indicate that the representative soil sample had a soluble sulfate content of 0.075 percent. Soils with a soluble sulfate content of less than 0.1 percent are considered to be negligible and no special recommendations are considered necessary for this condition. Nevertheless, Type II modified Portiand cement is recommended for concrete in contact with soil. CWE 2100122.01 May 28, 2010 Page No. 10 ON-GRADE SLABS INTERIOR FLOOR SLABS: When considered necessary due to loading conditions, the on-grade floor slabs should be designed by a stmctural engineer. However, from a geotechnical perspective, we recommend that the minimum floor slab thickness should be at least foxor inches (actual) and all floor slabs be reinforced with at least No. 3 reinforcing bars placed at 18 inches on center each way. Slab reinforcement should be supported on chairs such that the reinforcing bars are positioned at mid-height in the floor slab. The slab reinforcement should extend into the perimeter grade beams or foundations at least six inches. UNDER-SLAB VAPOR RETARDERS: Steps should be taken to minimize tiie transmission of moisture vapor firom the subsoil through the interior slabs where it can potentially damage the interior floor coverings. Local industry standards typically include the placement of a vapor retarder, such as plastic, in a layer of coarse sand placed directiy beneath the concrete slab. In this case, two inches of sand and two inches of sand are considered appropriate above and below the plastic, respectively. The vapor retarder should be at least 15- mil plastic with sealed seams and should extend at least 12 inches down the sides of the interior and perimeter footings. The sand shovild have a sand equivalent of at least 30, and contain less than 20% passing the Number 100 sieve and less than 10% passing the Number 200 sieve. Although the system described above has historically performed adequately, national standards for the installation of vapor retarders below interior slabs are changing as evidenced in currentiy published standards including ACI 302, "Guide to Concrete Floor and Slab Constmction" and ASTM E1643, "Standard Practice for Installation of Water Vapor Retarder Used in Contact with Earth or Granular Fill Under Concrete Slabs". Rather than placing the vapor retarder between the two sand layers, both of these standards recommend placing the sand capillary break layer onto the subgrade with a vapor retarder placed above the sand and the concrete placed directiy onto the vapor retarder. There are advantages and disadvantages to each of these installation procedures. An advantage to placing concrete directiy onto a vapor retarder is that it eliminates the layer of sand between the slab and vapor retarder. This layer of sand typically contains moisture prior to the placement of concrete and can receive more moisture during the curing and constmction processes. This moisture can be retained in the sand layer for an extended period of time until the concrete moisture decreases to the point at which the excess sand moisture is absorbed by the concrete and transmitted up through the slab. This process can take many months depending upon the environmental conditions. CWE 2100122.01 May 28, 2010 Page No. 11 One disadvantage to placing concrete directiy onto a vapor retarder is that removing the sand layer from directiy beneath the concrete restricts the ability of the concrete to lose moisture on both the top and bottom surfaces during the initial curing period. Variations in the drying rate between the top and bottom surfaces can result in increased concrete cracking, curling, and other finishing issues. The drying rate differences and their potential side effects can be minimized, however, with suitable finishing and curing procedures. Recognizing the stated benefits and limitations of these standard below-slab vapor retarder systems, the owner and designer should select the system that they believe is most suitable for this project considering the constmction schedule and planned floor coverings. It should be understood that neither of the described systems provides a "waterproof barrier". It should also be understood that slab concrete contains free water and should be allowed to reach equilibrium in an environment similar to that anticipated in the completed stmcture prior to installing floor coverings. We recommend that the flooring installer perform standard moisture vapor emission tests prior to the installation of all moisture-sensitive floor coverings in accordance with ASTM F1869 "Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride". EXTERIOR CONCRETE FLATWORK: Exterior concrete slabs on grade should have a minimum thickness of four inches and should be reinforced with at least No. 3 bars placed at 18 inches on center each way (ocew). Driveway slabs should have a minimum thickness of 5 inches and be reinforced with at least No. 4 bars placed at 18 inches ocew. Driveway slabs should be provided with a 12-inch-deep thickened edge. All slabs should be provided with weakened plane joints in accordance with the American Concrete Institute (ACI) guidelines. Altemative pattems consistent with ACI guidelines can also be used. A concrete mix with a 1-inch maximum a^regate size and a water/cement ratio of less than 0.6 is recommended for exterior slabs. Lower water content will decrease the potential for shrinkage cracks. Consideration should be given to using a concrete mix for the driveway that has a minimum compressive strength of 3,000 pounds per square inch. This suggestion is meant to address early driveway use prior to fiill concrete curing. Both coarse and fine aggregate should conform to the latest edition of the "Standard Specifications for Public Works Constmction" ('Greenbook"). Special attention should be paid to the method of concrete curing to reduce the potential for excessive shrinkage and resultant random cracking. It should be recognized that minor cracks occur normally in concrete slabs due to shrinkage. Some shrinkage cracks should be expected and are not necessarily and indication of excessive movement or stmctural distress. CWE 2100122.01 May 28, 2010 Page No. 12 EARTH RETAINING STRUCTURES FOUNDATIONS: Foundations for proposed retaining walls should be constmcted in accordance with the recommendations for shallow foundations presented previously in this report. PASSIVE PRESSURE: The passive pressure for the design of sliding resistance for the proposed retaining wall footings may be considered to be 350 pounds per square foot per foot of depth. This pressure may be increased one-third for seismic loading. The coefficient of friction for concrete to soil may be assumed to be 0.35 for the resistance to lateral movement. When combining factional and passive resistance, the friction should be reduced by one-third. ACTIVE PRESSURE: The lateral soil pressure for the design of unrestrained earth retaining stmctures with level backfill may be assumed to be equivalent to the pressure of a fluid weighing 38 pounds per cubic foot. This pressure does not consider any other surcharge. If any are anticipated, this office should be contacted for the necessary increase in soil pressure. These values are based on a drained, non-detrimentally expansive (EK50), granular backfill condition. Proposed retaining walls associated with this project will be less than four feet in height. Therefore, it is our opinion that seismic lateral earth pressures may not be considered for the design of said retaining walls. WATERPROOFING AND SUBDRAIN: Waterproofing details should be provided by die project architect. A suggested wall subdrain detail is provided on Plate No. 7. We recommend that the Geotechnical Consultant observe all retaining wall subdrains to verify placement. BACKFILL: All backfill soils should be compacted to at least 90 percent relative compaction. Expansive or clayey soils should not be used for backfill material. The wall should not be backfilled until the masonry has reached an adequate strength. LIMITATIONS REVIEW, OBSERVATION AND TESTING The recommendations presented in this report are contingent upon our review of final plans and specifications. Such plans and specifications should be made available to the geotechnical engineer and CWE 2100122.01 May 28, 2010 Page No. 13 engineering geologist so that they may review and verify their compliance with this report and with the Califomia Building Code. It is recommended that Christian Wheeler Engineering be retained to provide continuous soil engineering services during the earthwork operations. This is to verify compliance with the design concepts, specifications or recommendations and to allow design changes in the event that subsurface conditions differ from those anticipated prior to start of constmction. UNIFORMITY OF CONDITIONS The recommendations and opinions expressed in this report reflect our best estimate of the project requirements based on an evaluation of the subsurface soil conditions encountered at the subsurface exploration locations and on the assumption that the soil conditions do not deviate appreciably from those encountered. It should be recognized that the performance of the foundations and/or cut and fill slopes may be influenced by undisclosed or unforeseen variations in the soil conditions that may occur in the intermediate and unexplored areas. Any unusual conditions not covered in this report that may be encountered during site development should be brought to the attention of the geotechnical engineer so that he may make modifications if necessary. CHANGE IN SCOPE This office should be advised of any changes in the project scope or proposed site grading so that we may determine if the recommendations contained herein are appropriate. This should be verified in writing or modified by a written addendum. TIME LIMITATIONS The findings of this report are valid as of this date. Changes in the condition of a property can, however, occur with the passage of time, whether they be due to natural processes or the work of man on this or adjacent properties. In addition, changes in the Standards-of-Practice and/or Govemment Codes may occur. Due to such changes, the findings of this report may be invalidated wholly or in part by changes beyond our control. Therefore, this report should not be relied upon after a period of two years without a review by us verifying the suitability of the conclusions and recommendations. CWE 2100122.01 May 28, 2010 Page No. 14 PROFESSIONAL STANDARD In the performance of our professional services, we comply with that level of care and skill ordinarily exercised by members of our profession currentiy practicing under similar conditions and in the same locality. The client recognizes that subsurface conditions may vary from those encountered at the locations where our borings, surveys, and explorations are made, and that our data, interpretations, and recommendations be based solely on the information obtained by us. We will be responsible for those data, interpretations, and recommendations, but shall not be responsible for the interpretations by others of the information developed. Our services consist of professional consultation and observation only, and no warranty of any kind whatsoever, express or implied, is made or intended in connection with the work performed or to be performed by us, or by our proposal for consulting or other services, or by our fiimishing of oral or written reports or findings. CLIENT'S RESPONSIBILITY It is the responsibility of the client, or his representatives, to ensure that the information and recommendations contained herein are brought to the attention of the stmctural engineer and architect for the project and incorporated into the project's plans and specifications. It is further their responsibility to take the necessary measures to insure that the contractor and his subcontractors carry out such recommendations during constmction. FIELD EXPLORATIONS Four subsurface explorations were made on May 5, 2010 at the locations indicated on the attached Plate Number 1. These explorations consisted of hand-dug test pits. The fieldwork was conducted under the observation of our engineering geology personnel. The explorations were carefiilly lo^ed when made. The logs are presented on the following Plate Numbers 2 through 5. The soils are described in accordance with the Unified Soils Classification System. In addition, a verbal textural description, the wet color, the apparent moisture and the density or consistency are provided. The density of granular soils is given as very loose, loose, medium dense, dense or very dense. The consistency of silts or clays is given as either very soft, soft, medium stiff, stiff, very stiff, or hard. Relatively undisturbed chunk samples and bulk samples of the encountered earth materials were collected and transported to our laboratory for testing. CWE 2100122.01 May 28, 2010 Page No. 15 LABORATORY TESTING Laboratory tests were performed in accordance with the generally accepted American Society for Testing and Materials (ASTM) test methods or suggested procedures. A brief description of the tests performed is presented below: a) CLASSIFICATION: Field classifications were verified in the laboratory by visual examination. The final soil classifications are in accordance with the Unified Soil Classification System. b) MOISTURE-DENSITY: In-place moisture contents and dry densities of selected soil samples were detemiined in accordance with ASTM D 1188. The test results are summarized in the pit logs. c) MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT TEST: The maximum dry density and optimum moisture content of a selected soil sample were determined in accordance with ASTM D 1557, Method A. The results of this test are presented on Plate Number 6. d) DIRECT SHEAR TEST: A direct shear test was performed on a selected sample of the on-site soils in accordance with ASTM D 3080. The results of this test are presented on Plate Number 6. f) SOLUBLE SULFATES: The soluble sulfate content of a selected soil sample was determined in accordance with Califomia Test Method 417. The test results are presented on Plate Number 6. w CHRISTIAN WHEELER ENGINEERING REPORT OF GEOTECHNICAL INVESTIGATION PROPOSED BUENA VISTA WAY RESIDENCE 1099 BUENA VISTA WAY CARLSBAD. CALIFORNIA INTRODUCTION AND PROJECT DESCRIPTION This report presents the results of a geotechnical investigation performed for a proposed single- family residence to be located at 1099 Buena Vista Way, in the city of Carlsbad, Califomia. The following Figure Number 1 presents a site vicinity map showing the location of the property. We understand that the proposed project will consist of the constmction of a single-family residential stmcture, and an attached accessory dwelling unit. The residence will be a two-story, wood-frame stmcture with an on-grade concrete floor slab; the accessory building will be a single-story stmcture with an on-grade concrete floor slab. We expect that both stmctures will be supported by conventional shallow foundations. A retaining wall, less than four feet in height, is proposed along the eastem property line. Grading is expected to consist of cuts and fills of less than about three to five feet from existing grades. To assist in the preparation of this report, we were provided with a civil design plan of unknown origin, dated April 27, 2010. A copy of said plan was used as the base for our Site Plan and Geotechnical Map, which is included herewith as Plate Number 1. This report has been prepared for the exclusive use of Richard Smenud and his design consultants for specific application to the project described herein. Should the project be changed in any way, the modified plans should be submitted to Christian Wheeler Engineering for review to determine their conformance with our recommendations and to determine whether any additional subsurface investigation, laboratory testing and/or recommendations are warranted. Our professional services have been performed, our findings obtained, and our recommendations prepared in accordance with generally accepted engineering principles and practices. This warranty is in lieu of all other warranties, express or implied. 3980 Home Avenue San Diego, CA 92105 > 619-550-1700 -f FAX 619-550-1701 3+AV ai UJ Z ^ a: LU I U U » (J U n Q o S d CQ o O Z o IS: o < O Z Q LOG OF TEST PIT P-1 Date Excavated: 5/5/10 Logged by: Oh' [existing [''levation: 71 feet Proposed lilcvation: 74 feet Equipment: I land Tools Bucket Size: N/A Drive Weight: N/A Depth to Water: N/A Sample Type and Laboratory Test Legend Cal Modified Califomia Sampler SP'I Standard Penetration Test S r Shelby Tube (X ('hunk Sample DR Density Ring MD S04 SA IIA S1-; PI Ma.Kimum Density Soluble Sulfates Sieve Analysis i lydrometer Sand Equivalent I'lasticity Index DS Con F.I R-Val Chi Res Direct Shear ("onsolidation I^xpansion Index Resistance Value Soluble Chlondes :>H & Resistivity X Q Z g o CQ SUMMARY OF SUBSURFACE CONDITIONS (based on Unified Soil Classification System) 2 O z o o pq tn 71 -70 SM Artificial FiU/Topsoil (Oaf): Grayish-brown, damp, loose, SILTY SAND, fine to medium-grained, porous, with rootlets. SM •69 -68 Old Paralic Deposits ^Oop^: Orangish-brown, moist, medium dense, SILTY SAND, fine to medium-grained, slighdy weathered to 3 feet. At 3 feet becomes dense. CK 4.9 1048 •67 •66 CK 6.6 UI3.'; Test Pit terminated at 5 feet. No water or seepage encountered. Symbol Legend I (iroundwatcr ^ Apparent Seepage * No Sample Recovery "* NonrcprcscntaCivc Blow (^ount (rocks present) m CHRISTIAN WHEELER E N c. 1 N I-: i: R I N c; PROPOSED BUENA VISTA WAY RESIDENCE 1099 Buena Vista Way, Carlsbad, California Symbol Legend I (iroundwatcr ^ Apparent Seepage * No Sample Recovery "* NonrcprcscntaCivc Blow (^ount (rocks present) m CHRISTIAN WHEELER E N c. 1 N I-: i: R I N c; BY: DJF DATE: May 2010 Symbol Legend I (iroundwatcr ^ Apparent Seepage * No Sample Recovery "* NonrcprcscntaCivc Blow (^ount (rocks present) m CHRISTIAN WHEELER E N c. 1 N I-: i: R I N c; JOB NO.: 2100122 I'LATL; NO.: 2 LOG OF TEST PIT P-2 Date I'xcavated: 5/5/10 1 .ogged by: DF I''xisting I Elevation: 73.5 feet Proposed lUevation: 74 feet Equipment: Hand Tools Bucket Size: N/A Drive Weight N/A Depth to Water: N/A Sample Type and Laboratory Test Legend Cal Modified Califomia Sampler SP'I'Standard Penetration Test .S T Shelby Tube CK Chunk Sample DR Density Ring MD S()4 SA IIA S1-; PI Maximum Density Soluble Sulfates Sieve Analysis Hydrometer Sand Equivalent Plasticity Index DS C^on i:i R-Val Chi Res Direct Shear Consolidation 1-Apansion Index Resistance Value Soluble (Chlorides pi I & Resistivity z o i-l o CQ tn tn U tn P SUMMARY OF SUBSURFACE CONDITIONS (based on Unified Soil Classification System) z o h 5 ° is z o h o QQ tn 73.5 -72.5 SM Artificial Fill/Topsoil (Oaf): Cirayish-brown, damp, loose, SlLl'Y SAND, tine to medium-grained, porous, with rootlets. SM 71.5 Old Paralic Deposits (Oop): Orangish-brown, moist, medium dense to dense, SILTY SAND, fine to medium-grained, mottled, slighdy weathered to 2 feet. CK 7.4 121.4 70.5 Test Pit terminated at 3.5 feet. No water or seepage encountered. •69.5 •68.5 67.5 66.5 Symbol Legend I (iroundwater ^ Apparent Seepage * No Sample Recovery ** Nonrepresentative Ulow (^ount (rocks present) w CHRISTIAN WHEELER r. N c, i N i: i; R 1 N (i PROPOSED BUENA VISTA WAY RESIDENCE 1099 Buena Vista Way, Carlsbad, California Symbol Legend I (iroundwater ^ Apparent Seepage * No Sample Recovery ** Nonrepresentative Ulow (^ount (rocks present) w CHRISTIAN WHEELER r. N c, i N i: i; R 1 N (i BY: DJF DA TE: May 2010 Symbol Legend I (iroundwater ^ Apparent Seepage * No Sample Recovery ** Nonrepresentative Ulow (^ount (rocks present) w CHRISTIAN WHEELER r. N c, i N i: i; R 1 N (i JOB NO.: 2100122 PLATI'NO.: 3 LOG OF TEST PIT P-3 Date I'.xcavated: 5/5/10 Logged by: DF' F'.xisting l^levation: 73 feet Proposed Elevation: 74 feet Equipment: Hand Tools Bucket Sii!e: N/A Drive Weight; N/A Depth to Water: N/A Sample Type and Laboratory Test Legend f]al Modified (California Samplei SPl'Standard Penetration Test ST Shelby Tube CK ("hunk Sample DR Density Ring MD S04 SA HA SE PI Maximum Density- Soluble Sulfates Sieve Analysis I lydrometer Sand Equivalent Plasticitv Index DS (A)n i;i R-Val Chi Res Direct Shear Consolidation l^xpansion Index Resistance Value Soluble (Chlorides pi I & Resistivity z o 5.^ I-l o m tn SUMMARY OF SUBSURFACE CONDITIONS (based on Unified Soil Classification System) z o z H is z Z o it o 3S 73 -72 SM Artificial Fill/Topsoil (Oaf): Grayish-brown, damp, loose, Sll.'TY SAND, fine to medium-grained, porous, with rootlets. SM Old Paralic Deposits (Oop): Orangish-brown, moist, medium dense, SIl.lY' SAND, fine to medium-grained, moderately weathered to 2 feet. CK 4.0 11.3.8 Test Pit terminated at 3 feet. No water or seepage encountered. •69 •68 Svmbol Legend I (iroundwatcr ^ ;\pparcnt Seepage " No Sample Recovery ** Nonrepresentative Blow (]ount (rocks present) W CHRISTIAN WHEELER 1. N (. 1 N i; i; R 1 N c; PROPOSED BUENA VISTA WAY RESIDENCE 1099 Buena Vista Way, Carlsbad, California Svmbol Legend I (iroundwatcr ^ ;\pparcnt Seepage " No Sample Recovery ** Nonrepresentative Blow (]ount (rocks present) W CHRISTIAN WHEELER 1. N (. 1 N i; i; R 1 N c; BY: DJF' DATE: May 2010 Svmbol Legend I (iroundwatcr ^ ;\pparcnt Seepage " No Sample Recovery ** Nonrepresentative Blow (]ount (rocks present) W CHRISTIAN WHEELER 1. N (. 1 N i; i; R 1 N c; JOB NO,: 2100122 PLA'TF; NO.: 4 LOG OF TEST PIT P-4 Date ICxcavated: 5/5/10 Logged by: DF' Flxisting lUevation: 74 feet Proposed F.levation: 74 feet liquipment: I land Tools Bucket Size: N/A Drive Weight: N/A Depth to Water: N/A Sample Type and Laboratory Test Legend (^al Modified (Jalifomia Sampler SPTStandard Penetration Test .S T Shelby lube CK Chunk Sample DR Density Ring MD S04 SA HA SE PI Ma.ximum Density Soluble Sulfates Sieve Analysis Hydrometer Sand F.quivalent Plasticitv Index DS C^on IT R-Val Chi Res Direct Shear (Consolidation F.xpansion Index Resistance Value Soluble (Chlondes pH & Resistivity m Q z o s u X o n tn SUMMARY OF SUBSURFACE CONDITIONS (based on Unified Soil Classification System) z o P OH H 6 W S u z o P 5^ o 3 tn 74 •73 SM Artificial Fill/Topsoil (Oaf>: (Grayish-brown, damp, loose, SIL'TY S.'\ND, fine to medium-grained, porous, with rootlets. MD DS S04 SM Old Paralic Deposits (Oop): (Jrangish-brown, moist, medium dense to dense, Sll.'lY SAND, fine to medium-grained. •70 CK 5.3 11.3,1 'Test Pit terminated at 4 feet. No water or seepage encountered. •69 Symbol Legend I (iroundwater ^ Apparent Seepage * No Sample Recovery ** Nonrepresentative Blow (]ount (rocks present) m CHRISTIAN WHEELER T, N C 1 N 1. F. R 1 N G PROPOSED BUENA VISTA WAY RESIDENCE 1099 Buena Vista Way, Carlsbad, CaUfornia Symbol Legend I (iroundwater ^ Apparent Seepage * No Sample Recovery ** Nonrepresentative Blow (]ount (rocks present) m CHRISTIAN WHEELER T, N C 1 N 1. F. R 1 N G BY: DJF DA'TF: May 2010 Symbol Legend I (iroundwater ^ Apparent Seepage * No Sample Recovery ** Nonrepresentative Blow (]ount (rocks present) m CHRISTIAN WHEELER T, N C 1 N 1. F. R 1 N G JOB NO,: 2100122 PLA'TF:NO,: 5 LABORATORY TEST RESULTS PROPOSED BUENA VISTA WAY RESIDENCE 1099 BUENA VISTA WAY OCENASIDE. CALIFORNIA MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT (ASTM D1557) Sample Location Test Pit P-4 @ O-V/2' Sample Desciiption Gray Brown Silty Sand (S]VI) Maximum Density 126.2 pcf Optimum Moisture 8.2 % DIRECT SHEAR (ASTM D3080) Sample Location Test Pit P-4 @ O-V/2' Sample Type Remolded to 90 % Friction Angle 31° Cohesion 100 psf SOLUBLE SULFATES (CALIFORNIA TEST 417) Sample Location Test Pit P-4 @ O-lVz' Soluble Sulfate 0.075 % (SO4) CWE 2100122.01 May 28, 2010 Plate No. 6 3/4" CRUSHFD ROCX BACKFlIi FILTER FAHRK; BE'fWEliN ROCK AND SOIL (MIRAFI 14<)N OR FQUIV/U.EN'l') 4-INClI MIN. I'l'RT'ORA'I'liD PIPI' (I'VC SDR .35 OK SaiEDULI' 411) NOTES DRAINAGE, SWALE (BYOTHERS) 12" MIN, WATILRPROOI'ING (BY OTHERS) i'op OF C;ROUND OR CONCRE'TF; SLAB 12" MIN 1- 4 1, COMPOSITT; DRAINAGE MATS, SUCI 1 AS MIRADRAIN, ARF: CONSIDERI'D A SUITABLE ALTEiyvIATrVE AND SI lOULD BP; INSTALLliD IN ACCOROANCF: WITI I MANUT'ACTURI'R'S SPECIFICA'I'KJNS, 2. RETAINING WALL SUBDRvMN OUTLFXS SHOULD BE COORDINA'TI'D BY 'THE I'ROJIICT CIVIL ENG1NEF;R. SUBTERRANliAN RI'TAINING WAIJ.S MAY RI'{)UIRE A SUMP AND PUMP SY.STEM, NOSCAI.F: CHRISTIAN WHEELER. tNGINEI.R ING BUENA VISTA WAY RESIDENCE IO99BUT;NA VISTA W.\Y CARSLBAD, CAL .IF'ORNIA BY: sec DA TP:: MAY 28, 2010 RETAINING WALL SUBDRAIN DETAIL Rl'POR'T NO,: 2100122,01 PLAIT' NO,: CWE 2100122.01 May 28, 2010 Appendix A, Page A-1 REFERENCES Tan, S.S., 1995, Landslide Hazards in the Northern Part of the San Diego Metropolitan Area, San Diego County, Califomia, California Division of Mines and Geology Open-File Report 95-03. Unites States Geologic Survey, Seismic Design Values for Buildings, Java Ground Motion Calculator Version 5.0.9a. CWE 2100122.01 May 28, 2010 Appendix B, Page B-1 RECOMMENDED GRADING SPECIFICATIONS - GENERAL PROVISIONS PROPOSED BUENA VISTA WAY RESIDENCE 1099 BUENA VISTA WAY OCEANSIDE. CALIFORNIA GENERAL INTENT The intent of these specifications is to establish procedures for clearing, compacting natural ground, preparing areas to be fiUed, and placing and compacting fill soils to the Unes and grades shown on the accepted plans. The recommendations contained in the preliminary geotechnical investigation report and/or the attached Special Provisions are a part of the Recommended Grading Specifications and shall supersede the provisions contained hereinafter in the case of conflict. These specifications shall only be used in conjunction with the geotechnical report for which they are a part. No deviation from these specifications will be allowed, except where specified in the geotechnical report or in other written communication signed by the Geotechnical Engineer. OBSERVATION AND TESTING Christian Wheeler Engineering shall be retained as the Geotechnical Engineer to observe and test the earthwork in accordance with these specifications. It will be necessary' that the Geotechnical Engineer or his representative provide adequate observation so that he may provide his opinion as to whether or not the work was accomplished as specified. It shall be the responsibility of the contractor to assist the Geotechnical Engineer and to keep him apprised of work schedules, changes and new information and data so that he may provide these opinions. In the event that any unusual conditions not covered by the special provisions or preliminary geotechnical report are encountered during the grading operations, the Geotechnical Engineer shall be contacted for further recommendations. If, in the opinion of the Geotechnical Engineer, substandard conditions are encountered, such as questionable or unsuitable soil, unacceptable moisture content, inadequate compaction, adverse weather, etc., construction should be stopped until the conditions are remedied or corrected or he shall recommend rejection of this work. Tests used to determine the degree of compaction should be performed in accordance with the following American Society for Testing and Materials test methods: CWE 2100122.01 May 28, 2010 Appendix B, Page B-2 Maximum Density & Optimum Moismre Content - ASTM D-1557 Density of SoH In-Place - ASTM D-1556 or ASTM D-6938 All densities shall be expressed m terms of Relative Compaction as determined by the foregoing ASTM testing procedures. PREPARATION OF AREAS TO RECEIVE FILL AU vegetation, brush and debris derived from clearing operations shall be removed, and legally disposed of All areas disturbed by site grading should be left in a neat and finished appearance, free from unsightly debris. After clearing or benching the natural ground, the areas to be filled shall be scarified to a depth of 6 inches, brought to the proper moisture content, compacted and tested for the specified minimum degree of compaction. All loose soils in excess of 6 inches thick should be removed to firm natural ground which is defined as natural soil which possesses an in-situ density of at least 90 percent of its maximum dry density. When the slope of the natural ground receiving fill exceeds 20 percent (5 horizontal units to 1 vertical unit), the original ground shall be stepped or benched. Benches shall be cut to a firm competent formational soil. The lower bench shall be at least 10 feet wide or 1-1/2 times the equipment width, whichever is greater, and shall be sloped back into the hillside at a gradient of not less than two (2) percent. All other benches should be at least 6 feet wide. The horizontal portion of each bench shall be compacted prior to receiving fill as specified herein for compacted natural ground. Ground slopes flatter than 20 percent shall be benched when considered necessary by the Geotechnical Engineer. Any abandoned buried structures encountered during grading operations must be totally removed. All underground utilities to be abandoned beneath any proposed structure should be removed from within 10 feet of the structure and properly capped off The resulting depressions from the above described procedure should be backfilled with acceptable soil that is compacted to the requirements of the Geotechnical Engineer. This includes, but is not limited to, septic tanks, fuel tanks, sewer lines or leach lines, storm drains and water lines. Any buried structures or utilities not to be abandoned should be brought to the attention of the Geotechnical Engineer so that he may determine if any special recommendation wtU be necessary. AU water wells which will be abandoned should be backfilled and capped in accordance to the requirements set forth by the Geotechnical Engineer. The top of the cap should be at least 4 feet below finish grade or 3 CWE 2100122.01 May 28, 2010 Appendix B, Page B-3 feet below the bottom of footing whichever is greater. The type of cap will depend on the diameter of the well and should be determined by the Geotechnical Engineer and/or a qualified Structural Engineer. FILL MATERIAL Materials to be placed in the fill shall be approved by the Geotechnical Engineer and shall be free of vegetable matter and other deleterious substances. Granular soil shall contain sufficient fine material to fill the voids. The definition and disposition of oversized rocks and expansive or detrimental soils are covered in the geotechnical report or Special Provisions. Expansive soils, soils of poor gradation, or soils with low strength characteristics may be thoroughly mixed with other soils to provide satisfactory fill material, but only with the explicit consent of the Geotechnical Engineer. Any import material shall be approved by the Geotechnical Engineer before being brought to the site. PLACING AND COMPACTION OF FILL Approved fill material shall be placed in areas prepared to receive fiU in layers not to exceed 6 inches in compacted thickness. Each layer shall have a uniform moisture content in the range that will allow the compaction effort to be efficiently applied to achieve the specified degree of compaction. Each layer shall be uniformly compacted to the specified minimum degree of compaction with equipment of adequate size to economically compact the layer. Compaction equipment should either be specifically designed for soil compaction or of proven reliability. The minimum degree of compaction to be achieved is specified in either the Special Provisions or the recommendations contained in the preliminary geotechnical investigation report. When the stmctural fiU material includes rocks, no rocks wiU be allowed to nest and all voids must be carefully filled with soil such that the minimum degree of compaction recommended in the Special Provisions is achieved. The maximum size and spacing of rock permitted in stmctural fills and in non- stmctural fiUs is discussed in the geotechnical report, when applicable. Field observation and compaction tests to estimate the degree of compaction of the fiU wiU be taken by the Geotechnical Engineer or his representative. The location and frequency of the tests shall be at the Geotechnical Engineer's discretion. When the compaction test indicates that a particular layer is at less than the required degree of compaction, the layer shall be reworked to the satisfaction of the Geotechnical Engineer and until the desired relative compaction has been obtained. CWE 2100122.01 May 28, 2010 Appendk B, Page B-4 Fill slopes shall be compacted by means of sheepsfoot rollers or other suitable equipment. Compaction by sheepsfoot roller shall be at vertical intervals of not greater than four feet. In addition, fill slopes at a ratio of two horizontal to one vertical or flatter, should be trackrolled. Steeper fill slopes shall be over-built and cut- back to finish contours after the slope has been constmcted. Slope compaction operations shall result in all fill material six or more inches inward from the finished face of the slope having a relative compaction of at least 90 percent of maximum dry density or the degree of compaction specified in the Special Provisions section of this specification. The compaction operation on the slopes shall be continued until the Geotechnical Engineer is of the opinion that the slopes will be surficially stable. Density tests in the slopes will be made by the Geotechnical Engineer during constmction of the slopes to determine if the required compaction is being achieved. Where failing tests occur or other field problems arise, the Contractor will be notified that day of such conditions by written communication from the Geotechnical Engineer or his representative in the form of a daily field report. If the method of achieving the required slope compaction selected by the Contractor fails to produce the necessary results, the Contractor shall rework or rebuild such slopes until the required degree of compaction is obtained, at no cost to the Owner or Geotechnical Engineer. CUT SLOPES The Engineering Geologist shall inspect cut slopes excavated in rock or lithified formational material during the grading operations at intervals determined at his discretion. If any conditions not anticipated in the preliminary report such as perched water, seepage, lenticular or confined strata of a potentially adverse nature, unfavorably inclined bedding, joints or fault planes are encountered during grading, these conditions shall be analyzed by the Engineering Geologist and Geotechnical Engineer to determine if mitigating measures are necessary. Unless otherwise specified in the geotechnical report, no cut slopes shall be excavated higher or steeper than that allowed by the ordinances of the controlling governmental agency. ENGINEERING OBSERVATION Field observation by the Geotechnical Engineer or his representative shall be made during the filling and compaction operations so that he can express his opinion regarding the conformance of the grading with acceptable standards of practice. Neither the presence of the Geotechnical Engineer or his representative or CWE 2100122.01 May 28, 2010 Appendix B, Page B-5 the observation and testing shall release the Grading Contractor from his duty to compact all fiU material to the specified degree of compaction. SEASON LIMITS Fill shall not be placed during unfavorable weather conditions. When work is intermpted by heavy rain, filling operations shaU not be resumed until the proper moisture content and density of the fill materials can be achieved. Damaged site conditions resulting from weather or acts of God shall be repaired before acceptance of work. RECOMMENDED GRADING SPECIFICATIONS - SPECIAL PROVISIONS RELATIVE COMPACTION: The minimum degree of compaction to be obtained in compacted natural ground, compacted fiU, and compacted backfUl shall be at least 90 percent. For street and parking lot subgrade, the upper six inches should be compacted to at least 95 percent relative compaction. EXPANSIVE SOILS: Detrimentally expansive soil is defined as clayey soil which has an expansion index of 50 or greater when tested in accordance with ASTM D 4829. OVERSIZED MATERIAL: Oversized fill material is generally defined herein as rocks or lumps of soil over 6 inches in diameter. Oversized materials should not be placed in fiU unless recommendations of placement of such material is provided by the Geotechnical Engineer. At least 40 percent of the fill soils shaU pass through a No. 4 U.S. Standard Sieve. TRANSITION LOTS: Where transitions between cut and fill occur within the proposed buUding pad, the cut portion should be undercut a minimum of one foot below the base of the proposed footings and recompacted as stmctural backfiU. In certain cases that would be addressed in the geotechnical report, special footing reinforcement or a combination of special footing reinforcement and undercutting may be required. ^ CITY CARLSBAD O F CERTIFICATION OF SCHOOL FEES PAID B-34 Development Services Building Department 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov This form must be completed by the City, the applicant, and the appropriate school districts and returned to the City prior to issuing a building pennit. The City will not issue any building permit without a completed school fee form. Project Name: Building Permit Plan Check Number: Project Address: A.P.N.: Project Applicant (Owner Name): Project Description: Building Type: Residential: SMERUD RESIDENCE PCI10008 1099/1097 BUENA VISTA WAY 155 251 02 00 RICHARD SMERUD BUILD NEW SFD W / ATTACHED SDU 2 New Dwelling Unit(s) 3125 Square Feet of Living Area in New Dwelling Second Dwelling Unit: 640 Square Feet of Living Area in SDU Residential Additions: Net Square Feet New Area Commercial/Industrial: City Certification of Net Square Feet New Area Applicant Information: ^^-y'^y^^'f^^i^ V7t<^ Date: 04/21/2011 SCHOOL DISTRICTS WITHIN THE CITY OF CARLSBAD ^ Carlsbad Unified School District 6225 El Camino Real Carisbad CA 92009 (331-5000) n Vista Unified School District 1234 Arcadia Drive Vista CA 92083 (726-2170) r~1 San Marcos Unified School District 255 Pio Pico Ave Ste 100 Sari Marcos, CA 92069 (290-2619) Contact: Nancy Dolce (By Appt. Only) Q Encinitas Union School District 101 South Rancho Santa Fe Rd Encinitas, CA 92024 (944-4300 x1166) |~| San Dieguito Union High School District-By Appointment Only 710 Encinitas Blvd. Encinitas, CA 92024 (753-6491) Certification of Applicant/Owners. The person executing this declaration ("OwneO certifies under penalty of perjury that (1) the infbmnation provided above is conect and true to the best of the Owner's knowledge, and that the Owner will file an amended certification of payment and pay the additional fee if Owner requests an increase in the number of dwelling units or square footage after the building permit is issued or if the initial detenninatk>n of units or square footage is found to be incorrect, and that (2) the Owner is the owner/developer of the above described project(s), or that the person executing this declaration Is authorized to sign on behalf of the Owner. Date: '^SL/MZIX- Page 1 of 2 Rev. 03/09 SCHOOL DISTRICT SCHOOL FEE CERTIFICATION (To be completed by the school district(s)) THIS FORM INDICATES THAT THE SCHOOL DISTRICT REQUIREMENTS FOR THE PROJECT HAVE BEEN OR WILL BE SATISFIED. SCHOOL DISTRICT: The undersigned, being duly authorized by the applicable School District, certifies that the developer, builder, or owner has satisfied the obligation for school facilities. This is to certify that the applicant listed on page 1 has paid all amounts or completed other applicable school mitigation determined by the School District. The City may issue building pennits for this project. SIGNATURE OF AUTHORIZED SCHOOL DISTRICT OFFICIAL TITLE NAME OF SCHOOL DISTRICT DATE PHONE NUMBER CARLSBAD UNIREO SCHOOL DISTRICT CARLSBAD^ CA 92009 B-34 Page 2 Of 2 Rev. 03/09 ^AVIARAOAKSELEMENTARY CJO^mSBAD UNIRED SCHOOL DISTRICT •«C/FiC«MEt£ME/VMm' „ ^AVIARAOAKS MIDDLE SCHOOL CJ CARLSBAD VIUAGE ACADEMY riPOINSEmA ELEMENTARY ReCBipt NO. ^BUENAVISTAEt^MEMTARY ^HOPEELB^BnART H^flE^ Q /I O Q Q ^CALAVERAHILlSELmEMTARY {Z]^EFFERSON ELB^ENTARY HvAU.EY MIDDLE SCHOOL 0 ^ CO O [Z]CALAVERAHIU.S MIDDLE SCHOOL [^J KELLY B£MENTARY HoTHEfl [ZiCARLSBAD HIGH SCHOOL •AMGWOLMaEMENMfJV Applicable) PARENT OF (^ 1^*^ / 10'?7 ^Aa>^ V^, »-tzt tP«0^ PAYMENT FOR: RECEIVED FROM (If ACCOUNT NUMBER AMOUNT RECEIVED BY: CASH _CHECK#i^TOTAL SMJULI^ STRONGSIDE BUILDERS, INC 2835 PROGRESS PLACE ESCONDIDO, CA 92029 16-49-6/1220 umonBank Payable at iny Union mw'incltjding 400 fal^^Hb )Ftaji5«po;jCA ?41Q1 dnbanUjjofn DOCUMtNT COM 02/25/2011 12:07 7607372125 SURECRAFT SUPPLY INC PAGE 03/03 « ^ i CI T Y OF CARLSBAD PLUMBING, ELECTRICAL, MECHANICAL WORKSHEET B-18 Develooment Services Buildlne Department 1635 Faraday Awnu* 760-602-2719 www.carlsfaadca.eov Project Addres*: j^^f vi^^ y^y PemiitNo« pc U OOoS InfarmoBon proufclad below rafon tn werb bakig done on the obo\« mentioned permit on^. Thh faiiw"iHii>nii>TMiiile^^ to the Buildina DcBortmeiit fcefere tfo pennit can bt Iss—cL Building Dept rwt (7«0) 602^8558 Number of new or relocoted fixtures, traps, or floor drakw., New buildii19 Mwtt- Kn«7 now root drains?. Instail/alter wottr lint?- VM y No, Numbn- of now water heaten?.. Number of new, relocated or replaced got outietj?. Numbor of new hose t>l»? Upgrade existing panel? Number of new panels or subponek?., Single Phase Three Phaia From Ves_ _Amp»to_ NoX- Amp* : Three Phase 480. Remodel (relocate existing outtets/swHxhcs or odd outleb/twitdiet}? .Number of new laniuerai lOO ... Number of new amperes .Number of new amperes Ves_ Number of new fumaoeit. A/C or heat pumps?. New Or reloented duct worb?.. Number of new flreplaoei?. Number of new exhoust fans?. Relocate/Install wBnt?_.„_ Number of new axhauti hoods? Number of new boilers or oompresfors?» -.Ves ->( No, -4^ Number of HP Pflflel Of 1 02/25/2011 12:07 7607372125 SURECRAFT SUPPLY INC PAGE 02/03 ^^^^C I T Y OF CAI^LSBAD PLUMBING, ELECTRICAL, MECHANICAL WORKSHEET B-18 Building Department 1635 Faraday Avenue 760.602-27I9 www.carlsbadca.20v ; Project Addrtss! jo^-^ ^^^^ Vfi^lft wl^V PormltNo.- WOOoh Infafwirtlonpwwldedbetow refer; to woffc being done on the dbo^wwienttonedperm^ Thii iewj mest he completed eerf letefweJ to the ielMinq Peportiiwt fcefere tfie aeneit can he iiieed. Budding Dept. Poxc (700) e02-8SS8 ' Number of new or relocated fixtures, traps, or floor draim —„ ': New building sewer Hne?. : Number of new roof drains?. ; instalt/aMer water line?.. Ves y No. i Number of new water heaters? !Nurak)er of new, relocated or replaced gas outlets?. i Number of new hose bbs? f i Upgrade existing ponet? iNunrtber of new panels or subponds? Single Phase n»...m...,...u.MM..»«.u~......._ iThree PhcBe»M»»«....... «*»e*BiiJp««w*e«e«B •—»f < .Number of new amperes .Number of new amperes :Three Plrase 480 '. Number of new omoeres jRemodd (relocote existing outlets/switches or add outlets/switches}? Ves No^ I Nun^jcr of new furnaces, A/C, or heat pumps? i New or rdocated duct worfe?, \ Numbor of new ffreplaces? ! Number of new exhaust fans?. ! Relocate/Install vent? i Number of new exhaust Iwods? I Number of new boilen or comprestors?„ .Ves_ No ..Number of HP 4- B-18 Page 1 of 1 R«v. 03/09 — { r 11-15-2011 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Plan Check Revision Permit No:PCR11126 Builcling Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Reference #: PC #: Project Title: 1099 BUENA VISTA WY CBAD PCR 1552510200 Lot#: 0 $0.00 Construction Type: 5B NEW TRUSS MANUFACTURER FOR SFD&2DU Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: ISSUED 10/18/2011 JMA 11/15/2011 11/15/2011 Applicant: MARTIN VOLK Owner: SMERUD FAMILY TRUST 03-27-97 858-997-5866 3667 CAMINO MARGLESA ESCONDIDO CA 92025 Plan Check Revision Fee Fire Expedited Plan Review Additional Fees $100.00 $0.00 $0.00 Total Fees: $100.00 Total Payments To Date: $100.00 Balance Due: $0.00 Inspector: FINAL APPROVAL Date: Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, resen/ations, or other exactions hereafter collectively referred to as lees/exactions." You have 90 days from the date this permit was issued to protest Imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required infonnation with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have previously been oiven a NOTICE similar to this, or as to which the statute of limitations has previouslv othenwise expired. «$•> CITY OF CARLSBAD PLAN CHECK REVISION APPLICATION B-15 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Plan Check Revision No. fC^l - Original Plan Check No. f^C- M ""^ Project Address \o^'\ gt^^BKlA Vl^TA WAY Date Contact H-^izTiU Ph ^c>^ yn-5yUg Fax'JiOj^L^Email WtqY^oU^ ^^U.UM Contact Address 2t4t> ^(?^j^nx><.<, City €^UBHC?\17Q Zip jZJoZl General Scope of Woric (^Kit;in;»C/-r <^ "Sf 1^^oasf& v.,| Se»a>N£) tWxiNt^ \)ti(T Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 Elements revised: • Plans S Calculations • Soils • Energy • Other 2 Describe revisions in detail 3 List page(s) where each revision is shown 4 List revised sheets that replace existing sheets 5 Does this revision, in any way, alter the exterior of the project? • Yes 6 Does this revision add ANY new floor area(s)? Q Yes No T Does this revision affect any fire related issues? • Yes ^ No 8 Is this a complete set? • Yes S No >€S'Signature- ^ No 1635 Faraday Avenue, Carlsbad, CA 92008 Phone: 760-602-2717/2718/2719 www.carlsbadca.gov Fax: 760-602-8558 EsGil Corporation In AirtMr»% witt gwtnm«tfar9viUinf S^ty DATE: 10/24/11 • APPLICANT • JURIS. JURISDICTION: CARLSBAD • PLAN REVIEWER • FILE PLAN CHECK NO.: PCRl 1-126 ( PCll-0008) SET: RBV 2, Set I PROJECT ADDRESS: 1099 BUENA VISTA WAY PROJECT NAME: SFR WITH AN ACCESSORY UNIT (Revised Trusses ) O The plans transmitted herewith have t)een corrected where necessary and substantially comply with the Jurisdiction's building codes. Q The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor defldencies identified below are resolved and checked by building department staff. O The plans transmitted herewith have significant deficiencies identified on the enclosed checl< list and should be corrected and resubmitted for a complete recheck. ^ The REMARKS check list below is transmitted herewith for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck, Submit responses and /or 2 sets of revised plans to Esgil or City for recheck Q The applicant's copy of the check list is enclosed for the jurisdiction to fonvard to the applicant contact person. Q The applicants copy of the check list has been sent to: MARTIN VOLK 2835 PROGRESS PLACE, ESCONDIDO, CA 92029 Esgil Corporation staff did not advise the applicant that the plan check has been completed. ri Esgii Corporation staff did advise the applicant that the plan check has been completed. Person contacted: MARTIN Telephone #: 858-997-5866 Date contacted: (by: ) Email: martyvolk@gmail.com Fax #: Mail Telephone Fax In Person REMARKS Check List: The proposed revised trusses by Hanson Truss do not contain rafter tails. The plans shows 2'-0" rafter tails. Include as part of the truss details the size, spacing and connection of the rafter tails to the top chord of the trusses. By: Chuck Mendenhall Enclosures: EsGii Corporation n GA • EJ • PC 4/28 9320 Chesiipeake Drive, Suite 208 • San Diego, California 92123 • <SS8) S60'146S • Fax (858) S60< 1576 TOQ-ct 9iST 099 898 IIOSH TT:9T TT02-20-AON ZOO'd 'iViOl CARLSBAD PCRl 1-126 ( PCll-0008) 10/24/11 [DO NOT PAY- THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: CARLSBAD PLAN CHECK NO.: PCRll-126 ( PCll-0008) PREPARED BY: Chuck Mendenhall DATE: 10/24/11 BUILDING ADDRESS: 1099 BUENA VISTA WAY BUILDING OCCUPANCY: R3/U TYPE OF CONSTRUCTION: V-B/SPR. BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE m TRUSS PLANS & CALCS. TOTAL VALUE JuiUdictiM COM CB By OMInanc* BIdg. Permit Fee by Ordinance nan Checic F«e by Ordinance Type of Review; • Repetitive Fee —^ Repeats Complete Review • Other • Hourtv a Structural Only "~ilHr. @ • $100.00 9ased on hourly rate Comments: Sheet 1 of 1 m«cwaiu«.doc+ ZOO-d 9i9T 099 898 TT:9T U0Z-Z0-hO& ^^^^^^^^ ^^^^^^^^ > < S f-^" Z M Q O W > < M Q < to ^ ^ 2 < 0^ y fll 5 C « II 8 S • 3 O O £ « S ^ -I • o « E « s IL iJ «» lu (0 is ra = $ S o E UJ % a S 2 w (0 Ul h z • in z < i 5 BRACING WOOD TROSSES: COMMENTARY AND RECOMMENDATIONS ) TRUSS PLATE INSTITUTE, INC., 1976 INTRODUCTION In recognition ofthe inherent safety of a properly braced roof system, the apparent lack of knowledge of how, when, and where to install adequate bracing, and in the interest of public safety, the Truss Plate Institute, inc., in consultation with its Component Manufacturers Council membership, has undertaken the preparation of these recommendations. Substantial concentrated study and deliberative review by the TPI Technical Advisory Committee (comprising a membership of the chief structural engineers of member plate manufacturing companies, representatives of the academic community, and independent consulting engineers) have devoted to this effort. Consultation with the TPI Component Manufacturers Council has resulted in bringing practical field handling and erection problems into a sharper focus, inclusion of the tentative recommendations for on-site handling and erection procedures is one direct result of the conultations. ii is planned to study further and enlarge upon these tentative recommendations. While the recommendations for bracing contained herein are technically sound, it is not intended that they be considered the only method for bracing a roof system. Neither should these recommendations be interpreted as superior to or a standard that would necessarily be preferred in lieu of an architect's or engineer's design for bracing for a particular roof system. These recommendations for bracing wood trusses originate from the collective experience of leading technical personnel in the wood truss industry, but must, due to the nature of responsibilities involved, be presented only as a guide for the use of a qualified building designer, builder, or erection contractor. Thus, the Truss Plate institute expressly disclaims any responsibility for damages arising from the use application, or reliance on the recommendations and information contained herein by building designer or by erection contractors. Continuous lateral bracing as required (part of truss design] figure 1 (b) and 1(c) Figure 1(a) Compression webs: before and after buckling. Continuous lateral bracing maintains spacing, but permits lateral buckling ot all web members at the same time Bearing for trusses Figure 1(b) It is recommended that diagonal bracing (minimum 2-inch thick nominal lumber) be installed at approximately a 45 degree angle to the lateral brace. Diagonal bracing should be attached to the opposite side ofthe same member required lateral bracing. This bracing may be continuous or intermittent at the building designer's option; however, it is recommended that intermittent spacing not exceed 20 feet, or twice the horizontal run of the diagonal bracing. 4 However carefully wood trusses are designed and fabricated, all this is at stake in the final erection and bracing of a roof or floor system. It is at this critical stage of construction that many of the really significant design assumptions are either fulfilled or ignored. If ignored, the consequences may result in a collapse of the structure, which at best is a substantial loss of time and materials, and which at worst could result in a loss of life. The Truss Plate institute "Design Specifications for Light Metal Plate Connected Wood Trusses" are recommended for the design of individual wood trusses as structural components only. Lateral bracing, as may be required by design to reduce buckling length of individual truss members, is a part of the wood truss design and is the only bracing that will be specified on the truss design drawings. Lateral bracing is to be supplied in the size specified and installed at the location specified on the truss design drawings by the builder or erection contractor. The building designer or inspector must ascertain that the specified lateral bracing is properly installed and that this bracing is sufficiently anchored or restrained by diagonal bracing to prevent its movement. Special design requirements, such as wind bracing, portal bracing, seismic bracing, diaphragms, shear walls, or other load transfer elements and their connections to the wood trusses must be considered separately by the building designer. He shall determine size, location, and method of connecting for diagonal bracing as needed to resist these forces. Diagonal or cross bracing is recommended in the plane formed by the top chords, in the plane formed by the bottom chords and perpendicular to the truss web members, as needed for the overall stability of the entire structure. Truss bracing and connection details should be shown on the building designer's framing plan as part of the design drawings. Bracing materials are not usually furnished as part of the wood truss package, and should be provided by the builder or erection contractor. The builder or erection contractor is responsible for proper wood truss handling and for proper temporary bracing. He must assure that the wood trusses are not structurally damaged during erection and that they are maintained in alignment before, during, and after installation. Temporary or erection bracing may follow, but not necessarily be limited to, the building designer's framing plan. It is recommended that erection bracing be applied as each truss is placed in position, 2 . Sfieathing _ Ancfiorage (by building designer) into solid end wall • restrains lateral bracing, thereby preventing web buckling. - Continuous lateral bracing. Figure 1 (c) Compression web-sloping or vertical Continuous lateral bracing. Diagonal brace nailed to opposite side of web prevents lateral movement and sfiould be repeated at approximately 20 feet inten/als Figure 1 (d) Ceiling STAGE TWO: During Truss Erection the builder or erection contractor must take adequate precautions to assure that the wood trusses are not structurally damaged. Proper rigging, including the use of spreader bars and multiple pick-up points, where required, is necessary to prevent damage during handling; tentative recommendations are presented in the Appendix hereto. It is most important to brace the first truss at the end of the building securely. All other trusses are tied to the first truss, thus the The design of wood trusses in accordance with TPI design criteria assumes: 1. Truss members are initially straight, uniform in cross section, and uniform in design properties. 2. Trusses are plane structural components, installed vertically, braced to prevent lateral movement, and parallel to each other at the design spacing. 3. Truss members are pinned at joints for determination of axial forces only. 4. There is continuity of chord members at joints for determination of moment stresses. 5. Compression members are laterally restrained at specific locations or intervals. 6. Superimposed dead or live loads act vertically, wind loads are applied normal to the plane of the top chord, and concentrated loads are applied at a point. 7. In addition to the lateral bracing specified by the truss designer, the building designer will specify sufficient bracing at right angles to the plane of the truss to hold every truss member in the position assumed for it in design. 8. The building designer (not the truss designer) will specify sufficient bracing and connections to withstand lateral loading ofthe entire structure. The theory of bracing is to apply sufficient support at right angles to the plane of the truss to hold every truss member in the position assumed for it in design. This theory must be applied at three stages. STAGE ONE: During Building Design and Truss Design individual truss members are checked for buckling, and lateral bracing is specified as required for each truss member. The building designer must specify how this lateral bracing is to be anchored or restrained to prevent lateral movement should all truss members, so braced, tend to buckle together as shown in Figure 1(b). This may be accomplished by: 1. Anchorage to solid end walls (Figure 1 (c)). 2. Diagonal bracing intheplaneofwebmembers (Figure 1 (d)). 3. Other means as determined by the building designer. NOTE. Locate ground braces for first truss directly in line witli all rows of lop cfiord continuous lateral bracing (eilfier temporary or permanent) Figure 2(a) Ground brace Bearing tor trusses End diagonals to ground stakes Figure 2(b) bracing system depends to a great extent on how well the first truss is bracec. One satisfactory method is for the first truss top chord to be braced to a stake driven into the ground and securely anchored. The ground brace itself should be supported as shown in Figure 2 or it is apt to buckle. Additional ground braces, in the opposite direction, insidethe building are also recommended. The ground braces should be located directly in line with all rows of top chord continuous lateral bracing. Otherwise, the top chord of the first truss can bend sideways and allow the trusses to shift. This shift, however slight, puts a tremendous strain on all connections of the bracing system, i.e., the weight of the trusses would then be added to any wind force or construction load such as bundles of plywood or roof stiingles tending to tip the trusses over. All nailing of bracing should be done so that if the trusses should tend to buckle or tip, the nails will be loaded laterally, not in withdrawal. It is not recommended to nail scabs to the end of the building to brace the first truss. These scabs can break off or pull out, thus allowing atotal collapse. As trusses are set in place, the builder or erection contractor must apply sufficient temporary bracing to hold the trusses plumb, in alignment and in a safe condition until the permanent bracing, decking and/or sheathing can be installed. Temporary bracing should be not less than 2x4 dimension lumber and should be as long as practical for handling. The use of short spacer pieces of lumber between adjacent trusses is not recommended, unless used temporarily in preparation for immediate installation of longer continuous bracing (8-feet minimum length). Temporary bracing lumber should be nailed with two double headed 16d nails at every intersection with the braced member. Pre-assembly of groups of trusses, on the ground, into structurally braced units which are then lifted into place as assemblies is an acceptable alternate to the one-at-a-time method. Exact spacing between trusses should be maintained as bracing is installed to avoid the hazardous practice of removing bracing to adjust spacing as sheathing is applied. This act of "adjusting spacing" can cause trusses to topple if a key connection is removed at the wrong time. Truss bracing must be applied to three planes of reference in the roof system to insure stability: 1. Top chord (sheathing) plane, 2. web member plane or vertical plane perpendicular to trusses, and 3. bottom chord (ceiling) plane. 1. Top Chord Plane. Most important to the builder or erection contractor is bracing in the plane of the top chord. Truss top chords are susceptible to lateral buckling before they are braced or sheathed, it is Recommended that continuous lateral bracing be installed within 6 inches of the ridge line or center line and at approximately 8 feet to 10 feet intervals between the ridge line of sloped trusses or center line of flat trusses and the eaves. For double member trusses this spacing between laterals may be increased to 12 feet to 14 feet. Diagonals, located between the lateral bracing and set at approximately 45 degree angles, form the triangles required for stability in the plane of the top chord. NOTE: Long spans or heavy loads may require closer spacing between lateral bracing and closer intervals between diagonals. Figure 3(a) illustrates tenriporary bracing in the plane of the top chord for gabte trusses If possible, the continuous lateral bracing for the top chord should be placed on the underside of the top chord so that it will not have to be removed as the plywood decking is applied. The trusses are then held securely even during the decking process. It is equally important for the builder or erection contractor to install bracing in the plane of the top chord for flat roof or floor trusses. The use of a similar bracing pattern is recommended for all flat trusses. Particular attention is directed to bracing at the end of flat trusses as shown in Figure 3(b). 2. Web Member Plane- It is also necessary to install temporary bracing in the plane of the web members. This bracing is usually . — For singte member truss (1 V2 inch thickness) For double member truss (3 inch thickness) — Located within 6 inches of ndge li Repeated diagonals at approximately 20 feet intervals NOTE: Long span trusses may require closer Spacing. A • Bracing ' Top chord. Typical nailing ^Spacing same as Vjlor g;ible trusses Repeal diagonals at approximately feet intenials. Figure 3(b) installed at the same locations specified on the architectural plan for permanent bracing, and may become part of the permanent bracing, it is recommended that diagonal bracing be added at each web member requiring continuous lateral bracing, if none is specified, it is recommended that it be placed at no greater than 16 feet intei-vals along the truss length for roof trusses and 8 feet intervals for floor trusses. It is not generally necessary for diagonal bracing to run continuously for the full length of the building but it is recommended that the spacing between sets of diagonal bracing not exceed 20 feet, or twice the horizontal run of the diagonal bracing. Rows of 2x6 strong-backs may also be used to brace floor trusses where diagonal bracing is impractical. Figure 4(a) illustrates diagonal bracing in the plane of the web members; Figure 4i'b) illustrates the lateral movement that may occur if lateral bracing is used without diagonal bracing. 3. Bottom Chord Plane. In order to hold proper spacing on the bottom chord, temporary bracing is recommended in the plane ofthe bottom chord. Continuous lateral bracing at no greater than 8 feet to 10 feet on centers along the truss length is recommended full length of the building, nailed to the top of the bottom chord. Diagonal bracing 9 22'-0" SPAN I I I I M I I '' 01 :H tfl >' _i Q m PI ^ 0 > -o r^i „ |5§ m -* Hoo So' • 50 SOOf ORtG i Bd L I WILL W/750# DRAG 7 1/4" CANT. . 12'-5 1/2' STUB L alSafisiaSj tiil!;i a • ' il II il STRONGSIDE BUILDERS 1099 BUENA VISTA CARLSBAD, CA ORMKN m KYU ROOF I 1/8"=r-o" DATE 09/28/11 HANSON TRUSS I N NUL.U AND VOIP II* NOT ^AgWIOATgO BY HANSON TWUBS. IN' • [M a. Ui m 1 u H Q. UJ U] UJ I-< Q n • cn UJ • z m • >-oa UJ • z < • in z -• — UJ tn h UJ a. a ujn ° • • Q m -Q DO U < z z 5 a u • u u. Z J CD < UI • h 10 N 0> a % D> 2 n , n ID m g N 0" n • • P K • u 0. P: [11 IV Ll 1^ Lj a cr • J a I a S u F] n N -(n u • N UJ • H U < 2 < h • < J J _l D. Q. Q < D z < ta „ X H L. • t-< 0. y Q: < < I h iij £ z y Q U] " % J >-z < 2 tn [n Q LiJ O y» o a> CD -o a> CO 5 a> (U (A > '5 S:S.e. ill c. CJ c: (T5 > i5 o F ^ li. U] U Q _J • m Ul 9 Ul • z • a. h [0 111 Q. • UJ > Ul • 8 ^ - ™ <» — • ^ S3-, E •£ E ta Ui 3^o E "•i E 2 g g ^ W C = O o ™ cn t: ^ T5 fc: o <» o o 3 o w ot: c O- W O. CO c " c ^ e S » ° S g go s g-s CO _ 1= tf> (A t/> O (U -xs m W C ii; t l 1 E ° I dl 2 E esleOP 5 oj Tj ® SB • n OS -9 oj /> x: o <J • z h u < 5"8 ""S S o-fc-a "> S S O CO c e § * s £2 ^ „ -if </> OS UJ C3 z UJ _i «c O 3 I— CO CD S.2 Ss'S ? • h „ I to u ^ • in li. Q < • a. < ll J u < 2 U hi • < ^ a. n • ^ t in in • • n 0] • rg • n • 0) o< u. < I z 111 0. 0. I u n 10 to • • tt. o I- r- N m n ^ in N < ^ u cn Z ot y X • < u 01 u. • u (li Ul • a. \-z • in z < m UJ UJ I h z • (11 • I u < Ul H A N I N C • D N R P • TRUSS R A TED GENERAL NOTES 1. No splices except as noted on tmss di awings. 2. Panel point locations shall be equal divisions unless noted or dimensioned othenvise. 3. Gusset plates shall be installed on each side of all joints and shall not be installed where Icnots or wane are greater than 10% of plate area. 4. Gusset plates shall be centered on joints unless noted or dimensioned otherwise, 5. Truss designs shall comply with ANSl/T.P.I. - 1-2002 unless noted otherwise. 6. All gusset plates are 20 gauge and stamped TP. Unless noted otherwise. 7. All hangers specified are Simpson strong-tie or equal and are provided by others Unless noted otherwise. 8. All trusses are spaced at 24" on center unless dimensioned otherwise. 9. Moisture content in the lumber used may exceed 19% at the time of fabrication. A 20% reduction in plate values has been used. 10. The Hanson Truss, hic, engineering program is in compliance with section 2303.4 of the 2010 C.B.C. All heel joint connections are designed using an analysis considering the vector sum of concentric and eccentric loads. 1 1. All nails specified are to be box nails or better. ABBREVIATIONS B.C. Bottom Chord MGOV. Mono gable over B/O By Others O.A.II.S. Overall heel stand BGK Backing OC On Center BLK. Blocking PLF Pound per Linear Foot BM Beam Ply One Truss of a multiple-truss assembly BRG. Bearing Rbdg Repetitive bending factor CBO Conventional framing by otliers S.B. Setback DBL. Double member Sc. Scissor (sloped or vaulted) DR BM. Drop Beam ScBKG Scissor Backing FILL Vertical @ 16" o.c. Sc GET Scissor gable end truss FL. BM. Flush Beam SOF. Soffit (Non-structural) GET Gable end truss SPL. Splice GIR Girder truss STB. Stub GOV. Gable over T.C. Top Chord. HGR Hanger(s) U.N.O. Unless noted otherwise INV. GOV. Inverted gable over W/ With JKS Jacks w/o With out MB KG Mono Backing MGET Mono Gable end truss BASE DESIGN VALUES FOR VISUALLY GRADED LUMBER SPECIES & COMMERCIAL GRADES SIZE CLASSIFICATION Bending Fb Tension Parallel To Grain Ft Shear Parallel to grijin Fv Compression Perpendicular 'I'o grain F; Compression Parallel to grain Fc Modulus of Elasticity E GRADING RULKIiS AGIiNCV SPECIES & COMMERCIAL GRADES X25.4 FOR mm Bending Fb Tension Parallel To Grain Ft Shear Parallel to grijin Fv Compression Perpendicular 'I'o grain F; Compression Parallel to grain Fc Modulus of Elasticity E GRADING RULKIiS AGIiNCV DOUGLAS FIR LARCH Select Struct.. 1,500 1000 180 625 1,700 1,900,000 WCLIB WWPA Nol & Bettei-2" to 4" tliick 1200 800 180 625 1550 1,800,000 'l~700,000 WCLIB WWPA Nol 1,00 675 180 625 1500 1,800,000 'l~700,000 WCLIB WWPA No2 2" and wider 900 575 180 625 1350 1,600,000 WCLIB WWPA Stud 700 450 180 625 850 1,400,000 WCLIB WWPA Construction 2" to 4" wide 1,000 650 180 625 1650 1,500,00 WCLIB WWPA Standard 575 375 180 625 1400 1,400,000 WCLIB WWPA LVL 2950 1800 290 750 3200 2,000,000 LP ONI 'ssnax NOSNVH Aa aaxvoiiyavd ±ON di aioA QNV mnN X O X Pi Q O X PQ Q CO OH OO o J 5^ u u U n Q U pq >/-) O at UNO R LDG FC'IR: Wdthll lates: TP500 20g uno Centered onjoii R LDG FC'IR: ' Min Brg lates: TP500 20g uno Centered onjoii <n OH Q iri ti d 3 g o ffi S c! a o 3 « J3 o CO o ^ 0 * P3 P. . I u + o •a oo T3 P. OO m" X •3 K 0 H* PL, -F 1/2 CO in 0 CQ .-H Tj-0 *—' rj- (S 4- >o 0 -40H cn s +40H CO CO ON ON 0 u o .. .. in o Q s o S o • • f:: •-i o =^ 00 f ^ ^ ^ ^ M ^ CN m n- 10 u u u u J J J J >-> CO 1 CO ONI 'ssnyx NOSNVH Aa aaxvcmavd ±ON di aioA QNV mriN O PL, Q PQ PH OO C> -i <:i ^ J 0 J Q U U U U H H ffl 03 r-1 U O 3 o >H -a IH >>0 M u a Rl u n «.Q o u CO on 00 i « O «5 05 ^ o * 03 cn >o VO u u u u J J J J CO CO t— in •o OS ON CO OS d o II II II Ov II ON lO r- VO o CO r--oo CO o o VO v^ II CO II II CL Mp Mp CO co CO O CO II CO <U O o II li tj .-1 OH CIH • z ^ ' S ^ EJ^ FT^ pa r: -7? CO oo oCJO CN CO CO oo CO CO VO -vo o <=> <N oo o a^ CO <=><=> s S lO o ^ O ' 1 ^ r-, oo CO —' fs 22 O o ' ^?2-r;iro' 1—I m O S O pq VO VQ QQ CN zz VO oo ONI 'ssnidx NOSNVH Aa a3±voiyavd ±ON di aiOA QNV nnnN PQ 00 C3 CD 01 ci CN >-l •J Q •J 0 U U u H 03 03 0* fi . o ^ 3 S U p - VH 'p a 0 p " g o 0 la ffi .2Po Si g-fa g,>. « fl cU 0 C M XI oa '—' r tN o> -F cn lo VO U U U U J HJ J J C7V OV <T\ OO C^ CO • «-> CN ^ O O •"i u o CO VO rj >—I VO OO ^11 •>*• CN VO II II ss'^ II II tj —' PH CU Z ^ >< 1-1 (S DOCN fN pLi f-H J^Qfe U S & P^ CO QOgg pp _2 ^ CN "BH <^ O? O " ij CN <3v ^ Q o CO ^ -149 8-7 2 4-9 VO >A OO O CN Q CO CN oo •<1- CN ' op-t 1 U-) 1 9 750 484, CN ^ o CO VO ..c^ CO ^ CO CO VO CN v -'V' CN CO ^ CN rrl 1 O CNco" 1 H VO ^ rz! co" -H o\ CN . . 1 .. -j^ 1-4 12 ''^ <vi VO VO 55 VO oo II 13 1—1 w a ONI 'ssnax NOSNVH Aa adxvofcuavd ±ON di aiOA QNV nnriN 01 U Ul pp Q O O z 5 CN Q PR X CN PQ Q OH '—' oo O CZ3 CN CN CN •J Q hJ Q u U U U H H 03 PQ O z CN O oint •a & U ;Wd g PP Brg lates: TP 20gur Center 5 ' Min lates: TP 20gur Center in OH Q cn H'^^a^fl.Bg PI >^ o 0 a M a a a u H 2 S x> "I fl '3 fl MD<9 -^i^ 0 a fl a PI 3 2 U U -S.Sfo 8 g-h S M fl a o 3 M X) O 00 g O tn 03 •§ O c^ ^ « PQ o CN o CN VO VO — CN °o ,„ oo<^liS CN cn in U U U U J J _1 J VO VO CN <^< QQ o o M CN >^ ^4- C/5 VO I ONI 'ssnax NOSNVH Aa aaj-vomavd ±ON di aioA QNV nnriN X CN PLH Q X cN PQ Q t-i 05 CN S 5 0. —-' I-l Q Q U O U u H 01 03 O CN CN O D •S s o •a GFCTR •a TP500 guno ntered oi GFCTR Brg TP500 guno ntered oi LD Min .a CP Q m U fc! PI y -'•fi 2.Sxi » fl'd fl 611 a y isiiH a M p a K 3 2 u u ffi 3 fl S u 3 « * 09 a. oo PQ .1 PPi 00 OH in o to .. 1/3 <: u CQ K-1 cc + 03 —' o . . CN <^ OO in cN o U CN O .. in VD CN 9 cn O CO I-l in a - S o CN —I CN cn m U U U U HJ J i-l -1 VO m VO u-i r- C3 C3 II II in H .—I CO in VO <=> o C7V o •O VO m CN —1 .ri- ll II O VO CN VO CN lo II II E a CO CO CN VO CN CN OO s CO II ex CN r-o CO § 5 ° u y :5 f?! 2; S VO VO £ >^2s II II -PH II II OHP^ §3 topr^ CM ,J f-H 5^ —I CN ca Q 5^ " P3 Z Z2 ^^^vo;9-i-S^ii CN <^ Q S O E- OP ^ S VO ^ CN CN QQ CN ONI 'ssnax NOSNVH Aa aaxvomavd J.ON di QIOA QNV mnN tM u w pp Vi Q O o C3 VO X X X .j PL, 1 c-^ CN CN CN .j PL, 1 c-^ LF CZ5 i-J -J u o OH ">< PLH Q (Q Q PLF CO OO VO VO PQ PLF CN PQ Q PLF oc cn C/5 WEB: PCG: J WEB: PCG: 0 hJ Q ij U WEB: PCG: u u U U H 03 WEB: Vi H H 03 03 H U PP o 3 g Q O z o c So-a fl ooD<y :>.c»H y a W M fl C3 U 3 M ^3 o 03 -B « PQ CJ-O o 2; T3 Cl. CO oa" pq UH on PH m o o CN vb m VD CN ^ oo CN 8 OO + •Ay "B cjv Z 2 O o J. Q + < C/5 <n o 1—1 .—1 Q O w .. CO —I < U OQ a z > O o in CN CN cn u u u J J IJ ON @)® Hi PQ PH I fM ONI 'ssnyx NOSNVH Aa adxvoiaavd XON di QIOA m N o PQ OH Q o o z X X C-N CN —1 PL, PtH Q Q CN CN O O u 6 01 pp 1-1 u hJ J J Q a Q u o u H 03 03 O PP O a o 00 .3 I-l u PQ ^° » 03 in oo •o Cl. 1/3 m' p« .1 pPi o CN K OO VO + m trf cx> VO I + in CO p <: s pq CO < OQ oo cs o o CN o OQ -g o ^ Q HS; cn O CO 1-1 >n a m cN o o . . .. in VD CN CN cn Tl- m u u o o J 1-1 l-J I-l E^H j" VO VO CN CN HH QQ CN f:j Q2 CN "7> J^4- ONI 'ssndx NOSNVH Aa a3±v ON dl aioA QNV nnnN w N CO U OH CO Q O o z X c-v| P-i Q X CN P-i Q c~-l O X CN PP ^ OH '—' o -< 5^ Q hJ Q U O U H 03 01 1^ U (IH O Q I-l O I-l "S PI >.0 - " 0 >. S May O r! tfl Cfl CO.a u hj fi a PI 3 hp 01 fi C4 c« S'O a u o u CO t—1 cn OS < s < =t»: IP * 03 CN cn Tj- <n ^ u u u u u J HJ J J J C« o o u J3 oo o t—- VO CJv oo II II o ^ VO c-<3v un CO cd CO ^ -H O VO t— VO CO 11 II O. OH m VO r- VO t-- -H >0 CO B oo CI CO VO VO VO I •n CTv VO r-~ CO O CN O <-> ^^^^ n::^ CN -OH II II &H «^ S ^CN CN J >-l "-^'=^fefe"^:o g —; CP CN Q 5; PP t2 Z ^ CN u „ IO ^ "3, CO cfv "^l 2 CN CO Q ^3'gougO CO 8 o VO ^ c5 <N QQ CN CN CN r-- ONI 'ssnyx NOSNVH Aa aaxvoiyavd XON di aioA QNV nnnN Vi CN w E PP Q Vi ' ' CN O X CN CN O X CN p-1 Q PP Q E-i c/3 PP OH CO hJ Q Q u O U U H 03 03 CN O at UNO i LDG FCTR: WdthU ates: TP500 20g uno Centered onjoii i LDG FCTR: Min Brg ates: TP500 20g uno Centered onjoii Q 3.5" " PI >, O O M a fi 00 a y ^i,.^ o a s 3 fi s u 3 M .0 1^ oa -S ^° » 01 •a CO PQ" pq PP CO PH m o o CN IS lO in -I- 03 VO m + U CQ O >2 en CO Q < O pq CO < CQ —( —• o °o dK CN °^ oo <n CN .. o . . >n .. in CN VD CN 9 <=• < cn O CO I-l cn O - S o CN -H CN cn Tj- m o u u u J J J J so 00 VO X CO CO 5=: iJ ONI 'ssnyx NOSNVH Aa aaxvo ON dl aiOA QNV mnN N U pp CO Q X X X CN CN CN PP •J PP •J CN H-1 PLi —l PH OC PP Q Q Q C30 «/o CN CN rDB I—I PLH CN CN U PP O o rDB o n o n ffl PCG: I-l I-l • ffl PCG: IJ Q 0 0!i u u PCG: U U U u D H 03 CO H H 01 03 Q o z o •—^ Hi o •o u ™ fi M U 8 „ m S U I lis fi"! . « 0 ;^ c« M-o 9 cji|§^ fl "O >%>4H,2 a u Ui o u CO — < cs —. c^ W Q Q PQ -a ^° c^ ^ * PQ U f^oNi 'ssnax NOSNVH Aa adxvoiyavd XON di QIOA QNV nnnN 01 N CN O X CN PH Q CN O X CN PlH E-1 on PP OH C=5 <=0 S CN ri i=i u hJ J J Q 3 Q u u u H 03 03 O Z CN UNO oint Ul •a GFCTR Wd GFCTR Brg .a Pla D in Pla Q cn CJ a rfi B >, u H fl a "-I fi s u o hp CO fi eij 03 -g c^ « PQ ° S hH «ri=r' II II ^ S bpcN CN HJ CJ) pPi E Q .goQQoQ ™ r-i CN CN Q « Z Z a> rj 1^ 1^ , a.r: v ..^ "8 o o ..Q/c ni7 3NI 'ssnai hoSNVH AB QBivoiyavj AnvDuoadS ss3iNn Noisaa siHi JO janiwj MJHJO ANV ho Ajvnoaav ivyniondis 'ADvanoov 3HI aoj AiniaisN0dS3a ON jd303v n NVM IVS anv ONI 'ssnai NOSNVH o o N I nax NOSNVH ONI 'ssnuj. NOSNVH aaj.voiuavsi XON QIOA QNV innN 96-03-U 3iva >na-ODda-sw oNmoona 3? ONiovaa z: < Q_ (/) LLJ C/) < o o Q Q: O X o o o m (/) ce UJ LU < I < o f— o LJ tn o I CJ 2 O h-o LJ 00 < a: o CJ 1/5 CO ce 00 00 ZD Ct: o < ZD 2 < LJ CL Csl UJ o < a. o z or < LLJ m J o CJ CJ < SBSsnyi aooM ONiovaa boj SN0liVaN3lN1^033a NOIlVl^dOJNI IVNOIiiaQV dOJ IBIMOOS SSnyi JO a3A03 3aiSNI Oi y3J3d ONI 'ssnai NOSNVH AS a3ivoiaavj Amv3iji:33dS SSSINH Nois3a siHi JO 3Mniv3j y3Hio ANV ho A0vn03av nv^jfuonais 'AOvynaDv 3MI 803 MniaiSiM0dS3H ON ld330V 13 NVM IVS QNV 'JNl 'SSniJi NOSNVH a Q N nWX NDBNVH ONI 'ssnuj. NOSNVH XB oaxvoiuevd XON ;:1I aioA QNV niHN a3SIA3a 60-30-31 3iva OVaa-SSBddl^GD-SI'^ 3WN33IJ "iiviaa a3M NOissBddi^oo 2 O (/) (/I CD < 1 UJLU , < 1 ^5 // < 2 / k z o / 0 SECT IT lU < LU ir X CO * UJ > UJ X o X $ I— X Q: UJ UJ rv H Om UJm 3: Ul U.5 Ou. «o So UJ u. o b to z u < GO O ® z o p UJ UJ rin UJ OUJ*^ Ojz 2UJ_.0J QuJ^-* UJSUJS Oz I 0<t2H LO _J < X X) o I CN /—COMPRESSION / WEB UMERAL /"BRACING X CN 2-10d ^{ .131X3" ) > NAILS XI ^ 2-10d .131X3" NAILS +1 Xi IX XI B a IX o CO CO UJ or Q_ O o o Q O Z CJ < OQ z o Q. O o o z 3 CO ro QQ O m UJ IxJ (/) < 00 QQ (/) LJ Qi; Q- o o e z LJ Q: O O •jNi 'ssnyi NOSNVH AB a3iv3idevj A33v3iji33dS ss33Nn N0IS3Q SlHi 30 3dniV3J a3HiO ANV 80 A3Vn03av IWHiOnaiS 'A3Van33V 3Hi iJOJ Xini8ISNOdS3a ON ld333V 13 NVM IVS QNV 'ONI 'SSnm NOSNVH a V Ml n^X NOSNVH ONI 'ssnux NOSNVH AQ aaxvoiUBV.^ XON ^I OIOA ONV -|-inN 96-SZ-l I 3iva .V, nivi3a ce UJ UJ ce to CO ce /-•NIN3dD .OC -Or 3NI 'SSndi NOSN'/H AB aaiVOiaavj A33V3IJI33dS SS31Nri N0iS3a SIHI 30 3aniV33 a3Hio ANV ao A3vno3av 3vani3nais 'Aovanoov 3Hi aoj AiniaisN0dS3a ON id333v n NVM IVS QNV ONI 'ssnai NOSNVH nUXNQBNVH O id • O N i ONI 'ssnux NOSNVH XB OaXVOIUBV^ XON =11 OIOA QNV "IHON 3 96-Z3-U 3iv(>^3ViS-dJ-SlN nivi3a ><ovis 3Dvnd3aiJ a: UJ Q. 0 z Q; 1 O 3 in y Ul 3 o < O m =3 ^ Ul Q. < u ^ ^ 9o Ul I— Ul Q: < t 1.^^ o i 2 d o: O u. o Q. O I in to o < ^ > y li oS ce _j 3 < o 3 o< LJ si •3NI ssnai NOSNVH asivoiaavj Anvoijissas ss33Nn N0iS3a SIHI JO 3anjvj3 aSHio ANV ao A3vno3av ivjjnionaiS 'Aovanoov 3Hi a03 Aini9ISN0dS3a ON id333V 13 NVM IVS QNV 'OMI 'SSnaj NOSNVH o V N I nWi NQBNV ONI 'ssnux NOSNVH xa aaxvoiuavd XON M aioA QNV nnnN 66-3-3 nijivo-sw 3WN3nij nivi3a „nniJ„ viNaojnvo O O J < _,o J O ZIQ: • J < CL < rn iri 3NI 'ssnai NOSNVH AS a31V3IMaV3 A33V3l3l33dS SS31Nn N0is3a SlHi 30 3aniv33 a3Hio ANV ao A3vno3av 3van.i3najs 'A3van33v 3Hl a03 AiniaiSN0dS3a ON Ld333V n NVM IVS QNV •3NI 'SSnai NOSNVH a V o N I naX NDBNVH ONI 'ssnux NOSNVH XB aaxvoiusvd XON dl aiOA QNV nnnN 60-^1-31 3Jva A3y cJIH1V3-Sh 3MVN31IJ nivi3a diH viNaojnvo N0IS30 SIHI 30 3anjv33 a3Hio ANV ao A3vno3av 3vani3najs 'A3van33v 3HJ a03 A113l8ISNOdS3a ON ld333V 11 NVM IVS QNV 'ONI 'SSnai NOSNVH a max NDBNVH 66-Z:L-U 3iva 0M0'>IDVraV3HS-SN 3mN33i3 < < LJJ X 00 Lul > o Q or o X o o I— I— o CD CJ < ~3 00 LJ o ct: o < ct: LJ o • ••• o cr o < cr o 1^ oo o o 00 Csl o o ao Ld t— CL UJ LU X CD X oo X o X LD 3NI "ssnai NOSNVH i.a a3iv3iasvj Aiiv3i3i33ds ss3iNn Nnis30 siHi 30 3anLV33 ainjo ANV ao AOvnosov ivani3niiis *A3van33v 3Hi a03 JdniaiSN0dS3a ON ld333V n NVM IVS QNV •3NI 'SSnai NOSNVH V Ml I nUXNOSNVH ONI 'ssnux NOSNVH XB oaxvoiuavd XON dl aioA ONV nnnN 80-S-313iva OMQ'OOai 3WN33IJ -LtdOd3y oaol (t (/) z 111 I- o m o,— (0 0) 0) IT) CO (D CM S * (M I a: 0) lU a: DC to 0 0 < in I o: 05 LU DC o Q_ UJ a: z O < _l < > ILI 6 o >- < Z) cn oo 8 a) ^ UJ < J Q_ m D tr h 0 0 I Q. h 0) 111 D J < > UJ 0 z < h tn UJ QC J < tr UJ h < X h-a z [ll _j o o lU a. (n 111 cc < O < oc O IL o z o o HI QC Q UJ < UJ in UJ o UJ CL CO CO 00 ^-CN oo o o 00 CD r^) o to r-- OO c^J in in CJ) 00 00 >— 00 oo ^ r^ tn to to tn O) in CN o CM o 00 00 00 in CN o CN ^ ^ ^' _i LL. 1 _l u_ Li_ Li_ CL Li_ Lu CL Q X CO IJ Q X C/1 O o O O 00 OO 00 CN CN CN CNJ n E o ta p o> « CO o iz (d c o o U CO 0) u CO £ O o Ul i= O 4) -S 9- E fl> E >-(d c _ o (d 3 (D (O to (d O I- D) " 12 •O O XI 3 " » O 0) a) a c 13 c ' O (0 10 (0 0) g> 4> •2 -S ^ Id at > CL > I I I 0) UJ D J < > z 0 0) z UJ h o z lij _j o I- o 111 li- en 111 CE < O -I It. O z Q H O III Q 00 (0 0) d a (d «) a x: O c «> a ta •O c 3 o a «> u Id 10 4) 3 Id > I X I-o z lU (n UJ D J < > ft < UJ I o o lU CL cn LU CE 6 in to < O _J IL o z o o UJ Q o O) in rn oo tn to CN to O) lO 1064 1228 o in to to to in in to o CM 00 Ul «> jd a Id a 4> a x: U c a Ul T3 c 3 O a » a m «> Id > I UJ h 0 z i h 0) UJ D 0 UJ DC z 0 Q. D UJ J m < J < > < Q. 0 0 J J D U. ^ Diagonal bracing-repeat at approximalely 20 teel inlervals in Icnglh of building. Added diagonal bracing in the plane of the web mcmbefs, prevents lateral movement Space: 12 feet lo 16 teel on center across building for roofs Space. 8 feet on center across building for floors Figure 4(a] r II // II '/ ; ~xContinuous lateral bracing maintains spacing, but permits trusses to move laterally Figure 4(b) between laterals placed at approximately 45 degrees is recommended for stability of the bottom chord. Diagonal bracing in the plane of the bottom chord is generally not required throughout the length of the building, but it is recommended lhat it be located at least at each end of the building. In most cases, temporary bracing in the plane ofthe bottom chord is installed at the locations specified on the architectural plan for permanent bracing, and is, therefore, left in place as permanent bracing. Figure 5 illustrates bracing in the plane of the bottom chord. Full bundles of plywood should not be placed on trusses. This construction load should be limited to 8 sheets of plywood on any pair of trusses and should be located adjacent to the supports. No excess concentration of any construction materials (such as gravel or shingles) 10 ^ Diagonals form braced bay at approximately 20 feet inlervals, repeal at both ends ZZZ22i 7ZZZ. "cTZTZ YZZZL CT" O Continuous lateral bracing spaced 8 feel to 10 feel located at or near a panel point. —\ Bottom chord of trusses (typical) TZZZt Figure 5 should be placed on the trusses in any one area; they should be spread cut evenly over a large area so as to avoid overloading any one truss. All mechanical equipment should be located only on the trusses specifically designed to support it. It should not be dropped or even set temporarily any other area unless the trusses are adequately shored. All floor trusses should be adequately shored if pallets of masonry materials are to be stored temporarily until the next higher walls are finished, STAGE THREE: Permanent Bracing is designed and specified by the architect or engineer for the structural safety of the building, tt is the responsibility of the building designer to indicate size, location, ancj attachments for all permanent bracing as required by design analysis. In general, it is desirable to design and locate all bracing so that it may work together with other structural parts of the builcing (such as shear walls, portal frames, bearing walls, columns, beams, etc) to achieve total integrity. y///. I, ^22 1 . 1 . \ 1 \ 1 \ \ -rl T 1 1 1^1 1 ; -I r 1 l! 1 1 1 J 1 1 1 / ( : i / H •7 \ ; ( 1 i r- 1 I... r rr i 1 1 / / / V I \ ' 1 1 1 1 t t 1 1 1 1—*~r 1 1 1 ^ 1~ 1—'"T!—^ L-—V- —h 1 \ —h ' 1 t 7Z/7k, ^ ^ —^ C — All top chords can buckle togelfier if there IS no diagonal bracing Roof purlin (typical) Top chorOs can buckle despite frequent purlins Figure 6(a) Permanent bracing must provide sufficient support at right angles to the plane of the truss to hold every truss member in the position assumed for it in design. In addition, permanent bracing must be designed to resist lateral forces imposed on the completed building by wind or seismic forces. Permanent bracing may be subdivided into three logical components: 1, Top Chord Plane. This bracing is designed to resist lateral movement of the top chord. If plywood floor or roof sheathing is properly applied with staggered joints and adequate nailing, a continuous diaphragm action is developed and additional bracing in the plane is generally not required. Some metal roofing materials may be depended upon to act as a diaphragm when properly lapped and nailed. Selection and use of these materials is at the discretion ofthe building designer. 11 12 —Diagonals form braced bay Repeat at both ends and al approximately 20 leet intervals Diagonals bracing nailed to under j side of top chord prevents lateral movement of lop chord. Figure 6(b) If purlins are used, spaced not exceed the buckling length of the top chord, and adequately attached to the top chord, it is recommended that diagonal bracing be applied to the underside of the top chord to prevent lateral shifting of the purlins. Figures 6(a) illustrates the necessity for applying diagonal bracing in the plane of the top chord despite the use of closely spaced purlins. It is recommended that this diagonal bracing, as shown in Figure 6(b), be installed on both sides of the ridge line in all end bays. If the building exceeds 60 feet in length, this bracing should be repeated at intervals no greater that 20 feet. 2. Web Master Plane. The purpose bracing is to hold the trusses in a vertical position and to maintain the design sparing. In addition, this lateral bracing may be required to shorten the buckling 13 length of a web member As described earlier in the discussion of building design and truss design (STAGE ONE), diagonal bracing or end anchorage is essential to stabilize the lateral bracing. Diagonal bracing in the plane of the web members is also used to distribute unequal loading to adjacent trusses and to spread lateral forces to diaphragms or shear walls. Spacing of rows of diagonal bracing in the plane of the webs is a matter of judgment to be made by the building designer, and will depend upon the truss span, truss configurations, type of building, and the loading. Generally, for roof trusses, the spacing ranges from 12 feet to 16 feet depending upon how it relates to the bracing in the plane of the top chord. For floor trusses the cross bracing should be approxim ately 8 feet on centers. Lateral 2x6 strong-backs may also be used for some floor systems. Figure 1 and Figure 4 illustrate bracing in theplaneof the webs. 3. Bottom Chord Plane This bracing is required to maintain the truss design spacing and to provide lateral support to the bottom cnord to resist buckling forces in the event of reversal ot stress due to wind uplift or unequal roof or floor loadings. For multiple bearing trusses or cantilever conditions, portions ofthe bol':om chord become compression members and should be braced laterally to resist buckling in the same manner as the top chord of simple span trusses. Bracing in the plane of the bottom chord is also designed to transfer lateral forces due to wind or seismic loads into side walls, hear walls or other resisting structural elements. Diagonals between continuous lateral bracing serve to stabilize the bottom chord. It is recommended that one complete bay of diagonal bracing be installed at each end of any building, and additional such bays be located at specified intervals no to exceed 20 feet. Figure 5 illustrates the use of bracing in the plane of the bottom chord. These recommendations for bracing wood trusses have been derived from the collective experience of leading technical personne in the wood truss industry but must, due to the nature of responsibilities involved, be presented only as a gu/defortheuseof a qualifieo building designer, builder, or erection contractor. APPENDIX It is intended that this appendix contain only tentative recommendations that may be used as a guide for on-site handling and erection until a more complete statement can be prepared. There may be some instances in which additional precautions will be necessary. UNLOADING. If possible, trusses shall be unloaded on relatively smooth ground. They shall not be unloaded on rough terrain that would cause undue lateral strain that might result in distortion of truss joints. Dumping of trusses is an acceptable practice provided that tiie trusses are not damaged or excessively stressed in the act of dumping. The builder shall provide protection from damage that may be caused by on-site construction activity. STORAGE. Care shall be taken so as not to allow excessive bending of trusses or to allow tipping or toppling while the trusses are banded or when the banding is removed. If trusses fabricated with fire retardant treated wood must be stored prior to erection, they should be stored in a vertical position to prevent water containing chemicals leached from the wood from standing on the plates. A further precaution may be taken by providing a cover for the trusses that will prevent moisture from coming in direct contact with the trusses and which can be ventilated to prevent condensation. ERECTING TRUSSES- The truss erector or builder shall take the necessary precautions to insure that handling and erection procedures do not reduce the load-carrying capacity of the truss. Trusses shall be installed plumb, at specified spacing and In- plane (i.e., trusses will be properly aligned). V \ V / / / Approximately '/!• p. of truss length A suggested procedure for lifting trusses is illustrated in Figure A(1) if the truss span does not exceed 30 feet. For truss spans between 30 feet and 60 feet a suggested lifting procedure is shown in Figure A(2), It should be noted that the lines from the ends ofthe spreader bar "toe-in." If these lines should "toe- out, "they will tend to cause buckling ofthe truss. For lifting trusses with spans in excess of 60 feet, it is recommended that a strong-back be used as illustrated in Figure A(3), The strong-back should be attached to the top chord and web members al intervals of approximately 10 feet. Further, the strong- backs should be at or above the mid-height of the truss so as to prevent overturning. The strong-back can be of any matenal with sufficient rigidity to adequately resist bending of the truss.