Loading...
HomeMy WebLinkAbout1145 CARLSBAD VILLAGE DR; ; 74-2106; PermitPLUMBING PERMIT APPLICATION City of CARLSBAD, CALIFORNIA Applicant to complete numbered spaces only Permit No JOB ADDR ESS MAIL ADDRESS ARCHITECT OR DESIGNER MAIL ADDRESS LICENSE NO ENGINEER MAIL ADDBE5S t\ff 3 fff LICENSE NO COMfB-ENSATIQN fNS CARRIER WAIL ADDRESS USE OF BUILDING $7* 8 Class of work D ADDITION D ALTERATION D REPAIR Describe work 5 x PERMIT FEES No Type of Fixture or Item Fee SPECIAL CONDITIONS WATER CLOSET (TOILET) BATHTUB LAVATORY (WASH BASIN) SHOWER KITCHEN SINK & DISP DISHWASHER APPLICATION ACCEPTED 6V.PLANS CHECKED BY LAUNDRY TRAY CLOTHES WASHER WATER HEATER NOTICE THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR APERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM MENCED i HEREBY CERTIFY THAT i HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION URINAL DRINKING FOUNTAIN FLOOR—SINK OR DRAIN SLOP SINK GAS SYSTEMS NO OUTLETS WATER PIPING & TREATING EQUIP WASTE INTERCEPTOR VACUUM BREAKERS LAWN SPRINKLER SYSTEM SEWER CESSPOOL SEPTIC TANK & PIT ROOF DRAINS SIGNATURE OF CONTRACTOR OR AUTHORIZED AGENT PERMIT SIGNATURE OF OWNER (IF OWNER BUILDER)TOTAL FEE 7 $| y WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT PLAN CHECK VALIDATION CK M O CASH PERMIT VALIDATION CK MO CASH INSPECTOR !', £ C - 1 V San O J B ASKEW M D M P H Din~c:~3Fi OF PUJLIC HEALTH TArEXT OF PUBLIC HEALTH PACIFIC H1GH//AV SAN DIFCO CA 921O' August 27, Mr, ileil Williamson, District Shell Oil Company P. 0. Box. 20158 3^11 Camino Del Rio, Suite San Diego, CA 92120 Dear Mr. Williamson: Your three hundred and eighty Construct and Permits to Oper and tventy-nine Shell service briefly reviewed, and the District has decided on t Authority to Construct; is granted hereby pursuant to Rule 20 and 20.1, Rules and Regulations of the Air Pollution Control District for these facilities with monthly throughputs as stated on the individual applic- ations, using the Shell Oil Company vapor recovery system consisting of: \J/^~~) {/"Y 2 alternating service activated carbon canisters with 960 ^ I pounds of carbon . ) 1 Soencer kO cfm, 12 ounce suction assist blower-ft. .^ J- •* Kinney de sorb ing vacuum pusrp, model KD-30A 1 Young air-cooled heat exchanger, Model AU-105S *> -*• .ppropriate number of special vapor recovery nozzles as previously tted to the District. Reference drawings: Shell Oil Co. £-16361-!; dated Rev. 1 - 8/6/73 Shell Oil Co. E-16363-1; da-ced " 1 - 8/6/73 " D-73238-1; " " " i. tr it D-732Q2-1- " " ' " Mr. i'eil Williamson Shell Oil Co. PJ Tne:ie Authorities to Construct are issued conditional on the following: 1. Two vapor control systems are used on the service station located at 2075 Balboa Ave. having a nonthly throughput of 172?600 gallons per month 2. That adequate provisions be made to measure and sample the vapor flow entering the recovery system and leaving \ IT. as to be specified by the District. 3. That provisions be made to eliminate or reduce problems of liquid blockage in vapor return lines, vhen they occur. The approval of your applications for Authority to Construct and Permit to Operate can not be conditioned on any compliance date in your applications beyond the legal corrpliance date of December 1, 197^. Therefore, any extension beyond that date can only be granted through the issuance of a variance by the Air Pollution Hearing Board. The granting of variances are based upon findings by the Hearing Board which substantiate such action. If good faith efforts to meet Rules 6l and 63 are demonstrated by your company, this office would be in s position to support such a request. This Air Pollution Control District Authority to Construct does not relieve bhe holder from obtaining permits or authorisations that may be required by other governmental agencies. Please nobify bhe Air Pollution Control District as soon as the equipment is installed and in operational status so that it may be evaluated z'or Permit to Operate purposes. Applicant nust be prepared to make all changes to this equipment if indicated by future tes-cs. No further applications are necessary. The application filing fee receipts will be sent to you at a Irrcer date, together with a listing of all facilities, application ni^bers, tank si^es and other pertinent information. If you have any questions regarding this action, please contact Ray Skoff, Acting Senior Air Pollution Engineer, at 236-3826. Your cooperation in this natter Td.ll be appreciated. Sincerely, IIORMAJT H. SCHSLL Deputy Air Pollution Control Officer ITSS'RG'ba