HomeMy WebLinkAbout1145 CARLSBAD VILLAGE DR; ; 74-2106; PermitPLUMBING PERMIT APPLICATION
City of CARLSBAD, CALIFORNIA
Applicant to complete numbered spaces only Permit No
JOB ADDR ESS
MAIL ADDRESS
ARCHITECT OR DESIGNER MAIL ADDRESS LICENSE NO
ENGINEER MAIL ADDBE5S t\ff 3 fff LICENSE NO
COMfB-ENSATIQN fNS CARRIER WAIL ADDRESS
USE OF BUILDING
$7*
8 Class of work D ADDITION D ALTERATION D REPAIR
Describe work
5
x
PERMIT FEES
No Type of Fixture or Item Fee
SPECIAL CONDITIONS WATER CLOSET (TOILET)
BATHTUB
LAVATORY (WASH BASIN)
SHOWER
KITCHEN SINK & DISP
DISHWASHER
APPLICATION ACCEPTED 6V.PLANS CHECKED BY LAUNDRY TRAY
CLOTHES WASHER
WATER HEATER
NOTICE
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC
TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR APERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM
MENCED
i HEREBY CERTIFY THAT i HAVE READ AND EXAMINED THIS
APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT
ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS
TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED
HEREIN OR NOT THE GRANTING OF A PERMIT DOES NOT
PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE
PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING
CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION
URINAL
DRINKING FOUNTAIN
FLOOR—SINK OR DRAIN
SLOP SINK
GAS SYSTEMS NO OUTLETS
WATER PIPING & TREATING EQUIP
WASTE INTERCEPTOR
VACUUM BREAKERS
LAWN SPRINKLER SYSTEM
SEWER
CESSPOOL
SEPTIC TANK & PIT
ROOF DRAINS
SIGNATURE OF CONTRACTOR OR AUTHORIZED AGENT
PERMIT
SIGNATURE OF OWNER (IF OWNER BUILDER)TOTAL FEE
7
$| y
WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT
PLAN CHECK VALIDATION CK M O CASH PERMIT VALIDATION CK MO CASH
INSPECTOR
!', £ C - 1 V
San O
J B ASKEW M D M P H
Din~c:~3Fi OF PUJLIC HEALTH
TArEXT OF PUBLIC HEALTH
PACIFIC H1GH//AV SAN DIFCO CA 921O'
August 27,
Mr, ileil Williamson, District
Shell Oil Company
P. 0. Box. 20158
3^11 Camino Del Rio, Suite
San Diego, CA 92120
Dear Mr. Williamson:
Your three hundred and eighty
Construct and Permits to Oper
and tventy-nine Shell service
briefly reviewed, and the District has decided on t
Authority to Construct; is granted hereby pursuant to Rule 20 and 20.1,
Rules and Regulations of the Air Pollution Control District for these
facilities with monthly throughputs as stated on the individual applic-
ations, using the Shell Oil Company vapor recovery system consisting of:
\J/^~~)
{/"Y 2 alternating service activated carbon canisters with 960
^ I pounds of carbon
. ) 1 Soencer kO cfm, 12 ounce suction assist blower-ft. .^ J- •*
Kinney de sorb ing vacuum pusrp, model KD-30A
1 Young air-cooled heat exchanger, Model AU-105S *>
-*•
.ppropriate number of special vapor recovery nozzles as previously
tted to the District.
Reference drawings:
Shell Oil Co. £-16361-!; dated Rev. 1 - 8/6/73
Shell Oil Co. E-16363-1; da-ced " 1 - 8/6/73
" D-73238-1; " " "
i. tr it D-732Q2-1- " " ' "
Mr. i'eil Williamson
Shell Oil Co.
PJ
Tne:ie Authorities to Construct are issued conditional on the following:
1. Two vapor control systems are used on the service station
located at 2075 Balboa Ave. having a nonthly throughput
of 172?600 gallons per month
2. That adequate provisions be made to measure and sample
the vapor flow entering the recovery system and leaving \
IT. as to be specified by the District.
3. That provisions be made to eliminate or reduce problems
of liquid blockage in vapor return lines, vhen they occur.
The approval of your applications for Authority to Construct and Permit to
Operate can not be conditioned on any compliance date in your applications
beyond the legal corrpliance date of December 1, 197^. Therefore, any
extension beyond that date can only be granted through the issuance of
a variance by the Air Pollution Hearing Board.
The granting of variances are based upon findings by the Hearing Board
which substantiate such action. If good faith efforts to meet Rules 6l
and 63 are demonstrated by your company, this office would be in s position
to support such a request.
This Air Pollution Control District Authority to Construct does not relieve
bhe holder from obtaining permits or authorisations that may be required
by other governmental agencies.
Please nobify bhe Air Pollution Control District as soon as the equipment
is installed and in operational status so that it may be evaluated z'or
Permit to Operate purposes. Applicant nust be prepared to make all changes
to this equipment if indicated by future tes-cs. No further applications
are necessary.
The application filing fee receipts will be sent to you at a Irrcer date,
together with a listing of all facilities, application ni^bers, tank si^es
and other pertinent information. If you have any questions regarding this
action, please contact Ray Skoff, Acting Senior Air Pollution Engineer,
at 236-3826.
Your cooperation in this natter Td.ll be appreciated.
Sincerely,
IIORMAJT H. SCHSLL
Deputy Air Pollution Control Officer
ITSS'RG'ba