Loading...
HomeMy WebLinkAbout1165 CAPE AIRE LN; ; CB151824; Permit06-15-2015 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Plumbing/Mechanical/Electrical (PME) Permit Permit NG:CB151824 Builciing Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Reference #: PC #: Project Title: 1165 CAPE AIRE LN CBAD PME 2061402900 Lot #: HOLLINGSWOTH RES- ELECT PANEL UPGRADE FOR A PHOTOVOLTAIC INSTALLATION Applicant: SEQUOIA ROOFING INC STE 106 5933 SEA LION PL CARLSBAD CA 92010 760 739-7663 Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: ISSUED 06/15/2015 RMA 06/15/2015 06/15/2015 XT' Owner: HOLLINGSWORTH FAMILY TRUST 03-04-05 1165 CAPE AIRE LN CARLSBAD CA 92008 Plumbing Fees Electrical Fees Mechanical Fees Other PME Fees $0.00 $0.00 $0.00 $0.00 TOTAL PERMIT FEES $0.00 Total Fees: $0.00 Total Payments To Date: $0.00 Balance Due: $0.00 Inspector: FINAL APPROVAL Date: Clearance: NOTICE: Please take NOTICE ttiat approval of your project includes ttie Imposition" of fees, dedications, reservations, or ottier exactions Iiereafter collectively referred to as "fees/exactions." You iiave 90 days from ttie date ttiis pemiit was issued to protest imposition of these fees/exactions. If you protest ttiem, you must follow ttie protest procedures set fortfi in Govemment Code Section 66020(a), and file ttie protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attacl<, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any (ees/exactions of which vou have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously othenwise expired. Inspection List Permit#: CB151824 Type: PME HOLLINGSWOTH RES-ELECT PANEL UPGRADE FOR A PHOTOVOLTAIC INSTA Date Inspection Item Inspector Act Comments 06/24/2015 33 Service Change/Upgrade PB AP 06/24/2015 39 Final Electrical PB AP 06/23/2015 33 Service Change/Upgrade PB AP 06/23/2015 39 Final Electrical PB AP 06/17/2015 33 Service Change/Upgrade PY AP Thursday, June 25, 2015 Page 1 of 1 \ ^^S(>inpra Energy ui«ity" ELECTRIC UNDERGROUND METER & SERVICE LOCATION Customer Copy Notification #: 300000039572 Job #: TB: 1106-G7 Wanted Date: ON INSPECTION Date Prepared: 05/20/2015 Customer Type: Residentlal(1-2 Units) Service Type: UG REWIRE (NO TRENCHING) Project Title: HOLLINGSWORTH RESIDENCE (SOT) Project Address: 1165 CAPE AIRE LN Project City: CARLSBAD Additional Address Info: Customer POC: Amanda Customer Phone #: 760-807-5292 SDGE Contact: Service Coordinator Contact Info: WENDY JENSEN,760-476-5611 I I Traffic Control Permit Required • SDG&E Application Required-Call: 1-800-411-7343 Excavation/Encroachment Permits Required By: Municipal Inspection required By: CITY OF CARLSBAD Temp Service Charge due on First Bill $ 0.00 SERVICE ATTACHMENT POINT AND/OR METER LOCATION: Install 125-amp meter panel at existing location over existing conduit and service conductors. Customer to install the new panel to meet the location of the existing landing lugs. If, for any reason, the conductors cannot be reconnected due to substandard or damaged conduit, it is customer responsibility to trench and replace the conduit from the panel to the source. Call Wendy Jensen at 760-476-5611 to schedule a morning disconnect with afternoon reconnect provided that the City releases inspection to SDG&E by 2:00 PM on the same day the crew is scheduled.To avoid delays with reconnection, your permit should read "Customer Outage Involved". Station ID #: 303-71 Structure*: D3595166937 Joint Trench With: Handhole Installed By: Handhole Lid Shall Read: Standards Page: Ladder Arms: Stop Trench: from Pole Riser Quad: Bend Installed By: Bend Type: Bend Info: Conduit Installed By: Conduit Size: Service Panel Rating: 125 Number/Size of Main Switch: 1/125 Voltage: 120/240 # of Wires: 3 Phase: 1 Utilities Maximum Contribution to Fault Current: 10000 Metering: Self-Contained Meter Clips: 4 Meter height ~ 4'0" min. (3'0" min. for multiple installation) ~ 6'3" max. From finish grade to centeriine of meter base. Meters are required to be readily accessible 24 hours per day. Meters must be located in a safe area free of any potentially hazardous or dangerous condition. Provide 3-ft. x 3-ft. clear and level working space in front of meter. Where meter room is proposed, contact the planner at the nearest SDG&E office. Meter bases and meter service disconnects must be located at or immediately adjacent to each other and be identified with address and unit number. PROCEDURE FOR INSTALLATION 1. PHONE DIG ALERT "811" AT LEAST TWO DAYS PRIOR TO TRENCHING FOR LOCATION OF UNDERGROUND UTILITIES. 2. Phone Service Coordinator at 760-476-5611 for the following: - 3 Working days prior to trenching to arrange pre-meet with inspector and initiate trenching process. - After excavation of trench, installation of conduit and service entrance equipment at meter location, CALL FOR INSPECTION. Do not cover conduit wittiout inspector's written approval to backfill. - When trench is backfilled and compacted, CALL FOR INSPECTION. - If service entrance equipment is installed after backfill, CALL FOR INSPECTION OF THE EQUIPMENT. 3. Meter cannot be set until inspector has approved installation, including service equipment, and receipt of city/county/state inspection Additional Information: CH Right of Way Required Assessor's Parcel Number: To minimize the electrical outage, you are advised to schedule a morning disconnect with an afternoon reconnect. There is no charge for this service. Before you change out your meter consider (1) SDG&E needs advance notice to schedule a crew and (2) SDG&E will not reconnect the service without municipal approval on the new panel. Please contact the City/County regarding permits and inspections. City/County inspection should be received prior to 2:00 p.m. on the same day as the disconnection of service to allow the SDG&E crew enough time for reconnection of the service on the same day. If SDG&E encounters hazardous or toxic material while performing construction of your project, SDG&E will halt work immediately and it will be your responsibility to remove and or clean up all hazardous or toxic material prior to SDG&E continuing construction. SDG&E shall have no liability or obligation whatsoever to cleanup, remove or remediate any hazardous or toxic materials discovered during the course of construction unless it is through negligence of SDG&E. Customer-owned facilities to receive gas service are subject to all applicable local and state of California inspection authority requirements. Building address and/or houseline must be permanently identified prior to meter set. Information on this sheet is void after six (6) months. Keep this notice with building permit. Planned By: Sheena Ellis Phone#:7604765610