Loading...
HomeMy WebLinkAbout1201 Bowsprit Way; ; CBR2018-2811; PermitPrint Date: 11/07/2018 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: # Dwelling Units: Bedrooms: Project Title: 1201 Bowsprit Way BLDG-Residential 2122101300 $4,800.00 Residential Permit Work Class: Cogen Lot#: Reference#: Construction Type Bathrooms: Orig. Plan Check#: Plan Check#: Description: BATTER: 3.6 KW ROOF MOUNT PV SYSTEM, 12 MODS, 1 INVERTER {city of Carlsbad Permit No: CBR2018-2811 Status: Closed -Finaled Applied: 10/15/2018 Issued: 10/15/2018 Permit 11/07/2018 Fina led: Inspector: Final Inspection: 10/26/2018 Owner: Contractor: FEE BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) SB1473 GREEN BUILDING STATE STANDARDS FEE STRONG MOTION-RESIDENTIAL TRUST BATTER LAURIE J 2004 TRUST 04-26-04 SULLIVAN SOLAR POWER 1201 Bowspirit Way CARLSBAD,CA 92011 8949 Kenamar Dr, 101 San Diego, CA 92121-243S 858-271-7758 Total Fees: $ 121.66 Total Payments To Date : $ 121.66 Balance Due: AMOUNT $70.61 $49.43 $1.00 $0.62 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees /exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. Building Division 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: •PLANNING 0 ENGINEERING •BUILDING •FIRE •HEALTH 0 HAZMAT/APCD «1~ Building Permit Application Plan Check Nor ./-1.>i'<..O ('). \ 5(. ;::i_ R') I 1635 Faraday Ave., Carlsbad, CA 92008 Est. Value -1/ Ll x'OO __: ~ C I TY OF Ph: 760-602-2719 Fax: 760-602-8558 Plan Ck. Deposit CAR LSBAD email: building@carlsbadca.gov www.carlsbadca.gov Date 10 /1,,,-!1<?1 JOBAODRESS SUITEf/SPACEf /UNIT# r PN 212 1201 Bowsprit Way -210 -13 -00 CT/PROJECT# I LOT# I PHASE# I# OF UNITS I# BEDROOMS # BATHROOMS I TENANT BUSINESS NAME 1 CONSTR. TYPE I occ. GROUP DESCRIPTION OF WORK: Include Square Feet of Affected Area/s) Roof Mounted PV System 3.6Kw (12)Modules (1 )Inverter EXISTING USE I PROPOSED USE I GARAGE (SF) PATIOS (SF) I DECKS (SF) FIREPLACE 1 AIR CONDITIONING I FIRE SPRINKLERS YES[)!. NU YES0 No 0 YESO NoD APPLICANT NAME Garrett Galasso PROPERTY OWNER NAME Laurie Batter Prtnuu Contact ADDRESS ADDRESS 8949 Kenamar Dr. STE 101 1201 Bowsprit Wav CllY STATE ZIP CITY STATE ZIP San Dieao CA 92121 Carlsbad CA 92011 PHONE 'FAX PHONE I FAX 619-458-1527 7 60-518-9304 EMAIL EMAIL garrett.galasso@sullivansolarpower.com DESIGN PROFESSIONAL CONTRACTOR BUS. NAME Sullivan Solar Power ADDRESS ADDRESS 8949 Kenamar Dr. STE 101 CITY STATE ZIP CITY STATE ZIP San Dieao CA 92121 PHONE t AX PHONE 858-271 -7758 I FAX EMAIL EMAIL info@SullivanSolarPower.com 'STATE LIC. # STATE UC.# ICLA5S I CITY BUS. LIC.1226671 839077 C-10 (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statementthat he Is licensed pursuantto the provisions of the Contractor's License Law (Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500}}. WORl<ERS ' COMPENSATION .· -. -- Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declaralions: D I have and will maintain a certificate of consent to self-Insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for wtiich this penrit is issued. [Z] I have and will maintain workers' compensation, as reouired by Section 3700 of the Labor Code, for the perfonrance of the work for wtiich this penrit is issued. My workers' compensation insurance carrier and policy number are: Insurance Co. Tri State Policy No. RWC8036284 Expiration Date 12N/18 This section need not be completed if the penrit is lorone hundred dollars ($100) or less. 0 Certificate of Exemption: I certify that in the perfonrance of the work forwtiich this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of Cal~omia. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in addition to the cost of compensation, damages as provided for In Section 3706 of the Labor code, interest and attorney's fees. ,H5 CONTRACTOR SIGNATURE I hereby affirm that I am eKempt from Contractors License Law for the following reason: • • • I, as owner of the property or my employees with wages as their sole compensation, will do the wort< and the structure Is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property wtio builds or improves thereon, and wtio does such wort< himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property wno builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). I am exempt under Section ____ ,Business and Professions Code for this reason: 1. I personally plan to provide the major labor and materials for construction of the proposed property Improvement. O Yes 0 No 2. I (have / have not) signed an application for a building penrit for the proposed work. 3. I have contracted with the following person (finr) to provide the proposed construction (include name address/ phone / contractors' license number): 4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name I address / phone I contraclors' license number): 5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (Include name/ address/ phone I type of work): .H$ PROPERTY OWNER SIGNATURE •AGENT DATE ,COMPLETE THIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? D Yes D No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? D Yes D No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? D Yes D No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. , CONSTRUCTION LENDING AGENCY I hereby affirm that there 1s a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (1) CIVIi Code). Lender's Name Lender's Address APPLICANT CERTIFICATION I certify that I have read the application and state that the above Information Is correct and that the Information on the plans is acaJrate.I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representative of the City of C8r1sbad to enter upon the aoove mentioned p-operty klr inspecfun purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN COOSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: M OSHA permit is required for excavations over 5'0' deep and demolnion or construction of structures over 3 stories in height. EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and becorre null and void ff the building or 'Ml!k authorized by sudl permit is not oommenced "Mthin 180 days from the date of such permit or if the building or \',Ork authorized by sudl permn is suspended or abandoned at any time after the 'Ml!k is oommenced for a period of 180 days (Section 106.4.4 Uniklrrn Building Code). _,15 APPLICANT'S SIGNATURE DATE PERMIT INSPECTION HISTORY REPORT (CBR2018-2811) Permit Type: BLDG-Residential Application Date: 10/15/2018 Owner: TRUST BATTER LAURIE J 2004 TRUST 04-26-04 Work Class: Cogen Issue Date: 10/15/2018 Subdivision: CARLSBAD TCT#95-05 EMERALO RIDGE EAST Status: Issued -Active Expiration Date: 04/24/2019 Address: 1201 Bowsprit Way Carlsbad, CA 92011 IVR Number: 14620 Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspectlon Date Start Date Complete 10/26(2018 10/26(2018 BLDG-36 Solar 074313-2018 Passed Andy Krogh Complete Panel BLDG-Flnal 074388-2018 Passed Andy Krogh Complete Inspection Checklist Item COMMENTS Passed BLDG-Electrical Final Yes November 07, 2018 Page 1 of1