Loading...
HomeMy WebLinkAbout1217 BELLEFLOWER RD; ; CB971185; Permitic/~~5~1956s- B U I L D I N G P E R M I T Permit No: CB971185 05,'2?,'57 11: 47 Project No: A9701547 Page 1 #f 1 Development No: DEV92002 Jol~Jkddress: 1217 BELLEFLOWER RD 4 Suite: Permit Type: SINGLE FAMILY DWLNG - DETACHED Parcel No: 214-542-09-00 Lot#: 45 Occupancy Group: Reference#: CT 92-02 Status: ISSUED Description: PLAN 2,PHASE 1,2833+636 GAR+56 Applied: 04/07/97 : SFPORCH,W/OPTIONS ,SEASIDE HGHTS,KAUFMAN Apr/Issue: 05/21/97 I Valuation: 235,344 Construction Type: VN Entered By: RMA Appl/Ownr : KAUFMAN & BROAD 619 259-6000 12626 HIGH BLUFF STE 400 SAN DIEGO CA 92130 5162 05/21/97 OOO1 01 02 15293 a 00 *** c-mm Plan Check Numbers > ORIG 970369 PCK 970792 A** Fees Required A** *** Fees Collected &I Credits Fees : Adjustments: Total Fees: Fee description ..................... Number of Bedrooms 1L Number of Bathrooms Building Permit Plan Check Strong Motion Fee or Enter Park-in- Enter "Y" to Autoc Enter "Y" to Autoc CFD Fees Waived(W) Payoff Fee for CFD * BUILDING TOTAL Enter #Units & Code- Enter "Y" for Plumbin Each Plumbing Fixture Each Building Sewer Each Install/Repair Water Each Water Heater and/or V Gas Piping System .oo 350.00 15,293.80 Ext fee ______------ 5.00 2.50 1116.00 725.00 24.00 1575.00 4283.00 540.00 4670.80 12933.80 2400.00 20.00 " 105.00 15.00 7.00 7.00 7.00 Da .-- 3 Y Y N D5 Y Each Vacuum Breaker > 2 7.00 14.00 k PLUMBING TOTAL 175.00 Enter "Y" for Electric Issue Fee > 10.00 Y Single Phase Per AMP > 200 .25 50.00 * ELECTRICAL TOT.AL 60 00 Enter 'Y' for Mechanical Issue Fee> 15.00 Y Install Furn/Ducts/Heat Pumps > 2 9.00 18.00 Each Install Fireplace 6.50 26.00 9.00 75.00 Each Exhaust Fan -- Each Install/Reloc Vent * MECHANICAL TOTAL moFcAFusMD 2075 Las palmes Dr., Cdsbd, CA 82009 (619) 438-1161 ta -- /8 FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE PLANNING CMWD . PLAN CHECK#: CB971185 DATE : PERMIT#: CB971185 PERMIT PROJECT NAME: ELAN %,PHASE- 1,2833+636 GAR+56 SFPOR",W/OPTIONS ,SEASIDE €IG€ITS,EEAUF" ADDRESS: 1217 BELLEFIDWER RD Lot# 45 it[ 10/ 14/9 7 TYPE: SFD INSPECTED DATE BY: INSPECTED: APPROVED - DISAPPROVED - FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE PLANNING CMWD WATER PLAN CHECK#: CB971185 DATE: 10/14/97 PERMIT#: CB971185 PERMIT TYPE: SFD ' ----..--. .= .-.- - PROJECT NAME: PLAN 2,PHASE. 1,2833+636 GAR+56 , .- SFPORCH,W/OPTIONS ,SEASIDE HGHTS,Kh" .:) !' k 1 ", ' - -w-- '%*I - ADDRESS: 1217 BELLEFLOWER RD CONTACT PERSON/PHONE# : C/HAROLD/929-1008 SEWER DIST: CA WATER DIST: CA .. .. . -. .. __ INSPECTED . DATE BY: INSPSCPEDz A~~PROVED - DISAPPROVED - INSPECTED DATE BY: INSPECTED : APPROVED - DISAPPROVED - *. . FINAL BUILDING INSPECTION PEPT: BUILDING ENGINEERING FIRE PLANNING CMWD WATER PLAN CHECK#: CB971185 DATE: 10/14/97 PERMIT#: CB971185 PERMIT TYPE: SFD SFPORCH,W/OPTIONS ,SEASIDE HGHTS,KAUFMAN PROJECT NAME: PLAN 2,PHASE 1,2833+636 GAR+56 - ADDRESS: 1217 BELLEFLOWER RD Lot# 45 CONTACT PERSON/PHONE#: C/HAROLD/929-1008 SEWER DIST: CA WATER DIST: CA CD INSPECTED: )0/16/p 7 - DISAPPROVED - DATE INSPECTED BY : DATE ..., - 1)JsEVecTED: .. * APPROVED - DISAPPROVED - . INSPECTED BY: INSPECTED DATE BY: INSPECTED : APPROmD - DISAPPROVED - FINAL BUILDING INSPECTION DEPT: BUILDING NG FIRE PLANNING CMWD WATER PLAN CHECK#: CB971185 DATE: 10/14/97 PERMIT#: CB971185 PERMIT TYPE: SFD PROJECT NAME: PLAN 2,PHASE 1,2833+636-.GAR+56 SFPORCH, W/OE;TIONS ,SEASIDE HGHTS , KAUFMAN Lot# @T 15 ADDRESS: 1217 BELLEFLOWER RD CONTACT PERSON/PHONE# : C/HAROLD/929-1008 SEWER MST: CA WATER DIST: CA INSPECTED DATE BY: IWZPFK3TED: APPROVED - DISAPPROVED - INSPECTED DATE BY: INSPECTED : APPROVED - DISAPPROVED - t FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING WZRl! PLANNING CMWD WATER PLAN CHECK#: CB971185 .DATE: 10/14/97 PERMIT#: CB971185 PERMIT TYPE: SFD PROJECT NAME: PLAN.2,PHASE 1,2833+636 GAR+56 SFPO~CH,W/OPTIONS ,SEASIDE HGHTS,KAUPMAN ADDRESS: 1217 BELLEFLOWER RD CONTACT PERSON/PHONE# : C/HAROLD/929-1008 SEWER DIST: CA WATER DIST: CA I - - _. I_ ~~ . .-I --" I x-._-. DATE ou INSPECTED: )cI.4.>!4~ APPROVED .k - DISAPPROVED e INSPECTED DATE BY: INSPECTED: APPROVED - DISAPPROVED - ' INSPECTED DATE BY: INSPECTED: APPROVED - DISAPPROVED - 4 TIME ARRIVE: TIME CODE 84 DESCRIPTION c \ ACT COMMENTS .* INSPECTION HISTORY LISTING c 10/30/97 FOR PERMIT# CB971185 DATE 1 O/ 2 1/97 10/21/97 10/20/97 10/20/97 09/29/97 09/29/97 08/2 9/9 7 08/29/97 08/28/97 08/28/97 08/20/97 08/20/97 08/20/97 08/20/97 08/ 11/ 9 7 0 8/ 11/9 7 08/ 07/97 08/ 07/9 7 08/07/97 08/ 06/9 7 08/06/9 7 06/2 3/9 7 06/2 3/9 7 06/13/97 06/13/97 06/13/97 06/ 13/ 97 0 6/ 09/ 9 7 0 6/ 02/9 7 INSPECTION TYPE Final Combo Final Combo Fin 1 Combo Fin 1 1 Combo Final Electrical Final Electrical Gas/Test/Repairs Gas/Test/Repairs Interior Lath/Drywall Interior Lath/Drywall Exterior Lath/Drywall Exterior Lath/Drywall Rough Combo Rough Combo Shear Panels/HD8s Roof Sheathing/Ext Shea Shear Panels/HD8s Roof/Reroof Roof Sheathing/Ext Shea Roof Sheathing/Ext Shea Roof Sheathing/Ext Shea Ftg/Foundation/Piers Ftg/Foundat ion/Piers Underground/Under Floor Underground/Under Floor Sewer/Water Service Sewer/Water Service Underground/Under Floor Underground/Under Floor INSP PD RI PD RI RI PD RI NF RI NF RI PD RI PD RI PD PD PD RI RI PD RI PY RI PD RI PD RI PD ACT NR RI CA RI RI AP RI AP RI AP RI AP RI AP RI AP NR NR RI RI NR RI AP RI AP RI AP RI AP COMMENTS C/HAROLD/929-1008 C/HAROLD/9 2 9 -10 08 C/HAROLD/ 9 2 9 - 10 08 C/HAROLD/ 92 9 -1 008 C/HAROLD/92 9-1008 C/HAROLD/ 9 2 9 - 10 08 C/HAROLD/92 9-10 08 C/ 9 2 9 - 10 0 8 C/HAROLD/929-1008 C/HAROLD/ 9 2 9 - 10 08 R/HAROLD/ 9 2 9 -1 0 0 8 R/HAROLD/ 9 2 9 - 1008 R/HAROLD/9 2 9 -1 0 0 8 R/HAROLD/929-1008 PM PLEASE HIT <RETURN> TO CONTINUE... P I I I - DAILY FIELD ENGINEERING REPORT PACIFIC SOILS ENGINEERING, IN%. Client: k+ a Work Order: &.,lutr~ Project Location: & wnD Weather Conditions: -5 ,& '? LKI Clients Representative: Nama . Tract No.: Date: b/43icc7 Project Name: Day: H~, ,,-\ Contractor: Approximate Fill Yardage : 5 I ~~~ Type and Number of Rigs in Operation: Description of Project Activities: Site Visitors / Firm: For Pacific Soils Engineering, Inc. / Page -of - dafldrptsam