HomeMy WebLinkAbout123 CHANNEL RD; ; CB150989; Permit04-13-2015
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Pool Permit Permit No: CB150989
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Reference #:
PC #:
Project Title:
123 CHANNEL RD CBAD
POOL
2146000901 Lot#;
$3,904.00 Construction Type:
0
NEW
DIVERDE RES- 80 SF GUNITE SPA
W/ GAS TO FIREPLACE-NOT TO EXCEED 6 FEET HIGH
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
ISSUED
04/02/2015
RMA
04/13/2015
04/13/2015
Applicant:
DIVERDE MICHAEL D&RONDA M
Owner:
DIVERDE MICHAEL D&RONDA M
123 CHANNEL RD
CARLSBAD CA 92011
619 884-3891
123 CHANNELRD
CARLSBAD CA 92011
Building Permit $61 27
Add1 Building Permit Fee $0 00
Plan Check $42 89
Add1 Plan Check Fee $0 00
Electrical Fee $33 00
Plumbing Fee $33 00
Strong Motion Fee $1 00
Green Bldg Standards (SB1473) Fee $1 00
Renewal Fee $0 00
Add1 Renewal Fee $0 00
Other Building Fee $0 00
Additional Fees $0 00
TOTAL PERMIT FEES $172 16
Total Fees: $172.16 Total Paynnents To Date: $172.16 Balance Due: $0.00
Inspector:
FINAL APPROX^AL ^
Date: >//;7^^^ Clearance:
NOTICE: Please take NOTIIJE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions.' You have 90 days from the date this permit was Issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030, Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exartinns of which vou have oreviouslv been oiven a NOTICE similar to this, or as to which the statute of limitations has oreviouslv otherwise expired.
04-13-2015
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No:SW150143
Job Address:
Permit Type:
Parcel No:
Reference #:
CB#:
Project Title:
123 CHANNEL RD CBAD
SWPPP
2146000901
CBI50989
DIVERDE RES- GUNITE SPA
Applicant:
DIVERDE MICHAEL D&RONDA M
Status: ISSUED
Lot#: 0 Applied: 04/02/2015
Entered By: RMA
Issued: 04/13/2015
Inspect Area:
Tier: 1
Priority: M
Owner:
DIVERDE MICHAEL D&RONDA M
123 CHANNEL RD
CARLSBAD CA 92011
123 CHANNEL RD
CARLSBAD CA 92011
Emergency Contact:
FERNANDO GERARDO
619 368-2115
SWPPP Plan Check
SWPPP Inspections
Additional Fees
$53.00
$224.00
$0.00
TOTAL PERMIT FEES $277.00
Total Fees: $277.00 Total Payments To Date: $277.00 Balance Due: $0.00
FINAL APPROVAL
SIGNATURE
THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: • PUNNING •ENGINEERING O BUILDING QFIRE • HEALTH • HAZMAT/APCD
Ccityof
Carlsbad
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
Ph: 760-602-2719 Fax: 760-602-8558
email: building@carlsbadca.gov
www.carlsbadca.gov
Est. Value
Plan Ck. Deposit
Date "XT m SWPPP
I CONSTft. TYPE I occ. Gf
JOB ADDRESS SUITE«/SPACE«/UNIT*
CT/PROJECT # I # OF UNITS I # BEDROOMS # BATHROOMS TENANT BUSINESS NAME
DESCRIPTION OF WORK: fncfude Square Feet of Affected Area(s)
EXISTING PROPOSED USE GARAGE (SF) PATIOS (SF) DECKS (SF) FIREPLACE
YES|~1# Noj I
AIR CONDITIONING
YES I |NO| I
FIRESPRINKLERS
YES I |NO| I
APPLICANT NAME
Prtnarv Contact
PROPERTY 01 "•"p.^^Oft ^;vy>^^
ADDRESS
^ ^ " Z _SIATE zip
ADDRESS
CITY
DESIGN PROFESSIONAL CONTRACTOR BUS. NAME
ADDRESS ADDRESS
CITY STATE ZIP CITY STATE
PHONE FAX PHONE
EIVIAIL EtVIAIL
CITY BUS. LIC.#
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicantfor such permitto file a signed statement that he is licensed pursuantto the provisions ofthe Contractor's License Law (Chapter 9, commenaing with Section 7000 of Division 3 ofthe Business and Professions Code) ortnat he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicantfor a permit subjects the applicant to a civil penalty of not more than five hundred doiiars ($500)).
WORKERS' COMPENSATION
Workers' Compensation Declaration: / hereby affinn under penalty of perjury one ofthe foliowing deciaratbns:
HI have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the woric for which this pennit is issued,
I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the perfomnance of the work for which this pemiit is issued. My workers' compensation insurance canier and policy
number are: Insurance Co, Policy No. Expiration Date
This section need not be completed if the permit is for one hundred dollars ($100) or less,
I I Certificate of Exemption: I certify that in the perfomiance of the wod( for which this pennit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of
Califomia, WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employerto criminal penaKies and civil fines up to one hundred thousand dollars (&100,000), In
addition to the cost of compensation, damages as provided for in Section 3706 ofthe Labor code, interest and attomey's fees.
JS^ CONTRACTORSIGNATURE • AGENT DATE
#WM£R-BUILOeR OECLARATION
./ hgreby affinn that I am exempt from Contractor's License Law for the foliowing reason:
I, as owner of the praperty or my employees with wages as their sole compensation, will do the work and the stmcture is not intended or offered for sale (Sec. 7044, Business and Prafessions Code: The Contractor's
License Law does not apply to an owner of praperty who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the bunien of proving that he did not buiid or improve for the purpose of sale).
I I I, as owner of the property, am exclusively contracting with licensed contractors to constmct the project (Sec. 7044, Business and Professions Code: The Contractors License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractors Ucense Law),
I I I am exempt under Section Business and Professions Code for this reason:
1.1 personally plan to provide the major labor and materials for construction of the praposed praperty impravement. QYes I iNo
2.1 (have / have not) signed an application for a building pemiit for the proposed work.
3.1 have contracted with the following person (fimi) to pravide the proposed constmction (include name address / phone / contractors' license number):
4.1 plan to provide portions of the work, but I have hired the following person to coonlinate, supen/ise and provide the major work (include name / address / phone / contractors' license number):
5.1 will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of wori():
^efpROPERTY OWNER SIGNATURE GENT DATE
MIILiTi Tliis SECTIOIt rO« i«OW-»tllOE»ITIAt BUiLDIIKi PESMITI OiiY
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration fomn or risk management and prevention program under Sections 25505,25533 or 25534 of the
Presley-Tanner Hazardous Substance Account Act? • Yes • No
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? • Yes • No
Is the fxility to be constracted within 1,000 feet of the outer boundary of a school site? • Yes • No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT
cioHsrnutjiot* LENDING ASINCY
I hereby affinn that there Is a constmction lending agency for the performance of the work this permit Is Issued (Sec. 3097 (I) Civil Code).
Lender's Name Lender's Address
APPtlCANT CER TI F I C A TlO M
1 certify that 1 have read the applteatnn and state that the above infbimation is conectand thatthe intbrniation on the plans is accurate. I agiee to complywith ail City oidinances and State iaws relating to building constnictkin.
I hereby authorize nepresentative ofthe City of Carlsbad to enter upon the above mentbned praperty fbr inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CfTY OF CARLSBAD
AGAINST ALL LIABILfriES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT,
OSHA: An OSHA pemiit Is required for excavations over 5'0' deep and demolitigii«^constaictton of stnictunKOver 3 stories In height.
EXPIRATION: Every pemiit Issued by the BuikJing Official under the provisipilSof this Cojj&sbaJ expjjjjftffi&in and become null and void If the buikiing or wik aulhorized by such pemiit is not commenced wilhin
180 days from the date of such pemiit or if the buiWing or WDrt< authorizafby sudi^effnitis su^sflCled or abandoned at any (me ater the work is commenced fijr a peiiod of 180 days (Sectionip6.4.4 Unlfemi Building Code).
>eS"APPLICANT'S SIGNATURE DATE
iced for a peiiod of 180 days (Section
Inspection List
Permlt#: CB150989 Type: POOL DIVERDE RES- 80 SF GUNITE SPA
W/ GAS TO FIREPLACE-NOT TO EXCEED
Date Inspection Item Inspector Act Commeni
07/14/2015 55 Fence/Pre-Plaster -Rl GC 3938
07/14/2015 59 Final Pool -Rl GC 3938
07/14/2015 59 Final Pool PY AP
07/06/2015 53 Electric/Conduit/Wiring PY AP
07/06/2015 55 Fence/Pre-Plaster -Rl GC 3938
07/06/2015 55 Fence/Pre-Plaster PY PA
07/06/2015 59 Final Pool -Rl GC 3938
06/30/2015 51 Excav/Steel/Bonding/Fence PB NR
06/11/2015 23 Gas/Test/Repairs PB AP
06/11/2015 31 Underground/Conduit-Wirin PB AP
05/18/2015 21 Underground/Under Floor PB AP
05/18/2015 51 Excav/Steel/Bonding/Fence PB AP
05/15/2015 51 Excav/Steel/Bonding/Fence PB CA
Friday, July 17, 2015 Page 1 of 1
i' ml ^ PLAN CHECK i' ml ^ PLAN CHECK Community & Economic
CITY OF REVIEW Development Department
1635 Faraday Avenue
CARLSBAD TRANSMITTAL Carlsbad CA 92008
www.carlsbadca.gov
DATE: 04/06/2015 PROJECT NAME: DIVERDI RESIDENCE SPA AND FIRE PIT
PLAN CHECK NO: 1 SET#: 1 ADDRESS: 123 CHANNEL ROAD
VALUATION/SCOPE OF WORK: SPAAND GAS FIRE PIT
PROJECT ID: CB 150989
APN: 214-600-09 01
This plan check review is complete and has been APPROVED by the ENGINEERING
Division.
By: VALRAY NELSON
A Final Inspection by the ENGINEERING Division is required Yes / No
This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the
attached checklist. Please resubmit amended plans as required.
NOTE; ONLY ITEMS THAT NEED CORRECTiON/CLARIFICATfON ARE MARKED X,
Plan Check Comments have been sent to: CARIEJONES@HOTMAIL.COIV[
You may also have corrections from one or more ofthe divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit
Resubmitted plans should Include corrections from all divisions.
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING
760-602-4610
ENGINEERING
760-602-2750
FIRE PREVENTION
760-602-4665
Chris.Sexton@carlsbadca.gov
Kathleen Lawrence
760-602-2741
Kathleen.Lawrence@carlsbadca.gov Gregory.Rvan@carlsbadca.gov
Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cvnthia.Wong@carlsbadca.gov
/ ValRay Marshall
^ 760-602-2773
ValRay.Marshall(5)ca risbadca.gov Dominic.Fieri@carlsbadca.gov
Remarks:
Any outstanding issues ivill he marked ivilh unl X I Make the necessary corrections for
compliance ipilh applicable codes and standards. Submit corrected plans and/or specifications to
the Building division for re-submillal to the Engineering divisions.
Items that confonn to jiennit retjuirements are marked tvith [ ^ |
1. SITE PLAN
Provide a fully dimensioned site plan drawn to scale.
Show:
North arrow
Existing & proposed structures
Property line dimensions
Easements
Show on site plan:
Drainage patterns
Existing & proposed slopes
Existing topography
Retaining Walls (location and height)
/ Indicate what will happen with soil excavated from pool area.
Include on title sheet:
/ Site address
/ Assessor's parcel number
Legal description/lot number
Grading: Quantities of
Cut Fill Import Export
Project does not comply with the following engineering conditions of approval
for project no:
Conditions were complies with by: Date:
LOT NO,
MAP NO.
REF. NO.
E-37 Page 2 of 4 REV 6/2012
2. GRADING PERMIT REQUIREMENTS
The conditions that require a grading permit are found in Section 11.06.030 of the Municipal
Code.
Inadequate information available on site plan to make a determination on grading
requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and
remedial). This information must be included on the plans. If no grading is proposed
write: "NO GRADING"
Grading Permit required. NOTE: The grading permit must be issued and rough gradinq
approval obtained priorto issuance of a building permit A separate grading plan prepared a
registered civil engineer must be submitted together with the completed application form attached.
/ No grading permit required.
MISCELLANEOUS PERMITS
N/A RIGHT-OF-WAY PERIVIIT is required to do work in city right-of-way and/or private work
adjacent to the public right-of-way.
A separate right-of-way issued by the engineering division is required for the following:
Please complete attached right-of-way application form and return to the engineering
department together with the requirements on the attached right-of-way checklist, at
the time of resubmittal.
Right-of-way permit and pool permit will be issued simultaneously.
E-37 Page 3 of 4 REV 6/2012
4. STORMWATER
Construction Compliance
/ Project Threat Assessment Form complete / incomplete
/ Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form
and return (SW 15-143 )
Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2
SWPPP, payment of processing fee and review by city.
Post-Development (SUSMP) Compliance
^ Storm Water Standards Questionnaire complete / incomplete
Project is subject to Standard Storm Water Requirements. See city Standard Urban
Storm Water Management Plan (SUSMP) for reference.
http://www,carlsbadca,qov/business/buildinq/Documents/EnqStandsw-stds-vol4-ch2.pdf
Project needs to incorporate low impact development strategies throughout in one or
more of the following ways:
Rainwater harvesting (rain barrels or cistern)
Vegetated Roof
Bio-retentions cell/rain garden
Pervious pavement/pavers
Flow-through planter/vegetated or rock drip line
Vegetated swales or rock infiltration swales
Downspouts disconnect and discharge over landscape
Other:
5. ADDITIONAL COMMENTS
E-37 Page 4 of 4 REV 6/2012
CITY OF
CARLSBAD
STORM WATER COMPLIANCE FORM
TIER 1 CONSTRUCTION SWPPP
E-29
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
STORM WATER COMPLIANCE CERTIFICATE
>^ My project is not in a category of permit types exempt from the Construction
SWPPP requirements
My project Is not located inside or within 200 feet of an environmentally
sensitive area with a significant potential for contributing pollutants to nearby
receiving waters by way of storm water runoff or non-storm water
discharge(s).
^ My project does not require a grading plan pursuant to the Carlsbad
Grading Ordinance (Chapter 15.16 ofthe Carlsbad Municipal Code)
My project will not result in 2,500 square feet or more of soils disturbance
including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas that meets
one or more ofthe additional following criteria:
• located within 200 feet of an environmentally sensitive area or the
Pacific Ocean; and/or,
• disturbed area is located on a slope with a grade at or exceeding 5
horizontal to 1 vertical; and/or
• disturbed area is located along or within 30 feet of a stonm drain inlet, an
open drainage channel or watercourse; and/or
• construction wiii be initiated during the rainy season or w/ili extend into
the rainy season (Oct. 1 through April 30).
1 CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE
CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING
FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN
ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS.
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST; (1) IMPLEMENT BEST
MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES
TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE
MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE
THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED
POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH
THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE
DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE
CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF
CARLSSAD. V
OWNEH(S)/pWNER'S AGENT N/sW(PRINp / J
R(S)/OWNER'S AGENT NAME (SIGNATURE) DATE OWNER(S)/OWNER'S AGENT NAME (SIGNATURE)
STORM WATER POLLUTION PREVENTION NOTES
1. ALL NECESSARY EQUIPMENT AND MATERIALS
SHALL BE AVAILABLE ON SITE TO FACILITATE
RAPID INSTALLATION OF EROSION AND
SEDIMENT CONTROL BMPS WHEN RAIN IS
EMINENT.
2. THE OWNER/CONTRACTOR SHALL RESTORE
ALL EROSION CONTROL DEVICES TO
WORKING ORDER TO THE SATISFACTION OF
THE CITY ENGINEER AFTER EACH RUN-OFF
PRODUCING RAINFALL
3. THE OWNEFl/CONTRACTOR SHALL INSTALL
ADDITIONAL EROSION CONTROL MEASURES
AS MAY BE REQUIRED BY THE CITY
ENGINEERING OR BUILDING INSPECTOR DUE
TO UNCOMPLETED GRADING OPERATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY
ARISE.
4. ALL REMOVABLE PROTECTIVE DEVICES SHALL
BE IN PLACE AT THE END OF EACH WORKING
DAY WHEN THE FIVE (5) DAY RAIN
PROBABILITY FORECAST EXCEEDS FORTY
PERCENT (40%). SILT AND OTHER DEBRIS
SHALL BE REMOVED AFTER EACH RAINFALL.
5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE
WITH 3/4 INCH MINIMUM AGGREGATE.
6. ADEQUATE EROSION AND SEDIMENT
CONTROL AND PERIMETER PROTECTION BEST
MANAGEMENT PRACTICE MEASURES MUST BE
INSTALLED AND MAINTAINED.
SPECIAL NOTES
PROJECT INFORMATION
Site Address:
Assessor's Parcel Numbe
Project ID:
ircei r^umpeiw^ \
Construction Pennit No
Estimated Construction Start Dati
Project Duration :3L
4^
. Months/^
Emergency Contact: ^O^^CiA
Name; ^Fei/ryCUcXO
24 hour Phone;
Perceived Threat to Storm Water Quality
2^ Medium
Q Low
If medium box Is checked, must attach a site plan
sheet showing proposed work area and location
of proposed structural BMPs
'0\
For City Use Only
Approved
CITY OF CARLSBAD
STANDARD TIER 1 iSVyPPP
Bv; \ih ll^Q l| JgJ(^.
ate; ^' [f \S
E-29 Page 1 of 3 REV 4/30/10
CITY OF
CARLSBAD
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 FaradayAvenue
760-602-2750
www.carlsbadca.gov
TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPEMENT PROJECTS ONLY
Complete the questions below regarding your redevelopment project: YES NO
Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than
50% ofthe surface area ofthe previously existing development?
If you answered "yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement of
impervious surface and not the entire development. Go to step 4, check the "my project meets PDP requirements" box and
complete applicant information.
If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4,
check the "my project meets PDP requirements" box and complete applicant information.
CHECK THE APPROPRIATE BOX AND COMPLETE APPUCANT INFORMATION
• My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stonnwater
criteria per the SUSMP and I understand I must prepare a Stonn Water Management Plan for submittal at time of application.
I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details.
• My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per
the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project.
Applicant Information and Signature Box
Address: y^,^ CWo^Av^V<Z^
Applicant Nam^rV^ J\ QNOL S
Applicant Signature:
Accessor's Parcel Number(s)
Applicant Title
Date:
This Box for City Use Only
City Concurrence:
By:
Date:
YES NO
Project ID:
* Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas
designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the
San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources
Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their
quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent
environmentally sensitive areas which have been identified by the Copermittees.
E-34 Page 3 of 3 Effective 6/27/13
Erosion Control
BMPs Sediment Control BMPs
Best Management Practice
(BMP) Description Geotextiles & Mats Wood Mulching Earth Dikes and Drainage Swales Slope Drains Silt Fence Sediment Trap Check Dam Fiber Rolls Gravel Bag Berm Street Sweeping and Vacuuming Sandbag Barrier Storm Drain Inlet Protection Stabilized Construction Ingress/Egress Stabiiized Construction Roadway Water Consen/ation Practices Paving and Grinding Potable Water/irrigation Vehicle and Equipment Cleanina Material Deliveiy and Storaoe Material Use Stockpile Management Spill Prevention and Controi Solid Waste Manaaement Hazardous Waste Manaaement Concrete Waste CASQA Designation ->
Copstructlon Activity EC-7 EC-8 EC-9 EC-11 SE-1 SE-3 SE-4 L SE-5 SE-6 SE-7 SE-8 SE-10 TR-1 TR-2 NS-1 NS-3 NS-7 NS-8 WM-1 WM-2 WM-3 WM-4 WM-5 WM-6 1 CO
^/
grading/Soil Disturbance
^;Ffenching/Excavation i~ Stockpiling
Prilling/Boring i
' Concrete/Asphalt Saw
putting ?^ ' Concrete flatwori^
Paving n Conduit/Pipe installation
Slucco/Mortar Wortc
'Waste Disposal
Staging/Lay Down Area
Equipment Maintenance
and Fueling
Hazardous Substance
Use/Storage
Dewatering
Site Access Across Dirt
Other (list);
Tracking
Control
BMPs
Non-Storm Water
Management BMPs
Waste Management and Materials
Pollution Control BMPs
Instructions; Begin by reviewing the iist of construction activities and checking the box to the left of any activity that wiil occur during the proposed construction. Add any other activity descriptions in the
blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best
management practices (BMPs) from the list located along the top of fhe fonn. Then place an X in the box at fhe place where the activity row intersects with the BMP coiumn. Do this for each activity that was
checked off and for each of fhe selected BMPs selected from the list. For Example - If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review
the iist for something that appiies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Foiiow along the "Site Access Across Dirt" row untii you get to the "Stabilized Construction
Ingress/Egress" column and place an X in the box where the two meet. As another example say tt>e project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on
the iist of BMPs, then write in "Cover with Plastic" in the blank coiumn under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with
Plastic" column.
To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice
measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project.
E-29 Page 2 of 3 REV 4/30/10
^ CiTY OF
CARLSBAD
STORM WATER
COMPLIANCE
ASSESSMENT
B-24
Development Services
Building Division
1635 FaradayAvenue
760-602-2719
www.carlsbadca.gov
am applying to the City of Carlsbad for the following type(s) of construction permit:
• Building Permit • Right-of-Way Permit
• My project is categorically EXEMPT from
the requirement to prepare a storm water
pollution prevention plan (SWPPP) because it
only requires issuance of one or more ofthe
following permit types:
Electrical
Fire Additional
Fire Alarm
Fixed Systems
Mechanical
Mobile Home
Plumbing
Patio/Deck
Photo Voltaic
Re-Roofing
Sign
Spa-Factory
Sprinkler
Water Discharge
Project Storm Water Threat Assessment Criteria*
No ThreaiAssessment Criteria
• My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm wrater pollution prevention plan (SWPPP) because
it meets the "no threaf assessment criteria on the City's Project Threat /Assessment Worksheet for Determination of Construction SWPPP Tier
Level. My project does not meet any of the High, Moderate or Low Threat criteria described below.
Tierl - Low Threat Assessment Criteria
• My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type (See list above) and the project
meets one or more of the following criteria;
• Results in some soil disturbance; and/or
• Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling).
T/er2 - Moderate Threat Assessment Criteria
• My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria;
• Project requires a grading plan pursuantto the Carlsbad Grading Ordinance (Chapter 15.16 ofthe Carlsbad Municipal Code); or,
• Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas and project meets one or more ofthe additional tollowing criteria;
^ ^ • Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or
• Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or
• Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or
• Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30).
Tier 3 - Significant Threat Assessment Criteria
• My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas; and/or
• My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, refueling and maintenance areas; or,
• My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant
potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-stonn vi/ater discharge(s).
/ certify to the best of my knowledge that the above
checked statements are true and correct I understand
and acknowledge that even though this project does
not require preparation of a construction SWPP, I must
still adhere to, and at ali times during construction
activities for the permit type(s) check above comply
with the storm water best management practices
pursuant to Titie 15 of the Carlsbad Municipal Code
and to City Standards.
"The Clly Engineer may auttiorize minor variances from the Stomi
Water Threat Assessment Criteria In special circumstances where it
can be shown that 3 lesser or higher Constaiction SWPPP Tier Level is
wan-anted.
Project Address: i/\ (A /\ Assessor Parcel No.
Owner/Owner's Authorized Agent Name: Title:
Owner/Owner's ^^oiM^Agpt^Signature: Date: 1 ^
City Concurrence: By: Date:
^ES QNO 4. ./5^
B-24 Page 1 of 1 Rev.03/09
CITY
CARLSBAD
O F
CONSTRUCTION THREAT
ASSESSMENT WORKSHEET FOR
DETERMINATION OF PROJECT'S
PERCEIVED THREAT TO
STORM WATER QUALITY
E-33
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
Construction
SWPPP Tier
Level
Construction Threat Assessment Criteria*
Perceived
Threat to
Storm Water
Quality
Tier 3
Tier 3 - Hiah Construction Threat Assessment Criteria
High
Tier 3
• Project Site is 50 acres or more and grading will occur during the rainy season
• Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda
Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or
discharges directly to an ESA
• Soil at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors kf greater than or equal to 0.4)
• Site slope is 5 to 1 or steeper
• Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
through April 30).
• Owner/contractor received a Storm Water Notice of Violation within past two years
High
Tier 3
Tier 3 - Medium Constnjction Threat Assessment Criteria Medium
Tier 3
• All projects not meeting Tier 3 High Construction Threat Assessment Criteria Medium
Tier 2
Tier 2 Hiah Construction Threat Assessment Criteria
• Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or
within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA
• Soil at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors kf greater than or equal to 0.4)
• Site slope is 5 to 1 or steeper
• Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
through April 30).
• Owner/contractor received a Storm Water Notice of Violation within past two years
• Site results in one half acre or more of soil disturbance
High
Tier 2
Tier 2 - Medium Constmction Threat Assessment Criteria Medium
Tier 2
• All projects not meeting Tier 2 High Construction Threat Assessment Criteria Medium
Tier 1
Tier 1 - Medium Insoection Threat Assessment Criteria
• Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or
directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA
• Soil at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors kf greater than or equal to 0.4)
• Site slope is 5 to 1 or steeper
^S^^ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
^ through April 30).
• Owner/contractor received a Storm Water Notice of Violation within past two years
• Site results in one half acre or more of soil disturbance
1 \Medium \
Tier 1
Tier 1 - Low Insoection Threat Assessment Criteria
• All projects not meeting Tier 1 Medium Construction Threat Assessment Criteria Low
Exempt - Not Applicable -Exempt
*The city engineer may authorize minor variances from the construction threat assessment criteria in special circumstances
where it can be shown that a lesser or higher amount of stonn water compliance inspection is warranted in the opinion of
the city engineer
E-33 Page 1 of 1 REV 4/30/10
^ CITY OF
CARLSBAD
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 FaradayAvenue
760-602-2750
www.carlsbadca.gov
INSTRUCTIONS:
To address post-development pollutants that may be generated from development projects, the City requires that new development and
significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project
design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards
(Volume 4, Chapter 2) at www.carlsbadca.qov/standards.
Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision,
discretionary pennits and/or construction permits). The results of the questionnaire determine the level of storni water standards that
must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to
'Standard Stonnwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many
aspects of project site design are dependent upon the storm water standards applied to a project.
Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has
responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire
was incorrectly filled out and is subject to more stringent stonn water standards than initially assessed by you, this will result in the return
of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City.
If you are unsure about the meaning of a question or need help in detemnining how to respond to one or more of the questions, please
seek assistance from Land Development Engineering staff.
A separate completed and signed questionnaire must be submitted for each new development application submission. Only one
completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently.
In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits
for the project.
P/ease sfarf by completing Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your
application to the city.
STEP1
TO BE COMPLETED FOR ALL PROJECTS
To determine if your project is a priority development project, please answer the following questions:
YES NO
1. Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet
the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or
other non-erodible penneable areas; OR (2) designed and constructed to be hydraulically disconnected from
paved streets or roads; OR (3) designed and constructed with penneable pavements or surfaces in
accordance with USEPA Green Streets guidance?
2. Is your project LIMITED TO retrofitting or redeveloping existing paved alleys, streets, or roads that are
designed and constructed in accordance with the USEPA Green Streets guidance?
If you answered "yes" to one or more of the above questions, then your project is NOT a priority development project and therefore is
NOT subject to the storm water criteria required for priority development projects. Go to step 4, mark the last box stating "my
project does not meet PDP requirements" and complete applicant information.
If you answered "no" to both questions, then go to Step 2.
E-34 Page 1 of 3 Effective 6/27/13
CITY OF
CARLSBAD
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
To determine if your project is a priority development project, please answer the following questions: YES N 0
1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively
over the entire project site? This includes commerciai, industrial, residential, mixed-use, and public
development projects on pubiic or private land.
2. Is your project creating or replacing 5,000 square feet or more of Impervious surface collectively over the entire
project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial,
industrial, residential, mixed-use, and pubiic development projects on pubiic or private land.
3. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared
foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared
foods and drinks for immediate consumption.
4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a hillside development project? A hillside deveiopment
project includes development on any natural slope that is twenty-five percent or greater
5. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a parking lot. A parking iot is a land area or facility for the
temporary parking or storage of motor vehicles used personally for business or for commerce.
6. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a street, road, highway freeway or driveway? A street,
road, highway, freeway or driveway is any paved impervious surface used for the transportation of
automobiles, trucks, motorcycles, and other vehicles.
7. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of
impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive
Area (ESA)? "Discharging Directly to" includes flow that is conveyed overiand a distance of 200 feet or less
from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the
project to the ESA (i.e. not commingles with flows from adjacent lands).*
8. Is your project a new development that supports an automotive repair shop? An automotive repair shop is a
facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013,
5014, 5541, 7532-7534, or 7536-7539.
9. Is your project a new development that supports a retail gasoline outlet (RGO)? This category Includes RGO's
that meet the foliowing criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of
100 or more vehicles per day.
10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and
are expected to generate pollutants post construction?
Ills your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of
impervious surface or (2) increases impervious surface on the property by more than 10%?
If you answered "yes" to one or more of the above questions, you ARE a priority development project and are therefore subject to
implementing structural Best Management Practices (BMP's) in addition to implementing Standard Stonn Water Requirements such
as source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your
application(s) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this
questionnaire, check the "my project meets PDP requirements" box and complete applicant information.
If you answered "no" to all of the above questions, you ARE NOT a priority development project and are therefore subject to
implementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for all
development projects. A Stonn Water Management Plan (SWMP) is not required with your application(s) for development. Go to step
4 at the end of this questionnaire, check the "my project does not meet PDP requirements" box and complete applicant
information.
E-34 Page 2 of 3 Effective 6/27/13
CITY OF
CARI SRAD
PLANNING DIVISION
BUILDING PLAN CHECK
APPROVAL
P-29
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.eov
DATE: 4/3/15 PROJECT NAME: SPA AND FIREPLACE PROJECTID:
PLAN CHECK NO: CB150989 SET#: ADDRESS: 123 CHANNEL RD APN:
This plan check review is complete and has been APPROVED by the PLANNING
Division.
By: GINA RUIZ
A Final Inspection by the PLANNING Division is required • ves ^ No
Vou may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check APPROVAL has been sent to: CARRIEJONES@HOTMAIL.COM
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING
760-602-4610
ENGINEERING
760-602-2750
FIRE PREVENTION
760-602-4665
Chris Sexton
760-602-4624
Chris.Sexton@carlsbadca.gov
[ n Chris Glassen
760^602-2784
Christopher.Glassen@carlsbadca.gov
Greg Ryan
760-602-4663
Gregory,Ryan@carlsbadca.gov
X Gina Ruiz
760-602-4675
Gina.Rui2@carlsbadca.fiov
Q ValRay Marshall
760-602-2741
ValRav.Marshall@carlsbadca.gov
Cindy Wong
760-602-4662
Cvnthia.Won^@carisbadca.gov
• Linda Ontiveros
760-602-2773
Linda.Ontiveros@carlsbadca.gov
1 1 Dominic Fieri
760-602-4664
Dominic.Fieri@carlsbadca.gov
Remarks: FIREPLACE STATED AS 6 FEET HIGH MAX & REQ'D 15' X 15'
PROVIDED IN COURTYARD OVER 15' X 15'