HomeMy WebLinkAbout1232 Lanai Ct; ; CB164008; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Print Date: 04/20/2017 Residential Permit Permit No: CB164008
www.carlsbadca.gov
Job Address:1232 Lanai Ct
Permit Type:BLDG-Residential Work Class:Single Family Detached Status:Closed -Finaled
Parcel No:1563512400 Lot #:1 Applied:10/25/2016
Valuation:$454,793.00 Reference #:DEV12022 Issued:11/07/2016
Occupancy Group:Construction Type:VB Finaled:
# Dwelling Units:1 Bathrooms:3.50 Inspector:MColl
Bedrooms:3.00 Orig. Plan Check #:PC150036
Plan Check #:PC160057
Project Title:MILES PACIFIC SUBDIVISION
Description:RESDNTL -SFD LANAI: PHASE 5 //PLAN 1 2,854 SF LIV //566 SF GARAGE //283 SF PATIO
Applicant:Owner:Co-Applicant:
SHEA HOMES LIMITED PARTNERSHIP SHEA HOMES LIMITED PARTNERSHIP SHEA HOMES LIMITED PARTNERSHIP
SARAH MORRELL
9990 Mesa Rim Rd, 200 9990 Mesa Rim Rd, 200 9990 Mesa Rim Rd,200
San Diego, CA 92121-3932 San Diego, CA 92121-3932 San Diego, CA 92121-3932
858-526-6554 858-526-6554 858-526-6554
BUILDING PERMIT FEE $2000+$1,885.52
BUILDING PLAN CHECK FEE (BLDG)$819.86
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL $66.00
GREEN BUILDING STANDARDS PLAN CHECK $166.00
MANUAL BUILDING PERMIT FEE $209.59
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL $92.00
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL $182.00
PUBLIC FACILITIES FEES -outside CFD $15,917.76
SB1473 BUILDING STANDARDS FEE $18.19
SDCWA SYSTEM CAPACITY CHARGE 5/8" Displacement $4,840.00
SEWER CONNECTION FEE (General Capacity all areas)$899.00
STRONG MOTION-RESIDENTIAL $59.12
SWPPP INSPECTION FEE TIER 1 -Medium BLDG $232.00
TRAFFIC IMPACT Residential Single Fam. Outside CFD $3,230.00
WATER METER FEE 1" Displacement $362.00
WATER SERVICE CONNECTION FEE 5/8"DISPLACEMENT (P)$4,013.00
WATER TREATMENT CAPACITY CHARGE 5/8" Displacement $123.00
Total Fees:$33,115.04 Total Payments To Date:$33,115.04 Balance Due:$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project.NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or asto which the
statute of limitation has previously otherwise expired.
PERMIT INSPECTION HISTORY REPORT (CB164008)
Permit Type:BLDG-Residential Application Date:10/25/2016 Owner:SHEA HOMES LIMITED
PARTNERSHIP
Work Class:Single Family Detached Issue Date:11/07/2016 Subdivision:
Status:Closed -Fineled Expiration Date:07/25/2017 Address:1232 Lanai Ct
Carlsbad, CA
IVR Number:717915
Scheduled Actual
Date Start Date Inspection Type Inspection No.Inspection Status Primary Inspector Reinspection Complete
11/14/2016 BLDG-34 Rough 001222-2016 Passed Michael Collins Complete
Electrical
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
NOTES Created By TEXT Created Date
Michael Collins Ufer ok.11/14/2016
11/07/2016 11/07/2016 BLDG-21 000075.2016 Passed Michael Collins Complete
Underground/Underf
loor Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Waste to P.O.C.No
NOTES Created By TEXT Created Date
Emily Henderson MIGRATION 11/06/2016
11/14/2016 11/14/2016 BLDG-11 001005-2016 Passed Michael Collins Complete
Foundation/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
12/20/2016 12/20/2016 BLDG-15 006236-2016 Passed Michael Collins Complete
Roof/ReRoof (Patio)
01/09/2017 01/09/2017 BLDG-13 Shear 009039-2017 Passed Michael Collins Complete
Panels/HD (ok to
wrap)
01/18/2017 01/18/2017 BLDG-84 Rough 010006-2017 Failed Michael Collins Reinspection Complete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-14 No
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout No
BLDG-34 Rough Electrical No
BLDG-44 No
Rough-Ducts-Dampers
01/20/2017 01/20/2017 BLDG-27 Shower 010620-2017 Passed Michael Collins Complete
Pan/Tubs
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
April 20, 2017 Page 1 of 3
,.PERMIT INSPECTION HISTORY REPORT (CB164008)
Permit Type:BLDG-Residential Application Date:10/25/2016 Owner:SHEA HOMES LIMITED
PARTNERSHIP
Work Class:Single Family Detached Issue Date:11/07/2016 Subdivision:
Status:Closed -Finaled Expiration Date:07/25/2017 Address:1232 Lanai Ct
Carlsbad, CA
IVR Number:717915
Scheduled Actual
Date Start Date Inspection Type Inspection No.Inspection Status Primary Inspector Reinspection Complete
•—••—
BLDG-84 Rough 010321-2017 Passed Michael Collins Complete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
01/23/2017 01/23/2017 BLDG-16 Insulation 010602-2017 Passed Michael Collins Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Need cart for ceiling installation.Yes
NOTES Created By TEXT Created Date
Michael Collins Need cart for ceiling installation.01/23/2017
01/26/2017 01/26/2017 BLDG-17 Interior 011327-2017 Passed Michael Collins Complete
Lath/Drywall
BLDG-18 Exterior 011626-2017 Passed Michael Collins Complete
Lath/Drywall
Checklist Item COMMENTS Passed
•BLDG-Building Deficiency No
BLDG-23 011627-2017 Passed Michael Collins Complete
Gas/Test/Repairs
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
03/10/2017 03/10/2017 BLDG-Electric Meter 016134-2017 Passed Peter Dreibelbis Complete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
03/27/2017 03127/2017 BLDG-Fire Final 017954-2017 Passed Dominic Fieri Complete
Checklist Item COMMENTS Passed
FIRE-Building Final Yes
04/14/2017 04/14/2017 BLDG-Final 020055-2017 Failed Michael Collins Reinspection Complete
Inspection
April 20, 2017 Page 2 of 3
PERMIT INSPECTION HISTORY REPORT (CB164008)tom
Permit Type:BLDG-Residential Application Date:10/25/2016 Owner:SHEA HOMES LIMITED
PARTNERSHIP
Work Class:Single Family Detached Issue Date:11/07/2016 Subdivision:
Status.Closed -Finaled Expiration Date:07/25/2017 Address:1232 Lanai Ct
Carlsbad, CA
IVR Number:717915
Scheduled Actual
Date Start Date Inspection Type Inspection No.Inspection Status Primary Inspector Reinspection Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-Plumbing Final No
BLDG-Mechanical Final No
BLDG-Structural Final No
BLDG-Electrical Final No
04/20/2017 04/20/2017 BLDG-Final 020612-2017 Passed Michael Collins Complete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final GMR emailed to SDGE.Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
April 20, 2017 Page 3 of 3
bh A,Inc.ROD BRADLEY,Urban Plannerland planning, civil engineering, surveying RONALD L.HOLLOWAY,Civil Engineer
November 10, 2016
W.O. 452-1224-600
Mr. Michael Collins
CITY OF CARLSBAD
BUILDING INSPECTION
1635 Faraday Avenue
Carlsbad, CA 92008
RE:BUILDING FORM VERIFICATION OF LOTS 1, 4, 16 AND 17, MILES PACIFIC
SUBDIVISION, CT 12-01
Dear Mr. Collins:
This letter is to attest that BHA, Inc. has staked the location for the house construction on the
above-mentioned lots. We have checked the locations of the building forms of the proposed
houses and found the horizontal and vertical location to conform to the grading plans prepared
by our office.
If you have any questions regarding this matter, please contact our office.
Sincerely,
IAA,Inc.
VA-"IVO
/67 Se/
(c,ARMAND A.c.c.1
Armand A. Marois
r(f(MAROIS
a..Vice President PLS 5941
PLS 5941 (.1)
AAM:aam 1
°F CAOcc:Jason Korszeniewski -Shea Homes
K:\Civil 3D \1224 \Certification Letteraldg-form-verification.wpd
5115 Avenida Encinas, Suite L 0 Carlsbad, California 92008-4387 0 (760) 931 -8700 0 FAX (760)931 -7780
1.
W.0. 66 -•
DATE /
'ye "lb NAME /‹..
HOURS 0
Geotechnical • Coastal • Geologic • Environmental
FOOTING TRENCH OBSERVATION SUMMARY
Client Name:r)A Project Name:A
Location/Tract:
Unit/Phase/Lot(s):/...6 4 ./1.4 )1 /.)/*//4 '14 .t 7/1 -'4 I -
Referenced Geotechnical Report(s):I-A.;1 1//6.' f r.".C`A
Observation Summary
/4,A..Initials A representative of GeoSolls, Inc. observed onsite soil and footing trench conditions. Soil conditions
,r /-Date in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
k Initials A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width.Footing
I 1/.Date excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of the geotechnical report.
A Initials A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable).The
/rs Date setback was in general accordance with the recommendations of the geotechnical report.
;Initials 411.I 1,;/).
0 I 14 Date .
Notes to Superintendent/Foreman
1.Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
2.Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended. Consult
the geotechnical report for presoaldng recommendations.We note that clayey soils may take an extended
period of time for such, and the contractor should schedule accordingly.
3.In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
4.This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Notes to Building inspector
Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion
index test results are contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion
of grading.
11%
RepresentatiVe of GeoSoils, Inc.
5741 Palmer Way 1446 E. Chestnut Ave.26590 Madison Ave.
Carlsbad. CA 92008 SantaMa,CA 92701 Murdeta, CA 92562
Southwest Inspection and Testing, Inc.
441 Commercial Way, La Habra, Ca 90631
(562) 941-2990 •(714) 526-8441 •Fax (562) 946-0026
SWIT Job No.Date
REGISTERED INSPECTOR'S DAILY REPORT /543 -S/S--it /it /4TYPE OP t Reinforced Concrete 0 Welding 0 DIA/Epoxy
INSPECTION j Post Tensioned Concrete 0 Fireproofing 0 Wood Framing
REQUIRED 0 Reinforced Masonry 0 Asphalt 0 Other
Tract No.Lqt No.•-r /(...7JobAddressig .5eA(.-6e -/.-<x•-//-
Job Name /Perm Issued13'‘--A t-AA I ..z...-eur c.-.-054.0
Type of Structure ArchiteS...=")C....../C14.-
Mit:Material Description type,grade, source)Engineer •
t--coE41-1c-4014Z-.-
ACatt.
C-AAA Cger•Alc-r •
."---TV-44.(ActA. S -t/--z.si
44 -C.---.c/e..-A -qe.r.Contractor 1.VZ4A-t-4c 7it_A A E..S
Inspectors Name -,A !®
ojr Ver
Subcontractor
TESTS PERFORMED4 i/tc...._
SAMPLE AIR CONC WATER TIME'SET#TRUCK #TICKET #LOCATION SLUMP TEMP TEMP ADDED CAST MIX #REMARKS
INSPECTION SUMMARY-LOCATIONS OF WORK INSPECTED,TEST SAMPLES TAKEN,WORK REJECTED,JOB PROBLEMS,PROGRESS,
REMARKS, ETC. INCLUDES INFORMATION ABOUT -AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED, NUMBER, TYPE & IDENT. NO'S OF
TEST SAMPLES TAKEN: STRUCT. CONNECTIONS (WELD MADE H.T. BOLTS TORQUED) CHECKED, ETC.
Ple'e -tilt SOREU-10C.1"e co r'47 46-y 'erica_ 4-
1 7 -
7.
-.-
(9151FACe•Arrtlit.-41-\"2 7 •.14C.(
-)-.rrr_ACC V-A4.4Aireiree.4A4.L)Tf:t°4 i C t 7-S •40.G-CL-YrISL I 4/4 4*1 ,1*-ava
ip‘.4
-1_11M.S-PtEc...vr-TEAn AciScA...g...Farz.przicy-RAirr...Sy-LICS ,LA -et,_
C_A-.14.44e14-1.4.C...vs .`-/
-f o at...4SA...
9'C-CYc *(,(ZSL (....A.-v•A4 i c..OLA.re)r 4 -C.6/Co L(oe.e4+'t -Z.7.if)....rifi-CASko ul c:tW,.lir am I e..1 -7 .4 IEL-_,LedeS1 LP 5°oe.Cc.
+1`t -7 IZZ -1
..•WC-451 Liv't (:)--7
CERTIFICATION OF COMPLIANCE CONTINUED ON NEXT PAGE 0 PAGE OF
I HEREBY CERTIFY THA .VE OBS. -VED TO THE =EST OF MY KNOWLEDGE TIME IN TIME OUT SAMPLESALL OF THE ABO 'E '•-0'110 S/•ERWISE NOTED.I HAVE
FOUND THIS WO TO COMPLY fTH tile7:47.ED PLANS, SPECIFICATION,
AND APPLICABLE EC ION •-E f14:377 : UILDING LAWS.
4 aSIGN.•:-t .14IN -
11-•9.. .--..//V
4 CTOR
C)-1 S .b'°'-Cg.5-Cs.Approved By
SPECIALTY NA AGENCY Project Su rintendent
White-Office Copy •Canary-Accounting Copy •Pink -Inspector's Copy •Goldenrod -Jobsite Copy
SM F-049
fACo... Airiase..* Tne......14e.e.R.Melina..Trkr.
...„.
A CB164008 1232 LANAI CTNeC.TY OF LANAI: PHASE 5 Il PLAN 1CARLSBADINSPECTION RECORD Z854 SF UV 11566 SF GARAGE // 283 SF PATIOBuilding Division RESDNTL SFD
RI INSPECTION RECORD CARD WITH APPROVED Lot#:1 SHEA HOMES
DIANS MUST BE KEPT ON THE JOB
E.1.i. BEFORE 3:00 pm FOR NEXT WORK DAY INSPECTION
El FOR BUILDING INSPECTION CALL:760-602-2725
OR GO TO: www.Carisbadca.gov/Building AND CLICK ON 4 vk t L;URD Copy"Request Inspection"
DATE: if"YES' -YES.'is checked below that Division's approval is required prior to reQuesting a Final Building Inspection. If .vou have any questions
please call the applicable divisions at the phone numbers provided below. After all required approvals are signed off -fax to
760-602-8560. email to bidginspections@carlsbadca.;$0v or bring in a COPY of this card to: 1635 Faraday Ave.. Carlsbad.
NO YES Required Prior to Requesting Building Final If Checked YES Date Inspector Notes
IIIIIMPlanning/Landscape 760-944-8463 Allow 48 hours =lir MINIIIIIIMCM&I (Engineering Inspections)760-438-3891 Call before 2 pm ZIEOGIMIIIIIIIMIFire Prevention 760-6024660 Mow 48 hours 1171illfillrfall
1111 11M1111
1111
Type of Inspection Type of Inspection
coos #BUILDING Date Inspector CODE #ELECTRICAL Date Inspector
#11 FOUNDATION 11 (•(S ('4C #31 0 ELECTRIC UNDERGROUND P.:FER I i /4 14 M.
#12 REINFORCED STEEL #34 ROUGH ELECTRIC
#66 MASONRY PRE GROUT #33 ErELECTRIC SERVICE 0 TEMPORARY 5 .jo -i 7 6 -re
0 GROUT 0 WALL DRAINS #35 PHOTO VOLTAIC
_TILT PANELS #39 FINAL
#11 POUR STRIPS coDE #MECHANICAL
#11 COLUMN FOOTINGS #41 UNDERGROUND DUCTS &PIPING
#14 SUBFRAME 0 FLOOR 0 CEIUNG #44 0 DUCT& PLENUM 0 REF. PIPING
#15 ROOF SHEATHING r4 ..-61 i‘46 #43 HEAT-AIR COND. SYSTEMS
#13 EXT. SHEAR PANELS 0(.0 *#49 FINAL
#16 INSULATION 0i lEP 111111K0111111.1 CODE #COMBO INSPECTION
#18 EXTERIOR LATH #81 UNDERGROUND (11,12,21,31)
#17 INTERIOR LATH &DRYWALL #82 DRYWALL,EXT LATH,GASES 47,18,23)01/24 11 M.C.•
#51 POOL EXCA/STEEL/BOND/FENCE #83 ROOFSHEMN I,EXT SHEAR (13,15)
#55 PREPLASTER/FINAL #84 FRAME ROUGH COMBO (14,24,34,44)Olt240 Me_
#19 FINAL #85 T-Bar 44,24,34,44)
Date Inspector #89 FINAL OCCUPANCY (19,29,39,49)
#22 0 SEWER & BL/CO 0 PL/CO Date Inspector
#21 UNDERGROUND.WASTE 0 VVTR filioli k.6106'
#24 TOP OUT 0 WASTE 0 WM A/S UNDERGROUND VISUAL1...
#27 TUB &SHOWER PAN *sitzvi ill__646 A/S UNDERGROUND HYDRO
#23 0 GAS TEST 0 GAS PIPING •A/S UNDERGROUND FLUSH
#25 WATER HEATER A/S OVERHEAD VISUAL
ci;i1// 7
•C-
1.fr‘i
#28 SOLAR WATER A/S OVERHEAD HYDROSTATIC /trin e.''/:0 ,,#29 FINAL A/S FINAL V7/1 (4.
CODEs STORM WATER F/A ROUGH-IN
#600 PRE-CONSTRUCTION MEETING F/A FINAL
#603 FOLLOW UP INSPECTION FIXED EXTINGUISHING SYSTEM ROUGH-IN
NOTICETO CLEAN FIXED EXTING SYSTEM HYDROSTATIC TEST
#607 WRITTEN WARNING FIXED EXTINGUISHING SYSTEM FINAL
#609 NOTICE OF VIOLATION MEDICAL GAS PRESSURE TEST
#610 VERBAL WARNING MEDICAL GAS FINAL
REV 10.20.2 SEE BACK FOR SPECIAL NOTES
._.
Luc i vu‘o
c City of CIRCUIT CARD
Development Services
Building Division
Carlsbad B-36 1635 Faraday Avenue
760-602-2719
www.carIsbadca.gov
THIS CARD MUST BE FILLED OUT AND AVAILABLE AT THE SERVICE EQUIPMENT FOR THE ROUGH INSPECTION
Address:Permit Number:
Owner:Phone:Area in Sq. Ft,Contractor:Phone:
PANEL:A.I.C.VOLTS 0 WIRE
BKR WIRE WIRE BKRLOCATIONCKTMISCRECRECLTGMISC CKT LOCATIONSIZESIZETYPELTG.SIZE TYPE SIZE
Sy b 1 isb AL 14 5 1 i tt CA)1S 2 S1)/136D
S 0 5 3 _6 I)AL 8 7 .I LI Cu IS 4 (pTity
At-5 4o to (11 i 41 Ii L-V 9.)6 (ZIT C I
A C 7 t4 D /0 LA)i 1 IL (V 2.i 8 V I
Oa I-)9 .7-t)i t C LI I LI 1Z_CU 2.10 1-/"r ‘. ii
OV LI-)11 30 /0 C 0
1-
i 12 rX)20 12 ia.r
PTO 6 CI 13 12----'--0 5 I I `'t (-.0 1S 14 (T p.
1-10DD 15 )4)i.CA/1 )i Lr j 1S 16 I.)Li
(;•43itiikt 17 IS (4 (..-0 3 .6 18
19 20-
21 22
23 24
25 26
27 28-.
29 30
31 32
33 34
._
35 36
37 38
39 1 40
41 42
7)7)rMAIN:.41-‘.-AMP BRK/FUSE 0 MLO Computed Load AMPS
BUS:AMP See Calculation Worksheet on back
Service entrance or feeder conductors:Branch circuits required:
A) Lighting Circuits 220 -3(b), 4(d)A) Size: No.B) Type:0 CU 0 AL B) Two Small Appliance Circuits 210 -11(e)C) Insulation:D) Conduit Size:C) Laundry Circuit 220 -16(b)Service ground/bond:D) Central Heating Equipment 422 -12
A) Size: No.Li B) Type:>iCU 0 AL E) Bathroom 210 -52(d)
C) Clamp location(s):Z UFER 250 -50(c)Remarks:0 Water Pipe 250 -1040Ground Rod 250 -52
GFA61 AY"
cations 210 -
g
8, 680 -70:I certify that all terminations have been torqued in accordance with manufacturer's Bathroom(s)IN' Kitchen instructions and that the work shown on this circuit card represents the full extent of
Garage(s)OHydromassage Tub the work performed under this permit.a Outdoors IS 1.-ig\-PD11-7 0 Owner k 6 /A07AFCI Protected Circ. 210 -12 0 Contracto A r.tAter1-1 (__
irBedroom(s)0 Signed Date / -ki -17
B-36 Page 1 of 2 Rev. 03/09
....___
os\--
I sup.
(City of CIRCUIT CARD
Development Services
Building Division
Carlsbad B-36 1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
THIS CARD MUST BE FILLED OUT AND AVAILABLE AT THE SERVICE EQUIPMENT FOR THE ROUGH INSPECTION
Address:Permit Number.
Owner:Phone:Area in Sq.Ft,
Contractor:Phone:
PANEL:A.I.C.VOLTS 0 WIRE
BKR WIRE WIRE BKRLOCATIONCKTM1SVRECRECLTGMISC CKT LOCATIONSIZESIZETYPEL...-r6.,SIZE TYPE SIZE
foul-Art-I 1 15 14 &J 1 i _ 1Z_CA)20 2 1A51-1611-,.."
-'coti 3 i<I tri CA)6-<4 Lts
VII 1-5 15 1'1 CO 2 c._?I )1 6 j S 6 LI VI I\IN
1.40 g`r CO 7 I P't LA)
1 i ck 01 c'?/K'8 PI t3.(A)
kJ/Y.
1.4 fArl.9.1 C PI --t)J o ".2-S I7--6 u 2-u io pi„.._(il)
11 12
.,.-
13 14
15 16
17 18
.-
19 20
21 22
23 24'.
25 26
27 28
...-
29 30
31 32
33 34-
35 36
37 38
39 l40
41 42
MAIN:0 1 °0 AMP BRK/FUSE 0 MLO Computed Load AMPS
BUS:AMP See Calculation Worksheet on back
Service entrance or feedg r conductors:Branch circuits required:
A) Lighting Circuits 220 -3(b), 4(d)A) Size: No.B) Type:0 CU X AL B) Two Small Appliance Circuits 210 -11(e)C) Insulation:D) Conduit Size:C) Laundry Circuit 220 -16(b)Service ground/bond:D) Central Heating Equipment 422 -12
A) Size: No.&l B) Type:CU 0 AL E) Bathroom 210 -52(d)
C) Clamp location(s):X UFER 250 -50(c)Remarks:
El Water Pipe 250 -1040Ground Rod 250 -52
III &os
GFCI ovations 210 -8, 680 -70:1 certify that all terminations have been torqued in accordance with manufacturer's
Bathroom(s)pgKitchen instructions and that the work shown on this circuit card represents the full extentof
Garage(s)OHydromassage Tub the work performed under this permit.
Outdoors s LA 0419----1 lif Owner Cpl <K6i-itibb7
AFCI Protected Circ. 210 -12 ?<Contractor A rei t 1.--&(...Ti2A L.....):ir Bedroom(s)ZSigned --,-Date I —1 -IT
B-36 Page 1 of 2 Rev. 03/09
INSTALLATION CERTIFICATE CF-6R-ENV-01
Envelope —Insulation; Roofing; Fenestration (Page 1 of3)
Site Address:Enforcement Agency:Permit Number:
Lanai Ph. 5 -Lot 1 -1232 Lanai Court
Ijmore than one person has responsibilityfor installation ofthe items on this certykate, each person shall prepare and sign a certificate
applicable to the portion ofconstructionfor which they are responsible; alternatively, the person with chief responsibilityfor construction shall
prepare and sign this certjficatefor the entire construction.Allapplicable Mandatory Measures with check boxes require to be checked to ensure
the mandatory measures have been met.
Description of Insulation
1.RAISED FLOOR •
Material:Brand Name:
Thickness (inches):Thermal Resistance (R-Value):
O §150(d): Minimum R-I3 insulation in raised wood-frame floor or equivalent U-factor.
2.SLAB FLOOR/PERIMETER
Material:Brand Name:
Thickness (inches):Thermal Resistance (R-Value):
Perimeter Insulation Depth (inches):
§150(1):Water absorption rate for the insulation material alone without facings is no greater than 0.3%; water vapor permeance
rate is no greater than 2.0 perm/inch and shall be protected from physical damage and UV light deterioration.
3.EXTERIOR WALL
a.Insulation Type (e.x. Batt, Loose Fill, Spray Foam)a.Thermal Resistance (R-Value):
b..Insulation Type (e.x. Batt, Loose Fill, Spray Foam)b.Thermal Resistance (R-Value):
Brand:
Spray/Loose fill)Spray/Loose fill)Installed Actual Thickness Contractor's min installed weight/ft=lb(inches):
Manufacturer's installed weight per square foot to achieve Thermal Resistance (R-Value)
§150(c):Minimum R-13 insulation in wood-frame wall or equivalent U-factor.
Exterior Foam Sheathing (rigid Insulation)
Material:Brand Name:
Thickness (inches):Thermal Resistance (R-Value):
4.FOUNDATION WALL
Material:Brand Name:
Thickness (inches):Thermal Resistance (R-Value):
5.CEILING
Batt or Blanket Type:Brand Name:
Loose Fill Type:Thermal Resistance (R-Value):
Spray Foam Type:Brand Name:
Installed Actual Thickness (inches):Contractor's min installed weight/ft=lb
Manufacturer's installed weight per square foot to achieve Thermal Resistance (R-Value):
O §150(a): Minimum R-19 insulation in wood-frame ceiling or equivalent U-factor.
6.ATTIC ROOF INSULATION AND/OR ATTIC RADIANT BARRIER
Material:Brand Name:
Material:Brand Name:
Thickness (inches):Thermal Resistance (R-Value):
§118(a):Insulation installed meets Standards for Insulating Material.
C) §150(g): Mandatory Vapor barrier installed in Climate Zones 14 or 16.
2008 Residential Compliance Forms August 2009
INSTALLATION CERTIFICATE CF-6R-ENV-01
Envelope —Insulation; Roofing; Fenestration (Page 2 of 3)
Site Address:Enforcement Agency:Permit Number:
Lanai Ph. 5 -Lot 1 -1232 Lanai Court
Description ofRooting Products
CRRC Product ID Manufacturer -Product Roof Roof Product Initial Solar Aged Solar Thermal
Number'Information Brand/Model Type Area Slope Weight'Reflectance Reflectance'Emittance
NA Boral Weathered Wood CoS Entire 4.12 NA NA CI3 NA NA
CP
ra'
1.The CRRC Product ID Number can be obtainedfrom the Coo! Roof Rating Council's Rated Product Directory at
ww.coolroofs.org/products/search.php
2.The weight in lbs per square feet ofthe roofing product being installed
3.Check box ((the Aged Reflectance is a calculated value using the equation below, footnote 4.
4.Ifthe aged reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the initial reflectance valuefrom the
directory and use the equation (0.2+0.7(poillat— 0.2) to obtain a calculated aged value.
IOCHECKAPPLICABLE BOX BELOWIF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENT;
The roofarea covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempt from the above Cool
Roof criteria. Roofconstructions that have thermal mass over the roofmembrane with a weight ofat least 25 lb/ftl is exempted from the above Cool Roof
criteria.
To apply Liquid Field Applied Coatings, the coating must be applied with a minimum drymilthickness of20 mils across the entire roofsurface and
meet minimum performance requirements listed in §118(93 and Table 118-C.Select the applicable cowing0Aluminum-Pigmented Asphalt Roof Coating I 0 Cement-Based Roof Coating,0 Other 0 CRRC-1 Label Attached to CF-6R
(Note ifno CRRC-1 label is available, this compliance method cannot be used and another method is required to meet compliance).
FENESTRATION/GLAZING
Product Total Quantity Add. Exterior Comments/
Manufacturer/Brand Name U-Product of NFRC ofLike Product Area Shading Dev.Location/ Special
hem (GROUP LIKE RODUCTS)factor'SHGC'Panes Certified"(_Optional)ft2 or Overhang Features
2
3
4
S
7.
8.
I.Use valuesfrom a fenestration product's NFRC Certified Label. For fenestration produce without an NFRC label,use the default valuesfrom Section 116, Table
116-1 and 116-B ofthe 2008 Energy Effidency Standards.
2.NFRC Label Certificates shall not be removed until the building inspector has verified the efficiency. EnterYes orNo.
§116(a)1:Doors and windows between conditioned and unconditioned spaces designed to limit airleakage.
0 *116(8)2 and 3:Actual fenestration products installed we equivalent to or have a lower U-factor and/or a lower SHGC than that specified on
the Certificate ofCompliance (Form CF-IR).
§116(a)4:Fenestration products (except field-fabricated windows) have a label listing the certified U-Factor, certified Solar Heat Gain
Coefficient (SHGC), and infiltration that meets the requirements of§10-111(a)
O§117: Exteriordoors and windows weather-stripped; all joints and penetrations caulked and sealed.
2008 Residential Compliance Forms August 2009
_.__...,........._
INSTALLATION CERTIFICATE CF-6R-ENV-01
Envelope —Insulation; Roofing; Fenestration (Page 3 of 3)
Site Address:Enforcement Agency:Permit Number:
Lanai Ph.5 -Lot 1 -1232 Lanai Court
DECLARATION STATEMENT
•I certify under penalty ofperjury, under the laws ofthe State ofCalifornia, the information provided on this form is true and correct.
•I am eligible under Division 3 ofthe Business and Professions Code to accept responsibility for construction, or an authorized representative
ofthe person responsible for construction (responsible person).
•I certify that the installed features, materials, components, or manufactured devices identified on this certificate (the installation) conforms
to all applicable codes and regulations. and the installation is consistent with the plans and specifications approved by the enforcement
agency..
•I reviewed a copy ofthe Certificate ofCompliance (CF-IR) form approved by the enforcement agency that identifies the specific
requirements for the installation.I certify that the requirements detailed on the CI:-IR that apply to the installation have been met.
•I will ensure that a completed. signed copy of this Installation Certificate shall be posted, or made available with the building
permit(s) issued for the building. and made available to the enforcement agency for all applicable inspections.I understand that a
signed copy of this Installation Certificate is required to be included with the documentation the builder cs to the building
owner at occupancy.,-..----"..„,-----
.
Company Name:(installing Subcontractor or General Contractor or BuilderiOwner):-
Leonard Roofing, Inc.
1....1
Responsible Person's Name:Responsible Person's Si atu
17L
/
Bruce Leonard //
CSLI3 License:'Date Signed:Position With Comp y (Title):
840399 4/24/2017 PresidentI
•
2008 Residential Compliance Forms August 2009