Loading...
HomeMy WebLinkAbout1232 Lanai Ct; ; CB164008; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Print Date: 04/20/2017 Residential Permit Permit No: CB164008 www.carlsbadca.gov Job Address:1232 Lanai Ct Permit Type:BLDG-Residential Work Class:Single Family Detached Status:Closed -Finaled Parcel No:1563512400 Lot #:1 Applied:10/25/2016 Valuation:$454,793.00 Reference #:DEV12022 Issued:11/07/2016 Occupancy Group:Construction Type:VB Finaled: # Dwelling Units:1 Bathrooms:3.50 Inspector:MColl Bedrooms:3.00 Orig. Plan Check #:PC150036 Plan Check #:PC160057 Project Title:MILES PACIFIC SUBDIVISION Description:RESDNTL -SFD LANAI: PHASE 5 //PLAN 1 2,854 SF LIV //566 SF GARAGE //283 SF PATIO Applicant:Owner:Co-Applicant: SHEA HOMES LIMITED PARTNERSHIP SHEA HOMES LIMITED PARTNERSHIP SHEA HOMES LIMITED PARTNERSHIP SARAH MORRELL 9990 Mesa Rim Rd, 200 9990 Mesa Rim Rd, 200 9990 Mesa Rim Rd,200 San Diego, CA 92121-3932 San Diego, CA 92121-3932 San Diego, CA 92121-3932 858-526-6554 858-526-6554 858-526-6554 BUILDING PERMIT FEE $2000+$1,885.52 BUILDING PLAN CHECK FEE (BLDG)$819.86 ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL $66.00 GREEN BUILDING STANDARDS PLAN CHECK $166.00 MANUAL BUILDING PERMIT FEE $209.59 MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL $92.00 PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL $182.00 PUBLIC FACILITIES FEES -outside CFD $15,917.76 SB1473 BUILDING STANDARDS FEE $18.19 SDCWA SYSTEM CAPACITY CHARGE 5/8" Displacement $4,840.00 SEWER CONNECTION FEE (General Capacity all areas)$899.00 STRONG MOTION-RESIDENTIAL $59.12 SWPPP INSPECTION FEE TIER 1 -Medium BLDG $232.00 TRAFFIC IMPACT Residential Single Fam. Outside CFD $3,230.00 WATER METER FEE 1" Displacement $362.00 WATER SERVICE CONNECTION FEE 5/8"DISPLACEMENT (P)$4,013.00 WATER TREATMENT CAPACITY CHARGE 5/8" Displacement $123.00 Total Fees:$33,115.04 Total Payments To Date:$33,115.04 Balance Due:$0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project.NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or asto which the statute of limitation has previously otherwise expired. PERMIT INSPECTION HISTORY REPORT (CB164008) Permit Type:BLDG-Residential Application Date:10/25/2016 Owner:SHEA HOMES LIMITED PARTNERSHIP Work Class:Single Family Detached Issue Date:11/07/2016 Subdivision: Status:Closed -Fineled Expiration Date:07/25/2017 Address:1232 Lanai Ct Carlsbad, CA IVR Number:717915 Scheduled Actual Date Start Date Inspection Type Inspection No.Inspection Status Primary Inspector Reinspection Complete 11/14/2016 BLDG-34 Rough 001222-2016 Passed Michael Collins Complete Electrical Checklist Item COMMENTS Passed BLDG-Building Deficiency No NOTES Created By TEXT Created Date Michael Collins Ufer ok.11/14/2016 11/07/2016 11/07/2016 BLDG-21 000075.2016 Passed Michael Collins Complete Underground/Underf loor Plumbing Checklist Item COMMENTS Passed BLDG-Building Deficiency Waste to P.O.C.No NOTES Created By TEXT Created Date Emily Henderson MIGRATION 11/06/2016 11/14/2016 11/14/2016 BLDG-11 001005-2016 Passed Michael Collins Complete Foundation/Ftg/Pier s (Rebar) Checklist Item COMMENTS Passed BLDG-Building Deficiency No 12/20/2016 12/20/2016 BLDG-15 006236-2016 Passed Michael Collins Complete Roof/ReRoof (Patio) 01/09/2017 01/09/2017 BLDG-13 Shear 009039-2017 Passed Michael Collins Complete Panels/HD (ok to wrap) 01/18/2017 01/18/2017 BLDG-84 Rough 010006-2017 Failed Michael Collins Reinspection Complete Combo(14,24,34,44) Checklist Item COMMENTS Passed BLDG-Building Deficiency No BLDG-14 No Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout No BLDG-34 Rough Electrical No BLDG-44 No Rough-Ducts-Dampers 01/20/2017 01/20/2017 BLDG-27 Shower 010620-2017 Passed Michael Collins Complete Pan/Tubs Checklist Item COMMENTS Passed BLDG-Building Deficiency No April 20, 2017 Page 1 of 3 ,.PERMIT INSPECTION HISTORY REPORT (CB164008) Permit Type:BLDG-Residential Application Date:10/25/2016 Owner:SHEA HOMES LIMITED PARTNERSHIP Work Class:Single Family Detached Issue Date:11/07/2016 Subdivision: Status:Closed -Finaled Expiration Date:07/25/2017 Address:1232 Lanai Ct Carlsbad, CA IVR Number:717915 Scheduled Actual Date Start Date Inspection Type Inspection No.Inspection Status Primary Inspector Reinspection Complete •—••— BLDG-84 Rough 010321-2017 Passed Michael Collins Complete Combo(14,24,34,44) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-14 Yes Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout Yes BLDG-34 Rough Electrical Yes BLDG-44 Yes Rough-Ducts-Dampers 01/23/2017 01/23/2017 BLDG-16 Insulation 010602-2017 Passed Michael Collins Complete Checklist Item COMMENTS Passed BLDG-Building Deficiency Need cart for ceiling installation.Yes NOTES Created By TEXT Created Date Michael Collins Need cart for ceiling installation.01/23/2017 01/26/2017 01/26/2017 BLDG-17 Interior 011327-2017 Passed Michael Collins Complete Lath/Drywall BLDG-18 Exterior 011626-2017 Passed Michael Collins Complete Lath/Drywall Checklist Item COMMENTS Passed •BLDG-Building Deficiency No BLDG-23 011627-2017 Passed Michael Collins Complete Gas/Test/Repairs Checklist Item COMMENTS Passed BLDG-Building Deficiency No 03/10/2017 03/10/2017 BLDG-Electric Meter 016134-2017 Passed Peter Dreibelbis Complete Release Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 03/27/2017 03127/2017 BLDG-Fire Final 017954-2017 Passed Dominic Fieri Complete Checklist Item COMMENTS Passed FIRE-Building Final Yes 04/14/2017 04/14/2017 BLDG-Final 020055-2017 Failed Michael Collins Reinspection Complete Inspection April 20, 2017 Page 2 of 3 PERMIT INSPECTION HISTORY REPORT (CB164008)tom Permit Type:BLDG-Residential Application Date:10/25/2016 Owner:SHEA HOMES LIMITED PARTNERSHIP Work Class:Single Family Detached Issue Date:11/07/2016 Subdivision: Status.Closed -Finaled Expiration Date:07/25/2017 Address:1232 Lanai Ct Carlsbad, CA IVR Number:717915 Scheduled Actual Date Start Date Inspection Type Inspection No.Inspection Status Primary Inspector Reinspection Complete Checklist Item COMMENTS Passed BLDG-Building Deficiency No BLDG-Plumbing Final No BLDG-Mechanical Final No BLDG-Structural Final No BLDG-Electrical Final No 04/20/2017 04/20/2017 BLDG-Final 020612-2017 Passed Michael Collins Complete Inspection Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-Plumbing Final GMR emailed to SDGE.Yes BLDG-Mechanical Final Yes BLDG-Structural Final Yes BLDG-Electrical Final Yes April 20, 2017 Page 3 of 3 bh A,Inc.ROD BRADLEY,Urban Plannerland planning, civil engineering, surveying RONALD L.HOLLOWAY,Civil Engineer November 10, 2016 W.O. 452-1224-600 Mr. Michael Collins CITY OF CARLSBAD BUILDING INSPECTION 1635 Faraday Avenue Carlsbad, CA 92008 RE:BUILDING FORM VERIFICATION OF LOTS 1, 4, 16 AND 17, MILES PACIFIC SUBDIVISION, CT 12-01 Dear Mr. Collins: This letter is to attest that BHA, Inc. has staked the location for the house construction on the above-mentioned lots. We have checked the locations of the building forms of the proposed houses and found the horizontal and vertical location to conform to the grading plans prepared by our office. If you have any questions regarding this matter, please contact our office. Sincerely, IAA,Inc. VA-"IVO /67 Se/ (c,ARMAND A.c.c.1 Armand A. Marois r(f(MAROIS a..Vice President PLS 5941 PLS 5941 (.1) AAM:aam 1 °F CAOcc:Jason Korszeniewski -Shea Homes K:\Civil 3D \1224 \Certification Letteraldg-form-verification.wpd 5115 Avenida Encinas, Suite L 0 Carlsbad, California 92008-4387 0 (760) 931 -8700 0 FAX (760)931 -7780 1. W.0. 66 -• DATE / 'ye "lb NAME /‹.. HOURS 0 Geotechnical • Coastal • Geologic • Environmental FOOTING TRENCH OBSERVATION SUMMARY Client Name:r)A Project Name:A Location/Tract: Unit/Phase/Lot(s):/...6 4 ./1.4 )1 /.)/*//4 '14 .t 7/1 -'4 I - Referenced Geotechnical Report(s):I-A.;1 1//6.' f r.".C`A Observation Summary /4,A..Initials A representative of GeoSolls, Inc. observed onsite soil and footing trench conditions. Soil conditions ,r /-Date in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and are in general conformance with those indicated in the geotechnical report. k Initials A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width.Footing I 1/.Date excavations generally extend to proper depth and bearing strata, and are in general conformance with recommendations of the geotechnical report. A Initials A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable).The /rs Date setback was in general accordance with the recommendations of the geotechnical report. ;Initials 411.I 1,;/). 0 I 14 Date . Notes to Superintendent/Foreman 1.Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete. 2.Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended. Consult the geotechnical report for presoaldng recommendations.We note that clayey soils may take an extended period of time for such, and the contractor should schedule accordingly. 3.In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy rain, etc.), we should be contacted to perform additional site observations and/or testing. 4.This memo does not confirm the minimum footing dimension as required by the project structural engineer's design, if different from the geotechnical report. Notes to Building inspector Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion index test results are contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion of grading. 11% RepresentatiVe of GeoSoils, Inc. 5741 Palmer Way 1446 E. Chestnut Ave.26590 Madison Ave. Carlsbad. CA 92008 SantaMa,CA 92701 Murdeta, CA 92562 Southwest Inspection and Testing, Inc. 441 Commercial Way, La Habra, Ca 90631 (562) 941-2990 •(714) 526-8441 •Fax (562) 946-0026 SWIT Job No.Date REGISTERED INSPECTOR'S DAILY REPORT /543 -S/S--it /it /4TYPE OP t Reinforced Concrete 0 Welding 0 DIA/Epoxy INSPECTION j Post Tensioned Concrete 0 Fireproofing 0 Wood Framing REQUIRED 0 Reinforced Masonry 0 Asphalt 0 Other Tract No.Lqt No.•-r /(...7JobAddressig .5eA(.-6e -/.-<x•-//- Job Name /Perm Issued13'‘--A t-AA I ..z...-eur c.-.-054.0 Type of Structure ArchiteS...=")C....../C14.- Mit:Material Description type,grade, source)Engineer • t--coE41-1c-4014Z-.- ACatt. C-AAA Cger•Alc-r • ."---TV-44.(ActA. S -t/--z.si 44 -C.---.c/e..-A -qe.r.Contractor 1.VZ4A-t-4c 7it_A A E..S Inspectors Name -,A !® ojr Ver Subcontractor TESTS PERFORMED4 i/tc...._ SAMPLE AIR CONC WATER TIME'SET#TRUCK #TICKET #LOCATION SLUMP TEMP TEMP ADDED CAST MIX #REMARKS INSPECTION SUMMARY-LOCATIONS OF WORK INSPECTED,TEST SAMPLES TAKEN,WORK REJECTED,JOB PROBLEMS,PROGRESS, REMARKS, ETC. INCLUDES INFORMATION ABOUT -AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED, NUMBER, TYPE & IDENT. NO'S OF TEST SAMPLES TAKEN: STRUCT. CONNECTIONS (WELD MADE H.T. BOLTS TORQUED) CHECKED, ETC. Ple'e -tilt SOREU-10C.1"e co r'47 46-y 'erica_ 4- 1 7 - 7. -.- (9151FACe•Arrtlit.-41-\"2 7 •.14C.( -)-.rrr_ACC V-A4.4Aireiree.4A4.L)Tf:t°4 i C t 7-S •40.G-CL-YrISL I 4/4 4*1 ,1*-ava ip‘.4 -1_11M.S-PtEc...vr-TEAn AciScA...g...Farz.przicy-RAirr...Sy-LICS ,LA -et,_ C_A-.14.44e14-1.4.C...vs .`-/ -f o at...4SA... 9'C-CYc *(,(ZSL (....A.-v•A4 i c..OLA.re)r 4 -C.6/Co L(oe.e4+'t -Z.7.if)....rifi-CASko ul c:tW,.lir am I e..1 -7 .4 IEL-_,LedeS1 LP 5°oe.Cc. +1`t -7 IZZ -1 ..•WC-451 Liv't (:)--7 CERTIFICATION OF COMPLIANCE CONTINUED ON NEXT PAGE 0 PAGE OF I HEREBY CERTIFY THA .VE OBS. -VED TO THE =EST OF MY KNOWLEDGE TIME IN TIME OUT SAMPLESALL OF THE ABO 'E '•-0'110 S/•ERWISE NOTED.I HAVE FOUND THIS WO TO COMPLY fTH tile7:47.ED PLANS, SPECIFICATION, AND APPLICABLE EC ION •-E f14:377 : UILDING LAWS. 4 aSIGN.•:-t .14IN - 11-•9.. .--..//V 4 CTOR C)-1 S .b'°'-Cg.5-Cs.Approved By SPECIALTY NA AGENCY Project Su rintendent White-Office Copy •Canary-Accounting Copy •Pink -Inspector's Copy •Goldenrod -Jobsite Copy SM F-049 fACo... Airiase..* Tne......14e.e.R.Melina..Trkr. ...„. A CB164008 1232 LANAI CTNeC.TY OF LANAI: PHASE 5 Il PLAN 1CARLSBADINSPECTION RECORD Z854 SF UV 11566 SF GARAGE // 283 SF PATIOBuilding Division RESDNTL SFD RI INSPECTION RECORD CARD WITH APPROVED Lot#:1 SHEA HOMES DIANS MUST BE KEPT ON THE JOB E.1.i. BEFORE 3:00 pm FOR NEXT WORK DAY INSPECTION El FOR BUILDING INSPECTION CALL:760-602-2725 OR GO TO: www.Carisbadca.gov/Building AND CLICK ON 4 vk t L;URD Copy"Request Inspection" DATE: if"YES' -YES.'is checked below that Division's approval is required prior to reQuesting a Final Building Inspection. If .vou have any questions please call the applicable divisions at the phone numbers provided below. After all required approvals are signed off -fax to 760-602-8560. email to bidginspections@carlsbadca.;$0v or bring in a COPY of this card to: 1635 Faraday Ave.. Carlsbad. NO YES Required Prior to Requesting Building Final If Checked YES Date Inspector Notes IIIIIMPlanning/Landscape 760-944-8463 Allow 48 hours =lir MINIIIIIIMCM&I (Engineering Inspections)760-438-3891 Call before 2 pm ZIEOGIMIIIIIIIMIFire Prevention 760-6024660 Mow 48 hours 1171illfillrfall 1111 11M1111 1111 Type of Inspection Type of Inspection coos #BUILDING Date Inspector CODE #ELECTRICAL Date Inspector #11 FOUNDATION 11 (•(S ('4C #31 0 ELECTRIC UNDERGROUND P.:FER I i /4 14 M. #12 REINFORCED STEEL #34 ROUGH ELECTRIC #66 MASONRY PRE GROUT #33 ErELECTRIC SERVICE 0 TEMPORARY 5 .jo -i 7 6 -re 0 GROUT 0 WALL DRAINS #35 PHOTO VOLTAIC _TILT PANELS #39 FINAL #11 POUR STRIPS coDE #MECHANICAL #11 COLUMN FOOTINGS #41 UNDERGROUND DUCTS &PIPING #14 SUBFRAME 0 FLOOR 0 CEIUNG #44 0 DUCT& PLENUM 0 REF. PIPING #15 ROOF SHEATHING r4 ..-61 i‘46 #43 HEAT-AIR COND. SYSTEMS #13 EXT. SHEAR PANELS 0(.0 *#49 FINAL #16 INSULATION 0i lEP 111111K0111111.1 CODE #COMBO INSPECTION #18 EXTERIOR LATH #81 UNDERGROUND (11,12,21,31) #17 INTERIOR LATH &DRYWALL #82 DRYWALL,EXT LATH,GASES 47,18,23)01/24 11 M.C.• #51 POOL EXCA/STEEL/BOND/FENCE #83 ROOFSHEMN I,EXT SHEAR (13,15) #55 PREPLASTER/FINAL #84 FRAME ROUGH COMBO (14,24,34,44)Olt240 Me_ #19 FINAL #85 T-Bar 44,24,34,44) Date Inspector #89 FINAL OCCUPANCY (19,29,39,49) #22 0 SEWER & BL/CO 0 PL/CO Date Inspector #21 UNDERGROUND.WASTE 0 VVTR filioli k.6106' #24 TOP OUT 0 WASTE 0 WM A/S UNDERGROUND VISUAL1... #27 TUB &SHOWER PAN *sitzvi ill__646 A/S UNDERGROUND HYDRO #23 0 GAS TEST 0 GAS PIPING •A/S UNDERGROUND FLUSH #25 WATER HEATER A/S OVERHEAD VISUAL ci;i1// 7 •C- 1.fr‘i #28 SOLAR WATER A/S OVERHEAD HYDROSTATIC /trin e.''/:0 ,,#29 FINAL A/S FINAL V7/1 (4. CODEs STORM WATER F/A ROUGH-IN #600 PRE-CONSTRUCTION MEETING F/A FINAL #603 FOLLOW UP INSPECTION FIXED EXTINGUISHING SYSTEM ROUGH-IN NOTICETO CLEAN FIXED EXTING SYSTEM HYDROSTATIC TEST #607 WRITTEN WARNING FIXED EXTINGUISHING SYSTEM FINAL #609 NOTICE OF VIOLATION MEDICAL GAS PRESSURE TEST #610 VERBAL WARNING MEDICAL GAS FINAL REV 10.20.2 SEE BACK FOR SPECIAL NOTES ._. Luc i vu‘o c City of CIRCUIT CARD Development Services Building Division Carlsbad B-36 1635 Faraday Avenue 760-602-2719 www.carIsbadca.gov THIS CARD MUST BE FILLED OUT AND AVAILABLE AT THE SERVICE EQUIPMENT FOR THE ROUGH INSPECTION Address:Permit Number: Owner:Phone:Area in Sq. Ft,Contractor:Phone: PANEL:A.I.C.VOLTS 0 WIRE BKR WIRE WIRE BKRLOCATIONCKTMISCRECRECLTGMISC CKT LOCATIONSIZESIZETYPELTG.SIZE TYPE SIZE Sy b 1 isb AL 14 5 1 i tt CA)1S 2 S1)/136D S 0 5 3 _6 I)AL 8 7 .I LI Cu IS 4 (pTity At-5 4o to (11 i 41 Ii L-V 9.)6 (ZIT C I A C 7 t4 D /0 LA)i 1 IL (V 2.i 8 V I Oa I-)9 .7-t)i t C LI I LI 1Z_CU 2.10 1-/"r ‘. ii OV LI-)11 30 /0 C 0 1- i 12 rX)20 12 ia.r PTO 6 CI 13 12----'--0 5 I I `'t (-.0 1S 14 (T p. 1-10DD 15 )4)i.CA/1 )i Lr j 1S 16 I.)Li (;•43itiikt 17 IS (4 (..-0 3 .6 18 19 20- 21 22 23 24 25 26 27 28-. 29 30 31 32 33 34 ._ 35 36 37 38 39 1 40 41 42 7)7)rMAIN:.41-‘.-AMP BRK/FUSE 0 MLO Computed Load AMPS BUS:AMP See Calculation Worksheet on back Service entrance or feeder conductors:Branch circuits required: A) Lighting Circuits 220 -3(b), 4(d)A) Size: No.B) Type:0 CU 0 AL B) Two Small Appliance Circuits 210 -11(e)C) Insulation:D) Conduit Size:C) Laundry Circuit 220 -16(b)Service ground/bond:D) Central Heating Equipment 422 -12 A) Size: No.Li B) Type:>iCU 0 AL E) Bathroom 210 -52(d) C) Clamp location(s):Z UFER 250 -50(c)Remarks:0 Water Pipe 250 -1040Ground Rod 250 -52 GFA61 AY" cations 210 - g 8, 680 -70:I certify that all terminations have been torqued in accordance with manufacturer's Bathroom(s)IN' Kitchen instructions and that the work shown on this circuit card represents the full extent of Garage(s)OHydromassage Tub the work performed under this permit.a Outdoors IS 1.-ig\-PD11-7 0 Owner k 6 /A07AFCI Protected Circ. 210 -12 0 Contracto A r.tAter1-1 (__ irBedroom(s)0 Signed Date / -ki -17 B-36 Page 1 of 2 Rev. 03/09 ....___ os\-- I sup. (City of CIRCUIT CARD Development Services Building Division Carlsbad B-36 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov THIS CARD MUST BE FILLED OUT AND AVAILABLE AT THE SERVICE EQUIPMENT FOR THE ROUGH INSPECTION Address:Permit Number. Owner:Phone:Area in Sq.Ft, Contractor:Phone: PANEL:A.I.C.VOLTS 0 WIRE BKR WIRE WIRE BKRLOCATIONCKTM1SVRECRECLTGMISC CKT LOCATIONSIZESIZETYPEL...-r6.,SIZE TYPE SIZE foul-Art-I 1 15 14 &J 1 i _ 1Z_CA)20 2 1A51-1611-,.." -'coti 3 i<I tri CA)6-<4 Lts VII 1-5 15 1'1 CO 2 c._?I )1 6 j S 6 LI VI I\IN 1.40 g`r CO 7 I P't LA) 1 i ck 01 c'?/K'8 PI t3.(A) kJ/Y. 1.4 fArl.9.1 C PI --t)J o ".2-S I7--6 u 2-u io pi„.._(il) 11 12 .,.- 13 14 15 16 17 18 .- 19 20 21 22 23 24'. 25 26 27 28 ...- 29 30 31 32 33 34- 35 36 37 38 39 l40 41 42 MAIN:0 1 °0 AMP BRK/FUSE 0 MLO Computed Load AMPS BUS:AMP See Calculation Worksheet on back Service entrance or feedg r conductors:Branch circuits required: A) Lighting Circuits 220 -3(b), 4(d)A) Size: No.B) Type:0 CU X AL B) Two Small Appliance Circuits 210 -11(e)C) Insulation:D) Conduit Size:C) Laundry Circuit 220 -16(b)Service ground/bond:D) Central Heating Equipment 422 -12 A) Size: No.&l B) Type:CU 0 AL E) Bathroom 210 -52(d) C) Clamp location(s):X UFER 250 -50(c)Remarks: El Water Pipe 250 -1040Ground Rod 250 -52 III &os GFCI ovations 210 -8, 680 -70:1 certify that all terminations have been torqued in accordance with manufacturer's Bathroom(s)pgKitchen instructions and that the work shown on this circuit card represents the full extentof Garage(s)OHydromassage Tub the work performed under this permit. Outdoors s LA 0419----1 lif Owner Cpl <K6i-itibb7 AFCI Protected Circ. 210 -12 ?<Contractor A rei t 1.--&(...Ti2A L.....):ir Bedroom(s)ZSigned --,-Date I —1 -IT B-36 Page 1 of 2 Rev. 03/09 INSTALLATION CERTIFICATE CF-6R-ENV-01 Envelope —Insulation; Roofing; Fenestration (Page 1 of3) Site Address:Enforcement Agency:Permit Number: Lanai Ph. 5 -Lot 1 -1232 Lanai Court Ijmore than one person has responsibilityfor installation ofthe items on this certykate, each person shall prepare and sign a certificate applicable to the portion ofconstructionfor which they are responsible; alternatively, the person with chief responsibilityfor construction shall prepare and sign this certjficatefor the entire construction.Allapplicable Mandatory Measures with check boxes require to be checked to ensure the mandatory measures have been met. Description of Insulation 1.RAISED FLOOR • Material:Brand Name: Thickness (inches):Thermal Resistance (R-Value): O §150(d): Minimum R-I3 insulation in raised wood-frame floor or equivalent U-factor. 2.SLAB FLOOR/PERIMETER Material:Brand Name: Thickness (inches):Thermal Resistance (R-Value): Perimeter Insulation Depth (inches): §150(1):Water absorption rate for the insulation material alone without facings is no greater than 0.3%; water vapor permeance rate is no greater than 2.0 perm/inch and shall be protected from physical damage and UV light deterioration. 3.EXTERIOR WALL a.Insulation Type (e.x. Batt, Loose Fill, Spray Foam)a.Thermal Resistance (R-Value): b..Insulation Type (e.x. Batt, Loose Fill, Spray Foam)b.Thermal Resistance (R-Value): Brand: Spray/Loose fill)Spray/Loose fill)Installed Actual Thickness Contractor's min installed weight/ft=lb(inches): Manufacturer's installed weight per square foot to achieve Thermal Resistance (R-Value) §150(c):Minimum R-13 insulation in wood-frame wall or equivalent U-factor. Exterior Foam Sheathing (rigid Insulation) Material:Brand Name: Thickness (inches):Thermal Resistance (R-Value): 4.FOUNDATION WALL Material:Brand Name: Thickness (inches):Thermal Resistance (R-Value): 5.CEILING Batt or Blanket Type:Brand Name: Loose Fill Type:Thermal Resistance (R-Value): Spray Foam Type:Brand Name: Installed Actual Thickness (inches):Contractor's min installed weight/ft=lb Manufacturer's installed weight per square foot to achieve Thermal Resistance (R-Value): O §150(a): Minimum R-19 insulation in wood-frame ceiling or equivalent U-factor. 6.ATTIC ROOF INSULATION AND/OR ATTIC RADIANT BARRIER Material:Brand Name: Material:Brand Name: Thickness (inches):Thermal Resistance (R-Value): §118(a):Insulation installed meets Standards for Insulating Material. C) §150(g): Mandatory Vapor barrier installed in Climate Zones 14 or 16. 2008 Residential Compliance Forms August 2009 INSTALLATION CERTIFICATE CF-6R-ENV-01 Envelope —Insulation; Roofing; Fenestration (Page 2 of 3) Site Address:Enforcement Agency:Permit Number: Lanai Ph. 5 -Lot 1 -1232 Lanai Court Description ofRooting Products CRRC Product ID Manufacturer -Product Roof Roof Product Initial Solar Aged Solar Thermal Number'Information Brand/Model Type Area Slope Weight'Reflectance Reflectance'Emittance NA Boral Weathered Wood CoS Entire 4.12 NA NA CI3 NA NA CP ra' 1.The CRRC Product ID Number can be obtainedfrom the Coo! Roof Rating Council's Rated Product Directory at ww.coolroofs.org/products/search.php 2.The weight in lbs per square feet ofthe roofing product being installed 3.Check box ((the Aged Reflectance is a calculated value using the equation below, footnote 4. 4.Ifthe aged reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the initial reflectance valuefrom the directory and use the equation (0.2+0.7(poillat— 0.2) to obtain a calculated aged value. IOCHECKAPPLICABLE BOX BELOWIF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENT; The roofarea covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempt from the above Cool Roof criteria. Roofconstructions that have thermal mass over the roofmembrane with a weight ofat least 25 lb/ftl is exempted from the above Cool Roof criteria. To apply Liquid Field Applied Coatings, the coating must be applied with a minimum drymilthickness of20 mils across the entire roofsurface and meet minimum performance requirements listed in §118(93 and Table 118-C.Select the applicable cowing0Aluminum-Pigmented Asphalt Roof Coating I 0 Cement-Based Roof Coating,0 Other 0 CRRC-1 Label Attached to CF-6R (Note ifno CRRC-1 label is available, this compliance method cannot be used and another method is required to meet compliance). FENESTRATION/GLAZING Product Total Quantity Add. Exterior Comments/ Manufacturer/Brand Name U-Product of NFRC ofLike Product Area Shading Dev.Location/ Special hem (GROUP LIKE RODUCTS)factor'SHGC'Panes Certified"(_Optional)ft2 or Overhang Features 2 3 4 S 7. 8. I.Use valuesfrom a fenestration product's NFRC Certified Label. For fenestration produce without an NFRC label,use the default valuesfrom Section 116, Table 116-1 and 116-B ofthe 2008 Energy Effidency Standards. 2.NFRC Label Certificates shall not be removed until the building inspector has verified the efficiency. EnterYes orNo. §116(a)1:Doors and windows between conditioned and unconditioned spaces designed to limit airleakage. 0 *116(8)2 and 3:Actual fenestration products installed we equivalent to or have a lower U-factor and/or a lower SHGC than that specified on the Certificate ofCompliance (Form CF-IR). §116(a)4:Fenestration products (except field-fabricated windows) have a label listing the certified U-Factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration that meets the requirements of§10-111(a) O§117: Exteriordoors and windows weather-stripped; all joints and penetrations caulked and sealed. 2008 Residential Compliance Forms August 2009 _.__...,........._ INSTALLATION CERTIFICATE CF-6R-ENV-01 Envelope —Insulation; Roofing; Fenestration (Page 3 of 3) Site Address:Enforcement Agency:Permit Number: Lanai Ph.5 -Lot 1 -1232 Lanai Court DECLARATION STATEMENT •I certify under penalty ofperjury, under the laws ofthe State ofCalifornia, the information provided on this form is true and correct. •I am eligible under Division 3 ofthe Business and Professions Code to accept responsibility for construction, or an authorized representative ofthe person responsible for construction (responsible person). •I certify that the installed features, materials, components, or manufactured devices identified on this certificate (the installation) conforms to all applicable codes and regulations. and the installation is consistent with the plans and specifications approved by the enforcement agency.. •I reviewed a copy ofthe Certificate ofCompliance (CF-IR) form approved by the enforcement agency that identifies the specific requirements for the installation.I certify that the requirements detailed on the CI:-IR that apply to the installation have been met. •I will ensure that a completed. signed copy of this Installation Certificate shall be posted, or made available with the building permit(s) issued for the building. and made available to the enforcement agency for all applicable inspections.I understand that a signed copy of this Installation Certificate is required to be included with the documentation the builder cs to the building owner at occupancy.,-..----"..„,----- . Company Name:(installing Subcontractor or General Contractor or BuilderiOwner):- Leonard Roofing, Inc. 1....1 Responsible Person's Name:Responsible Person's Si atu 17L / Bruce Leonard // CSLI3 License:'Date Signed:Position With Comp y (Title): 840399 4/24/2017 PresidentI • 2008 Residential Compliance Forms August 2009