Loading...
HomeMy WebLinkAbout1241 BELLEFLOWER RD; ; CB971179; Permit* Permi t No : 05/21;97 ll:47 Project No: Page 1 of 1 Development No: Permit Type: SINGLE FAMILY DWLNG - DETACHED Parcel No: 214-542-03-00 Lot#: 39 Va lua t i on : 205,605 Construction Type: Occupancy Group: Reference#: CT92-02 Status: Description: PLAN1,PHASE 1,2434+697 GAR+62 Applied: : PORCH,W/OPTNS,SEASIDE HGTS,KAUFMAN&BROAD Apr/Issue: Entered By: BUILDING PERMIT I Job Address: 1241 BELLEFLOWER RD Suite: Appl/Ownr : KAUFMAN & BROAD 619 259-6000 12626 HIGH BLUFF DR STE 400 SAN DIEGO CA 92130 i i CB971179 A9701 541 DEV9 2 0 02 VN ISSUED 04/07/97 05/21/97 RMA > -CK 97a79itirq o1 F Fees Required **k A Cre qsmm Plan Check Numbers -_- Fees : Adjustments: *otal Fees: 14,' rn Fee dbscription , Number of Bedrooms NGmber of Bathroom Building Permit Plan Check Strong Motion Fee or Enter Park-in-L Enter "Y" to Autoca Enter "Y" to Autocal CFD Fees Waived(W)? Payoff Fee for CFD * BUILDING TOTAL Enter #Units & Code-Putd Enter "Y" for Plum .00 350 * 00 14,576.80 Ext. fee L 6.00 2.50 657.00 21.00 1575.00 3742, co 540.00 4670.80 12216.80 iau. oo 2400.00 20.00 Data .---- 3 Y Y 3 D5/8 Y Each Plumbing Fixture-or Tra; - Each Building Sewer Each Install/Repair Water Line > 1 7.00 7.00 Each Water Heater and/or Vent > 1 7.00 7.00 Gas Piping System > 1 7.00 7.00 Each Vacuum Breaker > 2 7.00 14.00 * PLUMBING TOTAL 175. ao Enter "Y" for Electric Issue Fee > 10.00 Y Single Phase Per AMP > 200 .25 50.00 h ELECTRICAL TOTAL 60.5)O Enter 'Y' for Mechanical Issue 15.00 Y Install Furn/Ducts/Heat Pumps Each Install Fireplace Each Exhaust Fan Each Install/Reloc Vent * MECHANICAL TOTAL ClTYoFcARLSBLuD 2075 Les palmas Dr., carlsbad, CA 92OW (619) 438-1161 BUILDING PERMIT Permit No : 09/29/97 10:45 Project No: Page 1 of 1 Development No: Permit Type: SINGLE FAMILY DWLNG - DETACHED 1 Job Address: 1241 BELLEFLOWER RD Suite: Parcel No: 214-542-03-00 Valuation: 223,623 Occupancy Group: Lot#: 39 Reference#: CT92-02 Description: PLAN1,PHASE 1,2665+697 GAR+62 Applied: : PORCH,W/OPTNS,SEASIDE HGTS,KAUFMAN&BROAD Apr/Issue: Entered By: Appl/Ownr : KAUFMAN & BROAD 619 259-6000 12626 HIGH BLUFF DR STE 400 SAN DIEGO CA 92130 Plan Check Numbers xxx Fees Required **x .- Fees : Adjustments: Total Fees: 15.4 Fee description .- Number of Bedroom Number of Bathrooi Building Permit Plan Check Strong Motion Fee or Enter Park-in Enter "Y" to Auto Enter "Y" to Autoca CFD Fees Waived(W)? Payoff Fee for CFD x BUILDING TOTAL Enter #Units & Code-Pota Enter "Y" for P '1 14,926 433 Ext f 6 2 1074 698 22 1575 4070 540 4670 12649 2400 20 105 1 15.00 15 Each Plumbing Fixture or Trap Each Building Sewer > Each Install/Repair Water Line > 1 7.00 7 Each Water Heater and/or Vent > 1 7.00 7 Gas Piping System > 1 7.00 7 Each Vacuum Breaker > 2 7.00 14 * PLUMBING TOTAL 175 Enter "Y" for Electric Issue Fee > 10 Single Phase Per AMP > 200 .25 50 * ELECTRICAL TOTAL 60 Enter 'Y' for Mechanical Issue Fee> 15 Install Furn/Ducts/Heat Pumps > 2 9.00 18 Each Install Fireplace > 1 6.50 6 Each Exhaust Fan > 4 6.50 26 Each Install/Reloc Vent > 2 4.50 9 * MECHANICAL TOTAL 75 FINAL APPROVAL CB971179 A9701541 DEV9200 2 VP 1ssmoO 04/07/97 0 5/2 1/97 RMA *** .oo .80 .oo ee Data .oo .50 .oo .oo .oo .oo 3 .oo Y .oo Y 3 .80 .80 .OO D5/8 .oo Y .oo .oo .oo a00 .oo .oo .oo .oo Y .oo .oo .oo Y .oo .50 .oo .oo -------- 1 CITY OF CA 2075 Las Palmas Dr., Carlsbad, FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE PLANNING CMWD WWER PLAN CHECK#: CB971179 DATE : PERMIT#: CB971179 PERMIT PROJECT NAME: PLAN1,PHASE 1,2665+697 GAR+62 PORCH,W/OPTNS,SEASIDE HGTS,KAUFMAN&BROAD 10/14/97 TYPE: SFD ADDRESS: 1241 BELLEFLOWER RD CONTACT PERSON/PHONE# : C/HAROLD/929-1008 Lot# 39 374 WATER DIST-: CA .................................. -======-==e== DISAPPROVED - DISAPPROVED - effl APPROVED ji DATE INSPECTED: DATE BY: INSPECTED : APPROVED - INSPECTED DATE *. BY: INSPECTED : APPROVED - DISAPPROVED - COMMENTS : FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE PLANNING CMWD WATER PLAN CHECK#: CB971179 DATE: 10/14/97 PERMIT#: C8971179 PERMIT TYPE: SFD PROJECT NAME: PLAN1,PHASE 1,2665+697 GAR+62 PORCH,W/OPTNS,SEASIDE HGTS,KAUFMAN&BROAD -e ADDRESS: 1241 BELLEFLOWER RD Lot# 39 ' CONTACT PERSON/PHONE# : C/HAROLDJ929-1008 SEWER DIST: CA WATER DIST: CA ,' 0C-r I 5 1997 INSPECTED DATE BY: INSPECTED : APPROVED - DISAPPROVED - INSPECTED DATE BY: INSPECTED: APPROVED - DISAPPROVED - .. FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE PLANNING CMWD WATER -LAN CHECK#: CB971179 DATE: 10/14/97 ERMIT#: CB971179 PERMIT TYPE: SFD PROJECT NAME: PLAN1,PHASE 1,2665+697 GAR+62 PORCH,, W/OPTNS, SEASIDE HGTS, KAUFMAN&BROAD ADDRESS: 1241 BEUEFLOWER RD - Lot# 39 CONTACT PERSON/PHONE#: C/HAROLD/929-1008 SEWER DIST: CA WATER DIST: CA INSPECTED DATE BY: L.4 INSPECTED: ''If9 ~ APPROVED 4 DISAPPROVED - INSPECTED DATE BY: INSPECTED: APPROVED - DISAPPROVED - .. I- *- INSPECTED DATE BY: INSPECTED : APPROVED - DISAPPROVED - FINAL BUILDING INSPECTION DE*: BUILDING ENGINEERING FIRE PLANNING CMWD WATER PLAN CHECK#: CB971179 DATE : PERMIT#: CB971179 PERMIT PROJECT NAME: PLAN1,PHASE 1,2665+697 GAR+62 PORCH,W/OPTNS,SEASIDE HGTS,KAUFMANhBROAD ADDRESS: 1241 BELLEFLOWER RD Lot# 39 CONTACT PERSON/PHONE# : C/HAROLD/929-1008 SEWER DI&: CA / WATER DIST: CA 10/14/97 TYPE: SFD . "-. DATE V INSPECTED BY: INSPECTED: APPROVED - DISAPPROVED - INSPECTED DATE BY: INSPECTED : APPROVED - DISAPPROVED - FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE PLANNING CMWD WATER PLAN CHECK#: CB971179 DATE : PROJECT NAME: PW1,PHASE 1,2665+697 GAR+62 PERMIT#: CB971179 PERMIT PORCH,W/OPTNS,SEASIDE HGTS,KAUFI"&BROAD .. ADDRESS: 1241 BELLEFLOWER RD Lot# 39 CONTACT PERSON/PHONE# : C/HAROLD/92 9-1008 SEWER DIST: CA WATER DIST: CA -, .-, .,- 1 O/ 14/ 9 7 TYPE: SFD _- 2 3 7997 CITY OF CARLSBAD INSPECTION REQUEST PERMIT# CB971179 FOR 10/24/97 INSPECTOR AREA PD DESCRIPTION: PLAN1,PHASE 1,2665+697 GAR+62 PLANCK# ORIG 970 TYPE: SFD CONSTR. TYPE VN APPLICANT: KAUFMAN & BROAD PHONE: 619 259-6000 PORCH,W/OPTNS,SEASIDE HGTS,KAUFMAN&BROAD OCC GRP JOB ADDRESS: 1241 BELLEFLOWER RD STE : LOT: 39 CONTRACTOR: PHONE : OWNER: REMARKS: C/HAROLD/929-1008 SPECIAL INSTRUCT: TOTAL TIME: CD LVL DESCRIPTION ACT COMMENTS 19 29 39 49 ST Final Structural PL Final Plumbing EL Final Electrical ME Final Mechanical * ***** INSPECTION HISTORY ***** DATE 101597 101497 090997 090897 090597 090597 090497 090397 090397 090297 090297 081897 081897 062497 061797 061797 061797 061697 061697 061397 061397 061297 061197 DESCRIPTION Final Electrical Final Electrical Drywall/Ext Lath/Gas Test Drywall/Ext Lath/Gas Test Insulation Rough Combo Rough Combo Exterior Lath/Drywall Rough Combo Exterior Lath/Drywall Rough Combo Shear Panels/HD's Roof /Reroof Ftg/Foundation/Piers Underground/Under Floor Sewer/Water Service Underground/Under Floor Underground/Under Floor Sewer/Water Service Underground/Under Floor Sewer/Water Service Underground/Under Floor Underground/Under Floor ACT INSP COMMENTS AP PD CA PK RESET FOR 10-15-97 AP PD NR PD AP PD AP PD AP PD NS PD NS PD CO PD CO PD AP PD AP PD AP PY AP PD AP PD AP PD NR PD NR PD NR PD NR PD AP PD AP PD Q SOUTHERN CALIFORNIA SOIL AND TESTING, INC. T 6280 RIVERDALE STREET, P. 0. Box 600627, SAN DIEGO, CA 92160 (619) 280-4321 Concrete Compressive Strength Test Report File Number: 971 21 87 Project Title: Collections Project Location: 1241 Belleflower Road Architect: Kaufman & Broad Permit No: 971 179 Engineer: J LD Plan File No: Contractor: Kaufman & Broad Location In Structure: Material Supplier: Superior Ready Mix Admixture (s): Time In Mixer (Minutes): 59 Slump, Inches: 4 CC Temp: 0 Truck Number: 390 Ticket Number: 142937 Air Temp: 0 Samples fabricated By: KE Samples Tested By: J WB Air Content: Lot #39 - Slab-on-Grade Mix Designation: 35P % Laboratory Number: Mark: 1 Date Made: Date Received Date Tested Diameter, Inches Area, Square Inches Maximum Load, psi Compressive Strength, psi Age Tested, Days Required 28 Day Strength, psi Unit Weight, pcf 8570 06-26-97 06-27-97 07-07-97 6.00 28.27 65,750 2,330 11 2,500 8571 0 7 - 2 4 - 9 7 91,000 3,220 28 Specimen sampling, transportation and compressive strength testing were performed by this agency in accordance with the applicable ASTM standards. This agency makes no other warranties express or implied. Distribution: (3) Kaufman & Broad (1) Superior Ready Mix (1 ) Cityof Carlsbad Reviewed By: George Gavit, kCE #56564 06-26a 7/25/97 DAILY FIELD ENGINEEHNG REPORT PACIFIC SOILS ENGINEERING, IN%. LA Clients Representative: # -L ) Tract NO.: Date: b/a%/~t Project Name: Cu cu Day: ~Qw Contractor: Approximate Fill Yardage : J/ Type and Number of Rigs in Operation: i Project Location: GP, si3- Weather Conditions: Ll. I IC) Description of Project Activities: Site Visitors / Firm: For Pacific Soils Engineering, Inc. w / Page -of - Wdrpt.sam I I