HomeMy WebLinkAbout1262 MARIPOSA RD; ; CB021241; PermitCity of Carlsbad
' 1635 Faraday Av Carlsbad, CA 92008
)6-14-2002 Residential Permit Permit No: CB021241
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Jccupancy Group:
16/14/2002
I Dwelling Units:
3edrooms:
?reject Title:
· oplicant:
1262 MARIPOSA RD CBAD
RESDNTL Sub Type:
Lot#: 2122200900
$251,809.00 Construction Type:
Reference #:
SFD
9
VN
CT97-14
1 Structure Type: SFD
5 Bathrooms: 4
MARIANO/SHOREPOINTE-PHASE 8
PLAN 3 • 2746 SF, 587 SF GAR,DECK 96 SF
Owner:
Status:
Applied:
Entered By:
Issued:
Inspect Area:
Orig PC#:
Plan Check#:
,TANDARD PACIFIC CORP STANDARD PACIFIC CORP
750 FLEET ST #200
;ARLSBAD CA 92008
5750 FLEET ST #200
CARLSBAD CA 92008
ISSUED
04/18/2002
AMA
Plan Approved:
06/14/2002
PD
PC99-168
PC020024
Total Fees: $20,113.16 Total Payments To Date: $0.00 Balance Due: $20,113.16
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
Inspector.
$1,014.72
$0.00
$659.57
$0.00
($52.77)
$25.18
$2,436.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,400.00
D5/8
$0.00
$0.00
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFD Payoff Fee
PFF
PFF (CFD Fund)
License Tax
License Tax (CFD Fund)
Traffic Impact Fee
Traffic Impact (CFD Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnlieu Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
$0.00
$140.00
$2,004.00
$3,946.54
$4,582.92
$0.00
$0.00
$0.00
$610.00
$0.00
$0.00
$196.00
$60.00
$72.00
$0.00
$0.00
$0.00
$2,019.00
$0.00
$20,113.16
FINAL APPROVAL
Date: /2-· 2 -o Z---Clearance: ~'-::]::t-P'l:✓
NOTICE: Please take NOTICE that approval of your project includes the ~Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the spec lied fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any . . .
... .... -----
City of Carlsbad Bldg Inspection Request
For: 11/27/2002
Permit# CB021241 Inspector Assignment: SR ---Title: MARIANO/SHOREPOINTE-PHASE 8
Description: PLAN 3 · 2746 SF, 587 SF GAR,DECK 96 SF
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
1262 MARIPOSA RD
lot 9
APPLICANT STANDARD PACIFIC CORP
Owner:
Remarks:
Total Time:
Phone: 6195205310
Inspector~
Requested By: BRIAN
Entered By: CHRISTINE
CD Description Act Comments
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Associated PCRs/CVs
lnsgection !:listo[ll
Date Description Act lnsp Comments
11/22/2002 89 Final Combo co SR LIST OF CORRECTIONS ON THE JOB SITE
11/01/2002 39 Final Electrical AP SR
09/26/2002 23 Gas/Test/Repairs AP SR
09/25/2002 23 Gasrr est/Repairs AP SR
09/18/2002 17 Interior Lath/Drywall AP SR
09/12/2002 16 Insulation co SR MISSING INSULATION/INSUL COVERING VENTS
09/10/2002 84 Rough Combo AP SR OK TO INSULATE/ALL CORRECTIONS ADDRESSED
09/09/2002 14 Frame/Steel/Bolting/Welding co SR PLUMBING/ELECT./STRUCT ISSUES/BOLT LOOSE ETC/ LIST OF
CORRECTIONS ON THE JOB SITE
08/23/2002 13 Shear Panels/HO'S AP SR OK TO WRAP
08/21/2002 13 Shear Panels/HO'S NR SR
08/21/2002 15 Roof/Reroof AP SR OKTO COVER
08/21/2002 18 Exterior Lath/Drywall NR SR
08/16/2002 15 Roof/Reroof co SR TRUSSES, DRAG NAILING AND STRAPPING NOT PER PLAN
08/13/2002 15 Roof/Reroof co SR TRUSSES DO NOT MATCH THE PLANS/OK TO PAPER ROOF
06/26/2002 11 FIQ/FoundaliorvPiers AP PD
City of Carlsbad Bldg Inspection Request
For: 11/01/2002
Permit# CB021241 Inspector Assignment: SR ---
Title: MARIANO/SHOREPOINTE-PHASE 8
Description: PLAN 3 -2746 SF, 587 SF GAR,DECK 96 SF
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
1262 MARIPOSA RD
Lot 9
APPLICANT STANDARD PACIFIC CORP
Owner:
Remarks: EMR -.
Total Time:
Phone:
Inspector: S ~ --~~-
Requested By: TOM
Entered By: CHRISTINE
CD Description Act Comments
39 Final Electrical J\&_ _______ _
Associated PCRs/CVs
lnsgection History
Date Description Act lnsp Comments
09/26/2002 23 Gas/TesVRepairs AP SR
09/25/2002 23 Gas/TesURepairs AP SR
09/16/2002 17 Interior Lath/Drywall AP SR
09/12/2002 16 Insulation co SR MISSING INSULATION/INSUL COVERING VENTS
09/10/2002 84 Rough Combo AP SR OK TO INSULATE/ALL CORRECTIONS ADDRESSED
09/09/2002 14 Frame/Steel/Bolting/Welding co SR PLUMBING/ELECT./STRUCT ISSUES/ BOLT LOOSE ETC/ LIST OF
CORRECTIONS ON THE JOB SITE
08/23/2002 13 Shear Panels/HO's AP SR OK TO WRAP
08/21/2002 13 Shear Panels/HD's NR SR
08/21/2002 15 Roof/Reroof AP SR OK TO COVER
08/21/2002 18 Exterior Lath/Drywall NR SR
08/16/2002 15 Roof/Reroof co SR TRUSSES, DRAG NAILING AND STRAPPING NOT PER PLAN
08/13/2002 15 Roof/Reroof co SR TRUSSES DO NOT MATCH THE PLANS/OK TO PAPER ROOF
06/26/2002 11 Fig/Foundation/Piers AP PD
06/17/2002 21 Underground/Under Floor AP RC
06/17/2002 22 Sewer/Water Service AP RC