Loading...
HomeMy WebLinkAbout1262 MARIPOSA RD; ; CB021241; PermitCity of Carlsbad ' 1635 Faraday Av Carlsbad, CA 92008 )6-14-2002 Residential Permit Permit No: CB021241 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Jccupancy Group: 16/14/2002 I Dwelling Units: 3edrooms: ?reject Title: · oplicant: 1262 MARIPOSA RD CBAD RESDNTL Sub Type: Lot#: 2122200900 $251,809.00 Construction Type: Reference #: SFD 9 VN CT97-14 1 Structure Type: SFD 5 Bathrooms: 4 MARIANO/SHOREPOINTE-PHASE 8 PLAN 3 • 2746 SF, 587 SF GAR,DECK 96 SF Owner: Status: Applied: Entered By: Issued: Inspect Area: Orig PC#: Plan Check#: ,TANDARD PACIFIC CORP STANDARD PACIFIC CORP 750 FLEET ST #200 ;ARLSBAD CA 92008 5750 FLEET ST #200 CARLSBAD CA 92008 ISSUED 04/18/2002 AMA Plan Approved: 06/14/2002 PD PC99-168 PC020024 Total Fees: $20,113.16 Total Payments To Date: $0.00 Balance Due: $20,113.16 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee Inspector. $1,014.72 $0.00 $659.57 $0.00 ($52.77) $25.18 $2,436.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,400.00 D5/8 $0.00 $0.00 Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWAFee CFD Payoff Fee PFF PFF (CFD Fund) License Tax License Tax (CFD Fund) Traffic Impact Fee Traffic Impact (CFD Fund) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing lnlieu Fee Master Drainage Fee Sewer Fee Additional Fees TOTAL PERMIT FEES $0.00 $140.00 $2,004.00 $3,946.54 $4,582.92 $0.00 $0.00 $0.00 $610.00 $0.00 $0.00 $196.00 $60.00 $72.00 $0.00 $0.00 $0.00 $2,019.00 $0.00 $20,113.16 FINAL APPROVAL Date: /2-· 2 -o Z---Clearance: ~'-::]::t-P'l:✓ NOTICE: Please take NOTICE that approval of your project includes the ~Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the spec lied fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any . . . ... .... ----- City of Carlsbad Bldg Inspection Request For: 11/27/2002 Permit# CB021241 Inspector Assignment: SR ---Title: MARIANO/SHOREPOINTE-PHASE 8 Description: PLAN 3 · 2746 SF, 587 SF GAR,DECK 96 SF Type: RESDNTL Sub Type: SFD Job Address: Suite: Location: 1262 MARIPOSA RD lot 9 APPLICANT STANDARD PACIFIC CORP Owner: Remarks: Total Time: Phone: 6195205310 Inspector~ Requested By: BRIAN Entered By: CHRISTINE CD Description Act Comments 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Associated PCRs/CVs lnsgection !:listo[ll Date Description Act lnsp Comments 11/22/2002 89 Final Combo co SR LIST OF CORRECTIONS ON THE JOB SITE 11/01/2002 39 Final Electrical AP SR 09/26/2002 23 Gas/Test/Repairs AP SR 09/25/2002 23 Gasrr est/Repairs AP SR 09/18/2002 17 Interior Lath/Drywall AP SR 09/12/2002 16 Insulation co SR MISSING INSULATION/INSUL COVERING VENTS 09/10/2002 84 Rough Combo AP SR OK TO INSULATE/ALL CORRECTIONS ADDRESSED 09/09/2002 14 Frame/Steel/Bolting/Welding co SR PLUMBING/ELECT./STRUCT ISSUES/BOLT LOOSE ETC/ LIST OF CORRECTIONS ON THE JOB SITE 08/23/2002 13 Shear Panels/HO'S AP SR OK TO WRAP 08/21/2002 13 Shear Panels/HO'S NR SR 08/21/2002 15 Roof/Reroof AP SR OKTO COVER 08/21/2002 18 Exterior Lath/Drywall NR SR 08/16/2002 15 Roof/Reroof co SR TRUSSES, DRAG NAILING AND STRAPPING NOT PER PLAN 08/13/2002 15 Roof/Reroof co SR TRUSSES DO NOT MATCH THE PLANS/OK TO PAPER ROOF 06/26/2002 11 FIQ/FoundaliorvPiers AP PD City of Carlsbad Bldg Inspection Request For: 11/01/2002 Permit# CB021241 Inspector Assignment: SR --- Title: MARIANO/SHOREPOINTE-PHASE 8 Description: PLAN 3 -2746 SF, 587 SF GAR,DECK 96 SF Type: RESDNTL Sub Type: SFD Job Address: Suite: Location: 1262 MARIPOSA RD Lot 9 APPLICANT STANDARD PACIFIC CORP Owner: Remarks: EMR -. Total Time: Phone: Inspector: S ~ --~~- Requested By: TOM Entered By: CHRISTINE CD Description Act Comments 39 Final Electrical J\&_ _______ _ Associated PCRs/CVs lnsgection History Date Description Act lnsp Comments 09/26/2002 23 Gas/TesVRepairs AP SR 09/25/2002 23 Gas/TesURepairs AP SR 09/16/2002 17 Interior Lath/Drywall AP SR 09/12/2002 16 Insulation co SR MISSING INSULATION/INSUL COVERING VENTS 09/10/2002 84 Rough Combo AP SR OK TO INSULATE/ALL CORRECTIONS ADDRESSED 09/09/2002 14 Frame/Steel/Bolting/Welding co SR PLUMBING/ELECT./STRUCT ISSUES/ BOLT LOOSE ETC/ LIST OF CORRECTIONS ON THE JOB SITE 08/23/2002 13 Shear Panels/HO's AP SR OK TO WRAP 08/21/2002 13 Shear Panels/HD's NR SR 08/21/2002 15 Roof/Reroof AP SR OK TO COVER 08/21/2002 18 Exterior Lath/Drywall NR SR 08/16/2002 15 Roof/Reroof co SR TRUSSES, DRAG NAILING AND STRAPPING NOT PER PLAN 08/13/2002 15 Roof/Reroof co SR TRUSSES DO NOT MATCH THE PLANS/OK TO PAPER ROOF 06/26/2002 11 Fig/Foundation/Piers AP PD 06/17/2002 21 Underground/Under Floor AP RC 06/17/2002 22 Sewer/Water Service AP RC