HomeMy WebLinkAbout1263 MARIPOSA RD; ; CB021231; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
06-14-2002 Residential Permit Permit No: cso21231
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
06/14/2002
# Dwelling Units:
Bedrooms:
Project Title:
Applicant:
1263 MARIPOSA RD CBAD
RESDNTL
2122204400
Sub Type:
Lot#:
$173,568.00 Construction Type:
Reference #:
SFD
84
VN
CT97-14
Structure Type: SFD
3 Bathrooms: 2
MARIANO/SHOREPOINTE· PHASES
PLAN 1,1812 SF,428 SF GAR,34 SF PORCH
Owner:
Status:
Applied:
Entered By:
Issued:
Inspect Area:
Orig PC#:
Plan Check#:
STANDARD PACIFIC CORP STANDARD PACIFIC CORP
5750 FLEET ST #200
CARLSBAD CA 92008
5750 FLEET ST #200
CARLSBAD CA 92008
ISSUED
04/18/2002
AMA
Plan Approved:
06/14/2002
PD
PC99-168
PC020024
Total Fees: $18,219.46 Total Payments To Date: $0.00 Balance Due: $18,219.46
Building Permit
Add'/ Building Permit Fee
Plan Check
Add'/ Plan Check Fee
Pian Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
STD #2 Fee
BTD #3 Fee
Renewal Fee
Add'/ Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'/ Pot. Water Con. Fee
Reel. Water Con. Fee
Inspector: SR
$774.48
$0.00
$503.41
$0.00
($40.27)
$17.36
$2,436.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,400.00
D5/8
$0.00
$0.00
Meter Size
Add'/ Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFO Payoff Fee
PFF
PFF (CFO Fund)
License Tax
License Tax (CFO Fund)
Traffic Impact Fee
Traffic Impact (CFO Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing /nlieu Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
FINAL ~PROVA~
Date: \ IL\ JC, Clearance:
$0.00
$140.00
$2,004.00
$3,946.54
$3,158.94
$0.00
$0.00
$0.00
$610.00
$0.00
$0.00
$140.00
$60.00
$50.00
$0.00
$0.00
$0.00
$2,019.00
$0.00
$18,219.46
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
of ,,._,_._ ··• '-•••-, '-----"-•--~ 1.1,..,TII"~ ' -• --tn ,.,,_,_._ H,--•-••••-' • , h-,., , -u.-n.,:,.,_ ,.,.,...;._,1
·----------~ ····= -, ··------_..._.------·--·--~~--------
•
City of Carlsbad Bldg Inspection Request
For: 12/09/2002
Permit# CB021231 Inspector Assignment: SR ---
Title: MARIANO/SHOREPOINTE-PHASES
Description: PLAN 1,1812 SF,428 SF GAR,34 SF PORCH
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
1263 MARIPOSA RD
Lot 84
APPLICANT STANDARD PACIFIC CORP
Owner:
Remarks:
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Associated PCRs/CVs
I nsQectioo Histo[)I
Date Description Act
11/14/2002 39 Final Electrical AP
11/08/2002 39 Final Electrical NR
10/07/2002 17 Interior Lath/Dr;wall AP
10/07/2002 18 Exterior Lath/Drywall AP
10/07/2002 23 Gasffest/Repairs co
10/04/2002 17 Interior Lath/Drywall co
10/04/2002 18 Exterior Lalh/Dr;wall AP
10/04/2002 23 Gasflest/Repairs co
09/26/2002 16 Insulation AP
09/25/2002 14 Frame/Steel/Bolting/Welding co
09/23/2002 14 Frame/Steel/Bolting/Welding co
09/03/2002 13 Shear Panels/HD's AP
08/28/2002 15 Roof/Reroof AP
08/26/2002 15 Roof/Reroof co
07/01/2002 11 Fig/Foundation/Piers AP
06/19/2002 22 Sewer/Water Service AP
Phone:
Inspector: ~
'
Requested By: BRIAN
Entered By: CHRISTINE
Comments
Q'\(ttr~~ '
lnsp Comments
SR
JM
SR
SR
SR OK
SR NOT SCRAPED OUT
SR
SR NOT AT 10 PSI
SR
SR SOME CORRECTIONS STILL NEED TO BE ADDRESSED
SR LIST OF CORRECTIONS ON THE JOB SITE
SR OK TO WRAP
SR
SR TRUSS PACKAGE NOT PER PLAN
PD
PS
City of Carlsbad Bldg Inspection Request
For: 11/14/2002
Permit# CB021231 Inspector Assignment: SR ---Title: MARIANO/SHOREPOINTE-PHASES
Description: PLAN 1,1812 SF,428 SF GAR,34 SF PORCH
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
1263 MARIPOSA RD
Lot 84
APPLICANT STANDARD PACIFIC CORP
Owner:
Remarks: EMR
Total Time:
Phone:
Inspector: __ s __ R~-
Requested By: TOM
Entered By: CHRISTINE
CD Description Act Comments
39 Final Electrical ~--------
Associated PCRs/CVs
lns(lection Histoiy
Date Description Act lnsp Comments
11/08/2002 39 Final Electrical NR JM
10/07/2002 17 Interior Lath/Drywall AP SR
10/07/2002 18 Exterior Lath/Drywall AP SR
10/07/2002 23 Gas/Test/Repairs CD SR DK
10/04/2002 17 Interior Lath/Drywall CD SR NOT SCRAPED OUT
10/04/2002 18 Exterior Lath/Drywall AP SR
10/04/2002 23 Gas/Test/Repairs CD SR NOT AT 10 PSI
09/26/2002 16 Insulation AP SR
09/25/2002 14 Frame/Steel/Bolting/Welding CD SR SOME CORRECTIONS STILL NEED TO BE ADDRESSED
09/23/2002 14 Frame/Steel/Bolting/Welding CD SR LIST OF CORRECTIONS ON THE JOB SITE
09/03/2002 13 Shear Panels/HD's AP SR DK TD WRAP
08/28/2002 15 Roof/Reroof AP SR
08/26/2002 15 Roof/Reroof co SR TRUSS PACKAGE NOT PER PLAN
07/01/2002 11 Ftg/Foundation/Piers AP PD
06/19/2002 22 Sewer/Water Service AP PS