HomeMy WebLinkAbout1265 CARLSBAD VILLAGE DR; 220; CO110017; Certificate of Occupancy05-27-2011
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Certificate of Occupancy Cert of Occ#: C0110017
Permit Type: COFO Related Bldg Permit*: CB110460
Bldg Address: 1265 CARLSBAD VILLAGE DR CBAD St: 220
Parcel No:1561802100 Issue Date: 05/27/2011
Occupant Name: EDWARD JONES INVESTING
Contact Name: VINCENT ALESSI
Phone#: 760/729-8300
Phone#:
Building Owner:
FRANK VIOLI Phone#: 760/390-1515
1265 CARLSBAD VILLAGE DR #100
CARLSBAD CA 92008
Description of Use: OFFICE
I certify that this building or portion complies with the Uniform Building Code for the group and division of
occupancy and the use for which the proposed occupancy is classified. The above information is true and
correct, and I make this statement under penalty ofperjury.
Signature of Building Official Date
Date Routed
Use Zone
/^lInspected B/J^^L
Inspected By
Inspected By
FOR DEPARTMENTAL USE ONLY
'..'•• • • .'•.••'' ' ' - .•••••'•'"•
Occupancy Group: B Construction Type:
/ ••-, -..- •" • ' . "v.;;-" .' • • ' •. - v
~~ S---7-7 '/> ^Date *~* &• l' '•/''•:• Approved A
Date Approved
Date Approved
'• -".- ' "•••" •
Disapproved
Disapproved
Disapproved
Comments:
05/25/2011 22:43 7144270873 EURO CAL
MAY-25-2011 WED 11:50 AM City of Carlsbad A. P. FAX NO. 760 602 8560
PAGE -01/01
P. 01/01
n C
CERTIFICATE OF
rtrr^iDAKirvOCCUPANCY
APPLICATION
R I «?B"35
Development Services
Building Division
WWW.WM
Fax 760-1302^560
www.caristaelca.gov
BUII-DING ADDRESS
BU1UDING PERMIT
OCCUPANCY GROUP
CONSTRUCTION TYPE
BUILDING OWNER
NAME
ADDRESS
PHC3NENUMBIER
\//LUV?CT Unit #
OCCUPANT NAME
CONTACT NAME
CONTACT PHONE
DESCRIBE THE EXACT USE OF ALL PORTIONS OF EACH BUILDING AREA
S.3S
0'. "Tl4- 4-2^.
Rev. 07/06
05-27-2011
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No: CB110460
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
Project Title:
1265 CARLSBAD VILLAGE DR CBAD St: 220
Tl Sub Type: COMM
1561802100 Lot#: 0
$42,391.00 Construction Type: 5A
Reference #:
EDWARD JONES
1142 SF OPEN OFFICE TO 3 PRIVATE OFFICES
Applicant:
IMMIS STUART
STE 205
17151 NEWPORT STREET
92708
714427-0809
Status: FINAL
Applied: 03/02/2011
Entered By: MDP
Plan Approved: 04/26/2011
Issued: 04/26/2011
Inspect Area: PD
Plan Check#:
Owner:
CARLSBAD VILLAGE DRIVE INVESTORS L L C
C/O FRANK VIOLI
1241 CARLSBAD VILLAGE DR #100
CARLSBAD CA 92008
Building Permit
Add'! Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
Green Bldg Stands (SB 1473) Fee
Fire Expedited Plan Review
$372.57 Meter Size
$0.00 Add1! Reel. Water Con. Fee
$242.17 Meter Fee
$0.00 SDCWA Fee
$0.00 CFD Payoff Fee
$8.90 PFF (3105540)
$0.00 PFF (4305540)
$0.00 License Tax (3104193)
$0.00 License Tax (4304193)
$0.00 Traffic Impact Fee (3105541)
$0.00 Traffic Impact Fee (4305541)
$0.00 PLUMBING TOTAL
$0.00 ELECTRICAL TOTAL
$0.00 MECHANICAL TOTAL
$0.00 Master Drainage Fee
Sewer Fee
$0.00 Redev Parking Fee
$0.00 Additional Fees
$1.00 HMPFee
$317.50
TOTAL PERMIT FEES
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$35.00
$24.00
$0.00
$0.00
$0.00
$0.00
$1,001.14
Total Fees:$1,001.14 Total Payments To Date:$1,001.14 Balance Due:$0.00
Inspector:
FINAL APPROVAL
Date:Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section ,66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to wafer and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which vou have oreviouslv been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.