HomeMy WebLinkAbout1267 MARIPOSA RD; ; CB021246; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
'.)6-14-2002 Residential Permit Permit No: CB021246
.Job Address:
Permit Type:
Parcel No:
Valuation:
.:Jccupancy Group:
,)6/14/2002
:1 Dwelling Units:
9edrooms:
?reject Title:
··9plicant:
Building Inspection Request Line (760) 602-2725
1267 MARIPOSA RD CBAD
RESDNTL Sub Type:
2122204500 Lot#:
$251,809.00 Construction Type:
Reference #:
SFD
85
VN
CT97-14
Structure Type: SFD
5 Bathrooms: 4
MARIANO/SHOREPOINTE-PHASE 8
PLAN 3 -2746 SF, 587 SF GAR,DECK 96 SF
Owner:
Status:
Applied:
Entered By:
Issued:
Inspect Area:
Orig PC#:
Plan Check#:
TANDARD PACIFIC CORP STANDARD PACIFIC CORP
· ,750 FLEET ST #200
· ~AR LS BAD CA 92008
5750 FLEET ST #200
CARLSBAD CA 92008
ISSUED
04/18/2002
AMA
Plan Approved:
06/14/2002
PD
PC99-168
PC020024
Total Fees: $20,113.16 Total Payments To Date: $0.00 Balance Due: $20,113.16
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
Inspector:
$1,014.72
$0.00
$659.57
$0.00
($52.77)
$25.18
$2,436.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,400.00
D5/8
$0.00
$0.00
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFD Payoff Fee
PFF
PFF (CFD Fund)
License Tax
License Tax (CFD Fund)
Traffic Impact Fee
Traffic Impact (CFD Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnlieu Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
FINAL GPRO}AL
Date: /q O;) Clearance:
$0.00
$140.00
$2,004.00
$3,946.54
$4,582.92
$0.00
$0.00
$0.00
$610.00
$0.00
$0.00
$196.00
$60.00
$72.00
$0.00
$0.00
$0.00
$2,019.00
$0.00
$20,113.16
NOTICE: Please take NOTICE that approval of your project includes the ~Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020{a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any . . . .
City of Carlsbad Bldg Inspection Request
For: 12/09/2002
Permit# CB021246 Inspector Assignment: SR ---
Title: MARIANO/SHOREPOINTE-PHASE 8
Description: PLAN 3 -2746 SF, 587 SF GAR,DECK 96 SF
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
1267 MARIPOSA RD
Lot 85
APPLICANT STANDARD PACIFIC CORP
Owner: STANDARD PACIFIC CORP
Remarks:
Total Time:
CD Description Act
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Associated PCRs/CVs
lnsgection Histo[Y
Date Description Act
11/14/2002 39 Final Electrical AP
11/08/2002 39 Final Electrical NR
10/03/2002 82 Drywall/Ext Lath/Gas Test AP
09/30/2002 82 Drywall/Ext Lath/Gas Test NR
09/25/2002 16 Insulation AP
09/24/2002 14 Frame/Steel/Bolting/Welding AP
09/23/2002 13 Shear Panels/HD's AP
09/23/2002 14 Frame/Steel/Bolting/Welding AP
09/20/2002 14 Frame/Steel/Bolting/Welding co
09/06/2002 13 Shear Panels/HD's NR
09/05/2002 15 Roof/Reroof AP
08129/2002 13 Shear Panels/HD's co
08/28/2002 13 Shear Panels/HD's NR
08/28/2002 15 Roof/Reroof co
08/26/2002 15 Roof/Reroof NR
lnsp
SR
JM
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
Phone:
Inspector: SR, ___ ......, __
Comments
Requested By: BRIAN
Entered By: CHRISTINE
NOT SCRAPPED OUT
APPROVED ON 9/23/2002
(£~)
SHEAR PANEL OK PER STRUCTURAL ENGINEER LETTER IN FILE
WITH US
OK TO INSULATE
PLUMBING/BOLTS/HEADER ISSUES/ NOT READY
SHEAR PANEL LENGTH UP STAIRS NOT PER PLAN/ND LETTER
FROM ARCH.
NEED TRUSS LAYOUT APPROVED/NOT PER PLAN OK TO COVER
City of Carlsbad Bldg Inspection Request
For: 11/14/2002
Permit# CB021246 Inspector Assignment: SR ---Title: MARIANO/SHOREPOINTE-PHASE 8
Description: PLAN 3 -2746 SF, 587 SF GAR,DECK 96 SF
Type: RESDNTL Sub Type: SFD
Job Address: 1267 MARIPOSA RD
Suite: Lot 85
Location:
APPLICANT STANDARD PACIFIC CORP
Owner: STANDARD PACIFIC CORP
Remarks:
Total Time:
Phone:
Inspector: SQ __ ......,;; __
Requested By: TOM
Entered By: CHRISTINE
CD Description Act Comments
39 Final Electrical ~-------
Associated PCRs/CVs
lnsgection Hisle()!
Date Description Act lnsp Comments
11/08/2002 39 Final Electrical NR JM
10/03/2002 82 Drywall/Ext Lath/Gas Test AP SR
09/30/2002 82 Drywall/Ext Lath/Gas Test NR SR NOT SCRAPPED OUT
09/25/2002 16 Insulation AP SR
09/24/2002 14 Frame/Steel/Bolting/Welding AP SR APPROVED ON 9/23/2002
09/23/2002 13 Shear Panels/HD's AP SR SHEAR PANEL OK PER STRUCTURAL ENGINEER LETTER IN FILE
WITH US
09/23/2002 14 Frame/Steel/Bolting/Welding AP SR OK TO INS ULA TE
09/20/2002 14 Frame/Steel/Bolting/Welding co SR PLUMBING/BOLTS/HEADER ISSUES/ NOT READY
09/0612002 13 Shear Panels/HD's NR SR
09/05/2002 15 Roof/Reroof AP SR
08/29/2002 13 Shear Panels/HD's co SR SHEAR PANEL LENGTH UP STAIRS NOT PER PLAN/ND LETTER
FROM ARCH.
08/28/2002 13 Shear Panels/HO's NR SR
08/28/2002 15 Roof/Reroof co SR NEED TRUSS LAYOUT APPROVED/NOT PER PLAN OK TO COVER
08/26/2002 15 Roof/Reroof NR SR
08/23/2002 13 Shear Panels/HD's NR SR
08/23/2002 15 Roof/Reroof NR SR
08/22/2002 15 Roof/Reroof NR SR
07/01/2002 11 Ftg/Foundation/Piers AP PD
06/19/2002 22 Sewer/Water Service AP PS