Loading...
HomeMy WebLinkAbout1286 MARIPOSA RD; ; CB020137; Permit, City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 04-02-2002 Residential Permit Permit No: CB020137 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 01/17/2002 # Dwelling Units: Bedrooms: Project Title: Building Inspection Request Line (760) 602-2725 1286 MARIPOSA RD CBAD RESDNTL Sub Type: Lot#: 2122200400 $244,813.00 Construction Type: Reference #: SFD 4 VN CT97-14 Structure Type: SFD 4 Bathrooms: 3 MARIANO/SHORPOINTE PHASE7-B PLAN 2, 2667 SF, 586 SF GAR,DECK 96 SF Owner: Status: Applied: Entered By: Issued: Inspect Area: Orig PC#: Plan Check#: ISSUED 01/02/2002 RMA Plan Approved: 01/17/2002 PD PC99-168 PC020001 Applicant: STANDARD PACIFIC CORP STANDARD PACIFIC CORP 42: .. 2 '.)4/)::/0'." )0(:2 "" 5750 FLEET ST #200 CARLSBAD CA 92008 Total Fees: $25,936.69 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'\ Pot. Water Con. Fee Reel. Water Con. Fee Inspector: ;:£ • 5750 FLEET ST #200 CARLSBAD CA 92008 Total Payments To Date: $25,909.37 Balance Due: $993.16 $0.00 $645.55 $0.00 ($51.64) $24.48 $2,436.00 $0.00 $0.00 $0.00 $0.00 $6,020.00 $0.00 $0.00 $0.00 $0.00 $2,400.00 05/8 $0.00 $0.00 Meter Size Add'\ Reel. Water Con. Fee Meter Fee SDCWAFee CFO Payoff Fee PFF PFF (CFO Fund) License Tax License Tax (CFO Fund) Traffic Impact Fee Traffic Impact (CFO Fund) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing lnLieu Fee Master Drainage Fee Sewer Fee Additional Fees TOTAL PERMIT FEES FINAL AP/P.l'20VAL Date: ca '-f /Oa_ Clearance: $27.31 $0.00 $140.00 $2,004.00 $3,946.54 $4,455.60 $0.00 $0.00 $0.00 $610.00 $0.00 $0.00 $175.00 $60.00 $59.00 $0.00 $0.00 $0.00 $2,019.00 $0.00 $25,936.69 NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest irr()osition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020{a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any City of Carlsbad Bldg Inspection Request For: 08/19/2002 Permit# CB020137 Title: MARIANO/SHORPOINTE PHASE7-B Description: PLAN 2, 2667 SF, 586 SF GAR,DECK 96 SF Type: RESDNTL Sub Type: SFD Job Address: Suite: Location: 1286 MARIPOSA RD Lot 4 APPLICANT STANDARD PACIFIC CORP Owner: STANDARD PACIFIC CORP Remarks: Total Time: Description Act Comments Inspector Assignment: PD --- Phone: 6199546757 Inspector: ~Q. Requested By: REUBEN Entered By: CHRISTINE CD 19 29 39 49 Final Structural Final Plumbing Final Electrical Final Mechanical ~F~ t--- y _____ _ Associated PCRs/CVs lnsgectjon Histo(ll Date Description Act lnsp Comments 08/0612002 29 Final Plumbing AP PD 08/06/2002 39 Final Electrical co PD KIT RECEPTICALS NOT ENERGIZED 08/06/2002 49 Final Mechanical AP PD 08/05/2002 89 Final Combo NS PD 07/15/2002 89 Final Combo CA PD 07/09/2002 39 Final Electrical AP PD EMR 05/13/2002 82 Drywall/Ext Lath/Gas Test AP PD 05/10/2002 82 Drywall/Ext Lath/Gas Test NR PD 05/06/2002 11 Ftg/Foundation/Piers AP PD DECK 05/03/2002 16 Insulation AP PD 04/30/2002 84 Rough Combo AP PD 04/29/2002 84 Rough Combo NR PD 04/26/2002 84 Rough Combo CA PD 04/24/2002 84 Rough Combo CA PD 04/09/2002 13 Shear Panels/HD's AP PD 04/02/2002 15 Roof/Reroof AP PY City of Carlsbad Bldg Inspection Request For: 07/09/2002 Permit# CB020137 Title: MARIANO/SHORPOINTE PHASE7-B Description: PLAN 2, 2667 SF, 586 SF GAR,DECK 96 SF Type: RESDNTL Sub Type: SFD Job Address: Suite: Location: 1286 MARIPOSA RD Lot 4 APPLICANT STANDARD PACIFIC CORP Owner: STANDARD PACIFIC CORP Remarks: EMR Total Time: CD Description Act Comments Inspector Assignment: PD --- Phone: 6192472327 lnspecto&_ Requested By: RICK Entered By: CHRISTINE 39 Final Electrical __f/;f!____ __ x_--- Associated PCRs/CVs lnsgection HistoQL Date Description Act lnsp Comments 05/13/2002 82 Drywall/Ext Lath/Gas Test AP PD 05/10/2002 82 Drywall/Ext Lath/Gas Test NR PD 05/06/2002 11 Ftg/Foundation/Piers AP PD DECK 05/03/2002 16 Insulation AP PD 04/30/2002 84 Rough Combo AP PD 04/29/2002 84 Rough Combo NR PD 04/26/2002 84 Rough Combo CA PD 04/24/2002 84 Rough Combo CA PD 04/09/2002 13 Shear Panels/HD's AP PD 04/02/2002 15 Roof/Reroof AP PY 02108/2002 11 Ftg/Foundation/Piers AP PD 01/31/2002 21 Underground/Under Floor AP PD 01/31/2002 22 Sewer/Water Service AP PD 01/29/2002 21 Underground/Under Floor NR PD WET 01/28/2002 21 Underground/Under Floor NR PD Dept: Bu' lanning CMWD St Lite Fire Plan Check #: Permit#: CB020137 Project Name: MARIANO/SHORPOINTE PHASE7-B Address: PLAN 2, 2667 SF, 586 SF GAR.DECK 96 SF 1286 MARIPOSA RO Contact Person: REUBEN Phone: 6199546757 Inspected Date Lot: Date: 08/05/2002 Permit Type: RESONTL Sub Type: SFO 4 By: __________ Inspected: _____ Approved: ___ Disapproved: __ Inspected Date By: __________ Inspected: _____ Approved: ___ Disapproved: __ ············································································· ....................... , ..................................................... , Comments: _____________________________ _ PLANNINC/ENGINEERINC APPROVALS PERMIT NUMBER CB &-/ :3 7 ADDRESS ~ -£~ i. "RESIDENTIAL /imSIDEN~L ADDITION Ml (< TENANT IMPROVEMENT PLAZA CAMINO REAL CARLSB~D COMPANY STORES VILLACI; FAIRE COMPLETE OFFICE BUILDING OTHER ___________________ _ PLANNER {) _. ~ DATE_3._/~__,__7/3_V---'-2-__ ENGINEER ________ _ DATE ______ _ DOCSJMlsformslPlannlng engineering Approvais .. SHOREPOINTE-BUYER SELECTED OPTIONAL DECK -96 SQ FT DECK LOT4 OF FINAL MAP NO.13840 b 2 1 z. % u MARIPOSA RD. N.T.S. !· .. CA"T'(