HomeMy WebLinkAbout1286 MARIPOSA RD; ; CB020137; Permit,
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
04-02-2002 Residential Permit Permit No: CB020137
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
01/17/2002
# Dwelling Units:
Bedrooms:
Project Title:
Building Inspection Request Line (760) 602-2725
1286 MARIPOSA RD CBAD
RESDNTL Sub Type:
Lot#: 2122200400
$244,813.00 Construction Type:
Reference #:
SFD
4
VN
CT97-14
Structure Type: SFD
4 Bathrooms: 3
MARIANO/SHORPOINTE PHASE7-B
PLAN 2, 2667 SF, 586 SF GAR,DECK 96 SF
Owner:
Status:
Applied:
Entered By:
Issued:
Inspect Area:
Orig PC#:
Plan Check#:
ISSUED
01/02/2002
RMA
Plan Approved:
01/17/2002
PD
PC99-168
PC020001
Applicant:
STANDARD PACIFIC CORP STANDARD PACIFIC CORP 42: .. 2 '.)4/)::/0'." )0(:2 ""
5750 FLEET ST #200
CARLSBAD CA 92008
Total Fees: $25,936.69
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'\ Pot. Water Con. Fee
Reel. Water Con. Fee
Inspector: ;:£ •
5750 FLEET ST #200
CARLSBAD CA 92008
Total Payments To Date: $25,909.37 Balance Due:
$993.16
$0.00
$645.55
$0.00
($51.64)
$24.48
$2,436.00
$0.00
$0.00
$0.00
$0.00
$6,020.00
$0.00
$0.00
$0.00
$0.00
$2,400.00
05/8
$0.00
$0.00
Meter Size
Add'\ Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFO Payoff Fee
PFF
PFF (CFO Fund)
License Tax
License Tax (CFO Fund)
Traffic Impact Fee
Traffic Impact (CFO Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnLieu Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
FINAL AP/P.l'20VAL
Date: ca '-f /Oa_ Clearance:
$27.31
$0.00
$140.00
$2,004.00
$3,946.54
$4,455.60
$0.00
$0.00
$0.00
$610.00
$0.00
$0.00
$175.00
$60.00
$59.00
$0.00
$0.00
$0.00
$2,019.00
$0.00
$25,936.69
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest irr()osition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020{a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
City of Carlsbad Bldg Inspection Request
For: 08/19/2002
Permit# CB020137
Title: MARIANO/SHORPOINTE PHASE7-B
Description: PLAN 2, 2667 SF, 586 SF GAR,DECK 96 SF
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
1286 MARIPOSA RD
Lot 4
APPLICANT STANDARD PACIFIC CORP
Owner: STANDARD PACIFIC CORP
Remarks:
Total Time:
Description Act Comments
Inspector Assignment: PD ---
Phone: 6199546757
Inspector: ~Q.
Requested By: REUBEN
Entered By: CHRISTINE
CD
19
29
39
49
Final Structural
Final Plumbing
Final Electrical
Final Mechanical
~F~ t---
y _____ _
Associated PCRs/CVs
lnsgectjon Histo(ll
Date Description Act lnsp Comments
08/0612002 29 Final Plumbing AP PD
08/06/2002 39 Final Electrical co PD KIT RECEPTICALS NOT ENERGIZED
08/06/2002 49 Final Mechanical AP PD
08/05/2002 89 Final Combo NS PD
07/15/2002 89 Final Combo CA PD
07/09/2002 39 Final Electrical AP PD EMR
05/13/2002 82 Drywall/Ext Lath/Gas Test AP PD
05/10/2002 82 Drywall/Ext Lath/Gas Test NR PD
05/06/2002 11 Ftg/Foundation/Piers AP PD DECK
05/03/2002 16 Insulation AP PD
04/30/2002 84 Rough Combo AP PD
04/29/2002 84 Rough Combo NR PD
04/26/2002 84 Rough Combo CA PD
04/24/2002 84 Rough Combo CA PD
04/09/2002 13 Shear Panels/HD's AP PD
04/02/2002 15 Roof/Reroof AP PY
City of Carlsbad Bldg Inspection Request
For: 07/09/2002
Permit# CB020137
Title: MARIANO/SHORPOINTE PHASE7-B
Description: PLAN 2, 2667 SF, 586 SF GAR,DECK 96 SF
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
1286 MARIPOSA RD
Lot 4
APPLICANT STANDARD PACIFIC CORP
Owner: STANDARD PACIFIC CORP
Remarks: EMR
Total Time:
CD Description Act Comments
Inspector Assignment: PD ---
Phone: 6192472327
lnspecto&_
Requested By: RICK
Entered By: CHRISTINE
39 Final Electrical __f/;f!____ __ x_---
Associated PCRs/CVs
lnsgection HistoQL
Date Description Act lnsp Comments
05/13/2002 82 Drywall/Ext Lath/Gas Test AP PD
05/10/2002 82 Drywall/Ext Lath/Gas Test NR PD
05/06/2002 11 Ftg/Foundation/Piers AP PD DECK
05/03/2002 16 Insulation AP PD
04/30/2002 84 Rough Combo AP PD
04/29/2002 84 Rough Combo NR PD
04/26/2002 84 Rough Combo CA PD
04/24/2002 84 Rough Combo CA PD
04/09/2002 13 Shear Panels/HD's AP PD
04/02/2002 15 Roof/Reroof AP PY
02108/2002 11 Ftg/Foundation/Piers AP PD
01/31/2002 21 Underground/Under Floor AP PD
01/31/2002 22 Sewer/Water Service AP PD
01/29/2002 21 Underground/Under Floor NR PD WET
01/28/2002 21 Underground/Under Floor NR PD
Dept: Bu' lanning CMWD St Lite Fire
Plan Check #:
Permit#: CB020137
Project Name: MARIANO/SHORPOINTE PHASE7-B
Address:
PLAN 2, 2667 SF, 586 SF GAR.DECK 96 SF
1286 MARIPOSA RO
Contact Person: REUBEN Phone: 6199546757
Inspected Date
Lot:
Date: 08/05/2002
Permit Type: RESONTL
Sub Type: SFO
4
By: __________ Inspected: _____ Approved: ___ Disapproved: __
Inspected Date
By: __________ Inspected: _____ Approved: ___ Disapproved: __
············································································· ....................... , ..................................................... ,
Comments: _____________________________ _
PLANNINC/ENGINEERINC APPROVALS
PERMIT NUMBER CB &-/ :3 7
ADDRESS ~ -£~ i.
"RESIDENTIAL
/imSIDEN~L ADDITION Ml
(<
TENANT IMPROVEMENT
PLAZA CAMINO REAL
CARLSB~D COMPANY STORES
VILLACI; FAIRE
COMPLETE OFFICE BUILDING
OTHER ___________________ _
PLANNER {) _. ~ DATE_3._/~__,__7/3_V---'-2-__
ENGINEER ________ _ DATE ______ _
DOCSJMlsformslPlannlng engineering Approvais
..
SHOREPOINTE-BUYER SELECTED OPTIONAL DECK -96 SQ FT DECK
LOT4
OF FINAL MAP NO.13840
b 2
1 z. % u MARIPOSA RD.
N.T.S.
!· ..
CA"T'(